Federal Register proposed rules — 1996-07-25

issue-1996-07-25Federal Register proposed rules — 1996-07-25Proposed Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-18952 Hazardous Materials in Intrastate Transportation; Access to Docket During Temporary Closure of Dockets Unit
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Page 38702]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18952]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Research and Special Programs Administration

49 CFR Parts 171, 173 and 180

[Docket No. HM-200; Notice No. 96-14]
RIN 2137-AB37

Hazardous Materials in Intrastate Transportation; Access to 
Docket During Temporary Closure of Dockets Unit

AGENCY: Research and Special Programs Administration (RSPA), DOT.

ACTION: Access to docket during temporary closure of Dockets Unit.

-----------------------------------------------------------------------

SUMMARY: This notice announces an alternate location for information 
contained in Docket HM-200 (Hazardous Materials in Intrastate 
Transportation) during temporary closure of RSPA's Dockets Unit.

DATES: Written Comments: The closing date for written comments under 
Notice No. 96-9 [61 FR 24904] remains August 16, 1996.

FOR FURTHER INFORMATION CONTACT: Jackie Smith or Diane LaValle, (202) 
366-8553, Office of Hazardous Materials Standards, RSPA, Department of 
Transportation, Washington, DC 20590.

SUPPLEMENTARY INFORMATION: In an effort to improve the indoor air 
quality in the Nassif Building, 400 Seventh Street, SW., Washington, DC 
20590, the U.S. Department of Transportation and the building's owner 
have initiated a major cleaning project. This project entails a 
thorough cleaning of the building on a floor-by-floor basis. During the 
cleaning of each floor, the floor will be closed to employees and 
visitors. It is estimated that the cleaning of each floor will take 
approximately three weeks. During this three-week period, the offices 
on each floor will be closed and the affected employees will be 
relocated to another building. Once the cleaning of a floor is 
complete, employees and visitors may return to that floor. RSPA's 
Dockets Unit is located on the eighth floor. Cleaning of the eighth 
floor is scheduled to begin on Monday, August 12, 1996 and last until 
September 3, 1996. As a result, RSPA's Dockets Unit is scheduled to 
close for approximately three weeks.
    Because of the volume of materials in the Dockets Unit, it cannot 
be relocated during the cleaning and will be closed. However, since the 
comment period is open until August 16, 1996 under the supplemental 
notice of proposed rulemaking, extension of comment period [61 FR 
24904], Docket HM-200 will be relocated and made available for review 
in Room 5414A of the Nassif Building, telephone (202) 366-4900. The 
public may view this docket between the hours of 8:30 a.m. and 5:30 
p.m., Monday through Friday, except Federal holidays.
    Following completion of cleaning, Docket HM-200 will be returned to 
the Dockets Unit in Room 8421 of the Nassif Building, 400 Seventh 
Street, SW., Washington, DC, 20590-0001, telephone (202) 366-5046.

    Issued in Washington, DC on July 19, 1996, under the authority 
delegated in 49 CFR part 106, Appendix A.
Alan I. Roberts,
Associate Administrator for Hazardous Materials Safety.
[FR Doc. 96-18952 Filed 7-24-96; 8:45 am]
BILLING CODE 4910-60-P

Complete official Federal Register PDF

FR Doc. 96-18936 Approval and Promulgation of State Implementation Plans; California State Implementation Plan Revision, Kern County Air Pollution Control District, Placer County Air Pollution Control District, Ventura County Air Pollution Control District, and San Joaquin Unified Air Pollution Control District
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38682-38683]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18936]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[CA 057-0009b; FRL-5527-7]

Approval and Promulgation of State Implementation Plans; 
California State Implementation Plan Revision, Kern County Air 
Pollution Control District, Placer County Air Pollution Control 
District, Ventura County Air Pollution Control District, and San 
Joaquin Unified Air Pollution Control District
AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: EPA is proposing to approve revisions to the California State 
Implementation Plan (SIP) which concern the control of volatile organic 
compound (VOC) emissions from metal parts and products coating, 
semiconductor manufacturing, petroleum refineries and chemical plants, 
polyester resin material operations and decontamination of soil.
    The intended effect of proposing approval of these rules is to 
regulate emissions of VOCs in accordance with the requirements of the 
Clean Air Act, as amended in 1990 (CAA or the Act). In the Final Rules 
Section of this Federal Register, the EPA is approving the state's SIP 
revision as a direct final rule without prior proposal because the 
Agency views this as a noncontroversial revision amendment and 
anticipates no adverse comments. A detailed rationale for this approval 
is set forth in the direct final rule. If no adverse comments are 
received in response to this proposed rule, no further activity is 
contemplated in relation to this rule. If EPA receives adverse 
comments, the direct final rule will be withdrawn and all public 
comments received will be addressed in a subsequent final rule based on 
this proposed rule. The EPA will not institute a second comment period 
on this document. Any parties interested in commenting on this action 
should do so at this time.

DATES: Comments on this proposed rule must be received in writing by 
August 26, 1996.

ADDRESSES: Written comments on this action should be addressed to: 
Daniel A. Meer, Rulemaking Section (A-5-3), Air and Toxics Division, 
U.S.

[[Page 38683]]

Environmental Protection Agency, Region 9, 75 Hawthorne Street, San 
Francisco, CA 94105-3901.
    Copies of the rule revisions and EPA's evaluation report of each 
rule are available for public inspection at EPA's Region 9 office 
during normal business hours. Copies of the submitted rule revisions 
are also available for inspection at the following locations:

California Air Resources Board, Stationary Source Divison, Rule 
Evaluation Section, 2020 ``L'' Street, Sacramento, CA 95812
Kern County Air Pollution Control District, 2700 ``M'' Street, Suite 
290, Bakersfield, CA 93301
Placer County Air Pollution Control District, 11464 B Avenue, Auburn, 
CA 95603
Ventura County Air Pollution Control District, 669 County Square Drive, 
Ventura, CA 93003
San Joaquin Unified Air Pollution Control District, 1999 Tuolumne 
Street, Suite 200, Fresno, CA 93721.

FOR FURTHER INFORMATION CONTACT: Daniel A. Meer, Chief, Rulemaking 
Section (A-5-3), Air and Toxics Division, U.S. Environmental Protection 
Agency, Region 9, 75 Hawthorne Street, San Francisco, CA 94105-3901, 
Telephone: (415) 744-1185.

SUPPLEMENTARY INFORMATION: This document concerns the following rules 
submitted to EPA by the California Air Resources Board on the dates 
noted. Kern County Air Pollution Control District's Rule 410.4, Surface 
Coating of Metal Parts and Products, submitted on May 25, 1995; Placer 
County Air Pollution Control District's Rule 244, Semiconductor 
Manufacturing Operations, submitted on May 24, 1995; Ventura County Air 
Pollution Control District's Rules 74.7, Fugitive Emissions of Reactive 
Organic Compounds (ROC) at Petroleum Refineries and Chemical Plants, 
submitted on March 26, 1996, and 74.14, Polyester Resin Material 
Operations, submitted on September 14, 1992; and San Joaquin Valley 
Unified Air Pollution Control District's Rule 4651, Volatile Organic 
Compound Emissions from Decontamination of Soil, submitted on December 
22, 1994. For further information, please see the information provided 
in the Direct Final action which is located in the Rules Section of 
this Federal Register.

    Authority: 42 U.S.C. 7401-7671q.

    Dated: June 17, 1996.
Felicia Marcus,
Regional Administrator.
[FR Doc. 96-18936 Filed 7-24-96; 8:45 am]
BILLING CODE 6560-50-W

Complete official Federal Register PDF

FR Doc. 96-18905 Capacity Reservation Open Access Transmission Tariffs
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38663-38664]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18905]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Part 35

[Docket No. RM96-11-000]

Capacity Reservation Open Access Transmission Tariffs

July 18, 1996.
AGENCY: Federal Agency Regulatory Commission.

ACTION: Notice of proposed rulemaking; extension of time and convening 
a public conference.

-----------------------------------------------------------------------

SUMMARY: Various participants have requested additional time to comment 
on the Commission's notice of proposed rulemaking in this proceeding. 
The proposed rule specifies filing requirements to be followed by 
public utilities in making transmission tariff filings based on 
capacity reservations for all transmission users. An extension of time 
is being granted and a one-day technical conference will be convened.

DATES: An extension of time for filing comments on the proposed rule is 
granted to and including October 21, 1996. A technical conference will 
be held on September 20, 1996.

ADDRESSES: Federal Energy Regulatory Commission, 888 First St., NE., 
Washington, DC 20426.

FOR FURTHER INFORMATION CONTACT:
David D. Withnell, Federal Energy Regulatory Commission, Office of the 
General Counsel, 888 First St., NE., Washington, DC 20426, telephone: 
(202) 208-2063.

SUPPLEMENTARY INFORMATION: On June 27, 1996, July 3, 1996, and July 17, 
1996, Various Utilities,\1\ Joint Petitioners,\2\ and Allegheny Power 
Service Corporation (Allegheny Power),\3\ respectively, filed motions 
for an extension of time within which to file comments in response to 
the Notice of Proposed Rulemaking issued April 24, 1996 in the above-
captioned proceeding.\4\ Various Utilities, Joint Petitioners, and 
Allegheny Power express concern that the August 1, 1996 date set by the 
Commission for filing written comments should hamper the ability of 
electric industry participants, who must also meet the various 
requirements of Order Nos. 888 and 889,\5\ to address the issues in a 
meaningful manner.\6\ Various Utilities and Allegheny Power request a 
61-day extension of time, until October 1, 1996. Joint Petitioners 
request a greater number of technical conferences or an

[[Page 38664]]

expanded schedule for the Commission's proposed technical conference, 
and request that the Commission issue, following such conferences, a 
Supplemental NOPR or Notice of Clarification upon which the parties 
would then be allowed to submit comments.
---------------------------------------------------------------------------

    \1\ Central Illinois Public Service Company, Cleveland Electric 
Illuminating Company, Commonwealth Edison Company, Central Power and 
Light Company, Ohio Edison Company, Pennsylvania Power Company, 
Public Service Company of Oklahoma, South Carolina Electric & Gas 
Company, Toledo Edison Company, Southwestern Electric Power Company, 
West Texas Utilities Company, and Union Electric Company.
    \2\ Edison Electric Institute, National Association of 
Regulatory Utility Commissioners, American Public Power Association, 
National Rural Electric Cooperative Association, and North American 
Electric Reliability Council.
    \3\ Submitted on behalf of Monongahela Power Company, The 
Potomac Edison Company, and West Penn Power Company.
    \4\ Capacity Reservation Open Access Transmission Tariffs, 
Notice of Proposed Rulemaking, 61 FR 21847 (May 10, 1996) (CRT 
NOPR).
    \5\ Promoting Wholesale Competition Through Open Access Non-
discriminatory Transmission Services by Public Utilities and 
Recovery of Stranded Costs by Public Utilities and Transmitting 
Utilities, 61 FR 21540 (May 10, 1996), FERC Stats. & Regs. para. 
31,036 (1996) (Order No. 888); Open Access Same-Time Information 
System (formerly Real-Time Information Networks) and Standards of 
Conduct, 61 FR 21737 (May 10, 1996), FERC Stats. & Regs. para. 
31,037 (1996) (Order No. 889); Order Clarifying Order Nos. 888 and 
889 Compliance Matters, 76 FERC para. 61,009 (July 2, 1996).
    \6\ Answers in support have been filed by Virginia Electric and 
Power Company, M-S-R Public Power Agency, Transmission Agency of 
Northern California, Colorado Association of Municipal Utilities, 
South Carolina Public Service Authority, and Transmission Access 
Policy Study Group.
---------------------------------------------------------------------------

    Upon consideration, notice is hereby given that the August 1, 1996 
deadline for filing written comments is extended to October 21, 1996 
and that the Commission will convene a technical conference on 
September 20, 1996. Because participants will now have the opportunity 
to submit comments following the technical conference, the Commission 
has decided to hold a one-day technical conference rather than the two-
day conference mentioned in the CRT NOPR. The agenda and the times for 
the technical conference will be announced at a later date. In 
addition, the Commission may schedule further procedures and offer 
further guidance based on the outcome of the technical conference.
Lois D. Cashell,
Secretary.
[FR Doc. 96-18905 Filed 7-24-96; 8:45 am]
BILLING CODE 6717-01-M

Complete official Federal Register PDF

FR Doc. 96-18898 International Code of Conduct for Responsible Fisheries: Draft Implementation Plan
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38703-38704]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18898]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 300

[I.D. 071296D]

International Code of Conduct for Responsible Fisheries: Draft 
Implementation Plan

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Notice of availability; request for comments.

-----------------------------------------------------------------------

SUMMARY: NMFS announces the availability of the Draft Implementation 
Plan for the Code of Conduct for Responsible Fisheries (Code) and is 
requesting comments from the public. The Code was negotiated under the 
sponsorship of the Food and Agriculture Organization of the United 
Nations (FAO) as an effort to promote international understanding about 
the responsible conduct of fishing and related activities. The intended 
effect of the Implementation Plan is to assess relevant U.S. policy and 
practices in relation to the standards set forth in the Code and, 
within the responsibilities of NMFS, to present actions to meet those 
standards.

DATES: Comments should be submitted on or before September 23, 1996.

ADDRESSES: Comments on the Draft Implementation Plan should be 
submitted to Dean Swanson, Acting

[[Page 38704]]

Director, Office of International Affairs, NMFS, 1315 East-West 
Highway, Silver Spring, MD 20910. Copies of the Draft Implementation 
Plan are available from the NMFS Office of International Affairs.

FOR FURTHER INFORMATION CONTACT: Dean Swanson, 301-713-2276.

SUPPLEMENTARY INFORMATION: The concept of responsible fisheries was 
raised by the FAO in 1991 at the 19th Session of the FAO Committee on 
Fisheries (COFI). COFI recognized that FAO has an important role to 
play in promoting international understanding about the responsible 
conduct of fishing organizations.
    In May 1992, the Government of Mexico, in consultation with FAO, 
organized the International Conference on Responsible Fishing, which 
resulted in the Cancun Declaration. The Conference requested FAO to 
draft the Code in consultation with other international organizations.
    At its 20th session, in 1993, COFI considered the contents of the 
proposed code and agreed that it should contain an introductory 
section, including general principles, and six thematic areas or 
articles: Fisheries management, fishing operations, aquaculture 
development, integration of fisheries into coastal area management, 
post-harvest practices and trade, and fisheries research. The Agreement 
to Promote Compliance with International Conservation and Management 
Measures by Fish Vessels on the High Seas (the Compliance Agreement) 
was to form an integral part of the code.
    Beginning in February 1994 and continuing through September 1995, 
FAO convened an informal working group of government-nominated experts, 
a technical consultation, and two sessions of a technical committee to 
elaborate the Code. In October 1995, the Code was submitted to the FAO 
Council and adopted by the FAO Conference in November 1995.
    Although the Code is a voluntary, non-binding instrument, it 
addresses aspects of responsible fisheries that are included in two 
recently concluded international agreements: The Compliance Agreement 
and the Agreement for the Implementation of the Provisions of the 
United Nations Convention on the Law of the Sea of 10 December 1982 
Relating to the Conservation and Management of Straddling Fish Stocks 
and Highly Migratory Fish Stocks (Straddling Stocks Agreement). The 
United States has signed both international agreements and deposited an 
instrument of acceptance for the Compliance Agreement.
    The Compliance Agreement sets forth a broad range of obligations 
for nations that have fishing vessels operating on the high seas, 
including the obligation to ensure that such vessels do not undermine 
international fishery conservation and management measures. Such 
nations must also prohibit their vessels from fishing on the high seas 
without specific authorization and must take enforcement measures in 
respect to vessels that contravene requirements associated with the 
Compliance Agreement. The Compliance Agreement is considered to be an 
integral part of the Code. The United States has implemented the 
Compliance Agreement through the High Seas Fishing Compliance Act of 
1995.
    The Straddling Stocks Agreement includes an article on general 
principles that is similar in content and wording to the article on 
general principles in the Code. These issues include the precautionary 
approach to fisheries management; the impacts of fishing on target 
stocks and species belonging to the same ecosystem or associated with 
or dependent upon the target stocks; the minimization of pollution, 
waste, discards, catch by lost or abandoned gear, and the catch of non-
target species; and the prevention or elimination of overfishing and 
excess fishing capacity. The Straddling Stocks Agreement, while 
generally limited to straddling stocks and highly migratory fish 
stocks, is applicable to fishing within national exclusive economic 
zones for purposes of Article 6 (application of the precautionary 
approach), Article 7 (compatibility of conservation and management 
measures) and, mutatis mutandis, to Article 5 (general principles).
    The Draft Implementation Plan for the Code is organized as follows:
    Section I. Actions to be initiated during Fiscal Year (FY) 1997-98.
    Section II. Actions to be initiated after FY 98.
    Section III. Standards under policy review within the U.S. 
Government.
    Section IV. Standards that are the responsibility of a Federal 
Agency other than the National Marine Fisheries Service.
    Appendix A. Standards that do not require the United States to 
initiate new action.
    Appendix B. Standards that do not apply to the United States.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: July 22, 1996.
Richard W. Surdi,
Acting Director, Office of Fisheries Conservation and Management, 
National Marine Fisheries Service.
[FR Doc. 96-18898 Filed 7-24-96; 8:45 am]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-18860 Freedom of Information and Privacy Act Regulations
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38657-38663]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18860]

========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================

Federal Register / Vol. 61, No. 144 / Thursday, July 25, 1996 / 
Proposed Rules

[[Page 38657]]

DEPARTMENT OF AGRICULTURE

Office of the Secretary

7 CFR Part 1

Freedom of Information and Privacy Act Regulations

AGENCY: Office of the Secretary of Agriculture, USDA.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The United States Department of Agriculture (USDA or the 
Department) is proposing to amend its regulations pertaining to the 
Freedom of Information and Privacy Act as part of the USDA regulatory 
reinvention initiative to improve its regulations. These proposed 
changes, if adopted, will correct references to statutes, regulations, 
USDA agencies, and USDA officials; reflect the change of the name of 
the Administration Building to the Jamie L. Whitten Federal Building; 
update the regulations to reflect changes in statutes and USDA policy; 
remove gender specific references; remove unnecessary regulations; and 
make minor, nonsubstantive changes for clarity.

DATES: Consideration will be given only to comments received on or 
before September 23, 1996.

ADDRESSES: Please send an original and three copies of your comments to 
Scott C. Safian, Staff Attorney, Regulatory Division, Office of the 
General Counsel, U.S. Department of Agriculture, Room 2422, South 
Building, 14th Street and Independence Avenue SW., Washington, D.C. 
20250-1400. Comments received may be inspected at USDA, Room 2422, 
South Building, 14th Street and Independence Avenue SW., Washington, DC 
20250-1400, between 8 a.m. and 4:30 p.m., Monday through Friday, except 
holidays. Persons wishing to inspect comments are encouraged to call 
ahead on (202) 720-5550 to facilitate entry.

FOR FURTHER INFORMATION CONTACT: Regarding the regulations mentioned in 
this document, contact Scott C. Safian, Staff Attorney, Regulatory 
Division, Office of the General Counsel, U.S. Department of 
Agriculture, Room 2422, South Building, 14th Street and Independence 
Avenue SW., Washington, D.C. 20250-1400, (202) 720-2003.
    Regarding general information on USDA's ``reinventing initiative,'' 
contact: Marvin Shapiro, Chief, Legislative, Regulatory and Automated 
Systems Division, Office of Budget and Program Analysis, U.S. 
Department of Agriculture, Room 147-E, Jamie L. Whitten Federal 
Building, 14th Street and Independence Avenue SW., Washington, D.C 
20250-1400, (202) 720-1516.

SUPPLEMENTARY INFORMATION:

Background

    On March 4, 1995, President Clinton announced plans for reforming 
the Federal regulatory system as part of his ``Reinventing Government'' 
initiative. In his March 4 directive, the President ordered the heads 
of all Federal departments and agencies to conduct a review of their 
regulations and to eliminate or revise those that are outdated or 
otherwise in need of reform. The U.S. Department of Agriculture 
completed its review and submitted a report on the review to the Office 
of Management and Budget on June 1, 1995. The review included USDA's 
Administrative Regulaitons--Official Records (7 CFR, part 1, subpart A) 
and Administrative Regulaitons--Privacy Act Regulations (7 CFR, part 1, 
subpart G). The Department found that these regulations contained 
incorrect references to statutes, regulations, USDA agencies, USDA 
officials, and the Jamie L. Whitten Federal Building; unnecessary and 
outdated provisions; gender specific references; and provisions that 
could be clarified by making minor, nonsubstantive changes. This 
proposal, which, if adopted, would correct references to statutes, 
regulations, USDA agencies, USDA officials and the Jamie L. Whitten 
Federal Building; remove gender specific references; remove unnecessary 
regulations; update the regulations to reflect statutory and policy 
changes that have been made since the regulations were last amended; 
and make minor nonsubstantive changes for clarity, represents USDA's 
continuing effort to implement the President's plan.

The Proposal

Authority Citations for 7 CFR, Part 1, Subparts A and G

    The Department is proposing to amend 7 CFR, part 1, subpart A, by 
revising the authority citation for subpart A to reflect the 
recodification of 7 U.S.C. 2244 at 7 U.S.C. 3125a and the new 
delegations of authority within the Department which were published in 
the Federal Register on November 8, 1995, at 60 FR 56392. This proposal 
also would amend the authority citation for subpart G by adding 
references to 5 U.S.C. 301 and 31 U.S.C. 9701 which should be included 
in the authority citation for subpart G.

Amendments to Numerous Provisions in 7 CFR, Part 1, Subparts A and G

    The Department also is proposing to amend numerous sections in 7 
CFR, part 1, subparts A and G by updating references to the Department 
offices, titles of Department officials, and Department agencies; 
replacing gender specific references with gender neutral references; 
replacing inaccurate cross references; replacing references to the 
``Administration Building'' with references to the ``Jamie L. Whitten 
Federal Building'' to reflect the change in the name of the building 
that was effectuated by the enactment of Pub. L. No. 103-404; 
eliminating surplusage; and clarifying provisions in 7 CFR, part 1, 
subparts A and G.
    The Department also is proposing to remove the word ``document(s)'' 
and add the word ``record(s)'' in the place of the word ``document(s)'' 
in all of the provisions in 7 CFR, part 1, subparts A and G which 
relate to the Freedom of Information Act and the Privacy Act, both of 
which concern access to ``records.''

Specific Amendments to 7 CFR, Part 1, Subparts A and G

    In addition to the proposed changes related above, the Department 
is proposing to amend specific provisions within 7 CFR, part 1, 
subparts A and G as described below.

Freedom of Information Regulations

    Section 1.1 states that subpart A of the regulations establishes 
policy, procedures, requirements, and responsibilities for 
administration and coordination of the Freedom of Information Act 
(FOIA), 5 U.S.C. 552,

[[Page 38658]]

and provides that the Office of Governmental and Public Affairs (OGPA) 
has the primary administrative responsibility for the FOIA in the USDA. 
The OGPA is no longer an agency of the USDA and its duties have been 
subsumed by the Office of Communications (OC). Furthermore, while the 
OGPA was headed by an Assistant Secretary and was part of the Office of 
the Secretary of Agriculture, the Office of Communications is headed by 
a Director and is not part of the Secretary's office. The Office of 
Communications consists of nine divisions, each headed by a director, 
and a Press Secretary staff. Accordingly, the Department is proposing 
to amend Sec. 1.1 to reflect these changes in Department administration 
and organization. Similar changes are proposed to be made in other 
sections of the regulations.
    Section 1.2(a) provides that agencies of USDA shall comply with the 
time limits set forth in the FOIA for responding to processing requests 
and appeals for agency documents, unless there are exceptional 
circumstances within the meaning of 5 U.S.C. 552(a)(6)(B). The 
Department is proposing to remove the reference to ``exceptional 
circumstances'' and replace it with a reference to ``unusual 
circumstances'' because the term defined in 5 U.S.C. 552(a)(6)(B) is 
``unusual circumstance.''
    Section 1.4(b)(6) describes the organization and responsibilities 
of the Office of Governmental and Public Affairs. As discussed above, 
this office no longer exists. Accordingly, this proposed rule would 
amend Sec. 1.4(b)(6) to reflect these changes in Department 
administration and organization, and describe the organization of the 
Office of Communications.
    Section 1.6(a) provides that a person requesting records from any 
agency of the Department may request a fee wavier ``if there is likely 
to be a charge for the requested information.'' Persons requesting 
records may not know whether the Department is likely to charge for the 
requested information, and the Department does not believe that any 
purpose is served by requiring persons requesting records to determine 
the likelihood of a fee as a condition of asking for a fee waiver. 
Accordingly, the Department is proposing to eliminate the requirement 
that a request for a few waiver may only be made if there is likely to 
be a charge for the requested information.
    Section 1.8(b) provides that if records requested contain some 
portions which are exempt from mandatory disclosure and others which 
are not exempt from disclosure, the official responding to the request 
shall ensure that all nonexempt portions are disclosed. In 1974, the 
FOIA was amended to provide that ``reasonably segregable'' portions of 
records shall be provided to persons requesting agency records after 
deletion of the portions which are exempt under 5 U.S.C. 552(b). For 
this reason, the Department is proposing to amend Sec. 1.8(b) to 
require that the official responding to the request ensure that 
reasonably segregable nonexempt portions are disclosed.
    Section 1.11(a) provides that whenever a request (including any 
``demand'' as defined in Sec. 1.21) is received in USDA for information 
which has been submitted by a business, all agencies of the Department 
must provide the business information submitter with certain specified 
information. Section 1.21 was removed from the regulations by a final 
rule published in the Federal Register on October 19, 1990, at 55 FR 
42347. Former 7 CFR 1.21 was reworded and incorporated in a new 
provision, 7 CFR 1.215. Therefore, the Department is proposing to 
eliminate the reference to ``Sec. 1.21'' and replace it with a 
reference to 7 CFR 1.215.
    Section 1.16 delegates authority within the USDA to promulgate 
regulations providing a uniform schedule of fees applicable to all 
agencies of the Department regarding requirements for records under 
subpart A of the regulations. The regulations providing for a uniform 
fee schedule are set forth at appendix A of the subpart. Section 1.16 
provides that any amendments to the fee schedule shall be made pursuant 
to notice and opportunity for comment. Under an overly strict reading 
of this section, even a minor, nonsubstantive change to the fee 
schedule, such as the correction of a spelling error, may only be made 
after notice and comment rulemaking. It is not the purpose of Sec. 1.16 
to require any more rulemaking procedure than that provided under the 
Administrative Procedure Act. Accordingly, the Department is proposing 
to remove the language in Sec. 1.16 which provides that any amendments 
to the fee schedule will be made pursuant to notice and opportunity for 
comment. Substantive amendments to the fee schedule, such as changes to 
the fees to be charged for processing requests under this subpart or 
changes to the uniform fee schedule that modify procedures for or 
circumstances under which a fee may be waived or reduced, will continue 
to be made pursuant to notice and comment rulemaking, as required by 
law.

Privacy Act Regulations

    Section 1.123 of the Department's Privacy Act regulations contains 
a listing of those systems of records maintained by agencies of USDA 
which have been exempted, pursuant to 5 U.S.C. 552a(K) from the 
provisions of 5 U.S.C. 552a, paragraphs (c)(3), (d), (e)(1), (e)(4)(G), 
(H), and (I), and (f) of the Privacy Act. The reasons for exempting 
each system of records are set out in the notice for that system 
published in the Federal Register. The names of several of the agencies 
and systems listed in Sec. 1.123 are antiquated or have otherwise 
changed. Accordingly, the Department is proposing to make several 
changes to Sec. 1.123 to reflect this fact.

Executive Order 12866 and Regulatory Flexibility Act

    This proposed rule has been reviewed under Executive Order 12866. 
The rule has been determined to be not significant for the purposes of 
Executive Order 12866 and, therefore, has not been reviewed by the 
Office of Management and Budget.
    This proposed rule, if adopted, would correct references to 
statutes, regulations, USDA agencies, USDA officials, and the 
Administration Building; remove gender specific references; remove 
unnecessary provisions; update regulations to reflect changes that have 
been made in statutes and policy since the regulations were last 
amended; and make minor, nonsubstantive changes for clarity. This 
proposed rule will not have any economic impact.
    Under these circumstances, the Secretary has determined that this 
action will not have a significant economic impact on a substantial 
number of small entities.

Executive Order 12778

    This proposed rule has been reviewed under Executive Order 12778, 
Civil Justice Reform, If this proposed rule is adopted, this rule 
would: (1) Preempt all state and local laws and regulations that are 
inconsistent with this rule; (2) have no retroactive effect; and (3) 
would not require administrative proceedings before parties may file 
suit in court challenging this rule.

Paperwork Reduction Act

    This proposed rule contains no information collection or 
recordkeeping requirements under the Paperwork Reduction Act of 1995 
(44 U.S.C. 3501 et seq.).

List of Subjects in 7 CFR Part 1

    Administrative practice and procedure, Agriculture, Antitrust,

[[Page 38659]]

Claims, Cooperatives, Courts, Equal access to justice, Federal 
buildings and facilities, Freedom of information, Government employees, 
Lawyers, Privacy.

    Accordingly, 7 CFR part 1, subpart A and subpart G, would be 
amended as follows:

PART 1--ADMINISTRATIVE REGULATIONS

Subpart A--Official Records

    1. The authority citation for part 1, subpart A, would be revised 
to read as follows:

    Authority: 5 U.S.C. 301, 552, 7 U.S.C. 3125a; 31 U.S.C. 9701; 
and 7 CFR 2.28(b)(7)(viii).

    2. Section 1.1 would be revised to read as follows:

Sec. 1.1  Purpose and scope.

    This subpart establishes policy, procedures, requirements, and 
responsibilities for administration and coordination of the Freedom of 
Information Act (FOIA), 5 U.S.C. 552, pursuant to which official 
records may be obtained by any person. This subpart also provides rules 
pertaining to the disclosure of records pursuant to compulsory process. 
This subpart also serves as the implementing regulations for the Office 
of the Secretary (the immediate offices of the Secretary, Deputy 
Secretary, Under Secretaries, and Assistant Secretaries) and for the 
Office of Communications. The Office of Communications has the primary 
responsibility for the FOIA in the Department of Agriculture (USDA). 
The term ``agency'' or ``agencies'' is used throughout this subpart to 
include both USDA program agencies and staff offices.

Sec. 1.2  [Amended]

    3. Section 1.2 would be amended as follows:
    a. Paragraph (a) would be amended by removing the word 
``documents'' and adding the word ``records'' in its place; and by 
removing the word ``exceptional'' and adding the word ``unusual'' in 
its place.
    b. Paragraph (b) would be amended by removing the word 
``documents'' and adding the word ``records'' in its place.

Sec. 1.3  [Amended]

    4. In Sec. 1.3, paragraph (a)(2) would be amended by removing the 
word ``thereto'' and adding the words ``to indexes'' in its place.
    5. Section 1.4 would be amended as follows:
    a. Paragraph (a) introductory text would be amended by removing the 
words ``Office of Governmental and Public Affairs'' and adding the 
words ``Office of Communications'' in their place.
    b. Paragraphs (a)(1) and (a)(2) would be amended by removing the 
words ``Administration Building'' and adding the words ``Jamie L. 
Whitten Federal Building'' in their place.
    c. Paragraph (a)(3) would be amended by removing the words 
``Director of Information, Office of Governmental and Public Affairs'' 
and adding the words ``FOIA Coordinator, Office of Communications'' in 
their place.
    d. Paragraph (a)(4) would be amended by removing the words 
``Assistant Secretary for Governmental and Public Affairs'' and adding 
the words ``Director of Communications, Office of Communications'' in 
their place.
    e. Paragraph (b) introductory text would be amended by removing the 
words ``Office of Governmental and Public Affairs (OGPA)'' and adding 
the words ``Office of Communications (OC)'' in their place.
    f. Paragraph (b)(3) would be amended by removing the reference ``7 
CFR part 2, subpart A'' and adding the reference ``part 2, subpart A, 
of this title'' in its place.
    g. Paragraph (b)(4) would be amended by removing the words ``Office 
of Governmental and Public Affairs'' and adding the words ``Office of 
Communications'' in their place; and by removing the words ``The Office 
is'' and adding the words ``The Office of Communications is'' in their 
place.
    h. Paragraph (b)(5) would be revised to read as set forth below.
    i. Paragraph (b)(6) would be revised to read as set forth below.

Sec. 1.4  Implementing regulations for the Office of the Secretary.

* * * * *
    (b) * * *
    5. The Office of Communications is headed by the Director of 
Communications. In the Director's absence, the Office of Communications 
is headed by the Press Secretary.
    (6) The Office of Communications consists of nine divisions, each 
headed by a director, and a Press Secretary.

Sec. 1.5  [Amended]

    6. In Sec. 1.5, paragraph (b) would be amended as follows:
    a. In the first sentence, by removing the word ``also''; and by 
adding the words ``for public inspection and copying'' immediately 
after the words ``make available''.
    b. In the second sentence, by removing the word ``thereto'' and 
adding the words ``to such indexes'' in its place.
    c. In the third sentence, by removing the word ``Notice'' and 
adding the word ``notice'' in its place.
    7. Section 1.6 would be amended as follows:
    a. In paragraph (a), the second sentence would be amended by 
removing the words ``if there is likely to be a charge for the 
requested information''; in the third sentence, by removing the words 
``Office of Governmental and Public Affairs'' and adding the words 
``Office of Communications'' in their place both time they appear; in 
the third sentence, by removing the words ``Director of Information'' 
and adding the words ``Director or Communications'' in their place; and 
in the fourth sentence, by removing the words ``that Act'' and adding 
the words ``the Freedom of Information Act'' in their place.
    b. Paragraph (b) would be amended by removing the words ``etc., 
which'' and adding the words ``names of individuals, names of offices, 
and names or agencies or other organizations that'' in their place.
    c. In paragraph (c), the first sentence would be amended by 
removing the word ``it'' and adding the words ``the agency'' in its 
place; and by removing the words ``he or she'' and adding the words 
``the requester'' in their place.
    d. Paragraph (e) would be amended by removing the words ``the 
person making the request'' and adding the words ``the requester'' in 
their place; and by adding the words ``of this subpart'' immediately 
after the words ``appendix A''.
    e. Paragraph (f) would be amended by removing the words 
``nonagency-specific, i.e., are''; and by removing the words ``Office 
of Governmental and Public Affairs, Office of Information, Special 
Programs Division'' and adding the words ``Office of Communications'' 
in their place.
    f. Paragraph (g) would be amended by removing the word 
``(agencies)'' and adding the words ``or agencies'' in its place; and 
by removing the words ``The unit'' and adding the words ``The central 
processing unit'' in their place.
    g. Paragraph (h) would be revised to read as set forth below.

Sec. 1.6  Requests for records.

* * * * *
    (h) Each agency shall develop and maintain a record of all written 
and oral requests and appeals received in that agency. The record shall 
include the name of the requester; a brief summary of the information 
requested; whether the request or appeal was granted, denied, or 
partially denied; the exemption from mandatory disclosure under 5 
U.S.C. 552(b) upon which any

[[Page 38660]]

denial was based; and the amount of any fees associated with the 
request or appeal.

Sec. 1.8  [Amended]

    8. Section 1.8 would be amended as follows:
    a. In paragraph (a) introductory text, the third sentence would be 
amended by removing the words ``it grants'' and adding the words ``the 
agency grants'' in their place.
    b. Paragraph (b) would be amended by removing the word ``insure'' 
and adding the word ``ensure'' in its place; and by adding the words 
``reasonably segregable'' immediately before the word ``nonexempt''.
    c. In paragraph (d) introductory text, the third sentence would be 
amended by removing the words ``it grants'' and adding the words ``the 
agency grants'' in their place.
    d. In paragraph (e), the sentence would be amended by removing the 
word ``Agencies'' and adding the words ``Each agency'' in its place; by 
removing the word ``thereof'' and adding the words ``of the fee'' in 
its place; in the third sentence, by removing the words ``In instances 
where'' and adding the word ``If'' in their place; and by removing the 
word ``likewise''.
    e. Paragraph (f) would be amended by removing the words ``the 
forwarding of copies'' and adding the words ``providing copies of the 
records'' in their place.
    f. Paragraph (g) would be amended by adding the words ``of this 
subpart'' immediately after the words ``appendix A'' both times they 
appear; and, in the second sentence, by removing the words ``Similarly, 
as a matter of policy, where'' and adding the word ``If'' in their 
place.
    9. Section 1.9 would be amended as follows:
    a. Paragraph (a) would be amended by removing the words ``They 
include'' and adding the words ``Search services include'' in their 
place; and by removing the words ``They also include'' and adding their 
words ``Search services also include'' in their place.
    b. Paragraph (c) would be removed.
    c. Paragraph (b) would be revised to read as set forth below.

Sec. 1.9  Search services.

* * * * *
    (b) Search services do not include the time spent locating a record 
if the record is in its normal location in a file or other facility or 
the review of records to determine whether the records are exempt.
    10. Section 1.10 would be amended as follows:
    a. Paragraph (a) would be amended by removing the word 
``documents'' and adding the word ``records'' in its place; by adding 
the words ``of this subpart'' immediately after the words ``appendix 
A''; and by removing the word ``document'' and adding the word 
``record'' in its place.
    b. Paragraph (b) would be amended by removing the word 
``documents'' and adding the word ``records'' in its place both times 
it appears.
    c. Paragraph (c) would be revised to read as set forth below.

Sec. 1.10  Review services.

* * * * *
    (c) Review services do not include the time spent resolving general 
legal or policy issues regarding the application of exemptions.

Sec. 1.11  [Amended]

    11. In Sec. 1.11, paragraph (a) introductory text would be amended 
by removing the words ``Whenever a request (including any `demand' as 
defined in Sec. 1.21)'' and adding the words ``If a request (including 
a subpoena duces tecum as described in Sec. 1.215)'' in their place.

Sec. 1.13  [Amended]

    12. Section 1.13 would be amended as follows:
    a. In paragraph (b), the last sentence would be amended by removing 
the words ``Assistant General Counsel.'' and adding the words 
``Assistant General Counsel, Research and Operations Division, Office 
of the General Counsel.'' in their place.
    b. Paragraph (c) would be amended by adding the words ``, Research 
and Operations Division, Office of the General Counsel,'' immediately 
after the words ``Assistant General Counsel''; by removing the words 
``Office of Governmental and Public Affairs'' and adding the words 
``Office of Communications'' in their place; and by removing the word 
``thereof'' and adding the words ``of the administrative deadline'' in 
its place.

Sec. 1.14  [Amended]

    13. Section 1.14 would be amended to read as follows:
    a. Paragraph (a) would be amended by removing the word 
``dispatched'' and adding the words ``sent to the requester'' in its 
place.
    b. Paragraph (b)(3) would be amended by removing the word 
``therein'' and adding the words ``in the request'' in its place; and 
by removing the words ``Office of Governmental and Public Affairs'' and 
adding the words ``Office of Communications'' in their place.
    14. Section 1.16 would be revised to read as follows:

Sec. 1.16  Fee schedule.

    Pursuant to Sec. 2.28 of this title, the Chief Financial Officer is 
delegated authority to promulgate regulations providing for a uniform 
fee schedule applicable to all agencies of the Department regarding 
requests for records under this subpart. The regulations providing for 
a uniform fee schedule are found in appendix A of this subpart.

Sec. 1.18  [Amended]

    15. Section 1.18 would be amended as follows:
    a. Paragraph (a)(7) would be amended by removing the word 
``fully''.
    b. Paragraph (b) would be amended by removing the words ``Director 
of Information, Office of Governmental and Public Affairs'' and adding 
the words ``Director of Communications, Office of Communications'' in 
their place.
    c. Paragraph (c) would be amended by removing the words ``Director 
of Information'' and adding the words ``Director of Communications, 
Office of Communications'' in their place; and by removing the 
reference ``5 U.S.C. 552(d)'' and adding the reference ``5 U.S.C. 
552(e)'' in its place.

Appendix A of Subpart A [Amended]

    16. Appendix A of subpart A would be amended as follows:
    a. Section 1 would be amended by removing the word ``documents'' 
and adding the word ``records'' in its place.
    b. In Sec. 2, the first sentence would be amended by adding the 
words ``of this appendix'' immediately after the words ``section 5'' 
and by removing the word ``document'' and adding the word ``record'' in 
its place; in the second sentence, by removing the words ``in 
certifying'' and adding the word ``certifying'' in their place and by 
removing the words ``in sending'' and adding the word ``sending'' in 
their place; and in the third sentence, by removing the word 
``schedule'' and adding the word ``appendix'' in its place.
    c. In Sec. 3, paragraph (a) would be amended by removing the word 
``documents'' and adding the word ``records'' in its place; by removing 
the words ``as specified below in section 5'' and adding the words ``as 
specified in section 5 of this appendix'' in their place; by removing 
the word ``information'' and adding the word ``records'' in its place; 
and by adding the words ``of this appendix'' immediately after the 
reference to ``section 4(e)''.

[[Page 38661]]

    d. In Sec. 3, paragraph (b) would be amended by removing the words 
``Also, no'' and adding the word ``No'' in their place.
    e. In Sec. 3, paragraph (c) would be amended by removing the words 
``In addition, fees'' and adding the word ``Fees'' in their place.
    f. In Sec. 3, paragraph (d) introductory text would be amended by 
removing the word ``Documents'' and adding the word ``Records'' in its 
place; and in paragraph d(2) by removing the word ``free'' and adding 
the word ``fee'' in its place.
    g. In Sec. 4, paragraph (c) would be amended by removing the word 
``information'' and adding the word ``records'' in its place; and by 
removing the word ``document(s)'' and adding the word ``records'' in 
its place.
    h. In Sec. 4, paragraph (j) would be amended by removing the words 
``as amended (5 U.S.C. 552),''; by adding the words ``of this 
appendix'' immediately after the reference to ``section 6''; and by 
removing the word ``schedule'' and adding the word ``appendix'' in its 
place.
    i. In Sec. 4, paragraph (k) would be amended by removing the word 
``schedule'' and adding the word ``appendix'' in its place; and by 
removing the words ``(formerly 31 U.S.C. 483a)''.
    j. Section 5 introductory text would be amended by removing the 
words ``as amended,''; and by removing the words ``The Act'' and adding 
the word ``FOIA'' in their place.
    k. In Sec. 5, paragraph (a) introductory text would be amended by 
adding the words ``of this appendix'' immediately after the reference 
to ``section 3(a)''; and in paragraph (a)(2) by removing the word 
``documents'' and adding the word ``records'' in its place.
    l. In Sec. 5, paragraph (b)(2) would be amended by adding the words 
``of this appendix'' immediately after the reference ``(see section 
5(a)(1))''.
    m. In Sec. 5, paragraph (d) would be amended by removing the words 
``any of the above categories'' and adding the words ``the categories 
described in paragraphs (a), (b), or (c) of this section'' in their 
place; by removing the word ``documents'' and adding the word 
``records'' in its place; and by adding the words ``of this appendix'' 
immediately after the reference to ``section 4(e)''.
    n. In Sec. 6, paragraph (a) introductory text would be amended by 
revising the first sentence to read, ``Agencies shall waive or reduce 
fees on request for records if disclosure of information in the records 
is deemed to be in the public interest.''.
    o. In Sec. 6, paragraph (a)(1)(v) would be amended by removing the 
words ``, if so,''.
    p. In Sec. 6, paragraph (a)(3)(i) would be amended by removing the 
word ``information'' and adding the word ``records'' in its place.
    q. In Sec. 6, paragraph (a)(3)(ii) would be amended by removing the 
word ``recipient'' and adding the word ``requester'' in its place.
    r. In Sec. 8, paragraph (d) would be amended by removing the word 
``below'' and adding the words ``in section 9 of this appendix'' in its 
place.
    s. Section 9 would be amended by removing the reference ``section 
3717 of title 31 U.S.C.'' and adding the reference ``31 U.S.C. 3717'' 
in its place.
    t. Section 10 would be amended by removing the reference ``the 
provisions of 31 U.S.C. 3701, 3711-3719'' and adding the reference ``31 
U.S.C. 3701, 3711-3720A'' in its place.
    u. In Sec. 13, the heading would be amended by removing the word 
``photographic''.
    v. Section 13 introductory text would be amended by removing the 
words ``this action to be'' and adding the words ``that furnishing free 
reproductions is'' in their place.
    w. In Sec. 13, paragraph (a) would be amended by removing the words 
``Press, radio, television, and newsreel representatives'' and adding 
the words ``Representatives of the news media'' in their place.
    x. Section 17 introductory text would be amended by removing the 
word ``here'' and adding the words ``in this section'' in its place.
    y. In Sec. 17, the fourth sentence of paragraph (a) would be 
amended by removing the words ``fee schedule'' and adding the word 
``appendix'' in their place; and by removing the words ``National 
Agricultural Library, Room 111, Information Access Division, USDA, 
Beltsville, Maryland 20705 (301-344-3834)'' and adding the words 
``National Agricultural Library, Agricultural Research Service, USDA, 
Document Delivery Services Branch, 10301 Baltimore Boulevard, 
Beltsville, Maryland 20705-2351 (301-504-6503)'' in their place.
    z. In Sec. 17, paragraph (c) would be amended by removing the word 
``below'' and adding the words ``in this paragraph'' in its place.
    aa. In Sec. 17, paragraph (d) would be amended by removing the word 
``below'' and adding the words ``in this paragraph'' in its place.
    bb. Section 11 including the heading would be revised to read as 
set forth below.
    cc. Section 12 would be revised to read as set forth below.
    dd. In Sec. 17, paragraph (e) would be revised to read as set forth 
below.

Appendix A--Fee Schedule

* * * * *

Section 11. Photographic and digital reproductions of microfilm, 
aerial imagery, and maps.

    Microfilm, aerial imagery, and maps that have been obtained in 
connection with the authorized work of this Department may be sold 
at the estimated cost of furnishing reproductions of these records, 
using photographic, digital, or other methods of reproduction as 
prescribed in this appendix.

Section 12. Agencies which furnish photographic reproductions.

    (a) Aerial photographic reproductions. The agencies of the 
Department identified in this paragraph furnish aerial photographic 
reproductions.
    (1) Farm Service Agency (FSA), APFO, USDA-FSA, 2222 West 2300 
South, P.O. Box 30010, Salt Lake City, Utah 84125.
    (2) Natural Resources Conservation Service (NRCS), National 
Cartography and Geospatial Center, 501 Felix Street, Building 23, 
Fort Worth, Texas 76115, or a cartographic facility in any NRCS 
Technical Service Center.
    (b) Other photographic reproductions. Photographic reproductions 
other than aerial photographic reproductions may be obtained from 
the agencies of the Department identified in this paragraph.
    (1) Farm Service Agency (FSA), Aerial Photography Field Office, 
USDA-FSA, 2222 West 2300 South, PO. Box 30010, Salt Lake City, Utah 
84125.
    (2) Forest Service (FS), USDA, PO. Box 96090, Washington, DC. 
20090-6090, or a FS Regional Office.
    (3) National Agricultural Library, Agricultural Research 
Service, USDA, Document Delivery Services Branch, 10301 Baltimore 
Boulevard, Beltsville, Maryland 20705-2351.
    (4) Natural Resources Conservation Service, National Cartography 
and Geospatial Center, 501 Felix Street, Building 23, Fort Worth, 
Texas 76115.
    (5) Office of Communications, Photography Division, Room 4407 
South Building, Washington, DC. 20250.
* * * * *

Section 17. Reproduction prices.

* * * * *
    (e) Special needs. For special needs not covered elsewhere in 
this section, persons desiring aerial photographic reproductions 
should contact the aerial photography coordinator, Farm Service 
Agency (FSA), Aerial Photography Field Office, USDA-FSA, 2222 West 
2300 South, PO. Box 30010, Salt Lake City, Utah 84125.
* * * * *

Subpart G--Privacy Act Regulations

    17. The authority citation for part 1, subpart G, would be revised 
to read as follows:

[[Page 38662]]

    Authority: 5 U.S.C. 301 and 552a; 31 U.S.C. 9701.

Sec. 1.110  [Amended]

    18. Section 1.110 would be amended by removing the word ``It'' and 
adding the words ``This subpart'' in its place; and by removing the 
words ``the Act'' and adding the words ``the Privacy Act'' in their 
place both times they appear.

Sec. 1.112  [Amended]

    19. In Sec. 1.112, paragraph (a) introductory text would be amended 
by adding the words ``or her'' immediately after the word ``him''.

Sec. 1.113  [Amended]

    20. Section 1.113 would be amended as follows:
    a. Paragraph (a) would be amended by adding the words ``or her'' 
immediately after the word ``him''; and by adding the words ``or 
herself'' immediately after the word ``himself''.
    b. In paragraph (b), the first sentence would be amended by 
removing the words ``he is'' and adding the words ``the requester is'' 
in their place; in the second sentence, by removing the words ``he 
shall'' and adding the words ``the requester shall'' in their place; by 
removing the word ``his'' and adding the words ``the requester's'' in 
its place; by removing the words ``he understands'' and adding the 
words ``the requester understands'' in their place; and, in the last 
sentence by removing the words ``when the records are ones whose 
disclosure is required by 5 U.S.C. 552'' and adding the words ``if the 
records are required by 5 U.S.C. 552 to be released'' in their place.
    c. Paragraph (c) would be amended by removing the words ``him via'' 
and adding the words ``himself or herself by'' in their place; by 
removing the words ``him during'' and adding the words ``the requester 
during'' in their place; and by removing the words ``their presence'' 
and adding the words ``the presence of such other person or persons'' 
in their place.
    d. Paragraph (d) would be amended by removing the words ``to him'' 
and adding the words ``to the requester'' in their place; by removing 
the words ``him copies'' and adding the words ``the requester copies'' 
in their place; and by removing the word ``thereof'' and adding the 
words ``of those records'' in its place.
    e. In paragraph (e), the first sentence would be amended by 
removing the words ``he shall'' and adding the words ``the requester 
shall'' in their place; by removing the words ``his request'' and 
adding the words ``his or her request'' in their place; by removing the 
words ``his identity'' and adding the words ``the requester's 
identity'' in their place; in the second sentence, by removing the 
words ``he is'' and adding the words ``the requester is'' in their 
place; by removing the words ``he understands'' and adding the words 
``the requester understands'' in their place; and in the third 
sentence, by removing the words ``when the records are ones whose 
disclosure is required by 5 U.S.C. 552'' and adding the words ``if the 
records are required by 5 U.S.C. 552 to be released'' in their place.

Sec. 1.114  [Amended]

    21. Section 1.114 would be amended as follows:
    a. Paragraph (d) would be amended by removing the word ``he'' and 
adding the words ``the system manager'' in its place both times it 
appears.
    b. Paragraph (e) would be amended by removing the word ``he'' and 
adding the words ``the head of the agency'' in its place; by removing 
the word ``therefor'' and adding the words ``for the determination'' in 
its place; and by removing the word ``his'' and adding the words ``the 
requester's in its place.

Sec. 1.116  [Amended]

    22. Section 1.116 would be amended as follows:
    a. Paragraph (a) introductory text would be amended by adding the 
words ``or her'' immediately after the word ``him''.
    b. Paragraph (b) would be amended by removing the reference ``5 
U.S.C. 552(e) (1) and (5)'' and adding the reference ``5 U.S.C. 552a(e) 
(1) and (5)'' in its place.

Sec. 1.117  [Amended]

    23. Section 1.117 would be amended as follows:
    a. Paragraph (a) introductory text would be amended by removing the 
word ``It'' and adding the words ``The agency'' in its place.
    b. In paragraph (a)(2), the first sentence would be amended by 
removing the word ``his'' and adding the word ``the'' in its place; and 
by removing the word ``he'' and adding the words ``the requester'' in 
its place.
    c. Paragraph (b) would be amended by removing the word ``therefor'' 
and adding the words ``for the inability to comply with paragraphs 
(a)(1) or (a)(2) of this section within 30 days,'' in its place.
    d. Paragraph (d)(3) would be amended by removing the words ``and 
where'' and adding the word ``if'' in their place.
    e. Paragraph (e)(2) would be amended by removing the word 
``therefor'' and adding the words ``for the determination not to grant 
all or a portion of the request for correction or amendment'' in its 
place.
    f. Paragraph (e)(3) would be amended by adding the words ``or she'' 
immediately after the word ``he''.

Sec. 1.118  [Amended]

    24. Section 1.118 would be amended as follows:
    a. Paragraph (c) would be amended by removing the word ``his'' and 
adding the word ``a'' in its place.
    b. Paragraph (d) would be amended by removing the word ``he'' and 
adding the words ``the head of the agency'' in its place.
    c. Paragraph (e) introductory text would be amended by removing the 
word ``he'' and adding the words ``the head of the agency'' in its 
place.
    d. Paragraph (e)(1) would be amended by removing the word 
``therefor'' and adding the words ``for the determination'' in its 
place.
    e. Paragraph (e)(2) would be amended by removing the word ``his'' 
and adding the words ``the requester's'' in its place.

Sec. 1.121  [Amended]

    25. Section 1.121 would be amended by removing the words 
``enumerated acts'' and adding the words ``acts enumerated in 5 U.S.C. 
552a(i)'' in their place; by removing the words ``on or after September 
27, 1995,''; and by removing the reference ``5 U.S.C. 552a(m)'' and 
adding the reference ``5 U.S.C. 552a(m)(1)'' in its place.

Sec. 1.122  [Amended]

    26. Section 1.122 would be amended by removing the word ``thereof'' 
and adding the words ``of systems of records'' in its place; by 
removing the word ``below'' and adding the words ``in this section'' in 
its place.

