Minnesota Rules — Water and Soil Resources Board

agency-183Minn. R. (Water and Soil Resources Board)Regulation

Chapter 8400 LAND AND WATER TREATMENT PROGRAM

Minn. R. 8400.0050 Purpose

The land and water treatment program is administered through districts to provide financial and technical assistance to land occupiers for the application of conservation practices that reduce erosion, control sedimentation, improve and protect water quality, or address water quantity problems due to altered hydrology to ensure the sustainable use of Minnesota's natural resources.

History

  • Statutory Authority: MS s 103C.501; 103F.531
  • History: 20 SR 2185; 37 SR 1277
Minn. R. 8400.0060 Authority

Minnesota Statutes, section 103C.501, authorizes the state board, in cooperation with the districts, to administer a program of cost sharing with land occupiers for the installation of soil and water conservation practices. Parts 8400.0060 to 8400.1900 provide procedures and criteria to be followed by the state board in allocating cost-sharing funds to districts and standards and guidelines that the district boards shall use in allocating funds to land occupiers.

History

  • Statutory Authority: MS s 103C.501; 103F.531
  • History: 37 SR 1277
Minn. R. 8400.0100 Definitions

Subpart 1. Scope.

For purposes of parts 8400.0050 to 8400.1900, the definitions in this part, in addition to those in Minnesota Statutes, chapter 103C, apply.

Subp. 1a.

[Repealed, 20 SR 2185]

Subp. 2.

[Repealed, 20 SR 2185]

Subp. 2a.

[Repealed, 37 SR 1277]

Subp. 3. Annual work plan.

"Annual work plan" means a plan prepared by the district pursuant to Minnesota Statutes, section 103C.331, subdivision 11, paragraph (e), and according to the most recent policy published by the state board.

Subp. 4.

[Repealed, 37 SR 1277]

Subp. 5.

[Repealed, 20 SR 2185]

Subp. 5a. Comprehensive local water plan.

"Comprehensive local water plan" means a local water plan authorized under Minnesota Statutes, section 103B.311; a watershed overall plan required under Minnesota Statutes, section 103D.401; a watershed management plan required under Minnesota Statutes, section 103B.231; or a county groundwater plan authorized under Minnesota Statutes, section 103B.255.

Subp. 6.

[Repealed, 20 SR 2185]

Subp. 7.

[Repealed, 9 SR 2439]

Subp. 7a.

[Repealed, 20 SR 2185]

Subp. 8. Comprehensive plan.

"Comprehensive plan" means a long-range plan adopted by the district pursuant to Minnesota Statutes, section 103C.331, subdivision 11, and according to the most recent policy published by the state board.

Subp. 8a.

[Repealed, 20 SR 2185]

Subp. 8b. Conservation practices.

"Conservation practices" means practices applied to the land for the purpose of controlling or preventing soil erosion, sedimentation, nutrient runoff, or other water pollution to maintain the sustainable use of soil and water and other natural resources.

Subp. 9. District.

"District" means a soil and water conservation district organized under Minnesota Statutes, chapter 103C.

Subp. 10. District board.

"District board" means the board of supervisors of a soil and water conservation district as organized under Minnesota Statutes, chapter 103C.

Subp. 10a.

[Repealed, 37 SR 1277]

Subp. 10b.

[Renumbered subp 8b]

Subp. 11.

[Repealed, 20 SR 2185]

Subp. 12.

[Repealed, 20 SR 2185]

Subp. 13.

[Repealed, 20 SR 2185]

Subp. 14. Effective life.

"Effective life" means the time span for which a conservation practice effectively fulfills its intended purpose.

Subp. 14a.

[Repealed, 20 SR 2185]

Subp. 14b.

[Repealed, 37 SR 1277]

Subp. 15.

[Repealed, 37 SR 1277]

Subp. 16.

[Repealed, 37 SR 1277]

Subp. 16a.

[Repealed, 37 SR 1277]

Subp. 16b.

[Repealed, 37 SR 1277]

Subp. 17.

[Repealed, 9 SR 2439]

Subp. 18. Land occupier.

"Land occupier" means a person, corporation, or legal entity that holds title to or is in possession of land within a district as an owner, lessee, tenant, or otherwise.

Subp. 18a.

[Repealed, 37 SR 1277]

Subp. 18b.

[Repealed, 37 SR 1277]

Subp. 19.

[Repealed, 20 SR 2185]

Subp. 19a.

[Repealed, 37 SR 1277]

Subp. 20.

[Repealed, 20 SR 2185]

Subp. 20a.

[Repealed, 37 SR 1277]

Subp. 20b.

[Repealed, 37 SR 1277]

Subp. 20c.

[Repealed, 20 SR 2185]

Subp. 20d.

[Repealed, 37 SR 1277]

Subp. 21.

[Repealed, 20 SR 2185]

Subp. 22.

[Repealed, 20 SR 2185]

Subp. 22a.

[Repealed, 37 SR 1277]

Subp. 23. State board.

"State board" means the state Board of Water and Soil Resources created in Minnesota Statutes, section 103B.101.

Subp. 24.

[Repealed, 9 SR 2439]

Subp. 25.

[Repealed, 37 SR 1277]

Subp. 26.

[Repealed, 37 SR 1277]

Subp. 27.

[Repealed, 37 SR 1277]

History

  • Statutory Authority: MS s 40.036; 103C.501; 103F.531
  • History: 9 SR 2439; L 1987 c 358 s 34; 20 SR 2185; 37 SR 1277
Minn. R. 8400.0200 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.0250 Program Policy

The state board shall adopt policies providing for administration and implementation of parts 8400.0500 to 8400.1900.

History

  • Statutory Authority: MS s 103C.501; 103F.531
  • History: 37 SR 1277
Minn. R. 8400.0300 Approved Conservation Practices

Subpart 1.

[Repealed, 37 SR 1277]

Subp. 2. Criteria for approved conservation practices.

Practices eligible for cost-share funds must meet the criteria in items A to D.

A. The objectives of the approved conservation practices may include, but are not limited to, activities that:

B. Practices to restore, protect, or enhance natural wildlife, aquatic, or native plant habitat are eligible when used in combination with the practices listed in item A.

C. No cost-share funds shall be furnished for conservation practices designed primarily to increase land productivity.

D. All conservation practices must be consistent with the district's comprehensive plan.

Subp. 3.

[Repealed, 37 SR 1277]

History

  • Statutory Authority: MS s 40.036; 103C.501; 103F.531; L 1999 c 231 s 203
  • History: 9 SR 2439; 20 SR 2185; 24 SR 1240; 37 SR 1277
Minn. R. 8400.0400 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.0500 [Repealed, L 2023 c 60 art 5 s 22]

[Repealed, L 2023 c 60 art 5 s 22]

Minn. R. 8400.0550 [Repealed, L 2023 c 60 art 5 s 22]

[Repealed, L 2023 c 60 art 5 s 22]

Minn. R. 8400.0600 Repealed by subpart

Subpart 1.

[Repealed, 37 SR 1277]

Subp. 2.

[Repealed, 9 SR 2439]

Subp. 3.

[Repealed, 37 SR 1277]

Subp. 4.

[Repealed, L 2023 c 60 art 5 s 22]

Subp. 5.

[Repealed, L 2023 c 60 art 5 s 22]

Minn. R. 8400.0700 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.0800 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.0900 Repealed by subpart

Subpart 1.

[Repealed, L 2023 c 60 art 5 s 22]

Subp. 2.

[Repealed, L 2023 c 60 art 5 s 22]

Subp. 3.

[Repealed, 37 SR 1277]

Subp. 4.

[Repealed, L 2023 c 60 art 5 s 22]

Subp. 5.

[Repealed, L 2023 c 60 art 5 s 22]

Minn. R. 8400.1000 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1100 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1200 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1250 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1300 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1400 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1405 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1460 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1500 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1600 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.1650 [Repealed, L 2023 c 60 art 5 s 22]

[Repealed, L 2023 c 60 art 5 s 22]

Minn. R. 8400.1700 [Repealed, L 2023 c 60 art 5 s 22]

[Repealed, L 2023 c 60 art 5 s 22]

Minn. R. 8400.1750 [Repealed, L 2023 c 60 art 5 s 22]

[Repealed, L 2023 c 60 art 5 s 22]

Minn. R. 8400.1800 [Repealed, L 2023 c 60 art 5 s 22]

[Repealed, L 2023 c 60 art 5 s 22]

Minn. R. 8400.1900 [Repealed, L 2023 c 60 art 5 s 22]

[Repealed, L 2023 c 60 art 5 s 22]

Minn. R. 8400.1950 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2000 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2100 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2200 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2300 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2400 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2500 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2600 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2700 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2705 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2800 [Repealed, 20 SR 2185]

[Repealed, 20 SR 2185]

Minn. R. 8400.2900 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.3000 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3030 Repealed by subpart

Subpart 1.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 2.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 3.

[Repealed, 14 SR 1928; L 2024 c 90 art 3 s 88]

Subp. 3a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 4.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 5.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 6.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 6a.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 7.

[Repealed, 14 SR 1928; L 2024 c 90 art 3 s 88]

Subp. 8.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 9.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 10.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 10a.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 10b.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 11.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 11a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 12.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 13.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 14.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 15.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 16.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 17.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 17a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 17b.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 18.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 19.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 20.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 20a.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 20b.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 21.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 22.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 23.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 24.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 25.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 26.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 27.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 28.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 29.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 30.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 31.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 31a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 32.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 33.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 33a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 33b.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 34.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 35.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 36.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 36a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 37.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 38.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 39.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 39a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 39b.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 39c.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 40.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 41.

[Repealed, 19 SR 550; L 2024 c 90 art 3 s 88]

Subp. 42.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 42a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 43.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 43a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 44.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 45.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 46.

[Repealed, 37 SR 1277; L 2024 c 90 art 3 s 88]

Subp. 47.

[Repealed, 14 SR 1928; L 2024 c 90 art 3 s 88]

Subp. 47a.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 48.

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3060 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.3100 [Repealed, 19 SR 550]

[Repealed, 19 SR 550]

Minn. R. 8400.3110 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3130 [Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3160 [Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3200 [Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3210 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3230 [Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3260 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3300 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3330 [Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3360 [Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3390 [Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3400 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3430 [Repealed, 19 SR 550]

[Repealed, 19 SR 550]

Minn. R. 8400.3460 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3500 [Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3530 Repealed by subpart

Subpart 1.

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Subp. 2.

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Subp. 2a.

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Subp. 3.

[Repealed, 19 SR 550, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Subp. 4.

[Repealed, 19 SR 550, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3560 [Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

[Repealed, L 2009 c 172 art 2 s 32; c 176 art 1 s 52]

Minn. R. 8400.3600 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3610 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3630 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3660 [Repealed, 19 SR 550]

[Repealed, 19 SR 550]

Minn. R. 8400.3700 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3730 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3760 [Repealed, 14 SR 1928; 19 SR 550]

[Repealed, 14 SR 1928; 19 SR 550]

Minn. R. 8400.3800 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3830 [Repealed, L 2024 c 90 art 3 s 88]

[Repealed, L 2024 c 90 art 3 s 88]

Minn. R. 8400.3860 [Repealed, 19 SR 550]

[Repealed, 19 SR 550]

Minn. R. 8400.3870 [Repealed, 37 SR 1277]

[Repealed, 37 SR 1277]

Minn. R. 8400.3900 [Repealed, 19 SR 550]

[Repealed, 19 SR 550]

Minn. R. 8400.3930 Repealed by subpart

Subpart 1.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 2.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 3.

[Repealed, L 2024 c 90 art 3 s 88]

Subp. 4.

[Repealed, 14 SR 1928; L 2024 c 90 art 3 s 88]

Minn. R. 8400.4000 General Provisions

Subpart 1. Purpose.

The purpose of parts 8400.4000 to 8400.4080 is to reduce the amount of soil erosion on Minnesota land. The benefits of the local adoption of parts 8400.4000 to 8400.4080 include decreasing the amount of off-site damages from sediment, retaining the productivity of the soil, and improving water quality.

Subp. 2. Policy.

Parts 8400.4000 to 8400.4080 are adopted in accordance with Minnesota Statutes, sections 103F.401 to 103F.455 and apply to all activities which cause excessive soil loss.

Subp. 3. Scope.

Parts 8400.4000 to 8400.4080 pertain to all activities that will disturb the land surface and cause excessive soil loss, and are consistent with the minimum degree of local protection against soil erosion. Local governments may enact soil loss limits which are more restrictive than parts 8400.4000 to 8400.4080.

Subp. 4. Voluntary adoption.

A local government of a county, home rule charter or statutory city, or town with the authority to adopt and administer an ordinance may choose to adopt and administer soil loss limits. Parts 8400.4000 to 8400.4080 are only applicable if the local government adopts a soil loss limits ordinance under Minnesota Statutes, sections 103F.401 to 103F.455.

Subp. 5. Conformance with local ordinances.

A local soil loss limits ordinance must not violate an ordinance the local government is enforcing.

History

  • Statutory Authority: MS s 40.21; 103F.411
  • History: 11 SR 742
Minn. R. 8400.4002 Definitions

Subpart 1. Scope.

For the purpose of parts 8400.4000 to 8400.4080 the terms defined in this part have the meanings given.

Subp. 2. Agricultural use.

"Agricultural use" means the use of land for the production of livestock, dairy animals, dairy products, poultry or poultry products, fur bearing animals, horticultural or nursery stock, including sod, fruit, vegetables, forage and cash grains, forestry, or bees and apiary products. Wetlands, pasture, and woodlands accompanying land in agricultural use are also defined as an agricultural use.

Subp. 3. Board.

"Board" means the state Board of Water and Soil Resources created under Minnesota Statutes, section 103B.101.

Subp. 4. Commissioner.

"Commissioner" means the commissioner of agriculture or a designated agent.

Subp. 5. Conservation plan and time schedule.

"Conservation plan" means a document listing a set of practices that, when implemented, will decrease soil erosion to the soil loss limits on a particular parcel of land. The "time schedule" will set times to implement, make satisfactory progress on, and complete the conservation plan.

Subp. 6. Conservation practice.

"Conservation practice" means a practice containing a definition, purpose, conditions under which the practice is applied including design requirements, and specifications containing a statement of details required for installing a conservation practice, including necessary kinds, quality, and quantity of work and materials. A conservation practice may be a permanent or temporary, vegetative or structural measure that, when applied to the land, will contribute to the control of wind and water erosion and sedimentation. "Conservation practices" may be used in a development activity area or an agricultural area. Permanent practices are those that have an effective life of ten years or more and include grassed waterways, terraces, field windbreaks, water control structures, grade stabilization structures, sediment retention structures, strip-cropping, water and sediment control basins, and other permanent practices approved by the board. Temporary practices include conservation tillage, contour farming, grasses and legumes in rotation, emergency tillage, fabric filter barriers, filter strips, stormwater inlet and outlet protection, and any other cultural practices approved by the board. The field office technical guide or other recognized technical procedures must be used to design, install, and certify practices.

Subp. 7. Development activity.

"Development activity" means a physical disturbance, excluding agricultural use, of the land associated with activities that may result in sedimentation of adjacent lands or waters. These activities include, but are not limited to, clearing, grading, excavating, transporting, draining, and filling lands. Federal, state, county, and municipal road construction designed and installed according to Department of Transportation standard specifications for construction are not development activities.

Subp. 8. District.

"District" means a soil and water conservation district organized under Minnesota Statutes, chapter 103C.

Subp. 9. Erosion.

"Erosion" means any process that wears away the surface of the land by the action of water, wind, ice, or gravity. "Erosion" can be accelerated by the activities of people or nature.

Subp. 10. Excessive soil loss.

"Excessive soil loss" means soil loss that is greater than the soil loss limit or which causes sedimentation on adjoining land or in a body of water, watercourse, or wetland.

Subp. 11. Field office technical guide.

"Field office technical guide" means the guide developed by the United States Department of Agriculture, Natural Resources Conservation Service and adopted by the soil and water conservation districts containing technical information including methods and procedures by which the various types of erosion can be estimated, and conservation practice standards and specifications required in the application of soil and water conservation practices.

Subp. 12. Land occupier.

"Land occupier" means a person, firm, corporation, municipality, or other legal entity that owns or possesses land as owner, lessee, renter, tenant, or otherwise. The terms include both the owner and the occupier of the land if they are not the same.

Subp. 13. Local government.

"Local government" means the elected governing body of a county, home rule charter or statutory city, or town, or their designated agents. Agents may include a soil and water conservation district, water management organization, joint power board, watershed district, or other governmental entity responsible for resource management within the affected jurisdiction.

Subp. 14. Sediment.

"Sediment" means solid mineral or organic material that is in suspension or motion, being transported or has been moved from its original site by air, water, gravity, or ice.

Subp. 15. Sedimentation.

"Sedimentation" means the process or action of depositing sediment that, upon inspection, is determined to have been caused by erosion.

Subp. 16. Sedimentation control plan; time schedule.

"Sedimentation control plan" means a document listing a set of practices that, when implemented, will decrease sedimentation to the allowable level on a particular parcel of land. A "time schedule" must set times to implement, make satisfactory progress on, and complete the "sedimentation control plan."

Subp. 17. Soil.

"Soil" means the unconsolidated mineral and organic material on the immediate surface of the earth that serves as a natural medium for the growth of land plants.

Subp. 18. Soil loss limits.

"Soil loss limits" means the maximum amount of soil loss from water or wind erosion, expressed in tons per acre per year, that is allowed by local regulations on a particular soil. The local soil loss limits ordinance must use the soil loss tolerance for each soil series described in the Field Office Technical Guide or the United States Department of Agriculture Natural Resources Conservation Service Soil Survey for a particular county, whichever is more current.

Subp. 19. Soil loss tolerance.

"Soil loss tolerance" means the maximum rate of annual soil erosion that will permit crop productivity to be sustained economically and indefinitely. In Minnesota, "soil loss tolerance" ranges from one to five tons per acre per year depending on the particular soil characteristics. "Soil loss tolerance" values for Minnesota soil series are provided in the Field Office Technical Guide or the United States Department of Agriculture Natural Resources Conservation Service Soil Survey for a particular county.

History

  • Statutory Authority: MS s 40.21; 103F.411
  • History: 11 SR 742; L 1987 c 358 s 34; 17 SR 1279; L 2015 c 21 art 1 s 109
Minn. R. 8400.4005 Local Duties

In accordance with Minnesota Statutes, sections 103F.401 to 103F.455, a local government may adopt soil loss limits which meet the minimum standards and criteria for soil loss, and once adopted shall administer and enforce the soil loss limits ordinance.

History

  • Statutory Authority: MS s 40.21; 103F.411
  • History: 11 SR 742
Minn. R. 8400.4010 Soil and Water Conservation District Duties

In accordance with Minnesota Statutes, sections 103F.401 to 103F.455, districts shall:

A. provide assistance to local governments in determining whether excessive soil loss is occurring;

B. provide assistance to the land occupiers in developing a conservation plan and time schedule suggesting conservation practices and a time schedule for their application;

C. make available to land occupiers state cost-share funds as provided by parts 8400.4045 and 8400.4060;

D. provide assistance to local governments in the development, review, monitoring, and enforcement of local soil loss limits ordinances, conservation plans, and time schedules, and sedimentation control plans and time schedules; and

E. provide assistance to the commissioner in the development and review of additional adequate technical information.

History

  • Statutory Authority: MS s 40.21; 103F.411
  • History: 11 SR 742
Minn. R. 8400.4015 Commissioner's Duties

In accordance with Minnesota Statutes, sections 103F.401 to 103F.455, the Board of Water and Soil Resources shall:

A. establish statewide standards reviewed every five years, for the management of land to prevent excessive soil loss from occurring;

B. upon request, assist the local government in the drafting of a soil loss limits ordinance which meets the provisions of Minnesota Statutes, sections 103F.401 to 103F.455 and parts 8400.4000 to 8400.4080 which assistance includes, but is not limited to, creation of specific guidelines to be used locally in the formulation of reasonable regulations and other conservation practices based on sound technical data and consistent with statewide standards and community land use needs;

C. where sufficient information is not available, cooperate to the fullest extent with appropriate federal, state, and local governments in securing adequate technical information;

D. periodically review and upgrade soil loss limits criteria based on new technical methodologies;

E. disseminate to the local government, whenever available, technical information including information of federal, state, and local programs, educational materials and other material useful in carrying out a soil loss limits program; and

F. coordinate federal, state, and local soil loss limits activities in the state.

History

  • Statutory Authority: MS s 40.21; 103F.411
  • History: 11 SR 742; L 2014 c 275 art 1 s 138
Minn. R. 8400.4025 Minimum Standards for Local Soil Loss Limits Ordinances

Subpart 1. Permitted soil loss.

Local government soil loss limits must use the soil loss tolerance for each soil series as the maximum amount of soil loss permitted. The final recommendation of the soil loss tolerance information used rests with the district.

Subp. 2. Permitted sedimentation limits.

Local government sedimentation limits must minimize sediment on adjoining land or in a body of water, watercourse, or wetland. In establishing these sedimentation limits the local government shall give consideration to the nature of the affected land or water. In making these determinations the local government should seek the advise of local, state, and federal agencies.

Subp. 3. Sedimentation control plan.

Local government soil loss limits must require that a sedimentation control plan and time schedule must be developed by a land occupier and submitted to the local government before any development activity begins. The following must be addressed in developing and implementing a sedimentation control plan:

A. stabilization of denuded areas and soil stockpiles;

B. establishment of permanent vegetation;

C. protection of adjacent properties;

D. timing and stabilization of sediment trapping measures;

E. sediment basins;

F. stabilization of cut and fill slopes;

G. stabilization of watercourses;

H. stabilization of construction access routes;

I. disposition of all temporary measures; and

J. maintenance of all temporary and permanent urban conservation practices.

Subp. 4. Model ordinances.

The model ordinances incorporated by reference in part 8400.4080 are the minimum standards for the adoption or amendment of soil loss limits under Minnesota Statutes, sections 103F.401 to 103F.455. A local government may adopt soil loss limits which are stricter than the model ordinances.

History

  • Statutory Authority: MS s 40.21; 103F.411
  • History: 11 SR 742
Minn. R. 8400.4030 Prohibited Activities

Subpart 1. General prohibition.

A person may not cause, conduct, contract for, or authorize an activity which causes excessive soil loss.

Subp. 2. Agricultural activity.

A land occupier shall:

A. if engaged in an agricultural use, prevent excessive soil loss and ensure that proper management and conservation practices are being applied to the land;

B. if using wooded or open land for pasture, ensure that proper management is used to prevent excessive soil loss due to overgrazing or cattle paths;

C. if using wooded land for timber harvest, ensure that proper management is used to prevent excessive soil loss; and

D. if a body of water, watercourse, or wetland is located within an agricultural use area, wooded or open land used for pasture, or a wooded area used for timber harvest, ensure that proper management and conservation practices are being applied to the surrounding land.

Subp. 3. Agricultural land occupier.

A land occupier of agricultural land is not violating subparts 1 and 2 if the district report, as developed through part 8400.4040, subpart 3, shows that the existing farming practices and methods being applied are effectively controlling soil loss.

Subp. 4. Development activity.

A person engaged in a development activity that will disturb over one acre of land must submit a sedimentation control plan and time schedule that will prevent excessive soil loss or sediment from damaging adjacent land, bodies of water, watercourses, or wetlands, to the local government for its approval.

Subp. 5. Road construction and maintenance.

A land occupier engaged in federal, state, county, municipal, or township road construction and maintenance is not violating subpart 1 if the road construction and maintenance is designed and installed according to Department of Transportation standard specifications for construction and maintenance.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742
Minn. R. 8400.4037 Procedure for Development Activity

Subpart 1. Submission of sedimentation control plan and time schedule.

A land occupier shall submit a sedimentation control plan and time schedule to the local government for approval prior to beginning any development activity which will disturb over one acre of land.

Subp. 2. Specification of methods.

A sedimentation control plan and time schedule must specify how the movement of soil and damage to other lands and regions will be minimized during the construction process. A sedimentation control plan and time schedule must address the items in part 8400.4025, subpart 3. Urban conservation practices in a sedimentation plan may include, but are not limited to, the use of temporary seeding, fabric fiber barriers, plastic, straw mulch, sediment control basins, or other conservation practices adequate to prevent erosion and sediment damage.

Subp. 3. Conformance with local ordinances.

Any method used in controlling sedimentation developed for the sedimentation control plan must not violate any existing ordinance the local government is enforcing.

Subp. 4. Review of plan and schedule.

The local government may appoint the zoning or planning director, building inspector, engineer, or district to review the sedimentation control plan and time schedule. The local government must forward the sedimentation control plan and time schedule to the appointed reviewer within seven days of receiving the sedimentation control plan and time schedule from the land occupier.

Subp. 5. Time for review.

The appointed reviewer shall review the sedimentation control plan and time schedule within 21 days of receiving the plan from the local government. The local government shall notify the land occupier of its decision after receipt of comments from the reviewer and no more than 28 days after receiving the sedimentation control plan and time schedule from the land occupier.

Subp. 6. Issuance of permit.

If the reviewer determines that the sedimentation control plan and time schedule will prevent sedimentation, the local government shall issue a permit that authorizes the development activity contingent upon the implementation of the sedimentation control plan and time schedule.

Subp. 7. Denial of permit.

If the reviewer determines that the sedimentation control plan and time schedule does not control sedimentation, the local government shall not issue a permit for the development activity. The sedimentation control plan and time schedule must be resubmitted for approval before the development activity begins.

Subp. 8. Penalty.

A land occupier engaged in a development activity who does not obtain an approved sedimentation control plan and time schedule or does not commence or complete the plan or make satisfactory progress to complete the plan is subject to a civil penalty and the local government shall file the complaint with the county attorney.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742
Minn. R. 8400.4040 Procedure for Agricultural Activities

Subpart 1. Complaint.

Adversely affected land occupiers, elected or duly appointed officials of the local government, or district board members may submit a signed written complaint to the local government if conditions exist that indicate there is excessive soil loss from a tract of land. The local government shall submit the complaint to the district for soil loss determination. The local government shall notify the alleged offending land occupier of the complaint and that the district will be contacting the land occupier to review the site, determine the severity of the problem, and assist the land occupier in correcting the problem. The local government shall also name a contact person for further assistance.

The signed written complaint must include:

A. the name and address of the alleged offending land occupier;

B. the location of the tract of land with the alleged excessive soil loss;

C. other land or water that is allegedly being affected by the excessive soil loss; and

D. a description of the nature of the alleged excessive soil loss and resulting sedimentation.

Subp. 2. Determination.

Upon request by the local government, the district shall determine the average annual soil loss in tons per acre per year of the tract of land cited in the complaint. The district may enter public or private land to make an inspection for the determination of soil loss or to complete the report. The district shall notify the land occupier of the time of the inspections and give the land occupier an opportunity to be present when the inspection is made.

The notice must:

A. be given ten days prior to the date of the inspection;

B. be delivered either by personal service or certified mail; and

C. if the owner of the property and the occupier of the residence differ, be delivered to both the owner and the occupier.

Subp. 3. Report.

The district shall submit a report to the local government that states the average soil loss in tons per acre per year for each tract of land and if that soil loss is excessive under the applicable soil loss limits.

If the soil loss is excessive, the report must include identification of existing farming practices and a preliminary conservation plan and time schedule that will prevent excessive soil loss.

If the report shows that soil loss from the tract of land is equal to or below the soil loss tolerance for that soil series, the local government shall dismiss the complaint and notify the land occupier.

Subp. 4. Notification of excessive soil loss.

If the local government finds that excessive soil loss is occurring, it must give written notification to the land occupier. The notification must:

A. describe the land and state the extent to which soil loss exceeds the soil loss limits;

B. be delivered within ten days of the local government's decision;

C. be delivered either by personal service or by certified mail; and

D. state a time, not more than 90 days after the date of delivery of the order, by which mediation must be commenced.

Subp. 5. Mediation.

If the district report shows that soil loss from a tract of land is excessive and conservation practices are available to reduce the soil loss, the local government shall request the offending land occupier to participate in mediation with the local government. The local government may appoint the planning and zoning director, a planning commissioner, or other official to act as mediator. The local government also may contract with a private mediation center to provide mediation services.

