DB-DENIED BENEFITS NUMBER OF PAGES 10 JUDGE Hilleren-Wilkins DECISION AND ORDER AFFIRMING FINAL DETERMINATION OF CERTIFYING OFFICER-In sum, the CO’s Final Determination denied Employer’s January 2, 2026 H-2B Application for Temporary Employment Certification, finding that Employer failed to establish the job opportunity as temporary in nature as required by 20 C.F.R. § 655.6(a) and (b) and failed to establish a temporary need for the number of workers requested pursuant to 20 C.F.R § 655.11(e)(3), (4); 20 C.F.R § 655.1(a)(1); and 20 C.F.R. § 655.6. After considering the entire record and applicable authority, the Board concludes that Employer has not shown the CO’s denial of Employer’s Application to be arbitrary, capricious, or not in accordance with applicable law. For the foregoing reasons, the Certifying Officer’s Final Determination denying Employer’s January 2, 2026 Application for Temporary Employment Certification is AFFIRMED. — 2026TLN00044

2026TLN00044Dol Oalj

Texte intégral

UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS
Washington, DC
______________
Issue Date: 27 April 2026
BALCA Case No.: 2026-TLN-00044
ETA Case No.: H-400-26002-530763
In the Matter of:
Bechtel Energy Construction Services, Inc.,
Employer.
Appearances:
Jay C. Ruby, Esq.
For Employer
Gema Hall, Esq.
Office of the Solicitor
United States Department of Labor
For the Certifying Officer
DECISION AND ORDER AFFIRMING FINAL
DETERMINATION OF CERTIFYING OFFICER
This case arises under the temporary nonagricultural labor or services provisions of the Immigration and
Nationality Act1 and its implementing regulations.2 This proceeding is before the Board of Alien Labor
Certification Appeals (“BALCA”) pursuant to a request for administrative review by Bechtel Energy
Construction Services, Inc. (“Employer”) of the Certifying Officer’s (“CO”) Final Determination denying
the above-captioned H-2B labor certification request. For the following reasons, the Board affirms the CO’s
denial of certification.
Procedural and Factual Background
On January 2, 2026, Employer filed an H-2B Application for Temporary Employment Certification
(“Application”) in the above-captioned case.3 As stated therein, Employer sought authorization to employ
50 Welder Journeyman for the period of April 1, 2026 to December 31, 2026 based on a temporary peakload
1 8 U.S.C. §§ 1101(a)(15)(H)(ii)(b), 1103(a), and 1184(a) and (c).
2 8 C.F.R. § 214.2(h) and 20 C.F.R. Part 655 Subpart A. On April 29, 2015, the Department of Labor and the
Department of Homeland Security jointly published an Interim Final Rule (IFR) amending the standards and
procedures that govern the H-2B temporary labor certification program. See Temporary Non-Agricultural
Employment of H-2B Aliens in the United States; Interim Final Rule, 80 Fed. Reg. 24,042 et seq. (Apr. 29, 2015).
All citations to 20 C.F.R. Part 655 in this decision and order are to the IFR.
3 Administrative File (“AF”), pp. 165-214.
- 2 -
need.4 In its Statement of Temporary Need, Employer indicated the requested workers would be working at
its Louisiana LNG Project (“Project”) worksite in Sulphur, Louisiana during its “peak welding phase.”5 In
support of its request, Employer included a payroll summary of its employed welders demonstrating that
Employer only employed two permanent welders from September 2023 through November 2023.6
Additionally, Employer included a staffing forecast curve that was alleged to demonstrate a need for 150
welders in April 2026 and over 300 welders in October 2026 before dropping in 2027.7 Despite its reported
need for several hundred more workers, Employer asserted that a majority of its welders will be U.S.
