Lynch v. Peter & Associates etc.

CourtListener 10114314Calctapp11 sept. 2024

Texte intégral

Filed 8/20/24; Certified for Publication 9/11/24 (order attached)

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FOURTH APPELLATE DISTRICT

DIVISION THREE

CHERYL LYNCH, Individually and
as Trustee, etc.,
G063021
Plaintiff and Appellant,
(Super. Ct. No. 30-2021-
v. 01183592)

PETER & ASSOCIATES, OPINION
ENGINEERS, GEOLOGISTS,
SURVEYORS, INC.,

Defendant and Respondent.

Appeal from a judgment of the Superior Court of Orange County,
Sheila Recio, Judge. Reversed and remanded with instructions.
Tomassian, Inouye & Grigorian, Serge Tomassian and Talin
Grigorian-Tabrizi for Plaintiff and Appellant.
The Morrison Law Group and Edward F. Morrison, Jr., for
Defendant and Respondent.
This case demonstrates the veracity of the California Supreme
Court’s observation that “[t]he declining significance of privity has found its
way into construction law.” (Beacon Residential Community Assn. v.
Skidmore, Owings & Merrill LLP (2014) 59 Cal.4th 568, 574 (Beacon).)
Appellant sued, amongst others, a soils engineering firm that had performed
what is alleged to be a very cursory geotechnical inspection of an excavated
footing trench on her property for a home remodeling project. She brought
claims against the firm for professional negligence and nuisance when her
home sustained significant damage from subsidence resulting from the
construction. The firm filed for summary judgment, arguing it had no
contract with appellant, and thus owed her no duty of care. The trial court
agreed and granted the firm’s motion. For the reasons stated herein, we find
the respondent firm failed to meet its moving burden. And we also hold it did
in fact owe appellant a duty of care. We therefore reverse.
STATEMENT OF FACTS
Appellant Cheryl Lynch is the owner of residential real property
located at 401 Avenida Arlena in San Clemente (the subject property).1 In the
summer of 2015, the Lynches engaged a general contractor, Hutton
Construction (Hutton), to perform two phases of home improvement
construction and repairs on the subject property, as per plans prepared by
architect Benjamin Stevens. The construction proposed was: a remodel of the

1
At all times relevant to the lawsuit in this case, and at the time
of commencement of the action, appellant owned the property with her
husband, Gregory, as trustees of The Lynch Family Trust dated August 29,
1997 (the trust). Unfortunately, Mr. Lynch passed away while the lawsuit
was pending and thus, Mrs. Lynch (individually, and as trustee of the trust)
is the sole appellant. Nevertheless, in describing many of the events that
occurred while Mr. Lynch was alive, we will often refer to the Lynches as a
couple for purposes of precision.

2
existing residence, building additions along the south and north sides of the
existing residence, a site retaining wall along the northern property
boundary, underpinning of the existing foundation along the general west
side of the existing residence, a new raised wood deck west of the residence,
and surrounding hardscape improvements.
The first phase of work was governed by a contract dated July 27,
2015. Pursuant to Stevens’ plans, the first phase involved site improvements.
This work was to commence August 3, 2015, and finish by September 14,
2015. The total to be paid to Hutton on the first phase was $154,677.60.
The second phase was governed by a contract dated July 8, 2016.
This phase was to consist of the residence remodel and addition. The second
phase was to commence June 14, 2016, and finish by October 14, 2016. The
total to be paid to Hutton on the second phase was $250,679.59.
In September 2014, Stevens requested a geotechnical services
proposal from Coastal Geotechnical (Coastal), a local geotechnical
engineering firm. Coastal provided its proposal, which was addressed to the
Lynches, on September 23, 2014, stating Coastal would “evaluate the
geotechnical conditions beneath the accessible portions of [the] property, and
. . . provide grading and foundation recommendations for the proposed
construction” for an estimated cost of $5,800. Included in Coastal’s scope of
work was review of available reports, maps, and photographs; subsurface
exploration by way of manually excavated test pits for geologic observation
and soil and rock sampling; laboratory testing of samples; engineering and
geologic analysis; and preparation of a final report with test results, analyses,
conclusions, and recommendations. Coastal noted that published geologic
maps of the area showed the subject property was situated on a “queried

