Filed 7/30/25 Winding Creek Solar v. Pacific Gas & Electric Co. CA1/2
NOT TO BE PUBLISHED IN OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication or
ordered published for purposes of rule 8.1115.

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIRST APPELLATE DISTRICT

DIVISION TWO

WINDING CREEK SOLAR LLC.,
et al.,
A168649
Plaintiffs and Appellants,
v. (San Francisco City & County
Super. Ct. No. CGC-22-600746)
PACIFIC GAS AND ELECTRIC
COMPANY,
Defendant and Respondent.

Federal and state law permit small scale generators of electricity to sell
electricity to larger utilities. Here, a group of those small generators failed to
have their proffered contracts accepted by a larger utility and sued the larger,
seeking a mandatory injunction compelling the larger to execute the pending
proffered agreements and damages of lost profits for the contracts not signed.
The trial court sustained a demurrer without leave to amend, on the ground
it lacked jurisdiction because the controversy lay within the exclusive
authority of the Public Utilities Commission, and entered judgment for
defendant. We conclude the trial court’s reasoning was eminently sound, and
we affirm.

1
BACKGROUND

The General Setting
In California, the generation, sale, distribution, and pricing of
electricity is covered by a jungle of dense federal and state regulation. The
controversy before us is a particular thicket within that jungle.
At the federal level, it has been declared policy for almost a half
century to encourage native alternatives to the burning of foreign fossil fuel,
a policy that is codified in the Public Utilities Regulatory Policies Act (16
U.S.C. § 2601 et seq. (PURPA).) One of the means selected to achieve that
goal is to require large electricity producers to purchase electricity from
smaller producers, known generically as “qualified facilities,” or QFs. (See
Southern Cal. Edison Co. v. Public Utilities Com. (2010) 101 Cal.App.4th 384,
387―388 and authorities cited.) The governing state regulatory agencies are
to implement this directive, and they have considerable discretion to do so.
That discretion includes fixing the requirements for valid QF-generated
electricity long-term purchase agreements, and establishing “ ‘alternative
programs that . . . limit how many QFs, or the total capacity of QFs, that may
participate in the program.’ ” (Winding Creek Solar LLC v. Peterman (9th
Cir. 2019) 932 F.3d 861, 865, quoting Winding Creek Solar LLC (2015) 151
F.E.R.C. 61103, 61103.)
In California, the responsible regulatory agency is the Public Utilities
Commission (PUC). It has responded to this obligation by first adopting
what was known as the FiT program (in effect from 2007 to 2013), then
replacing it with the ReMat program (effective from 2013 to 2020), and then
with the Modified ReMat program starting in 2020.

2
Since 2013, various QF entities operating numerous power generating
facilities have been demanding that PG&E buy their electricity―to no avail.
And in July 2022, nine years later, seven of the entities commenced this
action against PG&E.
There was some litigation in the years before this lawsuit was filed,
including one case that began in July 2013, with an administrative complaint
with the PUC that demanded the PUC require PG&E to enter into 20-year
contracts for 57 facilities―the same 57 facilities involved here―under PG&E
E-PWF Tariff (“the PUC Action”). In May, 2014, the PUC dismissed the
administrative complaint “with prejudice,” explaining among other things
that the law required implementation by the PUC, which PUC accomplished
through the ReMAT program; that PG&E “was required to follow [the PUC’s]
direction before amending or replacing its Schedule E-PWF tariff to remove
the public water or wastewater agency eligibility requirements”; and that “By
complying with its existing tariff,” “PG&E complied with the law.”
In November 2014, the PUC denied rehearing, again concluding that “it
was proper for PG&E to reject the rehearing applicants’ tariff requests
pursuant to Schedule E-PWF.” The complainants then filed a petition for a
writ of review in this court, which Division Three denied on March 5, 2015.
Seven years later this lawsuit was filed.
The Proceedings Below
On July 15, 2022, represented by two attorneys in Connecticut
identifying themselves as “ALLCO RENEWABLE ENERGY LIMITED” ,

