UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF NEW YORK
Northwell Health, Inc.,
Plaintiff,
-v-
Blue Cross and Blue Shield of Massachusetts, Inc.,
Defendant.
2:23-cv-977
(NJC) (AYS)
REDACTED
OPINION AND ORDER
NUSRAT J. CHOUDHURY, United States District Judge:
Plaintiff Northwell Health, Inc. (“Northwell”) brought this action against Defendant Blue
Cross and Blue Shield of Massachusetts, Inc. (“Blue Cross Massachusetts”) under New York law
for breach of contract, breach of a third-party beneficiary contract, and, in the alternative, for
unjust enrichment and quantum meruit over Blue Cross Massachusetts’ alleged failure to
reimburse Northwell for healthcare services provided to patients insured by Blue Cross
Massachusetts. (See generally Am. Compl., ECF No. 12.) On July 24, 2024, I issued an Opinion
and Order granting Blue Cross Massachusetts’ Motion to Dismiss the Amended Complaint with
prejudice (“Dismissal Order”) (Op. & Order, ECF No. 43). Northwell filed a Motion for
Reconsideration, and, on January 27, 2025, I issued a Memorandum and Order denying that
motion (“Reconsideration Order”) (Mem. & Order, ECF No. 68) (together, the “Orders”).
Before me is Northwell’s Motion for Leave to File a Second Amended Complaint
(“Motion to Amend”). (Mot. Amend, ECF No. 84.) For the following reasons, I deny the Motion
to Amend.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 1 of 34 PageID #:
<pageID>
2
BACKGROUND
The Dismissal Order and the Reconsideration Order are incorporated by reference, and I
presume familiarity with both Orders. See, e.g., Williams v. Nat’l R.R. Passenger Corp.
(Amtrak), No. 18-cv-7070, 2019 WL 3423267, at *1 (S.D.N.Y. July 30, 2019) (incorporating by
reference prior recitations of procedural history and facts). Consequently, I recite only those facts
necessary to resolve the Motion to Amend.
Northwell initially filed this case in New York state court on December 29, 2022
(Compl., ECF No. 7; Summons, ECF No. 1-1), and Blue Cross Massachusetts timely removed
the action to federal court on February 7, 2023, invoking this Court’s diversity jurisdiction under
28 U.S.C. § 1332(a). (Not. Removal, ECF No. 1.) The case was originally assigned to United
States District Judge Joan M. Azrack. (Elec. Notice Feb. 8, 2023.) The original Complaint
brought the following five New York common law claims against Blue Cross Massachusetts
based on the allegation that Blue Cross Massachusetts owes Northwell $1,841,884.59 plus
interest for unpaid claims for services Northwell provided to patients insured by Blue Cross
Massachusetts: (1) breach of contract, (2) breach of third-party beneficiary contract, (3) unjust
enrichment, (4) quantum meruit, and (5) a claim referred to generally as “prima facie tort.”
(Compl. ¶¶ 26–69.)
On April 27, 2023, Blue Cross Massachusetts filed a letter motion seeking a pre-motion
conference in anticipation of its motion to dismiss the Complaint. (Defs.’ Mot. Dismiss Ltr., ECF
No. 9.) Rather than oppose, Northwell exercised its right to amend the Complaint “once as a
matter of course” to cure the deficiencies raised by Blue Cross Massachusetts. Pl.’s Mot. Dismiss
Resp. Ltr., ECF No. 10; see Fed. R. Civ. P. 15(a)(1) (providing timeframes in which a plaintiff
may amend a complaint “once as a matter of course”).
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 2 of 34 PageID #:
<pageID>
3
On May 18, 2023, Northwell filed the Amended Complaint. (Am. Compl., ECF No. 12.)
The Amended Complaint brought three claims supported by what are materially the same
allegations, albeit with more detail, as those alleged in the original Complaint: (1) breach of
contract, (2) breach of third-party beneficiary contract, and (3) quasi-contract claims (i.e., unjust
enrichment and quantum meruit). (Id.)
On July 24, 2024, I granted Blue Cross Massachusetts’ Motion to Dismiss the Amended
Complaint with prejudice under Rule 12(b)(6), Fed. R. Civ. P., for failure to state any of the
asserted claims. (Dismissal Order.) I held that the breach of contract claim failed because,
contrary to Northwell’s argument, neither Section III.h. of the 2008 Amendment nor any other
provision of the Empire Agreements1 and their subsequent amendments plausibly established
contractual privity between Blue Cross Massachusetts and Northwell, and no exception to the
rule requiring privity applied. (Id. at 10–26.) I also held that the third-party beneficiary claim
failed because the Amended Complaint did not plausibly allege that Northwell was an intended
beneficiary of any of the agreements invoked, including but not limited to the License
Agreement. (Id. at 31–34.) Finally, I held that the Amended Complaint failed to state claims for
unjust enrichment and quantum meruit because these claims were precluded by the Empire
Agreements. (Id. at 35–37.)
The July 24, 2024 dismissal of the Amended Complaint with prejudice resolved all
claims in this action. However, due to a clerical error, the Clerk of Court did not file a separate
document marked “judgment” on the docket as required by Rules 79(a) and 58(a), Fed. R. Civ.
P. See Fed. R. Civ. P. 79(a) (requiring the clerk of court to record a judgment or order in the civil
1 All defined terms have the same meaning as set forth in the Orders. As explained there, the
Empire Agreements include the Hospital Agreements, the Practitioner Agreement, and
amendments to these agreements. (Dismissal Order at 3–6.)
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 3 of 34 PageID #:
<pageID>
4
docket sheet); Fed R. Civ P. 58(a) (“Every judgment and amended judgment must be set out in a
separate document.”). On August 2, 2024, I publicly filed a redacted version of the Dismissal
Order and closed the case. (ECF No. 45.)
Several days later, on August 7, 2024, Northwell filed the Motion for Reconsideration,
invoking Rule 59(e), Fed. R. Civ. P., which governs motions to “alter or amend a judgment,” as
well as Local Rule 6.3 and Rule 60(b)(1) and (b)(6), Fed. R. Civ. P. (Mot. Reconsid., ECF No.
46.) Northwell subsequently re-filed that motion in order to comply with the applicable page
limits and again invoked Rules 59(e) and 60(b)(1) and (b)(6), and Local Civil Rule 6.3.
(Corrected Mem. Supp. Mot. Reconsid., ECF No. 55-1.) In the Motion for Reconsideration,
Northwell maintained that the Amended Complaint plausibly alleged breach of contract and
third-party beneficiary claims against Blue Cross Massachusetts, raising multiple arguments
concerning why it believed that the Dismissal Order was wrongly decided. (See generally
Corrected Mem. Supp. Mot. Reconsid.) Nevertheless, in a footnote of its opening brief in support
of the Motion for Reconsideration, Northwell indicated that it “seeks leave to file a Second
Amended Complaint to further plead” facts concerning purported “rules” to which Blue Cross
Massachusetts and Empire are bound as part of their membership in the Association. (Id. at 4
n.5.) Through its invocation of Rule 59(e), the Motion for Reconsideration treated the Dismissal
Order as a final judgment in this action.
On August 9, 2024, Northwell filed a letter motion seeking a pre-motion conference in
anticipation of filing a motion to amend. (Pl.’s Mot. Amend PMC Ltr., ECF No. 48.) On August
19, 2024, Blue Cross Massachusetts opposed. (Defs.’ Mot. Amend PMC Resp. Ltr., ECF No.
51.) Northwell’s pre-motion conference letter asserted that amendment would not be futile and
vaguely referenced, among other things, “far more robust allegations . . . on the alleged payment
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 4 of 34 PageID #:
<pageID>
5
structure and Empire’s role in that structure,” “the intent and reasons for the terms in the
Hospital Agreements,” and “additional factual allegations [that] will provide plausible support
for additional legal bases for the third-party beneficiary claim.” (Id. at 2–3.) However, Northwell
did not address these proposed amendments with any specificity or attach a proposed second
amended complaint for the Court’s review. (See id.)
