Filed 8/28/24 Barajas v. City of Petaluma CA1/5
NOT TO BE PUBLISHED IN OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication or
ordered published for purposes of rule 8.1115.

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIRST APPELLATE DISTRICT

DIVISION FIVE

ADRIAN BARAJAS,
Plaintiff and Appellant, A165258
v.
CITY OF PETALUMA, (Sonoma County
Defendant and Respondent. Super. Ct. No. SCV-265770)

The Mitigation Fee Act (Gov. Code, § 66000 et seq.) (Act)1 authorizes
local agencies to impose fees on a specific development project to defray the
cost of public facilities related to that project. Section 66001,
subdivision (d)(1) (section 66001(d)(1)) requires that an agency make certain
“findings” every five years when these impact fees go unexpended.
In this action, plaintiff Adrian Barajas sought declaratory relief and a
writ of mandate ordering defendant City of Petaluma (City) to refund all
unexpended impact fees remaining in its accounts. Barajas alleged, among
other things, that City had failed to comply with section 66001(d)(1) because
its five-year findings for the 2018 fiscal year were based on studies conducted
before 2018. The trial court rejected this argument, concluding that section
66001(d)(1) required City to make new findings, not new studies, and that

1 Undesignated statutory citations herein are to the Government Code.

1
City’s findings for the 2018 fiscal year were based on sufficient evidentiary
support. Barajas challenges these rulings on appeal. We affirm.
BACKGROUND
I. The Act
In 1987, the Legislature enacted the Act “ ‘in response to concerns
among developers that local agencies were imposing development fees for
purposes unrelated to development projects.’ ” (Ehrlich v. City of Culver City
(1996) 12 Cal.4th 854, 864.) Although mostly “procedural in nature,” the Act
“embodies a statutory standard against which monetary exactions by local
governments subject to its provisions are measured.” (Id. at p. 865.)
Section 66001, subdivision (a) sets forth certain requirements for
“establishing, increasing, or imposing a fee as a condition of approval of a
development project by a local agency . . . .” Among other things, the agency
must determine how there is a “reasonable relationship” to the type of
development project for both the use of the fee and the need for the public
facility. (Id., subd. (a)(3)–(4).) The Act “thus codifies, as the statutory
standard applicable by definition to nonpossessory monetary exactions, the
‘reasonable relationship’ standard employed in California and elsewhere to
measure the validity of required dedications of land (or fees imposed in lieu of
such dedications) that are challenged under the Fifth and Fourteenth
Amendments.” (Ehrlich v. City of Culver City, supra, 12 Cal.4th at p. 865.)
Section 66001(d)(1) requires that “[f]or the fifth fiscal year following the
first deposit into the account or fund, and every five years thereafter, the
local agency shall make all of the following findings with respect to that
portion of the account or fund remaining unexpended, whether committed or
uncommitted . . . .” The agency must (1) identify “the purpose to which the
fee is to be put,” (2) demonstrate a “reasonable relationship between the fee

2
and the purpose for which it is charged,” (3) identify “all sources and amounts
of funding anticipated to complete financing in incomplete improvements” for
facilities identified when the fee was established/increased/imposed, and
(4) designate “the approximate dates” on which such funding is expected to be
deposited. (Id., subd. (d)(1)(A)–(D).) If these five-year findings are not made
as required, the agency “shall refund the moneys in the account or fund” to
“the then current record owner or owners of the lots or units . . . .”
(Id., subds. (d)(2), (e).)
Section 66001, subdivision (d)(2) requires that five-year findings “shall
be made in connection with the public information required by subdivision (b)
of Section 66006.” Section 66006, subdivision (b) identifies certain categories
of information about impact fee accounts or funds, and requires that this
information be made available to the public 180 days after the last day of
each fiscal year.
II. City’s Five-year Findings
The “entire focus” of Barajas’s claim and this appeal is limited to the
five-year findings made by City for the 2018 fiscal year. As of June 30, 2018
(the end of City’s fiscal year), it had approximately $32 million in unexpended
impact fee funds. City’s annual development impact fee report (2018 report)
described the purposes of these impact fees: to finance an aquatic center,
community center, fire suppression facilities, library facilities, parklands,
open spaces, law enforcement facilities, public facilities (e.g., city hall
renovation or relocation), city facilities (i.e., facilities constructed by City),
and traffic development.2

2 Two additional impact fee funds related to storm drainage also had

unexpended fees, but Barajas concedes these funds “are not subject to the
refund rules” of the Act and he is “no longer pursuing refunds therefrom.”

3
On February 25, 2019, City’s council adopted a resolution making its
five-year findings. The four findings stated:
“The purpose to which each fee is to be put is identified generally
in Exhibit A of the Report, and more specifically in the City of
Petaluma Mitigation Fee Report (Sinclair & Associates, May 8,
2008) and the Development Impact Fee Calculation and Nexus
Report for the City of Petaluma, California and Master Facilities
Plan for the City of Petaluma, California (both, Revenue & Cost
Specialists, L.L.C., August, 2003), as well as the ‘City of
Petaluma Mitigation Fee Act Nexus Report and Quimby Act
In-Lieu Report’ prepared by Municipal Resource Group and the
‘Traffic Mitigation Fee Program Update’ prepared by Fehr &
Peers (both, August, 2012) (collectively, the ‘Nexus Studies’).
Copies of the Nexus Studies are available for inspection at the
offices of the City Clerk.

