Filed 8/28/24 Northcoast Environmental Center v. County of Humboldt CA1/1
NOT TO BE PUBLISHED IN OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not
certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been
certified for publication or ordered published for purposes of rule 8.1115.
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
FIRST APPELLATE DISTRICT
DIVISION ONE
NORTHCOAST ENVIRONMENTAL
CENTER et al.,
Plaintiffs and Appellants, A167278
v. (Humboldt County
COUNTY OF HUMBOLDT et al., Super. Ct. No. CV2100518)
Defendants and Respondents,
ROLLING MEADOW RANCH, LLC,
et al.,
Real Parties in Interest and
Respondents.
Northcoast Environmental Center, Redwood Region Audubon Society,
Citizens for a Sustainable Humboldt, and Mary Gaterud (collectively
plaintiffs) appeal a trial court judgment denying their petition for writ of
mandate alleging violations of the California Environmental Quality Act
(CEQA; Pub. Resources Code, § 21000 et seq.)1 and Planning and Zoning Law
(Gov. Code, § 65000 et seq.). Plaintiffs seek to overturn the decision of
1 Further undesignated statutory references are to the Public
Resources Code.
1
defendants County of Humboldt and its board of supervisors (collectively
County) to adopt a mitigated negative declaration and approve conditional
use permits allowing Rolling Meadow Ranch, LLC and Rolling Meadow
Ranch, Inc. (collectively Rolling Meadow) to operate a cannabis cultivation
and processing project (project). Plaintiffs contend that the County should
have required preparation of an environmental impact report (EIR) and that
the project is inconsistent with the Humboldt County General Plan (General
Plan) and the County’s State Responsibility Area Fire Safe Regulations
(Humboldt County Code, § 3111-1 et seq.)2 (SRA Regulations). We disagree
and affirm.
I. BACKGROUND
Rolling Meadow proposes to develop a cannabis cultivation and
processing operation on 8.5 acres of its 7,110-acre ranch. The ranch—
historically used for ranching and timber operations—is located on the Eel
River and is comprised of agricultural and timber land. The project will
include 16 greenhouses—divided among four separate areas—and five
processing buildings. The project will be attended by a maximum of 30
employees each day.
Rolling Meadow first applied for conditional use permits in 2016. The
first initial study was prepared in 2017 and, following multiple rounds of
feedback from the County and project revisions by Rolling Meadow, the
County circulated for public review and comment a July 2020 initial study
and draft mitigated negative declaration. Rolling Meadow thereafter revised
the project based on comments received. Rolling Meadow submitted a revised
2 Further references to County Code are to the Humboldt County Code.
2
initial study and mitigated negative declaration (MND) in November 2020.3
The County provided notice of its intent to adopt the MND and circulated it
for a 30-day public review and comment period. After the review period
closed, the County’s planning commission (Planning Commission) held a
public hearing on the project. The Planning Commission adopted the MND,
found that the project complied with the General Plan and Zoning Ordinance,
and approved the conditional use permits. Three individuals (administrative
appellants) appealed the Planning Commission’s decision.4
After holding a public hearing on the appeal, the board of supervisors
(the Board) adopted CEQA findings, including finding that a mitigated
negative declaration was appropriate because there was substantial evidence
that the project may have a significant effect on the environment, but project
revisions would avoid or mitigate the effects, and that certain other
impacts—including hydrology and water quality, utilities, and wildfire—were
less than significant and did not require mitigation. The Board also found
the project conformed to the General Plan. The Board adopted the findings
set forth in its resolution, adopted the MND, denied the appeal, approved the
six conditional use permits, adopted conditions of approval, and adopted a
mitigation monitoring and report program.
In July 2021, plaintiffs filed the operative first amended petition for
writ of mandate (petition), which alleged causes of action for violations of
3 While the document was titled “initial study and environmental
checklist,” the County clarified that it was an initial study and mitigated
negative declaration. (Boldface, italics, and capitalization omitted.) Further
reference to “MND” refers to the initial study and mitigated negative
declaration.
4 The administrative appellants are not plaintiffs in this lawsuit.
3
CEQA and the Planning and Zoning Law.5 After briefing and oral argument,
the trial court denied the petition. In a written order, the court determined
plaintiffs had not met their burden of showing there was substantial evidence
of a fair argument that the project may have a significant effect on the
environment, and it rejected plaintiffs’ arguments related to consistency with
the General Plan.
II. DISCUSSION
A. CEQA
Plaintiffs contend the project has not been properly analyzed for
significant environmental effects related to its reliance on on-site wells for
water, the unstudied use of lignin oil for dust suppression, power
infrastructure, and wildfire risks. They argue that the County should have
required preparation of an EIR.
1. CEQA Principles and Standard of Review
“CEQA reflects the California state policy that ‘the long-term protection
of the environment, consistent with the provision of a decent home and
suitable living environment for every Californian, shall be the guiding
criterion in public decisions.’ (§ 21001, subd. (d).) ‘[T]o implement this
policy,’ CEQA and the Guidelines[6] ‘have established a three-tiered process to
ensure that public agencies inform their decisions with environmental
considerations.’ [Citation.] A public agency must ‘conduct a preliminary
5 Plaintiffs alleged a fifth cause of action for declaratory relief, which
they subsequently dismissed.
6 All references to “Guideline” or “Guidelines” are to the Guidelines
codified in the California Code of Regulations, title 14, section 15000 et seq.
They are guidelines for the implementation of CEQA, developed by the
Governor’s Office of Planning and Research and adopted by the Secretary of
the Resources Agency. (§ 21083.)
4
review in order to determine whether CEQA applies to a proposed activity.’
[Citation.] At this stage, the agency must determine whether any of CEQA’s
statutory exemptions apply. [Citation.] If the project is in an exempt
category for which there is no exception, ‘ “no further environmental review is
necessary.” ’ [Citations.]
“If the project is not exempt from CEQA, the next step is to conduct an
initial study. [Citation.] The initial study determines whether there is
‘ “substantial evidence that the project may have a significant effect on the
environment.” ’ [Citation.] If there is no such evidence, ‘ “CEQA excuses the
preparation of an EIR and allows the use of a negative declaration . . . .” ’
[Citation.] If there is such evidence, ‘ “but revisions in the project plans
‘would avoid the effects or mitigate the effects to a point where clearly no
significant effect on the environment would occur’ and there is no substantial
evidence that the project as revised may have a significant effect on the
environment, [an MND] may be used.” ’ [Citation.]
“If neither type of negative declaration is appropriate, the final step is
to prepare an EIR. [Citation.] Given that ‘the EIR is the “heart of CEQA,” ’
doubts about whether an EIR is required are resolved in favor of preparing
one. [Citations.] [¶] . . . [¶]
“The lead agency must prepare an EIR ‘whenever substantial evidence
supports a fair argument that a proposed project “may have a significant
effect on the environment.” ’ [Citation.] ‘The fair argument standard is a
“low threshold” test for requiring the preparation of an EIR.’ [Citation.]
‘[F]acts, reasonable assumptions predicated upon facts, and expert opinion
supported by facts’ all constitute ‘[s]ubstantial evidence’ of a significant effect
on the environment, and ‘[a]rgument, speculation, unsubstantiated opinion or
narrative, or evidence that is clearly inaccurate or erroneous, or evidence that
5
is not credible’ do not.” (Parker Shattuck Neighbors v. Berkeley City Council
(2013) 222 Cal.App.4th 768, 776–777 (Parker Shattuck).) “ ‘ “ ‘Significant
effect on the environment’ means a substantial, or potentially substantial,
adverse change in the environment.” ’ ” (Pocket Protectors v. City of
Sacramento (2004) 124 Cal.App.4th 903, 927.) “As long as there is
substantial evidence of a potential significant environmental effect, ‘contrary
evidence is not adequate to support a decision to dispense with an EIR.’ ”
(Parker Shattuck, at p. 777.)
The standard of review in a CEQA case is prejudicial abuse of
discretion, which is established if the agency has not proceeded in a manner
required by law, or the determination is not supported by substantial
evidence. (Save the Plastic Bag Coalition v. City of Manhattan Beach (2011)
52 Cal.4th 155, 171.) The “appellate court’s review ‘is the same as the trial
court’s: [It] reviews the agency’s action, not the trial court’s decision; in that
sense appellate judicial review under CEQA is de novo.’ ” (Protecting Our
Water & Environmental Resources v. County of Stanislaus (2020) 10 Cal.5th
479, 495.)
When reviewing an agency’s determination to adopt a mitigated
negative declaration, and thus dispose of an EIR, “we must determine
whether the record contains substantial evidence supporting a ‘fair argument’
that the project[] will have a significant impact on the environment.”
(McCann v. City of San Diego (2021) 70 Cal.App.5th 51, 87.) “ ‘ “[T]he
sufficiency of the evidence to support a fair argument” ’ is a question of law.
[Citation.] When determining whether sufficient evidence exists to support a
fair argument, ‘deference to the agency’s determination is not appropriate
and its decision not to require an EIR can be upheld only when there is no
6
credible evidence to the contrary.’ ” (Parker Shattuck, supra, 222 Cal.App.4th
at pp. 777–778.)
Plaintiffs have “the burden of proof ‘to demonstrate by citation to the
record the existence of substantial evidence supporting a fair argument of
significant environmental impact.’ [Citation.] ‘Unless the administrative
record contains this evidence, and [plaintiffs] cite[ ] to it, no “fair argument”
that an EIR is necessary can be made.’ ” (Parker Shattuck, supra,
222 Cal.App.4th at p. 778.) If plaintiffs demonstrate that substantial
evidence of an unmitigated impact exists, then we must conclude the County
abused its discretion by not preparing an EIR. (McCann v. City of San Diego,
supra, 70 Cal.App.5th at p. 87.)
