Tveidt v. Zandstra Construction, Inc.

CourtListener 901553Sd14 nov. 2007

Texte intégral

#24473-a-JKM

2007 SD 120

IN THE SUPREME COURT
OF THE
STATE OF SOUTH DAKOTA

* * * *

DEWAYNE C. TVEIDT, as Special
Administrator for the ESTATE OF
ESTHER A. TVEIDT, Plaintiff and Appellant,

v.

ZANDSTRA CONSTRUCTION, INC., Defendant and Appellee.

* * * *

APPEAL FROM THE CIRCUIT COURT OF
THE FOURTH JUDICIAL CIRCUIT
MEADE COUNTY, SOUTH DAKOTA

* * * *

HONORABLE JEROME A. ECKRICH, III
Judge

* * * *

JOHN W. BURKE of
Thomas, Nooney, Braun, Solay
& Bernard, LLP Attorneys for plaintiff
Rapid City, South Dakota and appellant.

ERIC J. PICKAR
TERRY L. HOFER of
Bangs, McCullen, Butler,
Foye & Simmons, LLP Attorneys for defendant
Rapid City, South Dakota and appellee.

* * * *

CONSIDERED ON BRIEFS
ON AUGUST 27, 2007

OPINION FILED 11/14/07
#24473

MEIERHENRY, Justice

[¶1.] Dewayne Tveidt (Tveidt), as Special Administrator for the Estate of

Esther A. Tveidt, appeals a summary judgment order in favor of Zandstra

Construction, Inc. (Zandstra). The dispute involved the interpretation of a contract

entered into between the parties in conjunction with a South Dakota Department of

Transportation (DOT) highway project. The project involved construction of U.S.

Highway 14A between Sturgis and Deadwood, South Dakota, and was referred to as

the Boulder Canyon Project. DOT contracted with local ranchers and landowners,

Esther and Lewis Tveidt, to use their land to dispose of excess embankment

material (DOT-Tveidt Contract). Pursuant to the DOT-Tveidt Contract, DOT would

be allowed to deposit 300,000 cubic yards of excess material on Tveidt’s property in

return for compensation.

[¶2.] DOT also contracted with Zandstra (DOT-Zandstra Contract) to serve

as the general contractor on the Boulder Canyon Project. As part of the DOT-

Zandstra Contract, Zandstra was required to install thousands of tons of riprap

(large stones or chunks of concrete) along the banks of the Bear Butte Creek for

erosion control. According to the undisputed facts, the DOT-Zandstra Contract

incorporated the DOT-Tveidt Contract.

[¶3.] Zandstra contracted with Tveidt (Zandstra-Tveidt Contract) to pay

them for a “return haul road” and to purchase “riprap produced on their property.”

The Zandstra-Tveidt Contract permitted Zandstra to “[u]se an area on Tveidt’s

property to screen and store riprap . . . .” The conditions of the contract specified

that Zandstra would compensate Tveidt in the amount of $30,000.00 for a return

-1-
#24473

haul road and an additional $2.50 per ton of riprap “produced on [Tveidt’s]

property.” In addition to this compensation, Zandstra was bound to “reseed and

reclaim” the affected area and backfill a pipe installed by Tveidt.

[¶4.] Zandstra, as general contractor, was responsible for transporting the

excess embankment, described in the DOT-Tveidt Contract, to Tveidt’s land. After

transporting the excess embankment material to Tveidt’s land, Zandstra screened

the embankment for riprap, setting any usable riprap to the side for eventual

application to the project. Additionally, Zandstra unearthed riprap from Tveidt’s

property, which also was screened and used on the project.

[¶5.] Upon completion of the Boulder Canyon Project, Zandstra had hauled

a total of 56,931.10 tons of riprap from Tveidt’s property. This total represented

riprap from two sources (1) riprap produced by screening the material unearthed

from Tveidt’s property (9,948.34 tons) and (2) riprap produced by screening the

excess embankment material that had been hauled onto Tveidt’s property pursuant

to the DOT-Tveidt Contract (46,982.76 tons). Zandstra tendered payment for the

9,948.34 tons of riprap produced from material unearthed from Tveidt’s property.

Tveidt subsequently commenced an action alleging that Zandstra had an obligation

to pay for all of the riprap that it screened from the excess embankment material.

The trial court granted Zandstra’s motion for summary judgment, finding that the

Zandstra-Tveidt Contract only obligated Zandstra to pay for riprap unearthed from

Tveidt’s property. Tveidt claims that the trial court erred.

[¶6.] Specifically, Tveidt contends that (1) they owned the excess

embankment material from which 46,982.76 tons of the riprap were produced and

-2-
#24473

(2) pursuant to the Zandstra-Tveidt Contract, Zandstra had an obligation to pay for

the riprap that it produced from the excess embankment material. Since there are

no material facts in dispute, our review is limited to whether the law was correctly

applied. Kling v. Stern, 2007 SD 51, ¶5, 733 NW2d 615, 617.

