UNITED STATES DEPARTMENT OF LABOR BOARD OF ALIEN LABOR CERTIFICATION APPEALS Washington, DC ______________ Issue Date: 20 November 2025 BALCA Case Nos.: 2025-TLN-00154 2025-TLN-00155 2025-TLN-00156 2025-TLN-00157 2025-TLN-00158 2025-TLN-00159 2025-TLN-00160 2025-TLN-00161 2025-TLN-00162 2025-TLN-00163 2025-TLN-00164 2025-TLN-00165 2025-TLN-00166 2025-TLN-00167 2025-TLN-00168 2025-TLN-00169 2025-TLN-00170 2025-TLN-00171 ETA Case Nos.: H-400-25184-150662 H-400-25184-149651 H-400-25184-149514 H-400-25184-151239 H-400-25184-150671 H-400-25184-149291 H-400-25184-149615 H-400-25184-149403 H-400-25184-150673 H-400-25184-151951 H-400-25184-151541 H-400-25184-151608 H-400-25184-151965 H-400-25184-151956 H-400-25184-149466 H-400-25184-151273 H-400-25184-149677 H-400-25184-149702 In the Matter of: BECHTEL ENERGY CONSTRUCTION SERVICES, INC., Employer
- 2 - Appearances: Jay C. Ruby, Esq. For the Employer Rebecca Nielsen, Esq. Employment and Training Legal Services Office of the Solicitor U.S. Department of Labor Washington, D.C. For the Certifying Officer Before: Natalie A. Appetta Administrative Law Judge DECISION AND ORDER AFFIRMING THE CERTIFYING OFFICER’S DENIAL OF CERTIFICATION These cases arise from the request for review of Bechtel Energy Construction Services Inc, (“Employer”) related to the Certifying Officer’s (“CO”) Final Determinations denying the above applications for temporary alien labor certification under the H-2B non-immigrant program. The H- 2B program permits employers to hire foreign workers to perform temporary nonagricultural work within the United States on a one-time occurrence, seasonal, peakload, or intermittent basis, as defined by the United States Department of Homeland Security. See 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6);1 20 C.F.R. § 655.6(b).2 Employers who seek to hire foreign workers under this program must apply for and receive labor certification from the United States Department of Labor using a Form ETA-9142B, Application for Temporary Employment Certification (“Form 9142”). A CO in the Office of Foreign Labor Certification (“OFLC”) of the Employment and Training Administration reviews applications for temporary labor certification. Following the CO’s denial of an application under 20 C.F.R. § 655.53, an employer may request review by the Board of Alien Labor Certification Appeals (“BALCA” or “the Board”). 20 C.F.R. § 655.61(a). 1 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated Appropriations Act, 2016, Pub. L. No. 114‐113, Division H, Title I, § 113 (2015). This definition has remained in place through subsequent appropriations legislation, including the current legislation. See Further Consolidated Appropriations Act, 2024, Pub. L. No. 118-47, Division D, Title I, § 111 (2024); Full-Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No. 119-4, Division A, Title I, §§ 1101(a)(8), 1105—1106 (2025) (extending the provisions of various appropriations acts, including the relevant provisions of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025). 2 On April 29, 2015, the Department of Labor (“DOL”) and the Department of Homeland Security jointly published an Interim Final Rule (“IFR”) amending the standards and procedures that govern the H-2B temporary labor certification program. See Temporary Non-Agricultural Employment of H-2B Aliens in the United States; Interim Final Rule, 80 Fed. Reg. 24,042 et seq. (Apr. 29, 2015). The rules provided in the IFR apply to applications “submitted on or after April 29, 2015, and that have a start date of need after October 1, 2015.” IFR, 20 C.F.R. §655.4(e). All citations to 20 C.F.R. Part 655 in this opinion and order are to the IFR.
- 3 - BACKGROUND On or about July 3, 2025, the Department of Labor’s Employment and Training Administration (“ETA”) received eighteen applications for temporary labor certification from Employer requesting certification for multiple construction positions. The positions, locations, and period of employment requested in each of the eighteen applications are listed in the chart below. Similar support for these applications was offered by the Employer in each of the eighteen applications. The CO’s notices of deficiency and bases for denial of these applications were nearly identical as indicated in the CO’s eighteen Final Determinations issued and found in each Administrative File. Accordingly for purposes of judicial efficiency, this decision addresses in a consolidated manner Employer’s requests for review of the CO’s denial of these eighteen applications. Although this case will refer initially to the request for review in Case No. 2025-TLN- 00154 and citations in this decision will primarily be to that Administrative case file, any pertinent discrepancies in the Administrative Files will be noted. The Employer’s applications for workers are summarized in the chart below. Employer claims a one-time occurrence need in all of the noted cases. 1 2025-TLN-00154 275 Pipefitter Journeymen Port Isabel, Texas October 1, 2025 - March 15, 2027 2 2025-TLN-00155 100 Welder Journeymen Port Isabel, Texas October 1, 2025 - January 15, 2027 3 2025-TLN-00156 200 Electrician Journeymen Port Isabel, Texas October 1, 2025 - November 15, 2026 4 2025-TLN-00157 50 Ironworker Journeymen Port Isabel, Texas October 1, 2025 - July 15, 2026 5 2025-TLN-00158 150 Rigger Journeymen Port Isabel, Texas October 1, 2025 - October 15, 2026 6 2025-TLN-00159 20 Equipment Mechanic Journeymen Port Isabel, Texas October 1, 2025 - March 15, 2026 7 2025-TLN-00160 100 Rigger Journeymen Port Arthur, Texas October 1, 2025 - May 15, 2026 8 2025-TLN-00161 275 Pipefitter Journeymen Port Arthur, Texas October 1, 2025 - November 15, 2026 9 2025-TLN-00162 15 Equipment Mechanic Journeymen Port Arthur, Texas October 1, 2025 - July 15, 2026 10 2025-TLN-00163 50 Pipefitter Journeymen Sulphur, Louisiana October 1, 2025 - November 15, 2027 11 2025-TLN-00164 50 Welder Journeymen Sulphur, Louisiana October 1, 2025 - March 15, 2028 12 2025-TLN-00165 20 Electrician Journeymen Sulphur, Louisiana October 1, 2025 - October 15, 2027 13 2025-TLN-00166 50 Ironworker Journeymen Sulphur, Louisiana October 1, 2025 - September 15, 2027 14 2025-TLN-00167 50 Rigger Journeymen Sulphur, Louisiana October 1, 2025 - September 15, 2027 15 2025-TLN-00168 100 Welder Journeymen Port Arthur, Texas October 1, 2025 - November 15, 2026 16 2025-TLN-00169 25 Ironworker Journeymen Port Arthur, Texas October 1, 2025 - March 15, 2026 17 2025-TLN-00170 100 Electrician Journeymen Port Arthur, Texas October 1, 2025 - July 15, 2026 18 2025-TLN-00171 30 Electrician Journeymen Corpus Christi, TX October 1, 2025 - March 15, 2026 In Case No. 2025-TLN-00154, Employer requested 275 workers under the job title of “Pipefitter Jouneyman” under the SOC Occupation Title of “Plumbers, Pipefitters, and Steamfitters,”
- 4 - for the period of October 1, 2025 to March 15, 2027. AF (154) 238.3 In all eighteen applications, Employer indicated that the nature of its temporary need was “one-time occurrence.” Id. In its applications Employer provided information regarding its company, noting that its parent company, Bechtel Group, Inc., is the second largest construction company in the United States and employs over 50,000 employees as of May 2025. Employer noted that “Bechtel’s Energy unit (which Bechtel Energy Construction is part of) designs and builds liquefied natural gas (LNG), oil, pipeline, petrochemicals, natural gas, and water treatment facilities.” AF 154 (252). Employer noted that Bechtel “has built approximately 50,000 miles of pipeline systems, more than 50 major oil and gas field developments, and completed over 380 major chemical and petrochemical projects.” Id. It also noted that it constructs and tests tanks for LNG storage and “has built a third of the world’s LNG liquefaction capacity.” Id. Employer stated the following in regard to its asserted temporary need in its application in Case No.2025-TLN-00154: Bechtel's need for the one-time occurrence need to meet the one-time occurrence demand for temporary supplemental Pipefitter Journeymen. Attached as Exhibit 1 is “Rio Grande LNG (Phase 1)” which provides an overview of the project as well as planned headcounts for each skilled crafts needed including Pipefitters. Per the planned headcount graph for Pipefitters, Bechtel will need 800 Pipefitters starting in October 2025 and will increase to a peak of 1400 Pipefitters by April 2026. The planned headcount for Pipefitters will drop after February 2027- with Bechtel needing less than 1000 Pipefitters by mid-March 2027. Attached as Exhibit 2 is Bechtel website information about the Rio Grande LNG project and Bechtel press release “NextDecade Announces Positive Final Investment Decision on Rio Grande LNG Phase 1” stating the $18.4 billion project for the Rio Grande LNG is the largest greenfield energy project financing in U.S. history. The planned headcount for Pipefitters takes into account U.S. worker Pipefitters to be engaged for the majority of the Pipefitter workforce. However, the Rio Grande LNG project is so unusually large that Bechtel will not be able to complete the pipefitting phase without the additional 275 H-2B Pipefitter Journeymen. There is an insufficient number of qualified Journeyman Pipefitters in the Brownsville, Texas area. Attached as Exhibit 3 is an article from the Rio Grande, “Bechtel looking for more workers for Rio Grande LNG project” reporting Bechtel efforts in recruiting for US workers in Brownsville, TX. Attached as Exhibit 4 is a June 2024 article “Natural Gas Intelligence, Bechtel Adapting to Workforce Shortage While Tackling Bevy of LNG Projects in Tight Labor Market” quoting Bechtel Energy President Paul Marsden about near all-time low construction unemployment and skilled trades experiencing a shortage of workers-wherein labor has grown as an inflationary concern. AF (154) 253. 3 References to the appeal file in 2025-TLN-00154 will be referred to as “AF (154)” followed by the page number. References to the other Case files will be denoted similarly. For example, 2025-TLN-00155 will be referred to as AF (155). Employer offered the same or similar materials in support of its applications in all eighteen cases although page references may vary slightly between the casefiles.
