#24473-a-JKM
2007 SD 120
IN THE SUPREME COURT
OF THE
STATE OF SOUTH DAKOTA
* * * *
DEWAYNE C. TVEIDT, as Special
Administrator for the ESTATE OF
ESTHER A. TVEIDT, Plaintiff and Appellant,
v.
ZANDSTRA CONSTRUCTION, INC., Defendant and Appellee.
* * * *
APPEAL FROM THE CIRCUIT COURT OF
THE FOURTH JUDICIAL CIRCUIT
MEADE COUNTY, SOUTH DAKOTA
* * * *
HONORABLE JEROME A. ECKRICH, III
Judge
* * * *
JOHN W. BURKE of
Thomas, Nooney, Braun, Solay
& Bernard, LLP Attorneys for plaintiff
Rapid City, South Dakota and appellant.
ERIC J. PICKAR
TERRY L. HOFER of
Bangs, McCullen, Butler,
Foye & Simmons, LLP Attorneys for defendant
Rapid City, South Dakota and appellee.
* * * *
CONSIDERED ON BRIEFS
ON AUGUST 27, 2007
OPINION FILED 11/14/07
#24473
MEIERHENRY, Justice
[¶1.] Dewayne Tveidt (Tveidt), as Special Administrator for the Estate of
Esther A. Tveidt, appeals a summary judgment order in favor of Zandstra
Construction, Inc. (Zandstra). The dispute involved the interpretation of a contract
entered into between the parties in conjunction with a South Dakota Department of
Transportation (DOT) highway project. The project involved construction of U.S.
Highway 14A between Sturgis and Deadwood, South Dakota, and was referred to as
the Boulder Canyon Project. DOT contracted with local ranchers and landowners,
Esther and Lewis Tveidt, to use their land to dispose of excess embankment
material (DOT-Tveidt Contract). Pursuant to the DOT-Tveidt Contract, DOT would
be allowed to deposit 300,000 cubic yards of excess material on Tveidt’s property in
return for compensation.
[¶2.] DOT also contracted with Zandstra (DOT-Zandstra Contract) to serve
as the general contractor on the Boulder Canyon Project. As part of the DOT-
Zandstra Contract, Zandstra was required to install thousands of tons of riprap
(large stones or chunks of concrete) along the banks of the Bear Butte Creek for
erosion control. According to the undisputed facts, the DOT-Zandstra Contract
incorporated the DOT-Tveidt Contract.
[¶3.] Zandstra contracted with Tveidt (Zandstra-Tveidt Contract) to pay
them for a “return haul road” and to purchase “riprap produced on their property.”
The Zandstra-Tveidt Contract permitted Zandstra to “[u]se an area on Tveidt’s
property to screen and store riprap . . . .” The conditions of the contract specified
that Zandstra would compensate Tveidt in the amount of $30,000.00 for a return
-1-
#24473
haul road and an additional $2.50 per ton of riprap “produced on [Tveidt’s]
property.” In addition to this compensation, Zandstra was bound to “reseed and
reclaim” the affected area and backfill a pipe installed by Tveidt.
[¶4.] Zandstra, as general contractor, was responsible for transporting the
excess embankment, described in the DOT-Tveidt Contract, to Tveidt’s land. After
transporting the excess embankment material to Tveidt’s land, Zandstra screened
the embankment for riprap, setting any usable riprap to the side for eventual
application to the project. Additionally, Zandstra unearthed riprap from Tveidt’s
property, which also was screened and used on the project.
[¶5.] Upon completion of the Boulder Canyon Project, Zandstra had hauled
a total of 56,931.10 tons of riprap from Tveidt’s property. This total represented
riprap from two sources (1) riprap produced by screening the material unearthed
from Tveidt’s property (9,948.34 tons) and (2) riprap produced by screening the
excess embankment material that had been hauled onto Tveidt’s property pursuant
to the DOT-Tveidt Contract (46,982.76 tons). Zandstra tendered payment for the
9,948.34 tons of riprap produced from material unearthed from Tveidt’s property.
Tveidt subsequently commenced an action alleging that Zandstra had an obligation
to pay for all of the riprap that it screened from the excess embankment material.
The trial court granted Zandstra’s motion for summary judgment, finding that the
Zandstra-Tveidt Contract only obligated Zandstra to pay for riprap unearthed from
Tveidt’s property. Tveidt claims that the trial court erred.
[¶6.] Specifically, Tveidt contends that (1) they owned the excess
embankment material from which 46,982.76 tons of the riprap were produced and
-2-
#24473
(2) pursuant to the Zandstra-Tveidt Contract, Zandstra had an obligation to pay for
the riprap that it produced from the excess embankment material. Since there are
no material facts in dispute, our review is limited to whether the law was correctly
applied. Kling v. Stern, 2007 SD 51, ¶5, 733 NW2d 615, 617.