[¶7.] The construction of a contract is a question of law which we review de

novo. Id. As this is a matter of contract interpretation, the plain meaning of the

words of the contract will be given effect. In re Dissolution of Midnight Star

Enterprises, L.P. ex rel. Midnight, 2006 SD 98, ¶12, 724 NW2d 334, 337. “An

interpretation which gives a reasonable and effective meaning to all the terms is

preferred to an interpretation which leaves a part unreasonable or of no effect.” Id.

(quoting Nelson v. Schellpfeffer, 2003 SD 7, ¶14, 656 NW2d 740, 744 (citing

RESTATEMENT (SECOND) CONTRACTS §203 (a) (1981))). When interpreting the

contract, “[w]e must ‘give effect to the language of the entire contract and particular

words and phrases are not interpreted in isolation.’” Id. (quoting Jones v.

Siouxland Surgery, 2006 SD 97, ¶15, 724 NW2d 340, 345) (quoting Hartig Drug Co.

v. Hartig, 602 NW2d 794, 797-98 (Iowa 1999))). The parties direct us to provisions

in both the DOT-Tveidt Contract and the Tveidt-Zandstra Contract. Both contracts

dealt with the same subject matter and when read together define the intent of the

parties in relationship to the excess embankment material, the riprap and its

production.

1. The DOT-Tveidt Contract

[¶8.] Tveidt claims that pursuant to the DOT-Tveidt Contract, the excess

embankment material hauled on the property to be stored and screened became the

-3-
#24473

personal property of Tveidt entitling the Estate to payment. As support, Tveidt

cites to the absence of language in the DOT-Tveidt Contract suggesting that

ownership of the excess embankment material would remain with DOT, and the

absence of language that suggests that DOT would have the right to screen riprap

from the excess embankment material. Tveidt claims that the contract only allowed

DOT and its agents to have a right of ingress and egress for the purpose of

depositing but not removing excess embankment materials.

[¶9.] Zandstra, on the other hand, argues that DOT only contracted with

Tveidt for storage and waste of the excess embankment material. In support of its

argument, Zandstra points to the absence of any language that suggests that the

excess embankment material would become the property of Tveidt. Zandstra

argues that the language of the contract implies that any excess waste material

would not become property of Tveidt until the area was graded to specification,

reseeded and re-fenced.

[¶10.] In order to resolve the issue of ownership, we look at the language of

both the DOT-Tveidt Contract and the Zandstra-Tveidt Contract, as both parties

suggest. The DOT-Tveidt Contract is a five page document detailing the rights and

responsibilities of DOT in regards to its use of Tveidt’s property. Among other

things, the contract granted DOT a right of ingress and egress for the purpose of

depositing excess embankment material and allowed for DOT’s continued use of

Tveidt’s property until the Boulder Canyon Project was complete. The contract also

required DOT to restore the property to its original condition after the project was

completed.

-4-
#24473

[¶11.] The DOT-Tveidt Contract noted that the purpose of the contract was

for “depositing approximately 300,000 cubic yards of excess embankment

materials.” For depositing the excess embankment material, DOT agreed to pay

Tveidt “a total compensatory sum of $90,000.00” plus an additional amount of

$2,500.00 for loss of trees “bring[ing] the total compensatory amount to $92,500.00

for the placement of waste material.” The contract provided additional

compensation “[i]f the quantity of excess embankment material exceed[ed] 300,000

cubic yards, . . . at a rate of $0.25 per cubic yard of rock/dirt in excess of 300,000

cubic yards.” The contract specified that “[t]he method of measurement to

determine the actual quantity of waste material will be by cross sections taken

before and after on the roadway project.”

2. The Zandstra-Tveidt Contract

[¶12.] The Zandstra-Tveidt Contract consisted of a one page form and in its

entirety read as follows:

The agreement made this 22nd day of May, 2000, between
Zandstra Construction, Inc. . . . and Ester [sic] A. and Lewis
Tveidt, . . . .

Zandstra Construction, Inc. hereby agrees to:

Pay Tveidt’s $30,000.00 for return haul road 35’ wide.
Pay Tveidt’s $2.50 per ton for riprap produced on their property.

Additional Conditions:

Return haul road will need to be 35’ wide. We will reseed & reclaim
when hauling is complete. All stumps from project will be buried in
Tveidt’s waste area. Use an area on Tveidt’s property to screen and
store riprap, we will reseed this area when completed. Not all riprap
for this project will be produced in Tvedt’d [sic] property. We will
grade a trail south of Highway on Tveidt’s property. We will also dig a

-5-
#24473

trench from the spring at STA 514+00 to the sleeve. Tveidt will install
a pipe from the spring to the sleeve. We will then backfill pipe.