- 5 - Regarding its argument that its request for workers should fall within the one-time occurrence standard, Employer asserted: Bechtel has an employment situation that is otherwise permanent---but has a temporary event of 18 months (completion of the pipefitting phase at the Rio Grande LNG project)-an event of short duration. The need for additional pipefitters is above and beyond even an established engineering/construction firm would normally experience. Bechtel will not have a need for H-2B Journeyman Pipefitters in the Brownsville, TX area again and has not had such a need in the past. The job opportunity for the Journeyman Pipefitter positions is full-time work (48 hours per week), but for a temporary duration, which is the pipefitting phase of the Rio Grande LNG project-from October 1, 2025, to March 15, 2027 ... AF (154) 254. Employer attached copies of its Exhibits 1-4 noted above, in support of its application. The CO issued a Notice of Deficiency (“NOD”) on July 11, 2025 in Case No. 2025-TLN- 00154. AF (154) 226-236. CO noted the first deficiency in this case, as well as the other seventeen, as “[f]ailure to establish the job opportunity as temporary in nature.” The CO cited 20 C.F.R. § 655.6(a) and (b) for the requirement that “an employer must establish that its need for non-agricultural services or labor is temporary, regardless of whether the underlying job is permanent or temporary.” AF (154) 231. The CO noted the regulatory language which states that an “employer’s need is considered temporary if justified to the CO as one of the following: 1) a one-time occurrence; 2) a seasonal need; 3) a peakload need; or 4) an intermittent need as defined by DHS regulations.” 20 C.F.R. § 655.6(b). Id. The CO found that the Employer did not demonstrate the requested standard of need which in this case is one-time occurrence. The CO observed that Employer is requesting 275 Pipefitter Journeyman Workers from October 1, 2025 to March 15, 2027, based on a one-time occurrence need. In order to prove a one-time occurrence need, the CO stated: [T]he employer must establish that it has not employed workers to perform the service or labor in the past and will not need workers to perform the services or labor in the future or the employer must have an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for a temporary worker. Id. The CO cited statements in the Employer’s application and determined that the Employer’s statements and supplemental documentation provided indicate that its temporary need is based on a specific Rio Grande LNG project. However, the CO noted that the Employer is in the business of soliciting and securing contracts on an ongoing and continuing basis. Therefore, the CO determined that it is reasonable to expect that the Employer will continue to be in the business of continually
- 6 - performing similar services as they present themselves. Further the CO noted that it is not known what other projects the Employer has completed in the past requiring Pipefitter Journeyman workers, is currently working on, or is contracted to work on in the future. Acknowledging the Employer’s explanation of its business history and accomplishments, the CO noted that it appeared the Rio Grande LNG Project is within the Employer’s normal business operations and does not appear to be a one-time occurrence need. Therefore, the CO determined that further explanation and documentation were necessary. Specific documentation requested included the following: 1. A statement further describing the employer's business history and activities; 2. Schedule of operations throughout the year and how its one-time need is an exception to those operations; 3. A summary list of all projects in the area of intended employment for the 2023 and 2024 calendar years, which includes start and end dates of each project, worksite addresses and the number of Pipefitter Journeyman employed for each project; 4. Summarized monthly payroll reports for 2023 and 2024 calendar years that identify, for each month and separately for full-time permanent and temporary employment in the requested occupation, Pipefitter Journeyman, Plumbers, Pipefitters, and Steamfitters, the total number of workers or staff employed; total hours worked; and total earnings received. The CO specified that such documentation must be signed by the employer attesting that the information being presented was compiled from the employer’s actual accounting records or system; 5. Contracts for all the identified projects in the employer’s summary that indicate the worksite/project. The contract must also include a description of the work to be performed and include signatures of all appropriate parties; 6. Explanation as to how a single contract (or contracts) represents a one-time need when the employer is in the business of securing contracts for services on an ongoing basis; and 7. Other evidence and documentation that similarly serves to justify the dates of need being requested for certification. AF (154) 233. . The CO listed a second deficiency in the Employer’s applications as “[f]ailure to establish temporary need for the number of workers requested.” Id. In regard to this deficiency, the CO stated that the employer had not established that the number of worker positions and period of need are justified, and that the request represents a bona fide job opportunity, as required by 20 C.F.R. §§ 655.11(e)(3) and (4) and 20 C.F.R. §§ 655.1(a)(1) and 655.6. The CO noted in Case 2025-TLN-00154 that the Employer is requesting 275 Pipefitter Jouneyman workers from October 1, 2025 to March 15, 2027. The CO stated that the Employer did not indicate how it determined that it needs the requested number of workers during the requested time period. Accordingly, the CO requested additional evidence and documentation to establish that the number of workers requested is true and accurate and represents bona fide job opportunities. The requested information included: 1) an explanation for why the Employer is requesting 275 Pipefitter
- 7 - Jouneyman workers for Port Isabel, TX during the dates of need requested; 2) Contracts, letters of intent etc. that specify the number of workers and dates of need; 3) Summarized monthly payroll reports for the 2023 and 2024 calendar years, that identify, for each month and separately for full- time permanent and temporary employment in the requested occupation, the total number of workers or staff employed, total hours worked, and total earnings received; and 4) An explanation of the payroll documentation, as well as other evidence and documentation that similarly serves to justify the number of workers requested. AF (154) 234. The CO also noted a third deficiency regarding Employer’s failure to “satisfy the obligations of H-2B employers.” AF (154) 235-236. However, as this deficiency was not noted in the Final Determination denying certification and did not form a basis for the final denial, it will not be addressed in this decision. Employer filed a response to the CO’s Notice of Deficiency on July 25, 2025 in which it provided further documentation and explanation. AF (154) 69-225. Employer’s cover letter reiterated information regarding its company noting that it designs and builds liquefied natural gas (LNG), oil, pipeline, petrochemicals, natural gas, and water treatment facilities. Employer stated that “Bechtel is heavily involved in the Liquefied Natural Gas (LNG) industry, both in the US and globally, as a leading engineering, procurement, and construction (EPC) company.” AF (154) 71. Employer asserted that Bechtel is “known for [its] work on large-scale LNG projects, including liquefaction plants and export terminals” and has partnered with various companies like Cheniere Energy, Woodside Energy, and NextDecade on major LNG initiatives.” Id. Employer noted that it has never requested certification for H-2B workers in the past and has a “one-time historic need for skilled craft including Pipefitter Journeymen.” Id. It stated that it has open shop projects across North America including Bechtel Equipment Operations, solar projects, and four mega LNG Projects in the US Gulf Coast requiring unprecedented skilled craftsmen at the same time at multiple locations. Employer provided information regarding the Rio Grande LNG project (RGLNG) attaching its Exhibits 1 – 4. Employer noted that despite recruitment efforts it projected a shortfall in skilled workers to complete the project. Employer stated that its one-time occurrence need will cover trains 1, 2, and 3 for the RGLNG terminal. Employer asserted that it has four major LNG projects that are overlapping/occurring simultaneously which has caused its need for H-2B workers. Employer noted that these projects which require Pipefitter Journeymen above and beyond current staffing levels are RGLNG (Rio Grande LNG) near Brownsville, TX, PALNG (Port Arthur LNG) near Beaumont, TX and LALNG (Woodside LNG) near Sulphur, LA. AF (154) 72. Employer attached as Exhibit 5 its signed summarized payroll record for permanent and temporary Pipefitter Journeymen, total hours worked, and total earnings received monthly, for the period of January 2023 through December 2024. Employer pointed out that Bechtel did not have Pipefitter Journeymen at the RGLNG terminal until August 2023 (starting with 4 pipefitters) with the number rising to 65 Pipefitters in December 2024. Employer also pointed out that its Exhibit 13 showing its projected pipefitter headcount at RGLNG indicates a spike from 125 to nearly 700 by July 2025. AF (154) 73.