workers such that only 50 supplemental H-2B workers are required.8 Employer further asserted that it
regularly employs permanent journeyman but the LA LNG Project is a short-term demand above the normal
experience and supplemental workers would not become part of its regular, year-round staff.9
On February 5, 2026, the CO issued a Notice of Deficiency identifying two principal deficiencies in
Employer’s Application.10 As to the first deficiency, the CO determined that Employer had failed to
establish the job opportunity as temporary in nature in accordance with 20 C.F.R. § 655.6(a) and (b).11
Thereunder, the CO acknowledged that Employer’s need is based on a specific project but reasoned that
Employer will continue to be in the business of continually performing similar services.12 Further, the CO
noted that Employer’s past, present, and future welding projects were not disclosed so it is unclear how this
single project caused a temporary peakload need for 50 welder journeyman workers from April 1, 2026 to
December 31, 2026. Lastly, the CO emphasized that most projects or contracts are for a limited duration,
yet that alone was insufficient to determine what seasonal or short-term demand led to Employer’s peakload
need. To remedy this deficiency, the CO required Employer to provide the following information and
documentation:
1. A statement describing the employer’s business history, activities, and schedule of
operations throughout the year;
2. A summary listing all projects in the area for the 2024 and 2025 calendar years, with
start and end dates of each project, worksite addresses, and the number of Welder
Journeyman workers employed for each project;
3. An explanation of how a single contract represents a peakload need when Employer is
in the business of securing contracts for services on an ongoing basis, with supporting
documentation of how Employer determined it would not receive other contracts
requiring additional Welder Journeyman workers during different peakload periods in
the future;
4. Contracts for all the identified projects from above;
5. Updated summarized monthly payroll reports for the complete 2025 calendar year that
identify, for each month and separately for full-time permanent and temporary
employment of Welder Journeyman workers, the total number of workers or staff
employed, total hours worked, and total earnings received;
6. An explanation of the data in submitted payroll documentation; and
7. Other evidence and documentation that similarly serves to justify Employer’s
Application.13
4 AF, p. 163.
5 AF, p. 168; see also AF, pp. 178-181.
6 AF, pp. 168, 195.
7 AF, pp. 168, 197.
8 AF, p. 168.
9 Id.
10 AF, pp. 153-161.
11 AF, pp.158-160.
12 AF, p. 159.
13 AF, pp. 159-160.
- 3 -
The CO clarified that if Employer did not have the specific information and documents requested, Employer
must submit any other evidence and documentation relating to its current business activities and trade
industry that similarly serves to justify the dates of need requested for certification.14 The CO specifically
instructed that the employer must submit an explanation of exactly how the document(s) supported its
requested dates of need if not clear to a layperson.15
As to the second deficiency, the CO determined that Employer had failed to establish temporary need for
the number of workers requested in accordance with 20 C.F.R. § 655.11(e)(3) and (4),
20 C.F.R § 655.1(a)(1), and 20 C.F.R. § 655.6.16 Thereunder, the CO acknowledged that Employer
provided estimations of the number of temporary Welder Journeyman workers required but it did not
provide further documentation or explanation to establish the need for workers.17 To overcome this
deficiency, the CO directed Employer to provide the following supporting evidence:
1. An explanation with supporting documentation of why Employer is requesting 50
Welder Journeyman workers for Sulphur, Louisiana during the dates requested;
2. If applicable, documentation supporting the employer’s need for 50 Welder Journeyman
workers such as contracts, letters of intent, etc., that specify the number of workers and
dates of need;
3. Updated Summarized monthly payroll reports for the complete 2025 calendar year;
4. An explanation of the data in submitted payroll documentation; and
5. Other evidence and documentation that similarly serves to justify the number of workers
requested, if any.18
On February 20, 2026, Employer submitted a Response to the Notice of Deficiency (“Response”), which
included a written letter and 10 exhibits.19 As stated therein, Employer is a leading engineering,
procurement, and construction (EPC) company that is heavily involved in the liquefied natural gas (LNG)
industry.20 Employer reported that it has built approximately 50,000 miles of pipeline systems, more than
fifty major oil and gas field developments, and over 380 major chemical and petrochemical projects, and
has constructed and tested LNG storage tanks while building approximately one-third of the world’s LNG
liquefaction capacity.21 Under this Project, Employer indicated it is contracted to develop a large-scale,
multi-phase, LNG export terminal project located in Louisiana.22 To address the first deficiency identified
by the CO, Employer explained that it regularly employs permanent Welder Journeyman workers; the
contract to complete the Project has a near, definable future; and the welding phase is the portion of the
14 AF, p. 160.
15 Id.
16 AF, pp. 160-161.
17 AF, p. 161.
18 Id.
19 AF, pp. 37-152; see also AF, pp. 280, 286. While the Final Determination referenced an Amended Job Order as
Exhibit 11, said exhibit was not included in the Administrative File provided to the Board. Notwithstanding this
omission, the Board finds there is sufficient information within the Administrative File to support its decision for
the reasons discussed below.