3
landslide,” and it emphasized its scope of work was not intended to remedy
that issue specifically or the slope stability issues that might accompany it.
The overall timeline of the project and its issues, as well as the
involvement of the various contractors and subcontractors, is not made
crystal clear by the record before us. However, it appears that by the spring
of 2018, the Lynches replaced the general contractor, Hutton, with an outfit
called Grover Construction (Grover). On April 25, 2018, Grover engaged the
respondent, Peter & Associates, Engineers, Geologists, Surveyors, Inc. (the
Peter firm), to do a geotechnical inspection of a footing trench it had
excavated for the proposed addition on the property. The contract for this
work, written up on the Peter firm’s letterhead, provided the Peter firm
would be paid $360. The contract also contained the following provision: “This
contract does not include: [¶] 1. Subsurface exploration, laboratory testing,
settlement analysis and/or slope stability calculations. Peter & Associates,
Inc. is not responsible for potential settlement and/or slope failure, if any. [¶]
2. Geotechnical review of grading plan, foundation plan, and/or structural
design calculations, if any. Peter & Associates, Inc. is not responsible for
adequacy of the plans/calculations.” The Peter firm’s contract did not mention
the Lynches and contained no clause pertaining to third party beneficiaries.
It also contained a clause limiting their liability to twice their fee.
Grover paid the Peter firm $360 on April 25, 2018, and that same
day, the Peter firm sent a licensed civil and geotechnical engineer named Lan
Pham to inspect the footing on the subject property. Pham’s inspection
consisted of visual observation of the trench, and use of a steel probe three
feet in length to “punch it down” into the trench to feel the soil. Afterward, he
prepared a single-page handwritten memo summarizing his findings. The
memo was addressed to both Mike Grover, principal of Grover, and “Gregory

4
& Cheryl Lynch.” The subject heading read “Geotechnical Acceptance of
Excavated Footing Trenches for Project Addition . . . .” Pham’s findings were,
in part: “The excavated footing trenches exposed firm competent bearing
earth materials, generally consisted [sic] of dark grey silty clay, damp moist
and stiff, and are considered geotechnically acceptable and suitable for the
intended use.”
Grover went ahead and poured the footing, but the soil proved
inadequate to the task of holding it up. The footing for the addition collapsed,
and the house subsided in that area, moving laterally toward the slope
underneath. Appellant was required to install a grade beam and caissons to
support the collapsed addition. As of May 2023, the house included over 4.9
inches of deflection, and had cracks in the floor and foundation, and other
signs of distress.
PROCEDURAL HISTORY
The Lynches filed suit in February 2021 against Hutton, Coastal,
Stevens, the Peter firm, and other subcontractors for breach of contract,
nuisance, and negligence. The operative pleading, the third amended
complaint, was filed on September 7, 2022. The Peter firm was named as a
defendant on the fifth cause of action for professional negligence and the
sixth cause of action for nuisance.
On January 23, 2023, the Peter firm filed a motion for summary
judgment against the third amended complaint, on the ground that it had “no
legal liability to” appellant “under any negligence or nuisance theory.” The
motion did not seek summary adjudication in the alternative. The Peter firm
argued it had no legal liability to appellant because it was “a small
engineering firm” hired to inspect a single footing “for a fee of $360.” It also
cited the exclusions in the contract, as well as the fact it had no other role in

