Pennsylvania Act 2022-27 — CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2021-2022 - ENACTMENT

act-2022-0-272022 Pa. Act 27Law

Act text
CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2021-2022 - ENACTMENT
Act of Jun. 27, 2022, P.L. 142, No. 27Cl. 86

An Act

Providing for the capital budget for fiscal year 2021-2022; itemizing public improvement projects, furniture and equipment projects, transportation assistance, redevelopment assistance projects, flood control projects and Pennsylvania Fish and Boat Commission projects leased or assisted by the Department of General Services and other State agencies, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies; authorizing the use of current revenue for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies stating the estimated useful life of the projects; and making appropriations.

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

Section 1. Short title.

This act shall be known and may be cited as the Capital Budget Project Itemization Act of 2021-2022.

Section 2. Total authorizations.

(a) Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $7,531,796,595.

(b) Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $340,239,190.

(c) Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt shall be $471,138,000.

(d) Redevelopment assistance.--The total authorization for the capital projects in the category of redevelopment capital projects itemized in section 6 for capital grants by the Department of Community and Economic Development, its successors or assigns, and to be financed by the incurring of debt shall be $12,904,190,591.

(e) Flood control.--The total authorization for the capital projects in the category of flood control projects itemized in section 7 and to be constructed by the Department of Environmental Protection, its successors or assigns, and to be financed by the incurring of debt shall be $112,127,000.

(f) Fish Fund and Boat Fund.--The total authorization for the capital projects in the category of public improvement projects itemized in section 8 to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by current revenues of the Fish Fund and the Boat Fund pursuant to executive authorization shall be $113,130,000.

Section 3. Itemization of public improvement capital projects.

Additional capital projects in the category of public improvement projects to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

ProjectTotal Project Allocation
(1) Department of Agriculture
(i) Farm Show Complex
(A) Renovations of the underground (Cameron Street) pedestrian/cyclist walk from Department of Agriculture to the Farm Show Complex and associated pathways
Project Allocation3,000,000
(ii) Samuel E. Hayes Jr. Livestock Evaluation Center
(A) Renovations to the Livestock Evaluation Center
Project Allocation2,000,000
(iii) Health Diagnostic Laboratory
(A) Renovations, additions and new construction, including site and infrastructure improvements for design and construction to satisfy modern testing procedures
Project Allocation25,000,000
(2) Department of Conservation and Natural Resources
(i) Clear Creek Forest District
(A) New maintenance shop and equipment storage
Project Allocation4,000,000
(ii) Cornplanter Forest District
(A) Office renovation
Project Allocation3,000,000
(ii.1) Cowans Gap State Park
(A) Rehabilitate Cowans Gap Dam
Project Allocation9,200,000
(iii) Delaware State Forest
(A) Lilly Pond Dam spillway repair/ replacement
Project Allocation1,350,000
(iii.1) Hickory Run State Park
(A) Additional funding to replace pit latrines with modern comfort stations
Project Allocation700,000
(iii.2) Kooser State Park
(A) Day-use improvements and dam rehabilitation
Project Allocation6,250,000
(iii.3) Laurel Hill State Park
(A) Rehabilitate Penn Scenic View Dam
Project Allocation5,000,000
(iii.4) Leonard Harrison State Park
(A) Turkey Path Trail rehabilitation and realignment
Project Allocation3,750,000
(iii.5) McKeever Center
(A) Land acquisition, construction and infrastructure costs
Project Allocation1,000,000
(iii.6) Memorial Lake State Park
(A) Rehabilitate dam
Project Allocation9,800,000
(iv) Norristown Farm Park
(A) Replace multiple vehicular and pedestrian bridges
Project Allocation6,250,000
(iv.1) Parker Dam State Park
(A) Dam repairs and lake dredging
Project Allocation11,250,000
(v) Pinchot State Forest
(A) Remove Turtle Creek Dam
Project Allocation1,875,000
(vi) Pinchot Forest District
(A) Remove Race Run Dam
Project Allocation2,000,000
(B) Remove Dam 148-118 SGL 260
Project Allocation2,000,000
(vi.1) Point State Park
(A) Portal bridge replacement and park sidewalk rehabilitation and ADA compliance
Project Allocation3,750,000
(vi.2) Prince Gallitzin State Park
(A) Rehabilitate Sandy Run Dam
Project Allocation12,000,000
(vi.3) Promised Land State Park
(A) Rehabilitate Promised Land Dam
Project Allocation5,000,000
(vi.4) Pymatuning State Park
(A) Rehabilitate park and campground facilities
Project Allocation5,000,000
(vi.5) Raccoon Creek State Park
(A) Extend toe drain at Raccoon Creek Lake Dam
Project Allocation1,250,000
(vi.6) Shikellamy State Park
(A) Rehabilitate dam
Project Allocation15,000,000
(vii) Tiadaghton & Tioga Forest Districts
(A) Pine Creek Rail Trail-truss bridges over Pine Creek
Project Allocation6,700,000
(vii.1) Yellow Creek State Park
(A) Construction, infrastructure, renovations and other related costs for improvements and upgrades
Project Allocation5,850,000
(viii) Various State Parks - Statewide
(A) Campground facility amenities - construct washhouses, including utility and site work
Project Allocation12,500,000
(B) Rehabilitate historic structures
Project Allocation12,500,000
(C) Statewide critical regulatory system repairs and replacements at multiple water and wastewater treatment plants
Project Allocation12,500,000
(D) New and replacement of roofed overnight colonies and support infrastructure at five State parks
Project Allocation6,250,000
(E) Construct solar arrays at various State park facilities
Project Allocation15,000,000
(ix) Bureau of Forestry
(A) New Regional Air Operations facilities
Project Allocation9,600,000
(B) New Fire Cache/Forestry warehouse - replace main building
Project Allocation7,200,000
(C) Construct solar arrays at various forestry facilities
Project Allocation3,750,000
(3) Department of Corrections
(i) Elizabethtown Training Facility
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation3,982,700
(ii) Quehanna Boot Camp
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation2,793,000
(iii) State Correctional Institution at Albion
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation4,362,000
(iv) State Correctional Institution at Benner
(A) Design and construction of a transportation hub, including land development and site infrastructure improvements
Project Allocation3,000,000
(B) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation5,933,490
(v) State Correctional Institution at Cambridge Springs
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation15,354,000
(vi) State Correctional Institution at Camp Hill
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation37,425,000
(vii) State Correctional Institution at Chester
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation6,848,000
(viii) State Correctional Institution at Coal Township
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation12,567,000
(ix) State Correctional Institution at Dallas
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation1,657,000
(x) State Correctional Institution at Fayette
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation15,679,200
(xi) State Correctional Institution at Forest
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation14,394,000
(xii) State Correctional Institution at Frackville
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation6,397,900
(xiii) State Correctional Institution at Graterford
(A) Design and construction of code, permit and site/utility/infrastructure-related issues
Project Allocation650,000
(xiv) State Correctional Institution at Greene
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation7,462,000
(xv) State Correctional Institution at Houtzdale
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation11,897,500
(xvi) State Correctional Institution at Huntingdon
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation14,292,350
(xvii) State Correctional Institution at Laurel Highlands
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation6,738,300
(xviii) State Correctional Institution at Mahanoy
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation20,493,500
(xix) State Correctional Institution at Mercer
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation7,908,500
(xx) State Correctional Institution at Muncy
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation14,342,980
(xxi) State Correctional Institution at Pine Grove
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation8,596,000
(xxii) State Correctional Institution at Retreat
(A) Design and construction of facility upgrades, including land development and site infrastructure improvements and new construction
Project Allocation1,500,000
(xxiii) State Correctional Institution at Rockview
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation10,131,000
(xxiv) State Correctional Institution at Smithfield
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation8,375,270
(xxv) State Correctional Institution at Somerset
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation8,403,610
(xxvi) State Correctional Institution at Waymart
(A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements
Project Allocation19,787,295
(4) Department of Education
(i) Department of Education Headquarters (Reserved)
(ii) Lincoln University
(A) Infrastructure replacement, upgrade and improvements
Project Allocation26,000,000
(B) Renovation of Houston Hall
Project Allocation12,000,000
(iii) The Pennsylvania State University
(A) Davey Laboratory Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Davey Laboratory at the University Park campus. The project scope includes building systems renewal, including mechanical, electrical, plumbing and sprinkler systems and code upgrades. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation100,000,000
(B) Osmond Laboratory Renovation - Phase II (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Phase II of Osmond Laboratory at the University Park campus. This project will complete the renovation of Osmond Laboratory. The project will renew the remainder of facility by replacing worn systems, improving the thermal envelope, replacing windows and interior finishes. Interior space modifications will be made to meet the needs of the departments and activities currently housed there and into the future. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation40,000,000
(C) Carpenter Building Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Carpenter Building at the University Park campus. The Carpenter Building requires building-wide renewal to include building, life safety system and accessibility upgrades. The project includes building systems and envelope renewal/replacement. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation40,000,000
(D) Student Support and Services Center (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Student Support and Services Center at the University Park campus. A new multistory building will be constructed to provide functional spaces for student support and engagement, admissions and administration. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation90,000,000
(E) Electrical Engineering West Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Electrical Engineering West at the University Park campus. This project addresses the continuing needs of the College of Engineering. The project scope includes building-wide systems renewal, including mechanical, electrical, plumbing and sprinkler systems to improve efficiency and performance. The building exterior improvements include masonry repair, roof and window replacement. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation65,000,000
(F) Electrical Engineering East Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Electrical Engineering East at the University Park campus. This project addresses the continuing needs of the College of Engineering. The project scope includes building systems renewal, including mechanical, electrical, plumbing and fire suppression systems to improve efficiency and performance. The building exterior improvements include glazing, curtain wall and door replacement. Interior and accessibility improvements are needed. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation45,000,000
(G) Pattee Library/Paterno Library Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Pattee Library/Paterno Library at the University Park campus. This project will address aging systems, accessibility concerns, reliability issues and safety concerns. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation60,000,000
(H) Sparks Building Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Sparks Building at the University Park campus. The project will include building system and envelope renewal and renovation to address programmatic and system needs. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation65,000,000
(I) Applied Research Laboratory Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Applied Research Laboratory at the University Park campus. The ARL Building requires building-wide renewal to include building systems and envelope renewal/replacement. The project scope also includes life safety system and accessibility upgrades. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation50,000,000
(J) Capital Renewal, Phase X (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Capital Renewal, Phase X at the University Park campus. This project will allow the University to replace, install or upgrade as appropriate systems in major academic, research and administrative buildings across campus that were not addressed in the other phases of renewal. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation40,000,000
(K) Chilled Water Plant (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Chilled Water Plant at the University Park campus. Scope includes new building construction along with the initial chilled water, condenser water and electrical equipment and plant infrastructure. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation80,000,000
(L) Advanced Water Treatment System (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for an Advanced Water Treatment System at the University Park campus. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation15,000,000
(M) Classroom-Library Building Renovation (and Nursing Addition) (Scranton Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Classroom-Library Building Renovation (and Nursing Addition) at the Scranton campus. A total renovation is needed to address a multitude of deficiencies. An addition for the expansion of the Nursing program is planned. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation20,000,000
(N) Kelly Library Renovation and Addition (Greater Allegheny Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Kelly Library Renovation and Addition at the Greater Allegheny campus. A total renovation is needed to address a multitude of deficiencies. An addition for an auditorium is planned. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation20,000,000
(O) Classroom/Class Lab Teaching and Learning Building (Harrisburg Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Classroom/Class Lab Teaching and Learning Building at the Harrisburg campus. A new multistory Classroom/Class Lab Teaching and Learning Building will be constructed to provide modern classrooms, instructional laboratories, faculty offices, instructional support and flexible/adaptable space to support both general and technology instructional programs, as well as campus engagement activities. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation50,000,000
(P) Teaching and Administrative Support Building (Hershey Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Teaching and Administrative Support Building at the Hershey campus. This project will provide space for key administrative units on campus. The program will include new administrative and support spaces, offices and meeting rooms. The facility will be equipped with state-of-the-art technology. The facility will be located on the core campus adjacent to clinical, administrative, research and academic facilities easily accessible by students, faculty and visitors. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation80,000,000
(Q) Capital Renewal (Hershey Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Capital Renewal at the Hershey campus. This project is part of a continuing effort to make significant comprehensive upgrades to infrastructure in the College of Medicine buildings at the Hershey campus. This project will allow the University to replace, install or upgrade as appropriate systems in major academic, research and administrative buildings across campus that were not addressed in routine renewal programs. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation30,000,000
(R) Academic and Research Building (Hershey Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for an Academic and Research Building at the Hershey campus. This project will include new wet and dry research laboratories, comparative medicine spaces, support spaces, instructional spaces, seminar rooms, offices and administration space. The facility will be equipped with state-of-the-art instructional technology. The facility will be located on the core campus adjacent to academic, clinical and other research facilities easily accessible by students, faculty and visitors. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation160,000,000
(S) North Wing of Chambers Building (University Park Campus) design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the North Wing of Chambers Building at the University Park campus. This project involves the renovation, demolition and reconstruction of Chambers Building. Funding will be used for design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for occupant and program relocation or interim facilities will be included. The construction will meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation60,000,000
(T) Demolition Program (University Park Campus) design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Demolition Program at the University Park campus. This project involves the demolition of campus facilities. Funding will be used for design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for occupant and program relocation or interim facilities will be included. The construction will meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes
Project Allocation10,000,000
(U) Critical infrastructure improvements to athletic facilities at University Park campus
Project Allocation150,000,000
(V) Acquisition, reclamation, infrastructure improvements and construction to land and facilities at the Pennsylvania College of Technology in the City of Williamsport
Project Allocation10,000,000
(iv) Temple University
(A) Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University
Project Allocation250,000,000
(B) Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University
Project Allocation185,000,000
(C) New classroom building, addition, renovation - design, infrastructure, abatement of hazardous materials and construction of a classroom building academic complex. This will involve renovating and adding to an existing building or building a stand-alone classroom building
Project Allocation125,000,000
(C.1) New Science, Technology, Engineering and Mathematics (STEM) academic building, addition, renovation - design, infrastructure, abatement of hazardous materials and construction of a STEM academic complex. This will involve renovating and adding to an existing building or building a stand-alone building
Project Allocation125,000,000
(D) Design, infrastructure, abatement of hazardous materials, renovation and construction of expansion to Ritter Hall, including utility upgrades and extensions, site improvements, code-related upgrades, including ADA compliance-related upgrades
Project Allocation40,000,000
(E) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the development of an ambulatory care facility, including related administrative, clinical, patient, community research, educational and exterior facilities of Temple University Hospital and affiliated physician practices
Project Allocation60,000,000
(F) Construction, renovation, infrastructure improvements, equipment and other related costs for the development and modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities of Temple University Health System
Project Allocation60,000,000
(G) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of administrative facilities and related clinical, patient, community, research, educational and exterior facilities of Temple University Health System
Project Allocation30,000,000
(H) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital-Boyer Pavilion
Project Allocation40,000,000
(I) Construction, renovation, infrastructure improvements, equipment and other related costs for the development of and modernization of women's health and patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities of Temple University Hospital
Project Allocation60,000,000
(J) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital
Project Allocation60,000,000
(K) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital Episcopal Campus
Project Allocation40,000,000
(L) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related administrative, clinical, community, educational and exterior facilities for Fox Chase Cancer Center
Project Allocation60,000,000
(M) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital Jeanes Campus
Project Allocation40,000,000
(N) Construction, infrastructure, acquisition, redevelopment and other related costs to be used for academic space at Temple University Main Campus
Project Allocation1,300,000
(v) Thaddeus Stevens College of Technology
(A) Hartzell renovations
Project Allocation4,000,000
(B) Jones renovations
Project Allocation5,000,000
(C) Mellor renovations
Project Allocation20,000,000
(D) Dorm renovations
Project Allocation7,000,000
(E) Shop addition
Project Allocation5,000,000
(F) Student Center addition
Project Allocation5,000,000
(G) Campus improvements to meet current and future demands, including, but not limited to, land acquisition, site and building infrastructure improvements, new construction, renovations and building system upgrades and improvements
Project Allocation18,000,000
(H) Branch Campus improvements to meet current and future demands, including, but not limited to, land acquisition, site and building infrastructure improvements, new construction, renovations and building system upgrades and improvements
Project Allocation8,000,000
(I) Roof - Renovations, alterations, infrastructure upgrades and associated design and construction expenses at the Bourne, Brenner, Kreider, Hartzell and Metzger Buildings
Project Allocation3,500,000
(J) Snyder Building - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses
Project Allocation5,000,000
(K) ALMS House - Renovations, repairs, alterations, additions, infrastructure upgrades and associated design and construction expenses
Project Allocation25,000,000
(L) Orange Street Campus - Renovations, repairs, alterations, additions, infrastructure upgrades and associated design and construction expenses
Project Allocation3,500,000
(M) Main Campus - Sidewalks/road repair
Project Allocation1,500,000
(vi) University of Pittsburgh
(A) New Integrated Health Sciences Building, Oakland Campus
Project Allocation200,000,000
(B) New Academic Student Support Center Building, Oakland Campus
Project Allocation80,000,000
(C) New One Bigelow Academic Teaching and Research Complex, Oakland Campus
Project Allocation300,000,000
(D) Posvar Hall addition and renovation, Oakland Campus
Project Allocation100,000,000
(E) Posvar Hall Chiller Plant expansion and upgrade, Oakland Campus
Project Allocation50,000,000
(F) Programmatic and infrastructure upgrades to buildings, Oakland Campus
Project Allocation50,000,000
(G) Crabtree Hall renovations, Oakland Campus
Project Allocation110,000,000
(vii) Butler County Community College
(A) Construction, infrastructure and other related costs for construction of a two-story building for additional instructional space
Project Allocation1,750,000
(5) Pennsylvania Emergency Management Agency (Reserved)
(6) Department of Environmental Protection
(i) Carbon County
(A) Quakake Treatment Facility - Additional funds for construction of acid mine treatment facility
Project Allocation6,000,000
(ii) Clarion County
(A) Mill Creek Treatment Facility - Construction of treatment facility
Project Allocation14,000,000
(iii) Clearfield County
(A) Additional funds for additional culvert alignment under borough streets at Stinky Run
Project Allocation1,000,000
(iv) Fayette County
(A) Phillips Discharge Treatment Facility - Construction of treatment facility
Project Allocation12,000,000
(v) Jefferson County
(A) Weisner Hollow - Additional funds to decertify high-hazard dam and construct permanent drainage channel. Regrade and revegetate site
Project Allocation6,500,000
(vi) Lycoming County
(A) Grafius Run and Freedom Road Tributary - Improve existing culverts in the City of Williamsport
Project Allocation3,500,000
(vii) Westmoreland County
(A) West Newton Coal Logistics Slope - Embankment stabilization and coal refuse slurry impoundment capping
Project Allocation23,000,000
(7) Department of General Services
(i) Berks County
(A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in the Reading area
Project Allocation15,000,000
(ii) Dauphin County
(A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in the Harrisburg area
Project Allocation200,000,000
(B) Upgrade and expansion of IT infrastructure and automation system redundancy
Project Allocation100,000,000
(C) Renovations and alterations for upgrades and infrastructure improvements to the Finance Building
Project Allocation100,000,000
(iii) Lackawanna County
(A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in Scranton
Project Allocation15,000,000
(iv) Statewide
(A) Professional services for the development of agency facility strategic master plans and capital planning
Project Allocation15,000,000
(B) Renovations, alterations, new construction, site improvements and infrastructure upgrades for Commonwealth child-care centers
Project Allocation7,000,000
(7.1) Department of Health
(i) Bureau of Laboratories
(A) Construct new laboratory, including site and infrastructure improvements
Project Allocation60,000,000
(8) Department of Human Services
(i) Clarks Summit State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(ii) Danville State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(iii) Ebensburg Center
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(iv) Loysville Youth Development Center
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(v) Norristown State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(B) Additional funds for the design and construction of a psychiatric forensic building on existing lands of the Commonwealth at Norristown State Hospital in West Norriton Township to be utilized for the care and treatment of clients admitted to the institution
Project Allocation190,000,000
(vi) North Central Secure Treatment Unit
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation7,000,000
(vii) Selinsgrove Center
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(viii) South Mountain Secure Treatment Unit
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation5,000,000
(ix) South Mountain Restoration Center
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(x) Torrance State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(xi) Warren State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(xii) Wernersville State Hospital
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(xiii) Youth Forestry Camp No.2
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation9,000,000
(xiv) Youth Forestry Camp No.3
(A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition
Project Allocation5,000,000
(xv) Northeast Juvenile Justice Facility
(A) New construction, renovation, rehabilitation, acquisition of land and facility and associated costs in northeastern Pennsylvania
Project Allocation25,000,000
(9) Pennsylvania Historical and Museum Commission
(i) State Museum
(A) Exhibit upgrades
Project Allocation20,000,000
(ii) Brandywine Battlefield Park
(A) Building, site and infrastructure improvements
Project Allocation5,000,000
(iii) Daniel Boone Homestead
(A) Building, site and infrastructure improvements
Project Allocation5,000,000
(iv) Drake Well
(A) Building, site and infrastructure improvements
Project Allocation3,000,000
(v) Erie Maritime Museum
(A) Building, site and infrastructure improvements
Project Allocation2,000,000
(vi) Graeme Park
(A) Building, site and infrastructure improvements
Project Allocation3,500,000
(B) Exhibit upgrades
Project Allocation1,000,000
(vii) Railroad Museum of Pennsylvania
(A) Building, site and infrastructure improvements
Project Allocation13,000,000
(10) Department of Military and Veterans Affairs
(i) Delaware Valley Veterans Home
(A) Construct new adult day health care and 48-bed nursing care addition with additional parking area
Project Allocation20,000,000
(B) Rehabilitate Veterans' Home
Project Allocation10,000,000
(ii) Gino J. Merli Veterans Center
(A) Construct new adult day health care addition with parking area, including demolition as required
Project Allocation13,500,000
(B) Rehabilitate Veterans' Home
Project Allocation10,000,000
(iii) Hollidaysburg Veterans Home
(A) Construct new adult day health care addition with additional parking area
Project Allocation8,040,000
(B) Rehabilitate Veterans' Home
Project Allocation10,000,000
(iv) Pennsylvania Soldiers' & Sailors' Home, Erie
(A) Construct new adult day health care addition with additional parking area
Project Allocation10,720,000
(B) Rehabilitate Veterans' Home
Project Allocation10,000,000
(v) Southeastern Veterans' Center, Spring City
(A) Rehabilitate Veterans' Home
Project Allocation10,000,000
(vi) Southwestern Veterans' Center, Pittsburgh
(A) Construct new adult day health care addition with additional parking area
Project Allocation14,740,000
(B) Rehabilitate Veterans' Home
Project Allocation10,000,000
(vii) Statewide Veterans' Homes
(A) Provide safety measures and physical security upgrades, including new construction, renovations, electronic security systems and equipment, and site work
Project Allocation30,000,000
(B) Provide additional funding to rehabilitate PA Veterans' Homes, including to remedy life safety and regulatory deficiencies
Project Allocation30,000,000
(viii) Allentown Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation10,000,000
(ix) Beaver Falls Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation10,000,000
(x) Berks County Readiness Centers
(A) Renovate DMVA facilities in Berks County, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation20,000,000
(xi) Cambridge Springs Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation12,500,000
(xii) Cumberland County Readiness Centers
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades for all DMVA facilities in Cumberland County
Project Allocation27,500,000
(xiii) Chambersburg Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation10,000,000
(xiv) Coatesville Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation10,000,000
(xv) Easton Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation10,000,000
(xvi) Everett Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation10,000,000
(xvii) Fort Indiantown Gap DMVA facilities and infrastructure
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation37,500,000
(xviii) Greensburg Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation10,000,000
(xviii.1) Hiller Army Reserve Center, Fayette County
(A) Rehabilitate various buildings, including an unheated storage facility and parking
Project Allocation2,500,000
(xix) Huntingdon Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation10,000,000
(xx) Lebanon Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation12,500,000
(xxi) Lewisburg Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation12,500,000
(xxii) Lewistown Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation12,500,000
(xxiii) Luzerne County Readiness Centers
(A) Renovate DMVA facilities in Luzerne County, including demolition, new construction, correcting structure and infrastructure deficiencies, and security system upgrades
Project Allocation25,000,000
(xxiv) Philadelphia/Delaware Counties Readiness Center
(A) Renovate the facility, including demolition, new construction, correcting structure and infrastructure deficiencies, and security system upgrades for Readiness Center
Project Allocation20,000,000
(xxv) Punxsutawney Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation7,500,000
(xxvi) South Mountain Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation7,500,000
(xxvii) Tamaqua Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation15,000,000
(xxviii) Wellsboro Readiness Center
(A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades
Project Allocation10,000,000
(xxix) New Readiness Center
(A) Land and/or building acquisition for new readiness center to relocate existing center in Dauphin and/or Lebanon counties
Project Allocation20,000,000
(B) Acquisition of land and or facilities to build or renovate buildings for a new readiness center in southeastern Pennsylvania
Project Allocation33,000,000
(xxx) Horsham Air Guard Station
(A) Acquisition, construction and other related costs for a capital improvement project
Project Allocation15,000,000
(11) Office of Administration
(i) Commonwealth Technology Center (Reserved)
(12) Pennsylvania State Police
(i) Statewide
(A) Capital renewal of existing facilities, including site and building envelop improvements, interior renovations, building system upgrades and code-required improvements
Project Allocation25,000,000
(B) Land acquisition or purchase of existing facility to replace existing troop headquarter buildings or provide new facilities
Project Allocation29,000,000
(ii) Regional Forensic Laboratory
(A) Renovate and construct new laboratory in central Pennsylvania, including site and infrastructure improvements
Project Allocation30,000,000
(iii) Pennsylvania State Police Academy and BESO Complex
(A) Additional funding for construction and other related costs for the Pennsylvania State Police Academy and BESO Complex in Derry Township, Dauphin County
Project Allocation8,000,000
(iv) Erie Headquarters
(A) Additional funding for construction and other related costs for new headquarters in Erie County
Project Allocation5,500,000
(v) DNA Laboratory
(A) Additional funding for design and construction of a new DNA laboratory in the City of Greensburg, Westmoreland County
Project Allocation5,500,000
(13) State System of Higher Education
(i) Bloomsburg University
(A) Acquisition or construction of student housing
Project Allocation98,000,000
(B) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation25,000,000
(C) Additional funding for Waller Administration Building renovations
Project Allocation11,000,000
(ii) California University
(A) Acquisition or construction of student housing, additional funds
Project Allocation33,000,000
(B) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation20,000,000
(C) Renovations and rehabilitation of athletic facilities
Project Allocation2,000,000
(iii) Cheyney University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation20,000,000
(iv) Clarion University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation20,000,000
(v) East Stroudsburg University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation20,000,000
(vi) Edinboro University
(A) Hamilton Hall renovation
Project Allocation25,000,000
(B) Demolition of underutilized and obsolete buildings
Project Allocation15,000,000
(C) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation20,000,000
(D) Renovation and rehabilitation of athletic facilities
Project Allocation2,000,000
(vii) Indiana University
(A) Upgrade of campus utilities infrastructure
Project Allocation40,000,000
(B) Demolition of underutilized and obsolete buildings, additional funds
Project Allocation15,000,000
(C) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation35,000,000
(viii) Kutztown University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation20,000,000
(B) Beeky Education Building renovation
Project Allocation19,000,000
(ix) Lock Haven University
(A) Acquisition or construction of student housing, additional funds
Project Allocation20,000,000
(B) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation20,000,000
(x) Mansfield University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation20,000,000
(B) Renovation, replacement or upgrade of campus utilities infrastructure, additional funds
Project Allocation5,000,000
(xi) Millersville University
(A) Renovation, replacement or upgrade of campus utilities infrastructure, additional funds
Project Allocation21,000,000
(B) Stadium renovation
Project Allocation15,000,000
(xii) Shippensburg University
(A) Heiges Field House renovation and addition
Project Allocation40,000,000
(B) Old Main renovation
Project Allocation15,000,000
(C) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation20,000,000
(xiii) Slippery Rock University
(A) Additional funds for McKay Building renovation/addition
Project Allocation15,000,000
(B) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation29,000,000
(xiv) West Chester University
(A) Provide for deferred maintenance needs and capital renewal repairs, additional funds
Project Allocation32,000,000
(14) Department of Transportation
(i) Adams County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(ii) Allegheny County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 11-0
Project Allocation10,000,000
(B) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the western training facility
Project Allocation5,000,000
(C) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(D) Provide for the construction or renovation of maintenance facility at Fort Pitt Tunnel, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(E) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 11
Project Allocation5,000,000
(F) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 12
Project Allocation5,000,000
(G) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(iii) Armstrong County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(iv) Beaver County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(v) Bedford County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(vi) Berks County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(vii) Blair County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 9-0
Project Allocation10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(viii) Bradford County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(ix) Bucks County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site P
Project Allocation5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(x) Butler County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xi) Cambria County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xii) Cameron County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xiii) Carbon County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xiv) Centre County
(A) Provide for the construction or renovation of Bellefonte Maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Provide for the construction or renovation of Phillipsburg Maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 29
Project Allocation5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 30
Project Allocation5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xv) Chester County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xvi) Clarion County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xvii) Clearfield County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 2-0
Project Allocation10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xviii) Clinton County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 33
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 34
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xix) Columbia County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 37
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 38
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xx) Crawford County
(A) Provide for the construction or renovation of Centerville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Provide for the construction or renovation of Meadville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 19
Project Allocation5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 20
Project Allocation5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxi) Cumberland County
(A) Provide for the construction or renovation of Carlisle maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Provide for the construction or renovation of Lemoyne maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 45
Project Allocation5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 46
Project Allocation5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxii) Dauphin County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 8-0
Project Allocation10,000,000
(B) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the material testing lab
Project Allocation8,000,000
(C) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the fleet management facility
Project Allocation5,000,000
(D) Construction or renovation of sign shop facility. May include site acquisition and development, design and construction of buildings and utility work
Project Allocation5,000,000
(E) Provide for the construction or renovation of Harrisburg maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(F) Provide for the construction or renovation of Elizabethville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(G) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 47
Project Allocation5,000,000
(H) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 48
Project Allocation5,000,000
(I) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxiii) Delaware County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site N
Project Allocation5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxiv) Elk County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxv) Erie County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site L
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site M
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxvi) Fayette County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 12-0
Project Allocation10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxvii) Forrest County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxviii) Franklin County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site G
Project Allocation5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxix) Fulton County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site B
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 3
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxx) Greene County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site D
Project Allocation5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxxi) Huntingdon County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxxii) Indiana County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 10-0
Project Allocation10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxxiii) Jefferson County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 25
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 26
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxxiv) Juniata County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxxv) Lackawanna County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 4-0
Project Allocation10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 55
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxxvi) Lancaster County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxxvii) Lawrence County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 15
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 16
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxxviii) Lebanon County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the eastern training facility
Project Allocation5,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xxxix) Lehigh County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 5-0
Project Allocation10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xl) Luzerne County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 39
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 53
Project Allocation5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 54
Project Allocation5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xli) Lycoming County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 3-0
Project Allocation10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xlii) McKean County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xliii) Mercer County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site E
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 17
Project Allocation5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 18
Project Allocation5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xliv) Mifflin County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xlv) Monroe County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site F
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 41
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xlvi) Montgomery County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 6-0
Project Allocation10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xlvii) Montour County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 35
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 36
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xlviii) Northampton County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(xlix) Northumberland County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(l) Perry County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(li) Philadelphia County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lii) Pike County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site K
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot, and sewage plant upgrades, at roadside rest area - Site 61
Project Allocation5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 62
Project Allocation5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(liii) Potter County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(liv) Schuylkill County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lv) Snyder County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lvi) Somerset County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lvii) Sullivan County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lviii) Susquehanna County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site H
Project Allocation5,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 56
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition, or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lix) Tioga County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site T
Project Allocation5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lx) Union County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lxi) Venango County
(A) Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 1-0
Project Allocation10,000,000
(B) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 21
Project Allocation5,000,000
(D) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 22
Project Allocation5,000,000
(E) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lxii) Warren County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lxiii) Washington County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Provide for the construction or renovation of West Brownsville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(C) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site A
Project Allocation5,000,000
(D) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lxiv) Wayne County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lxv) Westmoreland County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lxvi) Wyoming County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000
(lxvii) York County
(A) Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work
Project Allocation7,000,000
(B) Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site J
Project Allocation5,000,000
(C) Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements
Project Allocation5,000,000

Section 4. Itemization of furniture and equipment projects.

Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their estimated financial cost, as follows:

ProjectTotal Project Allocation
(1) Department of Agriculture
(i) Diagnostic Laboratory
(A) Provide original furniture and equipment for diagnostic laboratory
Project Allocation6,000,000
(1.1) Department of Education
(i) Lincoln University
(A) Provide original furniture and equipment for Houston Hall
Project Allocation3,000,000
(ii) The Pennsylvania State University
(A) Davey Laboratory renovation (University Park campus) original furniture, fixtures and equipment for Davey Laboratory at the University Park campus
Project Allocation15,000,000
(B) Osmond Laboratory renovation - Phase II (University Park campus) original furniture, fixtures and equipment for Phase II of Osmond Laboratory at the University Park campus
Project Allocation6,000,000
(C) Carpenter Building renovation (University Park campus) original furniture, fixtures and equipment for the Carpenter Building at the University Park campus
Project Allocation6,000,000
(D) Student Support and Services Center (University Park campus) original furniture, fixtures and equipment for the Student Support and Services Center at the University Park campus
Project Allocation12,000,000
(E) Electrical Engineering West renovation (University Park campus) original furniture, fixtures and equipment for Electrical Engineering West at the University Park campus
Project Allocation8,000,000
(F) Electrical Engineering East renovation (University Park campus) original furniture, fixtures and equipment for Electrical Engineering East at the University Park campus
Project Allocation6,000,000
(G) Pattee Library/Paterno Library renovation (University Park campus) Pattee Library/Paterno Library renovation at University Park campus
Project Allocation6,000,000
(H) Sparks Building renovation (University Park campus) original furniture, fixtures and equipment for the Sparks Building at the University Park campus
Project Allocation13,000,000
(I) Applied Research Laboratory renovation (University Park campus) original furniture, fixtures and equipment for the Applied Research Laboratory at the University Park campus
Project Allocation7,000,000
(J) Chilled water plant (University Park campus) original furniture, fixtures and equipment for a chilled water plant at the University Park campus
Project Allocation4,000,000
(K) Advanced water treatment system (University Park campus) original furniture, fixtures and equipment for an advanced water treatment system at the University Park campus
Project Allocation3,000,000
(L) Classroom-library building renovation (and nursing addition) (Scranton campus) original furniture, fixtures and equipment for the classroom-library building renovation (and nursing addition) at the Scranton campus
Project Allocation3,000,000
(M) Kelly Library renovation (and addition) (Greater Allegheny campus) original furniture, fixtures and equipment for Kelly Library renovation (and addition) at the Greater Allegheny campus
Project Allocation3,000,000
(N) Classroom/class lab teaching and learning building (Harrisburg campus) original furniture, fixtures and equipment for a classroom/class lab teaching and learning building at the Harrisburg campus
Project Allocation5,000,000
(O) Teaching and administrative support building (Hershey campus) original furniture, fixtures and equipment for a teaching and administrative support building at the Hershey campus
Project Allocation12,000,000
(P) Academic and research building (Hershey campus) original furniture, fixtures and equipment for an academic and research building at the Hershey campus
Project Allocation10,000,000
(Q) Chambers Building - North Wing Renovation (University Park campus) original furniture, fixtures and equipment for the North Wing of Chambers Building at the University Park campus
Project Allocation12,000,000
(iii) Thaddeus Stevens College of Technology
(A) Original furniture, fixtures and equipment for dormitory buildings
Project Allocation125,000
(B) Original furniture, fixtures and equipment for Transportation Center
Project Allocation3,500,000
(1.2) Department of Environmental Protection
(i) Bureau of Laboratories
(A) Provide original furniture and equipment for Bureau of Laboratories laboratory
Project Allocation18,000,000
(2) Department of General Services
(i) Department of General Services
(A) Provide original furniture and equipment for the Finance Building
Project Allocation25,000,000
(B) Provide original furniture and equipment for the Scranton State Office Building
Project Allocation3,500,000
(C) Provide original furniture and equipment for the Reading Office Building
Project Allocation3,500,000
(2.1) Department of Health
(i) Bureau of Laboratories
(A) Provide original furniture and equipment for Bureau of Laboratories laboratory
Project Allocation7,000,000
(3) Pennsylvania Historical and Museum Commission
(i) Pennsylvania State Archive Building
(A) Provide original furniture and equipment for facility
Project Allocation3,000,000
(3.1) Department of Human Services
(i) Norristown State Hospital
(A) Provide original furniture and equipment for the facility
Project Allocation13,000,000
(4) Department of Military and Veterans Affairs
(i) Delaware Valley Veterans Home
(A) Provide original furniture and equipment for new nursing care addition and new adult day health care program
Project Allocation3,814,190
(ii) Gino J. Merli Veterans Center
(A) Provide original furniture and equipment for new adult day health care program
Project Allocation500,000
(iii) Hollidaysburg Veterans Home
(A) Provide original furniture and equipment for new adult day health care program
Project Allocation500,000
(iv) Pennsylvania Soldiers' & Sailors' Home, Erie
(A) Provide original furniture and equipment for new adult day health care program
Project Allocation500,000
(v) Southwestern Veterans' Center, Pittsburgh
(A) Provide original furniture and equipment for new adult day health care program
Project Allocation500,000
(vi) Allentown Readiness Center
(A) Provide original furniture and equipment for Allentown Readiness Center
Project Allocation1,000,000
(vii) Beaver Falls Readiness Center
(A) Provide original furniture and equipment for Beaver Falls Readiness Center
Project Allocation1,000,000
(viii) Berks County Readiness Centers
(A) Provide original furniture and equipment for Berks County Readiness Centers
Project Allocation2,000,000
(ix) Cambridge Springs Readiness Center
(A) Provide original furniture and equipment for Cambridge Springs Readiness Center
Project Allocation1,000,000
(x) Carlisle Readiness Center
(A) Provide original furniture and equipment for Carlisle Readiness Center
Project Allocation1,000,000
(xi) Chambersburg Readiness Center
(A) Provide original furniture and equipment for Chambersburg Readiness Center
Project Allocation1,000,000
(xii) Coatesville Readiness Center
(A) Provide original furniture and equipment for Coatesville Readiness Center
Project Allocation1,000,000
(xiii) Easton Readiness Center
(A) Provide original furniture and equipment for Easton Readiness Center
Project Allocation1,000,000
(xiv) Everett Readiness Center
(A) Provide original furniture and equipment for Everett Readiness Center
Project Allocation1,000,000
(xv) Fort Indiantown Gap DMVA facilities
(A) Provide original furniture and equipment for Fort Indiantown Gap DMVA facilities
Project Allocation10,000,000
(xvi) Greensburg Readiness Center
(A) Provide original furniture and equipment for Greensburg Readiness Center
Project Allocation1,000,000
(xvii) Huntingdon Readiness Center
(A) Provide original furniture and equipment for Huntingdon Readiness Center
Project Allocation1,000,000
(xviii) Lebanon Readiness Center
(A) Provide original furniture and equipment for Lebanon Readiness Center
Project Allocation1,000,000
(xix) Lewisburg Readiness Center
(A) Provide original furniture and equipment for Lewisburg Readiness Center
Project Allocation1,000,000
(xx) Lewistown Readiness Center
(A) Provide original furniture and equipment for Lewistown Readiness Center
Project Allocation1,000,000
(xxi) Luzerne County Readiness Centers
(A) Provide original furniture and equipment for Luzerne Readiness Centers
Project Allocation5,000,000
(xxii) Philadelphia/Delaware Counties
(A) Provide original furniture and equipment for Philadelphia/Delaware County Readiness Centers
Project Allocation4,000,000
(xxiii) Punxsutawney Readiness Center
(A) Provide original furniture and equipment for Punxsutawney Readiness Center
Project Allocation500,000
(xxiv) South Mountain Readiness Center
(A) Provide original furniture and equipment for South Mountain Readiness Center
Project Allocation500,000
(xxv) Tamaqua Readiness Center
(A) Provide original furniture and equipment for Tamaqua Readiness Center
Project Allocation1,000,000
(xxvi) Wellsboro Readiness Center
(A) Provide original furniture and equipment for Wellsboro Readiness Center
Project Allocation1,000,000
(4.1) Pennsylvania State Police
(i) Regional Forensic Laboratory
(A) Provide original furniture and equipment for Regional Forensic Laboratory
Project Allocation7,000,000
(5) State System of Higher Education
(i) Edinboro University
(A) Provide original furniture and equipment for Hamilton Hall renovation
Project Allocation2,500,000
(ii) Shippensburg University
(A) Provide original furniture and equipment for Heiges Field House renovation and addition
Project Allocation4,000,000
(B) Provide original furniture and equipment for Old Main renovation
Project Allocation1,500,000
(6) (Reserved)
(7) Department of Transportation
(i) Adams County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(ii) Allegheny County
(A) Provide original furniture and equipment for District Office 11-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facilities
Project Allocation1,200,000
(iii) Armstrong County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(iv) Beaver County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(v) Bedford County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(vi) Berks County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(vii) Blair County
(A) Provide original furniture and equipment for District Office 9-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(viii) Bradford County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(ix) Bucks County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(x) Butler County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xi) Cambria County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xii) Cameron County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xiii) Carbon County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xiv) Centre County
(A) Provide original furniture and equipment for maintenance facilities
Project Allocation1,200,000
(xv) Chester County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xvi) Clarion County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xvii) Clearfield County
(A) Provide original furniture and equipment for District Office 2-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xviii) Clinton County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xix) Columbia County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xx) Crawford County
(A) Provide original furniture and equipment for maintenance facilities
Project Allocation1,200,000
(xxi) Cumberland County
(A) Provide original furniture and equipment for maintenance facilities
Project Allocation1,200,000
(xxii) Dauphin County
(A) Provide original furniture and equipment for District Office 8-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facilities
Project Allocation1,200,000
(xxiii) Delaware County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxiv) Elk County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxv) Erie County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxvi) Fayette County
(A) Provide original furniture and equipment for District Office 12-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxvii) Forrest County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxviii) Franklin County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxix) Fulton County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxx) Greene County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxxi) Huntingdon County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxxii) Indiana County
(A) Provide original furniture and equipment for District Office 10-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxxiii) Jefferson County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxxiv) Juniata County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxxv) Lackawanna County
(A) Provide original furniture and equipment for District Office 4-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxxvi) Lancaster County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxxvii) Lawrence County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxxviii) Lebanon County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xxxix) Lehigh County
(A) Provide original furniture and equipment for District Office 5-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xl) Luzerne County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xli) Lycoming County
(A) Provide original furniture and equipment for District Office 3-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xlii) McKean County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xliii) Mercer County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xliv) Mifflin County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xlv) Monroe County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xlvi) Montgomery County
(A) Provide original furniture and equipment for District Office 6-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xlvii) Montour County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xlviii) Northampton County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(xlix) Northumberland County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(l) Perry County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(li) Philadelphia County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lii) Pike County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(liii) Potter County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(liv) Schuylkill County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lv) Snyder County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lvi) Somerset County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lvii) Sullivan County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lviii) Susquehanna County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lix) Tioga County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lx) Union County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lxi) Venango County
(A) Provide original furniture and equipment for District Office 1-0
Project Allocation2,000,000
(B) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lxii) Warren County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lxiii) Washington County
(A) Provide original furniture and equipment for maintenance facilities
Project Allocation1,200,000
(lxiv) Wayne County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lxv) Westmoreland County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lxvi) Wyoming County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000
(lxvii) York County
(A) Provide original furniture and equipment for maintenance facility
Project Allocation600,000

Section 5. Itemization of transportation assistance projects.

(a) Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:

ProjectTotal Project Allocation
(1) York County
(i) York County Economic Alliance
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, rehabilitation and other related costs for public transit modernization in York County
Project Allocation8,000,000

(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

ProjectTotal Project Allocation
(1) Allegheny County
(i) County projects
(A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(2) Beaver County
(i) County projects
(A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(ii) Center Township
(A) Construction, excavation, infrastructure and other related costs for a new rail siding at the site of the former J&L Steel Plant
Project Allocation4,500,000
(2.1) Berks County
(i) County projects
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of a second rail line
Project Allocation5,000,000
(B) Rehabilitation, construction and renovation of rail infrastructure to service Evergreen Community Power site, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail service and any other related costs
Project Allocation5,000,000
(2.2) Carbon County
(i) Nesquehoning Borough
(A) Acquisition, redevelopment and other related costs for the renovation of current buildings and grounds and for repair and maintenance of open top and covered hoppers to support anthracite coal shipping domestically and internationally
Project Allocation1,000,000
(2.3) Chester County
(i) Phoenixville Borough
(A) Acquisition, infrastructure, remediation, abatement of hazardous materials, renovation, construction and other costs related to the widening and expansion of the Black Rock Train Tunnel and the construction and installation of a second track
Project Allocation10,000,000
(3) Clearfield County
(i) County projects
(A) Acquisition, construction, infrastructure and other related costs for rehabilitation of the rail line known as the Clearfield Cluster located in Cambria, Centre, Clearfield, Clinton and Indiana Counties, including railbed, ties, rail and other materials to support business growth and improve safety
Project Allocation15,000,000
(3.1) Cumberland and Adams Counties
(i) Gettysburg & Northern Railroad
(A) Rehabilitate rail infrastructure, construct new sidings and install transload equipment to support customer development
Project Allocation3,500,000
(B) Improve, replace and construct rail infrastructure to handle existing and prospective customer shipping needs, including land acquisition, engineering, site preparation, rail, ties, ballast, turnouts, other track materials, drainage, surfacing, crossings, bridges and related equipment
Project Allocation4,000,000
(4) Dauphin County
(i) Steelton and Highspire Railroad
(A) Rehabilitation of rail infrastructure, including engineering, site preparation, drainage, grading, ties, rail, ballast, switches, crossings, bridge and paving
Project Allocation7,500,000
(4.1) Fayette County
(i) County projects
(A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(4.2) Franklin County
(i) Meyers Grain LLC
(A) Construct rail infrastructure and install necessary transload equipment to support the development of a grain and fertilizer transload facility in Franklin County, including engineering, site preparation, rail, turnouts, ties, ballast, other track related materials, scales, rail car mover, car unloading equipment, unloading pits, conveyor and elevator systems and other required materials for project completion
Project Allocation5,000,000
(ii) Franklin Storage LP
(A) Rehabilitate, construct rail infrastructure and install necessary transload equipment to support existing operations in the county, including site preparation, engineering, rail, turnouts, ties, ballast, other track-related materials, overhead crane, car mover, fall protection, unloading ramps, paving, lighting and other required materials for project completion
Project Allocation5,000,000
(4.3) Greene County
(i) County projects
(A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(ii) Monongahela Township
(A) Construction and extension of an existing rail line in Monongahela Township, including an off-load facility to transport coal and other items on a currently idle coal site
Project Allocation10,000,000
(4.4) Indiana County
(i) County projects
(A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(5) Lackawanna County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery, equipment and other related costs for new, expansions and improvements to transportation, rail airport and multimodal infrastructure
Project Allocation15,000,000
(6) Lancaster County
(i) Lancaster County Redevelopment Authority
(A) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs for expansion and improvement of facilities to support growth in production volumes and jobs for Arconic, Inc.
Project Allocation3,500,000
(6.1) Lawrence County
(i) County projects
(A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(ii) LVR Railroad LLC
(A) Rehabilitate, construct, extend rail infrastructure and install necessary transload equipment to support existing operations, as well as the addition of a new food ingredient transfer customer in Lancaster County, including engineering, site preparation, rail, turnouts, ties, ballast, other track related materials, crossings, scales, utility upgrades, paving, required security/lighting for handling of food grade products, commodity storage, conveyor systems and other required materials for project completion
Project Allocation10,000,000
(7) Luzerne County
(i) Newport Township
(A) Acquisition, construction and infrastructure for a rail extension for the Newport Township Energy Park
Project Allocation5,000,000
(7.1) Montgomery County
(i) County projects
(A) Construct rail infrastructure to accommodate current traffic volume, as well as future planned expansions, including, but not limited to, property acquisition, rail car scale acquisition and installation, site preparation, engineering, permitting, drainage improvements, rail, ties, ballast, turnouts, switches, surfacing and all rail-related materials necessary for project
Project Allocation10,000,000
(8) Somerset County
(i) County projects
(A) Construction and rehabilitation of rail at the Cambria Branch Rail Line
Project Allocation7,000,000
(8.1) Union County
(i) County projects
(A) Construction of a standard ballasted track for a main loop and bypass track, including all track materials, turnouts, grade crossing and receiving equipment, including hoppers, bins, conveyors, outlets, elevators and other related costs to support a feed mill in White Deer Township
Project Allocation3,000,000
(8.2) Washington County
(i) County projects
(A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(8.3) Westmoreland County
(i) County projects
(A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(9) Multiple Counties
(i) Redevelopment Authority of County of Berks
(A) Acquisition, construction, infrastructure, rehabilitation and other related costs for the Colebrookdale Railroad Preservation Trust/Eastern Berks Gateway Railroad
Project Allocation30,000,000
(i.1) Berks and Montgomery Counties
(A) Rehabilitation of railroad, including track improvements, siding extensions, visitors center, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and preserve corridor for future freight traffic in Berks and Montgomery Counties
Project Allocation10,000,000
(ii) Bradford and Wyoming Counties
(A) Acquisition, construction, infrastructure and other related costs for rehabilitation of rail line, including railbed, ties, rail and other materials to support business growth and improve safety
Project Allocation5,000,000
(ii.1) Chester, Delaware, Montgomery and Philadelphia Counties
(A) Construction of infrastructure to support track, station, ancillary features and safety improvements for operation of West Chester Railroad tourist trains, restoration of common carrier passenger rail service to West Chester, West Chester University, Westtown, Cheyney University and Center City via SEPTA connection, restoration of freight rail access to Glen Mills Quarry and private-sector tech start-up to demonstrate innovative battery technology
Project Allocation3,963,000
(ii.2) Lackawanna, Luzerne, Monroe, Northampton and Wayne Counties
(A) Rehabilitate, replace and construct rail infrastructure for a passenger rail project, including land acquisition, engineering, site preparation, construction, drainage, grading, ties, rail, ballast, switches, track materials, crossings, bridges, paving and other costs related to the project
Project Allocation15,000,000
(iii) Reading Blue Mountain and Northern Railroad
(A) Reconstruction by process of crop and weld of 28 miles of heavy control-cooled 136-pound main line rail from Pittston (MP 3.59) to Mehoopany (MP 31.74)
Project Allocation3,300,000
(iv) Gettysburg and Northern Railroad
(A) Improve, replace and construct rail infrastructure in Adams and Cumberland Counties to handle existing and prospective customer shipping needs, including land acquisition, engineering, site preparation, rail, ties, ballast, turnouts, other track materials, drainage, surfacing, crossings, bridges and related equipment
Project Allocation4,000,000
(B) Rehabilitate rail infrastructure, construct new sidings and install transload equipment to support customer development in Adams and Cumberland Counties
Project Allocation3,500,000
(v) Delaware-Lackawanna Railroad
(A) Construction, renovation, rehabilitation and other costs related to the Delaware-Lackawanna Railroad rail infrastructure in the counties to handle existing and prospective customer shipping needs, including land acquisition, engineering, site preparation, rail, ties, ballast, turnouts, other track materials, drainage, surfacing, grade crossings, bridges, tunnels and related equipment in Lackawanna, Luzerne, Monroe, Northampton and Wayne Counties
Project Allocation7,500,000
(B) Construction, infrastructure and other costs related to the Delaware-Lackawanna Railroad upgrade of rail infrastructure, construction of new sidings and installation of transload equipment to support customer development in the counties
Project Allocation3,750,000
(vi) North Shore Railroad
(A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for rehabilitation of existing track and construction of new track in Centre, Clinton, Columbia, Lycoming, Mifflin, Montour, Northumberland and Union Counties in areas operated by North Shore Railroad Company
Project Allocation6,000,000

(c) Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

ProjectTotal Project Allocation
(1) Blair County
(i) Blair County Airport Authority
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for economic development of business and aviation facilities and infrastructure at the Altoona-Blair County Airport
Project Allocation5,000,000
(2) Cumberland County
(i) South Middleton Township
(A) Acquisition, renovation, construction, infrastructure and other related costs for improvement, expansion, redevelopment and revitalization of the Carlisle Airport
Project Allocation20,000,000
(3) Dauphin County
(i) Susquehanna Area Regional Airport Authority
(A) Construction, infrastructure, rehabilitation, abatement of hazardous materials and other related costs for the long-term parking lot at Harrisburg International Airport
Project Allocation3,000,000
(3.1) Indiana County
(i) White Township
(A) Acquisition, rehabilitation, infrastructure, construction and related development costs for improvements at the Indiana County - Jimmy Stewart Airport
Project Allocation7,000,000
(4) Lancaster County
(i) Lancaster Airport Authority
(A) Acquisition of aviation fueling vehicles
Project Allocation125,000
(B) Acquisition, construction, rehabilitation and other related costs for airport maintenance and construction equipment and a storage facility
Project Allocation500,000
(C) Construction, infrastructure, abatement of hazardous materials and other related costs for relocation of the Aircraft Fuel Farm
Project Allocation2,000,000
(D) Construction, infrastructure, rehabilitation and other related costs for airport infrastructure improvements, including parking, HVAC and other building services
Project Allocation2,500,000
(E) Construction, infrastructure, rehabilitation and other related costs for airport development and improvement, including hangars, aircraft and vehicle parking and associated facilities
Project Allocation2,500,000
(F) Construction, infrastructure, rehabilitation and other related costs for site development and construction of T-hangars and offices
Project Allocation3,500,000
(G) Construction, infrastructure, rehabilitation and other related costs for site development and construction of corporate hangars and offices
Project Allocation20,000,000
(5) Lawrence County
(i) Lawrence County Economic Development Corporation
(A) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for capacity expansion at the New Castle Municipal Airport in Union Township
Project Allocation10,000,000
(6) Luzerne County
(i) Wilkes-Barre Wyoming Valley Airport
(A) Construction, infrastructure and other related costs for improvements at the Wyoming Valley Airport
Project Allocation5,000,000
(7) Mercer County
(i) Borough of Grove City
(A) Acquisition, construction, infrastructure and other related costs for aviation, industrial and commercial site development and improvements at or surrounding the Grove City Regional Airport
Project Allocation1,000,000

Section 6. Itemization of redevelopment assistance projects.

Additional capital projects in the category of redevelopment assistance projects for capital grants by the Department of Community and Economic Development, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects, and to be financed by the incurring of debt, are hereby itemized, together with their estimated financial costs, as follows:

