RYAN BARKER, et al.,
Plaintiffs,
v.
NEXTRACKER INC., et al.,
Defendants.
Case No. 24-cv-09467-PCP
ORDER GRANTING DEFENDANTS’
MOTION TO DISMISS
Re: Dkt. Nos. 52, 53
In their class action complaint, plaintiffs Ryan Barker and Charles Bennett allege that
Nextracker Inc. and its executives Daniel Shugar, David Bennett, Howard Wenger, Charles
Boynton, and Nicholas Miller made materially false or misleading statements in 2024 in violation
of federal securities laws. Defendants now move to dismiss plaintiffs’ lawsuit for failure to state a
claim under Federal Rule of Civil Procedure 12(b)(6). For the reasons stated below, the Court
grants Nextracker’s motion to dismiss.
BACKGROUND
Nextracker sells equipment and software to help solar panels track the sun’s movement in
the sky.1 Nextracker is a public company.2 The individual defendants were all executives or
directors of Nextracker for at least some time during plaintiffs’ proposed class period of May 14,
1 The Court assumes the truth of the allegations in the amended class action complaint for the
purposes of defendants’ Rule 12(b)(6) motion.
2 In November 2025, Nextracker changed its name to Nextpower. Nextracker Rebrands as
Nextpower to Reflect the Company’s Position as an Integrated Power Technology Innovator, Bus.
Wire (Nov. 12, 2025 9:15 AM EST), https://www.businesswire.com/news/home/
20251112663209/en/NextrackerRebrands-as-Nextpower-to-Reflect-the-Companys-Position-as-an-
IntegratedPower-Technology-Innovator.
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 1 of 13
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
2024, to August 1, 2024. Daniel Shugar was CEO throughout the class period and is a co-founder
of Nextracker. David Bennett was CFO until May 2024, at which point he became Nextracker’s
Chief Accounting Officer. Howard Wenger was President and a director of Nextracker throughout
the class period. Charles Boynton was CFO after David Bennett and for the remainder of the class
period. Nicholas Miller was COO throughout the class period and is a co-founder of Nextracker.
After the passage of the Inflation Reduction Act of 2022, Nextracker’s revenues increased
sharply. One measure of Nextracker’s financial health is its “backlog,” or “executed contracts or
purchase orders with deposits and specific bills of material for specific projects with indicated start
dates.” Nextracker’s backlog provides a signal of Nextracker’s expected future revenue.
Throughout 2023, Nextracker reported large backlogs of $2–3 billion, as well as large increases in
the size of its backlog year-over-year, reaching quarterly growth in the double and even triple-digit
percentages. At the same time, the solar tracking industry generally risks being hurt by delays in
solar projects’ completion, which stem from complications relating to permits, inputs, regulatory
clearances, weather, or construction. Industry risks also include interconnection delays, which are
delays in connecting solar power projects to the electrical grid.
On May 10, 2023, Nextracker announced its quarterly and annual results for the quarter
and year that ended on March 31, 2023. Nextracker reported that its backlog of projects had
grown, forecasted revenue of $2.1 billion to $2.3 billion for the next year, and made other
optimistic financial projections. For three consecutive quarters thereafter, Nextracker raised its
guidance for the full year, projecting better financial results in July 2023, October 2023, and
January 2024.
A few months thereafter, Nextracker made three statements relevant to this action. First, on
May 14, 2024, Nextracker issued a press release and held an earnings call touting its financial
performance for the quarter and fiscal year that had ended on March 31, 2024. Second, on May 28,
2024, Nextracker’s Form 10-K filing reported that project delays “could have a material adverse
effect on us.” The filing also warned that the company’s financial results “may fluctuate from
quarter to quarter.” The filing stated, “We have experienced seasonal and quarterly fluctuations in
the past as a result of fluctuations in our customers’ businesses, changes in local and global market
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 2 of 13
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
trends, as well as seasonal weather-related disruptions.” Finally, on June 17, 2024, defendant
Boynton said at a conference that Nextracker had been able to withstand delays “because of the
size and scale and ab[ility] to meet our customers’ demands and really focus on on-time delivery.”