- 8 - Employer argued that there are multiple reasons for its one-time occurrence need which are: 1) COVID-19 delays/Restarts; 2) LNG pause under Biden administration; 3) competing projects in the region; and 4) confluence of 4 major Bechtel LNG projects in the region. Id. Employer provided Exhibits 6-12 elaborating on these reasons. Employer argues that it has an employment situation that is otherwise permanent but has a temporary event of short duration – the completion of the pipefitting phase at the Rio Grande LNG project – which forms the basis for its one-time occurrence temporary need. Employer also addressed the second deficiency noted by the CO regarding its failure to justify the number of workers it has requested. Employer provided a Labor Market Assessment Report for the Gulf Coast Region - 2025 Quarterly Update dated June 15, 2025, as its Exhibit 12 in support of its labor need and the shortfall anticipated. Employer also provided its historical pipefitter headcount from July 2023 to present. (Exhibit 13) and a copy of its staffing forecast (Exhibit 14) for all of its projects including the Rio Grande LNG. On August 21, 2025, the CO issued a Final Determination-Denial to the Employer, stating that the noted deficiencies in Employer’s applications remained. AF (154) 55-68. The CO acknowledged all of the information submitted by the Employer including its cover letter and 13 exhibits but determined that the information did not overcome the deficiency regarding its failure to establish its temporary need on the basis of a one-time occurrence. The CO quoted statements in the Employer’s application and response describing its business history and projects. The CO noted that the Employer builds liquefied natural gas (LNG), oil pipeline, petrochemicals, natural gas, and water treatment facilities and that it has built 50,000 miles of pipeline systems, more than 50 major oil and gas field developments, and completed over 380 major chemical and petrochemical projects. The CO quoted Employer’s assertion that it has built a third of the world’s LNG liquefaction capacity and that it is “heavily involved in the Liquefied Natural Gas (LNG) industry, both in the US and globally, as a leading engineering, procurement, and construction (EPC) company.” AF (154) 62. The CO also quoted Employer’s statements regarding the Rio Grande LNG project and that it has four major projects that are occurring simultaneously (overlapping) which require more Pipefitter Journeymen than it currently employes or that it believes are currently available in the local workforce. These are RGLNG (Rio Grande LNG) near Brownsville, TX, PALNG (Port Arthur LNG) near Beaumont, TX and LALNG (Woodside LNG) near Sulphur, LA. AF (154) 63. The CO also noted Employer’s claim that it has historically been able to stagger its permanent cadre of skilled craft workers across the U.S for projects across the U.S. and Employer’s claim that “[g]iven the unprecedented post COVID-19 pause and Biden Administration pause, Bechtel and its competitors are vying for the same limited number of qualified Pipefitters in the Gulf Coast Region to complete 138 projects at the same timeframe has created a historical demand for Pipefitters that significantly outweighs the current supply of Pipefitters. Id. The CO quoted Employer’s statement that it “has a temporary event of 18 months (completion of the pipefitting phase at the Rio Grande LNG project)-an event of short duration,” which forms the basis for its temporary one-time occurrence need. Id. The CO also noted Employer’s claim that “ a series of factors have caused its high demand for pipefitters, which Employer explains as “COVID restart,” a pause on LNG projects during the Biden Administration being recently lifted, and numerous competing LNG projects in the USGC Region. AF (154) 64. The CO quoted Employer’s statement that, “[t]his is a one-time occurrence
- 9 - need until Bechtel and its competitors build a future US workforce to cover current shortage of qualified US workers in the Gulf Coast region.” Id. In response to this claim the CO stated that a labor shortage alone does not meet the regulatory requirements for granting a temporary labor certification. The CO further determined that it is not possible for the Employer to predict with certainty that a shortage of qualified U.S. workers for any occupation is not permanent or for it to establish a date that it will end. The CO found that Employer did not provide documentation that establishes that the need for Pipefitter Journeymen for its Rio Grande LNG project is unusual or outside of its normal business operations. The CO reasoned that “[a]ny construction project has a need for various occupations at required intervals as construction progresses,” and that Employer’s need is not unusual in this regard. Id. The CO stated, “While its labor shortage may be above and beyond what it has experienced previously, the need for workers to accomplish the normal tasks associated with building large-scale LNG projects is not.” Id. The CO also determined that the Employer did not adequately explain or provide documentation to support its claim that it will not have a need for Pipefitter Journeymen in the Brownsville, Texas area upon completion of the Rio Grande LNG project. To the contrary, the CO noted Employer provided substantial documentation which demonstrated that the region is thriving with large scale LNG projects. The CO concluded: It is clear from the Employer’s descriptions of its business history and primary activities that it provides its services in a permanent cycle of acquiring and completing projects on a continual basis. It is reasonable to assume that it will continue to do so as additional opportunities present themselves, including the possibility of simultaneous projects. Further, as the USGC region is clearly conductive to large- scale LNG projects, it is logical that these types of projects in the region will continue to create and sustain a simultaneous need for the occupations associated with their construction for the foreseeable future. AF (154) 64. Finally, the CO noted that it had instructed Employer to provide contracts for all the identified projects in the Employer’s summary that indicated worksite/project and to include a description of the work to be performed and signatures of all appropriate parties. The CO acknowledged that Employer provided an internal project timeline and head count estimation for the project as well as articles from Bechtel and other sources pertaining to contracts with NextDecade to build the Rio Grande LNG project. AF (154) 65. However, the CO pointed out that no actual contracts or other documentation from Bechtel or NextDecade were provided. Therefore, the CO determined that the Department is unable to confirm the validity of the contract and the need for 275 Pipefitter Journeymen from October 1, 2025 to March 15, 2027. Id. For the reasons stated above, the CO determined that the Employer did not meet its burden of proving one time occurrence temporary need, that is, Employer “has not established that it has not employed workers to perform the service or labor in the past, and will not need workers to perform the services or labor in the future or that it has an employment situation that is otherwise permanent,
- 10 - but a temporary event of short duration has created the need for temporary workers.” Id. Accordingly, the CO concluded that Employer had not established a one-time occurrence temporary need for 275 Pipefitter Journeymen from October 1, 2025 to March 15, 2027. The Final Determination also addressed the second deficiency regarding Employer’s failure to establish its temporary need for the number of workers requested. AF (154) 65-68. The CO acknowledged the explanation and documents submitted by the Employer but concluded it did not overcome the deficiency. The CO noted that the employer was instructed to provide documentation supporting the employer’s need for 275 Pipefitter Journeymen such as contracts, letters of intent, etc. that specified the number of workers and dates of need. The CO acknowledged that the Employer provided an internal project timeline and head count estimation but pointed out that “these were presented as general figures with no insight as to how the number of workers was calculated based on the specific work required.” AF (154) 67. The CO also noted that although general articles were provided from Bechtel and other sources announcing that it had contracts with NextDecade to build the Rio Grande LNG project, no actual contracts or other documentation from Bechtel or NextDecade were provided. Therefore, the CO concluded that the Department is unable to confirm the validity of the contract or the need for the number of workers from October 1, 2025 to March 15, 2027. Accordingly, the CO determined that the Employer had not overcome the deficiency regarding its need for the number of workers requested. On September 5, 2025, Employer submitted a request for administrative review regarding the CO’s denials of its application. AF (154) 28-54. In its request for review Employer argues its position that the CO should be reversed. Employer claims there are four bases for reversal. Employer asserts initially that the CO’s decision is arbitrary and capricious because the CO failed to consider the evidence regarding the “event of short duration/sudden increase in the work (and the causes thereof) that is disrupting an otherwise permanent need” such that its labor need should be considered a one-time occurrence temporary need. AF (154) 33. The Employer argues that it is not possible for it to predict with certainty that a shortage of qualified U.S. workers for any occupation is not permanent or to establish a date when it will end. Employer reiterated the temporary events that it claims form the basis for its one-time occurrence need, namely, its “COVID-19 restart, a pause on LNG projects during the Biden Administration being recently lifted, and numerous competing LNG projects in the USGC Region.” Id. Employer argues that the CO did not adequately consider these factors in its decision. Employer asserts that these events taken together are the “event of short duration” that have caused its one-time occurrence temporary need. Employer admits that it has performed “large-scale contracts for over 100 years” and that there has been “perennially a need for workers to accomplish the normal tasks associated with such projects.” AF (154) 34. However, it argues that the named events have caused its one-time occurrence need. Secondly, Employer asserts that the Department erred by arbitrarily and capriciously finding that it could not determine whether a valid contract exists between Bechtel and NextDecade to build the Rio Grande LNG project. AF (154) 35. In this regard Employer argues that it provided sufficient evidence of the contract by providing articles including the following: “NextDecade Announces Positive Final Investment Decision on Rio Grande LNG Phase I”-a press release from the Bechtel website; “Bechtel nabs $9B more Rio Grande LNG work” --listing NextDecade as the owner; NextDecade website content about Rio Grande LNG (listing Bechtel as a partner); a