5
the construction project and had no contract with the Lynches. Relying
heavily on our opinion in Weseloh Family Ltd. Partnership v. K.L. Wessel
Construction Co., Inc. (2004) 125 Cal.App.4th 152 (Weseloh), and using the
factors our Supreme Court first outlined in Biakanja v. Irving (1958) 49
Cal.2d 647 (Biakanja) and later discussed in Beacon, the Peter firm argued it
owed appellant no duty of care, professional or otherwise. As for appellant’s
nuisance claim, the Peter firm contended its personnel were only on the
property one time, and were paid such a small sum that the firm could not
possibly be held liable for nuisance.
After hearing argument and taking the matter under submission,
the trial court, swayed significantly by Weseloh, granted summary judgment.
DISCUSSION
Appellant takes issue with this ruling on three grounds. First,
despite a lack of privity, she contends the Peter firm did indeed owe her a
duty of care pursuant to the Biakanja factors, in large part because she and
her late husband were the intended direct beneficiaries of the work being
performed. She submits that Weseloh is distinguishable and limited to its
facts. Second, she says there are triable issues of fact regarding her nuisance
cause of action and the trial court erroneously concluded her nuisance claim
was identical to her negligence claim. Finally, she thinks the trial court erred
by sustaining in blanket fashion the Peter firm’s objections to two
declarations she filed in opposition to summary judgment—her own
declaration and that of her expert, Gregory Axten. We agree with her on all
three points.

6
I.
MOTIONS FOR SUMMARY JUDGMENT AND STANDARD OF REVIEW
Our Supreme Court has acknowledged that summary judgment
is less “disfavored” now than it once was, especially since Code of Civil
2
Procedure section 437c was amended to bring it closer to the federal rules.
(See Perry v. Bakewell Hawthorne, LLC (2017) 2 Cal.5th 536, 542.) But this
does not mean the standards and principles for granting summary judgment
have changed. The trial court is still required to determine “if all the papers
submitted show that there is no triable issue as to any material fact and that
the moving party is entitled to a judgment as a matter of law.” (§ 437c, subd.
(c).) To be entitled to judgment as a matter of law, thus foregoing a trial, a
moving defendant still has the burden to show the plaintiff’s cause of action
has no merit. This is done by showing either that “one or more elements of
the cause of action, even if not separately pleaded, cannot be established, or
that there is a complete defense to the cause of action.” (Id., subd. (p)(2).)
Then, and only then, does the burden shift to the plaintiff to show the
existence of triable issues of material fact regarding the cause of action or a
defense thereto. (Ibid.)
“In reviewing a grant of summary judgment, we conduct an
independent review to determine whether there are triable issues of material
fact and whether the moving party is entitled to judgment as a matter of
law.” (Flores v. City of San Diego (2022) 83 Cal.App.5th 360, 372.) In doing so,
“[w]e apply the same standards as the trial court[.]” (Ibid.) The moving

2
All further statutory references are to the Code of Civil
Procedure unless otherwise indicated.

7
party’s evidence is strictly construed and the opposing party’s evidence
liberally construed. (Ibid.)
In this case, the Peter firm failed to meet its moving burden on
summary judgment. Even if it negated the element of duty in appellant’s
negligence claim—which, to be clear, it did not—it failed to make any
showing whatsoever to invalidate appellant’s nuisance claim. Its argument
regarding nuisance was limited to one sentence in its moving memorandum
of points and authorities stating it was on the property once and was paid
$360 to inspect a single excavated trench. But it offered no authority
explaining why or how these facts negate any element of appellant’s nuisance
claim. For this reason alone, the motion should have been denied. As we
explain below, however, that was not the only problem with the motion.
II.
PROFESSIONAL NEGLIGENCE AND DUTY OF CARE
It is axiomatic that liability for negligence in any scenario must
be premised on a duty of care, and “[t]he existence and scope of a defendant’s
duty is an issue of law to be decided by the court.” (Eriksson v. Nunnink
(2011) 191 Cal.App.4th 826, 838.) When professional negligence is alleged,
the plaintiff must show the defendant had a duty “to use such skill, prudence
and diligence as other members of the profession commonly possess and
exercise[.]” (Giacometti v. Aulla, LLC (2010) 187 Cal.App.4th 1133, 1137.) In
times past, “it was generally accepted that . . . there was no liability for
negligence committed in the performance of a contract in the absence of
privity.” (Biakanja, supra, 49 Cal.2d at p. 649.) However, as our Supreme
Court recognized as far back as 1958 in Biakanja, “the rule has [since] been
greatly liberalized, and the courts have permitted a plaintiff not in privity to