“There is a reasonable relationship between each fee and the
purpose for which it is charged, as more fully set forth in and
demonstrated by the Nexus Studies.

“The remainder of funds needed to construct the public
improvements identified in the Nexus Studies related to each fee
will be collected from future development impact fees through
2025, the life of the City of Petaluma General Plan 2025, and
from other sources as identified in the Nexus Studies and the
City’s adopted Capital Improvement Program.

“Future sources and amounts of funding anticipated to complete
the financing of specific future capital projects are identified and
deposited into the appropriate account as part of the City’s
Capital Improvement Program budget cycle. No individual
development impact fee fund has collected sufficient funds to
construct all improvements covered by that fund as described in
the Nexus Study.”

The August 2003 “Development Impact Fee Calculation and Nexus
Report for the City of Petaluma” (2003 report) identified the need for impact
fees based on City’s “continually expanding residential and business
community,” as well as City’s “changing requirements for public safety,

4
streets and signals, storm drainage, and other quality of life facilities.” It
explained that a “component in determining the magnitude of impact of
future development and the necessary facilities needed to mitigate that
impact is a realistic assessment of the build-out population of the City.”
From the existing population in Petaluma of 54,548 persons, it calculated a
potential build-out population of 65,794 by 2025. It noted that upcoming
census information would “confirm or update” these figures.
The May 2008 “City of Petaluma Mitigation Fee Report” (2008 report)
set out a development impact fee program that included nine of the ten fee
categories identified in the 2018 report: aquatic center, community center,
fire suppression facilities, library facilities, parklands, open spaces,
law enforcement facilities, public facilities, and city facilities. It did not
include traffic development impact fees. For the other fees, however, the
report identified specific projects necessary to maintain the current level of
service to residents and provide services for future residents. The fire
suppression facilities impact fee, for example, listed relocation/construction
and renovation of fire stations, additional vehicles, and additional firefighter
equipment. The report also explained how these projects would “mitigate the
additional impacts and demands” created by development projects. For
example, the section on the fire suppression facilities impact fee stated that
development would “generate new demands for fire suppression and
emergency services” and the projects were necessary to maintain City’s
standard of 1 firefighter per 1,000 additional residents. The report used the
existing population of 57,085 persons, with a build-out population of 72,707
by 2025.
The August 2012 “City of Petaluma Mitigation Fee Act Nexus Report &
Quimby Act In-Lieu Fee Report” (2012 report) was conducted to determine

5
whether revisions to the development impact fee program were appropriate
based on changes in “public facility requirements, construction costs and land
costs” since 2008. It used the existing population of 58,165 persons, with the
same build-out population of 72,707 by 2025. The report recommended
various modifications to the impact fee categories described ante. For
example, the section on the fire suppression facilities impact fee calculated
slightly higher costs for the particular projects identified ($4,862,229 versus
$4,767,845) attributable to future development. But many of the categories
(e.g., parklands impact fees) included lower cost calculations. As a result,
City decreased the amount of development impact fees it imposed.
The August 2012 “Traffic Mitigation Fee Program Update” (2012 traffic
report) discussed updates to the traffic mitigation fee program adopted four
years prior. It explained that the program was “intended to fully fund
transportation improvements needed as a result of growth in the City.” The
report identified specific projects to relieve cross-town traffic attributable to
new development, including street and lane extensions, highway interchange
improvements, intersection improvements and constructions, as well as
traffic signal updates, pedestrian/bicycle improvements, and public transit
system improvements.
The capital improvement program adopted by City for fiscal year 2018–
2019 (CIP) identified City’s five-year plan for capital improvement projects,
including improvements funded with impact fees as well as other sources.
For example, the CIP stated that City would be completing its remodel of fire
stations in fiscal year 2018–2019, using $98,000 from the fire suppression
facilities impact fee fund and $236,000 from City’s transient occupancy tax.

6
III. Barajas’s Action
This action was originally filed in December 2019. Barajas was added
as a named plaintiff in the first amended complaint for declaratory relief and
petition for writ of mandate. The second amended complaint and petition
was filed in July 2020. The original plaintiff dismissed her claims in January
2021, leaving Barajas as the only named plaintiff.
Barajas alleged that the five-year findings made by City for the 2018
fiscal year violated the Act because they relied on nexus studies “more than
five years past, not conducted in 2018.” He alleged: “California law does not
allow for reference to prior nexus studies to meet a current nexus study
requirement.” Barajas also alleged that these five-year findings were late
because they were adopted on February 19, 2019, but had to be made
“in accordance with” public information due on December 27, 2018 (180 days
after the end of City’s fiscal year on June 30th). (§§ 66001, subd. (d)(2),
66006, subd. (b)(1).)
Barajas sought declaratory relief that City breached its legal duties in
failing to make the requisite five-year findings, and that it must cease further
collection of impact fees and refund unexpended fees as invalid, void, and
illegal. Barajas also sought a writ of mandate ordering City to refund “all
unexpended Impact Fees remaining in [its] accounts” plus interest earned,
including all fees collected after the December 27, 2018 deadline, and to cease
collection of impact fees until City “makes and adopts the requisite 5-Year
Findings . . . .”
City filed its opposition brief to the complaint and petition. As a
preliminary matter, City argued that Barajas lacked standing to bring the
action because the developer of his property only paid impact fees in
September 2019—more than a year after the 2018 fiscal year for which City