- 11 - March 2025 article, “No Let-Up in LNG Activity in the United States” from Industrial Info Resources [which] chronicles a court judgment ordering that the five-train Rio Grande LNG facility can move forward (mentioning Bechtel as leading the construction efforts). AF (154) 35. Employer states that these documents show that it is “more likely than not that the content of these articles is true.” Id. Thirdly, Employer argues that the Department erred by arbitrarily and capriciously determining that a copy of the contract between Bechtel and NextDecade to build the Rio Grand LNG project would have included a fixed number of Pipefitter Journeymen needed for completion and the dates that the Pipefitter Journeymen would be needed. Id. Employer asserts that these contracts avoid these specifications because construction projects are dynamic and contractors need flexibility to manage staffing levels based upon the project’s evolving needs and schedule. Lastly Employer argues that the Department erred in determining that it was “less likely than not” that Bechtel would need the services of 275 Pipefitter Journeymen from October 1, 2025 to March 15, 2027. AF (154) 36. In this regard Employer asserts that the standard of review for this application is the “more likely than not/preponderance of the evidence” standard. Employer argues that the multiple exhibits it provided regarding its forecasted need for Pipefitters and articles regarding the labor supply and demand were sufficient to prove its need for the requested workers. In conclusion Employer asserts that the Department erred in not considering the alternate definitions of one-time occurrence need including an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for temporary workers for a one-time occurrence need. Employer argues that its labor shortage is above and beyond what it has experienced previously. Employer further argues that the reasons for the shortage consisting of COVID-19 delays for LNG projects, the Biden Administration pause on LNG projects and the unprecedented number of competing projects in the region establish a one-time occurrence series of events creating a one-time occurrence need for the workers for an otherwise permanent employment situation. By Order dated September 25, 2025, a briefing Order4 was issued providing the CO a deadline for submitting a brief in this matter. On September 29, 2025, the U.S. Department of Labor, Solicitor for Employment and Training Legal Services (“Solicitor”) notified the Office of Administrative Law Judges that it would not be filing a brief on behalf of the CO, in this, or any of the eighteen above- captioned cases. SCOPE OF REVIEW BALCA has a limited scope of review in H-2B cases. Specifically, BALCA may only consider the appeal file prepared by the CO, the legal briefs submitted by the parties, and the employer’s request for review, which may contain only legal argument and such evidence as was actually submitted to the CO before the date the CO’s determination was issued. 20 C.F.R. § 4 This briefing Order was issued by Administrative Law Judge John P. Sellers, III, who was the Administrative Law Judge previously assigned to this matter. On November 6, 2025, this case and the other related 17 cases were reassigned to Administrative Law Judge Natalie A. Appetta.
- 12 - 655.61(a). After considering this evidence, BALCA must take one of the following actions in deciding the case: (1) Affirm the CO’s determination; or (2) Reverse or modify the CO’s determination; or (3) Remand to the CO for further action. 20 C.F.R. § 655.61(e). STANDARD OF REVIEW Neither the Immigration and Nationality Act, nor the regulations applicable to H-2B temporary labor certifications, identify a specific standard of review pertaining to an Administrative Law Judge’s review of determinations by the CO in H-2B matters. BALCA has, fairly consistently, applied an arbitrary and capricious standard to its review of the CO’s determination in H-2B temporary labor certification cases. See Brook Ledge Inc., 2016-TLN- 00033 at 5 (May 10, 2016) (BALCA panel acknowledging that it reviewed the CO’s determination under an arbitrary and capricious standard). BALCA must be satisfied that the CO has examined “the relevant data and [has] articulate[d] a satisfactory explanation for its action including a rational connection between the facts found and the choice made.” See Custom Retaining Walls, LLC 2023 TLN 00057 (April 10, 2023) quoting Motor Vehicle Mfrs. Ass’n, Inc. v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983). In reviewing the CO’s explanation, BALCA must “consider whether the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment.” Id. ISSUES5 1) Whether the Certifying Officer properly denied the Employer’s H-2B applications due to Employer’s failure to establish that its request for 275 workers in the position of “Pipefitter Journeymen” for the period of October 1, 2025 to March 15, 2027, was based upon a “temporary” employment need, according to the Employer’s stated standard of “one-time occurrence.” 2) Whether the Certifying Officer properly denied the Employer’s temporary labor certification application due to Employer’s failure to meet its burden of establishing its bona fide need for the number of workers requested for the period of October 1, 2025 to March 15, 2027. DISCUSSION In order to obtain temporary labor certification for foreign workers under the H-2B program the Employer is required to establish that its need for the requested workers is “temporary.” 5 The issues in the other related seventeen cases vary to the extent that the claimed one time occurrence need applied to various worker positions and a specific number of workers requested at the four different worksites as noted in the summary chart. However, the underlying issues presented in this case as well as the arguments offered are essentially the same in all eighteen cases.
- 13 - Temporary need is defined by the DHS regulation at 8 C.F.R. § 214.2(h)(6)(ii)(A). This regulation states: (A) Definition. Temporary services or labor under the H-2B classification refers to any job in which the petitioner’s need for the duties to be performed by the employee(s) is temporary, whether or not the underlying job can be described as permanent or temporary. 8 C.F.R. § 214.2(h)(6)(ii)(A). The DHS regulation further states in regard to the nature of petitioner’s need: Employment is of a temporary nature when the employer needs a worker for a limited period of time. The employer must establish that the need for the employee will end in the near, definable future. Generally, that period of time will be limited to one year or less, but in the case of a one-time event could last up to 3 years. The petitioner’s need for the services or labor shall be a one-time occurrence, a seasonal need, a peakload need, or an intermittent need. 8 C.F.R. §214.2(h)(6)(ii)(B). The Employer bears the burden of establishing why the job opportunity and number of workers being requested reflect a temporary need within the meaning of the H-2B program. 20 C.F.R. § 655.6(a) and (b). See, e.g., Alter and Son General Engineering, 2013-TLN-3 (Nov. 9, 2012) (affirming denial where the Employer did not provide an explanation regarding how its request fit within one of the regulatory standards of temporary need). In this case (2025-TLN-00154) the Employer is alleging that it has a temporary need for 275 workers in the position of “Pipefitter Journeyman” for the period of October 1, 2025 to March 15, 2027 in Port Isabel, Texas, on the basis of a one-time occurrence. Employer is claiming a similar one-time occurrence need, for multiple other positions in four locations based on the same arguments. See Cases 2025-TLN-00155 – 2025-TLN-00171. Under the DHS regulation, in order to establish a temporary need on the basis of a one-time occurrence the following criteria must be met: The petitioner must establish that it has not employed workers to perform the services or labor in the past and that it will not need workers to perform the services or labor in the future, or that it has an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for a temporary worker. 8 C.F.R. §214.2(h)(6)(ii)(B)(1). In the Employer’s statement of temporary need and other submitted documentation, Employer noted that its parent company, Bechtel Group, Inc., is the second largest construction company in the United States and employs over 50,000 employees as of May 2025. Employer stated that “Bechtel’s Energy unit (which Bechtel Energy Construction is part of) designs and builds liquefied natural gas (LNG), oil, pipeline, petrochemicals, natural gas, and water treatment facilities.” AF 154 (252).
