act-1998-0-91•Pennsylvania Act 1998-91 — FISH AND BOAT CODE (30 PA.C.S.) - AMEND DAM MARKING
Pennsylvania Act 1998-91 — FISH AND BOAT CODE (30 PA.C.S.) - AMEND DAM MARKING
act-1998-0-911998 Pa. Act 91Law
Act text
FISH AND BOAT CODE (30 PA.C.S.) - AMEND DAM MARKING
Act of Jun. 19, 1998, P.L. 702, No. 91 Cl. 30
Session of 1998
No. 1998-91
HB 10
AN ACT
Amending Title 30 (Fish) of the Pennsylvania Consolidated
Statutes, providing for marking of dams.
The General Assembly of the Commonwealth of Pennsylvania
hereby enacts as follows:
Section 1. Title 30 of the Pennsylvania Consolidated
Statutes is amended by adding a section to read:
§ 3510. Marking of dams.
(a) New dams.--In issuing permits for the construction or
installation of new run-of-the-river dams on the waters of this
Commonwealth, the department shall include a permit advisory
notifying the permittee of the requirements of this section. The
permittee of a new run-of-the-river dam shall mark the areas
above and below the dam and on the banks immediately adjacent to
the dam with signs and buoys of a design and content determined
by the commission to warn the swimming, fishing and boating
public of the hazards posed by the dam.
(b) Existing dams.--
(1) The department shall compile and maintain a current
list of existing dams on the waters of this Commonwealth that
the department determines to be run-of-the-river type dams.
Within three months of the effective date of this section,
the department shall notify the permittees and owners of
those run-of-the-river dams of the requirements of this
section by certified letter. Within six months of receiving
notification of the requirements of this section from the
department, the permittees and owners of run-of-the-river
dams shall comply with the requirements of this section to
mark the areas above and below their dams and on the banks
immediately adjacent to their dams during the time periods of
the year required by the commission with signs and buoys of a
design and content determined by the commission to warn the
swimming, fishing and boating public of the hazards posed by
the dam.
(2) If the permittee or owner of a run-of-the-river dam
disagrees with the determination of the department, the
permittee or owner shall file written notice with the
Environmental Hearing Board within 30 days of receiving the
determination. The Environmental Hearing Board shall reach a
decision as soon as practicable. If the decision of the board
upholds the determination of the department, the permittee or
owner filing such notice shall have six months to comply with
this section following the decision.
(c) Maintenance of signs and buoys.--
(1) It shall be the responsibility of the permittees and
owners of run-of-the-river dams to maintain in proper
location, legible condition and during the time periods of
the year established by the commission signs and buoys
installed pursuant to the requirements of this section.
(2) When a permittee or owner learns that signs or buoys
installed under this section have been removed or defaced by
an act of God or the acts or omissions of third parties other
than the permittee or owner or his agent, he shall repair or
replace the signs or buoys within 30 days unless river
conditions during that time make such repair or replacement
dangerous to undertake or impracticable to effect, in which
case the permittee or owner shall repair or replace the signs
or buoys as soon as is reasonably practicable. If a permittee
or owner or his agent removes any signs or buoys, he shall
have five days thereafter to repair or replace the signs or
buoys.
(d) Size, content and location of signs and buoys marking
run-of-the-river dams.--The commission, after consultation with
the department, shall establish requirements for the content and
location of signs and buoys to be installed under the authority
of this section and the time periods of the year when the signs
and buoys shall be required to be in place. The commission shall
describe the requirements by notice published in the
Pennsylvania Bulletin and may from time to time revise the
requirements as circumstances require.
(e) Preemption of Federal law.--Any warning sign or buoy
installed and maintained in the areas above or below a run-of-
the-river dam or on the banks immediately adjacent to such a dam
by a dam permittee or owner in compliance with the requirements
of the United States Coast Guard, the Federal Energy Regulatory
Commission or any Federal agency having jurisdiction over a run-
of-the-river dam shall be deemed to meet the requirements
established or imposed by or under this section regarding the
placement of warning signs or buoys in said areas.
(f) Standard of care.--A dam permittee or owner who complies
with the provisions of this section to mark a dam and who
maintains signs and buoys as required by this section shall be
deemed to have met the standard of care for warning the public
of the hazards posed by the dam.
(g) Regulations.--The commission may promulgate regulations
to implement the provisions of this section.
(h) Penalties.--
(1) Any person who fails to comply with subsection (a)
or (b) shall forfeit and pay a civil penalty of not less than
$500 nor more than $5,000. The penalty shall be recovered by
civil suit or process in the name of the Commonwealth. Each
calendar year of noncompliance shall constitute a separate
violation.
(2) Any person who fails to comply with subsection (c)
shall forfeit and pay a civil penalty of not less than $250
nor more than $5,000. The penalty shall be recovered by civil
suit or process in the name of the Commonwealth. Each
calendar year of noncompliance shall constitute a separate
violation.
(3) Any person who enters an exclusion zone marked under
the provisions of this section commits a summary offense of
the third degree provided that it shall not be a violation of
this section for the permittee or owner and his agents and
officers of the Commonwealth and local government to enter
the exclusion zone for purposes of maintaining the dams and
signs and buoys or for enforcement and rescue purposes.
(4) All fines received under this subsection shall be
paid into the State Treasury for the use of the Fish Fund or
Boat Fund, as appropriate.
(i) Definitions.--As used in this section, the following
words and phrases shall have the meanings given to them in this
subsection:
"Department." The Department of Environmental Protection of
the Commonwealth.
"Owner." The person who owns a run-of-the-river dam
regulated by the Department of Environmental Protection pursuant
to the act of November 26, 1978 (P.L.1375, No.325), known as the
Dam Safety and Encroachments Act.
"Permit." A permit issued by the Department of Environmental
Protection pursuant to the act of November 26, 1978 (P.L.1375,
No.325), known as the Dam Safety and Encroachments Act.
"Permittee." The person who has been issued a permit by the
Department of Environmental Protection to maintain a run-of-the-
river dam.
"Run-of-the-river dam." A manmade structure which:
(1) is regulated or permitted by the Department of
Environmental Protection pursuant to the act of November 26,
1978 (P.L.1375, No.325), known as the Dam Safety and
Encroachments Act;
(2) is built across a river or stream for the purposes
of impounding water where the impoundment at normal flow
levels is completely within the banks and all flow passes
directly over the entire dam structure within the banks,
excluding abutments, to a natural channel downstream; and
(3) the department determines to have hydraulic
characteristics such that at certain flows persons entering
the area immediately below the dam may be caught in the
backwash.
Section 2. This act shall take effect January 1, 1999.
APPROVED--The 19th day of June, A. D. 1998.
THOMAS J. RIDGE
Poursuivez vos recherches dans ChatGPT ou Claude
Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.