DO-DECISION AND ORDER ON THE MERITS NUMBER OF PAGES 9 JUDGE Leslie DECISION AND ORDER AFFIRMING THE DECISION OF THE CERTIFYING OFFICER — 2026TLN00085

2026TLN00085Dol Oalj

Texte intégral

UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS
Washington, DC
Issue Date: 28 July 2026
BALCA Case No.: 2026-TLN-00085
2026-TLN-00100
ETA Case No.: H-400-26096-758907
H-400-26096-758894
In the Matter of:
LUMETON INDUSTRIES, LLC,
Employer.
Before: Heather C. Leslie
Administrative Law Judge
DECISION AND ORDER AFFIRMING THE DECISION OF THE
CERTIFYING OFFICER
This case arises from Lumeton Industries, LLC’s (“Employer”) request for
review of the Certifying Officer’s (“CO”) decision to deny an application for
temporary alien labor certification under the H-2B non-immigrant program. The H-
2B program permits employers to hire foreign workers to perform temporary
nonagricultural work within the United States on a one-time occurrence, seasonal,
peakload, or intermittent basis, as defined by the United States Department of
Homeland Security.1 Employers who seek to hire foreign workers under this
program must apply for and receive labor certification from the United States
1 See 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6);1 20 C.F.R. § 655.6(b). On April 29,
2015, the Department of Labor (“DOL”) and the Department of Homeland Security jointly published
an Interim Final Rule (“IFR”) amending the standards and procedures that govern the H-2B
temporary labor certification program. See Temporary Non-Agricultural Employment of H-2B Aliens
in the United States; Interim Final Rule, 80 Fed. Reg. 24,042 et seq. (Apr. 29, 2015). The rules
provided in the IFR apply to applications “submitted on or after April 29, 2015, and that ha[ve] a
start date of need after October 1, 2015.” IFR, 20 C.F.R. § 655.4(e). All citations to 20 C.F.R. Part
655 in this opinion and order are to the IFR.
-2-
Department of Labor using a Form ETA-9142B, Application for Temporary
Employment Certification (“Form 9142”).
FACTS AND PROCEDURAL HISTORY
On April 6, 2026, Employer filed two H-2B Applications for Temporary
Employment Certification, Form 9142.2 Employer’s applications requested
certification for 50 “Welders” and 50 “Structural Iron and Steel Workers,”
identifying the nature of temporary need as a “seasonal.”3 Employer requested a
temporary need4 from June 20, 2026 to April 19, 2027.5 The applications
represented that the job duties included, inter alia, weld metal pipe and plate
components, properly set up…and operate welding equipment, for the welding
application,6 and interpret engineering drawings, align and fit structural and pipe
steel components, and maintain tools and equipment.7
The CO issued a Notice of Deficiency (“NOD”) for each application, dated May
19, 2026, informing Employer of its failure to establish the job opportunity as
temporary in nature, failure to establish temporary need for the number of workers
requested, and deficiencies with job order assurances and contents.8 The CO
requested additional information from the Employer to support how its needs meet
the regulatory standard of temporary need.9
On June 4, 2026, Employer submitted five responses to the welding
application NOD,10 and six responses to the steel worker application NOD.11
2 AF1 at 1403; AF2 at 1487. All references to “AF1” reference the administrative file for
2026TLN00085; All references to “AF2” reference the administrative file for 2026TLN00100.
3AF1 at 1403; AF2 at 1487.
44 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). See Further
Consolidated Appropriations Act, 2024, Pub. L. No. 118-47, Division D, Title I, § 111 (2024); Full-
Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No. 119-4, Division A, Title I, §§
1101(a)(8), 1105—1106 (2025) (extending the provisions of various appropriations acts, including the
relevant provisions of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025);
Continuing Appropriations, Agriculture, Legislative Branch, Military Construction and Veterans
Affairs, and Extensions Act, 2026, Pub. L. No. 119-37, Division A, §§ 101, 106 (2025) (extending the
relevant provisions of the Full-Year Continuing Appropriations and Extensions Act, 2025, until
either subsequent appropriations legislation is enacted into law or January 30, 2026, whichever
occurs first).
