CourtListener 10754797•The Boeing Co. v. Regional Water Quality Control Bd CA2/5
The Boeing Co. v. Regional Water Quality Control Bd CA2/5
CourtListener 10754797Calctapp12 déc. 2025
Texte intégral
Filed 12/12/25 The Boeing Co. v. Regional Water Quality Control Bd CA2/5
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions
not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion
has not been certified for publication or ordered published for purposes of rule 8.1115.
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
SECOND APPELLATE DISTRICT
DIVISION FIVE
THE BOEING COMPANY, B344489
Plaintiff and Appellant, (Los Angeles County
Super. Ct. No.
v. 23STCP04550)
REGIONAL WATER QUALITY
CONTROL BOARD, LOS
ANGELES REGION,
Defendant and
Respondent.
APPEAL from an order of the Superior Court of Los
Angeles County, Stephen I. Goorvitch, Judge. Affirmed.
Jones Day, Thomas M. Donnelly and David J. Feder, for
Plaintiff and Appellant.
Rob Bonta, Attorney General, Evan Eickmeyer, Acting
Senior Assistant Attorney General, Jennifer Kalnins Temple,
Supervising Deputy Attorney General, and Dylan Redor, Deputy
Attorney General, for Defendant and Respondent.
******
For years now, the Boeing Company (Boeing) has been
engaged in environmental cleanup of the now-defunct Santa
Susana Field Laboratory (the site). Effective January 1, 2024,
the Regional Water Quality Control Board for the Los Angeles
Region (the Regional Board) issued Boeing a stormwater
discharge permit with two new requirements—namely, (1) a
requirement that Boeing monitor pollutants called
polychlorinated biphenyls (PCBs) in the stormwater runoff using
a sensitive testing method, and (2) a requirement that Boeing
limit the quantum of aluminum in stormwater runoff discharged
from the site. On appeal, Boeing argues that the first
requirement is invalid because the Regional Board did not first
balance the burdens of the more sensitive testing method against
its benefits, as mandated by Water Code section 13267,
subdivision (b) (section 13267(b)),1 and that the second
requirement is unwarranted because insufficient evidence ties
the aluminum levels in the stormwater runoff to the prior
industrial activity at the site. Because Boeing has failed to show
how the Regional Board’s error in failing to apply section
13267(b) was prejudicial, and because substantial evidence
supports the Regional Board’s finding that the aluminum levels
1 All further statutory references are to the Water Code
unless otherwise indicated.
2
are associated with industrial activity at the site, we affirm the
trial court’s denial of Boeing’s petition for a writ of administrative
mandate.
FACTS AND PROCEDURAL BACKGROUND
I. The Site
The site is a 2,850-acre property, comprised of developed
and undeveloped land, located in the Simi Hills of Ventura
County, California. More than 700,000 people live within 10
miles of the site.
From the 1950s through the mid-1970s, the site was used
by Boeing or its predecessors for research and development, as
well as the assembly, disassembly, and testing of rocket engines
and chemical lasers. The U.S. Department of Energy also
conducted research and development of energy-related programs
and seismic testing at the site, using nuclear reactors until 1980;
NASA operated rocket engine assembly and testing at the site
until 2006. Various pollutants were used during these
operations. Although industrial activity at the site ceased nearly
two decades ago, the site today still operates for cleanup and
remediation purposes to address the significant pollutants that
still remain.
The site is currently owned in part by Boeing and in part
by the federal government. This case concerns Boeing’s role at
the site.
II. Stormwater Discharge Permits at the Site
Although California’s Department of Toxic Substance
Control is the “lead agency” for soil and groundwater clean-up at
the site, this case concerns only the Regional Board’s oversight.
As pertinent here, the Regional Board issues a permit—
also known as waste discharge requirements (WDR)—that
3
governs the stormwater that may be discharged from the site.
Every time it rains or snows, stormwater traverses the site and
picks up pollutants remaining in the soil. For the majority of the
stormwater that flows over the site, that stormwater is first
“captured” in holding ponds, where it can be monitored and, if
warranted, conveyed to a treatment system; the stormwater is
then discharged through “outfalls” into nearby creeks and
tributaries that flow to the Los Angeles River. As pertinent here,
the permit issued by the Regional Board specifies how Boeing is
to (1) monitor specified pollutants in the stormwater, and (2)
treat specified pollutants so that only a maximum allowable
concentration of those pollutants (in the vernacular, an “effluent
limitation”) is discharged into the waterways. (See City of
Burbank v. State Water Resources Control Bd. (2005) 35 Cal.4th
613, 618-619 (Burbank); 33 U.S.C. § 1362(11).)
The site has the potential to discharge approximately 187
million gallons per day of stormwater runoff that may contain
pollutants.
A. Prior permits
The Regional Board has issued stormwater discharge
permits to Boeing for the site since 1998. In the last 16 years,
Boeing has expended over $100 million to improve stormwater
quality at the site.
B. The current permit issued in 2024
In 2019, Boeing applied to renew its stormwater discharge
permit.