ProjectTotal Project Allocation
(1) Adams County
(i) County projects
(A) Acquisition, site preparation, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other associated costs for the development of WellSpan Health health care facilities
Project Allocation5,000,000
(ii) Adams County Industrial Development Authority
(A) Site preparation, acquisition, remediation, renovation, construction, redevelopment, infrastructure and other costs associated with the development of a PA Agriculture Discovery Center attraction
Project Allocation10,000,000
(B) Acquisition, site preparation, remediation, renovation, construction, redevelopment, infrastructure and other associated costs for a community and economic development project
Project Allocation5,000,000
(C) Site preparation, acquisition, infrastructure, rehabilitation, renovation, construction and other related costs for the construction, expansion and adaptive reuse of Bermudian Springs buildings in Huntingdon Township
Project Allocation2,000,000
(D) Acquisition, site preparation, renovation, construction, infrastructure and other associated costs for the redevelopment of the Berlin Junction Manufacturing Center site in Oxford Township
Project Allocation5,000,000
(E) Site preparation, remediation, acquisition, renovation, construction, redevelopment, infrastructure and other associated costs for the redevelopment of former foundry site
Project Allocation3,500,000
(iii) Butler Township
(A) Acquisition, site preparation, infrastructure, construction, redevelopment, renovation, abatement of hazardous materials and other related costs associated with the construction of a municipal and emergency services facility
Project Allocation2,500,000
(iv) Reading Township
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, flood mitigation, renovation and other related costs for the complete replacement of an existing spillway at Lake Meade Dam with a three-stage labyrinth spillway, including the installment of a system to control the release capacity of the spillway to accommodate Department of Environmental Protection requirements
Project Allocation5,000,000
(2) Allegheny County
(i) County projects
(A) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project
Project Allocation30,000,000
(B) Acquisition, construction, renovation and other related costs for a firm in Marshall Township to acquire a robotics and manufacturing test facility or proving grounds in the field of automation, transportation and technology
Project Allocation600,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation30,000,000
(D) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation30,000,000
(E) Acquisition, construction, redevelopment, rehabilitation, infrastructure and other costs related to an elementary school building project in the Steel Valley School District
Project Allocation2,000,000
(F) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for SteelBridge Land Management, LLC, and its affiliates
Project Allocation25,000,000
(G) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation7,000,000
(H) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(I) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation3,000,000
(J) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for Watt Fuel Cell Corporation facilities
Project Allocation35,000,000
(i.1) City of Pittsburgh Urban Redevelopment Authority
(A) Construction, renovation, infrastructure and other costs related to HVAC, boilers, lighting improvements and other building system upgrades at the Squirrel Hill facility of the JCC of Greater Pittsburgh
Project Allocation750,000
(B) Construction, infrastructure and other costs related to a new medical center and office building complex for Primary Care Health Services in Homewood
Project Allocation7,500,000
(ii) Moon Transportation Authority
(A) Construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for development projects along Stevenson Mill and Rouser Road Connectors and adjacent areas in Moon Township
Project Allocation5,000,000
(iii) Allegheny County Airport Authority
(A) Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for the development of industrial and commercial sites at or surrounding Pittsburgh International Airport
Project Allocation50,000,000
(iv) Pittsburgh Gateways Corporation
(A) Construction, infrastructure, redevelopment, rehabilitation and other related costs for the Energy Innovation Center and related projects in accordance with Pittsburgh Gateway's mission
Project Allocation6,000,000
(B) Economic development projects in southwest Pennsylvania
Project Allocation6,000,000
(iv.1) Redevelopment Authority of Allegheny County
(A) Acquisition, construction, infrastructure and other related costs for an economic development project in Oakmont Borough
Project Allocation5,000,000
(B) Construction, infrastructure, rehabilitation and other costs related to the construction of housing for individuals with intellectual and physical disabilities in Ross Township
Project Allocation800,000
(C) Demolition, environmental assessment, planning, remediation, rehabilitation, site preparation, infrastructure, construction and other related costs associated with the redevelopment of a former power generation facility
Project Allocation10,000,000
(D) Construction, infrastructure and other related costs associated with the development of a teaching and research facility at Chatham University's Eden Hall campus
Project Allocation2,000,000
(iv.2) Urban Redevelopment Authority of Pittsburgh
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for a redevelopment project on land owned or controlled by Bethel A.M.E. Church in the Hill District Neighborhood
Project Allocation20,000,000
(v) Pittsburgh
(A) Acquisition, construction, infrastructure, redevelopment and other costs related to the UPMC Children's Hospital of Pittsburgh
Project Allocation30,000,000
(vi) City of Clairton
(A) Construction, acquisition, infrastructure, renovation and other related costs leading to economic development projects in the city
Project Allocation5,000,000
(vi.1) City of McKeesport
(A) Construction, rehabilitation, infrastructure, renovation and other related costs for the redevelopment of the Carnegie Library of McKeesport
Project Allocation500,000
(vii) City of Pittsburgh
(A) Construction, infrastructure, renovation, rehabilitation and abatement of hazardous materials associated with the development of a manufacturing facility with associated parking structure
Project Allocation10,000,000
(B) Construction, acquisition, infrastructure, renovation and rehabilitation for a construction project that will expand the History Center
Project Allocation5,000,000
(C) Construction, infrastructure, renovation and rehabilitation of structures and public open space assessments
Project Allocation5,000,000
(D) Construction, acquisition, infrastructure improvements, abatement of hazardous materials, renovation and rehabilitation related to the development of Hazelwood Green in the Greater Hazelwood neighborhood
Project Allocation50,000,000
(E) Construction, infrastructure improvement, renovation, rehabilitation and other related costs to create apartment-style living arrangements for individuals with disabilities
Project Allocation5,000,000
(F) Acquisition, construction, infrastructure, redevelopment, and all other related costs for Carrick redevelopment projects
Project Allocation20,000,000
(G) Acquisition, construction, infrastructure, redevelopment and all other related costs for the redevelopment of a former brownfield site in Squirrel Hill and Swisshelm Park neighborhoods
Project Allocation20,000,000
(H) Acquisition, construction, infrastructure, redevelopment and other costs related to the Homewood redevelopment projects
Project Allocation20,000,000
(I) Acquisition, construction, infrastructure, redevelopment and other costs related to a mixed-use affordable housing development in the Homewood Business district
Project Allocation20,000,000
(J) Acquisition, construction, infrastructure, redevelopment and other costs related to the Avenues of Hope Program - Homewood Avenue
Project Allocation25,000,000
(K) Acquisition, construction, infrastructure, redevelopment and other costs related to the Avenues of Hope Program - Second Avenue
Project Allocation25,000,000
(L) Construction and acquisition relating to the redevelopment of the Forest Hills - Chalfant Westinghouse Site
Project Allocation1,500,000
(M) Renovation, rehabilitation and other costs related to Phase 2 of this project, including the renovation of the 23 units in the former three-story Highlander building
Project Allocation1,300,000
(N) Renovation, rehabilitation and other costs related to the remediation and site infrastructure improvements to the former Westinghouse Atomy Smasher facility and site
Project Allocation10,000,000
(O) Construction, acquisition, renovation, rehabilitation and other costs related to the redevelopment project of the Trade Institute of Pittsburgh to renovate a nearby property into short-term workforce housing
Project Allocation500,000
(P) Construction, renovation and rehabilitation of an updated and expanded facility for the Jubilee Soup Kitchen
Project Allocation1,000,000
(Q) Acquisition, construction, infrastructure, redevelopment and all other related costs for Garfield redevelopment projects
Project Allocation20,000,000
(R) Acquisition, construction, infrastructure, redevelopment and all other related costs for Fairywood Industrial Park redevelopment projects
Project Allocation20,000,000
(S) Acquisition, construction, infrastructure, redevelopment and other related costs for the redevelopment of the former J. Allen Steel site redevelopment projects
Project Allocation60,000,000
(T) Acquisition, construction, infrastructure, redevelopment and other related costs for redevelopment projects in the Greater Hill District neighborhoods of Pittsburgh
Project Allocation20,000,000
(U) Acquisition, construction, infrastructure, redevelopment and other related costs for redevelopment projects in the Uptown neighborhood of Pittsburgh
Project Allocation20,000,000
(V) Acquisition, construction, infrastructure, redevelopment and other related costs for Beechview redevelopment projects
Project Allocation20,000,000
(W) Acquisition, construction, infrastructure, redevelopment and other related costs for Sheraden redevelopment projects
Project Allocation20,000,000
(X) Acquisition, construction, infrastructure, redevelopment and other related costs for Warrington Avenue redevelopment projects
Project Allocation20,000,000
(Y) Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - Centre Avenue
Project Allocation25,000,000
(Z) Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - Perrysville Avenue
Project Allocation25,000,000
(AA) Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - Chartiers Avenue
Project Allocation25,000,000
(BB) Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - East Warrington Avenue
Project Allocation25,000,000
(CC) Acquisition, construction, infrastructure and other related costs for the redevelopment of the Clack site in Lawrenceville
Project Allocation20,000,000
(DD) Acquisition, construction, infrastructure and other related costs for a scattered site mixed-use development in the Manchester neighborhood
Project Allocation20,000,000
(EE) Acquisition, construction, infrastructure and other related costs for a scattered site mixed-use development in the Perry South neighborhood
Project Allocation20,000,000
(FF) Acquisition, construction, infrastructure, redevelopment and other related costs for Chartiers City redevelopment projects
Project Allocation20,000,000
(GG) Acquisition, construction, infrastructure, redevelopment and other related costs for Elliot redevelopment projects
Project Allocation20,000,000
(HH) Acquisition, construction, infrastructure and other related costs for public park expansion project
Project Allocation20,000,000
(II) Acquisition, construction, infrastructure and other related costs for Allegheny Riverfront redevelopment project
Project Allocation20,000,000
(JJ) Acquisition, construction, infrastructure, redevelopment and other costs related to the Avenues of Hope Program - Larimer Avenue
Project Allocation25,000,000
(KK) Acquisition, construction, infrastructure, redevelopment and other costs related to East Liberty redevelopment projects
Project Allocation20,000,000
(LL) Acquisition, construction, infrastructure, redevelopment and all other related costs for the redevelopment of strategic brownfield sites
Project Allocation50,000,000
(MM) Acquisition, construction, infrastructure, redevelopment and all other related costs for transit-oriented development projects
Project Allocation50,000,000
(NN) Acquisition, construction, infrastructure, redevelopment and all other related costs for developing closed schools and historic churches for housing, office or commercial uses
Project Allocation50,000,000
(OO) Acquisition, construction, infrastructure, redevelopment and all other related costs for Innovation and Entrepreneurship Center projects
Project Allocation50,000,000
(PP) Acquisition, construction, infrastructure, redevelopment and all other related costs for Pittsburgh-based advanced technology and incubator development projects
Project Allocation50,000,000
(QQ) Acquisition, construction, infrastructure, redevelopment and all other related costs for Pittsburgh riverfront redevelopment projects
Project Allocation50,000,000
(RR) Acquisition, construction, infrastructure and other related costs for mixed-use development on Penn Avenue from Shady Avenue to Fifth Avenue in the Larimer and East Liberty sections of Pittsburgh
Project Allocation250,000,000
(SS) Construction, renovation, rehabilitation and other costs related to the next phase of the museum's growth on Pittsburgh's North Side, including redevelopment and maintenance to buildings and grounds
Project Allocation5,000,000
(TT) Acquisition, construction, infrastructure and other related costs for Pittsburgh riverfront redevelopment projects
Project Allocation14,000,000
(UU) Renovation, rehabilitation and other costs relating to the renovation of a commercial building to house Work Hard Pittsburgh's expanded coworking, media production, meeting and maker spaces
Project Allocation1,000,000
(VV) Construction, infrastructure, renovation, rehabilitation and other costs related to the rehabilitation and renovation of Saints Peter and Paul Church
Project Allocation10,000,000
(WW) Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation, and other costs related to infrastructure improvements to libraries within the Allegheny County Library System
Project Allocation10,000,000
(XX) Acquisition, construction, infrastructure and other related costs for mixed-use development, including residential, retail, parking and offices within the Boulevard of the Allies, Halket, Zulema and McKee Place in Oakland
Project Allocation200,000,000
(YY) Construction, infrastructure, acquisition, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment at and adjacent to 2400 East Carson Street in Pittsburgh's South Side
Project Allocation2,500,000
(ZZ) Construction and other costs related to the development of a multiphased, mixed-use knowledge community in the Pittsburgh Innovation District
Project Allocation10,000,000
(AAA) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to redevelopment located at the former Wholey building in the Strip District
Project Allocation20,000,000
(BBB) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to infrastructure construction and remediation projects throughout the region
Project Allocation50,000,000
(CCC) Acquisition, construction, infrastructure, rehabilitation and other related costs for the Pittsburgh Sky Car project
Project Allocation15,000,000
(DDD) Acquisition, construction, infrastructure, rehabilitation and other related costs for the Pittsburgh Downtown Commercial Office Conversion Program project
Project Allocation50,000,000
(EEE) Infrastructure, improvements, redevelopment, construction and other related costs for the renovation of the Historic Crawford Grill facility
Project Allocation3,000,000
(FFF) Infrastructure, renovation, rehabilitation and other related costs for an economic development project
Project Allocation3,000,000
(GGG) Construction, infrastructure, renovation and other related costs for the redevelopment and expansion of the Pittsburgh Ballet Theatre
Project Allocation5,000,000
(HHH) Construction, infrastructure, renovation, rehabilitation and other related costs for the development of the Marketplace of Ideas initiative
Project Allocation3,000,000
(III) Construction, rehabilitation, infrastructure, renovation and other related costs for the development of a facility for the Humane Animal Rescue of Pittsburgh
Project Allocation2,500,000
(JJJ) Construction, infrastructure, site preparation, rehabilitation and other related costs for the redevelopment of Beth Shalom Synagogue
Project Allocation2,500,000
(KKK) Construction, site preparation, demolition, infrastructure, acquisition and other costs related to the expansion and renovation of a STEM laboratory
Project Allocation2,000,000
(LLL) Construction, infrastructure and other costs related to the redevelopment of the National Aviary in Pittsburgh
Project Allocation10,000,000
(MMM) Construction, redevelopment and other related costs for the development of an advanced biotechnology center at Carnegie Mellon University
Project Allocation10,000,000
(NNN) Construction, redevelopment and other related costs for an economic development project at Carnegie Mellon University
Project Allocation5,000,000
(OOO) Renovation, rehabilitation and other related costs for the redevelopment of the DePaul School for Hearing and Speech
Project Allocation625,000
(PPP) Construction, renovation, infrastructure improvements and other related costs for the Kingsley Association in the neighborhood of Larimer
Project Allocation6,000,000
(viii) Bethel Park Borough
(A) Construction, rehabilitation and other related costs for the improvement of the Irishtown, Patterson and Logan intersection with a roundabout
Project Allocation1,300,000
(B) Construction, infrastructure, redevelopment, rehabilitation and other related costs for the expansion of the Montour Trail and construction of sidewalks for pedestrians
Project Allocation600,000
(viii.1) Braddock Borough
(A) Acquisition, construction, infrastructure and other related costs for the development of a facility for Braddock Arts and Media
Project Allocation2,000,000
(B) Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the redevelopment of a building
Project Allocation500,000
(viii.2) Bradford Woods Borough
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation1,000,000
(ix) Brentwood Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to facilities at AHN Brentwood Neighborhood Hospital
Project Allocation10,000,000
(B) Construction, redevelopment and other related costs for Brentwood Municipal Public Safety Center
Project Allocation3,000,000
(C) Construction, redevelopment and other related costs for Brentwood Municipal Stadium
Project Allocation1,000,000
(ix.1) Crafton Borough
(A) Crafton Park renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment projects, including improvements and upgrades to borough facilities
Project Allocation5,000,000
(x) Etna Borough
(A) Acquisition, construction, infrastructure and other related costs for residential, mixed-use and retail development
Project Allocation10,000,000
(x.1) Franklin Park Borough
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation1,000,000
(x.2) Green Tree Borough
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for Parkway Center Mall project as well as improvements and renovations to borough facilities
Project Allocation10,000,000
(x.3) Ingram Borough
(A) Ingram Park renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment projects in the borough, including improvements and upgrades to borough facilities
Project Allocation5,000,000
(xi) Borough of Jefferson Hills
(A) Acquisition, construction, infrastructure and other related costs for consolidation of existing and outdated fire stations into a new facility
Project Allocation1,000,000
(B) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for facility upgrades and renovations for the Steel Center
Project Allocation14,636,150
(xi.1) McKees Rocks Borough
(A) Renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment projects, including replacement or renovation of the Borough Building or other borough facilities
Project Allocation10,000,000
(xi.2) Mt. Oliver Borough
(A) Acquisition, construction, infrastructure and other related costs for Brownsville Road Corridor development projects
Project Allocation2,500,000
(xi.3) Oakmont Borough and Plum Borough
(A) Acquisition, construction, environmental remediation, infrastructure improvements, storm water management and other related costs for economic development initiatives at an outdoor facility and surrounding areas which host amateur and professional sporting events
Project Allocation10,000,000
(xii) Sharpsburg Borough and O'Hara Township
(A) Construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other costs associated with the development of a site along the Allegheny River
Project Allocation15,000,000
(xii.1) Swissvale Borough
(A) Acquisition, construction, infrastructure, site preparation, demolition and other related costs for the development of a municipal building
Project Allocation1,000,000
(xii.2) Thornburg Borough
(A) Renovation, rehabilitation, general construction, infrastructure, acquisition and redevelopment within the borough, including, but not limited to, improvements and upgrades to borough facilities
Project Allocation2,500,000
(xiii) Wilkinsburg Borough
(A) Renovation and rehabilitation of Community Forge to modernize key parts of the facility
Project Allocation750,000
(B) Construction, acquisition and other costs relating to the redevelopment of the Ardmore Boulevard Texaco Station site
Project Allocation1,750,000
(C) Construction and other costs related to the Wilkinsburg Townhome Development
Project Allocation1,750,000
(xiv) Wilmerding Borough
(A) Acquisition, construction, infrastructure and other costs related to the expansion of Allegheny Petroleum Products
Project Allocation20,000,000
(xiv.1) Elizabeth Township
(A) Construction, infrastructure and other related costs to convert a brownfield into a utility-scale solar field
Project Allocation10,000,000
(xv) Harmar Township
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at AHN Harmar Neighborhood Hospital
Project Allocation10,000,000
(xv.1) Marshall Township
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation1,000,000
(xvi) McCandless Township
(A) Acquisition, construction, infrastructure, redevelopment, and other related costs for facilities at AHN McCandless Neighborhood Hospital
Project Allocation10,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to infrastructure and renovation of the A.W. Beattie Career Center
Project Allocation5,000,000
(xvii) North Versailles Township
(A) Acquisition, construction, infrastructure, renovation, rehabilitation and other related costs for economic development projects and the construction of a new township building complex
Project Allocation10,000,000
(B) Acquisition, construction, infrastructure and other related costs for historic, cultural or civic and economic development
Project Allocation10,000,000
(xviii) Pine Township
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at AHN Wexford Hospital
Project Allocation10,000,000
(B) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation1,000,000
(xviii.1) Scott Township
(A) Renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment project, including, but not limited to, renovation or replacement of the township building or other township facilities
Project Allocation15,000,000
(xix) South Fayette Township
(A) Construction, infrastructure, redevelopment and other related costs for a municipal complex, police station and administration offices
Project Allocation6,000,000
(xx) South Park Township
(A) Construction, infrastructure, redevelopment, rehabilitation and other related costs for an addition to existing building
Project Allocation500,000
(B) Construction, redevelopment, rehabilitation and other related costs for the reconstruction of Route 88 and Brownsville Road intersection, including sidewalks
Project Allocation800,000
(xxi) Town of McCandless
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project
Project Allocation1,000,000
(B) Construction and renovation of municipal facilities and park areas in the Town of McCandless
Project Allocation1,000,000
(3) Armstrong County
(i) County projects
(A) Site development, construction and other related costs for relocation of the ARC Manor residential facility to property in the West Hills Industrial Park
Project Allocation2,000,000
(B) Acquisition, infrastructure, construction and other related costs for an on-campus, assisted living/senior housing facility adjacent to the Armstrong Center for Medicine and Health (ACMH), including expansion, acquisition of properties and buildings, renovations and equipment upgrades at ACMH facilities
Project Allocation10,000,000
(C) Construction, infrastructure and other related costs for construction of a two-story building for additional instructional space at Butler County Community College
Project Allocation1,750,000
(D) Acquisition, construction and other related costs for the improvement of the South Bend Quarry lightweight aggregate production facility
Project Allocation5,000,000
(4) Beaver County
(i) County projects
(A) Construction, infrastructure and other related costs for public works building and fire station in Big Beaver Borough
Project Allocation500,000
(B) Construction, infrastructure and other related costs for rehabilitation of the Legacy Dining Hall at Pine Valley Camp, including roofing, steel structure, enclosures, utilities and fire suppression services
Project Allocation1,000,000
(C) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for an emergency services garage, training and storage facility in the Borough of Ambridge
Project Allocation2,000,000
(D) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(F) Redevelopment, restoration and other related costs for the former Pittsburgh and Lake Erie Railroad passenger station to be used as a multipurpose meeting and event space
Project Allocation1,000,000
(G) Construction, infrastructure and other related costs for a public works building and fire station in Big Beaver Borough
Project Allocation500,000
(H) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(I) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation3,000,000
(J) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation7,000,000
(K) Acquisition, infrastructure, construction and other related costs for expansion of multiuse community operational food facilities and headquarters for Crop and Kettle
Project Allocation3,000,000
(ii) Beaver County Corporation for Economic Development
(A) Infrastructure, site improvements and other related costs for construction of compressed natural gas fueling facility
Project Allocation1,000,000
(B) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment of industrial properties located within Ellwood City
Project Allocation15,000,000
(C) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment and improvement of industrial sites located within Potter Township
Project Allocation15,000,000
(D) Infrastructure, site improvements and other related costs for construction of compressed natural gas fueling facility
Project Allocation1,000,000
(E) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment and improvement of industrial sites located in Potter Township
Project Allocation15,000,000
(iii) Redevelopment Authority of Beaver County
(A) Renovation and rehabilitation of patient rooms and corridors at Heritage Valley Beaver Hospital facility
Project Allocation1,000,000
(B) Rehabilitation, construction and other related costs for renovations to radiology department at Heritage Valley Beaver Hospital facility
Project Allocation1,000,000
(iii.1) City of Aliquippa
(A) Acquisition, construction, infrastructure and other related costs for a business or manufacturing facility associated with the petrochemical industry
Project Allocation10,000,000
(B) Infrastructure, demolition, construction and other related costs for rehabilitation and renovation of the high school stadium
Project Allocation2,000,000
(iii.2) Ambridge Borough
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development of buildings and surrounding grounds and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of a health, wellness and sports complex that will include exercise space and indoor athletic courts
Project Allocation5,000,000
(iv) Baden Borough
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for Baden Academy Charter School expansion project
Project Allocation5,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for Baden Academy Charter School expansion project
Project Allocation5,000,000
(iv.1) Conway Borough
(A) Acquisition, site preparation, renovation, remediation, demolition, construction, infrastructure and other related costs to be used for a municipal building project
Project Allocation3,000,000
(v) Ellwood City Borough
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for redevelopment projects
Project Allocation15,000,000
(vi) Harmony Township
(A) Construction, infrastructure and other related costs for CNG conversion project
Project Allocation1,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for an industrial park
Project Allocation20,000,000
(C) Construction, infrastructure and other related costs for CNG conversion project
Project Allocation1,000,000
(D) Acquisition, construction, infrastructure, redevelopment and other related costs for an industrial park
Project Allocation20,000,000
(5) Bedford County
(i) County projects
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for the Mission Critical Solutions Expansion project
Project Allocation750,000
(B) Design, engineering, demolition, renovation and construction for a community center and office space to house service providers and resources that promote self-sufficiency and community and economic development in Snake Spring Township
Project Allocation606,000
(ii) Bedford County Development Association
(A) Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for economic development projects in the county
Project Allocation5,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and/or green development of a community development project
Project Allocation5,000,000
(iii) Bedford County Economic Development Corporation
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for new construction, expansions and improvements for a value-added dairy processing facility using Pennsylvania milk
Project Allocation5,000,000
(6) Berks County
(i) County projects
(A) Construction, infrastructure, redevelopment and other related costs for a St. Luke's Medical Office Building in Ontelaunee Township
Project Allocation5,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation and abatement of hazardous materials related to an affordable, accessible and inclusive apartment complex and community and education center in the county
Project Allocation5,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation and abatement of hazardous materials relating to economic projects in the county
Project Allocation30,000,000
(D) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation10,000,000
(E) Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation10,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(G) Acquisition, infrastructure, construction and other related costs for development of 104 acres for expansion of Reading Health System
Project Allocation3,500,000
(H) Acquisition, construction, infrastructure, redevelopment and other related costs for projects for Berks County Community Health Center
Project Allocation15,000,000
(I) Rehabilitation of railroad, including track improvements, siding extensions, visitors center, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and preserve corridor for future freight traffic in Berks and Montgomery Counties
Project Allocation10,000,000
(ii) Berks County Redevelopment Authority
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for sewer-related services extension for the Blue Rock Bowman Business Center
Project Allocation3,000,000
(B) Redevelopment, infrastructure, construction and other related costs for a business expansion project in the county
Project Allocation10,000,000
(C) Rehabilitation, infrastructure, renovation, abatement of hazardous materials, construction and other related costs for redevelopment of Titus Station, a 200-acre industrial-zoned property in the county
Project Allocation10,000,000
(D) Acquisition, construction, infrastructure, rehabilitation and other related costs for expansion of Frecon Farms
Project Allocation5,000,000
(ii.1) Reading Redevelopment Authority
(A) Acquisition, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for 212 S. 8th Street and surrounding properties
Project Allocation10,000,000
(B) Acquisition, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for 7th Street and Franklin Street as well as surrounding properties
Project Allocation10,000,000
(ii.2) Berks County Industrial Development Authority
(A) Acquisition, construction, infrastructure, renovation and other related costs for development projects in Berks County
Project Allocation10,000,000
(iii) City of Reading
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment and rehabilitation of several buildings and properties in the area of 7th and Franklin Streets
Project Allocation30,000,000
(B) Construction, infrastructure, acquisition, renovation and rehabilitation relating to the general renovation and upgrade of the Santander Performing Arts Center
Project Allocation10,000,000
(C) Construction, acquisition, infrastructure, renovation and rehabilitation relating to the general renovation and upgrade of the Santander Arena
Project Allocation10,000,000
(D) Construction, acquisition, infrastructure, renovation and rehabilitation of a project involving the building of a new state-of-the-art early learning academy, with related academic training and support programs
Project Allocation16,500,000
(E) Renovation, rehabilitation and infrastructure relating to upgrades and renovations to an existing structure for the Reading Area Community College Weitz Health Pavilion
Project Allocation10,000,000
(F) Construction, acquisition, infrastructure, renovation and rehabilitation relating to a new support or academic facility for college and community use
Project Allocation5,000,000
(G) Renovation, restoration, construction, infrastructure improvements and other related costs to enhance and modernize the Reading Public Museum
Project Allocation5,000,000
(H) Construction, infrastructure and other related costs for an early learning center at Albright College
Project Allocation1,500,000
(I) Construction, infrastructure and other related costs for Albright College Co-Generation Plant expansion project
Project Allocation2,500,000
(J) Construction, infrastructure and other related costs for Albright College Track and Field Facility project
Project Allocation1,500,000
(K) Construction, infrastructure and other related costs for Albright College Library Holocaust Resource Center project
Project Allocation500,000
(L) Renovation, restoration, reconstruction, infrastructure improvements and related costs for Reading Public Museum
Project Allocation1,112,000
(M) Construction, infrastructure improvements and other related costs for installation of a natural gas refueling station at Evergreen Community Power site
Project Allocation5,000,000
(N) Construction, reconstruction, rehabilitation, remediation, infrastructure improvements and other related costs for redevelopment of existing building at Evergreen Community Power site
Project Allocation5,000,000
(O) Construction, infrastructure improvements and related costs for the Reading Area Community College Berks Hall renovation and conservation project
Project Allocation600,000
(P) Construction, infrastructure improvements and related costs for the Reading Area Community College pedestrian safety, gateway and traffic improvement project
Project Allocation1,178,000
(iii.1) Bernville Borough
(A) Acquisition, construction and other related costs for a new borough hall, library, police department, fire station and community center at the same location
Project Allocation3,500,000
(iii.2) Mohnton Borough
(A) Construction, infrastructure, redevelopment, renovation and other related costs for a Holocaust Museum
Project Allocation1,750,000
(iii.3) West Reading Borough
(A) Acquisition, infrastructure, renovations and other related costs for Reading Health System surgical tower and related facilities
Project Allocation3,500,000
(iv) Wyomissing Borough
(A) Acquisition, demolition, environmental remediation, infrastructure, site work, redevelopment, construction and related costs for blighted and underutilized sites intended for redevelopment
Project Allocation10,000,000
(v) Bern Township
(A) Construction, acquisition, redevelopment and other costs to develop a portion of Reading Regional Airport Authority-owned land for an end-user, with the potential for a maintenance and overhaul (MRO) operator and amenities other than fuel
Project Allocation8,400,000
(B) Construction, infrastructure, redevelopment, renovation and other related costs for Penn State Health St. Joseph Regional Medical Center
Project Allocation6,000,000
(v.1) Maxatawny Township
(A) Acquisition, construction, infrastructure, renovation and other related costs for an expansion project at the Rodale Institute
Project Allocation5,000,000
(vi) Muhlenberg Township
(A) Construction, facility improvements and renovations for the KidsPeace Berks campus
Project Allocation1,000,000
(B) Acquisition, infrastructure, renovations and other related costs for NKG Metals facility redevelopment and reuse project
Project Allocation5,000,000
(C) Acquisition, infrastructure, renovations and other related costs for Fifth Street Highway Corridor revitalization project
Project Allocation10,000,000
(vii) Ontelaunee Township
(A) Design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a copper tubing manufacturing facility
Project Allocation3,000,000
(7) Blair County
(i) County projects
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements related to energy, transportation, parking and common areas and other related costs for expansion, historic preservation and development of Conemaugh Nason Medical Center
Project Allocation5,000,000
(B) Acquisition, construction, restoration, historic preservation and other related costs for a rail heritage development project with the Railroaders Memorial Museum
Project Allocation40,000,000
(ii) Altoona-Blair County Development Corporation
(A) Construction, infrastructure, rehabilitation and other related costs for upgrades and improvements to the Peoples Natural Gas Field baseball stadium
Project Allocation10,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of a facility or facilities of the Southern Alleghenies Museum of Art
Project Allocation1,000,000
(8) Bradford County
(i) (Reserved)
(9) Bucks County
(i) County projects
(A) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a Lehigh Valley Health Network Facility 1
Project Allocation10,000,000
(B) Construction, infrastructure, renovation, rehabilitation and other costs related to the construction and renovation of bridges, trails, locks and other structures along Delaware Canal State Park
Project Allocation3,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of a life sciences advance manufacturing facility
Project Allocation15,000,000
(D) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction or renovation of buildings in order to utilize renewable energy or manufacture products to produce renewable energy
Project Allocation5,000,000
(E) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to waterway bank restoration projects and storm water management projects
Project Allocation5,000,000
(F) Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to a community mental health crisis center
Project Allocation2,500,000
(G) Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to the acquisition, renovation and construction of facilities for workforce development
Project Allocation5,000,000
(H) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(I) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(J) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation3,000,000
(ii) Bucks County Industrial Development Authority
(A) Construction, infrastructure, renovation and other related costs for water, sewer, commercial and industrial projects in Bensalem Township
Project Allocation3,000,000
(B) Acquisition, construction, infrastructure and abatement of hazardous materials for a mixed-use development project in Quakertown Borough
Project Allocation5,000,000
(C) Acquisition of land and other related costs for future construction and manufacturing expansion at the Klover III Panel Shop
Project Allocation5,000,000
(D) Acquisition, construction and other related costs for future construction of a crane-served building for increased engineering-related and manufacturing-related job expansion at the Klover III Panel Shop
Project Allocation11,000,000
(E) Construction, acquisition, infrastructure, redevelopment and other costs related to a mixed-use development project located at the corner of West Broad and Front Streets in Quakertown Borough
Project Allocation2,500,000
(F) Acquisition, construction and other related costs to purchase a prepared storage yard and construct a crane-served building for Klover Contracting in Richland Township
Project Allocation7,250,000
(iii) Redevelopment Authority of the County of Bucks
(A) Infrastructure, redevelopment, renovation, rehabilitation and other related costs to repurpose a former military site in Warminster Township
Project Allocation5,000,000
(B) Infrastructure, redevelopment and other related costs for an economic development project along the Delaware River in Bensalem Township
Project Allocation5,000,000
(C) Construction, redevelopment, renovation and other related costs for a historic building in Bristol Borough
Project Allocation500,000
(D) Construction, redevelopment and infrastructure for the installation of curbs and sidewalks and storm water management in Bensalem Township
Project Allocation5,000,000
(E) Construction, redevelopment, rehabilitation and other related costs for the Mill Race Inn site in Northampton Township
Project Allocation3,000,000
(F) Acquisition, construction, infrastructure, hazardous material remediation and other related costs for the Neshaminy Mall site in Bensalem Township
Project Allocation10,000,000
(G) Acquisition and construction for corporate headquarters development project in Bensalem Township
Project Allocation10,000,000
(H) Acquisition, rehabilitation, infrastructure, flood mitigation and associated costs for a riverfront redevelopment project
Project Allocation10,000,000
(iv) Bristol Borough
(A) Acquisition, construction and infrastructure for a new consolidated fire station in the borough
Project Allocation1,500,000
(v) Doylestown Borough
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to the renovation of a former PennDOT building and construction of additional structures for a regional police facility and mixed-use complex
Project Allocation2,500,000
(vi) Morrisville Borough
(A) Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to the acquisition and renovation of an existing building for affordable housing
Project Allocation3,000,000
(vii) New Hope Borough
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to the land acquisition and construction of a parking garage
Project Allocation4,000,000
(viii) Perkasie Borough
(A) Construction, infrastructure, redevelopment and other related costs for the Pennridge Airport Business Park
Project Allocation10,000,000
(B) Construction, infrastructure, redevelopment and other related costs for a retail/entertainment development project in downtown Perkasie Borough
Project Allocation750,000
(ix) Bensalem Township
(A) Construction and other related costs for the installation of a new drainage infrastructure project for the Bensalem Township County Club
Project Allocation1,000,000
(B) Construction and renovation of a recreational facility located in the township
Project Allocation1,000,000
(x) Bristol Township
(A) Infrastructure, construction and other related costs for a new fire and rescue services building in the township
Project Allocation2,500,000
(B) Infrastructure, construction and other related costs for a new fire and rescue services building
Project Allocation2,500,000
(C) Construction, reconstruction, renovation, infrastructure, improvements related to energy, transportation, parking and common areas and all other related costs for expansion and renovation of an existing facility
Project Allocation5,000,000
(D) Site preparation, construction, acquisition, preparation, infrastructure and other related costs to be used for the redevelopment of buildings and facilities at Lower Bucks Hospital
Project Allocation525,000
(xi) Buckingham Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the development of the PA Biotechnology Center Research Clusters
Project Allocation10,000,000
(xii) Doylestown Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of the former county nursing home into a mixed-use facility
Project Allocation5,000,000
(B) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the renovation and construction of a forensic diversion, treatment and rehabilitation center for mental health and substance abuse treatment and rehabilitation on land owned by Bucks County
Project Allocation4,000,000
(xiii) Doylestown Township and New Britain Borough
(A) Construction, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to the construction and renovation of three major capital projects at the Delaware Valley University relating to a mixed-use, multigenerational housing and health care development; the redevelopment of the campus gateway and main entrance to include a boutique hotel and conference center; and renovations to student housing buildings
Project Allocation40,000,000
(xiv) Falls Township
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to the renovation and expansion of a historic fire house to accommodate necessary fire equipment, firefighter accommodations and a community room
Project Allocation200,000,000
(B) Acquisition, construction, infrastructure and other related costs for the Keystone Trade Center Project
Project Allocation10,000,000
(xv) Lower Makefield Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction and/or renovation of Municipal Complex and Police Department
Project Allocation10,000,000
(xvi) Lower Southampton Township
(A) Construction, renovation and other related costs for projects at a swimming complex located in the township
Project Allocation1,000,000
(xvii) Middletown Township
(A) Infrastructure, construction, demolition, abatement of hazardous materials and other related costs for redevelopment of the township's Department of Public Works yard and facilities
Project Allocation5,000,000
(B) Construction, redevelopment and other related costs for a new education and training building and the renovation of an existing building for Woods Education and Training Center
Project Allocation1,000,000
(xviii) Northampton Township
(A) Construction, infrastructure and other related costs for a new fire station
Project Allocation2,000,000
(xviii.1) Plumstead Township
(A) Construction, renovation and other related costs for renovations to Plumsteadville Volunteer Fire Company Station 24
Project Allocation800,000
(B) Demolition, construction and other related costs for the demolition of an old fire house and the construction of a replacement structure for Plumsteadville Volunteer Fire Company Station 20
Project Allocation600,000
(xix) Richland Township
(A) Acquisition, construction, infrastructure and other related costs for the expansion of St. Luke's Upper Bucks Campus to meet the growing health care needs of the community
Project Allocation10,000,000
(xx) Solebury Township
(A) Construction, infrastructure and other related costs to build a new facility and parking areas for the Bucks County Children's Museum
Project Allocation500,000
(xxi) Warwick Township
(A) Construction of sidewalks and street frontages in the township
Project Allocation1,500,000
(10) Butler County
(i) County projects
(A) Site preparation, environmental remediation, development and redevelopment, infrastructure, construction and other related costs for economic development in the county
Project Allocation15,000,000
(B) Acquisition, construction, renovation and other related costs for a firm in Marshall Township to acquire a robotics and manufacturing test facility or proving grounds in the fields of automation, transportation and technology
Project Allocation600,000
(C) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation7,000,000
(ii) Butler County Community Development Corporation
(A) Acquisition, infrastructure, abatement of hazardous materials, rehabilitation, construction and other related costs for a Bantam Jeep Events Center
Project Allocation2,000,000
(iii) Cranberry Township
(A) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs for expansion and improvement of the Kawneer facilities
Project Allocation10,000,000
(B) Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for parks, recreational and open space in the township
Project Allocation2,000,000
(C) Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for economic development projects in the township
Project Allocation5,000,000
(D) Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for the Cranberry Township Municipal Center
Project Allocation2,500,000
(E) Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for township-owned facilities
Project Allocation5,000,000
(iv) Slippery Rock Township
(A) Acquisition, infrastructure, renovation, redevelopment, construction and other related costs for Slippery Rock University Foundation development
Project Allocation1,500,000
(v) Zelienople Borough
(A) Construction, infrastructure, redevelopment and other related costs for development of Sensory House Museum on Glade Run's Zelienople campus for individuals with autism and other developmental disabilities
Project Allocation1,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for a new fire station for Harmony Fire District
Project Allocation2,500,000
(11) Cambria County
(i) County projects
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, equipment upgrades and other related costs for expansion of a community dental center
Project Allocation2,500,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for a cultural, civic and historical community development project
Project Allocation5,000,000
(C) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for a regional economic development project
Project Allocation5,000,000
(D) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements related to energy, transportation, parking and common areas and other related costs for expansion, historic preservation and development of Conemaugh Health System
Project Allocation5,000,000
(E) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for an economic development project at John Murtha Johnstown-Cambria County Airport
Project Allocation5,000,000
(F) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for an infrastructure and facility improvement project at Saint Francis University
Project Allocation7,500,000
(G) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous materials assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for development, expansion, renovation, redevelopment, reuse, historic preservation and green development of any Conemaugh Health System new or existing facility located in the county
Project Allocation5,000,000
(H) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous materials assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for development, expansion, renovation, redevelopment, reuse, historic preservation and green development of an economic development project located at the John Murtha Johnstown-Cambria County Airport in Richland Township
Project Allocation5,000,000
(I) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(J) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(K) Construction, acquisition, redevelopment and other related costs for the installation of communications infrastructure in the county
Project Allocation9,000,000
(L) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development of building and grounds, and all other related costs for the development of a Community Health Wellness and Recreation Facility in the county
Project Allocation10,000,000
(i.1) Cambria County Redevelopment Authority
(A) Acquisition, renovation, redevelopment, construction, infrastructure and other related costs for the development of the Mid Atlantic Opportunity Park at Jack Murtha Cambria County Airport
Project Allocation10,000,000
(ii) City of Johnstown
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous materials assessment and remediation, infrastructure improvement, including improvements related to energy, transportation, parking and common areas, and all other related costs for development, expansion, renovation, redevelopment, reuse, historic preservation and green development of the Cambria County War Memorial
Project Allocation5,000,000
(B) Construction and other related costs of a new firehouse and Public Safety Administration Building for the city
Project Allocation3,000,000
(C) Economic development activities, including acquisition, construction, demolition, rehabilitation, infrastructure, installation of energy-efficient equipment and systems, for a pharmaceutical manufacturing facility
Project Allocation10,000,000
(D) Construction, infrastructure, acquisition, renovation, rehabilitation and other related costs to upgrade a facility at the Cambria County War Memorial site
Project Allocation1,000,000
(E) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs to develop a civic center in the city
Project Allocation3,000,000
(F) Acquisition, construction, demolition, rehabilitation, infrastructure, energy systems and equipment and other related costs for a pharmaceutical manufacturing facility
Project Allocation10,000,000
(iii) Cresson Township
(A) Acquisition, construction, demolition, renovation, rehabilitation, infrastructure and other related costs for the Mount Aloysius College campus
Project Allocation10,000,000
(B) Construction, infrastructure, renovation, rehabilitation and other related costs for the redevelopment of Ihmsen Hall at Mount Aloysius College
Project Allocation5,000,000
(12) Cameron County
(i) (Reserved)
(13) Carbon County
(i) County projects
(A) Construction, site development, infrastructure and other related costs for an educational facility located at Lehigh Carbon Community College
Project Allocation4,000,000
(B) Acquisition, construction, renovation, infrastructure and other related costs for expansion of the Carbon County Correctional facility
Project Allocation5,000,000
(C) Acquisition, demolition, construction, site development, infrastructure improvements and other related costs for economic development projects in the county
Project Allocation7,500,000
(D) Acquisition, demolition, construction, infrastructure improvements and other related costs to repurpose sites within Nesquehoning Borough
Project Allocation10,000,000
(E) Construction, infrastructure, abatement of hazardous materials and other related costs for rehabilitation, renovation, equipment and expansion of the county Human Services building
Project Allocation2,500,000
(F) Infrastructure, abatement of hazardous materials, rehabilitation and other related costs for the renovation and expansion of office space for the county, including equipment and furniture costs in Jim Thorpe Borough
Project Allocation2,500,000
(ii) Reading Blue Mountain and Northern Railroad
(A) Acquisition, redevelopment, rehabilitation and other related costs for renovation of buildings and grounds of the Nesquehoning plant to support anthracite coal shipping domestically and internationally
Project Allocation1,000,000
(ii.1) Carbon Chamber and Economic Development Corporation
(A) Construction, infrastructure, abatement of hazardous materials, rehabilitation and other related costs for the redevelopment of a former industrial site in Nesquehoning Borough
Project Allocation4,000,000
(iii) Bowmanstown Borough
(A) Construction, infrastructure and other related costs for a new fire station, borough hall and emergency shelter
Project Allocation1,000,000
(iv) Nesquehoning Borough
(A) Acquisition, redevelopment and other related costs for the renovation of current buildings and grounds and for repair and maintenance of open-top and covered hoppers to support anthracite coal shipping domestically and internationally
Project Allocation1,000,000
(v) Palmerton Borough
(A) Acquisition, site preparation, abatement, development, construction and infrastructure, including improvements related to energy and water utilities, on the former site of the New Jersey Zinc Company (West Plant)
Project Allocation20,000,000
(14) Centre County
(i) County projects
(A) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(C) Acquisition, infrastructure, construction and other related costs for rehabilitation and expansion of Memorial Field and Central Parklet in State College Borough
Project Allocation8,000,000
(D) Acquisition, infrastructure, construction and other related costs for centralized, all-inclusive YMCA multisports facility
Project Allocation10,000,000
(E) Construction, infrastructure, acquisition and other related costs for development of natural gas services
Project Allocation5,000,000
(i.1) Geisinger Authority
(A) Construction, infrastructure, redevelopment, renovation and other related costs for expanded access to primary and specialty care project
Project Allocation3,000,000
(ii) Moshannon Valley Economic Development Partnership, Inc.
(A) Construction and other related costs for a new Moshannon Valley Emergency Medical Services ambulance headquarters building
Project Allocation2,000,000
(iii) The Pennsylvania State University
(A) Critical infrastructure improvements to athletic facilities at University Park campus
Project Allocation150,000,000
(iv) State College Borough
(A) Construction, infrastructure and other related costs for mixed-use development, including retail, hotel, residential and parking
Project Allocation5,000,000
(15) Chester County
(i) County projects
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to enable the deployment of a facility that will permit a regionalized, coordinated or countywide delivery of emergency response services
Project Allocation10,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to construct a multiuse, income-based, affordable housing complex with an emphasis on veterans housing
Project Allocation10,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to deploy utility scale solar energy or other alternative green energy sources
Project Allocation10,000,000