The land occupier and local government must attempt to agree on a conservation plan and time schedule that will reduce soil loss to the acceptable limits set by a local soil loss limits ordinance.

A mediated settlement must be approved by the local government and land occupier, put in writing, and filed with the county.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742
Minn. R. 8400.4045 Cost-Share Funds for a Mediated Settlement

When the local government approves the mediated written agreement, the land occupier has 90 days to apply for state cost-share funds that will provide 75 percent of the cost of the permanent conservation practices.

If the land occupier does not apply for cost-share funds within 90 days after the local government approves the mediated written agreement, only 50 percent cost-share funds may be provided. The land occupier must apply for 50 percent cost-share funds within 270 days after the mediated written agreement is approved.

The method of application and eligibility requirements for state cost-share funds must follow parts 8400.0100 to 8400.2900. If any other state or federal cost-share funds are used, the method of application and eligibility requirements must follow the current state or federal guidelines.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742
Minn. R. 8400.4050 Penalty

If a land occupier does not comply with the provisions of the notification or mediated written agreement, the land occupier is subject to a civil penalty up to $500.

The local government shall file the complaint with the county attorney.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742
Minn. R. 8400.4055 Hearing Procedure

If the land occupier and local government do not reach a mediated written agreement or if the land occupier has refused mediation, the local government shall forward the complaint to the county attorney. The county attorney may petition the district court for a hearing.

At the hearing, the land occupier may present a conservation plan and time schedule as an alternative to the conservation plan and time schedule developed by the local government. The court shall review both plans and order the land occupier to implement the conservation plan and time schedule that will reduce soil loss to at least the soil loss limit. The court may choose to amend the conservation plan and time schedule developed by the local government or land occupier or develop a new conservation plan and time schedule.

The settlement must be put in writing and filed with the appropriate county official.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742
Minn. R. 8400.4060 Cost-Share Funds for a Court Order

Subpart 1. Alternative plans.

If the court orders the implementation of the land occupier's conservation plan and time schedule, an amended conservation plan and time schedule, or a new conservation plan and time schedule, the offending land occupier is eligible to apply for 75 percent cost-share funds for permanent conservation practices on that tract of land.

The land occupier must apply for those cost-share funds within 90 days after the court order. If the land occupier does not apply for the cost-share funds within 90 days, the cost-share funds are reduced to 50 percent. The court shall establish a time when the land occupier is no longer eligible for cost-share funds at 50 percent.

The method of application and eligibility requirements for state cost-share funds must follow parts 8400.0100 to 8400.2900. If any other state or federal cost-share funds are used, the method of application and eligibility requirements must follow the current state or federal guidelines.

Subp. 2. Local government plan.

If the court orders the implementation of the conservation plan and time schedule developed by the local government, the offending land occupier is eligible for only 50 percent cost-share funds for permanent conservation practices on that tract of land. To qualify for those cost-share funds, the land occupier must apply for those cost-share funds within 90 days after the court order.

The method of application and eligibility requirements for state cost-share funds must follow parts 8400.0100 to 8400.2900. If any other state or federal cost-share funds are used, the method of application and eligibility requirements must follow the current state and federal guidelines.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742
Minn. R. 8400.4065 Penalty

A land occupier who does not comply with a court-ordered agreement is subject to a civil penalty up to $500.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742
Minn. R. 8400.4070 Establishment of Cost-Share Funds

Except for a development activity, a land occupier may apply for cost-share funds in the amounts set in parts 8400.4045 and 8400.4060. If cost-share funds are not currently available, the land occupier and the district shall enter into a priority cost-share assistance contract for future cost-share funds. The priority cost-share assistance contract must state the percentage of cost-share funds as set in parts 8400.4045 and 8400.4060. With the approval of the priority cost-share assistance contract, the land occupier is considered to be in compliance with the mediated or court ordered agreement.

The priority cost-share assistance contract, prepared by the Board of Water and Soil Resources, is incorporated by reference. This document is subject to frequent change and is available at the State Law Library.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742; L 2014 c 275 art 1 s 138
Minn. R. 8400.4075 Variances

Subpart 1. Land occupier variance.

A land occupier may petition the local government for a variance from part 8400.4040 due to economic hardship or technical infeasibility.

Subp. 2. Local government variances.

If a local government feels that a particular requirement of parts 8400.4000 to 8400.4070 prevents conservation practices or sedimentation control practices from being installed, a written request for a variance may be filed with the board. The request must contain:

A. the name and address of the local government making the request and the signature of the appropriate personnel;

B. the nature of the variance being sought, including an identification of the applicable rule from which the variance is sought, the time period for which it is sought, and the reason for seeking the variance;

C. a statement of alternatives for dealing with installation of the affected practices if the variance is not granted; and

D. a statement of the effects on applicable natural resources and the public if the variance is granted.

Subp. 3. Decision.

Local government variance requests must be submitted to the board at least 30 days prior to the board meeting at which the variance is to considered. Within 45 days after the meeting, the board must approve or deny the variance request and provide written notification of the decision to the applicant. A variance may not be granted if it is in conflict with any statute.

Subp. 4. Modifications.

If a variance has been granted by the board, the local government holding the variance may file with the board, at any time, a written request for modification or amendment of the variance. The request for modification or amendment and the board's consideration of the request must comply with this part.

History

  • Statutory Authority: MS s 40.21
  • History: 11 SR 742
Minn. R. 8400.4080 Model Ordinance

The model ordinance, prepared by the Board of Water and Soil Resources, in consultation with counties, districts, and other appropriate agencies, pursuant to Minnesota Statutes, section 103F.411, subdivision 1, is incorporated by reference. That document may be subject to change and is available at the State Law Library.

History

  • Statutory Authority: MS s 40.21; 103F.411
  • History: 11 SR 742; L 2014 c 275 art 1 s 138

Chapter 8405 LOCAL WATER PROTECTION AND MANAGEMENT

Minn. R. 8405.0100 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0110 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0120 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0130 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0140 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0150 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0160 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0170 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0180 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0190 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0200 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0210 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0220 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Minn. R. 8405.0230 [Repealed, L 2002 c 220 art 8 s 16]

[Repealed, L 2002 c 220 art 8 s 16]

Chapter 8410 METROPOLITAN WATER MANAGEMENT

Minn. R. 8410.0010 Scope

Subpart 1. Application.

Parts 8410.0010 to 8410.0160 apply to the general administration of metropolitan watershed management activities and to ten-year plan amendments approved by the board one year or later after the effective date of this section, except when a watershed management organization requests approval of a ten-year plan amendment or portions of an amendment under parts 8410.0010 to 8410.0160 within one year of the effective date of this section. A watershed management organization shall amend its plan and submit amendments to the board according to its amendment schedule and amendment procedures consistent with this chapter.

Subp. 2.

[Repealed, 40 SR 6]

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6
Minn. R. 8410.0020 Definitions

Subpart 1. Applicability.

The definitions in this part and in Minnesota Statutes, section 103B.205, apply to parts 8410.0010 to 8410.0180 and have the meanings given them.

Subp. 2. Board.

"Board" means the Minnesota Board of Water and Soil Resources created by Minnesota Statutes, section 103B.101.

Subp. 3. Capital improvement.

"Capital improvement" means a physical improvement that has an extended useful life. A capital improvement is not directed toward maintenance of an in-place system during its life expectancy.

Subp. 3a. Capital improvement program.

"Capital improvement program" has the meaning given in Minnesota Statutes, section 103B.205, subdivision 3.

Subp. 4.

[Repealed, 40 SR 6]

Subp. 5.

[Repealed, 40 SR 6]

Subp. 6. Groundwater plan.

"Groundwater plan" means a county plan approved by the board and adopted under Minnesota Statutes, section 103B.255.

Subp. 7. Local comprehensive plan.

"Local comprehensive plan" has the meaning given "comprehensive plan" in Minnesota Statutes, section 473.852, subdivision 5.

Subp. 8. Local government unit.

"Local government unit" has the meaning given it in Minnesota Statutes, section 473.852, subdivision 7.

Subp. 8a. Local water plan.

"Local water plan" means a local water management plan prepared according to Minnesota Statutes, section 103B.235.

Subp. 8b. Metropolitan Council.

"Metropolitan Council" means the Metropolitan Council created by Minnesota Statutes, section 473.123.

Subp. 9. Metropolitan Water Management Act.

"Metropolitan water management act" has the meaning given it in Minnesota Statutes, sections 103B.201 to 103B.255.

Subp. 10.

[Repealed, 40 SR 6]

Subp. 11.

[Repealed, 40 SR 6]

Subp. 12.

[Repealed, 40 SR 6]

Subp. 13.

[Repealed, 40 SR 6]

Subp. 14. Official controls.

"Official controls" has the meaning given it in Minnesota Statutes, section 473.852, subdivision 9.

Subp. 15. Plan.

"Plan" means the watershed management plan prepared by a watershed management organization or county as required by Minnesota Statutes, section 103B.231, subdivision 1.

Subp. 15a. Plan review agencies.

"Plan review agencies" means the Metropolitan Council, the Department of Agriculture, the Department of Health, the Department of Natural Resources, the Pollution Control Agency, and the Board of Water and Soil Resources.

Subp. 16. Plan review authorities.

"Plan review authorities" means the Metropolitan Council, the Department of Agriculture, the Department of Health, the Department of Natural Resources, the Pollution Control Agency, the Board of Water and Soil Resources, and counties, cities, towns, and soil and water conservation districts partially or wholly within the watershed management organization as defined in Minnesota Statutes, section 103B.231, subdivision 7.

Subp. 17. Public waters.

"Public waters" means waters of the state identified as public waters under Minnesota Statutes, section 103G.005, subdivision 15.

Subp. 18. Seven-county metropolitan area or metropolitan area.

"Seven-county metropolitan area" or "metropolitan area" has the meaning given in Minnesota Statutes, section 473.121, subdivision 2.

Subp. 19.

[Repealed, 40 SR 6]

Subp. 19a. Ten-year plan amendment.

"Ten-year plan amendment" means a comprehensive amendment of a watershed management plan done not less than five years and not more than ten years after approval of the current plan by the Board of Water and Soil Resources. Ten-year plan amendments are typically done every ten years and are commonly referred to as plan revisions, revised plans, or plan updates.

Subp. 20. Watershed.

"Watershed" means a drainage area with boundaries that are substantially coterminous with those of an aggregation of contiguous minor watershed units possessing similar drainage patterns and that cross the borders of two or more local government units.

Subp. 21. Watershed district.

"Watershed district" means a district established under Minnesota Statutes, chapter 103D.

Subp. 22. Watershed management organization or organization.

"Watershed management organization" or "organization" means: (1) a watershed district wholly within the metropolitan area; or (2) a joint powers entity established wholly or partly within the metropolitan area by special law or by agreement that performs some or all of the functions of a watershed district that has the characteristics and the authority specified under Minnesota Statutes, section 103B.211. Counties may be watershed management organizations if a joint powers watershed management organization does not perform and the responsibility for plan preparation is deferred to the counties. Lake improvement or conservation districts are not watershed management organizations.

Subp. 23. Wetlands.

"Wetlands" has the meaning given in Minnesota Statutes, section 103G.005, subdivision 19, paragraph (a).

Subp. 24.

[Repealed, 40 SR 6]

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6
Minn. R. 8410.0030 Joint Powers Agreements

Subpart 1. Requirements.

In addition to a description of any authorities adopted under the content requirements of joint powers agreements as outlined in Minnesota Statutes, section 103B.211, subdivision 1, joint powers agreements establishing a watershed management organization or amending an existing joint powers agreement shall, at a minimum, contain the following items:

A. a purpose statement consistent with Minnesota Statutes, section 103B.201;

B. a section defining the powers and duties of the organization;

C. an official map based on parcels or a legal description defining the boundary of the organization;

D. a section defining how the organization's members will be represented, with the total number of members on a joint powers board to be at least three;

E. a section outlining meetings to be scheduled at least annually;

F. a notification process for the agenda, location, and time of meetings;

G. procedures for annual establishment of a work plan and budget;

H. a procedure for the establishment of an advisory committee or other means of public participation;

I. a formula for determining the share of the annual operating budget for each of the organization's members or a description of revenue generating authorities the organization will utilize;

J. a section establishing the duties and terms of the officers of the organization;

K. the process and responsibilities of the organization and its members for filling vacancies consistent with Minnesota Statutes, section 103B.227, subdivisions 1 and 2;

L. a section specifying the compensation for members of a joint powers board;

M. a section defining the voting requirements for decision making and capital improvements consistent with Minnesota Statutes, section 103B.211, subdivision 1, paragraph (c);

N. a requirement to adopt rules of order and procedure; and

O. the duration of the agreement and a process for dissolution that provides for at least 90 days' notice of the intent to dissolve to the affected counties and the board.

Subp. 2. Updating.

Joint powers agreements must be in conformance with this chapter, as determined by the board, before the board makes a decision on a draft plan or plan amendment.

Subp. 3. County membership.

A county may be a member of a joint powers agreement organization when the conditions described in Minnesota Statutes, section 103B.211, subdivision 3, are present.

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6
Minn. R. 8410.0040 Removal of Organization Representatives

Subpart 1. Removal for violations.

A manager of a watershed district or a member of a joint powers board may be removed from the position by a majority vote of the appointing authority before term expiration for violation of a code of ethics of the watershed management organization or appointing authority or for malfeasance, nonfeasance, or misfeasance, after being provided an opportunity for a hearing before the appointing authority.

Subp. 2. Removal; elected officials, at-will members.

A member of a joint powers board who is holding the position as an elected official who is no longer serving in that position or who is serving an indefinite term at the pleasure of the appointing authority, may be removed by the appointing authority at will.

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6
Minn. R. 8410.0045 Issue Identification and Assessment

Subpart 1. Priority issues.

A. Each plan shall identify priority issues in consideration of:

B. Priority issues must be evaluated, addressed, and prioritized in the goals and implementation sections of the plan according to parts 8410.0080 and 8410.0105.

Subp. 2. Advisory committee.

Watershed districts must comply with Minnesota Statutes, sections 103D.331 and 103D.337. All other organizations must establish an advisory committee, committees, or other means of public and technical participation acceptable to the board, for the purpose of making recommendations on a plan or ten-year plan amendment. The recommendations must address the issues identified under subpart 7. The process must be summarized in the plan or ten-year plan amendment.

Subp. 3. Plan review agency notification and involvement in plan development.

Before development of a plan or ten-year plan amendment, an organization must send notification to each plan review agency of plan initiation and correspondence requesting the management expectation for the plan review agency's priority issues, summaries of relevant water management goals, and water resource information. The organization must allow at least 60 days for the information to be submitted. For information received within the prescribed time period, the organization must take into consideration the goals of the plan review agencies and identify in the plan or plan amendment any inconsistencies with the organization's goals.

Subp. 4. Review of local issues and controls.

Before development of a plan or ten-year plan amendment, an organization must send notification to each county, city, township, and soil and water conservation district wholly or partially within the organization, and to known stakeholders including the Minnesota Department of Transportation, of plan initiation and correspondence requesting input that includes local water-related issues, water management goals, official controls, and programs. The organization must allow at least 60 days for the information to be submitted. Known stakeholders include, but are not limited to, any entity that requests to be placed on the organization's mailing list. For information received within the prescribed time period, the organization must take into consideration the local water management goals and identify in the plan or plan amendment any inconsistencies with the organization's goals.

Subp. 5. Initial planning meeting.

In the development of a plan or ten-year plan amendment and after completion of the time requirements under subparts 3 and 4, an organization must hold an initial planning meeting presided over by the organization's governing body to receive, review, and discuss input. Written notification must be made to the plan review authorities and known stakeholders including affected counties, cities, and towns and the Minnesota Department of Transportation. Legal notice must be posted on the organization's website and comply with open meeting law requirements. All notifications must occur at least two weeks before the meeting. The plan must document the public input.

Subp. 6. Relationship with other programs.

In consideration of subpart 1, item A, subitem (3), a plan or ten-year plan amendment shall identify and consider all relevant plans and programs in setting priority issues. An organization must coordinate its planning activities with contiguous organizations and with counties and cities conducting water planning within the boundaries of the organization.

Subp. 7. Assessment of issues and identification of priority issues.

In developing a plan or ten-year plan amendment, an organization must identify priority issues after assessing available information including the input received under this part and data and trend analyses under part 8410.0060. The input received must be summarized and the assessment process for evaluating issues received, and goals received from the plan review authorities, must be included in the plan or ten-year plan amendment. The success of implementing the previous plan, if any, must be summarized and considered in identifying priority issues.

History

  • Statutory Authority: MS s 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 40 SR 6
Minn. R. 8410.0050 Executive Summary

Each plan shall have a section entitled "Executive Summary." The summary must include:

A. the purpose of the watershed management organization;

B. a map of the organization;

C. the primary issues addressed in the plan;

D. the main goals in the plan;

E. the major actions in the plan; and

F. the responsibilities of local governments related to implementation of the plan including any changes in responsibilities from the previous plan.

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6
Minn. R. 8410.0060 Land and Water Resources

Subpart 1. Requirements.

Each plan must contain information and a general analysis based on existing records, plans, and publications for the elements listed in items A to M or from a previous plan of the organization or a county groundwater plan. Information may be incorporated by reference if the data is generally described in the plan and the complete data and analysis is in a freely accessible location that is specified. At a minimum, the plan must include a map of the surface water resources within the boundaries of the organization. Elements that must be included in each plan are:

A. topography;

B. soil;

C. general geology;

D. precipitation;

E. surface water resources including streams, lakes, wetlands, public waters, and public ditches;

F. water quality and quantity including trends of key locations and 100-year flood levels and discharges;

G. groundwater resources, including groundwater and surface water connections if defined in an approved and adopted county groundwater plan;

H. stormwater systems, drainage systems, and control structures;

I. regulated pollutant sources and permitted wastewater discharges;

J. fish and wildlife habitat and rare and endangered species;

K. water-based recreation areas;

L. existing land uses and proposed development in local and metropolitan comprehensive plans; and

M. priority areas for wetland preservation, enhancement, restoration, and establishment.

Subp. 2.

[Repealed, 40 SR 6]

Subp. 3.

[Repealed, 40 SR 6]

Subp. 4.

[Repealed, 40 SR 6]

Subp. 5.

[Repealed, 40 SR 6]

Subp. 6.

[Repealed, 40 SR 6]

Subp. 7.

[Repealed, 40 SR 6]

Subp. 8.

[Repealed, 40 SR 6]

Subp. 9.

[Repealed, 40 SR 6]

Subp. 10.

[Repealed, 40 SR 6]

Subp. 11.

[Repealed, 40 SR 6]

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; L 2010 c 361 art 4 s 82; 40 SR 6
Minn. R. 8410.0070 [Repealed, 40 SR 6]

[Repealed, 40 SR 6]

Minn. R. 8410.0080 Establishment of Goals

Subpart 1. Requirements.

Each plan or ten-year plan amendment shall contain specific measurable goals that address issues identified under subparts 2 to 8 in conjunction with the priority issues that are identified by the organization under part 8410.0045. The goals must be consistent with the intent of the metropolitan water management program purposes in Minnesota Statutes, section 103B.201, and state and federal standards. The goals of the organization shall coordinate and attempt to resolve conflict with town, city, county, regional, or state goals. The goals must contain sufficient detail to provide direction regarding what the goals should accomplish, provide direction to the organization's board, and allow for the success or failure of the goals to be measured. A procedure must be included to evaluate progress for each goal defined in this part at a minimum of every two years according to part 8410.0150, subpart 3, item E.

Subp. 2. Water quantity.

Water quantity goals must be established to address priority issues, at a minimum, considering volume, peak rate, base flow, and imperviousness. The goals must recognize current trend direction and the fundamental relationship between water quantity and land use.

Subp. 3. Water quality.

Water quality goals must be established to address priority issues considering the uses of the water resource. The goals must recognize current trend direction and the fundamental relationship between water quality and land use. If water quality goals in the plan are less stringent than state water quality standards, the plan must acknowledge this.

Subp. 4.

[Repealed, 40 SR 6]

Subp. 5.

[Repealed, 40 SR 6]

Subp. 6. Public drainage systems.

Public drainage system management goals must be established. The goals must define the organization's relationship to the drainage authority. The plan may recommend whether or not there are advantages to managing the drainage systems under the Metropolitan Water Management Act or through transferring the drainage authority according to Minnesota Statutes, section 103E.812, and may determine whether drainage maintenance activities have the potential of adversely impacting any goal of the organization. The plan must generally describe the effect of the plan on existing drainage systems.

Subp. 7. Groundwater.

Goals must be established to address groundwater-surface water interactions defined in approved and adopted county groundwater plans that are in effect. Organizations shall establish goals to address groundwater issues identified within the area of the organization in the Twin Cities Metropolitan Area Master Water Supply Plan, or the Metropolitan Council's subsequent equivalent, and source water protection plans. Additional goals may be established as determined by the organization.

Subp. 8. Wetlands.

Goals must be established for wetland management. The goals must recognize the fundamental relationship between wetland management and land use.

Subp. 9.

[Repealed, 40 SR 6]

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6
Minn. R. 8410.0090 [Repealed, 40 SR 6]

[Repealed, 40 SR 6]

Minn. R. 8410.0100 [Repealed, 40 SR 6]

[Repealed, 40 SR 6]

Minn. R. 8410.0105 Implementation Actions

Subpart 1. Requirements.

Each plan shall contain prioritized implementation actions through the year the plan extends to that consists of administrative processes and programs to address the goals defined under part 8410.0080 and that is consistent with the principles of part 8410.0045, subpart 1, item A. The programs described in subparts 2 to 6 must be included in each plan unless the plan sufficiently justifies that a program or program element is not needed. Each plan shall include a procedure to evaluate progress for the implementation actions at a minimum of every two years according to part 8410.0150, subpart 3, item E. Each plan shall:

A. include a table that briefly describes each component of the implementation actions, the schedule, estimated cost, and funding sources for each component including annual budget totals;

B. clearly define the responsibilities of the organization, the local government units, and other entities for carrying out the implementation actions;

C. define the organization's process for evaluating implementation of local water plans and procedures to address a local government unit failing to implement its local water plan or parts of its local water plan; and

D. include a procedure to establish an advisory committee, committees, or other means of public and technical participation acceptable to the board, for the purpose of making recommendations on a ten-year plan amendment.

Subp. 2. Capital improvement program.

Each plan must consider the feasibility of implementing structural solutions for attaining the goals defined under part 8410.0080 that cannot be resolved by nonstructural, preventative actions. Each plan must include a table for a capital improvement program that identifies structural and nonstructural alternatives that would lessen capital expenditures and sets forth, by year, details of each contemplated capital improvement that includes the need, schedule, estimated cost, and funding source. The information may be combined with subpart 1, item A. In assigning priorities, consideration must be given to federal, state, regional, local, and private partners and regional and state plans.

Subp. 3. Operation and maintenance programs.

The plan must define who is responsible for inspection, operation, and maintenance of stormwater infrastructure, public works, facilities, and natural and artificial watercourses and specify any new programs or revisions to existing programs needed to accomplish the goals defined under part 8410.0080.

Subp. 4. Information and education program.

Each plan must provide for an information and education program in consideration of the goals defined under part 8410.0080. The program must, at a minimum, include the purpose, targeted audiences, and actions. An annual communication must be distributed to residents of the organization in compliance with Minnesota Statutes, section 103B.227, subdivision 4.

Subp. 5. Data collection programs.

Each plan must address whether established water quality, water quantity, and other monitoring programs implemented by the organization and others are capable of producing an accurate evaluation of the progress being made toward the goals defined under part 8410.0080. The programs shall, at a minimum, include the location of sampling, the frequency of sampling, the proposed parameters to be measured, and the requirement of periodic analysis of the data. Each organization must annually submit the collected data that has been quality-controlled and quality-assured to the appropriate state agency.

Subp. 6. Regulatory program.

Controls or performance standards must be described in the plan, although an organization's rules in place at the time of plan approval may be referenced instead. The plan must specifically describe how the organization's controls will be implemented in coordination with local official controls. The plan must clearly distinguish between the responsibilities of the organization and the affected local government units relative to controls established according to this subpart. The enforcement process for violations of controls of the organization must be defined. Controls must take effect within two years of plan adoption by the organization. The plan must include an assessment of existing controls within the organization's jurisdiction and address any deficiencies or redundancies related to attaining the goals defined under part 8410.0080. If a plan notes the existence of certain land uses that could adversely affect the organization's ability to achieve the goals defined under part 8410.0080, the organization must provide written notification to that unit of government specifying the issue. The following items must be considered in developing a regulatory program:

A. standards or controls that may be more restrictive than those required by the Wetland Conservation Act determined to be necessary to achieve the goals defined under part 8410.0080. Local wetland management controls must include maps or inventories of wetlands, existing comprehensive wetland protection and management plans, descriptions of existing local wetland banking programs, and procedures used in determining replacement of wetland functions and values for evaluating wetland replacement proposals;

B. standards or controls for managing stormwater runoff must, at a minimum, address:

C. standards or controls to address flood impacts; and

D. management programs establishing a classification system for the management of water bodies must be consistent with chapter 7050. If the organization classifications are inconsistent, the organization must petition the Pollution Control Agency to revise the classifications in chapter 7050.

Subp. 7. Incentive programs.

The plan must define, for cost share or grant programs, if any, the general purpose, scope, time period, amount of funds, funding source, general eligibility criteria for disbursing funds, and a clear link to the goals the program addresses.

Subp. 8. Waters restoration and protection program.

A. A plan may implement a restoration and protection program for waters that are impaired or need to be protected. The program may involve monitoring, assessment, and water quality restoration and protection actions.

B. An organization may take the lead on developing a total maximum daily load (TMDL) or a TMDL implementation plan as a third party under Minnesota Statutes, section 114D.25, subdivision 5. The TMDL or TMDL implementation plan must be developed in coordination with, and provided to, the Pollution Control Agency for review and approval.

C. An organization may take the lead on developing a watershed restoration and protection strategy as described in Minnesota Statutes, section 114D.15, by entering into an agreement with the Pollution Control Agency.

D. An organization may submit a request as a third party for a Category 4b determination to the Pollution Control Agency as allowed under the federal Clean Water Act, section 303(d).

E. An organization may possess other authorities in addition to those listed in items A to D.

Subp. 9. Local water plans.

A. An organization plan must specify to what degree the organization plan may be adopted by reference by a local government unit for all or part of its local water plan. Upon request of a local government unit, an organization must provide a list to the local government unit and the plan review agencies of local water plan revisions necessary for compliance with the organization plan. A local water plan may serve as a stormwater pollution prevention program if it is approved by the Pollution Control Agency and it complies with the requirements of any applicable national pollutant discharge elimination system/state disposal system stormwater permit.

B. A plan must include a schedule for implementation of local water plans that requires all local water plans to be adopted not more than two years before the local comprehensive plan is due. A plan must not deviate from the schedule. Extensions of local comprehensive plan due dates do not alter the schedule. Organizations may extend all or portions of local water plans to align with the local comprehensive plan schedule during the initial three years of transition to the amended rule. Notwithstanding local water plan schedules in previously approved plans, all local water plans must be adopted according to this subpart after December 31, 2016.

History

  • Statutory Authority: MS s 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 40 SR 6
Minn. R. 8410.0110 [Repealed, 40 SR 6]

[Repealed, 40 SR 6]

Minn. R. 8410.0120 [Repealed, 40 SR 6]

[Repealed, 40 SR 6]

Minn. R. 8410.0130 [Repealed, 40 SR 6]

[Repealed, 40 SR 6]

Minn. R. 8410.0140 Plan Amendments

Subpart 1. Amendment section.

A. Each plan must contain a section entitled "Amendments to Plan" containing the year the plan extends to and establishing the process by which amendments, as defined in this part, may be made and who may initiate the amendments.

B. A plan must extend at least five years but no more than ten years from the date the board approves the plan.

C. An organization must evaluate the implementation actions in its plan with the annual activity report under part 8410.0150, subpart 3, item E, at a minimum of every two years. If changes to the implementation actions are necessary as a result of the evaluation, then a plan amendment is required unless otherwise provided under subpart 1a.