5 AF 1 at 1403; AF2 at 1487.
6 AF1 at 1405.
7 AF2 at 1493.
8 AF1 at 1397-1400; AF2 at 1469-1472.
9 Id.
10 AF1 at 573, 597, 744, 828, and 1106.
11 AF 2 at 614, 624, 809, 913, and 1197.
-3-
Employer responded to each deficiency in addition to project plans, website articles
growth reports, calculations, websites, and letters of intent.12 On June 5, 2026,
Employer provided email communication between Employer and the respective
unions,13 and provided copies of union job orders on June 8, 2026.14
The CO issued a Final Determination (“Determination 1”), dated June 8,
2026, denying Employer’s application and outlined the reasons why the application
was denied, for the welder application.15
The CO determined that Employer failed to establish the job opportunity as
temporary in nature and failed to establish temporary need for the number of
workers requested.16 As to the first deficiency, the CO determined that Employer
did not provide sufficient evidence to demonstrate a seasonal need. Employer
indicated that its seasonal need is driven by the Arctic sealift window in mid-June
through early September.17 However, Employer continued by stating that the
fabrication work has to be completed in their Texas facility and loaded for transport
to Alaska no later than April 19, 2027.18 A seasonal need is demonstrated by a
recurring demand and/or pattern or event. The CO found that the need is not based
on a seasonal need but, rather, is dependent on a single contract. A single contract
and the formation of a company do not independently demonstrate a seasonal
need.19 The CO concluded by stating the following:
The employer failed to establish that the need for these workers
is its own need and that its need is temporary… is unclear if the
employer has a true temporary need, as much of the information and
statements contained in the NOD response contradict one another.
Additionally, the employer’s explanation and documentation submitted
shows that the employer is in the business of soliciting and securing
contracts with clients in the area of intended employment and
reasonably will continue to do so. Furthermore, it is also unclear how
the alleged seasonal need for the specific Willow Project is actually the
12 See generally, AF1 at 573, 597, 744, 828, and 1106; AF 2 at 614, 624, 809, 913, and 1197.
13 AF1 at 571; AF2 at 612.
14 AF1 at 561; AF2 at 602.
15 AF1 at 549.
16 AF1 at 556.
17 Id.
18 Id.
19 AF1 at 557.
-4-
need of the employer itself, rather than the need Kiewit Offshore
Services Ltd (KOS).20
As to the second deficiency, the CO reiterated that Employer, despite filing a
substantial number of documents, failed to adequately justify their need for the 50
workers.21 The CO determined that the documentation does not clearly establish
the number of workers in the application.22
The CO issued a Final Determination (“Determination 2”), dated June 10,
2026, denying Employer’s application and outlined the reasons why the application
was denied, for the steel worker application.23 The exact same deficiencies were
cited, with identical reasoning by the CO.24
On June 23, 2026, Employer filed its request for administrative review of the
CO Final Determination.25 On June 24, 2026, I was assigned this case.26 The CO
submitted a Motion to Consolidate the two cases on July 6, 2026. That Motion was
granted on July 14, 2026. The AF was received on July 14, 2026.
The CO submitted a brief on July 17, 2026.27
20 Id.
21 AF1 at 560.
22 Id.
23 AF2 at 589.
24 See generally, AF2 at 589.
25 AF1 at 1; AF2 at 1.
26 The chief administrative law judge may designate a single member or a three-member panel of the
Board to consider a particular case. 20 C.F.R. § 655.61. Chief Judge Henley designated a single
member of the Board to hear this appeal.
