Decision: Motions for Contempt
Motion to Find Defendant in Contempt of Court and Enforce August 15, 2022 Judgment
(Motion #20), and Plaintiff’s Supplemental Motion for Coerceive Sanctions (Motion #32)
Plaintiff seeks sanctions for contempt and enforcement of an injunctive judgment issued
by the court on August 15, 2022, based on a Decision of March 28, 2022, in which the court
found that Defendant Farm had committed trespass and nuisance against its downslope neighbor
Plaintiff Aerie Point by increasing the volume and velocity of water discharged into two streams
that crossed Plaintiff’s land. This occurred as a result of the installation of an extensive tile
drainage system on Defendant’s farmland resulting in the discharge of water in a manner that
caused damage in a number of ways, including erosion of land and deposits of sediment and
phosphorous.
The Injunction that issued is as follows:
Defendant is enjoined from allowing water, and any particles it carries, from flowing
from the discharge points of Defendant’s drain tile system into the public ditches and
culverts westerly of Defendant’s land on Arnold Bay Road between Adams Ferry Road
and Pease Road.
A hearing was held on the Motion for Contempt in December of 2023. A Decision issued
on January 8, 2024, finding Defendant in contempt and finding Plaintiff entitled to attorneys’
fees. The Motion remained pending based on the parties’ agreement to go to mediation. After
mediation was not successful, Plaintiff filed the Supplemental Motion requesting a further
hearing on the issue of contempt and additional attorneys’ fees as well as coercive sanctions.
A hearing was held on July 17 and 30 and August 2 and 27, 2024, which was a
continuation of the hearing on the original Motion for Contempt, as well as a hearing on the
Motion for Coercive Sanctions. On July 17th, prior to taking evidence at the courthouse, the
undersigned took a site visit. In attendance were Dennis Hopper on behalf of Aerie Point with
Attorney Merrill Bent, and Gerard Vorsteveld and Hans Vorsteveld on behalf of the Farm with
1
Attorneys Claudine Safar and Miles Stafford. The site visit lasted from 9:00 am to
approximately 1:15 pm. Participants and the undersigned walked throughout both the Farm
property and Aerie Point property and observed all the tile drain discharge points, mitigation
measures undertaken by the Farm, water flow into the ditch on Arnold Bay Road and through the
culverts, and overall water flow on the properties of both parties. No testimony was taken.
Attorneys pointed out features for the court to observe about which there would be testimony in
court.
On July 10, 2024, Hurricane Beryl crossed over Addison County as it moved northeast,
causing extremely heavy rains that resulted in widespread flooding and culvert and road
washouts and a FEMA disaster declaration. During the taking of evidence on July 30th, the court
stated on the record that because this was an unusual widespread natural disaster, evidence of
what occurred on the parties’ properties as a result of the July 10th storm would not be considered
by the court. Plaintiff then withdrew from evidence some previously-admitted exhibits that were
photos related to that event.
Findings of Fact
The court hereby incorporates all of the Findings of Fact set forth in the Decision of
January 8, 2024, as if fully set forth herein. Additional facts based on events after December 14,
2023, (the last day of the first hearing) are as follows.
Since December of 2023 and the Decision of January 8, 2024, Mark Bannon has
continued to work with the Farm on both the EPA plan and in relation to the Injunction. The
Farm has implemented some mitigation measures pursuant to his plan.
In February, stone interceptors, or corridors of stone, were installed on the ground below
some discharge outlets and at other sites to slow the water flow. They are made of limestone,
which is intended to change the pH of the water over a period of years.
The parties participated in a mediation session in March. In March and April, Mark
Bannon and Dori Barton visited the Farm property to work primarily on the EPA project.
The Farm again planted corn in the spring on its 250 acres. It purchased a new high-tech
planter for $400,000 and planted an increased number of corn plants over the prior year. It also
planted some “filter strips” at various points in the corn fields. These are swaths of grassy areas
intended to stabilize the soil to prevent erosion. Vegetation buffers were also planted at some
locations.
In April, attorneys for the parties participated in oral argument before the Vermont
Supreme Court on an appeal of this court’s denial of the Farm’s Motion for Relief from
Judgment. The Farm relies on a comment made by Aerie Point’s attorney during the hearing to
support its current interpretation of the Injunction, as described below.