3
seven of the entities filed a complaint against PG&E.1 The complaint is a
most interesting filing, stating on its first page that it is a complaint for: (1)
Declaratory Relief; (2) Injunctive Relief; (3) Breach of Legally Enforceable
Obligation; and (4) Breach of Federal and State Laws Regulating Trade.
Despite that description, a fair reading of the complaint reveals that it in fact
asserts two causes of action: the first is a “claim for injunctive relief,”
“requiring PG&E to enter into contracts for the purchase of energy and
capacity from the Plaintiffs’ facilities or similar alternate facilities at the
same terms and prices in effect at the time . . . when Plaintiffs submitted
their applications to PG&E under” the FiT program in 2013. The second,
pleaded in the alternative, seeks “the amount of profits [Plaintiffs] would
have received had PG&E executed the contacts in 2013” under the FiT
program.2
The gist of the complaint, viewed according to the principles governing
review of demurrers (see O’Grady v. Merchant Exchange Productions, Inc.
(2019) 41 Cal.App.5th 771, 776―777), and disregarding the boilerplate
verbiage, can be distilled to the following:

1 The plaintiffs are Winding Creek Solar LLC, Foothill Solar LLC,
Hollister Solar LLC, Kettleman Solar LLC, Vintner Solar LLC, Bear Creek
Solar LLC, and Allco Renewable Energy Limited.
The briefing here represents that “Allco Finance Limited LLC has an
ownership interest in more than 10 percent in each of these Appellants.”
2 The complaint also pled alternative relief under ReMAT for Winding
Creek only. Winding Creek, which owns a single facility out of the 57, alleges
that “ ‘[l]ater in 2013,’ ” it “ ‘submitted the standard form documentation
for . . . the ReMAT,’ ” and seeks injunctive relief or damages under ReMAT in
the alternative to the FiT program.

4
Since 2013, plaintiffs have “offered to sell the energy and capacity for a
20-year term from various generating facilities to PG&E,” with the
appropriate documentation, but PG&E “wrongfully refused and has
continued to refuse” “to execute written contracts evidencing its obligation to
purchase the energy and capacity from those facilities.” Those refusals
constituted a “continued repudiation” of PG&E’s “obligation to purchase”
plaintiffs’ “energy and capacity,” and were wrongful because PG&E was
“obligated by federal and state law to purchase the Plaintiffs’ energy.” “Thus
PG&E breached and continues to breach the obligation imposed on it” by
Public Utilities Code section 399.20, thereby entitling plaintiffs “either to
injunctive relief requiring PG&E to execute the relevant contracts or
damages for Plaintiffs’ lost profits.”
PG&E filed a demurer that contended the complaint failed on three
separate, and independent, bases: (1) the superior court lacked jurisdiction
over the action; (2) the action is barred by res judicata; and (3) the action is
barred by all possibly applicable statutes of limitations.
Plaintiffs filed opposition, PG&E a reply, and the matter came on for
hearing on May 16, 2023, before the Honorable Richard Ulmer who, after a
hearing filed his order sustaining the demurrer without leave to amend. The
order sets out a comprehensive and persuasive analysis and with minor
editorial, non-substantive modifications, it merits quotation virtually in full.
Thus:
“Under section 1759, subdivision (a) of the Public Utilities Code, ‘[n]o
court of this state, except the Supreme Court and the court of appeal,
. . . shall have jurisdiction to review, reverse, correct, or annul any order or
decision of the [Public Utilities Commission (PUC)] or to suspend or delay the
execution or operation thereof, or to enjoin, restrain, or interfere with the