Sec. 1.123  [Amended]

    27. Section 1.123 would be amended as follows:
    a. The introductory text would be amended by removing the word 
``thereof'' and adding the words ``of systems of records'' in its 
place; by removing the word ``below'' and adding the words ``in this 
section'' in its place.
    b. By removing the heading ``AGRICULTURAL STABILIZATION AND 
CONSERVATION SERVICE'' and adding the heading ``FARM SERVICE AGENCY'' 
in its place.
    c. By removing the heading ``FARMERS HOME ADMINISTRATION'' and 
removing the words ``Credit Report File, USDA/FmHa-3''.
    d. By removing the heading ``FEDERAL GRAIN INSPECTION SERVICE'' and 
adding the heading

[[Page 38663]]

``GRAIN INSPECTION, PACKERS AND STOCKYARDS ADMINISTRATION'' in its 
place.
    e. By removing the heading ``FOOD AND NUTRITION SERVICE'' and 
adding the heading ``FOOD AND CONSUMER SERVICES'' in its place.
    f. By removing, under the subheading Community Development 
Division, the words ``Farmers Home Administration (FmHA) General Case 
Files, USDA/OGC-12.'' and adding the words ``Farm Service Agency (FSA) 
General Case Files, USDA/OGC-12a. Rural Housing Service (RHS) General 
Case Files, USDA/OGC-12b. Rural Business-Cooperative Development 
Service (RBS) General Case Files, USDA/OGC-12c. Federal Crop Insurance 
Corporation (FCIC) Cases, USDA/OGC-16.'' in their place.
    g. By removing the subheading Foreign Agriculture and Commodity 
Stabilization Division and adding the subheading International Affairs 
and Commodity Programs Division in its place.
    h. By removing under the newly designated subheading International 
Affairs and Commodity Programs Division the words ``Federal Crop 
Insurance Corporation (FCIC) Cases, USDA/OGC-16.''
    i. By removing the subheading ``Packers and Stockyards Division and 
adding the subheading Trade Practices Division in its place.

Appendix A of Subpart G--INTERNAL DIRECTIVES [Amended]

    28. Appendix A of subpart G would be amended as follows:
    a. In Sec. 1, paragraph (c) introductory text would be amended by 
adding the words ``, of'' immediately before the colon.
    b. In Sec. 1, paragraph (c)(4) would be amended by removing the 
word ``him'' and adding the words ``the individual'' in its place.
    c. In Sec. 1, paragraph (d)(7) would be amended by adding the words 
``or her'' immediately after the word ``his''; and by removing the word 
``him'' and adding the words ``the individual'' in its place.
    d. In Sec. 1, paragraph (d)(8) would be amended by adding the words 
``or her'' immediately after the word ``his''; by removing the word 
``he'' and adding the words ``the individual'' in its place both times 
in appears; and by adding the words ``or her'' immediately after the 
word ``him''.
    e. In Sec. 2, paragraph (a) would be amended by removing the words 
``insure that 30'' and adding the words ``ensure that at least 30'' in 
their place.
    f. In Sec. 3, paragraph (c) would be amended by removing the word 
``above'' and adding the words ``required under paragraph (a) of this 
section'' in its place; and by adding the words ``or her'' immediately 
after the word ``his''.
    g. In Sec. 4, by removing the words ``, if such contract is agreed 
to on or after September 27, 1975,''; and by removing the words ``that 
section'' and adding the reference ``5 U.S.C. 552a(i)'' in their place.
    h. In Sec. 6, paragraph (a) would be amended by adding the words 
``on her'' immediately after the word ``his''.
    i. In Sec. 6, paragraph (b) introductory text would be amended by 
removing the words ``The provisions of paragraph (a) of this Section'' 
and by adding the words ``Paragraph (a) of this section'' in their 
place.
    j. In Sec. 6, paragraph (c) would be amended by adding the words 
``or her'' immediately after the words ``his''.
    k. Section 7 introductory paragraph would be amended by removing 
the words ``(beginning March 30, 1976)''.
    l. Section 8 would be amended by removing the words ``the 
provisions of''.

    Done in Washington, DC., this 16th day of July 1996.
Dan Glickman,
Secretary of Agriculture.
[FR Doc. 96-18860 Filed 7-24-96; 8:45 am]
BILLING CODE 3410-01-M

Complete official Federal Register PDF

FR Doc. 96-18847 Geographic Partitioning and Spectrum Disaggregation by Commercial Mobile Radio Services Licensees; and Implementation of Section 257 of the Communications ActElimination of Market Entry Barriers
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38693-38701]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18847]

-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION
47 CFR Part 24

[WT Docket No. 96-148; GN Docket No. 96-113; FCC 96-287]

Geographic Partitioning and Spectrum Disaggregation by Commercial 
Mobile Radio Services Licensees; and Implementation of Section 257 of 
the Communications Act--Elimination of Market Entry Barriers

AGENCY: Federal Communications Commission.

ACTION: Notice of Proposed Rulemaking.

-----------------------------------------------------------------------

SUMMARY: In this Notice of Proposed Rulemaking in WT Docket No. 96-148 
and GN Docket No. 96-113, the Commission proposes modifications to the 
broadband personal communications services (PCS) rules to expand 
geographic partitioning and spectrum disaggregation provisions. The 
Commission also solicits comment on certain issues relating to these 
rules. The Commission's objective in expanding the partitioning and 
disaggregation rules is to enable a wide variety of applicants, 
including small businesses, to overcome barriers to entry in the 
broadband PCS market, to increase competition, and to expedite the 
provision of broadband PCS to areas that may not otherwise receive 
wireless services.

DATES: Comments must be filed on or before August 15, 1996. Reply 
comments are to be filed on or before August 30, 1996.

ADDRESSES: Federal Communications Commission, 1919 M Street, N.W., 
Washington D.C. 20554.

FOR FURTHER INFORMATION CONTACT: David Nall or Mika Savir, Commercial 
Wireless Division, Wireless Telecommunications Bureau, at (202) 418-
0620.

SUPPLEMENTARY INFORMATION: This Notice of Proposed Rulemaking in WT 
Docket No. 96-148 and GN Docket No. 96-113, adopted on June 28, 1996, 
and released on July 15, 1996, is available for inspection and copying 
during normal business hours in the FCC Reference Center, Room 575, 
2000 M Street N.W., Washington D.C. The complete text may also be 
purchased from the Commission's copy contractor, International 
Transcription Service, Inc., 2100 M Street, N.W., Suite 140, Washington 
D.C. 20037, (202) 857-3800. Synopsis of Notice of Proposed Rulemaking:

I. Background

    1. In the Broadband PCS Memorandum Opinion and Order, Amendment of 
the Commission's Rules to Establish New Personal Communications 
Services, GN Docket No. 90-314, Memorandum Opinion and Order, 59 FR 
32830 (June 24, 1994) (Broadband PCS Memorandum Opinion and Order), the 
Commission declined to allow general geographic partitioning, noting 
that licensees might use partitioning as a means of circumventing 
construction requirements. The Commission observed, however, that a 
limited partitioning scheme might facilitate participation by certain 
groups, including rural telephone companies and other designated 
entities, in the provision of broadband PCS. The Commission stated that 
it would consider the issue of geographic partitioning in a future 
proceeding to establish competitive bidding rules for broadband PCS.
    2. The Commission established geographic partitioning provisions 
for rural telephone companies in the Competitive Bidding Fifth Report 
and Order, Implementation of Section 309(j) of the Communications Act--
Competitive Bidding, PP Docket No. 93-253, 59 FR 37566 (July 22, 1995) 
(Competitive Bidding Fifth Report and Order). The Commission determined 
that partitioning would satisfy the Congressional mandate to provide an 
opportunity for rural telephone companies to participate at auction and 
in the provision of broadband PCS. The Commission decided that rural 
telephone companies could acquire a partitioned license (1) by forming 
an auction bidding consortium comprised entirely of rural telephone 
companies, and partitioning the license(s) won among consortium 
members; or (2) through private negotiation, either before or after an 
auction. The Commission required that partitioned areas conform to 
established

[[Page 38694]]

geopolitical boundaries (such as county lines) and that each area 
include all portions of the rural telephone company's wireline service 
area within the PCS service area.
    3. In the Competitive Bidding Further Notice of Proposed 
Rulemaking, Implementation of Section 309(j) of the Communications 
Act--Competitive Bidding, PP Docket No. 93-253, Further Notice of 
Proposed Rulemaking, 59 FR 41426 (August 12, 1994) (Competitive Bidding 
Further Notice of Proposed Rulemaking), the Commission requested 
comment on whether to extend post-auction partitioning of broadband PCS 
licenses to women- and minority-owned businesses. The Commission 
observed that allowing these entities to acquire partitioned licenses 
may, like rural telephone companies, facilitate their ability to 
participate in the provision of broadband PCS.
    4. In the Broadband PCS Memorandum Opinion and Order, the 
Commission held that broadband PCS licensees may disaggregate licensed 
broadband PCS spectrum under the current rules after January 1, 2000 if 
they have met the five-year construction requirement. The Commission 
reasoned that this limit on spectrum disaggregation for broadband PCS 
would allow the PCS market to take shape and prevent anti-competitive 
practices with regard to disaggregation. The Commission indicated, 
however, that it would initiate a proceeding at a later date to specify 
rules for allowing spectrum disaggregation.

II. Notice of Proposed Rulemaking

A. Partitioning

1. License Eligibility
    The Commission proposes to relax the broadband PCS geographic 
partitioning rules for the A, B, D, and E spectrum blocks to allow any 
party to acquire a license for a partitioned geographic service area 
that meets the eligibility requirements to be a broadband PCS licensee. 
The Commission tentatively concludes that this would allow spectrum to 
be used more efficiently, speed service to underserved areas, and 
increase competition. The Commission invites comment on this proposal. 
The Commission solicits comment on whether this proposal to liberalize 
the geographic partitioning rules would hinder a rural telephone 
company's ability to participate in the provision of broadband PCS.
2. Available License Area, Timing, and Financial Obligations
    The Commission proposes that any partitioning of broadband PCS 
licenses be along county lines in the same manner that rural telephone 
companies must partition along county lines under the current rules. 
The Commission tentatively concludes that this would reduce the 
administrative burden and minimize interference coordination concerns. 
Commenters are invited to address the merits of the Commission's 
proposal.
    7. Non-entrepreneur block licensees. The Commission believes that 
there may be significant advantages in broadening the partitioning 
rules to permit A, B, D, and E block broadband PCS licensees to 
partition a portion of their license area to any qualifying entity at 
any time after receiving a license. The Commission proposes that all 
licensees in the A, B, D, and E blocks be permitted to partition their 
license area along county lines, at any time. Commenters are invited to 
discuss whether the Commission should impose any limitations on the 
size of geographic area that a licensee would be allowed to partition 
in the non-entrepreneurs' blocks.
    8. Licensees with competitive bidding benefits. The Commission 
observes that small businesses face certain barriers to entry into the 
broadband PCS market that changes in the partitioning rules may 
address. The Commission proposes that an entrepreneurs' block (C and F 
block) licensee be permitted to partition at any time to other parties 
that would be eligible for a license in those blocks. The Commission 
seeks comment on this tentative conclusion.
    9. The Commission seeks comment on the treatment of installment 
plans for winning auction bids owned by partitioning licensees. The 
Commission seeks comment on whether an entrepreneur block licensee who 
partitions to another entrepreneur should be required to repay, on an 
accelerated basis, a portion of the outstanding principle balance owed 
under an installment payment plan. The Commission seeks comment on 
whether the partitionee should be required to guarantee payment of a 
portion of the partitioner's obligation.
    10. The Commission tentatively concludes that some form of the 
unjust enrichment requirements should apply to a partitioning licensee 
that has received bidding credits or is paying the winning bid through 
installment payments when the partitionee qualifies as an entrepreneur, 
but would receive less favorable installment plan payments. The 
Commission seeks comment on whether such unjust enrichment requirements 
in this case should be on a proportional basis, and how the payments 
should be calculated.
    11. The Commission proposes to apply the current five-year 
restriction against complete license transfers to prohibit partitioning 
and/or disaggregation by an entrepreneur block licensee to a non-
entrepreneur during the first five years of the license period. The 
Commission states that applying this holding period to partitioning and 
disaggregation will ensure the objective that entrepreneurs and small 
businesses continue to participate as PCS licensees for substantial 
periods of time, and through that participation obtain experience and 
profits that will enable their long-term participation in 
communications industries. The Commission tentatively concludes that 
after the five-year holding period, unjust enrichment requirements 
should apply as a condition for approval of an application for a 
partitioning transfer of an entrepreneur block license to a non-
entrepreneur. The unjust enrichment provisions would include 
accelerated payment of bidding credits, unpaid principal, and accrued 
unpaid interest, and would be applied on a proportional basis. The 
Commission seeks comment on how such unjust enrichment amounts should 
be calculated. The Commission seeks comment on whether the price paid 
by the partitionee should be considered in determining the percentage 
of the outstanding principle balance to be repaid.
    12. The Commission seeks comment on what the respective obligations 
of the participants in a partitioning transfer should be, and whether 
each party should be required to guarantee all or a portion of the 
partitionee's original auctions-related obligation in the event of 
default or bankruptcy by any of the parties to the partitioning 
transfer. The Commission seeks comment on whether the partitioner (the 
original licensee) should have a continuing obligation with respect to 
the entire initial geographic area. The Commission seeks comment on 
whether partitioning parties should be able to determine which party 
has a continuing obligation with respect to the original licensed area.
    13. The Commission tentatively concludes that the proposals to 
permit partitioning in the manner described above would allow broadband 
PCS spectrum to be used most efficiently, speed service to unserved or 
underserved areas, and facilitate competition. The Commission 
tentatively concludes that the proposal to permit partitioning by 
entrepreneur block licensees to similarly qualified parties would 
ensure that these entities retain a significant presence in the market. 
Additionally, this proposal may

[[Page 38695]]

help small business licensees compete more effectively in the areas 
they retain and assist in the elimination of entry barriers to the PCS 
market. The Commission solicits comment on this analysis of the 
intended effects of these proposals.
3. License Term
    14. The Commission proposes that a partitionee be authorized to 
hold its license for the remainder of the partitioner's original ten-
year license term. The Commission tentatively concludes that this 
approach is appropriate because a licensee, through partitioning, 
should not be able to confer greater rights than it was awarded under 
the terms of its license grant. The Commission solicits comment on this 
tentative conclusion.
    15. The Commission also proposes that a partitionee be afforded the 
same renewal expectancy as a market area licensee. Specifically, a 
partitionee would be granted a preference at a comparative renewal 
proceeding if it can demonstrate that it has provided ``substantial'' 
service during its past license term and has substantially complied 
with applicable Commission rules, policies and the Communications Act 
of 1934, as amended. The Commission invites comment on this proposal.
4. Construction Requirements
    16. In the Broadband PCS Memorandum Opinion and Order, the 
Commission found that broadband PCS would likely be a highly 
competitive service and that licensees would have incentives to 
construct facilities to meet the service demands in their licensed 
areas. Nevertheless, the Commission imposed minimum construction 
requirements to expedite service to the public and promote efficient 
use of the spectrum. Specifically, the Commission required 30 MHz 
broadband PCS licensees to construct facilities that provide coverage 
to one-third of the population of their service area within five years 
of the license grant and two-thirds of the population within ten years. 
Ten MHz licensees are required to provide coverage to one-fourth of the 
service area's population within five years or, alternatively, they may 
submit a showing to the Commission demonstrating that they are 
providing substantial service.
    17. The Commission tentatively concludes that both the partitioner 
and partitionee should be subject to coverage requirements that ensure 
that both portions of a partitioned licensing area will receive 
service. This proposal would facilitate partitioning by offering a 
choice between two different build-out options, which could be 
negotiated between the partitioner and partitionee. Applicants would 
then select in their assignment and transfer applications the 
construction option they would be obligated to meet.
    18. Under the first option, a partitionee would be obligated to 
satisfy the same construction requirements as the original licensee 
within its partitioned area, regardless of when it acquired the 
partitioned license. The Commission invites comment on this option.
    19. As a second option, the Commission proposes more modest build-
out requirements for a partitioned area where the original licensee has 
met its five-year build-out requirements and certifies that it will 
meet the ten-year coverage requirements for its entire license area. 
Specifically, the Commission proposes that partitionees must only 
satisfy the substantial service requirement for renewal expectancy for 
its partitioned area by the end of the original ten-year license term. 
For example: an A Block licensee who meets its five-year build-out 
requirements within three years after receiving its license, may, in 
its partitioning application, certify that it will meet the ten-year 
coverage requirement for its original license. In this scenario, the 
partitionee would only be required to meet the substantial service 
requirement for its partitioned area at the end of the A Block 
licensee's original ten-year license term.
    20. The Commission tentatively concludes that establishing flexible 
build-out requirements would encourage partitioning to entities that 
have a sincere interest in providing broadband PCS and would thereby 
expedite the provision of service to areas that otherwise may not 
receive it as quickly. The Commission also observes that this option 
may facilitate partitioning agreements, especially in the latter 
portion of a license term, by acknowledging licensees' efforts to bring 
broadband PCS service to their licensed areas. The Commission solicits 
comment on these build-out proposals.

B. Disaggregation

1. Timing of Disaggregation
    21. Currently, a broadband PCS licensee who has met the five-year 
construction requirement may assign portions of its licensed PCS 
spectrum after January 1, 2000. In the Broadband PCS Memorandum Opinion 
and Order, the Commission stated that allowing immediate disaggregation 
of spectrum before that time may impede competition in the provision of 
broadband PCS.
    22. The Commission tentatively concludes that the prohibitions on 
disaggregation may no longer be warranted. The Commission tentatively 
concludes that the current prohibitions on disaggregation may 
constitute a barrier to market entry for small businesses and other 
entrepreneurs which may lack the resources to participate successfully 
in auctions for 30 MHz and 10 MHz broadband PCS spectrum blocks. The 
Commission proposes to eliminate such market entry barriers by making 
changes in the disaggregation rules. The Commission seeks comment on 
these tentative conclusions.
    23. The Commission proposes to allow spectrum disaggregation prior 
to January 1, 2000, and to eliminate the condition that the licensee 
must satisfy the five-year build-out requirements before 
disaggregating. The Commission invites comment on whether to retain the 
five-year build-out requirement before allowing disaggregation. 
Commenters should discuss whether the goals of elimination of market 
entry barriers, efficient spectrum use, expedited access to broadband 
PCS service, and competition would be better served by eliminating this 
restriction. Specifically, the Commission proposes to allow non-
entrepreneurs to disaggregate to other qualified entities at any time, 
and to allow entrepreneurs to disaggregate to other qualified 
entrepreneurs at any time, but entrepreneurs would be restricted from 
disaggregating spectrum to non-entrepreneurs until after the five-year 
holding period. Commenters should discuss whether any alternate 
restrictions on allowing disaggregation may be appropriate.
2. Amount of Spectrum to Disaggregate
    24. In the Broadband PCS Memorandum Opinion and Order, the 
Commission established six frequency blocks of spectrum for licensed 
broadband PCS. Three of the blocks (A, B, and C) each have 30 MHz of 
spectrum, while the remaining blocks (D, E, and F) have 10 MHz of 
spectrum each. The Commission determined that this broadband PCS 
spectrum allocation plan would facilitate the rapid deployment of 
broadband PCS and enable broadband PCS licensees to compete fully with 
other commercial mobile radio services. The Commission determined that 
30 MHz blocks of spectrum would facilitate competition and the rapid 
development and implementation of the fullest range of PCS services and 
ensure that PCS is

[[Page 38696]]

more fully competitive with other mobile radio services. The Commission 
observed that 10 MHz licensees may be able to provide services ranging 
from specialized applications to services comparable to those now 
provided by cellular systems, through the use of advanced digital 
techniques, such as Code Division Multiple Access (CDMA) and Time 
Division Multiple Access (TDMA), and micro-cellular technology.
    25. The Commission seeks comment and proposals for the amount of 
spectrum that a licensee should be required to retain if disaggregation 
is allowed on a more expedited basis. The Commission seeks comment 
generally concerning whether some restriction or limit should be placed 
on the amount of spectrum a licensee may disaggregate or the timing of 
such disaggregation.
    26. The Commission proposes that licensees disaggregate frequencies 
in accordance with the pairings specified in our rules. The Commission 
tentatively concludes that for these purposes, disaggregation for 
broadband PCS in blocks smaller than a 1 MHz block of paired 
frequencies will not be permitted. The Commission seeks comment on this 
tentative conclusion. The Commission requests that commenters 
suggesting alternative approaches provide technical justifications and 
other relevant support in responding to this issue.
    27. The Commission seeks comment on whether broadband PCS licensees 
should be required to retain or acquire spectrum above the 
administrative minimum of 1 MHz. The Commission also seeks comment on 
the minimum amount of spectrum a disaggregatee could utilize for the 
provision of broadband type services. The Commission seeks comment 
generally on the relevance of the distinction between broadband and 
narrowband for purposes of disaggregation rules.
    28. The Commission tentatively concludes that elimination of the 
current prohibitions on broadband PCS disaggregation would be 
consistent with the recent elimination of the cellular/PCS cross-
ownership rule and the 40 MHz PCS spectrum cap, and the retention of 
the 45 MHz CMRS spectrum cap, because such actions facilitate market 
transfers of spectrum among cellular and PCS licensees while 
maintaining a provision to ensure a diversity of service providers. The 
Commission requests comment on this tentative conclusion, and generally 
on the impact of the present 45 MHz spectrum cap on these proposals.
3. Matters Relating to Entrepreneur Block Licensees
    29. The Commission proposes to allow all entrepreneur block 
licensees to disaggregate to similarly qualifying parties at any time 
without restriction, and to parties not eligible for entrepreneur block 
licenses after a five-year holding period. The Commission tentatively 
concludes that if an entrepreneur block licensee is permitted to 
disaggregate to a non-entrepreneur entity after the five-year holding 
period, the disaggregating entrepreneur block licensee will be required 
to repay the unjust enrichment provisions on a proportional basis. 
These unjust enrichment provisions would include accelerated payment of 
bidding credits, unpaid principal, and accrued unpaid interest, and 
would be applied on a proportional basis. The Commission seeks comment 
on how such unjust enrichment amounts should be calculated. The 
Commission seeks comment on whether the price paid by the 
disaggregating party should be considered in determining the percentage 
of the outstanding principle balance to be repaid.
    30. The Commission seeks comment on what the respective obligations 
of the participants in a disaggregation transfer should be, and whether 
each party should be required to guarantee all or a portion of the 
disaggregatee's original auctions-related obligation in the event of 
default or bankruptcy by any of the parties to the disaggregation 
transfer. The Commission seeks comment on whether the disaggregator 
(the original licensee) should have a continuing obligation with 
respect to the entire initial license. The Commission seeks comment on 
whether the parties should have available a choice of options, ranging, 
for example, from an accelerated payment based on purchase price to a 
guarantee for a larger payment by one party in the event another party 
defaults. Parties are also invited to comment on whether the 
disaggregating parties should be able to determine which party has a 
continuing obligation with respect to the original licensed area.
    31. The Commission tentatively concludes that if an entrepreneur 
block licensee is permitted to disaggregate to an entrepreneur that 
would not qualify for the same level of benefits as the disaggregating 
licensee, the disaggregating entrepreneur block licensee will be 
required to repay a portion of the unjust enrichment provisions as they 
apply to a full assignment of a license. The Commission seeks comment 
on whether this should be a proportional amount of its bidding credits, 
unpaid principal, and accrued unpaid interest to the U.S. Treasury, and 
how the amounts should be calculated. The Commission seeks comment on 
what provisions, if any, should be adopted to address the situation of 
an entrepreneur block licensee's disaggregation followed by default in 
payment of a winning bid at auction.
    32. The Commission seeks comment on whether there should be 
different requirements for entrepreneur block licensees and for non-
entrepreneur block licensees regarding the amounts of spectrum which a 
licensee must retain or may disaggregate.
4. Construction Requirements
    33. The Commission's rules currently require 30 MHz broadband PCS 
licensees to construct facilities that provide coverage to one-third of 
the population of their service area within five years of the initial 
license grant and two-thirds of the population within ten years. Ten 
MHz licensees are required to construct facilities that provide 
coverage to one-fourth of the service area's population within five 
years or, alternatively, they may submit a showing to the Commission 
demonstrating that they are providing substantial service.
    34. To address the concerns raised in the Broadband PCS Memorandum 
Opinion and Order about anti-competitive incentives to disaggregate and 
engage in spectrum warehousing, the Commission proposes two 
construction build-out options to apply to entities receiving 
disaggregated spectrum that do not already possess a broadband PCS 
license in the same geographic service area. Such applicants seeking to 
receive disaggregated spectrum would select the construction option for 
which they would be obligated to meet in their assignment and transfer 
applications. The Commission tentatively concludes that this proposal 
would prevent licensees from warehousing spectrum and would enable new 
entrants to provide service.
    35. Under the first option, a disaggregatee entering the geographic 
market would be obligated to satisfy the same construction requirements 
as the licensee, regardless of when it acquired the disaggregated 
spectrum. For example, an entity that acquires spectrum from a 30 MHz 
broadband PCS licensee (an A, B, or C block licensee) would be 
obligated to provide service to at least one-third of the population in 
the license area within five years of the underlying license term and 
two-thirds of the population in the

[[Page 38697]]

license area by the end of the ten-year license term. An entity that 
acquires spectrum from a 10 MHz broadband PCS licensee (a D, E, or F 
block licensee) would have to provide adequate service to at least one-
quarter of the population in the license area or make a showing of 
substantial service at the five-year benchmark. The Commission 
tentatively concludes that this approach would prevent spectrum 
warehousing and ensure expedited access to broadband PCS services. 
Commenters are invited to discuss the merits of this option.
    36. As a second option, the Commission proposes a modified build-
out requirement after the disaggregating licensee has met its five-year 
build-out requirement and certifies that it will meet the ten-year 
construction requirement by the end of its license term. Specifically, 
a disaggregatee must only satisfy the five-year build-out requirements 
for the license area by the end of the original ten-year license term. 
The Commission tentatively concludes that this build-out option will 
facilitate the rapid introduction of broadband PCS service and increase 
spectrum efficiency. The Commission seeks comment on this approach. 
Commenters are also invited to address whether these build-out 
requirements should apply where a licensee disaggregates a portion of 
its spectrum after the initial ten-year license term has expired.
    37. The Commission proposes to require, as a pre-condition for 
approving a proposed disaggregation, certifications from both the 
disaggregator and the disaggregatee that the time remaining before the 
ten-year construction benchmarks is sufficient for the disaggregator 
and disaggregatee to meet the pertinent construction benchmark for 
their respective licenses. This proposal would ensure against delay in 
the build-out of PCS, and place all parties on notice that the 
construction requirements must be considered during the negotiations. 
In addition, disaggregatees must file maps and other supporting 
documents showing compliance with the construction requirements within 
the appropriate five-year and ten-year bench marks of the date of their 
initial licenses.
    38. The Commission proposes that if a licensee fails to meet the 
construction requirements, the license of the disaggregator or 
disaggregatee would revert back to the Commission. In light of the fact 
that the disaggregator and disaggregatee are each licensees, their 
prospective construction requirements are independent from each other 
and failure to satisfy one construction requirement will not affect the 
renewal of the other.
    39. The Commission proposes no new construction requirements for 
disaggregatees already possessing a broadband PCS license in a 
geographic service area, on the premise that these licensees are 
already subject to coverage requirements under their existing licenses. 
The Commission seeks comment on this proposal. The Commission seeks 
comment on the construction requirements, if any, that should apply to 
other CMRS licensees receiving disaggregated broadband PCS spectrum.
5. License Term
    40. The Commission proposes a similar license term for 
disaggregation as for partitioning, i.e., that a disaggregatee would be 
authorized to hold its license for the disaggregated spectrum for the 
remainder of the disaggregator's original ten-year license term. The 
Commission believes this approach is appropriate because a licensee, 
through disaggregation, should not be able to bestow greater rights 
than it was awarded under the terms of its license grant. The 
Commission seeks comment on whether administrative efficiency and 
convenience for licensees support a limited exception to this general 
rule. The Commission proposes that a disaggregatee be afforded the same 
renewal rights as a market area licensee. A disaggregatee would be 
granted a preference at a comparative renewal proceeding if it can 
demonstrate that it has provided ``substantial'' service during its 
past license term and has substantially complied with applicable 
Commission rules, policies, and the Communications Act. The Commission 
invites comment on this proposal.

C. Related Matters

1. Combination of Partitioning and Disaggregation
    41. The Commission tentatively concludes that combinations of 
partitioning and disaggregation should be permitted. The Commission 
seeks comment on whether the benefits of allowing licensees to combine 
disaggregation and partitioning at any time outweigh factors supporting 
restrictions on such a combination. In those situations where the 
combination of partitioning and disaggregation is allowed under the 
proposed rules, the Commission proposes to implement the rules proposed 
for partitioning in the event there is a conflict in the application of 
the rules. The Commission seeks comment on where such conflicts 
conceivably could arise and on the overall approach to the combination 
of partitioning and disaggregation addressed herein.
2. Licensing
    42. The Commission proposes to follow existing partial assignment 
procedures for broadband PCS licenses in reviewing requests for 
geographic partitioning, disaggregation, or a combination of both. 
Thus, the licensee must file an FCC Form 490 that is signed by both the 
licensee and qualifying entity. The qualifying entity would also file 
an FCC Form 430 unless a current FCC Form 430 is already on file with 
the Commission. An FCC Form 600 would be filed by the qualifying entity 
to receive authorization to operate in the market area which is being 
partitioned or to modify an existing station of the qualifying entity 
to include the new or additional market area being partitioned. The 
Commission seeks comment on these proposed licensing rules.
    43. The Commission proposes that any requests for a partitioned 
license or disaggregated spectrum would contain the FCC Forms 490, 430, 
and 600 and be filed as one package under cover of the FCC Form 490. 
Parties are invited to comment on whether any additional procedures 
should be required. A broadband PCS disaggregatee must file FCC Form 
430 qualifying it as a common carrier unless a current FCC Form 430 is 
already on file with the Commission. An FCC Form 600 should be filed by 
the disaggregatee to receive authorization to operate in the market 
area which is covered by the disaggregated spectrum or to modify an 
existing station of the disaggregatee to include the new or additional 
spectrum being disaggregated. Parties are invited to comment whether 
any additional procedures should be required.
3. Technical and Microwave Relocation Rules
    44. In the Broadband PCS Second Report and Order, Amendment of the 
Commission's Rules to Establish New Personal Communications Services, 
GN Docket No. 90-314, Second Report and Order, 58 FR 59174 (November 8, 
1993) (Broadband PCS Second Report and Order) the Commission adopted 
minimal technical standards to allow PCS to develop in the most rapid, 
economically feasible and diverse manner. The Commission tentatively 
concludes that the current technical rules with respect to service area 
boundary limits and protections, which provide for coordination and 
negotiation among licensees, should be maintained and applied to 
partitioned license areas. The Commission seeks

[[Page 38698]]

comment on this tentative conclusion. The Commission seeks comment on 
whether any modifications to the technical rules are needed to 
accommodate these partitioning and disaggregation proposals.
    45. The Commission tentatively concludes that a new entrant PCS 
licensee who gains its license through partitioning or disaggregation 
should be treated as any other subsequent PCS licensee for purposes of 
the microwave relocation cost-sharing plan, including eligibility for 
installment plan payments if the transferee would be eligible for an 
installment plan equivalent to that enjoyed by the transferring 
licensee, unless the reimbursement obligations to which they would be 
subject have already been paid by the transferring licensee. The 
Commission seeks comment on this approach.
4. Clearinghouse for Spectrum.
    46. The Commission seeks comment on whether establishing an 
electronic database to make more readily accessible the information 
about licensed PCS spectrum would lower market entry barriers, 
consistent with the mandate of Section 257 of the Telecommunications 
Act of 1996, or otherwise be in the public interest. The Commission 
requests comment on how to encourage the creation of private 
information clearinghouses on available spectrum and what procedures 
could be utilized to assist small businesses in obtaining available 
licenses or spectrum from licensees to meet very limited or defined 
telecommunications needs. The Commission also seeks comment on how to 
promote information clearinghouses or other market solutions so that 
the public can be informed about spectrum availability in particular 
geographic areas or excess or available spectrum that could be 
disaggregated in minimum amounts.

III. Conclusion

    47. The Commission believes that these partitioning and 
disaggregation proposals are consistent with a pro-competitive 
deregulatory national policy framework and will promote the rapid 
creation of a competitive market to deliver broadband PCS to the 
largest number of consumers. These proposals are designed to meet the 
Congressional objectives of opening telecommunications markets to 
competition, providing advanced technologies and services efficiently 
and quickly, and identifying and eliminating market entry barriers for 
entrepreneurs and other small businesses in the provision and ownership 
of telecommunications services.

IV. Procedural Matters and Ordering Clauses

A. Regulatory Flexibility Act

    Summary: As required by Section 603 of the Regulatory Flexibility 
Act, the Commission has prepared an Initial Regulatory Flexibility 
Analysis (IRFA) of the expected impact on small entities of the 
policies and rules proposed in this Notice of Proposed Rulemaking.
    Reason for Action: This rulemaking proceeding was initiated to 
secure comment on proposals to modify our broadband PCS rules to permit 
partitioning and disaggregation for all Part 24 licensees. The 
proposals advanced in the Notice of Proposed Rulemaking are also 
designed to implement Congress' goal of giving small businesses the 
opportunity to participate in the provision of spectrum-based services.
    Objectives: The Commission proposes changes to its rules for 
broadband PCS that are intended to facilitate the efficient use of 
broadband PCS spectrum, increase competition, and expedite the 
provision of broadband PCS service to areas that may not otherwise 
receive broadband PCS or other wireless services in the near term. 
These proposals seek to increase the level of small business 
participation in the provision of broadband PCS. The Commission 
proposes to allow broadband PCS licensees in the non-entrepreneurs' 
blocks to partition any portion of their geographic license area to 
entities that are eligible to be broadband PCS licensees. The 
Commission further proposes to allow entrepreneurs' block licensees to 
partition any portion of their licensed geographic area to entities 
that qualify as entrepreneurs and are otherwise eligible to be 
broadband PCS licensees. Additionally, the Commission proposes to 
eliminate the January 1, 2000 benchmark for disaggregation, and allow 
disaggregation any time after the broadband PCS licensee meets the 
five-year build-out requirement. Specifically, the Commission proposes 
to allow broadband PCS licensees in the non-entrepreneurs' blocks to 
disaggregate spectrum to entities that are eligible to be broadband PCS 
licensees. The Commission proposes to allow entrepreneurs' block 
licensees to disaggregate to another entrepreneur, otherwise qualified 
to be a broadband PCS licensee. Additionally, the Commission proposes 
to establish license terms that permit partitionees to hold partitioned 
licenses and disaggregatees to hold disaggregated spectrum for the 
remaining duration of the original ten-year license term. The 
Commission also proposes to establish construction requirements to 
ensure expedient access to broadband PCS service in partitioned areas 
to ensure coverage and increase spectrum efficiency. Finally, the 
Commission proposes to allow licensees to combine partitioning and 
disaggregation under limited circumstances.
    Legal Basis: The proposed action is authorized under Sections 4(i), 
257, 303(r) and 309(j) of the Communications Act of 1934, as amended, 
47 U.S.C. Secs. 154(i), 257, 303(r) and 309(j), as amended.
    Reporting, Recordkeeping, and Other Compliance Requirements: The 
proposals under consideration in this Notice of Proposed Rulemaking 
include the possibility of imposing reporting and recordkeeping 
requirements for small businesses seeking licenses through the proposed 
partitioning and disaggregation rules. The information requirements 
would be used to determine if the licensee is a qualifying entity to 
obtain a partitioned license or disaggregated spectrum. This 
information will be a one-time filing by any applicant requesting such 
a license. The information will be submitted on the FCC Forms 490 (or 
430 and/or 600 filed as one package under cover of the Form 490) which 
are currently in use and have already received OMB clearance. We 
estimate that the average burden on the applicant is three hours for 
the information necessary to complete these forms. We estimate that 75 
percent of the respondents (which may include small businesses) will 
contract out the burden of responding. We estimate that it will take 
approximately 30 minutes to coordinate information with those 
contractors. The remaining 25 percent of respondents (which may include 
small businesses) are estimated to employ in-house staff to provide the 
information. Applicants (including small businesses) filing the package 
under cover of FCC Form 490 electronically will incur a $2.30 per 
minute on-line charge. On-line time would amount to no more than 30 
minutes. We estimate that 75 percent of the applicants may file 
electronically. We estimate that applicants contracting out the 
information would use an attorney or engineer (average of $200 per 
hour) to prepare the information.
    Federal Rules Which Overlap, Duplicate or Conflict With These 
Rules: None.
    Description, Potential Impact, and Number of Small Entities 
Involved: The rule changes proposed in this proceeding will affect all 
small businesses which avail themselves of these rule changes, 
including small

[[Page 38699]]

businesses currently holding broadband PCS licenses who choose to 
partition and/or disaggregate, and small businesses who may acquire 
licenses through partitioning and/or disaggregation. The Commission is 
required to estimate in its Final Regulatory Flexibility Analysis the 
number of small entities to which a rule will apply, provide a 
description of such entities, and assess the impact of the rule on such 
entities. To assist the Commission in this analysis, commenters are 
requested to provide information regarding how many total broadband PCS 
entities, existing and potential, would be affected by the proposed 
rules in the Notice of Proposed Rulemaking. In particular, the 
Commission seeks estimates of how many broadband PCS entities, existing 
and potential, will be considered small businesses. ``Small business'' 
is defined as a firm that has revenues of less than $40 million in each 
of the last three calendar years. This definition was used in the PCS C 
block auction and approved by the Small Business Administration. The 
Commission seeks comment as to whether this definition is appropriate 
in this context. Additionally, the Commission requests each commenter 
to identify whether it is a small business under this definition. If 
the commenter is a subsidiary of another entity, this information 
should be provided for both the subsidiary and the parent corporation 
or entity.
    The broadband PCS spectrum is divided into six frequency blocks 
designated A through F. The Commission has auctioned broadband PCS 
licenses in blocks A, B, and C. The Commission does not have sufficient 
information to determine whether any small businesses within the SBA-
approved definition bid successfully for licenses A or B block 
auctions. There were 89 winning bidders that qualified as small 
businesses in the C block PCS auctions. Based on this information, the 
Commission concludes that the number of broadband PCS licensees 
affected by the rules proposed in this Notice of Proposed Rulemaking 
includes the 89 winning bidders that qualified as small entities in the 
C block broadband PCS auction.
    The Commission estimates that up to 10,370 PCS licensees or 
potential licensees could take the opportunity to partition and/or 
disaggregate a license or obtain a license through partitioning and/or 
disaggregation. This estimate is based on the total number broadband 
PCS licenses auctioned and subject to auction, 2,074, and the estimate 
that each license would probably not be partitioned and/or 
disaggregated to more than five parties. The Commission notes that the 
A and B blocks each consist of 51 licenses (a total of 102 licenses) 
and the C, D, E, and F blocks each consist of 493 licenses (a total of 
1,972 licenses). Currently the C and F block licensees and potential 
licensees (holding a total of 986 licenses) must be small businesses or 
entrepreneurs with average gross revenues over the past three years of 
less than $125 million. Under the proposed rules they will be permitted 
to partition and/or disaggregate to other qualified entrepreneurs. The 
A, B, D, and E block licensees and potential licensees (holding a total 
of 1,088 licenses) will also be permitted under the proposed rules to 
partition and/or disaggregate to small businesses.
    At present, there have been no auctions held for the D, E, and F 
blocks of broadband PCS spectrum. The Commission anticipates a total of 
1,479 licenses will be awarded in the D, E, and F block PCS auctions, 
which are scheduled to begin on August 26, 1996. Eligibility for the F 
block licenses is limited to entrepreneurs with average gross revenues 
of less than $125 million. However, there is no basis upon which to 
estimate the number of licenses that will be awarded to small 
businesses, nor is there a basis for an estimate as to how many small 
businesses will win D or E block licenses. Given the fact that nearly 
all radiotelephone companies have fewer than 1,000 employees, and that 
no reliable estimate of the number of D, E, and F block licensees can 
be made, the Commission assumes, for purposes of this IRFA that all of 
the licenses will be awarded to small businesses. The Commission 
believes that it is possible that a significant number of the up to 
10,370 PCS licensees or potential licensees who could take the 
opportunity to partition and/or disaggregate a license or who could 
obtain a license through partitioning and/or disaggregation will be 
small businesses.
    Any Significant Alternatives Minimizing the Impact on Small 
Entities Consistent with the Stated Objectives: The proposals advanced 
in the Notice of Proposed Rulemaking are designed to implement 
Congress' goal of giving small businesses, as well as other entities, 
the opportunity to participate in the provision of spectrum-based 
services. The impact on small entities in the proposals in the Notice 
of Proposed Rulemaking is the opportunity to enter the broadband PCS 
market through the partitioning and disaggregation proposals herein.
    The rule changes proposed in the Notice of Proposed Rulemaking by 
the Commission are consistent with the mandate under the Communications 
Act of 1934, as amended, to identify and eliminate market entry 
barriers for entrepreneurs and small businesses in the provision and 
ownership of telecommunications services, and the mandate under Section 
309(j) of the Communications Act of 1934, as amended, to utilize 
auctions to ensure that small, minority and women-owned businesses and 
rural telephone companies have an opportunity to participate in the 
provision of spectrum-based services. The Commission's proposals in 
this Notice of Proposed Rulemaking, if implemented, will facilitate 
market entry by parties who may lack the financial resources for 
participation in PCS auctions, including small businesses. These 
proposals, if implemented, will promote technological advancement and 
participation by diverse entities, as well as facilitate the efficient 
use of broadband PCS spectrum. The alternative to the Commission's 
proposal to allow geographic partitioning would be to maintain the 
status quo and only permit rural telephone companies to utilize 
partitioning through forming an auction bidding consortium comprised 
entirely of rural telephone companies or through private negotiation 
post-auction. Limiting geographic partitioning to rural telephone 
companies would not permit other small businesses to obtain partitioned 
licenses or to partition to other parties, and thus would not promote 
the participation of small businesses in the provision of PCS. The 
Commission also noted that the proposed partitioning policy would allow 
spectrum to be used more efficiently, speed service to underserved 
areas, and increase competition.
    In this Notice of Proposed Rulemaking, the Commission observed that 
initially general partitioning by broadband PCS licensees was not 
permitted because of the concern that licensees might use partitioning 
as a means to circumvent construction requirements. The Commission 
tentatively concludes that both the partitioner and partitionee should 
be subject to coverage requirements that ensure that both portions of a 
partitioned licensing area will receive service. The Commission 
proposes facilitating partitioning by offering a choice between two 
different build-out options, which could be negotiated between the 
partitioner and partitionee. The first option proposed by the 
Commission would require a partitionee to satisfy the same construction

[[Page 38700]]

requirements as the original licensee within its partitioned area, 
regardless of when it acquired the partitioned license. This approach 
is consistent with the present construction requirements for rural 
telephone companies. The second option proposed by the Commission would 
apply where the original licensee has met its five-year build-out 
requirements and certifies that it will meet the ten-year coverage 
requirements for its entire license area. Specifically, the Commission 
proposes that partitionees must only satisfy the substantial service 
requirement for renewal expectancy for its partitioned area by the end 
of the original ten-year license term. The Commission tentatively 
concludes that these proposed flexible build-out requirements, if 
adopted, will encourage partitioning to entities that have a sincere 
interest in providing broadband PCS and will thereby expedite the 
provision of service to areas that otherwise may not receive it as 
quickly.
    The Commission considered the fact that many broadband PCS 
licensees may meet their five-year build-out construction obligation 
early, and therefore proposes revisiting the current prohibition on 
disaggregation. The Commission considered the alternative, requiring 
PCS licensees to wait until January 1, 2000 before disaggregating, and 
noted that this would not permit small businesses to disaggregate or 
obtain disaggregated spectrum and therefore, would not promote an 
efficient use of spectrum.
    The Commission is proposing to allow partitioning and/or 
disaggregation by entrepreneurs only to other qualified entrepreneurs 
for five years, to ensure the objective that entrepreneurs and small 
businesses continue to participate as PCS licensees for substantial 
periods of time, and through that participation obtain experience and 
profits that will enable their long term participation in 
communications industries. The Commission is proposing to apply 
proportional unjust enrichment provisions for partitioning and 
disaggregation by entrepreneurs to non-entrepreneurs after the five-
year period. The alternative to this proposal, would be to either 
prohibit partitioning by entrepreneurs or to allow entrepreneurs who 
have benefitted from special bidding provisions to become unjustly 
enriched by immediately partitioning a portion of their license area to 
parties that do not qualify for such benefits. The Commission also 
noted that allowing partitioning and/or disaggregation by entrepreneurs 
only to other qualified entrepreneurs for five years is consistent with 
the Commission's rule allowing license transfers by entrepreneurs only 
to other entrepreneurs in the first five years of the license period.
    The Commission believes that allowing entrepreneurs and small 
businesses to partition and/or disaggregate their licenses to other 
qualified entrepreneurs and small businesses, and allowing all non-
entrepreneurs to partition and/or disaggregate to any qualified party 
(including small businesses) will help attain the Congressional 
objective of ensuring that small businesses have an opportunity to 
participate in the provision of broadband PCS. These proposals will 
enable a wide variety of applicants, including small businesses, to 
overcome entry barriers in the provision and ownership of 
telecommunications services.
    This Notice of Proposed Rulemaking solicits comment on a variety of 
alternatives discussed herein. Any significant alternatives presented 
in the comments will be considered.
    IRFA Comments: The Commission requests public comment on the 
foregoing IRFA. Comments must have a separate and distinct heading 
designating them as responses to the IRFA and must be filed by the 
comment deadlines set forth in the Notice of Proposed Rulemaking.

B. Paperwork Reduction Act

    This Notice of Proposed Rulemaking contains either a proposed or 
modified information collection. The Commission, as part of its 
continuing effort to reduce paperwork burdens, invites the general 
public and the Office of Management and Budget (OMB) to comment on the 
information collections contained in this Notice of Proposed 
Rulemaking, as required by the Paperwork Reduction Act of 1995, Public 
Law No. 104-13. Public and agency comments are due at the same time as 
other comments on this Notice of Proposed Rulemaking; OMB notification 
of action is due September 23, 1996. Comments should address: (a) 
Whether the proposed collection of information is necessary for the 
proper performance of the functions of the Commission, including 
whether the information shall have practical utility; (b) the accuracy 
of the Commission's burden estimates; (c) ways to enhance the quality, 
utility, and clarity of the information collected; and (d) ways to 
minimize the burden of the collection of information on the 
respondents, including the use of automated collection techniques or 
other forms of information technology.

Dates: Written comments by the public on the proposed and/or modified 
information collections are due August 15, 1996. Written comments must 
be submitted by the Office of Management and Budget (OMB) on the 
proposed and/or modified information collections on or before September 
23, 1996.

Addresses: In addition to filing comments with the Secretary, a copy of 
any comments on the information collections contained herein should be 
submitted to Dorothy Conway, Federal Communications Commission, Room 
234, 1919 M Street, N.W., Washington D.C. 20554, or via the Internet to 
[email protected], and to Timothy Fain, OMB Desk Officer, 10236 NEOB, 
725-17th Street, N.W., Washington D.C. 20503 or via the Internet to 
[email protected].

For Further Information Contact: For additional information concerning 
the information collections contained in this Notice of Proposed 
Rulemaking contact Dorothy Conway at (202) 418-0217, or via the 
Internet at [email protected].

Supplementary Information:

    Title: Geographic Partitioning and Spectrum Disaggregation by 
Commercial Mobile Radio Services Licensees and Implementation of 
Section 257 of the Communications Act-Elimination of Market Entry 
Barriers.
    Type of Review: New Collection.
    Respondents: Number of Respondents: We estimate up to 10,370 PCS 
licensees or potential licensees could take the opportunity to 
partition and/or disaggregate a license or obtain a license through 
partitioning and/or disaggregation.
    Estimated Time Per Response: The average burden on the applicant is 
3 hours for the information necessary to complete FCC Forms 490, 430 or 
600 and be filed as one package under cover of the FCC Form 490. We 
estimate 75% of respondents will contract out the burden of responding. 
We estimate that it will take approximately 30 minutes to coordinate 
information with those contractors. The remaining 25% of respondents 
are estimated to employ in house staff to provide the information. 
7,778 applications (contracting out)  x .5 hour = 3,889 hours. 2,592 
applications (in house)  x 3 hours = 7,776 hours.
    Total burden = 3,889 + 7,776 = 11,665 hours.
    Estimated Cost to the Respondent: Total capital and start-up costs: 
Applicants wishing to file the package under cover of the FCC Form 490 
electronically will incur a $2.30 per minute on-line charge. On-line 
time

[[Page 38701]]

would amount to no more than 30 minutes. Seventy-five percent of the 
respondents are expected to file electronically. 7,778 applications  
x $2.30  x = $536,682. All other respondents would be expected to file 
manually and would incur the following costs: 2,592 applications  
x $1.15 = $2,981. Total capital and start-up costs = $536,682+$2,981 = 
$539,663.
    We assume that the respondents contracting out the information 
would use an attorney or engineer (average of $200 per hour) to prepare 
the information. 7,778 applications x $200 per hour x 3 hours = 
$4,666,800. Total Respondent Costs: $539,663 + $4,666,800 = $5,203,463.
    Cost to the Federal Government: The government review time for this 
submission is estimated at 15 minutes per response with the review 
being done by personnel at the GS-6 level. 10,370 applications  x $3.39 
= $35,154.

C. Ex Parte Rules--Non-Restricted Proceeding

    This is a non-restricted notice and comment rulemaking proceeding. 
Ex parte presentations are permitted except during the Sunshine Agenda 
period, provided they are disclosed as provided in the Commission's 
rules, 47 CFR Secs. 1.1202, 1.1203, 1.1206(a).

D. Comment Period

    Pursuant to applicable procedures set forth in Sections 1.415 and 
1.419 of the Commission's rules, interested parties may file comments 
on or before August 15, 1996. Reply comments are to be filed on or 
before August 30, 1996. To file formally in this proceeding, you must 
file an original and four copies of all comments, reply comments, and 
supporting comments. If you want each Commissioner to receive a 
personal copy of your comments, you must file an original plus nine 
copies. You should send comments and reply comments to Office of the 
Secretary, Federal Communications Commission, Washington D.C. 20554. A 
copy of all comments should also be filed with the Commission's copy 
contractor, ITS, Inc., 2100 M Street, N.W., Suite 140, (202) 857-3800.

E. Authority

    The above action is authorized under the Communications Act, 
Secs. 4(i), 303(r), 309(c), 309(j), and 332, 47 U.S.C. Secs. 154(i), 
303(r), 309(c), 309(j), and 332, as amended.

F. Ordering Clauses:

    It is ordered that, pursuant to Sections 4(i), 303(r), 309(c), 
309(j), and 332 of the Communications Act of 1934, as amended, 47 
U.S.C. Secs. 154(i), 303(r), 309(c), 309(j), and 332, a NOTICE OF 
PROPOSED RULEMAKING is hereby ADOPTED.
    It is further ordered, that comments in WT Docket No. 96-148 will 
be due August 15, 1996 and reply comments will be due August 30, 1996.

List of Subjects in 47 CFR Part 24

    Communications common carriers, Federal Communications Commission, 
Reporting and recordkeeping requirements.

Federal Communications Commission.
William F. Caton,
Acting Secretary.
[FR Doc. 96-18847 Filed 7-24-96; 8:45 am]
BILLING CODE 6712-01-P

Complete official Federal Register PDF

FR Doc. 96-18836 Land Disposal Program Flexibility Act of 1996Surface Impoundment Study
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38684-38687]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18836]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 148, 261, 268, 271

[FRL-5542-2]
RIN 2050-AD38

Land Disposal Program Flexibility Act of 1996--Surface 
Impoundment Study

AGENCY: Environmental Protection Agency.

ACTION: Request for comments.

-----------------------------------------------------------------------

SUMMARY: On March 26, 1996, the President signed the Land Disposal 
Program Flexibility Act of 1996. This statute overrules certain parts 
of the D.C. Circuit's opinion in Chemical Waste Management v. EPA, 976 
F. 2d 2 (D.C. Cir. 1992), cert. denied 113 S.Ct. 1961 (1993) which 
relate to managing so-called decharacterized wastes--characteristic 
hazardous waste whose characteristic has been removed before land 
disposal--in centralized wastewater management systems regulated under 
the Clean Water Act (CWA) or the Safe Drinking Water Act (SDWA).
    The subject of this Federal Register document is a related 
provision in the statute which requires that not later than five years 
after the date of enactment, EPA shall complete a study of potential 
risks to human health or the environment posed by managing these 
decharacterized hazardous wastes in either a) surface impoundments 
which are part of wastewater treatment systems whose ultimate discharge 
is regulated under the CWA, or b) Class I non-hazardous injection wells 
regulated under the SDWA.
    EPA is seeking to develop more information in order to prepare the 
portion of the study dealing with surface impoundments. This Federal 
Register document has been prepared for industry representatives and 
environmental groups to clearly define the Agency's expectations in 
requesting draft methodologies that outline the conceptual design of 
the study, including how best to collect data, data quality assurance/
quality control
(QA/QC), risk assessment, and peer review. Concurrently, the Agency 
will develop a methodology to ensure that requirements of the 
legislation are satisfied and the conceptual design of the study is 
balanced with those of the commenters. Upon receipt of draft 
methodologies from commenters, the Agency will convene a workgroup to 
select an overall, scientifically defensible approach to address the 
requirements of the legislation. The selected methodology will then be 
subject to a peer review process conducted by a peer review panel set 
up by the Agency to provide oversight and QA/QC of the study.

DATES: Draft methodologies are requested by September 23, 1996.

ADDRESSES: To submit draft methodologies, the public must send an 
original and two copies to Docket Number F-96-PMWA-FFFFF, located at 
the RCRA Docket. The mailing address is: RCRA Information Center, U.S. 
Environmental Protection Agency (5305G), 401 M Street, SW., Washington, 
DC 20460. The RCRA Information Center is located at 1235 Jefferson 
Davis Highway, First Floor, Arlington, Virginia. The RCRA Information 
Center is open for public inspection and copying of supporting 
information for RCRA rules from 9:00 a.m. to 4 p.m., Monday through 
Friday, excluding Federal holidays. The public must make an appointment 
to review docket materials by calling (703) 603-9230. The public may 
copy a maximum of 100 pages from any regulatory document at no cost. 
Additional copies cost $0.15 per page.