- 14 - Employer noted that Bechtel “has built approximately 50,000 miles of pipeline systems, more than 50 major oil and gas field developments, and completed over 380 major chemical and petrochemical projects.” Id. It also noted that it constructs and tests tanks for LNG storage and “has built a third of the world’s LNG liquefaction capacity.” Id. In its response to the CO’s Notice of Deficiency, Employer stated that “Bechtel is heavily involved in the Liquefied Natural Gas (LNG) industry, both in the US and globally, as a leading engineering, procurement, and construction (EPC) company.” AF (154) 71. Employer asserted that Bechtel is “known for [its] work on large-scale LNG projects, including liquefaction plants and export terminals” and has partnered with various companies like Cheniere Energy, Woodside Energy, and NextDecade on major LNG initiatives.” Id. Employer noted that it has never requested certification for H-2B workers in the past and has a “one-time historic need for skilled craft including Pipefitter Journeymen.” Id. It stated that it has open shop projects across North America including Bechtel Equipment Operations, solar projects, and four mega LNG Projects in the US Gulf Coast requiring unprecedented skilled craftsmen at the same time at multiple locations. Employer provided information regarding the Rio Grande LNG project (RGLNG) attaching its Exhibits 1 – 4. Employer noted that despite recruitment efforts it projected a shortfall in skilled workers to complete the project. Employer stated that its one-time occurrence need will cover trains 1, 2, and 3 for the RGLNG terminal. Employer asserted that it has four major LNG projects that are overlapping/occurring simultaneously which has caused its need for H-2B workers. Employer noted that these projects which require Pipefitter Journeymen above and beyond current staffing levels are RGLNG (Rio Grande LNG) near Brownsville, TX, PALNG (Port Arthur LNG) near Beaumont, TX and LALNG (Woodside LNG) near Sulphur, LA. AF (154) 72. Employer argued that the reasons for its one-time occurrence need can be summarized as: 1) COVID-19 delays/Restarts; 2) LNG pause under Biden administration; 3) competing projects in the region; and 4) confluence of 4 major Bechtel LNG projects in the region. Id. Employer provided Exhibits 6-12 elaborating on these reasons. Employer also argued that it has an employment situation that is otherwise permanent but has a temporary event of short duration – the completion of the pipefitting phase at the Rio Grande LNG project – which forms the basis for its one-time occurrence temporary need in this case. The CO issued a Final Determination on August 21, 2025, finding that the Employer failed to establish its temporary need on the basis of a one-time occurrence. AF (154) 55-68. The CO acknowledged all of the information submitted by the Employer including its cover letter and 13 exhibits, but determined that the information did not overcome the deficiency regarding its failure to establish its temporary need on the basis of a one-time occurrence. The CO quoted statements in the Employer’s application and response describing its business history and projects. The CO noted that the Employer builds liquefied natural gas (LNG), oil pipeline, petrochemicals, natural gas, and water treatment facilities and that it has built 50,000 miles of pipeline systems, more than 50 major oil and gas field developments, and completed over 380 major chemical and petrochemical projects. The CO quoted Employer’s assertion that it has built a third of the world’s LNG liquefaction capacity and that it is “heavily involved in the Liquefied Natural Gas (LNG) industry, both in the US and globally, as a leading engineering, procurement, and construction (EPC) company.” The CO also quoted
- 15 - Employer’s statements regarding the Rio Grande LNG project and that it has four major projects that are occurring simultaneously (overlapping) which require more Pipefitter Journeymen than it currently employes or that it believes are currently available in the local workforces. These are RGLNG (Rio Grande LNG) near Brownsville, TX, PALNG (Port Arthur LNG) near Beaumont, TX and LALNG (Woodside LNG) near Sulphur, LA. AF (154) 63. The CO also noted Employer’s claim that it has historically been able to stagger its permanent cadre of skilled craft workers across the U.S for projects across the U.S. and Employer’s claim that “[g]iven the unprecedented post COVID-19 pause and Biden Administration pause, Bechtel and its competitors are vying for the same limited number of qualified Pipefitters in the Gulf Coast Region to complete 138 projects at the same timeframe has created a historical demand for Pipefitters that significantly outweighs the current supply of Pipefitters. Id. The CO quoted Employer’s statement that it “has a temporary event of 18 months (completion of the pipefitting phase at the Rio Grande LNG project)-an event of short duration,” which forms the basis for its temporary one-time occurrence need. Id. The CO also noted Employer’s claim that “ a series of factors have caused its high demand for pipefitters, which Employer explains as “COVID restart,” a pause on LNG projects during the Biden Administration being recently lifted, and numerous competing LNG projects in the USGC Region. AF (154) 64. The CO quoted Employer’s statement that, “[t]his is a one-time occurrence need until Bechtel and its competitors build a future US workforce to cover current shortage of qualified US workers in the Gulf Coast region.” Id. In response to this claim the CO stated that a labor shortage alone does not meet the regulatory requirements for granting a temporary labor certification. The CO further determined that it is not possible for the Employer to predict with certainty that a shortage of qualified U.S. workers for any occupation is not permanent or for it to establish a date that it will end. The CO found that Employer did not provide documentation that establishes that the need for Pipefitter Journeymen for its Rio Grande LNG project is unusual or outside of its normal business operations. The CO reasoned that “[a]ny construction project has a need for various occupations at required intervals as construction progresses,” and that Employer’s need is not unusual in this regard. The CO stated, “While its labor shortage may be above and beyond what it has experienced previously, the need for workers to accomplish the normal tasks associated with building large-scale LNG projects is not.” The CO also determined that the Employer did not adequately explain or provide documentation to support its claim that it will not have a need for Pipefitter Journeymen in the Brownsville, Texas area upon completion of the Rio Grande LNG project. To the contrary, the CO noted Employer provided substantial documentation which demonstrated that the region is thriving with large scale LNG projects. The CO concluded: It is clear from the Employer’s descriptions of its business history and primary activities that it provides its services in a permanent cycle of acquiring and completing projects on a continual basis. It is reasonable to assume that it will continue to do so as additional opportunities present themselves, including the possibility of simultaneous projects. Further, as the USGC region is clearly conductive to large- scale LNG projects, it is logical that these types of projects in the region will continue
- 16 - to create and sustain a simultaneous need for the occupations associated with their construction for the foreseeable future. AF (154) 64. Finally, the CO noted that it had instructed Employer to provide contracts for all the identified projects in the Employer’s summary that indicated worksite/project and to include a description of the work to be performed and signatures of all appropriate parties. The CO acknowledged that Employer provided an internal project timeline and head count estimation for the project as well as articles from Bechtel and other sources pertaining to contracts with NextDecade to build the Rio Grande LNG project. However, the CO pointed out that no actual contract or other documentation from Bechtel or NextDecade was provided. Therefore, the CO determined that the Department is unable to confirm the validity of the contract and the need for 275 Pipefitter Journeymen from October 1, 2025 to March 15, 2027. For the reasons stated above, the CO determined that the Employer did not meet its burden of proving a one-time occurrence temporary need, that is, Employer “has not established that it has not employed workers to perform the service or labor in the past, and will not need workers to perform the services or labor in the future or that it has an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for temporary workers.” Accordingly, the CO concluded that Employer had not established a one-time occurrence temporary need for 275 Pipefitter Journeymen from October 1, 2025 to March 15, 2027. After thoroughly reviewing the record in this matter, including all of the documentation submitted and the arguments made by the Employer, the undersigned finds the CO did not act arbitrarily or capriciously, or contrary to law, in finding the Employer failed to meet its burden of establishing its temporary need, on the basis of a one-time occurrence, for the 275 Pipefitter Journeymen, for the period of October 1, 2025 to March 15, 2027 under the H-2B program regulations. As previously noted, to prove a temporary need on the basis of a one-time occurrence under the DHS regulation: The petitioner must establish that it has not employed workers to perform the services or labor in the past and that it will not need workers to perform the services or labor in the future, or that it has an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for a temporary worker. 8 C.F.R. §214.2(h)(6)(ii)(B)(1). In this case, Employer does not claim that it has not employed workers to perform the services or labor in the past, nor that it will not need workers to perform the services or labor in the future. In fact, Employer’s statements confirm that its business routinely employs workers in the Pipefitter position as well as all of the other positions requested in its eighteen applications. Employer confirms that its parent company, Bechtel Group, Inc. is the second largest construction company in the United States and employs over 50,000 employees as of May 2025. Employer noted that “Bechtel’s Energy
- 17 - unit (which Bechtel Energy Construction is part of) designs and builds liquefied natural gas (LNG), oil, pipeline, petrochemicals, natural gas, and water treatment facilities.” AF 154 (252). Employer noted that Bechtel “has built approximately 50,000 miles of pipeline systems, more than 50 major oil and gas field developments, and completed over 380 major chemical and petrochemical projects.” Id. It also noted that it constructs and tests tanks for LNG storage and “has built a third of the world’s LNG liquefaction capacity.” Id. Based on the Employer’s statements in its applications and in its responses to the CO, there is no question that the Employer has routinely employed the types of workers requested in the current application (Pipefitter Journeymen) as well as the other types of workers requested in its other seventeen pending applications, as these workers are essential to its stated business purpose of building pipeline systems related to liquefied natural gas (LNG), oil, pipeline, petrochemicals, natural gas, and water treatment facilities. Thus Employer’s request for H-2B workers does not fall within the first prong of the one-time occurrence definition – “that it has not employed workers to perform the services or labor in the past and that it will not need workers to perform the services or labor in the future.” See definition of one- time occurrence temporary need at 8 C.F.R. §214.2(h)(6)(ii)(B)(1). Employer argues however, that its temporary need falls under the second prong of the one-time occurrence definition – “that it has an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for a temporary worker.” In this regard the Employer asserts that the temporary event of short duration in this case is the 18 months required for completion of the pipefitting phase at the Rio Grande LNG project that has caused its temporary one-time occurrence need. Employer further argues that its temporary need has been caused by “COVID-19 restart, a pause on LNG projects during the Biden Administration being recently lifted, and numerous competing LNG projects in the USGC Region.” The CO found that Employer did not provide documentation that establishes that the need for Pipefitter Journeymen for its Rio Grande LNG project is unusual or outside of its normal business operations. The CO reasoned that “[a]ny construction project has a need for various occupations at required intervals as construction progresses,” and that Employer’s need is not unusual in this regard. The DHS and DOL (collectively “the Departments”) jointly-issued preamble to the most recently passed H-2B regulations, applicable to this H-2B application, (also known as the Interim Final Rule (“IFR”)), addressed the one-time occurrence need. … One-Time Occurrence. The Departments will employ the definition of one-time occurrence established in DHS regulations at 8 CFR 214.2(h)(6)(ii)(B)(1). The Departments do not intend for the 3-year accommodation of special projects to provide a specific exemption for industries like construction in which many of an employer’s projects or contracts may prove a permanent rather than a temporary need. Therefore, we will closely review all assertions of temporary need on the basis of a one-time occurrence to ensure that the use of this category is limited to those circumstances where the employer has a non-recurring need which exceeds the 9-month limitation.