On December 21, 2024, because 150 days had run from the date of the Dismissal Order,
judgment automatically entered under Rule 58(c)(2)(B), Fed. R. Civ. P. See Stidhum, 2022 WL
1087144, at *2 (“In the absence of a separate document, judgment is deemed entered 150 days
after entry of the order dismissing [the plaintiff’s] suit” (discussing Fed. R. Civ. P. 58(c)(2)(B));
see also Arzuaga v. Quiros, 781 F.3d 29, 33 (2d Cir. 2015) (holding that the 30-day period to
appeal begins to run 150 days from “the entry of the dispositive order” where the court “fails to
set out the judgment in a separate document”). Indeed, in Stidhum, the Second Circuit held that
where the district court dismissed an action without prejudice but “no judgment . . . was ever set
out in a separate document or labeled a ‘judgment,’” judgment was deemed to have been entered
150 days after the dismissal order was entered. Stidhum, 2022 WL 1087144, at *1–2.
On January 27, 2025, I denied the Motion for Reconsideration, finding that it did not
identify any “intervening change of controlling law, the availability of new evidence, or the need
to correct a clear error or prevent manifest injustice” that would warrant reconsideration under
Rules 59(e) or 60(b), Fed. R. Civ. P, but rather rehashed arguments already rejected in the
Dismissal Order. (See Reconsideration Order (quoting Metzler Inv. Gmbh v. Chipotle Mexican
Grill, Inc., 970 F.3d 133, 142–43 (2d Cir. 2020)).) On the same day, I denied Northwell’s pre-
motion letter concerning its anticipated motion to amend with leave to renew following the
parties’ review of the Reconsideration Order. (Elec. Order, Jan. 27, 2025.) I specifically required
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 5 of 34 PageID #:
<pageID>
6
that any renewed pre-motion letter concerning an anticipated motion to amend the Amended
Complaint “shall provide a non-frivolous basis to amend where, as here, the Court has already
issued judgment and found that there is no basis to grant reconsideration under Rules 59(e) or
60(b).” (Id.)
On February 10, 2025, Northwell filed a renewed pre-motion letter concerning its request
for leave to amend (Pl.’s Renewed Mot. Amend PMC Ltr., ECF No. 71), this time attaching a
Proposed Second Amended Complaint (Proposed Second Am. Compl., ECF No. 72-1) and a
redline version comparing the Amended Complaint and the Proposed Second Amended
Complaint (Redline, ECF No. 72-2). On February 25, 2025, Blue Cross Massachusetts opposed.
(Defs.’ Renewed Mot. Amend PMC Opp’n Ltr., ECF No. 77.) I found that a pre-motion
conference was not necessary and ordered full briefing on the Motion to Amend, specifically
requiring any briefing to address the following issues:
(1) Under the Second Circuit’s holding in Metzler Investment Gmbh v. Chipotle
Mexican Grill, Inc., 970 F.3d 133, 145 (2d Cir. 2020), and any other binding
Supreme Court or Second Circuit authority, what constitutes a “proper case” in
which to “take into account the nature of the proposed amendment in deciding
whether to vacate the previously entered judgment”? In addressing this question,
the parties will account for the following observation made by the Second Circuit
in Metzler:
“But we did not address directly whether [Indiana Public Retirement System v.
SAIC, Inc., 818 F.3d 85 (2d Cir. 2016)] was a ‘proper’ [case] within the meaning
of National Petrochemical [Co. of Iran v. M/T Stolt Sheaf, 930 F.2d 240, 245 (2d
Cir. 1991)], or indeed what that phrase meant. Nor did we identify any
circumstances in the case that would render it ‘appropriate’ to consider the nature
of the proposed amendment in determining whether the judgment should be
vacated.” Metzler, 970 F.3d at 145.
(2) Whether this is such a case in which it would be appropriate to take into
account the nature of the proposed amendment in deciding whether to vacate the
previously entered judgment under Rules 59(e) and 60(b), Fed. R. Civ. P.;
(3) Whether Plaintiff’s proposed amendments as set forth in the redlined second
amended complaint would be futile;
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 6 of 34 PageID #:
<pageID>
7
(4) Whether Defendant would suffer prejudice in the event this Court were to
grant Plaintiff leave to file the seconded amended complaint; and
(5) any other arguments the parties wish to raise concerning Plaintiff’s motion.
(Elec. Order, Aug. 18, 2025.) On September 23, 2025, Northwell filed the fully-briefed Motion
to Amend on the docket and again attached the Proposed Second Amended Complaint and the
redline identifying changes from the Amended Complaint. (Mem., ECF No. 84-1; Proposed
Second Am. Compl., ECF No. 83-1; Redline, ECF No. 83-2; Opp’n, ECF No. 83-3; Reply, ECF
No. 86-3.) The Motion to Amend is therefore fully briefed.
LEGAL STANDARD
As a general matter, Rule 15(a)(2) provides that the court should “freely give leave” for a
party to amend its pleadings “when justice so requires.” Fed. R. Civ. P. 15(a)(2). This is a
“liberal” and “permissive” standard, and, in the ordinary course, a district court should grant
leave to amend absent a showing of “undue delay, bad faith, dilatory motive, or futility.”
Sacerdote v. New York University, 9 F.4th 95, 115 (2d Cir. Aug 16, 2021).2 However, here,
Northwell seeks to amend its complaint after the entry of final judgment in the case. The Clerk of
Court did not file a separate document marked “judgment” on the docket as required under Rules
79(a) and 58(a), Fed. R. Civ. P. See Fed. R. Civ. P. 79(a) (requiring the clerk of court to record a
judgment in the civil docket sheet); Fed R. Civ P. 58(a) (“Every judgment and amended
judgment must be set out in a separate document.”); see also Axel Johnson Inc. v. Arthur
Andersen & Co., 6 F.3d 78, 84 (2d Cir. 1993) (requiring “that the document granting judgment
be separate from any judicial memorandum or opinion” and be “labeled a judgment” in order to
2 Unless otherwise indicated, case quotations omit all internal quotation marks, alterations,
brackets, and citations.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 7 of 34 PageID #:
<pageID>
8
“reduce uncertainty for the litigants with respect to the date of final disposition of [the] case”);
Stidhum v. 161-10 Hillside Auto Ave, LLC, No. 21-1653-cv, 2022 WL 1087144, at *1 (2d Cir.
Apr. 12, 2022) (summary order) (same). Nevertheless, judgment was automatically entered
under Rule 58(c)(2)(B) on December 21, 2024—150 days after entry of the Dismissal Order. See
Fed. R. Civ. P. 58(c)(2)(B); Stidhum, 2022 WL 1087144, at *1 (“Where a separate judgment was
never entered with the order . . . , judgment becomes final 150 days after the order was entered
. . . .” (citations omitted)) Accordingly, Northwell’s Motion to Amend is properly considered a
post-judgment motion,3 and Northwell “must first have the judgment vacated or set aside
pursuant to Fed. R. Civ. P. 59(e) or 60(b).” Ruotolo v. City of New York, 514 F.3d 184, 191 (2d
Cir. 2008); see also Metzler, 970 F.3d at 145–46 (2d Cir. 2020) (same). The standard for
vacating a judgment is “strict.” Cho v. Blackberry Ltd., 991 F.3d 155, 170 (2d Cir. 2021).
3 The parties do not contest that Northwell’s Motion to Amend is a post-judgment motion to
amend. Indeed, as noted, Northwell explicitly invoked Rule 59(e), which governs motions to
alter or amend a judgment, as a basis for reconsideration of the Dismissal Order in the August 7,
2024 Motion for Reconsideration, which was filed before Northwell’s deficient August 9, 2024
first letter seeking a conference concerning an anticipated motion to amend the Amended
Complaint. (See Mot. Reconsid., ECF No. 46; Corrected Mem. Supp. Mot. Reconsid., ECF No.
55-1; Pl.’s Mot. Amend PMC Ltr., ECF No. 48.)
Nor is the Motion to Amend properly understood to be anything other than a post-judgment
motion to amend. Northwell filed its renewed request for a conference on an anticipated motion
to amend the Amended Complaint on February 10, 2025, which was well after judgment entered
on December 21, 2024 under Rule 58(c)(2)(B).