[¶13.] The Zandstra-Tveidt Contract provided that Tveidt would receive

“$2.50 per ton for riprap produced on their property.” By using the word

“produced,” Tveidt argues that, by definition, Zandstra had an obligation to pay for

any riprap “brought into existence” or “created” on Tveidt’s property. See Black’s

Law Dictionary 1245 (8th ed 2004). Even if we were to accept this definition of the

term “produced,” Tveidt’s argument fails. The riprap obtained from the excess

embankment material was not created on Tveidt’s property. In other words, it did

not have its origin from Tveidt’s property. Rather, the DOT moved it from the

Boulder Canyon Project and placed it on Tveidt’s property for storage purposes. In

contrast, the 9,948.34 tons of riprap that Zandstra tendered payment for had its

origin in Tveidt’s property. Furthermore, Black’s Law Dictionary also defines

“produced” as “to bring (oil, etc.) to the surface of the earth.” Black’s Law

Dictionary 1245 (8th ed 2004). The riprap produced from the excess material had

already been brought to the surface of the earth when it was placed on Tveidt’s

property. Therefore, under both of these definitions, the term “produced” does not

apply to the riprap obtained from the excess embankment material.

[¶14.] Tveidt further argues the excess embankment material became the

property of the Tveidts once placed on their property. Tveidt cites Hayes v. Alaska

Juneau Forest Industries, Inc., a case dealing with the deposit of mine tailings, as

support for this position. 748 P2d 332, 336 (Alaska 1988). In Hayes, the Alaska

Supreme Court stated that “[a]ll authorities to which we have been referred hold

that when tailings or other mine wastes are deposited in such a manner or with

-6-
#24473

such an intention that they become real estate, they become the property of the

owner of the underlying land.” Id. at 337. However, in Hayes the minerals were

deposited for the purpose of disposal, “as distinct from being stockpiled for future

use.” Id. at 334-35. Zandstra, as an agent of DOT, did not dispose of excess

embankment material; it screened and stored the riprap for future use. This is not

indicative of an intent to abandon the riprap, as required in Hayes. Id. at 335. The

Hayes Court recognized that the minerals did not change ownership until they were

abandoned; stating: “[t]he concept of abandonment plays an important role . . . . If

the tailings are ‘abandoned’ they become real estate, if they are not abandoned they

remain the personal property of the mine or mill which created them.” Id. at 335.

Neither Zandstra nor the DOT abandoned any of the excess embankment until after

the completion of the Boulder Canyon Project. The Zandstra-Tveidt Contract and

the DOT-Tveidt Contract further emphasize this fact.

[¶15.] The DOT-Tveidt Contract stated the quantity of excess embankment

would be determined by measuring “cross sections taken before and after the roadway

project.” (Emphasis added). This measurement clause clearly states that DOT

would only pay Tveidt for the excess embankment remaining on the property at the

conclusion of the roadway project. It further implies that excess embankment

material may be removed from Tveidt’s land prior to the roadway project’s

completion. Hence, the property was not abandoned until the conclusion of the

Boulder Canyon Project. The Zandstra-Tveidt Contract also contradicts the Hayes

analogy.

-7-
#24473

[¶16.] The Zandstra-Tveidt Contract referred to both “stored” riprap and

“produced” riprap. It provided that Tveidt’s land would be used to “screen and store

riprap.” (Emphasis added). It further provided, “[n]ot all riprap for this project will

be produced in Tvedt’d [sic] property,” a reasonable interpretation of the two

provisions is that the parties agreed that not all of the “stored” riprap would be

“produced” in Tveidt’s property. In other words, some of the stored riprap would

come from another source. Rationally, another source of riprap was the excess

embankment material Zandstra stripped from the Boulder Canyon Project area and

transported to Tveidt’s land. Moreover, there would be no reason to “store” riprap

which was already part of Tveidt’s land. When interpreting a contract we prefer to

give effect to all its terms, rather than “an interpretation which leaves a part

unreasonable or of no effect.” In re Dissolution of Midnight Star Enterprises, L.P.

ex rel. Midnight, 2006 SD 98, ¶12, 724 NW2d at 337 (quoting Nelson v.

Schellpfeffer, 2003 SD 7, ¶14, 656 NW2d 740, 744 (citing RESTATEMENT (SECOND)

CONTRACTS § 203(a) (1981))).

[¶17.] Neither the DOT-Tveidt Contract nor the Zandstra-Tveidt Contract

obligated Zandstra to compensate Tveidt for riprap screened from the excess

embankment material; therefore, we find no error in the trial court’s grant of

summary judgment.

[¶18.] Affirmed.

[¶19.] GILBERTSON, Chief Justice, and SABERS, KONENKAMP, and

ZINTER, Justices, concur.

-8-