A-1-CA-42154•December 23, 2025- John Kemp v. JJJ Painting, No. A-1-CA-42154
Texte intégral
Corrections to this opinion/decision not affecting the outcome, at the Court's discretion, can occur up to the time of publication with NM Compilation Commission. The Court will ensure that the electronic version of this opinion/decision is updated accordingly in Odyssey. IN THE COURT OF APPEALS OF THE STATE OF NEW MEXICO 1 Opinion Number:__________ 2 Filing Date: December 23, 2025 3 No. A-1-CA-42154 4 JOHN KEMP, 5 Plaintiff-Appellant, 6 v. 7 JJJ PAINTING, JOSE SOSA, 8 and JOSE ALLEN SOSA, 9 Defendants-Appellees. 10 APPEAL FROM THE DISTRICT COURT OF DOÑA ANA COUNTY 11 Casey Fitch, District Court Judge 12 Salcedo & Company, LLC 13 Isidro Salcedo 14 Gilberto Gomez 15 Las Cruces, NM 16 for Appellant 17 Ramon Hernandez Law LLC 18 Ramon Hernandez 19 Las Cruces, NM 20 for Appellees 21 Court of Appeals of New Mexico Filed 12/23/2025 8:41 AM
OPINION 1
HENRY M. BOHNHOFF, Judge, Retired, Sitting by Designation. 2
{1} Plaintiff John Kemp filed this action to cancel mechanic’s liens that Defendant 3
JJJ Painting, a sole proprietorship owned by Defendant Jose Sosa (Jose), filed to 4
enforce its right to payment for painting, drywall, and stucco work it had performed 5
on homes being built on Kemp’s land. The district court ruled that Jose’s son, 6
Defendant Jose Allen Sosa (Allen), who managed the business, was an employee of 7
JJJ Painting, qualified as a “individual who works only for wages” (hereinafter 8
“wage earner”) under NMSA 1978, Section 60-13-3(D)(13) (1999) of the 9
Construction Industries Licensing Act (CILA or Act), NMSA 1978, §§ 60-13-1 10
to -59 (1967, as amended through 2021), and therefore was individually exempt from 11
the Act’s licensing requirement. The district court also determined that 12
subcontractors who performed drywall and stucco work for JJJ Painting were neither 13
licensed contractors nor JJJ Painting employees, and JJJ Painting therefore was 14
barred from enforcing its rights to compensation for those individuals’ work. 15
However, the district court ruled that this infirmity did not bar JJJ Painting from 16
otherwise enforcing the liens and collecting compensation for its own employees’ 17
work on the homes. Kemp appeals the district court’s judgment embodying these 18
rulings and awarding JJJ Painting damages. We affirm. 192
BACKGROUND 1
{2} As its name implies, CILA governs the licensing of construction contractors, 2
including the consequences of violating the Act’s requirements. Section 60-13- 3
12(A) provides that “[n]o person shall act as a contractor without a license issued by 4
the [New Mexico Construction Industries D]ivision [(CID)] classified to cover the 5
type of work to be undertaken.” See § 60-13-2(A) (defining CID). Sections 60-13- 6
30(A) and (B) generally bar an unlicensed contractor from taking legal steps to 7
enforce a right to compensation for contracting: 8
A. No contractor shall . . . bring or maintain any action in any 9
court of the state for the collection of compensation for the performance 10
of any act for which a license is required by [CILA] without alleging 11
and proving that such contractor was a duly licensed contractor at the 12
time the alleged cause of action arose. 13
B. Any contractor operating without a license as required by 14
[CILA] shall have no right to file or claim any mechanic’s lien as now 15
provided by law. 16
{3} The Act defines “contractor” generally to include anyone who undertakes 17
contracting, § 60-13-3(A), and specifically to include a subcontractor and a specialty 18
contractor, § 60-13-3(B). The Act defines “contracting” to include “constructing, 19
altering, repairing, installing or demolishing” any building or structure. Section 60- 20
13-3(A)(2). Section 60-13-3(D)(13), however, exempts from the definition of 21
contractor “an individual who works only for wages,” and Section 60-13-2(I) defines 223
“wages” as “compensation paid to an individual by an employer from which taxes 1
are required to be withheld by federal and state law.” 2
Factual Background 3
{4} The district court made the following findings of fact which, as discussed 4
below, are unchallenged on appeal. 5
{5} Jose is a painting contractor in Las Cruces, New Mexico, doing business as 6
JJJ Painting. Jose holds a GB-981 contracting license issued by the CID, and is the 7
qualifying party, see 14.6.3.8(A)(3)(a), (E) NMAC, for a GB-98 license that was 8
issued to JJJ Painting at the same time. 9
{6} Jose’s son, Allen, is an employee of JJJ Painting. Allen had significant 10
responsibility and discretion in running JJJ Painting, as would be typical of a 11
manager of a business. Notwithstanding Allen’s managerial role in JJJ Painting, Jose 12
retained control of the company and had to approve all substantial decisions. Allen 13
also engaged in work that constituted contracting within the meaning of Section 60- 14
13-3(A)(2). Allen does not hold a contractor’s license. Addressing testimony that 15
Allen’s compensation was based on the company’s profits, the district court found 16
1A GB-98 license generally authorizes the holder to “[e]rect, alter, repair or
demolish residential and commercial buildings.” 14.6.6.9(B)(2) NMAC. It includes
work authorized by GS classifications such as the GS-7 (defining drywall
classification) and GS-30 (defining plastering, stucco and lathing classifications)
specialty licenses, see id.;14.6.6.9(D)(5), (16) NMAC, but does not include certain
other specialties and other categories of contracting work. See generally 14.6.6.8
NMAC and 14.6.6.9 NMAC.4
that no credible testimony was presented that the compensation would not be subject 1
to withholding of taxes just as profit-based bonuses are subject to withholding. 2
{7} Kemp is a real estate investor. In partnership with Atlas Group, LLC, a 3
construction company owned by Cecil Campbell, Kemp built homes in Las Cruces. 4
Campbell engaged JJJ Painting in 2020 to paint homes that Campbell and Kemp 5
were building. The parties did not utilize written contracts, but JJJ Painting would 6
submit an invoice after assigned work was completed. 7
{8} JJJ Painting’s business relationship with Atlas fell apart in 2022 as a result of 8
work that JJJ Painting performed on homes Atlas was building at 2837 and 2845 9