Subp. 1a. Changes not requiring an amendment.

These changes to plans must be distributed according to subpart 5 with a version showing deleted text as stricken and new text as underlined. Amendments to plans are not required for changes such as:

A. formatting or reorganization of the plan;

B. revision of a procedure meant to streamline administration of the plan;

C. clarification of existing plan goals or policies;

D. inclusion of additional data not requiring interpretation;

E. expansion of public process; or

F. adjustments to how an organization will carry out program activities within its discretion.

Subp. 2. Amendment procedure.

All amendments to a plan must adhere to the review process provided in Minnesota Statutes, section 103B.231, subdivision 11, except when the proposed amendments are determined to be minor amendments according to the following provisions:

A. the board has either agreed that the amendments are minor or failed to act within five working days of the end of the comment period specified in item B unless an extension is mutually agreed to with the organization;

B. the organization has sent copies of the amendments to the plan review authorities for review and comment allowing at least 30 days for receipt of comments, has identified the minor amendment procedure is being followed, and directed that comments be sent to the organization and the board;

C. no county board has filed an objection to the amendments with the organization and the board within the comment period specified in item B unless an extension is mutually agreed upon by the county and the organization;

D. the organization has held a public meeting to explain the amendments and published a legal notice of the meeting twice, at least seven days and 14 days before the date of the meeting; and

E. the amendments are not necessary to make the plan consistent with an approved and adopted county groundwater plan.

Subp. 3.

[Repealed, 40 SR 6]

Subp. 4. Form of amendments.

Draft and final amendments may be sent electronically. A receiving entity may request to receive an amendment in paper format. Draft amendments must show deleted text as stricken and new text as underlined. Unless the entire document is redone, all final amendments adopted by the organization must be in the form of replacement pages for the plan with each page renumbered as appropriate and each page including the effective date of the amendment.

Subp. 5. Distribution of amendments.

Each organization must maintain a distribution list of agencies and individuals who have received a copy of the plan. An organization shall distribute copies of amendments to all on the distribution list and post the amendments on the organization's website within 30 days of adoption.

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6
Minn. R. 8410.0150 Annual Reporting and Evaluation Requirements

Subpart 1. Requirement for annual activity and audit reports.

A. An organization shall annually:

B. The reports may be combined into a single document.

Subp. 2.

[Repealed, 40 SR 6]

Subp. 3. Content of annual activity report.

The annual activity report must include the following information:

A. a list of the organization's board members, names of designated officers, and the governmental organization that each board member represents for joint powers organizations and the county that each member is appointed by for watershed districts;

B. identification of a contact person capable of answering questions about the organization including a postal and electronic mailing address and telephone number;

C. an assessment of the previous year's annual work plan that indicates whether the stated activities were completed including the expenditures of each activity with respect to the approved budget unless included in the audit report;

D. a work plan and budget for the current year specifying which activities will be undertaken;

E. at a minimum of every two years, an evaluation of progress on goals and the implementation actions, including the capital improvement program, to determine if amendments to the implementation actions are necessary according to part 8410.0140, subpart 1, item C, using the procedures established in the goals and implementation sections of the plan under parts 8410.0080, subpart 1, and 8410.0105, subpart 1;

F. a summary of significant trends of monitoring data required by part 8410.0105, subpart 5;

G. a copy of the annual communication required by part 8410.0105, subpart 4;

H. the organization's activities related to the biennial solicitations for interest proposals for legal, professional, or technical consultant services under Minnesota Statutes, section 103B.227, subdivision 5;

I. an evaluation of the status of local water plan adoption and local implementation of activities required by the watershed management organization according to part 8410.0105, subpart 1, items B and C, during the previous year;

J. the status of any locally adopted ordinances or rules required by the organization including their enforcement; and

K. a summary of the permits and variances issued or denied and violations under rule or ordinance requirements of the organization or local water plan.

Subp. 3a. Watershed management organization websites.

An organization shall have a website that, at a minimum, contains the location, time, agenda, and minutes for organization meetings and hearings; contact information for the organization including a person capable of answering questions about the organization; the current watershed management plan; annual activity reports and audits for the past three years; rules and regulatory program, if any; a list of the organization's board members including identification of designated officers and the governmental organization that each board member represents for joint powers organizations and the county that each board member is appointed by for watershed districts; and a list of employees including postal and electronic mailing addresses and telephone numbers. The website shall be kept current on a monthly basis or more frequently.

Subp. 4. Procedure for state audit.

The board shall use the procedure described in items A to D to determine whether to order a state financial or performance audit of an organization.

A. Before the board will consider ordering a state audit, a written complaint must be filed with the board's executive director requesting the board to order a state audit. The complaint must state as specifically as possible the grounds for requesting a state audit. Valid grounds for requesting a state audit include the mishandling or misuse of public funds or the documented failure to implement an approved plan.

B. The executive director shall determine whether there is a basis for a complaint before reporting the complaint to the board. The executive director shall ensure that the affected organization and the plan review agencies are notified of the complaint and given an opportunity to respond to, or comment on, the allegations before determining whether there is a basis for the complaint.

C. If the executive director determines there is a basis for the complaint, the affected organization shall be given an opportunity to appear before the board's dispute resolution committee established under Minnesota Statutes, section 103B.101, subdivision 10, and respond to the allegations in the complaint. The complainant shall also be given an opportunity to be heard.

D. After providing an opportunity for the organization and the complainant to be heard, the board shall decide whether to order a state financial or performance audit of the organization. The cost of state financial and performance audits shall be paid for by the organization.

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6
Minn. R. 8410.0160 Plan Structure

Subpart 1. Requirement.

Each local water plan must, at a minimum, meet the requirements for local water management plans in Minnesota Statutes, section 103B.235, and this part, except as provided by the watershed management organization plan under part 8410.0105, subpart 9.

Subp. 2. Local comprehensive plan.

Each local government unit must include the local water plan as a chapter of its local comprehensive plan. All local comprehensive plans must be consistent with local water plans adopted under this part.

Subp. 3. Plan contents.

Each local water plan, in the degree of detail required in the organization plan, must contain the following:

A. an executive summary that summarizes the highlights of the local water plan;

B. appropriate water resource management-related agreements that have been entered into by the local community must be summarized, including joint powers agreements related to water management that the local government unit may be party to between itself and watershed management organizations, adjoining communities, or private parties;

C. the existing and proposed physical environment and land use must be described. Drainage areas and the volumes, rates, and paths of stormwater runoff must be defined. Data may be incorporated by reference as allowed under parts 8410.0060 and 8410.0105, subpart 9, or the local comprehensive plan;

D. an assessment of existing or potential water resource-related problems must be summarized. The problem assessment must be completed for only those areas within the corporate limits of the local government unit and similar to the process under part 8410.0045, subpart 7; and

E. a local implementation program through the year the local water plan extends must describe nonstructural, programmatic, and structural solutions to problems identified in item D. The program must not jeopardize achievement of the goals of an organization's plan. The implementation components must be prioritized consistent with the principles of part 8410.0045, subpart 1, item A. Local water plans must prioritize the implementation components of an organization plan consistent with the organization priorities set forth under part 8410.0105 only for implementation components that must be facilitated by the local government unit. Local official controls must be enacted within six months of approval of the local water plan by the organization. The program shall:

Subp. 4. Amendment procedures.

A section entitled "Amendments to Plan" must establish the process by which amendments may be made. The amendment procedure shall conform with the plan amendment procedures in the organization plans that affect the community.

Subp. 5. Submittal and review.

After consideration and before adoption, the local water plan or local water plan amendments shall be submitted for review according to Minnesota Statutes, section 103B.235.

Subp. 6. Adoption and implementation.

Each local water plan shall be adopted not more than two years before the local comprehensive plan is due. Extensions of local comprehensive plan due dates do not alter the local water plan schedule. Each local water plan must be adopted and implemented in accordance with the time requirements of Minnesota Statutes, section 103B.235, subdivision 4. Each local government unit must notify watershed management organizations with jurisdiction over area subject to the local water plan and the Metropolitan Council within 30 days of adoption and implementation of the local water plan or local water plan amendment, including the adoption of necessary official controls.

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6
Minn. R. 8410.0170 [Repealed, 40 SR 6]

[Repealed, 40 SR 6]

Minn. R. 8410.0180 Determinations of Failure to Implement

Subpart 1. Applicability.

This part applies when a plan is not being implemented for a watershed either because no watershed management organization exists, because the organization has not adopted an approved plan, or because the approved plan is not being carried out.

Subp. 2. Petition.

The board shall establish just cause for determining whether a plan is being properly implemented by review of a written petition. A petition may be made by a plan review agency, board staff, a local government unit, or 50 residents with land in the area that is subject to the petition. A petition must be made in writing to the executive director of the board and must summarize the issues at dispute and the efforts the party made to resolve the problem.

Subp. 3. Petition review process.

A. Within 30 days of receiving a written petition, board staff are required to send a copy to the plan review authorities and the organization and initiate a preliminary assessment including a review of relevant documents, review of comments from the plan review authorities and the organization, and discussions with involved parties. The results of the preliminary assessment shall be reviewed with the executive director and a report prepared if the executive director determines just cause exists. Just cause may be established if no annual report or audit has been submitted compliant with the requirements in part 8410.0150, or if a plan has not been amended according to part 8410.0140, subpart 1, item C. Just cause may be established for other reasons according to subpart 3a. The executive director of the board may combine multiple petitions involving the same organization and process as one decision. If the executive director determines just cause does not exist, the petitioner, the organization, and the plan review authorities shall be provided written notice of the decision.

B. If just cause is established, board staff shall conduct further investigation and prepare a report. The report shall conclude whether a failure to implement exists, define the exact nature of the failure to implement, and recommend a course of action. The report shall be sent to the petitioner, the organization, and the plan review authorities. Board staff shall provide written notification to all those to whom it sent the report of the time and location of a meeting to discuss the contents of the report.

C. The organization is allowed 60 days after the meeting in item B to hold a public hearing to develop a formal course of action and send a formal response by mail to the board and known aggrieved parties.

Subp. 3a. Criteria and standards for determinations.

In making a determination on the petition, the board must consider:

A. whether the joint powers agreement and watershed management plan complies with this chapter and Minnesota Statutes, section 103B.211, subdivision 1;

B. whether the organization is actively implementing a plan that has been approved by the board within the previous ten years. At a minimum, the organization is addressing its priority issues in the plan, is carrying out its implementation actions, has a current monitoring program to assess whether progress is being made on goals, and has made progress on goals for the priority issues;

C. whether the organization is actively implementing the actions adopted in its plan that were derived from a county groundwater plan that has been approved by the board and adopted by the county;

D. whether the organization has a contact person that is capable of answering questions about the organization and able to assist local governments and citizens in resolving their concerns;

E. whether the organization submits annual activity reports and audits that comply with the requirements in part 8410.0150;

F. whether an evaluation under Minnesota Statutes, section 103B.102, of an organization's performance, financial, and activity information resulted in any corrective actions or areas of concern;

G. whether the organization sufficiently implemented the actions in its previous plan and made progress on attaining the goals in its previous plan;

H. whether the organization maintains a website that complies with part 8410.0150, subpart 3a; and

I. any other factors pertinent to the petition.

Subp. 4. Determinations.

A. On receipt of the information under subpart 3, items B and C, the board may:

B. The board shall provide written notice of the determination to the petitioner, the organization, and the plan review authorities.

C. On issuance of its findings under item A, subitem (5), the board shall notify the appropriate counties to proceed as required by Minnesota Statutes, section 103B.231, subdivision 3, paragraph (b) or (c), as applicable. If a county fails to act after it is notified, the board shall notify state agencies that they may initiate their responsibilities under Minnesota Statutes, section 103B.231, subdivision 3, paragraph (g).

Subp. 5. Appeal of determinations or decisions.

A. No appeal may be made to the board for the board's dispute resolution committee established under Minnesota Statutes, section 103B.101, subdivision 10, to hear and resolve disputes concerning plan implementation until after the procedures in subpart 4 have been completed or until after the executive director has made a decision that just cause does not exist under subpart 3, item A.

B. The determination of the board under subpart 4 or the decision of the executive director that just cause does not exist under subpart 3, item A, is final if not appealed to the executive director of the board within 30 days after the date on which the notice of determination or decision is sent to those required to receive notice. A written appeal may be made by the petitioner or the organization. Within 30 days after receiving the appeal, the board, its dispute resolution committee, or its executive director must decide whether to hear the appeal. An appeal may be denied and not heard if the board, its dispute resolution committee, or its executive director decide the appeal is without sufficient merit, trivial, or brought solely for purposes of delay.

C. After an appeal is granted, the appeal must be decided by the board within 60 days after the close of the hearing record by the dispute resolution committee. Parties to the appeal are the appellant and the organization. The board or its executive director may elect to join multiple appeals involving the same organization and actions into one decision. A party aggrieved by the board's final decision may seek judicial review as provided in Minnesota Statutes, sections 14.63 to 14.69.

Subp. 6. Determination necessary for watershed district termination.

A determination of failure to implement under subpart 4, item A, subitem (5), is necessary before the board may terminate a watershed district under Minnesota Statutes, section 103B.221.

History

  • Statutory Authority: MS s 103B.101; 103B.211; 103B.227; 103B.231; 103B.235; 103B.239
  • History: 17 SR 146; 40 SR 6

Chapter 8415 WATERSHED DISTRICT APPEALS

Minn. R. 8415.0100 Purpose

The rules of procedure in parts 8415.0100 to 8415.0120 govern appeals to the board pursuant to Minnesota Statutes, section 103D.537.

History

  • Statutory Authority: MS s 103D.537
  • History: 31 SR 646
Minn. R. 8415.0110 Definitions

Subpart 1. Scope.

The terms used in this chapter have the meanings given them in this part.

Subp. 2. Board.

"Board" means the Minnesota Board of Water and Soil Resources.

Subp. 3. Day.

"Day" means a calendar day unless specified otherwise. The day of the event must not be used in counting any time period.

Subp. 4. Dispute resolution committee.

"Dispute resolution committee" means the committee of the board established pursuant to Minnesota Statutes, section 103B.101, subdivision 10.

Subp. 5. Executive director.

"Executive director" means the executive director of the Minnesota Board of Water and Soil Resources.

Subp. 6. Person.

"Person" means an individual, partnership, joint venture, private or public corporation, association, firm, public service company, cooperative, political subdivision, municipal corporation, government agency, public utility district, or any other entity, public or private, however organized.

Subp. 7. Public transportation authority.

"Public transportation authority" means a state, county, city, or township road authority.

History

  • Statutory Authority: MS s 103D.537
  • History: 31 SR 646
Minn. R. 8415.0120 Appeals

Subpart 1. Appeal of rules.

A. An interested person may appeal a rule made by the managers of a watershed district by filing a petition with the board.

B. An appeal is effective upon submittal of the petition to the executive director with evidence that a copy of the petition has been served upon the watershed district.

C. An appeal filed under this subpart must follow the procedures in subpart 3.

Subp. 2. Appeal of permit decisions.

A. The watershed district must notify the public transportation authority promptly of its permit decision, but no later than ten days following the decision. A public transportation authority may appeal a final permit decision of a watershed district issued to it by filing a petition with the board. The appeal must be filed within 30 days of the decision by the watershed district managers pursuant to Minnesota Statutes, section 103D.537.

B. An appeal is effective upon submittal of the petition to the executive director with evidence that a copy of the petition has been served upon the watershed district.

C. An appeal filed under this subpart must follow the procedures in subpart 3 unless the public transportation authority makes a request in the petition for an expedited appeal hearing. The procedures in subpart 4 must be followed if an expedited appeal hearing is requested in the petition.

Subp. 3. Board appeal procedures.

A. Within 30 days after receiving the petition with evidence that the watershed district has been served with a copy of the petition, the board or its dispute resolution committee or executive director shall decide whether to grant the petition and hear the appeal. The board or its executive director shall grant the petition unless the appeal is deemed meritless, trivial, untimely, or brought solely for the purposes of delay or it is determined that the petitioner has not exhausted all local administrative remedies.

B. The board or its executive director may remand the appealed decision back to the watershed district if the petitioner has not exhausted all local administrative remedies, such as a public hearing, or if the watershed district's record is not adequate. If an appeal is remanded, the watershed district must make a decision within 60 days unless the remand order, or a subsequent order, specifies a longer period.

C. After granting the petition, the appeal must be heard by the dispute resolution committee and decided by the board within 60 days after the filing of the watershed district's record, submittal of the written briefs for the appeal, and the hearing by the dispute resolution committee. Parties to the appeal are the appellant and the watershed district. For appeals of rules, interveners are allowed. For appeals of permit decisions, interveners are not allowed unless they have been granted intervener status by the watershed district prior to the final permit decision.

D. Upon appeal, the watershed district shall forward to the board the record on which it based its decision within 30 days of the granting of the petition. The board shall make its decision on the appeal after hearing. Thirty days' notice of the hearing must be given by the board to the parties. The parties may present written and oral argument. When the watershed district has made formal findings contemporaneously with its decision or there is an accurate verbatim transcript of the proceedings and the proceedings were fairly conducted, the board shall base its review on the record. Otherwise it may remand the matter.

E. In the case of appeals of watershed district rules filed under subpart 1, the board shall affirm the watershed district's decision to adopt the rule if there was a rational basis to adopt the rule and if no procedural errors prejudicial to a party were made.

F. In the case of appeals of watershed district permit decisions filed under subpart 2, the board shall affirm the watershed district's decision if substantial evidence supports the findings of fact, if the watershed district correctly applied the law, watershed district rule and the watershed district's board-approved watershed management plan to the facts, and if the watershed district made no procedural errors prejudicial to a party. Otherwise, the board shall reverse the decision, amend it, or remand it with instructions for further proceedings.

Subp. 4. Expedited board appeal procedures.

A. A public transportation authority that requests an expedited appeal hearing via a petition filed with the executive director must include a written brief with the petition setting forth the items in dispute and the reasons for seeking expedited review, including the consequences of proceeding under subpart 3. A copy of the written brief must be provided to the watershed district at the same time as the petition as specified in subpart 2, item B.

B. Interveners are not allowed unless they have been granted intervener status by the watershed district prior to the final permit decision.

C. The watershed district must submit a copy of the record as soon as possible and in no case later than in conjunction with a written brief to the executive director and the public transportation authority at least ten days before the hearing. No further written submittals by the parties are allowed unless specifically authorized by the board.

D. The board or its dispute resolution committee shall hold a hearing within 30 days of receiving the petition. The board shall make a decision within 30 days of the hearing and apply the standard of review in subpart 3, item F, unless it decides there is not sufficient basis to grant the request to expedite the appeal in which case subpart 3 would apply.

History

  • Statutory Authority: MS s 103D.537
  • History: 31 SR 646

Chapter 8420 WETLAND CONSERVATION

Minn. R. 8420.0100 Purpose

Subpart 1. Purpose.

This chapter implements the regulatory provisions of the Wetland Conservation Act of 1991, Laws 1991, chapter 354, as amended by Laws 1993, chapter 175; Laws 1994, chapter 627; Laws 1996, chapter 462; Laws 2000, chapter 382; Laws 2001, chapter 146; Laws 2002, chapter 220; Laws 2003, chapter 128; Laws 2004, chapters 221 and 255; Laws 2007, chapters 57 and 131; and Laws 2008, chapter 368. This chapter shall be interpreted to implement the purpose of the act, which is to:

A. achieve no net loss in the quantity, quality, and biological diversity of Minnesota's existing wetlands;

B. increase the quantity, quality, and biological diversity of Minnesota's wetlands by restoring or enhancing diminished or drained wetlands;

C. avoid direct or indirect impacts from activities that destroy or diminish the quantity, quality, and biological diversity of wetlands; and

D. replace wetland values where avoidance of activity is not feasible and prudent.

Subp. 2. Method.

The regulatory provisions of the Wetland Conservation Act advance the purpose in this part by requiring persons proposing to impact a wetland to first, attempt to avoid the impact; second, attempt to minimize the impact; and finally, replace any impacted area with another wetland of at least equal function and value. As specified in greater detail in part 8420.0420, certain projects are exempt from the requirement for a replacement plan under the Wetland Conservation Act.

Subp. 3. Administration.

The Wetland Conservation Act is administered by local government units with oversight provided by the Board of Water and Soil Resources. Enforcement of the act is provided by Department of Natural Resources conservation officers and other peace officers. The Wetland Conservation Act became effective on January 1, 1992, and this chapter and portions of Minnesota Statutes, chapters 103A, 103B, 103E, 103F, and 103G, govern its implementation. Persons seeking general information on wetlands and the interpretation of this chapter may contact their local government unit or soil and water conservation district.

History

  • Statutory Authority: MS s 14.06; 103B.101; 103B.3355; 103G.2242
  • History: 18 SR 274; 22 SR 1877; 25 SR 152; 27 SR 135; 34 SR 145
Minn. R. 8420.0102 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0103 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0105 Scope

Subpart 1. Scope; generally.

Wetlands must not be impacted unless replaced by restoring or creating wetland areas of at least equal public value. This chapter regulates the draining or filling of wetlands, wholly or partially, and excavation in the permanently and semipermanently flooded areas of type 3, 4, or 5 wetlands, and in all wetland types if the excavation results in filling, draining, or conversion to nonwetland.

Subp. 2. Applicability.

A. This chapter does not prevent the use of the bed of wetlands for pasture or cropland during dry periods if dikes, ditches, tile lines, or buildings are not constructed or improved and the agricultural use does not impact the wetlands.

B. This chapter does not regulate normal farming practices in a wetland. "Normal farming practices" means ranching, silvicultural, grazing, and farming activities such as plowing, seeding, cultivating, and harvesting for the production of feed, food, and fiber products, but does not include activities that result in the draining of wetlands.

C. This chapter does not prevent control of noxious weeds if the control does not impact the wetland.

D. This chapter does not regulate impacts to incidental wetlands. "Incidental wetlands" are wetland areas that the landowner can demonstrate, to the satisfaction of the local government unit, were created in nonwetland areas solely by actions, the purpose of which was not to create the wetland. Incidental wetlands include drainage ditches, impoundments, or excavations constructed in nonwetlands solely for the purpose of effluent treatment, containment of waste material, stormwater retention or detention, drainage, soil and water conservation practices, and water quality improvements and not as part of a wetland replacement process that may, over time, take on wetland characteristics.

E. This chapter does not apply to the public waters and public waters wetlands as defined in Minnesota Statutes, section 103G.005, subdivisions 15 and 15a, which have been inventoried by the commissioner according to Minnesota Statutes, section 103G.201, except that:

F. This chapter is in addition to other regulations including those of the United States Army Corps of Engineers, United States Department of Agriculture, Minnesota state agencies, watershed districts, and local governments.

G. This chapter does not apply to peat mining as defined in Minnesota Statutes, section 93.461, which is subject to the permit to mine and reclamation requirements of Minnesota Statutes, sections 93.44 to 93.51, and the rules of the commissioner adopted under those sections.

H. This chapter does not require state agencies to obtain local government unit approvals. However, the state agencies must follow the procedures and standards prescribed by this chapter.

I. In addition to the provisions of this chapter, governmental decisions on impacting wetlands are subject to Minnesota Statutes, chapters 116B and 116D, which provide that an action which is likely to have material adverse effects on natural resources must not be allowed if there is a feasible and prudent alternative consistent with the requirements of the public health, safety, and welfare and the state's paramount concern for the protection of its natural resources. Economic considerations alone do not justify adversely effective actions.

History

  • Statutory Authority: MS s 14.06; 103B.101; 103B.3355; 103G.2242
  • History: 18 SR 274; L 1996 c 462 s 43; 22 SR 1877; 25 SR 152; 27 SR 135; 34 SR 145
Minn. R. 8420.0110 Repealed by subpart

Subpart 1.

[Repealed, 34 SR 145]

Subp. 1a.

[Repealed, 34 SR 145]

Subp. 1b.

[Repealed, 34 SR 145]

Subp. 2.

[Repealed, 34 SR 145]

Subp. 3.

[Repealed, 34 SR 145]

Subp. 4.

[Repealed, 34 SR 145]

Subp. 5.

[Repealed, 22 SR 1877]

Subp. 5a.

[Repealed, 34 SR 145]

Subp. 6.

[Repealed, 34 SR 145]

Subp. 7.

[Repealed, 34 SR 145]

Subp. 8.

[Repealed, 34 SR 145]

Subp. 9.

[Repealed, 34 SR 145]

Subp. 10.

[Repealed, 34 SR 145]

Subp. 10a.

[Repealed, 34 SR 145]

Subp. 11.

[Repealed, 34 SR 145]

Subp. 12.

[Repealed, 34 SR 145]

Subp. 13.

[Repealed, 22 SR 1877]

Subp. 13a.

[Repealed, 34 SR 145]

Subp. 14.

[Repealed, 34 SR 145]

Subp. 15.

[Repealed, 34 SR 145]

Subp. 16.

[Repealed, 34 SR 145]

Subp. 17.

[Repealed, 34 SR 145]

Subp. 18.

[Repealed, 34 SR 145]

Subp. 18a.

[Repealed, 34 SR 145]

Subp. 19.

[Repealed, 34 SR 145]

Subp. 20.

[Repealed, 34 SR 145]

Subp. 20a.

[Repealed, 34 SR 145]

Subp. 20b.

[Repealed, 34 SR 145]

Subp. 21.

[Repealed, 34 SR 145]

Subp. 22.

[Repealed, 34 SR 145]

Subp. 23.

[Repealed, 34 SR 145]

Subp. 24.

[Repealed, 34 SR 145]

Subp. 25.

[Repealed, 34 SR 145]

Subp. 26.

[Repealed, 22 SR 1877]

Subp. 27.

[Repealed, 22 SR 1877]

Subp. 28.

[Repealed, 34 SR 145]

Subp. 29.

[Repealed, 34 SR 145]

Subp. 29a.

[Repealed, 34 SR 145]

Subp. 30.

[Repealed, 34 SR 145]

Subp. 30a.

[Repealed, 34 SR 145]

Subp. 31.

[Repealed, 34 SR 145]

Subp. 31a.

[Repealed, 34 SR 145]

Subp. 31b.

[Repealed, 34 SR 145]

Subp. 31c.

[Repealed, 34 SR 145]

Subp. 31d.

[Repealed, 34 SR 145]

Subp. 32.

[Repealed, 34 SR 145]

Subp. 32a.

[Repealed, 34 SR 145]

Subp. 32b.

[Repealed, 34 SR 145]

Subp. 32c.

[Repealed, 34 SR 145]

Subp. 33.

[Repealed, 34 SR 145]

Subp. 34.

[Repealed, 34 SR 145]

Subp. 34a.

[Repealed, 34 SR 145]

Subp. 34b.

[Repealed, 34 SR 145]

Subp. 35.

[Repealed, 34 SR 145]

Subp. 36.

[Repealed, 34 SR 145]

Subp. 37.

[Repealed, 34 SR 145]

Subp. 37a.

[Repealed, 34 SR 145]

Subp. 38.

[Repealed, 34 SR 145]

Subp. 39.

[Repealed, 34 SR 145]

Subp. 39a.

[Repealed, 34 SR 145]

Subp. 40.

[Repealed, 34 SR 145]

Subp. 40a.

[Repealed, 34 SR 145]

Subp. 41.

[Repealed, 34 SR 145]

Subp. 42.

[Repealed, 34 SR 145]

Subp. 43.

[Repealed, 34 SR 145]

Subp. 44.

[Repealed, 27 SR 135]

Subp. 44a.

[Repealed, 34 SR 145]

Subp. 44b.

[Repealed, 34 SR 145]

Subp. 45.

[Repealed, 34 SR 145]

Subp. 46.

[Repealed, 34 SR 145]

Subp. 47.

[Repealed, 22 SR 1877]

Subp. 47a.

[Repealed, 34 SR 145]

Subp. 47b.

[Repealed, 34 SR 145]

Subp. 48.

[Repealed, 34 SR 145]

Subp. 49.