FOR FURTHER INFORMATION CONTACT: For general information or to order 
paper copies of this Federal Register document, call the RCRA Hotline. 
Callers within the Washington Metropolitan Area must dial (703) 412-
9810 or TDD (703) 412-3323 (hearing impaired). Long-distance callers 
may call 1-800-424-9346 or TDD 1-800-553-7672. The RCRA Hotline is open 
Monday through Friday from 9:00 a.m. to 6:00 p.m., Eastern Standard 
Time. For other information on this notice, contact Linda Martin 
(5307W), Office of Solid Waste, 401 M Street, SW., Washington, D.C. 
20460, phone (703) 308-0499.

SUPPLEMENTARY INFORMATION:

Paperless Office Effort

    EPA is asking prospective commenters to voluntarily submit one 
additional copy of their comments on labeled personal computer 
diskettes in ASCII (TEXT) format or a word processing format that can 
be converted to ASCII (TEXT). It is essential to specify on the disk 
label the word processing software and version/edition as well as the 
commenter's name. This will allow EPA to convert the comments into one 
of the word processing formats utilized by the Agency. Please use 
mailing envelopes designed to physically protect the submitted 
diskettes. EPA emphasizes that submission of comments on diskettes is 
not mandatory, nor will it result in any advantage or disadvantage to 
any commenter. This expedited procedure is in conjunction with the 
Agency ``Paperless Office'' campaign. For further information on the 
submission of diskettes, contact Linda Martin of the Economics, 
Methods, and Risk Assessment Division at (703) 308-0499. This Federal 
Register Notice is available on the Internet System through EPA Public 
Access Server at gopher.epa.gov or through WWW.epa.gov. For the text of 
the notice, choose: Rules, Regulations, and Legislation; the FR-Waste; 
finally, Year/Month/Day.

Request for Comments

    On March 26, 1996, President Clinton signed into law the Land 
Disposal Program Flexibility Act of 1996. This legislation amends 
section 3004(g) of RCRA to overrule portions of the District of 
Columbia Circuit Court of Appeals' 1992 decision (Chemical Waste 
Management v. EPA, 976 F. 2d 2) dealing with the requirement to treat 
wastes that as generated exhibit a characteristic of hazardous waste, 
but

[[Page 38685]]

are diluted to remove that characteristic and are then placed in land 
disposal units--either surface impoundments that are part of Clean 
Water Act wastewater treatment systems or Class I injection wells. The 
legislation, by and large, states that treatment of such wastes is not 
required before placing them in these land disposal units. See 
generally, 61 FR 15660 (April 8, 1996) codifying portions of this 
legislation.
    The statute further requires EPA to conduct a study characterizing 
risks to human health or the environment associated with management of 
decharacterized wastes in impoundments which are part of Clean Water 
Act treatment systems, or in Class I injection wells. EPA is also 
authorized to develop additional standards for such units as may be 
necessary to protect human health and the environment, and such 
standards could be based on the results of the study. (RCRA section
3004(g)(10)). This notice concerns the part of the study dealing with 
surface impoundments.
    In conducting the Surface Impoundment Study (hereafter referred to 
as ``the study''), the Agency hopes to arrange and maintain a 
cooperative effort with all interested parties as EPA moves forward to 
develop a scientifically defensible work plan for conducting the study. 
Input into the data collection and development of the study design, as 
well as information regarding current management practices will prove 
invaluable in developing such a work plan.
    Currently, the Agency is developing a draft methodology to assess 
potential risks posed by management of decharacterized wastes in 
surface impoundments. Key steps being taken to develop a draft 
methodology include identifying issues related to conducting the study, 
conducting meetings with interested parties, establishing a methodology 
for conducting the study, and establishing a peer-review structure for 
the study. The objective of the approach is to address Congress' 
concerns by assessing potential risks posed by management of 
decharacterized wastes in surface impoundments, assessing the degree to 
which existing State/Federal/Tribal programs effectively mitigate those 
risks, and finally determining which State/Federal/Tribal laws or 
programs are best equipped to manage the remaining risks, or whether 
independent controls may be needed.
    To this end, EPA requests that interested industry, environmental 
and state groups provide input to the Agency into the development of 
the study such that Congress' concerns are addressed. Issues for which 
input is needed include data collection, quality assurance/quality 
control of data, development of risk assessment methods, establishment 
of a peer-review structure for the study, and assessment of current 
State/Federal/Tribal regulations or programs that address risks posed 
by decharacterized wastewaters managed in surface impoundments. 
Additionally, the Agency also requests input regarding regulations or 
programs that could be developed to address these risks.
    Specifically, EPA requests that each interested group develop 
proposed methodologies and work plans for conducting the study of risks 
and existing regulations associated with surface impoundments receiving 
decharacterized wastes. Specific elements to be included in the 
methodology are outlined below. Following the methodology outline is 
EPA's preliminary schedule for completing the study, which is included 
in this document in order that commenters can better understand how and 
when EPA intends to proceed, and the role commenters can play. EPA will 
then evaluate proposed work plans submitted by commenters, in 
combination with its own work plan, by means of a peer review process.

Methodology Outline

    Proposed methodologies should be organized according to the 
following format.

I. Conceptual Approach to the Study

    The most critical element of the study is the completion of a high-
quality, peer-reviewed risk assessment, since accurate identification 
of priorities for surface impoundment regulation and conclusions about 
the need for new regulations depend on the risk results. The 
development of an appropriate risk assessment methodology is therefore 
very important. The purpose of this section of the proposed methodology 
is to address key elements of the methodology and threshold questions, 
including but not limited to:
    A. What should be the overall scope of the study?
    B. What should be done to ensure credibility of the study?
    C. What do you expect your group's role to be in conducting the 
study?
    D. How heavily should we rely upon fate and transport modeling 
versus actual exposure monitoring?
    E. Can the study be completed with available data?
    F. How should additional data be collected?
    G. Are there innovative mechanisms to conducting or designing the 
study using third parties (scientific organizations)?

II. Detailed Methodology

    A. Sampling strategy:
    i. Identification of the universe of facilities/ Study Population
    ii. Description of the approach to sampling the universe of 
facilities/ Study Population (representativeness of the sample)
    1. Random versus Judgmental
    2. Stratification
    3. Sample size
    B. Risk Characterization 1:
---------------------------------------------------------------------------

    \1\ It should be noted that, from the advent of the D.C. 
Circuit's decision, EPA has repeatedly solicited data on the types, 
volumes, and concentrations of hazardous constituents, plus types 
and magnitudes of releases from surface impoundments managing 
decharacterized wastes. See, e.g., Supplemental Information to 
Notice of Data Availability (58 FR 4972, Jan. 19, 1993) at pp. 17, 
18, 19; Phase 4 Proposed Rule (60 FR 43654, Aug. 22, 1995). To date, 
members of affected industry have provided virtually no hard 
information in response. EPA hopes that such information will be 
forthcoming as it develops the surface impoundment study.
---------------------------------------------------------------------------

    i. Data/Source Term Characterization
    1. Facility
    a. History
    b. Location
    c. Surrounding Land Uses
    d. Meteorological Data
    e. Subsurface Hydrogeology
    2. Units
    a. Point of Generation quantity of characteristic waste generated 
for each facility and/or industry; quantity of sludge generated 
(including sludge that is currently dredged from affected surface 
impoundments and sludge left in place in these units)
    b. Surface Impoundments (including the use of surface impoundments 
or tanks to treat decharacterized wastewaters; types of surface 
impoundments used; size of surface impoundments; waste segregation and 
treatment practices at the unit, including the quantity of 
characteristic wastewaters that are segregated and the potential cost 
associated with segregating wastewaters)
    c. Storm water Runoff (including the use of surface impoundments 
for Storm water runoff)
    3. Hazardous Constituents in Decharacterized Wastewaters
    a. Physical state
    b. Toxicity information
    c. Concentration
    1. At the point of generation (prior to aggregation and/or 
decharacterization)
    2. In surface impoundment based treatment systems (near the point 
at which they might be released to the environment)

[[Page 38686]]

    3. In leachate from surface impoundments (including leachate 
release quantities and estimates of the relationship between 
constituent concentrations in surface impoundment wastewater and 
constituent concentration in leaks)
    4. Estimates of the relationship between the concentration in 
surface impoundments and the subsequent releases to air at affected 
facilities (including concentrations of toxic constituents in ambient 
air around affected facilities)
    5. Sludge constituent concentrations
    ii. Fate and Transport
    1. Estimation of future fate and transport
    a. What models should be used to estimate fate and transport? What 
are the limitations of applying each model?
    b. Pathways of concern
    c. Handling complex environments; in subsurface, extreme 
meteorological events
    2. Describe key elements of fate and transport parameter selection
    a. Leachate flow volumes
    b. An assessment of surrounding hydrogeologic conditions
    c. Results from site specific fate and transport analyses that 
consider a site's hydrogeologic conditions
    d. Distance from the surface impoundment or landfill to the nearest 
well and the numbers of persons using those wells
    e. The exact location of the affected surface impoundment or 
facility (e.g., county, city, latitude and longitude)
    C. Exposure:
    i. Describe key elements of parameter selection
    a. Distance to potential receptor populations
    b. Size of potential receptor populations
    ii. Describe the extent to which modeling should be used to 
estimate risks, including which models should be used to determine 
risk, and whether the exposure model should be linked with the selected 
fate and transport model.
    iii. Describe the extent to which Monte Carlo analysis should be 
used to estimate risks
    iv. Describe the extent to which the study should focus upon highly 
exposed sub-populations versus individuals
    v. Describe whether the study should estimate High-End and/or 
Central Tendency risks
    D. Data QA/QC and Peer Review:
    i. Develop a QA Project Plan:
    1. data quality objectives;
    2. project objectives;
    3. sample collection;
    4. analysis and testing;
    5. quality control;
    6. project documentation;
    7. organization performing field or laboratory operations 
(performance evaluation; internal assessment by QA function; external 
assessment; on-site evaluation (field activities, laboratory 
activities); QA reports).
    ii. Describe how to establish a peer review process, including 
composition of the peer review panel.

Terms of Reference/ Evaluation Criteria

    To stimulate thinking on this topic and establish criteria for 
evaluating methodologies, the Agency has established terms of reference 
for the risk assessment. Input Data Requirements--Data collected to 
support the risk assessment must be quality controlled, must be 
representative of the target universe and must be sufficiently detailed 
to support statistical modeling of uncertainty in risk outputs. Release 
Estimates--The risk assessment should consider all plausible forms of 
release from surface impoundments. Releases to be considered should 
include, but not be limited to: releases to groundwater and air from 
the unit, overland releases, and releases associated with the dredging, 
treatment, and disposal of sludges.
    Fate and Transport Modeling--Fate and transport modeling should, to 
the extent possible, reflect the state of the art in groundwater and 
air dispersion modeling. At a minimum, the fate and transport modeling 
should incorporate speciation chemistry to non-toxic forms of chemical 
constituents where relevant, and, to facilitate review of the results, 
rely on non-proprietary models.
    Exposure Assessment--Exposure assessment should consider both 
direct and indirect pathways. Constituent-specific estimates of 
exposure should reflect cumulative exposure across all relevant 
pathways. Pathways should be omitted only after careful consideration 
of whether they contribute significantly to total exposure.
    Cancer and Non-Cancer Health Risk Assessment--The cancer and non-
cancer health risk assessment methodology should reflect new Agency 
guidelines for conducting these types of studies.
    Peer Review--The analysis must include provisions for peer review 
of proposed methodologies; intermediate results for input data, fate 
and transport, exposure assessment, and risk characterization; and, 
overall results. Elements of separate methodologies, including the 
Agency's own methodology may be combined to form an overall approach to 
assess risk. In this case, the overall approach would be subject to 
peer review.
    III. Assessment of Existing State/ Federal/Tribal Programs:
    A. Establish a methodology to conduct a systematic review of 
current and future planned regulations that might influence the 
management of decharacterized wastewaters at affected facilities. 
Include in the methodology a description of information collection 
activities and any limitations.

                                Major Milestones and Preliminary Completion Date                                
----------------------------------------------------------------------------------------------------------------
                      Milestone                                             Completion date                     
----------------------------------------------------------------------------------------------------------------
 1. Meetings with                                     Initiated in April 1996; On-going.                        
    --Industry; and,                                                                                            
    --Environmental Groups.                                                                                     
 2. Publish Federal Register Notice Soliciting        July 1996.                                                
 Proposed Methodologies from Commenters, with 60-day                                                            
 comment period.                                                                                                
 3. EPA develops proposed methodology to conduct      June-August 1996.                                         
 study.                                                                                                         
 4. Receive proposed methodologies..................  August 1996.                                              
 5. Convene EPA workgroup from relevant offices to    October 1996.                                             
 evaluate proposed methodologies and select one                                                                 
 methodology for peer review.                                                                                   
 6. Develop peer review panel for the selected        December 1996-February 1997.                              
 methodology.                                                                                                   
 7. Finalize work plan and methodology..............  April 1997-May 1997.                                      
 8. Develop and implement survey and data             April 1997-April 1999.                                    
 collection, including: EPA-conducted sampling;                                                                 
 pretesting; OMB approval of ICR; full                                                                          
 implementation of survey for several hundred                                                                   
 facilities; data compilation; and quality control                                                              
 checks.                                                                                                        
 9. Assess coverage of existing regulations.........  September 1997-September 1998.                            

[[Page 38687]]

                                                                                                                
 10. Reassess risks of the wastewaters; interim       April 1997-December 1999.                                 
 Report to Congress on risk results.                                                                            
 11. Combine risk results with regulatory review      January 2000-July 2000.                                   
 results, develop report recommendations, write                                                                 
 draft report.                                                                                                  
 12. Conduct review and finalize report.............  August 2000-March 2001.                                   
----------------------------------------------------------------------------------------------------------------

    Dated: July 18, 1996.
Elliott P. Laws,
Assistant Administrator, Office of Solid Waste and Emergency Response.
[FR Doc. 96-18836 Filed 7-24-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-18834 Correction of Implementation Plans; American Samoa, Arizona, California, Hawaii, and Nevada State Implementation Plans
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38664-38682]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18834]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[AS-AZ-CA-HW-NV-000-0001; FRL-5541-8]

Correction of Implementation Plans; American Samoa, Arizona, 
California, Hawaii, and Nevada State Implementation Plans

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: EPA is proposing to promulgate corrections to the American 
Samoa State Implementation Plan (SIP), the Arizona SIP, the California 
SIP, the Hawaii SIP, and the Nevada SIP. These corrections concern the 
deletion from the SIPs of the rules summarized in Table 1. These rules 
include a variety of administrative provisions concerning variances, 
hearing board procedures, and fees. EPA has determined that the rules 
to be deleted from the above-referenced SIPs were erroneously 
incorporated into the SIPs by the EPA, and in addition, the variance 
provisions currently in the SIPs were rendered without legal effect by 
amendments to the Clean Air Act enacted by Congress in 1977. In 
addition, the continued presence of these provisions in the SIPs is 
potentially confusing, and thus, harmful to the regulated community, 
the states, and EPA. The intended effect of proposing these corrections 
to the SIPs is to delete the above referenced rules and make the SIPs 
consistent with the requirements of the Clean Air Act, as amended in 
1990 (CAA or ``the Act''), regarding EPA action on SIP submittals and 
SIPs for national primary and secondary ambient air quality standards.

DATES: Comments must be received on or before August 26, 1996.

ADDRESSES: Comments may be mailed to: Daniel A. Meer, Rulemaking 
Section (A-5-3), Air and Toxics Division, U.S. Environmental Protection 
Agency, Region IX, 75 Hawthorne Street, San Francisco, CA 94105-3901.
    Copies of the rules being proposed for deletion are available for 
public inspection at EPA's Region IX office during normal business 
hours. Copies of the rules are also available for inspection at the 
locations listed in Supplementary Information under ``Public 
inspection''.

FOR FURTHER INFORMATION CONTACT: Julie A. Rose, Rulemaking Section (A-
5-3), Air and Toxics Division, U.S. Environmental Protection Agency, 
Region IX, 75 Hawthorne Street, San Francisco, CA 94105 Telephone: 
(415) 744-1184.

SUPPLEMENTARY INFORMATION:

Public Inspection

Arizona Department of Environmental Quality, P.O. Box 600, Phoenix, CA 
85001-0600.
Coconino County Air Pollution Control District, 1515 East Cedar Avenue, 
Flagstaff, AZ 86004.
Maricopa County, Environmental Services Department, 2406 S. 24th 
Street, Suite E-214, Phoenix, AZ 85034.
Pima County Department of Environmental Quality, 130 West Congress 
Street, 3rd Floor, Tucson, AZ 85701-1317.
Pinal County Air Quality Control District, P.O. Box 987, Florence, AZ 
85232.
California Air Resources Board, Stationary Source Division, Rule, 
Evaluation Section, 2020 ``L'' Street, Sacramento, CA 95814.
Amador County Air Pollution Control District, 500 Argonaut Lane, 
Jackson, CA 95642.
Bay Area Air Quality Management District, 939 Ellis Street, San 
Francisco, CA 94109.
Butte County Air Quality Management District, 2525 Dominic Drive, 
Chico, CA 95928.
Calaveras County Air Pollution Control District, 891 Mountain Ranch 
Road, San Andreas, CA 95249-9709.
Colusa County Air Pollution Control District, 100 Sunrise Blvd. Suite 
F, Colusa, CA 95932.
Glenn County Air Pollution Control District, P.O. Box 351, Willows, CA 
95988.
Great Basin Unified Air Pollution Control District, 157 Short Street, 
Suite 6, Bishop, CA 93514.
Imperial County Air Pollution Control District, 150 South Ninth Street, 
El Centro, CA 92243-2801.
Kern County (Southeast Desert) Air Pollution Control District, 2700 M. 
Street, Suite 290, Bakersfield, CA 93301,
Lake County Air Quality Management District, 883 Lakeport Blvd., 
Lakeport, CA 95453.
Lassen County Air Pollution Control District, 175 Russell Avenue, 
Susanville, CA 96130.
Mariposa County Air Pollution Control District, P.O. Box 2039, 
Mariposa, CA 95338.
Mendocino County Air Quality Management District, 306 E. Gobbi Street, 
Ukiah, CA 95482.
Modoc County Air Pollution Control District, 202 W. Fourth Street, 
Alturas, CA 96101.
Mojave Desert Air Quality Management District, 15428 Civic Drive, Suite 
200, Victorville, CA 92392.
Monterey Bay Unified Air Pollution Control District, 24580 Silver Cloud 
Ct., Monterey, CA 93940.
Northern Sierra Air Quality Management District, P.O. Box 2509, Grass 
Valley, CA 95945.
North Coast Unified Air Quality Management District, 2389 Myrtle 
Avenue, Eureka, CA 95501.
Northern Sonoma County Air Pollution Control District, 109 North 
Street, Healdsburg, CA 95448.
Placer County Air Pollution Control District, 11464 B Avenue, Auburn, 
CA 95603.
Sacramento Metropolitan Air Quality Management District, 8411 Jackson 
Road, Sacramento, CA 95826.
San Diego County Air Pollution Control District, 9150 Chesapeake Drive, 
San Diego, CA 92123-1096.
San Joaquin Valley Unified Air Pollution Control District, (Formerly: 
Fresno County APCD, Kern County APCD, Kings County, APCD, Madera County 
APCD, Merced County APCD, San Joaquin County, APCD, Stanislaus County 
APCD, and Tulare County APCD), 1999 Tuolumne Street, Suite 200, Fresno, 
CA 93721.
San Luis Obispo Air Pollution Control District, 2156 Sierra Way, Suite 
B, San Luis Obispo, CA 93401.

[[Page 38665]]

Santa Barbara County Air Pollution Control District, 26 Castilian 
Drive, B-23, Goleta, CA 93117.
Shasta County Air Quality Management District, 1640 West Street, 
Redding, CA 96001.
South Coast Air Quality Management District, 21865 E. Copley Drive, 
Diamond Bar, CA 91765.
Sutter County Air Pollution Control District, (Now Feather River Air 
Quality Management District), 938 14th Street, Marysville, CA 95901.
Tehama County Air Pollution Control District, 1750 Walnut Street, Red 
Bluff, CA 96080.
Tuolumne County Air Pollution Control District, 2 South Green Street, 
Sonora, CA 95370.
Ventura County Air Pollution Control District, 669 County Square Drive, 
Ventura, CA 93003.
Yolo-Solano Air Quality Management District, 1947 Galileo Court, Suite 
103, Davis, CA 95616.
Hawaii Department of Health, Environmental Management Division, P.O. 
Box 3378, Honolulu, HI 96801.
American Samoa Environmental Quality Commission, Governor's Office, 
Pago Pago, American Samoa 96799.
Nevada Division of Environmental Protection, 333 West Nye Lane, Carson 
City, NV 89710.
Clark County Air Pollution Control Division, P.O. Box 4426, Las Vegas, 
NV 89127.

Applicability

    This document addresses EPA's proposed action for the rules 
summarized in the table following this document.

Background

    The Clean Air Act was first enacted in 1970. At this time, a large 
number of state and district rules and regulations were submitted to 
the EPA for incorporation into the SIPs in order to fulfill the new 
federal requirements. In many cases states and districts submitted 
their entire regulatory air pollution programs, including many elements 
not required by the Act. Due to resource and budget constraints, EPA's 
review of these submittals focused primarily on the substantive 
technical, legal, and enforcement elements of the submittals. At the 
time, EPA did not perform a detailed review of the numerous 
administrative provisions, which in many cases included procedures for 
granting variances, hearings, fee provisions.

Variance Provisions

    A new section 110(i) was added to the Act when it was amended in 
1977. Section 110(i) prohibits the modification of any requirement of 
an applicable SIP by any means other than a SIP revision. Section 
110(i) contains the following exceptions from this requirement: primary 
nonferrous smelter orders under section 119, emergency suspensions 
issued by the President under 110(f) or the Governor under 110(g), 
exemptions issued by the President for federal facilities under section 
118, and compliance orders under section 113(d).
    Variance provisions that were mistakenly incorporated into the 
applicable SIPs provide for modification of the requirements of these 
applicable SIPs. Because these variance provisions do not fall under 
any of the exceptions set forth in section 110(i), they are prohibited 
by, and are not legally enforceable pursuant to, section 110(i) of the 
Act.
    Because variance provisions are prohibited by section 110(i) of the 
Act, their incorporation into the SIP is not only inconsistent with the 
Act but confusing to the regulated industry. A state or district issued 
variance has no effect on the federal enforceability of a provision 
unless the variance is submitted to EPA and approved into the SIP as a 
source-specific SIP revision. However, the variance provisions do not 
state this fact and their inclusion in the SIP is misleading.
    In addition to being prohibited by section 110(i) of the Act and 
misleading to the regulated community, the variance provisions have no 
relationship to the requirements of section 110 and Part D of the Act. 
For these reasons, EPA is proposing to delete the variance provisions 
listed in Table 1 from the SIPs for American Samoa, Arizona, 
California, Hawaii, and Nevada.

Hearing Board Procedures and Miscellaneous Administrative Provisions

    In addition to the specific variance provisions discussed above, 
many of the American Samoa, Arizona, California, Hawaii, and Nevada 
SIPs contain extensive provisions governing hearing board procedures 
and other administrative requirements. These provisions concern issues 
not required by the Act, such as the frequency of meetings, the fees, 
and salaries paid to board members; the type of forms that must be 
filed to petition for a hearing; and requirements for issuing abatement 
orders. These provisions were mistakenly incorporated into the 
applicable SIPs and are not requirements under section 110 and Part D 
of the Act. For this reason, EPA is proposing to delete the hearing 
board procedures and other administrative provisions listed in Table 1 
from the applicable SIPs for American Samoa, Arizona, California, 
Hawaii, and Nevada.

Fee Provisions

    Like the hearing board procedures discussed above, fee provisions 
which were mistakenly incorporated into the applicable SIPs are not 
requirements under section 110 and Part D of the Act, and the purposes 
of these rules have no relationship to these CAA requirements. Only fee 
provisions that are considered to be economic incentive rules under 
sections 110(a)(2)(A), 172(c)(6), or 182(g)(4) would appropriately be 
incorporated into the SIP. For this reason, EPA is proposing to remove 
the fee provisions listed in Table 1 from the applicable SIPs for 
American Samoa, Arizona, California, Hawaii, and Nevada.

Section 110(k)(6)

    Section 110(k)(6) of the Act provides:

    Whenever the Administrator determines that the Administrator's 
action approving, disapproving, or promulgating any plan revision 
(or part thereof), area designation, redesignation, classification, 
or reclassification was in error, the Administrator may in the same 
manner as the approval, disapproval, or promulgation revise such 
action as appropriate without requiring any further submission from 
the State. Such determination and the basis thereof shall be 
provided to the State and public.

    EPA interprets this provision to authorize the Agency to revise an 
action when EPA finds that (1) EPA clearly erred in failing to 
consider, or inappropriately considered, information made available to 
EPA at the time of the action or the information made available at the 
time of promulgation is subsequently demonstrated to have been clearly 
inadequate; and (2) other information persuasively supports a change in 
the action. See, e.g., 57 FR 56762, 56763 (November 30, 1992) 
(correcting designations, boundaries, and classifications of ozone, 
carbon monoxide, particulate matter and lead areas).

EPA Proposed Action

    EPA has reviewed the rules previously incorporated into the 
American Samoa, Arizona, California, Hawaii, and Nevada SIPs and has 
determined that the rules summarized in Table 1 were approved in error. 
These rules include administrative provisions regarding variances, 
hearing board procedures, and fee provisions.

[[Page 38666]]

Therefore, EPA is proposing to delete the rules summarized in Table 1 
from these SIPs under section 110(k)(6) of the Act, which gives EPA the 
authority to revise the existing SIP by removing the referenced rules 
from the above-referenced SIPs without additional State submission.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future request for 
revision to any state implementation plan. Each request for revision to 
the state implementation plan shall be considered separately in light 
of specific technical, economic, and environmental factors and in 
relation to relevant statutory and regulatory requirements.

Regulatory Process

    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises and 
government entities with jurisdiction over population of less than 
50,000.
    SIP approvals under sections 110 and 301(a) and subchapter I, Part 
D of the CAA do not create any new requirements, but simply approve 
requirements that the State is already imposing. Therefore, because the 
Federal SIP-approval does not impose any new requirements, I certify 
that it does not have a significant impact on any small entities 
affected. Moreover, due to the nature of the Federal-state relationship 
under the CAA, preparation of a regulatory flexibility analysis would 
constitute Federal inquiry into the economic reasonableness of state 
action. The CAA forbids EPA to base its actions concerning SIPs on such 
grounds. Union Electric Co. v. U.S. E.P.A., 427 U.S. 246, 256-66 (S. 
Ct. 1976); 42 U.S.C. 7410 (a)(2).

Unfunded Mandates

    Under Sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Mandates Act''), signed into law on March 22, 
1995, EPA must undertake various actions in association with proposed 
or final rules that include a Federal mandate that may result in 
estimated costs of $100 million or more to the private sector or to 
State, local, or tribal governments in the aggregate.
    The rules being proposed for removal by this action will not result 
in the imposition of new requirements.
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, Assistant Administrator for 
Air and Radiation. The Office of Management and Budget (OMB) has 
exempted this regulatory action from Executive Order 12866 review.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Hydrocarbons, Intergovernmental relations, Nitrogen dioxide, Ozone, 
Particulate matter, Reporting and recordkeeping requirements, Volatile 
organic compounds.

    Authority: 42 U.S.C. 7401-7671q.

    Dated: July 11, 1996.
Felicia Marcus,
Regional Administrator.

                                           Table 1.--State of Arizona                                           
----------------------------------------------------------------------------------------------------------------
                                                                                                       Approval 
                Regulation                    Rule No.              Rule name           Submit date      date   
----------------------------------------------------------------------------------------------------------------
                                     Arizona Dept. of Environmental Quality                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Revised Statutes.........................          36-781  Violations; Order of            07/13/81     06/18/82
                                                            Abatement; Time for                                 
                                                            Compliance.                                         
                                                   36-782  Hearings on Orders of           07/13/81     06/18/82
                                                            Abatement.                                          
                                                   36-784  Conditional Permit;             07/13/81     06/18/82
                                                            Standards.                                          
                                                36-784.01  Petition for Conditional        07/13/81     06/18/82
                                                            Permit; Publication;                                
                                                            Public Hearing.                                     
                                                36-784.02  Decisions on Petitions for      07/13/81     06/18/82
                                                            Conditional Permit: Terms.                          
                                                36-784.03  Term of Conditional Permit.     07/13/81     06/18/82
                                                36-784.04  Suspension and Revocation       07/13/81     06/18/82
                                                            of Conditional Permit.                              
                                                   36-785  Decisions of Hearing Board;     07/13/81     06/18/82
                                                            Subpoenas Effective Date.                           
                                                36-785.01  Judicial Review; Grounds;       07/13/81     06/18/82
                                                            Procedures.                                         
                                                   36-786  Notice of Hearing;              07/13/81     06/18/82
                                                            Publication; Service.                               
                                                   36-787  Injunctive Relief..........     07/13/81     06/18/82
                                                   36-788  Precedence of Actions......     07/13/81     06/18/82
                                                  36-1709  Violations; Order of            08/05/81     06/18/82
                                                            Abatement; Time for                                 
                                                            Compliance.                                         
                                                  36-1710  Hearings on Orders of           08/05/81     06/18/82
                                                            Abatement.                                          
                                                  36-1711  Temporary Conditional           08/05/81     06/18/82
                                                            Permits.                                            
                                                  36-1712  Conditional Permit;             08/05/81     06/18/82
                                                            Standards.                                          
                                               36-1712.01  Petition for Conditional        08/05/81     06/18/82
                                                            Permit; Public Hearing.                             
                                               36-1712.02  Decisions on Petitions for      08/05/81     06/18/82
                                                            Conditional Permit; Terms.                          
                                               36-1712.03  Term of Conditional Permit.     08/05/81     06/18/82
                                               36-1712.04  Suspension and Revocation       08/05/81     06/18/82
                                                            of Conditional Permit.                              
                                                  36-1713  Decisions of Hearing Board;     08/05/81     06/18/82
                                                            Subpoenas; Effective Date.                          
                                               36-1713.01  Judicial Review; Grounds;       08/05/81     06/18/82
                                                            Procedures.                                         
                                                  36-1714  Notice of Hearing;              08/05/81     06/18/82
                                                            Publication; Service.                               
                                                  36-1715  Injunctive Relief..........     08/05/81     06/18/82
                                                  36-1716  Precedence of Actions......     08/05/81     06/18/82
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                              Coconino County APCD                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
12-7 Violations..........................         12-7-2.  Order of Abatement.........     07/01/75     11/15/78
                                                 12-07-3.  Hearings on Orders of           07/01/75     11/15/78
                                                            Abatement.                                          
                                                 12-07-5.  Notice of Hearing,              07/01/75     11/15/78
                                                            Publication, Service.                               

[[Page 38667]]

                                                                                                                
                                                 12-07-6.  Injunctive Relief..........     07/01/75     11/15/78
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                              Maricopa County APCD                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
VI Violations............................              60  Order of Abatement;             05/30/72     09/22/72
                                                            Hearings.                                           
                                                       61  Conditional Permit;             05/30/72     09/22/72
                                                            Petition for Conditional                            
                                                            Permit.                                             
                                                       62  Appeals to the Hearing          05/30/72     09/22/72
                                                            Board.                                              
                                                       63  Decisions on Petitions for      05/30/72     09/22/72
                                                            Conditional Permit; Terms.                          
                                                       64  Decisions of Hearing Board;     05/30/72     09/22/72
                                                            Subpoenas; Effective Date.                          
                                                       65  Notice of Hearing;              05/30/72     09/22/72
                                                            Publication; Service.                               
                                                       66  Injunctive Relief..........     05/30/72     09/22/72
                                                       67  Misdemeanor; Penalty.......     05/30/72     09/22/72
Ch. I: General Provisions:                                                                                      
    14--Hearing Board....................             141  Establishment..............     10/09/79     04/16/82
                                                      142  Composition................     06/01/81     04/16/82
                                                      143  Terms; Nominations.........     10/09/79     04/16/82
                                                      144  Function...................     10/09/79     04/16/82
                                                      145  Officers; Procedures.......     10/09/79     04/16/82
                                                      146  Meetings; Hearings.........     10/09/79     04/16/82
                                                      147  Compensation; Absences.....     10/09/79     04/16/82
Ch. VII: Violations & Judicial                                                                                  
 Procedures:                                                                                                    
    70: Violation........................             702  Order of Abatement.........     10/09/79     04/16/82
    71--Condition........................             711  Legal Authority............     10/09/79     04/16/82
    (Variances)..........................             712  General Procedures.........     10/09/79     04/16/82
                                                      713  Judicial Review............     10/09/79     04/16/82
                                                      714  Time Limitations Regarding      10/09/79     04/16/82
                                                            Hearing.                                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                             Pinal-Gila County APCD                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
7-1-4-Order..............................         7-1-4.1  Violations: Orders of           07/01/75     11/15/78
                                                            Abatement, Time for                                 
                                                            Compliance.                                         
Abatement................................         7-1-4.2  Hearings on Order of            07/01/75     11/15/78
                                                            Abatement.                                          
7-1-5-Rev................................         7-1-5.1  Classification and              07/01/75     11/15/78
                                                            Reporting: Production of                            
                                                            Records.                                            
Procedures...............................         7-1-5.2  Special Inspection Warrant.     07/01/75     11/15/78
                                                  7-1-5.3  Decisions of Hearing            07/01/75     11/15/78
                                                            Boards: Subpoenas                                   
                                                            Effective Date.                                     
                                                  7-1-5.4  Judicial Review: Grounds,       07/01/75     11/15/78
                                                            Procedures.                                         
                                                  7-1-5.5  Notice of Hearing,              07/01/75     11/15/78
                                                            Publication, Service.                               
                                                  7-1-5.6  Injunctive Relief..........     07/01/75     11/15/78
----------------------------------------------------------------------------------------------------------------

                                               State of California                                              
----------------------------------------------------------------------------------------------------------------
                                                                                                       Approval 
                Regulation                    Rule No.              Rule name           Submit date      date   
----------------------------------------------------------------------------------------------------------------
                                               Amador County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
VI--Fees.................................             605  Hearing Board Fees.........     10/15/79     05/18/81
VII--Procedure Before the Hearing Board..             700  Applicable Articles of the      10/15/79     05/18/81
                                                            Health.                                             
                                                      701  General....................     10/15/79     05/18/81
                                                      702  Filing Petitions...........     10/15/79     05/18/81
                                                      703  Contents of Petitions......     10/15/79     05/18/81
                                                      704  Petitions for Variances....     10/15/79     05/18/81
                                                      705  Appeal for Denial..........     04/21/76     06/14/78
                                                      706  Failure to Comply with          04/21/76     01/24/78
                                                            Rules.                                              
                                                      707  Answers....................     04/21/76     01/24/78
                                                      708  Dismissal of Petition......     04/21/76     01/24/68
                                                      709  Place of Hearing...........     04/21/76     01/24/68
                                                      710  Notice of Hearing..........     10/15/79     05/18/81
                                                      711  Evidence...................     10/15/79     05/18/81
                                                      712  Preliminary Matters........     04/21/76     01/24/68
                                                      713  Official Notice............     04/21/76     01/24/68
                                                      714  Continuances...............     04/21/76     01/24/68
                                                      715  Decision...................     04/21/76     01/24/68
                                                      716  Effective Date of Decision.     04/21/76     01/24/68
                                                                                                                
----------------------------------------------------------------------------------------------------------------

[[Page 38668]]

                                                                                                                
                                                 Bay Area AQMD                                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             301  Hearing Board Fees.........     08/30/83     05/03/84
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Butte County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
VII--Procedure Before the Hearing Board..             601  General....................     02/10/86     02/03/87
                                                      602  Filing Petitions...........     02/10/86     02/03/87
                                                      603  Contents of Petitions......     02/10/86     02/03/87
                                                      604  Petitions for Variances....     02/10/86     02/03/87
                                                      605  Petition for Revocation of      02/10/86     02/03/87
                                                            Permit.                                             
                                                      606  Petition for Reinstatement      02/10/86     02/03/87
                                                            of Suspended Permit.                                
                                                      607  Noncompliance with District     02/10/86     02/03/87
                                                            Rules.                                              
                                                      608  Answers....................     02/10/86     02/03/87
                                                      609  Dismissal of Petition......     02/10/86     02/03/87
                                                      610  Time and Place of Hearing..     02/10/86     02/03/87
                                                      611  Notice and Hearing.........     02/10/86     02/03/87
                                                      612  Interested Members of           02/10/86     02/03/87
                                                            Public; Special Notice.                             
                                                      613  Evidence...................     02/10/86     02/03/87
                                                      614  Preliminary Matters........     02/10/86     02/03/87
                                                      615  Official Notice............     02/10/86     02/03/87
                                                      616  Continuances...............     02/10/86     02/03/87
                                                      617  Decision...................     02/10/86     02/03/87
                                                      618  Effective Date of Decision.     02/10/86     02/03/87
                                                      620  Appeal from Denial.........     02/10/86     02/03/87
                                                      621  Appeal and Petition for         02/10/86     02/03/87
                                                            Variance after Permit                               
                                                            Denial.                                             
VIII--Variances..........................             801  Request for Variance.......     02/10/86     02/03/87
                                                      802  Conditions for Granting         02/10/86     02/03/87
                                                            Variances.                                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                              Calaveras County APCD                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
VI--Fees.................................             305  Hearing Board Fees.........     06/30/72     09/22/72
VII--Procedure Before the Hearing Board..             700  Applicable Articles of the      07/22/75     08/22/77
                                                            Health & Safety Code.                               
                                                      701  General....................     07/22/75     08/22/77
                                                      702  Filing Petitions...........     07/22/75     08/22/77
                                                      703  Contents of Petitions......     07/22/75     08/22/77
                                                      704  Petitions for Variances....     07/22/75     08/22/77
                                                      705  Appeal for Denial..........     07/22/75     08/22/77
                                                      706  Failure to Comply with          07/22/75     08/22/77
                                                            Rules.                                              
                                                      707  Answers....................     07/22/75     08/22/77
                                                      708  Dismissal of Petition......     07/22/75     08/22/77
                                                      709  Place of Hearing...........     10/13/77     11/07/78
                                                      710  Notice of Hearing..........     07/22/75     08/22/77
                                                      711  Evidence...................     07/22/75     08/22/77
                                                      712  Preliminary Matters........     07/22/75     08/22/77
                                                      713  Official Notice............     07/22/75     08/22/77
                                                      714  Continuances...............     07/22/75     08/22/77
                                                      715  Decision...................     10/13/77     11/07/78
                                                      716  Effective Date of Decision.     07/22/75     08/22/77
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Colusa County APCD                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             3.1  Hearing Board Fees.........     06/30/72     09/22/72
V--Procedure Before the Hearing Board....             5.1  Applicable Articles of the      06/30/72     09/22/72
                                                            Health & Safety Code.                               
                                                      5.2  General....................     06/30/72     09/22/72
                                                      5.3  Filing Petitions...........     06/30/72     09/22/72
                                                      5.4  Contents of Petitions......     06/30/72     09/22/72
                                                      5.5  Petitions for Variances....     06/30/72     09/22/72
                                                      5.6  Failure to Comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                      5.7  Answers....................     06/30/72     09/22/72
                                                      5.8  Dismissal of Petition......     06/30/72     09/22/72
                                                      5.9  Place of Hearing...........     06/30/72     09/22/72
                                                     5.10  Notice of Hearing..........     06/30/72     09/22/72
                                                     5.11  Evidence...................     06/30/72     09/22/72
                                                     5.12  Record of Proceedings......     06/30/72     09/22/72
                                                     5.13  Preliminary Matters........     06/30/72     09/22/72

[[Page 38669]]

                                                                                                                
                                                     5.14  Official Notice............     06/30/72     09/22/72
                                                     5.15  Continuances...............     06/30/72     09/22/72
                                                     5.16  Decision...................     06/30/72     09/22/72
                                                     5.17  Effective Date of Decision.     06/30/72     09/22/72
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                               Fresno County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             305  Hearing Board Fees.........     10/15/79     12/09/81
V--Procedure Before the Hearing Board....             501  Applicable Articles of the      06/30/72     09/22/72
                                                            Health.                                             
                                                      502  General....................     06/30/72     09/22/72
                                                      503  Filing Petitions...........     01/10/75     08/22/77
                                                      504  Contents of Petitions......     06/30/72     09/22/72
                                                      505  Petitions for Variances....     10/13/74     08/22/77
                                                      506  Appeal for Denial..........     06/30/72     09/22/72
                                                      507  Failure to Comply with          01/10/75     08/22/77
                                                            Rules.                                              
                                                      508  Answers....................     06/30/72     09/22/72
                                                      509  Dismissal of Petition......     06/30/72     09/22/72
                                                      510  Place of Hearing...........     06/30/72     09/22/72
                                                      511  Notice of Hearing..........     06/30/72     09/22/72
                                                      512  Evidence...................     06/30/72     09/22/72
                                                      513  Preliminary Matters........     01/10/75     08/22/77
                                                      514  Official Notice............     06/30/72     09/22/72
                                                      515  Continuances...............     01/10/75     08/22/77
                                                      516  Decision...................     06/30/72     09/22/72
                                                      517  Effective Date of Decision.     06/30/72     09/22/72
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Glenn County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
V--Hearing Board.........................             110  Appl. Articles of the           11/03/80     01/26/82
                                                            Health & Safety Code.                               
                                                      111  Filing Petitions...........     01/10/75     05/11/77
                                                      112  Contents of Petitions......     11/03/80     01/26/82
                                                      113  Petitions for Variances....     01/10/75     05/11/77
                                                      114  Appeal for Denial..........     01/10/75     05/11/77
                                                      115  Failure to Comply with          01/10/75     05/11/77
                                                            Rules.                                              
                                                      116  Dismissal of Petition......     01/10/75     05/11/77
                                                      117  Place of Hearing...........     01/10/75     05/11/77
                                                      118  Notice of Hearing..........     01/10/75     05/11/77
                                                      119  Evidence...................     01/10/75     05/11/77
                                                      120  Record of Proceedings......     01/10/75     05/11/77
                                                      121  Preliminary Matters........     01/10/75     05/11/77
                                                      122  Official Notice............     01/10/75     05/11/77
                                                      123  Continuances...............     01/10/75     05/11/77
                                                      124  Decision...................     01/10/75     05/11/77
                                                      125  Effective Date of Decision.     01/10/75     05/11/77
VI--Fees.................................             150  Hearing Board Fees.........     01/10/75     05/11/77
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Great Basin APCD                                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                      600  General....................     04/21/76     06/06/77
                                                      601  Filing Petitions...........     04/21/76     06/06/77
                                                      602  Contents of Petitions......     04/21/76     06/06/77
                                                      603  Petitions for Variances....     04/21/76     06/06/77
                                                      604  Appeal from Denial.........     04/21/76     06/06/77
                                                      605  Failure to Comply with          04/21/76     06/06/77
                                                            Rules.                                              
                                                      606  Answers....................     04/21/76     06/06/77
                                                      607  Withdrawal of Petition.....     04/21/76     06/06/77
                                                      608  Place of Hearing...........     04/21/76     06/06/77
                                                      609  Notice of Hearing..........     04/21/76     06/06/77
                                                      610  Evidence...................     04/21/76     06/06/77
                                                      611  Record of Proceedings......     04/21/76     06/06/77
                                                      612  Preliminary Matters........     04/21/76     06/06/77
                                                      613  Official Notice............     04/21/76     06/06/77
                                                      614  Continuances...............     04/21/76     06/06/77
                                                      615  Decision...................     04/21/76     06/06/77
                                                      617  Emergency Variances........     12/17/79     01/27/81
VIII--Orders Abatement...................             800  General....................     04/21/76     06/06/77
                                                      801  Order for Abatement........     04/21/76     06/06/77
                                                      802  Filing Petitions...........     04/21/76     06/06/77

[[Page 38670]]

                                                                                                                
                                                      803  Contents of Petitions......     04/21/76     06/06/77
                                                      804  Scope of Order.............     04/21/76     06/06/77
                                                      805  Findings...................     04/21/76     06/06/77
                                                      806  Pleading...................     04/21/76     06/06/77
                                                      807  Evidence...................     04/21/76     06/06/77
                                                      808  Failure to Comply with          04/21/76     06/06/77
                                                            Rules.                                              
                                                      809  Withdrawal of Petition.....     04/21/76     06/06/77
                                                      810  Place of Hearing...........     04/21/76     06/06/77
                                                      811  Notice of Hearing..........     04/21/76     06/06/77
                                                      812  Preliminary Matters........     04/21/76     06/06/77
                                                      813  Official Notice............     04/21/76     06/06/77
                                                      814  Continuance................     04/21/76     06/06/77
                                                      815  Order and Decision.........     04/21/76     06/06/77
                                                      816  Effective Date of Decision.     04/21/76     06/06/77
                                                      817  Record of Proceedings......     04/21/76     06/06/77
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                              Imperial County APCD                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             305  Hearing Board Fees.........     10/23/81     05/27/82
V--Procedure Before the Hearing Board....             501  General....................     11/04/77     08/11/78
                                                      502  Filing Petitions...........     11/04/77     08/11/78
                                                      503  Contents of Petitions......     11/04/77     08/11/78
                                                      504  Petitions for Variances....     11/04/77     08/11/78
                                                      505  Supplemental Information...     11/04/77     08/11/78
                                                      506  Matters Initiated by            11/04/77     08/11/78
                                                            Control Officer or Hearing                          
                                                            Board.                                              
                                                      507  Answers....................     11/04/77     08/11/78
                                                      508  Withdrawal of Petition.....     11/04/77     08/11/78
                                                      509  Preliminary Matters........     11/04/77     08/11/78
                                                      510  Time and Place of Meeting..     11/04/77     08/11/78
                                                      511  Notice of Hearing..........     11/04/77     08/11/78
                                                      512  Record of Proceedings......     11/04/77     08/11/78
                                                      514  Evidence...................     11/04/77     08/11/78
                                                      515  Official Notice............     11/04/77     08/11/78
                                                      516  Decisions..................     11/04/77     08/11/78
                                                      517  Emergency Variance.........     12/24/79     01/27/81
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Kern County APCD                                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
I--General Provisions....................             105  Order for Abatement........     11/10/76     03/22/78
III--Fees................................             305  Hearing Board Fees.........     07/30/81     07/06/82
V--Procedure Before the Hearing Board....             501  Applicable Articles of the      11/10/76     03/22/78
                                                            Health.                                             
                                                      502  General....................     06/30/72     09/22/72
                                                      503  Filing Petitions...........     05/23/79     08/11/80
                                                      504  Contents of Petitions......     11/10/76     03/22/78
                                                      505  Petitions for Variances....     06/30/72     09/22/72
                                                      506  Appeal for Denial..........     06/30/72     09/22/72
                                                      507  Failure to Comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                      508  Answers....................     06/30/72     09/22/72
                                                      509  Dismissal of Petition......     06/30/72     09/22/72
                                                      510  Place of Hearing...........     06/30/72     09/22/72
                                                      511  Notice of Hearing..........     11/10/76     03/22/78
                                                      512  Evidence...................     06/30/72     09/22/72
                                                      513  Preliminary Matters........     06/30/72     09/22/72
                                                      514  Official Notice............     06/30/72     09/22/72
                                                      515  Continuances...............     06/30/72     09/22/72
                                                      516  Decision...................     07/19/74     08/22/77
                                                      517  Effective Date of Decision.     06/30/72     09/22/72
I--General Provisions....................             105  Order for Abatement........     11/10/76     03/22/78
III--Fees................................             305  Hearing Board Fees.........     07/30/81     07/06/82
V--Procedure Before the Hearing Board....             501  Appl. Articles of the           11/10/76     03/22/78
                                                            Health & Safety Code.                               
                                                      502  General....................     06/30/72     09/22/72
                                                      503  Filing Petitions...........     05/23/79     08/11/80
                                                      504  Contents of Petitions......     11/10/76     03/22/78
                                                      505  Petitions for Variances....     06/30/72     09/22/72
                                                      506  Appeal for Denial..........     06/30/72     09/22/72
                                                      507  Failure to Comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                      508  Answers....................     06/30/72     09/22/72

[[Page 38671]]

                                                                                                                
                                                      509  Dismissal of Petition......     06/30/72     09/22/72
                                                      510  Place of Hearing...........     06/30/72     09/22/72
                                                      511  Notice of Hearing..........     11/10/76     03/22/78
                                                      512  Evidence...................     06/30/72     09/22/72
                                                      513  Preliminary Matters........     06/30/72     09/22/72
                                                      514  Official Notice............     06/30/72     09/22/72
                                                      515  Continuances...............     06/30/72     09/22/72
                                                      516  Decision...................     07/19/74     08/22/77
                                                      517  Effective Date of Decision.     06/30/72     09/22/72
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Kings County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
I--General Provisions....................             105  Order for Abatement........     11/04/77     08/04/78
III--Fees................................             302  Hearing Board Fees.........     10/15/79     10/09/81
V--Procedure Before the Hearing Board....             501  Applicable Articles of the      11/04/77     08/04/78
                                                            Health.                                             
                                                      502  General....................     06/30/72     09/22/72
                                                      503  Filing Petitions...........     06/30/72     09/22/72
                                                      504  Contents of Petitions......     06/30/72     09/22/72
                                                      505  Petitions for Variances....     06/30/72     09/22/72
                                                      506  Appeal for Denial..........     06/30/72     09/22/72
                                                      507  Failure to Comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                      508  Answers....................     06/30/72     09/22/72
                                                      509  Dismissal of Petition......     06/30/72     09/22/72
                                                      510  Place of Hearing...........     07/25/73     08/22/77
                                                      511  Notice of Hearing..........     06/30/72     09/22/72
                                                      512  Evidence...................     06/30/72     09/22/72
                                                      513  Preliminary Matters........     06/30/72     09/22/72
                                                      514  Official Notice............     06/30/72     09/22/72
                                                      515  Continuances...............     06/30/72     09/22/72
                                                      516  Decision...................     06/30/72     09/22/72
                                                      517  Effective Date of Decision.     06/30/72     09/22/72
                                                      519  Emergency Variance.........     10/15/79     06/18/82
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Lake County APCD                                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Ch. I--General Provisions................             300  Hearing Board..............     02/10/77     08/04/78
Ch. VI, Chapter IX Hearing Board.........             301  Meeting Compensation.......     03/30/81     04/13/82
                                                      800  Orders of Abatement........     02/10/77     08/04/78
                                                     1600  Public Hearing.............     02/10/77     08/04/78
                                                     1601  Notice.....................     02/10/77     08/04/78
                                                     1602  Petition Procedures........     03/30/81     04/13/82
                                                     1610  Decisions..................     02/10/77     08/04/78
                                                     1611  Effective Date.............     02/10/77     08/04/78
                                                     1612  Transcripts................     02/10/77     08/04/78
                                                     1620  Fees.......................     02/10/77     08/04/78
Chapter X Variances: Article I Interim                                                                          
 Variances                                                                                                      
                                                     1700  ...........................     02/10/77     08/04/78
                                                     1701  ...........................     02/10/77     08/04/78
Article II Variance......................            1710  ...........................     02/10/77     08/04/78
                                                     1711  ...........................     02/10/77     08/04/78
                                                     1712  ...........................     02/10/77     08/04/78
                                                     1713  ...........................     02/10/77     08/04/78
                                                     1714  ...........................     02/10/77     08/04/78
Article III Increments of Progress.......                                                                       
                                                     1720  ...........................     02/10/77     08/04/78
                                                     1721  ...........................     02/10/77     08/04/78
                                                     1722  ...........................     02/10/77     08/04/78
                                                     1723  ...........................     02/10/77     08/04/78
                                                     1724  ...........................     02/10/77     08/04/78
                                                     1725  ...........................     02/10/77     08/04/78
Article IV Procedure.....................                                                                       
                                                     1730  ...........................     02/10/77     08/04/78
                                                     1731  ...........................     02/10/77     08/04/78
                                                     1732  ...........................     02/10/77     08/04/78
                                                     1733  ...........................     02/10/77     08/04/78
                                                     1734  ...........................     02/10/77     08/04/78

[[Page 38672]]

