Filed 11/19/24 McNiven v. City of Berkeley CA1/3
NOT TO BE PUBLISHED IN OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication or
ordered published for purposes of rule 8.1115.

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIRST APPELLATE DISTRICT

DIVISION THREE

CAROLYN McNIVEN, as Trustee,
etc.
Plaintiff and Appellant, A169867
v. (Alameda County
CITY OF BERKELEY et al., Super. Ct. No. RG18921578)
Defendants and Respondents;
MICHAEL DREYFUS et al.,
Real Parties in Interest and
Respondents.

In 2017, the City of Berkeley and its Department of Planning and
Development (collectively, the City) ministerially issued Karen and Michael
Dreyfus a building permit to remodel their home. In 2018, Carolyn McNiven
sought a writ of mandate challenging the permit. (Code Civ. Proc., §§ 1085,
1094.5.) Five years later, the trial court concluded the petition was moot.
We agree and dismiss the matter as moot.
BACKGROUND
In 2016, the Dreyfuses purchased a property on Hawthorne Terrace
(the home). The home is on the corner of Hawthorne Terrace and Vine Street
and shares a yard and patio with McNiven’s home; McNiven and the home’s

1
former owner promised to make no material alterations to the shared lawn
and patio, a covenant that runs with the land.
The home was in bad shape when the Dreyfuses purchased it, and they
planned a remodel. In April 2017, they applied for a building permit to
remove the den, expand the kitchen, add a family room, and remodel a
second-floor bathroom. The City sought additional documents and revisions
before ministerially issuing a permit in September. In November, the
Dreyfuses submitted revisions, adding new windows and doors. The City
questioned the revised plans because they showed Vine Street as the lot’s
front. The City stated that a corner lot’s front was the narrower of the two
intersecting lot lines, so it believed Hawthorne was the lot’s front and noted
the Berkeley Municipal Code thus required a 20-foot setback. The City asked
if the Dreyfuses planned construction in the required setback. If so, the
Berkeley Municipal Code mandated window and door replacements to be
“like for like.” The Dreyfuses responded the Vine Street frontage was
narrower, and their plans were correct. After more revisions in 2018, the
City ministerially approved a final permit in July 2018, apparently using
Hawthorne as the lot’s front.
McNiven tried to stop the remodel. In August 2018, she sent the City
two approximately 60-page PowerPoints “appealing” the nonappealable
permit. She argued the Dreyfuses planned work in the Hawthorne setback
and were thus required to apply for an Administrative Use Permit (AUP),
which would in turn trigger notice to neighbors and the Landmarks
Preservation Commission (LPC). She also applied to have her and the
Dreyfuses’ homes designated as landmarks.
The City reviewed McNiven’s complaints. A city planner and city
planning manager investigated but concluded the plans were code compliant.

2
A supervising engineer reviewed and rejected McNiven’s claims too, stating “I
do not see that you have indicated in what way [the Dreyfuses’ remodel plan]
is inaccurate or provided any documentation supporting this claim.” He went
on, the “other concerns you have raised do not affect the code compliance of
the proposed design and do not invalidate the issued permit.”
Later in August 2018, McNiven sued the Dreyfuses, alleging the
remodel violated the covenant.1 In September 2018, she also petitioned the
trial court for a writ of mandate directing the City to rescind the building
permit, require an AUP, comply with the California Environmental Quality
Act (CEQA), and requested a declaratory judgment that the City violated
its municipal code. The City responded that it lawfully issued the permit.
In May 2019, McNiven and the Dreyfuses stipulated to a temporary
injunction in the covenant action. The injunction prohibited work to the
shared lawn and patio, but it specifically allowed work on the Hawthorne
façade. In October 2019, the LPC designated certain features of “the
property” a landmark. Construction proceeded, and in May 2021, the City
conducted its final inspection and concluded the finished project was code
compliant. In March 2023, the trial court entered judgment in the covenant
action dissolving the injunction and enforcing the covenant.
In August 2023, the trial court heard the writ petition. Before the
hearing, the city planning manager submitted a declaration stating work did
not occur in the Hawthorne setback. Accordingly, the court concluded the
petition was moot because the project was complete, the City found it code
compliant, and the Dreyfuses relied on the permit in good faith.

