Brookshire Grocery Company v. Lindsey-Pine Plaza, L.L.C.

1:24-cv-01067Arwd10 nov 2025

Testo completo

IN THE UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF ARKANSAS
EL DORADO DIVISION
BROOKSHIRE GROCERY COMPANY 	PLAINTIFF/
COUNTER DEFENDANT
v. 	Case No. 1:24-cv-01067
LINDSEY-PINE PLAZA, LLC. 	DEFENDANT/
COUNTER PLAINTIFF
MEMORANDUM OPINION
Before the Court is a Motion for Summary Judgment filed by Plaintiff and Counter
Defendant Brookshire Grocery Company (“Brookshire”). (ECF No. 23). Defendant and Counter
Plaintiff Lindsey-Pine Plaza, LLC, (“Lindsey-Pine”) has filed a response. 	(ECF No. 28).
Brookshire has filed a reply. (ECF No. 31). The Court finds the matter ripe for consideration.
I. 	BACKGROUND
This case concerns a dispute about the meaning of a lease for a Brookshire grocery store
in the Pine Plaza shopping mall in Arkadelphia, Arkansas. The leased facility required extensive
repairs. 	Now, Brookshire, the lessee, and Lindsey-Pine, the lessor, disagree on who holds the
obligation to pay for those repairs. The relevant facts are as follows.
The Original Lease was executed in 1972 between Doyle and Josephine Rogers, the
original owners of the shopping center, and Safeway Stores, Inc. (ECF No. 23-6). The Original
Lease contained paragraphs 7 and 8, which carried over unchanged through multiple amendments
into the current lease, and which are at the center of the parties’ dispute. Paragraph 7 obligates the
lessor to maintain and repair structural damage to the leased premises. It states, in relevant part:
Lessor’s repairs. Lessor agrees to keep the building structure on the leased
premises (including, without limitation, the roof, roof structures and supports,
foundation and structural supports, walls, structural portion of the floors,
chimneys, skylights, gutters, downspouts and exterior doors) . . . in good
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 1 of 13 PageID #:
<pageID>
2
repair during the lease term . . . . If lessee is deprived of the use of a
substantial portion of the leased premises during the making of any repairs,
improvements or alterations by lessor under any provision of this lease, the
rent shall be abated or proportionally reduced according to the extent which
lessee is deprived of such use.
(ECF No. 23-6, at ¶ 7) (emphasis added).
Paragraph 8 of the Original Lease obligates the lessee “to repair all damage to the leased
premises caused by lessee’s use other than ordinary wear and tear and the matters covered in
paragraph 7 . . . .” (ECF No. 23-6, at ¶ 8) (emphasis added). Again, both the obligations set out
in paragraphs 7 and 8 of the Original Lease have been incorporated unchanged into the subsequent
amended leases.
In 1973, the Lease was amended to change the start and end dates (“Lease Amendment”).
(ECF No. 23-7). 	In 1984, the Lease was amended to contemplate an expansion (“First Lease
Modification”). 	(ECF No. 23-8). 	In 1987, Safeway sold its stores to Acadia Stores 61, which
operates as Harvest Foods. Safeway assigned its interest in the Original Lease, as amended, to
Acadia Stores. In 1988, Acadia Stores (operating as “Harvest Foods”) and the Rogers executed
another lease modification, the “Second Lease Modification,” which envisioned the relocation of
Harvest Foods to a different section of the shopping center. 	The Second Lease Modification
required the lessee “at its sole expense” to remodel the new location “for its exclusive use” in
accordance with plans that were subject to the Rogers’ approval. (ECF No. 23-9, at ¶ 3.1). If the
Rogers failed to object to the plans within twenty days, the Second Lease Modification provided
that “it shall be conclusively presumed that said plans . . . are approved on Lessor’s part.” (ECF
No. 23-9, at ¶ 3.2(c)). Harvest Foods produced the remodel plans and no evidence indicates that
the Rogers objected. After the remodel and relocation by Harvest Food was completed, Harvest
Food and the Rogers entered another amended lease (“Third Lease Modification”), which
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 2 of 13 PageID #:
<pageID>
3
memorialized the new location. 	(ECF No. 23-10). 	Importantly, all other terms of the Lease,
including the repair obligations of Paragraphs 7 and 8, remained unchanged.