                                                                                                                
                                                     1735  ...........................     02/10/77     08/04/78
                                                     1736  ...........................     02/10/77     08/04/78
Tables I-IV Table VI.....................  ..............  Schedule of Fees for Permit     03/30/81     04/13/82
I--General Provisions....................             1.5  Order for Abatement........     06/30/72     09/22/72
III--Fees................................             3.1  Hearing Board Fees.........     06/30/72     09/22/72
V--Procedure.............................             5.1  Appl. Articles of the           06/30/72     09/22/72
                                                            Health & Safety Code.                               
Before the Hearing Board.................             5.2  General....................     06/30/72     09/22/72
                                                      5.3  Filing Petitions...........     06/30/72     09/22/72
                                                      5.4  Contents of Petitions......     06/30/72     09/22/72
                                                      5.5  Petitions for Variances....     06/30/72     09/22/72
                                                      5.6  Appeal for Denial..........     06/30/72     09/22/72
                                                      5.7  Failure to Comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                      5.8  Answers....................     06/30/72     09/22/72
                                                      5.9  Dismissal of Petition......     06/30/72     09/22/72
                                                     5.10  Place of Hearing...........     06/30/72     09/22/72
                                                     5.11  Notice of Hearing..........     06/30/72     09/22/72
                                                     5.12  Record of Proceedings......     06/30/72     09/22/72
                                                     5.13  Preliminary Matters........     06/30/72     09/22/72
                                                     5.14  Official Notice............     06/30/72     09/22/72
                                                     5.15  Continuances...............     06/30/72     09/22/72
                                                     5.16  Decision...................     06/30/72     09/22/72
                                                     5.17  Effective Date of Decision.     06/30/72     09/22/72
I--General Provisions....................             106  Order for Abatement........     02/07/89     04/16/91
III--Fees................................             305  Hearing Board Fees.........     04/11/83     11/18/83
V--Procedure Before the Hearing Board....             501  Applicable Articles of the      02/07/89     04/16/91
                                                            Health.                                             
                                                      502  General....................     04/11/83     11/18/83
                                                      503  Filing Petitions...........     04/11/83     11/18/83
                                                      504  Contents of Petitions......     02/07/89     04/16/91
                                                      505  Petitions for Variances....     02/07/89     04/16/91
                                                      506  Appeal for Denial..........     02/07/89     04/16/91
                                                      507  Failure to Comply with          06/03/72     09/22/72
                                                            Rules.                                              
                                                      508  Answers....................     06/03/72     09/22/72
                                                      509  Dismissal of Petition......     06/03/72     09/22/72
                                                      510  Place of Hearing...........     06/03/72     09/22/72
                                                      511  Notice of Hearing..........     10/15/79     12/09/81
                                                      512  Evidence...................     06/30/72     09/22/72
                                                      513  Preliminary Matters........     06/30/72     09/22/72
                                                      514  Official Notice............     06/30/72     09/22/72
                                                      515  Continuances...............     06/30/72     09/22/72
                                                      516  Decision...................     06/30/72     09/22/72
                                                      517  Effective Date of Decision.     06/30/72     09/22/72
                                                      519  Emergency Variance.........     02/07/89     04/16/91
                                    
FR Doc. 96-18834 Correction of Implementation Plans; American Samoa, Arizona, California, Hawaii, and Nevada State Implementation Plans
                                                                            
----------------------------------------------------------------------------------------------------------------
                                              Mariposa County APCD                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
VI--Procedure Before the Hearing Board...             600  Appl. Articles of the           06/06/77     08/16/78
                                                            Health & Safety Code.                               
                                                      601  General....................     01/10/75     08/22/77
                                                      602  Filing Petitions...........     06/06/77     08/16/78
                                                      603  Contents of Petitions......     06/06/77     08/16/78
                                                      604  Petitions for Variances....     01/10/75     08/22/77
                                                      605  Appeal for Denial..........     01/10/75     08/22/77
                                                      606  Failure to Comply with          01/10/75     08/22/77
                                                            Rules.                                              
                                                      607  Answers....................     01/10/75     08/22/77
                                                      608  Dismissal of Petition......     01/10/75     08/22/77
                                                      609  Place of Hearing...........     01/10/75     08/22/77
                                                      610  Notice of Hearing..........     06/06/77     08/16/78
                                                      611  Evidence...................     01/10/75     08/22/77
                                                      612  Preliminary Matters........     01/10/75     08/22/77
                                                      613  Official Notice............     01/10/75     08/22/77
                                                      614  Continuances...............     01/10/75     08/22/77
                                                      615  Decision...................     01/10/75     08/22/77
                                                      616  Effective Date of Decision.     01/10/75     08/22/77
                                                      618  Hearing Board Fees.........     01/10/77     08/22/77
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                              Mendocino County APCD                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             320  Hearing Board Fees.........     05/23/79     10/13/80
V--Enforcement...........................             510  Orders for Abatement.......     11/10/76     11/07/78

[[Page 38673]]

                                                                                                                
VI--Hearing and Variance Procedures......             600  Authorization..............     04/19/84     12/05/84
                                                      610  Petition Procedure.........     04/19/84     12/05/84
                                                      615  Emergency Variances........     05/07/79     11/10/82
                                                      616  Interim Variance...........     08/06/82     11/10/82
                                                      618  Modification of Increments      08/06/82     11/10/82
                                                            of Progress Sch..                                   
                                                      620  Hearing Board..............     11/10/76     11/07/78
                                                      640  Record of Proceedings......     11/10/76     11/07/78
                                                      650  Appeal of Decision.........     11/10/76     11/07/78
                                                           Part XI Hearing Board......     02/21/72     05/31/72
                                                           Part XII Variances.........     02/21/72     05/31/72
                                                           Part XIII Meetings.........     02/21/72     05/31/72
I--General Provisions....................             105  Order for Abatement........     08/02/76     06/14/78
III--Fees................................             305  Hearing Board Fees.........     07/19/83     02/01/84
V--Procedure Before the Hearing Board....             501  Appl. Articles of the           08/02/76     06/14/78
                                                            Health & Safety Code.                               
                                                      502  General....................     06/30/72     09/22/72
                                                      503  Filing Petitions...........     06/30/72     09/22/72
                                                      504  Contents of Petitions......     08/02/76     06/14/78
                                                      506  Appeal for Denial..........     06/30/72     09/22/72
                                                      507  Failure to Comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                      508  Answers....................     06/30/72     09/22/72
                                                      509  Dismissal of Petition......     06/30/72     09/22/72
                                                      510  Place of Hearing...........     08/02/76     06/14/78
                                                      512  Evidence...................     06/30/72     09/22/72
                                                      513  Preliminary Matters........     06/30/72     09/22/72
                                                      514  Official Notice............     06/30/72     09/22/72
                                                      515  Continuances...............     06/30/72     09/22/72
                                                      516  Decision...................     06/30/72     09/22/72
                                                      517  Effective Date of Decision.     06/30/72     09/22/72
                                                      519  Emergency Variance.........     07/19/83     02/01/84
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Modoc County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
I--General Provisions....................             1.5  Order for Abatement........     06/30/72     09/22/72
IV--Procedure Before the Hearing Board...             4.1  Appl. Articles of the           06/30/72     09/22/72
                                                            Health & Safety Code.                               
                                                      4.2  General....................     06/30/72     09/22/72
                                                      4.3  Filing Petitions...........     06/30/72     09/22/72
                                                      4.4  Contents of Petitions......     06/30/72     09/22/72
                                                      4.5  Petitions for Variances....     06/30/72     09/22/72
                                                      4.6  Failure to Comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                      4.7  Answers....................     06/30/72     09/22/72
                                                      4.8  Dismissal of Petition......     06/30/72     09/22/72
                                                      4.9  Place of Hearing...........     06/30/72     09/22/72
                                                     4.10  Notice of Hearing..........     06/30/72     09/22/72
                                                     4.11  Evidence...................     06/30/72     09/22/72
                                                     4.12  Record of Proceedings......     06/30/72     09/22/72
                                                     4.13  Preliminary Matters........     06/30/72     09/22/72
                                                     4.14  Official Notice............     06/30/72     09/22/72
                                                     4.15  Continuances...............     06/30/72     09/22/72
                                                     4.16  Hearing and Decision.......     06/30/72     09/22/72
                                                     4.17  Effective Date of Decision.     06/30/72     09/22/72
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                      Mojave Desert AQMD (Los Angeles [LA], Riverside, San Bernardino [SB])                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
V--Procedure Before the Hearing..........  ..............  LA-501  General............     02/10/76     09/22/72
                                           ..............  LA-502  Filing Petitions...     06/06/77     09/08/78
                                           ..............  LA-509  Place of Hearing...     06/06/77     09/08/78
                                           ..............  Riverside General-501......     11/04/77     12/21/78
                                           ..............  Riverside Filing Petitions-     02/10/76     06/14/78
                                                            502.                                                
                                           ..............  Riverside Place of Hearing-     06/06/77     09/08/78
                                                            509.                                                
                                           ..............  SB  General 501............     11/04/77     12/21/78
                                           ..............  SB  Assistance to Small         05/23/79     01/27/81
                                                            Business 501.1.                                     
                                           ..............  SB  Filing Petitions 502...     11/04/77     12/21/78
                                           ..............  SB  Place of Hearing 509...     11/04/77     12/21/78
                                                                                                                
----------------------------------------------------------------------------------------------------------------
 
[[Page 38674]]

                                                                                                                
                                          LA, Riverside, San Bernardino                                         
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                      503  Contents of Petitions......     06/22/78     03/28/79
                                                      504  Petitions for Variances....     06/06/77     06/14/78
                                                      505  Appeal from Denial.........     08/02/76     06/14/78
                                                      506  Failure to Comply with          06/06/77     06/14/78
                                                            Rules.                                              
                                                      507  Pleading...................     06/06/77     06/14/78
                                                      508  Dismissal of Petition......     06/06/77     06/14/78
                                                      509  Notice of Hearing..........     06/06/77     06/14/78
                                                      510  Evidence...................     06/06/77     06/14/78
                                                      511  Preliminary Matters........     06/06/77     06/14/78
                                                      512  Official Notice............     06/06/77     06/14/78
                                                      513  Continuances...............     06/06/77     06/14/78
                                                      514  Decision...................     06/06/77     06/14/78
                                                      515  Effective Date of Decision.     06/06/77     06/14/78
                                                      517  Findings...................     06/06/77     06/14/78
VIII--Orders for Abatement...............             801  General....................     06/06/77     09/08/78
                                                      802  Order for Abatement........     06/06/77     09/08/78
                                                      803  Filing Petitions...........     06/06/77     09/08/78
                                                      804  Contents of Petitions......     06/06/77     09/08/78
                                                      805  Scope of Order.............     06/06/77     09/08/78
                                                      806  Findings...................     06/06/77     09/08/78
                                                      807  Pleading...................     06/06/77     09/08/78
                                                      808  Evidence...................     06/06/77     09/08/78
                                                      809  Failure to Comply with          06/06/77     09/08/78
                                                            Rules.                                              
                                                      810  Withdrawal of Petition.....     06/06/77     09/08/78
                                                      811  Place of Hearing...........     06/06/77     09/08/78
                                                      812  Notice of Hearing..........     06/06/77     09/08/78
                                                      813  Preliminary Matters........     06/06/77     09/08/78
                                                      814  Official Notice............     06/06/77     09/08/78
                                                      815  Continuance................     06/06/77     09/08/78
                                                      816  Order and Decision.........     06/06/77     09/08/78
                                                      817  Effective Date of Decision.     06/06/77     09/08/78
VI--Procedure Before the Hearing Board...             600  General....................     02/06/85     07/13/87
                                                      601  Filing Petitions...........     02/06/85     07/13/87
                                                      602  Contents of Petitions......     02/06/85     07/13/87
                                                      603  Petitions for Variances....     02/06/85     07/13/87
                                                      604  Appeal from Denial.........     02/06/85     07/13/87
                                                      605  Failure to Comply with          02/06/85     07/13/87
                                                            Rules.                                              
                                                      606  Answers....................     02/06/85     07/13/87
                                                      607  Withdrawal of Petition.....     02/06/85     07/13/87
                                                      608  Place of Hearing...........     02/06/85     07/13/87
                                                      609  Notice of Hearing..........     02/06/85     07/13/87
                                                      610  Evidence...................     02/06/85     07/13/87
                                                      611  Record of Proceedings......     02/06/85     07/13/87
                                                      612  Preliminary Matters........     02/06/85     07/13/87
                                                      613  Official Notice............     02/06/85     07/13/87
                                                      614  Continuances...............     02/06/85     07/13/87
                                                      615  Decision...................     02/06/85     07/13/87
                                                      616  Effective Date of Decision.     02/06/85     07/13/87
                                                      617  Emergency Variances........     02/06/85     07/13/87
VIII--Orders Abatement...................             800  General....................     02/06/85     07/13/87
                                                      801  Order for Abatement........     02/06/85     07/13/87
                                                      802  Filing Petitions...........     02/06/85     07/13/87
                                                      803  Contents of Petitions......     02/06/85     07/13/87
                                                      804  Scope of Order.............     02/06/85     07/13/87
                                                      805  Findings...................     02/06/85     07/13/87
                                                      806  Pleading...................     02/06/85     07/13/87
                                                      807  Evidence...................     02/06/85     07/13/87
                                                      808  Failure to Comply with          02/06/85     07/13/87
                                                            Rules.                                              
                                                      809  Withdrawal of Petition.....     02/06/85     07/13/87
                                                      810  Place of Hearing...........     02/06/85     07/13/87
                                                      811  Notice of Hearing..........     02/06/85     07/13/87
                                                      812  Preliminary Matters........     02/06/85     07/13/87
                                                      813  Official Notice............     02/06/85     07/13/87
                                                      814  Continuance................     02/06/85     07/13/87
                                                      815  Order and Decision.........     02/06/85     07/13/87
                                                      816  Effective Date of Decision.     02/06/85     07/13/87
                                                                                                                
----------------------------------------------------------------------------------------------------------------

[[Page 38675]]

                                                                                                                
                                  Northern Sierra AQMD (Nevada/Plumas/Sierra)                                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
IV--Permit Says..........................             404  Emergency Variance              10/15/79     05/18/81
                                                            Procedures.                                         
Reg V-Permit.............................             522  Analysis Fees..............     06/22/81     04/23/82
Operate Regs.............................             523  Permit Fees................     06/06/77     09/14/78
Reg VI-Procedure Before the Hearing Board             601  General....................     06/06/77     09/14/78
                                                      602  Filing Petitions...........     06/06/77     09/14/78
                                                      604  Petition for Variance......     06/06/77     09/14/78
                                                      605  Appeal from Denial.........     06/06/77     09/14/78
                                                      606  Failure to Comply Rules....     06/06/77     09/14/78
                                                      607  Answers....................     06/06/77     09/14/78
                                                      608  Dismissal of Petition......     06/06/77     09/14/78
                                                      609  Place of Hearing...........     06/06/77     09/14/78
                                                      611  Evidence...................     06/06/77     09/14/78
VII--Procedure Before the Hearing Board..             700  Appl. Articles of the           06/06/77     09/14/78
                                                            Health & Safety Code.                               
                                                      701  General....................     04/10/75     06/14/78
                                                      702  Filing Petitions...........     04/10/75     06/14/78
                                                      703  Contents of Petitions......     04/10/75     06/14/78
                                                      704  Petitions for Variances....     06/06/77     09/14/78
                                                      705  Appeal from Denial.........     06/06/77     09/14/78
                                                      706  Failure to Comply with          06/06/77     09/14/78
                                                            Rules.                                              
                                                      707  Answers....................     06/06/77     09/14/78
                                                      708  Dismissal of Petition......     06/06/77     09/14/78
                                                      709  Place of Hearing...........     06/06/77     09/14/78
                                                      710  Notice of Public Hearing...     06/06/77     09/14/78
                                                      711  Evidence...................     06/06/77     09/14/78
                                                      712  Preliminary Matters........     04/10/75     06/14/78
                                                      713  Official Notice............     04/10/75     06/14/78
                                                      714  Continuances...............     04/10/75     06/14/78
                                                      715  Decision...................     04/10/75     06/14/78
                                                      716  Effective Date of Decision.     04/10/75     06/14/78
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                            North Coast Unified AQMD                                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             300  Permit Fees................     10/23/81     04/13/82
                                                      310  Permit Fee Schedules.......     10/23/81     04/13/82
                                                      320  Hearing Board Fees.........     05/23/79     10/31/80
                                                      340  Technical Report--Charges       11/10/76     08/02/78
                                                            For.                                                
                                                      350  Fuel Burning and Power          02/03/83     11/18/83
                                                            Generation Surcharges.                              
V--Enforcement & Penalty Acts............             510  Orders for Abatement.......     11/10/76     08/02/78
VI--Hearing Board & Variance Procedures..             600  Authorization..............     03/14/84     12/05/84
                                                      610  Petition Procedure.........     03/14/84     12/05/84
                                                      615  Emergency Variances........     05/07/79     10/31/80
                                                      616  Interim Variance...........     08/06/82     11/10/82
                                                      618  Modification of Increments      08/06/82     11/10/82
                                                            of Progress Sch..                                   
                                                      620  Hearing Procedures.........     11/10/76     08/02/78
                                                      630  Decisions..................     11/10/76     08/02/78
                                                      640  Record of Proceedings......     11/10/76     08/02/78
                                                      650  Appeal of Decision.........     11/10/76     08/02/78
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                          Northern Sonoma County APCD                                           
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             300  Permit Fees................     10/23/81     04/13/82
                                                      310  Permit Fee Schedules.......     10/23/81     04/13/82
                                                      320  Hearing Board Fees.........     05/07/79     10/31/80
                                                      340  Technical Reports--Charges      11/10/76     08/16/78
                                                            For.                                                
V--Enforcement & Penalty Acts............             510  Orders for Abatement.......     11/10/76     08/16/78
VI--Hearing Board & Variance Procedures..             600  Authorization..............     11/10/76     08/16/78
VII--Procedure Before the Hearing Board..             610  Petition Procedures........     11/10/76     08/16/78
                                                      615  Emergency Variance.........     05/07/79     10/31/80
                                                      620  Hearing Procedures.........     11/10/76     08/16/78
                                                      630  Decisions..................     11/10/76     08/16/78
                                                      640  Record of Proceedings......     11/10/76     08/16/78

[[Page 38676]]

                                                                                                                
                                                      650  Appeal of Decision.........     11/10/76     08/16/78
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                            Placer County APCD (Mountain Counties Air Basin Portion)                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
IV--Misc. Provisions.....................             404  Upset Conditions,               10/15/79     05/18/81
                                                            Breakdown, or Scheduled                             
                                                            Maintenance.                                        
VI--Fees.................................              42  Technical Reports, Charges      02/21/72     05/31/72
                                                            for.                                                
                                                      601  Permit Fees................     05/28/81     04/23/82
                                                      602  Hearing Board Fees.........     10/15/79     05/18/81
                                                      603  Analysis Fees..............     05/23/79     05/18/81
VII--Procedure Before the Hearing Board..             701  General....................     01/10/75     06/14/78
                                                      702  Filing Petitions Hearing        05/28/81     04/23/82
                                                            Board.                                              
                                                      703  Contents of Petitions......     10/13/77     11/15/78
                                                      704  Petitions for Variances....     10/13/77     11/15/78
                                                      707  Answers....................     01/10/75     06/14/78
                                                      708  Dismissal of Petition......     10/13/77     11/15/78
                                                      709  Place of Hearing...........     10/13/77     11/15/78
                                                      710  Notice of Hearing..........     10/13/77     11/15/78
                                                      711  Evidence...................     01/10/75     06/14/78
                                                      712  Preliminary Matters........     01/10/75     06/14/78
                                                      713  Official Notice............     01/10/75     06/14/78
                                                      714  Continuances...............     01/10/75     06/14/78
                                                      715  Decision...................     10/13/77     11/15/78
                                                      716  Effective Date of Decision.     01/10/75     06/14/78
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                   Placer County APCD (Lake Tahoe Air Basin)                                    
                                                                                                                
----------------------------------------------------------------------------------------------------------------
VI--Fees.................................              40  Hearing Board Fees.........     02/21/72     05/31/72
                                                       42  Technical Reports..........     02/21/72     05/31/72
                                                      603  Analysis Fees..............     10/13/77     11/15/78
                                                      604  Renewal Fees...............     10/13/77     11/15/78
                                                      605  Exemption to Rule 604......     10/13/77     11/15/78
V--Procedure Before the Hearing Board....             701  General....................     01/10/75     06/14/78
                                                      702  Filing Petitions...........     10/13/77     11/15/78
                                                      703  Contents of Petitions......     10/13/77     11/15/78
                                                      704  Petitions for Variances....     10/13/77     11/15/78
                                                      705  Appeal for Denial..........     01/10/75     06/14/78
                                                      706  Failure to Comply with          10/13/77     11/15/78
                                                            Rules.                                              
                                                      707  Answers....................     01/10/75     06/14/78
                                                      708  Dismissal of Petition......     10/13/77     11/15/78
                                                      709  Place of Hearing...........     10/13/77     11/15/78
                                                      710  Notice of Hearing..........     10/13/77     11/15/78
                                                      711  Evidence...................     01/10/75     06/14/78
                                                      712  Preliminary Matters........     01/10/75     06/14/78
                                                      713  Official Notice............     01/10/75     06/14/78
                                                      714  Continuances...............     01/10/75     06/14/78
                                                      715  Decision...................     10/13/77     11/15/78
                                                      716  Effective Date of Decision.     01/10/75     06/14/78
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                          Sacramento Metropolitan AQMD                                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                       70  Permit Fees--Stationary         11/08/82     06/01/83
                                                            Source.                                             
                                                       71  Hearing Board Fees.........     05/23/79     01/26/82
                                                       74  Agricultural Burning.......     09/05/80     06/18/82
                                                      601  Procedure Before the            04/14/84     12/05/84
                                                            Hearing Board.                                      
                                                      602  Breakdown Conditions;           04/14/84     12/05/84
                                                            Emergency Variances.                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                              San Diego County APCD                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................              40  Permit Fees................     07/19/83     02/01/84
                                                       41  Annual Permit Renewal Fees.     07/25/73     05/11/77
                                                       42  Hearing Board Fees.........     10/23/81     07/06/82
                                                       44  Technical Reports--Charges      06/30/72     09/22/72
                                                            for.                                                
V--Procedure Before the Hearing Board....              75  General....................     07/13/78     07/30/79
                                                       76  Request for Hearing........     10/13/77     08/31/78
                                                       77  Contents of Petitions......     06/30/72     09/22/72
                                                       78  Petitions for Variances....     06/30/72     09/22/72

[[Page 38677]]

                                                                                                                
                                                       79  Appeal from Denial.........     06/30/72     09/22/72
                                                       80  Failure to comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                       82  Answers....................     06/30/72     09/22/72
                                                       83  Dismissal of Petition......     06/30/72     09/22/72
                                                       84  Place of Hearing...........     06/30/72     09/22/72
                                                       85  Notice of Hearing..........     10/13/77     08/31/78
                                                       86  Evidence...................     06/30/72     09/22/72
                                                       87  Preliminary Matters........     06/30/72     09/22/72
                                                       88  Official Notice............     06/30/72     09/22/72
                                                       89  Continuances...............     06/30/72     09/22/72
                                                       90  Decision...................     06/30/72     09/22/72
                                                       91  Effective Date of Decision.     06/30/72     09/22/72
                                                       95  Requirement for Hearing....     05/23/79     09/28/81
                                                       96  Compliance Schedules.......     10/13/77     08/31/78
                                                       97  Emergency Variance.........     07/13/78     07/30/79
                                                       98  Breakdown Conditions:           05/23/79     09/28/81
                                                            Emergency Variance.                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                             San Joaquin County APCD                                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             301  Authority to Construct Fee.     05/23/79     12/09/81
                                                      302  Analysis Fee...............     05/23/79     06/18/82
                                                      303  Permit Fee.................     05/23/79     12/09/81
                                                      304  Permit Fee Schedules.......     05/23/79     12/09/81
                                                      305  Hearing Board Fees.........     05/23/79     12/09/81
                                                      306  Emission Source Testing and     05/23/79     12/09/81
                                                            Evaluation Fees.                                    
                                                      307  Technical Reports-Charges       05/23/79     12/09/81
                                                            for.                                                
                                                      308  Rules and Regulations-          05/23/79     12/09/81
                                                            Charges for.                                        
                                                      309  Copies-Charges for.........     05/23/79     12/09/81
                                                      310  Professional Consultation       05/23/79     12/09/81
                                                            Fee.                                                
                                                      311  Special Burn Permit Fee....     05/23/79     12/09/81
V--Procedure Before the Hearing Board....             501  Appl. Articles of the           11/10/76     10/04/77
                                                            Health & Safety Code.                               
                                                      502  General....................     06/30/72     09/22/72
                                                      503  Filing Petitions...........     11/10/76     10/04/77
                                                      504  Contents of Petitions......     10/23/74     08/22/77
                                                      505  Petitions for Variances....     10/23/74     08/22/77
                                                      506  Appeal for Denial..........     06/30/72     09/22/72
                                                      507  Failure to Comply with                               
                                                            Rules 06/30/72 09/22/72.                            
                                                      508  Answers....................     06/30/72     09/22/72
                                                      509  Dismissal of Petition......     06/30/72     09/22/72
                                                      510  Place of Hearing...........     10/23/74     08/22/77
                                                      511  Notice of Hearing..........     05/23/79     12/09/81
                                                      512  Evidence...................     10/23/74     08/22/77
                                                      513  Compliance Schedule........     10/23/74     08/22/77
                                                      514  Preliminary Matters........     10/23/74     08/22/77
                                                      515  Official Notice............     10/23/74     08/22/77
                                                      516  Continuances...............     10/23/74     08/22/77
                                                      517  Decision...................     10/23/74     08/22/77
                                                      518  Effective Date of Decision.     10/23/74     08/22/77
                                                      520  Emergency Variance.........     10/23/74     08/22/77
                                                      521  Breakdown Conditions:           08/06/82     11/10/82
                                                            Emergency Variance.                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                              San Luis Obispo APCD                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             301  Fees.......................     10/23/81     06/18/82
                                                      302  Schedule of Fees...........     02/03/83     11/18/83
                                                      303  Hearing Board Fees.........     02/25/80     05/18/81
                                                      304  Technical Reports-Charges       02/25/80     05/18/81
                                                            for.                                                
V--Procedure Before the Hearing Board....             801  Hearing Board Fees.........     11/10/76     08/04/78
                                                      802  Filing Petitions...........     11/10/76     08/04/78
                                                      803  Contents of Petitions......     11/10/76     08/04/78
                                                      804  Petitions for Variances....     11/10/76     08/04/78
                                                      805  Appeal for Denial..........     11/10/76     08/04/78
                                                      806  Failure to Comply with          11/10/76     08/04/78
                                                            Rules.                                              
                                                      807  Notice of Hearing..........     11/10/76     08/04/78
                                                      808  Place of Hearing...........     11/10/76     08/04/78
                                                      809  Pleading...................     11/10/76     08/04/78
                                                      810  Dismissal of Petition......     11/10/76     08/04/78
                                                      811  Preliminary Matters........     11/10/76     08/04/78

[[Page 38678]]

                                                                                                                
                                                      812  Evidence...................     11/10/76     08/04/78
                                                      813  Official Notice............     11/10/76     08/04/78
                                                      814  Continuances...............     11/10/76     08/04/78
                                                      815  Decision...................     11/10/76     08/04/78
                                                      816  Effective Date of Decision.     11/10/76     08/04/78
                                                      817  Increments of Progress.....     11/10/76     08/04/78
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                            Santa Barbara County APCD                                           
                                                                                                                
----------------------------------------------------------------------------------------------------------------
II--Permits..............................             210  Fees.......................     05/23/79     05/18/81
                                                      211  Technical Reports--Fees....     05/23/79     05/18/81
V--Procedure Before the Hearing Board....             501  General....................     05/23/79     05/18/81
                                                      502  Filing Petitions...........     05/23/79     05/18/81
                                                      503  Contents of Petitions......     05/23/79     05/18/81
                                                      504  Petitions for Variances:        05/23/79     05/18/81
                                                            Contents.                                           
                                                      506  Emergency Variances for         05/23/79     05/18/81
                                                            Breakdowns.                                         
                                                      507  Appeal from Denial.........     05/23/79     05/18/81
                                                      508  Failure to Comply with          05/23/79     05/18/81
                                                            Rules.                                              
                                                      509  Petition Response..........     05/23/79     05/18/81
                                                      510  Withdrawal of Petition.....     05/23/79     05/18/81
                                                      511  Place of Hearing...........     05/23/79     05/18/81
                                                      512  Notice of Hearing..........     05/23/79     05/18/81
                                                      514  Preliminary Matters........     05/23/79     05/18/81
                                                      515  Official Notice............     05/23/79     05/18/81
                                                      516  Continuances...............     05/23/79     05/18/81
                                                      518  Effective Date of Decision.     05/23/79     05/18/81
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                               Shasta County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
IV--Procedure Before the Hearing Board...             4.1  Appl. Sections of the           11/21/86     04/12/89
                                                            Health & Safety Code.                               
                                                      4.2  General....................     07/19/74     08/22/77
                                                      4.3  Filing Petitions...........     07/19/74     08/22/77
                                                      4.4  Hearing Board Fees.........     05/20/82     08/22/77
                                                      4.5  Contents of Petitions......     10/13/77     11/14/78
                                                      4.6  Petitions for Variances....     10/13/77     11/14/78
                                                      4.8  Contents of Notice of           07/19/74     08/22/77
                                                            Appeal.                                             
                                                      4.9  Failure to Comply with          07/19/74     08/22/77
                                                            Rules.                                              
                                                     4.10  Answers....................     07/19/74     08/22/77
                                                     4.15  Rules of Evidence and           07/19/74     08/22/77
                                                            Procedure.                                          
                                                     4.23  Additional Rules...........     07/19/74     08/22/77
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                South Coast AQMD                                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             303  Hearing Board Fees.........     02/03/83     11/18/83
V--Procedure Before the Hearing Board....             501  Procedure Before the            02/10/76     06/14/78
                                                            Hearing Board--General.                             
                                                    501.1  Assistance to Small             12/17/79     09/28/81
                                                            Business.                                           
                                                      502  Filing Petitions...........     07/19/83     02/01/84
                                                      503  Contents of Petitions           06/22/78     03/28/79
                                                            (Deletion).                                         
                                                      504  Petitions for Variances and     10/23/81     07/06/82
                                                            Appeals.                                            
                                                    504.1  Rules from which Variances      10/23/81     07/06/82
                                                            are not Allowed.                                    
                                                      505  Appeal from Denial              12/17/79     09/28/81
                                                            (Deletion).                                         
                                                      506  Failure to Comply with          02/10/76     06/14/78
                                                            Rules.                                              
                                                      507  Pleading...................     02/10/76     06/14/78
                                                      508  Dismissal of Petition......     02/10/76     06/14/78
                                                      509  Place of Hearing...........     02/10/76     06/14/78
                                                      510  Notice of Hearing..........     02/10/76     06/14/78
                                                      511  Evidence...................     02/10/76     06/14/78
                                                    511.1  Subpoenas..................     02/10/76     06/14/78
                                                    512.1  Prehearing Conference......     02/10/76     06/14/78
                                                      513  Administrative Notice......     02/10/76     06/14/78
                                                      514  Continuances...............     02/10/76     06/14/78
                                                      515  Decision (Deletion)........     02/10/76     06/14/78
                                                      516  Findings and Decision......     02/10/76     06/14/78
                                                      517  Emergency Variance              02/10/76     06/14/78
                                                            Procedures--Breakdowns.                             
                                                      518  Findings (Deletion)........     02/10/76     06/14/78
VIII--Orders for Abatement...............             801  Order for Abatement--           02/10/76     06/14/78
                                                            General.                                            

[[Page 38679]]

                                                                                                                
                                                      802  Order for Abatement........     08/02/76     06/14/78
                                                      803  Filing Petitions...........     02/10/76     06/14/78
                                                      804  Contents of Petitions......     02/10/76     06/14/78
                                                      805  Scope of Order.............     08/02/76     06/14/78
                                                      806  Findings...................     08/02/76     06/14/78
                                                      807  Pleading...................     02/10/76     06/14/78
                                                      808  Evidence...................     02/10/76     06/14/78
                                                      809  Failure to Comply with          02/10/76     06/14/78
                                                            Rules.                                              
                                                      810  Withdrawal of Petition.....     02/10/76     06/14/78
                                                      811  Place of Hearing...........     02/10/76     06/14/78
                                                      812  Notice of Hearing..........     02/10/76     06/14/78
                                                      813  Preliminary Matters........     08/02/76     06/14/78
                                                      814  Official Notice............     02/10/76     06/14/78
                                                      815  Continuance................     02/10/76     06/14/78
                                                      816  Order and Decision.........     08/02/76     06/14/78
                                                      817  Effective Date of Decision.     02/10/76     06/14/78
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                             Stanislaus County APCD                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................             301  Permit fees................     03/28/81     06/18/82
                                                      302  Permit Fee Schedules.......     11/08/82     06/01/83
                                                      303  Analysis Fees..............     06/30/72     09/22/72
                                                      304  Technical Report-Charges        06/30/72     09/22/72
                                                            for.                                                
                                                      305  Hearing Board Fees.........     07/25/80     12/09/81
V--Procedure Before the Hearing Board....             501  Appl. Articles of the           08/02/76     08/22/77
                                                            Health & Safety Code.                               
                                                      502  General....................     06/30/72     09/22/72
                                                      503  Filing Petitions...........     08/06/82     11/10/82
                                                      504  Contents of Petitions......     08/02/76     08/22/77
                                                      505  Petitions for Variances....     06/30/72     09/22/77
                                                      506  Appeal for Denial..........     06/30/72     09/22/72
                                                      507  Failure to Comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                      508  Answers....................     06/30/72     09/22/72
                                                      509  Dismissal of Petition......     06/30/72     09/22/72
                                                      510  Place of Hearing...........     06/30/72     09/22/72
                                                      511  Notice of Hearing..........     08/02/76     08/22/77
                                                      512  Evidence...................     06/30/72     09/22/72
                                                      513  Preliminary Matters........     06/30/72     09/22/72
                                                      514  Official Notice............     06/30/72     09/22/72
                                                      515  Continuances...............     06/30/72     09/22/72
                                                      516  Decision...................     06/30/72     09/22/72
                                                      517  Effective Date of Decision.     06/30/72     09/22/72
                                                      519  Emergency Variance.........     05/23/79     06/18/82
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                               Sutter County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
V--Hearing Board & Procedures............             5.0  General....................     01/28/81     04/12/82
                                                      5.1  Hearing Board..............     01/28/81     04/12/82
                                                      5.2  Procedures.................     01/28/81     04/12/82
                                                      5.3  Hearings...................     01/28/81     04/12/82
                                                      5.4  Contents of Petitions for       01/28/81     04/12/82
                                                            Hearings.                                           
                                                      5.5  Request for Variances......     01/28/81     04/12/82
                                                      5.6  Appeal from Denial.........     01/28/81     04/12/82
                                                      5.7  Failure to Comply with          01/28/81     04/12/82
                                                            Rules.                                              
                                                      5.8  Answers....................     01/28/81     04/12/82
                                                      5.9  Dismissal of Request for        01/28/81     04/12/82
                                                            Hearing.                                            
                                                     5.10  Place of Hearing...........     01/28/81     04/12/82
                                                     5.11  Notice of Hearing..........     01/28/81     04/12/82
                                                     5.12  Evidence...................     01/28/81     04/12/82
                                                     5.13  Preliminary Matters........     01/28/81     04/12/82
                                                     5.14  Official Notice............     01/28/81     04/12/82
                                                     5.15  Continuances...............     01/28/81     04/12/82
                                                     5.16  Decision...................     01/28/81     04/12/82
                                                     5.17  Effective Date of Decision.     01/28/81     04/12/82
                                                     5.19  Record of Hearing..........     01/28/81     04/12/82
VI--Variances............................             6.0  Variance Applicability.....     01/28/81     04/12/82
                                                      6.1  Interim Variances..........     01/28/81     04/12/82
                                                      6.2  Limitation on Granting          01/28/81     04/12/82
                                                            Variance.                                           
                                                      6.3  Board's Auth. to Impose         01/28/81     04/12/82
                                                            Req. on Variances.                                  

[[Page 38680]]

                                                                                                                
                                                      6.4  Cash Bond..................     01/28/81     04/12/82
                                                      6.5  Modifying or Revoking           01/28/81     04/12/82
                                                            Variances.                                          
                                                      6.6  Variance Time Period.......     01/28/81     04/12/82
                                                      6.7  Variance Action............     01/28/81     04/12/82
VII--Fees................................             7.0  Hearing Board Fee..........     01/28/81     04/12/82
                                                      7.1  Analysis Fee...............     01/28/81     04/12/82
                                                      7.2  Technical Report Fee.......     01/28/81     04/12/82
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                               Tehama County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Reg V--Procedure Before the Hearing Board             5.1  Appl. Articles of the           02/21/72     05/31/72
                                                            Health & Safety Code.                               
                                                      5.2  General....................     02/10/86     02/03/87
                                                      5.3  Filing Petitions...........     02/10/86     02/03/87
                                                      5.6  Contents of Petitions......     02/10/86     02/03/87
                                                      5.7  Petitions for Variance.....     02/10/86     02/03/87
                                                      5.8  Petition for Abatement          02/10/86     02/03/87
                                                            Order.                                              
                                                      5.9  Failure to Comply with          02/10/86     02/03/87
                                                            Rules Service of Notices.                           
                                                     5.11  Answers....................     02/10/86     02/03/87
                                                     5.12  Withdrawal of Petitions....     02/10/86     02/03/87
                                                     5.13  Place of Hearing...........     02/10/86     02/03/87
                                                     5.15  Rules of Evidence &             02/10/86     02/03/87
                                                            Procedures.                                         
                                                     5.16  Preliminary Matters........     02/10/86     02/03/87
                                                     5.17  Official Notice............     02/10/86     02/03/87
                                                     5.18  Continuances...............     02/10/86     02/03/87
                                                     5.20  Effective Date of Decision.     02/10/86     02/03/87
                                                     5.21  Issuance of Subpoenas:          02/10/86     02/03/87
                                                            Subpoenas Duces Tecum.                              
                                                     5.22  Confidential Information...     02/10/86     02/03/87
                                                     5.23  Additional Rule                 02/10/86     02/03/87
                                                            Implementation plans                                
                                                            Agricultural Burning.                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                               Tulare County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
I--General Provisions....................             105  Order for Abatement........     11/10/76     09/21/77
III--Fees................................             301  Permit Fee.................     10/15/79     12/09/81
                                                      302  Permit Fee Schedules.......     10/15/79     12/09/81
                                                      303  Analysis Fees..............     06/30/72     09/22/72
                                                      304  Technical Reports--Charges      06/30/72     09/22/72
                                                            For.                                                
                                                      305  Hearing Board Fees.........     11/10/76     09/21/77
V--Procedure Before the Hearing Board....             501  Applicable Articles of the      06/30/72     09/22/72
                                                            Health.                                             
                                                      502  General....................     06/30/72     09/22/72
                                                      503  Filing Petitions...........     10/23/74     08/22/77
                                                      504  Contents of Petitions......     10/23/74     08/22/77
                                                      505  Petitions for Variances....     10/23/74     08/22/77
                                                      506  Appeal for Denial..........     06/30/72     09/22/72
                                                      507  Failure to Comply with          06/30/72     09/22/72
                                                            Rules.                                              
                                                      508  Answers....................     06/30/72     09/22/72
                                                      509  Dismissal of Petition......     06
FR Doc. 96-18834 Correction of Implementation Plans; American Samoa, Arizona, California, Hawaii, and Nevada State Implementation Plans
/30/72     09/22/72
                                                      510  Place of Hearing...........     06/30/72     09/22/72
                                                      511  Notice of Hearing..........     06/30/72     09/22/72
                                                      512  Evidence...................     06/30/72     09/22/72
                                                      513  Preliminary Matters........     06/30/72     09/22/72
                                                      514  Official Notice............     06/30/72     09/22/72
                                                      515  Continuances...............     10/23/74     08/22/77
                                                      516  Decision...................     06/30/72     09/22/72
                                                      517  Effective Date of Decision.     06/30/72     09/22/72
                                                      518  Lack of Permit.............     06/30/72     09/22/72
                                                      519  Emergency Variance.........     10/23/74     08/22/77
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                              Tuolumne County APCD                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
V--Permit to Operate Part D..............             516  Emergency Variance              10/23/81     05/27/82
                                                            Procedures.                                         
VI--Fees.................................             601  Permit Fee.................     02/10/77     12/06/79
                                                      602  Permit Fee Schedules.......     02/10/77     12/06/79
                                                      603  Analysis Fee...............     02/10/77     12/06/79
                                                      604  Technical Reports..........     02/10/77     12/06/79
                                                      605  Hearing Board Fees.........     02/10/77     12/06/79
VII--Procedure Before the Hearing Board..             700  Applicable Articles of the      02/10/77     12/06/79
                                                            Health.                                             

[[Page 38681]]

                                                                                                                
                                                      701  General....................     02/10/77     12/06/79
                                                      702  Filing Petitions...........     02/10/77     12/06/79
                                                      703  Contents of Petitions......     02/10/77     12/06/79
                                                      704  Petitions for Variances....     10/23/81     05/27/82
                                                      705  Appeal for Denial..........     02/10/77     12/06/79
                                                      706  Failure to Comply with          02/10/77     12/06/79
                                                            Rules.                                              
                                                      707  Answers....................     02/10/77     12/06/79
                                                      708  Dismissal of Petition......     02/10/77     12/06/79
                                                      709  Place of Hearing...........     02/10/77     12/06/79
                                                      710  Notice of Hearing..........     02/10/77     12/06/79
                                                      711  Evidence...................     02/10/77     12/06/79
                                                      712  Preliminary Matters........     02/10/77     12/06/79
                                                      713  Official Notice............     02/10/77     12/06/79
                                                      714  Continuances...............     02/10/77     12/06/79
                                                      715  Decision...................     02/10/77     12/06/79
                                                      716  Effective Date of Decision.     02/10/77     12/06/79
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                              Ventura County APCD                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
III--Fees................................              40  Fees-General...............     05/23/79     06/18/82
                                                       41  Hearing Board Fees.........     07/19/83     02/01/84
                                                       42  Permit Fees................     10/23/81     06/18/82
                                                       43  Technical Reports--Charges      04/21/76     08/15/77
                                                            for.                                                
VII--Procedure Before the Hearing Board..             110  General....................     05/23/79     06/18/82
                                                      111  Filing Petitions...........     05/23/79     06/18/82
                                                      112  Contents of Petitions......     05/23/79     06/18/82
                                                      113  Petitions for Variances....     05/23/79     06/18/82
                                                      114  Appeal from Denial,             05/23/79     06/18/82
                                                            Suspension, Conditional                             
                                                            Approval.                                           
                                                      115  Petitions for Abatement         11/10/76     08/15/77
                                                            Orders or Revocation of                             
                                                            Permits.                                            
                                                      116  Failure to Comply with          11/10/76     08/15/77
                                                            Rules.                                              
                                                      117  Answers....................     11/10/76     08/15/77
                                                      118  Dismissal of Petition......     11/10/76     08/15/77
                                                      119  Place of Hearing...........     11/10/76     08/15/77
                                                      120  Notice of Hearing..........     05/23/79     06/18/82
                                                      121  Evidence...................     05/23/79     06/18/82
                                                      122  Official Notice............     11/10/76     08/15/77
                                                      123  Findings,Variance or            05/23/79     06/18/82
                                                            Abatement Order.                                    
                                                      124  Decision...................     05/23/79     06/18/82
                                                      125  Abatement Order............     05/23/79     06/18/82
                                                      126  Effective Date of Decision.     05/23/79     06/18/82
                                                      128  Compensation-Hearing Board      11/10/76     08/15/77
                                                            Members.                                            
                                                      129  Burden of Proof............     11/10/76     08/15/77
                                                      130  Variance Order Conditions..     05/23/79     06/18/82
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                             Yolo-Solano County APCD                                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
IV--Fees.................................                                                                       
                                                      4.1  Authority to Construct Fees     05/20/82     11/10/82
                                                      4.2  Permit to Operate Fees.....     05/20/82     11/10/82
                                                      4.3  Hearing Board Fees.........     10/15/79     01/26/82
                                                      4.4  Analysis Fees..............     07/25/73     06/14/78
                                                      4.5  Technical Reports-Charges..     07/25/73     06/14/78
V--Procedure Before the Hearing Board....                                                                       
                                                      5.1  Appl. Articles of the           06/22/78     01/29/79
                                                            Health & Safety Code.                               
                                                      5.2  General....................     07/25/73     06/14/78
                                                      5.3  Filing Petitions...........     07/25/73     06/14/78
                                                      5.4  Contents of Petitions......     02/25/80     01/26/82
                                                      5.5  Petitions for Variances....     07/25/73     06/14/78
                                                      5.6  Appeal of Denial...........     07/19/74     06/14/78
                                                      5.7  Failure to Comply with          07/25/73     06/14/78
                                                            Rules.                                              
                                                      5.8  Answers....................     07/25/73     06/14/78
                                                      5.9  Dismissal of Petition......     07/25/73     06/14/78
                                                     5.10  Place of Hearing...........     06/22/78     01/29/78
                                                     5.11  Notice of Hearing..........     06/22/78     01/29/79
                                                     5.12  Evidence...................     07/19/74     06/14/78
                                                     5.13  Preliminary Matters........     07/25/73     06/14/78
                                                     5.14  Official Notice............     07/25/73     06/14/78
                                                     5.15  Continuances...............     07/25/73     06/14/78

[[Page 38682]]

                                                                                                                
                                                     5.16  Decision...................     07/25/73     06/14/78
                                                     5.17  Effective Date of Decision.     07/25/73     06/14/78
----------------------------------------------------------------------------------------------------------------

                                                 State of Hawaii                                                
----------------------------------------------------------------------------------------------------------------
                                                                                                       Approval 
                Regulation                    Rule No.              Rule name           Submit date      date   
----------------------------------------------------------------------------------------------------------------
Specific Variances.......................        11-60-36  Variances..................     12/20/82     08/18/83
Ch. 43, Sec. 7...........................  ..............  Variances..................     01/28/72     05/31/72
                                                           Variances..................     09/12/78     04/23/79
Ch. 43, Sec. 7...........................  ..............  A Variance of the Hawaii        04/06/82     09/30/82
                                                            Public Health Regs.                                 
----------------------------------------------------------------------------------------------------------------

                                                 American Samoa                                                 
----------------------------------------------------------------------------------------------------------------
                                                                                                       Approval 
                Regulation                    Rule No.              Rule name           Submit date      date   
----------------------------------------------------------------------------------------------------------------
Ch. 35.01................................  ..............  Environmental Quality Act..                          
----------------------------------------------------------------------------------------------------------------

                                                 State of Nevada                                                
----------------------------------------------------------------------------------------------------------------
                                                                                                       Approval 
                Regulation                    Rule No.              Rule name           Submit date      date   
----------------------------------------------------------------------------------------------------------------
                            Nevada Department of Conservation and Natural Resources                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
State Regs...............................             2.8  Administrative Fines.......     01/28/72     05/31/72
                                                     2.11  Variances..................     01/28/72     05/31/72
Statutes.................................         445.506  Variances: Conditions,          12/29/78     07/10/80
                                                            Criteria for Granting                               
                                                            Variance.                                           
                                                  445.511  Renewal, Protest & Hearing      12/29/78     07/10/80
                                                            on Application.                                     
                                                  445.516  Limitations on Duration;        12/29/78     07/10/80
                                                            Annual Review.                                      
                                                  445.521  Granting, Renewal of            12/29/78     07/10/80
                                                            Variance Discretionary.                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                   Clark County                                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
VII--Hearing Board.......................        7.1-7.13  Hearing Board..............     11/17/81     06/18/82
                                                     7.14  Request for Variances......     11/17/81     06/18/82
                                                     7.15  Renewals of Variances......     11/17/81     06/18/82
                                                     7.16  Duration of Variance.......     11/17/81     06/18/82
                                                7.17-7.19  Hearing Board..............     11/17/81     06/18/82
IX--Admin................................             9.1  Administrative Fines.......     11/17/81     06/18/82
Fines....................................         9.2-9.3  Administrative Fines.......     07/24/79     08/27/81
----------------------------------------------------------------------------------------------------------------

[FR Doc. 96-18834 Filed 7-24-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-18774 Acquisition Regulation; Department of Energy Management and Operating Contracts.
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38701-38702]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18774]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

48 CFR Parts 917, 950, 952 and 970

RIN 1991-AB-09

Acquisition Regulation; Department of Energy Management and 
Operating Contracts.

AGENCY: Department of Energy.

ACTION: Proposed rule; supplemental notice.

-----------------------------------------------------------------------

SUMMARY: On June 24, 1996, the Department of Energy (DOE or Department) 
published a notice of proposed rulemaking (61 FR 32588) (DOE-NOPR) to 
amend the Department of Energy Acquisition Regulation (DEAR) to 
incorporate certain contract reform initiatives. Among the contract 
reform initiatives contained in the DOE-NOPR was a proposal to amend 
the DEAR to address the treatment of costs which its management and 
operating contractors incur in proceedings involving qui tam actions. 
On June 20, 1996, the Civilian Agency Acquisition Council and the 
Defense Acquisition Council published a notice of proposed rulemaking 
(61 FR 31790) (FAR-NOPR) to amend the Federal Acquisition Regulation 
(FAR) to address the same issue. This notice solicits comments on 
whether the Department should adopt the FAR approach, instead of its 
originally proposed approach, in addressing legal costs incurred in 
connection with qui tam actions in which the Government does not 
intervene.

DATES: Written comments on the issue presented in this notice and on 
the DOE-NOPR must be submitted by August 23, 1996.

ADDRESSES: All comments are to be submitted to Connie P. Fournier, 
Office of Policy (HR-51), Department of Energy, 1000 Independence 
Avenue, SW., Washington, DC. 20585, (202) 586-8245; (202) 586-0545 
(facsimile); [email protected] (Internet).
    The administrative record regarding this rulemaking that is on file 
for public inspection, to include a copy of the transcript of the 
public hearing scheduled for August 1st at the Department's 
Independence Avenue address, and any additional public comments 
received, is located in the Department's Freedom of Information Reading 
Room, Room 1E-190, 1000 Independence Avenue, SW., Washington, DC 20585.

FOR FURTHER INFORMATION CONTACT: Connie P. Fournier, Office of Policy 
(HR-51), Department of Energy, 1000 Independence Avenue, SW., 
Washington, DC 20585, (202) 586-8245.

SUPPLEMENTARY INFORMATION: On June 24, 1996, DOE published a NOPR to 
amend the Department of Energy Acquisition Regulation (DEAR) to 
incorporate certain contract reform initiatives. Among the Department-
wide contract reform initiatives contained in the DOE-NOPR was a 
proposal to amend DEAR 970.5204-61, Cost Prohibitions Related to Legal 
and Other Proceedings, to add a new paragraph (h). The proposal 
addresses the treatment of management and operating contractor costs 
incurred in proceedings involving qui tam actions under the False 
Claims Act, 31 U.S.C. 3730, alleging fraud against the Government, 
which are not covered by the existing provisions of that clause.
    On June 20, while the Department was waiting for its own proposal 
to be published, the Civilian Agency Acquisition Council and the 
Defense Acquisition Council published a notice of proposed rulemaking 
that addresses the same issue. The FAR-NOPR approach would amend the 
cost principle at FAR 31.205-47 by amending paragraph (b), creating a 
new subparagraph (c)(2), and amending subparagraph (e)(3). Except for 
the change in existing policy contained in (e)(3), which goes beyond 
qui tam cases, the DOE-NOPR and FAR-NOPR approaches would have the same 
result. Both approaches would make legal costs connected with qui tam 
actions which result in a judgment against the contractor an 
unallowable cost, and both approaches authorize the contracting officer 
to make provisional or conditional reimbursement pending the outcome of 
a case. The only difference occurs in the event of a

[[Page 38702]]

settlement agreement, where the FAR-NOPR approach would only allow 80% 
of the contractor's costs to be reimbursed, even if the settlement 
agreement provides for full reimbursement.
    The Department is considering switching to the FAR-NOPR approach 
and amending existing paragraphs in its clause, rather than creating a 
new stand-alone paragraph. DOE urges interested members of the public 
to comment on the two approaches and whether the Department should 
adopt the FAR approach in its final rulemaking.

    Issued in Washington, DC on July 18, 1996.
Richard H. Hopf,
Deputy Assistant Secretary for Procurement and Assistance Management.
[FR Doc. 96-18774 Filed 7-24 -96; 8:45 am]
BILLING CODE 6450-01-P

Complete official Federal Register PDF

FR Doc. 96-18685 Endangered and Threatened Wildlife and Plants; Notice of Six Month Extension on the Proposed Rule to List the Barton Springs Salamander as an Endangered Species
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38702-38703]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18685]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Fish and Wildlife Service

50 CFR Part 17

RIN 1018-AC22

Endangered and Threatened Wildlife and Plants; Notice of Six 
Month Extension on the Proposed Rule to List the Barton Springs 
Salamander as an Endangered Species

AGENCY: Fish and Wildlife Service, Interior.

ACTION: Proposed rule; notice of extension.

-----------------------------------------------------------------------

SUMMARY: The U.S. Fish and Wildlife Service (Service) gives notice that 
the deadline to determine whether the Barton Springs salamander 
(Eurycea sosorum) is an endangered species under the Endangered Species 
Act of 1973 (Act), as amended, is extended for a period not to exceed 
August 30, 1996.

DATES: The new deadline for final action on the proposed listing of the 
Barton Springs salamander as an endangered species is August 30, 1996. 
The public comment period on this proposed listing was closed on July 
10, 1996 by virtue of an order issued on that date by the United States 
District Court for the Western District of Texas.

ADDRESSES: Inquiries regarding the proposed listing should be sent to 
the U.S. Fish and Wildlife Service, Austin Ecological Services Field 
Office, 10711 Burnet Road, Suite 200, Austin, Texas 78758. Comments and 
materials received will be available for public inspection, by 
appointment, during normal business hours at the above address.

FOR FURTHER INFORMATION CONTACT: Field Supervisor, U.S. Fish and 
Wildlife Service, Ecological Services, 10711, Burnet Road, Suite 200, 
Austin, Texas 78758 (512) 490-0057, facsimile (512) 490-0974.