27 Employer submitted Motion to Confine Review to Issues Raise in Accordance with 20 C.F.R. §§
655.31 & 655.32(a) on July 23, 2026. The CO filed a Response to Employer’s “Motion to Confine
Review” on July 27, 2026. Employer filed a Reply Brief on July 27, 2026. In the Order Granting
Certifying Officer’s Motion to Consolidate, dated July 14, 2026, the undersigned reminded Employer
that the only party permitted to write a brief at this stage in proceedings was the Certifying Officer.
The regulations at 20 C.F.R. §655.61(c) provide for briefing by the CO but do not provide for briefing
by an Employer. The regulations at 20 C.F.R. §655.61(a) already provide an Employer with the
opportunity to brief BALCA on the merits of the appeal and in fact require an Employer to brief the
merits, with §655.61(a) requiring an Employer to identify the particular determination for which
review is sought and set forth the grounds for request. While an ALJ writing for the Board may
permit an Employer to file an additional brief, it is not required to do so. See, e.g., Employment and
Training Administration v. Romulo Rosas DBA Rosas Vine Company, 2020-TLN-00010 (Nov. 19,
2019) (“The regulations instruct an employer to include legal argument and evidence in its initial
appeal. . . no brief from Employer will be accepted); Employment and Training Administration v.
-5-
This decision and order is based on the record consisting of the two AFs
forwarded by ETA. Upon a review of the record and the relevant legal authority, the
undersigned AFFIRMS the determination of the Certifying Officer.
SCOPE OF REVIEW
The Board’s standard of review in H-2B certification cases is limited. The
Board may only consider the appeal file prepared by the certifying officer, the legal
briefs submitted by the parties, and the Employer’s request for administrative
review, which may only contain legal arguments and evidence that the Employer
actually submitted to the certifying officer before the date the certifying officer
issued a final determination.28 After considering the evidence of record, the Board
must: (1) affirm the certifying officer’s determination; (2) reverse or modify the
certifying officer’s determination; or (3) remand the case to the certifying officer for
further action.29
“Neither the Immigration and Nationality Act, 8 U.S.C. § 1101, et seq.
(INA), nor the regulations applicable to H-2B temporary labor certifications, 20
C.F.R. Part 655, Subpart A, identify a specific standard of review for an employer’s
appeal under 20 C.F.R. § 655.61(e).”30 The Board has fairly consistently applied
the “arbitrary and capricious” standard to review certifying officers’ determinations
of H-2B applications.31 Accordingly, I will apply the arbitrary and capricious
Changwon America Inc., 2024-TLN-00042; 2024-TLN-00043 (Dec. 1, 2023) (“There is no right for
Employer to file a response brief contained in the regulation. Rather, Employer’s brief must be
contained with the request for review”); Employment and Training Administration v. C Eagle Stone
Supply LLC, 2021-TLN-00016 (Feb. 4, 2021) (“arguments must be presented in the request for
review itself, not in a subsequent brief”). Employer’s counsel has been informed of that fact by this
tribunal in the past. See Employment and Training Administration v. MB Florida LTD, 2022-TLN-
00005 (“Allowing Employer to submit additional legal argument. . . would provide Employer a
‘second bite at the apple’ which the regulations do not afford to either employers or the CO.”) (Oct.
27, 2021). Therefore, Employer’s “Motion to Confine Review” will not be considered or included in
this record. The CO’s Response and Employer’s subsequent Reply Brief will not be considered as
well.
28 20 C.F.R. § 655.61.
29 20 C.F.R. § 655.61(e).