7
made its five-year findings—and thus Barajas was not entitled to any refund
of fees that were the subject of those findings. City then argued that section
66001(d)(1) did not require it to conduct new nexus studies in support of its
five-year findings. City also argued that the purported two-month delay in
its adoption of the findings did not require City to refund any of its impact
fees.
The trial court held an initial hearing and then requested supplemental
briefing from the parties. Among other things, it noted that Barajas had
failed to “pinpoint” what City’s five-year findings “actually said” or “exactly
how they were deficient.” The court directed Barajas to cite to specific
portions of the record containing each finding and the related evidence.
The parties submitted additional briefing. Barajas clarified that “the
only 5-Year Findings upon which relief is sought” were the “late-filed” and
“fatally defective” findings for the 2018 fiscal year made on February 25,
2019. Barajas conceded that he did not challenge the sufficiency of the first
finding (purpose of fee) required under section 66001(d)(1). On the second
finding (reasonable relationship between fee and purpose), Barajas argued
that the finding was “conclusory” and had “no current analysis whatsoever.”
He stated that the prior nexus studies could not be sufficient because they
did not take current information, like the City’s population, into account.
On the third finding (sources and amounts of funding to complete
financing for incomplete improvements), Barajas argued that the CIP either
played “no role” because it was not cited in the previous two findings or was
only “partially helpful” because it detailed projects not financed by impact
fees alone. On the fourth finding (approximate dates for deposit of such
funding) is expected to be deposited, Barajas argued that the CIP did not
provide such dates.

8
The trial court held another hearing and then denied the petition. On
the issue of standing, it explained that the timing of the impact fee payment
on Barajas’s property (after City’s five-year findings for the 2018 fiscal year)
was “immaterial” because Barajas sought a refund of all unexpended impact
fees in City’s accounts. The court thus concluded that Barajas had standing
“due to a potential right to a refund should his arguments prove
persuasive . . . .”
Turning to the merits of those arguments, however, the trial court
determined there was “no legal support” for Barajas’s contention that section
66001(d)(1) required City to “make new detailed studies as opposed to new
findings.” Section 66001(d)(1) “does not state that the agency needs to do
anything more than make those required findings.” The City made those
findings for the 2018 fiscal year, and thus the question was “whether the
studies and information on which the findings . . . rely are informationally
sufficient or proper basis for the findings.” The court determined that City’s
prior studies, including the 2018 report and CIP, “contain much detailed
information clearly covering all of the findings required.” While
acknowledging it was “possible” that older studies “could be outdated,” the
court concluded that Barajas had failed to show any support for such a
contention here.
The trial court also concluded that City’s two-month delay in making
its findings for the 2018 fiscal year did not violate section 66001(d)(1) and did
not “automatically trigger” a refund of unexpended impact fees. Judgment
was entered in favor of City and against Barajas. This appeal followed.
DISCUSSION
“ ‘A petition for traditional mandamus is appropriate in . . . actions
brought to attack, review, set aside, or void a quasi-legislative . . . or

9
ministerial determination, or decision of a public agency.’ ” (Beach & Bluff
Conservancy v. City of Solano Beach (2018) 28 Cal.App.5th 244, 258.) The
parties agree that City’s adoption of findings for the 2018 fiscal year was a
quasi-legislative action. (Walker v. City of San Clemente (2015) 239
Cal.App.4th 1350, 1363–1364 (Walker) [five-year findings under § 66001,
subd. (d)(1) constitute quasi-legislative action].)
“ ‘The trial court reviews an administrative action pursuant to Code of
Civil Procedure section 1085 to determine whether the agency’s action was
arbitrary, capricious, or entirely lacking in evidentiary support, contrary to
established public policy, unlawful, procedurally unfair, or whether the
agency failed to follow the procedure and give the notices the law requires.’ ”
(Beach & Bluff Conservancy v. City of Solano Beach, supra, 28 Cal.App.5th at
pp. 258–259.)
In this appeal, Barajas challenges both the trial court’s legal
determination that section 66001(d)(1) requires only new findings (not new
studies) and its factual determination that City’s findings for the 2018 fiscal
year had sufficient evidentiary support. City responds that the trial court
was correct in both respects but also renews its argument that Barajas lacked
standing to bring the action altogether. We begin with standing.
I. Standing
“As a general rule, a party must be ‘beneficially interested’ to seek a
writ of mandate.” (Save the Plastic Bag Coalition v. City of Manhattan Beach
(2011) 52 Cal.4th 155, 165 (Save the Plastic Bag Coalition), quoting Code Civ.
Proc., § 1086.) The petitioner bears the burden to demonstrate this beneficial
interest, and must show either some benefit “could accrue to him if the writ
were issued” or some detriment would be suffered by him if it were denied.
(Parker v. Bowron (1953) 40 Cal.2d 344, 352.) In other words, the