Boynton was responding to a question as to why Nextracker had been able to weather project
delays “relatively less scathed,” to which he responded in full:
To the extent that there are movements, if a customer wants to delay,
we will work with that customer to delay. If a customer wants to pull
it in, we’ll try to pull it in. With that, we probably have been a little
more resilient because of the size and scale and able [sic] to meet our
customers’ demands and really focus on on-time delivery. That’s been
helpful to us. 3
On August 1, 2024, plaintiffs allege, “the truth emerge[d].” On that date, Nextracker
announced its results for the quarter ending on June 30, 2024, and disclosed that, in comparison to
the immediately prior quarter, its revenue had fallen from $737 million to $720 million and its
gross profits had fallen from $340 million to $237 million. On Nextracker’s earnings call that day,
Shugar said that “it is taking longer for projects to be fulfilled in real life due to” interconnection
and permitting delays. Wenger said that Nextracker’s backlog conversion rate—how quickly
Nextracker could turn backlog into actual revenue—would be around 80 percent in part because
“project life cycles are getting a little bit longer.” Nextracker’s stock price subsequently fell, as it
did again on October 30, 2024, when Nextracker again reported declines in quarterly revenue and
profits.
In support of their claim that defendants’ earlier statements were false or misleading,
plaintiffs’ complaint describes testimony from multiple former Nextracker employees. Those
employees report that Nextracker and its leadership “tracked and had real time access to all
information about projects, including and especially project delays.”
3 Nextracker requests judicial notice of a set of documents including publicly filed financial
statements, earnings call transcripts, and a transcript of the Energy, Power & Renewables
Conference during which defendant Boynton allegedly made his statements. Dkt. No. 54-10.
Plaintiffs have not opposed Nextracker’s request for judicial notice. Because all of the documents
are incorporated by reference in plaintiffs’ complaint or otherwise subject to judicial notice, the
Court grants Nextracker’s request.
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 3 of 13
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
Former Employee 1 (FE1) was an Assistant Project Manager from February 2023 through
November 2024 who reported to people who reported to Nextracker executives. FE1 explains that
Nextracker had Excel spreadsheets to track projects and included information about running
progress, including on the delivery of equipment. Senior leaders allegedly reviewed these project
spreadsheets and held weekly project meetings to discuss the projects.
Former Employee 2 (FE2) was a project manager from July 2024 through April 2025. FE2
reports that three or four of his eleven projects experienced delays. FE2 also reports that
Nextracker maintained revenue recognition forecasts that other project managers could see.
Former Employee 3 (FE 3) was a senior project manager from March 2016 through
November 2024 who claims that “approximately 20% of projects faced delays Company-wide.”
FE3 explains that if a customer asked to delay the delivery of equipment, “project managers
quickly reported up the chain, virtually immediately upon receiving delay letters from customers.”
Former Employee 4 (FE4) was a director of finance from April 2018 to April 2024 who
reported directly to then-CFO Bennett. FE4 says that “permitting delays, solar panel supply
challenges, and increasingly long wait times for interconnection to the electrical grids were
common causes for project delays” and that Nextracker leadership “constantly discussed project
delays and their causes” and held weekly leadership meetings.
Finally, Former Employee 5 (FE5) was a project manager from October 2023 to January
2024. FE5 also says that Nextracker leadership used Excel spreadsheets to track projects.
Lead Plaintiff Ryan Barker and co-plaintiff Charles Bennett seek to represent a class of
Nextracker shareholders who bought common stock between May 14, 2024, and August 1, 2024.
They allege that they suffered financial losses from Nextracker’s misrepresentations or omissions.