After circulating several drafts, analyzing over 20,000 data
points, and convening multiple highly attended public meetings
at which Boeing, local government and tribal officials, community
and non-profit organizations, and individual stakeholders
4
provided comments, the Regional Board adopted the current
permit on October 19, 2023. It became effective on January 1,
2024 (the 2024 permit).
This case concerns two specific conditions of the 2024
permit.
1. PCB monitoring
PCBs—an acronym for polychlorinated biphenyls— “are a
group of man-made organic chemicals” that “were manufactured
in the United States” starting in 1929 and were used in
“hundreds of industrial and commercial applications” including
“military and defense” work, until PCBs were banned in 1979.
They are “highly persistent in the environment” and can cause
acute chronic health effects. PCBs “generally occur as mixtures
of congeners,” with “the most common commercial mixtures”
being “aroclors.”
While the prior permit required Boeing to monitor the
aroclors (that is, the mixtures) using a testing method known as
Method 608.3, the 2024 permit requires Boeing to monitor PCBs
“as aroclors” using Method 608.3 and to monitor PCBs “as
congeners” (that is, the underlying components) using “[M]ethod
1668C or . . . a high resolution EPA-approved method.” With
regard to the PCB monitoring requirement generally (but not
with regard to the new congeners requirement specifically), the
Regional Board explained that PCB data is “important” to
monitor “for informational purposes” due to “changes in the
nature and quality of stormwater discharges” as “more intense
storm events and increased frequency of wildfires” occur as a
result of climate change. The Regional Board had also received a
public comment noting that groups monitoring the Los Angeles
River using a congener analysis had tracked PCBs “well above
5
the human health criterion.” The Regional Board did not
examine, or otherwise engage in any balancing, as to whether the
additional PCB congener monitoring requirement bore a
reasonable relationship to what it estimated were the costs of
that requirement.2
2. Aluminum effluent limitation
While the prior permit required Boeing merely to monitor
aluminum levels in the stormwater, the 2024 permit imposes an
effluent limitation for aluminum that requires Boeing to
ensure—by treatment or otherwise—that the concentration of
aluminum in the stormwater discharge does not exceed 1 mg/L.
The Regional Board based this new requirement on
evidence of nine separate exceedances of aluminum reported at
various outfalls on the site during the term of the prior permit,
and on knowledge that aluminum had a historical “industrial
application” as “a component in solid rocket propellants” and as
“a building material for space shuttles and equipment.”
C. Administrative exhaustion
Boeing submitted written and oral comments to the draft
2024 permit objecting to the additional PCB monitoring
requirement and to the aluminum effluent limitation. After the
2024 permit was adopted, Boeing exhausted its administrative
remedies by presenting a petition for review to the Regional
2 The Board had engaged in such a balancing analysis before
imposing a different requirement—namely, an infiltration study
to examine whether the unlined stormwater holding ponds
should be redesigned to prevent pollutants from leaching out of
the ponds and into the groundwater. Boeing challenged the
imposition of this requirement in its writ petition, but the trial
court denied that portion of the writ and Boeing has not appealed
that ruling.
6
Board on November 11, 2023, which was deemed denied by the
Regional Board’s inaction on the petition.
II. Trial Court Proceedings
A. Petition for writ of administrative mandate
In December 2023, Boeing filed a petition for a writ of
administrative mandate in the trial court seeking, as pertinent
here, to “remove” the “conditions” in the 2024 permit requiring
Boeing to (1) monitor PCBs using Method 1668C and (2) satisfy
the aluminum effluent limitation.3 Boeing subsequently filed the
operative, first amended petition.
B. Briefing
The parties addressed Boeing’s two challenges to the 2024
permit in their trial briefs. As for the use of Method 1668C to
monitor PCB congeners, Boeing argued that the Regional Board
failed to balance the benefits against the burdens of that method
as required by section 13267(b), while the Regional Board argued
that the statute did not apply at all and that an adequate
analysis was conducted even if the statute did apply. As for the
aluminum effluent limitation, Boeing argued that the evidence
“decisively” showed that aluminum in the stormwater was a
“naturally occurring constituent” rather than caused by any prior
industrial activity, while the Regional Board argued that the
evidence satisfied the standard of showing aluminum is
“associated with” Boeing’s activity at the site.
3 Boeing’s petition challenged four other conditions in the
permit. The trial court granted the petition as to two of those
conditions and denied the petition as to the other two conditions,
but neither the Regional Board nor Boeing has challenged those
rulings on appeal.
7
C. Ruling
Following a hearing, the trial court on December 30, 2024,
issued an order denying Boeing’s writ petition. The court ruled
that the additional PCB monitoring requirement was not invalid
for failure to apply section 13267(b), because that section did not
apply to the 2024 permit as a matter of statutory construction.
The court also ruled that the Regional Board’s findings justifying
the aluminum effluent limitation were “supported by the weight
of the evidence.”
III. Appeal
Boeing timely filed this appeal.
DISCUSSION
A party aggrieved by an order of a regional board may
obtain review in the trial court by filing a petition for writ of
mandate. (§ 13330, subd. (b); City of Duarte v. State Water
Resources Control Bd. (2021) 60 Cal.App.5th 258, 268 (Duarte).)