In 1994, Lindsey-Pine purchased the store property from the Rogers. (ECF No. 23-12, at
31). Following the bankruptcy of Harvest Foods in 1997, Brookshire purchased some of its assets
and assumed the at-issue Lease. 	(ECF No. 23-13). 	Under the Instrument of Assignment and
Assumption (“Assignment and Assumption”), Brookshire agreed to “assume the obligations and
liabilities under the [Lease] arising from and after the Closing Date.” 	(ECF No. 23-13, at 1).
Brookshire also agreed “to pay and discharge and perform and observe all the terms, covenants
and conditions of the Assumed Liabilities.” (ECF No. 23-13, at 1). On June 18, 2021, Brookshire
and Lindsey-Pine, the current lessee and lessor, entered the Fourth Lease Modification, which
incorporated the terms of the Original Lease and lease modifications. 	(ECF No. 23-14). 	The
Fourth Lease Modification is the current lease.
For clarity, the timeline of the lease modifications is as follows:
• 	Original Lease Agreement (1972)
• 	Lease Modification Agreement (1973) – amends the start and end dates.
• 	First Lease Modification (1984) – expands the leased premises.
• 	Second Lease Modification (1988) – envisions a relocation and remodel at the
Lessee’s (Harvest Food) expense.
• 	Third Lease Modification (1989) – memorializes the relocation.
• 	Fourth Lease Modification (2021) – affirms Lindsey-Pine as successor-in-interest
to the Rogers and Brookshire as successor-in-interest to Harvest Food.
In July 2021, Brookshire was informed that the concrete floor and steel supports beneath
the Loading/Storage Room and Market Prep Area of the leased property were failing and at risk of
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 3 of 13 PageID #:
<pageID>
4
collapse. (ECF No. 23-15). Under both the Loading/Storage Room and the Market Prep Area lie
the Basement and Crawlspace. The Basement contains structural steel columns and beams that
support the concrete slab floor between the Basement and the Loading/Storage Room. 	The
Crawlspace contains steel galvanized decking and 18-inch bar joists that support the concrete
flooring of the Loading/Storage Room and Market Prep Area above. (ECF No. 25, at 1-3).
The damage to the leased property included severe cracks and holes in the concrete flooring
of the Loading/Storage Room and corrosion of the steel supports in the Basement and Crawlspace.
(ECF Nos. 23-24; 28-17, at 11-14). Brookshire characterizes the damage and subsequent repairs
as structural in nature. 	Brookshire argues that Lindsey-Pine itself and Lindsey-Pine’s own
structural expert agree that the cement floor, steel supports, and subsequent repairs were structural.
(ECF Nos. 23-12, at 54; 23-13, at 62-63).
Lindsey-Pine does not argue that the steel supports, damages, and repairs were not
structural. 	Rather, Lindsey-Pine argues that Brookshire’s characterization of the supports,
damages, and repairs as structural overlooks the fact that the damage was caused by Brookshire’s
use, which Lindsey-Pine characterizes as “exceeding ordinary wear and tear” or “extraordinary
use.” (ECF No. 29, at 5-9).
Specifically, Lindsey-Pine argues that Brookshire caused the damage by using forklifts
with a weight and lift capacity that far exceed the load that the concrete floors could handle. (ECF
No. 29, at 6). Lindsey-Pine also argues that Brookshire installed a 10,000 lb. freezer, which caused
stress to the Loading/Storage Room floor and “created a highly corrosive environment” due to the
extreme heat produced by its electrical motors. (ECF No. 29, at 6). Further, Lindsey-Pine argues
that Brookshire’s extensive “wash down” procedure of the Market Prep Area, as well as the heat
from the freezer, caused the steel supports to corrode. (ECF No. 29, at 8-9).
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 4 of 13 PageID #:
<pageID>
5
After learning of the damage to the concrete floor and steel supports, Brookshire retained
a structural engineer to draw plans for the repair. 	(ECF Nos. 23-5; 23-16). 	In August 2021,
temporary support beams were installed under the Market Prep Area. Brookshire paid $21,546.80
to install the temporary supports and $197,581.23 to install the permanent structural steel work.
(ECF No. 23-17).
In December 2021, Brookshire and Lindsey-Pine agreed on a plan for the permanent repair
of the floor system of the Basement and Crawlspace. After Lindsey-Pine refused to pay for the
repairs, Brookshire paid for the fabrication and installation of structural supports in the Basement
and Crawlspace. (ECF Nos. 25, at 7-8; 30). Brookshire and Lindsey-Pine also agreed to repair
the cracks and holes in the concrete floor. The repair consisted of filling the cracks and holes with
epoxy resin and then installing a “fiber plate,” which distributes load and maintains the structural
strength of the floor, over the repaired-concrete floor. (ECF Nos. 25, at 8-9; 30). Lindsey-Pine
paid $345,724.27 for the costs of repairing the floor and installing the fiber plate. (ECF No. 25, at
9).