1 We take judicial notice of the complaint attached as exhibit 1 and the

judgment attached as exhibit 7 to the Dreyfuses’ request for judicial notice.
(Evid. Code, § 452, subd. (d).) All other requests are denied as unnecessary to
our resolution of the issues.
3
DISCUSSION
In reviewing a writ of mandate, we review questions of law de novo and
the administrative agency’s findings for substantial evidence. (Akella v.
Regents of University of California (2021) 61 Cal.App.5th 801, 814–815.)
In doing so, we view the evidence in the light most favorable to the City’s
findings and draw all inferences in support thereof. (Id. at p. 814.) We
cannot substitute our own findings or inferences, and we may conclude
findings are not supported by substantial evidence only if no reasonable
person could reach the City’s conclusion on the record before it. (Ibid.)
McNiven argues the trial court erred in concluding the petition was
moot because — in her view — the court could have referred the matter to
the LPC, ordered the Dreyfuses to restore the Hawthorne façade to its
original condition, or ordered the Dreyfuses to apply for an AUP. She also
argues the court could have revoked the building permit and ordered CEQA
review. We are unpersuaded.
We “ ‘decide only justiciable controversies.’ ” (Parkford Owners for a
Better Community v. County of Placer (2020) 54 Cal.App.5th 714, 722.)
Justiciability “ ‘ “involves the intertwined criteria of ripeness and standing.
A controversy is ‘ripe’ when it has reached, but has not passed, the point that
the facts have sufficiently congealed to permit an intelligent and useful
decision to be made.” ’ ” (Ibid.) In moot cases, “ ‘ “an actual controversy did
exist but, by the passage of time or a change in circumstances, ceased to
exist.” ’ ” (Ibid.) “ ‘The pivotal question in determining if a case is moot’ ” is
“ ‘whether the court can grant the plaintiff any effectual relief.’ ” (Ibid.) “ ‘If
events have made such relief impracticable,’ ” the case is “ ‘moot.’ ” (Ibid.)
“ ‘When events render a case moot, the court, whether trial or appellate,
should generally dismiss it.’ ” (Ibid.)

4
This case is moot. (Parkford Owners for a Better Community v. County
of Placer, supra, 54 Cal.App.5th at pp. 724–725 [project completion mooted
CEQA and zoning challenge when builders relied on permit in good faith];
Wilson & Wilson v. City Council of Redwood City (2011) 191 Cal.App.4th
1559, 1576 [project completion mooted request to rescind authorization and
compel CEQA review].) In arguing to the contrary, McNiven relies on
Horwitz v. City of Los Angeles (2004) 124 Cal.App.4th 1344. But there, the
court revoked building permits because the city mistakenly allowed work in a
setback. (Id. at pp. 1355–1356.) Here, substantial evidence supports the
City’s conclusion that the remodel was code compliant. A city planner, city
planning manager, and supervising engineer all concluded the plans did not
violate the Berkeley Municipal Code. Moreover, the City inspected the home
after the Dreyfuses completed the remodel, found no violations, and
concluded that the remodel complied with the plans approved by the City.
For the same reasons, we also conclude substantial evidence supports the
court’s finding that the Dreyfuses relied on the permit in good faith.
And contrary to McNiven’s claims, CEQA remedies are not available to
her. (Mission Peak Conservancy v. State Water Resources Control Bd. (2021)
72 Cal.App.5th 873, 880 [CEQA does not apply to ministerial permits];
League for Protection of Oakland’s etc. Historic Resources v. City of Oakland
(1997) 52 Cal.App.4th 896, 906 [CEQA does not apply to local historic
resources until they are “ ‘included’ ” in a local register].) Thus, the CEQA
cases she cites are distinguishable. (E.g., Vichy Springs Resort, Inc. v. City of
Ukiah (2024) 101 Cal.App.5th 46, 56; Save Our Skyline v. Board of Permit
Appeals (1976) 60 Cal.App.3d 512, 514, 522.)

5
DISPOSITION
The appeal is dismissed. Respondents shall recover costs on appeal.
(Cal. Rules of Court, rule 8.278(a)(1) & (2).)

6
_________________________
RODRÍGUEZ, J.

WE CONCUR:

_________________________
TUCHER, P. J.

_________________________
FUJISAKI, J.

A169867; McNiven v. City of Berkeley et al.

7

Poursuivez vos recherches dans ChatGPT ou Claude

Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.