DO-DECISION AND ORDER ON THE MERITS NUMBER OF PAGES 8 JUDGE ROSENOW DECISION AND ORDER AFFIRMING FINAL DETERMINATION OF CERTIFYING OFFICER — 2025TLN00134

2025TLN00134Dol Oalj

Texte intégral

UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS
Washington, DC
______________
Issue Date: 01 December 2025
BALCA Case No.: 2025-TLN-00134
ETA Case No.: H-400-25184-152429
In the Matter of:
PENNUM, INC.,
Employer.
Appearances:
Ronda Butler Harkey, Esq.
For Employer
Rebecca Nielsen, Esq.
Office of the Solicitor
United States Department of Labor
For the Certifying Officer
DECISION AND ORDER AFFIRMING FINAL
DETERMINATION OF CERTIFYING OFFICER
This case arises under the temporary nonagricultural labor or services provision of the
Immigration and Nationality Act1, and its implementing regulations.2 This proceeding is before
the Board of Alien Labor Certification Appeals (“BALCA”) pursuant to a request for
administrative review by Pennum, Inc. (“Employer”) of the Certifying Officer’s (“CO”) Final
Determination denying the above-captioned H-2B labor certification requests. For the following
reasons, the Board affirms the CO’s denial of certification.
1 8 U.S.C. §§ 1101(a)(15)(H)(ii)(b), 1103(a), and 1184(a) and (c).
2 8 C.F.R. § 214.2(h) and 20 C.F.R. Part 655 Subpart A. On April 29, 2015, the Department of Labor and
the Department of Homeland Security jointly published an Interim Final Rule (IFR) amending the
standards and procedures that govern the H-2B temporary labor certification program. See Temporary
Non-Agricultural Employment of H-2B Aliens in the United States; Interim Final Rule, 80 Fed. Reg.
24,042 et seq. (Apr. 29, 2015). All citations to 20 C.F.R. Part 655 in this decision and order are to the IFR.
- 2 -
Procedural and Factual Background
On July 3, 2025, Employer filed an H-2B Application for Temporary Employment
Certification (“Application”) in the above-captioned case.3 Therein, Employer requested 75
Welders from October 1, 2025 to July 31, 2026.4 In its Statement of Temporary Need, Employer
indicated:
[Employer], established in 2008 and headquartered in Houston, Texas, is a
minority-owned fabricator . . . . During each calendar year [Employer] fulfills long-
term fabrication and modular assembly contracts . . . . As of 2025, we manage and
fulfill over 20 discrete fabrication contracts, each with firm delivery schedules and
no operational slack to accommodate major additional work without supplemental
labor.
[Employer] has been awarded a modular fabrication subcontract by International
Plant Services (“IPS”) for the CP Chem Golden Triangle Polymers Project
(“GTP”). This project, located in Orange, Texas, involves the construction of a
major ethylene and polyethylene production facility and includes the fabrication
and assembly of over 50 large industrial process modules. . . . This work will take
place in a designated plant site in Orange, Texas. The scope is highly compressed
in schedule and substantial in volume with the temporary active fabrication period
running from October 1, 2025 through July 31, 2026. To fulfill this fixed-duration,
temporary project scope, [Employer] is requesting 75 temporary Welders under the
H-2B visa program to supplement our permanent team.5
Further, Employer explained that the short term increase in business activity, demand exceeding
its existing permanent workforce capacity, assurances temporary workers will not become part of
its regular operations, and defined end date support its Application.6 Along with its Application,
Employer submitted a copy of the job order, articles, project documents, corporate documents,
payroll information, and a prevailing wage determination.7
On July 22, 2025, the CO issued a Notice of Deficiency with respect to four issues in Employer’s
application.8 As to the first deficiency, the CO determined Employer failed to establish the job
opportunity as temporary in nature in accordance with 20 C.F.R. § 655.6(a) and (b).9 Specifically,
the CO highlighted Employer’s statements that suggested the temporary workers would not be
acting as a supplement to its permanent workforce when the temporary workers would be working
on a separate project in a different location.10 Further, the CO stated that securing a contract does
not create a peakload need when business operates year round and temporary Welders were