East Springs Road in Las Cruces. At 2837 East Springs Road, Atlas had asked JJJ 10
Painting to repaint the interior of the house because, due to problems with earlier 11
work by a drywall contractor, the drywall tape seams showed through the coats of 12
paint. JJJ Painting’s initial repainting effort did not solve the problem—the seams 13
started to show again once the paint dried—so Atlas asked JJJ Painting to come back, 14
this time to first redo the work of the drywall contractor (“re-embed[]” and 15
“textur[e]” the tape seams) and then repaint the house a second time. JJJ Painting 16
employees performed the painting work, but Allen hired a cousin, Cesar De la Rosa, 17
to handle the drywall task, because De la Rosa had drywall experience. JJJ Painting 18
paid De la Rosa $1,800 and then charged Atlas $2,000 for this work. The invoices 19
reflect that JJJ Painting charged $1,800 in Invoice No. 303 for the first repainting 205
effort, and then included the $2,000 drywall repair charge plus an additional $3,900 1
for the second repainting effort in Invoice No. 302. 2
{9} Campbell also had asked JJJ Painting to perform the stucco work at both 2837 3
and 2845 East Springs Road. Allen engaged Juan Viegas, who had his own 4
employees, to work with him on this task. JJJ Painting charged Atlas $15,456 5
(Invoice No. S-202) and $14,644 (Invoice No. S-217) for stuccoing 2837 and 2845 6
East Springs Road. Like De la Rosa, JJJ Painting paid Viegas a portion of what JJJ 7
Painting billed Atlas. 8
{10} Eventually, Campbell instructed JJJ Painting to stop working on all Atlas 9
homes and terminated the business relationship. Following the termination, Atlas 10
did not pay JJJ Painting for the balance of the painting, drywall, and stucco work on 11
2837 and 2845 East Springs Road that remained unpaid. Specifically, in addition to 12
not paying for any of the repainting and drywall work on 2837 East Springs Road as 13
reflected on Invoice Nos. 303 and 302, Atlas did not pay $6,182.40 and $5,587.60 14
balances that remained due for the stucco work on the two homes as reflected on 15
Invoice Nos. S-202 and S-217. While the parties disputed the reasons for the 16
termination, the district court found that JJJ Painting had completed the invoiced 17
work and that Campbell’s other dissatisfaction with JJJ Painting was not a basis for 18
denying payment. 196
{11} The district court determined that neither Viegas nor De la Rosa was a JJJ 1
Painting employee, Viegas did not have a contractor’s license, and JJJ Painting had 2
not established that De la Rosa was licensed. 3
Procedural Background. 4
{12} Following Campbell’s stop-work order, JJJ Painting recorded mechanic’s 5
liens against 2837 and 2845 East Springs with the Doña Ana County Clerk. Kemp, 6
the record owner of the two parcels, responded by initiating this action to cancel the 7
liens, as provided for by NMSA 1978, Section 48-2-9 (2007). 8
{13} Kemp’s grounds for challenging JJJ Painting’s liens evolved as the case 9
progressed. In his petition and at the beginning of the trial, Kemp contended that 10
Allen effectively had taken over the management and operation of JJJ Painting; 11
further, Allen was not paid an hourly wage, but rather a portion of the company’s 12
profits. Kemp urged that, for these reasons, Allen was a contractor as that term is 13
defined in Section 60-13-3(A), and the four invoices therefore were unenforceable. 14
{14} After a day and a half of trial, the district court rejected this argument. The 15
district court reasoned that, under Sections 60-13-2(I) and -3(D)(13), a wage earner 16
is exempt from the contractor licensing requirement; wage earner status hinges on 17
whether the compensation the person receives from the contractor is subject to 18
withholding under federal and state tax laws; and, even though it was based on JJJ 19
Painting’s profits, Allen’s compensation was still subject to withholding. However, 207
the court also ruled that De la Rosa and Viegas were acting as subcontractors and 1
not employees; unless they were licensed for drywall and stucco work, respectively, 2
Section 60-13-30 would bar JJJ Painting from collecting compensation for any work 3
by them. 4
{15} The remainder of the trial focused on what work reflected in Invoice Nos. 303, 5
302, S-202, and S-217 was performed by Allen and other JJJ Painting employees as 6
opposed to De la Rosa and Viegas, and whether those two individuals held contractor 7
licenses. Kemp now argued not only that De la Rosa and Viegas were not licensed 8
and thus payments to them were not recoverable, but also that this partial invalidity 9
operated to bar JJJ Painting from recovering for its own employees’ work as well. 10
{16} Following conclusion of the second part of the trial, the district court ruled 11
that JJJ Painting had failed to establish that De la Rosa and Viegas were either JJJ 12
Painting employees or alternatively licensed contractors, and thus JJJ Painting could 13
not recover for their work. However, the district court rejected Kemp’s contention 14
that this partial invalidity of Invoice Nos. 302, S-202, and S-217 barred JJJ Painting 15
from recovering the portion of the invoice amounts that reflected its own employees’ 16
work. On this basis, the district court ruled as follows: First, it did not find invalid 17
any portion of the $1,800 billed to Kemp in Invoice No. 303 for repainting work 18
performed by JJJ Painting employees. Second, it disallowed the $2,000 that JJJ 19
Painting had itemized for De la Rosa’s drywall work out of the total $5,900 bill to 208
Kemp in Invoice No. 302. Third, it allocated to Viegas’s labor and thus invalidated 1
$4,636.80 (amounting to 75 percent) out of the total $6,182.40 unpaid amount for 2
stucco work in Invoice S-202 (i.e., JJJ Painting was entitled to recover $1,545.60). 3
Fourth, similarly, it allocated to Viegas’s labor and thus invalidated $4,393.20 4
(amounting to 75 percent) out of the total $5,857.60 unpaid amount for stucco work 5
in Invoice No. S-217 (i.e., JJJ Painting was entitled to recover $1,464.40). The 6
district court accordingly entered final judgment on July 16, 2024, in favor of JJJ 7
Painting and against Kemp in the amount of $8,710 ($1,800 (Invoice No. 303) + 8
$3,900 (Invoice No. 302) + $1,545.60 (Invoice No. S-202) + $1,464.40 (Invoice No. 9
S-217)). 10
DISCUSSION 11