In April and May, “silt sox” were placed at various locations on the Farm property. These
are cylinders of filled cloth several feet long that are placed laterally and designed to slow the
water and retard sediment from going downhill. Mr. Bannon testified that he believes they have
2
impeded sediment to some degree, as he has seen biomass at the underside of some of the silt
sox. However, above Culvert #1, which runs from the ditch to the south part of Aerie Point land,
three silt sox were “blown out” by the high speed of the water passing through. 1
By May 15th, mediation had been completed without resolution. Later in May, the
Vermont Supreme Court affirmed the denial of the Motion for Relief from Judgment.
In June, Mr. Bannon revised his plan to include installing “spreaders” or “splitters” at
some discharge points. These are apparently pipe devices in the shape of a Y to be placed at the
discharge outlets to shift the water away from running directly downhill. The “hope” is that some
of the water will percolate into the ground and some will spill into basins and evaporate. So far
this is a concept only, because these spreaders or splitters have not yet been designed. Gerard
Vorsteveld testified that he hoped to have them installed by Thanksgiving. Mr. Barton noted that
installation would require an excavator, which could not happen with snow on the ground. This
means no installation would occur until next year. These spreaders or splitters are not intended
for all discharge outlets. It is unknown to what extent these devices will change the water flow or
cause some water to evaporate.
There was a rainfall on July 16th. The court’s site visit was July 17th.
On July 22, 2024, Mr. Bannon conducted four water tests. The first was a test of the
water that came out of one of the 17 tile drain discharge outlets. It looked clear as opposed to
murky. Test results showed that phosphorous and sediment levels were low. The second and third
tests were of the water above and below one of the silt sox installations near the most northerly
culvert (Culvert #3) leading to Aerie Point land, and showed reduction of both phosphorous and
suspended solids, indicating some beneficial effect from the silt sox. The fourth was a test of the
water in Lake Champlain below the high water mark where the water from Aerie Point land
empties into Arnold Bay. Mr. Bannon was satisfied with the levels of phosphorous and
suspended solids resulting from these tests. His view was that the water at all four sampling
points was “basically clean.”
In sum, the mitigation efforts that the Farm contends are sufficient to comply with its
understanding of the requirements of the Injunction have all been implemented except for the
design and installation of the splitters or spreaders.
Despite the probability that the mitigation measures may have had some effect in holding
back some sediment and phosphorous and possibly slowing down the rate of some of the
downhill flow of water, the effect of the tile drain discharges on Aerie Point land is essentially
unchanged. Prior to the tile drain installation, the two streambeds on Aerie Point land were
shallow and narrow, and carried only natural runoff from upslope land during snowmelt and
1
There are three culverts that carry water from the ditch on the pertinent section of Arnold Bay Road (the section
between Adams Ferry Road and Pease Road) through the culverts under Arnold Bay Road to Aerie Point land.
Culvert #1 is the southernmost, and is west and downslope of the 10.4-acre EPA wetlands project area. Culverts #2
and #3 carry water to the northern part of Aerie Point land. The water coming through them joins together to form
the northern streambed described in this and prior decisions.
3
intermittently during rain events. Other than those times, water did not run in the streambeds and
one could walk across them. 2 The streambeds generally dried out in the summer.
Now, year-round, whenever it rains more than a drizzle, water begins to run through both
of the streambeds on Aerie Point land. Although the flow begins modestly, after a period of time,
it starts gushing rapidly at a high velocity and with such force that at times it would be dangerous
for a person to walk through it. This can last for some hours. The water that gushes through
during this time is brown and murky and sometimes foamy as it emerges from the culverts under
Arnold Bay Road on to Aerie Point land. It can flow in a stream several feet wide. The southern
streambed was only 8” deep and one foot wide as it neared Lake Champlain before the tile drain
installation. Now it is 5-6 feet deep, and a 10-foot-long wooden bridge has been installed to cross
it. The force of the water continues to erode the sides of the deepened channel. In the northern
streambed on Aerie Point land, the flow sometimes cuts into the ground, creating and/or
deepening water channels.
The effect of these runoffs is to create two small rivers across Aerie Point land that
bifurcate the property into three sections such that at times one cannot cross from one portion of
the property to another on foot, but must go out to the road to enter another section. Silt
continues to flow into Arnold Bay and White Bay from the water running across Aerie Point
land. Between rain events, the water coming through the culverts can be a clear trickle, but the
harmful effects of water from the tile drain system occur on a regular basis with rainfalls.