On September 30, 2024, Brookshire filed its Complaint in this case. (ECF No. 2). In its
Complaint, Brookshire asserts breach of contract, unjust enrichment, and negligence claims
against Lindsey-Pine. 	On November 5, 2024, Lindsey-Pine filed its Answer and Counterclaim
against Brookshire. (ECF No. 10). Lindsey-Pine denies that it is responsible for the repairs paid
for by Brookshire and asserts that Brookshire is responsible for the repairs to the concrete floor
paid by Lindsey-Pine.
On September 9, 2025, Brookshire filed the instant Motion for Summary Judgment.1 (ECF
1 The Court notes that Brookshire moves the Court to enter summary judgment in its favor on its breach of contract
claim and to dismiss Lindsey-Pine’s counterclaim with prejudice. 	(ECF No. 23, at 3). 	Neither Brookshire nor
Lindsey-Pine address the elements (or defenses) of Brookshire’s breach of contract claim, or its related claims for
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 5 of 13 PageID #:
<pageID>
6
No. 23). Brookshire argues that Lindsey-Pine is required to pay for all repairs because the repairs
were entirely structural, and the parties’ Lease obligates the lessor to pay for structural repairs.
(ECF No. 24, at 9-11). Brookshire also argues that it is not responsible for any liabilities arising
from Harvest Food’s remodel of the facility under the Assignment and Assumption. (ECF No. 24,
at 15). Lindsey-Pine filed its Response on September 30, 2025. (ECF No. 28). In its Response,
Lindsey-Pine argues that it is not responsible for the repairs because paragraph 8 of the Lease only
requires the lessor to pay for damages caused by “ordinary wear and tear” and Brookshire’s use
exceeded “ordinary wear and tear.” (ECF No. 29, at 10). Lindsey-Pine contends that summary
judgment is not warranted because whether Brookshire’s use of the premises exceeded “ordinary
wear and tear” pursuant to the Lease is a genuine issue of material fact. Lindsey-Pine also argues
that the Assignment and Assumption and the Lease contractually obligated Brookshire to retrofit
the facility for its intended use. (ECF No. 29, at 12). On October 6, 2025, Brookshire filed its
Reply. (ECF No. 31). In its Reply, Brookshire argues that Lindsey-Pine admits that all repairs are
structural, that reading paragraphs 7 and 8 of the Lease together requires the lessor to make
structural repairs, and that the Assignment and Assumption expressly limited Brookshire’s liability
to the date Brookshire purchased Harvest Foods’ assets.
II. 	STANDARD OF REVIEW
The standard for summary judgment is well established. When a party moves for summary
judgment, “[t]he court shall grant summary judgment if the movant shows that there is no genuine
dispute as to any material fact, and the movant is entitled to judgment as a matter of law.” Fed. R.
Civ. P. 56(a); Krenik v. Cnty. of LeSueur, 47 F.3d 953, 957 (8th Cir. 1995). This is a “threshold
inquiry of . . . whether there is a need for trial—whether, in other words, there are genuine factual
unjust enrichment and negligence, in their briefs. Rather, the parties solely argue the issue of liability, asking the Court
to interpret their Lease. This is what the Court has done.
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 6 of 13 PageID #:
<pageID>
7
issues that properly can be resolved only by a finder of fact because they reasonably may be
resolved in favor of either party.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 250 (1986). A
fact is material only when its resolution affects the outcome of the case. Id. at 248. A dispute is
genuine if the evidence is such that it could cause a reasonable jury to return a verdict for either
party. Id. at 252.
In deciding a motion for summary judgment, the Court must consider all the evidence and
all reasonable inferences that arise from the evidence in a light most favorable to the nonmoving
party. Nitsche v. CEO of Osage Valley Elec. Co-Op, 446 F.3d 841, 845 (8th Cir. 2006). The moving
party bears the burden of showing that there is no genuine issue of material fact and that it is
entitled to judgment as a matter of law. See Enter. Bank v. Magna Bank, 92 F.3d 743, 747 (8th Cir.
1996). The nonmoving party must then demonstrate the existence of specific facts in the record
that create a genuine issue for trial. Krenik, 47 F.3d at 957. However, a party opposing a properly
supported summary judgment motion “may not rest upon mere allegations or denials . . . but must
set forth specific facts showing that there is a genuine issue for trial.” Anderson, 477 U.S. at 256.