{17} On appeal, Kemp reiterates his two principal arguments. First, the district 12
court erred in determining that Allen fell within the wage-earner exemption to 13
CILA’s licensing requirement. Second, the district court erred in allowing JJJ 14
Painting to obtain partial recovery on what Kemp characterizes as a “mixed 15
contract,” i.e., a contract that involves work by both an unlicensed subcontractor and 16
the licensed contractor (and its employees and/or licensed subcontractors). Kemp 17
additionally argues that, if recovery is allowed at all on a mixed contract, it should 18
be limited to instances where (1) the contractor acted in good faith; and (2) the 199
licensed and unlicensed work can be separated, neither of which requirements, he 1
maintains, JJJ Painting can satisfy. 2
{18} Before beginning our analysis, we note that neither Kemp nor the Defendants 3
challenge any of the district court’s findings of fact. In particular, while Kemp 4
challenges a contractor’s right to collect any compensation for work on a partially 5
invalid contract, he does not dispute the district court’s determination that JJJ 6
Painting performed the work that Atlas had assigned to it, and the court’s allocation 7
of the invoice amounts to JJJ Painting’s employees’ work versus the work of De la 8
Rosa and Viegas. Similarly, JJJ Painting has not cross-appealed, and otherwise does 9
not challenge in its answer brief, the district court’s ruling that JJJ Painting failed to 10
establish that De la Rosa and Viegas were either JJJ Painting employees or 11
alternatively licensed contractors and thus JJJ Painting could not recover for their 12
work.2 Accordingly, we accept the district court’s factual findings for purposes of 13
our analysis. See Martinez v. Sw. Landfills, Inc., 1993-NMCA-020, ¶ 18, 115 N.M. 14
2After completion of appellate briefing, on June 17, 2025, JJJ Painting filed
in the district court a motion pursuant to Rule 1-060(B) NMRA for relief from the
July 16, 2024 judgment. In the motion, JJJ Painting sought to present new evidence
that Viegas in fact was licensed as a contractor. Following the district court’s
apparent oral denial of the motion on the grounds that the current appeal divested it
of jurisdiction, JJJ Painting filed a motion with this Court seeking a limited remand
”to permit the district court to hear and adjudicate” the Rule 1-060(B) motion. Rather
than delay the disposition of this appeal, we will deny that motion. Following entry
of our mandate, JJJ Painting may pursue its motion with the district court, on the
merits of which we take no position.10
181, 848 P.2d 1108 (“[A]n appellant is bound by the findings of fact made below 1
unless the appellant properly attacks the findings,” which requires “properly 2
set[ting] forth all [of] the evidence bearing upon the findings.”). 3
I. Standard of Review 4
{19} In the absence of any challenge to the district court’s fact findings, resolution 5
of Kemp’s arguments requires either construction of CILA or application of the 6
statute to those findings. “The meaning of language used in a statute is a question of 7
law that we review de novo.” Cooper v. Chevron U.S.A., Inc., 2002-NMSC-020, 8
¶ 16, 132 N.M. 382, 49 P.3d 61. “[W]e review de novo a lower court[’s] 9
. . . application of law to facts.” TPL, Inc. v. N.M. Tax’n & Revenue Dep’t, 10
2003-NMSC-007, ¶ 10, 133 N.M. 447, 64 P.3d 474. 11
II. Allen Was an “Individual Who Works Only for Wages” Within the 12
Meaning of CILA Section 60-13-3(D)(13) 13
{20} On the basis of its factual findings set forth above, the district court concluded 14
that Sections 60-13-2(I) and -3(D)(13) exempted Allen from classification as a 15
contractor: he performed contracting but, because his compensation for that work 16
was subject to federal and state tax withholding, he was a wage earner and thus 17
exempt from CILA’s licensing requirement. The crux of Kemp’s first argument on 18
appeal, that the district court erred in concluding that Allen was a wage earner, rests 19
on the proposition that Allen’s compensation amounted to profit sharing, and such 20
compensation is not subject to withholding. 2111
A. Reule Sun Corp. v. Valles 1
{21} Because it addressed and construed Sections 60-13-2(I) and -3(D)(13), Reule 2
Sun Corp. v. Valles, 2010-NMSC-004, 147 N.M. 512, 226 P.3d 611, is the starting 3
point in our analysis. In that case, homeowners had engaged a licensed contractor to 4
apply stucco to their home. Id. ¶ 1. To handle the job, the contractor hired an 5
individual, Perez, who was not licensed to perform stucco work. Id. ¶ 2. The 6
homeowners were dissatisfied with the work and refused to pay the contract amount. 7
Id. ¶ 3. The contractor filed a claim of lien, followed by a complaint for damages for 8
breach of contract and to foreclose on the lien. Id. The homeowners defended in part 9
on the basis that, because Perez did not have a contractor’s license, the lien and 10
lawsuit were barred by Section 60-13-30(A). See id. ¶¶ 9-12. Following a trial, the 11
district court determined that Perez was under the contractor’s complete direction 12
and control, and therefore he did not need to be licensed. Id. ¶ 4. On appeal, this 13
Court found that substantial evidence supported the trial court’s determination that 14
Perez was an employee and not an independent contractor, and otherwise affirmed. 15
Reule Sun Corp. v. Valles, 2008-NMCA-115, ¶¶ 11-20, 31, 144 N.M. 736, 191 P.3d 16
1197, rev’d 2010-NMSC-004, ¶ 43. 17
{22} Our Supreme Court reversed. The Court determined first that Perez’s work in 18
applying stucco to the homeowners house constituted “contracting” within the 19
meaning of CILA Section 60-13-3(A)(2). Valles, 2010-NMSC-004, ¶ 16. Thus, the 2012
only question was whether Perez qualified under one of the exemptions listed in 1
Section 60-13-3(D). Valles, 2010-NMSC-004, ¶ 17. 2
{23} The Court next addressed whether Perez qualified for the wage earner 3
exemption under Section 60-13-3(D)(13). Valles, 2010-NMSC-004, ¶ 18. 4
Notwithstanding substantial evidence catalogued by this Court to the effect that 5
Reule Sun Corp. exercised control over Perez’s work and otherwise supporting the 6
district court’s determination that the contractor’s relationship with Perez was that 7
of an employer to an employee, see Valles, 2008-NMCA-115, ¶¶ 7, 14-16, our 8
Supreme Court noted that the contractor had testified that Perez paid his own taxes 9