It appears that the tile drain system may be operating as it was designed: to remove water
that would otherwise seep into the ground in order to lower the water table for the benefit of corn
growth; 3 the water is then flushed out through the tile drain pipes and sent downslope. The
mitigation measures now in place have not prevented the effect on Aerie Point land of having
rainfalls result in brown murky foamy water shooting out of the culverts in powerful streams that
erode and divide Aerie Point land and probably still carry sediment and phosphorous. These
effects occurred as a result of the rainfall on July 16th, the day before the site visit. There is no
evidence that this was an extraordinary rain event. On July 17th, the water was still running
through the culverts at a reasonably rapid rate and was brown. There was foam in the water as it
emerged from Culvert #1 on to Aerie Point land. The court does not doubt the results of the water
tests that took place on July 22nd, which was almost a week after the most recent rainfall.
However, the test results do not mean that those measurements reflect the composition of all of
the water that flows to Aerie Point land all of the time. The evidence does not show what the
water quality is during the flushing events that occur with rainfalls.
The Farm introduced credible testimony that the amount of rain that falls has increased in
recent years. For example, the total rainfall in July of 2024 is equal to the full year totals of 2022
and 2023. That does not absolve the Farm of responsibility for the manner in which it has
2
See Decision of March 28, 2022, Findings of Fact, page 2.
3
See Decision of March 28, 2022, Findings of Fact, page 9-10.
4
changed the natural flow of the water that comes from each rainfall by artificially increasing the
flow in a manner that causes injury to the downslope land of Aerie Point. 4
On the Farm’s upslope land, at some of the tile discharge outlets, the water coming out of
the pipes appears clear. On the site visit, Gerard Vorsteveld captured clear water at some of these
points in a glass cup and drank it. He testified that he did not get sick. However, by the time
water discharged from the tile drains gets down to the ditch on the Farm side of Arnold Bay
Road, the water that enters the ditch during rainfalls is generally brown and murky, and some is
foamy. Anna Hopper testified credibly that in the winter, when there are no leaves on the trees,
one can see the water from the uphill discharge points flow down the slope through the
streambeds toward the ditch and enter the ditch as brown, murky water. The court previously
found that the brown murky water contained sediment and phosphorous. The test results done on
July 22nd are not sufficient to prove that the water that continues to flow onto Aerie Point land
periodically in large quantities no longer contains sediment and phosphorous. The fact that the
force of the water going through Culvert #1 blew out three silt sox, which were placed there to
collect sediment, suggests that it probably does.
Both Mr. Bannon and Ms. Barton have continued to work on the EPA enforcement action,
which appears to be the Farm’s priority. The wetlands that are the subject of this action consist of
10.4 acres located above the southern part of Aerie Point property and involve four discharge
outlets (##1–4) that send water to the most southerly culvert (Culvert #1). The evidence about
that action is that three monitoring wells have been installed to monitor high and low water
levels over the next year. The proposal is apparently to move a few of the tile drain discharge
outlets to direct flow of water from those outlets into the wetlands, but with no action to take
place until after the results of the monitoring period, which ends in the summer of 2025. The
water from the four discharge outlets currently flows downhill in the southern streambed, into the
ditch, and through Culvert #1 onto Aerie Point land, carrying brown, murky, foaming water with
force strong enough to prevent a person from walking through it.
There is no specific evidence about the status or terms of the EPA action (e.g., whether
there is an approved plan or stipulated agreement and what its proposed or fixed terms are). The
Farm’s witnesses vaguely imply that the EPA action has priority over the Injunction such that
nothing can be done on that portion of the Farm property, but there is no factual proof that this is
so, nor has any credible legal argument been made to support such a proposition. There is no
evidence of efforts on the part of the Farm to work with EPA compliance officials to coordinate
that project with Injunction compliance. 5 It is difficult to imagine that even if the EPA has
superior authority over some of the water discharged from the tile drains, its officials would
require noncompliance with the Injunction such that brown murky runoff from the Farm will run
4
See Vermont Supreme Court cases quoted and cited on page 26 of the March 2022 Decision: “As a general
proposition, an upper property owner cannot artificially increase the natural flow of water to a lower property owner
or change its manner of flow by discharging it onto the lower land at a different place from its natural discharge. . .
But, in cases involving only increased flowage and not a change in the place of discharge, an upper owner may
increase the flow as long as it causes no injury to the lower property.” (Emphasis added.)
5
There is some evidence that Mr. Bannon discussed the idea of enlarging a wetland area at a different location with
persons from the Army Corps of Engineers and State wetlands agency, but there are no approvals or plans in place.
5
through Aerie Point land into Lake Champlain for the next year while waiting for results from
the monitoring wells. The knowledge of EPA officials of the Injunction and the effect of
noncompliance is simply unexplained. The Farm has not proved that the EPA action makes
compliance impossible.
Compliance
The result the Injunction was designed to achieve was to prevent the destructive flushing
of water that originates from the tile drain system onto Aerie Point land.