“Mere allegations, unsupported by specific facts or evidence beyond the nonmoving part’s own
conclusions, are insufficient to withstand a motion for summary judgment.” Thomas v. Corwin,
483 F.3d 516, 526-27 (8th Cir. 2007).
III. 	DISCUSSION
The parties’ dispute centers on a disagreement over the interpretation of two parts of their
Lease. First, the parties disagree on the meaning of paragraphs 7 and 8 of their Lease. Second, the
parties disagree on the consequence of the Assignment and Assumption and the 1988 Second Lease
Modification. The Court will take each in turn.
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 7 of 13 PageID #:
<pageID>
8
A. Paragraphs 7 and 8 of the Lease
To resolve the parties’ disagreement over the meaning of their Lease, the Court must first
determine whether the Lease is ambiguous. “When a contract is free of ambiguity, its construction
and legal effect are questions of law for the court to determine.” Roberts Contracting Co., Inc. v.
Valentine-Wooten Rd. Pub. Facility Bd., 2009 Ark. App. 437, 8-9, 320 S.W.3d 1, 10 (2009)
(citations omitted). “The determination of whether ambiguity exists is ordinarily a question of law
for courts to resolve.” Id. “Language is ambiguous if there is doubt or uncertainty as to its meaning
and it is fairly susceptible to more than one equally reasonable interpretation.” 	Id. (citations
omitted). If the Court finds the contract ambiguous, it may interpret the “ambiguous contract as a
matter of law when the ambiguity can be resolved by reference to the contract language itself.”
Roetzel v. Coleman, 210 Ark. App. 206, 7, 374 S.W.3d 166, 171 (2010). However, if the Court
finds the contract ambiguous “as to the intent of the parties, and the meaning of the language
depends on disputed extrinsic evidence, the issue is a question of fact for the jury.” 	Id. (citing
Perry v. Baptist Health, 358 Ark. 238, 189 S.W.3d 54 (2004)).
In interpreting a contract, the Court must apply the “three well-established principles of
[Arkansas] contract law.” First Nat’l Bank of Crossett v. Griffin, 310 Ark. 164, 169, 832 S.W.2d
816, 819 (1992). First, the Court should give the contract the meaning that the parties intended.
Id. Second, the Court must give the words of the contract “their plain [and] ordinary meaning.”
Id.; see also Missouri Pac. R. co. v. 	Strohacker, 202 Ark. 645, 152 S.W.2d 557, 563 (1941)
(directing courts to construe contracts by their plain terms as it would be construed by the parties
themselves and the “mass of mankind”). Third, the Court must read together the different clauses
of a contract and construe the contract “so that all of its parts harmonize, if that is at all possible.”
First Nat’l Bank of Crossett, 310 Ark. at 169-70, 832 S.W.2d at 819 (quoting Continental Casualty
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 8 of 13 PageID #:
<pageID>
9
Co. v. Davidson, 250 Ark. 35, 41, 463 S.W.2d 652, 655 (1971)). “A construction that neutralizes
any provision of a contract should never be adopted if the contract can be construed to give effect
to all provisions.” Tyson Foods, Inc. v. Archer, 356 Ark. 136, 144, 147 S.W.3d 681, 686 (2004).
The parties assert two different readings of paragraphs 7 and 8 of their Lease. Brookshire
argues that the Lease obligates the lessor (Lindsey-Pine) to keep the building structure in good
repair and to repair all structural damages. (ECF No. 24, at 10). Brookshire’s reading of the Lease
incorporates both paragraphs 7 and 8. Paragraph 8 requires the lessee (Brookshire) to repair all
damage caused by the lessee’s use “other than ordinary wear and tear and the matters covered in
paragraph 7.” (ECF No. 23-6, at ¶ 8) (emphasis added). Paragraph 7 states that the lessor must
“keep the building structure . . . in good repair.” (ECF No. 23-6, at ¶ 7). The building structure
includes, “without limitation,” the “foundation and structural supports” and the “structural portion
of the floors.” (ECF No. 23-6, at ¶ 7). Thus, Brookshire argues that, read together, paragraphs 7
and 8 assign all structural repairs to the lessor. Since the repairs made were structural, as admitted
by Lindsey-Pine and its expert, Brookshire argues that the duty to pay for those repairs falls on
Lindsey-Pine.