5
[PUC] in the performance of its official duties . . . .’ The [PUC] has ‘exclusive
jurisdiction over the regulation and control of utilities and that jurisdiction,
once assumed, cannot be hampered or second-guessed by a superior court
action addressing the same issue.’ (Anchor Lighting v. S. Cal. Edison Co.
(2006) 142 Cal.App.4th 541, 548.) The jurisdictional bar applies if the
following questions are answered in the affirmative: ‘(1) whether the [PUC]
has authority to adopt regulatory policy on the issue in question; (2) whether
the [PUC] has exercised that regulatory authority; and (3) whether the
superior court action would hinder or interfere with the [PUC’s] exercise of
that regulatory authority.’ (Goncharov v. Uber Technologies, Inc. (2018) 19
Cal.App.5th 1157, 1170.)
“In this case, the CPUC has authority to adopt regulatory policy on the
terms of energy purchases under PURPA (Public Utilities Regulatory Policies
Act) and Public Utilities Code sec. 399.20. The [PUC] ‘is charged with
implementing PURPA in California.’ (Southern California Edison Co. v.
Public Utilities Com. (2002) 101 Cal.App.4th 384, 388; 16 U.S.C. [§] 824a-3[,
subd.] (f).)
“The [PUC] has actively and continuously exercised its authority to
regulate qualified facility procurement under PURPA and section 399.20.
The [PUC] ‘has a long history of implementing PURPA over nearly four
decades . . . .’ The [PUC] enacted the Fit, ReMat, and Modified ReMat
programs to discharge its PURPA obligations. Winding Creek Solar LLC v.
Peevey, 293 F.Supp.3d 980, U.S.Dist.LEXIS 201893 (N.D. Cal. Dec. 6, 2017)
(Donato, J.) aff’d, Winding Creek Solar LLC v. Peterman, supra, 932 F.3d at
p. 892 [‘To regulate the terms under which electric utilities purchase power
from QFs, the . . . [PUC] established the Renewable Market Adjusting Tariff
(“Re-MAT”) program.’].)

6
“Granting the requested injunctive relief would interfere with the
[PUC’s] exercise of its regulatory authority and its prior decisions. Under the
third above-cited prong, section 1759 bars superior court lawsuits against
public utilities ‘not only when an award of damages would directly
contravene a specific order or decision of the commission, i.e., when it would
“reverse, correct, or annul” that order or decision, but also when an award of
damages would simply have the effect of undermining a general supervisory
or regulatory policy of the commission, i.e., when it would “hinder” or
“frustrate” or “interfere with” or “obstruct” that policy.’ (San Diego Gas &
Electric Co. v. Superior Court (1996) 13 Cal.4th 893, 918 (Covalt).) ‘[W]hen
the relief sought would have interfered with a broad and continuing
supervisory or regulatory program of the commission, the courts have found
such a hindrance and barred the action under section 1759.’ (Covalt, 13
Cal.4th at p. 919.)
“Plaintiff seeks to have contracts enacted whether or not they comply
with the [PUC’s] current, ongoing qualified facility procurement program.
‘ “The PUC has exclusive jurisdiction over the regulation and control of
utilities, and once it has assumed jurisdiction, it cannot be hampered,
interfered with, or second-guessed by a concurrent superior court action
addressing the same issue.” ’ (Id. at 918, fn. 20, italics omitted; see also
Anchor Lighting v. S. Cal. Edison Co. (2006) 142 Cal.App.4th 541, 544―547
[no jurisdiction where plaintiffs sought to require utility to provide discount
on terms different from PUC-approved plan]; Hartwell Corp. v. Superior
Court (2002) 27 Cal.4th 256, 278 [‘A court injunction, predicated on a
contrary finding of utility noncompliance, would clearly conflict with the
PUC’s decision and interfere with its regulatory functions in determining the
need to establish prospective remedial programs.’].)