10
“beneficially interested” requirement “ ‘has been generally interpreted to
mean that one may obtain the writ only if the person has some special
interest to be served or some particular right to be preserved or protected
over and above the interest held in common with the public at large.’ ” (Save
the Plastic Bag Coalition, at p. 165.) The beneficial interest must be both
“direct” and “substantial.” (Ibid.)
Here, City argues that Barajas lacked standing to pursue this action
because impact fees for his property were not paid until September 2019,
more than a year after City’s 2018 fiscal year ended and seven months after
City adopted its five-year findings. City contends that Barajas was not
“ ‘beneficially interested’ ” in the outcome of the writ because he would not be
entitled to receive any refund of monies that were in the City’s accounts at
the end of the 2018 fiscal year.
This argument does not account for the scope of Barajas’s claims and
relief requested therein. Barajas sought a writ of mandate ordering City to
refund “all unexpended Impact Fees remaining in [its] accounts” including all
fees collected after the end of the 2018 fiscal year. Barajas argued that this
refund was required under section 66001 because City’s failure to make the
requisite five-year findings mandated a refund of “the moneys in the account
or fund” to “the then current record owner or owners of the lots or units . . . .”
(Id., subds. (d)(2), (e).) Accordingly, Barajas would have accrued a “direct”
and “substantial” benefit if the trial court had granted this relief: He would
have received a portion of the refund. (Save the Plastic Bag Coalition, supra,
52 Cal.4th at p. 165.) We thus conclude Barajas had a beneficial interest
sufficient to confer standing to pursue this action.3

3 Given this conclusion, we need not address the parties’ arguments

regarding alternative bases for standing, including “public interest” standing,

11
II. Section 66001(d)(1) Findings
We turn to the trial court’s legal determination that section 66001(d)(1)
did not require City to conduct new studies to support its five-year findings.
“We review de novo any challenge based on an interpretation of the Act’s
requirements.” (Walker, supra, 239 Cal.App.4th at p. 1363.)
In interpreting section 66001(d)(1), “ ‘ “our fundamental task is ‘to
ascertain the intent of the lawmakers so as to effectuate the purpose of the
statute.’ ” ’ ” (Lee v. Hanley (2015) 61 Cal.4th 1225, 1232.) The process “may
involve up to three steps.” (MacIsaac v. Waste Management Collection &
Recycling, Inc. (2005) 134 Cal.App.4th 1076, 1082.) First, we begin with the
words of the statute themselves as “chosen language is the most reliable
indicator of its intent . . . .” (Ibid.) “If the statutory language is clear and
unambiguous, our task is at an end, for there is no need for judicial
construction.” (Id. at p. 1083.) When the plain meaning of the text does not
resolve the question, we proceed to the second step and turn to maxims of
construction and extrinsic aids, including legislative history materials.
(Ibid.) If ambiguity remains, we “must cautiously take the third and final
step” and “apply ‘reason, practicality, and common sense to the language at
hand.’ ” (Id. at p. 1084.)
The plain language of section 66001(d)(1) is clear and unambiguous:
It requires only that an agency make certain “findings” with respect to the
unexpended portion of an impact fee account or fund. It does not specify any
particular evidentiary support needed to make those findings, let alone that
new studies must be conducted every time the findings are required. We see

taxpayer standing under Civil Code section 526a, and the “continuous accrual
doctrine” discussed in County of El Dorado v. Superior Court (2019)
42 Cal.App.5th 620, 627.

12
nothing in the text of section 66001(d)(1) that obligated City to conduct
studies in 2018 to support its five-year findings for the 2018 fiscal year.
Even if the statutory language were ambiguous, the legislative history
of section 66001(d)(1) would support this interpretation. When enacted in
1987, the Act contained a requirement that an agency make findings “with
respect to any portion of the fee remaining unexpended or uncommitted in its
account five or more years after deposit of the fee to identify the purpose to
which the fee is to be put and to demonstrate a reasonable relationship
between the fee and the purpose for which it was charged.” (Stats. 1987,
ch. 927, § 1, p. 3132.)4 In other words, the original text included a similar
requirement that an agency make findings related to impact fees still
remaining after five years, albeit specifying only two of the four particular
findings now required by section 66001(d)(1).
The Legislative Counsel’s Digest stated that these findings would
require an agency to “reexamine the necessity for the unexpended balance of
the fee, as specified, every 5 years[.]” (Legis. Counsel’s Dig., Assem. Bill
No. 1600 (1987–1988 Reg. Sess.) 4 Stats. 1987, Summary Dig., pp. 301–302.)
But we reject Barajas’s repeated contention that this term “reexamine” shows
an intent by the Legislature to require that new studies be conducted to
support the findings. On the contrary, committee bill analysis shows that the
Legislature contemplated “local flexibility” in meeting the requirements.

4 We grant the request by amici curiae California Special Districts

Association, California State Association of Counties, and League of
California Cities to take judicial notice of legislative history materials for
Assembly Bill No. 1600 (1987–1988 Reg. Sess.), which adopted the Act.
(Evid. Code, § 452, subd. (d); People v. Superior Court (Ferguson) (2005) 132
Cal.App.4th 1525, 1532 [Legislative Counsel digests, legislative committee
reports and analyses, and prior bill versions are properly the subject of
judicial notice].)