[¶7.] The construction of a contract is a question of law which we review de
novo. Id. As this is a matter of contract interpretation, the plain meaning of the
words of the contract will be given effect. In re Dissolution of Midnight Star
Enterprises, L.P. ex rel. Midnight, 2006 SD 98, ¶12, 724 NW2d 334, 337. “An
interpretation which gives a reasonable and effective meaning to all the terms is
preferred to an interpretation which leaves a part unreasonable or of no effect.” Id.
(quoting Nelson v. Schellpfeffer, 2003 SD 7, ¶14, 656 NW2d 740, 744 (citing
RESTATEMENT (SECOND) CONTRACTS §203 (a) (1981))). When interpreting the
contract, “[w]e must ‘give effect to the language of the entire contract and particular
words and phrases are not interpreted in isolation.’” Id. (quoting Jones v.
Siouxland Surgery, 2006 SD 97, ¶15, 724 NW2d 340, 345) (quoting Hartig Drug Co.
v. Hartig, 602 NW2d 794, 797-98 (Iowa 1999))). The parties direct us to provisions
in both the DOT-Tveidt Contract and the Tveidt-Zandstra Contract. Both contracts
dealt with the same subject matter and when read together define the intent of the
parties in relationship to the excess embankment material, the riprap and its
production.
1. The DOT-Tveidt Contract
[¶8.] Tveidt claims that pursuant to the DOT-Tveidt Contract, the excess
embankment material hauled on the property to be stored and screened became the
-3-
#24473
personal property of Tveidt entitling the Estate to payment. As support, Tveidt
cites to the absence of language in the DOT-Tveidt Contract suggesting that
ownership of the excess embankment material would remain with DOT, and the
absence of language that suggests that DOT would have the right to screen riprap
from the excess embankment material. Tveidt claims that the contract only allowed
DOT and its agents to have a right of ingress and egress for the purpose of
depositing but not removing excess embankment materials.
[¶9.] Zandstra, on the other hand, argues that DOT only contracted with
Tveidt for storage and waste of the excess embankment material. In support of its
argument, Zandstra points to the absence of any language that suggests that the
excess embankment material would become the property of Tveidt. Zandstra
argues that the language of the contract implies that any excess waste material
would not become property of Tveidt until the area was graded to specification,
reseeded and re-fenced.
[¶10.] In order to resolve the issue of ownership, we look at the language of
both the DOT-Tveidt Contract and the Zandstra-Tveidt Contract, as both parties
suggest. The DOT-Tveidt Contract is a five page document detailing the rights and
responsibilities of DOT in regards to its use of Tveidt’s property. Among other
things, the contract granted DOT a right of ingress and egress for the purpose of
depositing excess embankment material and allowed for DOT’s continued use of
Tveidt’s property until the Boulder Canyon Project was complete. The contract also
required DOT to restore the property to its original condition after the project was
completed.
-4-
#24473
[¶11.] The DOT-Tveidt Contract noted that the purpose of the contract was
for “depositing approximately 300,000 cubic yards of excess embankment
materials.” For depositing the excess embankment material, DOT agreed to pay
Tveidt “a total compensatory sum of $90,000.00” plus an additional amount of
$2,500.00 for loss of trees “bring[ing] the total compensatory amount to $92,500.00
for the placement of waste material.” The contract provided additional
compensation “[i]f the quantity of excess embankment material exceed[ed] 300,000
cubic yards, . . . at a rate of $0.25 per cubic yard of rock/dirt in excess of 300,000
cubic yards.” The contract specified that “[t]he method of measurement to
determine the actual quantity of waste material will be by cross sections taken
before and after on the roadway project.”
2. The Zandstra-Tveidt Contract
[¶12.] The Zandstra-Tveidt Contract consisted of a one page form and in its
entirety read as follows:
The agreement made this 22nd day of May, 2000, between
Zandstra Construction, Inc. . . . and Ester [sic] A. and Lewis
Tveidt, . . . .
Zandstra Construction, Inc. hereby agrees to:
Pay Tveidt’s $30,000.00 for return haul road 35’ wide.
Pay Tveidt’s $2.50 per ton for riprap produced on their property.
Additional Conditions:
Return haul road will need to be 35’ wide. We will reseed & reclaim
when hauling is complete. All stumps from project will be buried in
Tveidt’s waste area. Use an area on Tveidt’s property to screen and
store riprap, we will reseed this area when completed. Not all riprap
for this project will be produced in Tvedt’d [sic] property. We will
grade a trail south of Highway on Tveidt’s property. We will also dig a
-5-
#24473
trench from the spring at STA 514+00 to the sleeve. Tveidt will install
a pipe from the spring to the sleeve. We will then backfill pipe.