“Reviewing courts also examine whether the agency’s decision to adopt
a negative declaration is based on a factual analysis of the project’s potential
impacts.” (2 Kostka & Zischke, Practice Under the Cal. Environmental
Quality Act (Cont.Ed.Bar 2024) § 6.75.) “The agency’s decision can be
invalidated if it appears the agency did not actually evaluate the question
whether significant effects might result.” (Ibid.) When the agency has failed
to study a potential environmental impact, “a fair argument may be based on
the limited facts in the record. Deficiencies in the record may actually
enlarge the scope of fair argument by lending a logical plausibility to a wider
range of inferences.” (Sundstrom v. County of Mendocino (1988)
202 Cal.App.3d 296, 311 (Sundstrom).) While an “ ‘agency [will] not be
allowed to hide behind its own failure to gather relevant data,’ ” the ultimate
issue is “the validity of the lead agency’s adoption of a negative declaration.”
(Gentry v. City of Murrieta (1995) 36 Cal.App.4th 1359, 1378–1379 (Gentry).)
It “ ‘remains the appellant’s burden to demonstrate by citation to the record
the existence of substantial evidence supporting a fair argument of
7
significant environmental impact.’ [Citation.] ‘An absence of evidence in the
record on a particular issue does not automatically invalidate a negative
declaration. “The lack of study is hardly evidence that there will be a
significant impact.” ’ ” (Id. at p. 1379.)
2. Hydrology and Water Quality
Plaintiffs contend the project has not been properly analyzed for
significant environmental impacts related to hydrology/water quality. They
argue that the County failed to proceed in a manner required by law, and
that there is a fair argument that the project’s water demands may have a
significant effect on the environment.
The project is located on the bank of the Eel River and there are
multiple streams within the project vicinity. The MND explained that all
“water used in cultivation, processing, and employee needs will be sourced
on-site from wells.” In June 2019, Rolling Meadow had three wells drilled
and tested for yield. The MND concluded that based on the project’s water
needs, the wells would provide “more than sufficient water supply” for the
project. In addition to the wells, the project will collect storm water, which
will be used for landscaping, fire protection, and supplemental water for dust
mitigation. In going through the checklist7 for hydrology and water quality
impacts, the MND concluded the project would not substantially decrease
groundwater supplies or interfere substantially with groundwater recharge.
The MND explained the wells are not hydrologically connected to any surface
7 “The checklist promulgated in the Guidelines asks the lead agency to
characterize each factor as potentially significant, less than significant with
mitigation incorporated, less than significant, or having no impact.
(Guidelines, appen. G.)” (Ocean Street Extension Neighborhood Assn. v. City
of Santa Cruz (2021) 73 Cal.App.5th 985, 1005 (Ocean Street).)
8
water or any part of a larger shallow homogeneous aquifer. The wells do not
draw from a contiguous shallow aquifer as they are spread over miles of hilly
terrain at different elevations.
a. Inconsistency in Documentation Regarding Wells
Plaintiffs contend the County failed to proceed in the manner required
by law because its conclusions that there are no substantial impacts related
to hydrology or water quality were based on conclusions which relied on
contradictory facts. The well completion reports submitted by the well
driller, David Fisch, located one of the wells on one parcel, 140 feet from
Beatty Creek, while other maps included in the MND located that well on a
different parcel, farther away from a watercourse. Based on this, plaintiffs
argue the conclusions are unsupported and the analysis incomplete.8
The County and Rolling Meadow argue plaintiffs may not raise this
argument based on failure to exhaust administrative remedies and forfeiture
for not raising this issue before the trial court.9 We reject their claim of
failure to exhaust. As plaintiffs demonstrate, a letter from Pacific Watershed
Associates (PWA)—retained by the administrative appellants—raised this
issue during the administrative process and fairly apprised the County of the
concern. (See Save the Agoura Cornell Knoll v. City of Agoura Hills (2020)
46 Cal.App.5th 665, 677 (Agoura); Save the Hill Group v. City of Livermore
(2022) 76 Cal.App.5th 1092, 1104–1105.)
8 The purposes of an initial study include to provide documentation of
the factual basis for the finding in a negative declaration that a project will
not have a significant effect on the environment. (Guidelines, § 15063,
subd. (c)(5).)
9 The County and Rolling Meadow filed a joint opposition brief.
9
We agree, however, with the County and Rolling Meadow’s contention
that plaintiffs forfeited this argument by raising it for the first time on
appeal. (See Ocean Street, supra, 73 Cal.App.5th at pp. 1008–1009 [plaintiff
forfeited argument by failing to raise it in the trial court].) Plaintiffs did not
argue this issue about well location in their trial court briefing on the merits
of the petition. Plaintiffs do not point to their trial court briefs or oral
argument. Instead, they only point to the petition itself. In their petition,
they alleged the project description was legally inadequate because it failed
to accurately and consistently describe and define project characteristics in
sufficient detail to enable impact analysis. They alleged the water supply
analysis was inadequate because it presented conflicting information
regarding groundwater use and the use of captured rainwater, undermining
its ability to accurately disclose, analyze, or mitigate water supply impacts.
They alleged there was not proper analysis of the hydrologic connectivity
between the well groundwater and surface waters, but plaintiffs point to
nothing in their petition that addresses the argument they now make. In any
event, even if it had been alleged in the petition, it was not raised to the trial
court on the merits. Plaintiffs cite no authority that asserting an allegation
in a petition is the equivalent of raising that issue to the trial court in
deciding the merits. Therefore, we will not address this argument.
b. Reasonably Foreseeable Future Activities
Plaintiffs contend the County failed to proceed in the manner required
by law because it did not analyze reasonably foreseeable groundwater
10
impacts.10 They contend it is reasonably foreseeable that the wells will be
insufficient to supply project water needs, but the MND did not address this.
In 2019, Fisch drilled the three on-site wells. In June 2019, he
measured the water levels and yields of the wells based on a four-hour test.
For each well he provided the estimated yield, remarking that it “[m]ay not
be representative of a well’s long term yield.” The project will use
approximately 4,628,200 gallons of water annually for year-round operations
(12,680 gallons per day). Relying on the well yield tests, the MND stated,
“Assuming year-round flow rates as tested, the project could produce a
combined average of 63 gpm [gallons per minute]; 63 gpm would result in
90,720 gallons in 24[ hours] and a more than sufficient water supply for the
projected project needs.”
Plaintiffs contend that this assumption of year-round flow rates as
tested by Fisch was impermissible speculative analysis, relying on Vineyard
Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova (2007)
40 Cal.4th 412 (Vineyard). There, in addressing whether an EIR provided
adequate information for the long-term provision of water to a development
project, the Supreme Court explained that “CEQA’s informational purposes
are not satisfied by an EIR that simply ignores or assumes a solution to the
problem of supplying water to a proposed land use project.” (Id. at pp. 430–
431.) The “future water supplies identified and analyzed must bear a
likelihood of actually proving available; speculative sources and unrealistic
allocations (‘paper water’) are insufficient bases for decisionmaking under
CEQA.” (Id. at p. 432.) The “EIR’s discussion must include a reasoned
10 Preparing a negative declaration “involves some degree of
forecasting. While foreseeing the unforeseeable is not possible, an agency
must use its best efforts to find out and disclose all that it reasonably can.”
(Guidelines, § 15144.)
11
analysis of the circumstances affecting the likelihood of the water’s
availability.” (Ibid.)
Unlike in Vineyard—which involved a challenge to an EIR, not an
initial study and negative declaration11—here the record demonstrates that
the conclusion about water supply is not speculative. In its report to the
Planning Commission, in response to concerns regarding well production
tests not being performed during the dry season, staff replied that it did not
preclude well production information from being utilized for review. Staff
explained that the wells tested at a combined total of 63 gallons per minute
which, if operated at that level, would provide all the water needed for the
project in 51 days. If the wells were only operated for 12 hours a day and
yielded half the tested flow, the total water demand could still be provided in
204 days. Staff concluded there “is not a doubt that there is sufficient water
to accommodate this use.” Plaintiffs do not point to any record evidence that
it is reasonably foreseeable that the wells will be unable to supply the
project’s water needs. (See Rominger v. County of Colusa (2014)
229 Cal.App.4th 690, 712 (Rominger) [plaintiffs did not point to any evidence
in the record that certain uses were a reasonably foreseeable consequence of
the project].)
Plaintiffs next take issue with the conditions of approval regarding
water use. Staff stated, “Conditions of approval require the applicant to
meter water use to demonstrate that the well meets the water demand and
provide evidence of metering at the time of annual inspection. Should the
wells not provide sufficient water for the operation, the applicant is required
11 “An initial study is only a ‘preliminary analysis’ [citation] and the
regulatory requirements regarding its contents are not as demanding as
those imposed upon an EIR.” (Lighthouse Field Beach Rescue v. City of Santa
Cruz (2005) 131 Cal.App.4th 1170, 1192.)
12
to modify this permit and propose a different non-divisionary [sic] source of
water, such as rain catchment and/or reduce the size of the cultivation area
to be consistent with water availability. As conditioned, the project therefore
conforms to the performance standards for water.”
Plaintiffs contend this language was not actually adopted as a condition
of approval, and they argue that the conditions which were adopted do not
require Rolling Meadow to modify the permit should there be insufficient
water. The County and Rolling Meadow argue plaintiffs forfeited this
argument because they did not raise it to the trial court, and that plaintiffs
waived this argument by not citing to legal authority or the record. We agree
with the County and Rolling Meadow. Plaintiffs cite only one page of their
trial brief, where they argued that the MND assumed sufficient groundwater
for the project in perpetuity, which was an inadequate analysis. Plaintiffs
urged that the analysis should have identified alternative sources of water
and analyzed the environmental impacts caused by using those sources.
What plaintiffs do not show, however, is that they made an argument to the
trial court which they make here—arguing that language in the staff reports
was not included in the adopted conditions of approval and challenging the
approved conditions. (See Ocean Street, supra, 73 Cal.App.5th at pp. 1008–
1009.) Additionally, in challenging the conditions of approval, plaintiffs do
not cite the record or legal authority,12 and the heading for this section in
12 We observe that throughout the discussion section of their opening
brief, plaintiffs cite little legal authority or, more frequently, none. They
merely provide “supra” references to a previous section on the standards of
review. “We are not required to develop appellants’ arguments for them.