8
recover damages in many situations for the negligent performance of a
contract.” (Ibid.)
In Biakanja, the plaintiff stood to inherit her late brother’s estate
by dint of the will prepared by the defendant, who, though not an attorney,
had prepared letters and income tax returns for the decedent for several
years. (Biakanja, supra, 49 Cal.2d at p. 648.) The will lacked sufficient
attestation and was denied probate. Plaintiff sued the defendant when she
only inherited one-eighth of the estate by intestate succession. Defendant
argued there was no privity of contract between himself and the plaintiff, and
thus he owed her no duty of care in preparing her brother’s will. (Ibid.) Our
high court disagreed and laid out for the first time a set of factors for courts
to use in determining whether a duty of care exists outside of contractual
privity. The factors to be balanced included “the extent to which the
transaction was intended to affect the plaintiff, the foreseeability of harm to
him, the degree of certainty that the plaintiff suffered injury, the closeness of
the connection between the defendant’s conduct and the injury suffered, the
moral blame attached to the defendant’s conduct, and the policy of preventing
future harm.” (Id. at p. 650.) These have since become known as the Biakanja
factors. In applying the factors, the Biakanja court noted the defendant had
to have been aware that plaintiff would have suffered loss if he negligently
prepared the will, because he knew from its terms that she stood to inherit.
But for his negligent preparation of the will, she would have received her
rightful inheritance. And his conduct was morally blameworthy because he
engaged in the unauthorized practice of law in undertaking to draft the will.
(Id. at pp. 650-651.)
Thirty-four years later, in Bily v. Arthur Young & Co. (1992) 3
Cal.4th 370 (Bily), the state high court substantially restricted the scope of

9
the professional duty owed by auditors to the investing public. In that case,
investors in a now-defunct computer company sued the company’s audit firm
when they issued clean opinions on the company’s financial statements right
before it began to implode financially. (Id. at pp. 377-378.) The plaintiffs
prevailed at trial on their professional negligence cause of action, and the
audit firm appealed. (Id. at p. 379.) For various policy reasons, the high court
determined that the audit firm only owed a duty of care for general
3
negligence to its client, and not to the investors who relied on its report. (Id.
at p. 406.) However, the court seemed to recognize that the damage caused by
an auditor’s negligence is economic in nature, in contrast to “personal injury
and property damage.” (Id. at pp. 385, 398, 400.) Because appellant here has
suffered property damage as a result of the Peter firm’s alleged negligence,
Bily is not dispositive of the duty issue before us.
To that point, California cases dealing with negligence by
construction professionals often take a harder line in general than those in
the accounting and audit space. Four years before Biakanja, in fact, the state
supreme court in Gagne v. Bertran (1954) 43 Cal.2d 481 (Gagne) affirmed a
judgment against a soils consultant who plaintiff hired to test for fill on a
property he was buying for purposes of building an apartment complex. The
consultant, who failed to mention he was neither a geologist nor a soils
engineer, gave his blessing for plaintiff to begin trenching for the foundation;
but upon doing so, it was discovered the fill required a much deeper

3
The high court did sanction a cause of action for negligent
misrepresentation against auditing firms for inaccurate information when a
plaintiff can show that the representation was intended to influence them
directly. (Bily, supra, 3 Cal.4th at p. 407.) Because appellant has alleged no
negligent misrepresentation claim, this point is an interesting but moot one.