20 AF, p. 41.
21 Id.
22 See generally, AF, pp. 41; see also AF, pp. 57-60 (Announcement); see also AF, pp. 62 (Online Article describing
project); see also AF, pp. 67-81 (Project Status Reports to Federal Energy Regulatory Commission); see also AF,
pp. 83-85 (Online Article); see also AF, pp. 45, 90-132 (EPC Agreement between Driftwood LNG LLC and
Employer). It is unclear how the terms of this EPC Agreement are relevant to this subsequently acquired Project
between Woodside Energy and Employer).
- 4 -
construction that demonstrated peakload need.23 To address the second identified deficiency, Employer
asserted that its request for 50 Welder Journeyman workers was justified by anticipated increases in welder
demand during the April 1, 2026 to December 31, 2026 period, resulting in a shortfall necessitating fifty
supplemental H-2B workers.24
On March 25, 2026, the CO issued a Final Determination denying Employer’s Application for failing to
cure the above-referenced deficiencies.25 With respect to the first deficiency, the CO found that Employer’s
explanation and documentation failed to show that its need for 50 welders from April through December
2026 was genuinely temporary.26 While Employer referred to this timeframe as the peak welding phase of
the Project, the CO determined that Employer's submitted evidence indicated otherwise. Specifically, the
CO reasoned that Employer’s filing history27 and supporting documentation demonstrate that this Project
is a multi-year project with inconsistent staffing forecasts that do not support a peak welding demand in
2026. The CO noted that Employer only submitted heavily redacted contract excerpts, which did not show
a defined end date or phase-specific staffing requirements supporting the purported peakload period.
Finally, the CO concluded that identifying one phase of work within a long, ongoing project is not enough
to establish temporary need and that general labor shortages do not convert a fundamentally permanent
need into a temporary one. With respect to the second deficiency, the CO found that Employer’s explanation
and documentation failed to demonstrate that its request for 50 Welder Journeyman workers represents
bona fide job opportunities.28 Although Employer submitted payroll summaries, staffing forecasts, and
general statements about increased welding demand, none of the materials explained or documented the
specific calculation leading to the numbering of fifty workers. Additionally, Employer did not provide
historical data, service contracts, or other documentation specifying required welder quantities. Without a
clear, evidence-based methodology tying the request to actual project demand, the CO concluded that
Employer had not met its burden to justify the number of positions requested.
On April 7, 2026, Employer submitted its Request for Administrative Review.29 Therein, Employer
requested that BALCA reverse the CO’s denial and grant certification for 50 Welder Journeyman for the
period of April 1, 2026 to December 31, 2026 or remand the matter to the CO for reconsideration.30
23 AF, p. 44; see also AF, pp. 134-133 (Summarized Payroll Records); see also AF, p. 137 (Staffing Forecast Graph);
see also AF, p. 139-143 (Slides of Explanation and Staffing Forecast); see also AF, p. 145-146 (Affidavit from
David Todd, Workforce Planning and Development Manager for Employer).
24 AF, pp. 48-50; see also AF, pp. 134-133 (Summarized Payroll Records); see also AF, p. 137 (Staffing Forecast
Graph); see also AF, p. 139-143 (Slides of Explanation and Staffing Forecast); see also AF, p. 145-146 (Affidavit
from David Todd, Workforce Planning and Development Manager for Employer).
25 AF, pp. 16-36.
26 AF, pp. 22-33.
27 See AF, pp. 24-25, 30, 231, 453, 458. The CO references Employer’s previously denied application, No. H-400-
25184-151541 seeking 50 Welder Journeyman under the same Project from October 1, 2025 to March 15, 2028, to
highlight inconsistencies in Employer’s representations. While the Board has upheld the CO’s practice of
considering previous applications filed by an employer in Hill N’ Dale Sales, 2016-TLN-00031 (April 14, 2016)
and JAJ Hauling, LLC, 2016-TLN-00054 (July 18, 2016), the CO here did not identify the prior application in its
Notice of Deficiency and Employer did not have the opportunity to clarify or respond to the perceived inconsistencies
prior to the issuance of the CO’s Final Determination. See 20 C.F.R. § 655.31. Accordingly, the undersigned will
not consider Employer’s previously denied application in review of this matter.