A writ of mandate seeking review of an administrative agency’s
determination is appropriately granted when the agency has
“prejudicial[ly] abuse[d] [its] discretion.” (Code Civ. Proc., §
1094.5, subd. (b); Malaga County Water Dist. v. Central Valley
Regional Water Quality Control Bd. (2020) 58 Cal.App.5th 418,
445 (Malaga).) The burden of showing both an abuse of
discretion and prejudice rests upon Boeing, as the appealing
party. (Gooden v. County of Los Angeles (2024) 106 Cal.App.5th
1, 14 (Gooden).)
In challenging the trial court’s ruling that the Regional
Board was not obligated under section 13267(b) to examine the
benefits and burdens of Method 1668C for monitoring PCBs,
Boeing challenges the trial court’s interpretation of the Water
Code; that is an issue we review de novo. (Family Health Centers
8
of San Diego v. State Dept. of Health Care Services (2021) 71
Cal.App.5th 88, 97.) In challenging the trial court’s ruling that,
in its independent judgment, the administrative record supported
the imposition of the aluminum effluent limitation (§ 13330,
subd. (e); Code Civ. Proc., § 1094.5, subd. (c)), Boeing challenges
the trial court’s interpretation of the Water Code as well as the
trial court’s factual findings. We review the former de novo
(Family Health, at p. 97), and review the latter for substantial
evidence (Fukuda v. City of Angels (1999) 20 Cal.4th 805, 824
(Fukuda)), bearing in mind that a trial court’s adoption of an
agency’s factual findings enjoys a “strong presumption of
correctness” grounded in “deference” to the agency and its
“technical expertise.” (Barclay Hollander Corp. v. California
Regional Water Quality Control Bd. (2019) 38 Cal.App.5th 479,
497; Fukuda, at p. 817; Sweeney v. California Regional Water
Quality Control Bd. (2021) 61 Cal.App.5th 1093, 1112 (Sweeney);
see also Divers’ Environmental Conservation Organization v.
State Water Resources Control Bd. (2006) 145 Cal.App.4th 246,
252 (Divers).)
I. Governing Law
The permit issued by the Regional Board in this case is
governed by a “complex” “web” of state and federal statutes and
regulations aimed at protecting the quality of our local and
national waters. (Burbank, supra, 35 Cal.4th at p. 619; City of
Rancho Cucamonga v. Regional Water Quality Control Bd. (2006)
135 Cal.App.4th 1377, 1380 (Rancho Cucamonga).)
A. California’s Porter-Cologne Water Quality
Control Act
In 1969, California enacted the Porter-Cologne Water
Quality Control Act (§ 13000 et seq.) (the Porter-Cologne Act) to
9
“attain the highest water quality which is reasonable, considering
all demands being made and to be made on those waters and the
total values involved, beneficial and detrimental, economic and
social, tangible and intangible.” (§ 13000; Burbank, supra, 35
Cal.4th at p. 619.) The State Water Resources Control Board and
nine regional boards are the “principal state agencies charged
with enforcing” the Porter-Cologne Act. (§ 13001; see § 13200,
subd. (d) [Los Angeles region]; Sweeney, supra, 61 Cal.App.5th at
p. 1113; Burbank, at p. 619; Building Industry Assn. of San Diego
County v. State Water Resources Control Bd. (2004) 124
Cal.App.4th 866, 875 (Building Industry).) They do so by
creating “water quality control plans” (§ 13241) and “prescrib[ing]
requirements as to the nature of any proposed discharge” that
may affect water quality. (§ 13263, subd. (a); Coastal
Environmental Rights Foundation v. California Regional Water
Quality Control Bd. (2017) 12 Cal.App.5th 178, 181 (Coastal);
Building Industry, at p. 875; Dept. of Finance v. Commission on
State Mandates (2017) 18 Cal.App.5th 661, 668 (Dept. of
Finance).)
B. The federal Clean Water Act
After the enactment of the Porter-Cologne Act, Congress in
1972 enacted what is now known as the Clean Water Act (33
U.S.C. § 1251 et seq.).4 (Burbank, supra, 35 Cal.4th at p. 625.)
The goal of the Clean Water Act is “to restore and maintain the
chemical, physical, and biological integrity of the Nation’s
waters” by, aspirationally, eliminating all discharges of
4 The precursor law was codified in 1948 as the Federal
Water Pollution Control Act. (Building Industry, supra, 124
Cal.App.4th at p. 872.)
10
pollutants in the United States by the year 1985. (33 U.S.C. §
1251(a).)
The Clean Water Act prohibits the discharge of pollutants
from a “point source,” such as the outfalls at the site here, into
navigable waters of the United States unless the discharger has a
permit. (33 U.S.C. § 1311(a); Building Industry, supra, 124
Cal.App.4th at pp. 872-873.) The National Pollutant Discharge
Elimination System (NPDES) sets out the conditions under
which a permit can be issued, including for discharges of
stormwater runoff.5 (33 U.S.C. § 1342(a) & (b); Association to
Protect Hammersley, ELD, and Totten Inlets v. Taylor Resources,
Inc. (9th Cir. 2002) 299 F.3d 1007, 1009 (Hammersley); National
Resources Defense Council, Inc. v. United States E.P.A. (9th Cir.