7
“Defendant [PG&E’s] demurrer to the . . . cause of action for damages is
also sustained without leave to amend because the court lacks jurisdiction
under the Public Utilities Code sec. 1759.
“As explained above, the [PUC] has authority to adopt regulatory policy
on the terms of energy purchases under PURPA and has actively exercised
that regulatory authority. Whether plaintiffs’ damages claim would hinder
or interfere with the [PUC’s] exercise of that regulatory authority presents a
close case. Plaintiffs rely on Hartwell to contend that claim can proceed.
There, the California Supreme Court ruled that while the trial court lacked
jurisdiction over most of the plaintiff’s claims per section 1759, some damages
claims could proceed.
“Hartwell supports defendant, however. In Hartwell, the plaintiff was
allowed to pursue a damages claim based on the theory that water failed to
meet federal and state drinking water standards. The court noted that the
[PUC] made a retrospective finding that the regulated utilities investigated
had substantially complied with Department of Health Services drinking
water standards for the past 25 years. But ‘that factual finding was not part
of an identifiable “broad and continuing supervisory or regulatory program of
the commission.” ’ (Hartwell, 27 Cal.4th at p. 276.) The [PUC] recognized
that the finding was merely part of the information gathering process and
was not part of the rulemaking or enforcement scheme.
“In this case, plaintiffs seek to recover damages because a federal court
determined that PURPA preempted certain PUC orders. Plaintiffs’ action
directly contravenes the [PUC’s] prior order that [PG&E] was not required to
enter into FiT contracts and that Winding Creek was not entitled to obtain a
contract under the suspended ReMAT program. ‘[T]he superior court is
precluded from deciding issues which must necessarily be decided by the

8
PUC in its continuing exercise of jurisdiction . . . .’ (Schell v. Southern Cal.
Edison Co. (1988) 204 Cal.App.3d 1039, 1046; id. at p. 1047 [‘Even if the PUC
makes an invalid order, it is binding and conclusive until annulled by the
Supreme Court . . . .’].)
“ ‘In short, an award of damages is barred by section 1759 if it would be
contrary to a policy adopted by the PUC and would interfere with its
regulation of public utilities.’ (Hartwell, 27 Cal.4th at p. 275; see also Waters
v. Pacific Telephone Co. (1974) 12 Cal.3d 1, 10―12 [damage action for
negligence in providing telephone service conflicted with PUC-approved tariff
limiting telephone customer to credit allowance for improper service].)
“In Truconnect Communications, Inc v. Maximus, Inc. [(2023) 91
Cal.App.5th 497,] the Court of Appeal held that section 1759 did nor bar an
action for damages against a defendant who allegedly negligently rolled out a
telephone service plan. There, the court noted that ‘the [PUC] has never
made any determinations about the qualifications of rejected applicants.’ (Id.
at p. 511.) Here, even though a court action focusing on past wrongdoing
does not necessarily interfere with the [PUC’s] ongoing regulatory
obligations, plaintiff is seeking relief that conflicts with the [PUC’s] prior
determinations.
“Under PURPA, claims against a utility may be brought in an
‘appropriate State court,’ and any such ‘action in a State court shall be
pursuant to any applicable State procedures.’ (16 U.S.C. [§§][ 824a-3[, subd.]
(g)(2), 2633[, subd.] (c)(1).) Plaintiffs therefore should not have filed this
action in superior court per Public Utilities Code sec. 1759.”
Judgment was entered for PG&E dismissing the action, from which
plaintiffs filed a timely appeal.