SUPPLEMENTARY INFORMATION:

Background

    The Service published a proposed rule to list the Barton Springs 
salamander as an endangered species on February 17, 1994 (59 FR 7968). 
As set forth in the proposal, the primary threat to this species is 
contamination of the waters that supply Barton Springs by potential 
catastrophic events and chronic degradation resulting from urban 
activities. Also of concern are disturbances to the salamander's above-
ground springhead habitats (the waters in Barton Springs, Eliza Pool, 
and Sunken Garden Springs) and reduced groundwater supplies resulting 
from increased groundwater withdrawal.
    The comment period on the proposed listing originally closed April 
18, 1994. It was reopened May 26, 1994 and closed July 1, 1994 (59 FR 
27257; May 26, 1994). On March 19, 1995, the Service published a notice 
extending the deadline for final action on this proposed listing for a 
period of up to six months and the public comment period was reopened 
until May 17, 1995 (60 FR 13105). The notice indicated this extension 
was necessary because, ``during the comment periods and subsequent to 
the close of comment on this proposal, the Service received 
recommendations and information relevant to a final decision on the 
listing of the salamander. In order to adequately incorporate all 
pertinent information in the deliberation leading

[[Page 38703]]

to a decision and to ensure an opportunity for public comment on as 
complete an administrative record as possible, the deadline for final 
action on this proposal is being extended and the comment period 
reopened'' (60 FR 13105).
    In the July 10, 1996, Order of United States District Court for the 
Western District of Texas (``July 10 Order''), the court found that, 
``the extension was not valid because an extension under the ESA can 
only be granted by the Secretary based on a finding that there is 
substantial disagreement regarding the sufficiency and accuracy of the 
available data upon which the listing decision is to be made.'' 
Specifically, the court found that the need to consider a report by the 
Barton Springs/Edwards Aquifer Conservation District did not justify 
the extension. The court found that ``Congress determined that there 
must be substantial scientific disagreement in order to warrant an 
extension * * *.'' However, the Act indicates ``substantial 
disagreement'' is necessary for a six month extension to be appropriate 
and does not specify that disagreement must be scientific. In that the 
inadequacy of existing regulatory mechanisms is one of the five 
elements which the Service must consider in determining whether to list 
a species, 16 U.S.C. 1533(a)(1)(D), the Service believes that 
substantial disagreement concerning this aspect of the listing decision 
constitutes a valid basis for a six month extension since data 
regarding that element is ``relevant to the determination * * * 
concerned * * *.'' 16 U.S.C. 1533(b)(6)(B)(i).
    The court ordered the Secretary to make a decision whether to list 
the salamander as endangered, withdraw the listing, or extend the time 
to make a decision by no more than six months. The Secretary now finds 
that there exists substantial disagreement regarding the sufficiency or 
accuracy of the data regarding the inadequacy of existing regulatory 
mechanisms upon which the listing decision is to be made.
    The court anticipated the possibility that the Secretary might opt 
for a six month extension and specified a method by which the six 
months should be calculated for the purposes of this listing. The court 
instructed the Secretary that in the event such an extension was deemed 
warranted, that, ``the six month period began on February 17, 1995, 
(the date upon which the Secretary was to make some determination) and 
continues until April 10, 1995 (the starting date of the moratorium--54 
days). The six month period commenced again on April 26, 1996, when the 
President waived the budget moratorium. Therefore, the six month 
extension, if invoked, expires on August 30, 1996'' July 10 Order at 7. 
Since the Southwest Region identified processing the final 
determination for the Barton Springs salamander as its highest priority 
under the listing priority guidance (61 FR 24722; May 16, 1996), the 
Service intends to issue a final determination by August 30, 1996.
    Section 4(b)(6)(I) of the Act indicates that the Secretary may 
extend the one year period following proposal for six months ``for 
purposes of soliciting additional data.'' The Service is unable to 
solicit additional data at this time since the court has ordered the 
comment period, which the Service reopened on June 24, 1996 (61 FR 
32413), closed effective July 10, 1996, the date of its order. At the 
time the Service reopened the comment period, however, it justified 
that action by noting the need to obtain additional information on 
``proposed regulatory protection under State authorities including 
water quality protection zones, nonpoint source pollution programs, 
monitoring, and Edwards Aquifer-specific actions * * *. To evaluate 
effectively whether the existing regulatory structure may adequately 
protect the species, the Service must obtain further information on 
these developments'' (61 FR 32414). The Service also reprinted two 
letters, one from the Texas Natural Resources Conservation Commission 
and one from Valarie Bristol, Travis County Commissioner, requesting 
the comment period be reopened and noting regulatory initiatives 
concerning which information should be gathered. In the notice 
reopening the comment period, the Service advised interested parties to 
submit any information as soon as possible because the comment period 
might be closed by the courts without advance notice. As described 
previously, the U.S. District Court for the Western District of Texas 
did order the comment period closed on July 10, 1996. However, during 
the two weeks the comment period was open, the Service received five 
comment letters, including comments from three Texas state regulatory 
agencies. Three of these comments referred specifically to the adequacy 
of existing regulatory mechanisms. Therefore, while the Service will 
not be able to seek additional information subsequent to the finding 
the Secretary makes today, the Service believes the public was given an 
opportunity to provide additional information in the very recent past. 
During the next several weeks, the information received during the 
comment period will be analyzed and the comments responded to in the 
final decision document, thus fulfilling the goal of the six month 
extension and assuring that the Service will appropriately evaluate the 
five factors provided in section 4 of the Act. Such consideration would 
not be possible if the Service were to make a final decision regarding 
the proposal to list the Barton Springs salamander as endangered by 
July 23, 1996, as required by the July 10 Order in the absence of a six 
month extension.

Authority

    The authority for this action is the Endangered Species Act of 
1973, as amended (16 U.S.C. 1531 et seq.).

    Dated: July 18, 1996.
John G. Rogers,
Acting Director, U.S. Fish and Wildlife Service.
[FR Doc. 96-18685 Filed 7-24-96; 8:45 am]
BILLING CODE 4310-55-P

Complete official Federal Register PDF

FR Doc. 96-18650 Clean Air Act Approval and Promulgation of Carbon Monoxide Implementation Plan for the State of Washington: Puget Sound Attainment Demonstration
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38683-38684]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18650]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[WA47-7120b; FRL-5538-4]

Clean Air Act Approval and Promulgation of Carbon Monoxide 
Implementation Plan for the State of Washington: Puget Sound Attainment 
Demonstration

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: EPA proposes to approve the attainment demonstration portion 
of the State Implementation Plan (SIP) revision submitted by the State 
of Washington Department of Ecology, as part of its Puget Sound 
nonattainment area carbon monoxide (CO) attainment plan.
    In the Final Rules section of this Federal Register, EPA is 
approving the attainment demonstration portion of the Puget Sound area 
CO SIP revision as a direct final rule. A detailed rationale for the 
action is set forth in the direct final rule. If no adverse comments 
are received in response to that direct final rule, no further activity 
is contemplated in relation to this proposed rule. If EPA receives 
adverse comments, the direct final rule will be withdrawn and all 
public comments received will be addressed in a subsequent final rule 
based on this proposed rule. EPA will not institute a second comment 
period on this document. Any parties

[[Page 38684]]

interested in commenting on this document should do so at this time.

DATES: Comments must be submitted by August 26, 1996.

ADDRESSES: Written comments should be addressed to: Montel Livingston, 
SIP Manager, Office of Air Quality (OAQ-107), EPA, 1200 Sixth Avenue, 
Seattle, Washington 98101. Documents which are incorporated by 
reference are available for public inspection at the Air and Radiation 
Docket and Information Center, Environmental Protection Agency, 401 M 
Street SW, Washington, D.C. 20460. Copies of material submitted to EPA 
may be examined during normal business hours at the following 
locations: EPA Region 10, Office of Air Quality, 1200 Sixth Avenue 
(OAQ-107), Seattle, Washington 98101; Washington Department of Ecology, 
Attention Tami Dahlgren, Olympia, Washington 98504-7600, telephone 
(360)407-6830; and the Puget Sound Air Pollution Control Authority, 110 
Union Street, Suite 500, Seattle, Washington 98101-2038.

FOR FURTHER INFORMATION CONTACT: William M. Hedgebeth, EPA Region 10, 
Office of Air Quality, 1200 Sixth Avenue, M/S OAQ-107, Seattle, 
Washington 98101, (206) 553-7369.

SUPPLEMENTARY INFORMATION: See the information provided in the Direct 
Final action which is located in the Rules Section of this Federal 
Register.

    Dated: July 2, 1996.
Chuck Clarke,
Regional Administrator.
[FR Doc. 96-18650 Filed 7-24-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-18648 Illinois; Air Quality Implementation Plans
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Page 38683]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18648]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[IL114-1-6788b; FRL-5540-9]

Illinois; Air Quality Implementation Plans

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The EPA proposes to approve the State Implementation Plan 
(SIP) revision request submitted by the State of Illinois on May 5, 
1995, and May 31, 1995, which establishes regulations for motor vehicle 
refinishing operations in the Chicago and Metro-East ozone 
nonattainment areas. In the final rules section of this Federal 
Register, the EPA is approving this action as a direct final rule 
without prior proposal because EPA views this as a noncontroversial 
action and anticipates no adverse comments. A detailed rationale for 
the approval is set forth in the direct final rule. If no adverse 
comments are received in response to that direct final rule, no further 
activity is contemplated in relation to this proposed rule. If EPA 
receives adverse comments, the direct final rule will be withdrawn and 
all public comments received will be addressed in a subsequent final 
rule based on the proposed rule. Any parties interested in commenting 
on this document should do so at this time.

DATES: Comments on this proposed rule must be received on or before 
August 26, 1996.

ADDRESSES: Written comments should be mailed to: J. Elmer Bortzer, 
Chief, Regulation Development Section, Air Programs Branch (AR18-J), 
Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, 
Chicago, Illinois 60604.
    Copies of the State submittal are available for inspection at: 
Regulation Development Section, Air Programs Branch (AR18-J), 
Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, 
Chicago, Illinois 60604.

FOR FURTHER INFORMATION CONTACT: Mark J. Palermo, Regulation 
Development Section, Air Programs Branch (AR-18J), Environmental 
Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago, 
Illinois 60604, (312) 886-6082.

SUPPLEMENTARY INFORMATION: For additional information see the direct 
final rule published in the rules section of this Federal Register.

    Dated: July 3, 1996.
Valdas V. Adamkus,
Regional Administrator.
[FR Doc. 96-18648 Filed 7-24-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-18532 Financial Responsibility Requirements for Licensed Launch Activities
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38992-39021]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18532]

[[Page 38991]]

_______________________________________________________________________

Part III

Department of Transportation

_______________________________________________________________________

Federal Aviation Administration

_______________________________________________________________________

14 CFR Part 440

Financial Responsibility Requirements for Licensed Launch Activities; 
Proposed Rule

Federal Register / Vol. 61, No. 144 / Thursday, July 25, 1996 / 
Proposed Rules

[[Page 38992]]

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 440

[Docket 28635; Notice 96-8]
RIN 2120-AF98

Financial Responsibility Requirements for Licensed Launch 
Activities

AGENCY: Federal Aviation Administration, Associate Administrator for 
Commercial Space Transportation, DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Associate Administrator for Commercial Space 
Transportation of the Federal Aviation Administration (FAA) currently 
prescribes financial responsibility requirements for licensees 
authorized to conduct commercial space launch activities on a case-by-
case basis, after analyzing the risks associated with licensed 
activities. This proposed rulemaking would codify the Associate 
Administrator's approach to implementing these requirements in rules of 
general applicability. Specifically, the proposed regulations would 
establish how certain risks are allocated among the various launch 
participants and addressed through financial responsibility 
requirements, including statutorily-based reciprocal waivers of claims. 
The proposed regulations would also address eligibility for payment by 
the United States Government of certain third-party claims and this 
Notice requests comments on appropriate means of implementing this 
obligation. The FAA is undertaking this rulemaking initiative to 
implement financial responsibility requirements under the Commercial 
Space Launch Act of 1984, as amended, codified at 49 U.S.C. Subtitle 
IX, ch. 701, Commercial Space Launch Activities.

DATES: Comments must be received by September 23, 1996.

ADDRESSES: Comments should reference the docket number of this notice. 
Commenters should mail four copies of any comments to the FAA Rules 
Docket, Room 915G, Federal Aviation Administration, U.S. Department of 
Transportation, 800 Independence Avenue, SW., Washington, DC 20591. 
Persons wishing to receive acknowledgment of receipt of their comments 
should include a self-addressed, stamped postcard. Copies of materials 
relevant to this rulemaking, including copies of all public comments, 
are kept by the Rules Docket Technician, Room 915G, at the above 
address. The docket is available for inspection between 8:30 a.m. and 5 
p.m., Monday through Friday, excluding Federal holidays.

FOR FURTHER INFORMATION CONTACT: Ms. Esta M. Rosenberg, Attorney-
Advior, Regulations Division, Office of the Chief Counsel, Federal 
Aviation Administration, U.S. Department of Transportation, (202) 366-
9305.

SUPPLEMENTARY INFORMATION:

Background

    The Commercial Space Launch Act of 1984, as amended (the Act), 49 
U.S.C. App. 2601-2623, codified, at 49 U.S.C. Subtitle IX, Commercial 
Space Transportation, ch. 701, Commercial Space Launch Activities, 49 
U.S.C. 70101-70119, authorizes the Secretary of Transportation to 
license and regulate commercial space launches and the commercial 
operation of launch sites carried out within the United States or by 
its citizens. Among the stated purposes of the Act are protection of 
public health and safety, safety of property, and United States 
national security and foreign policy interests, as well as ensuring 
compliance with international treaty obligations of the United States. 
In carrying out the Act, the Secretary is required to encourage, 
promote, and facilitate private sector launch activities. Another 
objective is to facilitate development of a commercial space 
transportation sector that is capable of competing in the international 
market. The Secretary's responsibilities under the Act are carried out 
by the Associate Administrator for Commercial Space Transportation of 
the Federal Aviation Administration (Office). Prior to Fiscal Year 
1996, the Secretary's responsibilies were carried out by the Office of 
Commercial Space Transportation, located within the Office of the 
Secretary of the Department of Transportation (DOT or Department). The 
Commercial Space Transportation Licensing Regulations set forth in 14 
CFR Ch. III remain applicable to regulatory activities administered by 
the Office.

Current Industry Status

    The commercial space industry is expanding and experiencing 
reinvigorated growth with the creation of new technologies and markets. 
U.S. commercial space revenues are estimated at $6.5 billion for 1994 
and prospects are positive for continued growth. As a July 15, 1996, 63 
DOT-licensed launches that have taken place since the first license was 
issued in 1998. Up to three big low earth orbit (LEO) 
telecommunications systems and two little LEO systems are projected for 
launch this decade, resulting in as many as 40 launches and 275 small 
satellites. Many other systems requiring additional launches are being 
planned and may increase projected launch rates.
    The U.S. commercial launch industry is responding to increasing 
demands and heightened international competition with new launch 
concepts and innovative partnerships. In addition to conventional 
suborbital and orbital launches of expendable launch vehicles (ELVs) 
from earth to space, the Office has licensed launches involving a 
variety of innovative space transportation technologies including air-
launched rockets and a reentry vehicle system. The Office has also 
begun discussions with industry on approaches to evaluating new 
reusable launch vehicle and sea-launch technologies. Currently, the 
private sector is conducting launch activities at four Federal launch 
ranges throughout the United States. Five States--Alaska, California, 
Florida, New Mexico, and Virginia--have plans under way for developing 
state-sponsored spaceports.

Evolution of U.S. Commercial Space Transportation Policy.

    The first ten years of the U.S. commercial launch industry have 
been a period of transformation, informed by national policy and world 
events.
    After passage of the Commercial Space Launch Act of 1984, the 
Government instituted policy and legislative initiatives encouraging 
commercial launches. Nevertheless, during this time, in the face of 
competing federal policies favoring maximum use of NASA's Space 
Transportation System and relatively low launch prices for services 
offered by the European launch operator, Arianespace, the U.S. private 
sector appeared reluctant to commit the resources necessary to compete 
for the relatively few launches of commercial satellites then available 
in the international market.
    The commercial launch services market was altered dramatically in 
1986 with the loss of the Space Shuttle Challenger. This event caused 
the United States Government to reverse its policy of reducing reliance 
on ELVs in favor of the Shuttle. On August 15, 1986, President Reagan 
announced a new United States Space Launch Strategy stating that NASA 
would ``no longer be in the business of launching private satellites,'' 
and that the government would be looking to the private sector to 
``become a highly competitive method of launching

[[Page 38993]]

commercial satellites'' and ``clear[ing] away the backlog that has 
built up during this time when our shuttles are being modified.''
    This decision removed the United States Government from direct 
competition with private launch services providers and, because the 
Challenger accident resulted in a backlog of payloads to be launched 
provided a potential market for U.S. launch firms. Shortly thereafter, 
the President initiated a comprehensive review of existing space policy 
for the purpose of providing a clear, unified statement of policy goals 
and directives.
    On February 11, 1988, President Reagan issued a directive on 
National Space Policy that consolidated and updated previous 
Presidential guidance on space activities. The National Space Policy 
recognized for the first time a distinct commercial space sector, 
alongside the military and civilian government sectors, as an integral 
part of an overall national effort to maintain United States space 
leadership. Concurrent with release of the National Space Policy, the 
Administration announced a fifteen-point Commercial Space Initiative 
that reinforced one of the principal objectives of the Act: The 
promotion of a robust commercial launch industry. This objective was to 
be accomplished by, among other things, instituting a more equitable 
allocation of risk between the Government and private sector for 
commercial launch activities at Government ranges. This provision of 
the initiative consisted of two elements: A United States Government 
waiver of claims of property damage to Government property in excess of 
DOT-required insurance; and a United States Government waiver of claims 
covered on DOT-required insurance when loss of injury results from 
Government willful misconduct or recklessness.
    Taken together, these policy initiatives created an environment 
that became more conductive to private investment in and business 
commitments to commercial space launch activities, and Federal agencies 
responded accordingly. Agencies operating United States Government 
launch facilities developed range support agreements to provide for 
commercial use of Government launch property and services in accordance 
with the Act. On April 4, 1988, the Office published DOT's Commercial 
Space Transportation Licensing Regulations, 14 CFR Ch. III, and on June 
22, 1988, issued the first of 33 licenses issued to date.
    Policy guidance supplementing the National Space Policy has been 
formulated to encourage further growth of private sector space 
activities. Most recently, on August 4, 1994, President Clinton 
announced a new National Space Transportation Policy reaffirming the 
Government's commitment to the commercial space transportation industry 
and the Department's critical role in licensing, facilitating and 
promoting commercial launch operations. Under this Policy, the 
Department, along with the Department of Commerce and other agencies as 
appropriate, is charged with developing an implementation plan focusing 
on measures to foster an internationally competitive U.S. launch 
capability. The Department also ensures that U.S. Government space 
technology plans address commercial space launch sector needs.

The 1988 Amendments

General

    The Commercial Space Launch Act Amendments of 1988, Public Law 100-
657 (1988 Amendments), replaced very general insurance requirements 
with a detailed, comprehensive financial responsibility and allocation 
of risk regime for commercial launch activities, including a more 
explicit exposition of the United States Government's risk-related 
rights and obligations. Reaffirmed, as part of the 1988 Amendments, is 
the Department's responsibility to protect United States interests when 
Government property or personnel is involved in supporting licensed 
activities.
    The principal features of the regime include risk-based insurance 
requirements, limited Government payment of certain third-party claims, 
and reciprocal waivers of liability among launch participants. 
Participants in licensed launch activities are protected from 
potentially unlimited liability by: (1) requiring the licensee to 
provide insurance (or otherwise demonstrate financial responsibility) 
based on maximum probable loss determinations that: (a) protects launch 
participants, including the United States Government, from third-party 
liability (in an amount not exceeding the lesser of $500 million or the 
maximum available on the world market at reasonable cost) (49 U.S.C. 
70112(a)), and (b) compensates for damage or loss to United States 
Government property (in an amount not exceeding $100 million) (49 
U.S.C. 70112(a)); and (2) providing for payment by the United States 
Government of successful third-party claims up to $1.5 billion in 
excess of the required amount of third-party liability insurance, 
subject to enactment by Congress of an appropriations law or other 
legislative authority (49 U.S.C. 70113(a)(1)). In addition, the goal of 
allocating risks and costs associated with licensed activities is met 
by requiring participants to enter into reciprocal waivers of claims in 
which each party absorbs certain losses it may sustain as a result of 
licensed activities. 49 U.S.C. 70112(b). Taken together, these 
provisions are intended to achieve a fair allocation among the various 
parties, including the United States Government, of the risks attendant 
to their involvement in commercial launch activities.
    The Office has been implementing the financial responsibility and 
allocation of risk provisions of the 1988 Amendments on a case-by-case 
basis, consistent with the adjudicatory process established by the 
Office in the Commercial Space Transportation Licensing Regulations, 14 
CFR Ch. III. Since early 1989, when the first license was issued after 
the 1988 Amendments became effective, licenses have included a license 
order devoted entirely to insurance and other financial responsibility 
requirements that must be satisfied as conditions of each license. As 
of July 15, 1996, 63 launches have been conducted pursuant to these 
requirements. As a result of this experience, the Office believes that 
many provisions included in license orders may be standardized in rules 
of general applicability. The specific amounts of required insurance 
would be set forth in a license order.
    Although requirements would be standardized, licensees may ask for 
relief from a particular regulatory requirement by petitioning the 
Associate Administrator for Commercial Space Transportation using the 
procedures set forth in Sec. 404.3 of the Commercial Space 
Transportation Licensing Regulations (14 CFR Sec. 404.3).

Allocation of Risk and Payment of Excess Claims Provisions

    The 1988 Amendments focus on two areas of risk allocation: (1) 
Protecting the commercial launch industry against catastrophic losses 
from third-party liability claims; and (2) limiting possible claims 
among launch participants. At the same time, the 1988 Amendments are 
directed at minimizing the potential liability of the United States as 
a launching state under international law; and protecting the United 
States Government, including its agencies, personnel and contractors, 
from liability, loss of injury resulting from the Government's 
participation in commercial launch activities by providing launch 
support to commercial launch services providers.

[[Page 38994]]

    This effort to insulate the United States Government and its 
agencies, personnel and contractors involved in DOT-licensed launch 
activities from a significant measure of exposure to liability, loss or 
injury resulting from licensed activities is important because of the 
Government's liability exposure. This exposure derives from two 
sources. Under international treaty, especially the Treaty on 
Principles Governing the Activities of States in the Exploration and 
Use of Outer Space, including the Moon and Other Celestial Bodies 
(Outer Space Treaty) (entered into force October 1967), and the 
Convention on International Liability for Damage Caused by Space 
Objects (Liability Convention) (entered into force September 1972), the 
United States Government has accepted certain obligations to compensate 
parties outside the United States for damage, including personal injury 
and loss of life, caused by space objects launched from the United 
States or by persons or entities whose activities are supervised or 
overseen by the United States Government. In addition, when the 
Government is involved in private sector launch activities through use 
of its property, facilities, equipment or personnel to support and 
facilitate those activities, the United States Government risks damage 
or injury to its own property and personnel and legal liability for 
other losses. It is the Office's view that, under the 1988 Amendments, 
risk for these losses should be allocated primarily to the 
nongovernmental launch participants, subject to three important 
exceptions, and the statutory requirements for insurance and waivers of 
claims must be construed and implemented to effect this allocation of 
risk. (The term ``nongovernmental'' is used throughout this discussion 
to mean launch participants other than U.S. Government, its agencies, 
contractors and subcontractors, and the employees of each.)
    The three important exceptions are those risks that the U.S. 
Government affirmatively accepts under the Act. They are: (1) The risk 
otherwise borne by the U.S. commercial launch industry of catastrophic 
losses and unlimited liability associated with commercial launch 
activities, up to the statutory limit of $1.5 billion above required 
third-party liability insurance, subject to enactment of legislation, 
49 U.S.C. 70113(a); (2) the risk of property damage or loss to United 
States Government launch property or facilities in excess of required 
insurance, 49 U.S.C. 70112(b)(2); and (3) acceptance of liability for 
death, bodily injury or property damage or loss that results from the 
willful misconduct of the United States Government or its agents, 49 
U.S.C. 70112(e).
    The Office believes that acceptance of these risks by the United 
States Government is necessary in order to accomplish the goals 
underlying the 1988 Amendments; that is for the U.S. commercial launch 
industry to compete effectively against foreign launch services 
providers that offer certain financial assurances from their 
governments,\1\ and to limit the amount of liability insurance that 
must be obtained to protect launch participants without, in industry's 
words, their ``betting the company'' on each launch.
---------------------------------------------------------------------------

    \1\ At the time the 1988 Amendments were enacted, entrants to 
the commercial launch industry expressed deep concern over 
potentially open-ended exposure to liability for damages associated 
with launch activities that could undermine the position of United 
States firms vis-a-vis their foreign competitors. For example, while 
customers of Arianespace benefited from full indemnification by the 
French Government for all third-party liability that exceeded 
required insurance levels of 400 million French francs 
(approximately $65 million in 1988), corresponding protection was 
not available to customers of emerging commercial launch services 
providers in the United States. Consequently, from a commercial 
perspective, foreign launch services providers possessed a 
significant competitive advantage over U.S. firms.
---------------------------------------------------------------------------

    Not surprisingly, the linchpin of the allocation of risk regime in 
industry's view has been the United States Government's agreement to 
protect launch participants against the risk of catastrophic losses and 
unlimited liability associated with commercial launch activities. 
Pursuant to the 1988 Amendments, the Department seeks to provide this 
protection, or so-called ``indemnification,'' by preparing a 
compensation plan that the President submits to Congress for review and 
approval, and, if necessary, enactment of additional legislative 
authority providing for the payment of claims.
    Significantly, the 1988 Amendments do not expressly mandate 
indemnification of launch participants and, unlike the 1988 Price-
Anderson Amendments. Pub. L. 100-408, the notion of a ``contract of 
indemnification'' does not appear. Rather the 1988 Amendments lay out a 
mechanism by which Congress may enact legislation to appropriate the 
requested funds. Accordingly, it would be inappropriate to refer to the 
payment of excess claims provisions without recognizing the role 
Congress must play in enacting appropriations. Nevertheless, it is the 
Office's view that the 1988 Amendments represent an undertaking by 
Congress to allocate to the United States Government the risk of 
certain losses, including damage to Government property in excess of 
required Government property insurance, and excess third-party claims. 
In this manner, commercial launch operators, their customers, and the 
contractors and subcontractors of each may be relieved from some of the 
risk associated with commercial launch activities. In return, the 
United States Government is protected from liability and loss by 
required insurance at no cost to the Government

Risk-Based Insurance Requirements

    One of the principal features of the 1988 Amendments is the 
Department's mandate to establish risk-based insurance requirements. 
Under the Act, the amount of required insurance is prescribed based on 
the Department's determination of the ``maximum probable loss'' that 
would result from licensed activities.
    Before enactment of the 1988 Amendments, section 16 of the Act 
prescribed general liability insurance requirements. It specified that 
any person launching a launch vehicle or operating a launch site under 
a license issued by the Department have in effect liability insurance, 
at least in the amount that the Department considered necessary for the 
licensed launch or operation, considering the international obligations 
of the United States.\2\ These obligations include, in particular, any 
United States obligations as a signatory to the Liability Convention.
---------------------------------------------------------------------------

    \2\ Each person who launches a launch vehicle or operates a 
launch site under a license issued or transferred under this Act 
shall have in effect liability insurance at least in such amount as 
is considered by the Secretary to be necessary for such launch or 
operation, considering the international obligations of the United 
States. The Secretary shall prescribe such amount after consultation 
with the Attorney General and other appropriate agencies.'' 49 
U.S.C. App. 2615.
---------------------------------------------------------------------------

    On May 7, 1985, the Office published an Advance Notice of Proposed 
Rulemaking on third-party liability insurance requirements for 
commercial space launch activities (the ANPRM), 50 FR 19280, focusing 
exclusively on implementation issues relating to section 16 of the Act.
    The ANPRM reflected the Office's conclusion that liability 
insurance should be adequate to compensate parties not participating in 
licensed launch activities for losses or damages resulting from those 
activities. The Office sought to identify considerations other than 
international obligations of the United States to be taken into 
account. Other general issues highlighted in the ANPRM were: (1) 
Whether evidence of insurance (including significant levels of risk 
retention) should be the exclusive

[[Page 38995]]

means of demonstrating financial responsibility; and (2) whether the 
Office should require launch services providers to obtain the maximum 
amount of liability insurance commercially available at reasonable 
rates (the standard employed by NASA in requiring insurance for 
commercial payloads launched on the Space Shuttle), or, alternatively, 
whether the Office should conduct an analysis of the risks arising from 
a launch and set appropriate financial responsibility requirements 
based upon that analysis. The ANPRM also sought comments on whether the 
Office should vary liability insurance requirements by vehicle class 
and the duration of licensed activities, and what factors the United 
States Government should consider in deciding whether to seek 
compensation from responsible parties for damages for which the United 
States may be held liable under United States or international law.
    Ten private parties submitted comments in response to the ANPRM. 
They included one commercial operator of a privatized United States 
expendable launch vehicle (ELV) launch system, three entrepreneurial 
launch firms, two space insurance brokers, two government aerospace 
contractors, and two law students.
    Most of the comments addressed the amount of liability insurance 
the Office should require and the appropriate standard for making that 
determination. Only three of the commenters, the insurance brokers and 
an entrepreneurial launch services provider, supported utilization of 
NASA's approach of requiring that launch services providers obtain the 
maximum amount of insurance commercially available at reasonable rates. 
One insurance broker favored applying this standard to the actual 
launch phase only, arguing that risk analysis should be employed in 
setting requirements for on-orbit liability coverage. All of the other 
launch and aerospace firms that commented favored the risk analysis 
approach.
    Commenters differed on the issue of duration of required insurance 
coverage. One commenter favored requiring coverage only for the launch 
phase, another preferred the useful life of a payload, and a third 
recommended insurance be maintained as long as a physical object 
remains in space. Only two commenters addressed the question of whether 
the Office should distinguish among the different ELV launch systems in 
setting third-party liability insurance requirements, both favoring 
making such distinctions if justified by risk analysis. In addition to 
the issues on which the ANPRM requested comment, five commenters argued 
that the United States Government should indemnify private launch firms 
and their contractors for damages that exceed the amount of required 
coverage. One commenter urged that the United States either re-
interpret its responsibilities under, or withdraw from, the Liability 
Convention.
    Following publication of the ANPRM, and in light of most 
commenters' endorsement of insurance requirements based on an analysis 
of risk, the Office developed a risk analysis approach to determining 
acceptable levels of public exposure to hazards associated with 
commercial launches, and it began applying risk analysis techniques on 
an application-specific basis. The Office's risk analysis approach was 
based upon extensive studies it had conducted on the risks associated 
with commercial launches and launch operations, and on the utility of 
various analytical techniques for quantifying them. These studies 
include a three-volume report, dated May 1988, entitled ``Hazard 
Analysis of Commercial Space Transportation'' and an ``Assessment of 
Third Party Liability Insurance Associated with Commercial Expendable 
Launch Vehicles,'' each of which is available from the Office.
    At the time the 1988 Amendments were enacted, the Office was 
preparing a rulemaking action to establish risk analysis as the 
preferred method for determining appropriate levels of insurance for 
licensed activities. The need to propose adoption of this approach 
became moot. In requiring maximum probable loss determinations, 
Congress effectively codified the Office's approach by mandating risk 
analysis as the basis on which the Department establishes required 
levels of financial responsibility under the Act.
    This rulemaking is intended to provide definition to the statutory 
term, ``maximum probable loss,'' in terms of the Office's approach to 
prescribing insurance requirements for each launch license issued. 
``Maximum probable loss'' does not mean maximum possible loss, that is, 
a ``worst case'' scenario regardless of likelihood. The Office 
determines maximum probable loss for licensed launch activities by 
analyzing the known hazards, and the probability of loss, associated 
with specific launch activities. A detailed explanation of maximum 
probable loss methodology is presented in the section-by-section 
analysis below.

Implementation Issues Following the 1988 Amendments

    In early 1989, the Risk Management Working Group of the Commercial 
Space Transportation Advisory Committee (COMSTAC) \3\ developed 
implementation positions on the 1988 Amendments, including a 
recommendation that the scope of required liability insurance coverage 
be commensurate with the scope of potential liability of those persons 
involved in providing launch services--the licensee, its customer, the 
U.S. Government, and the contractors and subcontractors of each--
resulting from activities carried out under the license. In its view, 
potential liability arose with the licensee's entry upon the launch 
complex. Additionally, the waiver of claims provisions and the so-
called ``indemnification'' provisions of the Act were viewed as being 
equally broad in scope. The COMSTAC further recommended that post-
launch protection under the Act remain in place for at least three 
years following ignition of the launch vehicle for flight.
---------------------------------------------------------------------------

    \3\ The COMSTAC, a duly chartered federal advisory committee 
consisting of public and private sector representatives appointed by 
the Secretary to advise on matters affecting the commercial space 
transportation industry, has taken a very active role in reviewing 
and commenting on the Office's implementation of the 1988 
Amendments. Based on its reviews, the COMSTAC submitted formal 
recommendations to the Secretary. These recommendations are 
available in the docket for this proposed rulemaking.
---------------------------------------------------------------------------

    In carrying out its licensing responsibilities, the Office began 
issuing licenses in 1989, authorizing a specific launch and preparatory 
launch site operations associated with the conduct of that launch. This 
approach was intended to satisfy industry's expectations, including 
those voiced by COMSTAC, and be consistent with the Department's 
understanding of the 1988 Amendments. Within two years, the Office 
issued the first of several operator licenses issued to date. Under 
this approach, the Office licensed and established financial 
responsibility requirements for site operations associated with the 
conduct of a program of commercial launches for a two-year period.
    This approach to licensing reflected an understanding between the 
Office and the U.S. Air Force, as the Department of Defense (DOD) 
element responsible for management of the Eastern Range, encompassing 
Cape Canaveral Air Station, and the Western Range, encompassing 
Vandenberg Air Force Base, to avoid conflicting insurance and liability 
requirements when commercial launch operators

[[Page 38996]]

conduct operations on Air Force ranges in support of commercial launch 
activities under a range use agreement. Despite this understanding with 
the Air Force, certain questions remain between the Office and the Air 
Force as well as other Federal agencies that operate and manage Federal 
range facilities.
    A September 1992 COMSTAC resolution reaffirmed COMSTAC's view that 
the financial responsibility regime should be construed broadly so as 
to cover all activities conducted by a licensee on a Federal range. 
Under this view, referred to as ``gate-to-gate'' licensing, all of a 
licensee's activities conducted on a Federal range in support of its 
commercial launch operations would be subject to DOT-determined 
financial responsibility requirements and eligibility for so-called 
indemnification. To address this and other uncertainties associated 
with the intended scope of the 1988 Amendments, the resolution 
recommended that the Department seek clarification by legislative 
means.

October 27-28, 1994 Public Meeting

    The Office convened a two-day public meeting on October 27-28, 
1994, to elicit industry views on, among other things, a range of 
issues associated with implementation of the 1988 Amendments. The 
meeting concentrated on licensing issues associated with commercial 
launch operations and the commercial operation of launch sites. One of 
the focal points of the meeting was a discussion of the appropriate 
scope of a license authorizing commercial launch activities and its 
relationship to financial responsibility and allocation of risk 
requirements.
    At the public meeting and in written comments submitted to the 
docket, industry remained fairly consistent in its view that the 
Office's licensing authority should be broadly construed to address 
risks associated with the flight of a launch vehicle and pre-flight 
hazardous operations in order to protect public health and safety. One 
commenter suggested that, as a starting point, it would be useful to 
look at those unusually hazardous activities for which the Government 
agrees to offer indemnification under other authority, such as Public 
Law 85-804, in attempting to determine the range of activities properly 
encompassed by the Department's licensing authority.
    Two launch services providers and one DOD element commented that 
all pre-launch processing on a Federal range should be licensed for 
purposes of the Act's financial responsibility requirements and setting 
the levels of required insurance. Other commenters observed that it is 
no longer sufficient to limit DOT licensing to activities done on a 
Federal range because, increasingly, launch operators are engaging in 
hazardous pre-launch processing activities off the range, either to 
reduce their costs or because they are not permitted to use Government 
facilities where comparable, off-range commercial services exist. A 
number of commenters, including a DOD element, an insurance broker, a 
prospective commercial spaceport operator and two launch services 
providers, suggested that DOT-licensed activities should include 
hazardous, as distinct from ultra-hazardous, operations defined in 
terms of risk, not geography, because the Office's mandate is 
protection of public safety. The prospective spaceport operator also 
suggested using the license as a kind of safety net to avoid gaps in 
regulatory oversight. In contrast, another Government agency 
representative offered a different approach, noting that other 
regulatory regimes would apply to hazardous operations when conducted 
somewhere other than at a Federal range.
    As an example of hazardous operations requiring licensing, a number 
of commenters, including a payload processing facility, stated that 
payload processing, whether conducted on a Federal range or at a 
privately operated facility located off the Federal range, should be 
covered by a DOT license. One launch company noted that manufacturing 
is not sufficiently hazardous as to warrant DOT licensing, but certain 
testing is. However, a prospective spaceport operator noted that 
manufacturing may be hazardous and, if so, should be covered by a DOT 
license. Another prospective spaceport operator stated that licensing 
matters should be separated from the issue of indemnification 
altogether, and noted that one could conceive of licensed activity 
without indemnification if the purpose of licensing is protection of 
public safety. The commenter suggested a narrower approach than that of 
licensing all activities conducted by a launch licensee on a Federal 
range, noting that material may be stored at the range for a long time 
in advance of a scheduled launch.
    Two DOD elements advocated that the Office establish maximum 
probable loss requirements for all commercial activities conducted on a 
Federal range facility. One of the agencies also indicated that the 
Office should set maximum probable loss requirements any time 
Government property would be placed at risk for commercial purposes, 
including coverage for commercial development and demonstration 
activities conducted on a Federal range.
    One launch services provider noted the benefits to the public of 
requiring statutory financial responsibility and allocation of risk 
requirements, along with so-called indemnification, in that third-party 
recovery for losses need not depend upon the financial health of a 
launch company. For example, without Government regulation, small 
start-up companies with limited financial means might buy less 
insurance than the Office would otherwise prescribe in insurance 
requirements.
    Another launch services provider noted that the financial 
responsibility requirements should be coextensive with a license. That 
is, the Government should provide indemnification to the extent 
activities are covered by a license. Likewise, according to the launch 
services provider, if there is no indemnification offered by the 
Government for an activity then it can be inferred that the Office has 
not licensed that activity. The commenter noted that this is not clear 
today.
    In a related rulemaking, the Office is planning to address, more 
specifically, such issues as the appropriate scope of a license to 
conduct commercial launches and the activities subject to the 
Department's licensing authority. As part of that rulemaking, the 
Office intends to address comprehensively those comments received at 
the public meeting concerning the appropriate scope of a license and 
licensable activities. The instant rulemaking focuses on implementation 
of financial responsibility requirements and the allocation of risks 
that attend licensed launch activities, as those activities are defined 
in a license issued by the Office.

The Proposed Regulations

Scope and Objectives

    The proposed regulations are intended to implement the full range 
of statutorily-imposed financial responsibility requirements and carry 
out the Department's responsibility under the Act to protect U.S. 
interests when Government property or personnel is involved in 
supporting licensed launch activities. The proposed regulations also 
clarify the means by which the commercial launch industry and its 
customers are provided with the assurances and protections that have 
been considered critical to their survival.
    This rulemaking does not address financial responsibility 
requirements for the operation of a launch site. To date, all U.S. 
commercial launches have taken place from U.S. Government facilities.

[[Page 38997]]

The Office believes that this fact will change in the not too distant 
future. Plans for developing state-sponsored spaceports in five states 
are under way and the Office is currently developing regulations that 
would apply to prospective applicants for licenses to operate launch 
sites or spaceports. The Office is also in the process of developing 
policies applicable to the appropriate implementation of financial 
responsibility requirements for launch site operators, including 
spaceports, consistent with the Act. As part of this effort, the Office 
requests comments on the full range of financial responsibility and 
risk allocation issues associated with licensing the operation of a 
launch site.
    More specifically, under the Act, a licensee is required to obtain 
two forms of insurance (or otherwise demonstrate financial 
responsibility) to compensate for certain claims ``resulting from an 
activity carried out under the license''--liability insurance that 
protects participants in launch services from third-party liability and 
property insurance that protects Government property. 49 U.S.C. 
70112(a). No distinction is made in the Act between the holder of a 
license to launch a launch vehicle and the holder of a license to 
operate a launch site. As one commenter pointed out at the October 1994 
public meeting, the legislative history accompanying the 1988 
Amendments provides no guidance as to whether, or how, financial 
responsibility and allocation of risk requirements would apply to a 
licensed operator of a launch site.
    One view under consideration by the Office is that the insurance 
that is required under a license to conduct licensed launch activities 
would be sufficient to protect United States interests as well as those 
of a licensed launch site operator. This view presumes that the 
potentially catastrophic risks that the 1988 Amendments intended to 
address are those associated with hazardous launch operations, and that 
the risks attendant to the industrial activity of managing a launch 
site can be managed effectively through available industrial risk 
insurance as a cost of doing business, and through contractual 
agreements between the site operator and its customers and contractors. 
Risks to the launch site operator change when licensed launch 
activities are conducted at the site, and the launch site operator 
should be protected as an additional insured under the launch 
licensee's liability policy because of the launch site operator's 
involvement in launch services. With respect to risks associated with 
other activities, a launch site operator can protect itself by 
requiring adherence to its own safety procedures and requirements and 
through business decisions regarding the need to obtain insurance.
    At the public meeting, one commenter representing a prospective 
spaceport licensee suggested an approach consistent with this view. The 
commenter noted that site operations not related to a particular launch 
may not be covered by the Act, and that the launch operator and launch 
site operator, rather than the Office, can allocate responsibilities 
between themselves. Launch-specific activities carried out at the site 
would be covered under the Act, in the commenter's view. However, 
another commenter at the public meeting noted that a state-sponsored 
spaceport could serve a consortium of commercial users, and the 
relationship between them may not be one of prime contractor and 
subcontractor. Another prospective state-sponsored spaceport 
representative commented that there is no need for the Office to 
license a spaceport operator if it is under the supervision and 
oversight of another Federal agency, such as the Air Force, and 
conducting operations as a subcontractor to the launch company. 
Similarly, a DOD element commented that the Office should review safety 
operations of a state-sponsored spaceport located on a Federal range 
facility only for purposes of determining maximum probable loss.
    Additional comments are solicited on the appropriate implementation 
of the financial responsibility and allocation of risk regime with 
respect to licensed launch site operators, including state-sponsored 
spaceports. Comments should address the requirements that would apply 
to an operator of a commercial launch site located on private property 
and that located on or adjacent to a Federal range facility.
    Implementation by the Office of the financial responsibility and 
allocation of risk requirements through license orders has resulted in 
some uncertainty and controversy over the scope of required insurance 
as well as the Government's obligation to cover excess third-party 
claims. Some issues result directly from the terminology used in the 
Act and have been voiced by both the Office and industry in a variety 
of fora, such as the October 1994 public meeting and COMSTAC meetings. 
Others have been aired by industry, from time to time, expressing 
disagreement with or concern over the Office's implementation of the 
requirements. In come instances, industry has offered a view contrary 
to that held by the Office, as reflected in license orders. In others, 
industry has complained that lack of clarity leaves both industry and 
the U.S. Government vulnerable to unintended disputes over the 
appropriate mechanism for compensating claims.
    The proposed regulations, as well as the Act, acknowledge that the 
commercial space industry must bear certain risks and costs associated 
with launch activities. However, the Office believes these risks and 
costs to be reasonable in light of the potential benefits industry 
receives.\4\ Moreover, the Office believes that issuing regulations 
will result in an additional benefit to the commercial space industry. 
That is, the increased certainty and clarity that will result from 
issuance of final regulations should prove beneficial to industry by 
allowing it to manage risks appropriately, through insurance and other 
business decisions and compete effectively in an increasingly 
competitive world market. At the same time, the Office remains mindful 
of the Government's unique interests and concerns.
---------------------------------------------------------------------------

    \4\ An economic impact assessment has been prepared and is 
available in the public docket for this proposed rulemaking for 
review and comment.
---------------------------------------------------------------------------

    In addition to protecting the United States Government from certain 
liability risks, this rulemaking proposal also recognizes the 
importance of valuable national range assets to the continued growth, 
vitality, viability and competitiveness of the U.S. commercial launch 
industry. One of the principal objectives of the statutory requirements 
is to ensure that these assets are protected, and that in the event of 
damage or loss, funds are available to restore the affected launch 
property to its present condition and use. Thus, when Government 
facilities or personnel are involved in licensed launch activities, the 
Department is authorized to establish requirements for proof of 
financial responsibility and other assurances necessary to protect the 
Government and its executive agencies and personnel from liability, 
death, bodily injury, or property damage or loss as a result of 
licensed activities. However, the Government is not relieved of 
liability that results from willful misconduct of the Government or its 
agents.
    In protecting the interests of Government personnel, the statutory 
financial responsibility and allocation of risk requirements also 
recognize the role Government contractors and subcontractors, and their 
respective employees, perform in supporting commercial launch-related 
operations on Federal range facilities on behalf of

[[Page 38998]]

the Government. For this reason, in establishing financial 
responsibility and allocation of risk requirements, the Department also 
ensures that their interests are protected. The Office solicits views 
on whether its approach to protecting Government contractors' and 
subcontractors' interests should be adopted in a final rule.
    To facilitate the reader's review of this proposal, the Office's 
rationale for allocating and addressing certain risks is presented 
below under appropriate topic headings, preceding the section-by-
section analysis. This approach should prove useful to the reader in 
understanding how certain risks would be addressed through both the 
required demonstration of financial responsibility and waivers of 
claims among the launch participants. The section-by-section analysis 
that follows describes and discusses specific provisions of the 
proposed implementing regulations which, taken together, effectuate the 
intent of the Act.

Protection of Government Personnel

    In providing direct support for commercial launch operations, 
either through its agencies or contractors, the U.S. Government 
necessarily exposes itself and certain Government personnel to 
potential losses and liabilities. Accordingly, under the approach the 
Office has adopted in the proposed regulations, certain Government 
personnel need to be afforded a variety of protections through the 
financial responsibility and allocation of risk regime. These 
protections are necessary to ensure that the U.S. Government does not 
bear any greater risk than it affirmatively accepts under the statute.
    Through the proposed regulations, risks to Government personnel, 
including employees of Government contractors and subcontractors, posed 
by their involvement in licensed launch activities are addressed as 
follows:
    1. Government personnel, including employees of the Government, its 
agencies, and its contractors and subcontractors, involved in licensed 
launch activities, would be included within the definition of third 
parties.
    2. Government personnel, including employees of the Government, its 
agencies, and its contractors and subcontractors, involved in licensed 
launch activities, would be named as additional insured under the 
required third-party liability policy.
    3. Claims for damage or loss to property belonging to the 
Government, its agencies, contractors and subcontractors, involved in 
licensed launch activities, would be covered under the required 
Government property policy, even if the damage or loss is caused by 
Government personnel, including employees of the Government, its 
agencies, and its contractors and subcontractors, involved in licensed 
launch activities, absent their willful misconduct.
    These three forms of protection from risk are explained below, in 
order.
    1. The proposed regulations would clarify that Government employees 
are included within the definition of third parties. This is 
significant because it means that Government employees' claims for 
property damage or bodily injury would be compensated under the third-
party liability insurance policy (or other demonstration of financial 
responsibility) required of the licensee up to the limit the Office 
establishes, within the statutory ceiling, based upon the Office's 
determination of maximum probable loss. (An explanation of the Office's 
risk-basing methodology for setting insurance requirements is set forth 
in the section-by-section analysis, below.)
    The definition of third parties would also include employees of 
U.S. Government contractors and subcontractors involved in licensed 
launch activities to ensure that their claims would also be covered by 
the required third-party liability insurance policy, in accordance with 
the statue.
    This approach is in accord with the definition of ``third party'' 
contained in the statute, 49 U.S.C. 70102(11), and the legislative 
history which expressly states that ``Government personnel directly 
associated with the commercial launch operations are still classified 
as third parties.'' S. Rep. No. 100-593, 100 Cong., 2d Sess. 8 (1988). 
This protection is necessary to minimize the risk the U.S. Government 
would otherwise bear if it were to accept responsibility for these 
claims under the Act.
    Currently, through a reciprocal waiver of claims agreement executed 
by the Office on behalf of the U.S. Government, the United States 
waives and releases claims it may have against the licensee and 
customer and their respective contractors and subcontractors, and 
agrees to be responsible, for property damage it sustains in excess of 
required insurance, and for bodily injury or property damage sustained 
by its employees in excess of required insurance. \5\ The Government is 
required to extend this waiver of claims and assumption of 
responsibility to its contractors and subcontractors. This practice 
would be altered under the proposed regulations in the following way. 
Because claims of Government employees and employees of Government 
contractors and subcontractors against the other launch participants 
would be covered as third-party claims under the liability insurance 
policy that the licensee obtains, the U.S. Government would not be 
required to assume responsibility for them as part of the reciprocal 
waiver of claims required in 49 U.S.C. 70112(b)(2). This approach 
deviates from the current practice of the Office but, we believe, more 
precisely reflects the intent of the statute.
---------------------------------------------------------------------------

    \5\ The reciprocal waiver of claims agreement is used by the 
Office to implement the Government's statutory responsibility to 
waive claims. 49 U.S.C. 70112(b)(2) requires a Government waiver 
only to the extent claims exceed the amount of insurance that is 
required to protect Government property. However, under current 
practice, the agreement provides that claims for injury or losses 
suffered by employees of the Government are waived only to the 
extent those claims exceed the required amount of third-party 
liability insurance. One reason the Office has taken this approach 
is that if Government employee claims for bodily injury or property 
damage were compensated under the property policy rather than the 
liability policy, the Government's waiver of claims for property 
damage could be triggered too soon leaving Government claims for 
property damage or loss uncompensated.
---------------------------------------------------------------------------

    Given that Government personnel are deemed third parties, their 
claims against the other launch participants would be presented as part 
of the successful third-party claims for which industry would seek 
payment from the Government under the payment of excess claims 
provision of the statute (so-called ``indemnification''). In essence, 
the Government's agreement to protect launch participants from third-
party claims in excess of required insurance would extend to cover the 
outstanding claims of its employees, and Government contractor and 
subcontractor employees, after the limits of the insurance policy 
obtained by the licensee have been reached.
    An alternative view--that Government personnel should not be 
considered third parties--has been suggested by representatives of the 
commercial space launch industry. This view suggests that the 1988 
Amendments assigned to the United States Government an assumption of 
responsibility and risk for losses sustained by Government personnel, 
including Government employees and employees of Government contractors 
and subcontractors, who are involved in licensed activities. This 
assumption of risk would be in addition to the three areas of risk the 
Government has agreed to accept under the Act, as delineated above. The 
Office does not agree.
    Considering Government personnel as third parties enables their 
claims to be covered by required third-party liability insurance under 
49 U.S.C.

[[Page 38999]]

70112(a)(3)(A)(i). Absent this protection for Government employees, the 
Government would be assuming an unfunded contingent liability for the 
successful claims of Government employees against other launch 
participants, without explicit statutory authority for doing so. This 
is contrary to appropriations laws. The Office does not believe that 
explicit statutory authority is provided by the Government waiver of 
claims provision of the Act, which limits the Government's waiver to 
excess property damage claims. 49 U.S.C. 70112(b)(2). Absent this 
protection for employees of Government contractors and subcontractors, 
additional costs to protect Government contractors and subcontractors 
from these risks would likely be passed to the Government, defeating 
the statutory directive to protect the Government from certain 
liability risks, at no cost to the Government.
    In the Office's view, this approach is beneficial to both the U.S. 
Government and nongovernmental launch participants. Nongovernmental 
launch participants are protected from claims by Government personnel, 
including employees of the Government's contractors and subcontractors, 
for loss of injury, by means of required liability insurance and 
procedures for U.S. Government payment of excess third-party claims, up 
to $1.5 billion above the required amount of liability insurance. The 
U.S. Government is protected in the event its personnel, as well as 
those operating on behalf of the Government, are exposed to risk of 
property damage or bodily injury because their claims will be 
compensated under the liability policy the licensee obtains at no cost 
to the Government. Considering Government personnel as third parties is 
not intended to supplant the individual rights of Government employees 
to file claims under the Federal Employees' Compensation Act (FECA), or 
the rights of Government contractor employees under workers 
compensation laws.
    2. Government personnel would be protected from third-party 
liability, absent their willful misconduct. The statute explicitly 
requires that the Government, ``executive agencies and personnel, 
contractors, and subcontractors of the Government'' be protected under 
an insurance policy required under section 70112(a), ``to the extent of 
their potential liability for involvement in launch services, at no 
cost of the Government.'' 49 U.S.C. 70112(a)(4). Therefore, under the 
liability policy, Government personnel are both protected parties, or 
additional insureds, and potential claimants.
    3. Under the property policy required under 49 U.S.C. 
70112(a)(1)(B), United States Government property is protected from 
damage from any source as a result of licensed activities, that is, 
even if the damage is caused by Government personnel, absent their 
willful misconduct.