[Citation.] ‘We may and do “disregard conclusory arguments that are not
supported by pertinent legal authority or fail to disclose the reasoning by
which the appellant reached the conclusions he wants us to adopt.” ’ ” (Los
13
their opening brief, titled “[the County and Rolling Meadow] did not address
the reasonably foreseeable insufficiency of wells to supply project needs,” does
not mention conditions. (Capitalization and boldface omitted.) We conclude
plaintiffs have forfeited and waived any challenge to the conditions of
approval. (See Los Angeles Unified, supra, 57 Cal.App.5th at pp. 497–498
[plaintiffs must provide cogent argument supported by legal analysis and
citation to the record]; Tsakopoulos Investments, LLC v. County of
Sacramento (2023) 95 Cal.App.5th 280, 310 [“ ‘Failure to provide proper
headings forfeits issues that may be discussed in the brief but are not clearly
identified by a heading.’ ”].)
Finally, to the extent plaintiffs argue the County improperly deferred
the issue of water supply for future analysis, we are not persuaded. This
argument is not fully developed by plaintiffs. (See Los Angeles Unified,
supra, 57 Cal.App.5th at pp. 497–498 [we are not required to develop
plaintiffs’ arguments for them].) Plaintiffs again rely on Vineyard, supra,
40 Cal.4th at page 431, where the Supreme Court stated, “[T]he future water
sources for a large land use project and the impacts of exploiting those
sources are not the type of information that can be deferred for future
analysis.” Here, there is no demonstration that the County deferred analysis.
Sufficient long term water supply did not need to be demonstrated “with
certainty”; it just needed to “show a likelihood water would be available, over
the long term, for this project.” (Id. at p. 441.)
Angeles Unified School District v. Torres Construction Corp. (2020)
57 Cal.App.5th 480, 497–498 (Los Angeles Unified); see also Cinema West,
LLC v. Baker (2017)13 Cal.App.5th 194, 219 (Cinema West) [“ ‘appellant must
present argument and authorities on each point to which error is asserted, or
else the issue is waived’ ”]; Hernandez v. First Student, Inc. (2019)
37 Cal.App.5th 270, 277 (Hernandez) [an issue raised but unsupported with
reasoned argument, citations to authority, and record citations is waived].)
14
c. Fair Argument of Significant Effect on the Environment
Plaintiffs contend substantial evidence exists to support a fair
argument that the project’s water demands may have a significant effect on
hydrology or water quality. We disagree.
The MND assessed potential hydrology and water quality impacts by
going through the checklist and it found each impact was less than
significant or nonexistent. It concluded, among other things, that the project
would not substantially decrease groundwater supplies or interfere
substantially with groundwater recharge. The MND also concluded the
project would have sufficient water supplies to serve the project, including
during dry years.13
The MND explained the project will use approximately 4,628,200
gallons of water per year, with daily water use of 12,680 gallons. In testing,
the three wells yielded 13 gallons per minute, 20 gallons per minute, and 30
gallons per minute. As explained above, the MND concluded the wells would
provide a more than sufficient supply of water for the project’s needs.
Additionally, storm water will be collected and stored near each greenhouse.
In commenting on the MND regarding well productivity, PWA
challenged the well yield tests being conducted in June instead of during the
dry season of August through September. County staff replied that this did
not preclude the well production information from being utilized for review.
Staff explained that the wells tested at a combined total of 63 gallons per
minute which, if operated at that level, would provide all the water needed
for the project in 51 days. If the wells were only operated for 12 hours a day
and at half the tested yield, the total water demand could still be provided in
13 This conclusion was part of the assessment of utilities and service
systems impacts.
15
204 days. Staff replied there “is not a doubt that there is sufficient water to
accommodate this use.”
Regarding hydrologic connectivity, the MND cited to Fisch, the well
driller, who had stated, “ ‘The wells were completed in the Franciscan
Sandstone. The wells are drilled into perched bedrock with no hydraulic
connection to any surface water or any part of a larger shallow homogeneous
aquifer. Considering the depth of the well, it appears to fall in line with the
guidelines of a non-jurisdictional well of similar depth in the surrounding
area.’ ” The MND explained that the project wells do not draw from a
contiguous shallow aquifer as they are spread over miles of hilly terrain at
different elevations.
A staff report to the Planning Commission explained that an
examination of Fisch’s well logs indicated that the depth and screening
intervals are such that “the wells are not connected to any surface water
features, and as such do not require water rights for diversion and use.” Staff
responded to public comments received on the MND. Staff explained that the
Department of Fish and Wildlife (CDFW) had raised concerns that the wells
may be hydrologically connected to surface water, and, by extension, the
large amount of proposed water use could have an adverse impact on aquatic
resources. Staff responded that the wells are deep groundwater wells that
have screening intervals which strongly indicate they are not connected to
the underflow of any surface water features, which indicates no direct
impacts to aquatic resources. “This analysis was performed by staff and is
also supported by the opinion of the well driller, Dave Fisch, who has
extensive expertise of installing and working with wells in” the County.
In reply to the administrative appellants’ claim that the depth at which
the wells were drawing water indicated they were connected to surface water
16
features, staff replied that their conclusory statement was not supported by
factual data to support their contention. Instead, the depth and location of
the wells relative to surface water features indicated they were not
hydrologically connected to surface water features.
The conditions of approval imposed by the County require Rolling
Meadow to “install and utilize a water meter to demonstrate that there is
sufficient water supply to meet the demands of the project. The water use for
cultivation is limited to the use of the well and amount of water available in
storage tanks and shall be provided annually prior to or during the annual
inspection.”
Plaintiffs rely on the following evidence to contend there is a fair
argument the project may have a significant environmental impact.
CDFW commented on the use of the wells, explaining that the
“scientific and engineering community universally accepts the connectivity of
surface water and groundwater systems and that groundwater discharge to
streams constitutes a sizeable and important fraction of streamflow.” CDFW
commented that the MND had relied on Fisch, a well contractor. It stated,
“In light of the Project’s geologic setting, mapped springs, wetlands, and
other surface water features . . . , and based on the potential total volume of
groundwater extraction from the three new wells, CDFW recommends the
applicant retain a qualified professional (e.g. geologist or engineer with
hydrogeology background)” to evaluate the potential impacts to local surface
water flows and provide recommendations that ensure the project will not
substantially affect aquatic resources.
PWA submitted a letter written by geologists discussing the hydrologic
connectivity of the wells. It discussed the locations of the three wells,
including its observation that well 1 is 140 feet from a tributary stream to
17
Beatty Creek, and wells 2 and 3 were 300 feet and 400 feet from a wetland
habitat. PWA stated that significant pumping of groundwater from the wells
“could have potential adverse impacts to the watershed from reduced
groundwater storage and/or a lowering of the local water table.” When
groundwater levels are reduced, the location where groundwater intersects
with the land surface can lower, causing springs and seeps to dry up. PWA
remarked that geologic investigations to quantify the hydraulic properties of
aquifers at the site had not been conducted. Due to the proximity of the wells
to surface waters, PWA remarked that the cone of depression from
continuous well water withdrawal may intersect and affect nearby stream
and wetland resources. PWA recommended that additional hydrogeologic
investigations should be conducted to better identify and describe potentially
significant impacts to the wetlands and watercourses.
PWA also discussed the wells’ productivity. PWA remarked that
pursuant to the County’s standards, water production tests must be
conducted during the dry season—August through September—and be
representative of the lowest annual water production anticipated from the
source. Because Fisch conducted testing in June, PWA recommended
additional testing be completed. PWA continued, stating that the wells are in
the rocks of the Yager terrane. Regarding the four-hour well productivity
tests, PWA stated it was “possible that short-term testing of wells in sheared
mudstone rocks of the Yager terrane is misrepresentative of sustained well
yield,” which “may be much lower than is recognized.” PWA recommended
“more prolonged well pump testing.”
PWA’s comments do not constitute substantial evidence of a fair
argument that the project may have a significant environmental effect. PWA
did not opine that the groundwater which will be drawn from the wells is
18
hydrologically connected, or is likely connected, to surface water. PWA
discussed the wells’ proximity to streams and wetlands habitats, but it did
not opine that such proximity means they are connected. In essence, PWA
merely recommended additional investigation. Regarding well productivity,
PWA’s comments again just recommended more testing.
Plaintiffs challenge Fisch’s qualifications to opine on hydrologic
connectivity. During early review of the project—before the wells were
drilled—in advising Rolling Meadow that a prior initial study was deficient,
County staff stated that consultation with an engineering geologist was
needed to document the groundwater supply. It explained Rolling Meadow
needed to demonstrate that the wells were not hydrologically connected to
the water flow of the river.
Plaintiffs cite documents referenced in the MND. This includes a
Department of Water Resources bulletin regarding the state’s groundwater.
While focusing on groundwater resources, the Department of Water
Resources recognized that, “[I]n reality groundwater and surface water are
inextricably linked in the hydrologic cycle. As an example, groundwater may
be recharged by spring runoff in streams, but later in the year the base flow
of a stream may be provided by groundwater. So, although the land surface
is a convenient division for categorizing water resources, it is a somewhat
arbitrary one. It is essential that water managers recognize and account for
the relationship between groundwater and surface water in their planning
and operations.” Plaintiffs also point to documents referenced by CDFW in
commenting on the MND. A 2012 U.S. Geological Survey publication
regarding streamflow depletion by wells noted that a common misconception
is that pumping groundwater exclusively below a confining layer will
eliminate the possibility of depletion of surface water connected to the
19
overlying groundwater system. These materials do not demonstrate a fair
argument of a significant environmental effect because they contain general
information and are unrelated to the project area.