3 Administrative File (“AF”), pp. 250-340.
4 AF, p. 251.
5 AF, p. 268, see also AF, p. 256.
6 AF, pp. 269-271.
7 AF, pp. 271-345.
8 AF, pp. 238-249.
9 AF, p. 243.
10 AF, pp. 244-245.
- 3 -
employed before and after the requested peak season.11 To remedy this deficiency, the CO
required Employer to provide the following information and documentation:
1. A statement describing the employer’s business history, activities, and schedule
of operations throughout the year;
2. A summary listing of all projects in the area of intended employment for the
previous two calendar years;
3. Summarized payroll reports for the three previous calendar years for full-time
permanent and temporary Welders;
4. An explanation of the data in submitted payroll documents; and
5. Other evidence and documentation that similarly serves to justify the dates of
need being requested for certification.12
The CO also clarified that if Employer does not have the specific information and documents
requested, “the employer must submit any other evidence and documentation relating to the
employer’s current business activities and the trade industry that similarly serves to justify the
dates of need being requested for certification.”13 The Notice of Deficiency specifically instructed:
If the submitted document(s) and its relationship to the employer’s need is not clear to a lay person,
then the employer must submit an explanation of exactly how the document(s) supports its
requested dates of need.14
As to the second deficiency, the CO determined Employer failed to establish temporary need for
the number of workers requested in accordance with 20 C.F.R. § 655.11(e)(3) and (4),
20 C.F.R § 655.1(a)(1), and 20 C.F.R. § 655.6.15 Among other things, CO stated that payroll
reports show that temporary staff are the main workforce and it appears that Employer has
permanent positions available. As a result, the Department was unable determine the actual number
of workers needed for the job opportunities.16 To address this deficiency, the CO requested
Employer provide the following supporting evidence:
1. An explanation with supporting documentation of why the employer is
requesting 75 Welders for the Orange, Texas worksite during the requested
period;
2. An explanation with supporting documentation of why the employer has
historically employed more temporary Welders than permanent Welders
3. Documentation supporting the employer’s need for 75 Welders such as
contracts, letters of intent, etc. that specify the number of workers and dates of
need;
4. Summarized monthly payroll reports for a minimum of three previous calendar
years that separately identify full-time permanent and temporary Welders;
5. An explanation of the data in submitted payroll documentation; and
11 Id.
12 AF, p. 245.
13 Id.
14 AF, p. 246.
15 Id.
16 AF, pp. 246-247.
- 4 -
6. Other evidence and documentation that similarly serves to justify the number of
workers requested, if any.17
Additionally, with respect to the third deficiency, the CO determined Employer must submit an
amended job order in accordance with 20 C.F.R. § 655.18(a)(1).18 Lastly, as to the fourth
deficiency, the CO determined Employer’s application did not comply with disclosure of foreign
worker recruitment requirements in accordance with 20 C.F.R. §655.9 (a) and (b). 19
On August 4, 2025, Employer submitted a Response to the Notice of Deficiency and various
supporting documents.20 In its Response, Employer explained that the project-specific surges in
operations meet the definition of the peakload need because they arise from a short-term, high
value contract; are clearly defined in scope and duration; require temporary supplemental labor;
and conclude with no ongoing operation necessity in the area of need.21 Employer further
explained that the number of requested workers was based on the required man-hours to execute
the project scope of work.22 Further, Employer acknowledged and addressed the issues with
respect to the job order assurances and disclosure of foreign worker recruitment.23
On August 27, 2025, the CO issued a Final Determination denying the Application for failing to
cure the first and second deficiencies above.24 With respect to the first deficiency, the CO found
that Employer appears to be in the business of securing contracts for its services and appears to
have a permanent, ongoing need for workers, even though its contracts and projects may be of a
limited duration.25 Additionally, the CO found that the payroll does not show that the temporary
workers were acting as a “supplement” to an already-existing permanent workforce.26 As a result,
the CO concluded that Employer’s need for workers vary depending on timing and scope of
contracts, rather than an established peakload period from October 1, 2025 through July 31, 2026.27
With respect to the second deficiency, the CO recognized that Employer’s calculation method was
driven by a single contract, payroll data showed enough additional work to support the 75
temporary Welders throughout the entire year, not specifically during the requested period of
