cmr-974-2.02•974 CMR 2.02 — General Provisions
974 CMR 2.00 SUBDIVISION
974 CMR 2.02 General Provisions
2.02 ���General Provisions
2.02:���General Provisions
-
Authority to Undertake a Subdivision. No person shall make a subdivision nor proceed with the Improvement or sale of Lots from a subdivision, the construction or reconstruction of Streets and/or Roads, or the installation and/or extension of Utilities, facilities, and services therein, unless and until a Subdivision Plan has been submitted to and endorsed by the DEC and only then in accordance with 974 CMR 2.00
-
Determination of Completeness of Application. Submissions of subdivision plans shall be determined Complete.
-
Endorsement of Plan. Endorsement of a Level One Plan shall be by the signature of the Director. In the absence of the Director, the signature of the Chairperson shall suffice. Endorsement of a Level Two Definitive Subdivision Plan shall be by the signatures of a quorum of the DEC (seven members) on the first page of the plan, and by the signature of the DEC Chairperson or designee on subsequent pages of the plan.
Poursuivez vos recherches dans ChatGPT ou Claude
Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.