In February 2019—before the wells were drilled—Rolling Meadow’s
president wrote to the County identifying the steps Rolling Meadow had
taken to obtain permit approval. He explained Rolling Meadow’s proposal
that water for the greenhouses would be supplied by wells, and he stated
there was an “abundance of water on the property. The head waters of
Beatty Creek and Camron [sic] Creek are on the property that produce large
quantity of water year-round.” He stated Fisch had assured they would have
an abundance of available water to meet their demands. Once Rolling
Meadow obtained approval, they would “drill the wells to guarantee there is
adequate water at strata that does not adversely affect the Eel River.” The
president is not an expert on hydrology and his statements cannot be
construed as substantial evidence supporting a fair argument of hydrologic
connectivity. A review of his full letter demonstrates his belief that once the
wells were drilled it would be shown that the wells would provide sufficient
water which did not affect the Eel River. His observations about
watercourses on his property do not constitute substantial evidence that
those watercourses are connected to the well groundwater.
Finally, plaintiffs assert that the public commented on potentially
significant impacts, relying on their personal experience with the Eel River
and associated waterways, as well as literature. Plaintiffs just list, without
discussing, a long string of record citations. Their “failure to explain the
significance of” these public comments “is by itself sufficient to defeat their
arguments,” because “it is not for us to construct a sufficient argument for
them.” (Rominger, supra, 229 Cal.App.4th at p. 729.) In any event, the
20
comments from the public—mainly local residents—do not constitute
substantial evidence. The commenters provided their personal experience
and observations, including that the area has a dire water situation, with the
creeks barely flowing in the summer and the river being bare, so they think it
“mind blowing” to take water from the aquifer for the project. They
expressed their concerns over the project taking water from the dwindling
watersheds. One commenter stated the “wells are absolutely ‘connected’ to
the Eel River,” however they provided no support for that contention. One
commenter stated that basic concepts of hydrology show that groundwater is
the source of many springs and creeks, especially in the dry months, so
unlimited groundwater pumping would impact all downstream water users.
While area residents may provide their experience and observations
regarding drought conditions and the creeks and river being dry during
summer, they do not have expertise to opine on whether the groundwater
wells are hydrologically connected to surface waters. (See Ocean View
Estates Homeowners Assn., Inc. v. Montecito Water Dist. (2004) 116
Cal.App.4th 396, 402 [personal observations on “nontechnical issues” may
constitute substantial evidence]; Newtown Preservation Society v. County of
El Dorado (2021) 65 Cal.App.5th 771, 789 [lay opinion based on technical
information which requires expertise does not constitute substantial
evidence].)
For the reasons explained above, and taking together plaintiffs’ cited
evidence, the evidence does not support a fair argument that the project’s
water demands may have a significant effect on the environment, either
related to hydrologic connectivity or well productivity.
The evidence does not support a fair argument that the wells may be
hydrologically connected to local surface water, such that use of the wells
21
may have a substantial impact on hydrology or water quality. Plaintiffs’
arguments are really an attack on the County’s reliance on the information
provided by Fisch, including his well logs and explanation that the wells are
not hydrologically connected. The cited evidence attacks Fisch’s
qualifications and recommends further testing. (See Parker Shattuck, supra,
222 Cal.App.4th at p. 786 [“a suggestion to investigate further is not
evidence, much less substantial evidence, of an adverse impact”].) The
evidence does not, however, support a fair argument that the project’s wells
may be hydrologically connected to surface flows and, thus, impact local
surface water flows and groundwater supplies. “In other words, the thrust of
[plaintiffs’] criticism was apparently to attack the evidentiary basis for the
[C]ounty’s conclusion that the project would not have a significant impact on
groundwater supplies, rather than identifying or providing evidence to
support a fair argument to the contrary.” (Rominger, supra, 229 Cal.App.4th
at p. 730.)
Nor does the evidence support a fair argument that the wells may not
be able to supply the project’s water needs. Again, plaintiffs attack the
results of Fisch’s well yield tests and recommend further testing be conducted
during the dry season. But they have failed to cite evidence demonstrating
the wells will not, or may not, be sufficiently productive. Even if we assume
there is substantial evidence demonstrating that the wells may be less
productive than identified in the yield tests, plaintiffs have not demonstrated
how that may affect the environment. For example, if the wells cannot
supply sufficient water for project operations, there is no evidence that
Rolling Meadow would then divert water from a nearby watercourse.
22
In sum, plaintiffs have not met their burden of demonstrating that
substantial evidence supports a fair argument that the project’s water
demands may have a significant effect on the environment.
3. Lignin Oil
Plaintiffs argue the County failed to proceed in the manner required by
law because it did not analyze the impacts of the use of lignin oil for dust
suppression on biological resources, hydrology/water quality, hazards and
hazardous materials, or wildfires. We disagree.
A prior initial study—prepared in 2018—assessed air quality impacts
and discussed dust generated during the construction phase of the project
and the methods to control it. This included spraying the road with water
and it also stated that the dirt roads would be rocked and oiled with lignin
sulfonate compound to further reduce airborne particulate. In subsequent
correspondence with the County, Rolling Meadow explained that regarding
dust being produced on the roads, dust was not reflective of the project
operations as the predominant use in the ranch’s roads would be by the guard
shuttling employees in the electric bus. Rolling Meadow explained the road
would “be rocked and, in any event, if any dust was generated, we would have
the road sealed with lignin oil. Lignin oil is a chemically derived
biodegradable oil that is completely harmless to fish and wildlife.” In
response, the County remarked that the chemical makeup of lignin oil and
the quantity and frequency of use had not been described. The County
explained that the initial study’s analyses of impacts to air quality, biological
resources, and hydrology did not “discuss the effect [of lignin oil] on biological
resources, run-off potential and impacts to watercourses.” Rolling Meadow
subsequently advised the County that it had removed lignin oil from the
proposal because it was unnecessary. Rolling Meadow explained that clean
23
gravel, a conservative speed limit, and reduced traffic (bus only and not
individual trips) would be adequate for dust control.
Because Rolling Meadow eliminated the use of lignin oil as a dust
suppressant, the MND did not address it. In discussing air quality impacts,
the MND discussed dust emissions during both the construction of the project
and its operation. It concluded any impact was less than significant by
complying with the North Coast Unified Air Quality Management District’s
rule 104. In compliance with rule 104, during construction, the project would
use water trucks to spray surfaces to control fugitive dust. Additionally, the
roads would be rocked with clean road rock. During project operations,
project roads are either rocked or will only be used during the wet season,
eliminating the prospect of fugitive dust. Additionally, the project applied
U.S. Department of Transportation strategies to mitigate unpaved road dust,
including a 15 miles per hour speed limit, limiting the number of vehicles on
the road—employees would be transported from the parking area via electric
bus—and rocking the ranch roads.
After the Planning Commission approved the project, and before the
Board hearing, Rolling Meadow proposed project revisions in response to
concerns raised by neighbors. It proposed to have employees park at the park
and ride lot near the highway and be shuttled to the ranch to cut down on
individual car trips on McCann Road, and “[i]f necessary, the project will
periodically treat the dirt portion of McCann Road in front of residences with
Lignin Oil or [a] similar product to control dust.” In addressing these
proposals, County staff stated in their report to the Board that these changes
had been added to the proposed findings and conditions of approval, and they
would “not cause any new environmental effects.”
24
At the Board hearing, counsel for the administrative appellants
brought up the reintroduction of lignin oil and remarked that the County had
previously advised Rolling Meadow that it had a concern about lignin oil not
being properly addressed. In approving the project, the Board adopted
conditions of approval which included, as relevant here, a mandate that
Rolling Meadow monitor the dirt portion of McCann Road in front of
residences and “shall treat the road surface with Lignin Oil or [a] similar
product to control dust.”
Plaintiffs challenge the County’s conclusion that lignin oil poses no
potentially significant impact, contending it is unsupported by
documentation. Demonstrating that the County approved the project with a
condition requiring that Rolling Meadow monitor the dirt portion of McCann
Road in front of residences and treat the road “with Lignin Oil or [a] similar
product to control dust”—even though lignin oil had not been analyzed in the
MND—does not, by itself, demonstrate a prejudicial abuse of discretion.
Staff’s report to the Board on Rolling Meadow’s proposed changes which
occurred post-Planning Commission approval was brief. Staff merely
reported that the proposed changes, including the use of lignin oil, had been
added to the findings and conditions of approval and would “not cause any
new environmental effects.” While there appears to be no comprehensive
analysis, such shortcomings merely relate to the determination of whether
there is substantial evidence supporting a fair argument that the project’s
potential use of lignin oil may have a significant effect on the environment.
Plaintiffs cite no authority supporting their proposition that failure to
analyze a potential impact and lack of documentation regarding a component
of a project constitute a prejudicial abuse of discretion. In fact, in the
25
sections of their briefs addressing lignin oil, plaintiffs cite no authority at all.
(See Cinema West, supra, 13 Cal.App.5th at p. 219.)
It remains plaintiffs’ burden to cite record evidence supporting a fair
argument of significant environmental impact. (Gentry, supra,
36 Cal.App.4th at pp. 1378–1379.) Lack of study does not constitute evidence
that there will be a significant impact. (Id. at p. 1379.) When a potential
environmental impact has not been studied, “a fair argument may be based
on the limited facts in the record. Deficiencies in the record may actually
enlarge the scope of fair argument by lending a logical plausibility to a wider
range of inferences.” (Sundstrom, supra, 202 Cal.App.3d at p. 311.)
Plaintiffs make no argument that applying lignin oil on the roads for dust
suppression may have a significant environmental impact. As plaintiffs
reference, in reviewing a prior initial study, County staff had advised Rolling
Meadow that the study had not addressed the chemical makeup of lignin oil,
its frequency of use, or the potential for environmental impacts. But these
comments do not constitute substantial evidence of a fair argument that
lignin oil may have a significant environmental effect. They just called for
additional information.