30 Herder Plumbing, Inc., 2019-TLN-00022, *2 (Jan. 23, 2019).
31 G.A.S. Unlimited, Inc., 2018-TLN-00028 (Dec. 21, 2017); see, e.g., United Forest Services LLC,
2019-TLN-00028, *3 (Feb. 11, 2019); Cooper Roofing & Solar, 2018- TLN-00056, *4-5 (Feb. 15,
2018); Three Seasons Landscape Contracting Service, Inc., 2016- TLN-00045, *19 (Jun. 15, 2016);
-6-
standard in this matter.32 Under the arbitrary and capricious standard, if there is
any rational basis for the certifying officer’s determination, it must be sustained.33
DISCUSSION
To obtain certification under the H-2B program, an applicant must establish
that its need for workers qualifies as temporary under one of the four temporary
need standards: one-time occurrence, seasonal, peakload, or intermittent.34
In the instant case, the Employer attempted to establish a seasonal need for
the period of June 20, 2026 to April 19, 2027. To establish a seasonal need,
[t]he petitioner must establish that the services or labor is traditionally
tied to a season of the year by an event or pattern and is of a recurring
nature. The petitioner shall specify the period(s) of time during each
year in which it does not need the services or labor. The employment is
not seasonal if the period during which the services or labor is not
needed is unpredictable or subject to change or is considered a vacation
period for the petitioner's permanent employees.35
Following the CO’s NOD, Employer submitted project development plans,
articles, letters of intent, and company formation documentation. In the Final
Determination, the CO concluded that: (1) Employer did not provide sufficient
documentation to establish a recurring need during the requested period of need,
and (2) Employer did not sufficiently explain, nor provided adequate
documentation, to establish a seasonal need for the requested number of workers.36
Employer contends that letters of intent with their contracting company
sufficiently demonstrate seasonal need due to specific deadlines enumerated in the
Brooks Ledge, Inc., 2016-TLN-00033, *4-5 (May10, 2016) (panel decision); see also J and V Farms,
LLC, 2016-TLC-00022 (Mar. 4, 2016).
32 Brazen & Greer Masonry, Inc., 2019-TLN-00038, PDF at 3-9 (Mar. 6, 2019) (analyzing the various
standards of review used by the Board to review certifying officers’ determinations of H-2B
applications and choosing the arbitrary and capricious standard).
33 See Dellew Corp. v. United States, 108 Fed. Cl. 357, 368 (Fed. Cl. 2012); Erinys Iraq Ltd. v.
United States, 78 Fed. Cl. 518, 525 (Fed. Cl. 2007); see also Spokane County Legal Services, Inc. v.
Legal Services Corp., 614 F.2d 662, 669, n.11 (9th Cir. 1980).
34 See 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6); 20 C.F.R. § 655.6(b).
35 8 C.F.R. § 214.2(h)(6)(ii)(B)(2).
36 AF1 at 549; AF2 at 589.
-7-
letters.37 Employer further argues that their need for welders and fitters arises from
contractual obligations to complete their work on time within a seasonal window.38
In contrast, the CO states that the letters of intent only show a contractual
obligation, but are not indicative of an underlying temporary or seasonal need.39
I agree with the CO that Employer did not sufficiently demonstrate their
recurring need during the requested period of need with documentation. Merely
because an employer executes a contract for services for a supposed seasonal need,
does not guarantee or evidence the existence of a seasonal need alone.40 Employer
argues that their seasonal need is tied to temperature changes in Alaskan
waterways, the location of their contracted agreement.41 However, it is incumbent
on an employer to substantiate this relationship. Here, Employer failed to
adequately explain to the CO how Alaskan weather and seasons impact the
operation scheduled of their welding and fitting projects.
To demonstrate a seasonal need, a recurring nature, or work “tied to” a
specific season, is a requisite element.42 Where an employer only demonstrates a
singular deadline or suggests that the need for their services is unpredictable or
subject to change, the employer has not established a seasonal need.43 This may not
be demonstrated merely based on the number of contracts an employer has, nor just
on the contract completion deadline.44 In the present case, however, this was
Employer’s strategy.45 Therefore, the CO’s denial was appropriate and aligned with
the Board’s standards.