Although Northwell filed its original, deficient request for a conference concerning an
anticipated motion to amend on August 9, 2024, such a motion is not properly considered a pre-
judgment motion for two reasons. First, at that point, the Court had dismissed with prejudice all
claims in Northwell’s Amended Complaint. Second, in the August 9, 2024 letter, Northwell
addressed its arguments for leave to amend in broad strokes and failed to provide a redlined
version of the Amended Complaint showing any amendments it sought to make, in violation of
Local Civil Rule 15.1(a). The Court denied the August 9, 2024 request for a pre-motion
conference without prejudice and subject to renewal following the parties’ consideration of the
January 27, 2025 Reconsideration Order. (Elec. Order, Jan. 27, 2025.)
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 8 of 34 PageID #:
<pageID>
9
Under Rule 59(e), courts should vacate a judgment “only when the [movant] identifies
‘an intervening change of controlling law, the availability of new evidence, or the need to correct
a clear error or prevent manifest injustice.’” Metzler, 970 F.3d at 42–43 (2d Cir. 2020) (quoting
Kolel Beth Yechiel Mechil of Tartikov, Inc. v. YLL Irrevocable Tr., 729 F.3d 99, 104 (2d Cir.
2013)) (emphasis added). The “manifest injustice” standard affords the district court substantial
discretion and is rarely met. See Chitkara v. N.Y. Tel. Co., 45 F. App’x 53, 55 (2d Cir. 2002).
Rule 60(b) is “a mechanism for extraordinary judicial relief invoked only if the moving party
demonstrates exceptional circumstances.” Ruotolo, 514 F.3d at 191.4 Specifically, a motion for
relief from judgment under Rule 60(b)(6) (for “any other reason that justifies relief”) must only
be applied in “extraordinary circumstances.” BLOM Bank SAL v. Honickman, 605 U.S. ---, 145
S. Ct. 1612, 1617, 1620 (2025).
The Supreme Court first addressed the standards applied to resolve a post-judgment
motion to amend in Foman v. Davis, 371 U.S. 178 (1962). In that case, the Supreme Court held
that the district court abused its discretion in denying the plaintiff’s motion to vacate the
judgment under Rule 59(e) in order to amend the complaint “in the absence of any apparent or
4 The exceptional circumstances permitting Rule 60(b) relief are:
(1) mistake, inadvertence, surprise, or excusable neglect;
(2) newly discovered evidence that, with reasonable diligence, could not have
been discovered in time to move for a new trial under Rule 59(b);
(3) fraud (whether previously called intrinsic or extrinsic), misrepresentation, or
misconduct by an opposing party;
(4) the judgment is void;
(5) the judgment has been satisfied, released, or discharged; it is based on an
earlier judgment that has been reversed or vacated; or applying it prospectively is
no longer equitable; or
(6) any other reason that justifies relief.
Fed. R. Civ. P. 60(b).
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 9 of 34 PageID #:
<pageID>
10
declared reason.” Id. at 182. Since Foman, the Second Circuit, on multiple occasions, has applied
the Supreme Court’s holding to address the interplay between the different standards for
resolving a motion to amend under Rule 15(a)(2) and a motion to vacate a judgment under Rules
59(e) and 60(b).
First, in National Petrochemical Company of Iran v. M/T Stolt Sheaf, 930 F.2d 240 (2d
Cir. 1991), the Second Circuit affirmed a district court’s denial of a plaintiff’s post-judgment
motion to vacate the court’s grant of summary judgment under Rule 60(b)(1) (for “mistake”) in
order to amend the complaint. The Court held that, while “it might be appropriate in a proper
case to take into account the nature of the proposed amendment in deciding whether to vacate the
previously entered judgment,” that case was not such a “proper case” because the plaintiff
“belatedly” sought to amend after summary judgment in order to “withdraw” certain admissions
it had previously made. Id. at 245 (emphasis added).
Second, in Williams v. Citigroup, Inc., 659 F.3d 208 (2d Cir. 2011), the Second Circuit
held that the district court abused its discretion in denying the plaintiff’s request under Rules
59(e) and 60(b) to vacate the judgment in order to file a first amended complaint, where the
district court reasoned that the plaintiff “[did] not explain why she should be granted leave to
replead at this stage when she failed to request an opportunity to replead in the first instance.” Id.
at 214. In doing so, the Second Circuit held that a plaintiff is under no “obligation to seek leave
to replead,” either (1) “immediately upon answering the motion to dismiss the complaint
(without yet knowing whether the court will grant the motion, or, if so, on what ground),” or (2)
“immediately upon receipt of the court’s ruling granting the motion and prior to the entry of
judgment thereupon.” Id.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 10 of 34 PageID #:
<pageID>
11
Third, in Indiana Public Retirement System v. SAIC, Inc., 818 F.3d 85 (2d Cir. 2016), the
Second Circuit vacated the order of a district court, which denied a plaintiff’s motion to vacate a
judgment under Rules 59(e) and 60(b) in order to file a second amended complaint and reasoned
that the proposed amendments would be futile under Rule 15(a)(2). Id. at 93–96. The parties did
not raise—and, accordingly, the Second Circuit did not directly address—whether that case was
“a proper case to take into account the nature of the proposed amendment in deciding whether to
vacate the previously entered judgment”; however, in conducting a Rule 15(a)(2) analysis and
finding that amendment would not be futile, the Second Circuit did, in fact, take into account the
nature of the proposed amendments in deciding that vacatur was warranted. See id.
Fourth, in Metzler Investment Gmbh v. Chipotle Mexican Grill, Inc., 970 F.3d 133 (2d
Cir. 2020), the Second Circuit upheld the district court’s denial of the plaintiff’s motion to vacate
the judgment under Rules 59(e) and 60(b) in order to file a third amended complaint. In doing so,
the Second Circuit interpreted the Supreme Court’s holding in Foman to stand for the
proposition that “it is an abuse of discretion to deny a motion under Rule 59(e)—to prevent a
‘manifest injustice,’ although the [Supreme] Court did not say so explicitly—when the plaintiff
was never given an opportunity to replead in the first place.” Id. at 144 (emphasis added). The
Second Circuit also elaborated on its prior ruling in SAIC, acknowledging that, in SAIC, it did
not address “whether that case was a ‘proper’ one within the meaning of National
Petrochemical, or indeed what the phrase meant,” nor did it “identify any circumstances in the
case that would render it ‘appropriate’ to consider the nature of the proposed amendment in
determining whether the judgment should be vacated.” Id. at 145. The Second Circuit then
explained that SAIC was a “proper” case in which to consider the nature of the proposed
amendment on a motion to vacate the judgment because, in that case: (1) the district court “had
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 11 of 34 PageID #:
<pageID>
12
permitted amendment after its first decision on the motion to dismiss”; (2) the plaintiffs chose
not to amend but instead proceeded on their surviving claims; (3) “on reconsideration, the district
court dismissed all the plaintiffs’ claims including the theretofore surviving claims with
prejudice, prohibiting amendment without providing a justification”; and (4) “the plaintiffs then
were unable to proceed except by motion for relief from the judgment.” Id. By contrast, Metzler
was not such a “proper case” because: (1) the district court had issued a “thorough opinion”
dismissing the first amended complaint and plaintiff failed to cure those deficiencies in the
second amended complaint; and (2), in total, the plaintiffs “had three opportunities to state a
claim.” Id.
Fifth, in Mandala v. NTT Data, Inc., 88 F.4th 353 (2d Cir. 2023), the Second Circuit
reversed the district court’s denial of the plaintiffs’ motion to vacate the judgment in order to file
an amended complaint, specifically in the context of a motion for relief from judgment under
Rule 60(b)(6)—a catchall provision permitting relief from judgment for “any other reason that
justifies relief.” In that case, the district court granted the defendant’s motion to dismiss the
original complaint. Id. at 357. The plaintiff appealed; a split panel affirmed the dismissal but, in
doing so, noted that the complaint might have survived dismissal had it pled certain allegations
to which the Second Circuit alluded in its decision. Id. at 357–58. Following a denial of their
request for rehearing en banc, and one year and eight months after the initial judgment was
entered, the plaintiffs sought to set aside the judgment under Rule 60(b)(6) in order to amend
their complaint. Id. at 358.
Notwithstanding the long delay between the district court’s dismissal and the plaintiffs’
request to amend, the Second Circuit held that the case was a “proper” one in which to consider
the nature of the proposed amendment in determining whether to vacate the judgment, since the
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 12 of 34 PageID #:
<pageID>
13
plaintiffs had not yet had the opportunity to amend and the district court provided no “justifying
reason” for the denial. Id. at 364–65. The Second Circuit also noted that the plaintiffs “cannot be
foreclosed from obtaining post-judgment relief solely because they chose to appeal rather than
seek vacatur immediately upon dismissal of their claim.” Id. at 364.