Further, as the County and Rolling Meadow point out, there is evidence
in the record regarding lignin. The County’s approval was under the
provisions of the 2016 Commercial Medical Marijuana Land Use Ordinance
(CMMLUO). In enacting the CMMLUO, the County had adopted a mitigated
negative declaration, with mitigation measures, finding that all potential
impacts associated with implementation of the ordinance had been reduced to
a less than significant level. The CMMLUO MND explained that the
ordinance’s requirements worked “to mitigate both project-specific and
cumulative watershed-level impacts through implementation of ‘standard
26
conditions’ and ‘best management practices.’ ” One of the best management
practices for site maintenance and operations stated, “Road surfacing,
especially within a segment leading to a watercourse, is critical to prevent
and minimize sediment delivery to a watercourse and maintain road integrity
for expected uses. Road surfacing can include pavement, chip-seal, lignin,
rock, or other material appropriate for timing and nature of use.” (Italics
added.) While a lack of study may enlarge the scope of fair argument, here
the record does not permit a reasonable inference that use of lignin oil may
have a significant environmental impact. (Sundstrom, supra, 202 Cal.App.3d
at p. 311.)14
4. Infrastructure
Plaintiffs contend the project has not been properly analyzed for
significant environmental impacts related to power infrastructure. They
argue that the County failed to proceed in a manner required by law, and
that there is a fair argument that the project’s power needs may have a
significant effect on the environment.
The MND explained Pacific Gas and Electric Company (PG&E) will
supply the project’s electricity. There is existing PG&E infrastructure in
above-ground poles located on the south side of the property near the Eel
River. New electrical lines will be run underground from the existing section
to the greenhouses and processing buildings. Power will be supplied by the
local utility Redwood Coast Energy Authority (RCEA) Community Choice
14 We note that even if lignin oil were used for dust suppression on the
dirt portion of McCann Road in front of residences—as stated in the
conditions of approval—such use would be minimal as the predominant use of
the road would be by the electric shuttle bus to transport employees from the
parking lot to the work site. Thus, there is no demonstration that any
potential environmental impacts would rise to any significant levels.
27
Energy, Repower Plus Program, which allows the project to purchase on-grid
power with 100 percent renewable energy resources. The project will have
four emergency propane generators and water pumps. The MND stated the
generators will be utilized in case of a power failure during a fire. They will
only be used to run water pumps for fire suppression, and they “will not be
used to power grow lights.” To maintain readiness, the generators will run
an exercise cycle for five minutes every two weeks, consuming 1.5 gallons of
propane a year. If no fires occur, generators will not run apart from the
exercise cycle.
The MND concluded the generators would not have potentially
significant air quality impacts or noise impacts to wildlife and neighbors. It
also concluded the project’s energy requirements would have no impact on
energy resources, would not conflict with a renewable energy plan, and would
not have significant greenhouse gas emissions.
The Board resolution adopting the MND found that the project’s power
would be provided by PG&E. The conditions of approval require Rolling
Meadow to record a development plan approved by the County’s planning
department (Planning Department) that the electric service developed for the
project is only to be used for the cannabis cultivation areas and associated
structures that support the cannabis operation. The conditions of approval
also require Rolling Meadow to construct noise containment structures for
the generators, and the ongoing requirements and development restrictions
require that the “noise produced by a generator used on an emergency-only
basis for cannabis drying, curing, and processing shall not be audible” by
neighbors.
28
a. Documentation to Support Findings
Plaintiffs contend the MND’s conclusions of no potentially significant
impacts related to air quality, noise, energy, greenhouse gas emissions, and
utilities and service systems are based on assumptions that (1) PG&E can
provide the necessary infrastructure, (2) RCEA can provide 100 percent
renewable energy resources, and (3) generator usage will be limited to
exercise cycles and operation of water pumps during fire emergencies. They
argue no documentation supports these assumptions and, therefore, the
County failed to proceed in the manner required by law.
Specifically, plaintiffs argue that the record does not establish that
PG&E can or will install underground power lines and can or will meet the
energy requirements for the project, and the conditions of approval do not
include a requirement that PG&E provide a “ ‘will serve’ letter” before project
operation; the conditions of approval and mitigation monitoring program do
not include a requirement that PG&E conduct a site-specific review and
create a site-specific construction plan; the conditions of approval and
mitigation monitoring program do not include a requirement that RCEA
confirm that it can provide 100 percent renewable energy for the project; and
the conditions of approval and mitigation monitoring program do not limit
generator use for fire suppression purposes during an emergency.
To the extent plaintiffs contend that the County’s conclusions of no
significant environmental impacts caused by the project’s power
infrastructure are “unsupported by any evidence,” we observe that plaintiffs
cite no authority in the sections of their opening brief (section V.C.1.a) or
reply brief (section II.E.1) on this topic showing that unsupported conclusions
in an initial study and negative declaration constitute a prejudicial abuse of
discretion. This is justification to disregard plaintiffs’ contention. (See Los
29
Angeles Unified, supra, 57 Cal.App.5th at pp. 497–498; Cinema West, supra,
13 Cal.App.5th at p. 219.) In any event, we are not persuaded by plaintiffs.
The findings of no significant impacts as related to the project’s power
infrastructure are supported by evidence. The record demonstrates that if
PG&E cannot supply power to the site, then the project will not operate.
Regarding renewable energy, the MND stated the “project operator has
secured a letter from the RCEA that confirms availability for the project’s
power demand.” And the record shows that Rolling Meadow will not use
generators during power outages other than for fire suppression.
To the extent plaintiffs are challenging the conditions of approval or
the mitigation monitoring and report program, the County and Rolling
Meadow argue, and we agree, that plaintiffs forfeited these arguments by
raising them for the first time on appeal. In the trial court, plaintiffs did not
argue, as they do here, that any claimed lack of documentation to support the
conclusions was addressed “through reference to mitigation conditions that
were not made enforceable.” In their trial court merits briefing, in
attempting to demonstrate a fair argument that the project may have
significant energy impacts, plaintiffs argued, among other things, that the
power extension was unverified despite requests from PG&E and RCEA to
verify the infrastructure and service. And without power, prolonged reliance
on generators was likely and would cause various environmental impacts
which were not analyzed. They continued to assert that the adopted findings
and conditions did not restrict generator use. But plaintiffs advanced these
arguments to support their contention that there was a fair argument of
environmental impacts associated with satisfying the project’s energy
requirements. They were not a separate argument challenging the conditions
of approval or mitigation monitoring and report program, like here. This is
30
clear from plaintiffs’ trial brief where they claimed, the “lack of necessary and
specifically requested information concerning the Project’s energy needs and
infrastructure, together with the absence of any conditions restricting
generator use, expands the fair argument concerning impacts associated with
satisfying the Project’s energy requirements.” Because plaintiffs did not
advance these arguments to the trial court, we will not address them. (See
Ocean Street, supra, 73 Cal.App.5th at pp. 1008–1009.)
Plaintiffs have not demonstrated that the conclusions of no significant
environmental effects related to the project’s power sources constitute a
prejudicial abuse of discretion.
b. Reasonably Foreseeable Future Activities
Plaintiffs argue the County failed to proceed in the manner required by
law by not analyzing impacts from reasonably foreseeable future activities.
They contend it is reasonably foreseeable that PG&E may not provide the
proposed infrastructure, may not provide it before the project is operational,
and may not have the capacity to meet the project’s needs. They further
argue that RCEA may not be able to provide 100 percent renewable energy
sources. They also assert it is reasonably foreseeable that generators will be
used for purposes beyond emergency fire suppression. Therefore, plaintiffs
contend the County was required to, but did not, address the environmental
impacts of these circumstances.
We agree with the County and Rolling Meadow that plaintiffs waived
this argument. This three-paragraph section in plaintiffs’ opening brief
(section V.C.1.b) does not cite any legal authority or record evidence.
Plaintiffs have failed, therefore, to support their claimed foreseeable
circumstances. (See Hernandez, supra, 37 Cal.App.5th at p. 277 [an issue
raised but unsupported with reasoned argument, citations to authority, and
31
record citations is waived]; Stolman v. City of Los Angeles (2003)
114 Cal.App.4th 916, 926–927 [cursory arguments unsupported by record
citations are disregarded].) Therefore, we do not address this issue.
c. Fair Argument of Significant Effect on the Environment
Plaintiffs contend substantial evidence exists to support a fair
argument that the power needs of the project may have a significant effect on
the environment. We disagree.
The MND explained that electricity for the project will be supplied by
PG&E through installation of new underground electrical lines run from the
existing section of infrastructure. The local utility, RCEA, will supply the
project’s power through the purchase of 100 percent renewable sources. The
MND stated, the “project operator has secured a letter from the RCEA that
confirms availability for the project’s power demand.” The MND stated that,
“PG&E will conduct a site-specific review of the project and create a site
specific construction plan. The project will comply with PG&E’s site-specific
safety and installation requirements.”
Staff responded to public comments which questioned PG&E’s ability to
adequately supply power needs for the project. Staff explained that PG&E
was the only authorized power source for the project. “The applicant is
required to demonstrate that PG&E is installed as described by the project
description prior to use of any power use for the proposed project.” At the
Board hearing, regarding a “will serve letter” from PG&E, the County’s
planning director (Planning Director) explained that obtaining such letter is
normally done with water and sewer service. He explained that if the
applicants could not get PG&E on the site, they are not authorized to run on
a generator so, “the site would not be able to operate until PG&E is on-site.”
Regarding generator use, County staff reiterated that “the [MND] is very
32
clear. The project does not use generators to provide backup power in the
case of PG&E outages. The generators are there specifically to support the
fire safety mechanisms. They’re for no other use. So if the power goes out
from PG&E, the project [will be] without power, but the generators are there
to support the fire safety equipment. That’s the only reason their [sic] there,
and the [MND] is very clear on that purpose.”
The conditions of approval and requirements and restrictions which
must be satisfied for the life of the project include a mandate that all
components of the project must be developed, operated, and maintained in
conformance with the project description, the approved site plan, the plan of
operations, and the conditions of approval. The project description in the
MND stated, in relevant part, that the electricity would be supplied by PG&E
and power would be 100 percent renewable supplied by RCEA. The project
description also explained that generators could only be used in case of a
power failure during a fire to run water pumps, and during their exercise
cycles.
Plaintiffs argue the record contains substantial evidence demonstrating
that PG&E will either not be able to provide power to the project or will not
be able to meet the needs of the project’s operation, which would result in
generator usage above that analyzed in the MND. Thus, plaintiffs argue that
more generator usage may have environmental impacts on air quality,
biological resources, energy, greenhouse emissions, and utilities and service
systems.