As set forth in the Facts in the January 2024 Decision on the Motion for Contempt, both
Gerard and Hans Vorsteveld testified showing that they correctly understood the requirement of
the Injunction:
Hans Vorsteveld stated in an affidavit, “I am aware of this court’s August 2022 order that
requires Vorsteveld Farm. . .to prevent water from our tile drains from reaching the ditch
along Arnold Bay Road.” Gerald Vorsteveld testified that he understood that the
Injunction meant that the Farm “can’t let tile water go into ditches and culverts.”
Decision of March 28, 2022, Findings of Fact, page 6.
All of the water continues to flow out of the discharge outlets and proceed downslope to
the ditch and on to Aerie Point land. Although a bit of it may be slowed or diverted and seep
back into the ground, and some of the sediment and phosphorous may be prevented from
reaching Aerie Point land, those effects are minimal. The trespass and nuisance found by the
court in March of 2022 continue with ongoing injurious effect.
The Vorstevelds have evolved their own interpretation of what compliance with the
Injunction calls for, based on the word “excess” (which does not appear in the Injunction) and on
their understanding of a comment made by Aerie Point’s attorney during an oral argument on the
Farm’s Motion for Relief from Judgment. Their interpretation hinges on the word “excess.” If the
court understands their argument correctly, it is that the Farm believes that it is only required to
mitigate 10% of the overall water on its land based on the following reasoning: Dr. Joshua
Faulkner testified that tile drains remove 10-25% of ground water from the soil; this figure is
based on information from the Midwest, which has flat land, so they conclude that the applicable
number for Vermont sloping land is 10%. (There is no evidence to support this 10% figure.)
Therefore, they contend that as long as 10% of overall water from Farm property is prevented
from entering Aerie Point land, the Farm is in compliance.
They believe that once the splitters are in place, compliance will be complete under this
standard. (They are apparently excepting the water discharged from outlets ##1–4 involved in the
EPA action.) They believe that Aerie Point concedes that it is only this 10% of overall water that
6
is “excess” water subject to the Injunction. Mr. Bannon subscribes to this interpretation and
acknowledges that his revised plan is based on it. 6
There are several problems with this theory. For one thing, it is at odds with the explicit
terms of the Injunction, which were formulated carefully to provide a clear enforcement
standard. It requires that the water coming out of the tile drain discharge outlets not be permitted
to flow into the ditch on the east side of Arnold Bay Road at the bottom of the sloping Farm land.
Thus, the Farm could either capture it as it exits from each of the discharge outlets, most of
which are uphill, and remove it from there, or let it flow downhill and capture it somewhere
above the ditch and remove it from there. In the latter case, the water would probably be mingled
with surface runoff from which it could not be separated, in which case all of it would have to be
removed in order to ensure removal of the target tile drain water. In either case, it is all of the
water that leaves the discharge outlets that is required to be removed, not just a portion of it. The
December 2023 testimony of both Gerard and Hans Vorsteveld showed that they understood the
requirements of the Injunction correctly.
Compliance does not call for reduction of only a percentage of overall water on the land,
but requires that all water emerging from the tile drains be prevented from entering Aerie Point
land where it constitutes both a nuisance and a trespass. This is not only because of the amount
of the water, but also the manner and timing of its discharge, i.e., the velocity it acquires from
being concentrated in the drain pipes, causing it to shoot out of the discharge outlets in the first
place, and then secondarily being concentrated in the ditch causing it to shoot out of the culverts.
The manner of discharge also impacts its quality, as the water may pick up sediment and
phosphorous on its downhill journey.
Second, the plain meaning of the court’s Decision and related Injunction is that the water
to be enjoined is water that would not be running downslope in streambeds to the ditch if no tile
drains had been installed on the Farm’s land. It is all of the water from the tile drains that
periodically goes downhill and causes damage; it is not just a percentage of the overall amount of
water on and in the ground on the farmland as a whole. This is the second time that the Farm
principals have sought to assert an interpretation of the Injunction that is inconsistent with its
terms in an effort to minimize their failure of compliance. 7
Third, Plaintiff’s counsel disagrees that any comment made at oral argument before the
Supreme Court signified agreement with the Farm’s current interpretation. This court has listened
to the full argument before the Supreme Court and concludes that Aerie Point’s counsel’s
6
His testimony was that his goal has been to reduce the velocity of the water as it moves downhill and mitigate the
transport of sediment and phosphorous and that the scope of his plan was to address 10% of the water. There is no
evidence that the Farm asked him to design a system that would comply with the actual terms of the Injunction.