(D) Acquisition, infrastructure, remediation, renovation, construction and other related costs for the adaptive reuse of historical assets (both land and buildings) throughout the county
Project Allocation10,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(G) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research, provide medical education and other related activities for Penn Medicine and its affiliates
Project Allocation20,000,000
(H) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation3,000,000
(I) Acquisition, construction, demolition, reconstruction, rehabilitation, remediation, renovation, infrastructure improvements, lot stabilization and other related costs for the redevelopment of the mushroom industry
Project Allocation40,000,000
(ii) City of Coatesville
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of a new public safety, fire, police and EMS station
Project Allocation15,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of an economic development project to include retail, commercial, manufacturing, industrial and housing projects
Project Allocation20,000,000
(iii) City of Coatesville and Valley Township
(A) Acquisition, infrastructure, remediation, construction and other related costs for the economic development of the National Sports Events Center
Project Allocation10,000,000
(iv) Downingtown Borough
(A) Acquisition, infrastructure, remediation, renovation, construction and other related costs for the redevelopment of the former industrial maintenance yard
Project Allocation10,000,000
(v) Kennett Square Borough
(A) Acquisition, infrastructure, remediation, renovation, construction and other related costs for redeveloping a former industrial site
Project Allocation5,000,000
(B) Site preparation, construction, acquisition, preparation, infrastructure and other related costs for the redevelopment of the Kennett Library
Project Allocation3,000,000
(vi) Modena Borough
(A) Infrastructure, remediation, renovation, construction and other related costs for the rehabilitation of historic buildings and new municipal construction
Project Allocation2,000,000
(vi.1) Phoenixville Borough
(A) Construction, infrastructure improvements and other costs related to Colonial Theatre expansion project
Project Allocation4,000,000
(B) Mixed-use development, including construction, infrastructure, acquisition and related costs at former Phoenix Steel site
Project Allocation5,000,000
(C) Construction, acquisition, infrastructure, redevelopment and other related costs for parking garage and reconstruction of transit service trestle bridge
Project Allocation2,000,000
(D) Construction, renovation and other related costs for upgrades to Reeves Park, including renovations to historic memorials and Civil War-era display
Project Allocation750,000
(vii) West Chester Borough
(A) Acquisition, infrastructure, remediation, abatement of hazardous materials, renovation, construction and other costs related to the development and expansion of a West Chester train line and transportation center
Project Allocation20,000,000
(B) Site preparation, construction, infrastructure and other related costs for the renovation and redevelopment of a community cafe and culinary institute with expanded workforce development training facilities, a health and wellness clinic and a day-care facility at the Charles A. Melton Arts & Education Center
Project Allocation3,000,000
(C) Site preparation, construction and other related costs for the revitalization and redevelopment of the Charles A. Melton Arts & Education Center
Project Allocation5,000,000
(D) Acquisition, construction, infrastructure and other related costs for West Chester Borough redevelopment projects
Project Allocation7,000,000
(E) Acquisition, construction, infrastructure and other related costs for former biopharma site redevelopment projects
Project Allocation2,500,000
(viii) Berwyn Township
(A) Acquisition, construction, demolition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to infrastructure improvements at Berwyn Fire Company
Project Allocation4,500,000
(viii.1) Birmingham Township
(A) Site preparation, construction, adaptive reuse and other related costs for the development of a museum and education center on Linden Farm on Brandywine Battlefield
Project Allocation1,200,000
(ix) East Fallowfield Township
(A) Acquisition, infrastructure, remediation, renovation, construction and other related costs for the development of a new municipal building
Project Allocation1,500,000
(x) East Goshen Township
(A) Acquisition, construction, redevelopment, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to enhancements at the CTDI manufacturing facility, distribution center and headquarters
Project Allocation10,000,000
(x.1) East Marlborough Township
(A) Infrastructure, construction, preparation and other related costs for a wastewater treatment facility at Longwood Gardens
Project Allocation1,000,000
(x.2) East Whiteland Township
(A) Construction, site preparation, demolition, infrastructure, acquisition and other costs for an economic development project
Project Allocation10,000,000
(xi) Elk Township
(A) Infrastructure, remediation, renovation, construction and other related costs for redevelopment and expansion projects at the South Mill Champs mushroom facility
Project Allocation5,000,000
(xii) Kennett Township
(A) Construction, infrastructure and other related costs for a Kennett Area Community Service (KACS) facility
Project Allocation5,000,000
(xiii) London Grove Township
(A) Demolition, infrastructure, environmental remediation, site work, construction and other related costs necessary to construct a materials recovery facility for rural, single-stream recycling at the Southeastern Chester County Refuse Authority landfill
Project Allocation3,000,000
(xiv) New Garden Township
(A) Infrastructure, remediation, renovation, construction and other related costs for the rehabilitation and renovation of a former 137-acre day camp into a regional park and amphitheater for public use
Project Allocation5,000,000
(xv) Sadsbury Township
(A) Acquisition, construction, renovation, rehabilitation, infrastructure, redevelopment and other costs related to economic development projects at 110 Stewart Huston Drive
Project Allocation5,000,000
(B) Acquisition, construction, renovation, rehabilitation, infrastructure, redevelopment and other related costs for the enhancements at an International Paper manufacturing or distribution site
Project Allocation5,000,000
(xvi) Schuylkill Township
(A) Construction and other related costs for renovations to municipal complex, including police indoor shooting range, installation of geothermal and solar and new outbuilding
Project Allocation1,250,000
(B) Construction, renovation, demolition, abatement of hazardous chemicals and other related costs for fire company apparatus
Project Allocation4,500,000
(xvii) West Goshen Township
(A) Acquisition, construction, infrastructure and other related costs for the expansion and redevelopment of Carlino's Market food manufacturing facility
Project Allocation2,500,000
(xviii) Westtown Township
(A) Acquisition, infrastructure, site preparation and other related costs associated with the redevelopment of Crebilly Farm
Project Allocation14,500,000
(16) Clarion County
(i) County projects
(A) Acquisition, infrastructure, equipment, abatement of hazardous materials, construction and other related costs for upgrades and improvements to the Modern Living Solutions site
Project Allocation2,500,000
(B) Construction, infrastructure and other related costs for renovations of the Foxburg Country Club and golf course
Project Allocation2,000,000
(C) Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for county facility projects
Project Allocation10,000,000
(D) Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for open space, trail, tourism and outdoor recreation projects
Project Allocation10,000,000
(E) Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for economic development and community revitalization projects
Project Allocation10,000,000
(ii) Knox Borough
(A) Acquisition, construction, infrastructure, equipment, redevelopment and other related costs for an economic development project
Project Allocation5,000,000
(17) Clearfield County
(i) (Reserved)
(ii) Clearly Ahead - Clearfield County Economic Development Corporation
(A) Infrastructure, redevelopment and other related costs for design and construction of a shell building in Curwensville Borough
Project Allocation2,000,000
(B) Infrastructure, redevelopment and other related costs for design and construction of a shell building in Lawrence Township
Project Allocation2,250,000
(iii) Sandy Township
(A) Construction, infrastructure and other related costs for an indoor sports complex, parking area, storm water management, associated utility extensions and a traffic control device
Project Allocation2,050,000
(18) Clinton County
(i) (Reserved)
(19) Columbia County
(i) County projects
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county
Project Allocation5,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county
Project Allocation10,000,000
(ii) Columbia County Housing and Redevelopment Authorities
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for expansion of the Berwick YMCA, including space for a basketball court and additional parking
Project Allocation2,000,000
(B) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure, redevelopment and other related costs for the expansion of the Bloomsburg YMCA for a new child-care facility
Project Allocation3,000,000
(20) Crawford County
(i) County projects
(A) Construction, infrastructure and other related costs for Bethesda Lutheran Services
Project Allocation1,500,000
(ii) Economic Progress Alliance of Crawford County
(A) Acquisition, construction, infrastructure, site planning, storm water management, abatement of hazardous materials and other related costs for phases of development at the Cochranton Community Services Complex
Project Allocation1,000,000
(B) Acquisition, construction, infrastructure, site planning, storm water management, abatement of hazardous materials and other related costs for phases of development at the Linesville Business Park
Project Allocation2,000,000
(C) Land and right-of-way acquisition, planning, permitting, rehabilitation, construction and other related costs for economic development projects in and around the Keystone Regional Industrial Park and surrounding regional areas
Project Allocation20,000,000
(D) Acquisition, construction, infrastructure and other related costs for redevelopment and expansion of Meadville Medical Center
Project Allocation25,000,000
(iii) Borough of Conneaut Lake
(A) Construction, infrastructure, redevelopment and other related costs for revitalization of the downtown business district
Project Allocation4,000,000
(21) Cumberland County
(i) County projects
(A) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for redevelopment and/or expansion of Williams Grove Historical Steam Engine site
Project Allocation2,500,000
(B) Site preparation, acquisition, remediation, renovation, construction, redevelopment, infrastructure and other costs associated with the development of a PA Agriculture Discovery Center attraction
Project Allocation10,000,000
(ii) Cumberland Area Economic Development Corporation
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the Central Penn College campus
Project Allocation5,000,000
(B) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for a redevelopment and renovation project in Silver Spring Township
Project Allocation5,000,000
(C) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for a freestanding rehabilitation hospital located in Hampden Township
Project Allocation10,000,000
(D) Acquisition, construction, redevelopment, renovation, infrastructure, abatement of hazardous materials and other related costs for improvements to a Safe Harbour facility
Project Allocation1,250,000
(E) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for renovation of farm land buildings in Monroe Township
Project Allocation4,000,000
(iii) Cumberland County Industrial Development Authority
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the historic Penn Harris Hotel located in East Pennsboro Township
Project Allocation5,000,000
(B) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for the redevelopment and renovation of the historic Penn Harris Hotel
Project Allocation5,000,000
(iv) Susquehanna Area Regional Airport Authority
(A) Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for safety improvements and economic development at Capital City Airport
Project Allocation1,500,000
(iv.1) East Pennsboro Township
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the redevelopment of an existing structure and property for the creation of a health care workforce training center at Central Penn College
Project Allocation2,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the development of community sports and recreational facilities at Central Penn College
Project Allocation5,000,000
(C) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the redevelopment of existing structures and property for affordable student housing at Central Penn College
Project Allocation2,000,000
(v) Hampden Township
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the Hampden Township Municipal Pool
Project Allocation2,000,000
(vi) Mechanicsburg Borough
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment of the Mechanicsburg Borough Downtown Partnership project
Project Allocation2,500,000
(vii) Silver Spring Township
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the Hempt Farms
Project Allocation10,000,000
(viii) South Middletown Township
(A) Acquisition, renovation, construction, infrastructure and other related costs for a community revitalization and economic development project in the township
Project Allocation5,000,000
(B) Acquisition, site preparation, renovation, construction, infrastructure and other associated costs for a community revitalization and economic development project
Project Allocation5,000,000
(C) Acquisition, site preparation, renovation, construction, infrastructure and other associated costs for the improvement, expansion, redevelopment and revitalization of the Carlisle Airport facilities
Project Allocation20,000,000
(22) Dauphin County
(i) County projects
(A) Site preparation, acquisition, remediation, renovation, construction, redevelopment, infrastructure and other related costs for development of a PA Agriculture Discovery Center attraction
Project Allocation10,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for a mixed-use commercial development project in Derry Township
Project Allocation5,000,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(D) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(ii) Redevelopment Authority of Harrisburg
(A) Acquisition, rehabilitation, construction, infrastructure and other related costs for economic development and growth of Harrisburg businesses
Project Allocation10,000,000
(B) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects in the City of Harrisburg
Project Allocation10,000,000
(ii.1) Capital Region Economic Development Corporation
(A) Modernization, construction, storm water management, electrical, exterior work and other related costs for the redevelopment and renovation of an old building in downtown Hershey
Project Allocation2,000,000
(iii) Harrisburg Land Bank
(A) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for rehabilitation and development along Paxton Creek
Project Allocation5,000,000
(iii.1) City of Harrisburg
(A) Acquisition and redevelopment costs for a commercial site at the corner of Green and Maclay Streets for the adaptive reuse of a new commercial and retail facility
Project Allocation2,000,000
(iii.2) Hummelstown Borough
(A) Acquisition, site preparation, renovation, construction, infrastructure, parking and other related costs associated with a redevelopment project
Project Allocation2,500,000
(iv) Lower Paxton Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a beverage production/processing facility and venue
Project Allocation2,500,000
(v) Lower Swatara Township
(A) Renovation and other related costs to revitalize six of Lower Swatara Township's playgrounds by updating current play equipment, adding ADA-compliant playground equipment and updating walkways to facilitate the use of wheelchairs
Project Allocation500,000
(vi) Swatara Township
(A) Acquisition, construction, redevelopment, renovation and other related costs associated with infrastructure investments, connectivity improvements, blight mitigation, business relocation and site remediation and redevelopment
Project Allocation2,000,000
(vii) West Hanover Township
(A) Acquisition, site preparation, infrastructure, construction, redevelopment, renovation, abatement of hazardous materials and other related costs for construction of a municipal complex facility
Project Allocation5,000,000
(23) Delaware County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for Share Food Program's Delaware County Hub Facility project
Project Allocation1,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(D) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation3,000,000
(ii) Delaware County Redevelopment Authority
(A) Construction, infrastructure, rehabilitation and other costs for Riddle Hospital in Middletown Township
Project Allocation10,000,000
(iii) City of Chester
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to the creation of integrated, community-based housing for people with disabilities
Project Allocation3,000,000
(iii.1) Aldan Borough
(A) Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the expansion and redevelopment of police and municipal buildings
Project Allocation1,250,000
(iv) Glenolden Borough
(A) Acquisition, construction and other related costs for recreational fields, maintenance facility and walking trails
Project Allocation500,000
(v) Morton Borough
(A) Construction, renovation and other related costs for improvements to municipal building, including police station, borough offices and community facilities
Project Allocation500,000
(vi) Norwood Borough
(A) Construction and other related costs for new firehouse
Project Allocation500,000
(vii) Prospect Park Borough
(A) Construction, redevelopment, rehabilitation and other related costs to revitalize a blighted business and civic district
Project Allocation800,000
(B) Construction, rehabilitation, site preparation, infrastructure, upgrades, renovation and other related costs for the improvement and redevelopment of Interboro School District
Project Allocation20,000,000
(viii) Ridley Park Borough
(A) Infrastructure improvements, construction, relocation, renovation and other related costs for Taylor Hospital
Project Allocation4,000,000
(ix) Yeadon Borough
(A) Construction, renovation and rehabilitation of the property to expand, update and add new updates to the Nile Swim Club
Project Allocation1,000,000
(ix.1) Aston Township
(A) Renovations, rehabilitation, site preparation, construction and other related costs for the development of a hockey rink at Neumann University
Project Allocation10,000,000
(x) Concord Township
(A) Construction and other related costs for Phase 1B and Phase 2 of the Octoraro Trail
Project Allocation1,000,000
(B) Acquisition of various parcels within the historic Ivy Mills District and potential Octoraro Trail connections
Project Allocation500,000
(C) Acquisition, construction, infrastructure and other related costs for the completion of the Garnet Valley Greenway Trail that transects the north and south of the township and connects important public resources
Project Allocation1,500,000
(xi) Marple Township
(A) Construction, infrastructure and other related costs for new municipal police station and magisterial district court
Project Allocation4,100,000
(B) Construction, infrastructure, rehabilitation, renovation and other related costs for Marple Township municipal and library building
Project Allocation654,000
(xi.1) Newtown Township
(A) Design, construction and all associated costs of a new Early Childhood Education Center and Recreational Facility for Garrett Williamson
Project Allocation5,000,000
(xii) Radnor Township
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to construction, redevelopment and rehabilitation projects to the Villanova University Campus
Project Allocation10,000,000
(B) Construction, renovation and rehabilitation of capital facilities, including infrastructure on campus of Cabrini College
Project Allocation10,000,000
(C) Construction, redevelopment and other related costs for projects relating to Creutzburg Center
Project Allocation1,050,000
(D) Construction, infrastructure and other related costs for project in Fenimore Woods Park
Project Allocation700,000
(E) Construction, infrastructure, redevelopment and other related costs for projects relating to Radnor Township Building
Project Allocation500,000
(F) Upgrades and deferred maintenance, Phase VII, for north Wayne flood mitigation
Project Allocation550,000
(G) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for the expansion and renovation of Radnor Fire Company's facilities
Project Allocation1,750,000
(H) Infrastructure, improvements, redevelopment, construction and other related costs for repairs and updates to a storm water management system
Project Allocation5,000,000
(xiii) Springfield Township
(A) Rehabilitation, renovation, infrastructure and other related costs for improvements to two business districts
Project Allocation1,000,000
(B) Renovations and other related costs for ADA accessibility requirements and upgrade facilities used for township public safety and emergency operation activities
Project Allocation500,000
(C) Renovation, infrastructure and other related costs for township parks and recreation projects
Project Allocation1,000,000
(D) Construction, infrastructure and other related costs for development of full-service hotel facility
Project Allocation3,000,000
(E) Renovation, infrastructure and other related costs for township building and police station
Project Allocation2,500,000
(xiv) Tinicum Township
(A) Construction, redevelopment, rehabilitation and other related costs for renovation of Lazaretto Quarantine Station for reuse as Tinicum Township Municipal Building
Project Allocation3,000,000
(xv) Tinicum Township and City of Philadelphia
(A) Planning, development, construction and other costs associated with cargo expansion at the Philadelphia International Airport and/or the infrastructure improvement projects at the Philadelphia International Airport or the Philadelphia Northeast Airport
Project Allocation30,000,000
(xvi) Upper Chichester Township
(A) Construction, infrastructure and other related costs for a library and resource center
Project Allocation1,000,000
(xvii) Upper Darby Township
(A) Construction, renovation, rehabilitation and abatement of hazardous materials relating to a major facility redevelopment project at Delaware County Community College to create a new Southeast campus
Project Allocation33,250,000
(B) Acquisition, infrastructure, renovation, rehabilitation, environmental remediation, construction and other related costs for a community and economic development project
Project Allocation6,000,000
(C) Redevelopment, construction, demolition, infrastructure and other related costs for the development of the Upper Darby Community Center
Project Allocation5,000,000
(xviii) Upper Darby Township and Clifton Heights and Millbourne Boroughs
(A) Acquisition, development, redevelopment, site work, remediation and project site infrastructure improvements to Upper Darby School District
Project Allocation80,000,000
(xix) Aldan, Colwyn, Darby, East Lansdowne, Lansdowne and Yeadon Boroughs
(A) Acquisition, development, redevelopment, site work, remediation and project site infrastructure improvements to William Penn School District
Project Allocation60,000,000
(24) Elk County
(i) (Reserved)
(ii) Bradford Office of Economic and Community Development
(A) Construction, infrastructure and other related costs for a new three-story building in downtown St. Marys, relocation of offices, meeting spaces and treatment program areas
Project Allocation2,100,000
(25) Erie County
(i) County projects
(A) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(C) Acquisition, construction, infrastructure improvements and other costs related to the L2S-NMI-ERIE Medical Device Assembly Plant project
Project Allocation500,000
(D) Acquisition, construction, infrastructure, redevelopment and other related costs for Erie Metropolitan Transit Authority projects
Project Allocation2,500,000
(E) Acquisition, construction, infrastructure, redevelopment and other related costs for CNG fueling station projects of Erie Metropolitan Transit Authority
Project Allocation2,500,000
(F) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation7,000,000
(ii) Corry Area Industrial Development Corporation
(A) Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for projects on vacant industrial facilities for one or more manufacturing units
Project Allocation5,000,000
(ii.1) Economic Development Corporation of Erie County
(A) Infrastructure, construction, redevelopment and other related costs for improvement of former potato chip factory
Project Allocation1,000,000
(ii.2) The Erie County General Authority
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for a commercial facility renovation project
Project Allocation20,000,000
(B) Acquisition, infrastructure, rehabilitation, environmental remediation, construction and other related costs for a brownfield redevelopment project
Project Allocation10,000,000
(C) Acquisition, infrastructure, rehabilitation, construction and other related costs for a business and industrial park project
Project Allocation20,000,000
(iii) Erie-Western Pennsylvania Port Authority
(A) Acquisition, infrastructure, construction, redevelopment, abatement of hazardous materials, renovation, rehabilitation and other related costs for existing and proposed waterfront development
Project Allocation30,000,000
(iv) Erie County Redevelopment Authority
(A) Acquisition, infrastructure, construction, redevelopment, abatement of hazardous materials, renovation, rehabilitation and other related costs for properties to promote development
Project Allocation5,000,000
(B) Acquisition, infrastructure, construction, abatement of hazardous materials, renovation, rehabilitation and other related costs for redevelopment of properties within the City of Corry to promote development
Project Allocation5,000,000
(C) Site acquisition for development, infrastructure and other related costs to create new business parks and space
Project Allocation25,000,000
(D) Construction, renovations and other related costs for expansion of the physician assistant program at Mercyhurst University in the City of Erie
Project Allocation5,000,000
(v) Erie Redevelopment Authority
(A) Construction, renovation, rehabilitation and other related costs for upgrades at senior care community
Project Allocation1,500,000
(vi) Redevelopment Authority in the City of Corry
(A) Infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for upgrades to multitenant manufacturing facilities
Project Allocation7,500,000
(vi.1) The Pennsylvania State University
(A) Construction, infrastructure, equipment and other related costs for education and research facilities at Knowledge Park at Penn State Behrend
Project Allocation15,000,000
(vii) Borough of Union City
(A) Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs for improvements and restoration to previous industrial sites
Project Allocation500,000
(B) Acquisition, infrastructure, construction and other related costs for the development of a trail system
Project Allocation500,000
(viii) City of Erie
(A) Infrastructure, construction and other related costs for public space improvements
Project Allocation5,000,000
(B) Infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for improvements to firehouses and police stations and creation of a joint public safety facility
Project Allocation15,000,000
(C) Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for development of sports complexes
Project Allocation10,000,000
(D) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for the development of sports complexes
Project Allocation15,000,000
(E) Acquisition, infrastructure, rehabilitation, construction and other related property improvement costs for building projects
Project Allocation25,000,000
(F) Acquisition, renovation, remediation and redevelopment of brownfield sites for new and expanding companies
Project Allocation10,000,000
(G) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for redevelopment of commercial and industrial corridors
Project Allocation20,000,000
(H) Construction, renovation and other costs related to the redevelopment of exhibits, buildings, pathways, parking areas and other facilities and projects at Erie Zoo
Project Allocation5,000,000
(I) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for redevelopment of a business or industrial park
Project Allocation5,000,000
(J) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for historic preservation and cultural asset improvements
Project Allocation5,000,000
(K) Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for an economic development project
Project Allocation5,000,000
(L) Site preparation, abatement, acquisition, construction, expansion, demolition, rehabilitation, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation25,000,000
(M) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for an expansion project at Mercyhurst University
Project Allocation5,000,000
(26) Fayette County
(i) County projects
(A) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(C) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(ii) Fay-Penn Economic Development Council
(A) Acquisition, infrastructure, construction and other related costs for countywide economic development
Project Allocation25,000,000
(iii) Dunbar Borough
(A) Acquisition, infrastructure, construction and other related costs for the expansion of a facility to accommodate growing trucking fleet operations
Project Allocation2,000,000
(iv) South Union Township
(A) Engineering, construction, renovation and other related costs for the Uniontown Area YMCA
Project Allocation7,500,000
(27) Forest County
(i) (Reserved)
(28) Franklin County
(i) County projects
(A) Construction, infrastructure, redevelopment and other improvements to the Wilson College campus
Project Allocation20,000,000
(ii) Franklin County Redevelopment Authority
(A) Acquisition, site preparation, renovation, rehabilitation, infrastructure, construction and other related costs for development of Phase II of Herbruck's Poultry Ranch and Blue Springs Egg Farm expansion
Project Allocation5,000,000
(B) Acquisition, site preparation, renovation, rehabilitation, construction, infrastructure and other related costs for development of a pullet site to support Herbruck's Poultry Ranch and Blue Springs Egg Farm
Project Allocation5,000,000
(C) Acquisition, site preparation, remediation, infrastructure, renovation, construction and other related costs associated with a new facility to house the Cumberland Valley School of Music
Project Allocation750,000
(29) Fulton County
(i) (Reserved)
(30) Greene County
(i) County projects
(A) Acquisition, redevelopment, infrastructure, construction and other related costs for a Center for Economic Development facility and resources to build research, workforce readiness, social wellness, vocational and career development, and support educational initiatives, including early childhood education
Project Allocation5,000,000
(B) Acquisition, construction, site preparation, infrastructure and other related costs for community and economic development projects in the county
Project Allocation30,000,000
(C) Acquisition, construction, redevelopment, infrastructure and other related costs for a center for economic development at Waynesburg University
Project Allocation5,000,000
(D) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(E) Construction, infrastructure, land acquisition and other related costs to upgrade East Dunkard Water Authority's water treatment plant and distribution system
Project Allocation8,000,000
(F) Acquisition, infrastructure, construction and other related costs for an economic development project
Project Allocation7,500,000
(i.1) Franklin Township
(A) Acquisition, construction, infrastructure and other related costs for Waynesburg Crossings economic development project
Project Allocation2,000,000
(B) Acquisition, construction, infrastructure and other related costs for Franklin Township Business Park project
Project Allocation5,000,000
(ii) Perry Township
(A) Renovation and construction of the township building
Project Allocation1,000,000
(31) Huntingdon County
(i) County projects
(A) Acquisition, renovation, redevelopment, infrastructure, abatement of hazardous materials, construction and other related costs for expansion of Health and Wellness facilities of the Broad Top Area Medical Center, Inc.
Project Allocation7,000,000
(32) Indiana County
(i) County projects
(A) Acquisition, infrastructure, construction, renovation, abatement of hazardous materials and other related costs for Phase II rehabilitation of the Indiana County Education and Technology Center
Project Allocation5,000,000
(B) Acquisition, infrastructure, construction, renovation, abatement of hazardous materials and other related costs for capital projects, including recreational facilities and county fairground buildings at Mack Park
Project Allocation5,000,000
(C) Acquisition, infrastructure, construction, renovation, abatement of hazardous materials and other related costs for capital projects, including recreational and aquatic facilities at the YMCA of Indiana County
Project Allocation5,000,000
(D) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for historic preservation and/or redevelopment and blight remediation
Project Allocation8,000,000
(E) Acquisition, rehabilitation, infrastructure, construction and other related costs for business park site improvements and multitenant building development at Windy Ridge Business & Technology Park - Phases 3 through 5
Project Allocation10,000,000
(F) Acquisition, rehabilitation, infrastructure improvements, construction and other related costs for expansion of community health care services and educational and training partnerships through the Indiana Regional Medical Center
Project Allocation15,000,000
(G) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for historic preservation and/or green development in the county
Project Allocation75,000,000
(H) Acquisition, construction, infrastructure, abatement of hazardous materials, equipment upgrades and other related costs associated with development of clean coal technology
Project Allocation10,000,000
(I) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects
Project Allocation10,000,000
(J) Construction, infrastructure and other related costs for an Innovation and Entrepreneurship Center
Project Allocation5,000,000
(K) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for the advancement and preservation of historic, cultural and civic facilities and sites
Project Allocation8,000,000
(L) Construction, infrastructure and other related costs for countywide broadband fiber and wireless communications projects
Project Allocation9,000,000
(M) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects in Burrell Township
Project Allocation15,000,000
(N) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects in West Wheatfield Township and East Wheatfield Township
Project Allocation50,000,000
(O) Acquisition, rehabilitation, infrastructure, construction and related development costs for improvements at the Indiana County - Jimmy Stewart Airport
Project Allocation7,000,000
(P) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for the advancement and development of the Allegheny Arboretum at Indiana University of Pennsylvania's Confluence Discovery Park
Project Allocation10,000,000
(Q) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(R) Construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development and all other related costs for the development of a facility or facilities for the Indiana Regional Medical Center
Project Allocation10,000,000
(ii) Homer City Borough
(A) Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects, including development of a connecting trail between proposed economic development site and existing county-owned regional trail network to new rail trail spur
Project Allocation1,500,000
(33) Jefferson County
(i) (Reserved)
(34) Juniata County
(i) County projects
(A) Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project in Fayette Township
Project Allocation2,000,000
(ii) Juniata County Industrial Development Authority
(A) Development of natural gas infrastructure in the Juniata County Industrial Park, including construction, remediation, landscaping and other related costs for future expansion in the park
Project Allocation1,000,000
(B) Development of Phase V of the Juniata County Industrial Park, including grading, landscaping, construction of an access road, utilities, storm water management and all ancillary construction for pad-ready lots
Project Allocation5,000,000
(C) Construction, infrastructure, redevelopment and other related costs for the development of natural gas infrastructure, including pipeline construction, LNG storage and ancillary construction work
Project Allocation1,000,000
(35) Lackawanna County
(i) County projects
(A) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to a residential care facility specializing in brain injury care
Project Allocation6,000,000
(B) Acquisition, construction, renovation, rehabilitation and other costs related to Lackawanna County Park redevelopment and improvement projects
Project Allocation5,000,000
(C) Acquisition, construction, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other costs related to an economic project
Project Allocation20,000,000
(D) Infrastructure, improvements and acquisition for a sustainable energy project
Project Allocation10,000,000
(E) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the reconstruction and/or restoration of Valley View School District pool
Project Allocation1,500,000
(F) Construction, infrastructure and other costs relating to an indoor athletic field and training facility
Project Allocation10,000,000
(G) Construction, infrastructure and other costs related to the Valley View Business Park new building project
Project Allocation2,000,000
(H) Construction, infrastructure and other costs related to the Valley View Business Park Industrial Facility
Project Allocation5,000,000
(I) Acquisition, construction, infrastructure and other costs related to recreational facilities and housing projects for Keystone College
Project Allocation3,500,000
(J) Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility in or around Dickson City
Project Allocation10,000,000
(K) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(L) Acquisition, construction, redevelopment, infrastructure and other related costs for new fields and facilities and improvements to existing fields and facilities at Hillside Park
Project Allocation10,000,000
(M) Acquisition, construction, redevelopment, infrastructure and other related costs for new facilities and expansion of existing facilities of Abington Heights School District
Project Allocation10,000,000
(N) Acquisition, construction, redevelopment, infrastructure and other related costs for expansion of a sports facility within the Abington Heights School District
Project Allocation5,000,000
(O) Acquisition, construction, redevelopment, infrastructure and other related costs for consolidation, modernization and facility upgrades within the Abington Heights School District
Project Allocation10,000,000
(P) Acquisition, construction, infrastructure and other related costs for Valley View Business Park Industrial Facility
Project Allocation5,000,000
(Q) Acquisition, construction, renovations, infrastructure and other related costs for dental, medical, health sciences and patient care facilities project
Project Allocation20,000,000
(ii) City of Scranton
(A) Acquisition, construction, infrastructure, renovation, rehabilitation and other costs related to the relocation, renovation and/or expansion of buildings in the downtown business district
Project Allocation4,000,000
(B) Design, construction, infrastructure improvements, renovation and other costs related to a health-related clinical and academic community outreach facility at the University of Scranton
Project Allocation10,000,000
(C) Design, construction, infrastructure improvements, renovation and other costs related to a University of Scranton housing project
Project Allocation15,000,000
(D) Construction, infrastructure, acquisition, renovation, rehabilitation and other costs related to the site, replacement of specialized canopy and parking expansion of the Pavilion at Montage Mountain
Project Allocation5,000,000
(E) Construction, infrastructure, renovation, demolition and other costs related to the Scranton Enterprise Center renovation project
Project Allocation1,000,000
(F) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to the redevelopment of the Green Ridge neighborhood
Project Allocation2,000,000
(G) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the economic development project revitalizing riverfront property along the Lackawanna River
Project Allocation10,000,000
(H) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to renovations associated with the passenger rail station and modifications to the multimodal center
Project Allocation10,000,000
(I) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of West Linden Street
Project Allocation5,000,000
(J) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to a redevelopment project in the West Side
Project Allocation2,500,000
(K) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project along North South Road
Project Allocation5,000,000
(L) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project in the central business district
Project Allocation2,500,000
(M) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to economic development associated with the Neighborhood Commercial District revitalization project
Project Allocation5,000,000
(N) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project in South Scranton
Project Allocation2,500,000
(O) Acquisition, construction, infrastructure, renovation and other related costs for a health care facility
Project Allocation10,000,000
(P) Acquisition, construction, infrastructure, renovation and other related costs for a school of dentistry
Project Allocation10,000,000
(Q) Acquisition, construction, infrastructure, renovation and other related costs for a school of osteopathic medicine
Project Allocation10,000,000
(R) Acquisition, construction, infrastructure, renovation and other related costs for business and residential development in West Scranton
Project Allocation3,000,000
(S) Acquisition, construction, infrastructure, renovation and other related costs for business development in the downtown area
Project Allocation4,000,000
(T) Acquisition, construction, infrastructure, renovation and other related costs for business development project
Project Allocation4,000,000
(U) Acquisition, remediation and other related costs for a former, underutilized manufacturing facility
Project Allocation5,000,000
(V) Improvements, construction and other related costs for Downtown Scranton infrastructure improvements
Project Allocation3,000,000
(W) Construction, infrastructure and other related costs for streetscape project
Project Allocation3,000,000
(X) Acquisition, remediation and other related costs for vacant properties within the city to expand an existing business park
Project Allocation5,000,000
(Y) Construction, rehabilitation, infrastructure, site preparation and other related costs for improvements to parks, trails and recreation facilities
Project Allocation5,000,000
(Z) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for the development of a community center
Project Allocation5,000,000
(iii) Archbald Borough
(A) Construction, infrastructure and other costs relating to the Archbald Business Park Phase II Redevelopment Project
Project Allocation3,000,000
(B) Construction, infrastructure and other costs relating to the Archbald Route 6 Facility Redevelopment Project
Project Allocation4,000,000
(C) Construction, infrastructure and other costs related to the Valley View Business Park redevelopment project
Project Allocation2,500,000
(D) Acquisition, construction, infrastructure and other related costs for an economic development project in the borough
Project Allocation5,000,000
(iii.1) Dunmore Borough
(A) Acquisition, construction, infrastructure and other related costs for an economic development project in the borough
Project Allocation5,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovations and other related costs for the redevelopment of land along the highway system
Project Allocation5,000,000
(iii.2) Jermyn Borough
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation5,000,000
(iv) Jessup Borough
(A) Construction, infrastructure, renovations and other costs related to a new building at the Jessup Small Business Center
Project Allocation2,000,000
(B) Acquisition, construction, infrastructure, renovation and other costs related to the Valley View Business Park Interchange Project
Project Allocation10,000,000
(v) Moosic Borough
(A) Acquisition, construction, infrastructure, renovations and other costs related to a new building at the Glenmaura Corporate Center
Project Allocation2,000,000
(B) Construction, infrastructure improvements and other costs related to a redevelopment project at the Office Park at Montage Mountain
Project Allocation4,000,000
(v.1) Moscow Borough
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for senior housing development
Project Allocation4,000,000
(v.2) Vandling Borough
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation5,000,000
(vi) Carbondale Township
(A) Construction, infrastructure and other costs relating to the Carbondale Technology Transfer Center Multitenant Flex Project
Project Allocation1,000,000
(vii) Covington Township
(A) Construction, infrastructure improvements and other costs for the Moffat Estate redevelopment project
Project Allocation500,000
(viii) Fell Township
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation5,000,000
(viii.1) Greenfield Township
(A) Construction, infrastructure, acquisition, renovation and other related costs for a facility advancing pet therapy in the township
Project Allocation2,000,000
(ix) Glenburn Township
(A) Acquisition, construction, redevelopment, infrastructure and other related costs for municipal buildings
Project Allocation2,000,000
(x) Jefferson Township
(A) Construction, infrastructure and other costs related to the development of a commercial site and to provide sanitary sewer infrastructure for projects
Project Allocation1,000,000
(B) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historic or civic projects
Project Allocation5,000,000
(xi) Newton Township
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation5,000,000
(xii) Ransom Township
(A) Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects
Project Allocation5,000,000
(xiii) Scott Township
(A) Construction, infrastructure improvements, renovations and other costs related to the Scott Township Technology and Industrial Facility redevelopment project
Project Allocation3,000,000
(36) Lancaster County
(i) County projects
(A) Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for the development of the PA Agriculture Discovery Center
Project Allocation10,000,000
(B) Construction, infrastructure, site preparation and other related costs for a state-of-the-art Lancaster Environmental Center of Excellence facility
Project Allocation10,000,000
(C) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation20,000,000
(D) Construction and other related costs for DiaVac R&D Center and Manufacturing Facility for Diagnostic Biotechnology
Project Allocation10,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(G) Acquisition, construction, infrastructure, redevelopment and other related costs for a medical education building
Project Allocation20,000,000
(ii) Lancaster County Redevelopment Authority
(A) Acquisition, redevelopment, renovation, construction, infrastructure and other related costs for economic development projects in the county
Project Allocation15,000,000
(B) Acquisition, redevelopment, renovation, construction, infrastructure and other related costs for economic development of an agriculture education facility that supports manufacturing and demonstration projects
Project Allocation12,500,000
(C) Acquisition, redevelopment, renovation, construction, infrastructure and other related costs for Lancaster Life Sciences Incubator
Project Allocation10,000,000
(D) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for emergency medical services program
Project Allocation5,000,000
(E) Acquisition, redevelopment, renovation, construction, infrastructure, equipment and other related costs for modernization and expansion of the Schreiber Center for Pediatric Development
Project Allocation4,000,000
(F) Acquisition, site preparation, redevelopment, renovation, construction, infrastructure and other related costs for the development of the Brookside Medical Campus
Project Allocation4,000,000
(G) Construction, infrastructure and other related costs for the Centro Hispano Community Center
Project Allocation500,000
(H) Acquisition, construction, redevelopment and other related costs for the establishment of an aluminum extrusion facility in the county
Project Allocation3,500,000
(I) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation10,000,000
(J) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for community and economic development projects for an entity to provide a fitness-based mentoring program that focuses on long-term support for at-risk teens that have experienced childhood trauma, have behavioral challenges and are struggling academically
Project Allocation500,000
(ii.1) Redevelopment Authority of the County of Lancaster
(A) Acquisition, construction, infrastructure, site preparation, architectural and design and other related costs for development of Landis Place on Doe Run in Penn Township
Project Allocation5,000,000
(iii) City of Lancaster
(A) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for Lancaster Stockyards Surgical Center
Project Allocation10,000,000
(B) Construction and other related costs for improvements to the Centro Hispano Community Center
Project Allocation500,000
(C) Acquisition, construction, infrastructure, redevelopment and other related costs for North Prince Street redevelopment project
Project Allocation8,000,000
(D) Construction, infrastructure, redevelopment and other related costs for green infrastructure initiative
Project Allocation12,000,000
(E) Acquisition, design, infrastructure, construction and other related costs for a medical education building for Lancaster General College of Nursing and Applied Sciences
Project Allocation22,000,000
(F) Construction, infrastructure, acquisition, redevelopment and other related costs for multimodal safety improvements
Project Allocation2,000,000
(G) Acquisition, demolition, construction, infrastructure, site development and other related costs for public parks, recreation and open space
Project Allocation5,000,000
(H) Construction, infrastructure, acquisition, redevelopment, site development and other related costs to upgrade and improve facilities
Project Allocation5,000,000
(I) Acquisition, demolition, construction, infrastructure, development and other related costs for public works operations
Project Allocation4,000,000
(J) Construction, infrastructure, site preparation and other related costs for the development of a facility for environmental organizations in Lancaster County
Project Allocation10,000,000
(K) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the northeastern area of Lancaster
Project Allocation5,000,000
(L) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the northwestern area of Lancaster
Project Allocation5,000,000
(M) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the southwestern area of Lancaster
Project Allocation5,000,000
(N) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the southeastern area of Lancaster
Project Allocation5,000,000
(iv) Columbia Borough
(A) Construction, infrastructure, redevelopment and other related costs for a parking facility in the downtown to support existing businesses and attract new businesses
Project Allocation1,500,000
(B) Construction, infrastructure, abatement of hazardous materials and other related costs for the development of an innovation and technology campus on the property of the former McGinness Airport
Project Allocation3,000,000
(C) Acquisition, renovation, construction and associated costs for improvements at the National Watch and Clock Museum
Project Allocation2,500,000
(D) Construction, infrastructure and other related costs for the development of a regional recreation facility
Project Allocation2,750,000
(v) Bart Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(vi) East Cocalico Township
(A) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements
Project Allocation15,000,000
(vii) Lititz Regional Community Development Corporation
(A) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for Live Event Museum
Project Allocation20,000,000
(B) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project in Warwick Township
Project Allocation15,000,000
(C) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for community asset project in Warwick Township
Project Allocation15,000,000
(D) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project for Elizabeth Township
Project Allocation15,000,000
(E) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project in Elizabeth Township
Project Allocation15,000,000
(F) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project in Lititz Borough
Project Allocation15,000,000
(G) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for community asset project in Lititz Borough
Project Allocation15,000,000
(viii) Elizabethtown Borough
(A) Construction, infrastructure, renovation, rehabilitation and other related costs for the demolition of an existing building and the construction of a new fire station that will also house the Regional Emergency Management Agency
Project Allocation4,000,000
(B) Construction, renovation and other related costs to build new or renovate space designed to support health-related majors
Project Allocation2,500,000
(C) Construction, renovation and other related costs to renovate or create space to house a Health Services Center designed to support the physical and mental health needs of Elizabethtown College students and the community
Project Allocation750,000
(D) Acquisition, construction, redevelopment, renovation and other related costs to create new and extend existing walking, living and learning pathways and fitness trail designed to tie Elizabethtown Borough and Mt. Joy Township paths to campus pathways
Project Allocation1,500,000
(E) Construction, redevelopment, renovation and other related costs to expand connection to downtown Elizabethtown by renovating space for college-sponsored or small business locations as part of a mixed-use space on College Avenue and/or Market Street
Project Allocation500,000
(F) Acquisition, construction, redevelopment, renovation and other related costs to create living and learning space for graduate students
Project Allocation1,500,000
(G) Site development, infrastructure improvements, construction and renovation of space related to academic programs and/or residence halls at Elizabethtown College
Project Allocation2,500,000
(H) Renovation of Elizabethtown College's Thompson Gymnasium or creation, renovation, construction of other health and fitness facilities on campus designed to enhance student intramural opportunities and expand community programs
Project Allocation3,000,000
(I) Acquisition, construction, redevelopment, renovation and other related costs to renovate existing space into a boutique hotel or space that will provide short-term housing for business leaders in downtown Elizabethtown
Project Allocation2,500,000
(J) Construction, infrastructure, redevelopment, renovation and other related costs to transform a historically significant building into a Downtown Cultural and Welcome Center and improvements to public parking facilities
Project Allocation1,500,000
(K) Partial demolition, construction, infrastructure, redevelopment and other related costs for the renovation of the former Borough Public Works facility to develop operations and training space for the Elizabethtown Police Department and emergency management operations as well as meeting space for community organizations
Project Allocation743,000
(L) Construction, infrastructure, redevelopment and other related costs for the renovation of the existing police and government facility on Hanover Street to allow for reconfiguration of operational space for the Elizabethtown Police Department as well as safety and accessibility improvements for borough administration offices
Project Allocation633,000
(viii.1) Ephrata Borough
(A) Construction, renovation, infrastructure and other related costs for renovating and rehabilitating a retired Pennsylvania State Police barracks, located in Ephrata Township and owned by Ephrata Borough, into a multiuse training facility and construction of an exterior training yard
Project Allocation1,000,000
(viii.2) Manheim Borough
(A) Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for an economic development project
Project Allocation15,000,000
(B) Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for a community asset project
Project Allocation15,000,000
(ix) Millersville Borough
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(x) Mount Joy Borough
(A) Acquisition, redevelopment, construction, infrastructure, renovation and other related costs for expansion project at the Janus School
Project Allocation3,000,000
(B) Construction, redevelopment and other related costs for sidewalk connections and handicapped accessible ramps adjacent to three borough-owned public parks, completing public trail connections within these parks, creating a public parking lot and associated storm water, grading and restoration, raised pedestrian crosswalks and installation of pedestrian-activated Rectangular Rapid Flashing Beacons
Project Allocation500,000
(C) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xi) New Holland Borough
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xii) Quarryville Borough
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xiii) Colerain Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xiv) Drumore Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xv) Earl Township
(A) Construction, infrastructure, renovation and other related costs for a new multipurpose municipal building
Project Allocation1,250,000
(B) Construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for a combined heat and power facility for Garden Spot Village