In reaching its conclusion, the Second Circuit in Mandala cited a number of prior
decisions addressing motions to amend purely in the Rule 15(a)(2) context (i.e., where no
judgment had yet been entered and thus Rules 59(e) and 60(b) were not implicated), in which the
court emphasized that “it is improper to simultaneously dismiss a complaint with prejudice under
Rule 12(b)(6) and deny leave to amend when the district court has not adequately informed the
plaintiffs of its view of the complaint’s deficiencies.” Id. at 363 (citing, inter alia, Attestor Value
Master Fund v. Republic of Argentina, 940 F.3d 825, 833 (2d Cir. 2019) (noting that the Second
Circuit has been “particularly skeptical of denials of requests to amend when a plaintiff did not
previously have a district court’s ruling on a relevant issue”)). On this point, the Second Circuit
specifically discussed its ruling in Loreley Financing (Jersey) No. 3 Limited v. Wells Fargo
Security, LLC, 797 F.3d 160 (2d Cir. 2015), where the Second Circuit held that the district court
abused its discretion in denying leave to amend under Rule 15(a)(2) because, at a pre-motion
conference on the motion to dismiss, the district court “presented [the] [p]laintiffs with a
Hobson’s choice: agree to cure deficiencies not yet fully briefed and decided or forfeit the
opportunity to replead.” Id. at 190.
Since Mandala, the Supreme Court has recently addressed these issues, specifically in the
context of a motion to vacate under Rule 60(b)(6). See BLOM v. Bank SAL v. Honickman, 605
U.S. ---, 145 S. Ct. 1612 (2025). In BLOM, the Supreme Court overturned a summary order by
the Second Circuit, which applied Mandala to hold that “special considerations . . . come into
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 13 of 34 PageID #:
<pageID>
14
play when vacatur is sought in order to obtain leave to file a second amended complaint.”
Honickman v. BLOM Bank SAL, No. 22-1039-cv, 2024 WL 852265, at *2 (2d Cir. Feb. 29,
2024). Specifically, the Supreme Court held:
Relief under Rule 60(b)(6) requires extraordinary circumstances. That standard
does not become less demanding when a Rule 60(b)(6) movant also hopes to
amend his complaint. Rather, a party seeking to reopen his case and replead must
first satisfy Rule 60(b) on its own terms and obtain Rule 60(b) relief before Rule
15(a)’s liberal amendment standard can apply. Because the Second Circuit’s
balancing approach conflates this order of operations and dilutes Rule 60(b)(6)’s
well-established standard, we must reject it.
BLOM, 145 S.Ct. at 1619 (emphasis supplied). However, despite overturning the Second
Circuit’s application of a lower Rule 60(b)(6) standard for determining whether vacatur is
appropriate in order to permit amendment of a complaint, the Supreme Court expressly affirmed
its prior holding in Foman in the context of Rule 59(e) motions, holding that “because Rule
59(e)” (which must be filed within 28 days of the entry of judgment) “does not threaten the
finality of judgments to the same degree” as Rule 60(b)(6) (which has no express time limit),
“we do not require a movant to show the same ‘extraordinary circumstances’ to receive relief.”
Id. at 1622.
Thus, in summary, in determining whether a given case is a “proper” one in which “to
take into account the nature of the proposed amendment in deciding whether to vacate the
previously entered judgment,” the following principles are instructive. Nat’l Petrochemical, 930
F.2d at 245. First, a plaintiff filing a post-judgment motion to amend under Rule 15(a)(2) must
first show that the judgment should be vacated under Rule 59(e) and/or Rule 60(b). Second, Rule
60(b) enumerates the criteria under which a final judgment may be vacated under that rule and
specifically requires a showing of “extraordinary circumstances”; these criteria cannot be diluted
when the Rule 60(b) motion is made in conjunction with a motion to amend. See BLOM, 145 S.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 14 of 34 PageID #:
<pageID>
15
Ct. at 1619, 1622. Third, nevertheless, when a litigant seeks to vacate or alter a judgment under
Rule 59(e) and to amend the operative pleading under Rule 15(a)(2), the court must still conduct
the Rule 59(e) analysis first. Fourth, under Rule 59(e), it is a “manifest injustice” to deny
amendment without first conducting a Rule 15(a)(2) analysis “when the plaintiff was never given
an opportunity to replead in the first place”; accordingly, in such circumstances, it is “proper” to
take into account the nature of the proposed amendment (e.g., whether the proposed amendment
would be futile or is the result of undue delay, bad faith, or a dilatory motive on the part of the
moving party) in determining whether to vacate the judgment under Rule 59(e). Metzler, 970
F.3d at 144 (citing Foman, 371 U.S. at 182). Fifth, while there is no requirement that a plaintiff
be given an opportunity to amend after the issuance of a decision ruling on a motion to dismiss
the operative pleading, courts should generally permit amendment at least once after the district
court has articulated its substantive concerns with the pleading—again, absent a finding of undue
delay, bad faith, dilatory motive, or futility. See Mandala, 88 F.4th at 363.
DISCUSSION
Northwell argues that this is a “proper case” in which to consider its Proposed Second
Amended Complaint addressing the Motion to Amend. It relies primarily on Rule 15(a)(2)’s
liberal amendment standard in order to advance this argument, rather than either Rule 59(e)’s
“manifest injustice” standard or Rule 60(b)’s “extraordinary circumstances” standard, which are
the standards applied to determine whether post-judgment relief is warranted. (Mem. at 1–7.)
Further, Northwell argues that amendment is warranted under Rule 15(a)(2) because there is no
showing of “undue delay, bad faith, dilatory motive, or futility.” (Id. at 7–25.)
Blue Cross Massachusetts argues that a “proper case” in which to consider the nature of
the proposed amendment in determining whether to vacate a judgment is one that “promotes” the
principles of “finality inherent in Rule[s] 59(e) and 60(b) and of liberality of amendment under
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 15 of 34 PageID #:
<pageID>
16
Rule 15”—i.e., where “a court deems it necessary to do so to determine whether a plaintiff’s
reasons for seeking post-judgment leave to amend outweigh the principles of finality inherent in
Rules 59(e) and 60(b).”5 (Opp’n at 5–6, 8.) It contends that this is not such a “proper case”
because Northwell “previously amended its complaint, is not relying on new discovery evidence
or a change in the law, and yet waited until after judgement to seek leave to amend to bring
substantively identical claims.” (Id. at 9.) Blue Cross Massachusetts also argues that I should
deny leave to amend because the proposed amendments would be futile and because Northwell
has unduly delayed seeking leave to amend. (Id.at 9–25.)
As set forth below, I deny the Motion to Amend. Because Northwell brings its Motion to
Amend post-judgment, before reaching the amendment analysis under Rule 15(a)(2), I must first
determine whether Northwell has shown that the judgment should be vacated under Rule 59(e) or
60(b). Northwell does specify whether it seeks to vacate the judgment under Rule 59(e), Rule
5 Blue Cross Massachusetts also argues that Northwell waived its right to appeal and thus
amendment is foreclosed as a matter of law. (Opp’n at 4–5.) Blue Cross Massachusetts relies on
my February 22, 2025 Electronic Order granting Northwell’s request for an extension of time to
appeal the sealed Dismissal Order, the August 2, 2024 redacted Dismissal Order filed on the
public docket (ECF No.45), and the Reconsideration Order until “14 days after the Court rules
on [Northwell’s] letter motion seeking a pre-motion conference concerning its anticipated
renewed motion for leave to file a second amended complaint.” (Elec. Order Feb. 22, 2025; see
ECF No. 76 (Northwell’s February 20, 2025 request for an extension of time to appeal the three
specified Orders.) Blue Cross Massachusetts correctly notes that I ruled on Northwell’s pre-
motion conference letter on August 18, 2025; accordingly, at that time, Northwell should have
filed another motion seeking to forestall the time to appeal until after my ruling on its fully-
briefed Motion to Amend. (Elec. Order Aug. 18, 2025.) However, my ruling on the pre-motion
conference letter set a briefing schedule for the anticipated motion to amend and did not
substantively address whether Northwell should be granted leave to file a second amended
complaint under the applicable rules of the Federal Rules of Civil Procedure. Therefore,
notwithstanding Northwell’s failure to file a motion to extend the time for filing a notice of
appeal within fourteen days of my August 18, 2025 Order, I resolve the Motion to Amend.