13
(Sen. Local Government Com., Analysis of Assem. Bill No. 1600 (1987–1988
Reg. Sess.), as introduced July 1, 1987, p. 2 (1987 Analysis).) It explained
that the Act “directs local agencies to meet these new fee requirements
without specifying the manner in which, or the basis upon which, these
requirements must be met.” (Ibid., italics added.)
Finally, we note that the recent addition of section 66016.5 to the Act is
consistent with our view on section 66001(d)(1). While subsequent legislative
history is ordinarily “given little weight,” it is “ ‘sometimes considered
relevant’ ” to clarify the Legislature’s intent regarding an earlier enacted
statute. (Barrett v. Rosenthal (2006) 40 Cal.4th 33, 54, fn. 17; Ailanto
Properties, Inc. v. City of Half Moon Bay (2006) 142 Cal.App.4th 572, 589,
fn. 13 [“While the concept of ‘subsequent legislative history’ may seem
oxymoronic, it is well established that ‘the Legislature’s expressed views on
the prior import of its statutes are entitled to due consideration, and we
cannot disregard them’ ”].)
Section 66016.5 added specific “standards and practices” for impact fee
nexus studies and now requires, as of January 1, 2022, that such studies “be
updated at least every eight years.” (Stats. 2021, ch. 347, § 2.) The bill was
introduced following a report released by the Department of Housing and
Community Development which “stressed the need for additional guidance on
how local jurisdictions conduct nexus studies, which are currently governed
by an opaque and informal patchwork of guidelines and common practices.”
(Assem. Com. on Housing and Community Development, Analysis of Assem.
Bill No. 602 (2021–2022 Reg. Sess.), as amended Apr. 19, 2021, p. 2.) Bill
analysis made clear that these were “new” requirements that would “add
more rigor to the process for preparing and adopting impact fee nexus
studies.” (Id. at pp. 1, 4.) They were not a clarification of any existing

14
obligations to update nexus studies within a particular time frame. The plain
language and legislative history of section 66001(d)(1) make clear that City
was only required to make new findings, not new studies, for the 2018 fiscal
year.
We are not persuaded by Barajas’s argument that Walker commands
otherwise. In that case, the city of San Clemente imposed impact fees for
beach parking based on anticipated inland development. (Walker, supra, 239
Cal.App.4th at p. 1356.) From 1989 to 2009, the city collected almost
$10 million in beach parking impact fees but spent less than $350,000 to
purchase a vacant parcel and did not construct any parking facilities on the
parcel. (Ibid.) The plaintiffs sought a refund of unused fees, arguing that the
city failed to make sufficient five-year findings and the purported need for the
fees (increased parking demand) had not materialized. (Id. at pp. 1356–
1357.)
Before the fee was established in 1989, the city studied the proposed
developments and concluded that the developments would require additional
parking spaces. (Walker, supra, 239 Cal.App.4th at p. 1360.) By 1995, newer
studies determined that parking needs could be satisfied with existing
facilities. (Ibid.) The fee was reduced and used to finance broader parking
improvements. (Ibid.) Additional studies were conducted into the 2000’s
that also recognized the city had adequate beach parking. (Id. at p. 1361.) In
2009, the city attempted to make five-year findings when it “ ‘receive[d] and
file[d]’ ” a staff report. (Ibid.)
The appellate court concluded that the city had violated section
66001(d)(1). (Walker, supra, 239 Cal.App.4th at p. 1363.) For its finding to
demonstrate a reasonable relationship between the unexpended fees and the
purpose for which the fee was originally charged, the city’s report stated:

15
“ ‘New parking facility improvements are determined by the City Engineering
department and cost estimates established.’ ” (Id. at p. 1364.) The city
argued that it was not required to provide any more detail because “nothing
of any significance had changed” since 1989. (Id. at p. 1366.) The appellate
court disagreed, concluding that the city “may not rely on findings it made 20
years earlier to justify the original establishment of the Beach Parking
Impact Fee, or the findings it made 13 years earlier to justify reducing the
amount of the fee” but, instead, must “make new findings demonstrating a
continuing need for beach parking improvements caused by the new
development in the noncoastal zone.” (Ibid.)
As a preliminary matter, Walker is easily distinguishable on its facts.
The purported findings in Walker did not appear to follow the language
required by section 66001(d)(1). On the second finding (reasonable
relationship between fee and purpose for which it was charged), for example,
San Clemente tried to rely on a statement that improvements were
“determined” by its engineering department. (Walker, supra, 239
Cal.App.4th at p. 1364.) Here, unlike Walker, City’s four findings tracked the
section 66001(d)(1) language and explicitly cited to nexus studies and the CIP
that, as described ante, contained evidentiary support for the findings.
Walker is also distinguishable on its facts because San Clemente tried to rely
on older findings from 1989 and 1996 to argue it had satisfied section
66001(d)(1) despite intervening studies that plainly refuted the need for
additional parking found in the older studies. (Walker, supra, 239
Cal.App.4th at p. 1366.) Here, Barajas has not identified anything in the
substance of the nexus studies that made City’s reliance on them improper.
More importantly, we see nothing in Walker to support Barajas’s
position that an agency can never rely on studies made in prior years as