and he did not treat Perez as an employee for tax purposes. Valles, 2010-NMSC- 10
004, ¶¶ 2, 11. On the basis of this testimony, and reading Section 60-13-3(D)(13) in 11
conjunction with the definition of “wages” in Section 60-13-2(I), our Supreme Court 12
concluded that Perez did not qualify under the wage-earner exception to the 13
definition of contractor, and therefore he was required to have a contractor’s license. 14
Valles, 2010-NMSC-004, ¶ 18. 15
{24} The Court also addressed whether the common law “control” test for 16
distinguishing between an employee and an independent contractor was material to 17
determining a person’s status as a contractor or subcontractor for licensing purposes 18
under CILA. Id. ¶¶ 19-29. Earlier Supreme Court precedent had held that a person 19
who by the nature of their work otherwise would fall within the statutory definition 2013 of contractor was exempt from CILA’s licensing requirement if they qualified as an 1 employee under the common law control test: 2 [T]he findings make it sufficiently plain that Latta [the plaintiff worker] 3 was an employee, and not an independent contractor. At all times, the 4 right of control of the performance of the work and the right to direct 5 the manner in which the work would be done was in Bokum [the 6 defendant owner]. 7 . . . . 8 [T]he lower court having concluded that Latta was an employee, . . . we 9 find that Latta is not barred from maintaining this action. 10 Latta v. Harvey, 1960-NMSC-046, ¶¶ 7, 10, 67 N.M. 72, 352 P.2d 649; accord 11 Campbell v. Smith, 1961-NMSC-059, ¶¶ 11, 14, 68 N.M. 373, 362 P.2d 523. The 12 Valles Court overruled this precedent, reasoning that it effectively established an 13 “employee” exception to CILA’s licensing requirement that was broader than 14 Section 60-13-3(D)(13)’s “wage earner” exception. Valles, 2010-NMSC-004, ¶¶ 27- 15 29.3 Thus, as a matter of New Mexico law, evidence of control over the putative 16 employee’s performance of assigned work is not material to determining wage 17 earner status under Section 60-13-3(D)(13). 18 3The Court also rejected Reule Sun Corp.’s related argument that Section 60- 13-3.1 adopted the common law control test as an exception to the contractor licensing requirement: notwithstanding its codification as part of CILA, the statute was enacted separately and is applicable to unfair labor practices, not contractor licensing. See Valles, 2010-NMSC-004, ¶¶ 30-34.
14
B. Profit-Based Compensation 1
{25} Profit-based compensation of employees, which as the district court noted is 2
not uncommon in professional firms and elsewhere, is subject to tax withholding. 3
Federal tax law broadly includes “all remuneration . . . for services performed by an 4
employee for [their] employer” within the ambit of “wages” subject to income 5
taxation, I.R.C. § 3401(a), and then requires employers to withhold income taxes 6
from such wages, see I.R.C. § 3402(a)(1); see also I.R.C. § 3121(a) (defining 7
“wages” for purposes of social security taxation as “all remuneration for 8
employment”); 26 C.F.R. § 31.3401(a)-1(3) (stating that “[t]he basis upon which the 9
remuneration is paid is immaterial in determining whether the remuneration 10
constitutes wages. Thus, it may be paid on the basis of piecework, or a percentage 11
of profits; and may be paid hourly, daily, weekly, monthly, or annually” (emphasis 12
added)); 26 C.F.R. § 31.3121(a)-1(d) (same). New Mexico law, in turn, requires 13
employers to withhold state income taxes from an employee’s wages if withholding 14
of federal taxes is required under federal law. See NMSA 1978, § 7-3-3(A) (1996); 15
see also NMSA 1978, § 7-3-2(J) (2002) (defining “wages,” for purposes of Section 16
7-3-3(A), as “remuneration . . . for services performed by an employee for an 17
employer”). Thus, profit-based compensation such as that which Allen received 18
could constitute “wages” within the meaning of Section 60-13-3(D)(13)’s 19
exemption. 2015
{26} In the case at bar, the parties on appeal have not cited any testimony or 1
documentary evidence introduced at trial bearing on whether Jose d/b/a JJJ Painting 2
treated Allen as an employee or an independent contractor for tax purposes. Further, 3
Kemp did not argue to the district court, nor does he argue on appeal, that under 4
Section 60-13-30(A) JJJ Painting failed to meet any burden of proving Allen’s status 5
as a wage earner. We therefore decline to consider the question here. See N.M. Dep’t 6
of Hum. Servs. v. Tapia, 1982-NMSC-033, ¶ 11, 97 N.M. 632, 642 P.2d 1091 (stating 7
that courts should not address legal questions not raised by the parties and their 8
counsel); State ex rel. Hum. Servs. Dep’t v. Staples (In re Doe), 1982-NMSC-099, 9
¶¶ 3, 5, 98 N.M. 540, 650 P.2d 824 (same); see also Corona v. Corona, 2014- 10
NMCA-071, ¶ 28, 329 P.3d 701 (“This Court has no duty to review an argument that 11
is not adequately developed.”). Because the argument that Kemp does advance— 12
that profit-based compensation is not subject to withholding under federal and state 13
tax law—lacks merit, we affirm the district court’s conclusion that Sections 60-13- 14
2(I) and -3(D)(13) operated to exempt Allen from classification as a contractor.4
15
4Kemp also argues that, as a sole proprietorship, JJJ Painting does not file a
separate tax return, and thus is a “disregarded entity” or a “pass-through entity”
under federal and state tax law. The point is irrelevant. Even if JJJ Painting does not
file a separate income tax return, and instead the business’s net income is included
in Jose’s personal tax return, as we have explained, compensation paid to JJJ
Painting employees, including Allen, could still be considered “wages” for tax
purposes.16
III. CILA Section 60-13-30(A) Did Not Bar JJJ Painting From Collecting 1
Compensation for Its Own Work, Even Though It Was Barred From 2
Collecting for the Work of De La Rosa and Viegas. 3
{27} As stated, the district court determined that neither De la Rosa nor Viegas 4
possessed, or was shown to possess, a license to perform drywall or stucco work, 5
respectively, and neither was an employee of JJJ Painting. On the basis of these facts, 6
the district court ruled that JJJ Painting could not recover $2,000 that JJJ Painting 7
charged in Invoice No. 302 for the drywall work performed by De la Rosa, and 8