Property Protection for Government Launch Participants

    In addition to protection from third-party liability, as explained 
above, Government launch participants are protected from the risk of 
their own property losses where their property, facilities, equipment 
or personnel, are used to support commercial launch operations. In the 
Office's view, this risk is allocated primarily to the licensee, who is 
required under 49 U.S.C. 70112(a)(1)(B) to obtain liability insurance 
(or otherwise demonstrate financial responsibility), up to the $100 
million statutory ceiling, to compensate for the maximum probable loss 
from claims by the U.S. Government against a person for damage or loss 
to Government property resulting from an activity carried out under the 
license. The Government waives claims for property damage to the extent 
those claims exceed the required amount of insurance or result from 
willful misconduct of the government or its agents.
    This requirement to protect Government property addresses an 
important objective--to assure that facilities used by commercial 
launch operators can be restored promptly to current launch-ready 
status. These facilities are considered critical to U.S. national 
security interests and funds must be readily available to repair them 
in the event they are damaged as a result of commercial launch 
activities.
    Two recurring issues are the scope of Governmental property that 
must be protected by property insurance and the extent to which 
Government property that is either on a Federal range but not used to 
support a licensee's launch, or off the Federal range entirely, is 
required to be covered by insurance. Government property on a Federal 
range that is not used for commercial launch support purposes may 
include anything from a U.S. Post Office to launch vehicles or 
components that are intended for use exclusively in Government launch 
operations.
    The Office's view is that any U.S. Government property that is on a 
Federal range facility is exposed to damage or loss as a result of 
licensed launch activities conducted on that facility. Accordingly, 
coverage for all such property must be provided to ensure the U.S. 
Government is fully compensated. The only exception would be for a 
Government payload where the Government is the customer for the 
licensed launch activity. (A discussion of how different types of 
Government property on a Federal range facility are considered in 
establishing insurance requirements for Government property is 
presented in the section-by-section analysis accompanying proposed 
Sec. 440.7, Determination of Maximum Probable Loss.)
    It is also the Office's view that Government range facility assets 
that are not on the launch facility from which the launch takes place, 
but are identified as being exposed to damage or loss as a result of 
licensed launch activities, should also be covered by the required 
property insurance. For example, a licensed launch at Cape Canaveral 
Air Station, Florida, could expose Government assets on neighboring 
Kennedy Space Center (KSC) to damage or loss. Under the proposed 
regulations, the Office would include these assets in determining 
appropriate insurance levels for Government property and prescribe that 
property at KSC be covered. The Office believes that this approach is 
necessary and reasonable to carry out the statutory mandate of 
protecting Government range assets exposed to risk from commercial 
launch activities. Similarly, a licensed launch conducted at a 
commercially operated launch site or spaceport situated on, or adjacent 
to, a Federal range facility, would expose the Federal range facility 
to risk of damage or loss. Accordingly, insurance to protect the 
Federal range facility placed at risk would be required even if there 
were no Government involvement in supporting licensed launch activities 
conducted at the commercial launch site.
    In the Office's view, Government property that is involved in 
licensed launch activities but is located at a site that is remote from 
the launch site would be covered by the third-party liability insurance 
protection required of the licensee because risk to that property 
should be no greater than the risk posed to other third-party property. 
Government property meeting this description would include, for 
example, remote Government tracking stations and other support 
facilities located downrange from the Federal range facility at which 
the launch takes place.
    Accordingly, Government property that is not located on the Federal 
range facility from which the launch takes place or not located at a 
neighboring

[[Page 39000]]

Federal range facility would be included under the third-party 
liability insurance protection required of the licensee. This would 
include any unrelated Government property located outside of a Federal 
range facility, such as a U.S. Post Office building.
    It has been suggested that the additional cost of covering all 
Government property, wherever located, would be prohibitive. However, 
the Office views the U.S. Government as situated similarly to any other 
third party for purposes of calculating maximum probable loss for 
property damage claims off the range, subject to the limited exception 
noted above for nearly Federal range facility assets located in close 
proximity to, or adjacent to, a Federal range. This is because the 
probability of damaging unrelated government property away from the 
launch site is no different from that of damaging private property off 
the launch site. The Office does not believe that this coverage should 
increase the cost of liability insurance or expand the risks covered by 
the policy.
    In summary, all Government property on a Federal range facility, 
whether or not involved in licensed launch activities, must be covered 
by the required Government property insurance policy (or other 
demonstration of financial responsibility). Federal range facility 
assets adjacent to or in close proximity to the launch site where 
licensed launch activities take place would also be covered by required 
property insurance. Government property located away from the Federal 
range facility that is used to support licensed launch activities, such 
as downrange tracking stations, are not covered by the required 
Government property insurance policy, nor is Government property that 
is located off the Federal range facility and totally unrelated to 
licensed launch activities. Instead, with respect to these Government 
assets, the Government is a third party and its claims for loss or 
damage would be covered under the required third-party liability 
insurance policy (of other demonstration of financial responsibility), 
up to the limits required by the Office.
    Some of the confusion surrounding the required coverage of 
Government property results from the manner in which licensees have 
satisfied the financial responsibility requirements for protecting 
Government property. Some licensees have obtained two types of policies 
to address Government property. One policy typically provides coverage 
for United States Government property, including property of United 
States Government contractors and subcontractors, that the licensee 
utilizes or otherwise has in its care, custody or control at the site 
where licensed launch activities take place. The second policy provides 
third-party liability coverage for all other property, including 
Government property located elsewhere on the Federal range facility. In 
the first policy, the United States and its contractors and 
subcontractors are the named insureds; in the second policy, the 
additional insureds are the same parties as those protected in 
satisfying the third-party liability insurance requirement. This 
approach accommodates certain customary insurance practices in covering 
property losses but is not required by the Office.
    However, where a licensee elects to protect certain Government 
property under its third-party liability insurance policy, coverage 
cannot be allowed to limit or dilute the availability of insurance 
proceeds to cover third-party liability claims. To avoid this 
possibility, some licensees have submitted a liability insurance 
certificate indicating two levels of coverage, i.e., one amount to 
cover claims for damage to Government property that is not in the 
licensee's care, custody or control and another amount for ``other' 
third-party liability, claims.
    The proposed regulations would continue the Office's current 
practice, implemented through license orders, of requiring coverage for 
property of Government contractors and subcontractors under the 
Government property policy. The Office's rationale for doing so 
includes the following considerations. Absent certain protections for 
Government contractors and subcontractors, the Government would bear 
greater risk and incur greater expense than is contemplated under the 
statute's risk and incur greater expense than is contemplated under the 
statute's risk allocation regime. Section 70112(b)(2) of the Act 
requires the Secretary of Transportation to enter into reciprocal 
waivers of claims under the licensee, its customer, and the contractors 
and subcontractors of each, ``for the Government, executive agencies of 
the Government involved in launch services, and contractors and 
subcontractors involved in launch services. * * *'' The waiver applies 
only to the extent that claims are more than the amount of Government 
property insurance or other demonstration of financial responsibility 
required under 49 U.S.C. 70112(a)(1)(B). By waiving claims ``for'' its 
contractors and subcontractors involved in launch services, the 
Government passes certain rights and responsibilities to its 
contractors and subcontractors, consistent with those the Government 
accepts, including the waiver of claims for property damage above 
required insurance. In light of the waiver the Government undertakes on 
behalf of its contractors, the Government would necessarily assume 
greater risk or costs if the Government's contractors and 
subcontractors were not also protected by required Government property 
insurance. If there were no insurance protection provided by the 
licensee for property of Government contractors and subcontractors 
involved in launch services, those parties would be likely to seek 
compensation for their losses from the Government. Thus, the Government 
would be accepting the risk of property losses in excess of required 
insurance, plus, ad a practical matter, responsibility for property 
losses incurred by its contractors and subcontractors. Alternatively, 
Government contractors and subcontractors could purchase property 
insurance protection, as a licensee has suggested; however, the cost 
would likely be passed through to the Government as an allowable cost 
under a contract with the Government. This is contrary to the statutory 
directive that the Government be afforded certain protections at no 
cost to the Government.
    In determining to adopt this approach in the proposed regulation, 
the Office also considered whether coverage for property of Government 
contractors and subcontractors could be provided under the third-party 
liability insurance protection the licensee is required to obtain. This 
approach is contrary to the definition of ``third party'' contained in 
the statute at 49 U.S.C. 70102(11) and was not further considered.
    There is one important distinction in the requirement to protect 
property of Government contractors and subcontractors in the Office's 
view, however. That is, with respect to the Government and its 
agencies, all Government property on a Federal range facility must be 
protected. With respect to Government contractors and subcontractors, 
only property on a Federal range facility belonging to those 
contractors and subcontractors involved in licensed launch activities 
must be covered under the property policy. Government contractors and 
subcontractors that do not support licensed launched activities or 
whose property is located away from a Federal range facility would be 
protected as third parties under the liability policy, and their claims 
for injury, damage or loss would be compensated by the required third-
party liability policy. For

[[Page 39001]]

example, a food concessionnaire located on a Federal range facility 
would be considered a third party for purposes of insurance and risk 
allocation.
    One licensee has noted its disagreement with the Office's 
requirement. In the licensee's view, requiring this coverage is 
contrary to the statute and legislative history. The licensee has 
sought clarification of the Office's requirements to avoid the 
potential for duplicative, or possibly unnecessary, coverage under the 
liability and property policies.
    The Office disagrees with the licensee's contention for the reasons 
explained above. The U.S. Government utilizes contractors and 
subcontractors in carrying out certain activities at Federal range 
facilities. Accordingly, for purposes of risk allocation and protection 
of the U.S. Government, its contractors and subcontractors stand in the 
shoes of the Government and its agencies involved in launch services. 
The Office believes that any other view would defeat reasonable 
implementation of the Amendments.
    The Office believes that a variety of risk management approaches to 
protecting Government property may be acceptable as long as the 
statutory objectives are achieved; that is, providing for the 
compensation of property damage sustained by the United States, its 
agencies involved in launch services, and its contractors and 
subcontractors, resulting from activities carried out under the license 
and ensuring that policy proceeds will be made available to the 
Government to effect needed repairs in the event of any damage 
resulting from licensed launch activities. These objectives can best be 
met through a non-fault, non-subrogation, comprehensive all-risk type 
of property policy that would compensate the U.S. Government on behalf 
of itself and Government launch participants, as additional insureds, 
in the event of any occurrence resulting in property damage, regardless 
of fault, absent willful misconduct by the Government or its agents. In 
order to satisfy statutory objectives, the policy must respond to 
damage caused by Government launch participants, as well as Government 
personnel, i.e., employees of the Government and its contractors and 
subcontractors. An exception may be allowed where insurance is not 
available because of a policy exclusion that is determined by the 
Secretary of Transportation to be usual for the type of insurance 
involved. In those instances, the Secretary, following consultation 
with other interested Federal agencies, may waive claims for property 
damage from the first dollar of loss. In all other circumstances, 
coverage must be provided to protect U.S. Government property from any 
damage incurred during or as a result of licensed launch activities, 
regardless of fault, absent willful misconduct by the Government or its 
agents.

Government Customer

    When the licensee's customer is a United States Government agency, 
the agency is treated the same as any nongovernmental customer for 
purposes of determining the appropriate amount of property insurance 
required of the licensee and in terms of the U.S. Government's waiver 
of claims or property damage or less above the required amount of 
property insurance under 49 U.S.C. 70112(b)(2). That is, a Government 
payload is not covered by the required Government property insurance 
and the United States Government agency-customer accepts responsibility 
for property damage to the payload. For other purposes, the government 
agency customer is an agency of the United States involved in licensed 
activities. This is an important distinction because employees of a 
U.S. Government agency are third parties and their claims against other 
launch participants for bodily injury or property damage are covered by 
the third-party liability policy required under 49 U.S.C. 
70112(a)(1)(A), even when the agency that employs them is involved in 
the launch as the customer. The basis for the Office's distinction is 
grounded in appropriations law. An agreement on the part of the United 
States Government to be responsible for claims of its employees for 
injury or damage from the first dollar of loss, other than employee 
claims compensated under FECA, would be an unfunded contingent 
liability which, in the Office's view, is not statutorily sanctioned. 
Rather, through statutorily-mandated insurance insurance protections, 
waiver of claims requirements and payment of excess claims provisions, 
Congress has limited the unfunded contingent liability the U.S. 
Government may accept. The Office believes its approach to protecting 
the U.S. Government when it is a customer of commercial launch services 
providers is consistent with the limit of risk the Government has 
agreed to accept under the statute.
    To summarize the Office's view of the statutor
FR Doc. 96-18532 Financial Responsibility Requirements for Licensed Launch Activities
y allocation of risk 
regime, whereas nongovernmental parties involved in licensed launch 
activities accept responsibility for property damage or loss they 
sustain and for injury or loss sustained by their employees, the United 
States Government is covered on both accounts by insurance secured by 
the licensee. Should the loss exceed the amount of required insurance 
that a licensee has secured to cover such claims, then the Government 
assumes responsibility for loss of or damage to its property (and 
property of its contractors and subcontractors) in accordance with 
required reciprocal waivers of claims under 49 U.S.C. 70112(b)(2). 
Should the loss exceed the required insurance a licensee has secured to 
cover third-party liability, then the Government, in effect, assumes 
limited responsibility for losses above that amount sustained by 
Government personnel by agreeing to pay excess third-party claims. At 
the same time, nongovernmental parties are effectively protected from 
claims for Government property losses by required insurance and the 
Government's waiver of claims in excess of insurance; and from third-
party claims, including claims of Government personnel, by required 
liability insurance and by procedures for U.S. Government payment of 
third-party claims up to $1.5 billion in excess of insurance.

Section-by-Section Analysis

Part 440, Subpart A--Financial Responsibility for Licensed Launch 
Activities

Section 440.1--Scope; Basis

    Proposed Sec. 440.1 identifies the activities to which the Office's 
proposed financial responsibility and allocation of risk requirements 
would apply as all commercial space launch activities that are 
authorized to be carried out under a launch issued by the Office.

Section 440.3--Definition

    Section 440.3 defines terms used in part 440 that are not otherwise 
defined in 14 CFR Ch. III. Terms defined in Sec. 401.5 of the 
Commercial Space Transportation Licensing Regulations have the same 
meaning for purposes of this part unless otherwise indicated. Some of 
the terms, as defined in the proposed regulation, are self-explanatory 
and required no additional elaboration. Other terms are discussed 
below.
    The term ``contractors and subcontractors'' is defined in this 
section to address parties intended to be covered by the phrase 
``contractors and subcontractors involved in launch services'' in 49 
U.S.C. 70112 and 70113. This is important because these contractors and 
subcontractors have certain responsibilities and enjoy certain benefits 
under the statute relating specifically to the requirements

[[Page 39002]]

for insurance (or other form of financial responsibility), reciprocal 
waivers of claims and the U.S. Government's payment under certain 
circumstances of successful third party claims in excess of required 
liability insurance.
    As used in the Act, the term ``contractors and subcontractors'' is 
generally modified by the phrase, ``involved in launch services.'' The 
term ``launch services'' is defined by the Act to include ``(A) 
activities involved in the preparation of a launch vehicle and payload 
for launch; and (B) the conduct of a launch.'' 49 U.S.C. 70102(5). When 
this term is coupled with ``contractors and subcontractors'' for 
purposes of sections 70112 and 70113 of the statute, a literal reading 
could narrowly limit the group of covered contractors and 
subcontractors to service providers involved strictly in on-site launch 
preparatory and support activities. The Office does not believe that 
this interpretation is consistent with the overall objective of the 
financial responsibility and payment of excess claims provisions of the 
statute, which is to ensure financial protection and an equitable 
sharing of risks among the parties exposed to potentially catastrophic 
losses from a launch accident. The group of covered parties should not 
be limited only to the most obvious and visible launch participants 
that are engaged in preparing the launch vehicle and payload for launch 
and conducting the launch at the launch range. This group should also 
encompass, for example, the manufacturer that produces a component part 
for installation in the launch vehicle or payload, or the supplier that 
delivers a piece of equipment or other physical object used to prepare 
for or conduct a launch, as well as the contractor that constructs or 
refurbishes a launch pad specifically for licensed launch activities. 
In other words, to the extent a third-party loss is attributable to the 
direct or direct involvement of contractors or subcontractors who have 
provided goods or services in connection with licensed launch 
activities, the required insurance should cover their resulting 
liability. It is important to note that the statute addresses claims 
that result from an activity carried out under a license. Third-party 
claims that do not result from licensed activities are not addressed by 
the financial responsibility requirements of the statute. For example, 
third-party claims that arise during the manufacture of a component 
part would not be covered by required insurance.
    Accordingly, the term ``contractors and subcontractors'' as set 
forth in proposed Sec. 440.3 would include all contractors and 
subcontractors at any tier that participate in or contribute to the 
conduct of licensed launch activities, including suppliers of property 
and services and component manufactures of a launch vehicle or payload. 
The Office requests comments on the practical ability to protect all of 
these parties through required insurance.
    The definition of the term ``customer'' in proposed Sec. 440.3 is 
intended to respond to concerns that the protections afforded ``the 
customer'' under the statutory allocation of risk regime be available 
not only to the party that actually contracts with the commercial 
launch services provider and prospective licensee, but also to the 
intended beneficiary or recipient of launch services when the latter 
party is different from the former. For example, this situation 
typically arises in the context of ``turnkey'' contracts for on-orbit 
delivery of a satellite. Under this type of arrangement, the ultimate 
owner/operator of the satellite contracts with a satellite manufacturer 
to produce the satellite and secure launch services to deliver the 
satellite to a prescribed orbit. The satellite manufacturer purchases 
launch services directly from a commercial launch services provider, 
and transfers title to the satellite only after successful completion 
of the launch and on-orbit tests to confirm that the satellite is 
functioning properly. For this reason, the term ``customers'' also 
includes a person to whom the procurer of launch services conditionally 
sells, leases, assigns, or otherwise transfers its rights in the 
payload or a part thereof. Another example is the purchaser of an 
interest in the satellite, e.g., transponders, from the party that owns 
the satellite whether that party has purchased launch services directly 
or has contracted for on-orbit delivery on a ``turnkey'' basis. Another 
example is the customer who has placed its property on board the 
payload in order to receive an on-orbit service, such as microgravity 
experiments. The Office believes that these parties should be viewed as 
``customers'' in order to enable U.S. commercial launch services 
providers to compete with foreign operators, consistent with one of the 
objectives of the 1988 Amendments. The proposed definition of 
``customer'' therefore includes the person who enters into a launch 
services agreement with the licensee, as well as any person to whom the 
customer has, conditionally or otherwise, sold, leased, assigned or 
otherwise transferred any of its rights in the payload to be launched.
    The term ``customer'' does not include the ultimate beneficiary of 
the payload services, as opposed to launch services, because doing so 
could theoretically include any person who uses a television or makes a 
long-distance telephone call, and goes beyond the intended scope of the 
Act.
    When the licensee's customer is a U.S. Government agency, it is not 
intended that the agency be treated any differently from a 
nongovernmental customer with respect to the payload. Thus, as 
discussed in greater detail in the accompanying supplementary 
information under the heading, ``Government Customer,'' and in the 
analysis of Sec. 440.17 of the proposed regulations, the Government 
payload is not covered by required Government property insurance and 
the U.S. Government agency involved accepts responsibility for property 
damage to the payload. For other purposes, the Government customer is 
an agency of the United States involved in licensed launch activities 
and, as such, it is a named insured in required insurance and its 
employees are deemed third parties.
    A definition of the term ``Government personnel'' has been included 
in proposed Sec. 440.3 for purposes of identifying those employees of 
the Government and its contractors and subcontractors entitled to 
protection and coverage by required insurance.
    A definition of the term ``hazardous operations'' is included to 
add clarity to the list of information required by the Office to 
perform a determination of maximum probable loss. The definition 
proposed is consistent with the Office's study, ``Hazard Analysis of 
Commercial Space Transportation,'' prepared in May 1988, and is 
intended to capture activities that create a potential for an accident 
that would result in damage or injury.
    The term ``liability'' refers to any legal obligation, whether 
arising under United States, international or foreign law, to pay 
claims for bodily injury or property damage resulting from licensed 
launch activities.
    The term ``licensed launch activities'' is intended to reflect the 
activities subject to the Department's authority under the Act to 
license the launch of a launch vehicle. For purposes of applying the 
proposed regulations, it focuses specifically on activities authorized 
to be conducted under a particular license issued by the Office.
    The term ``maximum probable loss'' (or MPL) refers to the Office's 
determination, in the form of a dollar amount, of the greatest 
potential losses for bodily injury and property damage

[[Page 39003]]

that can reasonably be expected to occur as a result of licensed launch 
activities. The Office determines the value of the maximum probable 
loss attributable to licensed launch activities by analyzing the known 
hazards, the consequences (amount of loss), and probability of loss 
associated with such activities. It does not mean maximum possible 
loss, that is, a ``worst case'' scenario regardless of likelihood. 
Rather, assessing maximum probable loss employs risk analysis 
methodology. The analysis takes into account the characteristics of one 
or more launches in similar circumstances, the proximity of persons and 
property on and around the launch site and the likelihood of injury and 
damage within an established probability threshold. (A more elaborate 
explanation of the Office's methodology for determining the value of 
maximum probable loss is provided in the section-by-section analysis 
accompanying Sec. 440.7.)
    Through risk analysis, the Office determines two results: the 
probability an undesirable event will occur and the consequences 
(measured as the amount of loss) of that event. The Office then 
compares these results to a threshold probability of occurrence 
selected by the Office in order to determine whether the results are 
reasonable to expect, or probable, and therefore warrant financial 
protection against their occurrence. Typically, the larger, or more 
catastrophic, the potential loss or damage, the less likely it is to 
occur. The threshold probability is the probability value selected by 
the Office at and below which loss or damage that can be reasonably 
expected to occur is measured. Loss or damage that has a likelihood of 
occurring that is equal to or greater than the threshold probability is 
considered probable. Accordingly, insurance to protect against that 
amount of damage or loss is required. Loss or damage that has a 
likelihood of occurring that is less than the threshold probability is 
not reasonably likely to occur and is therefore considered improbable. 
Accordingly, insurance to protect against such loss or damage is not 
required. In summary, maximum probable loss is the dollar value 
determined by the Office as the upper bound of loss that can reasonably 
be expected to result from licensed launch activities. Loss or damage 
exceeding the upper bound would result from events that are so very 
unlikely as to be unreasonable to expect. That is, they are not 
sufficiently probable.
    Currently, the Office utilizes two different threshold 
probabilities in determining third-party and Government property 
maximum probable loss. The threshold probability used for determining 
third-party MPL, exclusive of Government personnel, is on the order of 
one in ten million. The threshold probability for determining 
Government property MPL and third-party MPL for Government personnel is 
on the order of one in one hundred thousand. The thresholds are defined 
to accommodate the difficulty of setting precise bounds on risks that, 
by definition, are somewhat remote.
    The Office's selection of on the order of one in ten million as the 
threshold probability (the probability of occurrence) for determining 
third-party MPL is based upon the Government's experience in supporting 
launch activities at Federal ranges. Because of the stringent safety 
requirements used at Federal range facilities, the general public in 
the vicinity of the range has little chance of being adversely affected 
by a launch event. As a result, the likelihood of a third-party 
casualty resulting from a launch from a Federal range should be no 
greater than on the order of one in one million. If the Office used one 
in one million as the threshold probability for determining third-party 
MPL, no third-party loss would reasonably be expected to occur, the MPL 
would be zero, and no third-party liability insurance would be 
required. The Office does not believe that this was the result Congress 
intended in adopting maximum probable loss as the basis for setting 
financial responsibility requirements. Accordingly, the Office's view 
is that the Act requires a reasonable and measurable amount of 
financial responsibility by licensees and has selected the very low 
threshold of on the order of one in ten million probability of 
occurrence as the threshold probability that achieves this result. The 
MPL determination using this threshold signifies that there is less 
than on the order of a one in ten million chance that claims for third-
party losses would exceed the required amount of insurance. Stated 
another way, the insurance requirement set by the Office is the maximum 
magnitude of loss such that there is less than on the order of one in 
ten million chance of exceeding this amount.
    The Office utilizes on the order of one in one hundred thousand as 
the threshold probability for determining Government property insurance 
requirements because Federal range facilities, by their very nature and 
intended purpose, will be exposed to hazardous activities and may 
suffer some damage. Thus, the Government appropriately accepts greater 
risk than third parties and the MPL is determined using the higher 
threshold probability. This assumption of some amount of risk may, in 
part, account for the lower statutory ceiling on insurance requirements 
and the Government's waiver of claims for damage above the amount of 
required insurance. Similarly, Government personnel, including 
employees of Government contractors and subcontractors, accept greater 
risk than the general public or other third parties through their 
exposure to or involvement in hazardous operations. For this reason, 
the third-party MPL determination includes risks to Government 
personnel measured at the probability threshold of on the order of one 
in one hundred thousand, rather than on the order of one in ten 
million.
    In the Office's experience, this approach results in insurance 
requirements that are reasonable, within the statutory ceiling for 
required insurance, and adequate to protect U.S. Government interests.
    The proposed definition of the term ``third party'' reflects the 
definition contained in 49 U.S.C. 70102(11). However, the Office's 
definition of ``third party'' clarifies the statutory definition by 
expressly including as third parties United States Government 
personnel, including employees of Government contractors and 
subcontractors, to the extent that they are directly involved in 
providing launch support or launch services for licensed launch 
activities. The purpose of the definition is to ensure that liability 
insurance, or other form of acceptable financial responsibility, 
required under Sec. 440.5(b) of the proposed regulations is available 
to cover the claims of Government personnel, as well as persons not 
involved in licensed launch activities, who are injured or otherwise 
sustain a loss as a consequence of those activities. Government 
personnel who contract personally and directly with a licensee or other 
nongovernmental launch participant to provide a service are not 
considered Government personnel for purposes of these regulations when 
performing that service. In addition, the proposed definition would 
expressly exclude employees of other launch participants because their 
claims for injury or loss are not intended to be included in the 
Office's determination of required third-party liability insurance. 
Responsibility for employee losses is assumed by each employer under 
the reciprocal waiver of claims required under Sec. 440.17 of the 
proposed regulations, and those employee claims are not eligible for 
payment by the U.S. Government in the event of excess third-party 
claims.

[[Page 39004]]

    The term ``United States'' is intended to refer to the United 
States Government in its entirety and as the collective sum of its 
various parts.

Section 440.5--General

    Although issuance of a license constitutes legal authorization to 
carry out the activities specified therein, certain conditions must be 
satisfied for the licensee to proceed with authorized activities.
    Section 440.5(a), as proposed, would establish the fundamental 
requirement that authorization to conduct licensed launch activities 
pursuant to a license issued by the Office is contingent upon the 
licensee's demonstration of financial responsibility and compliance 
with risk allocation requirements as set forth in proposed regulations. 
In addition to insurance required by this part, a licensee may be 
required by other agencies of the United States Government to obtain 
other types of liability or property insurance covering activities 
involving United States launch property, launch services or personnel. 
Other insurance requirements may include workers compensation, 
unemployment insurance, employer's liability, comprehensive automobile 
liability, environmental liability, or insurance required by Federal, 
State or local environmental protection laws and regulations. These 
other insurance requirements are not set forth in license orders issued 
by the Office; however, licensees are not relieved of the requirement 
to comply with them.
    In addition, as further explained in the section-by-section 
analysis accompanying Sec. 440.15(b), the financial responsibility 
requirements prescribed under the proposed regulations would preempt 
those provisions in agreements between the licensee and the United 
States, or any agency thereof, involving United States launch property 
or launch services that address financial responsibility, allocation of 
risk, and related matters covered by 49 U.S.C. 70112 and 70113. The 
objective of this preemption is to avoid duplicative requirements, but 
not to relieve the licensee of contractual or legal obligations 
intended to address interests other than those served by the statute.
    Section 440.5(b) would codify the Office's existing practice of 
setting the required amount of financial responsibility in license 
orders. As a procedural matter, the Office has relied on the issuance 
of license orders to supplement the license and prescribe specific 
terms, conditions and limitations, including financial responsibility 
requirements, on a case-by-case basis. Many of these terms and 
conditions would now be set forth in rules of general applicability. 
The amount of financial responsibility that must be obtained would 
continue to be set forth in a license order. The license order would 
generally be issued concurrently with the license, although there may 
be circumstances when it would follow issuance of the license. The 
Office may also revise financial responsibility requirements in a 
subsequent license order in the event of a change in exposed property 
or risks affecting the required amount of coverage. In any event, to 
the extent the license order reflects the Office's determination of 
maximum probable loss, the timing of its issuance would be subject to 
the provisions of proposed Sec. 440.7.
    Propose Sec. 440.5(c) states the fundamental principle that 
evidence of financial responsibility provided by the licensee is no 
substitute for actual financial responsibility of the licensee. In the 
event the licensee fails to obtain or maintain insurance or financial 
responsibility in amounts and according to the terms and conditions 
prescribed, the licensee would bear the risk and be liable for claims 
resulting from licensed launch activities that would otherwise have 
been covered. In addition, in the event of a defense raised, or 
exclusion, to coverage under the policy that relieves the insurer from 
compensating claims, the licensee would remain responsible for 
satisfying the claim. The only exception to this fundamental principle 
provided under the statue is where the Secretary of Transportation 
specifically determines that an exclusion is usual for the type of 
insurance involved, and the United States Government agrees to provide 
for paying claims from the first dollar of loss. As explained in the 
section-by-section analysis accompanying Sec. 440.19, a policy 
exclusion would be considered ``usual'' only if insurance covering the 
excluded risk is not commercially available at reasonable rates. The 
licensee is required to submit a certification to that effect when 
demonstrating compliance with financial responsibility requirements. No 
final determination is made by the Department unless and until an 
occasion arises when the Department is called upon to prepare a 
compensation plan covering excluded claims. If it then becomes evident 
that insurance was, in fact, available at commercially reasonable 
rates, the Government need not pay claims from the first dollar of loss 
and the licensee remains responsible for the liability.
    Failure by the licensee to comply with these requirements may 
result in suspension or revocaton of the license and also subjects the 
licensee to other penalties as provided in section 405.7 of this 
chapter.

Section 440.7--Determination of Maximum Probable Loss

    Section 440.7, as proposed, describes the Office's procedures for 
assessing and issuing a determination of maximum probable loss (MPL) on 
which financial responsibility requirements are based. Section 440.7(a) 
would provide that a determination of maximum probable loss resulting 
from licensed launch activities forms the basis of the financial 
responsibility order issued by the Office.
    Section 440.7(b) would provide the timing for the Office's issuance 
of the MPL determination, consistent with the Act. The Act provides 
that MPL determinations must be made no later than 90 days after a 
licensee or transferee requires it and has submitted all of the 
information needed to make a determination. In practice, the Office 
begins the risk analysis required for the MPL determination during the 
180-day license application review period. Doing so enables the Office 
to issue financial responsibility requirements concurrently with a 
license so as not to delay commencement of licensed launch activities.
    On a very few occasions, the Office has been unable to issue the 
MPL determination concurrently with the license. This result may occur 
for several reasons. In order to conduct the analyses, the Office 
requires from the applicant information described in Appendix I to the 
proposed regulations and may also request information from Federal 
range facilities involved in proposed launch activities or exposed to 
risk of damage or loss as a result of proposed activities. Incomplete 
information, either from the applicant or from the Federal range 
facility, can extend the amount of time necessary for the Office to 
complete and issue the MPL determination. Typically, a delayed 
determination results from submission by the applicant of incomplete 
information on which to perform the necessary risk analyses. Until the 
Office has complete and sufficient information the 90-day period does 
not begin. A delayed determination as a result of incomplete 
information is not untimely. In addition, the Act requires that the 
Office consult with heads of other appropriate Federal agencies in 
issuing financial responsibility requirements. The Office's practice 
has been to share its

[[Page 39005]]

MPL analyses with affected Federal agencies and request comments within 
three weeks. The Office's experience has shown that three weeks may not 
be sufficient for other Federal agencies to complete their reviews and 
issuance of the MPL determination may necessarily be delayed.
    Accordingly, proposed Sec. 440.7(b) would provide that the Office 
notify a licensee or transferee of any delays in issuing the MPL 
determination beyond the statutory 90-day period. The Office intends 
that this provision would be invoked only in circumstances beyond the 
Office's control, such as protracted consultation with other Federal 
agencies.
    Proposed Sec. 440.7(c) refers to Appendix I to the proposed 
regulations which prescribes information requirements for issuing a 
maximum probable loss determination. Appendix I is intended to be a 
comprehensive list of information requirements, some of which could be 
waived by the Office if, as a result of consultation with the 
applicant, the Office finds that the information is not necessary in 
light of the particular launch proposal. Once information is provided, 
the person requesting the MPL determination is responsible for 
reporting any changes that could affect the outcome of the risk 
analyses.
    As provided in proposed Sec. 440.7(d), the Office may amend or 
adjust its maximum probable loss determination to reflect any new 
information relevant to an accurate assessment of risk. In lieu of 
submitting duplicative information, a person requesting a MPL 
determination who has previously been issued one may certify that there 
has been no change from information previously submitted. This 
provision is intended to reduce the regulatory burden on licensees who 
conduct similar launch activities under separate licenses.
    An MPL determination must accompany every license authorizing 
launch activities and is therefore typically performed in conjunction 
with the Office's review of a license application. Section 440.7(e) 
would address the situation in which the Office is requested to issue a 
determination of maximum probable loss resulting from activities that 
are not the subject of a specific license application. A determination 
made under this section would not be governed by the 90-day requirement 
set forth in Sec. 440.7(b).
Methodology for Determining Maximum Probable Loss
    The Office derives the value of the maximum probable loss that may 
result to third parties and Government property from licensed launch 
activities through case-by-case risk analyses. The Office considers 
factors ranging from the kinds of hazardous operations, as defined in 
proposed Sec. 440.9, to be conducted under a license, to the number of 
third parties that may be exposed to risk in the event of a launch 
accident. Failure modeling techniques, the Office's experience in 
preparing numerous MPL determinations, and engineering judgment all 
play roles in the final determination. A more complete description of 
the Office's approach to hazard analysis and risk analysis techniques 
appears in a study, entitled ``Hazard Analysis of Commercial Space 
Transportation,'' released by the Office in May 1988. A copy may be 
obtained from the Office upon request. In addition, the Office is 
preparing a comprehensive description of its procedural methodology for 
determining maximum probable loss in a separate report to be made 
available to the public. A brief summary of the Office's approach to 
determining MPL is presented below to explain the underlying rationale 
for the information requirements referenced in proposed Sec. 440.7(c) 
and listed in appendix I to part 440.
    In addition to information required from the applicant, the office 
obtains certain information from the Federal range facility in order to 
assess properly the value of Government property exposed to risk. This 
information is not reflected in regulatory requirements. Typically, 
this information consists of identification of facilities the Federal 
range facility has authorized for use by the licensee and the value of 
those facilities, other range facilities that the Federal range 
facility identifies as exposed to risk as a result of the licensee's 
proposed launch activities due to their proximity to the licensee's 
hazardous operations, the number of Government personnel that the 
Federal range facility believes would be exposed to risk, and range-
required risk mitigation measures.
    Much of the information required to complete the MPL determination 
is provided as part of the application to conduct a launch. However, 
because any person can request a maximum probable loss determination at 
any time, information requirements for obtaining a determination are 
included as part of this proposed regulation. The proposed information 
requirements are not intended to place an additional or duplicative 
burden on prospective licensees and can be satisfied by specific 
reference to the license application.
    Appendix I describes the full range of information required from an 
applicant to complete the MPL determination. In certain circumstances, 
not all of the information would be required and the Office will advise 
the applicant accordingly during pre-application consultation. For 
example, where a launch from an isolated location would not expose any 
identifiable Government property to risk, the Office would waive those 
information requirements directed at assessing risk to Federal range 
facility assets. A launch proposal may involve vehicles and risks 
similar to those previously considered by the Office and the Office may 
waive information requirements it believes would be unnecessary or 
duplicative in light of existing analyses. Where the Office can 
determine, on the basis of the launch proposal, that certain risks need 
not be considered in order to calculate MPL, the Office will waive the 
requirements that pertain to those risks.
    The complexity of the MPL analysis will depend upon the risks that 
attend a specific launch proposal. At its most complicated, a complex 
launch vehicle involving hazardous operations and flight paths that 
expose people and property on and off-range to risk, the Office is able 
to employ a variety of risk analysis tools, such as computer models 
that estimate impact probabilities, potential property damage and 
casualty expectations. For all proposals, government property and 
third-part losses are considered in separate MPL analyses.
    The Office's objective is to determine the value of the maximum 
magnitude of loss that is sufficiently probable to warrant financial 
responsibility protection. That is, within the stated probability 
thresholds, as defined in proposed Sec. 440.3, the Office must 
establish a maximum value of loss. By corollary, the maximum magnitude 
of loss within the probability threshold drives the MPL value. This 
means that the Office need not consider every single accident scenario 
that falls within the threshold probability. Those having relatively 
minimal damage consequences need not be individually considered. 
Rather, the office's focus is on finding the maximum value of loss that 
would result from an accident that is within the specified threshold 
probability of occurrence. The Office does so by identifying 
specifically the hazardous activities to be conducted under a license, 
Government and third-party property placed at risk by those activities, 
and the number of third parties placed at risk. Then, the Office 
identifies a range of accident or failure scenarios and estimates the 
probability

[[Page 39006]]

of occurrence for each scenario. The Office then estimates the value of 
loss for various accident scenarios.
    The Office utilizes several methodologies, in order of preference, 
to estimate the probability of occurrence of the different scenarios. 
The order of preference begins with actual experience or existing 
models, and descends to expert probability analysis as the second best 
alternative, followed by professional engineering judgment.
    Estimating the value of loss for each accident scenario is done 
similarly, using different methodologies in an order of preference. 
Actual experience is most reliable and is used wherever it exists and 
is directly applicable to a launch proposal. For pre-flight licensed 
launch activities, the Office uses estimates that are informed by 
facility damage tables developed for the Federal range facilities, 
building design specifications, and engineering judgment. Computer 
models, such as the Facility Damage and Personnel Injury (DAMP) 
programs, may be used to estimate damage during and immediately 
following vehicle life-off. For third-party casualties, the Office 
develops an Expectation of Casualty figure for off-range population and 
Government personnel at risk.
    As noted above, low loss scenarios need not be considered unless a 
possible accident scenario involves losses that, when combined, may be 
significant in determining the value of the maximum probable loss. 
However, in many instances, accident scenarios are mutually exclusive. 
For example, a pre-flight accident that destroys the launch vehicle 
means there will be no launch, and there is no need to aggregate the 
damage from a pre-flight accident of this nature and a post-launch 
accident in determining the maximum value of loss.
    In summary, the Office performs a detailed estimate of property 
damage and casualties for the different accident scenarios that fall 
within the threshold probability of occurrence in order to determine 
the maximum value of loss. The MPL value becomes the amount associated 
with the most costly accident scenario falling within the threshold 
probability of occurrence.
Government Property
    The Office's maximum probable loss determination for Government 
property damage takes into account U.S. Government property situated on 
a Federal range facility, wherever located. As noted above in the 
Supplementary Information, the Office includes as part of its 
determination Government range assets on adjacent Federal range 
facilities that are exposed to risk of damage or loss as a result of 
licensed launch activities.
    The Office historically has not considered temporarily placed or 
``transient'' Government property, including launch vehicles and 
payloads, in calculating the maximum probable loss determination. The 
Office bases its approach on several considerations. First, the Federal 
range facility is responsible for maintaining a schedule of launch 
activities. The Government is therefore aware of upcoming commercial 
launch activities and, by exposing its transient or movable property to 
the possibility of damage or loss due to commercial launch activities, 
accepts certain risks. Second, readily movable property may no longer 
be present at the time the licensee ultimately conducts licensed launch 
activities. If that property were included in the MPL determination, 
the licensee may be unfairly burdened with too great an insurance 
requirement. One alternative would be to adjust, either upward or 
downward, the amount of property insurance that would be required just 
prior to commencing licensed activities. This approach is arguably 
contemplated by the statue, which provides for the Secretary to amend 
the maximum probable loss determination when new information so 
warrants. However, last minute adjustments to the MPL determination due 
to the Government's action of placing its property at risk, could prove 
administratively burdensome for both the Office and the licensee, whose 
launch could be delayed by having to demonstrate additional financial 
responsibility due to last minute changes in requirements. Third, 
including transient or Government property temporarily located on the 
Federal range, such as launch vehicles and payloads, could readily 
drive the MPL value above the $100 million statutory ceiling for 
required insurance. Although the Act contains provisions whereby the 
Department is directed to review annually the statutory ceilings on 
required insurance and report to Congress proposed adjustments to 
conform with changed liability expectations and the insurance market, 
the Office views the $100 million statutory ceiling on the Government 
property insurance requirement as a clear indication that Congress did 
not intend for these Government assets, which typically cost in excess 
of $100 million each, to be included as part of the range assets on 
which the MPL determination is based.
    The Office makes an important distinction between transient, 
movable property that is not included in the MPL determination and 
property that has been placed in a storage facility on the Federal 
range. The latter is included in the MPL determination. The rationale 
for the Office's distinction is that certain facilities are intended, 
by design, to house Government property on a temporary or long-term 
basis. However, where Government property has been stored in a facility 
not designed or intended for storage, thereby exposing the property to 
additional risk, the Office believes it would be unreasonable to impose 
the cost of this additional risk on the licensee. The Office therefore 
excludes the stored property from its MPL determination. In addition, 
to the extent this stored property, such as rocket motors or 
explosives, may contribute to the possible extent of damage to 
Government facilities, the Office does not factor the additional losses 
that may be attributed to that property in determining the MPL value.
    In taking the approach of excluding certain transient, movable 
Government property, the Office is aware that failure to include it 
could expose the Government to greater risk of loss. However, the 
Office believes that its approach reflects the intent underlying the 
comparatively low statutory ceiling on the Government property 
insurance requirement, and is reasonable in light of the Government's 
assumption of risk in placing property on the Federal range facility in 
a manner that exposes it to damage or loss from commercial launch 
activities. For these reasons, the Office believes that its approach is 
the better one. Nevertheless, it is important to bear in mind that, 
whether or not the value of certain property is included in making the 
MPL determination, damage or loss to any Government property, whether 
fixed or movable, located on the Federal range facility must be covered 
by the insurance policy the licensee obtains under 49 U.S.C. 
70112(a)(1)(B). Comments are requested on the Office's approach to 
considering non-fixed Government property in determining Government 
property insurance requirements.
Current Replacement Value
    In determining maximum probable lose for Government property, the 
Office bases its findings on the current replacement value of the 
property. The notion of current replacement value takes into account 
the current use and function of a Government facility, not its 
originally intended use. For example, the current replacement value for 
a facility that was originally built to support engineering operations 
but is no longer needed for that purpose and is

[[Page 39007]]

now used as an excess storage facility would most likely be lower than 
its original construction cost, even if a launch accident meant its 
total loss. The Office's rationale is that the cost of restoring 
property to its original use when the Government itself has chosen not 
to maintain the property in its original condition imposes an unfair 
cost on the licensee. The reverse situation may also occur, whereby 
restoring property to its current use may cost more than restoring it 
to its original use. This could occur where property has been up-graded 
or modified to support another purpose than originally intended. In 
that event, the Office believes that it is fair and appropriate to 
require insurance that covers the maximum probable loss to the 
property's current value, up to the statutory ceiling. In all 
circumstances, the Office consults with Federal range authorities in 
valuing Government property.
Third-Party Property Damage
    Under the proposed regulations, third-party property includes all 
property owned by persons or entities other than the licensee and its 
customer, and the contractors, subcontractors, and employees of each, 
involved in licensed launch activities, the Government's contractors 
and subcontractors involved in licensed launch activities, and the 
Government (except for property located on a Federal range facility). 
It includes the personal property belonging to Government personnel 
involved in licensed launch activities, and all off-range private and 
public property other than property on nearby or adjacent Federal range 
facilities for which Government property insurance coverage is 
required.
    The risk analysis performed to determine the value of third-party 
property maximum probable loss utilizes three approaches to estimating 
property values: (1) Specific determinations, (2) averaging, and (3) 
setting an upper bound or ceiling. The Office selects the appropriate 
methodology to use on a case-by-case basis, taking into account such 
factors as the availability of information, the launch site, and the 
range of risks to third parties presented by a particular launch 
proposal. The Office may use all three methods of estimating third-
party property losses in one MPL determining, depending upon the type 
and amount of property exposed to loss or damage as a result of 
licensed launch activities. In all instances, the Office utilizes a 
conservative approach to ensure the adequacy and sufficiency of its MPL 
determination and third-party liability financial responsibility 
requirement.
    The first estimation methodology, specific determinations, entails 
obtaining actual property values and determining the likelihood and 
consequences of an accident affecting that property. This method is 
typically used for very high-value property in the area that would be 
most exposed to risk. The second method, averaging, can be accomplished 
in several ways. One way is to average estimated property values in a 
homogeneous area through such means as county or city tax assessment 
records. Another is to assume that an accident will occur in the high-
value part of the risk area and determine the average of the high-value 
property exposed to risk. This conservative approach assures that the 
MPL determination will be sufficient to cover losses to this high-value 
property. The third method, setting an upper bound, also yields a 
conservative result. This approach utilizes the Office's experience by 
considering the nature and size of the area exposed to risk, e.g., 
urban, suburban, rural, industrial, farm, or some combination, and 
comparing it to third-party property considered at risk in past MPL 
analyses and to know values of Government property placed at risk. 
Setting an upper bound involves a qualitative assessment of the value 
of third-party property at risk and is based on the Office's extensive 
experience in assessing risk.
Third-Party Casualties
    The Office must also consider third-party casualties in determining 
maximum probable loss to third parties. Doing so requires an analysis 
of the number of persons exposed to risk and assigning a value of life. 
Department guidance issued in 1993 for preparing economic evaluations 
suggests using $2.5 million as the value of life in estimating one's 
willingness to pay for safety measures in order to reduce one's 
probability of death. However, the Office is mindful of the distinction 
between the value of life used for purposes of estimating the cost of 
safety requirements in regulations and for seeking damages in civil 
litigation. Accordingly, the Office utilizes the somewhat higher figure 
of three million dollars as the value of a life to assure a 
conservative, but reasonable, result.
    The Office requests comments on the appropriate means of assessing 
the value of third-party property and the value of life for purposes of 
determining maximum probable loss to third parties. In their comments, 
commenters are requested to consider the impact on insurance 
requirements that could result from a change in methodology.

Section 440.9--Insurance Requirements for Licensed Launch Activities

    This section would establish in a regulation financial 
responsibility requirements in the form of insurance as a condition of 
every license issued by the Office authorizing commercial space launch 
activities. A licensee would also be allowed to demonstrate an 
equivalent amount of financial responsibility through means other than 
insurance.
    Proposed Sec. 440.9(b) would establish the requirement that a 
licensee obtain a policy of liability insurance to pay claims of third 
parties for bodily injury or property damage resulting from licensed 
launch activities. In accordance with 49 U.S.C. 70112(a)(4), the 
parties protected under the insurance policy as insureds, or additional 
insureds, are the United States, its agencies, and its contractors and 
subcontractors, and their respective personnel, involved in licensed 
launch activities; and the licensee, the customer, and their respective 
contractors and subcontractors involved in licensed launch activities. 
Because Government personnel, as defined in proposed Sec. 440.3, are 
included within the proposed definition of ``third party,'' Government 
personnel may be both third-party claimants whose claims are 
compensable by required liability insurance, as well as additional 
insureds.
    Under proposed Sec. 440.9(c), the amount of required insurance is 
based on the Office's determination of maximum probable loss from 
third-party claims resulting from licensed launch activities. As 
provided by statute, the amount of coverage required by the Office may 
not exceed $500 million, or the maximum liability insurance available 
on the world market at reasonable cost. It should be noted that the 
maximum limit on insurance applies to the aggregate of claims for any 
particular launch, as provided by 49 U.S.C. 70112(a)(3). A policy may 
cover more than one launch. However, the amount of insurance prescribed 
by the Office in a license order must be available to cover the total 
of third-party claims resulting from each launch event. For example, if 
a licensee intends to conduct a series of launches under an operator 
license and third-party claims resulting from the first launch are 
compensated by the liability policy, the amount of coverage for each 
succeeding launch must be the amount required by the license order. 
Coverage may not be reduced by the amount of claims paid

[[Page 39008]]

as a result of previous launch activities conducted under the same 
license.
    Section 440.9(d) would establish in a regulation the requirement 
that a licensee must obtain a policy of insurance to compensate for 
damage to or loss of property at a Federal range facility that is 
owned, leased or occupied by, or in the care, custody or control of, 
the United States, its agencies, and its contractors and subcontractors 
involved in licensed launch activities, that results from licensed 
launch activities. The maximum probable loss determination to support 
this requirement focuses on valuable national assets located at Federal 
range facilities that are put at greatest risk by licensed activities; 
however, all Government property (and that of its agencies, contractors 
and subcontractors involved in licensed launch activities) at a Federal 
range facility must be protected. This would include Government range 
facilities surrounding or adjacent to the proposed launch site. The 
Office's experience in administering financial responsibility 
requirements to protect Government property has been previously 
described in the supplementary information accompanying this proposal 
under the heading, ``Property Protection for Government Launch 
Participants.'' The Office does not object to any reasonable approach 
on the part of a licensee that is taken to meet this requirement as 
long as the ultimate objective is achieved, that is, providing for the 
compensation of property damage sustained at Federal range facilities 
by the United States, its agencies, contractors and subcontractors 
involved in licensed launch activities, resulting from activities 
carried out under a license. However, the Office believes that, at a 
minimum, naming the U.S. Government and its agencies, contractors and 
subcontractors, involved in licensed launch activities, as additional 
insureds is necessary to accomplish this objective. Comments are 
requested on whether the Government should also be named the loss payee 
and be responsible for administering payment of insurance proceeds to 
its contractors and subcontractors.
    Under proposed Sec. 440.9(e), the amount of required insurance 
would be based on the Office's determination of maximum probable loss 
attributable to property damage claims of the United States, its 
agencies involved in launch services, and its contractors and 
subcontractors involved in licensed launch activities; however, the 
amount would not exceed $100 million. As noted in the analysis 
accompanying proposed Sec. 440.9(c), the maximum limit on insurance 
applies to the aggregate of claims for any particular launch. Covered 
claims are those against a person, including Government employees, for 
damage or loss to Government property, including the property of 
Government contractors and subcontractors, resulting from licensed 
launch activities. In this respect, the named insureds are different 
from those on the liability policy.
    Section 440.9(f) would provide that, in lieu of obtaining policies 
of insurance, the licensee may demonstrate financial responsibility in 
an alternative form--such as insurance purchased from a risk retention 
group authorized under the Risk Retention Amendments of 1986, surety 
bonds, letters of credit, or some combination--that reflects 
substantially the same terms and conditions of the requirements set 
forth in these regulations. Whatever the form of financial 
responsibility proposed in lieu of insurance, the licensee must 
demonstrate that it meets the requirements for financial 
responsibility.
    Section 6 of the 1988 Amendments to the Commercial Space Launch Act 
provides special incentives to certain satellites affected by National 
Security Decision Directive 254. This directive, issued by President 
Reagan in August 1986, following the Challenger accident, essentially 
ended NASA's role in launching commercial and foreign satellites. 
Section 6 of the 1988 Amendments provides that if certain eligibility 
criteria are met, the requirement that the licensee obtain property 
insurance covering loss of or damage to United States Government 
property does not apply. The Office believes that there are no 
remaining ``eligible satellites'' that have not been launched or 
otherwise accounted for and no provision is made in the proposed 
rulemaking to cover them. Comments are requested as to whether this 
provision may be properly omitted in final regulations.

Section 440.11--Duration of Coverage; Modifications

    Proposed Sec. 440.11(a) would specify when financial responsibility 
must be in place. Section 440.11(a), as proposed, would provide that 
required insurance coverage or other form of financial responsibility 
must attach upon commencement of licensed launch activities, and remain 
in full force and effect until the later of: (i) The completion of 
licensed launch activities, as defined by the Office in a regulation, 
or (ii) until risk resulting from licensed launch activities to third 
parties and Government property is sufficiently small, as determined by 
the Office through the risk analysis conducted to determine maximum 
probable loss, that financial responsibility is no longer necessary. 
The duration of financial responsibility requirements for a particular 
launch is specified by the Office in a license order.
    The statutory requirement for a licensee to obtain insurance or 
otherwise demonstrate financial responsibility refers to providing 
compensation for claims ``resulting from an activity carried out under 
the license.'' 49 U.S.C. 70112(a)(1). Based upon this language, the 
Office's view is that insurance requirements attach upon commencement 
of licensed launch activities but do not necessarily cease upon 
completion of a licensed launch, defined for orbital launches as the 
point when any remaining fuel is emptied from the upper stage, the 
vehicle tank is vented and otherwise ``safed,'' and the upper stage is 
no longer subject to the operator's control. Hazard analyses performed 
by the Office to determine maximum probable loss have shown that the 
greatest exposure for which insurance is typically required exists at 
the time of lift-off and flight, and that there is virtually no 
quantifiable risk to third parties or to United States Government 
property after completion of a nominal launch. The Office has found 
that thirty days is an appropriate amount of time in which to determine 
whether an orbital launch has been nominal or whether an anomaly has 
occurred that could affect risks to third parties or the Government. 
For this reason, historically, the Office has provided in license 
orders applicable to orbital launches that insurance coverage is 
required to attach upon commencement of licensed activities and remain 
in force ``for a period of thirty (30) days following payload insertion 
into orbit.'' For suborbital launches, insurance has been required to 
be maintained at least until motor impact and payload recovery. 
However, in the event of a launch anomaly, the Office may amend the 
license order to require that the licensee maintain insurance until the 
Office determines that risks to third parties and Government property 
are sufficiently small that insurance is no longer needed.
    When the licensee is no longer required to maintain insurance under 
the license, both the Government's waiver of excess property damage 
claims under Sec. 440.17(c), and the Government payment of excess 
third-party claims provisions under Sec. 440.19, would apply from the 
first dollar of loss. However, it is important to note that the

[[Page 39009]]

Act requires that the third-party claim result from the licensed 
activity in order for the Government payment of excess third-party 
claims provision to apply. When that nexus no longer exists, neither 
does the Government's acceptance of the risk of such claims. In every 
instance, a factual determination would be required as to whether a 
sufficient nexus exists between the licensed activity and the third-
party claim. In terms of business planning, it has been the Office's 
experience that for nominal launches, licensees may procure insurance 
for periods of time in excess of thirty days in accordance with 
individual risk management practices because the premium rate 
difference to cover any additional period of time tends to be 
negligible.
    As noted in the preceding Supplementary Information, questions have 
arisen over time with respect to the appropriate scope of a license 
authorizing pre- and post-flight ground operations and associated 
requirements for insurance coverage. As to pre-flight activities, the 
Office intends to address the question of the appropriate scope of a 
license authorizing launch activities in a separate rulemaking. With 
respect to post-launch ground operations, the Office believes that 
damage to Government property or property of Government contractors and 
subcontractors, as well as to third parties, could occur during clean-
up and from removal of launch-related equipment and material and that 
insurance should remain in place to protect against such claims. In 
this regard, it is significant to note that the Act requires financial 
responsibility to protect against claims ``resulting from an activity 
carried out under license'' (emphasis supplied) (49 U.S.C. 
70112(a)(1)). Comments are requested on the proposed duration of 
required insurance with respect to ground operations, including clean-
up and removal of launch-related equipment from the launch site. 
Comments are also requested on the extent to which insurance should be 
required to compensate claims of third-parties and the Government for 
short-term environmental damage, or alternatively, whether clean-up or 
short-term environmental damage to Government property should be 
charged to the licensee as a direct cost.
    The Office is also requesting comments on the extent to which 
insurance to protect against claims for long-term environmental or 
property damage should be required, its availability, and mechanisms 
for assuring adequate coverage has been obtained. The Office is aware 
that long-term environmental damage risks are typically excluded from 
launch insurance coverage because of, among other things, the 
difficulties of insuring against claims that may not arise until long 
after the risk period (generally launch plus a number of days) is 
concluded. Commenters should address whether such claims should be 
included in determining maximum probable loss for licensed launch 
activities and whether the existing statutory ceilings are adequate if 
such claims are included. In considering the issue, commenters are 
requested to suggest mechanisms for ensuring that funds are available 
to address long-term environmental damage that results from commercial 
launch activities. Commenters are also requested to address whether and 
the extent to which insurance to protect against property damage that 
results from orbital debris long after a launch has been completed 
should be required.
    Section 440.11(b), as proposed, would provide that the licensee may 
not replace, cancel, change or withdraw the insurance or other form of 
financial responsibility required, or in any way modify it to reduce 
the limits of liability or the extent of coverage, and that any form of 
financial responsibility may not be permitted to expire prior to the 
time specified by the Office in a license order, unless the Office is 
notified in advance and expressly approves of the modification. The 
purpose of this requirement is to ensure that the licensee has adequate 
coverage in place that meets the requirements of the applicable license 
order.