28 AF, pp. 33-36.
29 AF, pp. 1-14.
30 The scope of the Board’s review is limited to the appeal file prepared by the CO, any legal briefs submitted, and the
request for review, which may only contain legal argument and such evidence as was actually submitted to the CO
before the date the CO’s determination was issued. 20 C.F.R. § 655.61(a), (e). Accordingly, any arguments within
Employer’s Request for Administrative Review or documentation attached thereto that were not before the CO prior
to issuance of the Final Determination were not considered.
- 5 -
This matter was docketed on April 7, 2026 and assigned to the undersigned Administrative Law Judge on
April 8, 2026.31 The undersigned received the Administrative Appeal File on April 14, 2026. The CO did
not file a brief in this matter.32
Applicable Legal Authority
The H-2B program permits employers to hire foreign workers on a temporary basis to “perform temporary
service or labor if unemployed persons capable of performing such service or labor cannot be found in [the
United States].”33 Employers who seek to hire foreign workers through the H-2B program must apply for
and receive a “labor certification” from the United States Department of Labor, Employment and Training
Administration.34 To apply for this certification, an employer must file an Application for Temporary
Employment Certification with ETA’s National Processing Center.35 A petitioning employer must establish
that its need for the services or labor qualifies under one of the four standards of temporary need:36 a one-
time occurrence, a seasonal need, a peakload need, or an intermittent need. To demonstrate a peakload need,
the petitioner must establish that it regularly employs permanent workers to perform the services or labor
at the place of employment and that it needs to supplement its permanent staff at the place of employment
on a temporary basis due to a seasonable or short-term demand and that the temporary additions to staff
will not become a part of the petitioner’s regular operation.37 After an employer’s application has been
accepted for processing, it is reviewed by a certifying officer, who will either request additional information
or issue a decision granting or denying the requested certification.38 If the CO denies certification in whole
or in part, the employer may seek administrative review before BALCA.39
An employer bears the burden of proof to establish that it has met all requirements under the H-2B
program.40 BALCA’s standard of review in H-2B cases is limited, and may only consider the Appeal File
prepared by the CO, any legal brief submitted by the CO, and an employer’s request for administrative
review, which may only contain legal arguments and evidence that the employer submitted to the CO before
the date of the CO’s Final Determination.41 After considering the evidence of record, BALCA must: (1)
affirm the CO’s determination; (2) reverse or modify the CO’s determination; or (3) remand the case to the
CO for further action.42 A CO’s denial of certification must be upheld unless shown by an employer to be
arbitrary, capricious, or otherwise not in accordance with law.43
31 See Notice of Case Assignment and Order Establishing Expedited Briefing Schedule (April 9, 2026).
32 See Email Confirmation dated April 22, 2026.
33 8 U.S.C. § 1101(a)(15)(H)(ii)(b).
34 8 C.F.R. § 214.2(h)(6)(iii).
35 20 C.F.R. § 655.2(a).
36 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated Appropriations Act,
2016, Pub. L. No. 114-113, Division H, Title I, § 113 (2015). This definition has remained in place through
subsequent appropriations legislation, including the current legislation. See Consolidated Appropriations Act, 2026,
Pub. L. No. 119-75, Division B, Title I, § 111 (2026).
37 8 C.F.R. § 214.2(h)(6)(ii)(B)(3). The CO will review the Application and its accompanying documentation for
completeness and determine, in part, whether the employer’s need is temporary in nature, the number of worker
position and period of need are justified, and the request represents a bona fide job opportunity. 20 C.F.R. §
655.11(e)(2)-(4).
38 20 C.F.R. § 655.30
39 20 C.F.R. § 655.61(a).
40 8 U.S.C. § 1361; J&J Construction Company, 2019-TLN-00020 (January 30, 2019).
41 20 C.F.R. § 655.61(a)(5).
42 20 C.F.R. § 655.61(e).
43 Super Bob’s Lawn and Landscaping, LLC, 2021-TLN-00060, slip op. at 3 (August 27, 2021) (citing Brooks Ledge,
Inc., 2016-TLN-00033, slip op. at 5 (May 10, 2016)).
- 6 -
Discussion
1. Employer failed to submit all evidence or information requested by the CO to cure the
identified deficiencies.