1992) 966 F.2d 1292, 1295 (NRDC); California Sportfishing
Protection Alliance v. Shiloh Group, LLC (N.D. 2017) 268
F.Supp.3d 1029, 1040 (Sportfishing) [NPDES permitting is the
“‘centerpiece’” of the Clean Water Act].)
C. Implementation of federal law in California
The federal Clean Water Act empowers states to issue
NPDES permits as long as the states’ enforcement of water
quality complies with the federal standards—that is, as long as
the state-issued permit imposes water quality standards that are
equal to or more stringent than the federal standards. (33 U.S.C.
§§ 1342(a)-(b), 1370; § 13377; Burbank, supra, 35 Cal.4th at pp.
618, 620; NRDC, supra, 966 F.2d at p. 1295; Dept. of Finance,
5 Federal law did not regulate stormwater discharges
specifically until Congress amended the Clean Water Act in 1987.
(33 U.S.C. § 1342(p); 40 C.F.R. § 122.1(a); Divers, supra, 145
Cal.App.4th at pp. 254-255; Building Industry, supra, 124
Cal.App.4th at p. 874.)
11
supra, 18 Cal.App.5th at p. 669; Building Industry, supra, 124
Cal.App.4th at p. 873.) In 1972, California added Chapter 5.5 (§§
13370-13389) to the Porter-Cologne Act, thereby empowering
regional boards to issue permits that serve both as “waste
discharge requirements” compliant with state law and NPDES
permits compliant with federal law.6 (§ 13374; Building
Industry, at p. 875.) Although Chapter 5.5 was added to
specifically address these dual permits, section 13372—which is
part of Chapter 5.5—provides that the other provisions of the
Porter-Cologne Act continue to “apply” to such permits “[t]o the
extent” they are “consistent with the provisions” of Chapter 5.5.7
(§§ 13372, subd. (a), 13370, subd. (c); Sweeney, supra, 61
Cal.App.5th at p. 1113; Burbank, at p. 620; Dept. of Finance, at p.
669; Building Industry, at p. 875; cf. Burbank, at p. 626-627
6 The federal authorities subsequently authorized California
to issue such permits. (Department of Finance v. Commission on
State Mandates (2016) 1 Cal.5th 749, 757.)
7 The full text of the statute states: “This chapter shall be
construed to ensure consistency with the requirements for state
programs implementing the [Clean Water Act] and acts
amendatory thereof or supplementary thereto. To the extent
other provisions of this division are consistent with the provisions
of this chapter and with the requirements for state programs
implementing the [Clean Water Act] and acts amendatory thereof
or supplementary thereto, those provisions apply to actions and
procedures provided for in this chapter. The provisions of this
chapter shall prevail over other provisions of this division to the
extent of any inconsistency. The provisions of this chapter apply
only to actions required under the [Clean Water Act] and acts
amendatory thereof or supplementary thereto.” (§ 13372, subd.
(a).)
12
[California law cannot, “[under] the principles of federal
supremacy,” authorize the regional boards to issue permits that
fail to comply with the “mandates of federal law”].)
II. Analysis
A. Monitoring of PCB congeners using Method
1668C
Boeing asserts that the requirement in the 2024 permit
that it use Method 1668C to monitor PCB congeners must be
removed because the Regional Board did not first balance the
burdens of this additional monitoring requirement against its
benefits, as required by section 13267(b). This assertion requires
us to examine (1) whether the Regional Board erred in failing to
comply with section 13267(b), and if so, (2) whether the error was
prejudicial.
1. The Regional Board erred in failing to comply
with section 13267(b)
Section 13267 empowers a regional board to “require that
any person . . . who proposes to discharge waste within its region”
“furnish . . . monitoring program reports.” (§ 13267, subd. (b).)
However, “[i]n requiring those reports,” (1) “[t]he burden,
including costs, of those reports [must] bear a reasonable
relationship to the need for the report and the benefits to be
obtained from the reports,” and (2) the regional board must “[(a)]
provide the person with a written explanation with regard to the
need for [such] reports, and [(b)] identify the evidence that
supports requiring th[e] person to provide the reports.” (Ibid.)
As noted above, section 13372 incorporates all other provisions of
the Porter-Cologne Act—including section 13267—to apply to
dual permits as long as those provisions are “consistent” with the
provisions of Chapter 5.5. In general, provisions are “consistent”
13
if they are “compatible,” are not “conflicting,” and are “capable of
existing together without discord or disharmony.” (See Muzzy
Ranch Co. v. Solano County Airport Land Use Com. (2008) 164
Cal.App.4th 1, 8-9.) Because section 13267(b)’s narrower duty to
justify a monitoring requirement is “capable of existing together”
with Chapter 5.5’s broader duty that dual permits be at least as
stringent as federal NPDES permits, section 13267(b) applies to
the 2024 permit. (Accord, Burbank, supra, 35 Cal.4th at p. 625
[examining plain language of statutory text].)