Whether Northwell is permitted to file a notice of appeal concerning the sealed Dismissal Order,
the redacted Dismissal Order, and the Reconsideration Order is a separate question that is not
before the Court at this time.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 16 of 34 PageID #:
<pageID>
17
60(b), or both. However, given that Northwell filed its initial pre-motion conference letter
seeking amendment within 28 days of my issuance of the Dismissal Order, I understand that, at a
minimum, Northwell seeks to vacate the judgment under Rule 59(e). See Fed. R. Civ. P. 59(e)
(“A motion to alter or amend a judgment must be filed no later than 28 days after the entry of the
judgment.”). Accordingly, before showing that amendment is warranted under Rule 15(a)(2),
Northwell must first show that vacatur is warranted under Rule 59(e) “to prevent a manifest
injustice.” Metzler, 970 F.3d at 144 (2d Cir. 2020).
I find that this case is a “proper” one in which to consider the proposed amendments in
determining whether it is appropriate to vacate the judgment under Rule 59(e) to permit
Northwell to further amend its Amended Complaint. Nevertheless, based on my close review of
the Proposed Second Amended Complaint, I find that amendment would be futile and therefore
decline to vacate the judgment under Rule 59(e) to permit Northwell to file a second amended
complaint. Moreover, I also find that vacatur it is not warranted under Rule 60(b)’s higher
“extraordinary circumstances” standard.
I. 	Whether This is a “Proper Case” in Which to Consider the Nature of the
Proposed Amendment in Determining Whether to Vacate the Judgment Under
Rule 59(e)
While it is a close question, this is a “proper case” where it is appropriate to take into
account the nature of the proposed amendment in determining whether to vacate judgment under
Rule 59(e) under the Second Circuit’s line of cases interpreting Foman, including Williams,
National Petrochemical, SAIC, and Metzler, for the following reasons.
First, although Northwell did have the opportunity to amend its original Complaint after
reviewing Blue Cross Massachusetts’ first letter requesting a pre-motion conference in
anticipation of filing a motion to dismiss (and availed itself of such opportunity), it did not have
the opportunity to amend after hearing the Court’s views concerning the inadequacies in any of
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 17 of 34 PageID #:
<pageID>
18
its pleadings—not in a pre-motion conference concerning either Blue Cross Massachusetts’
anticipated motion to dismiss the original Complaint or its anticipated motion to dismiss the
Amended Complaint, not in oral argument on the fully-briefed Motion to Dismiss the Amended
Complaint, and not in a written order from the Court evaluating that motion. See Mandala, 88
F.4th at 363 (holding that it is often “improper to simultaneously dismiss a complaint with
prejudice under Rule 12(b)(6) and deny leave to amend when the district court has not
adequately informed the plaintiffs of its view of the complaint’s deficiencies”). In fact, the first
time that Northwell heard from this Court regarding its views on any of its pleadings was in the
Dismissal Order ruling on the Motion to Dismiss the Amended Complaint. (See Dismissal
Order.)6
Second, although Northwell first filed its Motion for Reconsideration of the Dismissal
Order rather than its Motion to Amend, the Second Circuit has noted that a plaintiff availing
itself of the available legal process to challenge a district court’s ruling does not foreclose its
ability to also seek amendment to cure the deficiencies in its pleadings identified in the district
court’s ruling. Mandala, 88 F.4th at 364 (holding that plaintiffs “cannot be foreclosed from
obtaining post-judgment relief solely because they chose to appeal rather than seek vacatur
immediately upon dismissal”).
6 As the parties are aware and as I noted in prior orders, Northwell is currently litigating cases
against other BlueCard Program members bringing nearly identical claims based on the same
agreements it has raised in this action. District courts have reached different conclusions
regarding the viability of Northwell’s breach of contract and third-party beneficiary claims
against these other BlueCard Program member entities. See, e.g., Northwell Health, Inc. v.
BlueCross BlueShield of Tennessee, Inc., No. 23-cv-600, 2024 WL 5108159 (E.D.N.Y. Dec. 13,
2024) (denying motion to dismiss with respect to breach of contract and third-party beneficiary
claims). At least one other judge of this District has dismissed all of Northwell’s claims on
similar grounds to those set forth in the Dismissal Order. Northwell Health, Inc. v. Group
Hospitalization and Med. Servs., Inc., No. 23-cv-1268, 2024 WL 5213366 (E.D.N.Y. Dec. 24,
2024) (granting motion to dismiss all claims) (appeal filed).
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 18 of 34 PageID #:
<pageID>
19
Blue Cross Massachusetts raises the fact that, through its pleadings and the various
motions, Northwell essentially keeps bringing the same, albeit rephrased, claims and arguments,
and argues that it “should not have to endlessly litigate seriatim amendments each time
Northwell comes up with a new way to restate the same facts and legal theories.” (Opp’n at 24.) I
find this argument to be persuasive; indeed, I noted in the Reconsideration Order that I had
already fully addressed in the Dismissal Order all of the arguments that Northwell raised in its
Motion for Reconsideration, notwithstanding Northwell’s unsupported contention that the
Dismissal Order committed “clear error.” (See Reconsideration Order at 12–22.) However, while
the fact that Northwell continues to bring essentially the same arguments without making
material modifications to its factual pleadings is relevant to my finding of futility (discussed
below), this alone does not foreclose me from reviewing the Proposed Second Amended
Complaint in determining whether it would be appropriate to vacate the judgment under Rule
59(e).
For these reasons, under the principles laid out in Williams, National Petrochemical,
SAIC, and Metzler, this is a “proper case” in which “to take into account the nature of the
proposed amendment in deciding whether to vacate the previously entered judgment” under Rule
59(e).
II. 	Whether Vacating the Judgment Under Rule 59(e) to Permit Amendment Under
Rule 15(a)(2) is Warranted
Having taken into account all of the proposed amendments as set forth in the redlined
Proposed Second Amended Complaint, I find that amendment would be futile. Accordingly,
Northwell has not shown that vacating the judgment is necessary to prevent a manifest injustice
under Rule 59(e) as required for it to secure leave to file the Proposed Second Amended
Complaint.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 19 of 34 PageID #:
<pageID>
20
Except in very limited circumstances, a plaintiff cannot recover against a defendant for
breach of contract where the defendant was not a signatory to the agreement that the plaintiff
seeks to enforce. See Reza v. Khatun, No. 09-cv-233, 2017 WL 1170559, at *4 (E.D.N.Y. Dec.
22, 2017) (“Under New York law, it is well established that—with few exceptions—a breach of
contract claim cannot be maintained against a party who is not a signatory to the underlying
agreement, and not in privity with a contracting party.”) (collecting cases). First, a plaintiff may
recover against a non-signatory defendant where the non-signatory defendant’s “relationship
with the contracting party is ‘so close as to approach that of privity.’” Id. at *4–5 (quoting
Ossining Union Free Sch. Dist. v. Anderson LaRocca Anderson, 73 N.Y.2d 417, 424 (1989)). A
plaintiff may allege such a relationship where the non-party signatory was acting as the
defendant’s agent in executing the agreement at issue. See Bailey v. City of New York, 2024 WL
2947473, *2 (N.Y. App. Div. 2024). A plaintiff may also allege such a relationship where the
non-party signatory “manifested an intent to be bound by the contract” or assumed obligations
under the contract. MBIA Ins. Corp. v. Royal Bank of Can., 706 F. Supp. 2d 380, 396–97
(S.D.N.Y. 2009) (citing Horsehead Indus., Inc. v. Metallgesellschaft AG, 657 N.Y.S.2d 632, 633
(1997)). Second, a plaintiff may recover against a non-signatory defendant where the plaintiff
was the intended “third-party beneficiary” of the agreement at issue. Dormitory Auth. v. Samson
Constr. Co., 30 N.Y.3d 704, 710–11 (2018). Third, a plaintiff may recover against a defendant
under a “quasi-contract” theory, where no contract exists at all but where failure to recognize a
contract would result in the defendant’s unjust enrichment. Mid-Hudson Catskill Rural Migrant
Ministry, Inc. v. Fine Host Corp., 418 F.3d 168, 175 (2d Cir. 2005).