16
evidentiary support for its findings under section 66001(d)(1). Walker simply
concluded that old findings were insufficient because section 66001(d)(1)
required “new” findings. (Walker, supra, 239 Cal.App.4th at p. 1366.) City
did that here, adopting new findings for the 2018 fiscal year. Walker
reasoned that new findings were required because they demonstrate a
“continuing need” for the improvements. (Ibid.) Such a demonstration may
not be satisfied by outdated evidence (e.g., prior findings long since refuted),
but Walker did not categorically preclude reliance on evidence from prior
years to support new findings being made.
In sum, we conclude the trial court did not err in determining that
section 66001(d)(1) did not require City to conduct new studies to support its
new five-year findings for the 2018 fiscal year.
III. Sufficiency of City’s Five-year Findings
We turn next to the trial court’s factual determination that City’s five-
year findings made for the 2018 fiscal year were based on sufficient
evidentiary support. We review this determination for substantial evidence
and “are bound by the ‘elementary, but often overlooked principle of law, that
. . . the power of an appellate court begins and ends with a determination as
to whether there is any substantial evidence, contradicted or
uncontradicted,’ ” to support the determination below. (Walker, supra, 239
Cal.App.4th at p. 1363; Jessup Farms v. Baldwin (1983) 33 Cal.3d 639, 660.)
“We must therefore view the evidence in the light most favorable to the
prevailing party, giving it the benefit of every reasonable inference and
resolving all conflicts in its favor in accordance with the standard of review so
long adhered to by this court.” (Jessup, at p. 660.) Barajas bears the burden
to demonstrate that there is insufficient evidence to sustain the court’s
ruling. (Foreman Clark Corp. v. Fallon (1971) 3 Cal.3d 875, 881.)

17
Barajas concedes that he is not challenging the determination
regarding the first of City’s four section 66001(d)(1) findings: the purpose to
which the fee is to be put. We thus turn to his arguments related to the three
remaining findings.
A. Section 66001(d)(1)(B)–(D) Findings in General
Barajas appears to argue for the first time in his reply brief that City
failed to make “ ‘specific’ ” findings for each of the impact fees, instead
adopting one set of general findings. An appellant forfeits an issue by failing
to raise it below or in its opening appellate brief. (Dumas v. Los Angeles
County Bd. of Supervisors (2020) 45 Cal.App.5th 348, 356, fn. 5 (Dumas).)
Even if not forfeited, we are not persuaded that section 66001(d)(1) requires a
separate finding for each individual fee. The plain language of the provision
requires only that an agency make “findings,” and the legislative history
confirms this requirement was imposed “without specifying the manner in
which” it would be met. (1987 Analysis, supra, at p. 2.) Barajas points to an
excerpt in Walker that an agency must “specifically demonstrate” the
reasonable relationship on its second finding, but we read this excerpt to
simply confirm that such findings have some specific evidentiary support.
(Walker, supra, 239 Cal.App.4th at p. 1370.)
B. Section 66001(d)(1)(B) Finding
Barajas argues that City’s second finding is “conclusory” as it does not
itself include a “ ‘demonstration’ ” of the reasonable relationship. To the
contrary, the finding states that the reasonable relationship is “more fully set
forth in and demonstrated by the Nexus Studies,” including evidence
contained in the 2008 and 2012 reports, as well as the 2012 traffic report.5

5 We do not consider any information included in City’s 2008 traffic

report, 2011 staff review, 2016 traffic report, or parkland reports referenced

18
We conclude that the finding is sufficient because these reports describe the
reasonableness of fees for improvements that were also included in the 2018
report. For example, the 2018 report referenced traffic impact fees related to
the Rainier Avenue cross-town connector. The 2012 traffic report stated that
improvements to Rainier Avenue “would relieve some of the future traffic
growth” on other roads by providing an additional crossing.
Barajas argues next that the 2008 report and 2012 traffic report cannot
be used to substantiate City’s findings because after those reports were
issued, some of the impact fees were consolidated into one fund and new
funds were created for other fees. But again, the 2008 and 2012 reports
describe fees and improvements that were also included in the 2018 report,
regardless of how fee funds were created or consolidated in the intervening
period. We do not see these fund adjustments as a basis to preclude City
from relying on prior evidence.
Even assuming this evidence could be used to support City’s findings,
Barajas argues that the 2008 report and 2012 traffic report were flawed
because they were based on “overstated” projections about population growth.
While Barajas did argue to the trial court that reliance on prior studies was
inappropriate because it failed to account for current population figures, he
has not provided any citation to the record showing these specific arguments
about the 2008 and 2012 projections were raised below. (Dumas, supra,
45 Cal.App.5th at p. 356, fn. 5.) Even if he had, we see no merit in his
complaint that the build-out population projection in the 2008 report (72,707)
contained an “unexplained increase” from the projection in the 2003 report
(65,794). City’s findings did not rely on the 2003 report, which was explicit

in the respondent’s brief. We agree with Barajas that these reports are
irrelevant because they were not referenced in City’s five-year findings.

19
that subsequent data may “confirm or update” its projection. Barajas offers
nothing to show that the 2008 projection was based on some actual error, or
that it was an error of such magnitude that it invalidated analysis regarding
the reasonable relationship between impact fees and their purposes
contained in the report. Barajas also contends that the 2012 traffic report
projected population growth despite the “de minimis” growth that occurred
from 2007 to 2012.6 Again, Barajas does not show that higher growth
projections in the 2010’s were in fact untenable, particularly given the
economic downturn of the late 2000’s discussed in City materials. We thus
conclude that City’s finding under section 66001, subdivision (d)(1)(B) was
supported by sufficient evidence.
C. Section 66001(d)(1)(C)–(D) Findings
City’s third finding stated that the “remainder of funds needed to
construct the public improvements identified in the Nexus Studies related to
each fee will be collected from future development impact fees through 2025”
and “other sources as identified in the Nexus Studies and the City’s adopted
Capital Improvement Program.” Its fourth finding stated that future
“sources and amounts of funding anticipated to complete the financing of
specific future capital projects are identified and deposited into the
appropriate account as part of the City’s [CIP] budget cycle” and “[n]o
individual development impact fee fund has collected sufficient funds to

6 We grant Barajas’s request for judicial notice of 2010 census data for

Petaluma. (Evid. Code, § 452, subd. (h).) We deny the request for judicial
notice of 2020 census data, as it is not necessary or helpful to our analysis of
evidence relied upon in 2018. (Cal. Rules of Court, rule 8.252; Jordache
Enterprises, Inc. v. Brobeck, Phleger & Harrison (1998) 18 Cal.4th 739, 748,
fn. 6.)