Project Allocation2,000,000
(xvi) East Drumore Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xvii) East Lampeter Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(B) Permitting, construction, infrastructure, site preparation, various site fixed amenities and other related costs to support economic growth and redevelopment at Greenfield
Project Allocation15,000,000
(xviii) Eden Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xix) Fulton Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xx) Lancaster Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xxi) Leacock Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xxii) Little Britain Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xxii.1) Manheim Township
(A) Construction, abatement of hazardous materials, redevelopment, renovation and other related costs for the expansion of a commercial building, parking lot renovation, green space, sidewalk and storm water management
Project Allocation3,000,000
(B) Acquisition of land to an existing commercial property, construction, infrastructure, redevelopment and other related costs for a building expansion, parking lot extension and storm water management facilities
Project Allocation2,500,000
(C) Acquisition and other related costs to purchase a building that will accommodate the growth of Aaron's Acres
Project Allocation1,500,000
(xxiii) Martic Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(B) Acquisition, construction, infrastructure and other related costs for a recreational pedestrian bridge across Route 324 to enable safe passage between the eastern and western portions of the Enola Low Grade Trail
Project Allocation2,000,000
(xxiv) Mount Joy Township
(A) Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project
Project Allocation15,000,000
(xxv) Paradise Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xxvi) Penn Township
(A) Acquisition, site preparation, redevelopment, renovation, construction, infrastructure and other related costs for expansion of Pleasant View Communities
Project Allocation5,000,000
(B) Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for Fenner Precision's plant expansion project
Project Allocation30,000,000
(xxvii) Pequea Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xxviii) Providence Township
(A) Acquisition, construction, demolition, redevelopment and other related costs for an economic development project
Project Allocation1,000,000
(xxviii.1) Rapho Township
(A) Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for an economic development project
Project Allocation15,000,000
(xxix) Salisbury Township
(A) Construction, reconstruction, infrastructure, improvements, rehabilitation and other related costs to renovate and expand a facility
Project Allocation5,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment, remediation, infrastructure, improvements and other related costs for an economic development project
Project Allocation5,000,000
(xxx) Strasburg Borough
(A) Renovation, rehabilitation and construction protecting a National Registered Historic District providing for economic development
Project Allocation1,000,000
(37) Lawrence County
(i) County projects
(A) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(B) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(C) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation7,000,000
(ii) Lawrence County Economic Development Corporation
(A) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an Incubator/Makerspace
Project Allocation7,500,000
(B) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for county agribusinesses
Project Allocation7,500,000
(C) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Mahoning Township
Project Allocation10,000,000
(D) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Neshannock Township
Project Allocation10,000,000
(E) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in New Beaver Borough
Project Allocation10,000,000
(F) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in New Wilmington Borough
Project Allocation10,000,000
(G) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in North Beaver Township
Project Allocation10,000,000
(H) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Pulaski Township
Project Allocation10,000,000
(I) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Shenango Township
Project Allocation10,000,000
(J) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Taylor Township
Project Allocation10,000,000
(K) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Union Township
Project Allocation10,000,000
(L) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Volant Borough
Project Allocation10,000,000
(M) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Wampum Borough
Project Allocation10,000,000
(N) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Wayne Township
Project Allocation10,000,000
(O) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Wilmington Township
Project Allocation10,000,000
(P) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Bessemer Borough
Project Allocation10,000,000
(Q) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Little Beaver Township
Project Allocation10,000,000
(R) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Ellwood City Borough
Project Allocation10,000,000
(S) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in the City of New Castle
Project Allocation10,000,000
(T) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in the county
Project Allocation12,500,000
(U) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for expansion of an historical facility in the City of New Castle
Project Allocation13,000,000
(V) Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for a cultural facility project in the county
Project Allocation13,000,000
(W) Acquisition, construction, infrastructure and other related costs for the Baird Road business park economic development project in Mahoning Township
Project Allocation20,000,000
(iii) City of New Castle
(A) Acquisition, demolition, infrastructure, rehabilitation and construction of properties in the business district of the city
Project Allocation6,125,000
(38) Lebanon County
(i) County projects
(A) Site preparation, acquisition, renovation, construction, infrastructure and other related costs for development of the Annville Logistics Park
Project Allocation5,000,000
(B) Acquisition, site preparation, renovation, redevelopment, construction, infrastructure, abatement of hazardous materials and other related costs for development of WellSpan Health health care facilities
Project Allocation5,000,000
(ii) City of Lebanon
(A) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for urban revitalization, including façade improvements in the commercial corridors of 9th and Lehman Streets
Project Allocation10,000,000
(39) Lehigh County
(i) County projects
(A) Construction, infrastructure redevelopment and other related costs for restoration and repair of the Scottish Rite Cathedral in the City of Allentown
Project Allocation1,000,000
(B) Construction, renovation, acquisition and other related costs for an early childhood education center in the City of Allentown
Project Allocation12,000,000
(C) Acquisition, construction, infrastructure improvements and other related costs for the D&L Trail
Project Allocation10,000,000
(D) Acquisition, construction, infrastructure, renovation and other related costs for an economic development project in the county
Project Allocation15,000,000
(E) Acquisition, construction, infrastructure, renovation and other related costs for an economic development project in the City of Allentown
Project Allocation15,000,000
(F) Acquisition, construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the development, expansion or renovation of Lehigh Valley Health Network properties
Project Allocation10,000,000
(G) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project
Project Allocation30,000,000
(H) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for community homes by Keystone Human Services to support persons with intellectual disabilities
Project Allocation10,000,000
(I) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a Lehigh Valley Health Network facility in the City of Allentown
Project Allocation10,000,000
(J) Construction, infrastructure, redevelopment and other related costs for infrastructure improvements, additional space and renovations at St. Luke's West End Medical Center in South Whitehall Township
Project Allocation5,000,000
(K) Acquisition, construction, renovation, abatement of hazardous materials and other related costs for a Lehigh Valley Health Network health center
Project Allocation12,500,000
(L) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for St. Luke's University Health Network
Project Allocation12,500,000
(M) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(i.1) Allentown Housing Authority
(A) Acquisition, construction, infrastructure and other related costs for the development or redevelopment of affordable housing in the City of Allentown
Project Allocation4,000,000
(i.2) Lehigh Northampton Airport Authority
(A) Construction, infrastructure development, redevelopment and other related costs for a new hotel and retail development at Lehigh Valley International Airport
Project Allocation15,000,000
(i.3) Whitehall Township Industrial and Commercial Development Authority
(A) Site work, construction, preparation, infrastructure, renovation and other related costs for the redevelopment of the Whitehall Mall
Project Allocation2,300,000
(ii) City of Allentown
(A) Construction infrastructure improvements and other related costs for renovation and rehabilitation of a former convent located on Hanover Avenue
Project Allocation500,000
(B) Construction infrastructure improvements and other related costs for interior and exterior upgrades to the Agri-Plex building
Project Allocation500,000
(C) Construction, acquisition and other costs related to the purchase and renovation of the Madison Hamilton building
Project Allocation500,000
(D) Acquisition, construction, rehabilitation, infrastructure and other related costs for the Community Bike Works youth center facilities
Project Allocation1,000,000
(E) Renovation, construction, building acquisition and equipment purchases for Lehigh Valley Hospital - 17th and Chew extended campus, including medical office buildings, the School of Nursing and legal office buildings
Project Allocation10,000,000
(F) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for rehabilitation of a theater
Project Allocation2,500,000
(G) Acquisition, construction, renovation, infrastructure and other related costs for Da Vinci Science Center
Project Allocation2,500,000
(H) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for redevelopment of underutilized properties
Project Allocation21,000,000
(I) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for a multistory adaptive reuse project
Project Allocation35,000,000
(J) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for sports medicine, rehabilitation and health care facilities
Project Allocation5,000,000
(K) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for St. Luke's University Health Network
Project Allocation7,500,000
(L) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for a historic structure in the west end theater district
Project Allocation2,000,000
(M) Construction, renovation, infrastructure and other related costs for civic, cultural or economic development projects for Phoebe Ministries
Project Allocation5,000,000
(N) Acquisition, construction, rehabilitation, infrastructure, site preparation, environmental remediation and other related costs for a food manufacturing and distribution center
Project Allocation1,500,000
(O) Construction, rehabilitation, infrastructure, utilities and infrastructure relocation and other related costs for a pharmaceutical and vaccine manufacturing and storage facility
Project Allocation5,300,000
(P) Acquisition, construction, rehabilitation, infrastructure and other related costs for the development or redevelopment of affordable housing in the Franklin Park neighborhood
Project Allocation2,000,000
(Q) Construction, rehabilitation, infrastructure, site preparation, environmental remediation and other related costs for an economic development project along Mack Boulevard
Project Allocation1,500,000
(R) Construction, rehabilitation, infrastructure and other related costs for the rehabilitation of Miller Symphony Hall
Project Allocation2,500,000
(S) Acquisition, construction, rehabilitation, infrastructure and other related costs for an early childhood facility and neighborhood resource center
Project Allocation10,000,000
(T) Acquisition, construction, rehabilitation, infrastructure and other related costs for an early education center and a community center in Old Allentown
Project Allocation2,500,000
(U) Construction, infrastructure, improvements, renovation and other related costs for the development and expansion of athletic facilities at Cedar Crest College
Project Allocation1,500,000
(V) Construction, infrastructure, improvements, renovation and other related costs for the development and expansion of academic buildings at Cedar Crest College
Project Allocation5,500,000
(W) Construction, renovation and other related costs for rehabilitation of Sacred Heart Hospital
Project Allocation5,000,000
(X) Land acquisition, infrastructure improvements, construction and other costs related to Little Lehigh Creek Industrial Corridor redevelopment project
Project Allocation2,000,000
(iii) City of Bethlehem
(A) Acquisition, construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the development, expansion or renovation of Lehigh Valley Health Network properties
Project Allocation10,000,000
(iii.1) Catasauqua Borough
(A) Construction, infrastructure improvements and other costs related to the mixed-use Catasauqua redevelopment project
Project Allocation5,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for a redevelopment project
Project Allocation5,000,000
(iv) Fountain Hill Borough
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to the renovation and expansion of current facilities and operations of St. Luke's Bethlehem
Project Allocation10,000,000
(B) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at Fountain Hill Elementary School
Project Allocation11,000,000
(C) Construction, infrastructure, redevelopment and other related costs for Mill 2 projects
Project Allocation2,000,000
(v) North Whitehall Township
(A) Construction, facility improvements, renovations and other related costs for KidsPeace Orchard Hills campus
Project Allocation2,000,000
(B) Acquisition, construction, redevelopment, infrastructure and other related costs for a youth camp
Project Allocation2,500,000
(vi) Salisbury Township
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials, equipment, machinery and other costs related to the renovation and expansion of Lehigh Valley Hospital - Cedar Crest Campus, including, but not limited to, the hospital, MOBs and Lehigh Valley Reilley Children's Hospital
Project Allocation10,000,000
(vi.1) South Whitehall Township
(A) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for redevelopment of underutilized properties
Project Allocation3,000,000
(B) Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for a multistory adaptive reuse project
Project Allocation5,000,000
(C) Construction, renovations, abatement of hazardous materials, infrastructure and other related costs for improvements to and an expansion of a fire and rescue department facility
Project Allocation1,000,000
(vii) Upper Macungie Township
(A) Construction, redevelopment, infrastructure and other related costs for a new community center, including indoor sports and recreation areas, meeting space, a walking track and rental space
Project Allocation10,000,000
(40) Luzerne County
(i) County projects
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for an economic development project
Project Allocation10,000,000
(B) Construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs associated with improvements to Kirby Park
Project Allocation5,000,000
(C) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements, abatement of hazardous materials and other related costs associated with the Hazleton Creek economic development project
Project Allocation5,000,000
(D) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs associated with the expansion of a commercial property located on Route 315 in Plains Township
Project Allocation5,000,000
(E) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements, abatement of hazardous materials and other related costs associated with the construction of a new animal shelter
Project Allocation3,000,000
(F) Renovation, rehabilitation and other related costs to repair and restore the Luzerne County Courthouse
Project Allocation1,000,000
(G) Acquisition, construction, infrastructure, redevelopment and other related costs for a sustainable energy project for production of renewable fuels
Project Allocation10,000,000
(H) Acquisition, construction, renovation, infrastructure and other costs related to economic development projects
Project Allocation15,000,000
(I) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(J) Site preparation, acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for the improvement of the Greater Wyoming Valley Area YMCA facilities
Project Allocation5,000,000
(K) Acquisition, construction, demolition, reconstruction, rehabilitation, remediation, renovation, infrastructure improvements, lot stabilization and other related costs for the redevelopment of Upward Farms
Project Allocation20,000,000
(L) Construction, infrastructure, redevelopment, renovation and other related costs for improvements to the Luzerne County Fairgrounds
Project Allocation5,000,000
(i.1) Luzerne County Redevelopment Authority
(A) Acquisition, infrastructure, construction, redevelopment and other related costs for an economic development project in Forty Fort Borough
Project Allocation10,000,000
(i.2) Luzerne County Industrial Development Authority
(A) Acquisition, infrastructure, site preparation, construction and other related costs associated with the development of Grimes Industrial Park Lot No. 5
Project Allocation5,500,000
(ii) City of Hazleton
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation10,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site improvements and other related costs associated with an economic development project
Project Allocation5,000,000
(iii) City of Nanticoke
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site improvements and other related costs associated with an economic development project
Project Allocation10,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site improvements and other related costs associated with the redevelopment of the LS site project
Project Allocation10,000,000
(C) Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project
Project Allocation5,000,000
(iii.1) City of Pittston
(A) Acquisition, construction, infrastructure and other costs related to Main & Market Professional Center project
Project Allocation2,500,000
(B) Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project
Project Allocation5,000,000
(iv) City of Wilkes-Barre
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs associated with Wilkes University facilities
Project Allocation5,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other related costs associated with an economic development project
Project Allocation5,000,000
(C) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs related to the improvement of facilities for the Wilkes-Barre YMCA
Project Allocation2,500,000
(D) Acquisition, construction, infrastructure and other costs related to the redevelopment of Citizens Bank Center
Project Allocation5,000,000
(E) Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project
Project Allocation5,000,000
(F) Acquisition, construction, infrastructure and other related costs for a project at King's College
Project Allocation2,000,000
(iv.1) Dupont Borough
(A) Acquisition, construction, infrastructure and other costs related to Wilkes-Barre/Scranton International Airport economic development project
Project Allocation2,000,000
(v) Edwardsville Borough
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements and other related costs associated with an energy sector economic development project
Project Allocation20,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements and other related costs associated with a manufacturing or technology incubator project
Project Allocation2,000,000
(vi) Exeter Borough
(A) Construction, infrastructure and other related costs for an economic development and job creation project
Project Allocation15,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other related costs associated with the redevelopment of a commercial property on Wyoming Avenue
Project Allocation5,000,000
(C) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for an economic development project along Wyoming Avenue
Project Allocation5,000,000
(vi.1) Dallas Township
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for an economic development project along Lt. Michael Cleary Drive
Project Allocation5,000,000
(vii) Greater Wilkes-Barre Industrial Fund
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for the Jewish Community Center of Northeastern Pennsylvania
Project Allocation10,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for the Wyoming Valley Art League
Project Allocation3,000,000
(viii) Hanover Township
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project
Project Allocation5,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for an economic development project
Project Allocation5,000,000
(viii.1) Jenkins Township
(A) Construction, infrastructure, acquisition, site preparation, environmental remediation and other related costs for the redevelopment, upgrade, relocation and expansion of a facility
Project Allocation6,000,000
(viii.2) Kingston Borough
(A) Acquisition, infrastructure, construction, redevelopment and other related costs for an economic development project
Project Allocation5,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for the redevelopment of property along Wyoming Avenue
Project Allocation5,000,000
(C) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for the economic redevelopment of land along Market Street
Project Allocation3,000,000
(ix) Luzerne Borough
(A) Construction, renovation, rehabilitation, infrastructure and other related costs associated with an infrastructure project that includes deploying sound barriers to address recent development
Project Allocation1,500,000
(x) Newport Township
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with the development of an energy park
Project Allocation20,000,000
(B) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for repurposing SCI Retreat for economic development in the township
Project Allocation10,000,000
(xi) Plains Township
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project
Project Allocation5,000,000
(B) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with a multiuse sports complex project
Project Allocation5,000,000
(xii) Pittston City
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project
Project Allocation5,000,000
(xiii) Rice Township
(A) Acquisition, infrastructure, construction and other related costs for a community center in the township
Project Allocation2,000,000
(xiv) Wilkes-Barre Township
(A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project
Project Allocation5,000,000
(41) Lycoming County
(i) County projects
(A) Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation10,000,000
(B) Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for an open space, trail, tourism and outdoor recreation project in the county
Project Allocation10,000,000
(42) McKean County
(i) County projects
(A) Acquisition, infrastructure, construction and other related costs for an economic development project
Project Allocation5,000,000
(B) Acquisition, infrastructure, construction and other related costs for an energy project
Project Allocation5,000,000
(C) Acquisition, infrastructure, construction, renovation and other related costs for projects at UPMC Kane
Project Allocation10,000,000
(ii) City of Bradford
(A) Renovation, construction and other related costs to modernize, expand and improve facilities of a rehabilitation center for individuals with disabilities
Project Allocation3,000,000
(B) Acquisition, infrastructure, construction, renovation, rehabilitation and other related costs for projects at Bradford Regional Medical Center
Project Allocation10,000,000
(iii) Foster Township
(A) Construction, site work, infrastructure improvements, land acquisition and other related costs for an at-risk youth education and treatment facility on the main campus of Beacon Light
Project Allocation7,000,000
(43) Mercer County
(i) County projects
(A) Acquisition, construction, infrastructure and abatement of hazardous materials at the former Damascus-Bishop Tube facility in the Reynolds Industrial Park
Project Allocation1,500,000
(B) Acquisition, construction, infrastructure and other related costs for facilities development
Project Allocation4,400,000
(C) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an industrial facility
Project Allocation2,000,000
(D) Construction, infrastructure and other related costs for a work force development center to be built
Project Allocation2,225,000
(E) Acquisition, construction, redevelopment and infrastructure for a new multitenant health care facility
Project Allocation2,000,000
(F) Construction and/or renovation of a multitenant facility in the Reynolds Industrial Park
Project Allocation1,000,000
(G) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(H) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(I) Acquisition, construction, infrastructure and related improvements for a recreational facilities project
Project Allocation5,000,000
(ii) Greenville Area Economic Development Corporation
(A) Acquisition, construction, redevelopment, infrastructure and abatement of hazardous materials for the former Trinity Industries site in Hempfield Township
Project Allocation3,000,000
(iii) Greenville-Reynolds Development Corporation
(A) Construction, infrastructure and other related costs to erect three versatile commercial buildings in industrial parks within the county
Project Allocation2,000,000
(iv) Penn-Northwest Development Corporation
(A) Construction, renovation and infrastructure costs related to the conversion of the Sacred Heart Church and rectory into a community theater
Project Allocation1,500,000
(B) Acquisition and renovation of an industrial manufacturing facility known as the Trinity South Plant
Project Allocation1,000,000
(C) Construction, renovation, infrastructure and related costs for the expansion of the HopeCAT facility
Project Allocation2,500,000
(D) Construction, renovation and infrastructure for modernization of fire prevention, chemical storage and overall facility upgrades to the Jamestown Coatings plant
Project Allocation1,000,000
(E) Construction, redevelopment, infrastructure and abatement of hazardous materials for the expansion of NLMK's operation
Project Allocation5,000,000
(F) Renovation of all or part of four buildings on East State Street and Chestnut Street in the City of Sharon as part of the redevelopment of Shenango Riverfront
Project Allocation2,000,000
(G) Construction, infrastructure and other related costs for a community wellness center on the Thiel College Campus
Project Allocation5,000,000
(H) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for facilities at AHN Grove City
Project Allocation10,000,000
(I) Construction, renovation and other related costs for the Grove City YMCA to renovate an unoccupied building
Project Allocation1,000,000
(J) Construction, acquisition, redevelopment, renovation and infrastructure costs for the Town of Greenville central business district improvements
Project Allocation2,000,000
(v) Borough of Grove City
(A) Acquisition, construction, infrastructure and other related costs for an industrial facility
Project Allocation1,000,000
(B) Acquisition, construction, infrastructure and other related costs for commercial facilities
Project Allocation1,000,000
(v.1) City of Farrell
(A) Acquisition, infrastructure, construction and other related costs for an economic development project
Project Allocation2,000,000
(vi) City of Hermitage
(A) Acquisition, construction and infrastructure improvements for a business park project
Project Allocation3,000,000
(B) Acquisition, construction, infrastructure and related improvements for a Hermitage community and economic development project
Project Allocation2,500,000
(C) Acquisition, construction, infrastructure and related improvements for a Hermitage community recreational facilities project
Project Allocation3,000,000
(D) Acquisition, construction, renovation and infrastructure improvements for an industrial facility
Project Allocation3,500,000
(vii) City of Sharon
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for the development of the commercial corridor of the city
Project Allocation3,000,000
(B) Acquisition, construction and redevelopment of the banks of the Shenango River within the city
Project Allocation5,000,000
(C) Infrastructure, construction and other related costs for the WaterFire Sharon riverbank development
Project Allocation4,000,000
(44) Mifflin County
(i) County projects
(A) Acquisition, construction, site preparation, infrastructure and other related costs for a community and economic development project in the county
Project Allocation25,000,000
(ii) Mifflin County Industrial Development Authority
(A) Abatement of hazardous materials, demolition and redevelopment of abandoned building number four located in the MCIDC Plaza
Project Allocation1,000,000
(45) Monroe County
(i) County projects
(A) Acquisition, construction, renovation, infrastructure and other costs related to economic development projects
Project Allocation10,000,000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(ii) Monroe County Industrial Development Authority
(A) Construction, infrastructure and other related costs for redevelopment of the Chelsea property
Project Allocation5,000,000
(B) Construction, infrastructure and other related costs for development of an industrial property on Airstrip Road
Project Allocation5,000,000
(C) Construction, infrastructure and other related costs for development of a commercial site on Sullivan Trail
Project Allocation3,000,000
(D) Construction, infrastructure and other related costs for redevelopment of the former Birchwood Resort property
Project Allocation5,000,000
(E) Construction, infrastructure and other related costs for redevelopment of the site of the former Mount Pocono Golf Course
Project Allocation5,000,000
(F) Construction, infrastructure and other related costs for redevelopment of an industrial property on North Road
Project Allocation5,000,000
(G) Construction, infrastructure and other related costs for redevelopment of an industrial property located at 303 Possinger Drive
Project Allocation5,000,000
(H) Construction, infrastructure and other related costs for redevelopment of property located at 142 Quarry Lane
Project Allocation3,000,000
(I) Construction, infrastructure and other related costs for development of the Lynch Corporation property
Project Allocation3,000,000
(J) Construction, infrastructure and other related costs for redevelopment of the former HJ Davis property
Project Allocation3,000,000
(K) Construction, infrastructure and other related costs for the Monroe Career and Technical Institute (MCTI)
Project Allocation2,000,000
(ii.1) Pocono Mountains Economic Development Corporation
(A) Construction, infrastructure, redevelopment, renovation and other related costs for repairs, upgrades and improvements to the existing facilities of the Salvation Army of East Stroudsburg
Project Allocation4,000,000
(iii) Borough of East Stroudsburg
(A) Construction, infrastructure, renovation and other related costs for improvements to the East Stroudsburg University athletic and academic facilities
Project Allocation10,000,000
(B) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation10,000,000
(iii.1) Stroudsburg Borough
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation10,000,000
(iii.2) Barrett Township
(A) Construction, infrastructure and other related costs to develop a parcel of township-owned land for an administrative and recreation complex
Project Allocation600,000
(iii.3) Chestnuthill Township
(A) Acquisition, construction, infrastructure and other related costs for a shared emergency services facility
Project Allocation2,500,000
(iii.4) Coolbaugh Township
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation10,000,000
(iii.5) Paradise Township
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation10,000,000
(iv) Pocono Township
(A) Construction, infrastructure, renovation and other related costs for the Center for Advanced Technology and Sustainability at the Northampton Community College Monroe campus
Project Allocation2,500,000
(v) Price Township
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation10,000,000
(vi) Stroud Township
(A) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation10,000,000
(46) Montgomery County
(i) County projects
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to construct a multiuse, income-based, affordable housing complex with an emphasis on veterans housing
Project Allocation10,000,000
(B) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to deploy utility scale solar energy or other alternative green energy sources
Project Allocation10,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to enable the deployment of a facility that will permit a regionalized, coordinated or countywide delivery of emergency response services
Project Allocation10,000,000
(D) Acquisition, construction, infrastructure, redevelopment and other related costs for Share Food Program's Montgomery County hub facility project
Project Allocation1,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation30,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation30,000,000
(G) Acquisition, infrastructure, construction and other related costs for renovation and expansion of Rosemont College's Cardinal Hall
Project Allocation2,500,000
(H) Construction, infrastructure, renovation, acquisition, redevelopment and other costs related to the development of a child advocacy training facility
Project Allocation7,000,000
(I) Construction, infrastructure, renovation, acquisition, redevelopment and other costs related to the development of a child advocacy center
Project Allocation7,000,000
(J) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research, provide medical education and other related activities for Penn Medicine and its affiliates
Project Allocation20,000,000
(K) Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for the redevelopment of Elmwood Park Zoo
Project Allocation10,000,000
(L) Demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for improvements to Enfield Elementary School
Project Allocation5,000,000
(M) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation3,000,000
(i.1) Horsham Land Redevelopment Authority
(A) Construction, infrastructure, redevelopment, renovation and other related costs to redevelop Naval Air Station Joint Reserve Base Willow Grove in Horsham Township
Project Allocation35,000,000
(i.2) Montgomery County Redevelopment Authority
(A) Acquisition, site preparation, infrastructure, renovations, construction and other related costs for the development of a railroad trestle plaza and riverfront development in Royersford Borough
Project Allocation5,000,000
(B) Site preparation, acquisition, renovation, construction, redevelopment and other related costs for the expansion of Merion Hall on Saint Joseph's University campus
Project Allocation7,400,000
(ii) Pottstown Area Industrial Development, Inc.
(A) Construction, rehabilitation, renovation, rehabilitation and other related costs for the Hard Hat Cherry Street improvement project
Project Allocation500,000
(B) Construction, infrastructure, equipment and other related costs for the American Keg Company deep draw press project
Project Allocation1,000,000
(C) Construction, rehabilitation, abatement of hazardous materials and other related costs for renovation, remediation and redevelopment of the former Pottstown Plating Works property
Project Allocation1,250,000
(D) Construction, redevelopment and other related costs for the Iron Globe Entertainment Complex project
Project Allocation5,000,000
(E) Infrastructure, redevelopment and other related costs for Pottstown Sustainable Energy Plant
Project Allocation2,000,000
(F) Acquisition, redevelopment, infrastructure and other related costs for the expansion of production and hiring in Pottstown Borough
Project Allocation1,000,000
(G) Redevelopment, construction and other related costs for the renovation of an industrial site in Pottstown Borough
Project Allocation5,000,000
(H) Redevelopment, construction, renovation, remediation and other related costs for the development of a vacant and blighted property in Pottstown Borough
Project Allocation1,250,000
(I) Infrastructure, construction, renovation and other related costs for the redevelopment of an underutilized building in Pottstown Borough
Project Allocation500,000
(ii.1) Ambler Borough
(A) Infrastructure, redevelopment, construction and other related costs for parking garage on Lindenwold Avenue
Project Allocation2,000,000
(B) Infrastructure, redevelopment, construction and other related costs for parking lot, including street safety, mobility and parking improvements, and storm sewer enhancements on Poplar Street
Project Allocation700,000
(C) Construction, rehabilitation and other related costs for Montco SAAC Senior Center Facility
Project Allocation2,500,000
(ii.2) Collegeville Borough
(A) Construction, infrastructure, restoration, renovation and other related costs for redevelopment
Project Allocation6,000,000
(ii.3) Conshohocken Borough
(A) Construction, infrastructure, redevelopment and other related costs for development at First and Fayette Streets
Project Allocation10,000,000
(ii.4) Hatboro Borough
(A) Infrastructure, construction and other related costs for rehabilitation, expansion and modernization of borough facilities, including borough hall, police station and public works building
Project Allocation1,500,000
(B) Acquisition, infrastructure, preservation and other related costs for reuse of existing historic facility
Project Allocation2,500,000
(iii) Jenkintown Borough
(A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery, equipment and other related costs for the municipal offices and police station improvement and/or relocation project
Project Allocation3,000,000
(B) Construction, renovation, rehabilitation and other costs related to campus construction, renovations and miscellaneous improvement projects at Manor College
Project Allocation5,000,000
(iii.1) Lansdale Borough
(A) Infrastructure and other related costs for facility improvements and renovation of Fairmount Volunteer Fire Company's fire house on Vine Street in Lansdale, including HVAC, fire doors and generator upgrades
Project Allocation4,000,000
(B) Renovations, rehabilitation, construction and other related costs to restore a historic freight house building into a visitor and welcome center, community hub and venue
Project Allocation5,000,000
(iv) Narberth Borough
(A) Construction, renovation and rehabilitation of 201 Sabine Avenue to provide economic and community benefits by improving the park and building facilities
Project Allocation3,000,000
(B) Construction, infrastructure, renovation, site work and other related costs for the redevelopment of a property
Project Allocation3,000,000
(v) Norristown Borough
(A) Acquisition, demolition, construction, renovation, infrastructure and other development costs for primary care, outpatient, clinical and education facilities at the Nicholas and Athena Karabots Medical Building
Project Allocation5,000,000
(B) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for public safety projects
Project Allocation10,000,000
(C) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects
Project Allocation10,000,000
(D) Construction, infrastructure improvements and other costs related to new mixed-income development in downtown Norristown
Project Allocation2,000,000
(E) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for medical office building
Project Allocation5,000,000
(F) Acquisition, construction, infrastructure, redevelopment and other related costs for supermarket project on Markley Street
Project Allocation2,500,000
(G) Construction, infrastructure, redevelopment and other related costs for the George Washington Carver Community Center
Project Allocation2,000,000
(H) Acquisition, construction, rehabilitation and other related costs for a new Montco SAAC Senior Center
Project Allocation5,000,000
(v.1) North Wales Borough
(A) Construction, renovation and other related costs for the North Penn fire house
Project Allocation650,000
(v.2) Pottstown Borough
(A) Infrastructure, improvements, redevelopment, construction and other related costs to update a storm water system
Project Allocation3,750,000
(B) Infrastructure, improvements, redevelopment, construction and other related costs for repairs and updates to a storm water system section on High Street
Project Allocation750,000
(C) Construction and other related costs for a walking trail through campus and walkway between Sustainability and Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus
Project Allocation1,000,000
(D) Infrastructure, construction, rehabilitation, equipment and other related costs for STEM Pavilion main entrance, facade, addition and expansion for Sustainability and Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus
Project Allocation3,000,000
(E) Infrastructure, construction, rehabilitation, equipment and other related costs for renovation of South Hall Building, facade, exterior, second floor and parking lot on the Montgomery County Community College Pottstown Campus
Project Allocation22,000,000
(F) Construction, infrastructure, redevelopment and other related costs to create a North Hall Gateway on the Montgomery County Community College Pottstown Campus
Project Allocation4,000,000
(G) Acquisition, construction, renovation, equipment and other related costs for Hanover Building on the Montgomery County Community College Pottstown Campus
Project Allocation3,000,000
(H) Infrastructure, construction and related costs to build multisport athletic fields on the Montgomery County Community College Pottstown Campus
Project Allocation15,000,000
(I) Construction and other related costs for a walking trail through campus and walkway between Sustainability and Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus
Project Allocation1,000,000
(v.3) Souderton Borough
(A) Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for a community and economic development project in the township
Project Allocation2,500,000
(v.4) Telford Borough
(A) Infrastructure and other related costs for facility improvements and renovations of Telford Volunteer Fire Company's fire house
Project Allocation4,000,000
(v.5) Trappe Borough
(A) Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the development of a new fire station
Project Allocation4,500,000
(vi) Abington Township
(A) Construction and infrastructure relating to storm water management projects as identified by the township's storm water management plan
Project Allocation15,000,000
(B) Construction, renovation, rehabilitation and infrastructure relating to the building of a new municipal building to increase resident access to township services
Project Allocation10,500,000
(C) Construction and infrastructure relating to the creation of an inclusive park in the township for use by disabled individuals and others
Project Allocation550,000
(D) Acquisition, construction, renovation, remediation, site work, infrastructure and related improvements for a filtration project
Project Allocation6,000,000
(vii) Cheltenham Township
(A) Acquisition, demolition, construction, renovation, infrastructure and other development costs for inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Elkins Park projects
Project Allocation15,000,000
(B) Construction, renovation, rehabilitation, abatement of hazardous materials, infrastructure and replacement of aging property related to the repair of two heavily traveled bridges, rebuilding the entrance areas to Curtis Arboretum and rebuilding and consolidation of the township pool system
Project Allocation7,500,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other expenses related to the consolidation of township facilities onto specified township sites
Project Allocation27,000,000
(D) Construction, infrastructure improvements, including rehabilitation of sanitary sewer system, and other related costs for business development
Project Allocation6,000,000
(E) Construction, infrastructure improvements and other costs related to pedestrian signals and crossings
Project Allocation2,000,000
(F) Acquisition, construction, redevelopment and other related costs for public works facility relocation
Project Allocation7,500,000
(G) Acquisition, construction, infrastructure and other costs related to Glenside area flood protection project
Project Allocation10,000,000
(H) Construction, infrastructure, renovation and other related costs for the restoration of the Beth Sholom synagogue
Project Allocation15,000,000
(vii.1) Douglass Township
(A) Construction, infrastructure and other related costs for a firehouse and emergency services building, including, but not limited to, site work, landscaping and curb and sidewalk changes
Project Allocation1,510,000
(viii) East Norriton Township
(A) Acquisition, demolition, construction, renovation, infrastructure and other development costs for inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Montgomery projects
Project Allocation15,000,000
(B) Construction, infrastructure improvements and other costs related to renovation of patient rooms
Project Allocation2,000,000
(viii.1) Hatfield Township
(A) Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for an updated location for the Hatfield Township Police Department
Project Allocation4,000,000
(B) Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for a community and economic development project in the township
Project Allocation5,000,000
(C) Infrastructure and other related costs for facility improvements and renovations of Colmar Volunteer Fire Company fire house
Project Allocation5,000,000
(viii.2) Horsham Township
(A) Construction, infrastructure, renovation and other related costs to convert the Horsham Soccer Association's home field complex from grass to turf
Project Allocation600,000
(B) Construction, infrastructure, renovation and other related costs to construct a Miracle Field for visually impaired players and players in wheelchairs and construction of a new facility to house concessions, restrooms, storage and a meeting room at Deep Meadow Park
Project Allocation1,250,000
(viii.3) Limerick Township
(A) Construction, renovation, infrastructure, redevelopment, realignment and other related costs for ramps, roadways, intersections and utilities for regional economic and cultural or civic development in Limerick Township
Project Allocation14,000,000
(B) Site preparation, demolition, construction, infrastructure, rehabilitation and other related costs for the redevelopment of a pharmaceutical manufacturing facility
Project Allocation1,900,000
(ix) Lower Gwynedd Township
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to a health care innovation project at Gwynedd Mercy University's campus
Project Allocation10,000,000
(B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project
Project Allocation10,000,000
(C) Construction, infrastructure and other related costs for a new fire substation to assist the North Penn Volunteer Fire Company
Project Allocation5,000,000
(D) Land acquisition, construction, infrastructure and other related costs for a new public works facility
Project Allocation6,250,000
(x) Lower Merion Township
(A) Construction, acquisition, infrastructure improvement, renovation, rehabilitation and associated costs for the expansion of Merion Hall on the Saint Joseph's University Campus to accommodate growth of the Kinney Center, which provides support for those on the autism spectrum
Project Allocation7,400,000
(B) Construction, infrastructure, renovation, rehabilitation and other costs related to renovation and/or replacement of the Ardmore Avenue Community Center and the PALM Senior Center
Project Allocation6,000,000
(C) Construction, infrastructure, improvements and other costs related to expansion of Ardmore Train Station transit and parking improvements project
Project Allocation10,000,000
(xi) Lower Providence Township
(A) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation5,000,000
(B) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for the development of a fire department facility and an emergency medical services facility
Project Allocation2,500,000
(C) Infrastructure, construction and other related costs, including abatement of hazardous materials, for redevelopment of a superfund site at Lower Providence Business Park
Project Allocation2,500,000
(xii) Lower Salford Township
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a new public works complex with a detached salt storage building
Project Allocation2,100,000
(xiii) Plymouth Township
(A) Acquisition, construction, renovation, redevelopment, site preparation, infrastructure and other related costs for a municipal administration building, police station, public works garage and other municipal buildings
Project Allocation10,000,000
(B) Design, site preparation, demolition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for the redevelopment of the Plymouth Meeting Mall
Project Allocation14,000,000
(C) Construction, infrastructure improvements and renovations for the East Plymouth Valley Park Little League facility
Project Allocation500,000
(D) Construction, demolition, renovations, hazardous materials abatement, infrastructure and other related costs for improvements to and an expansion of Harmonville Fire Company
Project Allocation4,500,000
(xiv) Skippack Township
(A) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation5,000,000
(xv) Springfield Township
(A) Acquisition and construction of a new fire station on an existing vacant industrial property
Project Allocation2,500,000
(xvi) Upper Dublin Township
(A) Acquisition, renovation, infrastructure development, site preparation and construction to support redevelopment and revitalization of Fort Washington Office Park
Project Allocation10,000,000
(B) Reconstruction, repair, renovation, infrastructure, redevelopment and other related costs to upgrade the township building
Project Allocation10,000,000
(C) Construction, infrastructure, renovation and other related costs for the reconstruction of the tornado-damaged Upper Dublin Township building
Project Allocation10,000,000
(xvii) Upper Merion Township
(A) Site preparation, acquisition, renovation, environmental remediation, construction, infrastructure and other related costs for the expansion and redevelopment of land and buildings
Project Allocation2,500,000
(B) Construction and other related costs for ambulance station project
Project Allocation1,000,000
(C) Construction, infrastructure, redevelopment and other related costs for projects related to Triad commercial office facility in King of Prussia
Project Allocation3,000,000
(D) Site preparation, acquisition, renovation, environmental remediation, construction, infrastructure and other related costs for the redevelopment of a Top Golf facility
Project Allocation5,000,000
(E) Construction, rehabilitation, site preparation, infrastructure, renovation and other related costs for the redevelopment of the First Avenue Linear Park multimodal trail
Project Allocation657,962
(F) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of the Maurice Stephens House in Valley Forge Park
Project Allocation1,000,000
(xviii) Upper Moreland Township
(A) Construction, infrastructure improvements and other related costs for Willow Grove Industrial Commons, including construction of regional storm water management basin to improve economic development of the area
Project Allocation500,000
(B) Construction, acquisition, renovation, rehabilitation, abatement of hazardous materials, redevelopment and other related costs for improvements to PA 611 and I-276 Exit 343
Project Allocation2,000,000
(C) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development of buildings and surrounding grounds and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of economic and community development projects in the township, including township buildings and facilities
Project Allocation5,000,000
(xix) Upper Providence Township
(A) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project
Project Allocation5,000,000
(xx) West Norriton Township
(A) Construction, infrastructure, restoration, renovation and other related costs for the redevelopment of Jeffersonville Golf Club
Project Allocation3,444,100
(B) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for the development of a community center
Project Allocation5,000,000
(xxi) Whitemarsh Township
(A) Construction, infrastructure improvements and other costs related to AIM Institute for Learning and Research redevelopment and expansion project
Project Allocation3,500,000
(xxii) Whitpain Township
(A) Infrastructure, rehabilitation, equipment and related costs for the construction of the Hospitality Institute at Montgomery County Community College
Project Allocation15,000,000
(B) Development, construction and related costs for the athletic fields, amphitheater and stadium complex at Montgomery County Community College
Project Allocation20,000,000
(C) Construction, infrastructure and other related costs for renovation of Montgomery County Community College Science Center's west wing
Project Allocation1,500,000
(D) Acquisition, infrastructure, renovation, rehabilitation, environmental remediation, construction and other related costs for a community and economic development project
Project Allocation6,000,000
(E) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of Mermaid Park
Project Allocation2,000,000
(47) Montour County
(i) County projects
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county
Project Allocation5,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county
Project Allocation10,000,000
(48) Northampton County
(i) County projects
(A) Construction, renovation infrastructure and redevelopment of the Nazareth YMCA
Project Allocation3,500,000
(B) Construction, infrastructure and other related costs for a multipurpose indoor and outdoor sports complex in the Lehigh Valley
Project Allocation9,500,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials, equipment, machinery and other costs related to the Lehigh Valley Health Network facilities
Project Allocation10,000,000
(D) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for St. Luke's Hospital Easton campus
Project Allocation10,000,000
(E) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(F) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation15,000,000
(G) Acquisition, construction, rehabilitation, infrastructure improvements and other related costs for historic rehabilitation and other improvements in the Historic Moravian Bethlehem national historic landmark district and contributing properties to the district
Project Allocation3,000,000
(ii) Bangor Area Commercial and Industrial Development Authority
(A) Acquisition, construction, infrastructure and other related costs for redevelopment and site improvements to the former Portland Power Plant
Project Allocation11,000,000
(iii) City of Bethlehem
(A) Construction, acquisition, infrastructure, renovation, rehabilitation, demolition and other costs related to a mixed-use building on the Northside
Project Allocation5,000,000
(B) (Reserved)
(C) Construction, infrastructure, renovation, rehabilitation and other costs related to the maintenance and preservation efforts related to the aging blast furnaces on the SteelStacks campus
Project Allocation15,000,000
(D) Construction, infrastructure, renovation, rehabilitation and other costs related to the construction and renovation of the National Museum of Industrial History
Project Allocation3,000,000
(E) Construction, infrastructure, renovation, rehabilitation and other costs relating to the construction, facilities improvements, infrastructure upgrade and redevelopment of buildings on the ArtsQuest SteelStacks campus
Project Allocation7,500,000
(F) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects
Project Allocation10,000,000
(G) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for a mixed-use development project
Project Allocation1,000,000
(H) Construction, infrastructure, renovation and rehabilitation of the National Museum of Industrial History, including expansion of museum exhibit space
Project Allocation4,000,000
(iv) City of Easton
(A) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects
Project Allocation10,000,000
(B) Site preparation, renovation, construction, infrastructure and other related costs for the redevelopment of the former Easton Iron & Metal site
Project Allocation5,000,000
(C) Site preparation, renovation, construction, infrastructure and other related costs for the redevelopment of the Pine Street Garage
Project Allocation8,000,000
(D) Site preparation, renovation, construction, redevelopment, infrastructure and other related costs for the redevelopment of the former Stewart Silk Mill tract
Project Allocation2,500,000
(E) Construction, infrastructure and other costs related to redevelopment of mixed-use commercial and office building with integrated parking and residential upper floor
Project Allocation2,000,000
(F) Acquisition, construction and other related costs for redevelopment of Ferry Street
Project Allocation3,000,000
(G) Acquisition, construction and other related costs for redevelopment of Centre Square
Project Allocation10,000,000
(H) Construction, infrastructure, site preparation, site work, renovation and other related costs associated with the Watermark Easton residential development project
Project Allocation3,000,000
(iv.1) Freemansburg Borough
(A) Construction, infrastructure and other related costs for fire, administration and public works department facilities
Project Allocation2,000,000
(v) Hellertown Borough
(A) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of the former Champion Spark Plug Factory
Project Allocation15,000,000
(B) Acquisition, construction, infrastructure and other costs related to rehabilitation of former Champion Spark Plug facility
Project Allocation2,500,000
(v.1) Pen Argyl Borough
(A) Construction, redevelopment and other related costs for an outdoor aquatic facility incorporating a splash pad, swimming pool and ice rink
Project Allocation2,500,000
(vi) Tatamy Borough