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 20 of 34 PageID #:
<pageID>
21
For the reasons set forth below, the Proposed Second Amended Complaint fails to state a
claim under any of these theories.7
A. Breach of Contract Claim
The proposed amendments do not materially alter Northwell’s breach of contract claim as
set forth in the Amended Complaint. Accordingly, as explained with respect to the Amended
Complaint in the Dismissal Order and the Reconsideration Order, the Proposed Second
Amended Complaint fails to state a breach of contract claim against Blue Cross Massachusetts
under the theories that Empire acted as Blue Cross Massachusetts’ agent in executing the Empire
Agreements or that Blue Cross Massachusetts manifested its intent to be bound by the Empire
Agreements.
Under New York law, an agency relationship requires a showing of three elements: (1)
the manifestation by the principal that the agent shall act on the principal’s behalf; (2) the agent’s
consent; and (3) the understanding of both parties that the principal is in control of the
relationship. Bailey, 228 A.D. 3d at 715. As to the first element of the test, courts consider
whether the principal has vested the agent with “actual authority” (either express or implied) or
“apparent authority” to bind the principal. Id. at *2. “[A]ctual authority exists where the principal
has granted the agent the power to enter into contracts on the principal’s behalf, subject to
whatever limitations the principal places on this power, either explicitly or implicitly.” Ridge
Clearing & Outsourcing Sols., Inc. v. Khashoggi, No. 07-cv-6611, 2011 WL 3586455, at *7
(S.D.N.Y. Aug. 12, 2011) (citing Ford v. Unity Hosp., 299 N.E.2d 659, 664 (N.Y.1973)), aff’d
sub nom. Broadridge Sec. Processing Sols., LLC v. Khashoggi, 507 F. App’x 57 (2d Cir. 2013).
7 Because I find that amendment would be futile, I do not address Blue Cross Massachusetts’
argument that amendment should be denied due to undue delay.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 21 of 34 PageID #:
<pageID>
22
Apparent authority exists when the “words or conduct of the principal, communicated to a third
party, . . . give rise to the appearance and belief that the agent possesses authority to enter into a
transaction.” Sherrod v. Mount Sinai St. Luke’s, 168 N.Y.S.3d 95, 102 (2022). Apparent
authority requires a “factual showing” that the third party reasonably relied “upon the
misrepresentations of the agent because of some misleading conduct on the part of the
principal—not the agent.” Id.
An agent may bind its principal in the absence of express, implied, or apparent authority
if the principal ratifies the agent’s conduct. See Crimi v. Nat’l Life Ins. Co., 767 N.Y.S.2d 309,
310–11 (2d Dep’t 2003). “Ratification is the express or implied adoption of” the unauthorized
acts of the agent by the principal with “full knowledge of the material facts.” Hempstead Realty,
LLC v. Sturrup, 2017 WL 2215747, at *5 (N.Y. Sup. Ct. 2017), aff’d, 144 N.Y.S.3d 440 (2021)
(citing Holm v C.M.P. Sheet Metal, 455 N.Y.S. 2d 429, 432 (1982)).
A non-signatory to a contract may also be held liable for breach of contract if it
“manifested an intent to be bound by the contract” or assumed obligations under the contract.
MBIA Ins. Corp. v. Royal Bank of Can., 706 F. Supp. 2d 380, 396–97 (S.D.N.Y. 2009) (citing
Horsehead Indus., 657 N.Y.S.2d at 633). Courts infer an intent to be bound “from the [non-
signatory’s] participation in the negotiation of the contract, or if the [signatory] is a dummy for
the [non-signatory], or if the [signatory] is controlled by the [non-signatory] for the [non-
signatory] own purposes.” Id.
The Proposed Second Amended Complaint’s new allegations concerning a purported
agency relationship between Blue Cross Massachusetts and Empire are implausible. For
example, Northwell argues that the following factual allegations show that Blue Cross
Massachusetts gave Empire “actual” or “apparent” “authority to negotiate and execute the
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 22 of 34 PageID #:
<pageID>
23
[Practitioner] Agreement,” that Blue Cross Massachusetts ratified the terms of the Practitioner
Agreement, or the Blue Cross Massachusetts manifested its intent to be bound by the Practitioner
Agreement:
(1) an alleged BlueCard Program “Membership Standard” requiring Association members
participating in the BlueCard Program to “take such action as required to ensure [the
Association’s] financial performance in programs and contracts of an inter-Plan nature,”
including the Blue Card Program (Mem. at 10; PSAC ¶¶ 15–17, 43, 47–47, 83–86);
(2) that Blue Cross Massachusetts “agreed that [its] sister organizations, including Empire,
would negotiate with local healthcare providers” such as Northwell “on behalf of all
member companies” because “they were prohibited from negotiating in-network
agreements with providers outside their territory” (Mem. at 10–11; PSAC ¶¶ 53–54, 93–
99);
(3) Blue Cross Massachusetts’ identification cards issued to its insureds, which it purportedly
instructed its insureds “to present . . . to healthcare providers (including Northwell) to
obtain medical care” (Mem. at 13–14; PSAC ¶¶ 23–28); and
(4) an alleged “claim determination procedure” pursuant to which Blue Cross Massachusetts
reimbursed Empire (Mem. at 16 (PSAC ¶¶ 16, 21, 104–22).)8
Even with these allegations, the Proposed Second Amended Complaint fails to plead a plausible
breach of contract claim against Blue Cross Massachusetts for multiple reasons
First, these allegations, read in the context of the entire Proposed Second Amended
Complaint, are insufficient to plausibly allege that Empire had actual or apparent authority to act
as Blue Cross Massachusetts’ agent in executing the Empire Agreements. As with the Amended
Complaint, the Proposed Second Amended Complaint alleges no formal agency agreement (or
8 The Proposed Second Amended Complaint does not clearly allege whether Blue Cross
Massachusetts agreed to reimburse Empire for payments made to Northwell for services
provided to people insured by Blue Cross Massachusetts or whether Blue Cross Massachusetts
agreed to pay Northwell directly for such costs. (See Proposed Second Am. Compl. ¶ 30 (“Those
individuals insured by Defendant’s plans who received healthcare services from
Northwell . . . were submitted by Northwell for payment and paid in accordance with the terms
of the [Practitioner] Agreement.”); id. ¶ 32 (“More often than not for claims submitted to
Defendant during the relevant period, Defendant processed and paid claims at the proper, in-
network rates.”).)
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 23 of 34 PageID #:
<pageID>
24
any agreement at all) between Empire and Blue Cross Massachusetts, instead relying on generic
obligations undertaken by each individually as part of their membership in the Association,
which administers the BlueCard Program. (See Dismissal Order at 23 (finding no allegations of
“a written agreement and evidence of direct dealings between the parties alleged to have
functional privity”).)
The Proposed Second Amended Complaint alleges that, by signing the License
Agreement, which prohibits Association member entities from “negotiating in-network
agreements with providers outside their territory,” Blue Cross Massachusetts “agreed that”
Empire “would negotiate with local healthcare providers” like Northwell to set rates on behalf of
Blue Cross Massachusetts (and all Association members). (Mem. at 10–11 (citing PSAC ¶¶ 53–
54, 93–99).) The Proposed Second Amended Complaint also alleges that “Membership
Standards”—to which each Association member individually agrees—require Blue Cross
Massachusetts to “take such action as required to ensure [Blue Cross Massachusetts’] financial
performance in programs and contracts of an inter-Plan nature,” including the Blue Card
Program. (PSAC ¶ 48.) But these allegations do not plausibly establish an agency relationship, in
light of the fact that the License Agreement signed by Blue Cross Massachusetts and the
Association expressly disclaims any such agency relationship, providing:
Likewise, the Hospital Agreements
between Northwell and Empire expressly provide:
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 24 of 34 PageID #:
<pageID>
25
(Hospital HMO Agreement art. II.A, ECF No. 21-3.)