[¶13.] The Zandstra-Tveidt Contract provided that Tveidt would receive
“$2.50 per ton for riprap produced on their property.” By using the word
“produced,” Tveidt argues that, by definition, Zandstra had an obligation to pay for
any riprap “brought into existence” or “created” on Tveidt’s property. See Black’s
Law Dictionary 1245 (8th ed 2004). Even if we were to accept this definition of the
term “produced,” Tveidt’s argument fails. The riprap obtained from the excess
embankment material was not created on Tveidt’s property. In other words, it did
not have its origin from Tveidt’s property. Rather, the DOT moved it from the
Boulder Canyon Project and placed it on Tveidt’s property for storage purposes. In
contrast, the 9,948.34 tons of riprap that Zandstra tendered payment for had its
origin in Tveidt’s property. Furthermore, Black’s Law Dictionary also defines
“produced” as “to bring (oil, etc.) to the surface of the earth.” Black’s Law
Dictionary 1245 (8th ed 2004). The riprap produced from the excess material had
already been brought to the surface of the earth when it was placed on Tveidt’s
property. Therefore, under both of these definitions, the term “produced” does not
apply to the riprap obtained from the excess embankment material.
[¶14.] Tveidt further argues the excess embankment material became the
property of the Tveidts once placed on their property. Tveidt cites Hayes v. Alaska
Juneau Forest Industries, Inc., a case dealing with the deposit of mine tailings, as
support for this position. 748 P2d 332, 336 (Alaska 1988). In Hayes, the Alaska
Supreme Court stated that “[a]ll authorities to which we have been referred hold
that when tailings or other mine wastes are deposited in such a manner or with
-6-
#24473
such an intention that they become real estate, they become the property of the
owner of the underlying land.” Id. at 337. However, in Hayes the minerals were
deposited for the purpose of disposal, “as distinct from being stockpiled for future
use.” Id. at 334-35. Zandstra, as an agent of DOT, did not dispose of excess
embankment material; it screened and stored the riprap for future use. This is not
indicative of an intent to abandon the riprap, as required in Hayes. Id. at 335. The
Hayes Court recognized that the minerals did not change ownership until they were
abandoned; stating: “[t]he concept of abandonment plays an important role . . . . If
the tailings are ‘abandoned’ they become real estate, if they are not abandoned they
remain the personal property of the mine or mill which created them.” Id. at 335.
Neither Zandstra nor the DOT abandoned any of the excess embankment until after
the completion of the Boulder Canyon Project. The Zandstra-Tveidt Contract and
the DOT-Tveidt Contract further emphasize this fact.
[¶15.] The DOT-Tveidt Contract stated the quantity of excess embankment
would be determined by measuring “cross sections taken before and after the roadway
project.” (Emphasis added). This measurement clause clearly states that DOT
would only pay Tveidt for the excess embankment remaining on the property at the
conclusion of the roadway project. It further implies that excess embankment
material may be removed from Tveidt’s land prior to the roadway project’s
completion. Hence, the property was not abandoned until the conclusion of the
Boulder Canyon Project. The Zandstra-Tveidt Contract also contradicts the Hayes
analogy.
-7-
#24473
[¶16.] The Zandstra-Tveidt Contract referred to both “stored” riprap and
“produced” riprap. It provided that Tveidt’s land would be used to “screen and store
riprap.” (Emphasis added). It further provided, “[n]ot all riprap for this project will
be produced in Tvedt’d [sic] property,” a reasonable interpretation of the two
provisions is that the parties agreed that not all of the “stored” riprap would be
“produced” in Tveidt’s property. In other words, some of the stored riprap would
come from another source. Rationally, another source of riprap was the excess
embankment material Zandstra stripped from the Boulder Canyon Project area and
transported to Tveidt’s land. Moreover, there would be no reason to “store” riprap
which was already part of Tveidt’s land. When interpreting a contract we prefer to
give effect to all its terms, rather than “an interpretation which leaves a part
unreasonable or of no effect.” In re Dissolution of Midnight Star Enterprises, L.P.
ex rel. Midnight, 2006 SD 98, ¶12, 724 NW2d at 337 (quoting Nelson v.
Schellpfeffer, 2003 SD 7, ¶14, 656 NW2d 740, 744 (citing RESTATEMENT (SECOND)
CONTRACTS § 203(a) (1981))).
[¶17.] Neither the DOT-Tveidt Contract nor the Zandstra-Tveidt Contract
obligated Zandstra to compensate Tveidt for riprap screened from the excess
embankment material; therefore, we find no error in the trial court’s grant of
summary judgment.
[¶18.] Affirmed.
[¶19.] GILBERTSON, Chief Justice, and SABERS, KONENKAMP, and
ZINTER, Justices, concur.