20
construct all improvements covered by that fund as described in the Nexus
Study.”
Barajas again objects to any reliance on studies conducted before 2018,
which we reject for the reasons detailed ante. Further, these studies
contained information regarding funding sources, amounts, and dates for
facilities identified when the fee was imposed. In the 2012 report, for
example, the fire suppression facilities section estimated that the
refurbishing of two fire stations would cost $6,344,000 and that $1,338,584
was assigned to the impact fee program. It set an impact fee of $5,399 to be
imposed to fund this project (as well as the other city facilities fee projects).
Barajas makes no specific argument that the funding sources or amounts
indicated in these studies are wrong.
As for its reliance on the CIP, Barajas argues for the first time in his
reply brief that a CIP cannot be used to support section 66001(d) findings “as
a [m]atter of [l]aw.” (Boldface omitted.) The argument is forfeited and, in
any event, unpersuasive. (Dumas, supra, 45 Cal.App.5th at p. 356, fn. 5.)
Barajas points to section 66001, subdivision (a)(2), which states that an
agency “may, but need not,” reference a CIP in identifying public facilities for
which a fee is charged. Barajas contends that the failure to also reference
CIP’s in section 66001(d)(1) means they cannot be relied upon to make
five-year findings. We agree that a statute defining a concept with a
particular term in one subdivision but excluding it in another generally
should not be interpreted to imply that term where excluded. (Brown v. Kelly
Broadcasting Co. (1989) 48 Cal.3d 711, 725.) But this general rule is not
appropriate here, where one subdivision provides an example of an option for
meeting a requirement and the other subdivision provides no examples. This
is particularly true given the legislative history regarding the flexibility of

21
section 66001 not “specify[ing] the basis upon which” its requirements are
met. (1987 Analysis, supra, at p. 2.)
Barajas then objects that City’s CIP was not made in conjunction with
an annual report and was not made within 180 days after the 2018 fiscal
year. But these are requirements for the City’s findings pursuant to section
66001, subdivision (d)(2) (section 66001(d)(2)), and section 66006,
subdivision (b)(1). There is no indication that these provisions apply to the
evidence used to support such findings. Barajas also argues that the CIP is
insufficient because it does not “justif[y] or explain[]” the funding for impact
fee projects. Again, nothing in section 66001, subdivision
(d)(1)(C) or (d)(1)(D) requires such justification or explanation.
Finally, Barajas cites to purported “deficiencies” on nine pages of the
CIP without reference to any record of raising these particular issues in the
trial court, below. (Dumas, supra, 45 Cal.App.5th at p. 356, fn. 5.) Even if
not forfeited, two of these pages are simply summaries of projects listed on
other pages. Five of those other pages relate to projects (storage for reserved
fire apparatus, playground replacements at specific parks, construction of a
baseball diamond, seismic rehabilitation of a bridge, and construction of a
river trail) that are not identified in the 2008 or 2012 reports. Section 66001,
subdivision (d)(1)(C) and (d)(1)(D) require an agency to make findings on the
sources, amounts, and dates of funding to complete financing for incomplete
improvements “identified” when an agency establishes the impact fee.
Barajas has failed to meet his burden to present sufficient facts or legal
argument regarding how those requirements apply to these projects. Even if
he had met this burden, the CIP contained information regarding funding
sources, amounts, and dates for these projects. On the reserved apparatus
storage project, for example, the CIP stated that City would be completing

22
the project in fiscal year 2019–2020, using $10,000 in fire suppression impact
fees projected for that fiscal year and $40,000 in transient occupancy tax
budgeted for fiscal year 2018–2019.
The remaining two pages relate to projects (remodel of two fire stations
and Rainier Avenue cross-town connector) that are discussed in the 2008 and
2012 reports. The 2008 report identified the remodeling of the fire stations,
and the 2012 report assigned $1,338,584 of the estimated costs to the impact
fee program. An associated impact fee was approved. The CIP stated that
City would be completing its remodel of the fire stations in fiscal year 2018–
2019, using $98,000 from the fire suppression impact fees received through
fiscal year 2017; $150,000 in transient occupancy tax estimated from fiscal
year 2017–2018; and $86,000 in transient occupancy tax budgeted for fiscal
year 2018–2019. Similarly, for the Rainier Avenue cross-town connector, the
2012 traffic report identified the project and assigned costs to impact fees,
funds from the former Petaluma Community Development Commission
(PCDC), and other sources. An associated impact fee was approved. The CIP
stated that $38,449,000 was needed for the undercrossing structure and
would come from $28,226,000 in total traffic mitigation impact fees:
$1,717,000 projected for fiscal year 2019–2020; $2,250,000 projected for fiscal
year 2020–2021; and $11,800,000 projected for both fiscal year 2021–2022
and fiscal year 2022–2023. It also identified PCDC as a source of $10,224,000
in funds: $3,224,000 received through fiscal year 2017 and $7,000,000
estimated from fiscal year 2017–2018. We agree with the trial court that the
2008 and 2012 reports, along with the 2018 report and CIP, provided
sufficient evidence to support City’s findings required by section 66001,
subdivision (d)(1)(C) and (d)(1)(D).