(A) Construction, acquisition, renovation, rehabilitation and other costs related to an addition to the municipal building for the police department and police vehicle parking and the purchase of land and the construction of a community center and yard waste facility
Project Allocation2,000,000
(vii) Wilson Borough
(A) Construction, acquisition, infrastructure and other costs relating to the construction of a new Wilson Borough Police Department station
Project Allocation2,000,000
(B) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of the former Dixie Cup site
Project Allocation15,000,000
(viii) Bethlehem Township
(A) Construction, infrastructure, renovation, rehabilitation and other costs related to an improvement for the Northampton Community College Multicultural Center
Project Allocation1,000,000
(B) Construction, renovation, rehabilitation, infrastructure and other costs related to support the creation of the Student Veteran's Center at Northampton Community College
Project Allocation1,000,000
(C) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at William Penn Elementary School
Project Allocation7,000,000
(D) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at Thomas Jefferson Elementary School
Project Allocation7,000,000
(E) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at Freedom High School
Project Allocation12,000,000
(F) Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at East Hills Middle School
Project Allocation10,000,000
(G) Rehabilitation, infrastructure, site preparation, environmental remediation and other costs related to rehabilitation and improvement projects at the historic Archibald Johnston property
Project Allocation1,000,000
(ix) Hanover Township
(A) Construction, infrastructure and other related costs for nonhighway roads and other infrastructure at the Majestic Business Park at the Lehigh Valley International Airport
Project Allocation20,000,000
(B) Construction and other related costs for a community pool facility
Project Allocation1,500,000
(ix.1) Lehigh Township
(A) Construction and other related costs for a new township maintenance facility
Project Allocation1,500,000
(x) Moore Township
(A) Construction of a new, or renovation of the existing, municipal building housing administration, police department and a public meeting room
Project Allocation3,000,000
(xi) Upper Mount Bethel Township
(A) Acquisition, construction, infrastructure and other related costs for development of River Pointe Commerce Center
Project Allocation25,000,000
(49) Northumberland County
(i) County projects
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county
Project Allocation5,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county
Project Allocation10,000,000
(C) Acquisition, construction, infrastructure, renovation and other related costs for a new and independent community college
Project Allocation5,000,000
(D) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the renovation of a former elementary school to become a multipurpose community center in Riverside Borough
Project Allocation2,500,000
(ii) DRIVE - Economic Development Pennsylvania
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for construction of an industrial facility
Project Allocation5,000,000
(iii) City of Sunbury
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for redevelopment of the former Sunbury Textile facility
Project Allocation3,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for redevelopment of the former Sunbury Community Hospital site
Project Allocation5,000,000
(C) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for consolidation of the fire companies within the city
Project Allocation5,000,000
(D) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for the renovation and expansion of an existing multipurpose community facility
Project Allocation3,000,000
(50) Perry County
(i) County projects
(A) Construction, infrastructure, acquisition and other related development costs for an economic development project in the county
Project Allocation10,000,000
(B) Construction, infrastructure, acquisition and other related development costs for a new Government Center
Project Allocation10,000,000
(51) Philadelphia County
(i) County projects
(A) Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University
Project Allocation250,000,000
(B) Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University
Project Allocation185,000,000
(C) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project
Project Allocation30,000,000
(D) Construction, renovation, acquisition, infrastructure improvement, equipment and other related costs for the development of an ambulatory care facility, including related administrative, clinical, patient, community research, education and exterior facilities of Temple University Hospital and affiliated physician practices
Project Allocation60,000,000
(E) Construction, renovation, infrastructure improvements, equipment and other related costs for the development and modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities of Temple University Health System
Project Allocation60,000,000
(F) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of administrative facilities and related clinical, patient, community, research, education and exterior facilities of Temple University Health System
Project Allocation30,000,000
(G) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital-Boyer Pavilion
Project Allocation40,000,000
(H) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation100,000,000
(I) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project
Project Allocation100,000,000
(J) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for WES Health System facilities
Project Allocation10,000,000
(K) Design, planning, acquisition, demolition, abatement of hazardous materials, extensions or upgrading of utilities, site grading, storm water management, construction of new space or addition to and renovation of existing space, infrastructure upgrades and other related costs within an area bounded by the Schuylkill River, the Schuylkill Expressway, 26th Street and Penrose Avenue, including adjacent lots
Project Allocation100,000,000
(L) Construction, infrastructure, renovation, rehabilitation, historic preservation and related costs for Memorial Hall
Project Allocation25,000,000
(M) Acquisition, demolition, renovation, remediation, construction, infrastructure and other related costs for the development of campus assets and adjacent properties for Drexel University
Project Allocation30,000,000
(N) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at St. Christopher's Hospital for Children
Project Allocation20,000,000
(O) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility
Project Allocation3,000,000
(P) Acquisition, construction, demolition, reconstruction, rehabilitation, remediation, renovation, infrastructure improvements, including electrical wiring, vacant lot stabilization and other related costs for affordable housing developments owned, managed or supported by the Philadelphia Housing Authority
Project Allocation250,000,000
(i.1) Philadelphia Industrial Development Corporation
(A) Construction, redevelopment and other related costs for the renovation of the International Union of Elevator Constructors (IUEC) Local 5 building
Project Allocation1,000,000
(B) Construction and other related costs for a cold storage facility for a local community food bank
Project Allocation2,000,000
(i.2) Philadelphia Authority for Industrial Development
(A) Site preparation, construction, acquisition, infrastructure and other related costs for the development of the Floating Water Workshop facility in Philadelphia
Project Allocation3,000,000
(B) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for the improvement and expansion of athletic facilities on Saint Joseph's University Campus
Project Allocation7,000,000
(i.3) Philadelphia Industrial Redevelopment Authority
(A) Reconstruction of the Trocadero Theatre, including construction, infrastructure, redevelopment and other related costs
Project Allocation5,000,000
(i.4) Schuylkill River Development Corporation
(A) Acquisition, construction, infrastructure and other costs related to Schuylkill Banks redevelopment and improvement projects
Project Allocation20,000,000
(ii) City of Philadelphia
(A) Construction, renovation, rehabilitation and other related costs for improvements at Eastwick Park and Suffolk Park
Project Allocation600,000
(B) Construction, infrastructure, redevelopment and other related costs for the uCity Square innovative district
Project Allocation10,000,000
(C) Renovation and rehabilitation of church property to construct a permanent fence around the perimeter
Project Allocation500,000
(D) Acquisition, site preparation, renovation, construction, redevelopment, infrastructure and associated costs for the improvement and expansion of athletic facilities on the Saint Joseph's University campus
Project Allocation7,000,000
(E) Infrastructure, renovation and rehabilitation of Bethesda Manor and the Mt. Airy Administration Building
Project Allocation2,000,000
(F) Construction, acquisition, infrastructure, renovation and rehabilitation of the Broad and Olney Business District
Project Allocation500,000
(G) Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs relating to a project to improve public recreation facilities, public amenities and commercial storefronts
Project Allocation500,000
(H) Construction, infrastructure, renovation and rehabilitation along the Stenton Avenue Business District
Project Allocation450,000
(I) Construction, acquisition, infrastructure, renovation and rehabilitation of St. Michael's Hall mansion
Project Allocation5,000,000
(J) Construction, infrastructure, abatement of hazardous materials and other costs related to the construction of an indoor go-cart track, classroom space and garage
Project Allocation15,000,000
(K) Construction, infrastructure, renovation and other related costs for the Women Empowered 4 Life state-of-the-art center
Project Allocation750,000
(L) Construction, infrastructure and other costs relating to a 14,000-square-foot addition to an existing charter school facility to alleviate student and staff overcrowding and space shortages
Project Allocation2,600,000
(M) Construction, infrastructure, renovation and rehabilitation of additional square feet to the existing facility for the Ryeco LLC project
Project Allocation6,000,000
(N) Construction, infrastructure, renovation and other related costs for the Salvation Army West Philadelphia Corps Development project
Project Allocation6,000,000
(O) Construction and other costs related to the restoration of the church spire and replacement of the roof at Arch Street United Methodist Church
Project Allocation10,000,000
(P) (Reserved)
(Q) Construction, infrastructure, renovation and rehabilitation of the Arch Street Presbyterian Church
Project Allocation5,000,000
(R) Construction and infrastructure relating to the reconstruction of the Historic Tun Tavern
Project Allocation5,000,000
(S) Construction, acquisition, infrastructure, renovation and rehabilitation relating to Peirce College projects
Project Allocation5,000,000
(T) Construction, infrastructure, renovation, rehabilitation and other costs related to the demolition, expansion and construction of a new center for Dare to Imagine Church, Inc.
Project Allocation2,000,000
(U) Construction, renovation, rehabilitation and other related costs for design services, building and site improvements to the Water Tower Recreation Center
Project Allocation10,000,000
(V) Construction, renovation, rehabilitation and other related costs for design services, building and site improvements to the Waterview Recreation Center
Project Allocation10,000,000
(W) Construction, infrastructure, acquisition, abatement of hazardous materials and other related costs for capital improvements and development of an autism, early childhood and adult services center for SPIN, Inc.
Project Allocation4,000,000
(X) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for capital improvements and renovations to the Philadelphia State Hospital at Byberry, Self Help Movement Inc., facility
Project Allocation5,000,000
(Y) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for capital improvements and renovations to the IUEC5 building
Project Allocation1,000,000
(Z) Construction, infrastructure, acquisition, abatement of hazardous materials and other costs related to projects at Jefferson-Torresdale Hospital in Northeast Philadelphia
Project Allocation3,000,000
(AA) Construction, infrastructure, renovation, rehabilitation and other costs related to the facilities master plan of the Philadelphia Museum of Art
Project Allocation15,000,000
(BB) Construction, acquisition, renovation, rehabilitation, abatement of hazardous materials and other costs related to the rehabilitation of the Charles Jacquin Et Cie, Inc. distillery
Project Allocation7,500,000
(CC) Construction, infrastructure, abatement of hazardous materials and other costs related to the construction of a dedicated building for vocational training and work force development
Project Allocation4,000,000
(DD) Construction, acquisition, renovation, rehabilitation and other costs related to improvements to and the expansion of Liguori Academy
Project Allocation2,000,000
(EE) Construction, infrastructure, renovation, rehabilitation and other costs related to the redevelopment of Philadelphia's industrial real estate stock along the major inner-city trucking corridor of Castor Avenue and East Erie Avenue
Project Allocation20,000,000
(FF) Acquisition, construction, renovations, infrastructure and other related costs for the Gaudenzia Foundation project
Project Allocation10,000,000
(GG) (Reserved)
(HH) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to physical plant renovations and miscellaneous improvement projects at the Library Company of Philadelphia
Project Allocation5,000,000
(II) Construction, acquisition, renovation, rehabilitation and other costs related to the South Street Art Gallery
Project Allocation2,500,000
(JJ) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to a child care facility project
Project Allocation5,000,000
(KK) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to a work force development project
Project Allocation5,000,000
(LL) Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs relating to an affordable housing project
Project Allocation5,000,000
(MM) Acquisition, construction, infrastructure and equipment related to the development of a youth career and entrepreneurial innovation center in North Philadelphia
Project Allocation5,000,000
(NN) Acquisition, construction and development of a complex of neighborhood multiseason, multipurpose indoor and outdoor sports facilities at Hartranft Community Center
Project Allocation20,000,000
(OO) Acquisition, construction, infrastructure and equipment related to a Title IX sports complex in North Philadelphia
Project Allocation10,000,000
(PP) Rehabilitation, construction, infrastructure and equipment related to the redevelopment of Youthbuild Charter School in North Philadelphia
Project Allocation8,000,000
(QQ) Acquisition, construction, infrastructure and equipment related to the development of the Life Do Grow Farm
Project Allocation1,000,000
(RR) Acquisition, construction, infrastructure and equipment related to the neighborhood development of the Cecil B. Moore corridor in North Philadelphia
Project Allocation10,000,000
(SS) Acquisition, construction, infrastructure and equipment related to the development of a technical training institute in North Philadelphia
Project Allocation10,000,000
(TT) Acquisition, construction, infrastructure and equipment related to the development of a one-stop resource center in North Philadelphia
Project Allocation5,000,000
(UU) Construction and renovations for a Happy Hollow Recreation Center
Project Allocation5,000,000
(VV) Acquisition, construction, infrastructure and equipment related to the development of a one-stop resource center for the formerly convicted in North Philadelphia
Project Allocation2,000,000
(WW) Acquisition, construction, infrastructure and equipment related to an economic development project promoting the cultures of Africa
Project Allocation2,000,000
(XX) Acquisition, construction, infrastructure and equipment related to the expansion of Esperanza Health Center in Hunting Park
Project Allocation5,000,000
(YY) Construction and renovations for a One Day At A Time Recovery Center at 17th and Cambria Streets
Project Allocation2,000,000
(ZZ) Acquisition and renovation to establish a permanent office space for the N. 5th Street Revitalization Project (Olney Community Collaborative), as well as tenant space for additional businesses/services providing social service resources (digital access, housing programs, food insecurity, etc.), work force development, job development training and experience and technical assistance for small business owners
Project Allocation500,000
(AAA) Construction, acquisition, infrastructure improvements, redevelopment and other related costs for projects aiming to improve transportation and streetscapes, green infrastructure, public amenities and commercial storefronts/façades on the Broad and Olney Business District and adjacent corridors
Project Allocation500,000
(BBB) Construction, infrastructure improvements, redevelopment, equipment and other related costs for youth football fields across the City of Philadelphia
Project Allocation30,000,000
(CCC) Acquisition, demolition, construction, renovation, infrastructure and other development costs for emergency, inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Philadelphia projects. Einstein intends to enhance and expand current medical center operations, including, but not limited to, expansion/renovation of the Emergency Department and enhancing educational experiences with expansion/renovation of Medical Library
Project Allocation15,000,000
(DDD) Historic adaptive redevelopment of a nine-story, 600,000-square-foot building at 2700 North Broad Street. Current plans call for the first and second floors to be commercial/retail use, anchored by a grocery store. Third, fourth and fifth floors will contain medical office space to be used by a recognized, local educational institution. The remaining four floors will be comprised of 120 units of market rate and affordable apartments. Originally, the building was designed by renowned architect Albert Kahn and constructed in 1913-1914 as a manufacturing facility for the Ford Motor Company. 2700 North Broad was the largest building in the Automobile Row district and served as regional health quarters for Ford. Due to the building having sat vacant for several decades, the redevelopment costs are anticipated to be very high to save this historic structure
Project Allocation15,000,000
(EEE) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to facility upgrades at the Kimmel Center, Inc.
Project Allocation10,000,000
(FFF) Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the Red Shield Family Residence
Project Allocation1,000,000
(GGG) Acquisition, construction, infrastructure, redevelopment and other related costs for the Greenfield House Community Center project
Project Allocation600,000
(HHH) Acquisition, demolition, construction, renovation, infrastructure and other related costs for Thomas Jefferson University projects
Project Allocation25,000,000
(III) Construction, facility improvements, infrastructure and other related costs for the Special Smiles project
Project Allocation1,500,000
(JJJ) Acquisition, construction, infrastructure, redevelopment and other related costs for a project to make improvements to an elementary school on Saint Joseph's University campus
Project Allocation10,000,000
(KKK) Acquisition, construction, infrastructure, redevelopment and other related costs for the West Philadelphia Revitalization project
Project Allocation10,000,000
(LLL) Acquisition, construction, infrastructure, redevelopment and other related costs for the North Philadelphia Revitalization project
Project Allocation10,000,000
(MMM) Construction, renovation, rehabilitation and other costs associated with the redevelopment of the Huntingdon project to create work spaces, residential units, a food hall and a ghost kitchen
Project Allocation4,000,000
(NNN) Construction, renovation, rehabilitation and other costs related to the construction of the 52nd Street Hub, including a building to contain commercial, business and communal office spaces, as well as community space for the business community to facilitate entrepreneurial growth in underserved neighborhoods
Project Allocation5,000,000
(OOO) Construction, acquisition, infrastructure, redevelopment and other related costs for projects aiming to improve transportation and streetscapes, improve public amenities, preserve and reuse historic property and improve commercial storefronts in the area around the Broad, Germantown and Erie intersection in North Philadelphia
Project Allocation40,000,000
(PPP) Acquisition, construction, infrastructure, renovation and other related costs for the Consortium's Hope Counseling Center
Project Allocation8,000,000
(QQQ) Acquisition, construction, infrastructure, renovation and other related costs for parks, recreation centers and libraries as part of the Philadelphia Rebuild Program
Project Allocation50,000,000
(RRR) Acquisition, site preparation, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for economic development projects within the Allegheny West neighborhood
Project Allocation25,000,000
(SSS) Construction, infrastructure, renovation, rehabilitation and other related costs for the redevelopment of the outdoor campus and the interior building for the Woodmere Art Museum restoration and expansion project
Project Allocation5,000,000
(TTT) Construction, infrastructure, renovation and other related costs for the Liberty 53: Estelle Richman Place project
Project Allocation3,000,000
(UUU) Acquisition, construction, infrastructure, redevelopment and other related costs for the Neighborhood Engagement Initiative affordable housing project
Project Allocation10,000,000
(VVV) Acquisition, construction, infrastructure, redevelopment and other related costs for the Enterprise Center Entrepreneurial campus development project
Project Allocation10,000,000
(WWW) Construction, renovation, infrastructure improvements, equipment and other related costs for the development of and modernization of women's health and patient care facilities, including related administrative, clinical, community, research, education and exterior facilities of Temple University Hospital
Project Allocation60,000,000
(XXX) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital
Project Allocation60,000,000
(YYY) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital Episcopal campus
Project Allocation40,000,000
(ZZZ) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related administrative, clinical, community, education and exterior facilities for Fox Chase Cancer Center
Project Allocation60,000,000
(AAAA) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital Jeanes campus
Project Allocation40,000,000
(BBBB) Acquisition, site improvements, construction and other related costs for a minority-owned, unionized modular manufacturing factory which will offer cross-training of construction trades
Project Allocation5,000,000
(CCCC) Construction, infrastructure, restoration, redevelopment and other costs related to projects in The Woodlands' National Historic Landmark District
Project Allocation5,000,000
(DDDD) Acquisition, construction, infrastructure, renovation and other costs related to the redevelopment of a recreation center and related facilities along Chester Avenue
Project Allocation10,000,000
(EEEE) Infrastructure, improvements, redevelopment, construction, site development and other related costs for the expansion of a school building
Project Allocation3,000,000
(FFFF) Construction, renovation, infrastructure, acquisition and other related costs associated with enhanced access to the AdvanSix facility for improved public safety, including upgraded pipeline and dock operations, in the Bridesburg neighborhood
Project Allocation30,000,000
(GGGG) Construction, rehabilitation, infrastructure and other related costs for a sports complex and activity center
Project Allocation8,000,000
(HHHH) Construction, infrastructure, renovation, preparation and other related costs for the redevelopment of buildings and facilities at the Philadelphia Urban Riding Academy
Project Allocation500,000
(IIII) Construction, infrastructure, acquisition, site development, preparation and other related costs for the expansion and redevelopment of a homeless shelter in Center City
Project Allocation5,000,000
(JJJJ) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for improvements to the Walnut Street Theatre
Project Allocation10,000,000
(KKKK) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for campus improvements at Girard College
Project Allocation10,000,000
(LLLL) Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for campus improvements at Philadelphia Technician Training Institute
Project Allocation10,000,000
(MMMM) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for Independence Seaport Museum at Penn's Landing
Project Allocation8,000,000
(NNNN) Construction, infrastructure, renovations and other costs for Independence Visitor Center
Project Allocation2,000,000
(OOOO) Construction, infrastructure, renovations and other costs for projects at Eastern State Penitentiary Historic Site
Project Allocation10,000,000
(PPPP) Acquisition, construction, infrastructure improvements and other related costs for Strawberry Mansion housing development project
Project Allocation10,000,000
(QQQQ) Construction, infrastructure, redevelopment and other related costs to support the Pennovation Works project in the Grays Ferry neighborhood of Philadelphia
Project Allocation5,000,000
(RRRR) Construction, infrastructure, renovation, rehabilitation and other costs related to WHYY's facility at 150 North 6th Street
Project Allocation10,000,000
(SSSS) Site preparation, renovation, construction and other related costs for the development of a floating art gallery on the Delaware River
Project Allocation3,000,000
(TTTT) Construction, infrastructure, renovation, rehabilitation and other costs, including necessary upgrades for the Semiquincentennial Celebration, at the Museum of the American Revolution located at 3rd and Chestnut Streets
Project Allocation10,000,000
(UUUU) Acquisition, site preparation, renovation, construction and other related costs for the development of an art facility on South Street in Philadelphia
Project Allocation2,500,000
(VVVV) Site preparation, acquisition, construction, infrastructure and other related costs for the development of the Wharton Centre
Project Allocation2,147,379
(WWWW) Acquisition, construction, redevelopment and other related costs for the project at the site of North Broad Salvation Army
Project Allocation1,000,000
(XXXX) Construction, redevelopment, site preparation, infrastructure and other related costs to be used on Hunter Street
Project Allocation500,000
(YYYY) Construction, redevelopment, site preparation, infrastructure and other related costs to renovate and improve the Haddington neighborhood
Project Allocation5,000,000
(ZZZZ) Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project in the Overbrook Farms neighborhood
Project Allocation600,000
(A5) Site preparation, construction, acquisition, preparation, infrastructure and other related costs to be used for the development of outdoor space at Robert E. Lamberton Elementary School for educational and recreational purposes by students and community members
Project Allocation639,500
(B5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building QO in the Philadelphia Navy Yard
Project Allocation5,000,000
(C5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 543 in the Philadelphia Navy Yard
Project Allocation5,000,000
(D5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 500 in the Philadelphia Navy Yard
Project Allocation5,000,000
(E5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 139 in the Philadelphia Navy Yard
Project Allocation5,000,000
(F5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 41 in the Philadelphia Navy Yard
Project Allocation5,000,000
(G5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 25 in the Philadelphia Navy Yard
Project Allocation5,000,000
(H5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 22 in the Philadelphia Navy Yard
Project Allocation10,000,000
(I5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 19 in the Philadelphia Navy Yard
Project Allocation10,000,000
(J5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 18 in the Philadelphia Navy Yard
Project Allocation5,000,000
(K5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 17 in the Philadelphia Navy Yard
Project Allocation5,000,000
(L5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 16 in the Philadelphia Navy Yard
Project Allocation10,000,000
(M5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 15 in the Philadelphia Navy Yard
Project Allocation5,000,000
(N5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 14 in the Philadelphia Navy Yard
Project Allocation5,000,000
(O5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 12 in the Philadelphia Navy Yard
Project Allocation5,000,000
(P5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 10 in the Philadelphia Navy Yard
Project Allocation5,000,000
(Q5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 7 in the Philadelphia Navy Yard
Project Allocation5,000,000
(R5) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 3 in the Philadelphia Navy Yard
Project Allocation5,000,000
(S5) Site preparation, construction, renovation and other related costs for the redevelopment of a community building at Granahan Playground
Project Allocation1,200,000
(T5) Site preparation, acquisition, demolition, construction, fit out for mixed uses, including ground level retail, light industrial, community services spaces and residential end uses, and other related costs for the redevelopment of the Enterprise Center Campus Project
Project Allocation7,000,000
(U5) Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the redevelopment of an underutilized manufacturing facility on the western edge of Center City
Project Allocation5,000,000
(V5) Construction, infrastructure, acquisition, development and other related costs for capital improvements and renovations to the Christ the King Church and buildings
Project Allocation2,000,000
(W5) Construction, infrastructure, acquisition, development and other related costs for capital improvements and renovations to Our Lady of the Cavalry Catholic Church and buildings
Project Allocation2,000,000
(X5) Infrastructure, development, construction and other related costs for the redevelopment of properties along the Academy Road Commercial Corridor
Project Allocation2,000,000
(Y5) Infrastructure, development, construction and other related costs for the redevelopment of properties along the section of Castor Avenue within zip code 19152
Project Allocation2,000,000
(Z5) Infrastructure, development, construction and other related costs for the redevelopment of properties along the section of Bustleton Avenue within zip code 19152
Project Allocation2,000,000
(A6) Infrastructure, development, construction and other related costs for the redevelopment of properties along the section of Grant Avenue Commercial Corridor
Project Allocation2,000,000
(B6) Construction, renovation, infrastructure improvement and equipment related to the development of a neighborhood community facility in the northeast section of Philadelphia containing the zip codes 19114, 19136, 19152 and 19154
Project Allocation5,000,000
(C6) Expansion and renovation of a training facility with a State-approved apprenticeship program in the northeast section of Philadelphia containing zip codes 19114, 19130 and 19154
Project Allocation20,000,000
(D6) Construction, infrastructure, acquisition and other costs related to the expansion and renovation of a facility used for dance education and training located in the northeast section of Philadelphia containing zip code 19114
Project Allocation15,000,000
(E6) Construction, infrastructure, acquisition and other costs for the creation of a new early childhood center and outdoor playground located in the northeast section of Philadelphia containing zip code 19114
Project Allocation1,100,000
(F6) Construction, site preparation, expansion and renovation of sports complex to provide community access to indoor and outdoor family activities in the northeast section of Philadelphia containing zip codes 19114, 19136, 19152 and 19154
Project Allocation5,000,000
(G6) Construction, site preparation, demolition, infrastructure, acquisition and other costs for field renovation for Mastery Charter Schools
Project Allocation2,000,000
(H6) Construction, site renovation, demolition, infrastructure and other related costs for the redevelopment of the Christy Recreation Center
Project Allocation5,000,000
(I6) Demolition, infrastructure improvements, construction and other related costs for a redevelopment project in the vicinity of 11th and Walnut Streets
Project Allocation15,000,000
(J6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of Vernon House
Project Allocation4,000,000
(K6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of Colonel Charles Young Post #682
Project Allocation1,000,000
(L6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the revitalization of a commercial building on North Broad Street
Project Allocation5,000,000
(M6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the revitalization of a commercial building
Project Allocation20,000,000
(N6) Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the Weavers Way Germantown Expansion Project
Project Allocation2,500,000
(O6) Construction, renovation, including major systems, plumbing, electrical, HVAC and roofing renovation, and other related costs to maintain and redevelop the Project Learn School
Project Allocation1,000,000
(P6) Remediation, renovation and construction for ADA-compliant access and all major systems upgrades and other related costs for the water tower recreation center
Project Allocation2,500,000
(Q6) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs to revitalize the Tioga Marine Terminal along with the rehabilitation of two container cranes
Project Allocation25,000,000
(R6) Acquisition, demolition, construction, infrastructure, redevelopment, securitization, fencing and other related costs to revitalize, rehabilitate and enhance security on a portion of the Consolidated Rail Corporation (Conrail) line bounded by Aramingo Avenue and the Frankford Creek
Project Allocation2,500,000
(S6) General improvements, including infrastructure enhancement, new construction and demolition, land and equipment acquisition and main capital maintenance projects at all Philadelphia Regional Port Authority facilities
Project Allocation200,000,000
(T6) Rehabilitation, renovation, construction, infrastructure and other related costs for the redevelopment of the Philadelphia Orchestra and Kimmel Center, Inc.
Project Allocation20,000,000
(U6) Rehabilitation, renovation, construction, infrastructure and other related costs for redevelopment at 300 South Broad Street
Project Allocation20,000,000
(V6) Infrastructure, development, construction and other related costs for facilities improvement to the Northeast Family YMCA
Project Allocation2,000,000
(W6) Infrastructure, development, construction and other related costs for facilities renovation and improvement to the Penn Crisp Gym
Project Allocation2,000,000
(X6) Construction, site preparation, expansion and other related costs for golf facilities and a youth golf learning center for the Union League Golf Club at Torresdale
Project Allocation5,000,000
(Y6) Construction, infrastructure, development and other related costs for capital improvements and renovation of clubhouse facilities and a youth golf education center for the First Tee of Greater Philadelphia
Project Allocation2,000,000
(Z6) Construction, site development, infrastructure, redevelopment and other costs and improvements to Al-Aqsa Islamic Academy
Project Allocation7,500,000
(A7) Construction, site development, infrastructure, redevelopment and other costs and improvements for Al-Aqsa Islamic Academy and the surrounding campus
Project Allocation7,500,000
(B7) Construction, infrastructure, redevelopment and other improvements to 1501 North Germantown Avenue in Philadelphia
Project Allocation7,500,000
(C7) Acquisition, construction, infrastructure and equipment related to the expansion of Esperanza Health Center's Health and Wellness Campus in Kensington
Project Allocation7,500,000
(D7) Acquisition, construction, infrastructure and equipment related to the expansion of Esperanza Health Center's North 5th Street location
Project Allocation5,000,000
(E7) Construction, infrastructure and other related costs for the Children's Crisis Treatment Center - North Philadelphia
Project Allocation6,000,000
(F7) Design, construction, redevelopment, renovation, rehabilitation and other related costs for the development of property located in the city related to an e-Sports facility located at 401 North Broad Street
Project Allocation2,000,000
(G7) Construction, infrastructure, redevelopment, renovation and other related costs for an industrial warehouse
Project Allocation3,000,000
(H7) Acquisition, construction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the development of industrial warehouse facilities
Project Allocation20,000,000
(I7) Acquisition, construction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the development of industrial warehouse facilities for Bridge Point Philadelphia
Project Allocation20,000,000
(iii) Philadelphia Independent School District
(A) Construction, site preparation, expansion and infrastructure-related costs and construction of a school campus academic facility located in the northeast section of Philadelphia containing zip code 19154
Project Allocation10,000,000
(B) Construction, site preparation, expansion and infrastructure-related costs and construction of a grade school academic facility located in the northeast section of Philadelphia containing zip codes 19114, 19136 and 19152
Project Allocation10,000,000
(C) Construction, site preparation, expansion and infrastructure-related costs and construction of a state-of-the-art STEM education facility located in the northeast section of Philadelphia containing zip codes 19114, 19136 and 19152
Project Allocation10,000,000
(52) Pike County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation10,000,000
(B) Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation10,000,000
(53) Potter County
(i) (Reserved)
(54) Schuylkill County
(i) County projects
(A) Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility
Project Allocation10,000,000
(B) Physical infrastructure improvements at Penn State Schuylkill
Project Allocation750,000
(C) Construction, infrastructure and other related costs for the Schuylkill County Emergency Management Offices and Training Facility in West Mahanoy Township
Project Allocation1,500,000
(ii) City of Pottsville
(A) Acquisition, infrastructure, construction, renovation and other related costs for development of a farmers market
Project Allocation500,000
(B) Acquisition, infrastructure, construction, renovation and other related costs for a streetscape project, including stormwater management, façade improvements, landscaping, lighting, parking lots, restrooms and streetscape improvements
Project Allocation5,000,000
(C) Acquisition, infrastructure, construction, renovation and other related costs for development of downtown properties and streetscape improvements
Project Allocation5,000,000
(D) Acquisition, infrastructure, construction, renovation and other related costs for historic housing revitalization
Project Allocation5,000,000
(iii) Tamaqua Borough
(A) Infrastructure, rehabilitation and other related costs for development of a live-work space entrepreneurial center with high-speed fiber optic Internet service
Project Allocation2,500,000
(iv) Schuylkill Economic Development Corporation
(A) Redevelopment and construction of an industrial shell building at Rush Township Industrial Park
Project Allocation1,500,000
(B) Acquisition, infrastructure, construction, utility extensions and roadway improvements for development of a Schuylkill Airport Industrial Park
Project Allocation2,000,000
(C) Redevelopment and construction of commercial and industrial buildings at Highridge Industrial Park
Project Allocation2,000,000
(D) Acquisition, infrastructure, construction and other related costs for a rehabilitation of the former Ashland State Hospital complex to retrofit into a multipurpose facility
Project Allocation2,000,000
(E) Rehabilitation, infrastructure and other related costs for construction of additional buildings and expansion at an industrial complex
Project Allocation20,000,000
(55) Snyder County
(i) County projects
(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for renovations of a county-owned facility
Project Allocation2,000,000
(B) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county
Project Allocation5,000,000
(C) Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county
Project Allocation10,000,000
(ii) Selinsgrove Borough
(A) Acquisition, construction, infrastructure, rehabilitation, abatement of hazardous materials and other related costs for creation of an intergenerational community life center
Project Allocation2,500,000
(56) Somerset County
(i) County projects
(A) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for historic preservation and/or green development of Conemaugh Health System facilities
Project Allocation5,000,000
(57) Sullivan County
(i) (Reserved)
(58) Susquehanna County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation10000000
(B) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for historic rehabilitation, new facilities and other improvements to the historic Dennis Farm property
Project Allocation5,000,000
(59) Tioga County
(i) (Reserved)
(60) Union County
(i) County projects
(A) Acquisition, infrastructure, rehabilitation, redevelopment, construction and other related costs for the Evangelical Community Hospital
Project Allocation10,000,000
(61) Venango County
(i) County projects
(A) Construction and other related costs for renovations to the dementia wing of a senior care facility
Project Allocation1,000,000
(B) Acquisition, construction, infrastructure, abatement of hazardous materials, equipment upgrades and other related costs for expansion of a community dental center
Project Allocation2,500,000
(C) Construction and other related costs to build residential homes for residents currently being served at the Polk Center in Polk Borough
Project Allocation2,000,000
(62) Warren County
(i) (Reserved)
(ii) Northwest Pennsylvania Regional Planning and Development Commission
(A) Acquisition of a property within Warren County for the purpose of construction of a new building or renovation of an existing building to meet the needs of current employers or attract new employers to the county
Project Allocation1,500,000
(iii) City of Warren
(A) Construction, infrastructure, redevelopment, renovation and other related costs for Warren General Hospital, including, but not limited to, updating elevators, bathrooms and sidewalks to meet ADA requirements
Project Allocation5,000,000
(63) Washington County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs for a community and economic development project in the county
Project Allocation25,000,000
(B) Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and/or green development of an alternative energy facility in Robinson Township
Project Allocation10,000,000
(C) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(D) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation7,000,000
(ii) Redevelopment Authority of the County of Washington
(A) Construction, renovation, rehabilitation and infrastructure costs for capital improvements to the Washington Wild Things park
Project Allocation10,000,000
(B) Acquisition, demolition, infrastructure, abatement of hazardous materials, renovation, rehabilitation, construction and other related costs for a blight remediation project at the intersection of Main and Chestnut streets in the City of Washington
Project Allocation5,000,000
(C) Acquisition, construction, renovation, rehabilitation, abatement of hazardous materials, redevelopment, infrastructure, other related costs and economic development projects for Arc Human Services, Inc. in Canonsburg Borough
Project Allocation3,000,000
(D) Acquisition, construction, renovation, rehabilitation, abatement of hazardous materials, redevelopment, infrastructure, other related costs and economic development projects for Arc Human Services, Inc. in the City of Washington
Project Allocation3,000,000
(E) Acquisition, construction, renovation, rehabilitation, infrastructure and other related costs for a capital construction project that will include a visitors' center at Meadowcroft Rockshelter and Historic Village
Project Allocation2,000,000
(F) Construction, infrastructure, rehabilitation and other related costs for expansion and upgrades to the Donora Public Library, including new green heating and cooling
Project Allocation350,000
(iii) City of Washington
(A) Construction, renovation, rehabilitation, redevelopment and other related costs for a community center renovation project at Transitional Paths to Independent Living (TRPIL)
Project Allocation1,500,000
(iv) Midway Borough
(A) Acquisition, construction, renovation, rehabilitation, demolition, redevelopment and other related costs for a project to relocate the existing municipal building
Project Allocation1,000,000
(v) North Strabane Township
(A) Acquisition, construction, renovation, rehabilitation and other related costs for a new public safety building
Project Allocation4,100,000
(vi) Peters Township
(A) Redevelopment, infrastructure and other related costs for a spillway enhancement project for the dam at Peters Lake Park
Project Allocation2,500,000
(B) Acquisition, construction, redevelopment, infrastructure and other related costs for the construction of a new fire substation and the purchase of a new fire engine
Project Allocation2,500,000
(vii) South Strabane Township
(A) Acquisition, construction, infrastructure and other related costs for an indoor waterpark, hotel and convention center, including a solar array to power the complex and adjacent properties
Project Allocation25,000,000
(64) Wayne County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation10,000,000
(ii) Greater Honesdale Partnership
(A) Acquisition, site development, demolition, infrastructure, vertical construction, redevelopment and related costs for a community or economic development project
Project Allocation5,000,000
(65) Westmoreland County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation and other related costs for an economic development project in the county as identified in the 2018 comprehensive plan "Reimagining Our Westmoreland"
Project Allocation25,000,000
(B) Acquisition, construction, renovation, infrastructure improvements and other related costs for a community or economic development project or initiative
Project Allocation25,000,000
(C) Construction, demolition, site and material abatement, site predevelopment activities, redevelopment, renovation, rehabilitation, infrastructure and other related costs to replace a roof; repair, replace or separate utilities; establish multitenant corridors; construct multitenant truck courts; and construct new buildings
Project Allocation20,000,000
(D) Acquisition, construction, demolition, renovation, rehabilitation, redevelopment, infrastructure and other related costs for the development of a convention center as a priority project for the comprehensive plan "Reimagining Our Westmoreland"
Project Allocation10,000,000
(E) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure improvements and other related costs for a facility to house a medical school for the Lake Erie College of Osteopathic Medicine (LECOM)
Project Allocation10,000,000
(F) Acquisition, construction, demolition, renovation, rehabilitation, abatement of hazardous materials, infrastructure and other related costs for the Seton Hill University campus
Project Allocation10,000,000
(G) Acquisition, redevelopment, construction, renovation, rehabilitation, infrastructure extensions and improvements and other related costs for an economic development project along or near US Route 22
Project Allocation5,000,000
(H) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions
Project Allocation20,000,000
(I) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership
Project Allocation7,000,000
(J) Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for Watt Fuel Cell Corporation facilities
Project Allocation35,000,000
(ii) Redevelopment Authority of the County of Westmoreland
(A) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs to adaptively reuse a three-story building in the City of Monessen
Project Allocation7,500,000
(B) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs to redevelop a brownfield site in Trafford Borough
Project Allocation3,500,000
(C) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs to redevelop a former steel plant facility in the City of Latrobe
Project Allocation1,500,000
(D) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs to redevelop a former metal roll manufacturing facility in Avonmore Borough
Project Allocation1,500,000
(E) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs to redevelop a former glass plant in Hempfield Township
Project Allocation1,500,000
(F) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs for the adaptive reuse of a former five-story bank building in the City of Jeannette
Project Allocation1,500,000
(G) Construction, redevelopment, abatement of hazardous materials and other related costs to redevelop a site in Mount Pleasant Borough
Project Allocation500,000
(H) Acquisition, demolition, redevelopment, abatement of hazardous materials and other related costs to redevelop a site in East Huntingdon Township
Project Allocation500,000
(I) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs to redevelop a former brewing facility in Smithton Borough
Project Allocation500,000
(J) Construction, redevelopment, abatement of hazardous materials and other related costs to adaptively reuse a former trolley barn in Derry Borough
Project Allocation500,000
(K) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for facilities at AHN Hempfield Neighborhood Hospital
Project Allocation10,000,000
(iii) Economic Growth Connection of Westmoreland
(A) Acquisition, construction, renovation, rehabilitation, infrastructure and other related costs for a new aluminum manufacturing innovation and technical center and new laboratory infrastructure
Project Allocation7,000,000
(iii.1) Export Borough
(A) Acquisition, construction, infrastructure, redevelopment, rehabilitation and other related costs for a downtown renovation project, including park development, renovation of a historic train station and development of the Westmoreland Heritage Bike Trail
Project Allocation1,000,000
(B) Construction and other related costs for the development of a park and facilities, including a parking lot, picnic shelters, sidewalks and restrooms
Project Allocation667,000
(iv) Hempfield Township
(A) Acquisition, construction, renovation, rehabilitation, infrastructure and other related costs for a new regional public safety facility
Project Allocation10,000,000
(v) Latrobe Industrial Development Authority
(A) Acquisition, construction, renovation, rehabilitation, redevelopment, infrastructure and other related costs for the Saint Vincent College community outreach center in the City of Latrobe, other facilities in the City of Latrobe and facilities on the Saint Vincent College campus
Project Allocation5,000,000
(v.1) Redevelopment Authority of Westmoreland County
(A) Construction, acquisition, infrastructure, redevelopment and other related costs for renovation and rehabilitation of the Laurel Highlands Workforce and Opportunity Center in Hempfield Township
Project Allocation2,000,000
(vi) Southwest Greensburg Borough
(A) Construction and other related costs for a borough garage
Project Allocation1,000,000
(vii) Westmoreland County Industrial Development Corporation
(A) Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs associated with the improvement and expansion of the Adelphoi campus and associated facilities
Project Allocation3,000,000
(B) Acquisition, construction and other related costs for Online Stores, Inc., to build a warehouse and manufacturing facility in Sewickley Township
Project Allocation1,500,000
(66) Wyoming County
(i) County projects
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county
Project Allocation10,000,000
(B) Acquisition, redevelopment, renovation, rehabilitation and other related costs for Tyler Memorial Hospital
Project Allocation1,000,000
(67) York County
(i) County projects
(A) Acquisition, site preparation, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for development of WellSpan Health health care facilities
Project Allocation5,000,000
(B) Acquisition, site preparation, infrastructure, construction and other related costs associated with a large-scale, mixed-use development project north of Canal Road in Conewago Township
Project Allocation5,000,000
(C) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project
Project Allocation15,000,000
(D) Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic, or historical project
Project Allocation15,000,000
(i.1) City of York Redevelopment Authority
(A) Construction, infrastructure, acquisition, site preparation, abatement of hazardous materials and other related costs for the redevelopment of the former Dentsply manufacturing facility and the creation of a mix-used urban redevelopment project
Project Allocation15,000,000
(B) Construction, infrastructure, site preparation and other related costs for the redevelopment of new retail and housing spaces to eliminate and enhance surface parking areas
Project Allocation10,000,000
(C) Construction, infrastructure, site preparation and other related costs for the development of structured parking and the development of new retail and housing spaces to eliminate and enhance surface parking areas
Project Allocation9,000,000
(i.2) Red Lion Municipal Authority
(A) Demolition, construction, infrastructure and other related costs for the demolition of an aged and damaged steel water storage tank and the construction of a new concrete water storage tank in Red Lion Borough and Windsor Township
Project Allocation1,150,000
(i.3) Redevelopment Authority of the County of York
(A) Site preparation, remediation, construction, infrastructure, renovation and other related costs for the development and site improvement for York College facility
Project Allocation3,000,000
(ii) York County Economic Alliance
(A) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for development of an outdoor economy site for recreation
Project Allocation4,000,000
(B) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for business expansion and development within York County's Historic Trail Towns communities
Project Allocation4,000,000
(C) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for historic preservation, restoration and reuse of property located within the City of York
Project Allocation5,000,000
(D) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for expansion and development of a manufacturing facility
Project Allocation5,000,000
(E) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for historic preservation, restoration and reuse of property located within the Borough of Hanover
Project Allocation5,000,000
(F) Acquisition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of property for mixed-use in a strategic corridor of the county
Project Allocation5,000,000
(G) Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for site redevelopment along the York County Heritage Rail Trail
Project Allocation5,000,000
(H) Acquisition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of property for mixed-use along the Codorus Innovation Corridor in the City of York
Project Allocation6,000,000
(I) Acquisition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for nonprofit redevelopment, modernization and service enhancements throughout the county
Project Allocation10,000,000
(J) Acquisition, construction and other related costs for safe workforce sustainable living units and commercial spaces
Project Allocation5,000,000
(K) Acquisition, construction, infrastructure and redevelopment of a strategic site in Hanover Borough to enhance the property for productive use
Project Allocation5,000,000
(ii.1) City of York
(A) Acquisition, demolition, construction, infrastructure and other related costs to redevelop and expand a facility
Project Allocation10,000,000
(iii) Chanceford Township
(A) Construction, renovation and other related costs for the existing township community/municipal building
Project Allocation1,000,000
(iv) Windsor Township
(A) Construction, infrastructure, design, administration, storm water management and other related costs for a community center building and other site improvement activities
Project Allocation3,000,000
(68) Multiple Counties
(i) Crawford, Erie, Mercer, Venango and Warren Counties
(A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for construction or improvement of a regional juvenile detention facility
Project Allocation25,000,000
(ii) Allegheny, Armstrong, Beaver, Butler, Cambria, Fayette, Washington and Westmoreland Counties
(A) Acquisition, construction, infrastructure redevelopment, renovation and other related costs for construction or improvement of a regional juvenile detention facility
Project Allocation25,000,000
(iii) Columbia and Luzerne Counties
(A) Acquisition, construction, infrastructure, rehabilitation, abatement of hazardous materials and other related costs for expansion of the Berwick Hospital behavioral health unit
Project Allocation3,000,000
(iv) Lackawanna and Wyoming Counties
(A) Construction, infrastructure, redevelopment, acquisition and other related costs for Keystone College improvement projects
Project Allocation5,000,000
(v) Chester County
(A) Construction of infrastructure to support track, station, ancillary features and safety improvements for operation of West Chester Railroad tourist trains, restoration of common carrier passenger rail service to West Chester, West Chester University, Westtown, Cheyney University and Center City via SEPTA connection, restoration of freight rail access to Glen Mills Quarry and private-sector tech start-up to demonstrate innovative battery technology
Project Allocation3,962,500
(vi) Cumberland, Franklin, Lancaster and York Counties
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for new construction, expansions and improvements for a value-added dairy processing facility using Pennsylvania milk
Project Allocation25,000,000
(vii) Armstrong, Clarion, Forest and Venango Counties
(A) Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for multicounty trail projects
Project Allocation10,000,000