7
See Decision of January 8, 2024, pp 5–6. “It is disingenuous for the Farm to claim that it is not in violation of the
Injunction because of a technical argument that the water travels to the ditchline via streambeds rather than directly
from the discharge outlets into the ditch.” Id. at 6.
7
comment did not signify agreement with the Farm’s current interpretation. In any event, any such
agreement, if it had occurred, would not change the court order. 8
The Farm introduced evidence at the hearing that some of the water in the ditch that goes
onto Aerie Point land comes from other sources, such as natural seepage or from other properties
upslope of Farm land or nearby. Specifically, a video from July 16th, when it rained, showed that
significant water flowed down the ditch on Adams Ferry Road from above Farm land and was
destined for the ditch on Arnold Bay Road and would go through a northern culvert onto Aerie
Point land. This water did not originate from the use of tile drains on Farm land. The Farm is
correct that Aerie Point cannot attribute such water to it, and cannot complain about such water,
just as it did not and cannot complain about the snowmelt or runoff from rains that flowed onto
its land prior to the tile drain installation. However, that does not excuse the Farm from
compliance with the Injunction. The need for the Injunction results from the enhanced quantity,
velocity, and particle-laden character of the water that comes out of the tile drains and runs
downhill, into the ditch, and through the culverts onto Aerie Point land on a recurring basis.
In sum, the court rejects the argument made by the Farm that it will soon be in
compliance with the Injunction because some mitigating effects from the Bannon plan are
projected to impact 10% of overall water. Even if this were true, which has not been proven, it
would still not constitute compliance with the terms of the Injunction.
The nuisance and trespass on Aerie Point land continue. While some measures have been
taken, none of them show concrete steps either to capture and remove the water as it emerges
from the 17 discharge outlets or to capture and remove the water after it has flowed downhill but
before it reaches the ditch. There is no evidence that the Farm has asked contractors or engineers
to install or design a system for collecting or diverting all of the water exiting from the discharge
outlets, as the Injunction requires. 9 Moreover, the impact of the measures does not fulfill the
purpose of the Injunction, nor were they designed to do so. They were designed to meet a
standard based on a misinterpretation of the purpose of the Injunction, not the terms of the actual
Injunction.
The evidence is clear that the Farm wishes to continue to grow corn for the economic
purposes of its large-scale farming operation. If the Farm did not grow its own corn, it would
have to spend $300,000 annually to buy corn. 10 The Farm has only undertaken any action at all
under pressure and only done the minimum it hoped would be sufficient, but it is not enough
either to comply with the Injunction or satisfy its purpose.
8
The court continues to be open to amending the Injunction if there is a showing by specific facts that alternative
terms would achieve the objective of the Injunction. See Order: Motion for Relief from Judgment (Motion #24),
September 21, 2023, pp 5-6; Decision of January 8, 2024, page 5, n.2; and Order: Motion to Amend Judgment
(Motion #35), July 3, 2024.
9
The exception is that Mr. Bannon has proposed designing and installing splitters that would divert water from some
of the outlets to percolate in the soil or evaporate, but they are not intended for all the outlets and not intended to
remove more than a fraction of the water.
10
See Decision of March 28, 2022, page 6.
8
In the meantime, it has spent $1.1 million dollars to buy additional land and an expensive
new planter. There is no evidence that it could not have used that money to comply with the
Injunction. Gerard Vorsteveld estimates that the Farm has spent approximately $60,000 on
compliance measures, including materials. This figure includes expenditures for the EPA action,
so it is unknown how much relates to the Injunction. The evidence shows that unless the Farm
faces significant economic pressure, it will seek to find ways to avoid full compliance.
The essential facts, based on the Findings of Fact set out above, are that:
• Water from the discharge outlets continues to flow downhill through streambeds and into
the ditch on Arnold Bay Road and from there on to Aerie Point land on a regular basis at
levels of quantity, velocity, and quality that cause damage to Aerie Point land. In other
words, the nuisance and trespass have not abated.
• The measures implemented by the Farm have had some mitigating effects, at least at
some locations, specifically (a) some dispersal and slowing down of the speed of the
downhill flow at some locations, (b) some capture of sediment in the downhill-flowing
water, and (c) some reduction in phosphorous in the water that reaches the ditch.
• These mitigating effects are insufficient to prevent the ongoing and regular flow of water
from the discharge outlets onto Aerie Point land during rain events in a velocity that is
forceful and destructive of Aerie Point land, in quantities that exceed the natural runoff
flow that existed prior to the installation of the tile drains and cause erosion of Aerie
Point land, and with a brown, murky color and foam, indicating the continued presence
of sediment and phosphorous.