They contend that Nextracker and Nextracker’s executives committed fraud in violation of Section
10(b) of the Securities Exchange Act of 1934 (Exchange Act), as applied in Rule 10b-5, and
Section 20(a) of the Exchange Act. Plaintiffs seek to represent a class defined as “all persons and
entities that purchased Nextracker publicly traded common stock during the Class Period, and who
were damaged thereby,” except for defendants and other Nextracker leaders and related entities.
Plaintiffs seek class certification, damages, fees and costs, and a jury trial.
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 4 of 13
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
Defendants now move to dismiss plaintiffs’ suit for failure to state a claim.
LEGAL STANDARD
Federal Rule of Civil Procedure 8(a)(2) requires a complaint to include a “short and plain
statement of the claim showing that the pleader is entitled to relief.” If the complaint does not do
so, the defendant may move to dismiss the complaint under Federal Rule of Civil Procedure
12(b)(6). Dismissal is required if the plaintiff fails to allege facts allowing the court to “draw the
reasonable inference that the defendant is liable for the misconduct alleged.” Ashcroft v. Iqbal, 556
U.S. 662, 678 (2009). “Dismissal under Rule 12(b)(6) is appropriate only where the complaint
lacks a cognizable legal theory or sufficient facts to support a cognizable legal theory.”
Mendiondo v. Centinela Hosp. Med. Ctr., 521 F.3d 1097, 1104 (9th Cir. 2008). To survive a Rule
12(b)(6) motion, a plaintiff need only plead “enough facts to state a claim to relief that is plausible
on its face.” Bell Atl. Corp. v. Twombly, 550 U.S. 544, 570 (2007).
In considering a Rule 12(b)(6) motion, the Court must “accept all factual allegations in the
complaint as true and construe the pleadings in the light most favorable” to the non-moving party.
Rowe v. Educ. Credit Mgmt. Corp., 559 F.3d 1028, 1029–30 (9th Cir. 2009). While legal
conclusions “can provide the [complaint’s] framework,” the Court will not assume they are correct
unless adequately “supported by factual allegations.” Iqbal, 556 U.S. at 679. Courts do not “accept
as true allegations that are merely conclusory, unwarranted deductions of fact, or unreasonable
inferences.” In re Gilead Scis. Secs. Litig., 536 F.3d 1049, 1055 (9th Cir. 2008) (quoting Sprewell
v. Golden State Warriors, 266 F.3d 979, 988 (9th Cir. 2001)).
Besides satisfying Rule 12(b)(6), securities fraud plaintiffs must also satisfy “the “dual
pleading requirements” Rule 9(b) and the Private Securities Litigation Reform Act, which together
require a plaintiff to plead fraud as to each allegedly fraudulent statement with “particularity.” See
Zucco Partners, LLC v. Digimarc Corp., 552 F.3d 981, 990 (9th Cir. 2009); 15 U.S.C. § 78u-
4(b)(1). Thus, a plaintiff must plead how each allegedly false or misleading statement is false or
misleading, the reasons each is misleading, and, if the allegations are based on information and
belief, the facts on which that belief is based. See Zucco, 552 F.3d at 990–91.
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 5 of 13
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
DISCUSSION
A plaintiff alleging a claim for securities fraud under Rule 10b-5(b), which implements
Section 10(b) of the Exchange Act, must plead “six essential elements: (1) a material
misrepresentation or omission by the defendant; (2) scienter; (3) a connection between the
misrepresentation or omission and the purchase or sale of a security; (4) reliance upon the
misrepresentation or omission; (5) economic loss; and (6) loss causation.” Retail Wholesale &
Dep’t Store Union Loc. 338 Ret. Fund v. Hewlett-Packard Co., 845 F.3d 1268, 1274 (9th Cir.
2017) (cleaned up). Defendants argue that plaintiffs have not plausibly alleged material
misrepresentations or omissions or scienter. Because plaintiffs’ failure to plead a material
misrepresentation or omission is dispositive, the Court declines to consider at this time whether
they have adequately pleaded scienter.