23
In sum, we conclude there was substantial evidence to support the trial
court’s determination that City’s five-year findings for the 2018 fiscal year
were based on sufficient evidentiary support.7
IV. Forfeiture of Lateness Argument
For the first time in his reply brief, Barajas also challenges the trial
court’s ruling that the two-month delay in City’s findings for the 2018 fiscal
year (adopted on February 25, 2019, instead of December 27, 2018) did not
violate section 66001(d)(1) and did not “automatically trigger” a refund of
unexpended impact fees.
“On appeal we need address only the points adequately raised by
plaintiff in his opening brief on appeal.” (Tellez v. Rich Voss Trucking, Inc.
(2015) 240 Cal.App.4th 1052, 1066.) “ ‘Obvious considerations of fairness in
argument demand that the appellant present all of his points in the opening
brief. To withhold a point until the closing brief would deprive the
respondent of his opportunity to answer it or require the effort and delay of
an additional brief by permission.’ ” (Neighbours v. Buzz Oates Enterprises
(1990) 217 Cal.App.3d 325, 335, fn. 8.)
We reject Barajas’s contention that he properly raised the argument in
his opening brief, as he relies on two references to the lateness of City’s
findings in the factual background section of that brief. The opening brief
contains no legal argument that City’s two-month delay violates section
66001(d)(2), let alone any argument made under separate heading with

7 Given this conclusion, we need not address arguments made by the

parties and amici curiae related to the remedy for failure to make sufficient
findings under section 66001, subdivision (d), including whether such failure
requires a refund (versus opportunity for agency to correct) and whether that
refund includes all unexpended fees (versus unexpended fees held more than
five years).

24
supporting citations to both legal authority and the record. (Cal. Rules of
Court, rule 8.278(a)(2).) We deem the argument forfeited. (Dumas, supra,
45 Cal.App.5th at p. 356, fn. 5.)
In so doing, we also note that the bulk of Barajas’s “legal argument” in
his reply brief consists of quotations from Hamilton & High, LLC v. City of
Palo Alto (2023) 89 Cal.App.5th 528 (Hamilton), new authority issued one
month after his opening brief. According to Barajas, Hamilton “makes clear”
that City’s two-month delay “alone is sufficient to compel the City to refund.”
But in Hamilton, the city of Palo Alto was required to make five-year
findings by December 27, 2019. (Hamilton, supra, 89 Cal.App.5th at p. 540.)
In January 2020, a plaintiff requested that Palo Alto refund certain parking
fees because it had not provided five-year findings for those fees. (Id. at
p. 539.) In February 2020, Palo Alto denied the request, stating that the fees
were “ ‘currently committed’ ” to construction of a parking garage. (Id. at
pp. 539–540.) In April 2020, the plaintiffs responded with a “detailed
timeline” regarding the fees and the legal basis for their claim. (Id. at
p. 540.) On May 11, 2020, Palo Alto’s city council adopted a resolution
making five-year findings, including findings “in connection with the parking
fund and its anticipated use to construct a garage ‘pending further discussion
by the City Council regarding downtown parking management.’ ” (Ibid.) In
other words, Palo Alto made findings more than a year after they were due
and only after plaintiffs’ demand for a refund based on its failure to do so.
(Ibid.)
The appellate court concluded that the findings were untimely and
noncompliant with section 66001(d)(2) and section 66006, subdivision (b)(1).
(Hamilton, supra, 89 Cal.App.5th at p. 567.) In reaching this conclusion,
however, the appellate court made clear: “As the City’s adoption of the May

25
2020 five-year findings occurred more than one year after the end of the
180-day period, we have not been asked to and do not decide whether
section 66001(d)(2)’s requirement that five-year findings be made ‘in
connection with’ the annual public information findings required by
section 66006, subdivision (b), might be satisfied on different facts.”
(Hamilton, at p. 567, fn. 13.)
Barajas’s reply brief fails to provide any specific argument or authority
regarding this open question from Hamilton, which is problematic because it
is directly at issue here. Unlike the year-long delay in Hamilton remedied
only after plaintiff intervention, City adopted its findings here less than two
months late. And Hamilton not only declined to decide this question—
whether delay of less than a year violates section 66001(d)(2)—but expressly
acknowledged the possibility that the statutory requirement “might be
satisfied on different facts.” (Hamilton, supra, 89 Cal.App.5th at p. 567,
fn. 13.) Barajas only offers a conclusory, contradictory statement that “the
result is the same.” It is not the responsibility of this court, or City, to
consider this issue without timely or adequate presentation by Barajas.
DISPOSITION
The judgment is affirmed. City is entitled to its costs on appeal.
(Cal. Rules of Court, rule 8.278(a)(2).)

Jackson, P. J.

WE CONCUR:

Simons, J.
Chou, J.

A165258/Barajas v. City of Petaluma

26