9
DISCUSSION
Introduction
Now represented by one of the two Connecticut attorneys who
represented them below, Plaintiffs have filed an opening brief that does not
comply with the California Rules of Court, beginning with rule 8.204(a)(2)(C)
that provides that an appellant’s opening brief shall “[p]rovide a summary of
the significant facts . . . .” The leading California appellate practice guide
instructs about this: “Before addressing the legal issues, your brief should
accurately and fairly state the critical facts . . . free of bias; and likewise as to
the applicable law. [¶] Misstatements, misrepresentations, and/or material
omissions of the relevant facts of law can instantly ‘undo’ an otherwise
effective brief, waiving issues and arguments; it will certainly case doubt on
your credibility, may draw sanctions [citation], and may well cause you to
lose the case.” (Eisenberg, et al., Cal. Practice Guide: Civil Appeals and
Writs (The Rutter Group 2024) ¶ 9:27, p. 5, italics omitted.)
Plaintiffs’ brief does not measure up.
As noted, PG&E’s demurrer asserted three separate bases why the
complaint failed: lack of subject matter jurisdiction, res judicata, and statute
of limitations. But one reading Plaintiffs’ brief would never know that, as the
brief barely acknowledges that the case arises on demurrer, let alone sets
forth what the trial court did. Bad enough.
Worse, plaintiffs’ claimed standard of review flatly misstates the
standard, their statement ending with this: “In order to prevail on appeal
from an order sustaining a demurrer, the appellant must affirmatively
demonstrate error. Specifically, the appellant must show that the facts
pleaded are sufficient to . . . overcome the legal ground on which the trial

10
court sustained the demurrer.” (Scott v. JP Morgan Chase Bank, N.A. (2013)
214 Cal.App.4th 743, 752.) That is very wrong.
Had plaintiffs read the next sentence in Scott, they would have seen
that our colleagues ended their statement of the standard of review with the
well settled principle that “We will affirm the ruling if there is any ground on
which the demurrer could have properly sustained.” (Scott, supra, 214
Cal.App.4th at p. 752.) And that brings into play other well-settled law,
including that an appellant has the burden to address in the opening brief
each ground for a demurrer argued in the trial court, not just the ground or
grounds relied upon by the trial court, and that a reviewing court could deem
the appellant to have waived all alternative grounds by failing to address
them in its opening brief.
Tukes v. Richard (2022) 81 Cal.App.5th 1 is instructive. Itself an
appeal from a motion granting judgment on the pleadings, Tukes notes that
the principles it discusses have been applied in demurrer cases, going on with
this comprehensive discussion of the law:
“First, one challenging a judgment after demurrer or on a motion for
judgement on the pleadings bears the burden to demonstrate reversible error.
(Berman v. HSBC Bank, USA, N.A. (2017) 11 Cal.App.5th 465, 471.) Since
showing merely that the trial court sustained a motion for judgment on the
pleadings for the wrong reason is insufficient to show reversible error
(Stevenson Real [Estate Servies Inc. v. CB Richard Ellis Real Estate (2006)
138 Cal.App.4th 1215,] 1220), an appellant must address in its opening brief
each ground argued to the trial court in support of the motion. (Cf. Weaver v.
Shell Oil Co. (1933) 129 Cal.App.232, 234 [‘[T]he burden is upon appellants to
show error in the ruling. In other words, it is incumbent upon appellants to
overcome the presumption in favor of the order and this cannot be done by

11
merely giving consideration to some of the grounds upon which the motion
was based’].) Failure to meet that burden in an opening brief may result in
waiver or forfeiture. (Berman, supra, 11 Cal.App.5th at p. 471; cf. Hastaran
v. Marchand (1913) 23 Cal.App.126, 134 [‘[E]very point relied upon for a
reversal should [be] stated and argued in the opening brief or counsel for the
appellant; and therefore points not so stated and argued may be deemed to be
waived’].) However, ‘the rule that legal arguments made in the trial court
but not addressed in an opening brief are forfeited is a discretionary one, and
we may consider the merits of the arguments.’ (Barriga v. 99 Cents Only
Stores LLC (2020) 51 Cal.App.5th 299, 321).” (Tukes, supra, 81 Cal.App.5th
at p. 20.)
PG&E calls out plaintiffs on this, and their reply brief does address the
issues, though not in a very comprehensive way. We nevertheless exercise
our discretion to not hold this against Plaintiffs and thus address the merits
of their argument―and conclude there are none.
The Demurrer was Properly Sustained
In their briefs, plaintiffs make no real effort to grapple with Judge
Ulmer’s reasoning and demonstrate why it is erroneous. Instead, they leap
over it with a theory that is almost breathtaking in its boldness. For
plaintiffs, PURPA decreed that all utilities were required to accept any
contract for electricity proffered by a QF and, according to plaintiffs, only the
Federal Energy Regulatory Authority (FERC) has authority “to promulgate
regulations to promote energy purchases from cogeneration and small power
production facilities like the Appellants’ facilities at issue in this case.” The
role given to the PUC was simply to implement congressional policy. That
role is virtually ministerial, the PUC having no power to modify or dilute
Congress’s decision in the guise of administering it. When the PUC