Accordingly, the Proposed Second Amended Complaint’s allegations do not remedy a
key deficiency identified in the Dismissal Order—that “both Blue Cross Massachusetts and
Empire mutually participate in the BlueCard Program as separate, independent entities pursuant
to the terms and payment structure set out in their separate License Agreements with the
Association and relevant provider agreements.” (Dismissal Order at 19.) At bottom, the theory
Northwell presents in the Proposed Second Amended Complaint is the same as the theory it
presented in the Amended Complaint: that, by virtue of its participation in the BlueCard
Program, Empire, in executing the Empire Agreements which are between Northwell and Empire
alone, acted not only as its own principal, but also as the agent to Blue Cross Massachusetts—as
well as the agent of every single other Blue Cross entity nationwide that participates in the
BlueCard Program. This is not plausible, especially given the fact that Blue Cross Massachusetts
and every Association member, other than Empire, did not even see the confidential Empire
Agreements between Northwell and Empire. (Proposed Second Am. Compl. ¶ 171 (alleging that
Blue Cross Massachusetts had generalized “knowledge” of the Practitioner Agreement
“regardless of whether or not it ever saw . . . the [Practitioner] Agreement”); see also Dismissal
Order at 13 (“It is not plausible that two sophisticated entities such as the parties in this action
would agree to be bound to terms they did not negotiate or sign, and which could be amended
without their consent.”).)
Second, to the extent that Northwell argues that Blue Cross Massachusetts ratified
Empire’s conduct with respect to Northwell through the alleged “claim determination procedure”
pursuant to which Blue Cross Massachusetts paid for its insureds receiving out-of-network care
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 25 of 34 PageID #:
<pageID>
26
from Northwell, such allegations are too vague to establish ratification. This is particularly so in
light of the fact that the Proposed Second Amended Complaint does not clearly allege whether
Blue Cross Massachusetts ever paid Northwell for its treatment of Blue Cross Massachusetts
insureds’ (as opposed to reimbursing Empire for Empire’s payment to Northwell pursuant to a
private agreement between Empire and Blue Cross Massachusetts that has not been identified in
this litigation). (Mem. at 16 (PSAC ¶¶ 16, 21, 104–22).) In fact, the Proposed Second Amended
Complaint’s allegations concerning the “claim determination procedure” supports the Court’s
understanding of the structure of the Empire Agreements—that Empire (not Blue Cross
Massachusetts) contracts with Northwell to set rates for in-network providers and that, whatever
Blue Cross Massachusetts’ obligations to other Association member entities may be, it is not in
privity with Northwell. (PSAC ¶¶ 104–22.)
Moreover, as I noted in the Reconsideration Order, Northwell has made the strategic
decision not to sue Empire, the Blue Cross entity with whom it does have a contractual
relationship. See Reconsideration Order at 22 n.6. Whatever the reason is behind Northwell’s
decision, it cannot use that decision to overcome the requirement under New York contract law
that there be privity between Blue Cross Massachusetts and Empire in order to hold Blue Cross
Massachusetts responsible for Empire’s obligations under the Empire Agreements.
Third, the Proposed Second Amended Complaint does not plausibly allege that Blue
Cross Massachusetts manifested its intent to be bound by any of the Empire Agreements. Again,
I emphasize that the only alleged relationship between Empire and Blue Cross Massachusetts is
through their separate, individual licensing contracts with the Association—not through any
formal agreements or other relationship with each other.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 26 of 34 PageID #:
<pageID>
27
Accordingly, the Proposed Second Amended Complaint fails to state a claim for breach
of contract under New York law.
B. Third-Party Beneficiary Claims
Northwell’s proposed amendments are likewise futile with respect to its third-party
beneficiary claims. “New York contract law distinguishes between an intended third-party
beneficiary who may sue on a contract made for its benefit, and an incidental beneficiary with no
right to enforce a particular contract.” In re George Wash. Bridge Bus Station Dev. Venture LLC,
65 F.4th 43, 54 (2d Cir. 2023) (emphasis added) (citing Dormitory Auth. of N.Y., 30 N.Y.3d at
710). “A party asserting rights as a third-party beneficiary must establish ‘(1) the existence of a
valid and binding contract between other parties, (2) that the contract was intended for his benefit
and (3) that the benefit to him is sufficiently immediate, rather than incidental, to indicate the
assumption by the contracting parties of a duty to compensate him if the benefit is lost.’”
Madeira v. Affordable Hous. Found., Inc., 469 F.3d 219, 251 (2d Cir. 2006) (quoting Cal. Pub.
Employees. Ret. Sys. v. Shearman & Sterling, 95 N.Y.2d 427, 434–35 (2000)).
In the Proposed Second Amended Complaint, Northwell raises new, but not materially
different, allegations concerning its claim that Northwell was the third-party beneficiary to: (1)
the License Agreement between Blue Cross Massachusetts and the Association; (2) any other
agreements into which Blue Cross Massachusetts entered with the Association concerning
participation in the BlueCard Program; (3) any agreements into which Empire entered with the
Association concerning participation in the BlueCard Program; (4) any agreements between Blue
Cross Massachusetts and Empire; or (5) Northwell’s various agreements with Empire. For
example, the Proposed Second Amended Complaint alleges that:
(1) “Empire receives Northwell’s statement of its billed charges, confirms the Home
Licensee, but then forwards Northwell’s claims to Defendant in a standard format”
(Mem. at 18 (citing PSAC ¶¶ 104–05));
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 27 of 34 PageID #:
<pageID>
28
(2) “Defendant makes the final claim determination in accordance with the Provider
Agreement terms” (id. (citing PSAC ¶¶ 106–07));
(3) “Defendant delivers its claim disposition to Empire, prohibits Empire from changing the
claim disposition, and instructs Empire to transmit it to Northwell” (id. (citing PSAC
¶¶ 109–10, 125–26));
(4) “Empire, at Defendant’s direction, sends to Northwell, unaltered, the explanation of
payment, or Defendant gives Empire written direction and authorization to pay that
amount to Northwell, and provides Empire the funds to do so on Defendant’s behalf” (id.
(citing PSAC ¶ 111));
(5) “Defendant handles any appeals submitted by Northwell” (id. (citing PSAC ¶ 106–10));
(6) “More often than not, Defendant pays for claims submitted by Northwell at the proper in-
network rate” (id. (citing PSAC ¶ 32)); and
(7) “Empire only transfers payment to Northwell for services rendered to Defendant’s
insureds subject to Defendant’s control” (id. ¶ 115).
Here, Northwell’s proposed amendments are insufficient to state a claim that Northwell
was the intended third-party beneficiary to the License Agreement between Blue Cross
Massachusetts and the Association, the License Agreement between Empire and the Association,
or any purported “Membership Standards,” “Rules,” or other separate agreements among the
Association member entities. The Proposed Second Amended Complaint—though more detailed
than the Amended Complaint—alleges fundamentally the same structure of relationships in the
BlueCard Program as that alleged in the Amended Complaint: that, as members of the
Association, Blue Cross entities have agreements with the Association (and potentially among
each other, although the Proposed Second Amended Complaint still fails to allege specific facts
supporting the existence of any formal agreements between Blue Cross Massachusetts and
Empire), but not with any out-of-state providers, each of whom has a direct agreement with an
in-state Blue Cross entity. (Cf. Am. Compl. ¶¶ 12–13 (alleging that Blue Cross Massachusetts
must adhere to
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 28 of 34 PageID #:
<pageID>
29
including the BlueCard
Program); Proposed Second Am. Compl. ¶¶ 47–48
As I noted in the Dismissal Order, to the extent that Blue Cross
Massachusetts is not fulfilling its obligations to Empire or to the Association, those entities may
have legal recourse to enforce any agreements between them and Blue Cross Massachusetts.