I. Section 10(b)
For the purposes of Section 10(b), a material misrepresentation or omission occurs when a
communication “would give a reasonable investor the ‘impression of a state of affairs that differs
in a material way from the one that actually exists.’” Berson v. Applied Signal Tech., Inc., 527
F.3d 982, 985 (9th Cir. 2008) (quoting Brody v. Transitional Hosps. Corp., 280 F.3d 997, 1006
(9th Cir. 2006)). The statement must be misleading in the context of the “totality of the statements
made within the Class Period.” Retail Wholesale, 845 F.3d at 1277.
A statement is not a material misrepresentation if it is “transparently aspirational” or “mere
corporate puffery.” In re Alphabet, Inc. Sec. Litig., 1 F.4th 687, 700 (9th Cir. 2021). Corporate
statements that are merely “vague statements of optimism like ‘good,’ ‘well-regarded,’ or other
feel good monikers” are generally not misrepresentations because investors “know how to devalue
the optimism of corporate executives.” Police Ret. Sys. of St. Louis v. Intuitive Surgical, 759 F.3d
1051, 1060 (9th Cir. 2014) (quoting In re Cutera Sec. Litig., 610 F.3d 1103, 1111 (9th Cir. 2010)).
Puffery and vague statements of misrepresentations become actionable “only if they provide
concrete description of the past and present that affirmatively create a plausibly misleading
impression of a state of affairs that differed in a material way from the one that actually existed.”
In re Alphabet, 1 F.4th at 700 (cleaned up). One can create such a “misleading impression of a
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 6 of 13
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
state of affairs” by warning that risks “‘could’ or ‘may’ occur … when [one already knows] that
those risks had materialized.” Id. at 700, 704. For example, the president of a pharmaceutical
company made material misrepresentations in responding to concerns that the FDA would not
approve the company’s drug by calling those concerns “scientifically wrong” and “irresponsible”
and stating that “everything [was] going fine,” when the company allegedly “knew, based on its
clinical studies, that [the drug] might not work and would never be approved by the FDA.”
Warshaw v. Xoma Corp., 74 F.3d 955, 957, 959 (9th Cir. 1996).
Plaintiffs allege that three sets of statements were false or misleading: Nextracker’s May
14, 2024, earnings report and the accompanying press release and conference call; Nextracker’s
May 28, 2024, Form 10-K; and Boynton’s June 17, 2024, answer to a question at an energy
conference. Considering each in turn, none plausibly includes an actionable falsity,
misrepresentation, or omission.
A. May 14, 2024, Press Release and Earnings Call
In their May 14, 2024, press release and earnings call, Nextracker “reported results that
exceeded Nextracker’s full year guidance” as measured year-over-year by revenue, net income,
earnings per share, and earnings before interest, taxes, depreciation, and amortization. In the
release, defendant CEO Shugar said that 2024 “was a year of strong execution and significant
growth for Nextracker, and we reached a record backlog of over $4 billion that more than tripled
in 2 years.” Shugar also said, “We’ve accelerated our pace of product innovation, scaled global
revenue and supply chain, more than doubled our profits from the prior year, and exceeded all
elements of our full year guidance.” During Nextracker’s earnings call, Shugar responded to
concerns about delays by stating: “On prior earnings calls, we’ve had questions regarding sector
headwinds and interconnection permitting and other areas. We noted that these headwinds can be
real for any given project or customer, but that the total universe of projects and customers has
grown such that in totality the market continued strong growth.” Defendant Wenger responded to
a question about delays by saying, “We’re pleased with the growth of our backlog. Typically, it
results in revenue in two to eight quarters and most of that in two to five quarters.”