12
attempted to do so, it was exceeding its proper role, and thus no longer
exercising a regulatory function, hence the Covalt standard is inapplicable.
The consequence is that PURPA authorizes plaintiffs to apply for damages
and injunctive relief in the superior court, where it could enjoy its
constitutional right to trial by jury. In short, “PURPA creates an original
cause of action in a state court, not in a state agency to which there may or
may not be a mandatory de novo appeal and where there is no right to a jury
trial.”
It is entirely natural that plaintiffs build their arguments around the
provision in PURPA (16 U.S.C. § 1824a-3, subd. (a)) that appears to direct
utilities like PG&E to purchase electricity from QFs without qualification. It
is in fact commonly referred to as the “must take” obligation. (See, e.g.,
Winding Creek Solar LLC v. Peterman, supra, 932 F.3d at p. 892.) But while
the existence of the provision is undeniable, that does not mean it stands by
itself without qualification―or that it is self-executing.
It would be a mistake to imagine that a utility-QF agreement is the
product of the negotiations attending any other type of contract. First, an
entity cannot simply declare itself a QF and put an end to it: the entity must
meet the PURPA statutory standard (16 U.S.C. § 796, subd. (17)(C)) and
FERC guidelines (18 C.F.R. § 292.203) and then be accepted as a QF. And
accepted by whom? By the PUC. (Cf. Winding Creek Solar LLC v. Peterman,
supra, 932 F.3d at p. 865 [293 F.Supp.3d 980][“ ‘[A]s long as a state provides
QFs the opportunity to enter into long-term legally enforceable obligations . .
. , a state may also have alternative programs that limit how many QFs’ ”
and electric utilities may agree to participate in; such alternative programs
may also limit how many QFs that may “ ‘participate in the [alternative]
program’ ”]; West Penn. Power Co. (1995) 71 FERC 61,153, 61,495 [1995 WL

13
265,343 at *p.13] [“It is up to the States, not this Commission, to determine
the specific parameters of individual QF power purchase agreements.”].).
And unlike the ordinary buyer and seller, the parties do not set the
price to be paid by the utility for a QF’s electricity. Who does? The PUC,
according to a tariff it has approved. Indeed, the agreement itself is to be
memorialized in a form contract―FiT, ReMAT, or Modified
ReMAT―promulgated by the PUC, a fact plaintiffs appear to concede,
however grudgingly. Even the parties’ offer and acceptance are conditioned
on PUC approval. In short, the PUC is an indispensable actor, and it stands
athwart the entire process, involved at every stage. If the PUC can fix prices,
it can hardly be deemed to be merely and solely a ministerial agent.
Unlike plaintiffs, PURPA very clearly does not treat state utility
regulatory agencies as ministerial actors. On the contrary, they are not only
vested with what would be the primary enforcement of PURPA (see 16 U.S.C.
§ 824-3, subd. (f)(1)), but the FERC recognizes the PUC as having “a wide
degree of latitude in establishing an implementation plan” for QF
participation. (California Public Utilities Commission v. Southern California
Edison Company et al. (2020) 133 FERC 61059, 61,266 [2010 WL 4144227 at
*p.7].)
The FERC went on to say that “the determinations that a state
commission makes to implement the rate provisions of . . . PURPA are by
their nature fact-specific and include consideration of many factors, and we
are reluctant to second-guess the state commission’s determinations; our
regulations thus provide state commissions with guidelines on factors to be
taken into account, ‘to the extent practicable,’ . . . .” (Ibid., fn. omitted.)
Moreover, as shown by Judge Ulmer’s order and the record, the PUC
has been in the thick of that process from the beginning―as plaintiffs well