$4,636.80 and $4,393.20 that it determined was the portion (amounting to 9
75 percent) of Invoices Nos. S-202 and S-217, respectively, attributable to Viegas’s 10
stucco work. However, the district court rejected Kemp’s legal argument that, 11
because JJJ Painting could not recover a portion of the amounts charged in these 12
invoices, they were entirely invalid and unenforceable. Instead, the court awarded 13
the remaining amounts charged in these three invoices, plus the $1,800 charged in 14
Invoice No. 303, to JJJ Painting as damages for its painting work. 15
{28} Kemp acknowledges that no New Mexico court has directly addressed his 16
argument. He argues, however, that recovery should be barred because (1) doing so 17
will effectuate the legislative purpose that underlies CILA; and (2) allowing a 18
licensed contractor to recover for its own work leads to an untenable situation— 19
difficulty in sorting out the work of the licensed contractor versus the work of the 20
subcontractor—in the event of litigation. Kemp further argues that, if a licensed 2117
contractor is allowed to recover for its own work, New Mexico should require the 1
contractor to satisfy the requirements of a “good faith” partial lien recovery rule that 2
he maintains is the law in other states. For the following reasons, we are not 3
persuaded that Section 60-13-30’s sanction extends as far as Kemp urges. We 4
therefore affirm the district court on this point. 5
A. Statutory Construction Rules 6
{29} In Valles, our Supreme Court identified the following principles of statutory 7
construction that informed its construction of CILA, in particular Section 60-13-30: 8
The guiding principle of statutory construction is that a statute 9
should be interpreted in a manner consistent with legislative intent, 10
which is determined by looking not only to the language used in the 11
statute, but also to the purpose to be achieved and the wrong to be 12
remedied. We will give effect to the legislative intent by adopting a 13
construction which will not render the statute’s application absurd or 14
unreasonable and will not lead to injustice or contradiction. 15
Our statutory construction analysis begins by examining the 16
words chosen by the Legislature and the plain meaning of those words. 17
Under the plain meaning rule, when a statute’s language is clear and 18
unambiguous, we will give effect to the language and refrain from 19
further statutory interpretation. We will not read into a statute language 20
which is not there, especially when it makes sense as it is written. In 21
addition to the plain meaning examination, we also consider the 22
statutory subsection in reference to the statute as a whole and read the 23
several sections together so that all parts are given effect. Finally, the 24
practical implications, as well as the statute’s object and purpose are 25
considered. 26
Valles, 2010-NMSC-004, ¶¶ 14-15 (text only) (citation omitted); see also Johnson 27
v. Bd. of Educ. for Albuquerque Pub. Schs., 2025-NMSC-014, ¶ 9, 572 P.3d 904 2818
(stating that “the plain language of the statute is our primary guide to legislative 1
intent” (alteration, internal quotation marks, and citation omitted)); Triple B Corp. 2
v. Brown & Root, Inc., 1987-NMSC-058, ¶ 9, 106 N.M. 99, 739 P.2d 968 (stating 3
that “we cannot look beyond the express language of Section 60-13-30,” which 4
clearly barred suit by an unlicensed contractor regardless of whether the work was 5
“fully and satisfactorily performed”). 6
B. Section 60-13-30(A)’s Plain Meaning 7
{30} To interpret Section 60-13-30(A), we look first to the words the Legislature 8
used in the statute, as well as other provisions in CILA. As stated, Section 60-13- 9
30(A) provides in pertinent part: 10
No contractor shall . . . bring or maintain any action in any court of the 11
state for the collection of compensation for the performance of any act 12
for which a license is required by [CILA] without alleging and proving 13
that such contractor was a duly licensed contractor at the time the 14
alleged cause of action arose. 15
(Emphasis added.) This provision’s prohibition is focused: it bars compensation for 16
acts, i.e., work, for which a CID license is required. It does not prohibit more 17
broadly, as Kemp argues, compensation for an entire contract or project on which 18
an unlicensed contractor or subcontractor worked. We note that CILA Section 60- 19
13-52(A) similarly imposes criminal misdemeanor sanctions only for acting in the 20
capacity of a contractor without a license: again, the focus of the sanction is on a 21
particular act, and imposed only on the offending unlicensed contractor. From the 2219
plain language of these two provisions, we can infer that in enacting Section 60-13- 1
30(A), the Legislature did not intend to bar a licensed contractor from recovering for 2
its own work that it is licensed to perform. 3
C. CILA’s Legislative Purpose 4
{31} The stated purpose of CILA is to “promote the general welfare of the people 5
of New Mexico by providing for the protection of life and property by adopting and 6
enforcing codes and standards for construction, alteration, install[ing], connection, 7
demolition[,] and repair work.” Section 60-13-1.1. In Mascarenas v. Jaramillo, our 8
Supreme Court elaborated on CILA’s purpose: 9
In determining legislative intent, we look not only to the 10
language used in the statute, but also to the object sought to be 11
accomplished and the wrong to be remedied. The object sought to be 12
accomplished by [CILA] is a healthy, ordered market in which 13
consumers may contract with competent, reliable construction 14
contractors who have passed the scrutiny of a licensing division. The 15
wrong to be remedied is the exploitation of the public by incompetent 16
and unscrupulous contractors who are unable or unwilling to obtain a 17
license. In effect, the wrongs to be remedied are circumstances which 18
permit unlicensed contractors to flourish and profit at the expense of 19
the public. 20
1991-NMSC-014, ¶ 14, 111 N.M. 410, 806 P.2d 59 (citations omitted); see also Peck 21
v. Ives, 1972-NMSC-053, ¶ 23, 84 N.M. 62, 499 P.2d 684 (summarizing CILA’s 22
purpose as “protect[ing] the public from incompetent and irresponsible builders”). 23
{32} New Mexico courts recognize that Section 60-13-30 represents a conscious 24