(Dismissal Order at 33 (“[P]resumably, either the Association or Empire itself could sue if Blue
Cross Massachusetts failed to reimburse Empire under contracts to which they—and not
Northwell—are parties.”).)9
The fact that Northwell may incidentally benefit from the License Agreement between
Blue Cross Massachusetts and the Association, the separate License Agreement between Empire
and the Association, and other “standards” that may apply to Association member entities by
virtue of their entry into such agreements does not make Northwell an intended third-party
beneficiary to any of those agreements. See In re George Wash. Bridge Bus Station Dev. Venture
LLC, 65 F.4th at 54 (holding that “an incidental beneficiary” has “no right to enforce a particular
contract”). Indeed, under Northwell’s theory, every hospital system that contracts with an
Association member to provide in-network services to people insured by an out-of-state Blue
Cross entity becomes the third-party beneficiary of the specific agreement between the provider
and the in-state Association member. Therefore, as I found in the Dismissal Order with respect to
the Amended Complaint, such allegations, read in the context of the entire Proposed Second
9 Likewise, Northwell could presumably sue Empire for breach of the Empire Agreements to
which Empire is a party. For whatever reason, Northwell has chosen not to do so.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 29 of 34 PageID #:
<pageID>
30
Amended Complaint, fail to plead a plausible third-party beneficiary claim. (See Dismissal Order
at 29 (“holding that Northwell had not plausibly alleged that it was the intended third-party
beneficiary to any “agreements regarding participation in the BlueCard Program, [or] any other
agreement between Empire and Defendant, or among the [Association] Member companies as a
group, with respect to the BlueCard Program.”).)
Northwell’s proposed amendments are also insufficient to state a claim that Northwell
was the intended third-party beneficiary to its own Empire Agreements with Empire. As an
initial matter, it is implausible that Northwell can be the third-party beneficiary of its own
Empire Agreements (i.e., where it is not a third party at all, but rather a contracting party).
Further, I find unpersuasive Northwell’s argument that it can enforce its Empire Agreements
with Empire alone against Blue Cross Massachusetts on the theory that Empire engaged in a
“partial assignment of access to Northwell’s in-network services, rate, and terms” and Empire’s
“partial assign[ment]” or “partial delegation” of some portion of its obligations under the Empire
Agreements to Blue Cross Massachusetts, including but not limited to “the contractual obligation
to pay Northwell pursuant to the Practitioner Agreement when it treats a patient insured under a
plan issued or administered by Defendant.” (Proposed Second Am. Compl. ¶ 213; see also id.
¶¶ 204–06 (alleging that “Empire included in the [Hospital Agreements] terms that gave [Blue
Cross Massachusetts] the same access as Empire to Northwell’s in-network services, rates and
terms,” which constitute a “partial assignment” of the Hospital Agreements to Blue Cross
Massachusetts).) Northwell advances this “partial assignment” theory in direct contravention of
the Hospital Agreements, which expressly provide that
(Hospital HMO Agreement art. II.A.). Moreover, Northwell’s partial
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 30 of 34 PageID #:
<pageID>
31
assignment theory necessarily means that Empire assigned a portion of its obligations under
agreements solely between Empire and Northwell to every single Blue Cross entity that
participates in the BlueCard Program, despite the lack of any allegations in the Proposed
Second Amended Complaint that any of those entities expressly agreed to any such assignment,
much less saw the actual contracts purportedly assigned to them in part. The Proposed Second
Amended Complaint simply does not allege a plausible claim that Northwell is a third-party
beneficiary of any of the agreements alleged to exist.
C. Quasi-Contract Claims
“[T]he existence of a valid and enforceable written contract governing a particular subject
matter ordinarily precludes recovery in quasi contract for events arising out of the same subject
matter.” Villnave Constr. Servs., Inc. v. Crossgates Mall Gen. Co. Newco, LLC, 161 N.Y.S.3d
480, 485 (2022). Only “where the existence of the contract is in dispute” may the plaintiff
“allege causes of action to recover for unjust enrichment and in quantum meruit as alternatives to
a cause of action alleging breach of contract.” Id. (emphasis added); see also Mid-Hudson
Catskill Rural Migrant Ministry, Inc, 418 F.3d at 175 (2d Cir. 2005) (“New York law does not
permit recovery in quantum meruit, however, if the parties have a valid, enforceable contract that
governs the same subject matter as the quantum meruit claim.”). “This principle applies even
where the plaintiff or defendant is not a party to the contract.” Sols. Express Ltd. v. Ashley
Furniture Indus., Inc., No. 20-cv-7843, 2023 WL 2393861, at *5 (S.D.N.Y. Mar. 7, 2023)
(emphasis added); see also Viable Mktg. Corp. v. Intermark Commc’ns, Inc., No. 09-cv-1500,
2011 WL 3841417, at *3 (E.D.N.Y. Aug. 26, 2011) (unjust enrichment claim under New York
law precluded by contract even where plaintiff was not party to contract); Tchrs. Ins. & Annuity
Ass’n of Am. v. CRIIMI MAE Servs. Ltd. P’ship, 681 F. Supp. 2d 501, 511 (S.D.N.Y. 2010)
(same), aff’d, 481 F. App’x 686 (2d Cir. 2012).
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 31 of 34 PageID #:
<pageID>
32
The Proposed Second Amended Complaint does not alter any of the allegations
concerning Northwell’s quasi-contract claims set forth in the Amended Complaint,
notwithstanding the dismissal of these claims in the Dismissal Order and the fact that Northwell
did not seek reconsideration of that ruling. (See Dismissal Order at 34–37; Mot. Reconsid.) As
with the Amended Complaint, the Second Amended Complaint pleads the existence of valid
contracts that Northwell seeks to enforce, thereby precluding quasi-contract claims, which
require that there is no valid or enforceable contract (or that there is at least a dispute as to the
existence of a valid or enforceable contract). (See Dismissal Order at 36.) Accordingly, the
Proposed Second Amended Complaint is futile with respect to Northwell’s ability to plead
plausible quasi-contract claims.
* 	* 	*
Northwell’s proposed amendments thus do not allege any material new facts that would
alter the findings in the Dismissal Order and Reconsideration Order regarding the structure set
out by the Blue Card Program (including the License Agreement between Blue Cross
Massachusetts and the Association) and the Empire Agreements (which include the Hospital
Agreements and Practitioner Agreement, and associated amendments), as well as the
relationships and responsibilities of the parties involved. Instead, Northwell’s serial motions boil
down to a fundamental disagreement with this Court about whether such alleged structure,
relationships, and responsibilities plead breach of contract, third party beneficiary, or quasi-
contract claims against Blue Cross Massachusetts under New York law. To the extent that
Northwell disagrees with this Court’s ruling, the proper avenue to raise these disagreements is an
appeal, not serial attempts to relitigate the same issues under the guise of different factual
theories. See State Trading Corp. of India, Ltd. v. Assuranceforenigen Skuld, 921 F.2d 409, 418
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 32 of 34 PageID #:
<pageID>
33
(2d Cir. 1990) (“[A] busy district court need not allow itself to be imposed upon by presentation
of theories seriatim.”).
III. 	Whether Vacating the Judgment Under Rule 60(b) to Permit Amendment Under
Rule 15(a)(2) is Warranted
The Supreme Court has explained that a movant seeking vacatur under Rule 60(b) must
demonstrate “extraordinary circumstances,” and that this standard cannot be relaxed where the
movant also seeks leave to amend the complaint post-judgment. See BLOM, 145 S. Ct. at 1622
(holding that a movant under Rule 59(e) is “not required] to show the same ‘extraordinary
circumstances’” required under Rule 60(b) “to receive relief” from a judgment). Northwell fails
to demonstrate “extraordinary circumstances” that would merit vacating the Court’s dismissal of
the First Amended Complaint with prejudice because, for the reasons addressed above, the
Proposed Second Amended Complaint fails to plead plausible claims under New York law for
breach of contract, breach of a third-party beneficiary contract, and, in the alternative, for unjust
enrichment and quantum meruit.
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 33 of 34 PageID #:
<pageID>
34
CONCLUSION
For the reasons explained above, the Court denies Plaintiff Northwell Health, Inc.’s
Motion to Amend (ECF No. 84). As reflected in this Opinion and Order, judgment was
automatically entered under Rule 58(c)(2)(B) on December 21, 2024—150 days after entry of
the July 24, 2024 Dismissal Order (ECF No. 43). See Fed. R. Civ. P. 58(c)(2)(B). Accordingly,
the Clerk of Court shall file a separate document reflecting that “Judgment” was entered on
December 21, 2024, and shall close this case.
Dated: Central Islip, New York
November 24, 2025
/s/ Nusrat J. Choudhury
NUSRAT J. CHOUDHURY
United States District Judge
Case 2:23-cv-00977-NJC-AYS Document 97 Filed 12/05/25 Page 34 of 34 PageID #:
<pageID>

Continua la tua ricerca in ChatGPT o Claude

Collega Omnilex per cercare nel corpus legale dal tuo assistente IA.