14
know. According to their complaint, plaintiffs have been trying to get QF
agreements with PG&E since 2013. Indeed, that same year, the lead
plaintiff, Winding Creek Solar LLC, even successfully sued the PUC in
federal court about how the QF program was being administered.
It is instructive that both the district and the circuit court rebuffed
Winding Solar’s request effort to enforce a never executed contract, the latter
stating: “[T]he district court did not abuse its broad discretion to fashion
equitable relief by declining to grant Winding Creek a contract with
PG&E . . . . Indeed, it would be inappropriate to order a non-party to
contract with Winding Creek under a modified version of the very program
the court had just determined to be [incompatible with] federal regulation.”
(Winding Creek Solar LLC v. Peterman, supra, 932 F.3d at p. 866.)
Nevertheless, that is still what plaintiffs are seeking in the present
litigation with their claim that they are entitled to “damages in the amount of
profits they would have received had PG&E executed the contracts in 2013.”
(Emphasis added.) The absurdity of plaintiffs getting profits from electricity
never delivered is too obvious to bear scrutiny.
Even more telling is that once the federal litigation was concluded,
plaintiffs did not go into state court, but went back before the PUC.
It is therefore no burden to demonstrate that the setting here easily
satisfies the three-part standard formulated by our Supreme Court in Covalt.
Has the PUC authority to adopt regulatory policy? Obviously, ever since
Congress tapped the PUC on its shoulder and gave it that authority. Has the
PUC exercised that authority? Also obviously, in addition to the
responsibility for the purely Californian counterparts codified in Public
Utilities Code section 399.20. That the FERC retains a supervisory oversight
does not, as plaintiffs believe, demonstrate that the PUC is a mere puppet,

15
with no independent potency, because our Supreme Court has held that
partial or shared authority will suffice. (Gantner v. PG&E Corp. (2023) 15
Cal.5th 396, 414; see also Davis v. Southern California Edison Co. (2015) 236
Cal.App.4th 619, 642; Anchor Lighting v. Southern California Edison Co.,
supra, 142 Cal.App.4th at p. 549.) Finally, permitting plaintiffs’ superior
court action would hinder or interfere with the PUC’s exercise of that
regulatory authority. As evidenced by their complaint, plaintiffs’ approach to
this process was to ignore the PUC and go around it, after having spent
several years being a full participant in that process.
Instead, they sue a party who has never been alleged to have been
disciplined or sanctioned by the PUC for violating a PUC order or directive.
On the contrary, plaintiffs filed a complaint against PG&E for refusing to
execute plaintiffs’ proffered contracts, which the PUC rejected. Plaintiffs
then complied with Public Utilities Code section 1759 by petitioning for a
writ of review, which Division Three of this Court summarily denied.
(Winding Creek Solar LLC et al v. Cal. Pub. Utilities Com. (March 4, 2015,
A143797 [nonpub. order])―a fact plaintiffs do not mention in their opening
brief.
Moreover, plaintiffs then sue that party for lost profits on those
contracts that were never executed or performed, contracts the PUC has
refused to approve. PG&E would be placed in an impossible situation, whip-
sawed whichever way it was forced to turn. Even if plaintiffs were ultimately
unable to prevail should this litigation proceed, their example might induce
other QFs to follow. It would be hard to imagine a result more likely to
produce regulatory chaos.
In short, plaintiffs have accepted PUC jurisdiction. They may even be
said to have consented to it. Having done so, they will not now be heard to

16
say that PUC jurisdiction was never proper. It follows that the superior court
was entirely correct in ordering the dispute back to the PUC.
DISPOSITION
The judgment of dismissal is affirmed.

17
RICHMAN, J.

We concur.

STEWART, P. J.

DESAUTELS, J.

(A168649N)