decision by our Legislature to “harshly penalize unlicensed contractors by denying 2520
them access to the courts to collect compensation for work performed,” Koehler v. 1
Donnelly, 1992-NMSC-058, ¶ 6, 114 N.M. 363, 838 P.2d 980, and that the statute’s 2
penalties are consistent with the purpose of CILA. Id. ¶ 7. Where necessary and 3
appropriate to “serve[] and advance[]” CILA’s purposes, Mascarenas, 1991-NMSC- 4
014, ¶ 16, our courts have not hesitated to strictly construe and apply Section 60-13- 5
30. Thus, an unlicensed contractor will be denied recovery even if it has fully and 6
satisfactorily performed the contracted work, Triple B Corp., 1987-NMSC-058, ¶ 9, 7
or the owner is aware that the contractor is unlicensed, see Mascarenas, 1991- 8
NMSC-014, ¶ 16. In addition, unlicensed contractors may not assert a defense of 9
unjust enrichment; on the contrary, the policy underlying CILA overrides the 10
equitable considerations that disfavor unjust enrichment. Triple B. Corp., 1987- 11
NMSC-058, ¶ 8. Further, an unlicensed contractor not only will be denied recovery 12
of contracted amounts that the owner has not paid, it will be required to disgorge 13
amounts that the owner has previously paid. See Mascarenas, 1991-NMSC-014, 14
¶ 16. 15
{33} Similarly, as discussed above, in Valles, our Supreme Court concluded that 16
Section 60-13-30(A) operated to bar a licensed contractor from enforcing its right to 17
compensation for its subcontractor’s work, based on the subcontractor’s unlicensed 18
status. Valles, 2010-NMSC-004, ¶¶ 36-42. The Court acknowledged the contractor’s 19
argument that, under the plain meaning of the statute, which bars only an unlicensed 2021
contractor or their agent from filing suit to collect compensation, the contractor’s 1
suit was not barred. See id. ¶¶ 36-37. However, given the legislative purpose of 2
CILA—ensuring that persons who perform contracting meet the training and 3
experience requirements for licensing, see § 60-13-1.1—the Court held that Section 4
60-13-30(A) “precludes a licensed contractor from bringing or maintaining an action 5
to collect compensation for work performed by an unlicensed subcontractor.” Valles, 6
2010-NMSC-004, ¶ 38. That construction was “aligned with the CILA’s purpose.” 7
Id. ¶ 41. 8
{34} New Mexico courts have not, however, construed CILA to harshly penalize 9
contractors beyond CILA’s plain meaning where doing so is not necessary to carry 10
out the statute’s purpose. In Peck, the plaintiff held a contractor’s license that limited 11
him to performing contracts valued at up to $50,000. 1972-NMSC-053, ¶ 4. The 12
plaintiff agreed to build a house for the defendant. Id. ¶ 1. At the time of contracting, 13
the parties had discussed a cost of $40,000-$45,000, but as a result of alterations 14
requested by the defendant the finished cost exceeded $90,000. Id. ¶¶ 1-3. The 15
defendant refused to pay that amount, and the plaintiff filed, and then sued to 16
foreclose on a mechanic’s lien. Id. ¶ 1. The trial court had granted summary 17
judgment for the defendant based on plaintiff’s failure to be properly licensed, but 18
our Supreme Court reversed. Id. ¶ 1. Notwithstanding the contractor’s technical 19
violation of what is now codified as Section 60-13-30(A) in not being “a duly 2022
licensed contractor at the time the alleged cause of action arose,” id. ¶ 8 (internal 1
quotation marks and citation omitted), the Court held that he substantially complied 2
in that (1) he held a valid license at the time of contracting; and (2) following 3
completion of the defendant’s house he had renewed his license with a $100,000 4
limit. Peck, 1972-NMSC-53, ¶¶ 19-23. In explaining its decision, the Court wrote: 5
The purpose of [CILA] is to protect the public from incompetent and 6
irresponsible builders. This purpose should not be lost sight of. In view 7
of the severity of the sanctions and the forfeitures which could be 8
involved, we are reluctant to construe the statute more broadly than 9
necessary for the achievement of its purpose. The statute should not be 10
transformed into an unwarranted shield for the avoidance of a just 11
obligation. 12
Id. ¶ 23 (internal quotation marks omitted). Cf. Koehler, 1992-NMSC-058, ¶¶ 11-15 13
(citing Peck and holding that contractor substantially complied with CILA where he 14
had no notice of cancelation of his performance bond and contractor’s license before 15
entering into construction contract, but then after learning of the cancelations 16
promptly took steps to satisfy CILA financial responsibility requirements and 17
reinstate his license). 18
{35} Read together, Little v. Jacobs (hereinafter Jacobs), 2014-NMCA-105, 336 19
P.3d 398, and Little v. Baigas (hereinafter Baigas), 2017-NMCA-027, 390 P.3d 201, 20
illustrate the judicial balancing required to “serve and advance” CILA’s purpose 21
without transforming Section 60-13-30(A) into an “unwarranted shield for the 22
avoidance of a just obligation.” See Peck, 1972-NMSC-053, ¶ 23 (internal quotation 2323
marks omitted). In Jacobs, a vacationing tenant renting a home in 2009 fell from a 1
deck that had been built by an unlicensed contractor in 2000. 2014-NMCA-105, ¶ 2. 2
The tenant initially sued the owner for his injuries in 2011, then in 2013 joined the 3
builder after learning of the latter’s identity. Id. The trial court initially dismissed the 4
claims against the builder on the grounds that the claim was barred by NMSA 1978, 5
Section 37-1-27 (1967), the ten-year statute of repose for actions based on defective 6
or unsafe improvements to real property. Jacobs, 2014-NMCA-105, ¶ 4. In Jacobs, 7
this Court reversed the dismissal, reasoning that extending the benefits of Section 8
37-1-27 to unlicensed contractors would conflict with the purpose of CILA. See 9
Jacobs, 2014-NMCA-105, ¶¶ 1, 14-20. “Given our Legislature’s position on 10
unlicensed contracting, we cannot extend unlicensed contractors any semblance of 11
legitimacy under the law. A statute that was enacted to shield those in the 12
construction industry from liability after a certain point, requires that those protected 13
by it be legitimately in that industry; i.e., be licensed.” Id. ¶ 18. 14
{36} Following remand, the district court granted summary judgment in favor of 15
the defendant contractor on the alternative grounds that the claims against him were 16