Plaintiffs have not adequately pleaded that any of these statements were false or
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 7 of 13
8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
misleading; at most, their statements amount to “vague statements of optimism.” In re Alphabet, 1
F.4th at 700. Plaintiffs do not contend that the press release and earnings report were materially
false or misleading to the extent that they reported on the previous period’s financial results. And
though optimistic statements about the past might sometimes suggest optimistic forecasts about
the future, the alleged misstatements here did not do so. Shugar’s comments were statements
about the past. Wenger’s comments were either statements of subjective assessment, such as
saying that the company is “pleased with the growth of our backlog,” or reporting of past trends,
saying that “[t]ypically [backlogs] result[] in revenue in two to eight quarters and most of that in
two to five quarters.” These statements did not “affirmatively create an impression of a state of
affairs that differs in a material way from the one that actually exists.” Brody, 280 F.3d at 1006.
Plaintiffs make no allegations that the underlying figures and reporting themselves were
false or misleading. Instead, they argue that the above statements were “materially false and
misleading” because defendants “knew or recklessly disregarded at the time that they issued this
press release that project delays were increasing and lengthening as a result of interconnection
queue and permitting delays[] and materially impacting Nextracker’s results due to its inability to
convert material backlog into revenue.” In support, plaintiffs point to former employees who
purportedly provide “‘particularized facts’ showing that [defendants’] answers to analysts’
questions were false.”
Plaintiffs fail, however, to establish that the defendants “affirmatively create[d] an
impression of a state of affairs that differs in a material way from the one that actually exists.” Id.
A statement can be incomplete without being materially false or misleading. See id. The former
employee statements do not create a plausible inference of material misrepresentation because
they do not establish that project delays were significant enough either in number or magnitude to
undermine Shugar’s or Wenger’s statements. Many of the former employees’ statements are vague
or anecdotal, such as FE1’s explanation that senior leaders actively monitored detailed project
spreadsheets or FE2’s note that three to four out of eleven projects experienced delays, “last[ing]
months to years, including one project that experienced a delay until 2027.” The closest plaintiffs
come to a broader allegation about Nextracker’s statements being materially false is FE3’s claim
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 8 of 13
9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
that “approximately 20% of projects faced delays Company-wide.” But without more detail, such
as an explanation of how this delay rate compared to the delay rates in prior fiscal years, even
FE3’s statements are insufficiently specific to suggest that Shugar’s and Wenger’s
acknowledgement of project delays was false or misleading.
Plaintiffs also argue that Shugar’s and Wenger’s comments constituted material
misrepresentations because they were made in direct response to analysts’ questions. But Shugar
and Wenger merely responded generally and did not provide statements of assurance as sweeping
as the president in Warshaw, who said that “everything [was] going fine.” 74 F.3d at 959. Shugar
and Wenger acknowledged concerns and presented somewhat bland and general statements about
Nextracker but did not present or suggest that “everything [was] going fine.” Id. The two pointed
to specific projections and understandings that guided their thinking. The defendants also pointed
to past trends and thus did not “significantly alter[] the ‘total mix’ of information made available’
to investors.” In re Palo Alto Networks, Inc. Sec. Litig., 2025 WL 1093247, at *6 (N.D. Cal. Apr.
11, 2025) (quoting Basic Inc. v. Levinson, 485 U.S. 224, 231–32 (1988)).
The cases plaintiffs cite in opposition are inapposite. In In re Quality Systems, Inc.
Securities Litigation, 865 F.3d 1130 (9th Cir. 2017), the plaintiffs alleged that defendant officers
had made public statements that were “inconsistent with real-time financial information,” id. at
1144, and quoted former employees who provided specific testimony regarding larger trends in the
company. Id. Here, by contrast, the former employee statements are vague and general and do not
specifically contradict anything the executives said.
Similarly, in Glazer Capital Management, L.P. v. Forescout Technologies, 63 F.4th 747
(9th Cir. 2023), confidential witnesses reported systemic problems with Forescout’s business
practices, including executives’ practice of misleadingly labeling “numerous seven-figure deals as
‘committed’ when, in fact, the buyers had no interest.” Id. at 769. Plaintiffs here do not allege
similarly misleading practices. Finally, the backlog of orders at issue in Berson included “stop-
work order[s]” which, in the defendant’s business, meant that those orders were “often …
eventually cancelled altogether.” 527 F.3d at 984. Here, by contrast, plaintiffs do not contend that
Nextracker’s backlog of orders was comparably misreported, nor did Nextracker executives
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 9 of 13
10
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
obfuscate about the nature of their backlog to the same degree as the defendants in Berson did. See
id. at 986–87.