If a CO determines that an employer’s application for temporary employment certification is incomplete,
contains errors or inaccuracies, or does not meet the regulatory standards, the CO will issue a Notice of
Deficiency to offer the employer an opportunity to cure the deficiency.44 The employer’s failure to comply
with a Notice of Deficiency, including not responding in a timely manner or not providing all required
documents, will result in a denial of the application.45 Notably, administrative errors in transmitting
documents to the CO cannot be forgiven.46
Here, the CO’s Notice of Deficiency requested a number of documents to support and substantiate
Employer’s Application. With respect to the first deficiency, the CO requested signed contracts that
included a description of the work to be performed for the identified projects.47 Employer did not submit a
signed contract with Woodside Energy with respect to the Project in question.48 Rather, Employer argued
that EPC contracts often do not explicitly define the specific number of workers or exact manpower level.49
In lieu of said contract, Employer submitted various online articles, status reports to FERC, and an EPC
Contract between Driftwood LNG LLC and Employer.50 However, these records do not serve as an
adequate substitute for a signed contract demonstrating work to be performed for this Project. First, the
articles and announcements only generally describe the project but do not provide specific information
regarding welding demands. Second, the status reports reflect project activities during certain reporting
periods, but it is unclear what, if any, welding demands are tied to the activities listed. Third, while
Employer explains that this Project was originally known as Driftwood LNG, there is no showing that the
terms of said contract were adopted by Woodside Energy when it took over the project from Tellurian.
Furthermore, as discussed below, this contract fails to demonstrate staffing needs in support of Employer’s
Application. Even if the Board credited Employer’s argument that EPC contracts often do not explicitly
define the specific number of workers or exact manpower level,51 the Notice of Deficiency specifically
advises Employer to submit other evidence and documentation that similarly serves to justify Employer’s
need.52 Accordingly, the undersigned finds that Employer did not submit all evidence or information
44 20 C.F.R. § 655.31.
45 20 C.F.R. § 655.32(a) (emphasis added); Jim Connelly Masonry, Inc., 2009-TLN-00052 (Apr. 23, 2009) (While the
employer has flexibility in selecting the type of documents to submit in support of its application, that flexibility
does not lessen the employer’s ultimate burden. The employer’s submission of agreement letters, which were not
legally binding, did not provide adequate evidence of its need to supplement its permanent workforce with
temporary workers during the stated time period); Saigon Restaurant, 2016-TLN-00053 (July 8, 2016) (CO’s denial
was proper when the employer did not submit a description of its business history, activities, and schedule of
operations along with other documentation sufficient to show its entitlement); Munoz Enterprises, 2017-TLN-00016
(January 19, 2017) (CO’s denial was affirmed when employer failed to provide adequate documentation such as
schedules or contracts to support its need for temporary workers); Erickson Construction, 2016-TLN-00036, (May
6, 2016) (BALCA upheld the CO’s denial of the temporary labor employment application because the CO could
not determine Employer’s workload increase after Employer failed to provide contracts specifying dates when work
would commence/end or the scope of work in relation to the amount of time or number of workers needed).
46 Fullerton Landscape Architects, 2014-TLC-00030 (May 23, 2014) (denial upheld where the employer sent an email
without requested attachment); Running Sports, 2016-TLN-00049 (June 20, 2016) (denial upheld where notice of
deficiency response was sent to incorrect email address).
47 AF, p. 159.
48 See AF, pp. 44-46.
49 AF, pp. 45-46.
50 AF, pp. 57-132.
51 AF, pp. 45-46.
52 See AF, p. 160.
- 7 -
requested by the CO. Given Employer’s burden of proof and regulatory obligation to submit the identified
documentation or a sufficient substitute, denial is appropriate for this reason alone.