[Repealed, 34 SR 145]

Subp. 50.

[Repealed, 34 SR 145]

Subp. 51.

[Repealed, 34 SR 145]

Subp. 51a.

[Repealed, 34 SR 145]

Subp. 52.

[Repealed, 34 SR 145]

Subp. 53.

[Repealed, 34 SR 145]

Subp. 54.

[Repealed, 34 SR 145]

Subp. 54a.

[Repealed, 34 SR 145]

Minn. R. 8420.0111 Definitions

Subpart 1. Scope.

The terms used in this chapter have the meanings given them in this part.

Subp. 2. Account or wetland bank account.

"Account" or "wetland bank account" means a record of wetland banking debits and credits established by an account holder within the state wetland banking system.

Subp. 3. Account holder.

"Account holder," in the state wetland banking system, means a person, corporation, government agency, or organization that is the owner of credits.

Subp. 4. Act.

"Act," when not used in reference to a specific state or federal act, means the Wetland Conservation Act of 1991, Laws 1991, chapter 354, as amended.

Subp. 5. Activity.

"Activity" means any work or action conducted in or near a wetland that could potentially affect a wetland. An activity may or may not result in an impact.

Subp. 6. Agricultural land.

"Agricultural land" means land used for horticultural, row, close grown, pasture, or hayland crops; growing nursery stocks; animal feedlots; farmyards; or associated building sites and public and private drainage systems and field roads located on any of these lands. Agricultural land must be used principally for the cultivation or production of plants or farm animals and includes former agricultural land that is presently enrolled in a conservation program under contract or easement.

Subp. 7. Applicant.

"Applicant" means a person, corporation, government agency, or organization that submits an application.

Subp. 8. Application.

"Application" means a formal request for a decision by a local government unit, made under this chapter and the act, for an exemption, no-loss, wetland boundary, wetland type, sequencing, replacement plan, or banking plan. The board shall provide forms to be used for applications.

Subp. 9. Approve or approval.

"Approve" or "approval" means the formal authorization by a local government unit of an activity described in an application.

Subp. 10. Aquaculture.

"Aquaculture" means cultivation of plants and animals in water for harvest, including hydroponics and raising fish in fish farms.

Subp. 11. Banking credits.

"Banking credits" means replacement credits resulting from the actions in part 8420.0526 that have been certified and deposited in the wetland bank according to part 8420.0725.

Subp. 12. Best management practices.

"Best management practices" means state-approved and published practices that are capable of preventing and minimizing degradation of surface water and groundwater.

Subp. 13. Board.

"Board" means the Board of Water and Soil Resources under Minnesota Statutes, section 103B.101.

Subp. 14. City.

"City" means a home rule charter or statutory city.

Subp. 15. Commissioner.

"Commissioner" means the commissioner of natural resources.

Subp. 16. Creation.

"Creation" means construction of wetlands in an area that was not wetlands in the past.

Subp. 17. Day.

"Day" means a calendar day unless specified otherwise. The day of the event is not used in counting any time period.

Subp. 18. Decision.

"Decision" means a formal action by the local government unit or delegated staff to approve, approve with conditions, or deny an application.

Subp. 19. Degraded wetland.

"Degraded wetland" means a wetland that provides minimal wetland function and value due to human activities such as drainage, diversion of watershed, filling, excavating, pollutant runoff, and vegetative or adjacent upland manipulation.

Subp. 20. Determination or determine.

"Determination" or "determine" refers to a technical finding by the technical evaluation panel or local government unit staff.

Subp. 21. Ditch.

"Ditch" has the meaning given under Minnesota Statutes, section 103E.005, subdivision 8.

Subp. 22. Drain or drainage.

"Drain" or "drainage" means any method for removing or diverting waters from wetlands. Methods include, but are not limited to, excavation of an open ditch, installation of subsurface drainage tile, filling, diking, or pumping.

Subp. 23. Drainage system.

"Drainage system" means a system of ditch or tile, or both, to drain property, including laterals, improvements, and improvements of outlets.

Subp. 24. Eligible.

"Eligible" means the maximum extent to which a local government unit or, when appropriate, delegated staff, can set the applicable parameter in the application of the Wetland Conservation Act and parts 8420.0100 to 8420.0935. The actual amount awarded is determined by the specific circumstances of each application, determined on a case-by-case basis, applying the standards set out in parts 8420.0100 to 8420.0935.

Subp. 25. Excavation.

"Excavation" means the displacement or removal of substrate, sediment, or other materials by any method.

Subp. 26. Fill.

"Fill" means any solid material added to or redeposited in a wetland that would alter the wetland's cross-section or hydrological characteristics, obstruct flow patterns, change the wetland boundary, or convert the wetland to a nonwetland. Fill does not include posts and pilings for linear projects such as bridges, elevated walkways, or powerline structures, or structures traditionally built on pilings such as docks and boathouses. Fill includes posts and pilings that result in bringing the wetland into a nonaquatic use or significantly altering the wetland's function and value, such as the construction of office and industrial developments, parking structures, restaurants, stores, hotels, housing projects, and similar structures. Fill does not include slash or woody vegetation, if the slash or woody vegetation originated from vegetation growing in the wetland and does not impair the flow or circulation of water or the reach of the wetland.

Subp. 27. 50 to 80 percent area.

"50 to 80 percent area" means a county or watershed with at least 50 percent but less than 80 percent of the presettlement wetland acreage intact, as provided in part 8420.0117.

Subp. 28. Greater than 80 percent area.

"Greater than 80 percent area" means a county or watershed where 80 percent or more of the presettlement wetland acreage is intact and:

A. ten percent or more of the current total land area is wetland; or

B. 50 percent or more of the current total land area is state or federal land. Greater than 80 percent areas are provided in part 8420.0117.

Subp. 29. Hayland.

"Hayland" means an area that was mechanically harvested or that was planted with annually seeded crops in a crop rotation seeded to grasses or legumes in six of the last ten years.

Subp. 30. Hydric soils.

"Hydric soils" means soils that are saturated, flooded, or ponded long enough during the growing season to develop anaerobic conditions in the upper part.

Subp. 31. Hydrophytic vegetation.

"Hydrophytic vegetation" means macrophytic plant life growing in water, soil, or on a substrate that is at least periodically deficient in oxygen as a result of excessive water content.

Subp. 32. Impact.

"Impact" means a loss in the quantity, quality, or biological diversity of a wetland caused by draining or filling of wetlands, wholly or partially, or by excavation in the permanently and semipermanently flooded areas of type 3, 4, or 5 wetlands, as defined in subpart 75, and in all wetland types if the excavation results in filling, draining, or conversion to nonwetland.

Subp. 33. Impacted wetland.

"Impacted wetland" means a wetland that has been partially or wholly subjected to an impact.

Subp. 34. Indirect impact.

"Indirect impact" means an impact that is the result of an activity that occurs outside of the wetland boundary.

Subp. 35. Infrastructure.

"Infrastructure" means public water facilities, stormwater and sanitary sewer piping, outfalls, inlets, street subbase, roads, ditches, culverts, bridges, and any other work defined specifically by a local government unit as constituting a capital improvement within the context of an approved development plan.

Subp. 36. Landowner.

"Landowner" means a person or entity having the rights necessary to drain, excavate, or fill a wetland or to establish and maintain a replacement or banked wetland. Typically, the landowner is a fee title owner or a holder of an easement, license, lease, or rental agreement providing the necessary rights. The right must not be limited by a lien or other encumbrance that could override the obligations assumed with the replacement or banking of a wetland.

Subp. 37. Less than 50 percent area.

"Less than 50 percent area" means a county or watershed with less than 50 percent of the presettlement wetland acreage intact or any county or watershed not defined as a greater than 80 percent area or 50 to 80 percent area, as provided in part 8420.0117.

Subp. 38. Local government unit.

"Local government unit" means:

A. outside of the seven-county metropolitan area, a city council, county board of commissioners, or soil and water conservation district or their delegate;

B. in the seven-county metropolitan area, a city council, town board, watershed management organization as defined under Minnesota Statutes, section 103B.205, subdivision 13, or soil and water conservation district or their delegate; and

C. in those cases where an activity or replacement will occur on state land, the agency with administrative responsibility for the land.

Subp. 39. Local water plan.

"Local water plan" means a watershed plan pursuant to Minnesota Statutes, sections 103B.201 to 103B.255; a comprehensive local water management plan pursuant to Minnesota Statutes, sections 103B.301 to 103B.355; or a watershed management plan pursuant to Minnesota Statutes, section 103D.401.

Subp. 40. Major watershed.

"Major watershed" means the 81 major watershed units delineated by the map State of Minnesota Watershed Boundaries, 1979, incorporated by reference under part 8420.0112, item Q.

Subp. 41. Mining.

"Mining" means the removal of peat and metallic minerals as provided in Minnesota Statutes, sections 93.461 and 93.481.

Subp. 42. Minor watershed.

"Minor watershed" means one of the 5,600 minor watersheds delineated by the map State of Minnesota Watershed Boundaries, 1979, incorporated by reference under part 8420.0112, item Q.

Subp. 43. Municipality.

"Municipality" has the meaning given in Minnesota Statutes, section 103G.005, subdivision 12.

Subp. 44. Native vegetation.

"Native vegetation" means plant species that are indigenous to Minnesota or that expand their range into Minnesota without being intentionally or unintentionally introduced by human activity and that are classified as native in the Minnesota Plant Database, incorporated by reference under part 8420.0112, item O.

Subp. 45. Noninvasive vegetation.

"Noninvasive vegetation" means plant species that do not typically invade or rapidly colonize existing, stable plant communities.

Subp. 46. Nonwetland.

"Nonwetland" means upland areas or previously converted areas that do not meet the criteria for classification as a jurisdictional wetland using the United States Army Corps of Engineers Wetland Delineation Manual (January 1987) and deepwater habitats identified using Classification of Wetlands and Deepwater Habitats of the United States. Both documents are incorporated by reference under part 8420.0112, items B and C.

Subp. 47. On-site.

"On-site" means within or directly adjacent to a project.

Subp. 48. Ordinance.

"Ordinance" means a body of regulations developed, approved, and implemented by a county, city, or township as authorized by Minnesota Statutes, chapters 394, 462, and 366, respectively.

Subp. 49. Pasture.

"Pasture" means an area that was grazed by domesticated livestock or that was planted with annually seeded crops in a crop rotation seeded to grasses or legumes in six of the last ten years.

Subp. 50. Peace officer.

"Peace officer" has the meaning given under Minnesota Statutes, section 626.84.

Subp. 51. Permanently and semipermanently flooded area of a type 3, 4, or 5 wetland.

"Permanently and semipermanently flooded area of a type 3, 4, or 5 wetland" means the portion of a type 3, 4, or 5 wetland below the level where the water has been maintained for a sufficient period of time to leave evidence upon the landscape, commonly the point where the natural vegetation changes from predominantly aquatic to predominantly terrestrial.

Subp. 52. Plant community.

"Plant community" means a wetland plant community classified according to Wetland Plants and Plant Communities of Minnesota & Wisconsin, incorporated by reference under part 8420.0112, item P.

Subp. 53. Presettlement wetland.

"Presettlement wetland" means a wetland or public waters wetland that existed in Minnesota at the time of statehood in 1858.

Subp. 54. Project.

"Project" means a specific plan, contiguous activity, proposal, or design necessary to accomplish a goal as defined by a local government unit. As used in this chapter, a project may not be split into components or phases for the purpose of gaining additional exemptions.

Subp. 55. Project-specific.

"Project-specific" means the applicant for a replacement plan approval provides the replacement as part of the project, rather than attain the replacement from a wetland bank.

Subp. 56. Public transportation project.

"Public transportation project" means a project conducted by a public agency involving transportation facilities open to the public.

Subp. 57. Public value of wetlands.

"Public value of wetlands" means the importance and benefit to the public derived from the wetland functions listed in part 8420.0522, subpart 1.

Subp. 58. Public waters wetlands.

"Public waters wetlands" has the meaning given under part 6115.0170.

Subp. 59. Public waters.

"Public waters" has the meaning given under part 6115.0170.

Subp. 60. Replacement wetland.

"Replacement wetland" means a wetland restored or created or an area designated in part 8420.0526, or the equivalent, to replace wetland area or the public value of wetland functions lost at an impacted wetland.

Subp. 61. Responsible party.

"Responsible party" means an individual, business, or other organization causing draining, excavation, or filling of wetlands on the property of another, with or without the landowner's permission or approval.

Subp. 62. Restoration.

"Restoration" means reestablishment of an area as wetlands that was historically wetlands and that is no longer wetlands or remains as a degraded wetland.

Subp. 63. Rule.

"Rule" means a body of regulations developed, approved, and implemented by a watershed management organization as authorized under Minnesota Statutes, chapter 103D.

Subp. 64. Shoreland or shoreland wetland protection zone.

A. For local government units that have a shoreland management ordinance approved under Minnesota Statutes, sections 103F.201 to 103F.221, "shoreland" or "shoreland wetland protection zone" means:

B. For local government units that do not have a shoreland management ordinance approved under Minnesota Statutes, sections 103F.201 to 103F.221, "shoreland" or "shoreland wetland protection zone" means:

Subp. 65. Silviculture.

"Silviculture" means management of forest trees.

Subp. 66. Soil and water conservation district.

"Soil and water conservation district" means a legal subdivision of state government under Minnesota Statutes, chapter 103C.

Subp. 67. State wetland banking system, wetland bank, or bank.

"State wetland banking system," "wetland bank," or "bank" means a system of identifying wetlands restored or created for replacement credit and providing for, facilitating, and tracking the exchange of wetland banking credits for projects that require replacement plans or wetland mitigation required by other local, state, or federal authorities.

Subp. 68. Structure.

"Structure" means any object erected or placed in, under, or over or anchored or attached to a wetland area.

Subp. 69. Utility.

"Utility" means a sanitary sewer; a storm sewer; potable water distribution; or transmission, distribution, or furnishing, at wholesale or retail, of natural or manufactured gas, petroleum products, electricity, telephone, or radio service or communications.

Subp. 70. Watershed.

"Watershed" means a land area that drains to a common waterway, such as a stream, lake, estuary, or wetland.

Subp. 71. Watershed management organization.

"Watershed management organization" has the meaning given under Minnesota Statutes, section 103B.205, subdivision 13.

Subp. 72. Wetlands, a wetland, the wetland, or wetland area.

A. "Wetlands" means lands transitional between terrestrial and aquatic systems where the water table is usually at or near the surface or the land is covered by shallow water. For purposes of this subpart, wetlands must:

B. "A wetland" or "the wetland" means a distinct hydrologic feature with characteristics of item A, surrounded by nonwetland and including all contiguous wetland types, except those connected solely by riverine wetlands. "Wetland area" means a portion of a wetland or the wetland.

C. Wetlands does not include public waters wetlands and public waters unless reclassified as wetlands by the commissioner under Minnesota Statutes, section 103G.201.

D. The wetland size is the area within its boundary. The boundary must be determined according to the United States Army Corps of Engineers Wetland Delineation Manual (January 1987). The wetland type must be determined according to Wetlands of the United States, (1971 edition). Both documents are incorporated by reference under part 8420.0112, items A and B. The local government unit may seek the advice of the technical evaluation panel as to the wetland size and type.

Subp. 73. Wetlands in a cultivated field.

"Wetlands in a cultivated field" means a wetland where greater than 50 percent of its boundary abuts land that was in agricultural crop production in six of the ten years before January 1, 1991.

Subp. 74. Wetlands located on agricultural land.

"Wetlands located on agricultural land" means a wetland where greater than 50 percent of its boundary abuts agricultural land.

Subp. 75. Wetland type or type.

"Wetland type" or "type" means a wetland type classified according to Wetlands of the United States (1956 and 1971 editions), as summarized in this subpart. Classification of Wetlands and Deepwater Habitats of the United States is a separate, parallel wetland typing system that may be used to characterize components of a wetland. Both documents are incorporated by reference under part 8420.0112, items A and B.

A. "Type 1 wetlands" are seasonally flooded basins or flats in which soil is covered with water or is waterlogged during variable seasonal periods but usually is well-drained during much of the growing season. Type 1 wetlands are located in depressions and in overflow bottomlands along watercourses. In type 1 wetlands, vegetation varies greatly according to season and duration of flooding and includes bottomland hardwoods as well as herbaceous growths.

B. "Type 2 wetlands" are inland fresh meadows in which soil is usually without standing water during most of the growing season but is waterlogged within at least a few inches of the surface. Vegetation includes grasses, sedges, rushes, and various broad-leafed plants. Meadows may fill shallow basins, sloughs, or farmland sags or may border shallow marshes on the landward side.

C. "Type 3 wetlands" are inland shallow fresh marshes in which soil is usually waterlogged early during a growing season and often covered with as much as six inches or more of water. Vegetation includes grasses, bulrushes, spikerushes, and various other marsh plants such as cattails, arrowheads, pickerelweed, and smartweeds. These marshes may nearly fill shallow lake basins or sloughs or may border deep marshes on the landward side and are also common as seep areas on irrigated lands.

D. "Type 4 wetlands" are inland deep fresh marshes in which soil is usually covered with six inches to three feet or more of water during the growing season. Vegetation includes cattails, reeds, bulrushes, spikerushes, and wild rice. In open areas, pondweeds, naiads, coontail, water milfoils, waterweeds, duckweeds, water lilies, or spatterdocks may occur. These deep marshes may completely fill shallow lake basins, potholes, limestone sinks, and sloughs or may border open water in such depressions.

E. "Type 5 wetlands" are inland open fresh water, shallow ponds, and reservoirs in which water is usually less than ten feet deep and is fringed by a border of emergent vegetation similar to open areas of type 4 wetland.

F. "Type 6 wetlands" are shrub swamps in which soil is usually waterlogged during the growing season and is often covered with as much as six inches of water. Vegetation includes alders, willows, buttonbush, dogwoods, and swamp privet. This type occurs mostly along sluggish streams and occasionally on floodplains.

G. "Type 7 wetlands" are wooded swamps in which soil is waterlogged at least to within a few inches of the surface during the growing season and is often covered with as much as one foot of water. This type occurs mostly along sluggish streams, on floodplains, on flat uplands, and in shallow basins. Trees include tamarack, arborvitae, black spruce, balsam, red maple, and black ash. Northern evergreen swamps usually have a thick ground cover of mosses. Deciduous swamps frequently support beds of duckweeds and smartweeds.

H. "Type 8 wetlands" are bogs in which soil is usually waterlogged and supports a spongy covering of mosses. This type occurs mostly in shallow basins, on flat uplands, and along sluggish streams. Vegetation is woody or herbaceous or both. Typical plants are heath shrubs, sphagnum moss, and sedges. In the north, leatherleaf, Labrador-tea, cranberries, carex, and cottongrass are often present. Scattered, often stunted, black spruce and tamarack may occur.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0112 Incorporation by Reference

This chapter incorporates by reference the following documents and any subsequent updates, addenda, or derivations related to them, as approved by the board:

A. Wetlands of the United States (United States Fish and Wildlife Service Circular No. 39, 1956 and 1971 editions).

B. United States Army Corps of Engineers Wetland Delineation Manual (January 1987).

C. Classification of Wetlands and Deepwater Habitats of the United States (Cowardin, et al., 1979 edition).

D. Criteria and Guidelines for Assessing Geologic Sensitivity of Groundwater Resources in Minnesota (Minnesota Department of Natural Resources, 1991).

E. United States Geological Survey Hydrologic Unit Map for Minnesota (1974).

F. National Wetland Inventory maps (United States Fish and Wildlife Service).

G. Growing Energy Crops on Minnesota Wetlands: The Land Use Perspective, Anderson and Craig, 1984.

H. Wetland Restoration Guide, Minnesota Board of Water and Soil Resources (December 1982).

I. Vegetation in Restored and Created Wetlands, Minnesota Board of Water and Soil Resources, September 2000.

J. Wildlife Habitat Improvements in Wetlands: Guidance for Soil and Water Conservation Districts and Local Government Units in Certifying and Approving Wetland Conservation Act Exemption Proposals, Minnesota Interagency Wetlands Group, December 2000.

K. Sustaining Minnesota Forest Resources: Voluntary Site-Level Forest Management Guidelines for Landowners, Loggers and Resource Managers. Minnesota Forest Resources Council, St. Paul, 1999.

L. Minnesota Construction Site Erosion and Sediment Control Planning Handbook. Minnesota Board of Water and Soil Resources and the Association of Metropolitan Soil and Water Conservation Districts, St. Paul, 1988.

M. Agriculture and Water Quality: Best Management Practices for Minnesota, Minnesota Pollution Control Agency, St. Paul, 1991.

N. Storm-Water and Wetlands: Planning and Evaluation Guidelines for Addressing Potential Impacts of Urban Storm-Water and Snow-Melt Runoff on Wetlands, Minnesota Storm-Water Advisory Group, 1997.

O. Minnesota Plant Database, Minnesota Department of Natural Resources, St. Paul, 2002.

P. Wetland Plants and Plant Communities of Minnesota & Wisconsin, S. Eggers and D. Reed, 1997.

Q. State of Minnesota Watershed Boundaries, 1979, Minnesota Department of Natural Resources, St. Paul, 1979. These documents are available through the State Law Library, except the National Wetland Inventory maps, which are available at Minnesota soil and water conservation district offices. Except for the Minnesota Plant Database in item O, none of the documents are subject to frequent change.

History

  • Statutory Authority: MS s 14.06; 103B.101; 103B.3355; 103G.2242
  • History: 18 SR 274; 22 SR 1877; 25 SR 152; 27 SR 135; 34 SR 145
Minn. R. 8420.0115 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0117 Presettlement Wetland Acres and Areas

Subpart 1. County classification.

For purposes of this chapter:

A. the following counties are greater than 80 percent areas: Aitkin; Beltrami; Carlton; Cass; Clearwater; Cook; Crow Wing; Hubbard; Isanti; Itasca; Kanabec; Koochiching; Lake; Lake of the Woods; Mille Lacs; Pine; St. Louis; and Wadena;

B. the following counties are 50 to 80 percent areas: Anoka; Becker; Benton; Chisago; Morrison; Otter Tail; Sherburne; and Todd; and

C. the following counties are less than 50 percent areas: Big Stone; Blue Earth; Brown; Carver; Chippewa; Clay; Cottonwood; Dakota; Dodge; Douglas; Faribault; Fillmore; Freeborn; Goodhue; Grant; Hennepin; Houston; Jackson; Kandiyohi; Kittson; Lac Qui Parle; Le Sueur; Lincoln; Lyon; Mahnomen; Marshall; Martin; McLeod; Meeker; Mower; Murray; Nicollet; Nobles; Norman; Olmsted; Pennington; Pipestone; Polk; Pope; Ramsey; Red Lake; Redwood; Renville; Rice; Rock; Roseau; Scott; Sibley; Stearns; Steele; Stevens; Swift; Traverse; Wabasha; Waseca; Washington; Watonwan; Wilkin; Winona; Wright; and Yellow Medicine. WETLAND AREAS

Subp. 2. County or watershed reclassification.

A. A local government unit may request the board to reclassify a county or major watershed wholly or partly within its jurisdiction on the basis of its percentage of presettlement wetlands remaining. After receipt of satisfactory documentation from the local government, the board must change the classification of a county or major watershed. If requested by the local government unit, the board must assist in developing the documentation. Within 30 days of its action to approve a change of wetland classifications, the board must publish a notice of the change in the Environmental Quality Board Monitor.

B. One hundred citizens who reside within the jurisdiction of the local government unit may request the local government unit to reclassify the county or major watershed on the basis of its percentage of presettlement wetlands remaining. In support of the petition, the citizens must provide satisfactory documentation to the local government unit. The local government unit must consider the petition and forward the request to the board or provide a reason why the petition is denied.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0120 [Repealed, 22 SR 1877]

[Repealed, 22 SR 1877]

Minn. R. 8420.0122 Repealed by subpart

Subpart 1.

[Repealed, 34 SR 145]

Subp. 2.

[Repealed, 34 SR 145]

Subp. 3.

[Repealed, 34 SR 145]

Subp. 4.

[Repealed, 34 SR 145]

Subp. 5.

[Repealed, 34 SR 145]

Subp. 6.

[Repealed, 34 SR 145]

Subp. 7.

[Repealed, 34 SR 145]

Subp. 8.

[Repealed, 32 SR 281]

Subp. 9.

[Repealed, 34 SR 145]

Subp. 10.

[Repealed, 34 SR 145]

Minn. R. 8420.0200 Determining Local Government Unit; Duties

Subpart 1. Determining local government unit.

The local government unit responsible for making decisions must be determined according to items A to J.

A. Outside the seven-county metropolitan area, the local government unit is the county or city in which the activity is located, or its delegate.

B. In the seven-county metropolitan area, the local government unit is the city, town, or water management organization regulating surface-water-related matters in the area in which the activity is located, or its delegate. The watershed management plan adopted under Minnesota Statutes, section 103B.231, and related board rules will normally indicate the appropriate local government unit. Lacking an indication, the local government unit must be the city, town, or its delegate.

C. For activities on state land, the local government unit is the state agency, or the agency's designee, with administrative responsibility for that land. However, state agencies must coordinate with local government units that would otherwise have jurisdiction, according to items A and B, when conducting or making decisions on activities in wetlands.

D. Notwithstanding items A to G, the Department of Natural Resources is the approving authority for activities associated with projects requiring permits to mine under Minnesota Statutes, section 93.481, and for projects affecting calcareous fens.

E. Implementation of this chapter and the act may be delegated from a county, city, or town, as applicable according to item A or B, to a soil and water conservation district or other governmental entity by the passage of resolutions by both parties. The delegation becomes effective when resolutions have been passed by both parties, or on the date specified in the resolutions, whichever is later. Both parties must provide notice to the board, the commissioner, and the soil and water conservation district within 15 business days of adoption of the resolution. The notice must include a copy of the resolution and a description of the applicable geographic area.

F. If the activity is located in two jurisdictions, the local government unit is the one exercising zoning authority over the project or, if both have zoning authority, the one in which most of the wetland impacts will occur. If no zoning permits are required, the local government unit is the one in which most of the wetland impacts will occur. If an activity will affect wetlands in more than one local government unit, the board may coordinate the project review to ensure consistency and consensus among the local government units involved. Local government units may maintain separate jurisdiction if mutually agreed upon.

G. For a replacement site located in more than one jurisdiction, the local government unit is the one in which most of the replacement wetland area occurs.

H. For replacement plans where the project-specific replacement will occur in a different local government unit than the impact, approval of all local government units involved or as specified in items A to G constitutes final approval of the replacement plan and is required before the project may proceed. The local government unit with jurisdiction for the impact site must approve all components of the replacement plan, following the procedures required by this chapter. The local government unit with jurisdiction for the replacement site must limit the review to evaluation of the replacement site and make a decision accordingly. As part of the approval of the replacement plan, the local government unit with jurisdiction for the replacement site assumes responsibility for ensuring compliance with monitoring provisions according to parts 8420.0800 to 8420.0820. The local government unit with jurisdiction for the replacement site may enter into joint powers agreements with a local government unit with jurisdiction for the impact site, assess fees, or develop other procedures considered necessary to facilitate the process.

I. For instances where the activity or replacement occurs in multiple jurisdictions, the local government unit with decision-making authority must coordinate with the other local government units.

J. The board shall resolve all questions as to which government entity is the responsible authority, applying the guidelines in items A to I.

Subp. 2. Local government unit duties.

A. Local government units are responsible for making decisions on applications made under this chapter. Each local government unit of the state, except tribal lands and state agencies, must send a written acknowledgment, including a copy of the adopting resolution, to the board that it is assuming its responsibilities under this chapter and the act.

B. A local government unit must provide knowledgeable and trained staff with expertise in water resource management to manage the program or secure a qualified delegate. Otherwise, the board may declare a moratorium as prescribed in subpart 3 or take other appropriate legal action to ensure proper implementation and compliance with this chapter. The board may establish standards and requirements for training, experience, and certification.