Section 7. Itemization of flood control projects.

Additional capital projects in the category of flood control projects to be constructed by the Department of Environmental Protection, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal Project Allocation
(1) Department of Environmental Protection
(i) Allegheny County
(A) Construction, infrastructure and other related costs for a storm water line replacement, including storm sewer, manhole and replacement of a failing inlet, to reduce excessive runoff and flooding in Ben Avon Heights Borough
Project Allocation50,000
(B) Construction, infrastructure and other related costs for drainage improvement and flood control on Harmony Road in Ohio Township, including installation of inlet boxes, cast iron frames, safety grates, culvert piping, outlets, earth work and wall erosion and sediment control
Project Allocation158,000
(C) Construction, redevelopment and other related costs for a detention pond retrofit at Northridge, including earth work, maintenance and protection of traffic, culvert pipe installation, outlet removal and removal and replacement, erosion and sediment control, fencing and landscape restoration in Ohio Township
Project Allocation169,000
(D) Construction, infrastructure and other related costs for a pollutant reduction plan project, including storm water detention pond improvements and sediment reduction in South Fayette Township
Project Allocation250,000
(E) Construction, rehabilitation and other related costs for the Werner Avenue Slope Stabilization project, including a new retaining wall, roadway improvements and installation of storm sewer and catch basins for erosion prevention in Bridgeville Borough
Project Allocation700,000
(F) Construction, infrastructure and other related costs for detention pond construction to alleviate flooding in the Broughton area of South Park Township
Project Allocation900,000
(G) Construction, infrastructure, rehabilitation and other related costs for a flood mitigation project in Oakdale Borough
Project Allocation1,000,000
(H) Construction, infrastructure, rehabilitation and other related costs for Phase I of the McLaughlin Run Flood Control project, including construction of a levee with pumps along Carol Avenue and replacement of the Commercial Street culverts in Bridgeville Borough
Project Allocation5,600,000
(ii) Bucks County
(A) Core Creek Dam flood control - rehabilitation
Project Allocation1,700,000
(B) Acquisition, rehabilitation, infrastructure, flood mitigation and related costs for a riverfront redevelopment project
Project Allocation10,000,000
(C) Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to waterway bank restoration projects and storm water management projects
Project Allocation5,000,000
(iii) Crawford County
(A) Rainbow Dam flood control - rehabilitation
Project Allocation3,800,000
(iii.1) Delaware County
(A) Construction and other costs relating to the South Wayne Avenue Flood Reduction Project in Radnor Township
Project Allocation1,000,000
(iii.2) Lackawanna County
(A) Acquisition, construction, infrastructure and other related costs to mitigate flooding
Project Allocation10,000,000
(iv) Luzerne County
(A) Construction, infrastructure, rehabilitation and other related costs for the West Pittston flood mitigation levee project
Project Allocation15,000,000
(B) Acquisition, construction, infrastructure and other related costs to mitigate flooding
Project Allocation5,000,000
(v) Lycoming County
(A) Construction, infrastructure and other related costs for the Lawshee Run culvert replacement project in Jersey Shore Borough
Project Allocation15,000,000
(B) Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for a flood control project
Project Allocation20,000,000
(v.1) Monroe County
(A) Acquisition, construction, infrastructure and other related costs to mitigate flooding
Project Allocation5,000,000
(vi) Montgomery County
(A) Construction, infrastructure and other related costs for a storm water arch rehabilitation project located under 1200 High Street in the Borough of Pottstown
Project Allocation750,000
(B) Construction, infrastructure and other related costs for a storm water arch rehabilitation project in the Borough of Pottstown
Project Allocation3,750,000
(vii) Pike County
(A) Kintz Creek Dam flood control - rehabilitation
Project Allocation2,300,000
(viii) Tioga County
(A) Hamilton Dam flood control - rehabilitation
Project Allocation1,800,000
(ix) Washington County
(A) Construction, infrastructure and other related costs for a storm water management and backflow prevention project in West Brownsville Borough
Project Allocation500,000
(B) Construction, infrastructure, rehabilitation and other related costs for a two-stage flood plain restoration project located along Tributary 1 of Catfish Creek upstream of SR 18 in the City of Washington, including realignment of the stream, recreation of historical floodplain, stabilization of existing incised banks and natural plan stabilization
Project Allocation700,000
(x) York County
(A) Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for rehabilitation of Silver Lake
Project Allocation2,000,000