Section 440.13--Standard Conditions of Coverage

    Proposed Sec. 440.13(a) identifies the terms and conditions that 
must be included in any insurance policy obtained to satisfy the 
requirements of proposed Sec. 440.9. With some modification, the 
proposed terms and conditions of insurance coverage have been required 
by the Office in license orders issued on a case-by-case basis in order 
to carry out the office's responsibilities under the statute, and to 
the Office's knowledge, have not been difficult to obtain.
    Section 440.13(a)(1) would provide in a regulation that any 
required policy of insurance must provide that bankruptcy or insolvency 
of the insured (licensee) or any additional insured does not relieve 
the insurer of any of its obligations under the policy. This 
requirement is commonly found in liability insurance policies. Its 
presence is desirable because under common law, if an insurance 
agreement were construed as only an agreement to indemnify against 
loss, under certain circumstances the insurer could avoid payment of 
third-party claims altogether where the insured was declared insolvent. 
This condition is intended to remove any doubt that the policy insures 
against liability to pay damages and is not merely an agreement to 
indemnify against loss.
    Section 440.13(a)(2), as proposed, would provide that the policy 
limits for any required insurance policy apply separately to each 
occurrence and in the aggregate with respect to claims resulting from 
licensed activities associated with a particular launch. This provision 
would further the intent of 49 U.S.C. 70112(a)(3), which prescribes 
insurance ceilings applicable to ``the total claims related to one 
launch, * * *'' As noted above, where insurance is obtained by a 
licensee for a number of launches under an operator license, the limits 
of the policy must be available for each licensed launch and may not be 
reduced due to claims resulting from a prior occurrence.
    Proposed Sec. 440.13(a)(3) would state that any required policy of 
insurance must provide for the payment of claims from the first dollar 
of loss, without regard to any deductible, to the policy limits, except 
in the limited circumstances allowed in the regulation. The Office 
discourages the use of a deductible because of the clear statutory 
mandate to ensure comprehensive protection for all insureds from 
liability for third-party claims and prompt restoration of United 
States range assets. If this coverage entails additional cost to the 
licensee, it is not unreasonable relative to the policy objectives 
underlying the statute. Risk retention arrangements between the 
licensee and its insurer may be used as a means of reducing the policy 
premium.
    Nevertheless, the Office understands that licensees may desire a 
small deductible amount from their coverage in order to reduce policy 
premiums and the Office has included a provision in the proposal that 
would allow the reasonable use of deductible amounts. However, to 
ensure that statutory objectives are achieved, a deductible would be 
allowed only if the amount of the deductible is placed in a an escrow 
account established to cover claims resulting from licensed launch 
activities or if the licensee can demonstrate to the office that it has 
that amount readily available to it, with no prior liens or obligations 
on the funds. The Office believes that use of a deductible is 
appropriate only for comparatively small sums and should not be used as 
a means of avoiding insurance.

[[Page 39010]]

Comments are requested on whether the proposed approach is reasonable. 
Where Government property is concerned, commenters should bear in mind 
the objective that proceeds must be made immediately available to 
restore Government property to its prior condition and use, and that 
any delays (e.g., in the event assets must be liquidated to pay claims) 
would be counter to the statute. The Government may also be exposed to 
claims by its contractors and subcontractors for their property damage 
where insurance proceeds are not immediately available to cover those 
loses. Any inability to obtain promptly full payment of such claims 
could expose the Government to administrative and legal expenses the 
Government seeks to avoid through required insurance.
    Section 440.13(a)(4), as proposed, limits the defenses available to 
the insurer to avoid paying claims under the policy. It states that a 
required policy of insurance must provide that the actions of the 
insured or any additional insured shall not result in invalidation of 
the policy; however, an insured or additional insured itself may be 
denied coverage under a policy for claims against it in the event of 
any breach or violation by it of any warranties, declarations, or 
conditions contained in the policy. Action by the insured includes 
nonpayment of the policy premium. Thus, although the Office views the 
licensee as ultimately responsible for paying additional insureds under 
the policy as a result of the licensee's nonpayment of the premium.
    As a general rule, liability and property insurance policies issued 
by insurance underwriters contain certain standard exclusions of 
coverage as well as particular exclusion depending on the activities 
for which insurance is sought. Proposed Sec. 440.13(a)(5) acknowledges 
that the insurance policies required under Sec. 440.9 may contain 
certain exclusion from coverage. Those exclusion must be specified.
    In the event of a claim for property damage or bodily injury that 
is not covered by insurance, the liability for such damage and injury 
would ordinarily fall on the licensee or additional insured in the 
absence of some form of indemnification. The Secretary of 
Transportation is empowered, under 49 U.S.C. 70113(a)(2), to provide 
for payment of third-party claims that are the subject of insurance 
policy exclusions that ``are usual for the type of insurance involved'' 
and for which insurance is therefore not available to cover the claim. 
49 U.S.C. 70113(a)(2). In addition, under 49 U.S.C. 70112(b)(2), the 
Secretary may, following interagency consultation, waive claims for 
property damage not covered by required property insurance by reason of 
exclusions that are ``usual for the type of insurance involved'' such 
that insurance is not available. 49 U.S.C. 70112(b)(2). As a result, a 
claim that is not compensated by insurance because it falls within an 
insurance exclusion determined by the Office to be usual would 
essentially permit first-dollar payment by the United States Government 
without regard to the thresholds provided, respectively, in 49 U.S.C. 
70113(a)(1) and 70112(b)(2).
    However, in determining what may be considered usual exclusions for 
the type of insurance involved, the Office is necessarily mindful of 
the direction from Congress that first-dollar payments by the United 
States for such exclusions should not be an inducement for insurers to 
begin restricting the scope of coverage in their insurance contracts 
with licensees. Moreover, payments for claims excluded from third-party 
liability coverage, like payments generally of third-party claims in 
excess of required insurance under 49 U.S.C. 70113, are subject to 
certain conditions including Congressional approval of a compensation 
plan and appropriation of funds.
    There are no identical exclusions found in each and every policy. 
Variations exist among U.S., London, continental European and other 
overseas insurance markets. Moreover, exclusions may be added by an 
insurer depending on the particular market and types of risks involved, 
or can often be ``bought out'' by an endorsement or by a separate 
policy. Also, exclusions may be added or existing exclusions modified 
as a result of judicial interpretations the insurance market neither 
intended nor anticipated in setting its premium rates. Based on 
insurance market conditions and loss experience, future exclusions may 
vary from customary or usual exclusions today. Consequently, the 
proposed regulations define a usual exclusion as one for which coverage 
is not commercially available at reasonable rates. Licensees must 
certify at the time they demonstrate compliance with insurance 
requirements that insurance covering the excluded risks is unavailable 
at reasonable rates in order for the United States Government to 
provide for payment of claims from the first dollar of loss. However, 
the licensee's certification does not finally resolve that a particular 
exclusion will be deemed to be ``usual.'' That is, in the event the 
Office determines that insurance was available at reasonable rates the 
Secretary need not provide for payment of claims from the first dollar 
of loss. Comments are requested on other appropriate criteria for 
determining whether an exclusion may be considered ``usual.''
    Proposed Secs. 440.13(a)(6)-416.13(a)(8) would prescribe, in 
regulations, additional insurance requirements that have been 
customarily imposed by the Office in license orders in carrying out its 
statutory mandate.
    Comments are requested on any other terms and conditions that would 
be appropriate to require in rules of general applicability.

Section 440.15--Demonstration of Compliance

    As proposed, Sec. 440.15(a) would require the licensee to 
demonstrate that it has complied with the insurance and allocation of 
risk requirements under the proposed regulations no later than thirty 
days before commencing licensed launch activities. However, a license 
order may require a licensee to demonstrate compliance in less than 
thirty days where the license or license order is issued less than 
thirty days before the licensee intends to commence licensed launch 
activities. It is strongly recommended that licensees submit required 
documentation demonstrating compliance with these requirements well in 
advance of the thirty-day period to ensure that the Office has adequate 
opportunity to review the submission and confirm compliance by the time 
the licensee wishes to commence licensed activities. It has been the 
Office's experience that thirty days is a reasonable length of time to 
address any issues that arise as a result of the licensee's submission. 
Where a licensee uses a form of financial responsibility other than 
insurance to demonstrate compliance, the Office require sixty days to 
review the submission and ensure its sufficiency.
    Section 440.15(b) would establish in a regulation that once the 
licensee has fully demonstrated compliance with part 440 financial 
responsibility and allocation of risk requirements, these requirements 
preempt any conflicting or inconsistent requirements in any agreements 
the licensee may have previously entered into with other agencies of 
the United States concerning access to or use of United States launch 
property or launch services. This express preemption is necessary 
because there has been a significant amount of confusion in the past 
concerning the effect of similar or additional insurance requirements 
imposed by agreements governing

[[Page 39011]]

access to United States launch facilities. As stated above in the 
section-by-section analysis accompanying Sec. 440.5(c), the object of 
this preemption is to avoid imposing duplicative and inconsistent 
obligations on the licensee, but not to relieve the licensee of 
contractual or legal obligations intended to address interests other 
than those served by the statute. The Office evidences its 
determination that a licensee has fully complied with part 440 
requirements in a letter issued to the licensee.
    Under the proposal Sec. 440.15(c) would establish requirements for 
a licensee to provide the Office with proof of insurance. It is 
extremely important for the Office to secure adequate assurance that 
the licensee has obtained the insurance required under the regulations. 
However, the Office believes that it is unnecessary and impractical to 
review each policy constituting part of an insurance submission to 
ensure compliance. Accordingly, proposed Sec. 440.15(c) and (d) would 
provide for certain certifications and representations from the 
licensee and its insurer, respectively. The licensee must certify that 
it has obtained insurance in conformance with the part 440 regulations 
and the applicable license order. In addition, the licensee must file 
with the Office one or more certificates of insurance evidencing 
coverage, as prescribed by the Office, under currently effective and 
properly endorsed policies applicable to licensed launch activities. A 
certificate of insurance must specify any policy exclusions or 
limitations in detail, in accordance with proposed Sec. 440.13(a)(5a). 
In addition, the licensee would be required to certify that insurance 
is not commercially available at reasonable rates in order for the 
exclusion to be found usual for the type of insurance and the United 
States Government to provide for payment of claims from the first 
dollar of loss. The licensee would also be required to submit duly 
executed waiver of claims agreements, signed by the licensee and its 
customer. The licensee's certifications must be signed by a duly 
authorized officer of the licensee and may be submitted in one 
document.
    Section 440.15(d), as proposed, would specify certain insurance 
certificate requirements. Each certificate of insurance must be signed 
by the insurer and accompanied by a signed opinion of the insurer 
stating that the policy obtained by the licensee complies with the 
requirements set forth in part 440.
    Section 440.15(e) would further require the licensee to maintain, 
and make available for inspection by the Office upon request, all 
required policies of insurance and other documents necessary to 
demonstrate compliance with part 440 requirements. Although this 
section essentially imposes a mandatory recordkeeping requirement upon 
the licensee, the Office believes that the maintenance and 
administration of these records by the licensee is consistent with the 
Office's regulatory authority to monitor compliance with the license. 
Moreover, it is considerably less burdensome and time-consuming for 
both the Office and the licensee than requiring submittal of all the 
policy documents to the Office.
    Proposed Sec. 440.15(f) recognizes that the licensee may propose to 
satisfy financial responsibility requirements in a form other than 
insurance. A licensee may do so, provided it otherwise satisf
FR Doc. 96-18532 Financial Responsibility Requirements for Licensed Launch Activities
ies 
regulatory requirements. In practice, licensees have furnished 
insurance in order to meet the financial responsibility requirements 
prescribed by the Office pursuant to the statue. Under existing 
insurance market conditions, third-party liability insurance is 
obtainable to prescribed limits at reasonable cost. A presentation by 
the Risk Management Working Group of the COMSTAC at its meeting on May 
18, 1995, projected market capacity as sufficient to satisfy launch 
insurance demand in 1995. In addition, property insurance, where 
required, may be accommodated within the licensee's existing property 
and casualty insurance program and is therefore easily obtained.
    While the Act does state that a licensee may demonstrate financial 
responsibility in a form other than insurance, it does not specify what 
other forms of financial responsibility would be acceptable. A number 
of alternatives are possible and the Office necessarily will examine 
any proposal for demonstrating financial responsibility through 
alternative means on a case-by-case basis to determine whether it 
otherwise satisfies the requirements for demonstrating financial 
responsibility.

Section 440.17--Reciprocal Waiver of Claims Requirements

    This section, as proposed, establishes requirements for reciprocal 
waivers of claims among launch participants. These requirements are 
additional conditions of a license.
    Proposed Sec. 440.17(b) would implement 49 U.S.C. 70112(b)(1), 
which requires the licensee to implement reciprocal waivers of claims 
with its contractors and subcontractors, its customers, and the 
contractors and subcontractors of its customer, whereby each party 
agrees to be responsible for loss or damage it sustains. Parties to a 
waiver of claims agreement waive two types of claims: Claims for their 
own property damage, and claims they may have against another launch 
participant as a result of losses for property damage or bodily injury 
sustained by their employees, resulting from licensed launch 
activities.
    49 U.S.C. 70112(b)(2) requires the Secretary of Transportation, for 
the United States, its agencies involved in licensed launch activities, 
and its contractors and subcontractors, to enter into reciprocal 
waivers of claims with the licensee, its customer, and their respective 
contractors and subcontractors involved in launch services. In the 
Office's view, the purpose of this provision is to establish the 
Government's waiver of claims against the private sector launch 
participants and acceptance of responsibility for property damage that 
exceeds the level of Government property insurance obtained by the 
licensee under 49 U.S.C. 70112(a)(1)(B).
    The approach taken in proposed Sec. 440.17(c), of requiring a 
formal three-party agreement among the United States, the licensee and 
its customer, deviates from the form suggested by a literal reading of 
the Act. However, the Office believes that this approach is the most 
desirable and efficient one to effectuate the overall purpose of the 
statutory reciprocal waiver of claims requirements: To limit the 
universe of potential claims that could arise out of licensed launch 
activities, and to eliminate the need for each participant in licensed 
launch activities to obtain separate liability insurance protection 
against such claims. This approach has also proved manageable for the 
launch services industry in executing agreements with customers and the 
U.S. Government.
    Section 440.17(c), as proposed, would require that the licensee, 
its customer and the Department of Transportation on behalf of the U.S. 
Government enter into a three-party agreement as set forth in appendix 
II to part 440. The form of the Agreement for Waiver of Claims and 
Assumption of Responsibility (Agreement) presented in Appendix II 
deviates from the current practice of the Office and is intended to 
clarify the scope of the waiver that the United States provides when it 
is involved in licensed launch activities, and the waiver it requires 
in return. Simply put, the Department of Transportation, on behalf of 
the United States, its agencies involved in licensed launch activities, 
and its contractors and subcontractors, would agree to waive claims 
against the

[[Page 39012]]

licensee, its customer and the contractors and subcontractors of the 
licensee and its customer, and accept responsibility for losses to 
property of the Government launch participants, only to the extent that 
such claims exceed the level of insurance the licensee must obtain 
under Sec. 440.9(d). As a reciprocal undertaking, the licensee and its 
customer each would waive claims against the other party and the United 
States and its agencies involved in licensed launch activities, and 
against the contractors and subcontractors of each of those parties, 
and accept responsibility for damage to its own property and losses 
sustained by its own employees, respectively.
    Whereas other parties to the three-party reciprocal waiver of 
claims agreement would agree to waive and accept responsibility for 
claims for property damage or bodily injury sustained by its employees, 
the U.S. Government need not do so. Because Government personnel are 
third parties, their claims for bodily injury or property damage would 
be compensated by the third-party liability insurance the licensee is 
required to obtain. Claims in excess of required insurance would become 
eligible for payment by the Government under the payment of excess 
claims provisions of the statute. 49 U.S.C. 70113. Although the 
approach reflected in the proposed form of Agreement is not currently 
reflected in existing license orders, the Office believes it more 
accurately reflects the allocation of risks intended by the statute and 
correctly responds to the Government's inability under appropriations 
law to accede to unfunded contingent liability, unless so authorized.
    In addition, under the proposed from of the Agreement, the licensee 
and its customer would further agree to extend, or flow down, the 
waiver obligations to their respective contractors and subcontractors, 
and all three principals to the Agreement--including the Department--
would agree to indemnify the other parties from claims by their 
contractors and subcontractors arising out of the indemnifying party's 
failure properly to implement or extend the waiver.
    One launch company has objected to the indemnification provisions 
required under the three-party reciprocal waiver of claims agreement 
currently employed by the Office and included in this proposal for all 
interparty waiver of claims agreements. In the launch company's view, 
this provision is not required by statute and adds liability and risk 
over and above that imposed by a breach of contract remedy, which the 
launch company believes would be the appropriate remedy for failure to 
flow down the cross-waiver requirement.
    The Office's view is that a contractual undertaking to indemnify 
another party for one's own failure to implement properly the 
agreements flow-down requirements is preferable. It would provide a 
strong incentive for parties to be attentive to the flow-down 
requirement. This is significant because of the limitation on the 
Office's ability to monitor each licensee's and customer's cross-
waivers with their myriad contractors and subcontractors. It would also 
provide a ready remedy for parties who sustain loss because of another 
party's failure to flow down the cross-waiver requirement.
    In those situations where the licensee's customer is a Government 
agency, the provisions applicable to the customer are the same as those 
for an agency involved in licensed launch activities for purposes of 
the reciprocal waiver of claims requirement. However, because the 
Government property insurance requirement does not cover the Government 
payload, the Government waives claims for property damage and assumes 
responsibility for damage or loss to the payload from the first dollar 
of loss.
    Some concern has been expressed within the commercial space launch 
industry over the assumption of responsibility for employee losses 
required of signatories to the waiver of claims agreement. In the 
Office's view, this is a risk that can be effectively managed without 
imposing unreasonable economic burdens on launch participants.
    The assumption of responsibility by nongovernmental launch 
participants for their own employees' losses represents a mutual 
undertaking by each entity to cover losses of its employees. Although 
employees of nongovernmental launch participants would not be ``third 
parties'' whose claims are compensated under the liability insurance 
required under the proposed regulations, launch participants could 
protect themselves by ensuring that their general liability policies 
would respond to compensate such claims. The Office believes that a 
variety of measures may be utilized by launch participants to manage 
the mandatory assumption of responsibility. At the same time, the 
objective of the risk allocation scheme--to limit the need for each 
launch participant to obtain broad liability coverage to protect itself 
from the universe of potential third-party claims--would be realized. 
The Office requests comments on its approach to implementing the waiver 
of claims and assumption of responsibility requirements of the Act. In 
doing so, commenters should bear in mind that there is no indication in 
the Act or its legislative history that employees of nongovernmental 
launch participant, unlike employees of Government launch participants, 
are intended to be included in the definition of ``third parties'' for 
purposes of these regulations. Nor is there any indication that the 
Government would agree to pay their claims as excess third-party claims 
(so-called ``indemnification'') to the extent employees' claims exceed 
required insurance. Moreover, considering employees of launch 
participants as third parties under the statutory definition would run 
counter to the assumption of responsibility for their loses mandated by 
the statute. Also, if such employees were included as ``third 
parties,'' the amount of third-party liability coverage the licensee 
would be required to obtain would likely increase significantly.
    It is important to note that not all private participants in 
licensed launch activities are necessarily expected to accede to the 
reciprocal waiver of claims scheme in order to effect its purpose. Only 
those participants who have their personnel or property involved in 
licensed launch activities, and who may make claims against other 
participants as a result of loss or damage sustained by their personnel 
or property in the event of an accident, should be expected to enter 
into reciprocal waivers of claims. If all participants having personnel 
or property involved in licensed launch activities have acceded to the 
reciprocal waiver scheme, they would be foreclosed from making any 
claims against each other.
    A question has been raised by a payload company as to the Office's 
requirements when multiple customers contract with a launch operator 
for launch services or there is more than one customer's payload on the 
launch manifest for a single launch. In those cases, executing a single 
waiver of claims agreement that includes each customer as a party to 
the agreement, or executing separate but appropriately modified 
agreements, would serve to ensure all parties have been included and 
protected as intended.
    There has been some question as to the meaning and appropriate 
implementation of the provision in 49 U.S.C. 70112(b)(2), which 
requires the Secretary to enter into reciprocal waivers of claims 
``for'' the Government's contractors and subcontractors involved in 
launch services. The Office has interpreted this provision to mean that 
contractors and

[[Page 39013]]

subcontractors of the United States are intended to be included as 
beneficiaries of the waiver of claims by the licensee, the customer and 
their respective contractors and subcontractors; and that the United 
States, through its appropriate agencies involved in licensed 
activities, is responsible for protecting their interests.
    The proposed form of Agreement set forth in Appendix II to the 
proposed regulation continues the current practice of excluding from 
the waiver and assumption of responsibility claims for bodily injury or 
property damage resulting from willful misconduct of the parties. It 
also continues the current practice of requiring that parties waive 
claims, regardless of fault. Questions have been raised as to whether 
claims resulting from gross negligence are also excluded from the 
intended scope of the waiver. The Office believes that carving out an 
exception for gross negligence from the reciprocal waiver of claims 
could result in parties attempting, in effect, to nullify or avoid 
required waivers of claims by alleging sufficient evidence of gross 
negligence to withstand legal challenge, thereby defeating one of the 
purposes of the Agreement. The Office has not elected to do so in the 
proposed form of Agreement.
    The Office believes its approach is consistent with the statutory 
intent of requiring launch participants to enter into a no-fault waiver 
of claims agreement in order to eliminate the need for additional 
insurance to protect against claims for damage caused by a party to the 
launch to any other party to the launch and to limit the total universe 
of claims resulting from a launch. Comments are solicited from the 
public on the proposed Agreement implementing 440.11(b), which is set 
out in Appendix II to the proposed regulation. If differs from the form 
that currently accompanies financial responsibility license orders but 
more closely conforms to the Office's view of the objectives of the 
statutory waiver requirements. A part to the Agreement wishing to 
modify its form may petition the Associate Administrator under the 
procedures set forth in 404.3 of the Regulations.

Section 440.19--United States Payment of Excess Third-Party Liability 
Claims

    Payment by the United States of successful claims of third parties 
resulting from licensed launch activities, as provided in 49 U.S.C. 
70113, is subject to appropriations laws or enactment of other 
legislative authority providing for the payment of claims submitted as 
part of a compensation plan prepared by the Office. The total amount of 
excess third-party claims that may be paid by the United States will 
not be greater than $1,500,000,000 (as adjusted for inflation occurring 
after January 1, 1989) above the amount of insurance required under 
Sec. 440.9(c). However, to the extent a third-party claim results from 
the willful misconduct of a launch participant, the Government is not 
required to provide for payment of the claim. The statute limits this 
exception to willful misconduct by a licensee or transferee; however, 
the Office believes that any launch participant's willful misconduct 
relieves the Government from providing for payment of third-party 
claims against that launch participant under 49 U.S.C. 70113(a)(2).
    In the event a successful claim is not covered by required 
insurance due to a policy exclusion that is found to be usual because 
insurance is not commercially available at reasonable cost, the 
Government would pay such claims from the first dollar of loss up to 
$1,500,000,000 (as adjusted for inflation occurring after January 1, 
1989), again, subject to appropriate legislative action.
    Excluded from the statutory obligation of the Secretary of 
Transportation to provide for payment of successful third-party claims 
are claims against contractors and subcontractors of the United States 
and its agencies involved in licensed activities. It has been suggested 
that this exclusion was inadvertent, and the Office believes that this 
is the better view. On the other hand, the Office is mindful of the 
availability of Government indemnification that may benefit such 
contractors and subcontractors pursuant to statutes other than 49 
U.S.C. Subtitle IX. However, provision of this protection by the 
Government to its contractors and subcontractors may be made only under 
certain narrow circumstances, and is not routinely done. Where it is 
not done, a Government contractor or subcontractor would be required to 
purchase liability insurance to protect itself from third-party claims 
in excess of the liability policy obtained by the licensee, and would 
pass the cost through to the Government as an allowable cost under the 
contract. Therefore, absent legislative clarification, the Office is of 
the view that the United States would afford its contractors and 
subcontractors the protections offered to other launch participants 
under the payment of excess claims provisions of the statute, after the 
limits of the liability policy obtained by the licensee have been 
reached. However, this approach is not intended to interfere with or 
encumber the Government's enforcement of contractual rights and 
remedies with respect to its contractors. Public comment is sought as 
to whether this interpretation of 49 U.S.C. 70113 is in keeping with 
the overall risk allocation scheme of the Act.
    Under proposed Sec. 440.19(d), the Government would pay claims from 
the first dollar of loss upon expiration of the prescribed period of 
time for which the licensee is responsible for maintaining financial 
responsibility. Industry representatives have suggested that the 
Government's obligation to pay claims remains for three years following 
the launch event. However, the statutory payment of excess claims 
provision is limited to a successful claim of a third party against a 
launch participant ``resulting from an activity carried out under the 
license * * * for death, bodily injury or property damage or loss 
resulting from an activity carried out under the license.'' The statute 
further limits payment of excess claims ``to the extent the total 
amount of successful claims related to one launch'' exceeds the 
required amount of third-party liability insurance and is not more than 
$1,500,000,000 above that amount. 49 U.S.C. 70113(a). The Office 
believes that these provisions may be intended as a limitation on the 
claims that would be eligible for so-called indemnification by the 
Government. The Office requests comments on the nexus that must exist 
between a third-party claim and the licensed launch activity in order 
for the claim to be eligible for payment by the Government.
    Proposed Sec. 440.19(e) would establish procedural conditions for 
invoking the Government's payment of excess third-party claims 
provisions of the Act, including notice and participation or assistance 
in the defense by the United States of any claim or lawsuit by a third 
party arising out of licensed launch activities. This is consistent 
generally with the Government's usual practice for responding to 
similar claims.
    Some industry representatives, as well as the COMSTAC, have 
recommended that the statutory provisions for Government payment of 
excess third-party claims should be memorialized in a contract between 
the United States Government and the intended beneficiaries of these 
provisions, similar to the indemnification agreements the Nuclear 
Regulatory Commission is required to enter into on behalf of the United 
States under the 1988 Price-Anderson Amendments, Pub. L. 100-408, to 
protect licensed operators of nuclear reactors from catastrophic 
losses. The Office believes that 49 U.S.C. 70113

[[Page 39014]]

does not constitute or establish an indemnification obligation on the 
part of the United States like that set forth in the Price-Anderson 
regime which, among other things, expressly requires a contractual 
undertaking and specifies necessary contractual provisions. 42 U.S.C. 
2210. In contrast, 49 U.S.C. 70113 is largely procedural in nature. Any 
payment that the Secretary proposes be made under the statute is 
contingent on Congressional approval of a compensation plan and 
appropriation of funds or other legislative authority. Accordingly, the 
recommendation to reflect the Government's agreement for payment of 
excess claims in a contract is not included in this proposal.
    As provided the statute and proposed section 440.19(f), in the 
event of catastrophic losses, the Office would prepare a compensation 
plan specifying the total amount of claims, suggesting sources of 
funding that may be available to pay the claims, and proposing any 
legislation necessary to authorize appropriation of funds and otherwise 
implement the plan. In addition, as provided by the Act, the Office is 
authorized to withhold payment of a claim that has not been decided by 
a Federal court if the Office finds the amount is unreasonable.
    The Office welcomes comments from the public on appropriate 
implementation of 49 U.S.C. 70113 payment provisions. Comments would 
assist the Office in developing a future rulemaking that would address, 
more specifically, the mechanism for seeking payment by the Government 
of excess third-party claims.

Statutory Authority for This Proposed Rule

    This proposal is issued pursuant to 49 U.S.C. Subtitle IX, ch. 
701--Commerical Space Launch Activities, sections 70101-70119, formerly 
the Commercial Space Launch Act of 1984 (CSLA), as amended (49 U.S.C. 
App. 2601-2623). In 1988, Congress amended the CSLA by replacing 
general insurance requirements with a detailed financial responsibility 
and allocation of risk regime for licensed operations. The provisions, 
referred to as the 1988 Amendments, include procedures whereby the 
United States Government requires risk-based insurance to compensate 
for third-party liability and Government property damage claims, waives 
certain claims for its property damage and, subject to an appropriation 
law or other legislative authority, agrees to provide for payment of 
third-party claims in excess of required liability insurance. In 
addition, the 1988 Amendments require launch participants to enter into 
reciprocal waivers of claims in which the parties agree to absorb 
certain losses and the nongovernmental launch participants agree to be 
responsible for claims of their employees for damage or loss.
    The Office has been implementing the 1988 Amendments on a case-by-
case basis, through license orders issued with each license authorizing 
commercial space launch activities. Based upon its experience, the 
Office proposes to standardize requirements into rules of general 
applicability, wherever practicable.
    Under 49 U.S.C. Subtitle IX, ch. 701, the Secretary is responsible 
for licensing and otherwise regulating commercial space launches and 
the commercial operation of launch sites carried out within the United 
States or by its citizens. In doing so, the Secretary is charged with 
protecting public health and safety, safety of property, and United 
States national security and foreign policy interests, and must ensure 
compliance with international treaty obligations of the United States, 
including the United Nations Treaties on Outer Space. The Secretary is 
also responsible for establishing requirements for proof of financial 
responsibility and other assurances necessary to protect the Government 
and its agencies and personnel from certain losses as a result of 
licensed activities involving Government facilities or personnel. 49 
U.S.C. 70112(e).
    The Associate Administrator for Commercial Space Transportation of 
the Federal Aviation Administration was delegated the Secretary's 
authority for carrying out the Secretary's responsibilities under the 
statute, effective November 15, 1995. The Commercial Space 
Transportation Licensing Regulations set forth in 14 CFR Ch. III apply 
to regulatory activities administered by the Office.

Paper Work Reduction Act

    14 CFR part 440, as proposed, contains information collection 
requirements. In accordance with the Paperwork Reduction Act of 1995, 
44 U.S.C. 3501 et seq., the information collection requirements 
associated with this rule are being submitted to the Office of 
Management and Budget for review. The required information will be used 
to determine appropriate levels of financial responsibility and to 
determine whether licensees have complied with financial responsibility 
requirements as set forth in regulations and in a license order issued 
by the Office. The information to be collected includes data required 
for determining maximum probable loss, the three-party cross-waiver of 
claims agreement and evidence of insurance or other form of financial 
responsibility. Launch licensees must demonstrate financial 
responsibility at least 30 days before commencing licensed launch 
activities. The frequency of required submissions may depend upon the 
frequency of licensed launch activities; however, a license may 
authorize more than one launch. Respondents are all licensees 
authorized to conduct licensed launch activities. In addition to the 
licensee, its customers and the contractors and subcontractors of each 
are required to enter into reciprocal waiver of claims agreements. 
Estimated Average Burden Hours Per Respondent: 261 hours.
    The Office considers comments by the public on the proposed 
collection of information in order to evaluate the accuracy of the 
Office's estimate of the burden of the proposed collection of 
information, the quality, utility and clarity of the information to be 
collected, and possible ways to minimize the burden of the collection.
    In submitting comments to OMB, commenters should keep in mind that 
OMB is required to make a decision concerning the collection of 
information contained in the proposed regulations between 30 and 60 
days after publication of this document in the Federal Register.
    Comments on the proposed information collection requirements should 
be submitted to: Office of Management and Budget, Washington, DC 20503, 
Attention: Desk Officer for the Federal Aviation Administration, U.S. 
Department of Transportation. It is requested that comments sent to OMB 
also be sent to the rulemaking docket for this proposed action, Room 
612, Federal Aviation Administration, U.S. Department of 
Transportation, 800 Independence Avenue, SW., Washington, DC 20591.

Impact Analyses

    Proposed changes to Federal regulations must undergo several 
economic analyses. First, Executive Order 12866 directs that agencies 
shall propose or adopt a regulation only upon a determination that the 
benefits of the intended regulation justify its costs. Second, the 
Regulatory Flexibility Act of 1980 requires agencies to analyze the 
economic effect of regulatory changes on small entities. Third, the 
Office of Management and Budget (OMB) directs agencies to assess the 
effect of regulatory changes on international trade. In addition, under 
regulatory policies and procedures of the Department of Transportation 
(44 FR

[[Page 39015]]

11034; February 26, 1979), this proposed rule is considered significant 
because there is substantial public interest in the rulemaking. This 
rule has been reviewed by OMB under Executive Order 12866.

Economic Impacts

    Executive Order 12866 directs that each Federal agency proposing to 
adopt a regulation may do so only upon a reasoned determination that 
the benefits of the intended regulation justify its costs. The Office 
has prepared a detailed analysis of the economic effects that would be 
associated with the proposed rule. Its findings are set forth in an 
economic impact assessment, copies of which are available from the FAA 
Rules Docket. As part of its analysis, the Office considered 
alternatives, taking into account that the principal requirements of 
the proposed rule are mandated by statute.
    Under the 1988 Amendments, as implemented by the Office in 
regulations, required insurance would be available to compensate third 
parties, including certain Government personnel, who may suffer bodily 
injury or property damage as a result of licensed launch activities. 
Additionally, required insurance protects all launch participants from 
third party claims and provides cost savings to each participant by 
relieving them of the need to obtain separate liability insurance 
covering those risks. Potential costs of litigation should be 
eliminated as a result of required cross-waivers of claims among launch 
participants. There is a reallocation of expected costs of claims of 
$20,000 over a four-year period from the U.S. commercial space launch 
industry to the United States, as a consequence of the Government's 
payment of excess third-party claims under the Act, up to a $1.5 
billion exposure for liability. Additional costs to the Government to 
administer requirements imposed under the 1988 Amendments and the 
proposed regulations are expected to have an upper limit of $673,000 
over four years.

Impacts on Small Entities

    The Regulatory Flexibility Act of 1980 (RFA) was enacted by 
Congress to ensure that small entities are not unnecessarily or 
disproportionately burdened by Federal regulations. The Office analyzed 
the economic impact of the proposed regulations on small commercial 
entities, as part of its economic impact assessment. For purposes of 
the analysis, the Office utilized the Standard Industrial 
Classification codes and size standards for business entities relating 
to space vehicles, which define small entities as those comprised of 
fewer than 1000 employees. 13 CFR 121.601. Because the commercial 
launch industry is evolving new ways of doing business, the Office also 
considered as small commercial entities those firms offering or 
planning to offer commercial space transportation services that have 
not had long-term relationships with the U.S. Government as a 
contractor-manufacturer of expendable launch vehicles or components, or 
have not received rights to use government-developed launch vehicles. 
These are few in number.
    The economic impacts on small commercial entities resulting from 
the 1988 Amendments to the Act are largely benefits. The Office's 
analysis reveals only non-quantifiable costs to commercial entities as 
a result of the proposed regulations. They include minimal paperwork 
costs and costs that may result from having to obtain insurance in 
advance of licensed launch activities to demonstrate compliance with 
financial responsibility requirements. Neither of these costs would 
have a disproportionate impact on small commercial entities. Based upon 
the Office's economic impact assessment, the Office has determined that 
the proposed rule would not have a significant economic impact on a 
substantial number of small entities.

International Trade Impact Assessment

    The impact of the proposed rule on international trade is expected 
to be beneficial. The proposal rule would codify in regulations the 
financial responsibility and allocation of risk requirements imposed 
under the 1988 Amendments to the Commercial Space Launch Act of 1984, 
codified at 49 U.S.C. Subtitle IX, ch. 701. One of the primary 
objectives of the 1988 Amendments was to enable U.S. launch services 
providers to compete more effectively with foreign competitors.
    Customers may enjoy enhanced understanding of the benefits and 
responsibilities that attend licensed launch activities carried out 
within the United States or by its citizens. By clarifying the U.S. 
Government's agreement, subject to appropriations laws or other 
additional legislative authority, to provide for the payment of excess 
third-party claims above required insurance, the proposed regulations 
may enable U.S. companies to negotiate more effectively with foreign 
customers who must choose between U.S. and other competing launch 
services providers.

Federalism Implications

    The proposed regulations would not have substantial direct effects 
on the states, on the relationship between the Federal government and 
the states, or on the distribution of power and responsibilities among 
the various levels of government. Therefore, in accordance with 
Executive Order 12612, it is determined that the proposed regulation 
does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.

List of Subjects in 49 CFR Part 440

    Armed forces; Claims; Federal building and facilities; Government 
property; Indemnity payments; Insurance; Reporting and recordkeeping 
requirements; Rockets; Space transportation and exploration.

Proposed Regulation

    In consideration of the foregoing, the Office of the Associate 
Administrator for Commercial Space Transportation proposes to amend the 
Commercial Space Transportation Licensing Regulations, 14 CFR Ch. III, 
as follows:
    1. Subchapter C of Chapter III, Title 14, Code of Federal 
Regulations, would be amended by adding a new part 440 to read as 
follows:

PART 440--FINANCIAL RESPONSIBILITY

Subpart A--Financial Responsibility for Licensed Launch Activities

Sec.
440. 1  Scope; Basis.
440. 3  Definitions.
440. 5  General.
440. 7  Determination of maximum probable loss.
440. 9  Insurance requirements for licensed launch activities.
440. 11  Duration of coverage; modifications.
440. 13  Standard conditions of insurance coverage.
440. 15  Demonstration of compliance.
440. 17  Reciprocal waiver of claims requirement.
440. 19  United States payment of excess third-party liability 
claims.

    Authority: 49 U.S.C. 70101-70119; 49 CFR 1.47.

Sec. 440.1  Scope; Basis.

    This part sets forth financial responsibility and allocation of 
risk requirements applicable to commercial space launch activities that 
are authorized to be conducted under a launch license issued pursuant 
to this subchapter.

Sec. 440.3  Definitions.

    (a) For purposes of this part--
    (1) Bodily injury means physical injury, sickness, disease, 
disability, shock, mental anguish, or mental injury sustained by any 
person, including death.

[[Page 39016]]

    (2) Contractors and subcontractors means those entities that are 
involved at any tier, directly or indirectly, in licensed launch 
activities, and includes suppliers of property and services, and the 
component manufacturers of a launch vehicle or payload.
    (3) Customer means the person who procures launch services from the 
licensee, and any person to whom the customer has sold, leased, 
assigned, or otherwise transferred its rights in the payload (or any 
part thereof) to be launched by the licensee, including a conditional 
sale, lease, assignment, or transfer of rights.
    (4) Federal range facility means a Government-owned installation at 
which launches take place.
    (5) Financial responsibility means statutorily required financial 
ability to meet liability as required under 49 U.S.C 70101-70119.
    (6) Government personnel means employees of the United States, its 
agencies, and its contractors and subcontractors, involved in launch 
services for licensed launch activities. Employees of the United States 
include members of the Armed Forces of the United States.
    (7) Hazardous operations means activities, processes, and 
procedures that, because of the nature of the equipment, facilities, 
personnel, or environment involved or function being performed, may 
result in bodily injury or property damage.
    (8) Liability means a legal obligation to pay claims for bodily 
injury or property damage resulting from licensed launch activities.
    (9) License means an authorization to conduct licensed launch 
activities, issued by the Office under this subchapter.
    (10) Licensed launch activities means the launch of a launch 
vehicle as defined in a regulation or license issued by the Office and 
carried out pursuant to a license.
    (11) Maximum probable loss (MPL) means the greatest dollar amount 
of loss for bodily injury or property damage that is reasonably 
expected to result from licensed launch activities;
    (i) Losses to third parties, excluding Government personnel, that 
are reasonably expected to result from licensed launch activities are 
those having a probability of occurrence on the order of no less than 
one in ten million.
    (ii) Losses to Government property and Government personnel that 
are reasonably expected to result from licensed launch activities are 
those having a probability of occurrence on the order of no less than 
one in one hundred thousand.
    (12) Office means the Associate Administrator for Commercial Space 
Transportation of the Federal Aviation Administration, U.S. Department 
of Transportation.
    (13) Property damage means partial or total destruction, 
impairment, or loss of tangible property, real or personal.
    (14) Regulations means the Commercial Space Transportation 
Licensing Regulations, codified at 14 CFR Ch. III.
    (15) Third party means.
    (i) Any person other than:
    (A) The United States, its agencies, and its contractors and 
subcontractors involved in launch services for licensed launch 
activities;
    (B) The licensee and its contractors and subcontractors involved in 
launch services for licensed launch activities; and
    (C) The customer and its contractors and subcontractors involved in 
launch services for licensed launch activities.
    (ii) Government personnel, as defined in this section, are third 
parties. For purposes of these regulations, employees of other launch 
participants identified in paragraphs (a)(15)(i)(B) and (C) of this 
section are not third parties.
    (16) United States means the United States Government, including 
its agencies.
    (b) Except as otherwise provided in this section, any term used in 
this part and defined in 49 U.S.C. 70101-70119, or in Sec. 401.5 of 
this chapter shall have the meaning contained therein.

Sec. 440.5  General.

    (a) No person shall commence or conduct launch activities that 
require a license unless that person has obtained a license and fully 
demonstrated compliance with the financial responsibility and 
allocation of risk requirements set forth in this part.
    (b) The Office shall prescribe the amount of financial 
responsibility a licensee is required to obtain, and any additions to 
or modifications of the amount, in a license order issued concurrently 
with or subsequent to the issuance of a license.
    (c) Demonstration of financial responsibility under this part shall 
not relieve the licensee of ultimate responsibility for liability, 
loss, or damage sustained by the United States resulting from licensed 
launch activities, except to the extent that:
    (1) Liability, loss, or damage sustained by the United States 
results from willful misconduct of the United States or its agents, 
including Government personnel;
    (2) Covered claims by third parties for bodily injury or property 
damage arising out of any particular launch exceed the amount of 
financial responsibility required under Sec. 440.9(c) of this part and 
do not exceed $1,500,000,000 (as adjusted for inflation occurring after 
January 1, 1989) above such amount, and are payable pursuant to 49 
U.S.C. 70113 and Sec. 440.19 of this part;
    (3) Covered claims for property loss or damage exceed the amount of 
financial responsibility required under Sec. 440.9(e) of this part; or
    (4) The licensee has no liability for claims by third parties for 
bodily injury or property damage arising out of any particular launch 
that exceed $1,500,000,000 (as adjusted for inflation occurring after 
January 1, 1989).
    (d) A licensee's failure to comply with the requirements in this 
part may result in suspension or revocation of a license, and subjects 
the licensee to civil penalties as provided in part 405 of this 
chapter.

Sec. 440.7  Determination of maximum probable loss.

    (a) The Office shall determine the maximum probable loss (MPL) from 
claims by a third party for bodily injury or property damage, and the 
United States, its agencies, and its contractors and subcontractors for 
covered property damage or loss, resulting from licensed launch 
activities. The maximum probable loss determination forms the basis for 
financial responsibility requirements issued in a license order.
    (b) The Office issues its determination of maximum probable loss no 
later than ninety days after a licensee or transferee has requested a 
determination and submitted all information required by the Office to 
make the determination. The Office shall consult with Federal agencies 
that are involved in, or whose personnel or property are exposed to 
risk of damage or loss as a result of, licensed launch activities 
before issuing a license order prescribing financial responsibility 
requirements and shall notify the licensee or transferee if timely 
issuance of the MPL determination is not possible due to interagency 
consultation.
    (c) Information requirements for obtaining a maximum probable loss 
determination are set forth in Appendix I to this part. Any person 
requesting a determination of maximum probable loss shall submit 
information in accordance with Appendix I requirements, unless the 
Office has waived requirements. In lieu of submitting required 
information, a person requesting a maximum probable loss determination 
may designate and

[[Page 39017]]

certify certain information previously submitted for a prior 
determination as complete, valid, and equally applicable to its current 
request. The requester is responsible for the continuing accuracy and 
completeness of information submitted under this part and shall 
promptly report any changes in writing.
    (d) The Office shall amend a determination of maximum probable loss 
required under this section at any time prior to completion of licensed 
launch activities as warranted by supplementary information provided to 
or obtained by the Office after the MPL determination is issued. Any 
change in financial responsibility requirements as a result of an 
amended MPL determination shall be set forth in a license order.
    (e) The Office may make a determination of maximum probable loss at 
any time other than as set forth in paragraph (b) of this section upon 
request by any person.

Sec. 440.9  Insurance requirements for licensed launch activities.

    (a) As a condition of each launch license, the licensee shall 
comply with insurance requirements set forth in this section and in a 
license order issued by the Office, or may otherwise demonstrate the 
required amount of financial responsibility.
    (b) The licensee shall obtain and maintain in effect a policy or 
policies of liability insurance, in an amount determined by the Office 
under paragraph (c) of this section, that protects the following 
persons as additional insureds to the extent of their respective 
potential liabilities against claims by a third party for bodily injury 
or property damage resulting from licensed launch activities:
    (1) The licensee, its customer, and their respective contractors 
and subcontractors;
    (2) The United States, its agencies, and its contractors and 
subcontractors; and
    (3) Government personnel.
    (c) The Office shall prescribe for each licensee the amount of 
insurance required to compensate the total of third-party claims for 
bodily injury or property damage resulting from licensed launch 
activities in connection with any particular launch. The amount of 
insurance required is based upon the Office's determination of maximum 
probable loss; however, it will not exceed the lesser of:
    (1) $500 million; or
    (2) The maximum liability insurance available on the world market 
at a reasonable cost, as determined by the Office.
    (d) The licensee shall obtain and maintain in effect a policy or 
policies of insurance, in an amount determined by the Office under 
paragraph (e) of this section, that covers claims by the United States, 
it agencies, and its contractors and subcontractors for property damage 
or loss resulting from licensed launch activities. Property covered by 
this insurance shall include all property owned, leased, or occupied 
by, or within the care, custody, or control of, the United States, its 
agencies, and its contractors and subcontractors, at a Federal range 
facility. Insurance shall protect the United States, its agencies, and 
it contractors and subcontractors.
    (e) The Office shall prescribe for each licensee the amount of 
insurance required to compensate claims for property damage under 
paragraph (d) of this section resulting from licensed launch activities 
in connection with any particular launch. The amount of insurance is 
based upon a determination of maximum probable loss; however, it will 
not exceed $100 million.
    (f) In lieu of a policy of insurance, a licensee may demonstrate 
financial responsibility in another manner meeting the terms and 
conditions applicable to insurance as set forth in this part. The 
licensee shall describe in detail the method proposed for demonstrating 
financial responsibility and how it assures that the licensee is able 
to cover claims as required under this part.

Sec. 440.11  Duration of coverage; modifications.

    (a) Insurance coverage required under Sec. 440.9, or other form of 
financial responsibility, shall attach upon commencement of licensed 
launch activities, and remain in full force and effect until the later 
of completion of licensed launch activities as defined by the Office in 
regulations, or until risk to third parties and Government property as 
a result of licensed launch activities is sufficiently small, as 
determined by the Office through the risk analysis conducted to 
determine MPL, that financial responsibility is no longer necessary. 
The required duration of financial responsibility shall be specified in 
a license order, and may be amended in the event a launch anomaly 
results in additional risks to third parties or Government property.
    (b) Financial responsibility required under this part may not be 
replaced, canceled, changed, withdrawn, or in any way modified to 
reduce the limits of liability or the extent of coverage, nor expire by 
its own terms, prior to the time specified in a license order, unless 
the Office is notified in advance and expressly approves the 
modification.

Sec. 440.13  Standard conditions of insurance coverage.

    (a) Insurance obtained under Sec. 440.9 shall comply with the 
following terms and conditions of coverage:
    (1) Bankruptcy or insolvency of an insured, including any 
additional insured, shall not relieve the insurer or any or its 
obligations under any policy.
    (2) Policy limits shall apply separately to each occurrence and to 
the total claims arising out of licensed launch activities in 
connection with any particular launch.
    (3) Except as provided herein, each policy shall pay claims from 
the first dollar of loss, without regard to any deductible, to the 
limits of the policy. A licensee may obtain a policy containing a 
deductible amount if the amount of the deductible is placed in an 
escrow account or otherwise demonstrated to the unobligated, 
unencumbered funds of the licensee, available to compensate claims at 
any time claims may arise.
    (4) Policies shall not be invalidated by any action or inaction of 
the licensee or any additional insured, including nonpayment by the 
licensee of the policy premium, and shall insure the licensee and each 
additional insured regardless of any breach or violation of any 
warranties, declarations, or conditions contained in the policies by 
the licensee or any additional insured (other than a breach of 
violation by the licensee or an additional insured, and then only as 
against that licensee or additional insured).
    (5) Exclusions from coverage shall be specified.
    (6) Insurance shall be primary without right of contribution from 
any other insurance that is carried by the licensee or any additional 
insured. Each policy shall expressly provide that all of its 
provisions, except the policy limits, operate in the same manner as if 
there were a separate policy with and covering the licensee and each 
additional insured.
    (7) Each policy shall be placed with an insurer of recognized 
reputation and responsibility that is licensed to do business in any 
State, territory, possession of the United States, or the District of 
Columbia.
    (8) Except as to claims resulting from the willful misconduct of 
the United States or its agents, the insurer shall waive any and all 
rights of subrogation against each of the parties protected by required 
insurance.
    (b) [Reserved]

[[Page 39018]]

Sec. 440.15  Demonstration of compliance.

    (a) A licensee must submit evidence of financial responsibility and 
compliance with allocation of risk requirements under this part, as 
follows, unless a licensee order specifies fewer days due to the 
proximity of the licensee's intended date for commencement of licensed 
launch activities:
    (1) The three-party cross-waiver of claims agreement required under 
Sec. 440.17(c) of this part shall be submitted at least 30 days before 
commencement of licensed launch activities;
    (2) Evidence of insurance shall be submitted at least 30 days 
before commencement of licensed launch activities; and
    (3) Evidence of financial responsibility in a form other than 
insurance, ad provided under Sec. 440.9(f) of this part, shall be 
submitted at least 60 days before commencement of licensed launch 
activities.
    (b) Upon a complete demonstration of compliance with financial 
responsibility and allocation of risk requirements under this part, the 
requirements shall preempt any provisions in agreements between the 
licensee and an agency of the United States governing access to or use 
of United States launch property or launch services for licensed launch 
activities which address financial responsibility, allocation of risk 
and related matters covered by 49 U.S.C. 70112, 70113.
    (c) A licensee must demonstrate compliance as follows:
    (1) The licensee shall provide proof of insurance required under 
Sec. 440.9 by:
    (i) Certifying to the Office that it has obtained insurance in 
compliance with the requirements of this part and any applicable 
license order;
    (ii) Filing with the Office one or more certificates of insurance 
evidencing insurance coverage by one or more insurers under a currently 
effective and properly endorsed policy or policies of insurance, 
applicable to licensed launch activities, on terms and conditions and 
in amounts prescribed under this part, and specifying policy 
exclusions;
    (iii) In the event of any policy exclusions or limitations of 
coverage that may be considered usual under Sec. 440.19(c) of this 
part, or for purposes of implementing the Government's waiver of claims 
for property damage under the Act, certifying that insurance covering 
the excluded risks is not commercially available at reasonable cost; 
and
    (iv) Submitting to the Office, for signature by the Department on 
behalf of the United States Government, the duly executed waiver of 
claims and assumption of responsibility agreement required by 
Sec. 440.17(c) of this part.
    (2) Certifications required under this section shall be signed by a 
duly authorized officer of the licensee.
    (d) Certificate(s) of insurance required under paragraph (c)(1)(ii) 
of this section shall be signed by the insurer issuing the policy and 
accompanied by an opinion of the insurer that the insurance obtained by 
the licensee complies with the specific requirements for insurance set 
forth in this part and any applicable license order.
    (e) The licensee shall maintain, and make available for inspection 
by the Office upon request, all required policies of insurance and 
other documents necessary to demonstrate compliance with this part.
    (f) In the event the licensee demonstrates financial responsibility 
using means other than insurance, as provided under Sec. 440.9(f) of 
this part, the licensee shall provide proof that it has met the 
requirements set forth in this part and in a license order issued by 
the Office.

Sec. 440.17  Reciprocal waiver of claims requirements.