The record is devoid of any evidence that the Regional
Board complied with section 13267(b). Nothing in the record
indicates that the Regional Board considered whether the
burden, including costs, of the additional monitoring requirement
bore a “reasonable relationship” to the benefits obtained from
that requirement. Although we are to presume that agencies
regularly perform their duties (Duarte, supra, 60 Cal.App.5th at
p. 273), and although section 13267(b) does not obligate the
Regional Board to explicitly “include any type of weighing or cost-
benefit analysis” in the record (Sweeney, supra, 61 Cal.App.5th at
p. 1115), the Regional Board elsewhere engaged in a detailed
cost-benefit analysis when applying section 13267(b) to a
different monitoring requirement in the 2024 permit (namely,
with respect to investigating the lining of the stormwater holding
ponds), but did not do so with respect to the PCB congeners
monitoring requirement. In light of this differential treatment,
we cannot infer or otherwise presume that the Regional Board
engaged in the analysis required by section 13267(b). (Cf.
Sweeney, at p. 1115 [inferring compliance where the record
showed that the “Regional Board was aware of the requirement
that the burden of reports be proportional to their anticipated
14
benefit”]; see Rancho Cucamonga, supra, 135 Cal.App.4th at p.
1386 [inferring compliance with section 13241’s requirement that
“economic factors” be considered where the record showed that
the permit “was based on a fiscal analysis and a cost-benefit
analysis”].)
Echoing the trial court’s ruling, the Regional Board urges
that section 13267(b) does not apply to the dual permit in this
case. Specifically, the Regional Board argues that it issued the
2024 permit pursuant to the provisions of Chapter 5.5—more
specifically, pursuant to section 13383—and that section 13383
empowers “regional boards” to “require any person . . . to
establish and maintain monitoring . . . methods” but makes no
mention of a requirement that the Regional Board examine the
burdens and benefits of those methods. (§ 13383, subd. (b).) We
reject this argument because it ignores that, as noted above,
section 13372 incorporates into Chapter 5.5 all other mandates of
the Porter-Cologne Act—including section 13267(b)—as long as
they are not “[in]consistent” with Chapter 5.5 and, as we have
concluded above, we discern no inconsistency.
The Regional Board resists our conclusion with three
further arguments.
First, the Regional Board asserts that section 13383 applies
whenever a permit allows for discharge into “navigable waters,”
and thus applies under different circumstances than section
13267(b), which applies only when a permit allows for discharge
into state waters. This assertion makes no sense. The federal
Clean Water Act only applies to discharges into navigable waters
of the United States. (33 U.S.C. § 1251(a)(1); City of Arcadia v.
State Water Resources Control Bd. (2005) 135 Cal.App.4th 1392,
1402.) By definition, a dual permit issued by a regional board
15
allows for discharge into both federal navigable waters and state
waters. If, as the Regional Board contends, section 13383’s use of
the term “navigable waters” subjects dual permits only to the
provisions of Chapter 5.5 of the Porter-Cologne Act, then section
13372—and its mandate to apply all “consistent” provisions of the
Porter-Cologne Act outside of Chapter 5.5—would be nullified.
We are not allowed to un-write statutes. (J.M. v. Huntington
Beach Union High School Dist. (2017) 2 Cal.5th 648, 655 (J.M.)
[“‘An interpretation that renders related provisions [of a statute]
nugatory must be avoided’”].)
Second, the Regional Board asserts that section 13267(b)’s
mandate does not apply because it is not “consistent” with the
federal Clean Water Act, as it obligates a regional board to
engage in the additional procedural step of examining the
burdens and benefits of a monitoring requirement. But requiring
a regional board to engage in additional procedural steps does
not, by itself, render a provision “inconsistent” with Chapter 5.5.
The provisions of the Porter-Cologne Act outside of Chapter 5.5
are replete with procedural steps a regional board must take; if
this were enough to negate their application when considering a
dual permit, then section 13372 would, again, be rendered a
nullity. (J.M., supra, 2 Cal.5th at p. 655.) What is more, we
conclude that the two provisions specifically at issue here—
section 13383 and section 13267(b)—are consistent: Section
13383 limits a regional board to imposing monitoring duties “as
may be reasonably required” (§ 13383, subd. (b), italics added),
while section 13267(b) limits a regional board to imposing
monitoring duties that “bear a reasonable relationship to the
need for the [monitoring] report and the benefits to be obtained
from the reports” (§ 13267, subd. (b), italics added). Both
16
provisions obligate a regional board to act reasonably, and a
monitoring duty with burdens grossly disproportionate to its
benefits is not “reasonable.”
Third, the Regional Board asserts that subdivision (c) of
section 13383 explicitly cross-references subdivision (c) of section
13267, such that the absence of such a cross-reference to section
13267(b) in subdivision (b) of section 13383 means that section
13267(b) does not apply. We also reject this assertion. To be
sure, the Regional Board is correct that subdivision (c) of section
13383, dealing with the power to inspect a dual permit holder’s
facilities, explicitly incorporates the inspection procedures found
in subdivision (c) of section 13267. But this does not mean that
any provision outside of Chapter 5.5 is inapplicable unless a
provision within Chapter 5.5 makes an explicit cross reference.