Plaintiffs cite to record evidence from 2017 and 2018 related to a prior
initial study, which the County deemed inadequate for failing to analyze
impacts from generator usage, identifying concern over generator usage, as
the area “would not be a priority for PG&E to restore power during winter
33
events.” This evidence is irrelevant. It is based on a prior version of the
project which proposed to use generators for backup power. As discussed
above, the project as approved does not include such generator usage.
Plaintiffs cite to record evidence demonstrating that in 2018, the
County’s peer review consultant recommended Rolling Meadow obtain a
letter from PG&E describing how PG&E planned to provide power to the site
and obtain a letter from RCEA confirming it could provide the renewable
energy source for the project. According to plaintiffs, no such letters were
obtained.
Plaintiffs cite to area residents’ comments about long lasting winter
power outages. They questioned whether PG&E could supply year-round
power in the rural area and explained that PG&E did not have enough power
for current farm owners to obtain industrial power drops. One commenter
stated PG&E was unable to meet the demand of recent cannabis farms
because its infrastructure was not designed for that level of industry.
Commenters suggested that during power outages the project would use
generators for backup power, which could have fire safety and ecological
impacts. While area residents may comment on their experiences with power
outages and the inability to obtain power (see Ocean View Estates
Homeowners Assn., Inc. v. Montecito Water Dist., supra, 116 Cal.App.4th at
p. 402), comments regarding the project’s claimed generator usage and any
alleged resulting impacts are speculative and inaccurate given the record and
do not constitute substantial evidence (see Parker Shattuck, supra,
222 Cal.App.4th at p. 777).
Taking the evidence together, plaintiffs did not identify substantial
evidence in the record of a fair argument that there may be a significant
environmental effect. Even if we assume the record demonstrates that the
34
project may not be able to obtain power, it does not demonstrate that the
project may have a substantial effect on the environment. If Rolling Meadow
cannot obtain power, the project will not operate. Even if plaintiffs’
assertions that PG&E will not be able to provide power to the project or that
there may be long periods without power, the next step of their premise is
unsupported. Their arguments are all based on the premise that if there is
no power to the project site, then generators will be used to power operations.
For the reasons explained above, this claim is speculative and contrary to the
record.
Plaintiffs have not met their burden of demonstrating that substantial
evidence supports a fair argument that the project’s power demands may
have a significant effect on the environment.
5. Fire Risk and Safety
Plaintiffs contend that the conclusions on fire risk and safety are
unsupported by documentation, and that substantial evidence supports a fair
argument that the fire risks associated with the project may have a
significant effect on the environment. We disagree.
The project site is accessed by two routes. During the dry season, when
the low water bridge over the Eel River is available, primary access is
McCann Road via Dyerville Loop Road. McCann Road is a county-
maintained road between its connection with Dyerville Loop Road and the
ranch’s property line. During winter, when the bridge is not available, access
will be via Alderpoint Road. The project will be attended by a maximum of
30 employees a day. While Rolling Meadow initially proposed that employees
would park on the ranch and then ride an electric bus to the cultivation
locations, the project as approved will have the employees park at the park
and ride lot near the highway and be picked up by a project bus.
35
As explained in the MND, the project is in a State Responsibility Area
(SRA) and is designated by the Department of Forestry and Fire Protection
(Cal Fire) as a very high fire hazard severity area. In the MND’s checklist on
wildfire impacts, the checklist asks, if located in a SRA or classified as a very
high fire hazard severity zone, whether the project would substantially
impair an adopted emergency response or evacuation plan, would exacerbate
wildfire risks thereby exposing occupants to wildfire pollutants or the
uncontrolled spread of a wildfire, would require the installation or
maintenance of associated infrastructure, such as roads or emergency water
sources, which may exacerbate fire risk or that may result in impacts to the
environment, and would expose people or structures to significant risks
resulting from runoff, post-fire slope instability, or drainage changes. The
MND concluded these impacts were less than significant or nonexistent.
In assessing the impact of whether the project would exacerbate
wildfire risks thereby exposing occupants to wildfire pollutants or the
uncontrolled spread of a wildfire, the MND explained that the project had the
potential to significantly exacerbate wildfire risk. It explained that because
the project design included rainwater storage and emergency generators, and
because it will improve internal roads to meet the SRA Regulations, the
project would improve evacuation success, and the impact was reduced to less
than significant.
In assessing the impact of whether the project would require the
installation or maintenance of associated infrastructure, such as roads,
emergency water sources, or power lines, which may exacerbate fire risk or
result in impacts to the environment, the MND concluded the impact was less
than significant. The MND explained the project would expand electric
power into the project area with underground PG&E power lines. PG&E
36
would conduct a site-specific review of the project and create a construction
plan. The project would comply with PG&E’s site-specific safety and
installation requirements and thereby it reduced the potential of the project
to exacerbate fire risk and associated environmental impacts to less than
significant. The MND concluded the associated fire risk from power line
installation was less than significant.
In assessing hazards impacts, the MND concluded the project would
not impair implementation of or physically interfere with an adopted
emergency response plan or emergency evacuation plan. The MND explained
that this is because of the isolated location. If there was a wildfire, the
project would use the electric bus to evacuate the employees, so there was no
potential for employee traffic to interfere with emergency evacuation.
Regarding response time, the MND explained that Cal Fire provides
emergency response to fire, and the nearest Cal Fire station is in Weott, 12
miles away. It stated it would take firefighters 35 minutes to reach the
project site.
The MND relied on an access assessment of McCann Road prepared by
Northpoint Consulting in 2020. The MND stated Northpoint Consulting
concluded McCann Road meets the category 2 road standard and is the
functional equivalent of a category 4 road15 with implementation of
recommendations the consultant made and due to extremely low traffic
volumes. Record evidence demonstrates that the County’s department of
public works (Department of Public Works) also investigated the width of
McCann Road and conducted multi-day traffic counts. The deputy director
15 Per the SRA Regulations, for emergency access, roads must meet a
minimum category 4 road standard, which requires two 10-foot-wide traffic
lanes capable of providing for two-way traffic to support emergency vehicle
and civilian egress. (County Code, § 3112-3.)
37
stated that while McCann Road was not developed to category 4 road
standards, it was “developed to an adequate functional classification for the
proposed project.” The Department of Public Works reviewed Northpoint
Consulting’s access assessment and found its conclusions to be consistent
with the Department’s findings.
In approving the project, the conditions of approval include
requirements that a minimum of 50 percent of the stored rainwater must be
reserved for fire suppression purposes, that Rolling Meadow must store
sufficient water at each structure for firefighting purposes, which amount
“shall be approved” by the Planning Director in consultation with either
Cal Fire or the Fruitland Ridge Fire District, and that Rolling Meadow must
purchase a tanker truck to have onsite in the event of a fire.
a. Unsupported Conclusions
Plaintiffs contend the County’s conclusion that there were no
potentially significant environmental impacts based on wildfire conditions is
not supported by documentation, constituting a prejudicial abuse of
discretion. Preliminarily, we observe, again, that plaintiffs cite no legal
authority in this section of their opening brief (section V.D.2) or reply brief
(section II.F.5). (See Cinema West, supra, 13 Cal.App.5th at p. 219.)
Plaintiffs assert there is “no documentation establishing that McCann
Road can handle emergency wildland fire equipment and civilian evacuation
(see supra, section V.D.1).” On this topic, that is the entirety of their claim
related to emergency access and evacuation. Section V.D.1 of plaintiffs’
opening brief addresses their contention that the project conflicts with the
General Plan and SRA Regulations. It is not a CEQA argument. Because
plaintiffs make no substantive argument demonstrating how this issue was a
prejudicial abuse of discretion under CEQA and do not cite the record or legal
38
authority, we will not address their one-sentence argument. (See Los Angeles
Unified, supra, 57 Cal.App.5th at pp. 497–498; Cinema West, supra,
13 Cal.App.5th at p. 219; Hernandez, supra, 37 Cal.App.5th at p. 277.)
Plaintiffs also contend “there is a lack of substantiation regarding the
ability of rainwater storage to address wildfire emergencies.” Plaintiffs point
to the MND, which stated that the project will store up to 320,000 gallons of
rainwater, which will be used for landscaping, fire protection, and
supplemental water for dust mitigation and irrigation. In concluding the
project would have a less than significant impact on exacerbating wildfire
risks, the MND pointed to rainwater storage as one reason the impact had
been reduced to less than significant. In approving the project, the County
imposed a condition of approval that a “minimum of 50% of the stored water
shall be reserved for fire suppression purposes. The applicants shall install
meters at all storage tanks and make the logs available to [C]ounty staff
upon inspection.” Plaintiffs argue “there is no documentation supporting the
conclusion that 50% of the stored water will be available during the entirety
of the fire season or that 50% of the stored water would be sufficient to
address a wildfire.”
The County and Rolling Meadow argue plaintiffs forfeited this
argument for failure to exhaust administrative remedies. We disagree. The
issue was raised during the administrative process. (See Agoura, supra,
46 Cal.App.5th at p. 677.) For example, in remarking on wildfire risk, a
member of the public commented that the “new water use plan put forth by
the applicant at the last minute . . . shows that stored water of 320,000
gallons will be ‘depleted in August and September.’ . . . There is no additional
proposed water storage and the new plan shows that stored water will be
depleted in August, September and October—when it would be most needed
39
for fire season.” The commenter requested the County “[r]equire that there
will either be additional storage or that water for fire suppression is not
depleted at any time.” At the appeal hearing, counsel for the administrative
appellants argued that various conditions of approval should be adopted,
including that rainwater must be reserved for firefighting during fire season.
Plaintiffs fail to demonstrate how their contention that no
documentation supports the conclusion regarding rainwater being used for
fire suppression constitutes a prejudicial abuse of discretion. On this topic,
plaintiffs spend one paragraph merely summarizing parts of the record. They
do not cite legal authority or provide a substantive analysis to demonstrate
how their argument—if accurate—constitutes a CEQA violation.