10
foundation than originally expected. (Id. at pp. 484-485.) Our high court’s
assessment was scathing. “The services of experts are sought because of their
special skill. They have a duty to exercise the ordinary skill and competence
of members of their profession, and a failure to discharge that duty will
subject them to liability for negligence. Those who hire such persons are not
justified in expecting infallibility, but can expect only reasonable care and
competence. They purchase service, not insurance.” (Id. at pp. 489-490.) It
went on: “Defendant’s duty of care in performing the soil test was established
by his contract with plaintiffs . . . had defendant made his test with due care,
he would have discovered the true extent of the fill. . . . Defendant’s repeated
assertion that he was not qualified to test for soil fill, contrary to the finding
that he so held himself out, and the testimony of his expert witness that
laboratory tests were necessary, also indicate that defendant did not exercise
the ordinary skill and competence of those in the business of soil testing.” (Id.
at p. 490.)
While the plaintiff and defendant in Gagne were in contractual
privity, we cannot help but note the similarities between Gagne and this case
in terms of the faulty work alleged to have been done. Appellant too claims
the Peter firm would have been able to render an accurate opinion on the
load the soil could bear had it performed an adequate investigation. Indeed,
the language of Gagne supports a duty of care owed by the Peter firm to at
least Grover because of their contract. Is it so speculative to think the Peter
firm could owe the same duty to the direct and intended beneficiaries of the
work to be performed under the contract, i.e., the Lynches? We think not.
In fact, the Peter firm attempts to make a very similar argument
to the one rejected by the First District Court of Appeal in M. Miller Co. v.
Dames & Moore (1961) 198 Cal.App.2d 305 (Miller). There, a general

11
contractor sued a soils engineering firm employed by the property owner and
civil engineer on a project to “construct a portion of an outfall sewer
system[.]” (Id. at p. 307.) The soils engineer allegedly conducted its tests in a
negligent manner and its final report failed to disclose unstable material
underneath the construction site. Because the report was intended to
influence prospective bidders on the project and was made available to them
prior to bidding, plaintiff alleged the soils engineer had a duty of care to such
bidders in rendering its opinion. (Ibid.) The trial court granted an unopposed
summary judgment to the soils engineer based on lack of privity, but the
Court of Appeal reversed. (Id. at pp. 306-307.) The appellate court observed
defendant knew its information would influence prospective bidders, and
moreover, defendant never said its work was properly done. Defendant, like
the Peter firm, pretty much relied on a lack of privity to the exclusion of any
other argument. (Id. at p. 308.) But even without privity, the uncontradicted
allegations of plaintiff’s complaint would have supported a duty under the
Biakanja factors. (Id. at p. 309.)
Also like the Peter firm, the defendant in Miller attempted to rely
on limitations on its liability contained in its contract. It pointed to provisions
requiring bidders to examine and investigate the site for themselves. (Miller,
supra, 198 Cal.App.2d at p. 309.) But the court noted these provisions were
not necessarily binding on the plaintiff. (Id. at p. 310.)
Appellant also helpfully points us to Shurpin v. Elmhirst (1983)
148 Cal.App.3d 94 (Shurpin), a case the Peter firm decided not to address in
its respondent’s brief. There, plaintiff experienced a landslide of mud and
debris from a neighboring property, causing structural damage to his
property. The neighbor, defendant Elmhirst, hired a firm called Geosoils to
reconstruct the slope. Geosoils submitted recommendations for the