• The mitigating efforts, including those that are proposed but not yet implemented, are
insufficient to prevent the ongoing harm for which the Injunction was imposed as a
remedy for nuisance and trespass.
• The Farm seeks to implement a misinterpretation of the Injunction rather than comply
with its actual terms, despite its principals’ having an accurate understanding of the
requirements of the Injunction.
• The Farm has not pursued compliance with the actual terms of the Injunction with due
diligence.
• During the period of contempt, the Farm has spent $1.1 million dollars on purchases of
additional land and equipment to enhance its operations. It has spent only a portion of
$60,000 on mitigation efforts based on a premise that is a misinterpretation of the
Injunction.
Conclusions of Law
The legal standards for contempt and enforcement are set forth on pages 6–7 of the
Decision of January 8, 2024, and are hereby incorporated as if fully set forth herein. To
summarize, once a plaintiff shows that there was a court order that required specific action and
that the defendant had actual notice of it and failed to comply, the burden shifts to the defendant
to establish by clear and convincing evidence either that it has complied or that it has a defense
9
to contempt, such as inability to comply. For an inability to comply defense, the defendant has
the burden of proving, by clear and convincing evidence, impossibility of compliance as well as
that it had diligently attempted to comply. See pages 6–7 of the January 8, 2024 Decision for
legal authority and case citations.
Aerie Point has shown by clear and convincing evidence that the Farm has not stopped
allowing water from the 17 tile drain discharge outlets from flowing into the ditch and culverts
westerly of the Farm’s land between Adams Ferry Road and Pease Road, and, moreover, that the
nuisance and trespass the Injunction was designed to stop have continued.
The Farm claims compliance based on its misinterpretation of the requirements of the
Injunction, despite the fact that its principals, Hans and Gerard Vorsteveld, understood the terms
of the Injunction correctly. The Farm relies on its interpretation of the purpose of the Injunction
based on Plaintiff’s attorney’s comment at oral argument before the Vermont Supreme Court.
Despite the principals’ correct understanding of the Injunction, rather than complying, they chose
to adopt a misinterpretation that was not consistent with its clearly stated terms nor reasonable.
Although the Farm has undertaken efforts to mitigate the effect of its drain tile system, it has not
taken action necessary to be in compliance with the clear provisions of the Injunction or prevent
the harm it was designed to remedy.
The Farm has not sustained its burden to show that it has pursued diligent efforts to
comply with the Injunction as plainly written. For these reasons, the court concludes that the
Farm remains in contempt of the Injunction.
Sanctions
Plaintiff seeks attorneys’ fees, fines, and orders for the Farm to: (a) cut its corn plants and
cease corn production, (b) cease all planting of crops other than perennial forage cover or fully
protective plant cover, and (c) cease applications of manure on its land.
Attorneys’ fees may be awarded “in those exceptional cases where justice demands an
award of attorney’s fees, such as where a party is unjustly forced to endure a second round of
litigation.” Agency of Natural Res. v. Lyndonville Sav. Bank & Tr. Co., 174 Vt. 498, 501 (2002)
(mem.) (citations omitted); Sutton v. Purzycki, 2022 VT 56, ¶ 63, 217 Vt. 326. Plaintiff has been
obliged to incur not just a second round of litigation in order to protect its interests, for which it
has been awarded attorneys’ fees, but a third round. It is entitled to attorneys’ fees for the filing
of the Supplemental Motion for Coercive Sanctions and the conduct and costs of the hearing
thereon.
With respect to Aerie Point’s request for coercive sanctions, as noted on page 8 of the
Decision of January 8, 2024, the purpose of sanctions for civil contempt is not to punish but to
obtain compliance. This is accomplished through fines and imprisonment. As stated in a treatise
on remedies by a leading jurist,
10
The court’s power to hold a person in contempt is a power to impose various
sanctions of a fairly serious order, including fines and imprisonment. . . The court
may . . .sanction contempt by a coercive or remedial fine or imprisonment. A
coercive imprisonment is not designed to punish, but is designed to produce
action. A coercive fine might be one that accumulated at a certain rate for each
day, but stopped accumulating when the defendant obeyed.
Dobbs’ Remedies § 2.9.
Plaintiff asks the court to make the Farm stop growing corn and plant hay instead.
Plaintiff has not shown that the court has authority to require the Farm to adopt specific
agricultural practices on its property. Pursuant to established law on trespass and nuisance, the
court has enjoined specific conduct that causes injury to Aerie Point land.