2. Employer’s Response Failed to Overcome the Deficiencies stated in the Notice of Deficiency.
In order to obtain temporary labor certification for foreign workers under the H-2B program, the employer
is required to establish that its need for the requested workers is temporary.53 The employer’s need is
considered temporary if justified to the CO as one of the following: a one-time occurrence; a seasonal need;
a peakload need; or an intermittent need, as defined by the applicable regulations.54 To qualify as a peakload
need, the employer must establish that it regularly employs permanent workers to perform the services or
labor at the place of employment and that it needs to supplement its permanent staff at the place of
employment on a temporary basis due to a seasonable or short-term demand and that the temporary
additions to staff will not become a part of the petitioner’s regular operation.55
The applicable Regulations further provide the following:
Employment is of a temporary nature when the employer needs a worker for a limited
period of time. The employer must establish that the need for the employee will end in the
near, definable future. Generally, that period of time will be limited to one year or less, but
in the case of a one-time event could last up to 3 years.56
Furthermore, an employer must demonstrate a bona fide need for the number of workers and period of need
requested.57 The employer bears the burden of establishing why the job opportunity and number of workers
requested reflect a temporary need within the meaning of the H-2B program.58
53 8 C.F.R. § 214.2(h)(6)(ii)(A) (Temporary service or labor “refers to any job in which the petitioner’s need for the
duties to be performed by the employee(s) is temporary, whether or not the underlying job can be described as
permanent or temporary.”)
54 20 C.F.R. § 655.6(b); Alter and Son General Engineering, 2013-TLN-00003 (November 9, 2012) (affirming denial
where the Employer did not sufficiently provide an explanation regarding how its request fit within one of the
regulatory standards of temporary need); see also 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6)(ii)(B).
55 8 C.F.R. § 214.2(h)(6)(ii)(B)(3).
56 8 C.F.R. § 214.2(h)(6)(ii)(B); See Further Consolidated Appropriations Act, 2024, Pub. L. No. 118-47, Division D,
Title I, § 111 (2024); Full-Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No. 119-4, Division
A, Title I, §§ 1101(a)(8), 1105—1106 (2025) (extending the provisions of various appropriations acts, including the
relevant provisions of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025); Continuing
Appropriations, Agriculture, Legislative Branch, Military Construction and Veterans Affairs, and Extensions Act,
2026, Pub. L. No. 119-37, Division A, §§ 101, 106 (2025) (extending the relevant provisions of the Full-Year
Continuing Appropriations and Extensions Act, 2025, until either subsequent appropriations legislation is enacted
into law or January 30, 2026, whichever occurs first); Kiewit Offshore Services, LTD., 2013-TLN-00020 (Jan. 15,
2013) (affirming denial where the employer’s documentation revealed that the employer’s alleged “peak load” need
spanned at least a 19-month period).
57 20 C.F.R. § 655.11(e)(3) and (4). North Country Wreaths, 2012-TLN-00043 (Aug. 9, 2012) (affirming partial
certification where the employer failed to provide any evidence, other than its own sworn declaration, that it had a
greater need for workers this year than it did in 2012); Roadrunner Drywall, 2017-TLN-00035 (May 4, 2017)
(affirming denial where the employer’s temporary and permanent employee payroll data did not support its claimed
number of workers or period of need).
58 Empire Roofing, 2016-TLN-00065 (Sept. 15, 2016) (“An employer cannot just toss hundreds of puzzle pieces—or
hundreds of pages of document—on the table and expect a CO to see if he or she can fit them together. The burden
is on the applicant to provide the right pieces and to connect them so the CO can see that the employer has established
a legitimate temporary need for workers”); A B Controls & Technology, 2013-TLN-00022 (Jan. 17, 2013) (bare
assertions without supporting evidence are insufficient to carry an employer’s burden of proof); D & R Supply,
2013-TLN-00029 (Feb. 22, 2013) (affirming denial where the employer failed to sufficiently explain how its request
- 8 -
In the current case, Employer requested temporary labor certification for 50 Welder Journeyman from the
period of April 1, 2026 to December 31, 2026 based on a peakload need.59 Employer further attested that it
regularly employs permanent Welder Journeymen but has a short-term demand of nine months to cover its
“peak welding phase” during the Project. Employer further asserted that this Project has a definite-end and
that supplementary H2-B workers would not become part of its year-round staff.60
The undersigned is not persuaded by Employer’s documentary showing that it regularly employs permanent
Welder Journeyman workers.61 Rather, Employer’s documents suggest that it is in the business of
continually securing and fulfilling EPC contracts and the number of welders needed is largely volatile
depending on the contract or project phase.62 In its Application documents for this Project, Employer
provided a payroll form showing two permanent Welder Journeyman who worked a total of 282.50 hours
in September 2023, 390 hours in October 2023, and 244 hours in November 2023.63 In its Response to the
Notice of Deficiency, Employer supplemented the payroll records to show that it did not employ any Welder
Journeyman in the year 2024.64 Then, Employer hired two permanent Welder Journeyman in February
2025, increased to 19 permanent Welder Journeyman in July 2025, and then declined to nine permanent
Welder Journeyman in December 2025.65 Employer did not explain the reason for the inconsistent and
sporadic range of permanent Welder Journeyman working at this site from 2023 through 2025.