12
reconstruction, which were completed by another contractor. (Id. at p. 97.)
Shurpin filed a lawsuit against, amongst others, Elmhirst and Geosoils for
negligence and nuisance. Geosoils demurred to the complaint and trial court
sustained the demurrer without leave to amend. (Id. at pp. 97-98.) The
appellate court reversed, holding Geosoils owed a duty of care to foreseeable
plaintiffs such as Shurpin, clearly an intended beneficiary of the work. (Id. at
pp. 99-100.)
All of this brings us to Weseloh, the case sitting at the heart of
this appeal. Weseloh was also a summary judgment case; it involved design
engineers Owen Engineering Company (Owen) and its employee Charles
Randle, who were paid $1,500 to $2,200 by a subcontractor, Sierra Pacific
Earth Retention Corporation (Sierra), for the design of two retaining walls at
a commercial auto dealership. (Weseloh, supra, 125 Cal.App.4th at pp. 158-
159.) When the retaining walls failed, the owners of the property sued Owen
and Randle for a defective design. (Id. at p. 160.) Randle and Owen filed
motions for summary judgment based on lack of duty of care. The trial court
granted the motions. (Id. at p. 161.) We found Randle and Owen had
established a lack of contractual privity with plaintiffs, and thus, the burden
shifted to the plaintiffs to show a triable issue of material fact as to duty. (Id.
at p. 164.) This they did not do.
Analyzing the Biakanja factors, we found Randle and Owen’s
participation in the project was intended primarily to benefit Sierra, not the
property owners. (Id. at p. 167.) Plaintiffs failed to produce evidence showing
how and to what extent their damages were caused by Randle and Owen’s
allegedly defective design. (Weseloh, supra, 125 Cal.App.4th at p. 168.) There
was also no evidence to indicate Randle and Owen participated in or
supervised the construction of the retaining wall. (Id. at p. 169.) Randle and

13
Owen shouldered little, if any, moral blame, and finding a duty would not
prevent future harm, since plaintiffs could have protected themselves
through inclusion of a beneficiary clause in the contract between
Randle/Owen and Sierra. In the end, we were very clear that Weseloh should
“not be interpreted to create a rule that a subcontractor who provides only
professional services can never be liable for general negligence to a property
owner . . . with whom no contractual privity exists.” We found it altogether
conceivable that “a set of circumstances that would support such a duty”
could exist. (Id. at p. 173.) And here we have such a case.
Indeed, there is much distinguishing our case from Weseloh. First
and foremost, as appellant emphasizes, the project here was not commercial,
as it was in Weseloh, but residential. Contractors working on a residential
project surely know their work directly impacts a person’s home, which
changes the analysis substantially. And as appellant points out, unlike in
Weseloh, the defendant’s written report was addressed directly to the
Lynches as well as Grover. The Peter firm knew its contract with Grover was
for appellant’s benefit. Also, appellant argues the same footing trench
inspected by the Peter firm was inadequate to hold up the foundation as
represented by Pham in his report. This same foundation failed and required
further repairs. The Peter firm does not show that the soil in the excavated
trench was adequate for the intended use. Additionally, the Peter firm’s
contract contained exclusions, essentially allowing it to abdicate some of the
basic steps necessary to make the geotechnical inspection it was required to
make.
Many questions of fact arise from these exclusions. Did the Peter
firm’s scope of work include or exclude subsurface exploration, laboratory
analysis, slope stability calculations, settlement analysis, and review of

14
grading plans, foundation plans, and other geotechnical reviews (one of which
had already been performed by Coastal)? How exactly was it able to perform
any sort of meaningful geotechnical inspection? Appellant’s expert, Gregory
Axten, opined that the geotechnical inspection the Peter firm agreed to
conduct “required it to do some, if not all, of the tasks it excluded from its
4
contract.”
Another reason to diverge from Weseloh is because, 10 years after
we published the opinion, the state high court handed down Beacon. Albeit a
case decided on a demurrer, Beacon looms large because the court was willing
to deviate from the Bily line of cases and take a different view of residential
construction professionals. In Beacon, the court held a principal architect
owes a duty of care to future homeowners of a residential building site, even
without any contractual privity. (Beacon, supra, 59 Cal.4th at p. 571.) Beacon
distinguished Bily’s policy concerns about limitless liability, and noted that,
unlike the audit firm in Bily, the principal architect defendant had “played a
lead role not only in designing” the defective homes, “but also in
implementing the Project design.” (Id. at pp. 583-584.) To be sure, Beacon
indicates the high court is far more likely to sanction a professional duty of
care in residential construction.
In light of all of this precedent, we return to the Biakanja factors.
The allegations in appellant’s professional negligence claim against the Peter
firm echo Biakanja’s language. Therefore, in order to sustain its moving
burden, the Peter firm was obligated to meaningfully address these factors in
its papers, which it failed to do. Instead, it focused on aligning itself with