need.28
17 AF, p. 248.
18 AF, pp. 248-249.
19 AF, p. 249.
20 AF, pp. 197-237.
21 AF, pp. 197-199; see also AF, pp. 204-216.
22 AF, pp. 199-201; see also AF, p. 222.
23 AF, pp. 201-202, see also AF pp. 229-237.
24 AF, pp. 182-195.
25 AF, p. 190.
26 Id.
27 AF, p. 191.
28 AF, pp. 191-195. BALCA’s review is limited to the information contained in the record before the CO at
the time of the final determination; only the CO has the ability to accept documentation after the final
determination. See Clay Lowry Forestry, 2010-TLN-00001, slip op. at 3 (Oct. 22, 2009); Hampton Inn,
2010-TLN-00007, slip op. at 3-4 (Nov. 9, 2009); Earthworks, Inc., 2012-TLN-00017, slip op. at 4-5 (Feb.
21, 2012), (“[t]he scope of the Board’s review is limited to the appeal file prepared by the CO, legal briefs
submitted by the parties, and the request for review, which may only contain legal argument and such
- 5 -
On September 10, 2025, Employer submitted its Request for Administrative Review.29 The matter
was docketed and subsequently assigned to the Covington District Office. On September 12, 2025,
a Notice of Case Assignment and Order Establising Expedited Briefing Schedule was issued.
Following a lapse in government funding, OALJ and BALCA offices were closed from October
1, 2025 to November 12, 2025. The matter was reassigned and the undersigned received the
Administrative File on November 17, 2025. The CO did not file a brief.
Applicable Legal Authority
The H-2B program permits employers to hire foreign workers on a temporary basis to “perform
temporary service or labor if unemployed persons capable of performing such service or labor
cannot be found in [the United States].”30 Employers who seek to hire foreign workers through the
H-2B program must apply for and receive a “labor certification” from the United States
Department of Labor, Employment and Training Administration.31 To apply for this certification,
an employer must file an Application for Temporary Employment Certification with ETA’s
National Processing Center.32 After an employer’s application has been accepted for processing,
it is reviewed by a certifying officer, who will either request additional information or issue a
decision granting or denying the requested certification.33 The CO may only grant an employer’s
application to admit H-2B workers for temporary nonagricultural employment if that employer has
demonstrated that: (1) insufficient qualified U.S. workers are available to perform the temporary
services or labor for which that employer desires to hire foreign workers; and (2) employing H-2B
workers will not adversely affect the wages and working conditions of U.S. workers similarly
employed.34 If the CO denies certification in whole or in part, the employer may seek
administrative review before BALCA.35
An employer bears the burden of proof to establish that it has met all requirements under the H-2B
program.36 BALCA’s standard of review in H-2B cases is limited, and may only consider the
Appeal File prepared by the CO, any legal brief submitted by the CO, and an employer’s request
for administrative review, which may only contain legal arguments and evidence that the employer
submitted to the CO before the date of the CO’s final determination.37 A CO’s denial of
certification or extension thereof must be upheld unless shown by an employer to be arbitrary,
evidence that was actually submitted to the CO in support of the application. 20 C.F.R. § 655.33(a), (e).