Furthermore, while the undersigned recognizes that these payroll records are limited to the Sulphur,
Louisiana location66 and the closest other project is in Port Arthur, Texas,67 Employer provides little
supporting documentation to contextually show how many Welder Journeyman workers are employed in
total, at which location or project site all permanent welders are assigned, and whether Employer can
temporarily reassign said permanent workers from other sites to this Project and location.68 Given the lack
of clarity and corroboration in this regard, it was reasonable for the CO to determine that Employer did not
demonstrate a temporary peakload need.69
Furthermore, there is no showing of how Employer defined its peakload need as of the period of April 1,
2026 to December 31, 2026.70 As discussed above, Employer’s payroll records and staffing forecasts do
for temporary labor certification met the regulatory criteria for a peakload, temporary need); Alter and Son General
Engineering, 2013-TLN-00003 (Nov. 9, 2012) (affirming denial where the Employer did not provide an explanation
regarding how its request fits within one of the regulatory standards of temporary need).
59 AF, pp. 163, 168.
60 AF, pp. 168.
61 Masse Contracting, 2015-TLN-00026 (April 2, 2015) (to utilize the peakload standard, the employer must have
permanent workers in the occupation).
62 Cajun Contractors, Inc., 2009-TLN-00096 (an employer who by nature of its business works on a project until
completion and then moves on to another has a permanent rather than a temporary need); Pronto Solutions Inc.,
2025-TLN-00003 (October 18, 2024) (finding that the existence of one contract for the requested dates does not, by
itself, establish a temporary need since Employer works on contracted projects year-round).
63 AF, p. 195; see also AF, p. 168 (Statement of Need).
64 AF, p. 135.
65 AF, pp. 134-135.
66 AF, pp. 134-135, 195.
67 AF, p. 42.
68 See AF, p. 55 (Employer hired zero welders in 2024 and 23 welders in 2025 at the Port Aurthur site). Notably, the
CO did not limit the request for additional payroll information to this location or project. See AF, pp. 159-160.
69 AF, pp. 22-33.
70 BMC West, 2016-TLN-00043 (May 16, 2016) (CO’s denial affirmed where the employer failed to provide sufficient
evidence to substantiate its dates of need and evidence of industry peak season need did not match the employer’s
purported need); Progressio, LLC, d/b/a La Michoacana Meat, 2013-TLN-00007 (Nov. 27, 2012) (affirming denial
where the employer’s payroll records did not demonstrate a consistent need for increased labor during the entire
alleged period of temporary need).
- 9 -
not demonstrate a consistent demand during the April to December months.71 In its Application, Employer
characterized said period as the “Peak Welding Phase”72 of the Project despite staffing forecast graphs
showing a rising need for welders beyond the December 2026 period.73 Employer does not clarify this
inconsistency. Furthermore, based on the documents provided, the undersigned is unable to determine the
scope of welding work, timeline for anticipated welding work during the requested period, and demand for
welding at other phases of the Project to determine a peakload period.74 As discussed above, Employer
simply provided general website articles announcing the Project, status reports to FERC that do not quantify
welding needs or timelines, and a previous contract between different parties.75 Even assuming that
Woodside Energy adopted the terms of that EPC contract, Employer heavily redacted or omitted over 60
pages of the contract, including pages addressing the commencement of work, project schedule, and
scheduling obligations.76 In consideration of the above-mentioned inconsistency and lack of demonstrable
corroboration, the undersigned finds that Employer fails to justify a peakload period from April 1, 2026 to
December 31, 2026.
Lastly, the undersigned is not persuaded that Employer’s number of requested workers represents a bona
fide job opportunity.77 In its statement of temporary need, Employer explained that its request for 50 Welder
Journeymen workers was based on staffing forecasts that purportedly demonstrate a need of 150 welders in
April 2026, a need for 300 welders in October 2026, and a reduced need in 2027.78 Contrary to those
assertions and staffing forecast, Employer’s supporting documents in its Response to Notice of Deficiency
claim that this Project will require 235 welders at the end of 2026.79 Employer did not clarify the internal
inconsistency in its projected numbers. Further, it remains unclear what data or information was used to
calculate the purported number of workers and whether said data or information is reliable. Notwithstanding
these significant foundational issues, Employer does not logically explain how it calculated a need for 50
supplemental workers given its changing staffing levels, anticipated hires, and conflicting forecasted need.