barred by the applicable statute of limitations, see NMSA 1978, § 37-1-8 (1976) 17
(establishing a three-year statute of limitations for personal injury actions). See 18
Baigas, 2017-NMCA-027, ¶ 5. On appeal in Baigas, this Court affirmed the district 19
court’s determination that the plaintiff had no grounds for asserting equitable tolling 2024
or estoppel. Id. ¶¶ 10-32. Among other arguments, the plaintiff relied on our holding 1
in Jacobs and urged that courts should “construct yet ‘another detriment’ to 2
contracting without a license.” Id. ¶ 32. We declined to take that step, stating: 3
Though we acknowledge the importance of the policy denying 4
unlicensed contractors the fruits of licensure—payment for their work 5
and a statute of repose—we have found no basis to hold that equitable 6
tolling or estoppel is triggered as a matter of law by Baigas’s unlicensed 7
status . . . . The statute of limitations is an affirmative defense available 8
to all defendants, and we will not extend our previous holding here to 9
create a legal bar to unlicensed contractors invoking it. 10
Id. 11
{37} Applying this body of precedent to the case at bar, we conclude that to serve 12
and advance CILA’s purposes, it is not necessary to construe Section 60-13-30(A) 13
to bar, in a manner that varies from the statute’s plain meaning, a licensed general 14
contractor from collecting compensation for its own work, even though it is barred 15
from collecting compensation for an unlicensed subcontractor’s work. The existing 16
sanctions are sufficient to prevent unlicensed contractors from “flourish[ing] and 17
profit[ing] at the expense of the public.” Mascarenas, 1991-NMSC-014, ¶ 14. First, 18
the statute bars a general contractor from collecting from the owner compensation 19
for work that an unlicensed subcontractor has performed. See Valles, 2010-NMSC- 20
004, ¶ 41. Second, if the general contractor has not yet paid the unlicensed 21
subcontractor for the work, then the subcontractor is barred from collecting payment 22
from the general contractor. See Romero v. Parker, 2009-NMCA-047, ¶¶ 1, 3, 27, 2325
146 N.M. 116, 207 P.3d 350. Third, if the general contractor has paid the unlicensed 1
subcontractor, then the general contractor cannot recover what it has paid to the 2
unlicensed subcontractor. See id. ¶¶ 1, 20-24. Fourth, if the general contractor has 3
obtained payment from the owner for the unlicensed subcontractor’s work, the 4
general contractor is subject to disgorgement of the payment. See Mascaraenas, 5
1991-NMSC-014, ¶ 16. We believe these economic sanctions, as well as the 6
additional threat of criminal prosecution under Section 60-13-52(A) for contracting 7
without a license, are sufficient incentive for a licensed general contractor to act 8
diligently to verify that its subcontractors are licensed to perform the work the 9
general contractor gives them, and for subcontractors to obtain licenses for the work 10
that they undertake to perform. 11
{38} We note that the concerns that prompted the harsh sanctions in Mascarenas 12
are not present here. As stated, in Mascarenas, the Court construed Section 60-13- 13
30(A) to require disgorgement of amounts an owner previously had paid the 14
unlicensed contractor for his work, notwithstanding that the statute by its terms bars 15
only actions by the unlicensed contractor to collect unpaid compensation from the 16
owner. Mascarenas, 1991-NMSC-014, ¶ 16. The Court found this sanction 17
necessary to prevent unlicensed contractors from “evad[ing] the harsh consequences 18
of [the statute] by collecting most or all of the contract price before significant 19
commencement of performance.” Id. Allowing a licensed contractor partial recovery 2026
on a contract for work other than that performed by an unlicensed subcontractor does 1
not give rise to this risk of evasion. 2
{39} Similarly, in Gamboa v. Urena, 2004-NMCA-053, ¶ 2, 135 N.M. 515, 90 P.3d 3
534, an unlicensed contractor fabricated and installed cabinets and countertops for 4
homeowners. This Court accepted, for purposes of its decision, the contractor’s 5
testimony that he charged only for the cost of fabrication, which did not require a 6
contractor’s license, see § 60-13-3(D)(1), and did not charge for the cost of 7
installation, which required a license, see § 60-13-3(A). Gamboa, 2004-NMCA-053, 8
¶¶ 10-11. In ruling that Section 60-13-30(A) nevertheless barred the contractor from 9
collecting compensation for his work, we stressed that, if we allowed an unlicensed 10
contractor to obtain recovery in such circumstances, “we would encourage 11
contractors to engage in creative contract[ing] whereby they attribute all charges to 12
the cost of materials and supplies and charge nothing for labor.” Gamboa, 2004- 13
NMCA-053, ¶ 16. That risk is not present here. JJJ Painting made no argument that 14
De la Rosa or Viegas provided labor or goods that did not require licensure, and the 15
district court barred JJJ Painting, without qualification, from collecting any 16
compensation for De la Rosa’s and Viegas’s work. We see little risk of this type of 17
“creative contracting” that would enable a licensed contractor to receive 18
compensation for the work of an unlicensed subcontractor. 1927
{40} In summary, construing Section 60-13-30(A) to bar JJJ Painting only from 1
recovering the amounts it paid to its unlicensed subcontractors for work those 2
unlicensed subcontractors performed does not lead to any absurd or unreasonable 3
consequences, or to injustice or contradiction. Consequently, we need not give the 4
statute any different construction to effectuate the Legislature’s intent. See Valles, 5
2010-NMSC-004, ¶ 14. 6
D. Practical Consequences 7
{41} Valles instructs us to also consider the “practical implications” of any 8
construction of Section 60-13-30(A). 2010-NMSC-004, ¶ 15. Kemp argues that 9
allowing a general contractor to collect compensation for its work on a contract while 10
denying compensation for the work of an unlicensed subcontractor “creates an 11
unworkable lien recovery system.” He asserts that litigation to allocate the work of 12
the licensed contractor and its unlicensed subcontractor and then quantify the values 13
of each one’s work would be “incredibly complex, expensive, and time-wasting.” 14