C. The local government unit may, through resolution, rule, or ordinance, place decision-making authority with staff according to procedures it establishes. For final decisions made by staff, the local government unit must establish a local appeal process that includes an evidentiary public hearing before appointed or elected officials.

D. As provided for in part 8420.0240, technical questions concerning the public value, location, size, and type of wetland must be submitted to the technical evaluation panel. The local government unit may use a technical evaluation panel to predetermine public value, location, size, or type of wetlands under its jurisdiction and use this determination in administering this chapter and the act.

E. An application must not be approved unless entitlement thereto is established by a fair preponderance of the evidence. For each finding of fact and recommendation included in a written technical evaluation panel report that is not adopted by the local government unit, the local government unit must provide detailed reasons for rejecting the finding of fact or recommendation in its record of decision; otherwise, the local government unit has not sufficiently considered the technical evaluation panel report.

F. In the absence of an application, the local government unit may evaluate information related to a potential activity upon the request of a landowner. The evaluation provided does not constitute a decision for the purposes of parts 8420.0100 to 8420.0935.

G. The local government unit must retain a record of all decisions for a minimum of ten years after all applicable requirements and conditions pertaining to the project are fulfilled.

H. The local government unit and soil and water conservation district may charge processing fees in amounts not greater than are necessary to cover the reasonable costs of implementing this chapter and for technical and administrative assistance to landowners in processing other applications for projects affecting wetlands.

I. The local government unit must annually report information to the board regarding implementation of this chapter in a format and time period prescribed by the board. Failure to comply with the board's reporting requirements may subject the local government to a penalty under subpart 3.

Subp. 3. Failure to apply law.

A. If a local government unit fails to acknowledge in writing its responsibilities under this chapter and the act, as required in subpart 2, the board must impose, in the local government unit's jurisdiction, a 60-day moratorium on making decisions and implementing this chapter and the act. The board must notify the local government unit in writing of the start and end dates of the moratorium. The board must end the moratorium within the 60 days upon written agreement by the local government unit that it will assume, and is currently capable of implementing, its duties under this chapter and the act. If at the end of the initial 60-day moratorium a written agreement has not been made for the local government unit to apply the law, the board may extend the moratorium until the local government unit agrees to apply the law.

B. If the board has information that a local government unit is not following this chapter or the act in making decisions; if the local government unit does not have knowledgeable and trained staff with experience in water resource management; or if the local government unit fails to comply with the board's reporting requirements, the board must notify the local government unit in writing of its concerns. The local government unit must respond in writing within 60 days of being notified by the board. If not satisfied with the local government unit's written response, or none is received, the board must ask the local government unit to appear at a hearing before the board to discuss the matter. The board may invite comments from other local governments or state and federal agencies. If the board determines at the hearing that corrective action is necessary, the board must write the local government unit directing specific corrective action to occur within 60 days of receiving the board's decision. The notice must explain the reason for the action. If, after the 60-day period, the local government unit has not corrected the problem to the satisfaction of the board, the board must declare a moratorium as prescribed in item A or take other appropriate legal action to ensure compliance.

C. When a moratorium is declared as prescribed in item A or B, a decision cannot be made on an application because a local government unit authorized to implement this chapter does not exist while the moratorium is in effect. An application pending a local government unit decision when a moratorium is declared must be returned by the local government unit to the applicant within 15 business days of the moratorium being placed in effect. An application submitted while a moratorium is in effect must be returned by the local government unit to the applicant with an explanation and within 15 business days of the local government unit's receipt of the application.

History

  • Statutory Authority: MS s 14.06; 14.386; 103B.101; 103B.3355; 103G.2242
  • History: 18 SR 274; 22 SR 1877; 25 SR 152; 27 SR 135; 32 SR 281; 34 SR 145
Minn. R. 8420.0210 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0220 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0225 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0230 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0233 Other Local Government Unit Wetland Rules and Ordinances

This chapter and the act provide minimum standards. Local government units may require more procedures and more wetland protection, but not less.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0235 [Repealed, 27 SR 135]

[Repealed, 27 SR 135]

Minn. R. 8420.0240 Technical Evaluation Panel Procedures

A. For each local government unit, there is a technical evaluation panel. Panel membership consists of: a technical professional employee of the board, a technical professional employee of the soil and water conservation district of the county in which the activity is occurring, and a technical professional with expertise in water resource management appointed by the local government unit. For projects affecting public waters, public waters wetlands, or wetlands within the shoreland protection zone, the panel also includes a technical professional employee of the Department of Natural Resources. The local government unit must coordinate the panel.

B. Two members of the technical evaluation panel must be knowledgeable and trained in applying methodologies of the United States Army Corps of Engineers Wetland Delineation Manual (January 1987), Wetland Plants and Plant Communities of Minnesota & Wisconsin (S. Eggers and D. Reed 1997), Wetlands of the United States (United States Fish and Wildlife Service Circular 39, 1971 edition), and Classification of Wetlands and Deepwater Habitats of the United States (Cowardin, et al., 1979 edition), including updates and supplements, and any modifications or guidance provided by the board. The panel must also be knowledgeable and trained in evaluation of wetland functions and the resulting public value. The panel may seek advice and assistance from others with additional expertise to help the panel in its work.

C. The technical evaluation panel, if requested to do so by the local government unit, the landowner, or a member of the panel, must make technical findings and recommendations regarding applications, the scope of this chapter and the act, the applicability of exemption and no-loss standards, wetland functions and the resulting public value, direct and indirect impacts, possible violations of this chapter and the act, enforcement matters under part 8420.0900, comprehensive wetland protection and management plans and implementing rules and ordinances, and other technical issues related to implementation of this chapter. The panel must review applications for replacement of public road projects submitted according to part 8420.0544, banking projects according to parts 8420.0700 to 8420.0755, and replacement wetland monitoring as provided in parts 8420.0800 to 8420.0820. The panel must provide its findings to the local government unit for consideration. For violations of this chapter that may result in the issuance of an enforcement order, the panel must consult with the enforcement authority.

D. The panel's recommendation to the local government unit may recommend approval, approval with changes or conditions, or denial of an application. When a technical evaluation panel assembles findings or makes a recommendation, the local government unit must consider the findings or recommendation of the panel in its approval or denial of an application. The panel shall make no findings or recommendations without at least one member having made an on-site inspection. Panel findings and recommendations must be documented and endorsed by a majority of the members. If the local government unit does not agree with the panel's findings and recommendation, the detailed reasons for the disagreement must be part of the local government unit's record of decision.

E. Applicants must cooperate in providing local government unit staff and members of the technical evaluation panel and their designated experts with access to proposed project sites for investigation. Investigations must be preceded by notice to the landowner or designated agent, unless prior approval has been granted. If an applicant refuses to allow access, the local government unit may deny an application.

History

  • Statutory Authority: MS s 14.06; 103B.101; 103B.3355; 103G.2242
  • History: 18 SR 274; 22 SR 1877; 25 SR 152; 27 SR 135; 34 SR 145
Minn. R. 8420.0245 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0250 Repealed by subpart

Subpart 1.

[Repealed, 34 SR 145]

Subp. 2.

[Repealed, 22 SR 1877]

Subp. 3.

[Repealed, 34 SR 145]

Subp. 4.

[Repealed, 34 SR 145]

Subp. 5.

[Repealed, 27 SR 135]

Minn. R. 8420.0255 Local Government Unit Application and Decision Procedures

Subpart 1. General.

Notices and local government unit decisions made under this chapter must be in compliance with Minnesota Statutes, section 15.99.

Subp. 2. Determination of complete application.

The local government unit must determine that an application is complete based on parts 8420.0305 to 8420.0330. For incomplete applications, the local government unit must notify the applicant within 15 business days of receipt of the application and list in writing what items or information is missing.

Subp. 3. Notice of application.

A. Within 15 business days of receipt of a complete application, the local government unit must send a copy of the application and a notice of application on a form provided by the board to members of the technical evaluation panel; the watershed district or water management organization, if there is one; the commissioner; and individual members of the public who request a copy. The notice must identify the type of application, the date the comment period ends, and where to submit comments. Individual members of the public who request a copy must be sent a summary of the application that includes information to identify the applicant and the location and scope of the project. The comment period must be at least 15 business days from the date the notice of application is sent. Revisions of an approved and valid replacement plan must be noticed according to this subpart by sending a summary of the proposed revisions if:

B. This subpart does not apply to exemption or no-loss applications. However, a local government unit may issue a notice for an exemption or no-loss application following the requirements in this part when the local government unit believes that input from those required to receive notice will be useful in determining whether an exemption or no-loss applies.

Subp. 4. Decision.

The local government unit's decision must be based on the standards and procedures required by this chapter and on the technical evaluation panel's findings and recommendation, when provided. The local government unit must consider and include in its record of decision the technical evaluation panel's recommendation, when provided, to approve, modify, or deny the application. The local government unit must also consider any comments received from those required to receive notice. The local government unit's decision must be made in compliance with the time period prescribed by Minnesota Statutes, section 15.99, which, on the effective date of this part, generally requires a decision in 60 days. The local government unit may make on-site exemption and no-loss decisions if the decisions are noticed according to subpart 5 and project details are provided sufficient to document eligibility. The local government unit's decision is valid for three years or as otherwise specified in the local government unit's decision when the technical evaluation panel advises that a longer period is justified in accordance with the standards in parts 8420.0100 to 8420.0935.

Subp. 5. Notice of decision.

The local government unit's decision must be mailed to the landowner within ten business days of the decision. A summary of the local government unit's decision, in a format prescribed by the board, must be sent within ten business days of the decision to those required to receive notice of the application. The notice of decision must include information on the process and time period to appeal the decision of the local government unit.

Subp. 6. Decisions and notice for replacement via banking.

For replacement plan applications proposing the use of banking credits, the local government unit must verify, before approving the application, that the credits to be withdrawn are available and the applicant has a purchase agreement with the seller. For an approval of a replacement plan using banking credits as replacement, the local government unit must notify the board's banking administrator of the approval. The notification must be sent concurrent with the notice of decision and must include the bank account, the user of credits, and the amount of credit approved for withdrawal.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0260 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0265 Previously Approved Applications

Activities for which an application was approved may be completed under the laws, rules, conditions, and guidelines in effect when they were approved, provided the local government unit's approval is still valid.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0268 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0270 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0280 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0290 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0300 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0305 General Application Requirements

A. Persons requesting approval of an application must fulfill the application requirements of this part and those applicable to the type of application submitted according to parts 8420.0310 to 8420.0330 and, for wetland banking, part 8420.0705.

B. The following information must be submitted to the local government unit for all types of applications:

C. A landowner may seek advice from the local government unit regarding the applicability of a no-loss or exemption, the adequacy of sequencing arguments and alternatives, or other interpretation of this chapter without submitting an application.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0310 Wetland Boundary or Type Applications

A landowner may apply for a wetland boundary or type decision from the local government unit. The landowner is responsible for submitting proof necessary to make the decision. Applications for approval of wetland boundary or type must include information according to the wetland delineation report submittal guidelines provided by the board. A wetland boundary or type application may be submitted independently or as part of a no-loss, exemption, sequencing, replacement plan, or banking application. When an independent wetland boundary or type application is approved, and the approval remains valid, the applicant may incorporate the approval in a subsequent application for a no-loss, exemption, sequencing, replacement plan, or banking application.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0315 No-Loss Applications

A. A landowner may apply to the local government unit for a no-loss decision. A landowner who does not request a decision from the local government unit and proceeds with the activity may be subject to the enforcement provisions under part 8420.0915 and Minnesota Statutes, section 103G.2372.

B. The landowner applying for a no-loss is responsible for submitting the proof necessary to show qualification for the claim. This part also applies to applications requesting a decision on whether an activity or wetland falls within the scope of this chapter.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0320 Exemption Applications

A. A landowner intending to impact a wetland without replacement, claiming exemption under part 8420.0420, may apply to the local government unit for an exemption decision or request an on-site exemption decision before beginning the activity to verify whether the proposed impact is exempt. A landowner who does not request a decision from the local government unit and proceeds with the activity may be subject to the enforcement provisions under part 8420.0915 and Minnesota Statutes, section 103G.2372. An exemption may apply whether or not the local government unit has made an exemption decision. If the landowner requests an exemption decision, then the local government unit must make one.

B. The landowner applying for exemption must identify the specific exemption being claimed and submit the proof necessary to show qualification for the exemption.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0325 Sequencing Applications

An applicant may either submit the information required for sequencing analysis as part of a replacement plan application or apply separately for a preliminary sequencing decision from the local government unit before preparing a complete replacement plan. The applicant must provide written documentation of the project's compliance with the sequencing standards in part 8420.0520, including the identification of the project purpose and a detailed description of the project and alternatives considered. The local government unit may request additional information needed to make a decision.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0330 Replacement Plan Applications

Subpart 1. Requirement.

A landowner proposing a wetland impact that requires replacement under this chapter must apply to the local government unit and receive approval of a replacement plan before impacting the wetland.

Subp. 2. Preapplication conference and site visit.

Before preparation of a replacement plan, it is recommended that the landowner meet with the local government unit for a preapplication conference and site visit. The local government unit is encouraged to inform the landowner of all sequencing requirements and the criteria used to evaluate replacement plans.

Subp. 3. Application contents.

On an application form approved by the board in consultation with the commissioner, provided through the local government unit, and with required attachments supplied by the applicant, the following documentation must be provided in addition to the information required in part 8420.0305:

A. for the impacted wetland:

B. for the replacement wetland when replacement is project-specific:

C. for the replacement wetland when the replacement consists of wetland bank credits:

D. a description of the required replacement as determined according to the proposed replacement actions and the replacement standards in part 8420.0522.

Subp. 4. Approval conditions.

A landowner must not impact a wetland under an approved replacement plan until submittal of the following, to the satisfaction of the local government unit:

A. for project-specific replacement that is not in advance according to part 8420.0522, subpart 8, item B, a financial assurance according to part 8420.0522, subpart 9, unless waived by the local government unit;

B. for project-specific replacement, evidence that a notice in a form prescribed by the board has been attached to and recorded with the deed for lands containing a replacement wetland, specifying the following:

C. for replacement consisting of wetland bank credits, confirmation that the board has withdrawn the credits from the state wetland bank as specified in the approved replacement plan.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0335 Contractor's Notification Responsibility

A. For the purposes of this part, "contractor" means an individual, business, or other organization providing to a landowner or the landowner's agent a product or service that drains, fills, or excavates a wetland.

B. A contractor must not drain, excavate, or fill a wetland, wholly or partially, unless the contractor has:

C. A form shall be provided by the board for use in complying with this part.

D. Work performed in violation of this part is a misdemeanor by operation of Minnesota Statutes, section 103G.141.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0350 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0400 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0405 Boundary or Type

Subpart 1. Wetland boundary.

Wetland boundaries must be determined using the methodologies in the United States Army Corps of Engineers Wetlands Delineation Manual (January 1987), including subsequent updates and supplements, and guidance provided by the board.

Subp. 2. Wetland type.

Wetland type must be identified according to United States Fish and Wildlife Service Circular No. 39 (1971 edition) Wetlands of the United States and Classification of Wetlands and Deepwater Habitats of the United States, including modifications or guidance provided by the board. Wetland type in relation to Wetland Plants and Plant Communities of Minnesota & Wisconsin is shown in the following table:

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0410 No-Loss and Exemption Conditions

A person conducting an activity in a wetland under no-loss in part 8420.0415 or an exemption in part 8420.0420 must ensure that:

A. appropriate erosion control measures are taken to prevent sedimentation of the wetland or of any receiving waters;

B. the activity does not block fish activity in a watercourse, except when done purposely to prevent movement of undesirable fish species in accordance with a recommendation from the commissioner; and

C. the activity is conducted in compliance with all other applicable federal, state, and local requirements, including best management practices according to the documents referenced in part 8420.0112, items L, M, and N, and water resource protection requirements established under Minnesota Statutes, chapter 103H.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0415 No-Loss Criteria

"No-loss" means no permanent loss of, or impact to, wetlands from an activity according to the criteria in this part. The following qualify for a no-loss:

A. an activity that will not impact a wetland;

B. excavation in wetlands when limited to removal of sediment or debris such as trees, logs, stumps, beaver dams, blockage of culverts, and trash, provided the removal does not result in alteration of the original cross-section of the wetland or watercourse. Wetland areas created solely by beaver activities may be drained by removing those materials placed by beaver. Drainage is permitted by removing or moving materials blocking installed roadway culverts and related drainage structures. Additional excavation or removal of other materials is not permitted unless it can be shown by aerial photographs that the proposed activity will not drain or fill wetland that was there before the beaver dam was built or before the culvert became plugged;

C. temporary or seasonal water level management activities done for the purpose of performing maintenance or as part of vegetation or habitat management activities, which will not result in the conversion of a wetland to a nonwetland or conversion of a nondegraded wetland to a different type;

D. an activity conducted as part of an approved replacement or banking plan, conducted or authorized by public agencies for the purpose of wetland restoration or fish and wildlife habitat restoration or improvement according to the guidance referenced in part 8420.0112, items J and H, or repair and maintenance of earthen containment structures;

E. excavation limited to removal of deposited sediment in wetlands that are presently utilized as stormwater management basins, or excavation and removal of contaminated substrate, when the excavated area is limited to the minimum dimensions necessary for achieving the desired purpose and stabilized to prevent water quality degradation;

F. an activity associated with the operation, routine maintenance, or emergency repair of existing utilities and public works structures, including pipelines, provided the activity does not result in additional wetland intrusion or additional impacts, either wholly or partially;

G. temporarily crossing or entering a wetland to perform silvicultural activities, including timber harvest as part of a forest management activity, so long as the activity limits the impact on the hydrologic and biologic characteristics of the wetland; the activity does not result in the construction of dikes, drainage ditches, tile lines, or buildings; and the timber harvesting and other silvicultural practices do not result in the drainage of the wetland or public waters; or

H. a temporary impact that is rectified by repairing, rehabilitating, or restoring the affected wetland. No-loss under this item only applies if all of the following conditions are met:

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0420 Exemption Standards

Subpart 1. Scope.

A. An impact is exempt from replacement if it qualifies for any one of the listed exemptions. An impact is not disqualified when it is indicated as not exempt under a different exemption. Persons proposing to conduct an exempt activity may contact the local government unit to verify eligibility for an exemption and to evaluate alternatives to avoid or minimize wetland impacts. When the total amount of impact exceeds the amount allowed under the applicable exemption, the impact is not exempt and the entire amount of impact must be replaced.

B. No exemptions apply to:

C. Exemptions may not be combined on a project.

D. Present and future owners of wetlands impacted without replacement under an exemption for agricultural activities in subpart 2 or drainage in subpart 3 must make no use of the wetland area after it is impacted, other than as agricultural land or other use specified in subpart 2, for at least ten years after the impact unless it is first replaced according to Minnesota Statutes, section 103G.222. Except for land in public ownership, at the time of impact, the local government unit may require the landowner to record a notice of these restrictions in the office of the county recorder for the county in which the project is located if the local government unit determines the wetland area impacted is at risk of conversion to a nonagricultural use or use other than that specified in subpart 2 within ten years, based on the zoning classification, proximity to a municipality or full-service road, or other criteria as determined by the local government unit. In making a decision under this item, the local government unit must review the applicable comprehensive plan, if one exists, when evaluating the risk of conversion to a nonagricultural use and monitor and enforce the prohibition on using the area impacted for a nonagricultural purpose for at least ten years. At a minimum, the recorded document must contain the name or names of the landowners, a legal description of the property to which the restrictions apply, a statement of the restrictions, the date on which the restrictions expire, the name of the local government that approved the exemption, if an exemption occurred, the signatures of all owners, and an acknowledgment.

Subp. 2. Agricultural activities.

A replacement plan is not required for:

A. impacts resulting from agricultural activities in a wetland that was planted with annually seeded crops or was in a crop rotation seeding of pasture grass or legumes in six of the last ten years prior to January 1, 1991. Documentation, such as aerial photographs, United States Department of Agriculture records, or other applicable documentation may be used as evidence for this exemption. Impacts eligible for this exemption must be to type 1 or 2 wetlands;

B. impacts resulting from agricultural activities in a type 1 wetland on agricultural pasture land that remains in the same use, except for bottomland hardwood type 1 wetlands, and impacts resulting from agricultural activities in a type 2 or 6 wetland that is less than two acres in size and located on agricultural pasture land that remains in the same use;

C. impacts resulting from soil and water conservation projects that are certified by soil and water conservation district technical staff after review by the technical evaluation panel, if the project minimizes adverse effects on the hydrologic and biologic characteristics of the wetland. For purposes of this item, examples of soil and water conservation projects include those identified in the State Cost Share Program Manual, available from the board or soil and water conservation districts, and federally funded demonstration, research, and cost share programs and projects;

D. filling a wetland to accommodate wheeled booms on irrigation devices if the fill does not impede normal drainage;

E. impacts resulting from aquaculture activities, including pond excavation and construction and maintenance of associated access roads and dikes, authorized under and conducted in accordance with a permit issued by the United States Army Corps of Engineers under section 404 of the federal Clean Water Act, United States Code, title 33, section 1344, but not including construction or expansion of buildings;

F. impacts resulting from wild rice production activities, including necessary diking and other activities authorized under a permit issued by the United States Army Corps of Engineers under section 404 of the federal Clean Water Act, United States Code, title 33, section 1344; or

G. impacts resulting from agricultural activities that are subject to federal farm program restrictions that meet minimum state standards under this chapter and Minnesota Statutes, sections 103A.202 and 103B.3355, and that have been approved by the board, the commissioners of natural resources and agriculture, and the Pollution Control Agency. An exemption under this item is not valid until such approval is obtained. If approved, the conditions and standards shall be noticed by the board to local government units and published in the State Register. The conditions and standards take effect 30 days after publication and remain in effect unless superseded by subsequent statute, rule, or notice in the State Register. Upon taking effect, this exemption only applies to impacts on agricultural land annually enrolled in the federal Farm Program that are not beyond what is:

Subp. 3. Drainage.

A. For the purposes of this subpart, "public drainage system" means a drainage system as defined in Minnesota Statutes, section 103E.005, subdivision 12, and any ditch or tile lawfully connected to the drainage system.

B. A replacement plan is not required for:

C. A replacement plan is not required for:

D. For projects completed under this subpart, spoil must be placed and stabilized in a manner that minimizes wetland impacts without jeopardizing the stability of the ditch or contributing to the degradation of downstream water quality.

E. A public drainage authority may, as part of a repair, install control structures, realign a ditch, construct dikes along a ditch, or make other modifications as necessary to prevent drainage of a wetland.

F. Wetlands and public waters of all types that could be drained as a part of a public drainage repair project are eligible for the permanent wetlands preserve program established under Minnesota Statutes, section 103F.516. The board must give priority to acquisition of easements on type 3, 4, or 5 wetlands that have been in existence for more than 25 years on public drainage systems and other wetlands that have the greatest risk of drainage from a public drainage repair project.

Subp. 4. Federal approvals.

A replacement plan is not required for impacts authorized under section 404 of the federal Clean Water Act, United States Code, title 33, section 1344, or section 10 of the Rivers and Harbors Act of 1899, United States Code, title 33, section 403, and regulations that meet minimum state standards under this chapter and that have been approved by the board, the Department of Agriculture, the Department of Natural Resources, and the Pollution Control Agency. This exemption is not valid until such approval is obtained. If approved, the conditions and standards shall be noticed by the board to local government units and published in the State Register. The exemption takes effect 30 days after publication and remains in effect unless superseded by subsequent statute, rule, or notice in the State Register.

Subp. 5. Restored wetlands.

A replacement plan is not required for:

A. draining a wetland that was restored or created for conservation purposes under a contract or easement providing the landowner with the right to drain the restored or created wetland to preproject hydrologic conditions. The landowner must provide a contract or easement conveyance demonstrating that the landowner or a predecessor restored or created the wetland for conservation purposes but retained the right to subsequently drain the restored or created wetland to the conditions that existed before restoration or creation; or

B. impacts to a wetland that was restored or created by a landowner without any assistance or financing from public agencies or private entities other than the landowner, if the wetland has not been used for wetland replacement or deposited in the state wetland bank. For purposes of this item, assistance by public agencies does not include consultation on project design or advice on the project's relationship to state or federal programs. The landowner must provide a contract, billing statements, or other evidence sufficient to demonstrate that the landowner or a predecessor restored or created the wetland without any assistance or financing from public agencies or private entities other than the landowner or predecessor. The landowner must also provide sufficient information to determine that the area was not wetland before restoration or creation activity.

Subp. 6. Utilities.

A. A replacement plan is not required for impacts resulting from:

B. For maintenance, repair, and replacement, a local government unit may issue a seasonal or annual exemption approval or the utility may proceed without local government unit approval if the utility is carrying out the work according to approved best management practices. Work of an emergency nature may proceed as necessary and any impacts must be addressed with the local government unit after the emergency work has been completed.

Subp. 7. Forestry.

The exemption under this subpart is for roads and crossings solely constructed, and primarily used, for the purpose of providing access for the conduct of silvicultural activities. A replacement plan is not required for impacts resulting from construction of forest roads and crossings so long as the activity limits the impact on the hydrologic and biologic characteristics of the wetland; the construction activities do not include, or result in, the access becoming a dike, drainage ditch, or tile line; impacts are avoided wherever possible; and there is no drainage of the wetland or public waters.

Subp. 8. De minimis.

A. Except as provided in items B and C, a replacement plan is not required for projects that impact up to the following amounts of wetlands:

B. The amounts listed in item A may not be combined on a project.

C. The exemption under this subpart no longer applies to a landowner's portion of a wetland when the proposed project impact area and the cumulative area of the landowner's portion drained, excavated, or filled since January 1, 1992, is the greater of:

D. Property may not be divided to increase the amounts listed in item A or to gain an exemption.

E. For purposes of this subpart, for wetlands greater than 40 acres, the wetland type may be determined to be the wetland type with the deepest water regime within the wetland and within 300 feet of the impact.

F. For purposes of this subpart, the 11-county metropolitan area consists of the counties of Anoka, Carver, Chisago, Dakota, Hennepin, Isanti, Ramsey, Scott, Sherburne, Washington, and Wright.

Subp. 9. Wildlife habitat.

A replacement plan is not required for:

A. excavation or the associated deposition of spoil within a wetland for the primary purpose of wildlife habitat improvement, if:

B. duck blinds.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0500 Purpose and Requirement

Subpart 1. Purpose.

Parts 8420.0500 to 8420.0544 specify the procedures and criteria for avoiding and minimizing impacts and for ensuring adequate replacement of lost public value from unavoidable impacts.

Subp. 2. Requirement.

No person may impact a wetland, wholly or partially, without being eligible for an exemption or no-loss, or first having a wetland replacement plan approved by the local government unit. Before approval of a replacement plan, the local government unit must ensure that the applicant has exhausted all possibilities to avoid and minimize wetland impacts according to sequencing in part 8420.0520. The applicant must demonstrate to the local government unit that the replacement plan complies with this part and parts 8420.0515 to 8420.0528. A replacement plan that fails to meet the requirements of this chapter is inadequate in replacing lost function and value and must be denied by the local government unit.

Subp. 3. Alternative evaluation methodologies.

The local government unit may evaluate the replacement plan using a scientifically accepted methodology that evaluates all wetland functions specified in Minnesota Statutes, section 103B.3355, for both the impacted and replacement wetlands. The alternative methodologies must be approved and listed by the board, in consultation with the commissioners of natural resources and agriculture and local government units. When using alternative evaluation methodologies to evaluate replacement plans, the ratio of replacement credit to impacted wetland must not be less than the minimum requirements listed in part 8420.0522, subpart 4, except as provided for in part 8420.0830.

History

  • Statutory Authority: MS s 14.06; 103B.101; 103B.3355; 103G.2242
  • History: 18 SR 274; 34 SR 145
Minn. R. 8420.0505 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0510 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0515 Special Considerations

Subpart 1. Scope.

The factors in this part, when identified as being applicable to an impact site or a replacement site, must be considered by the applicant before submitting a replacement plan and by the local government unit in the review of replacement plans.

Subp. 2. Endangered and threatened species.