Here, Employer submitted a Motion for Administrative Review and what appears to be duplicate copies
of supporting documents that were already part of the Administrative File. In accordance with above, the
undersigned will only consider and rely on original submissions in the Administrative File.
29 AF, pp. 1-181.
30 8 U.S.C. § 1101(a)(15)(H)(ii)(b).
31 8 C.F.R. § 214.2(h)(6)(iii).
32 20 C.F.R. § 655.2(a).
33 20 C.F.R. § 655.30
34 20 C.F.R. § 655.50(b).
35 20 C.F.R. § 655.61(a).
36 J&J Construction Company, 2019-TLN-00020 (January 30, 2019); D & R Supply, 2013-TLN-00029
(February 22, 2013) (citing 8 U.S.C. §1361); Cajun Contractors, 2011-TLN-00004 (Jan. 10, 2011);
BMGR Harvesting, 2017-TLN-00015 (Jan. 23, 2017).
37 20 C.F.R. § 655.61(a)(5).
- 6 -
capricious, or otherwise not in accordance with law.38 After considering the evidence of record,
BALCA must: (1) affirm the CO’s determination; (2) reverse or modify the CO’s determination;
or (3) remand the case to the CO for further action.39
Discussion
In order to obtain temporary labor certification for foreign workers under the H-2B program the
employer is required to establish that its need for the requested workers is temporary.40
Employment is of a temporary nature when the employer needs a worker for a limited period. An
employer must establish that its need for temporary services or labor “will end in the near,
definable future,” which is generally limited to one year or less, but in the case of a one-time event
could last up to three years if an application for an extension is granted.41
The employer’s need is considered temporary if justified to the CO as one of the following: a one-
time occurrence; a seasonal need; a peakload need; or an intermittent need, as defined by
DHS regulations.42 To qualify as a peakload need, the employer must establish that it regularly
employs permanent workers to perform the services or labor at the place of employment and that
it needs to supplement its permanent staff at the place of employment on a temporary basis due to
a seasonable or short-term demand and that the temporary additions to staff will not become a part
of the petitioner’s regular operation.43
Here, Employer requested 75 Welders from October 1, 2025 to July 31, 2026 based on a purported
peakload need. Employer asserted that its need for temporary workers is driven by project-specific
38 Under the arbitrary and capricious standard, the reviewing judge or panel looks to see if the initial decision
maker examined the relevant data and articulated a satisfactory explanation for its action including a
rational connection between the facts found and the choice made. If the agency relied on factors which
Congress did not intend it to consider, entirely failed to consider an important aspect of the problem,
offered an explanation for its decision that runs counter to the evidence before the agency, or is so
implausible that it could not be ascribed to a difference in view or the product of agency expertise, then
it is arbitrary and capricious. See Jose Uribe Concrete Const., 2019-TLN-00025, at 4 (Feb. 21, 2019);
Super Bob’s Lawn and Landscaping, LLC, 2021-TLN-00060, slip op. at 3 (August 27, 2021), citing
Brooks Ledge, Inc., 2016-TLN-00033, slip op. at 5 (May 10, 2016).
39 20 C.F.R. § 655.61(e).
40 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). See Further Consolidated
Appropriations Act, 2024, Pub. L. No. 118-47, Division D, Title I, § 111 (2024); Full-Year Continuing
Appropriations and Extensions Act, 2025, Pub. L. No. 119-4, Division A, Title I, §§ 1101(a)(8), 1105—
1106 (2025) (extending the provisions of various appropriations acts, including the relevant provisions
of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025); Continuing
Appropriations, Agriculture, Legislative Branch, Military Construction and Veterans Affairs, and
Extensions Act, 2026, Pub. L. No. 119-37, Division A, §§ 101, 106 (2025) (extending the relevant
provisions of the Full-Year Continuing Appropriations and Extensions Act, 2025, until either subsequent
appropriations legislation is enacted into law or January 30, 2026, whichever occurs first).