He complains of the burden of calling the contractor and subcontractor to testify 15
about “who nailed what nail or what section of the wall they each painted,” and of 16
“quantifying the value of each minuscule and independent action.” 17
{42} While quantifying damages in construction contract disputes can be 18
complicated, the questions in this case were relatively straightforward: what drywall 19
and stucco work did JJJ Painting and its employees perform, and what was the value 2028
of that work; and what work did De la Rosa and Viegas perform, and what was the 1
value of that work? The invoices established how much JJJ Painting charged Atlas 2
for all of its work. There was testimony here, and in many cases there will be records 3
as well, to establish what the general contractor has paid its subcontractors, which 4
amounts presumably will reflect the value of their work. In any event, the burden to 5
prove licensure is on the contractor, see § 60-13-30(A), and NMSA 1978, Section 6
48-2-14 (2007) allows a party in a mechanic’s lien dispute, if successful, to recover 7
its attorney fees. For these reasons, we do not view the task of presenting evidence 8
about “mixed contracts” as a practical implication that would justify departure from 9
the plain meaning of Section 60-13-30(A). 10
E. Public Policy Favoring Enforcement of Contracts 11
{43} Lastly, we are mindful of New Mexico’s public policy in favor of enforcing 12
contracts. “New Mexico . . . has a strong public policy of freedom to contract that 13
requires enforcement of contracts unless they clearly contravene some law or rule of 14
public morals.” United Wholesale Liquor Co. v. Brown-Forman Distillers Corp., 15
1989-NMSC-030, ¶ 14, 108 N.M. 467, 775 P.2d 233; see First Baptist Church of 16
Roswell v. Yates Petroleum Corp., 2015-NMSC-004, ¶ 12, 345 P.3d 310 (same). By 17
enacting Section 60-13-30(A), our Legislature has made clear that, notwithstanding 18
a contract to the contrary, an unlicensed contractor cannot collect compensation for 19
its work. And in Valles our Supreme Court construed the statute also to bar a licensed 2029
contractor from collecting compensation for work performed by the contractor’s 1
unlicensed subcontractor. 2010-NMSC-004, ¶¶ 36-42. However, as discussed above, 2
Section 60-13-30(A) by its plain language does not bar, much less clearly bar, a 3
licensed contractor from collecting compensation for its own work, even if 4
compensation cannot be recovered for the work of an unlicensed subcontractor on 5
the same contract or project. In the absence of clear language to the contrary, the 6
public policy favoring enforcement of contracts supports enforcing the parties’ 7
contract to the extent of allowing JJJ Painting to recover for its own work. 8
F. Other Jurisdictions’ Partial Validity Rules 9
{44} Kemp argues in the alternative that, should this Court determine that Section 10
60-13-30(A) allows a licensed contractor to collect compensation for its own work 11
on a contract even though it cannot collect compensation for the work of an 12
unlicensed subcontractor on the same contract, the right of recovery should be 13
subject to two limitations: (1) the partial invalidity must have resulted from an honest 14
mistake and not bad faith and (2) the valid and invalid portions of the claimed 15
amount due can be separated. Kemp asserts that these limitations for recovery on 16
partially valid liens are recognized in Caird Engineering Works v. Seven-up Gold 17
Mining Co., 111 P.2d 267, 279 (Mont. 1940); Palmer v. McGinness, 102 N.W. 802, 18
803 (Iowa 1905); and Kittrell v. Hopkins, 90 S.W. 109, 110 (Mo. Ct. App. 1905), 19
and that in this case JJJ Painting cannot satisfy either one. 2030
{45} The cases cited by Kemp do not address liens that are partially invalid due to 1
the participation of a contractor who has not met statutory licensing requirements, 2
and at least one other jurisdiction has approved a licensed contractor’s right to 3
enforce the balance of a contract that is partially invalidated due to a subcontractor’s 4
unlicensed status. See ThyssenKrupp Steel USA, LLC v. United Forming, Inc., 926 5
F. Supp. 2d 1286, 1297 (S.D. Ala. 2013) (declining to bar general contractor from 6
recovering on such a contract). In any event, as discussed above, Section 60-13-30, 7
other provisions of CILA, and New Mexico appellate court decisions applying 8
Section 60-13-30 direct us to the answer here. Therefore, it is not necessary to look 9
to other jurisdictions for guidance. 10
CONCLUSION 11
{46} Pursuant to Sections 60-13-2(I) and -3(D)(13), Defendant Jose Allen Sosa was 12
exempt from Section 60-13-12(A)’s requirement that he be licensed to perform the 13
contracting services that Defendant Jose Sosa d/b/a JJJ Painting provided to Atlas 14
Group, LLC, as reflected in Invoice Nos. 303, 302, S-202, and S-217. Sections 60- 15
13-30(A) and (B) therefore did not bar JJJ Painting from filing liens or taking legal 16
action to collect compensation for Allen’s and its other employees’ work. 17
{47} Because Juan Viegas was not a licensed stucco contractor and Oscar De la 18
Rosa was not established to be a licensed drywall contractor, and neither individual 19
was a wage earner of JJJ Painting within the meaning of Sections 60-13-2(I) 2031
and -3(D)(13), Sections 60-13-30(A) and (B) barred JJJ Painting from filing liens 1
and taking legal action to collect compensation for those individuals’ work as 2
reflected on the invoices. However, that proscription did not further bar JJJ Painting 3
from taking these steps to collect compensation for its employees’ own work. We 4
affirm the district court’s July 16, 2024 final judgment. 5
{48} Defendants’ September 8, 2025, motion for a limited remand to the district 6
court is denied as moot. 7
{49} IT IS SO ORDERED. 8
____________________________________ 9
HENRY M. BOHNHOFF, Judge, Retired, 10
Sitting by Designation 11
WE CONCUR: 12
______________________________ 13
J. MILES HANISEE, Judge 14
______________________________ 15
KATHERINE A. WRAY, Judge 16Vous vous demandez comment ce texte s’applique à votre situation ?
Consultation gratuite, sans engagement
Décrivez votre situation. Notre équipe vous recontactera par e-mail pour votre consultation.
Poursuivez vos recherches dans ChatGPT ou Claude
Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.