A replacement plan for activities that involve taking species listed as endangered or threatened in parts 6134.0200 to 6134.0400 must be denied unless the commissioner issues a permit under part 6212.1800 or Minnesota Statutes, section 84.0895, subdivision 7. Applicants may identify if there are known locations of listed species at a particular site by contacting the Department of Natural Resources' natural heritage and nongame research program.

Subp. 3. Rare natural communities.

A replacement plan for activities that involve the modification of a rare natural community as determined by the Department of Natural Resources' natural heritage program must be denied if the local government unit determines that the proposed activities will permanently adversely affect the natural community.

Subp. 4. Special fish and wildlife resources.

A replacement plan for activities that would have a significant adverse effect on a special or locally significant fish and wildlife resource that cannot be functionally replaced must be denied. These resources include, but are not limited to:

A. fish passage and spawning areas;

B. colonial water bird nesting colonies;

C. migratory waterfowl concentration areas;

D. deer wintering areas; and

E. wildlife travel corridors. Activities involving streams must not block fish passage unless approved by the commissioner.

Subp. 5. Archaeological, historic, or cultural resource sites.

A replacement plan for activities that involve the modification of known archaeological, historical, or cultural resource sites on or eligible for the National Register of Historic Places, as designated by the state historic preservation officer, must be denied if the local government unit, in consultation with the State Historical Preservation Office, determines that the proposed activities will have a significant adverse effect on the archaeological or historical value of the site.

Subp. 6. Groundwater sensitivity.

A replacement plan for activities must be denied if the local government unit determines the activities would have a significant adverse effect on groundwater quality. The publication Criteria and Guidelines for Assessing Geologic Sensitivity of Groundwater Resources in Minnesota may be used as a guide in determining potential impacts.

Subp. 7. Sensitive surface waters.

A replacement plan must be denied if the local government unit determines the activities will have a significant adverse effect on the water quality of outstanding resource value waters listed in part 7050.0335 or on trout waters designated by the commissioner.

Subp. 8. Education or research use.

A replacement plan for impacts to wetlands known to be used for educational or research purposes must be denied if the local government unit determines that those uses will not be maintained or adequately replaced.

Subp. 9. Waste disposal sites.

The local government unit must evaluate the type and amount of waste material found at the site. Activities involving known or potential hazardous wastes or contaminants must be conducted according to applicable federal and state standards.

Subp. 10. Consistency with other plans.

The local government unit must consider the extent to which proposed activities are consistent with other plans, such as local water management plans, watershed management plans, land use plans, zoning, and comprehensive plans.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145; 41 SR 545
Minn. R. 8420.0520 Sequencing

Subpart 1. Requirement.

The local government unit must not approve a wetland replacement plan unless the local government unit finds that the applicant has demonstrated that the activity impacting a wetland complies with all of the following principles in descending order or priority:

A. avoids direct or indirect impacts that may destroy or diminish the wetland under the criteria in subpart 3;

B. minimizes impacts by limiting the degree or magnitude of the wetland activity and its implementation under the criteria in subpart 4;

C. rectifies impacts by repairing, rehabilitating, or restoring the affected wetland under the criteria in subpart 5;

D. reduces or eliminates impacts over time by operating the project in a manner that preserves and maintains the remaining wetland under the criteria in subpart 6; and

E. replaces unavoidable impacts by restoring or, if wetland restoration opportunities are not reasonably available, creating replacement wetland areas having equal or greater public value as provided for in parts 8420.0500 and 8420.0522 to 8420.0528. Wetlands located in cultivated fields that are subject to subpart 8 are an exception to this part.

Subp. 2.

[Repealed, 34 SR 145]

Subp. 3. Impact avoidance.

A. Avoidance is required when indicated by part 8420.0515.

B. Wetland dependence determination:

C. Alternatives analysis:

Subp. 4. Impact minimization.

The applicant shall demonstrate to the local government unit's satisfaction that the activity will minimize impacts to wetlands. In reviewing the sufficiency of the applicant's proposal to minimize wetland impacts, the local government unit must consider all of the following:

A. the spatial requirements of the project;

B. the location of existing structural or natural features that may dictate the placement or configuration of the project;

C. the purpose of the project and how the purpose relates to placement, configuration, or density;

D. the sensitivity of the site design to the natural features of the site, including topography, hydrology, and existing vegetation;

E. the value, function, and spatial distribution of the wetlands on the site;

F. individual and cumulative impacts; and

G. an applicant's efforts to:

Subp. 5. Impact rectification.

Temporary impacts must be rectified by repairing, rehabilitating, or restoring the affected wetland according to the no-loss provisions of part 8420.0415, item H.

Subp. 6. Reduction or elimination of impacts over time.

After an activity is completed, further impacts must be reduced or eliminated by maintaining, operating, and managing the project in a manner that preserves and maintains remaining wetland functions. The local government unit must require applicants to implement best management practices to protect wetland functions.

Subp. 7. Unavoidable impacts.

Unavoidable impacts that remain after efforts to minimize, rectify, or reduce or eliminate them must be replaced according to parts 8420.0522 to 8420.0528.

Subp. 7a. Sequencing flexibility.

A. Flexibility in application of the sequencing steps may be requested by the applicant and allowed at the discretion of the local government unit, subject to the conditions in item B, as determined by the local government unit, if:

B. Flexibility in the order and application of sequencing standards must not be implemented unless alternatives have been considered and the proposed replacement wetland is certain to provide equal or greater public value as determined based on a functional assessment reviewed by the technical evaluation panel using a methodology approved by the board. The applicant must provide the necessary information and the local government unit must document the application of sequencing flexibility in the replacement plan approval.

Subp. 8. Wetlands on cultivated fields.

If the wetland is located on a cultivated field and will be replaced through restoration, then the priority order for sequencing in subpart 1 is not required. A wetland impacted under this subpart must not be converted to nonagricultural land for ten years. The landowner must execute and record a notice of this requirement in the office of the county recorder for the county in which the property is located and, as a condition of approval, provide documentation of the recording to the local government unit.

Subp. 9.

[Repealed, 34 SR 145]

History

  • Statutory Authority: MS s 14.06; 14.386; 103B.101; 103B.3355; 103G.2242
  • History: 18 SR 274; 22 SR 1877; 25 SR 152; 27 SR 135; 32 SR 281; 34 SR 145
Minn. R. 8420.0522 Replacement Standards

Subpart 1. General requirement.

Wetland replacement must replace the public value of wetlands lost as a result of an impact. Replacement of wetland function and value may occur at more than one location. The public value of wetlands is based upon the functions of wetlands, including:

A. water quality, including filtering pollutants to surface water and groundwater, using nutrients that would otherwise pollute public waters, trapping sediments, protecting shoreline, and recharging groundwater;

B. flood water and stormwater retention, including the potential for flooding in the watershed, the value of property subject to flooding, and the reduction in potential flooding by the wetland;

C. public recreation and education, including hunting and fishing areas, wildlife viewing areas, and nature areas;

D. commercial uses, including wild rice and cranberry growing and harvesting and aquaculture;

E. fish, wildlife, and native plant habitats;

F. low-flow augmentation; and

G. other functions and public uses as identified in wetland evaluation methods demonstrated to reasonably identify appropriate candidates for wetland replacement. The board shall maintain a publicly available list of the methods that have been approved for wetland evaluation under the standards set out in this item.

Subp. 2. Determining impacts of partial drainage.

In cases where wetlands will be partially drained, the amount of wetland to be replaced must be determined according to this subpart. The area impacted by partially draining a wetland is determined in two parts. The wetland area where the hydrology will be totally removed must be considered an impact in its entirety. The amount of impact for the area that is partially drained must be at least 50 percent of the acreage of the remaining wetland area determined by an assessment acceptable to the technical evaluation panel.

Subp. 3. In-kind wetland replacement.

In-kind means a wetland of similar type and function to the impacted wetland. Wetland replacement is in-kind if it is:

A. the same type or plant community as the impacted wetland or, for degraded wetlands, the same type or plant community that historically occurred at the impact site; or

B. the same hydrologic conditions and landscape position as the impacted wetland.

Subp. 4. Replacement ratios.

A. The replacement ratio is 2.5 replacement credits for each acre of wetland impacted, except in greater than 80 percent areas or on agricultural land the replacement ratio is 1.5 replacement credits for each acre of wetland impacted. The replacement ratio may be reduced by 0.5:1 when the replacement consists of:

B. For replacement via banking, impacts in bank service area 10 that are replaced in bank service area 9 or the Des Moines River Basin in bank service area 8 and impacts in bank service area 1 that are replaced in bank service area 2 count as replacement within the same bank service area for the purpose of reducing the minimum required replacement ratio according to this subpart.

C. For purposes of determining project-specific replacement ratios, the local government unit may authorize the use of out-of-kind wetland replacement in the same ratio allowed for in-kind replacement. Out-of-kind replacement may qualify for the same ratio as in-kind when it consists of a type or plant community that has been significantly lost in the watershed or that will provide important functional benefits to the watershed in accordance with the principles described in part 8420.0830, subpart 5, as determined by the technical evaluation panel based on a review of available evidence or according to a local plan approved by the board. A reduced ratio for out-of-kind replacement is typically not appropriate for wetlands that are difficult to replace, such as white cedar swamps or bogs.

D. Wetland replacement must be of a size sufficient to ensure that it provides equal or greater public value than the impacted wetland it will replace. The actual replacement ratio required may be more than the ratio required in item A if the local government unit determines that a higher ratio is necessary to replace the public value of the wetland lost. In no case shall the replacement ratio be less than 1:1 in greater than 80 percent areas or agricultural land, and 2:1 in all other areas.

E. Owners of wetlands impacted for use as agricultural land may make no use of the wetland area after it is impacted, other than as agricultural land, for a period of ten years unless future replacement to achieve a ratio equaling or exceeding the appropriate ratio for nonagricultural land in item A occurs. The landowner must record a notice of this restriction in the office of the county recorder in which the project is located, and, as a condition of local government unit approval, provide documentation of the recording to the local government unit.

F. The board may approve special replacement ratios based on data derived from comprehensive inventories of replacement opportunities. The board must give notice of the replacement ratios to local government units and must publish the ratios in the State Register. The board must provide opportunities for public input and comment before publishing the special replacement ratios. The conditions and standards take effect 30 days after publication and remain in effect unless superseded by subsequent statute, rule, or notice in the State Register.

Subp. 5. Ecological suitability and sustainability.

A. The preferred method of replacement is that which takes advantage of naturally occurring hydrogeomorphic conditions with minimal landscape alteration and is most likely to result in a wetland area that functions wholly, perpetually, and naturally. Wetland restoration is generally preferred over creation, and restoration of completely impacted wetlands is generally preferred over other methods of replacement.

B. Restoration and replacement of wetlands must be accomplished according to the ecology of the landscape area. The replacement site must be ecologically suitable for providing the desired functions and compatible with adjacent land uses. A replacement or banking plan that would result in wetland types or characteristics that do not naturally occur in the landscape area in which the replacement will occur must be denied. Replacement must not adversely affect other habitat types or ecological communities that are important in maintaining the overall biological diversity of the area.

C. Replacement projects must be located and designed, to the maximum extent practicable, to be self-sustaining once performance standards have been achieved. "Self-sustaining" refers to the ability of a wetland to provide the desired functions over time in a changing landscape without human intervention.

D. In addition to items A to C, when determining the location, type, function, and design of replacement, applicants and local government units must consider: landscape position, habitat requirements, development and habitat loss trends, sources of watershed impairment, protection and maintenance of upland resources and riparian areas, and providing a suite of functions.

Subp. 6. Required upland buffer.

A. Establishment or preservation of unmanicured vegetated upland buffer areas is required adjacent and contiguous to replacement wetlands receiving credit under part 8420.0526, subparts 3 to 7.

B. For replacement wetlands less than two acres in size, the buffer must be a minimum average width of 25 feet. For all other replacement wetlands, the buffer must be a minimum width of 25 feet and an average width of 50 feet.

C. The applicant may request the local government unit to vary the upland buffer standards under items A and B. The local government unit may vary the standards under items A and B based on a recommendation by the technical evaluation panel when compliance is not practicable or feasible, and the replacement wetland will otherwise meet the requirements of subpart 5, or when the variance would be ecologically beneficial.

Subp. 7. Siting of replacement.

A. Siting wetland replacement must follow this priority order:

B. Notwithstanding item A, siting wetland replacement in greater than 80 percent areas may follow the priority order under this item:

C. Notwithstanding item A, siting wetland replacement in the seven-county metropolitan area must follow the priority order under this item:

D. Siting wetland replacement for public transportation projects must comply with part 8420.0544.

E. When reasonable, practicable, and environmentally beneficial replacement opportunities are not available in siting priorities listed in items A to D, the applicant may seek opportunities at the next level. For the purposes of this item, "reasonable, practicable, and environmentally beneficial replacement opportunities" means opportunities that are:

F. Regulatory agencies, local government units, and other entities involved in wetland restoration must collaborate to identify potential replacement opportunities in watersheds within their jurisdictional areas. LIST OF 81 MAJOR WATERSHED UNITS OF MINNESOTA

Subp. 8. Timing of replacement.

A. Replacement of wetland function and value must be completed in advance of or concurrent with the actual wetland impact. For replacement that is not in advance, a financial assurance is required according to subpart 9.

B. Replacement is in advance if the replacement is:

C. Any action being proposed for replacement credit must be specifically identified for replacement purposes and approved by the local government unit as part of a replacement or banking plan before the actual restoration or creation activity is initiated.

Subp. 9. Financial assurance.

A. For wetland replacement that is not in advance, a financial assurance acceptable to the local government unit must be submitted to, and approved by, the local government unit to ensure successful replacement. The local government unit may waive this requirement if it determines the financial assurance is not necessary to ensure successful replacement. The local government unit may incorporate this requirement into any financial assurance required by the local government unit for other aspects of the project.

B. The financial assurance may be used to cover costs of actions necessary to bring the project into compliance with the approved replacement plan specifications and monitoring requirements. The financial assurance does not serve as an in-lieu fee and is not a substitute for enforcement, but may be used for repair, construction, vegetation establishment and management, maintenance, monitoring, or other actions the local government unit determines necessary to ensure adequate replacement.

C. Before drawing on the financial assurance, the local government unit must provide written notice to the landowner stating the actions necessary to bring the replacement project into compliance and that the landowner has 30 days to complete the actions, after which the local government unit will use the financial assurance to gain compliance. Use of the financial assurance by the local government unit may be appealed by the landowner within 30 days after the date on which the notice is mailed, according to part 8420.0910.

D. The local government unit may release a portion of the financial assurance upon successful completion of construction, but must retain a sufficient amount to ensure successful vegetative establishment and completion of the monitoring requirements. Within 60 days of certification of successful replacement and completion of monitoring according to part 8420.0820, subpart 2, the local government unit must release any remaining financial assurance submitted by the applicant, provided all other conditions of the approval are met.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0526 Actions Eligible for Credit

Subpart 1. Scope.

A. The actions in this part are eligible for replacement credit as determined by the local government unit in parts 8420.0500 to 8420.0820. Sufficient information to determine eligibility and credit must be provided to the local government unit as part of a replacement or banking plan application.

B. This part identifies the amount of credit allowed for each action, however, the actual amount may be less as determined by the local government unit. When the local government unit allows less replacement credit than the amounts described in this part, the local government unit must provide justification for the lower credit allocation.

C. Subparts 3 to 7 require the incorporation of buffer areas meeting the minimum requirements described in part 8420.0522, subpart 6.

D. Modification or conversion of nondegraded wetlands from one wetland type to another by damming, diking, impounding, or excavating does not constitute replacement credit. Restoration of wetlands drained or filled in violation of this chapter is not eligible for replacement credit. Wetlands impacted under an exemption may not be restored for replacement credit for ten years after the impact.

Subp. 2. Upland buffer areas.

A. Up to ten percent of the buffer area is eligible for replacement credit for establishment or preservation of nonnative vegetation and up to 25 percent of the buffer area is eligible for replacement credit for establishment or preservation of native, noninvasive vegetation. Establishing upland buffer around existing high value wetlands adjacent to the replacement wetland is eligible for replacement credit only when the minimum widths provided in part 8420.0522, subpart 6, are maintained and the maximum buffer area under item B is not exceeded.

B. The area of buffer for which replacement credit is granted under item A must not exceed the area of the replacement wetland.

C. For buffer areas of native, noninvasive vegetation, the local government unit may increase the amount of credit to a maximum of 50 percent if the technical evaluation panel finds that additional buffer will improve replacement wetland sustainability and provide significant functional benefits. Buffers add to replacement wetland sustainability and provide significant functional benefits when they:

Subp. 3. Restoration of completely drained or filled wetland areas.

Restoration of both the natural hydrology regime and native, noninvasive vegetation on wetlands that have been completely drained or filled is eligible for replacement credit in an amount up to 100 percent of the wetland area hydrologically and vegetatively restored. To be eligible for replacement credit, the vegetation establishment and management plan must set a goal of restoring the historic native plant community typical of the wetland being restored, or other plant community when the technical evaluation panel determines that establishment of the historic native plant community is not ecologically feasible.

Subp. 4. Restoration of partially drained or filled wetland areas.

Restoration of both the natural hydrology regime and native, noninvasive vegetation of wetlands that have been degraded by prior drainage, filling, or a diversion of the natural watershed is eligible for replacement credit as follows:

A. any wetland area substantially degraded by partial drainage or fill that was planted with annually seeded crops, was in a crop rotation seeded to pasture grasses or legumes, or was required to be set aside to receive price supports or equivalent payments in at least ten of the last 20 years before the date of application, is eligible for replacement credit in a percentage equivalent to the percent of the time the wetland area was annually seeded, in rotation, or set aside during the prior 20-year period; and

B. all other wetland areas substantially degraded by partial drainage or fill are eligible for replacement credit of up to 50 percent of the wetland area restored.

Subp. 5. Vegetative restoration of farmed wetlands.

Reestablishment of permanent native, noninvasive vegetative cover on farmed wetland areas that have not been affected by prior drainage or filling is eligible for replacement credit for:

A. up to 50 percent of the area restored for wetland areas that were planted with annually seeded crops, were in a crop rotation seeded to pasture grasses or legumes, or were required to be set aside to receive price supports or equivalent payments in at least ten of the last 20 years before the date of application for a replacement or bank plan; or

B. up to 90 percent of the area restored for wetland areas in bank service areas 2, 3, and 4 in a percentage equivalent to the percent of time the wetland areas were planted with annually seeded crops, were in a crop rotation seeded to pasture grasses or legumes, or were required to be set aside to receive price supports or equivalent payments during the 20-year period prior to the date of application for a replacement or bank plan.

Subp. 6. Protection of wetlands previously restored via conservation easements.

Permanently protecting wetlands previously restored or created for conservation purposes under a contract or easement, when the contract or easement has expired and gives the landowner the right to drain or fill the wetland upon termination, is eligible for replacement credit where the area receiving credit meets the replacement wetland construction standards of part 8420.0528. The maximum replacement credit is 75 percent of the area created or restored under the conservation contract or easement. Alternatively, credit may be allocated according to the other subparts in this part as applied prior to initiation of the contract or easement, when the applicant can document eligible credit yield to the satisfaction of the local government unit.

Subp. 7. Wetland creations.

A. A wetland created in an upland area is eligible for replacement credit in an amount up to 75 percent of the total wetland area created.

B. A wetland created due to mineral extraction activities is eligible for replacement credit under this subpart only for those areas actively mined within ten years prior to the application for credit.

C. A wetland created as part of a water quality treatment system is eligible for replacement credit under this subpart only if the wetland area receiving credit is a functioning wetland designed for a maximum 24-inch rise in water level for the ten-year critical storm event and treatment of runoff is provided before discharge into the replacement wetland area according to part 8420.0528, subpart 2, item G. Any portions of water quality treatment systems allowed for replacement are not eligible for the exemptions in part 8420.0420 and are subject to the replacement requirements under parts 8420.0500 to 8420.0544 and the monitoring requirements under parts 8420.0800 to 8420.0820.

Subp. 8. Restoration and protection of exceptional natural resource value.

A. Restoration and protection of calcareous fens, white cedar swamps, floodplain or riparian wetlands and upland buffers, habitat corridors with other important resources, wetlands adjacent to designated trout waters or other actions that restore and protect wetlands and adjacent areas are eligible for replacement credit when the action improves or directly contributes to the function and sustainability of an exceptional natural resource. For purposes of this subpart, exceptional natural resources are:

B. Project eligibility and the allocation of credit under this subpart is determined by the local government unit with concurrence of the technical evaluation panel based on the qualification of the resource as exceptional, the actions proposed, and the resulting contribution to the value and sustainability of the exceptional resource. Areas receiving credit must be protected by a permanent conservation easement, in a format prescribed by the board, that is granted to and accepted by the state.

Subp. 9. Preservation of wetlands owned by the state or a local unit of government.

In greater than 80 percent areas, up to 12.5 percent of wetland areas and adjacent buffer owned by the state or a local unit of government and protected by a permanent conservation easement is eligible for replacement credit. The easement must be in a format prescribed by the board and granted to and accepted by the board after approval of the replacement or banking plan application. Replacement credit for wetland preservation may only be granted after considering replacement as provided under subparts 3 to 8. To be eligible for credit under this subpart, the technical evaluation panel must determine that there is a high probability the wetland will be degraded or impacted and the wetland:

A. contains or benefits an exceptional resource identified in subpart 8;

B. is of a type or function that is rare, difficult to replace, or of high value to the watershed;

C. contains a rare or declining plant community; or

D. is of a type that is not likely to regenerate, such as northern white cedar.

Subp. 10. Replacement credit conversion.

A. Replacement plans and banking plans approved after August 10, 2009, must determine replacement credit according to subparts 2 to 9. Public value credit that has been deposited in the state wetland bank or approved as part of a banking plan application before August 10, 2009, must be converted as follows:

B. Previously approved public value credit must be converted according to this subpart on August 10, 2009, for deposited credits and at the time of deposit for future deposits resulting from a previously approved banking plan.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0528 Replacement Wetland Construction Standards

Subpart 1. General requirement.

The standards and guidelines in this part must be followed in wetland creation and restoration efforts to ensure adequate replacement of wetland function and value.

In evaluating a proposed replacement or banking plan application, the local government unit must determine that the plan will adequately replace the public value of wetlands lost. If the local government unit determines that the proposed replacement is not likely to result in adequate replacement of function and public value, the local government must either require modifications necessary to obtain adequate replacement or deny the application.

Subp. 2. Design requirements.

A. The standards in this subpart must be met for all replacement wetlands unless the local government unit, with concurrence of the technical evaluation panel, determines that a standard is clearly not appropriate.

B. Water control structures must be constructed using specifications provided in the Minnesota Wetland Restoration Guide or their equivalent. Control structures may be subject to the Department of Natural Resources dam safety regulations.

C. Best management practices must be established and maintained at the replacement site as necessary to protect the replacement wetland and other waterbodies. Erosion control measures must be employed during construction and until permanent ground cover is established.

D. Native, noninvasive vegetation must be established in restored and created wetlands. Each replacement or banking plan must include a vegetation establishment and management plan. The vegetation establishment and management plan must include a goal of, and specific provisions for, establishing plant communities that correspond to the hydrology and landscape position of the replacement site. If the replacement wetland is seeded or planted, the seed or planting stock should be from native, noninvasive species in accordance with the Minnesota Wetland Restoration Guide. In evaluating the vegetation establishment and management plan, the local government unit must determine that implementation of the plan is likely to result in establishment of the appropriate native, noninvasive vegetation within the monitoring period. During the monitoring period, the applicant must take reasonable steps to control invasion by any nonnative or invasive species.

E. The bottom contours of created types 3, 4, and 5 wetlands must provide a variety of water depths, comparable to natural wetlands in the vicinity of the replacement, and be consistent with part 8420.0522, subpart 5.

F. The edge of created or graded wetlands must be comparable to other naturally occurring wetlands of similar hydrologic condition and landscape position in the major watershed. Sideslopes of created wetlands, graded portions of restored wetlands, and graded buffer strips, must not be steeper than 8:1, eight feet horizontally for every one foot vertically, or flatter, unless the technical evaluation panel concurs that steeper slopes are acceptable based on the surrounding landscape and the characteristics of other naturally occurring wetlands in the vicinity. Sideslopes of 10:1 to 15:1 are preferred.

G. Treatment of runoff before discharge to replacement areas is required to improve sustainability and minimize degradation of the wetland over time. The replacement area must be physically separated from any water quality treatment system. "Treatment of runoff" under this part means:

H. For projects that contain elements that include dams, dikes, or other impoundment features, the construction plans must be designed, overseen, and certified by a registered professional engineer.

Subp. 3. Design considerations.

The following replacement wetland design elements must be considered for replacement wetlands and incorporated to the extent practicable and feasible:

A. restored wetlands should emulate the hydrology and vegetation of the presettlement wetland condition;

B. expanded buffers should be incorporated into the design of replacement wetlands in areas where there is a high potential for erosion and the buffer will improve slope stability or when necessary to provide wildlife habitat corridor connections with other wetlands or habitats;

C. measures should be taken to manage hydraulic bounce as indicated in the guidance document under part 8420.0112, item N; and

D. for all restored wetlands where the original organic substrate has been stripped away and for all created wetlands, the organic substrate must be sufficient to establish a functioning wetland and to accomplish the goals of the replacement or banking plan. When feasible, organic soil used for backfill should be salvaged from the impacted wetland for utilization in the replacement wetland. Organic soil for backfill from wetlands dominated by nonnative or invasive species should be avoided.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0530 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0540 Repealed by subpart

Subpart 1.

[Repealed, 34 SR 145]

Subp. 2.

[Repealed, 34 SR 145]

Subp. 3.

[Renumbered 8420.0542]

Subp. 4.

[Renumbered 8420.0543]

Subp. 5.

[Renumbered 8420.0544]

Subp. 5a.

[Renumbered 8420.0545]

Subp. 6.

[Renumbered 8420.0546]

Subp. 7.

[Renumbered 8420.0547, subpart 1]

Subp. 8.

[Renumbered 8420.0547, subp 2]

Subp. 9.

[Renumbered 8420.0548, subps 1 to 10]

Subp. 10.

[Renumbered 8420.0549, subps 1 to 8]

Minn. R. 8420.0541 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0542 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0543 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0544 Replacement for Public Transportation Projects

A. Impacts resulting from public transportation projects must be replaced according to the requirements of this chapter except as provided in this part.

B. Wetlands impacted by public transportation projects:

C. A replacement plan is required for public transportation projects that involve new roads or roads expanded solely for additional traffic capacity lanes.

D. A replacement plan is not required for individual public road projects that impact wetlands for the repair, rehabilitation, reconstruction, or replacement of a currently serviceable existing state, city, county, or town public road necessary, as determined by the public road authority, to meet state or federal design or safety standards or requirements. This item only applies to authorities for public road projects that:

E. For impacts associated with a new public road project, or a public road project expanded solely for additional traffic capacity, the public transportation authority may purchase credits from the board at the cost to the board to establish credits. Purchase of credits under this item is allowed only when the board has determined that sufficient credits are available for sale.

F. The technical evaluation panel must review minimization and delineation decisions made by the public road authority and provide recommendations regarding on-site replacement if requested to do so by the local government unit, a contiguous landowner, or a member of the technical evaluation panel.

G. Those required to receive notice of public road projects may appeal minimization, delineation, and on-site replacement decisions made by the public road authority to the board according to part 8420.0905.

H. Changes to impacts proposed by local road authorities in item D must be reported to the board within six months from the date of the change being finalized.

I. Except for state public transportation projects, for which the state Department of Transportation is responsible, and public road authority projects that do not meet the requirements of item D, the board must replace public road project impacts, including impacts to public waters if authorized by the commissioner or a delegated authority, that result from local government projects on existing roads.

J. Public road authorities, at their discretion, may deviate from federal and state design standards on existing road projects when practical and reasonable to avoid impacts, provided that public safety is not unreasonably compromised. The local road authority and its officers and employees are exempt from liability for any tort claim for injury to persons or property arising from travel on the highway and related to the deviation from the design standards for construction or reconstruction under this item. This item does not preclude an action for damages arising from negligence in construction or maintenance on a highway.