41 8 C.F.R. § 214.2(h)(6)(ii)(B).
42 20 C.F.R. § 655.6(b); Alter and Son General Engineering, 2013-TLN-00003 (November 9, 2012)
(affirming denial where the Employer did not sufficiently provide an explanation regarding how its
request fit within one of the regulatory standards of temporary need); see also 8 U.S.C. §
1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6)(ii)(B).
43 8 C.F.R. § 214.2(h)(6)(ii)(B)(3).
- 7 -
surges and it does not rely on temporary workers as a substitute for permanent labor. Specifically,
this need was prompted by an awarded subcontract to construct a production facility and over 50
large industrial process modules outside of its usual production facility and beyond the capacity of
its permanent workforce. Employer further explained it cannot reassign or reallocate permanent
personnel away from other projects due to contractual obligations and the temporary workers
would be dedicated exclusively to this project.
While a certain project may drive a peakload need, Employer’s need, not a singular contract must
be shown to be temporary.44 Here, Employer’s business model of securing contracts, appears to
result in a permanent, ongoing need for workers, even though individual contracts may be of a
limited duration. Employer’s practice45 of utilizing temporary employees and payroll records
support this conclusion. Historical payroll records show that Employer has heavily relied on
temporary employees year round and outside of the purported peakload period.46 For instance, in
2023, Employer employed significantly more temporary workers than permanent workers every
month but for September. Further, in 2024, Employer employed significantly more temporary
workers than permanent workers for each month but for October, November and December.
Although Employer argued this fluctuation confirms its need for temporary welders is short-term
and project specific, there is no explanation of how permanent workers are sufficient to maintain
regular operations.47 Considering this historical data, coupled with the fact that this contract is
treated as distinct and separate from Employer’s main operations in Houston, Texas, the CO was
correct to conclude that temporary workers are not acting as the occasional “supplement” to
Employer’s permanent workforce.48
Accordingly, I find that the record before the Board does not establish that the CO erred in the
denial of certification. Employer bears the burden of establishing entitlement to labor certification,
through compliance with all requirements in the regulation, and it did not meet that burden here.
Thus, no further discussion on the second deficiency is necessary.
///
44 Pennum, Inc., 2024-TLN-0071 (December 29, 2023); see also Industrial Equipment Solutions, Inc.,
2018-TLN-00147 and 2018-TLN-00148 (July 13, 2018).
45 AF, p. 198 (Employer states that it is their standard practice to maintain a core team while occasionally
scaling labor through temporary staff for high volume projects).
46 Progressio, LLC, d/b/a La Michoacana Meat, 2013-TLN-00007 (Nov. 27, 2012) (affirming denial where
the employer’s payroll records did not demonstrate a consistent need for increased labor during the entire
alleged period of temporary need); Los Altos Mexican Restaurant, 2016-TLN-00073 (Oct. 28, 2016)
(payroll records do support alleged period of need).
47 Empire Roofing, 2016-TLN-00065 (Sept. 15, 2016) (“An employer cannot just toss hundreds of puzzle
pieces—or hundreds of pages of document—on the table and expect a CO to see if he or she can fit them
together. The burden is on the applicant to provide the right pieces and to connect them so the CO can
see that the employer has established a legitimate temporary need for workers”); D & R Supply, 2013-
TLN-00029 (Feb. 22, 2013) (affirming denial where the employer failed to sufficiently explain how its
request for temporary labor certification met the regulatory criteria for a peak load, temporary need).
48 AF, p. 190.
- 8 -
ORDER
Based on the foregoing, the Certifying Officer’s Final Determination denying Employer’s July 4,
2025 Application for Temporary Employment Certification is AFFIRMED.
SO ORDERED on December 1, 2025.
For the Board:
PATRICK M. ROSENOW
Regional Chief Administrative Law Judge

Poursuivez vos recherches dans ChatGPT ou Claude

Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.