Lindsey-Pine argues that Brookshire’s interpretation reads paragraph 7 in isolation of and
disharmony with paragraph 8. Lindsey-Pine argues that paragraph 8 expressly provides that the
lessee must repair all damage to the leased premises in excess of “ordinary wear and tear.” (ECF
No. 29, at 11). 	Brookshire’s interpretation, Lindsey-Pine argues, disharmonizes the two
paragraphs because it would neutralize the “ordinary wear and tear” provision of paragraph 8,
rendering it superfluous. 	(ECF No. 29, at 11). 	Lindsey-Pine contends that Brookshire’s use
exceeded “ordinary wear and tear,” and thus a clear reading of paragraph 8 requires the lessee to
pay for the damages.
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 9 of 13 PageID #:
<pageID>
10
Neither party argues that the Lease terms are ambiguous. Rather, both parties ask the Court
to adopt their interpretation of the Lease. The Court finds that any ambiguity can be resolved with
a plain reading of the contract. See Zulpo v. Farm Bureau Mut. Ins. Co. of Arkansas, Inc., 98 Ark.
App. 320, 324, 255 S.W.3d 494, 498 (2007) (“[W]here the issue of ambiguity may be resolved by
reviewing the language of the contract itself, it is the trial court’s duty to make such a determination
as a matter of law.”).
The Court finds that the contract, read together, requires the lessor to pay for both damage
caused by ordinary wear and tear and structural repairs. Lindsey-Pine’s interpretation of paragraph
8 asks the Court to stop reading after “ordinary wear and tear.” However, paragraph 8 goes on to
exempt the lessee from paying for any structural repairs by incorporating by reference paragraph
7. To read otherwise would fail to read the plain language of the Lease or to consider the Lease as
a whole. See Fowler v. Unionaid Life Ins. Co., 180 Ark. 140, 144-45, 20 S.W.2d 611, 612 (1929)
(“The contract must be viewed from the beginning to end, and all its terms must pass in review,
for one clause may modify, limit or illuminate the other.”).
The Court does not agree with Lindsey-Pine’s assertion that reading paragraph 8 as written,
to include “other than ordinary wear and tear and the matters covered in paragraph 7”
disharmonizes the two paragraphs and renders the phrase “other than ordinary wear and tear”
superfluous. 	The Lease clearly states that the lessee is exempt from the duty to pay for both
damage caused by ordinary wear and tear and structural repairs. If, as Lindsey-Pine asserts, the
structural disrepair was caused by Brookshire’s use exceeding that of ordinary wear and tear,
paragraph 8 still envisions any structural repairs to be made by the lessor through its reference to
paragraph 7. 	Further, an interpretation of the Lease which omits “and the matters covered in
paragraph 7” from paragraph 8 would render that phrase superfluous.
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 10 of 13 PageID #:
<pageID>
11
Accordingly, the Court holds that the Lease obligates the lessor, Lindsey-Pine, to pay for
structural upkeep and repairs of the leased premises.
B. Second Lease Modification and Assignment and Assumption
The 	parties 	also 	disagree 	on 	Brookshire’s 	obligations 	under 	the Assignment 	and
Assumption and the Second Lease Modification.
Following Harvest Food’s bankruptcy, Brookshire purchased Harvest Food’s “right, title
and interest” in the Original Lease. The Assignment and Assumption obligates Brookshire “to pay
and discharge and perform and observe all the terms, covenants, and conditions” of the Lease,
which incorporates all lease modifications. 	(ECF No. 23-13, at 1). Accordingly, Lindsey-Pine
argues that Brookshire assumed the obligation through the Assignment and Assumption to remodel
the leased facility for its exclusive use pursuant to paragraph 3.1 of the Second Lease Modification.
See Pemberton v. Arkansas State Highway Commission, 268 Ark. 929, 933, 596 S.W.2d 605, 608
(1980) (“An assignment . . . is essentially a delegation of the performance of the duties of an
assignor to another who, by its acceptance, promises to perform those duties.”). Paragraph 3.1 of
the Second Lease Modification states that the lessee “at its sole expense shall remodel the
Relocation Area for its exclusive use . . . .” (ECF No. 28-4, at ¶ 3.1). In other words, according to
Lindsey-Pine, Brookshire should have remodeled the facility to withstand its heavy forklifts,
freezer, and intense “wash down” procedures that led to the deterioration of the floor and support
structures.2
Brookshire argues that the Assignment and Assumption limited the obligations and
liabilities that it assumed when it purchased the assets of Harvest Food. 	Brookshire points to a
2 Lindsey-Pine also argues that Brookshire was contractually obligated under the Assignment and Assumption to honor
the Original Lease, which requires the lessee repair all damages it caused in excess of “ordinary wear and tear.” (ECF
No. 29, at 13). Lindsey-Pine’s argument, however, is based on its reading of paragraphs 7 and 8 of the Original Lease,
which the Court has rejected in its analysis above.