Accordingly, plaintiffs have not plausibly alleged that defendants’ May 14, 2024,
statements were materially false or misleading.
B. May 28, 2024, Form 10-K
Plaintiffs next argue that a statement that project delays “could have a material adverse
effect” in Nextracker’s May 28, 2024, 10-K filing was materially false because, according to
plaintiffs, project delays were already having a material adverse effect.
Plaintiffs’ argument that this was a material misrepresentation fails in the first instance
because Nextracker in fact warned investors of the risk of project delays. According to plaintiffs’
own allegations, Nextracker did not merely say that delays “may” occur but instead acknowledged
past delays. Nextracker’s 2024 Form 10-K warned that the company’s financial performance “may
fluctuate from quarter to quarter” and stated, “We have experienced seasonal and quarterly
fluctuations in the past as a result of fluctuations in our customers’ businesses, changes in local
and global market trends, as well as seasonal weather-related disruptions.”
In support of their claim that the 10-K’s statement was false or misleading, plaintiffs cite
In re Alphabet, 1 F.4th 687, which held that risk disclosures that do not mention instances of that
risk already having occurred can be plausibly materially misleading. Id. at 702. But in that case,
Alphabet only described the risk possibilities generally and said that there had been “no material
changes to our risk factors since” its 2017 Form 10-K, when the truth was that certain of those
risks had already materialized. Id.at 696; see also id. at 704 (“[T]he complaint plausibly alleges
that Alphabet’s warning in each Form 10-Q of risks that ‘could’ or ‘may’ occur is misleading to a
reasonable investor when Alphabet knew that those risks had materialized.”). Unlike Alphabet,
Nextracker did “alert” investors “that some of these risks may already have come to fruition” by
expressly discussing the existence of delays. See Glazer, 63 F.4th at 781 (quoting Berson, 527
F.3d at 985–87). And more importantly, none of former employee statements offered by plaintiffs
in support of their suit provide any specific allegations that, by the time of the 10-K’s issuance,
there had been an increase in delays sufficient to have a materially adverse effect on Nextracker’s
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 10 of 13
11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
earnings. In the absence of particularized allegations supporting the claim that such an effect had
already been realized, Nextracker’s acknowledgment that delays “could” have a material adverse
effect was not false or misleading.
The broader context of defendants’ statements also does not render the statements false or
misleading. On multiple occasions, in at least May 2023, July 2023, October 2023, January 2024,
and March 2024, Nextracker warned that interconnection and permitting delays could adversely
affect its business. Given this factual context, it is not plausible that a reasonable investor would
think that Nextracker was intimating a false state of affairs—i.e., that its projects would not be
affected by potential delays. And plaintiffs have not alleged facts from which the Court could
plausibly conclude that defendants were aware, by May 28, 2024, that the number or length of
project delays had changed to a degree that would materially affect the company’s business.
C. June 17, 2024, Resiliency Statement
Finally, plaintiffs allege that defendant Boynton made a material misrepresentation when
he said, on June 17, 2024, that Nextracker “had been resilient in the face of delays ‘because of the
size and scale and ab[ility] to meet our customers’ demands and really focus on on-time
delivery.’” Plaintiffs argue that Boynton’s comment was false and misleading because “Boynton
knew that the project delays as a result of interconnection queue and permitting delays were
lengthening.” In their request for judicial notice, defendants include a transcript providing
Boynton’s remarks in full, which shows that he was responding to a question as to why Nextracker
had been able to weather project delays “relatively less scathed.” Boynton responded, in part,
To the extent that there are movements, if a customer wants to delay,
we will work with that customer to delay. If a customer wants to pull
it in, we’ll try to pull it in. With that, we probably have been a little
more resilient because of the size and scale and able to meet our
customers’ demands and really focus on on-time delivery. That’s been
helpful to us. Id.