Vermont case law has long approved fines and imprisonment as available remedies for
obtaining compliance with injunctive judgments. These remedies are entirely avoidable by the
party in contempt and are reasonably enforceable. In Mayo v. Mayo, 173 Vt. 459, 463 (2001)
(mem.), the Vermont Supreme Court discussed “the coercive nature of the civil contempt
mechanism, which, in contrast to criminal contempt, focuses not on punishment but on
compelling compliance with a preexisting court order.” (Citation omitted). It stated:
The scope of civil contempt sanctions is limited to “compensatory fines or
coercive sanctions” such as imprisonment for an indeterminate period. Sheehan
[v. Ryea], 171 Vt. 511, 512 (2000) (mem.) (citation omitted). Such fines or
sanctions must similarly be “purgeable, i.e., they must be capable of being
avoided by defendants through adherence to the court’s order.” [Town of
Hinesburg v. Dunkling, 167 Vt. 514, 526 (1998)] (citation omitted).
Id. at 463.
In Vermont Women’s Health Center v. Operation Rescue, 159 Vt. 141, 149 (1992), the
Court wrote that “orders of contempt are discretionary, and we will not reverse unless the court’s
discretion was withheld or exercised in an untenable fashion.” (citing Persons v. Lehoe, 150 Vt.
582, 585–86 (1988)). The trial court in that case had imposed prospective coercive fines of
$10,000 per day for the first violation of its order not to block access to a clinic providing
abortions and $20,000 per day for further violations. Id. at 151. Defendants challenged the
fines, and the Court stated:
Although purely prospective fines are not favored in Vermont, State v. Pownal
Tanning Co., 142 Vt. 601, 606, 459 A.2d 989, 992 (1983), civil contempt fines
may be imposed in an appropriate circumstance either to compensate
complainants or as a coercive sanction. See Johnson v. Bednar, 573 So.2d 822,
825 (Fla.1991) (court may, in its discretion, impose fine unrelated to actual
damages to coerce compliance with previously issued court order). When imposed
as a coercive sanction, the fine must be purgeable—that is, capable of being
avoided by defendants through adherence to the court’s order. Pownal Tanning
11
Co., 142 Vt. at 604, 459 A.2d at 991. Further, the situation must be such that “it is
easy to gauge the compliance or noncompliance with an order.” Id. at 606, 459
A.2d at 992.
Id. at 151. Although the fines were high, the Court affirmed the trial court’s decision because the
defendants “did not feel bound by the injunction” and “some coercive sanction is necessary . . .
to deter repetition.” Id. at 152.
In this case, the Farm did nothing meaningful for a year and a half after the Vorstevelds
knew and understood the terms of the Injunction. They began efforts only when a hearing on the
Motion for Contempt was imminent. They have tried twice to interpret the Injunction in ways to
minimize what is required for compliance, despite the clarity of the written Injunction and the
visible ongoing harm from their failure to comply. It is clear that a significant coercive sanction
is needed for the Farm to take seriously its responsibility for compliance.
In the 2004 case of Mann v. Levin, 2004 VT 100, 177 Vt. 261, defendant failed to comply
with a restrictive covenant limiting the height of any building constructed on her land. The trial
court granted plaintiff a permanent injunction ordering defendant to present the court with a plan
to reduce the ridge line elevation of her home by August 1, 2003, and to comply with the height
restriction by September 1, 2003. Id. ¶ 9. If she failed to comply with either of the deadlines,
defendant “would have to immediately vacate the premises and pay $500 per day until
compliance was reached.” Id.
Acknowledging that prospective fines are not favored in Vermont, the Court found that
they may be appropriate when “imposed as a coercive sanction,” such that they may be avoided
by adhering to the court’s order, and when it is easy to gauge the defendant’s compliance or
noncompliance with the order. Id. ¶ 32 (citing Vt. Women’s Health Ctr., 159 Vt. at 151). Finding
that both requirements were met, the Court affirmed the trial court’s prospectively identified
sanction of a daily fine:
As of February 2003, Levin was aware that her building violated the restrictive
covenant. In April 2003, the court indicated that it would order her to present it
with a plan for complying with the covenant, and that it would impose fines
should she fail to do so. The court imposed these requirements in its July 2003
order. Levin had ample notice that she would need to develop a plan to reduce the
height of her building. Given Levin’s attempt to frustrate the covenant, and her
ongoing violation of the covenant’s terms, the court acted reasonably in ordering
Levin to timely comply with its order, and imposing prospective fines to ensure
Levin’s compliance. We find no abuse of discretion.