That is because section 13372 effects an across-the-board cross
reference unless the provision to be applied is “inconsisten[t]”
with Chapter 5.5. That our Legislature chose to adopt a belt-and-
suspenders approach to section 13383, subdivision (c) does not
give us warrant to negate section 13372. (In re J.W. (2002) 29
Cal.4th 200, 209 [statutory construction principles to “assume[]
that every part of a statute serves a purpose and that nothing is
superfluous” and “the expression of one thing in a statute
ordinarily implies the exclusion of other things” do not apply if
they “would defeat legislative intent or produce an absurd
result”].)
2. Boeing has failed to demonstrate prejudice
Relief is warranted on a petition for administrative
mandate only if an agency’s “abuse of discretion” is “prejudicial”
(Code Civ. Proc., § 1094.5, subd. (b)), and Boeing—as the
appellant—accordingly bears the burden of showing that the
17
Regional Board’s failure to apply section 13267(b) was
prejudicial. (Gooden, supra, 106 Cal.App.5th at p. 14 [“The
burden of demonstrating a prejudicial abuse of discretion rests on
the party challenging the agency’s action”].)8 The Regional
Board’s failure to examine the burdens and benefits of expanded
monitoring of PCB congeners using Method 1668C or an
alternative methodology is prejudicial only if that examination
would have led the Regional Board not to impose the additional
monitoring requirement. (Malaga, supra, 58 Cal.App.5th at pp.
445-446 [prejudice evaluated according to harmless error
analysis].)
Boeing has not made this showing. Neither in its briefs nor
when asked at oral argument did Boeing point to anything in the
record indicating that the benefits of monitoring PCB congeners
using Method 1668C are not proportional to the burdens,
including costs, of that monitoring requirement; indeed, Boeing
has not pointed to anything in the record delineating the costs of
the additional monitoring. Boeing laments that the Regional
Board refused to consider evidence submitted by Boeing of the
“problems with Method 1668C,” but fails to mention that this
evidence was buried amid 140,000 pages of documents Boeing
dumped on the Regional Board less than 48 hours before the final
public meeting on the permit. The Regional Board was well
within its rights to decline to consider Boeing’s voluminous, late
submission.
8 We reject Boeing’s argument that the Board’s failure to
undertake a section 13267(b) analysis excuses Boeing from
having to show prejudice; the Board’s error establishes the “abuse
of discretion,” but Boeing must still show prejudice.
18
Even if we consider this late-submitted evidence, Boeing at
most attacks the efficacy of Method 1668C as a monitoring tool,
suggesting that it is so poor a tool that its benefits are necessarily
outweighed by the burdens it imposes, such that any balancing
by the Regional Board would have led to a different outcome. For
support, Boeing cites an opinion from the Washington Supreme
Court upholding an agency’s decision to not apply that method
(Puget Soundkeeper Alliance v. State, Department of Ecology
(Wash. 2018) 424 P.3d 1173, 1178) as well as comments from
“industry groups” predictably critical of Method 1668C.9 Boeing
fails to acknowledge the evidence in the record on the other side
of the ledger, including comments from an NPDES representative
at the public hearing stating the Regional Board “appropriately”
selected Method 1668C and other evidence from the EPA that
several states were using Method 1668C with “good success.”
Because the contrary evidence indicating Method 1668C’s
validity constitutes substantial evidence, and because the
requirement in the 2024 permit allows PCB monitoring through
Method 1668C or any other “high resolution EPA-approved
method,” we reject Boeing’s argument that there would have been
a different outcome had the Regional Board applied section
13267(b). Because Boeing offers no further argument or evidence
9 Boeing also urges that the EPA has endorsed a different
method of monitoring PCBs called Method 1628 (90 Fed. Reg.
6967-6969), but this methodology was not endorsed until January
2025—long after the 2024 permit was issued. It does not in any
event undermine the substantial evidence indicating that Method
1668C is valid.
19
in support of its position,10 we conclude that the Regional Board’s
error was not prejudicial.
B. Aluminum effluent limitation
Boeing asserts that the aluminum effluent limitation
contained in the 2024 permit is invalid.
1. The effluent limitation is within the Regional
Board’s authority and supported by substantial evidence
A regional board has the authority to set an effluent
limitation for discharges of stormwater “associated with
industrial activity” because such discharges can contain
pollutants and the stormwater itself qualifies as a “pollutant.”11
(33 U.S.C. §§ 1342(p)(1), (p)(2)(B), (p)(3)(A), 1311, 1362(16); 40
10 For the first time at oral argument, Boeing asserted that
the more extensive PCB monitoring requirement imposes
unreasonable costs upon Boeing because monitoring using
Method 1668C might yield “false positives” of PCB levels that
somehow trigger penalties. Boeing has waived this argument,
both by failing to raise it in its briefs (Kinney v. Vaccari (1980) 27
Cal.3d 348, 356, fn. 6) and by failing to support, with legal
authority or reasoned argument, the counter-intuitive portion of
this argument that penalties might be imposed for reporting
information about pollutants that are not otherwise subject to an
effluent limitation (see Cahill v. San Diego Gas & Electric Co.
(2011) 194 Cal.App.4th 939, 956; In re A.C. (2017) 13 Cal.App.5th
661, 672).