Finally, plaintiffs contend the County’s conclusions regarding wildfire
conditions “also relied on PG&E being able to run new electric lines
underneath the existing road structure. As addressed supra, section V.C.1,
there is no documentation supporting this.” In section V.C.1 of their opening
brief, plaintiffs argued that the findings regarding the project’s power sources
were conclusions unsupported by any documentation. We need not address
this argument further.
b. Fair Argument of Significant Effect on the Environment
Plaintiffs argue substantial evidence in the record supports a fair
argument that the fire risks associated with the project may have a
significant effect on the environment. We disagree.
Plaintiffs focus on access issues and response times for emergency
services. The County and Rolling Meadow argue plaintiffs forfeited their
contention regarding emergency response times by not raising it before the
trial court. In response, plaintiffs point to one sentence in their trial brief
where they asserted that the MND downplayed “the site access challenges
40
that would be encountered by police, fire, and other emergency services.”
They also point to a brief remark at the trial court hearing where plaintiffs
argued that the project posed a significant risk of environmental impact if
there is a wildfire “and fire protection services, fire suppression services,
cannot get there safely and timely.” The trial brief, despite the sentence
plaintiffs point to, did not make any arguments based on record evidence
discussing long emergency response times to the project area. Plaintiffs
forfeited any argument attempting to demonstrate a significant effect on the
environment based on response times. (See Ocean Street, supra,
73 Cal.App.5th at pp. 1008–1009.) Even assuming plaintiffs did not forfeit
this argument, they did not meet their burden of citing record evidence
supporting a fair argument that the project may have a significant effect on
the environment. Plaintiffs rely on the following evidence.
In 2017—before any MND was circulated for review—Cal Fire advised
the County that “many hazards” confronted “fire protection agencies in most
subdivisions on SRA lands. Steep terrain and heavy wildland fuels
contribute to fire intensity and spread. The distances from fire stations and
road grades encountered usually create an excessive response time for
effective structure fire suppression purposes.” Cal Fire advised that in SRA
areas, it “does not support development in areas where there is no local
agency fire service for structure fires and emergency medical response.”
In January 2018, County staff wrote to Rolling Meadow after reviewing
the 2017 initial study. Staff identified various deficiencies in that initial
study, including on the topic of fire protection in the public services impact
analysis. Staff expressed concerns regarding the response time to access the
site during a fire, and stated that the initial study must respond to this
potential impact resulting from high risk response times.
41
The Fruitland Ridge Volunteer Fire Protection District (district)—first
responders for the project site—commented on the MND. The district
explained that it took 22 minutes to reach the McCann bridge, with
additional time added for any location, like the project, on the east side of the
Eel River. The farthest location of the project is over five miles from the
bridge. Depending on road conditions, it could take an emergency vehicle
between 20 and 60 minutes to navigate the incident, for a total response time
between 42 minutes to 1 hour, 22 minutes. The district also expressed
concern about access, stating the roads to the area are category 2 roads made
of gravel and dirt, with steep slopes and hairpin turns. The private roads
across the river are narrow and dangerous for emergency vehicles.
Additionally, the district commented on the project’s water storage in
the event of a wildfire. It stated the approximately 300,000 gallons of stored
water were inadequate, explaining that the turnaround time for a water
tender was at least 45 minutes, and the water tender would use its 2,500
gallons of water in 20 minutes. The district recommended the project be
required to store one million gallons of water.
The administrative appellants retained Steve Salzman, a licensed civil
engineer, to conduct an evaluation of McCann Road. Salzman performed a
survey of McCann Road from Dyerville Loop Road to the gate of Rolling
Meadow’s property. He determined whether the road meets the standards of
a category 4 (or equivalent) road pursuant to the County “Standards for
Roadway Categories.”
Salzman observed the following road conditions from McCann Road’s
intersection with Dyerville Loop Road, across the river, and east to the
property gate: The bridge over the river is 11 feet wide and if a vehicle broke
down on the bridge access would be blocked. The segment of the road
42
heading east from the bridge is a 12-foot wide gravel causeway, next to about
800 feet of gravel bar. Moving east, the road varies between 12 and 16 feet
wide with no consistent shoulders and a number of pinch points where the
road is too narrow for two vehicles to pass, some with adequate turnouts and
others without. The remainder of the road to the property gate is gravel or
dirt with short segments of old asphalt, with widths that vary between 12
and 14 feet. This area has no consistent shoulders and a number of pinch
points where the road is too narrow for two vehicles to pass, some have
turnouts to allow passing while others do not. He described it as a one-lane
dirt road. Salzman concluded that none of the segments of McCann Road
from the bridge to the property meet category 4 requirements. He explained
that the County’s director of Public Works has the authority to declare the
road a category 4 equivalent, based on evaluation of the road conditions and
its uses. He opined, though, that McCann Road does not meet the
requirements for a category 4, or equivalent, road.
Plaintiffs also cite to public comments, claiming the public “commented
about the increased fire risk posed by the Project, and based upon personal
knowledge, they addressed drought conditions, road hazards, emergency
response time, and more.” But plaintiffs merely provide a lengthy string of
record cites “without making an attempt to explain what is contained in those
pages or why it is relevant,” which “is by itself sufficient to defeat their
arguments.” (Rominger, supra, 229 Cal.App.4th at p. 729.)
Plaintiffs’ evidence does not support a fair argument that the project
may have a significant effect on the environment related to wildfire risks.
Plaintiffs focus on evidence regarding response times in the event of an
emergency, but they do not explain how lengthy response times constitute an
impact on the environment caused by the project. (See § 21068 [“ ‘Significant
43
effect on the environment’ means a substantial, or potentially substantial,
adverse change in the environment.”]; § 21060.5 [“ ‘Environment’ means the
physical conditions which exist within the area which will be affected by a
proposed project, including land, air, water, minerals, flora, fauna, noise, or
objects of historic or aesthetic significance.”].) Any difficulty for first
responders to access the project site, and the surrounding area, exists
without the project. Plaintiffs fail to explain how any issues related to
access—emergency vehicle ingress and civilian egress—may impact the
environment. “The question is not whether substantial evidence supports a
fair argument that the proposed project will have significant impacts on
resident safety and emergency evacuation. . . . [T]he question is whether the
project may have a significant effect on the environment.” (Newtown
Preservation Society v. County of El Dorado, supra, 65 Cal.App.5th at p. 788,
italics omitted.) Here, the environment affects access, not the project. (See
ibid. [analysis does not extend to situations where the environment has an
effect on a project]; see also City of Hayward v. Trustees of California State
University (2015) 242 Cal.App.4th 833, 843 [“The need for additional fire
protection services is not an environmental impact that CEQA requires a
project proponent to mitigate.” (italics omitted)].)
This shortcoming is further emphasized in plaintiffs’ reply brief. In
claiming to support their fair argument contention, plaintiffs contend that
the “record demonstrates that the location of the Project is such that wildfire
risks are exacerbated, and should a fire start, its uncontrolled spread is
likely. This is so because the Project’s location and roadways prevent quick
access by emergency services.” This claim does not satisfy plaintiffs’ burden
to demonstrate a fair argument of a significant effect on the environment.
44
Plaintiffs also assert, “Credible, substantial evidence exists that the
Project is associated with an increased risk of wildfire, and the County has
not properly mitigated for this impact. Specifically, the County’s reliance on
rainwater catchment tanks is not a sufficient mitigation measure to address
the increased risk of wildfire associated with the Project.” To the extent
plaintiffs are arguing the project’s use of rainwater catchment tanks may
have a significant effect on the environment, they do not provide any
substantive argument of how so. (See Cinema West, supra, 13 Cal.App.5th at
p. 219; Hernandez, supra, 37 Cal.App.5th at p. 277.)
In sum, plaintiffs have not met their burden of demonstrating that
substantial evidence supports a fair argument that the project may have a
significant effect on the environment related to fire and safety risks.
B. Planning and Zoning Law
In discussing fire risks and safety, plaintiffs argue the project conflicts
with the General Plan and SRA Regulations.
1. Additional Background
As summarized above, based on Northpoint Consulting’s access
assessment and the Department of Public Works’ evaluation, the County
determined that McCann Road meets category 4 functional equivalency. At
the Board hearing, the deputy director of the Department of Public Works
explained that not all roads need to meet or exceed category 4 standards to
have adequate functional capacity; if a road is less than category 4, it may be
shown that it is functionally equivalent to meet Cal Fire requirements.
Roads not constructed to category 4 standards must be analyzed by an
engineer to ensure the road has adequate functional capacity which, here,
was documented in the access assessment for the project. County staff
explained that the concept of functional capacity stems from the SRA
45
Regulations and considers the volume of the road related to its capacity. A
road with adequate functional capacity can accommodate the demands of the
road and emergency response vehicles. Based on the access assessment and
Department of Public Works’ evaluation, the Planning Department
determined McCann Road can accommodate the traffic associated with the
project.
In approving the project, the County found the project was consistent
with the General Plan. The County’s consistency findings discussed fire risk,
explaining that Cal Fire’s comments had recommended compliance with the
SRA Regulations, which establish development standards for minimizing
wildfire danger in SRAs. The findings explained that Cal Fire had been sent
referrals for the project. The County found the project to be consistent with
the fire protection policies of the General Plan’s Safety Element.
The County also found the project would be required to comply with all
County regulations for fire risk, explaining that the “project is required to
adhere to all Cal[ ]Fire regulations and standards regarding fire safety.
County [Department of] Public Works states that McCann Road is developed
to an adequate functional classification for the project.” The County found
the “project conforms to the General Plan policies related to access roads in
areas of fire risk, including Safety Element . . . policies.” It explained that
Northpoint Consulting’s access assessment “concluded that the project
conforms to County Code Fire Safe Regulations with recommended
improvements, which are incorporated into the project.” A condition of
approval requires Rolling Meadow to complete all recommended
improvements to McCann Road as specified in the Northpoint Consulting
report. Another condition of approval requires Rolling Meadow to submit a
46
transportation management plan detailing how employees will park at the
park and ride lot off the highway and be picked up by a project bus.