    (a) As a condition of each launch license, the licensee shall 
comply with reciprocal waiver of claims requirements as set forth in 
this section.
    (b) The licensee shall implement reciprocal waivers of claims with 
its contractors and subcontractors, its customer(s) and the customer's 
contractors and subcontractors, under which each party waives and 
releases claims against the other parties to the waivers and agrees to 
assume responsibility for property damage it sustains and for bodily 
injury or property damage sustained by its own employees resulting from 
licensed launch activities, regardless of fault.
    (c) For each licensed launch in which the U.S. Government, its 
agencies, or its contractors and subcontractors is involved in licensed 
launch activities or where property insurance is required under 
Sec. 440.9(d) of this part, the Department of Transportation, the 
licensee, and its customer shall enter into a three-party reciprocal 
waiver of claims agreement in the form set forth in Appendix II to this 
part. If the licensee's customer is an agency of the U.S. Government, 
the Agreement shall be modified to reflect that, for purposes of the 
Agreement, the customer is a Government agency involved in licensed 
launch activities except that the government customer waives claims and 
accepts responsibility for damage or loss to its property.
    (d) The licensee, its customer, and the United States but only to 
the extent provided in legislation, shall agree in any waiver of claims 
agreements required under this part to indemnify another party to the 
agreement from claims by the indemnifying party's contractors and 
subcontractors arising out of the indemnifying party's failure to 
implement properly the waiver requirement.

Sec. 440.19  United States payment of excess third-party liability 
claims.

    (a) The United States shall pay successful claims (including 
reasonable expenses of litigation or settlement) of a third party 
against the licensee, the customer, and the contractors and 
subcontractors of the licensee and the customer, and the contractors 
and subcontractors of the United States and its agencies involved in 
licensed launch activities to the extent provided in an appropriation 
law or other legislative authority providing for payment of claims in 
accordance with 49 U.S.C. 70113, and to the extent the total amount of 
such claims arising out of any particular launch:
    (1) Exceeds the amount of insurance required under Sec. 440.9(b); 
and
    (2) Is not more than $1,500,000,000 (as adjusted for inflation 
occurring after January 1, 1989) above that amount.
    (b) Payment by the United States under paragraph (a) of this 
section shall not be made for any part of such claims for which the 
bodily injury or property damage results from willful misconduct by the 
party seeking payment.
    (c) The United States shall provide for payment of claims by third 
parties for bodily injury of property damage that are payable under 49 
U.S.C. 70113 and not covered by required insurance under Sec. 440.9(b), 
without regard to the limitation under paragraph (a)(1) of this 
section, because of an insurance policy exclusion that is usual. A 
policy exclusion is considered usual only if insurance covering the 
excluded risk is not commercially available at reasonable rates. The 
licensee must submit a certification in accordance with 
Sec. 440.15(c)(1)(iii) of this part for the United States to cover such 
claims.
    (d) Upon the expiration of the policy period prescribed in 
accordance with Sec. 440.11(a), the United States shall provide for 
payment of claims that are payable under 49 U.S.C. 70113 from the first 
dollar of loss up to $1,500,000,000 (as adjusted for inflation 
occurring after January 1, 1989).
    (e) Payment by the United States of excess third-party claims under 
49 U.S.C. 70113 shall be subject to:

[[Page 39019]]

    (1) Prompt notice by the licensee to the Office that the total 
amount of claims arising out of licensed launch activities exceeds, or 
is likely to exceed, the required amount of financial responsibility. 
For each claim, the notice must specify the nature, cause, and amount 
of the claim or lawsuit associated with the claim, and the party or 
parties who may otherwise be liable for payment of the claim;
    (2) Participation or assistance in the defense of the claim or 
lawsuit by the United States, at its election;
    (3) Approval by the Office of any settlement, or part of a 
settlement, to be paid by the United States; and
    (4) Approval by Congress of a compensation plan prepared by the 
Office and submitted by the President.
    (f) The Office will:
    (1) Prepare a compensation plan outlining the total amount of 
claims and meeting the requirements set forth in 49 U.S.C. 70113;
    (2) Recommend sources of funds to pay the claims; and
    (3) Propose legislation as required to implement the plan.
    (g) The Office may withhold payment of a claim if the Office finds 
that the amount is unreasonable, unless it is the final order of a 
United States Court.

Appendix I--Information Requirements for Obtaining a Maximum Probable 
Loss Determination for Licensed Launch Activities

    Any person requesting a maximum probable loss determination 
shall submit the following information to the Office, unless the 
Office has waived a particular information requirement under 14 CFR 
440.7(c):

I. General Information

    A. Mission description.
    1. A description of mission parameters, including:
    a. Launch trajectory;
    b. Orbital inclination; and
    c. Orbit altitudes (apogee and perigee).
    2. Flight sequence.
    3. Staging events and the time for each event.
    4. Impact locations.
    5. Identification of the launch range facility, including the 
launch complex on the range, planned date of launch, and launch 
windows.
    6. If the applicant has previously been issued a license to 
conduct launch activities using the same launch vehicle from the 
same launch range facility, a description of any differences planned 
in the conduct of proposed activities.
    B. Launch Vehicle Description.
    1. General description of launch vehicle and its stages, 
including dimensions.
    2. Description of major systems, including safety systems.
    3. Description of rocket motors and type of fuel used.
    4. Identification of all propellants to be used and their hazard 
classification under the Hazardous Materials Table, 49 CFR 172.101.
    5. Description of hazardous components.
    C. Payload.
    1. General description of the payload, including type (e.g., 
telecommunications, remote sensing), propellants, and hazardous 
components or materials, such as toxic or radioactive substances.
    D. Flight Termination System.
    1. Identification of any flight termination system (FTS) on the 
launch vehicle, including a description of operations and component 
location on the vehicle.

II. Pre-flight Processing Operations

    A. General description of pre-flight operations including 
vehicle processing consisting of an operational flow diagram showing 
the overall sequence and location of operations, commencing with 
arrival of vehicle components at the launch range facility through 
final safety checks and countdown sequence, and designation of 
hazardous operations, as defined in 14 CFR 440.3. For purposes of 
these information requirements, payload processing, as opposed to 
integration, is not a hazardous operation.
    B. For each hazardous operation, including but not limited to 
fueling, solid rocket motor build-up, ordnance installation, 
ordnance checkout, movement of hazardous materials, and payload 
integration:
    1. Identification of location where each operation will 
performed, including each building or facility identified by name or 
number.
    2. Identification of facilities adjacent to the location where 
each operation will be performed and therefore exposed to risk, 
identified by name or number.
    3. Maximum number of third-party personnel, including but not 
limited to Government personnel, who may be exposed to risk during 
each operation. For Government personnel, identification of his or 
her employer.
    4. Identification of launch range facility policies or 
requirements applicable to the conduct of operations.

III. Flight Operations

    A. Identification of launch range facilities exposed to risk 
during launch vehicle lift-off and flight.
    B. Identification of accident failure scenarios, probability 
assessments for each, and estimation of risks to third parties and 
Government property due to property damage or bodily injury. 
Scenarios shall cover the range of launch trajectories, inclinations 
and orbits for which authorization is sought in the license 
application. The estimation of risks for each scenario shall take 
into account the number of third parties at risk as a result of 
lift-off and flight of a launch vehicle (on-range, off-range, and 
down-range) and specific, unique facilities exposed to risk.
    C. On-orbit risk analysis assessing risks posed by a launch 
vehicle to operational satellites.
    D. Reentry risk analysis assessing risks to third parties as a 
result to reentering debris or reentry of the launch vehicle or its 
components.
    E. Trajectory data as follows: Nominal and 3-sigma lateral 
trajectory data in x, y, z and X, Y, Z coordinates in one-second 
intervals, data to be pad-centered with x being along the initial 
launch azimuth and continuing through impact for suborbital flights, 
and continuing through orbital insertion or the end of powered 
flight for orbital flights.
    F. Tumble-turn data for guided vehicles only, as follows: For 
vehicles with gimbaled nozzles, tumble turn data with zeta angles 
and velocity magnitudes stated. A separate table is required for 
each combination of fail times (every two to four seconds), and 
significant nozzle angles (two or more small angels, generally 
between one and five degrees).
    G. Identification of debris lethal areas and the projected 
number and ballistic coefficient of fragments expected to result 
from flight termination, initiated either by command or self-
destruct mechanism, for lift-off, land overflight, and reentry.

IV. Post-flight Processing Operations

    A. General description of post-flight ground operations 
including overall sequence and location of operations for removal of 
vehicle components and processing equipment from the launch range 
facility and for handling of hazardous materials, and designation of 
hazardous operations.
    B. Identification of all facilities used in conducting post-
flight processing operations.
    C. For each hazardous operation:
    1. Identification of location where each operation is performed, 
including each building or facility identified by name or number.
    2. Identification of facilities adjacent to location where each 
operation is performed and exposed to risk, identified by name or 
number.
    3. Maximum number of third-party personnel, including but not 
limited to Government personnel, who may be exposed to risk during 
each operation. For Government personnel, identification of his or 
her employer.
    4. Identification of launch range facility policies or 
requirements applicable to the conduct of operations.

Appendix II--Agreement for Waiver of Claims and Assumption of 
Responsibility

    THIS AGREEMENT is entered into this ____ day of __________, by 
and among [Licensee] (the ``Licensee''), [Customer] (the 
``Customer'') and the Department of Transportation, on behalf of the 
United States Government (collectively, the ``Parties''), to 
implement the provisions of section 440.7(c) of the Commercial Space 
Transportation Licensing Regulations, 14 CFR Ch. III (the 
``Regulations'').
    In consideration of the mutual releases and promises contained 
herein, the Parties hereby agree as follows:

1. Definitions

    ``Customer'' means the above-named Customer on behalf of the 
Customer and any

[[Page 39020]]

person to whom the Customer has sold, leased, assigned, or otherwise 
transferred its rights in the payload (or any part thereof) to be 
launched by the licensee, including a conditional sale, lease, 
assignment, or transfer of rights.
    ``License'' means License No. ____ issued on ________, by the 
Associate Administrator for Commercial Space Transportation, Federal 
Aviation Administration, Department of Transportation, to the 
Licensee, including all license orders issued in connection with the 
License.
    ``Licensee'' means the Licensee and any transferee of the 
Licensee under 49 U.S.C. Subtitle IX, ch. 701.
    ``United States Government'' means the United States, its 
agencies involved in Licensed Launch Activities, and its contractors 
and subcontractors involved in Licensed Launch Activities.
    Except as otherwise defined herein, terms used in this Agreement 
and defined in 49 U.S.C. Subtitle IX, ch. 701--Commercial Space 
Launch Activities, or in the Regulations, shall have the same 
meaning as contained in 49 U.S.C. Subtitle IX, ch. 701, or the 
Regulations, respectively.

2. Waiver and Release of Claims

    (a) Licensee hereby waives and releases claims it may have 
against Customer, Customer's Contractors and Subcontractors, and the 
United States Government, for Property Damage it sustains and for 
Bodily Injury or Property Damage sustained by its own employees, 
resulting from Licensed Launch Activities, regardless of fault.
    (b) Customer hereby waives and releases claims it may have 
against Licensee, its Contractors and Subcontractors, and the United 
States Government, for Property Damage it sustains and for Bodily 
Injury or Property Damage sustained by its own employees, resulting 
from Licensed Launch Activities, regardless of fault.
    (c) The United States Government hereby waives and releases 
claims it may have against Licensee and Customer, and against their 
respective Contractors and Subcontractors, for Property Damage it 
sustains, to the extent that claims it would otherwise have for such 
damage exceed the amount of insurance or demonstration of financial 
responsibility required under section 440.9(e) of the Regulations, 
14 CFR Sec. 440.9(e), regardless of fault.

3. Assumption of Responsibility

    (a) Licensee and Customer shall each be responsible for Property 
Damage it sustains and for Bodily Injury or Property Damage 
sustained by its own employees, resulting from Licensed Launch 
Activities, regardless of fault.
    (b) The United States Government shall be responsible for 
Property Damage it sustains, to the extent that claims it would 
otherwise have for such damage exceed the amount of insurance or 
demonstration of financial responsibility required under section 
440.9(e) of the Regulations, 14 CFR Sec. 449.9(e), regardless of 
fault.

4. Extension of Assumption and Waiver

    (a) Licensee shall extend the waiver and release of claims and 
the requirement of the assumption of responsibility as set forth in 
paragraphs 2(a) and 3(a), respectively, to its Contractors and 
Subcontractors by requiring them to waive and release all claims 
they may have against Customer, Customer's Contractors and 
Subcontractors, and the United States Government, and to agree to be 
responsible, for Property Damage they sustain and for Bodily Injury 
or Property Damage sustained by their own employees, resulting from 
Licensed Launch Activities, regardless of fault.
    (b) Customer shall extend the waiver and release of claims and 
the requirement of the assumption of responsibility as set forth in 
paragraphs 2(b) and 3(a), respectively, to its Contractors and 
Subcontractors by requiring them to waive and release all claims 
they may have against Licensee, the Licensee's Contractors and 
Subcontractors, and the United States Government, and to agree to be 
responsible, for Property Damage they sustain and for Bodily Injury 
or Property Damage sustained by their own employees, resulting from 
Licensed Launch Activities, regardless of fault.

5. Indemnification

    (a) Licensee shall hold harmless and indemnify Customer and its 
directors, officers, servants, agents, subsidiaries, employee and 
assignees, or any of them, and the United States Government and its 
directors, officers, servants, agents, subsidiaries, employee and 
assignees, or any of them, from and against liability, loss or 
damage arising out of claims that Licensee's Contractors and 
Subcontractors may have for Property Damage sustained by them and 
for Bodily Injury or Property Damage sustained by their employees, 
resulting from Licensed Launch Activities.
    (b) Customer shall hold harmless and indemnify Licensee and its 
directors, officers, servants, agents, subsidiaries, employees and 
assignees, or any of them, and the United States Government and its 
directors, officers, servants, agents, subsidiaries, employees and 
assignees, or any of them, from and against liability, loss or 
damage arising out of claims that Customer's Contractors and 
Subcontractors, or any person on whose behalf Customer enters into 
this Agreement, may have for Property Damage sustained by them and 
for Bodily Injury or Property Damage sustained by their employees, 
resulting from Licensed Launch Activities.
    (c) To the extent provided in advance in an appropriation law or 
to the extent there is enacted additional legislative authority 
providing for the payment of claims, the United States shall hold 
harmless and indemnify Licensee and Customer and their respective 
directors, officers, servants, agents, subsidiaries, employees and 
assignees, or any of them, from and against liability, loss or 
damage arising out of claims that any person on whose behalf the 
Department enters into this Agreement may have for Property Damage 
sustained by them, resulting from Licensed Launch Activities.

6. Assurances under 49 U.S.C. 70112(e)

    Notwithstanding any provision of this Agreement to the contrary, 
Licensee shall hold harmless and indemnify the United States 
Government and its agencies, servants, agents, employees and 
assignees, or any of them, from and against liability, loss or 
damage arising out of claims for Bodily Injury or Property Damage, 
resulting from Licensed Launch Activities, regardless of fault, 
except to the extent that: (i) As provided in section 7(b) of this 
Agreement, claims result from willful misconduct of the United 
States Government or its agents; (ii) claims for Property Damage 
sustained by the United States Government exceed the amount of 
insurance or demonstration of financial responsibility required 
under section 440.9(e) of the Regulations (14 CFR Sec. 440.9(e)); 
(iii) claims by a Third Party for Bodily Injury or Property Damage 
exceed the amount of insurance or demonstration of financial 
responsibility required under section 440.9(c) of the Regulations 
(14 CFR Sec. 440.9(c)), and do not exceed $1,500,000,000 (as 
adjusted for inflation after January 1, 1989) above such amount, and 
are payable pursuant to the provisions of 49 U.S.C. 70113 and 
section 440.19 of the Regulations (14 CFR Sec. 440.19); or (iv) 
Licensee has no liability for claims exceeding $1,500,000,000 (as 
adjusted for inflation after January 1, 1989).

7. Miscellaneous

    (a) Nothing contained herein shall be construed as a waiver or 
release by Licensee, Customer or the United States Government of any 
claim by an employee of the Licensee, Customer or the United States 
Government, respectively, including a member of the Armed Forces of 
the United States, for Bodily Injury or Property Damage, resulting 
from Licensed Launch Activities.
    (b) Notwithstanding any provision of this Agreement to the 
contrary, any waiver, release, assumption of responsibility or 
agreement to indemnify herein shall not apply to claims for Bodily 
Injury or Property Damage resulting from willful misconduct of any 
of the Parties, the Contractors and Subcontractors of any of the 
Parties, and the directors, officers, agents and employees of any of 
the foregoing.
    (c) In the event that more than one customer is involved in 
Licensed Launch Activities, references herein to Customer shall 
apply to, and be deemed to include, each such customer severally and 
not jointly.
    (d) The Agreement shall be governed by and construed in 
accordance with United States Federal law.
    In Witness Whereof, the Parties to this Agreement have caused 
the Agreement to be duly executed by their respective duly 
authorized representatives as of the date written above.

Licensee

By:
Its:

Customer

By:
Its:

Department of Transportation

By:
Its: Associate Administrator for Commercial Space Transportation, 
Federal Aviation Administration

[[Page 39021]]

    Issued in Washington, DC., this 17th day of July 1996.
Patti Grace Smith,
Acting Associate Administrator for Commercial Space Transportation, 
Federal Aviation Administration.
[FR Doc. 96-18532 Filed 7-24-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-18479 Telephone Number Portability
[Federal Register Volume 61, Number 144 (Thursday, July 25, 1996)]
[Proposed Rules]
[Pages 38687-38693]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-18479]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Parts 20 and 52

[CC Docket No. 95-116; FCC 96-286]

Telephone Number Portability

AGENCY: Federal Communications Commission.

ACTION: Proposed Rule.

-----------------------------------------------------------------------

SUMMARY: On July 13, 1995, the Commission issued a Notice of Proposed 
Rulemaking (CC Docket No. 95-116) seeking comments on a wide variety of 
policy and technical issues related to number portability. On June 27, 
1996, the Commission adopted a First Report and Order which is 
published elsewhere in this issue. On the same day, the Commission 
adopted a Further Notice of Proposed Rulemaking (Further Notice or 
FNPRM) seeking comment on the appropriate methods of cost recovery of 
long-term number portability. Since the Telecommunications Act of 1996 
requires that the costs of number portability be borne by all 
telecommunications carriers on a competitively neutral basis, the 
Commission will determine the appropriate method of cost recovery in 
this proceeding.

DATES: Comments are due on or before August 16, 1996, and reply 
comments are due on or before September 16, 1996.

ADDRESSES: Comments and reply comments should be sent to Office of the 
Secretary, Federal Communications Commission, 1919 M Street, NW., Room 
222, Washington, DC 20554, with a copy to Wanda Harris of the 
Competitive Pricing Division of the Common Carrier Bureau, 1919 M 
Street, NW., Room 518, Washington, DC 20554. Parties should also file 
one copy of any documents filed in this docket with the Commission's 
copy contractor, International Transcription Services, Inc., 2100 M 
Street, NW., Suite 140, Washington, DC 20037.

FOR FURTHER INFORMATION CONTACT: Neil Fried, Attorney, Common Carrier 
Bureau, Competitive Pricing Division, (202) 418-1530.

SUPPLEMENTARY INFORMATION: This is a summary of the Commission's 
Further Notice of Proposed Rulemaking June 27, 1996, and released July 
2, 1996 (FCC 96-286). This FNPRM contains no proposed or modified 
information collections subject to the Paperwork Reduction Act of 1995 
(PRA). The full text of this Further Notice of Proposed Rulemaking is 
available for inspection and copying during normal business hours in 
the FCC Reference Center (Room 239), 1919 M St., NW., Washington, DC. 
The complete text also may be obtained through the World Wide Web, at 
http://www.fcc.gov/Bureaus/Common Carrier/Orders/fcc96286.wp, or may be 
purchased from the Commission's copy contractor, International 
Transcription Service, Inc., (202) 857-3800, 2100 M St., NW., Suite 
140, Washington, DC 20037.

Initial Regulatory Flexibility Analysis

    Pursuant to section 603 of the Regulatory Flexibility Act, 5 U.S.C. 
603, the Commission prepared an Initial Regulatory Flexibility Analysis 
(IRFA) of the expected impact on small entities of the policies and 
rules proposed in the Further Notice of Proposed Rulemaking. The IRFA 
is set forth in Appendix C of the FNPRM. The Commission, in compliance 
with sections 251(b)(2) and 251(d)(1) of the Act, proposes rules 
necessary to implement section 251(e)(2) of the Act, which requires 
that the costs of number portability be borne by all telecommunications 
carriers on a competitively neutral basis. The Commission's objective 
in issuing the FNPRM is to propose and seek comment on rules 
establishing a cost recovery mechanism for carriers to use in 
implementing a long-term number portability method pursuant to the Act 
and in accordance with the First Report and Order in this proceeding. 
Specifically, the Commission's goal is to propose rules which implement 
section 251(e)(2) of the Act, requiring that the cost of ``number 
portability be borne by all telecommunications carriers on a 
competitively neutral basis as determined by the Commission.'' 47 
U.S.C. 251(e)(2). The legal basis for action as proposed in the FNPRM 
is contained in sections 1, 4(i), 4(j), 201-205, 218, 251(b), 251(e), 
and 332 of the Communications Act of 1934, as amended. 47 U.S.C. 151, 
154(i), 154(j), 201-205, 218, 251(b), 251(d), 251(e), The Commission's 
proposed rules governing cost recovery for long-term number portability 
apply to all LECs, including incumbent LECs as well as new LEC 
entrants, and also apply to cellular, broadband PCS, and covered SMR 
providers. According to the SBA definition, incumbent LECs do not 
qualify as small businesses because they are dominant in their field of 
operation. However, the proposed rules may have a significant economic 
impact on a substantial number of small businesses insofar as they may 
apply to telecommunications carriers other than incumbent LECs. The 
proposed rules may have such an impact upon new entrant LECs as well as 
cellular, broadband PCS, and covered SMR providers. Based upon data 
contained in the most recent census and a report by the Commission's 
Common Carrier Bureau, the Commission estimates that 2,100 carriers 
could be affected. The Commission requests comment on this estimate. 
These entities could include various categories of carriers, including 
competitive access providers, cellular carriers, interexchange 
carriers, mobile service carriers, operator service providers, pay 
telephone operators, PCS providers, covered SMR providers, and 
resellers. The FNPRM requests comment on the appropriate method by 
which the costs of long-term number portability should be recovered. 
One possible cost recovery method would be based upon a percentage of a 
carrier's gross revenues. Such a rule, if promulgated, would not impose 
a reporting requirement on LECs because they already file information 
about gross revenues with the Commission for other purposes. There are 
no other reporting requirements contemplated by the FNPRM. There are no 
federal rules

[[Page 38688]]

which overlap, duplicate or conflict with these proposed rules.

Synopsis of Further Notice of Proposed Rulemaking

Further Notice of Proposed Rulemaking

I. Long-Term Number Portability--Costs and Cost Recovery
A. Background
    1. In the NPRM (Telephone Number Portability, Notice of Proposed 
Rulemaking, 60 FR 39136 (August 1, 1995)), we requested comment on 
appropriate cost recovery mechanisms regarding long-term number 
portability. We also sought comment, data, studies, and other 
information on the costs associated with designing, building, and 
deploying long-term number portability. Section 251(e)(2) of the 1996 
Act requires, inter alia, that the costs of number portability be borne 
by all telecommunications carriers on a competitively neutral basis.
B. Positions of the Parties
    2. In response to the July NPRM, many parties assert that the costs 
of number portability cannot be estimated until the industry adopts a 
particular architecture. While the incumbent LECs generally urge the 
Commission to continue to gather information concerning the potential 
costs and impacts on existing networks from ongoing state activities, a 
few parties offer rough estimates regarding the costs of implementing 
long-term number portability. We note that many of these estimates 
assume a significant level of location portability.
    3. The incumbent LECs generally assert that the costs of providing 
long-term number portability should be borne on a ``competitively 
neutral'' basis by those carriers that cause or benefit from number 
portability. They assert that specific cost recovery mechanisms cannot 
be established until a better understanding is developed regarding how 
number portability should be provided. Ameritech, however, proposes a 
cost recovery structure with three categories of costs: (1) 
Administrative and overhead costs for SMS/databases--to be recovered 
from all providers; (2) costs directly assignable to number portability 
deployment--to be recovered from all LECs, both incumbents and new 
entrants, in proportion to the amount of telephone numbers that each 
has transferred to its switches; and (3) costs incurred to increase the 
capacity of existing infrastructure--to be borne mostly by incumbent 
LECs. Some incumbent LECs also contend that the costs of deploying 
long-term number portability should be allocated between state and 
federal jurisdictions.
    4. Most other parties generally contend that all telecommunications 
carriers and their customers should bear the costs of long-term number 
portability because they all benefit from the service and price 
competition stimulated by portability. Non-LEC parties generally 
contend that carrier-specific costs incurred in adapting existing 
systems to long-term number portability should be recovered, like other 
network upgrades such as AIN and SS7, through tariff and contract 
mechanisms. Sprint and AT&T advocate implementing portability on a 
region-by-region basis (with costs amortized over several years) to 
minimize incumbent carriers' greater burdens for upgrading existing 
networks. Several parties also contend that the external costs of long-
term number portability, i.e., the costs of designing, deploying, and 
operating facilities common to all carriers, should be shared equitably 
among all affected carriers. Parties offer several different methods of 
allocating costs among the relevant carriers.
    5. After passage of the 1996 Act, and in response to the March 
Public Notice, several parties addressed the meaning of the statutory 
language ``competitively neutral'' as set forth in section 251(e)(2). 
Ameritech asserts that this standard requires that all costs be 
allocated to all telecommunications carriers on a basis that is 
independent of who incurred the cost or who uses portability, and that 
gives no competitor an advantage. Ameritech criticizes proposals that 
would limit or exclude recovery of costs incurred by incumbent LECs or 
allocate costs based on lines. BellSouth urges the Commission to 
consider the types of infrastructure costs that all classes of carriers 
will bear in implementing number portability, not just incumbent LECs, 
in order to avoid imposing large financial burdens on any particular 
class of carriers, especially those not required to participate in 
portability. GTE and Pacific Bell argue that requiring each carrier to 
bear its own costs would result in incumbent LECs paying most of the 
implementation costs, which is not competitively neutral.
    6. In contrast, ALTS, Omnipoint, and Cox maintain that competitive 
neutrality requires each carrier to bear its own costs, and that no 
carrier should be required to pay for upgrades to another carrier's 
network. Moreover, Cox argues that incumbent LEC proposals to require 
that the new entrants bear all number portability costs are not 
competitively neutral because it would unreasonably burden those 
carriers. In addition, Cox asserts that, because new entrants will 
begin providing service at different times, it would be difficult to 
allocate costs on a competitively neutral basis unless each carrier 
bears its own costs of implementation. Omnipoint asserts that requiring 
carriers to compensate other carriers with less efficient systems and 
networks is competitively unfair.
    7. US West advocates permitting LECs to recover their costs using a 
per-line surcharge, claiming that all carriers are entitled to recover 
their implementation costs under the 1996 Act. GTE suggests 
establishment of a ``cost pool,'' under which each subscriber would be 
assessed an amount, regardless of which carrier it used. Bell Atlantic 
claims that allowing incumbent LECs to recover their costs only from 
their customers, and not from other providers, is not competitively 
neutral because costs would be recovered only from those end users who 
do not use or benefit from portability, and higher incumbent LEC rates 
would encourage their customers to switch providers. USTA cautions that 
not permitting carriers to recover their costs through separate charges 
for number portability will result in an across-the-board increase in 
local rates, which, for incumbent LECs, must be approved by state 
regulators.
    8. In contrast, MFS maintains that the competitive neutrality 
requirement does not apply to end users at all, but rather requires an 
analysis of charges assessed to other, competing telecommunications 
carriers. Teleport argues that number portability costs should not be 
recovered from customers through a number portability surcharge, as 
such charges would deter customers from transferring their numbers. Cox 
asserts that GTE's pooling argument is not competitively neutral 
because it would create incentives for incumbents to inflate costs.
    9. MFS argues that the competitive neutrality standard in the 1996 
Act requires that only the shared/common costs be borne by all 
telecommunications carriers, and that such allocation should be done 
based on net revenues. It notes that all telecommunications users 
should not be interpreted to mean only a segment of the market, a 
single class of carriers, or a single class of customers. MFS further 
argues that the shared/common costs could be recovered from each 
carrier's customer base, but not from other carriers in the form of 
increased charges. TRA contends that section 251(e)(2) contemplates a 
competitively fair distribution of the common costs associated with 
number portability

[[Page 38689]]

among only those carriers engaged in the provision of local exchange/
exchange access services, not a general levy on all telecommunications 
providers. Teleport and Time Warner Holdings propose similar cost 
recovery mechanisms to MFS, but argue that the shared costs should be 
allocated based on the number of lines served, rather than net 
revenues. ALTS argues that, in order to expedite the implementation of 
number portability, shared/common costs (e.g., costs associated with 
the number portability database(s)) should be recovered by a third 
party from all carriers on a per line basis, but notes that there is 
considerable economic logic in recovering such costs according to net 
revenues.
C. Discussion
    10. We tentatively conclude that three types of costs are involved 
in providing long-term service provider portability: (1) Costs incurred 
by the industry as a whole, such as those incurred by the third-party 
administrator to build, operate, and maintain the databases needed to 
provide number portability; (2) carrier-specific costs directly related 
to providing number portability (e.g., the costs to purchase the switch 
software implementing number portability); and (3) carrier-specific 
costs not directly related to number portability (e.g., the costs of 
network upgrades necessary to implement a database method). We seek 
comment on this tentative conclusion and ask whether other types of 
costs are involved in the provision of long-term service provider 
number portability.
    11. New section 251(e)(2) of the Communications Act requires that 
the costs of establishing ``number portability be borne by all 
telecommunications carriers on a competitively neutral basis as 
determined by the Commission.'' We tentatively conclude that the 
``competitively neutral'' standard in section 251(e)(2) applies only to 
number portability costs, and not to cost recovery of carrier-specific, 
non-number portability-specific costs, such as upgrades to SS7 or AIN 
technologies. This interpretation is borne out by the plain language of 
the statute, which only requires that telecommunications carriers bear 
the costs of number portability. We also tentatively conclude that 
section 251(e)(2) does not address recovery of those costs from 
consumers, but only the allocation of such costs among carriers. We 
seek comment on these tentative conclusions. We also seek comment on 
the meaning of the statutory language ``all telecommunications 
carriers'' as that term is used in section 251(e)(2). We further seek 
comment on whether the Commission has authority to exclude certain 
groups of telecommunications carriers from the cost recovery mechanisms 
for number portability, and, if so, which carriers should be excluded.
    12. In determining the cost recovery mechanism for currently 
available number portability measures, we set forth principles with 
which any competitively neutral cost recovery mechanism should comply. 
Specifically, we required that (1) a competitively neutral cost 
recovery mechanism should not give one service provider an appreciable, 
incremental cost advantage over another service provider, when 
competing for a specific subscriber; and (2) a competitively neutral 
cost recovery mechanism should not have a disparate effect on the 
ability of competing service providers to earn a normal return. As in 
the case of currently available number portability measures, we believe 
that these principles equally apply to the allocation of costs incurred 
due to the implementation of long-term number portability. We, 
therefore, tentatively conclude that any long-term cost recovery method 
should comply with these principles. We seek comment on this tentative 
conclusion.
    13. Pursuant to the requirement of section 251(e)(2) that number 
portability costs be borne by all telecommunications carriers on a 
competitively neutral basis as determined by this Commission, we must 
establish pricing principles that are applied consistently to all 
carriers. Consequently, we tentatively conclude that the pricing for 
state-specific databases should be governed by the pricing principles 
established in this proceeding. We believe the use of our pricing 
mechanism--even in states that opt out of the regional database 
system--will help to maintain consistency between states, thereby 
improving the likelihood that competition will develop nationwide.
a. Costs of Facilities Shared by All Carriers for the Provision of 
Number Portability
    14. The costs of facilities shared by all telecommunications 
carriers for providing long-term number portability include, for 
example, the costs of building and administering regional databases. We 
seek comment on whether the database administrator(s) selected through 
the NANC should recover the costs of facilities shared by all 
telecommunications carriers for the provision of long-term number 
portability through a charge assessed only on those carriers using the 
databases or on all carriers whether or not they use the databases. We 
note that if a regional database consists only of the SMS, usage would 
consist of uploading and downloading number portability routing 
information. However, to the extent a database architecture is chosen 
that utilizes an SMS/SCP pair, usage additionally may include carrier 
queries to the regional SCP for purposes of providing routing 
instructions to carriers for individual calls. We seek comment on 
whether such costs, if recovered from all carriers, should be recovered 
on a nationwide or regional basis, and how they should be recovered on 
such bases. To the extent such costs are recovered on a nationwide 
basis, and multiple entities are selected to administer the regional 
databases, we seek comment on whether either one of the neutral third-
party administrators or a separate entity should be designated to 
allocate the aggregate costs among each telecommunications carrier and 
determine the method by which such payments should be made.
    15. With regard to those carriers responsible for bearing the costs 
of the shared facilities, we tentatively conclude that the recovery of 
the costs associated with these databases should be allocated in 
proportion to each telecommunications carrier's total gross 
telecommunications revenues minus charges paid to other carriers. We 
believe that the use of gross telecommunications revenues to allocate 
costs best comports with our principles for competitively neutral cost 
recovery set forth above. As we indicated in our discussion of 
currently available number portability measures, such allocator would 
not give any provider an appreciable, incremental cost advantage over 
another service provider, nor have a disparate effect on the ability of 
competing service providers to earn a normal return. In addition, gross 
telecommunications revenues are the least distortionary, among 
practical applications, of allocating costs across telecommunications 
carriers. We also believe it is appropriate to subtract out charges 
paid to other carriers, such as access charges, when determining the 
relevant amount of each carrier's telecommunications revenues for 
purposes of cost allocation. This is because the revenues attributable 
to such charges effectively would be counted twice in determining the 
relative number portability costs each carrier should pay--once for the 
carrier

[[Page 38690]]

paying such charges and once for the carrier receiving them. We believe 
that a reasonable, equitable, and competitively neutral measure of the 
competitive benefits which will result from number portability is each 
telecommunications carrier's gross telecommunications revenues minus 
charges to other telecommunications carriers. We seek comment on 
whether this proposal for recovery of the costs associated with 
regional databases comports with the standard set forth in section 
251(e)(2), and whether there exists alternative ways of allocating this 
type of cost among the relevant carriers.
    16. We currently require the NANPA to recover the costs of 
administering the NANP, and operating databases to perform such 
administration, from all telecommunications carriers. The recovery of 
these costs is allocated among all telecommunications carriers based on 
the carriers' gross revenues. In our recent Interconnection NPRM (61 FR 
18311 (April 25, 1996)), we tentatively concluded that we need not take 
any further action to comply with section 251(e)(2)'s mandate that the 
cost of establishing telecommunications numbering administration 
arrangements be borne by all telecommunications carriers on a 
competitively neutral basis, in light of the action taken in the 
Numbering Plan Order (60 FR 38737 (July 28, 1996)).
    17. With the implementation of long-term number portability 
measures, all carriers, including currently regulated incumbent LECs, 
will incur costs specific to the deployment and usage of number 
portability databases. Therefore, we seek comment on whether incumbent 
LECs should be able to recover their portion of the costs of facilities 
shared by all carriers in providing long-term number portability from 
their end users or from other carriers, and whether the Commission 
should prescribe the particular cost recovery mechanism. To the extent 
parties argue that such costs should be recovered from other carriers, 
we seek comment on whether such carriers should include all 
telecommunications carriers, such as other local exchange providers, 
CMRS providers, IXCs, and resellers, or only those carriers that have 
received ported numbers. In addition, assuming that we prescribe a 
particular recovery mechanism, we ask parties to identify alternative 
ways carriers may recover this type of cost from carriers (or end 
users).
    18. We tentatively conclude the number portability costs of 
facilities shared by all carriers fall into three subcategories: (a) 
Non-recurring costs, including the development and implementation of 
the hardware and software for the database; (b) recurring (monthly or 
annually) costs, such as the maintenance, operation, security, 
administration, and physical property associated with the database; and 
(c) costs for uploading, downloading, and querying number portability 
database information. We seek comment on this tentative conclusion and 
ask whether there are other types of costs associated with the 
facilities that will be shared by all carriers.
    19. We seek comment on whether the first two subcategories, non-
recurring and recurring costs, should be recovered through monthly 
charges to the individual carriers using the database, allocated in 
proportion to each carrier's gross telecommunications revenues net of 
payments to other carriers, or from all carriers operating in areas 
where number portability is offered. We note that non-recurring charges 
could be recovered in a one-time payment or over time.
    20. We believe that there are at least two methods for recovering 
the third subcategory of shared costs, i.e., the costs of uploading, 
downloading, or querying the database. First, these costs could be 
recovered through usage charges assessed on those carriers that either 
access the database to upload number portability routing information, 
download such information, or directly query the database. Those 
carriers, including IXCs, could then either recover such costs from 
their own customer base, or choose not to recover such costs.
    21. Second, the upload, download, and/or per-query costs could be 
folded into the monthly charges assessed on the carriers using the 
databases, which would be allocated in proportion to each carrier's 
gross telecommunications revenues. We believe this approach is most 
appropriate in those instances where it is not practical to determine 
the cost causer of the usage costs, e.g., per-query costs. Under 
current database approaches, there is no direct correlation between the 
number of queries made and the number of telephone numbers that have 
been forwarded because queries will be performed on all calls to a 
particular switch once any single number has been transferred from that 
switch. We invite commenting parties to provide credible, substantiated 
estimates of the amount of the usage costs, including upload, download, 
and per-query costs, to the extent applicable, and whether such costs 
will be incurred on a per-minute, per-call, or other basis. We also 
seek comment on these and alternative methods for recovering per-query 
costs. Parties are asked to state with specificity the advantages and 
disadvantages of each.
    22. In accordance with the 1996 Act, the costs of number 
portability are to be recovered from all telecommunications carriers on 
a competitively neutral basis. We seek comment on what steps we need to 
take to ensure that this requirement is satisfied for all shared 
industry costs. For instance, we seek comment on whether it is 
necessary for the Commission to establish a mechanism to ensure that 
the LNPA(s) recovers its costs in a competitively neutral fashion. We 
also seek comment on what mechanism(s), e.g., federal tariffs, periodic 
reports, etc., should be utilized to ensure compliance with the 
statutory requirement and under what authority the Commission can 
impose such obligations. We note that section 251(e)(1) requires the 
Commission to create or designate one or more impartial entities to 
administer telecommunications numbering, and provides the Commission 
with exclusive jurisdiction over the NANP, and section 251(e)(2) gives 
the Commission the authority to establish rules by which carriers must 
bear the costs of telecommunications numbering administration and 
number portability. We seek comment on the relevance of these 
provisions to the Commission's authority to impose obligations on the 
LNPA(s).
b. Direct Carrier-Specific Costs to Implement Number Portability
    23. Carrier-specific costs directly related to number portability 
include, for example, the costs of purchasing the switch software 
necessary to implement a long-term number portability solution. There 
are at least two ways of allocating these carrier-specific costs. 
First, we could require individual carriers to bear their own costs of 
deploying number portability in their networks. Second, we could 
require all carriers in a given region to pool their number portability 
costs, which then would be spread across all carriers providing and 
using number portability based on some allocator, such as gross 
telecommunications revenues or number of subscriber lines. We seek 
comment on whether this proposal comports with the standard set forth 
in section 251(e)(2), and whether there exist alternative ways of 
allocating this type of cost among the relevant carriers.
    24. We seek comment on whether we can and should mandate a 
mechanism by which incumbent LECs or others then may recover these 
costs, from either end users or other carriers (such as other local 
exchange service

[[Page 38691]]

providers, CMRS providers, IXCs, and resellers), and ask that parties 
identify the jurisdictional basis for such authority.
    25. If the Commission were to permit costs to be recovered from 
consumers, there are at least two options. One option would be to allow 
carriers the flexibility to recover their number portability-specific 
costs from their customers in whatever manner the carrier chooses. A 
second option would be to require carriers to recover their number 
portability-specific costs through a number portability charge assessed 
on their end user customers located in areas where number portability 
is available. We seek comment on the advantages and disadvantages of 
these proposals and any alternative mechanisms for recovering these 
costs from consumers. Parties favoring a specific option should comment 
on whether their preferred approach is consistent with principles of 
competitive neutrality.
    26. We note that several additional issues are raised if the 
carrier-specific, number portability-specific costs are to be passed on 
to consumers. Therefore, we seek comment on whether, under any cost 
recovery mechanism, the cost to consumers should: (1) Vary among 
carriers in a given geographic region; (2) remain constant among all 
carriers in a given geographic region; or (3) vary among different 
geographic regions, e.g., states or LATAs (while remaining constant 
within that region, i.e., state or LATA). For each of these approaches, 
we ask whether the costs to consumers should be permitted to change, 
for example, on a monthly or annual basis. We also seek comment on 
whether carriers should charge their customers a single, one-time 
charge, a monthly fee, or some percentage of the customer's monthly 
bill, to recover their carrier-specific number portability-specific 
costs. To the extent this Commission permits carriers to recover their 
costs through use of a number portability charge, we seek comment on 
whether such a charge should be specifically identified on consumer 
bills from those carriers as a separate line item. We seek comment on 
whether any such charge should be filed as a tariff at either the 
federal or state level.
    27. Finally, we seek comment on whether carriers should be 
permitted to recover carrier-specific, number portability-specific 
costs from other carriers, through increases in charges for regulated 
services. Parties that advocate increases in charges for regulated 
services are asked to specify which charges should be increased and 
under what jurisdictional authority the Commission can prescribe such 
increases.
c. Indirect Carrier-Specific Costs to Implement Number Portability
    28. We tentatively conclude that carrier-specific costs not 
directly related to number portability should be borne by individual 
carriers as network upgrades. As such, carrier-specific costs not 
directly related to number portability are not subject to the 
requirements set forth in section 251. We seek comment on this 
tentative conclusion and on alternative methods for recovering this 
type of cost.
    29. Carrier-specific costs that are not directly related to the 
provision of number portability include, for example, the costs of 
upgrading SS7 capabilities or adding intelligent network (IN) or 
advanced intelligent network (AIN) capabilities. These costs are 
associated with the provision of a wide variety of services unrelated 
to the provision of number portability, such as CLASS features. 
Provision of these services will facilitate the ability of incumbent 
carriers to compete with the offerings of new entrants.
    30. Incumbent LECs, as well as new entrants, will be required to 
incur these costs to support the provision of number portability and 
other services. While some incumbent LECs may have to upgrade existing 
networks and infrastructure, new entrants will need to design their 
networks from the outset to include these capabilities. Many incumbent 
LECs, though, may already have the necessary network capabilities to 
support the provision of long-term number portability, thus minimizing 
the need to incur upgrade costs. By limiting the deployment of long-
term portability to those geographic areas where carriers are already 
offering, or are likely to offer, competing telephone exchange and 
exchange access services, we limit these expenditures and their 
recovery to areas where the incumbent carriers would, solely for 
competitive reasons, likely upgrade their networks. We note that this 
approach is also consistent with that taken in implementing 800 number 
portability, where LECs recovered the core costs of deploying SS7 
capabilities as network upgrades from all end users.
    31. We seek comment on whether we should specify a particular 
recovery mechanism for carrier-specific costs not directly related to 
number portability, and on alternative methods of recovering such costs 
from consumers or other carriers. In addition, we believe that due to 
the inevitable implementation of switch and other network upgrades to 
support long-term number portability and other AIN capabilities, 
networks will operate with greater efficiencies, resulting in increased 
productivity. We seek comment on whether such future network design 
modifications should be considered in determining the extent to which 
carriers may recover carrier-specific, non-number portability-specific 
costs, and if so, how they should be considered.
d. Price Cap Treatment
    32. If this Commission were to specify a particular method of cost 
recovery from end users, such requirement would include companies that 
are subject to price cap treatment. Price cap regulation may affect 
carriers' ability to recover their costs under the methods described 
above, or other possible methods, because it restricts the flexibility 
with which price cap carriers may price various services. We 
tentatively conclude that price cap carriers should be permitted to 
treat as an exogenous cost any carrier-specific, number portability-
specific costs they incur, but that such carriers should not be 
permitted to treat as an exogenous cost any carrier-specific, non-
number portability-specific costs. These conclusions are consistent 
with our 800 Access proceeding where costs specific to 800 access were 
accorded exogenous cost treatment, while core SS7 costs were treated as 
general network upgrades. We, therefore, seek comment specifically on 
how price cap companies should be permitted to recover costs for 
facilities shared by all carriers; carrier-specific, number 
portability-specific costs; and carrier-specific, non-number 
portability-specific costs. In particular, we seek comment on whether 
price cap companies should be permitted to treat exogenously any of the 
above number portability-specific cost categories. We also seek comment 
on whether these costs, alternatively, should be placed in a new price 
cap basket or an existing basket. If parties recommend that such costs 
are to be placed in an existing basket, we ask parties to identify 
which basket would be most appropriate.
II. Procedural Matters
A. Ex Parte
    33. This is a non-restricted notice and comment rulemaking. Ex 
parte presentations are permitted, except during the Sunshine period, 
provided they are disclosed as provided in the Commission's rules.
B. Regulatory Flexibility Act
    34. As required by section 603 of the Regulatory Flexibility Act, 5 
U.S.C. 601

[[Page 38692]]

et seq. (1981), the Commission prepared an Initial Regulatory 
Flexibility Analysis (IRFA) of the expected impact on small entities 
resulting from the policies and proposals set forth in this FNPRM. The 
IRFA appears at Appendix C of the FNPRM. Written public comments are 
requested on the IRFA. These comments must be filed in accordance with 
the same filing deadlines as comments on the remainder of the FNPRM, 
but they must have a separate and distinct heading designating them as 
responses to the regulatory flexibility analysis. The Secretary shall 
cause a copy of the FNPRM, including the IRFA, to be sent to the Chief 
Counsel for Advocacy of the Small Business Administration in accordance 
with section 603(a) of the Regulatory Flexibility Act.
    35. Reason for Action: The Commission, in compliance with sections 
251(b)(2) and 251(d)(1) of the Act, proposes rules and procedures 
intended to ensure the prompt implementation of telephone number 
portability with the minimum regulatory and administrative burden on 
telecommunications carriers. The rules proposed in the FNPRM are 
necessary to implement section 251(e)(2) of the Act, which requires 
that the costs of number portability be borne by all telecommunications 
carriers on a competitively neutral basis.
    36. Objectives and Legal Basis for Proposed Rules: The Commission's 
objective in issuing the FNPRM is to propose and seek comment on rules 
establishing a cost recovery mechanism for carriers to use in 
implementing a long-term number portability method pursuant to the Act 
and in accordance with our Report and Order in this proceeding. 
Specifically, our goal is to propose rules which implement section 
251(e)(2) of the Act, requiring that the cost of ``number portability 
be borne by all telecommunications carriers on a competitively neutral 
basis as determined by the Commission.'' 47 U.S.C. 251(e)(2). The legal 
basis for action as proposed in the FNPRM is contained in sections 1, 
4(i), 4(j), 201-205, 218, 251(b), 251(e), and 332 of the Communications 
Act of 1934, as amended. 47 U.S.C. 151, 154(i), 154(j), 201-205, 218, 
251(b), 251(d), 251(e), 332.
    37. Description and Estimated Number of Small Entities Affected: 
The rules governing long-term number portability apply to all LECs, 
including incumbent LECs as well as new LEC entrants, and also apply to 
cellular, broadband PCS, and covered SMR providers. According to the 
SBA definition, incumbent LECs do not qualify as small businesses 
because they are dominant in their field of operation. Accordingly, we 
will not address the impact of these rules on incumbent LECs.
    38. However, our rules may have a significant economic impact on a 
substantial number of small businesses insofar as they apply to 
telecommunications carriers other than incumbent LECs. The rules may 
have such an impact upon new entrant LECs as well as cellular, 
broadband PCS, and covered SMR providers. Based upon data contained in 
the most recent census and a report by the Commission's Common Carrier 
Bureau, we estimate that 2,100 carriers could be affected. We have 
derived this estimate based on the following analysis:
    39. According to the 1992 Census of Transportation, Communications, 
and Utilities, there were approximately 3,469 firms with under 1,000 
employees operating under the Standard Industrial Classification (SIC) 
category 481--Telephone. See U.S. Dept. of Commerce, Bureau of the 
Census, 1992 Census of Transportation, Communications, and Utilities 
(issued May 1995). Many of these firms are the incumbent LECs and, as 
noted above, would not satisfy the SBA definition of a small business 
because of their market dominance. There were approximately 1,350 LECs 
in 1995. Industry Analysis Division, FCC, Carrier Locator: Interstate 
Service Providers at Table 1 (Number of Carriers Reporting by Type of 
Carrier and Type of Revenue) (December 1995). Subtracting this number 
from the total number of firms leaves approximately 2,119 entities 
which potentially are small businesses which may be affected. This 
number contains various categories of carriers, including competitive 
access providers, cellular carriers, interexchange carriers, mobile 
service carriers, operator service providers, pay telephone operators, 
PCS providers, covered SMR providers, and resellers. Some of these 
carriers--although not dominant--may not meet the other requirement of 
the definition of a small business because they are not ``independently 
owned and operated.'' See 15 U.S.C. 632. For example, a PCS provider 
which is affiliated with a long distance company with more than 1,000 
employees would be disqualified from being considered a small business. 
Another example would be if a cellular provider is affiliated with a 
dominant LEC. Thus, a reasonable estimate of the number of ``small 
businesses'' affected by this Order would be approximately 2,100. We 
request comment on this estimate. These entities could include various 
categories of carriers, including competitive access providers, 
cellular carriers, interexchange carriers, mobile service carriers, 
operator service providers, pay telephone operators, PCS providers, 
covered SMR providers, and resellers. The SIC codes which describe 
these groups are 4812 and 4813.
    40. Reporting, Recordkeeping and Other Compliance Requirements: The 
FNPRM requests comment on the appropriate method by which the costs of 
long-term number portability should be recovered. One possible cost 
recovery method would be based upon a percentage of a carrier's gross 
revenues. Such a rule, if promulgated, would not impose a reporting 
requirement on LECs because they already file information about gross 
revenues with the Commission for other purposes. There are no other 
reporting requirements contemplated by the FNPRM.
    41. Federal Rules Which Overlap, Duplicate or Conflict with these 
Rules: None.
C. Notice and Comment Provision
    42. Pursuant to applicable procedures set forth in sections 
Secs. 1.415 and 1.419 of the Commission's Rules, 47 CFR 1.415 and 
1.419, interested parties may file comments on this FNPRM on or before 
August 16, 1996, and reply comments on or before September 16, 1996. To 
file formally in this proceeding, parties must file an original and 
twelve copies of all comments, reply comments, and supporting comments. 
Parties wanting each Commissioner to receive a personal copy of their 
comments must file an original plus sixteen copies. Comments and reply 
comments should be sent to the Office of the Secretary, Federal 
Communications Commission, 1919 M Street, NW., Room 222, Washington, DC 
20554. In addition, parties should file two copies of any such 
pleadings with the Competitive Pricing Division, Common Carrier Bureau, 
Room 518, 1919 M Street, NW., Washington, DC 20554. Parties should also 
file one copy of any documents filed in this docket with the 
Commission's copy contractor, International Transcription Services, 
Inc. (ITS, Inc.), 2100 M Street, NW., Suite 140, Washington, DC 20037 
(202/857-3800). Comments and reply comments will be available for 
public inspection during regular business hours in the FCC Reference 
Center, Room 239, 1919 M Street, NW., Washington, DC 20554.
    43. In order to facilitate review of comments and reply comments, 
both by parties and by Commission staff, we require that comments be no 
longer than forty (40) pages and reply comments be no longer than 
twenty five (25) pages.

[[Page 38693]]

Empirical economic studies, copies of relevant state orders, and 
proposed rule text will not be counted against these page limits. 
Specific rule proposals should be filed as an appendix to a party's 
comments or reply comments. Such appendices may include only proposed 
text for rules that would implement proposals set forth in the parties' 
comments and reply comments in this proceeding, and may not include any 
comments or arguments. Proposed rules should be provided in the format 
used for rules in the Code of Federal Regulations and should otherwise 
conform to the Comment Filing Procedures set forth in this order. 
Comments and reply comments must include a short and concise summary of 
the substantive arguments raised in the pleading. Comments and reply 
comments also must clearly identify the specific portion of this FNPRM 
to which a particular comment or set of comments is responsive. Parties 
will not be permitted to file more than a total of ten (10) pages of ex 
parte submissions, excluding cover letters, except in response to 
direct requests from Commission staff. This would not include written 
ex parte filings made solely to disclose an oral ex parte contact. Ex 
parte filings in excess of this limit will not be considered as part of 
the record in this proceeding.
    44. Parties also are asked to submit comments and reply comments on 
diskette. Such diskette submissions would be in addition to and not a 
substitute for the formal filing requirements addressed above. Parties 
submitting diskettes should submit them to Wanda M. Harris, Competitive 
Pricing Division of the Common Carrier Bureau, 1919 M Street, NW., Room 
518, Washington, DC., 20554. Such a submission should be on a 3.5 inch 
diskette formatted in an IBM compatible form using MS DOS 5.0 and 
WordPerfect 5.1 software. The diskette should be submitted in ``read 
only'' mode. The diskette should be clearly labelled with the party's 
name, proceeding, type of pleading (comment or reply comments) and date 
of submission. The diskette should be accompanied by a cover letter.
D. Ordering Clause
    It is ordered that, pursuant to the authority contained in sections 
1, 4(i), 4(j), 201-205, 218, 251, and 332 of the Communications Act as 
amended, 47 U.S.C. Secs. 151, 154(i), 154(j), 201-205, 218, 251, and 
332, a further notice of proposed rulemaking is hereby adopted.

List of Subjects

47 CFR Part 20

    Federal Communications Commission, Local number portability, Radio, 
Telecommunications.

47 CFR Part 52

    Federal Communications Commission, Cost recovery, Local exchange 
carrier, Local number portability, Long-term database methods, 
Numbering, Telecommunications.

Federal Communications Commission.
William F. Caton,
Acting Secretary.
[FR Doc. 96-18479 Filed 7-24-96; 8:45 am]
BILLING CODE 6712-01-P

Complete official Federal Register PDF

Poursuivez vos recherches dans ChatGPT ou Claude

Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.