11 A “pollutant” is defined as, among other things, “biological
material” that is “discharged into water” (33 U.S.C. § 1362(6)),
while “pollution” is defined as a “man-made or man-induced
alteration of the chemical, physical, biological, and radiological
integrity of water” (33 U.S.C. § 1362(19)). We reject Boeing’s
attempts to conflate and collapse together the separately and
distinctly defined terms.
20
C.F.R. §§ 122.44(d)(1)(i), 122.26(a)(1)(ii), (b)(14); Sportfishing,
supra, 268 F.Supp.3d at p. 1040; NRDC, supra, 966 F.2d at p.
1296 [stormwater discharges “associated with industrial activity”
are an exception to the moratorium on permitting requirements];
see also Duarte, supra, 60 Cal.App.5th at p. 270 [permits for
“industrial activity” must satisfy effluent limitations]; Puget
Soundkeeper Alliance v. Whitley Mfg. Co. (W.D. Wash. 2015) 145
F. Supp. 3d 1054, 1057 [“stormwater associated with industrial
activity . . . itself is a pollutant subject to regulation under the
[Clean Water Act]”], italics added.) “Storm water discharge
associated with industrial activity” is defined by federal
regulation as “the discharge [of stormwater] from any conveyance
that is used for collecting and conveying storm water and that is
directly related to manufacturing, processing or raw materials
storage areas at an industrial plant,” and “includes, but is not
limited to,” “storm water discharges from industrial plant yards”
and “areas where industrial activity has taken place in the past
and significant materials remain and are exposed to storm
water.” (40 C.F.R. § 122.26(b)(14).) Because the Act itself
requires only that a discharge of stormwater be “associated with
industrial activity” and because the pertinent regulation requires
only that the conveyance carrying the stormwater be directly
related to present or past industrial activity, “[i]t is not necessary
that storm water be contaminated or come into direct contact
with [other] pollutants”; it is enough if the stormwater has
“association with any type of industrial activity.” (NRDC, at p.
1304; North Carolina Shellfish Growers Association v. Holly
Ridge Associates, LLC (E.D.N.C. 2003) 278 F.Supp.2d 654, 678-
679; accord, Hughey v. JMS Development Corp. (11th Cir. 1996)
78 F.3d 1523, 1525, fn. 1 [stormwater constitutes a “pollutant”
21
whose discharge is subject to an effluent limitation if “rain water
flows from a site where land disturbing activities have been
conducted”].)
Substantial evidence supports the Regional Board’s finding
that stormwater flowing from the site is “associated with
industrial activity.” The record contains articles detailing how
aluminum was used generally in the assembly and testing of
rockets as well as evidence that rocket fuel containing aluminum
was likely stored on the site and that aluminum may have been
released during open burning on the site. The record also
contains evidence that, during the term of the prior permit, the
quantum of aluminum in the stormwater from the site exceeded
water quality standards on nine separate occasions. What is
more, the exceedances showed aluminum concentrations at
different levels at the various outfalls. From this evidence, the
Regional Board could reasonably infer that the unevenly
distributed exceedances of aluminum in the stormwater flowing
over the site was associated with the past industrial use of
aluminum at the site.
2. Boeing’s challenges
Boeing makes what boil down to two attacks on the
Regional Board’s imposition of the effluent limitation for
aluminum in the 2024 permit.12
First, Boeing asserts that the Regional Board applied the
wrong legal standard in assessing whether the aluminum in the
12 Boeing makes a third attack, asserting that the Regional
Board failed to conduct a “reasonable potential analysis” for
aluminum, but the trial court ruled that Boeing did not exhaust
its administrative remedies on this issue and Boeing does not
22
stormwater discharge from the site was “associated with
industrial activity.” Boeing urges that the requisite “association”
occurs only if a regional board is able to affirmatively prove that
the prior industrial activity “caused” the aluminum to be in the
stormwater or that the aluminum was in the stormwater
“because of” or “due to” the prior industrial activity.13 In support
of its proffered definition, Boeing points to case law equating an
“association” with having a “close[] connect[ion]”, and lifts
phrases from the federal regulation defining “storm water
discharge associated with industrial activity” (40 C.F.R. §
122.26(b)(14)).
We reject this argument for several reasons.
To begin, Congress could have made a regulator’s authority
to impose effluent limitations contingent upon an affirmative
showing that past or present industrial activity “caused”
pollutants to be in stormwater or that pollutants were in the
stormwater “because of” or “due to” the industrial activity;
Congress instead required only a showing that the stormwater
discharge be “associated with industrial activity.” We must give
weight to this textual distinction. (Jam v. International Finance
Corp. (2019) 586 U.S. 199, 209 [“‘the legislative purpose is
expressed by the ordinary meaning of the words used’”]; In re
Corrine W. (2009) 45 Cal.4th 522, 529 [“the words the Legislature
meaningfully challenge that ruling on appeal. The argument is
accordingly waived.
13 Boeing goes on to argue that this standard is not met
because the Regional Board never proved that industrial activity
caused the aluminum in the stormwater because there was never
proof that the aluminum used or stored at the site leaked into the
soil and, thence, into the stormwater.
23
chose to enact are the most reliable indicator of its intent”].)
Employing this more permissive threshold for regulatory
authority is also not illogical as a matter of public policy. (See
Sportfishing, supra, 268 F.Supp.3d at p. 1045 [“‘if you own the
leaky “faucet,” you are responsible for its “drips”’”].)