2. Legal Principles & Standard of Review
The Planning and Zoning Law provides every county must adopt a
“comprehensive, long-term general plan for the physical development of the
county.” (Gov. Code, § 65300.) A general plan is essentially the
“ ‘constitution for all future developments’ ” within a city or county. (Citizens
of Goleta Valley v. Board of Supervisors (1990) 52 Cal.3d 553, 570.)
“ ‘[A] governing body’s conclusion that a particular project is consistent
with the relevant general plan carries a strong presumption of regularity that
can be overcome only by a showing of abuse of discretion.’ [Citations.] ‘An
abuse of discretion is established only if the city council has not proceeded in
a manner required by law, its decision is not supported by findings, or the
findings are not supported by substantial evidence.’ ” (Friends of Lagoon
Valley v. City of Vacaville (2007) 154 Cal.App.4th 807, 816.) “A project need
not conform perfectly to every general plan policy to be consistent with the
general plan. [Citation.] The rule of general plan consistency is that the
project ‘must be “compatible with the objectives, policies, general land uses,
and programs specified in” ’ the general plan.” (Golden Door Properties, LLC
v. County of San Diego (2020) 50 Cal.App.5th 467, 501 (Golden Door).) In
determining whether a project conflicts with a general plan, “ ‘the nature of
the policy and the nature of the inconsistency are critical factors to consider.’
[Citation.] A project is inconsistent with a general plan ‘if it conflicts with a
general plan policy that is fundamental, mandatory, and clear.’ ” (Spring
Valley Lake Assn. v. City of Victorville (2016) 248 Cal.App.4th 91, 100.)
“ ‘[C]ourts accord great deference to a local governmental agency’s
determination of consistency with its own general plan, recognizing that “the
47
body which adopted the general plan policies in its legislative capacity has
unique competence to interpret those policies when applying them in its
adjudicatory capacity. [Citations.] Because policies in a general plan reflect
a range of competing interests, the governmental agency must be allowed to
weigh and balance the plan’s policies when applying them, and it has broad
discretion to construe its policies in light of the plan’s purposes.” ’ ” (Golden
Door, supra, 50 Cal.App.5th at p. 501.)
“It is, emphatically, not the role of the courts to micromanage these
development decisions. Our function is simply to decide whether the city
officials considered the applicable policies and the extent to which the
proposed project conforms with those policies, whether the city officials made
appropriate findings on this issue, and whether those findings are supported
by substantial evidence.” (Sequoyah Hills Homeowners Assn. v. City of
Oakland (1993) 23 Cal.App.4th 704, 719–720.) Courts may not substitute
their view for the view of the county officials, nor reweigh conflicting
evidence. (Id. at p. 717.) As stated by our Supreme Court, “Reviewing courts
must defer to a procedurally proper consistency finding unless no reasonable
person could have reached the same conclusion.” (Orange Citizens for Parks
& Recreation v. Superior Court (2016) 2 Cal.5th 141, 155.) The burden is on
plaintiffs to demonstrate, based on the evidence in the record, that a general
plan consistency determination was unreasonable. (Pfeiffer v. City of
Sunnyvale City Council (2011) 200 Cal.App.4th 1552, 1563.)
A county’s “interpretation of its own ordinance is ‘ “entitled to
deference” in our independent review of the meaning or application of the
law.’ ” (Harrington v. City of Davis (2017) 16 Cal.App.5th 420, 434.)
Turning to the General Plan, the Safety Element includes policies S-
P19 and S-S9, both of which state that development “shall conform to” the
48
SRA Regulations. Implementation measure S-IM5 states that the County
“shall maintain efficient and timely procedures for processing SRA Exception
Requests to CAL FIRE.”
The SRA Regulations “constitute the basic wildland fire protection
standards of the County for lands within” SRAs. (County Code, § 3111-1.)
The SRA Regulations were adopted to establish “minimum wildlife protection
standards in conjunction with building, construction and development in
SRA.” (Id., § 3111-2.) They require that the “future design and construction
of structures, subdivisions and developments in SRA shall provide for basic
emergency access.” (Ibid.)
Chapter 2 of the SRA Regulations dictates emergency access, requiring
that non-exempt roads provide “safe access for emergency wildland fire
equipment and civilian evacuation concurrently.” (County Code, § 3112-1.)
For width, roads must meet a minimum category 4 road standard, which
requires two 10-foot-wide traffic lanes capable of providing for two-way traffic
to support emergency vehicle and civilian egress. (Id., § 3112-3.) Roadways
must support at least 75,000 pounds for a fire vehicle. (Id., § 3112-4.)
An exception to the requirement to meet a category 4 road standard
may be granted. (County Code, § 3112-3.) The exception must provide “the
same overall practical effect as these regulations towards providing
defensible space.” (Id., § 3111-8.) The exception provisions of the SRA
Regulations require an applicant to apply for an exception, which are dealt
with by the local inspection authority together with Cal Fire. (Id., §§ 3111-7,
3111-9.) When an exception to the access standards is requested, the County
must request Cal Fire to review the exception request. (Id., § 3111-9.) If Cal
Fire does not respond within 30 days, the Planning Director shall assume Cal
Fire supports the exception. (Ibid.)
49
3. Analysis
Plaintiffs focus on emergency access via McCann Road and the General
Plan’s mandate to coordinate with Cal Fire.
As to access, plaintiffs contend the project does not conform to the SRA
Regulations regarding road standards and, therefore, is inconsistent with the
General Plan. General Plan policies S-P19 and S-S9 require that
development “shall conform to” the SRA Regulations. The SRA Regulations,
in turn, require roads to meet a minimum category 4 road standard—two 10-
foot-wide lanes. (County Code, § 3112-3.) McCann Road does not meet a
category 4 minimum width. However, the purpose of the category 4 width
standard is to allow “for two-way traffic flow to support emergency vehicle
and civilian egress.” (Ibid.) The exception provisions authorizing a lower
road category demonstrate that the goal is to protect the intent of the SRA
Regulations without imposing undue hardship due to conditions peculiar to
the County. (Id., § 3111-7.) An exception may be allowed where it “provides
the same overall practical effect as” the SRA Regulations. (Id., § 3111-8.)
Substantial evidence in the record demonstrates that McCann Road
allows for a traffic flow which supports emergency vehicle access and civilian
evacuation and, thus, has the same overall practical effect that the SRA
Regulations require. As already discussed, the Department of Public Works
independently evaluated McCann Road and reviewed Northpoint
Consulting’s access assessment, and it concluded the road was “developed to
an adequate functional classification for the proposed project.” The County
made findings on General Plan consistency and relied on this information.
Plaintiffs argue that no reasonable person could conclude that McCann Road
is functionally equivalent to a category 4 road. We disagree. Plaintiffs failed
50
to meet their burden of demonstrating that the project is inconsistent with
the General Plan’s requirements to conform with the SRA Regulations.
Plaintiffs also contend the County failed to properly coordinate with
Cal Fire, in violation of General Plan policy S-P17 and implementation
measure S-IM5, and in violation of SRA Regulations sections 3111-4, 3111-9,
and 3112-3.16 Implementation measure S-IM5 states the County “shall
maintain efficient and timely procedures for processing SRA Exception
Requests to CAL FIRE.” The SRA Regulations’ exception provisions require
the County to ask Cal Fire to review an exception request. (County Code,
§ 3111-9.)
The County and Rolling Meadow claim the County did consult with Cal
Fire. In 2017, Cal Fire submitted a comment letter on Rolling Meadow’s
permit applications. For projects in SRAs, Cal Fire submitted its
recommendations for development, including that the development must
meet minimum fire safe standards in conformance with the County
regulations, including specific standards for roads providing ingress and
egress. Cal Fire stated that if it developed any additional comments on the
project, it would submit an additional response letter. There is no showing
that Cal Fire commented further. Based on Cal Fire’s letter, the County’s
staff report included a chart showing to which referral agencies the project
had been referred to for review and comment, and it marked that Cal Fire
had responded and provided conditional approval. The Board’s resolution
16 The County and Rolling Meadow argue plaintiffs are barred from
raising arguments based on General Plan policy S-P17 and County Code,
section 3111-4 because they were not raised during the administrative
process. Plaintiffs concede that neither policy S-P17 nor section 3111-4 were
raised during the administrative process so, therefore, we do not consider
their arguments based on these authorities. (See Agoura, supra,
46 Cal.App.5th at p. 677.)
51
approving the project stated Cal Fire had been sent referrals for the project.
The record demonstrates that the County sent Rolling Meadow’s permit
applications to Cal Fire and received a reply.
It is unclear whether the material provided to Cal Fire in 2017 included
information about road standards or emergency access. But even if the
County did not request Cal Fire to specifically review a determination that
McCann Road is the functional equivalent of a category 4 road, plaintiffs fail
to demonstrate how this constitutes an abuse of discretion. Substantial
evidence summarized above demonstrates that the County considered the
General Plan and SRA Regulations, evaluated McCann Road, and found it
functionally equivalent to meet the SRA Regulations’ access standards.
Plaintiffs have not explained how noncompliance with the requirement to
have Cal Fire review a road standard exception request mandates that we
find an abuse of discretion. (See Golden Door, supra, 50 Cal.App.5th at
p. 501 [a project need not conform perfectly to every general plan policy].)
In sum, plaintiffs have not met their burden of showing an abuse of
discretion.
III. DISPOSITION
The judgment is affirmed. The County and Rolling Meadow are
awarded their costs on appeal. (Cal. Rules of Court, rule 8.278(a)(1), (2).)
52
LANGHORNE WILSON, J.
WE CONCUR:
BANKE, ACTING P. J.
SIGGINS, J.*
A167278
Northcoast Environmental Center v. County of Humboldt
* Retired Presiding Justice of the Court of Appeal, First Appellate
District, assigned by the Chief Justice pursuant to article VI, section 6 of the
California Constitution.
53
Ti chiedi come si applica questo testo alla tua situazione?
Consulenza gratuita, senza impegno
Descrivi la tua situazione. Il nostro team ti ricontatterà via e-mail per la tua consulenza.
Continua la tua ricerca in ChatGPT o Claude
Collega Omnilex per cercare nel corpus legale dal tuo assistente IA.