- 18 - 80 Fed. Reg at 24056 (Apr. 29, 2015). This preamble passage is relevant to the current applications and makes clear that the “3 year accommodation” which applies to a one-time occurrence temporary need is not meant to provide an exemption for industries like construction in which many of an employer’s projects or contracts may prove a permanent rather than a temporary non-recurring need for workers. Based on the Employer’s own statements and admissions, its parent company is the second largest construction business in the United States and employs over 50,000 employees as of May 2025. Employer noted that “Bechtel’s Energy unit (which Bechtel Energy Construction is part of) designs and builds liquefied natural gas (LNG), oil, pipeline, petrochemicals, natural gas, and water treatment facilities.” AF 154 (252). Employer noted that Bechtel “has built approximately 50,000 miles of pipeline systems, more than 50 major oil and gas field developments, and completed over 380 major chemical and petrochemical projects.” Id. It also noted that it constructs and tests tanks for LNG storage and “has built a third of the world’s LNG liquefaction capacity.” Id. Thus, consistent with the preamble passage cited above, it is reasonable that the CO would review the Employer’s applications to “ensure that the use of [the one-time occurrence standard]is limited to those circumstances where the employer has a non-recurring need which exceeds the 9- month limitation.” The CO concluded: It is clear from the Employer’s descriptions of its business history and primary activities that it provides its services in a permanent cycle of acquiring and completing projects on a continual basis. It is reasonable to assume that it will continue to do so as additional opportunities present themselves, including the possibility of simultaneous projects. Further, as the USGC region is clearly conductive to large- scale LNG projects, it is logical that these types of projects in the region will continue to create and sustain a simultaneous need for the occupations associated with their construction for the foreseeable future. AF(154) 64. The CO’s conclusion that Employer’s need for the specified workers represents a recurring need, rather than a one-time occurrence temporary need, is reasonable and is based on the Employer’s business history and explanations regarding its business and the industry in the Gulf coast region, as well as the documentation provided. BALCA caselaw supports that single contracts alone do not create a temporary event of short duration as defined by the regulation when a business’s model consists of securing one contract after another. As stated by BALCA in the case of M and L Cleaning Services, 2023-TLN-00064 (Apr. 4, 2023) slip op. at 4: In the ordinary sense of the words, perhaps, a “temporary” contract or project is a “one-time occurrence,” in that it is only going to be completed once. But in that sense
- 19 - of the word, every temporary contract and every temporary project is a one-time occurrence, because every temporary contract or project ends when it is finished. As noted in this case, a temporary contract or project may be temporary in that it is only going to be completed once and has a limited duration. However, this definition does not comport with the Department’s interpretation of the one-time occurrence standard, cited above, which specifically notes that the one-time occurrence standard of temporary need does not provide “a specific exemption for industries like construction in which many of an employer’s projects or contracts may prove a permanent rather than a temporary need.” In its response to the NOD, Employer stated that it has open shop projects across North America including Bechtel Equipment Operations, solar projects, and four mega LNG Projects in the US Gulf Coast requiring unprecedented skilled craftsmen at the same time at multiple locations. Employer provided information regarding the Rio Grande LNG project (RGLNG) attaching its Exhibits 1 – 4. Employer noted that despite recruitment efforts it projected a shortfall in skilled workers to complete the project. Employer stated that its one-time occurrence need will cover trains 1, 2, and 3 for the RGLNG terminal. Employer asserted that it has four major LNG projects that are overlapping/occurring simultaneously which has caused its need for H-2B workers. Employer noted that these projects which require Pipefitter Journeymen above and beyond current staffing levels are RGLNG (Rio Grande LNG) near Brownsville, TX, PALNG (Port Arthur LNG) near Beaumont, TX and LALNG (Woodside LNG) near Sulphur, LA. AF (154) 72. In part the Employer argues that the temporary event of 18 months is the “completion of the pipefitting phase at the Ro Grande LNG project” which has caused its need for Pipefitters in the current application. For the reasons noted above, every project is arguably an event of short duration that is completed when the project is fulfilled. However, as stated previously, this does not comport with the definition of one time occurrence because every project can be viewed as a temporary event of short duration, but every project does not create a temporary need under the H-2B regulations. The CO found that Employer did not provide documentation that establishes that the need for Pipefitter Journeymen for its Rio Grande LNG project is unusual or outside of its normal business operations. The CO reasoned that “[a]ny construction project has a need for various occupations at required intervals as construction progresses,” and that Employer’s need is not unusual in this regard. The CO stated, “While its labor shortage may be above and beyond what it has experienced previously, the need for workers to accomplish the normal tasks associated with building large-scale LNG projects is not.” I find that the CO reasonably determined based on the explanation, documentation and the Employer’s business model of securing contracts in the industry on a continual basis that it failed to prove a temporary need for workers on the basis of a one-time occurrence. See Sirtecom USA, LLC, 2023-TLN-00073, slip op. at 10 (May 10, 2023) (Considering employer’s business model of soliciting and securing similar contracts employer’s need to employ similar workers to execute its obligations under the contracts is permanent, rather than temporary).