In order to “plead[] falsity of opinion statements[,] … the plaintiff must allege both that
‘the speaker did not hold the belief [he] professed’ and that the belief is objectively untrue.” City
of Dearborn Heights Act 345 Police & Fire Ret. Sys. v. Align Tech., Inc., 856 F.3d 605, 615–16
(9th Cir. 2017) (quoting Omnicare, Inc. v. Laborers Dist. Council Constr. Indus. Pension Fund,
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 11 of 13
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
575 U.S. 175, 186 (2015)). Here, plaintiffs have not adequately pleaded that Boynton “did not
hold the belief [he] professed” and that his belief was “objectively untrue.” Id. There is no
indication in the complaint that Boynton did not believe what he was saying, even assuming
Boynton was aware of the former employees’ testimony. Boynton provided his subjective
assessment of an explanation for his company’s performance. His statement was careful and
relative: “[W]e probably have been a little more resilient….” The complaint contains no specific
allegation that makes plausible the inference that Boynton’s belief was “objectively untrue,”
because plaintiffs do not allege that a reasonable person would not think that Nextracker is “a little
more resilient” than its competitors. Id. at 615–16. Therefore, plaintiffs have not plausibly alleged
that Boynton’s June 17, 2024, statement was materially false or misleading.
Further, “when a plaintiff relies on a theory that a statement of fact contained within an
opinion statement is materially misleading, the plaintiff must allege that ‘the supporting fact [the
speaker] supplied [is] untrue.” Align, 856 F.3d at 616 (quoting Omnicare, 575 U.S. at 186). Here,
the supporting fact—whether Nextracker “probably [has] been a little more resilient”—is too
vague and circumlocutory to be untrue. Boynton’s statement is careful, comparative, and general.
Plaintiffs’ allegations from former employees do not plausibly allege that Boynton’s opinion was
materially misleading because they do not contradict the possibility that Nextracker was “a little
more resilient” than its competitors. Therefore, plaintiffs have not plausibly alleged that Boynton’s
June 17, 2024, statement was materially false or misleading.
* * *
In short, plaintiffs have not plausibly alleged that any of the statements identified in their
complaint constituted a material misrepresentation or omission. Defendants’ motion to dismiss
their Section 10(b) claim is therefore granted with leave to amend.
II. Section 20(a)
Section 20(a) of the Exchange Act imposes liability on individual who “control[] any
person” who has violated, among other laws, Section 10(b) and Rule 10b-5. 15 U.S.C. § 78t(a);
Zucco, 552 F.3d at 990. Section 20(a) requires a “primary violation” of the federal securities laws,
on which to base Section 20(a) liability. See Prodanova v. H.C. Wainwright & Co., LLC, 993 F.3d
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 12 of 13
13
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
United States District Court
Northern District of California
1097, 1113 (9th Cir. 2021). Because plaintiffs have failed to plead a violation of Section 10(b),
they have not pleaded a predicate “primary violation” and their Section 20(a) claim “necessarily
fail[s].” Id. Nextracker’s motion to dismiss that claim is therefore granted with leave to amend.
CONCLUSION
For the reasons set forth above, defendants’ motion to dismiss is granted with leave to
amend. Plaintiffs must file any amended complaint within 28 days of the filing of this order.
Failure to file an amended complaint will result in the dismissal with prejudice of all claims.
IT IS SO ORDERED.
Dated: March 9, 2026
P. Casey Pitts
United States District Judge
Case 5:24-cv-09467-PCP Document 61 Filed 03/09/26 Page 13 of 13

Continua la tua ricerca in ChatGPT o Claude

Collega Omnilex per cercare nel corpus legale dal tuo assistente IA.