Rather, in its Response to the Notice of Deficiency, Employer simply concluded: (1) This project will require
235 welders at the end of 2026; (2) 21% (10 out of 48) of welder are within 100 miles of the project site;
(3) an estimated 79% of the total welder need (185) will be non-local; and (4) Employer expects slightly
under 30% of the remaining contested position (50) are fillable by temporary foreign workers.80 However,
71 See AF, pp. 134-135, 195.
72 AF, p. 168.
73 AF, pp. 197, 147 (Staffing forecast graph showing peak need for 427 workers needed though May 2027); see also
AF p. 141 (Staffing forecast graph showing peak number of 450 welders needed between September 2027 to
November 2027); see also AF, pp. 142 (Staffing forecast graph showing peak number of welders near September
2027); see also AF, p. 143 (Staffing forecast graph showing peak number of welders sometime between November
2026 to April 2027).
74 See Munoz Enterprises, 2017-TLN-00016 (Jan. 19, 2017) (an increase in construction work will not necessarily
result in a peakload need for employer; rather it depends on the amount of work the employer is contractually
obligated to perform, when such work must be performed, whether the employer’s contractual obligations overlap,
and how many permanent workers are employed in that occupation).
75 AF, pp. 57-132.
76 See AF, p. 92 (Table of Contents, Article 5 Commencement of Work, Project Schedule, and Scheduling
Obligations); see also AF, p. 95 (Attachments re: Scope of Work and Contractor Deliverables); Compare AF, pp.
45-46 (Employer asserts that EPC contracts focus on final results, project timeliness, and price rather than explicitly
defining the specific number of workers or exact manpower level).
77 20 C.F.R. § 655.11(e)(3) and (4); North Country Wreaths, 2012-TLN-00043, slip op. at 6 (Aug. 9, 2012) (It is the
employer’s burden to prove the requested positions represent bona fide job opportunities, and the CO is not required
to take the employer at its word”); Erickson Construction d/b/a Erickson Framing AZ LLC, 2016-TLN-00060 (Aug.
19, 2016) (assertions of an increase and reliance on industry wide data falls short of demonstrating employer’s
specific need for workers).
78 AF, p. 180. Compare AF, p. 197 (Staffing Forecast showing peak of 427 welders in May 2027).
79 AF, pp. 148.
80 AF, p. 139.
- 10 -
these representations do not appear to logically support the number of requested workers. Assuming a total
need of 235 workers in December 2026, minus 10 available local welders and 185 non-local welders to be
reassigned or hired, there is only a shortage of 40 workers. However, the shortage of 40 workers is not
further delineated between travelers, subcontractors, permanent welders, and temporary foreign workers.81
It therefore remains unclear how Employer calculated the need for 50 temporary foreign workers based on
the above information, and the affidavit from Employer’s Workforce Planning & Development Manager
simply regurgitating Employer’s conclusions and generalized claims of labor shortages does not cure this
deficiency.82 The Board therefore finds that Employer failed to show a temporary need for the number of
workers requested.
In sum, the CO’s Final Determination denied Employer’s January 2, 2026 H-2B Application for Temporary
Employment Certification, finding that Employer failed to establish the job opportunity as temporary in
nature as required by 20 C.F.R. § 655.6(a) and (b) and failed to establish a temporary need for the number
of workers requested pursuant to 20 C.F.R § 655.11(e)(3), (4); 20 C.F.R § 655.1(a)(1); and 20 C.F.R. §
655.6. After considering the entire record and applicable authority, the Board concludes that Employer has
not shown the CO’s denial of Employer’s Application to be arbitrary, capricious, or not in accordance with
applicable law.
ORDER
For the foregoing reasons, the Certifying Officer’s Final Determination denying Employer’s January 2,
2026 Application for Temporary Employment Certification is AFFIRMED.
SO ORDERED on April 27, 2026.
For the Board:
CHRISTINE HILLEREN-WILKINS
Administrative Law Judge
81 AF, pp. 47-53.
82 AF, pp. 145-145; see also AF, pp. 148-149.