History

  • Statutory Authority: MS s 14.06; 14.386; 103B.101; 103B.3355; 103G.2242
  • History: 18 SR 274; 22 SR 1877; 25 SR 152; 27 SR 135; L 2004 c 228 art 1 s 71; 32 SR 281; 34 SR 145
Minn. R. 8420.0545 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0546 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0547 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0548 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0549 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0550 Repealed by subpart

Subpart 1.

[Repealed, 34 SR 145]

Subp. 2.

[Repealed, 34 SR 145]

Subp. 3.

[Repealed, 27 SR 135]

Minn. R. 8420.0600 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0610 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0620 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0630 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0650 Repealed by subpart

Subpart 1.

[Repealed, 34 SR 145]

Subp. 2.

[Repealed, 34 SR 145]

Subp. 2a.

[Repealed, 34 SR 145]

Subp. 3.

[Repealed, 34 SR 145]

Subp. 4.

[Repealed, 34 SR 145]

Subp. 5.

[Repealed, 27 SR 135]

Subp. 6.

[Repealed, 27 SR 135]

Subp. 7.

[Repealed, 34 SR 145]

Subp. 8.

[Repealed, 34 SR 145]

Minn. R. 8420.0700 Purpose of Wetland Banking

The purpose of parts 8420.0700 to 8420.0755 is to provide standards for the establishment and administration of a state wetland banking system, including individual wetland bank sites, as authorized by Minnesota Statutes, section 103G.2242. The purpose of the state wetland banking system is to provide a market-based structure that allows for replacement of unavoidable impacts with preestablished replacement wetlands. The board or the board's designee is responsible for management of the bank, including recording all bank transactions, maintaining bank records, and ensuring that the operation of the bank complies with parts 8420.0700 to 8420.0755.

History

  • Statutory Authority: MS s 14.06; 103B.101; 103B.3355; 103G.2242
  • History: 18 SR 274; 34 SR 145
Minn. R. 8420.0705 Establishing Wetland Bank Site

Subpart 1. Eligibility for wetland banking.

Replacement wetland credits that result from any of the eligible actions in part 8420.0526, and that meet the standards of parts 8420.0522 and 8420.0528, may be deposited in the state wetland bank for later use in replacing unavoidable impacts. To be eligible for deposit in the bank, the credits must be specifically designated for wetland banking purposes prior to undertaking the replacement actions and certified by the local government unit prior to deposit. Designation of credits for wetland banking is accomplished by approval of a wetland banking plan by a local government unit. Replacement actions completed or initiated without prior local government unit approval are not eligible for deposit in the wetland bank.

Subp. 2. Local government unit and board authority.

A. Based on a comprehensive local water or wetland protection and management plan approved by the board, a local government unit may, by rule or ordinance, limit the establishment of bank sites within its jurisdiction. The local government unit that approves a banking plan application is responsible for construction certification according to part 8420.0800, ensuring the monitoring provisions of part 8420.0810 are fulfilled, and certifying credits for deposit according to part 8420.0725.

B. The board may reject or modify an application for deposit if, during its review, any part of the bank application or plan is missing, incorrect, or inconsistent with this chapter.

Subp. 3. Application procedures.

When replacement actions are proposed for banking purposes, the applicant must submit to the local government unit a banking plan application, in a form prescribed by the board, containing the information identified in parts 8420.0305, item B, and 8420.0330, subpart 3, item B, and other information required by the board. The banking plan must also contain specific performance standards and a proposed credit release schedule based upon achievement of those standards. The local government unit is responsible for ensuring that a copy of the banking plan application is sent to the administrator of the state wetland bank, to the St. Paul District Office of the United States Army Corps of Engineers, and to those required to receive a copy of an application in part 8420.0255, subpart 3. The technical evaluation panel must review the banking plan application and may recommend changes or additions to the performance standards and credit allocation schedule. The wetland banking plan applicant must be advised of any panel recommendations. Based on the panel's findings and recommendations and other comments received, the local government unit must determine the likelihood that the replacement actions will be successful and approve, approve with modifications, or deny the banking plan application.

Subp. 4. Combined banking and project-specific replacement.

When a banking plan applicant wishes to use a portion of the credits generated from a banking project for project-specific replacement, the banking plan must identify the project-specific impact and the amount of credits to be used according to a corresponding replacement plan. The credits must meet the requirements of parts 8420.0500 to 8420.0528 and the approved replacement plan, and be deducted before deposit of any credits into the state wetland bank.

Subp. 5. Conservation easement.

No credits may be deposited in the state wetland bank until a perpetual conservation easement, in a format prescribed by the board, is granted to and accepted by the state. The easement must encompass the entire replacement area, unless the local government unit and the board approve an alternate boundary at the time of bank application approval. The easement must provide for preservation of the banked wetland's functions by the fee owner and wetland banking plan applicant. The wetland banking plan applicant must also provide a title insurance policy that is acceptable to the state naming the state of Minnesota as the insured. If the conservation easement does not abut a public road, the fee owner and wetland banking plan applicant must also grant and record an access easement in favor of the board; the local government unit; and any other state, local, or federal regulatory authority that has authorized use of credits from the site for wetland replacement. The access easement does not confer a right of access to the general public. The boundary of bank areas must be clearly marked as prescribed in the conservation easement. This subpart does not apply to state land.

Subp. 6. Time limits for construction.

Replacement actions under an approved banking plan must be initiated within three years of banking plan approval or the banking plan must be resubmitted to the local government unit for consideration. Construction certification according to part 8420.0800 must be gained within five years of banking plan approval.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0710 [Repealed, 22 SR 1877]

[Repealed, 22 SR 1877]

Minn. R. 8420.0720 Repealed by subpart

Subpart 1.

[Repealed, 34 SR 145]

Subp. 2.

[Repealed, 34 SR 145]

Subp. 3.

[Repealed, 34 SR 145]

Subp. 4.

[Repealed, 34 SR 145]

Subp. 5.

[Repealed, 34 SR 145]

Subp. 6.

[Repealed, 34 SR 145]

Subp. 7.

[Repealed, 34 SR 145]

Subp. 8.

[Repealed, 34 SR 145]

Subp. 8a.

[Repealed, 34 SR 145]

Subp. 9.

[Repealed, 27 SR 135]

Subp. 10.

[Repealed, 34 SR 145]

Subp. 11.

[Repealed, 34 SR 145]

Subp. 12.

[Repealed, 34 SR 145]

Subp. 13.

[Repealed, 34 SR 145]

Subp. 14.

[Repealed, 34 SR 145]

Minn. R. 8420.0725 Certification and Deposit of Credits

A. To be deposited into the state wetland bank, replacement credits must be certified for deposit by the local government unit in which they are located. Certification of credits by the local government unit is requested by the banking plan applicant and may occur at any time during the monitoring period. The certification must be based on the findings and recommendation of the technical evaluation panel and must identify the area by type, area of buffer, and credits eligible for deposit. The technical evaluation panel must ensure that sufficient time has passed for the wetland to become established, especially vegetation and hydrology, before recommending certification. The area certified must be based on a land survey or comparable method of field measurement. The person making the measurement must verify in writing as to the method and accuracy of the measurement. Failure to follow the approved construction specifications or vegetation management plan is sufficient grounds for the local government unit to deny certification of credits for deposit.

B. The certification and request for deposit of credits must be in a form prescribed by the board and must contain the following information:

C. Up to 15 percent of the credits proposed for banking are eligible for deposit in the bank immediately after the certification of construction according to part 8420.0820, subpart 2, and recording of a conservation easement according to part 8420.0705, subpart 5.

D. After the initial deposit, the remaining credits proposed for banking are eligible for deposit in accordance with the credit release schedule and performance standards included in the approved banking plan, subject to review by the technical evaluation panel and certification by the local government unit. If the approved banking plan does not contain a credit release schedule and associated performance standards, remaining credits will be eligible for deposit based on the findings and recommendation of the technical evaluation panel regarding the success of the proposed replacement action.

E. After certifying the credits for deposit, the local government unit must forward the signed request for deposit form to the board's banking administrator. No credits will be deposited until receipt of the completed and approved request to deposit form by the board. The board must acknowledge the deposit to the banking plan applicant and local government unit and enter the information in item B into the wetland bank.

F. If the banking plan applicant chooses not to proceed with the initial deposit, the banking plan applicant may return the site to its preconstruction condition without replacement. If credits have been deposited but none have been withdrawn, the banking plan applicant may request the board vacate the conservation easement at the applicant's expense. If the board vacates the conservation easement, the account will be closed and the site may be returned to preconstruction condition without replacement. Replacement areas wholly or partially deposited into the bank, on which withdrawals have occurred or which otherwise have been used for replacement, are subject to this chapter, including replacement for any subsequent impacts.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0730 Repealed by subpart

Subpart 1.

[Repealed, 34 SR 145]

Subp. 2.

[Repealed, 34 SR 145]

Subp. 3.

[Repealed, 27 SR 135]

Minn. R. 8420.0735 Monitoring and Corrective Actions

Subpart 1. Monitoring.

A. Monitoring of wetland bank sites must conform to the monitoring requirements of part 8420.0810. Failure to submit the required monitoring reports or otherwise comply with monitoring requirements will prevent the deposit of credits and may result in the freezing of the bank account by the board until compliance is attained.

B. After completion of the required monitoring period, the board shall periodically inspect wetlands deposited into the bank at a frequency sufficient to ensure that easement conditions are being met.

Subp. 2. Maintenance responsibilities.

The fee owner and the banking applicant, if different from the fee owner, are jointly and severally responsible for the success of the banking project according to the approved banking plan and for maintaining the banking project according to the conditions of the conservation easement. The banking plan applicant, if different from the fee owner, is not responsible for maintenance after the monitoring requirements have been completed if the banking plan applicant no longer owns an easement interest in the real estate or credits associated with the banked wetland.

Subp. 3. Corrective actions.

A. If, during the monitoring period, the local government unit or the technical evaluation panel determines that a bank site does not meet the specifications in the approved banking plan, the local government unit must require corrective actions and notify the board's banking administrator. The board may restrict further deposits, withdrawals, and transfers of all credits associated with the bank site until the local government unit and the board, based on findings from the technical evaluation panel, determine that the banking project has been brought into compliance.

B. If, after the monitoring period, the board determines that wetlands deposited into the bank are not in compliance with the conditions of the conservation easement, the board must require corrective actions of the fee owner or banking plan applicant to bring the bank site into compliance with easement conditions.

C. If satisfactory remediation does not result under item A or B, the local government unit or the board may undertake reconstruction work to bring the site into compliance. Alternatively, when credits have not been withdrawn or transferred, the board may vacate the conservation and access easement and close the account. The board and local government unit may require reimbursement of reasonable costs of bringing the site into compliance or vacating the conservation and access easement.

D. Fee owners, banking plan applicants, or account holders may appeal restrictions on credit deposits, withdrawals, and transfers or demands for reimbursement of reconstruction costs to the board.

E. Noncompliance with easement conditions or impacts to bank sites are subject to enforcement under part 8420.0900.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0740 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0745 Withdrawals and Transfers

Subpart 1. General.

Credits from the state wetland bank may be used to replace wetland impacts authorized by local government units under this chapter or by other local, state, and federal regulatory authorities, provided the impacted wetland is within the state of Minnesota and the credit withdrawal procedures of this chapter are followed. No sale, withdrawal, transfer, or use of banking credits for replacement is valid until the board debits the applicable bank account. Bank credits may be used only once to replace wetland impacts. Bank accounts must maintain a positive balance. When all credits have been withdrawn or transferred, the account is closed.

Subp. 2. Withdrawals.

Replacement plan applicants seeking to use banking credits for replacement are responsible for contacting and arranging for acquisition of the credits from the holder of a bank account according to the wetland replacement requirements of this chapter. The board shall supply information on wetland bank sites according to part 8420.0755, subpart 1, item B. Replacement plan applicants proposing the use of bank credits for replacement must complete a credit withdrawal form prescribed by the board and include it as part of the replacement plan application submitted to the local government unit. If the local government unit approves the use of bank credits for replacement, the local government unit must sign the credit withdrawal form and notify the board's banking administrator according to part 8420.0255, subpart 5. The board shall not withdraw credits from a bank account unless a regulatory entity with authority over the use of the credits has approved the use of the subject credits for replacement of a specific wetland impact. Local government unit approval of replacement plans involving the use of banking credits is conditional upon withdrawal of the credits by the board. Impacts under replacement plans must not occur until the board has notified the replacement plan applicant that the credits have been withdrawn.

Subp. 3. Transfers.

Wetland credits deposited in the state wetland bank may be transferred from one account to another. If the recipient of the credits does not already have an account, one must be established. To transfer credits, a credit transfer form provided by the board must be completed and submitted to the board's bank administrator. The board shall notify all affected account holders upon transfer of the credits.

Subp. 4. Reporting credit transactions.

Upon the sale, use, or transfer of credits, the owner of the account must immediately report the transaction to the board's banking administrator on withdrawal or transfer forms provided by the board and include a copy of the bill of sale when applicable. The board shall complete the accounting transactions and send a notice of credit withdrawal to the local government unit, the account holder, and the applicant. Failure to report the sale, use, or transfer of credit may result in restrictions on withdrawals until the account is reconciled.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0750 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0755 Bank Account Administration

Subpart 1. Account information.

A. For each wetland bank site, the board shall maintain at least the following information:

B. The board shall provide the following information to persons inquiring about available bank credits within a local government unit, county, major watershed, or bank service area:

Subp. 2. Administrative fees.

The board may collect administrative fees for managing bank accounts. The following fees must be paid to the board to be used for administering and monitoring the wetland bank:

A. account maintenance annual fee: one percent of the value of credits not to exceed $500 for any year the account is active;

B. account deposit or transfer: 6.5 percent of the value of credits not to exceed $1,000 per deposit or transfer; and

C. withdrawal fee: 6.5 percent of the value of credits withdrawn.

Subp. 3. Audit.

The board may periodically inspect wetland bank records and correspondence maintained by a local government unit to determine compliance with this part.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0760 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.0800 Replacement Wetland Construction Certification

Subpart 1. Purpose.

The local government unit must certify the initial construction of replacement wetlands before replacement wetland monitoring begins. The local government unit may require a preconstruction meeting before replacement wetland construction begins and may inspect the replacement wetland at any time during construction. This part applies to both wetland banking and project-specific replacement.

Subp. 2. Construction as-built documentation.

Upon completion of initial construction or restoration activities, the landowner must provide the local government unit with as-built information that documents compliance with the approved replacement plan. As-built information includes:

A. surveyed elevations of slopes, contours, outlets, and dikes;

B. seed tags and contractor receipts or other documentation of seeding or planting;

C. a description of site preparation activities, such as mulching, seedbed preparation, seeding methods, or initial weed control activities;

D. a survey map showing relevant areas of seeding and construction activities;

E. construction photos showing relevant restoration work;

F. evidence that, for projects including dams, dikes, or other impoundment features, the construction was designed, overseen, and certified by a licensed professional engineer; and

G. a comparison of the as-built documentation versus the design specifications and a description and rationale for any significant changes.

Subp. 3. Construction inspection and certification.

Upon receipt of as-built documentation from the landowner, the local government unit must inspect the replacement wetland to determine whether the as-built conditions comply with the construction specifications of the approved replacement plan. The local government unit may inspect the replacement wetland at any time during the construction and monitoring periods to assess its long-term viability. If the local government unit determines that the construction is not in compliance with the approved plan, it must promptly notify the landowner of the deficiencies and actions required to gain compliance. For projects involving the practice of engineering, the local government unit must ensure an engineer has certified the construction. When the local government unit certifies that the construction specifications have been met, the local government unit must notify the applicant and technical evaluation panel. Upon construction certification, the local government unit may release a portion of any financial assurance the applicant had provided, while retaining a sufficient amount to ensure compliance with monitoring and replacement requirements.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0810 Replacement Wetland Monitoring

Subpart 1. Purpose.

The purpose of replacement wetland monitoring is to measure replacement wetland success relative to the goals of the approved replacement or banking plan and to identify any needed corrective actions during the monitoring period.

Subp. 2. Responsibilities.

A. Monitoring of replacement wetlands is the responsibility of the landowner of the property where the replacement wetland is located. Any agreement to transfer monitoring responsibilities from the landowner to a local government unit or other party must be in writing and signed by both parties and does not release the applicant from the responsibility to provide replacement as specified in the approved replacement plan.

B. For project-specific replacement in which the wetland impact site occurs in a different local government unit from the replacement site, the local government unit for the impact site may assume the monitoring enforcement responsibility for the replacement site upon written agreement between the local government units.

Subp. 3. Duration of monitoring.

A. Monitoring may, at the discretion of the local government unit, begin upon construction certification, but must begin no later than the first full growing season following construction certification. Monitoring must continue for five full growing seasons or until the local government unit determines, with the concurrence of the technical evaluation panel, that the replacement is successful, but in no case may the determination be made before the end of the third full growing season.

B. If the goals of the approved plan have not been achieved after the fifth season of monitoring but, in the written opinion of the technical evaluation panel, may be achieved with more time, the local government unit may, through written notification of the applicant, extend the monitoring period for not more than an additional five growing seasons. The local government unit's notification of extension must specify the reasons for the extension and any corrective actions necessary to bring the replacement wetland into compliance with the approved plan.

C. For project-specific replacement plans, if the local government unit determines that, at any time during the monitoring period and based on the recommendation of the technical evaluation panel, the goals of the approved replacement plan have not been achieved, and will not be achieved with more time, the local government unit must pursue one or more corrective actions identified in part 8420.0820, subpart 1.

Subp. 4. Monitoring reports.

A. Following the first full growing season after construction certification, the applicant must submit annual monitoring reports documenting the progress of the replacement wetland during the monitoring period. The first annual monitoring report must include any monitoring required by the local government unit during the previous year. The applicant must submit the annual report to the appropriate local government unit on a date determined by the local government unit, but no later than December 31. The local government unit must ensure that copies of the monitoring report are distributed to the technical evaluation panel. For wetland banking projects, the applicant must also submit the annual report to the board's wetland banking administrator. The monitoring reports must be submitted annually, or biannually if the local government unit determines that, after the third full growing season, biannual reports are sufficient for long-term monitoring, until the local government unit determines the replacement has been successful.

B. The purpose of the annual report is to describe actual wetland restoration or creation activities completed during the past year, activities planned for the upcoming year, and the success of the replacement activities in achieving identified goals and performance standards. The annual report must, at a minimum, include:

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0820 Local Government Unit Monitoring Responsibilities

Subpart 1. Monitoring oversight.

A. The local government unit must evaluate all monitoring reports for compliance with report requirements and must determine if the goals of the approved plan can be met within the specified monitoring period based on the current condition of the replacement wetland and the applicant's proposed management activities for the following growing season.

B. For project-specific replacement, if the local government unit determines that the goals of the approved replacement plan will not be met, it must take one or more of the following actions:

C. If the landowner fails to submit the annual report associated with a project-specific replacement plan in accordance with part 8420.0810, the local government unit responsible for monitoring oversight must either pursue enforcement actions under item B or prepare the annual report for the applicant. The local government unit may charge fees for preparing the report or use any financial assurance the applicant had provided to complete monitoring requirements.

Subp. 2. Certification of successful replacement and completion of monitoring.

Upon completion of the minimum monitoring period, the applicant may request a field review by the local government unit and technical evaluation panel of the success of the replacement wetland. If the replacement is determined successful, the local government unit must provide written notification to the applicant that the replacement has been certified and the monitoring requirements have been fulfilled.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0830 Local Comprehensive Wetland Protection and Management Plans

Subpart 1. Purpose and eligibility.

A. As an alternative to the rules adopted under Minnesota Statutes, section 103G.2242, subdivision 1, and the public value criteria established or approved under Minnesota Statutes, section 103B.3355, a comprehensive wetland protection and management plan may be developed by a local government unit, or one or more local government units operating under a joint powers agreement, provided that the requirements of this part are met. This part provides minimum standards. Local government units may require equivalent or more stringent standards and procedures for wetland conservation, but not less stringent standards and procedures.

B. The ultimate goal of a comprehensive wetland protection and management plan is to maintain and improve the quality, quantity, and biological diversity of wetland resources within watersheds through the prioritization of existing wetlands and the strategic selection of replacement sites. The purpose of developing a plan is to provide a watershed and ecosystem-based framework to make wetland impact and replacement decisions that meet state standards and locally identified goals and support the sustainability or improvement of wetland resources in watersheds while providing local flexibility as allowed under subpart 4.

C. Any local government unit opting to pursue development of a plan and incorporating this chapter into local ordinance must provide documentation to the board demonstrating local capacity to implement the plan.

Subp. 2. Relationship to other plans.

To maximize effectiveness, the comprehensive wetland protection and management plan should be developed as part of, or in coordination with, other relevant local or regional plans and requirements. The plan should provide a mechanism for integrating local land use decisions with wetland ecosystem management goals at the watershed level.

Subp. 3. Plan area.

To the extent practical and feasible, the comprehensive wetland protection and management plan should be based on watershed boundaries. The size of watershed addressed should not be larger than is appropriate to ensure that the wetland resources provided through replacement will effectively compensate for approved impacts. For local governments with multiple watersheds, a separate analysis should be completed for each watershed substantially within the local government's jurisdiction. Local governments should consider joint planning efforts for those watersheds that cross political boundaries.

Subp. 4. Flexibility options under local plan.

The comprehensive wetland protection and management component of the local water plan may:

A. vary application of the sequencing standards in part 8420.0520, for projects based on the classification and criteria in the plan;

B. vary the replacement standards of part 8420.0522, subparts 3 to 9, and the actions eligible for credit under part 8420.0526, based on the classification and criteria in the plan, so long as there is no net loss of public value within the area subject to the plan and so long as:

C. in a greater than 80 percent area, allow replacement credit, based on the classification and criteria in the plan, for any project that increases the public value of wetlands, including activities on adjacent upland acres;

D. in a greater than 80 percent area, based on the classification and criteria in the plan, expand the application of the exemptions in part 8420.0420, subpart 2, item B, to also include nonagricultural land, provided there is no net loss of wetland value;

E. prescribe standards for size and location of replacement wetlands by establishing type requirements, size and ratio requirements, functional quality requirements, location requirements, and criteria for wetland mitigation fee in lieu of direct replacement. Requirements for replacement must have a direct relationship with wetland classification as defined in the plan and must result in no net loss of wetland quantity, quality, and biological diversity over the life of the plan; and

F. allow exemptions based on ordinance or rule standards, eligibility criteria, and processes that are not less restrictive than the requirements in parts 8420.0320 and 8420.0420 based on wetland classifications as defined in the plan.

Subp. 5. Plan content.

A. The comprehensive wetland protection and management plan must include the establishment of watershed goals based on an analysis of the existing ecological conditions of the plan area and the development of corresponding goals for maintaining and improving those conditions. The ecological condition of the plan area should be based on inventories of historic and existing wetland resources, including identification of degraded wetlands, existing high-quality wetlands, and immediate and long-term resource needs within the plan area. The analysis may be completed as part of the comprehensive wetland protection and management plan or adopted from a relevant local or regional water plan, if one exists.

B. The plan may provide for the classification of wetlands in the plan area based on:

C. The plan must include an inventory and prioritization of replacement sites based on an analysis of the types and locations of replacement projects that will provide the desired wetland functions, benefit the watershed from a landscape perspective, and best offset losses of public value caused by approved impacts. The goal of the analysis is to provide a framework from which replacement actions and locations will provide the greatest value to the public based on the ecological needs of the watershed. Priority should be given to naturally self-sustaining replacement that best achieves watershed goals and improves the ecological condition of the watershed. The plan must include strategies for the promotion and establishment of high-priority replacement sites that best meet the goals of the plan.

D. Comprehensive wetland protection and management plans developed as part of county, watershed district, or watershed management organization plan may identify those areas that qualify as high-priority areas for wetland preservation, enhancement, restoration, and establishment according to part 8420.0835.

E. The plan must include a provision for periodic assessment of the effectiveness of the plan, and the local government unit's implementation of it, in achieving plan goals. Updates to previously approved plans must include an analysis of the effectiveness of the previous plan, including the identification of barriers to achieving identified goals and development of strategies to overcome them.

F. The plan must specify the period covered by the plan, which must extend at least five years but not more than ten years from the date the board approves the plan.

Subp. 6. Plan development and review process.

A. A notice of intent to plan must be sent, at the beginning of the planning process, to the technical evaluation panel, the Department of Natural Resources, the Department of Agriculture, the Pollution Control Agency, watershed management organizations within the plan area, local government units within and adjacent to the plan area, and the St. Paul district office of the United States Army Corps of Engineers with an invitation to actively participate in the development of the plan. The notice should also include a general description of the planning effort, the planning area, and an anticipated timeline.

B. The technical evaluation panel must be consulted in all components of plan and ordinance development, including conducting wetland functional assessments, establishing wetland management classifications and standards, prioritizing replacement sites, and identifying local reference standard wetlands.

C. The local government unit must implement a process for notifying and involving local citizens in the development of the plan and determination of local value. Local citizen involvement may include the formation of a citizen's advisory committee or utilization of other existing citizen groups.

D. Upon completion, the local government unit must submit the draft comprehensive wetland protection and management plan and ordinance or rule for a 60-day review and comment period to those required to receive notice under item A. The local government unit must respond in writing, within 30 days of the end of the review period, to any comments received during the review period.

E. The local government unit must conduct a public hearing on the plan no sooner than 30 days after the end of the 60-day review period but before submitting the final draft plan to the board for approval.

F. After conducting the public hearing but before final adoption, the local government unit must submit the plan and ordinance or rule, all written comments received, a record of the public hearing, and a summary of responses to comments and changes incorporated as a result of the review process to the board for review under subpart 7.

G. An organization that is invited to participate in the development of the draft local plan, but declines to do so or fails to participate or to provide written comments during the local review process, waives the right during the review under item D to submit comments, except comments concerning consistency of the plan with laws and rules administered by that agency. In determining the merit of an agency comment, the board must consider the involvement of the agency in the development of the local plan.

H. Except as otherwise provided for in this part, all other requirements relating to development of the plan must be consistent with the local water plan processes under Minnesota Statutes, section 103B.231, 103B.311, or 103D.401. A plan developed as part of a local water management plan may follow the review and approval process applicable to the local water management plan instead of the review and approval process under items D to F.

Subp. 7. Board decision; mediation; judicial review.

A. The board shall make a decision to approve or disapprove a comprehensive wetland protection and management plan within 60 days of receipt of a complete and final draft of the plan and ordinance or rule as required in subpart 6, item F. The board may disapprove all or parts of the plan if the board determines the plan does not meet the requirements of this part. If the board has not made a decision within 60 days of receipt of the final plan, the plan is deemed approved. The 60-day period may be extended upon mutual agreement of the board and the local government unit.

B. In its review of a plan, the board must advise the local government unit of those elements of the plan that are more restrictive than this chapter and the act.

C. If the board disagrees with the plan or any elements of the plan, the board shall, in writing, notify the local government unit of the plan deficiencies and suggested changes. The board must include in the response to the local government unit the scientific justification, if applicable, for the board's concerns with the plan. Upon receipt of the board's concerns with the plan, the local government unit has 60 days to revise the plan and resubmit the plan to the board for reconsideration, or the local government unit may request a hearing before the board. The board must hold a hearing within the boundaries of the jurisdiction of the local government within 60 days of the request for hearing. After the hearing, the board must, within 60 days, prepare a report of its decision and inform the local government unit.

D. If, after the hearing, the board and local government unit disagree on the plan, the board must, within 60 days, initiate mediation through a neutral party. If the board and local government unit agree in writing not to use mediation or the mediation does not result in a resolution of the differences between the parties, then the board may commence a declaratory judgment action in the district court of the county where the local government unit is located. If the board does not commence a declaratory judgment action within the applicable 60-day period, the plan is deemed approved.