The authority Boeing relies upon is unpersuasive. The
cases Boeing cites are not to the contrary because they arise in a
different context. (E.g., Gordon v. Warner Bros. Pictures, Inc.
(1969) 269 Cal.App.2d 31, 37 [looking to dictionary to define
“associated with” as meaning “closely connected” in context of
whether unfair competition exists for using a book’s title for a
movie]; Morales v. Trans World Airlines, Inc. (1992) 504 U.S. 374,
383 [examining meaning of the phrase “related to” in context of
federal preemption by the Federal Deregulation Act of 1978].)
Nor is the federal regulation Boeing cites to the contrary. As
noted above, that regulation defines “[s]torm water discharge
associated with industrial activity” as “discharge from any
conveyance that is used for collecting and conveying storm water
and that is directly related to manufacturing, processing or raw
materials storage areas at an industrial plant” and “includes”
“areas where industrial activity has taken place in the past and
significant materials remain and are exposed to storm water.”
(40 C.F.R. § 122.26(b)(14), italics added.) Boeing urges that the
phrase “directly related” demands a direct causal link between
the industrial activity and the stormwater, but this argument
ignores that the phrase containing “directly related” modifies the
word “conveyance” rather than the term “stormwater”; the Ninth
Circuit in NRDC, supra, 966 F.2d at pp. 1304-1305 rejected the
assertion that the “directly related” language imposes any higher
causal standard. Boeing invites us to reject NRDC, but proffers
24
no persuasive reason to do so. Boeing urges that the term
“remains” implies that people placed the offensive chemical in the
path of the stormwater runoff, but that phrase refers to what
remains in the “area[] where [the] industrial activity has taken
place” (40 C.F.R. § 122.26(b)(14)), and thus does not demand a
causal link between the activity and the stormwater itself.
Second, Boeing argues that, even if the Regional Board
applied the proper standard for assessing whether aluminum in
the site’s stormwater is “associated with industrial activity,”
substantial evidence does not support such a finding because an
expert panel retained for the site14 reported in 2022-2023, and
one of the panel’s members opined at a public hearing, that the
concentration of aluminum was no different than the
concentration that “naturally occur[s]” in the soil at the site, such
that imposing an effluent limitation for aluminum is effectively
requiring Boeing to “clean[] up nature itself.” (Hammersley,
supra, 299 F.3d at pp. 1016-1017 [“pollutants” also include
“biological materials”—in that case, mussel feces—only if they
have been “transformed by human activity”].) However, the
administrative record also contains evidence to the contrary—
namely, that the nine exceedances in aluminum levels at the site
were not evenly distributed geographically (five of the nine were
located at a specific outfall), and that the aluminum levels
recorded in those exceedances varied. If the aluminum was
endemic to the soil, one would expect it to be more evenly
distributed geographically and to be consistent in concentration.
14 In 2015, Boeing “agreed to maintain” a “Surface Water
Expert Panel” that provides input for Boeing’s “annual reports” to
the Regional Board describing “monitoring results” and other
data from the site.
25
These variances support the Regional Board staff’s opinion that
the reported aluminum was not “naturally occurring” at the site.
(See Rancho Cucamonga, supra, 135 Cal.App.4th at p. 1387
[opinion of agency staff may constitute substantial evidence].)
Boeing effectively argues that its evidence is more persuasive
than the Regional Board’s, but this argument misapprehends
substantial evidence review—which requires us to defer to an
agency’s decision in making one amply supported factual finding
over another. (Young v. City of Coronado (2017) 10 Cal.App.5th
408, 419-420 [“It is for the agency to weigh the preponderance of
conflicting evidence, ‘as we may reverse its decision only if, based
on the evidence before it, a reasonable person could not have
reached the conclusion reached by it’”].)15
15 For similar reasons, Boeing’s contention that the trial court
applied an “improperly heightened standard of proof” is without
merit. Although the trial court stated in its ruling that the
expert panel’s opinion did not “conclusively” establish that
aluminum was naturally occurring, the court was doing no more
than properly rejecting Boeing’s assertion that the expert report
should be given conclusive weight over the contrary evidence in
the administrative record. Indeed, the trial court went on to find
that the “weight of the evidence” supported the Regional Board’s
factual finding that aluminum was not naturally occurring—
which is undoubtedly the proper standard to be applied by a trial
court exercising its independent judgment when reviewing an
administrative agency’s ruling. (Fukada, supra, 20 Cal.4th at p.
817; Coastal, supra, 12 Cal.App.5th at p. 187.)
26
DISPOSITION
The order denying Boeing’s petition for a writ of
administrative mandate is affirmed. The Regional Board is
entitled to its costs on appeal.
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS.
______________________, P.J.
HOFFSTADT
We concur:
_________________________, J.
MOOR
_________________________, J.
KIM (D.)
27
Vous vous demandez comment ce texte s’applique à votre situation ?
Consultation gratuite, sans engagement
Décrivez votre situation. Notre équipe vous recontactera par e-mail pour votre consultation.
Poursuivez vos recherches dans ChatGPT ou Claude
Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.