Id. ¶ 33.
In Town of Windham v. Reese, No. 2011-053, 2011 WL 5996017, at *1 (Vt. Nov. 9, 2011)
(unpub. mem.), the Town obtained an injunction against landowners whose pond was
overflowing and flooding a town road. Downhill neighbors, also affected by the overflow,
intervened as plaintiffs. The court ordered landowners to “take immediate steps” to lower the
12
pond by at least 15 feet from the point where it spills over the edge. Id. Landowners did not
take steps to lower the pond level, and the neighbors moved the court to hold landowners in civil
contempt. The court granted the motion based on landowners’ failure “to attempt even minimal
temporary alleviation of the overflow problem.” Id. at *2. The court ordered landowners to pay
$50 per day until the water level was brought down to at least two feet below the edge and then
$20 per day until the level is down to the 15-foot level initially ordered. Id. The trial court
rejected landowners’ motions for relief from the fines, finding that landowners had been dilatory
in taking any steps to fix the problem.
On appeal, the 3-judge panel stated the following:
We will not disturb the trial court’s decision on a motion for relief from judgment
“[a]bsent a clear and affirmative abuse of discretion.” Sandgate Sch. Dist. v. Cate,
178 Vt. 625, 883 A.2d 774, 2005 VT 88, ¶ 6 (mem.). . . . “Once the trial court has
made its findings of fact, and in its discretion entered a judgment of contempt, we
will not disturb the judgment unless the court’s discretion was entirely withheld or
was exercised on grounds clearly untenable.” Vt. Women’s Health Ctr. v.
Operation Rescue, 159 Vt. 141, 146–47 (1992) (quotation omitted).
Id. at *3.
In this case, there have been two years of noncompliance following the issuance of the
Injunction, and two findings of contempt. The court prefers to impose the least restrictive
remedy that is likely to be effective in bringing about compliance, and to avoid imprisonment if
possible. The evidence is clear that unless the Farm faces significant economic pressure, it will
seek ways to avoid proper compliance. The Farm benefits economically from disposing of its
waste from its tile drain system on to Aerie Point land. To trigger compliance, the economic
pressure must be sufficiently strong to affect the Farm’s business interests.
The evidence shows that the cost to the Farm of purchasing corn for feed would be
$300,000 per year if it did not grow its own corn. That amounts to $822 per day. This suggests
that the daily fine should be at least that much in order to prompt compliance. Accordingly, the
court hereby imposes a fine of $1,000 per day for as long as the Farm fails to comply with the
Injunction. This amount is wholly avoidable by compliance.
Given that the Farm has implemented some mitigation measures which may have had
some beneficial effect, albeit based on what appears to be a deliberate misinterpretation of the
Injunction, the court will delay the start date of the fine for two months to give the Farm time to
come into compliance before the daily fine is triggered. A period of two months appears
reasonable for the Farm to take action to comply with the two-year-old Injunction and will likely
allow the Farm to obtain the benefit of this year’s corn crop. Accordingly, the court will delay the
effective date of the daily fine for two months.
This is a civil suit between private parties, with no involvement of governmental bodies
charged with regulating the impact of water use. The effect of the Farm’s contempt over the last
two years has been to continue using Aerie Point’s land as a disposal site for its agricultural
13
waste, thereby causing continued trespass, nuisance, and permanent injury to the land. Therefore,
any fines that may accrue will be payable to Aerie Point as compensation for both permanent
injury to its property and interference with the use of its property during the period of contempt.
Plaintiff may seek judgment periodically, but not more often than once each year. Again, the
Farm has the opportunity to avoid fines altogether by compliance within two months.
Order
Based on the foregoing,
1. Defendant is found in contempt of court.
2. Both Motions (#20 and #32) are granted.
3. Plaintiff is entitled to attorneys’ fees in connection with the Motion for Coercive
Sanctions; any request must be filed by September 26, 2024, and must be supported by
affidavit and time and billing records. If such a request is filed, Defendant may file any
objection within 14 days and the court will determine whether a hearing is warranted.
4. If Defendant has not complied with the Injunction by November 15, 2024, a daily fine of
$1,000.00 will begin to accrue on November 16, 2024. It will be the responsibility of
Defendant to file a motion to show that compliance has been achieved. In the absence of
such a motion, the daily fine will continue to accrue.
Electronically signed September 12, 2024 pursuant to V.R.E.F. 9 (d).
Mary Miles Teachout
Superior Judge (Ret.), Specially Assigned
14
Poursuivez vos recherches dans ChatGPT ou Claude
Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.