E. The declaratory judgment action must be commenced within 60 days after the date of the written agreement not to use mediation or 60 days after conclusion of the mediation. If the board commences a declaratory judgment action, the district court must review the board's record of decision and the record of decision of the local government unit. The district court must affirm the plan if it meets the requirements of this part.

Subp. 8. Effective date and amendments.

A. The comprehensive wetland protection and management plan is effective after approval by the board as provided in subpart 7 and after adoption of the plan into the official controls of the local government unit.

B. Comprehensive wetland protection and management plans remain in effect according to subpart 5, item F, unless revised according to subpart 6 and approved by the board. Plans that contain revision dates inconsistent with this part must comply with the plan's date if the date is not more than ten years beyond the date of board approval. An extension of the revision date of the plan may be granted by the board.

C. All amendments to the adopted plan and ordinance are effective upon completion of the same process required for the original plan, except when the proposed amendments constitute minor amendments and:

D. For the purposes of this subpart, "minor amendments" include clarifications, updates to wetland or replacement site inventories, and other changes that do not substantially alter the standards of the approved plan and ordinance or rule, as determined by the board. Amendments required to bring the plan into conformance with revisions to this chapter are also considered minor.

Subp. 9. Implementation.

A. The comprehensive wetland protection and management plan must be implemented by ordinance as part of the local government unit's official controls under Minnesota Statutes, chapter 394, for a county; Minnesota Statutes, chapter 462, for a city; and Minnesota Statutes, chapter 366, for a town and by rules adopted under Minnesota Statutes, chapter 103D, for a watershed district; and Minnesota Statutes, chapter 103B, for a watershed management organization.

B. After board approval and local government adoption, decisions made to implement this chapter and the act must be made according to the plan and ordinance or rule.

C. Noticing, appeals, and all other administrative processes under a local plan must follow the requirements of this chapter.

Subp. 10. Reporting.

In addition to and as part of the reporting requirements of part 8420.0200, subpart 2, item I, a local government unit with an approved and adopted comprehensive wetland management plan must annually provide information to the board regarding activities that vary from this chapter, this part notwithstanding, and documenting compliance with the minimum plan standards developed according to subpart 4. Failure to provide this information on an annual basis may subject the local government unit to penalties under part 8420.0200, subpart 3.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0835 High-Priority Regions and Areas

Subpart 1. High-priority regions.

Parts of the state that are high-priority regions for preservation, enhancement, restoration, and establishment of wetlands include all major watersheds with a majority of their land area contained within counties that have lost 50 percent or more of their presettlement wetland base, which are those listed in part 8420.0117, subpart 1, item C. In all other major watersheds of the state, high-priority regions are high-priority areas approved as such by the board according to subpart 2.

Subp. 2. High-priority areas.

A. Water management plans prepared by water management organizations in the metropolitan area under Minnesota Statutes, section 103B.231, by counties outside the metropolitan area under Minnesota Statutes, section 103B.311, and by watershed districts outside the metropolitan area under Minnesota Statutes, sections 103D.401 and 103D.405, may identify those areas that qualify as high-priority areas for wetland preservation, enhancement, restoration, and establishment. To designate a high-priority area, the preservation, enhancement, restoration, and establishment of wetlands must have or achieve high public value based on the functions of wetlands listed in part 8420.0522, subpart 1, and the goals of the water management plan.

B. High-priority areas should be designated by minor watershed or subwatershed. Strong consideration should be given to identifying as high-priority areas minor watersheds that have less than 50 percent of their original wetland acreages and where restoration of previously impacted or degraded wetlands will contribute toward achieving watershed-based goals. Consideration should also be given to watersheds that contain high-valued wetlands that are at risk of degradation or loss, the protection of which is integral to maintaining the ecology and condition of the watershed. Identification of high-priority watersheds should be consistent with part 8420.0830, subpart 5, item A.

C. Local water plans may identify individual wetlands, or criteria to establish individual wetlands, as high-priority areas. Individual wetlands identified as high-priority areas should be of high local value, at risk of degradation or loss, and consistent with any existing wetland classification criteria established under part 8420.0830, subpart 5, items A and B. Plans may also identify individual sites as high-priority areas for wetland restoration and establishment. High-priority restoration sites should be identified according to the criteria in part 8420.0830, subpart 5, items A and C.

D. Local water plans that identify high-priority areas and intend to accept applications for wetland preservation areas under part 8420.0840 should include criteria for eligibility and prioritization of applications.

E. The board shall review the inclusion of high-priority areas in plans as part of the standard process for plan review. High-priority areas approved by the board that are not in a high-priority region under subpart 1 become high-priority regions with board approval.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0840 Wetland Preservation Areas

Subpart 1. Purpose and eligibility.

The purpose of this part is to provide local governments with a tool to promote the preservation of high-valued wetlands and the restoration and enhancement of wetland areas that will contribute toward meeting watershed-based goals identified in a local water management plan. Wetlands located in high-priority areas as identified in part 8420.0835 and a local water plan are eligible for enrollment as wetland preservation areas. A wetland so enrolled is exempt from property tax. Sites identified as high-priority areas for wetland restoration and establishment are eligible for wetland preservation area designation only after restoration of the wetland. Wetland areas receiving replacement credit are not eligible for designation as a wetland preservation area.

Subp. 2. Landowner application for wetland preservation area.

A landowner may apply to the county or watershed district, if the county or watershed district chooses to accept wetland preservation areas, for designation of a wetland as a wetland preservation area on forms provided by the board. The applicant must include a buffer strip that meets the minimum width requirements of part 8420.0522, subpart 6, around the perimeter of the wetland. The applicant may include up to four acres of upland for each acre of wetland. The application must be accompanied by a restrictive covenant on a form provided by the board. The covenant must contain the same limitations on use that are provided in Minnesota Statutes, section 103F.515, subdivision 4, including a covenant that the enrolled upland area must be vegetated by the landowner to permanent vegetation other than noxious weeds. The covenant must be signed, acknowledged, and ready for recording.

Subp. 3. County or watershed district review of application.

Upon receipt of a complete application, the county or watershed district must send a copy of the application to the county assessor, the board, and the soil and water conservation district where the land is located. The soil and water conservation district must prepare an advisory statement of existing and potential preservation problems or conflicts and send the statement to the owner of record and to the county or watershed district. The county or watershed district may accept the application if the wetland is in a high-priority region and high-priority area, the application provides for the minimum required buffer strip, and the application is accompanied by the proper covenant. The county or watershed district may limit or reject additional upland proposed to be included according to criteria identified in the approved plan and standards the county may establish. The county or watershed district may reject the application if the application does not qualify or may require modification and resubmittal of the application. If the application qualifies, the county or watershed district may approve it and mark the date of approval on the application. The county or watershed district must notify the landowner of the acceptance or denial of the application within 60 days from the date of the application. Within five business days of approval of the application, the county or watershed district must forward it to the county recorder for recording of the restrictive covenant or memorialization of the application on the certificate of title. The county or watershed district must also send a copy of the approved application to the county assessor for entry in the assessor's records as a wetland preservation area. The county or watershed district must also send copies of the approved application to the soil and water conservation district, the local government unit, and the board.

Subp. 4. Applicable statutes.

In addition to this chapter, wetland preservation areas are subject to Minnesota Statutes, sections 103F.612 to 103F.616, and the property tax provisions of Minnesota Statutes, section 272.02, subdivision 11.

Subp. 5. Commencement of wetland preservation area.

A wetland is a wetland preservation area commencing 30 days after the date the county notifies the landowner of acceptance of the application under subpart 3.

Subp. 6. Fee.

The county or watershed district may require an application fee to defray administrative costs of the program.

Subp. 7. Maps.

Counties having approved wetland preservation areas within their legal boundaries must maintain maps illustrating land covenanted as wetland preservation areas.

Subp. 8. Reimbursement of unpaid taxes.

A county or watershed district with an approved wetland preservation area shall be reimbursed for lost tax revenue according to Minnesota Statutes, section 275.295.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0900 Enforcement Procedures

Subpart 1. Enforcement authorities.

The commissioner, conservation officers, and other peace officers may issue cease and desist orders and restoration and replacement orders.

Subp. 2. Cease and desist orders.

A. Cease and desist orders may be issued when the enforcement authority has probable cause that an activity is being or will again be conducted that impacts a wetland, does not qualify for no-loss or an exemption under parts 8420.0415 and 8420.0420, and is being or will again be conducted without prior approval of a replacement plan by a local government unit under part 8420.0255 or involving a decision stayed by the board pursuant to part 8420.0905.

B. A cease and desist order must not be issued if the landowner:

C. The enforcement authority must advise the landowner that the landowner's written application, if any, for a replacement plan, exemption, or no-loss should be made immediately to the local government unit and that any wetland that has been impacted may require restoration if the application for replacement plan, exemption, or no-loss is denied or reversed on appeal. The enforcement authority issuing a cease and desist order must promptly submit copies to the soil and water conservation district, local government unit, and Department of Natural Resources.

D. If an application for a replacement plan, exemption, or no-loss approval is triggered by a cease and desist order, the local government unit must make the decision according to part 8420.0255 and the standards and application procedures applicable to the type of application.

E. If the decision is that the activity is exempt or qualifies as a no-loss, the local government unit must request that the enforcement authority rescind the cease and desist order, pending the outcome of any appeal, and notify the soil and water conservation district, the enforcement authority, and the landowner.

F. If the application is denied, the local government unit must immediately notify the soil and water conservation district, the enforcement authority, and the landowner.

G. In cases where the cease and desist order has been issued to a local government unit, the decision of exemption or no-loss must be made by the board.

Subp. 3. Restoration and replacement orders.

A. The enforcement authority must issue a restoration order or replacement order when:

B. Promptly upon being informed by the enforcement authority or the local government unit of the need, a soil and water conservation district staff person must inspect the site and prepare a plan in consultation with the local government unit and the enforcement authority for restoring the site to its prealtered condition. The soil and water conservation district may request assistance from the local government unit or technical evaluation panel in inspecting the site and preparing the plan. Restoration must be ordered unless the technical evaluation panel concludes that restoration is not possible or prudent. The soil and water conservation district must incorporate its plan into a restoration or replacement order and send it to the enforcement authority for service in person or by certified mail to the landowner or responsible party.

Subp. 4. Contents of order.

A. A restoration order must specify dates by which the landowner or responsible party must:

B. If an application submitted under item A, subitem (2), is denied, the landowner or responsible party must restore the wetland as specified in the order.

C. The restoration order must be rescinded if the landowner or responsible party obtains approval of an after-the-fact replacement plan, exemption, or no-loss from the local government unit that is not reversed on appeal.

D. A replacement order must specify a date by which the landowner or responsible party must submit a complete replacement plan application to the local government unit and a subsequent date by which the landowner or responsible party must replace the wetland according to the approved replacement plan and obtain a certificate of satisfactory replacement from the soil and water conservation district. The restoration or replacement order must specify a time period of at least 30 days for submittal of a complete application under this subpart.

E. If a complete application is not submitted within the time period specified in the restoration order, or as properly extended, the landowner or responsible party must restore the wetland as specified in the order before submitting an application under item A, subitem (2), unless the local government unit and the enforcement authority agree otherwise or unless allowed under appeal.

F. A certificate of satisfactory restoration or replacement may be issued with conditions that must be met in the future, such as for issues with wetland vegetation, weed control, inspections, monitoring, or hydrology. Failure to fully comply with any conditions that have been specified may result in the issuance of a new restoration or replacement order.

Subp. 5. Enforcement authority orders.

A. If the technical evaluation panel determines that restoration will not restore all the loss caused by the impact, the order may require a combination of restoration and replacement or may require replacement rather than restoration. The order must direct the landowner or responsible party to obtain replacement plan approval from the local government unit. The order must specify that if replacement plan approval is not obtained, the landowner or responsible party must restore the wetland as ordered.

B. Each cease and desist, restoration, and replacement order must state that violation of the order is a misdemeanor.

C. If, as part of a misdemeanor proceeding, the court orders restoration or replacement, the technical evaluation panel must determine which is appropriate, and if it is restoration, the method of restoration. If the court orders replacement, the landowner or responsible party must follow the replacement plan process under subpart 6 and part 8420.0330, and the wetland replacement, construction, and monitoring requirements of this chapter.

Subp. 6. After-the-fact replacement.

If a landowner or responsible party seeks approval of a replacement plan after the proposed project has already impacted the wetland or if an approved replacement plan has not been implemented in advance of or concurrent with the impact, the local government unit must require the landowner or responsible party to replace the impacted wetland at a ratio twice the replacement ratio otherwise required, unless the local government unit and enforcement authority concur that a lesser ratio is acceptable.

Subp. 7. Misdemeanor.

A violation of an order issued under this part is a misdemeanor and must be prosecuted by the county attorney where the wetland is located or the illegal activity occurred.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0905 Appeals

Subpart 1. Appeal of replacement and restoration orders to the board.

A landowner or responsible party may appeal the terms and conditions of a restoration or replacement order issued according to part 8420.0900 to the board's executive director within 30 days of receipt of the order by filing a written request for review and paying a nonrefundable filing fee to the board. The time frame for appeal may be extended beyond 30 days upon mutual agreement, in writing, between the landowner or responsible party, the local government unit, and the enforcement authority. The filing fee is an amount determined by the board not to exceed $1,000. If the written request is not submitted within 30 days, the restoration or replacement order is final. The executive director must review the request and supporting evidence and render a decision within 30 days of the request for review. The executive director may stay the restoration or replacement order until the appeal is resolved.

Subp. 2. Appeal of local government unit staff decisions.

A. A decision made by local government unit staff is final if not appealed to the local government unit within 30 days after the date on which the decision is sent to those required to receive notice of the decision. Notwithstanding the time frames of Minnesota Statutes, section 15.99, or any other law to the contrary, the local government unit must make a ruling within 30 days from the date of the filing of the appeal, unless the appellant and local government unit mutually agree, in writing, to an extension of time beyond the 30 days.

B. Appeal of a final decision made by staff may be made by the landowner, by any of those required to receive notice of the decision, or by 100 residents of the county in which a majority of the wetland is located.

C. An appeal is effective upon mailing the petition and payment of any applicable fees to the local government unit. A filing fee is not required for appeals petitioned by state agencies or members of the technical evaluation panel.

Subp. 3. Appeal of local government unit decisions to the board.

A. The decision of a local government unit to approve, approve with conditions, or deny an application is final if not appealed to the board within 30 days after the date on which the decision is sent to those required to receive notice of the decision unless the applicant and local government unit mutually agree, in writing, to an extension of time beyond the 30 days. Appeals of decisions made by local government staff must be made to the local government unit as provided for in subpart 2. This subpart also applies to decisions made under comprehensive wetland protection and management plans.

B. Appeal may be made by the landowner, by any of those required to receive notice of the decision, or by 100 residents of the county in which a majority of the wetland is located.

C. An appeal is effective upon mailing the petition and payment of a nonrefundable filing fee in an amount determined by the board, not to exceed $1,000, to the board with evidence that a copy of the petition has been mailed to the local government unit. The petition should include information to establish sufficient grounds for the appeal. The filing fee is not required for appeals petitioned by state agencies or members of the technical evaluation panel. Another filing fee is not required for appeals that have been remanded if the filing fee was paid and the same party appeals the new decision made under remand. After receipt of a petition, the local government unit must send a copy of the petition to all those to whom it was required to send a notice of the decision.

Subp. 4. Board appeal procedures.

A. Within 30 days after receiving the petition, the board, its dispute resolution committee, or its executive director must decide whether to grant the petition and hear the appeal. After considering the size of the proposed impacts and the quality of the affected wetland, any patterns of similar acts by the petitioner or responsible party or by the local government unit in administration of this chapter and the act, and the consequences of the delay resulting from the appeal, the board, its dispute resolution committee, or its executive director shall grant the petition unless the appeal is deemed to be without sufficient merit, trivial, or brought solely for the purposes of delay; the petitioner has not exhausted all local administrative remedies; or the petitioner has not submitted the required filing fee.

B. The board, its dispute resolution committee, or its executive director may stay the local government unit decision until the appeal is resolved.

C. The board, its dispute resolution committee, or its executive director may remand the appealed decision back to the local government unit if the petitioner has not exhausted all local administrative remedies, such as a local government unit evidentiary public hearing, if expanded technical review is needed, or if the local government unit's record is not adequate. If an appeal is remanded, a new application is not required and additional information may be submitted before a decision is made by the local government unit. The local government unit must make a decision on an appeal that has been remanded within 60 days unless the remand order, or a subsequent order, specifies a longer period.

D. After the petition is granted, the appeal must be heard by the dispute resolution committee and decided by the board within 60 days after filing of the local government unit's written record, submittal of written briefs for the appeal, and a hearing by the dispute resolution committee. Parties to the appeal are the appellant, the landowner, the local government unit, and those required to receive notice of the local government unit decision.

E. The board or its executive director may elect to combine related appeals and process as one decision, either multiple appeals on the same project or appeals of different local government unit decisions on the same project.

F. Within 30 days of the grant of the appeal, unless an extension of time is approved by the board, the local government unit must forward to the board the written record on which it based its decision. The board must forward one copy of the record to each of the parties to the appeal. The board shall make its decision on the appeal after hearing. The board must give the parties 30 days' notice of the hearing. The board must base its review on the record and the argument presented to the board by the parties. However, if the local government unit did not consider fundamental information, such as aerial photographs, soil maps, or wetland maps, or did not make formal findings contemporaneously with its decision; if there is not accurate verbatim transcript of the proceedings; if the proceedings were not fairly conducted; or if the record is otherwise incomplete or deficient, the board may remand the matter or receive additional evidence. If, before the date set for the hearing, application is made to the board for leave to present additional evidence on the issues in the case and it is shown to the satisfaction of the board that additional evidence is material and that there were good reasons for failure to present it in the proceeding before the local government unit, the board may order that the additional evidence be taken before the local government unit upon such conditions that the board deems proper. The local government unit may modify its findings and decision by reason of the additional evidence and must file with the board, to become a part of the record, the additional evidence, together with any modifications or new findings or decision.

G. The board shall affirm the local government unit's decision if the local government unit's findings of fact are not clearly erroneous; if the local government unit correctly applied the law to the facts, including this chapter; and if the local government unit made no procedural errors prejudicial to a party. Otherwise, the board shall reverse the decision, amend it, or remand it with instructions for further proceedings. The board must provide notice of its decision to the parties to the appeal.

Subp. 5. Appeal of board decisions.

An appeal of a board decision may be taken to the state court of appeals and must be considered an appeal from a contested case decision for purposes of judicial review under Minnesota Statutes, sections 14.63 to 14.69.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0910 Compensation Claims Against Local Government Units

Subpart 1. Intervention.

At the request of a local government unit against which a compensation action is brought based at least in part on the local government unit's application of Minnesota Statutes, section 103G.222, 103G.2241, 103G.2242, 103G.237, or 103G.2372, or rules adopted by the board to implement these sections, the state, through the attorney general, must intervene in the action on behalf of the local government unit and is thereafter considered a defendant in the action. A local government unit making a request under this subpart must provide the attorney general with a copy of the complaint as soon as possible after being served. If requested by the attorney general, the court must grant additional time to file an answer equal to the time between service of the complaint on the local government unit and receipt of the complaint by the attorney general.

Subp. 2. Liability of state for certain costs.

The state is liable for costs, damages, fees, and compensation awarded in the action based on the local government unit's adoption or implementation of standards that are required by state law, as determined by the court. The local government unit is liable for costs, damages, fees, and compensation awarded in the action based on local standards that are more restrictive than state law and rules.

Subp. 3. Definition.

For purposes of this part, "compensation action" means an action in which the plaintiff seeks compensation for taking private property under the state or federal constitution.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0915 Compensation to Landowners

Subpart 1. Eligibility.

Replacement plan applicants who have completed the local government unit process and the board appeal process, and the replacement plan has not been approved as submitted, may apply to the board for compensation under Minnesota Statutes, section 103G.237.

Subp. 2. Application requirements.

A. An application for compensation under this part must identify the applicant, locate the wetland, and refer the board to its appeal file in the matter.

B. An application must include an agreement that, in exchange for compensation, the applicant shall convey to the state a perpetual conservation easement in the form required by Minnesota Statutes, section 103F.516. The applicant must provide an abstract of title demonstrating the ability to convey the easement free of any prior title, lien, or encumbrance. Failure to provide marketable title negates the state's obligation to compensate.

C. The applicant must submit official documentation from the United States Army Corps of Engineers, the Minnesota Pollution Control Agency, the watershed district or water management organization, if any, the county, and the town or city, as applicable, that the proposed impact and the proposed subsequent use of the wetland are lawful under their respective legal requirements.

D. The landowner must demonstrate that the proposed impact is a feasible and prudent project and that the replacement plan as proposed is a reasonable good faith effort to fulfill the wetland replacement, construction, and monitoring requirements of this chapter and the act.

E. If the replacement plan was approved, but with conditions or modifications, the applicant must show that the conditions or modifications make the replacement unworkable or not feasible. A plan is unworkable or not feasible if the replacement must be on land that the applicant does not own, the applicant has made good faith efforts to acquire a replacement site and not succeeded, and there is not a qualifying replacement available in a wetland bank. A plan is also unworkable or not feasible if it is not possible to carry out for engineering reasons. The applicant must show that forgoing the proposed project will cause the applicant damages and that disallowing the proposed use will enhance the public value of the wetland.

F. The applicant must submit to the board the requirements in this part in writing, by certified mail. The applicant must indicate on the application whether the applicant wants to make oral argument to the board. The board may require that the applicant appear before the board.

Subp. 3. Board action.

If the board finds that the applicant has submitted a complete application and proved the requirements in this part, the board must compensate the applicant as required by law within 90 days after the board received a completed application, provided that within the same time period the applicant conveys to the board a conservation easement in the form required by Minnesota Statutes, section 103F.516. If the board does not provide the required compensation in exchange for the conservation easement, the applicant may impact the wetland in the manner proposed, without replacement.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0930 Mining

Subpart 1. Impacts from mining.

Wetlands must not be impacted as part of a project for which a permit to mine is required by Minnesota Statutes, section 93.481, except as approved by the commissioner. Impacts to wetlands that the landowner can demonstrate, to the satisfaction of the local government unit, were created by pits, stockpiles, or tailing basins, and by actions the purpose of which was not to create the wetland according to part 8420.0105, subpart 2, item D, are not regulated under this chapter.

Subp. 2. Mining operations; post-July 1, 1993.

For mining operations that are permitted and initiated after July 1, 1993:

A. mining must not be conducted without first receiving a permit to mine issued under chapter 6130 for iron ore and taconite or chapter 6132 for nonferrous metallic minerals; and

B. the mining and reclamation operating plans or annual reports submitted by the applicant as required in the permit to mine must include an approved wetland replacement plan that meets the same principles and standards for replacing wetlands under parts 8420.0500 to 8420.0528 and provides for construction certification and monitoring according to parts 8420.0800 and 8420.0810.

Subp. 3. Mining operations; pre-July 1, 1993.

For mining operations in existence before July 1, 1993, and operated on or after that date under a permit to mine issued under chapter 6130 for iron ore and taconite or chapter 6132 for nonferrous metallic minerals:

A. wetlands for which impacts were approved but not initiated before July 1, 1993, must not be impacted until the operating plan or annual report as required in the permit to mine includes an approved wetland replacement plan for the undisturbed wetlands. The wetland replacement plan must meet the same principles and standards for replacing wetlands under parts 8420.0500 to 8420.0528 and provide for construction certification and monitoring according to parts 8420.0800 and 8420.0810;

B. for filling activities that were approved and initiated before July 1, 1993, placement of fill atop a stockpile, roadway, or other mining-related facility that occupies a wetland filled before July 1, 1993, is allowed to continue within the areal extent, as it existed on July 1, 1993, of the stockpile, roadway, or other mining-related facility without the requirement of a replacement plan or amendment of the permit to mine. An expansion of the areal extent of the fill in the wetland requires an approved replacement plan in the operating plan or annual report as required in the permit to mine, according to item A; and

C. for draining activities that were approved and initiated before July 1, 1993, draining of a wetland to facilitate mining, using ditches and other drainage facilities that existed on July 1, 1993, is allowed to continue without the requirement of a replacement plan or amendment of the permit to mine. Maintenance of the ditches and structures are allowed without the requirement of a replacement plan or amendment of the permit to mine, provided that as a result of the maintenance, wetlands are not drained beyond the extent that existed as of July 1, 1993. Otherwise, the permit to mine must be amended to provide for replacement according to item A.

Subp. 4. Applicability.

A. Replacement wetlands approved under this part must only be used for mining-related impacts covered under a permit to mine unless the credits are approved and deposited in the state wetland bank according to parts 8420.0700 to 8420.0755.

B. Applicable procedures are those required for permits to mine.

C. This part does not apply to peat mining as defined under Minnesota Statutes, section 93.461, that is subject to the mine permit and reclamation requirements under Minnesota Statutes, sections 93.44 to 93.51, and the rules adopted thereunder.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.0935 Standards and Criteria for Identification, Protection, and Management of Calcareous Fens

Subpart 1. Purpose.

The purpose of this part is to provide minimum standards and criteria for identifying, protecting, and managing calcareous fens as authorized by Minnesota Statutes, section 103G.223. Calcareous fens, as identified by the commissioner, must not be impacted or otherwise altered or degraded, wholly or partially, by any action, unless the commissioner, under an approved management plan, decides some alteration is necessary. The exemptions under part 8420.0420 and the sequencing provisions under part 8420.0520 do not apply to calcareous fens.

Subp. 2. Identifying calcareous fens.

A calcareous fen is a peat-accumulating wetland dominated by distinct groundwater inflows having specific chemical characteristics. The water is characterized as circumneutral to alkaline, with high concentrations of calcium and low dissolved oxygen content. The chemistry provides an environment for specific and often rare hydrophytic plants.

Subp. 3. Procedures to list calcareous fens.

A. The commissioner must investigate wetlands to determine if the wetland is properly identified as a calcareous fen.

B. The commissioner must, by written order published in the State Register, maintain a current list of known calcareous fens in the state and their location.

C. The commissioner must provide an updated list of calcareous fens to the board for further distribution.

Subp. 4. Management plans.

Calcareous fens must not be impacted or otherwise altered or degraded except as provided for in a management plan approved by the commissioner. The commissioner must provide technical assistance to landowners or project sponsors in the development of management plans.

Subp. 5. Restoration.

The commissioner may approve management plans to restore or upgrade a previously damaged calcareous fen.

Subp. 6. Appeals.

A. A landowner or project proposer may challenge the commissioner's determination that a wetland is a calcareous fen or the commissioner's calcareous fen management plan by requesting a hearing. The hearing shall be conducted in the same manner as water permit hearings under Minnesota Statutes, chapter 103G.

B. The determination that a wetland is a calcareous fen may be appealed at any time by requesting a hearing. For a decision under a management plan, the hearing must be requested within 30 days after the notice of the commissioner's decision was mailed to the project proposer; otherwise the decision becomes final and may not be challenged by the project proposer.

C. Appeal of the commissioner's decision after the hearing must be done in the manner provided for appeals from contested case decisions under Minnesota Statutes, chapter 14.

Subp. 7. Enforcement procedures.

Enforcement procedures for calcareous fens must be conducted consistent with Minnesota Statutes, sections 103G.141 and 103G.2372, except that necessary restoration or replacement activities, if required, must be determined by the commissioner, in consultation with the local soil and water conservation district.

History

  • Statutory Authority: MS s 103G.2242
  • History: 34 SR 145
Minn. R. 8420.1010 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.1020 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.1030 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.1040 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.1050 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.1060 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Minn. R. 8420.1070 [Repealed, 34 SR 145]

[Repealed, 34 SR 145]

Chapter 9300 LOCAL WATER MANAGEMENT

Minn. R. 9300.0010 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0020 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0030 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0040 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0050 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0060 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0070 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0080 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0090 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0100 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0110 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0120 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0130 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0140 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0150 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0160 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0170 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0180 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0190 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0200 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0210 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0310 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Minn. R. 9300.0410 [Repealed, L 2003 c 128 art 1 s 176]

[Repealed, L 2003 c 128 art 1 s 176]

Continua la tua ricerca in ChatGPT o Claude