Section 8. Itemization of Pennsylvania Fish and Boat Commission capital projects.

Capital projects in the category of public improvement projects to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by the current revenues of the Fish Fund and the Boat Fund pursuant to executive authorizations are hereby itemized, together with their respective estimated costs, as follows:

ProjectTotal Project Allocation
(1) Pennsylvania Fish and Boat Commission
(i) Cambria County
(A) Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Duman Lake
Project Allocation4,715,000
(ii) Carbon County
(A) Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Mauch Chunk Lake
Project Allocation7,075,000
(iii) Centre County
(A) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Bellefonte State Fish Hatchery
Project Allocation8,385,000
(B) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Pleasant Gap State Fish Hatchery
Project Allocation5,235,000
(C) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Benner Spring State Fish Hatchery
Project Allocation9,125,000
(iv) Clinton County
(A) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Tylersville State Fish Hatchery
Project Allocation3,155,000
(v) Columbia County
(A) Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Briar Creek Lake
Project Allocation7,765,000
(vi) Crawford County
(A) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Linesville State Fish Hatchery
Project Allocation14,365,000
(vi.1) Cumberland County
(A) Design, permit, acquisition of properties, dam construction, repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary at Children's Lake
Project Allocation2,000,000
(vii) Erie County
(A) Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Hatchery Pond
Project Allocation1,045,000
(B) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Corry State Fish Hatchery
Project Allocation9,125,000
(C) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Fairview State Fish Hatchery
Project Allocation4,465,000
(D) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Union City State Fish Hatchery
Project Allocation4,365,000
(viii) Forest County
(A) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Tionesta State Fish Hatchery
Project Allocation5,185,000
(ix) Luzerne County
(A) Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Lilly Lake
Project Allocation485,000
(x) Potter County
(A) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Oswayo State Fish Hatchery
Project Allocation8,485,000
(xi) Susquehanna County
(A) Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Stump Pond
Project Allocation3,435,000
(xii) Warren County
(A) Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Browns Pond
Project Allocation3,485,000
(xiii) Wayne County
(A) Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Douglas Pond
Project Allocation3,715,000
(B) Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Pleasant Mount State Fish Hatchery
Project Allocation7,035,000
(xiv) Wyoming County
(A) Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Lake Winola
Project Allocation485,000

Section 9. Debt authorization.

(a) Public improvements.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(a).

(b) Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(b) as may be found necessary to carry out the acquisition and construction of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in the capital budget.

(c) Transportation assistance.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(c) as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.

(d) Redevelopment assistance.--Subject to the limitations in section 2.1 of the act of May 29, 2020 (P.L.205, No.25), known as the Capital Budget Act of 2019-2020, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(d) as may be found necessary to carry out the redevelopment assistance capital projects specifically itemized in the capital budget.

(e) Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(e) as may be found necessary to carry out the acquisition and construction of the flood control projects specifically itemized in a capital budget.

(f) Pennsylvania Fish and Boat Commission projects.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate specified in section 2(f) to carry out the acquisition and construction of the Pennsylvania Fish and Boat Commission projects specifically itemized in a capital budget.

Section 10. Issue of bonds.

The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed the estimated useful life of the projects being financed as stated in section 11.

Section 11. Estimated useful life and term of debt.

(a) Estimated useful life.--The General Assembly states that the estimated useful life of the capital projects itemized in this act is as follows:

(1) Public improvement projects, 30 years.

(2) Furniture and equipment, 10 years.

(3) Transportation assistance projects:

(i) Rolling stock, 15 years.

(ii) Passenger buses, 12 years.

(iii) Furniture and equipment, 10 years.

(iv) All others, 30 years.

(4) Redevelopment assistance projects, 30 years.

(b) Term of debt.--The maximum term of the debt authorized to be incurred under this act is 30 years.

Section 12. Appropriations.

(a) Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount specified in section 2(a) to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the money as required and certified by it to be legally due and payable.

(b) Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount specified in section 2(b) to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the money as required and certified by it to be legally due and payable.

(c) Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount specified in section 2(c) to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the money as required and certified by it to be legally due and payable.

(d) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community and Economic Development in the maximum amount specified in section 2(d) to be used by it exclusively to defray the financial cost of the redevelopment assistance capital projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community and Economic Development the money as required and certified by it to be legally due and payable.

(e) Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Protection in the maximum amount specified in section 2(e) to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Protection the money as required and certified by it to be legally due and payable.

Section 13. Federal funds.

(a) Projects itemized in this act.--All money received from the Federal Government for the projects specifically itemized in this act are also hereby appropriated for those projects.

(b) Projects not requiring itemization.--Department of Military and Veterans Affairs construction projects which are totally federally funded and to be administered by the Department of General Services are hereby authorized.

Section 14. Editorial changes.

In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The Legislative Reference Bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and department totals as necessary to agree with the total monetary amounts of the projects.

Section 15. Effective date.

This act shall take effect immediately.