The temporary element of the seasonal standard is a foundational element of
consideration for the CO. Employer states that an essential component of their
business is the “ongoing” practice of contract services to clients in industrial and
37 See AF1 at 1-10.
38 See AF1 at 1421.
39 AF1 at 555-556.
40 Rubees Cleaners, 2024-TLN-00179, at 10, (July 2, 2024); see also, Jackson’s Contracting, LLC,
2025-TLN-00048, at 3, (March 25, 2025)(affirming the CO’s denial of certification for failure to
establish a seasonal need where employer provided one contract to provide forestry workers.”)
41 AF1 at 1106.
42 8 C.F.R. § 214.2(h)(6)(ii)(B)(2).
43 See Weldflow Industrial, 2025-TLN-00024 (Jan. 16, 2025); Taylors International Services, Inc.,
2024-TLN-00141 (May 13, 2024).
44 All Phase Development, LLC, 2024-TLN-00091, at 7 (February 20, 2024) (affirming the CO’s denial
where an employer’s purported seasonal need was based on securing multiple construction
contracts.); see also Seven Star, Inc. v. U.S., 873 F.2d 225, 226 (9th Cir. 1989) (“The permanence of a
position is determined based on the nature of the employers need for the duties to be performed,
rather than the parties intentions as to how long any one worker will actually hold a particular job.”)
45 AF1 at 25.
-8-
engineering services.46 It could be understood that instead of temporary, the
ongoing nature of Employer’s need is actually permanent, which is directly in
opposition to the regulations. Finally, a temporary need for clients does not
guarantee the demonstration of an employer-filer’s temporary need before the CO.47
Properly documented and demonstrated need is required for approval by the CO,
and the burden is on the Employer to clearly articulate the connection between the
temporary need and the request for workers.48 Employer does not meet this
standard. Indeed, as the CO noted, much of the documentation submitted by the
Employer was contradictory when attempting to articulate the temporary need.
Therefore, I affirm the CO’s finding that Employer has not adequately
demonstrated a seasonal need.
As to the other stated deficiency, the undersigned sees no clear error in the
CO’s determinations that Employer did not adequately explain or document
seasonal temporary need for the number of workers requested. However, having
determined that the Employer failed to comply with 20 C.F.R. §§ 655.6(a) and (b)
the undersigned need not decide the remaining deficiencies identified by the CO.
CONCLUSION
For the aforementioned reasons, I find the CO did not act arbitrarily and
capriciously in denying Employer’s application 50 “Welders” and 50 “Structural Iron
and Steel Workers,” as seasonal need, for the period of June 20, 2026 to April 19,
2027. Based on the evidence of record, I conclude that Employer has not carried its
burden to show that the CO acted in an arbitrary or capricious manner in denying
the application based on timeliness. Therefore, I find that the CO properly denied
Employer’s Application.
46 AF1 at 16.
47 See Lumeton Industries, LLC, 2025-TLN-00142 and 2024-TLN-000143, at 16 citing 20 C.F.R.§ 655.6
(a)(“The regulations specify that even a “job contractor will only be permitted to seek certification if it
can demonstrate through documentation its own temporary need, not that of its employer-clients.” 20
C.F.R.§655.6.”)
48 See Empire Roofing, 2016-TLN-00065 (Sept. 15, 2016) (“An employer cannot just toss hundreds of
puzzle pieces—or hundreds of pages of documents—on the table and expect a CO to see if he or she
can fit them together. The burden is on the applicant to provide the right pieces and to connect them
so the CO can see that the employer has established a legitimate temporary need for workers”). See
also BMC West Corporation and BMC West Corporation d/b/a BMC, 2016-TLN-00043/44 slip op. at
7-8 (May 31, 2016) (Denial affirmed where employer’s offered explanation failed to substantiate its
dates of need).
-9-
ORDER
It is hereby ORDERED that the Certifying Officer’s determination is
AFFIRMED.
SO ORDERED.
For the Board of Alien Labor Certification Appeals:
Heather C. Leslie
Administrative Law Judge
Covington, LA