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 11 of 13 PageID #:
<pageID>
12
“Whereas clause” in the Assignment and Assumption in which it only “agreed to assume the
obligations and liabilities under the [Lease] arising from and after the Closing Date.” (ECF No.
23-13, 1). The closing date was March 10, 1997. (ECF No. 23-13). Thus, Brookshire contends
that any liabilities from before its purchase remain with Harvest Food. Brookshire also contends
that the Second Lease Modification did not shift responsibility of structural repairs or integrity
from the lessor to the lessee. (ECF No. 24, at 16). Rather, the Second Lease Modification only
required that Harvest Food remodel the leased premises to which it relocated.
To determine the intent of the drafters from the whole context of the Lease, the Court will
consider the Second Lease Modification and the Third Lease Modification together.3 See First
Nat’l Bank of Crossett, 310 Ark at 170, 832 S.W.2d at 819-20; see also Smith v. Arrington Oil &
Gas, Inc., 664 F.3d 1208, 1213 (8th Cir. 2012) (noting that Arkansas law requires courts to construe
a lease agreement and its corresponding drafts together as a single contract).
The Second Lease Modification was drafted because the lessee at the time, Harvest Food,
planned to relocate its grocery store to a new area of the lessor’s shopping center (“Relocation
Area”), which was previously used as a department store. Thus, in the Second Lease Modification,
Harvest Food and the lessor agreed that Harvest Food would remodel the Relocation Area for its
exclusive use as a grocery store. 	(ECF No. 23-9). The Second Lease Modification also states that
“[u]pon Lessee’s opening for business in the Relocation Area, Lessee shall surrender the Current
Leased Premises” and “the parties shall … execute a Lease Modification Agreement incorporating
the Relocation Area as the new leased premises.” (ECF No. 23-9, at ¶ 3.1). Pursuant to the Second
Lease Modification, after Harvest Food remodeled and relocated to the Relocation Area, it entered
the Third Lease Modification with the lessor. The Third Lease Modification then incorporated the
3 The 2021 Fourth Lease Modification incorporated the terms of the Original Lease and subsequent modifications
leaving the obligations of Lindsey-Pine and Brookshire, as assignees to the Lease, unmodified.
Case 1:24-cv-01067-SOH Document 37 Filed 11/10/25 Page 12 of 13 PageID #:
<pageID>
13
Relocation Area as the new leased premises. (ECF No. 23-10, at ¶ 3.2).
Accordingly, the Court finds that the drafters of the Second Lease Modification intended
the requirements of paragraph 3.1 to apply to Harvest Food’s specific move to and remodel of the
Relocation Area. See First Nat’l Bank of Crossett, 310 Ark at 170, 832 S.W.2d at 819 (“It is a well
settled rule in construing a contract that the intention of the parties is to be gathered . . . from the
whole context of the agreement.”). 	Said otherwise, the Court finds that the Second Lease
Modification does not obligate Brookshire to remodel the Relocation Area or perform structural
repairs. See Kraft v. Limestone Partners, LLC, 2017 Ark. App. 315, 8, 522 S.W.3d 150, 155 (2017)
(“[Courts] will not read into the contract words that are not there, and we will not rewrite a contract
or approve additional terms that would, in effect, enforce a contract that the parties might have
made, but did not make.”).
In sum, the Court holds that the Lease, read together as a whole, does not shift the liability
for structural repairs to the lessee. Thus, the Court finds that Lindsey-Pine is liable for structural
repairs. Finally, the Court finds it unnecessary to address Brookshire’s counterargument that the
Assignment and Assumption limits its liability for Harvest Food’s actions to the closing date
because liability for structural repairs in the Lease remains with the lessor.
IV. 	CONCLUSION
For the reasons stated above, the Court finds that Plaintiff Brookshire Grocery Company’s
Motion for Summary Judgment on Liability (ECF No. 23) should be and hereby is GRANTED.
IT IS SO ORDERED, this 10th day of November, 2025.
/s/ Susan O. Hickey
Susan O. Hickey
United States District Judge