- 20 - The Employer also argues in its request for review that “the event of short duration” that causes its one-time occurrence need consists of 1) COVID-19 delays/Restarts; 2) LNG pause under Biden administration; 3) competing projects in the region; and 4) confluence of 4 major Bechtel LNG projects in the region. These factors may be relevant to the company’s business success and growth. However, they do not necessarily create a “temporary” need for workers under the H-2B regulations. All U.S. businesses were required to adjust to changes caused by the COVID-19 pandemic. The other factors noted which include the variations in the political climate, and fluctuations in the economic or business climate, clearly can affect a business’s ability to prosper and grow. However the CO did not act arbitrarily or capriciously in finding that Employer failed to establish a temporary non- recurring need for labor, rather than a permanent and growing need for labor, in the Employer’s construction business involving liquefied natural gas (LNG), oil, pipeline, petrochemicals, natural gas, and water treatment facilities, based on the statements and documentation provided by the Employer. Contrary to the Employer’s assertion in its request for review, the CO addressed these factors in its Final Determination, acknowledging the Employer’s argument. The CO stated: In describing its one-time occurrence temporary need, the employer explains that a series of factors have caused a high demand for Pipefitter Journeymen in the USGC region that exceeds the labor supply. Specifically, these factors are explained as a “COVID restart,” a pause on LNG projects during the Biden Administration being recently lifted, and numerous competing LNG projects in the USGC Region. The employer asserts that these factors have resulted in Bechtel currently contracted to build four LNG projects in the USGC region simultaneously, which combined with the labor shortage for Pipefitter Journeymen in the region has created a circumstance “beyond and above the staffing levels Bechtel currently has and has ever encountered.” The employer also states, “This is a one-time occurrence need until Bechtel and its competitors build a future US workforce to cover current shortage of qualified US workers in the Gulf Coast region.” AF (154) 64. In response to these statements the CO stated that a labor shortage alone does not establish a temporary need under the H-2B program regulations. The CO also noted that it is not possible for the Employer to predict with certainty that a shortage of qualified U.S. workers for any occupation is not permanent or to establish a date when the labor shortage will end. BALCA has previously determined that a labor shortage alone does not establish the Employer’s temporary need under the H-2B regulations. All H-2B applications require recruitment of U.S. workers and certification that qualified U.S. workers are not available prior to certification. However, a labor shortage does not establish the Employer’s standard of temporary need under the H-2B regulations – which are limited to peakload, seasonal, intermittent or one time occurrence. Clearly an employer can have a real need for permanent workers. However, a need for permanent workers cannot be fulfilled by the temporary labor certification program. See BMC West LLC, 2018-TLN-00099, at 11 (July 13, 2018) (“The presence of a labor shortage … does not support a finding that Employer’s need is temporary in
- 21 - nature”) and Tofte General Store, Inc., 2022-TLN-00010, at 5 (Nov. 1, 2021) (finding that a “wage war” in the employer’s location due to a labor shortage caused by the COVID-19 pandemic does not meet the requirements for a successful H-2B application). Employer also argues in its request for review that the CO acted arbitrarily and capriciously in requiring the Employer to provide actual contracts to document its temporary need and that the documentation provided by the Employer, which included news articles, internal website press releases, and industry journal articles should have been sufficient to prove that it is “more likely than not that the content of these articles is true.” Employer argues that the multiple exhibits it provided regarding its forecasted need for Pipefitters and articles regarding the labor supply and demand in the Gulf coast region were sufficient to prove its need for the requested workers. After considering the Employer’s argument and the documentation submitted I find that the CO was not unreasonable to require the Employer to provide specific documentation including the actual contracts for the projects in question. This is the type of information and documentation that the CO typically reviews in making its reasoned determination on whether certification of temporary H-2B workers is warranted under the regulations. Employer cannot avoid its responsibility to provide this information without providing an adequate reason for failing to do so. Employer’s argument that it should be able to substitute news articles, press releases and internal labor projections for the actual requested documentation which include actual contracts and letters of intent, is without merit. Thus, for the reasons set forth above, Employer has failed to meet its burden of proving that its request for 275 Pipefitter Jouneyman workers for the period of October 1, 2025 to March 15, 2027 is based on a temporary one-time occurrence standard of need. Employer also failed to establish its bona fide need for the number of workers requested. Although this point is moot, in light of the Employer’s failure to establish its temporary need based on the one-time occurrence standard, the CO’s conclusion regarding Employer’s failure to establish a bona fide need for the number of workers requested is supported by the record. The CO acknowledged the explanation and documents submitted by the Employer but concluded it did not overcome the deficiency. The CO noted that the employer was instructed to provide documentation supporting the employer’s need for 275 Pipefitter Journeymen such as contracts, letters of intent, etc. that specified the number of workers and dates of need. The CO acknowledged that the Employer provided an internal project timeline and head count estimation but pointed out that “these were presented as general figures with no insight as to how the number of workers was calculated based on the specific work required.” AF (154) 65. The CO also noted that although general articles were provided from Bechtel and other sources announcing that it had contracts with NextDecade to build the Rio Grande LNG project, no actual contracts or other documentation from Bechtel or NextDecade were provided. Therefore, the CO concluded that the Department is unable to confirm the validity of the contract or the need for the number of workers from October 1, 2025 to March 15, 2027. Employer argues that the CO erred in finding that the requested contracts, which were not provided, would have included the specific number of workers needed for a particular project. Employer asserts that these types of contracts avoid these specifications because construction projects are dynamic, and contractors need flexibility to manage staffing levels based upon the project’s
- 22 - evolving needs and schedule. Employer asserts that it need only prove that it would be “more likely than not” that it would need the number of workers requested. Employer’s argument lacks merit. The CO’s conclusion regarding Employer’s failure to establish the number of workers requested for the period of October 1, 2025 to March 15, 2027 is reasonable. Employer failed to provide the specific documents requested to document the number of workers requested and Employer failed to provide alternative information that could be objectively verified. Although the Employer provided its internal project timeline and estimations regarding the number of workers needed, these were general estimates which could not be verified, nor was any insight provided as to how the number of workers were calculated based on the work required. Employer provided no objective basis for the CO to analyze its estimates. Accordingly, the CO’s conclusion that the Employer did not establish its need for the number of workers requested is supported by the record and is rational. BALCA has consistently found that the CO is not required to accept the claims of an Employer who does not supply adequate supporting documentation. See AB Controls & Technology, 2013-TLN-00022 (Jan. 17, 2013) (bare assertions without supporting evidence are insufficient). The regulations are clear that the burden is on the Employer to establish its temporary need on the basis of the chosen standard as well as the number of workers requested. See Empire Roofing, 2016-TLN-00065 (Sept. 15, 2016) (“An employer cannot just toss hundreds of puzzle pieces--or hundreds of pages of document—on the table and expect a CO to see if he or she can fit them together. The burden is on the applicant to provide the right pieces and to connect them so the CO can see that the employer has established a legitimate temporary need for workers.”). Accordingly, based on the information submitted to the CO, and for the reasons stated above, the undersigned finds the CO considered the documentation submitted by the Employer and reasonably determined that the Employer failed to meet its burden of proving its temporary need for 275 Pipefitter Journeyman workers for the period of October 1, 2025 to March 15, 2027, based on Employer’s stated “one-time occurrence” standard, as defined by the applicable regulation at 8 C.F.R. § 214.2(h)(6)(ii). The CO did not act arbitrarily or capriciously, nor contrary to law, in denying Employer’s application for temporary labor certification. Case Numbers 2025-TLN-00155 – 2025-TLN-00159 (Port Isabel, Texas) 2025-TLN-00154 275 Pipefitter Journeymen Port Isabel, Texas October 1, 2025 - March 15, 2027 2025-TLN-00155 100 Welder Journeymen Port Isabel, Texas October 1, 2025 - January 15, 2027 2025-TLN-00156 200 Electrician Journeymen Port Isabel, Texas October 1, 2025 - November 15, 2026 2025-TLN-00157 50 Ironworker Journeymen Port Isabel, Texas October 1, 2025 - July 15, 2026 2025-TLN-00158 150 Rigger Journeymen Port Isabel, Texas October 1, 2025 - October 15, 2026 2025-TLN-00159 20 Equipment Mechanic Journeymen Port Isabel, Texas October 1, 2025 - March 15, 2026 Similar to Case Number 2025-TLN-00154, the above cases also involve Employer’s request for workers at the Port Isabel, Texas worksite for the periods noted in the chart above. The documentation provided by the Employer in support of its applications is nearly identical to that which was provided in Case Number 2025-TLN-00154, with the exception that the payroll records
- 23 - for the years 2023 and 2024 pertain to the specific position requested in each case. The Administrative Files reflect that Employer provided payroll records for the position of “Welder Journeyman” in Case No. 2025-TLN-00155, See AF(155) 107; “Electrician Journeyman” in Case No. 2025-TLN-00156, See AF(156) 107; “Ironworker Journeyman” in Case No. 2025-TLN-00157, See AF(157) 108; “Rigger Journeyman” in Case No. 2025-TLN-00158, See AF(158) 107; and “Equipment Mechanic Journeyman” in Case No. 2025-TLN-00159, See AF(159) 108. Employer also provided a headcount projection of the workers it estimated it would need at the Port Isabel, Texas location in each of the requested positions. In addition, Employer provided its staffing forecast in the Gulf coast region based on the overlapping projects for each of the requested positions. The CO acknowledged the specific payroll information submitted in each case in the Final Determinations, as well as the other documentation and explanations provided by the Employer. The reasoning applied by the CO and bases for denial of certification as stated in the Final Determinations in each of these cases is the same. Employer also made similar arguments in its requests for review in each of these cases. After reviewing the documentation submitted, the Employer’s arguments, and the bases for the CO’s denial, I find the CO did not act arbitrarily or capriciously or contrary to law in denying these applications, for the same reasons as stated in my review of Case No. 2025-TLN-00154, as noted above. Case Numbers 2025-TLN-00160 – 2025-TLN-00162 and 2025-TLN-168 – 2025-TLN-170 2025-TLN-00160 100 Rigger Journeymen Port Arthur, Texas October 1, 2025 - May 15, 2026 2025-TLN-00161 275 Pipefitter Journeymen Port Arthur, Texas October 1, 2025 - November 15, 2026 2025-TLN-00162 15 Equipment Mechanic Journeymen Port Arthur, Texas October 1, 2025 - July 15, 2026 2025-TLN-00168 100 Welder Journeymen Port Arthur, Texas October 1, 2025 - November 15, 2026 2025-TLN-00169 25 Ironworker Journeymen Port Arthur, Texas October 1, 2025 - March 15, 2026 2025-TLN-00170 100 Electrician Journeymen Port Arthur, Texas October 1, 2025 - July 15, 2026 Case Numbers 2025-TLN-00160 – 2025-TLN-162 and 2025-TLN-00168 – 2025-TLN-170 involve a Port Arthur worksite. In addition to the general documentation provided in all of the eighteen cases pertaining to the LNG industry on the Gulf coast, in these cases Employer also provided an article and press release from Sempra Infrastructure specifically related to Bechtel’s contract for the Port Arthur project, in support of its one-time occurrence need for workers and time periods noted in the chart above. In addition, Employer provided requested payroll documentation for the years 2023 and 2024 pertaining to this worksite for each of the requested positions noted above. Employer provided payroll records for the position of “Rigger Journeyman” in Case No. 2025-TLN-00160, See AF(160) 90; “Pipefitter Journeyman” in Case No. 2025-TLN-00161, See AF(161) 95; “Equipment Mechanic Journeyman” in Case No. 2025-TLN-00162, See AF(162) 95; “Welder Journeyman” in Case No. 2025-TLN-00168, See AF(168) 90; “Ironworker Journeyman” in Case No. 2025-TLN-00169, See AF(169) 93; and “Electrician Journeyman” in Case No. 2025-TLN- 00170, See AF(170) 90. Employer also provided a headcount projection of the workers it estimated it would need at the Port Arthur, Texas location in each of the requested positions. In addition, Employer provided its staffing forecast in the Gulf coast region based on the overlapping projects for each of the requested positions. The CO acknowledged the specific payroll information submitted in each case in the Final Determinations, as well as the other documentation and explanations provided by the Employer. The reasoning applied by the CO and bases for denial of certification as stated in
- 24 - the Final Determinations in each of these cases is the same. Employer also made similar arguments in its requests for review in each of these cases. After reviewing the documentation submitted, the Employer’s arguments, and the bases for the CO’s denial, I find the CO did not act arbitrarily or capriciously or contrary to law in denying these applications, for the same reasons as stated in my review of Case No. 2025-TLN-00154, as noted above. Case Numbers 2025-TLN-00163 – 2025-TLN-00167 2025-TLN-00163 50 Pipefitter Journeymen Sulphur, Louisiana October 1, 2025 - November 15, 2027 2025-TLN-00164 50 Welder Journeymen Sulphur, Louisiana October 1, 2025 - March 15, 2028 2025-TLN-00165 20 Electrician Journeymen Sulphur, Louisiana October 1, 2025 - October 15, 2027 2025-TLN-00166 50 Ironworker Journeymen Sulphur, Louisiana October 1, 2025 - September 15, 2027 2025-TLN-00167 50 Rigger Journeymen Sulphur, Louisiana October 1, 2025 - September 15, 2027 Case Numbers 2025-TLN-00163 – 2025-TLN-00167 reflect similar documentation offered by the Employer in support of its one-time occurrence need for workers at the Sulphur, Louisiana location for the positions and time periods noted above. In addition to the general articles discussing matters related to the LNG industry on the Gulf coast and the competing projects in the area, the Employer provided Woodside Energy website information regarding the Louisiana LNG project and two articles specifically addressing the Woodside/LA LNG project at Sulphur Louisiana, as opposed to the articles discussing the Rio Grande LNG project offered in support of Employer’s applications for the Port Isabel, TX applications. Employer also provided the payroll record for the years 2023 and 2024 for each of the requested positions at the Woodside/LA LNG location. Employer provided payroll records for the position of “Pipefitter Jouneyman” in Case No. 2025-TLN-00163, See AF(163) 99; “Welder Jouneyman” in Case No. 2025-TLN-00164, See AF(164) 99; “Electrician Journeyman” in Case No. 2025-TLN-00165, See AF(165) 98; “Ironworker Journeyman” in Case No. 2025-TLN-00166, See AF(166) 99; and “Rigger Journeyman” in Case No. 2025-TLN-00167, See AF(167) 99. Employer also provided a headcount projection of the workers it estimated it would need at the Sulphur, Louisiana location in each of the requested positions. In addition, Employer provided its staffing forecast in the Gulf coast region based on the overlapping projects for each of the requested positions. The CO acknowledged the specific payroll information submitted in each case in the Final Determinations, as well as the other documentation and explanations provided by the Employer. The arguments offered by the Employer in support of its one-time occurrence need for these workers are the same as those offered in the other cases including Case No. 2025-TLN-00154. The bases for denial in the CO’s Final Determinations, in the cases noted above at the Sulphur LA worksite, are also the same as those in the other seventeen cases including Case No. 2025-TLN-00154 which has been discussed thoroughly above. Arguments offered by the Employer in its request for review are the same in all of these cases. After reviewing the documentation submitted, the Employer’s arguments, and the bases for the CO’s denial, I find the CO did not act arbitrarily or capriciously, or contrary to law, in denying these applications, for the same reasons as stated in my review of Case No. 2025-TLN-00154, as set out above.
- 25 - Case Number 2025-TLN-00171 2025-TLN-00171 30 Electrician Journeymen Corpus Christi, TX October 1, 2025 - March 15, 2026 Case Number 2025-TLN-00171 involves a Corpus Christi, Texas worksite. In addition to the general documentation provided in all of the eighteen cases pertaining to the LNG industry on the Gulf coast, in this case Employer also provided its website information on the Corpus Christi project and an article from Cheniere Energy specifically related to the Corpus Christi liquefaction project, in support of Employer’s alleged one-time occurrence need for Electrician Journeymen from October 1, 2025 to March 15, 2026. In addition, Employer provided requested payroll documentation for the years 2023 and 2024 pertaining to the Corpus Christi worksite for the “Electrical Journeyman position. See AF (171) 117. Employer also provided its headcount projection for the number of electricians it estimated it would need at the Corpus Christi, Texas location. In addition, Employer provided its staffing forecast in the Gulf coast region based on the overlapping projects for the position of electrician. The CO acknowledged the specific payroll information submitted in each case in the Final Determinations, as well as the other documentation and explanations provided by the Employer. The reasoning applied by the CO and bases for denial of certification as stated in the Final Determination in this case is the same as the other seventeen cases. Employer also made similar arguments in its requests for review in this case. Although Employer submitted some additional documentation with its request for review in this case, that is, a copy of an agreement between itself and its client, this information cannot be considered in this request for review as it had not been submitted to the CO prior to issuance of the Final Determination. See 20 C.F.R. § 655.61(e).6 After reviewing the documentation submitted, the Employer’s arguments, and the bases for the CO’s denial, I find the CO did not act arbitrarily or capriciously or contrary to law in denying this application, for the same reasons as stated in my review of Case No. 2025-TLN-00154, as noted above. ORDER Wherefore, for the reasons stated above, it is hereby ORDERED: 1. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 275 Pipefitter Jouneyman workers in Case No. 2025-TLN-00154 is AFFIRMED. 2. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 100 Welder Jouneyman workers in Case No. 2025-TLN-00155 is AFFIRMED. 6 20 C.F.R. §655.61(e) provides that BALCA has a limited scope of review in H-2B cases. Specifically, BALCA may only consider the appeal file prepared by the CO, the legal briefs submitted by the parties, and the employer’s request for review, which may contain only legal argument and such evidence as was actually submitted to the CO before the date the CO’s determination was issued. 20 C.F.R. § 655.61(a).
- 26 - 3. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 200 Electrician Jouneyman workers in Case No. 2025-TLN-00156 is AFFIRMED. 4. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 50 Ironworker Jouneyman workers in Case No. 2025-TLN-00157 is AFFIRMED. 5. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 150 Rigger Jouneyman workers in Case No. 2025-TLN-00158 is AFFIRMED. 6. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 20 Equipment Mechanic Journeyman workers in Case No. 2025-TLN-00159 is AFFIRMED. 7. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 100 Rigger Jouneyman workers in Case No. 2025-TLN-00160 is AFFIRMED. 8. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 275 Pipefitter Jouneyman workers in Case No. 2025-TLN-00161 is AFFIRMED. 9. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 15 Equipment Mechanic Jouneyman workers in Case No. 2025-TLN-00162 is AFFIRMED. 10. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 50 Pipefitter Jouneyman workers in Case No. 2025-TLN-00163 is AFFIRMED. 11. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 50 Welder Jouneyman workers in Case No. 2025-TLN-00164 is AFFIRMED. 12. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 20 Electrician Jouneyman workers in Case No. 2025-TLN-00165 is AFFIRMED. 13. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 50 Ironworker Jouneyman workers in Case No. 2025-TLN-00166 is AFFIRMED. 14. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 50 Rigger Jouneyman workers in Case No. 2025-TLN-00167 is AFFIRMED. 15. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 100 Welder Jouneyman workers in Case No. 2025-TLN-00168 is AFFIRMED. 16. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 25 Ironworker Jouneyman workers in Case No. 2025-TLN-00169 is AFFIRMED. 17. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 100 Electrician Jouneyman workers in Case No. 2025-TLN-00170 is AFFIRMED.
- 27 - 18. The Certifying Officer’s DENIAL of Employer’s application for temporary labor certification for 30 Electrician Jouneyman workers in Case No. 2025-TLN-00171 is AFFIRMED. For the Board of Alien Labor Certification Appeals: NATALIE A. APPETTA Administrative Law Judge
Vous vous demandez comment ce texte s’applique à votre situation ?
Consultation gratuite, sans engagement
Décrivez votre situation. Notre équipe vous recontactera par e-mail pour votre consultation.
Poursuivez vos recherches dans ChatGPT ou Claude
Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.