4
The trial court sustained evidentiary objections to the Axten
declaration, which we will address shortly.

15
Weseloh and distinguishing itself from Beacon, and its analysis of the factors
essentially came down to one phrase: “the $360 contract with Grover
Construction was to inspect one footing[.]”
Our analysis of the factors is quite different. All six factors
support finding a duty of care in this case. First, as we have already noted,
the transaction was most definitely intended to affect the Lynches as
homeowners, and the harm to them if the job was not correctly done was
certainly foreseeable. Coastal had noted as early as 2014 the property’s being
situated on a possible landslide area, which was information easily accessible
to the Peter firm if they had tried to obtain it. Because of the nature of the
property, the Peter firm had to have known a proper soils inspection was
crucial to successfully building the foundation for the addition. The injury
here is reasonably certain: appellant claims the house has subsided laterally
into the slope, which suggests the ground underneath the house is moving. It
is less clear who is more or less responsible for the subsidence, but certainly
given what has occurred, a trier of fact could reasonably conclude that the
Peter firm’s inspection should have raised the soil issues. And the Peter firm
did not submit any evidence to show its inspection was adequate. As we have
already said, moral blame attaches due to the contract between Grover and
the Peter firm. And finding a duty in this case would further the policy of
preventing harm. We hold the Peter firm owed appellant a duty of care to
perform its geotechnical inspection with the skill expected of a professional in
its position.
III.
NUISANCE
As we previously explained, the motion for summary judgment
failed to undermine or negate any element in appellant’s nuisance claim

16
either. Under Civil Code section 3479, a nuisance includes “an obstruction to
the free use of property, so as to interfere with the comfortable enjoyment of
life or property[.]” Appellant alleges the damage to her house is ongoing as
the slope underneath it continues to essentially give way. In its motion, the
Peter firm argued it was only on the property once to conduct a single
inspection of one footing, and thus could not be held liable for nuisance.
Nothing could be further from the truth. As Shurpin counsels, “not only is the
party who maintains the nuisance liable but also the party or parties who
create or assist in its creation[.]” (Shurpin, supra, 148 Cal.App.3d at p. 101.)
The Peter firm did not adduce any evidence showing it was not responsible
for the damage and subsidence at the Lynches’ home, whether it was the
result of one trip to the property or multiple trips.
At oral argument, we asked respondent’s counsel whether the
Peter firm’s motion actually negated any element of appellant’s nuisance
claim. Counsel pointed us to the trial court’s ruling, which, relying on El
Escorial Owners’ Assn. v. DLC Plastering, Inc. (2007) 154 Cal.App.4th 1337,
1349 (El Escorial), concluded that appellant’s nuisance claim is identical to or
duplicative of her negligence claim. The trial court surmised both claims rely
on the same facts, and appellant only sought monetary relief. Counsel did
not, however, point us to any place in his moving or reply papers below in
which he cited El Escorial or made the argument the trial court outlined. In
our review of the record, we were unable to find any evidence the Peter firm

17
made this argument at all, which leads us to conclude the trial court
articulated the argument on its own.
5

We acknowledge authority to the effect that “the trial court has
the inherent power to grant summary judgment on a ground not explicitly
tendered by the moving party when the parties’ separate statements of
material facts and the evidence in support thereof demonstrate the absence of
a triable issue of material fact put in issue by the pleadings and negate the
opponent’s claim as a matter of law. [Citations.] [¶] However, when the trial
court grants a summary judgment motion on a ground of law not explicitly
tendered by the moving party, due process of law requires that the party
opposing the motion must be provided an opportunity to respond to the
ground of law identified by the court and must be given a chance to show
there is a triable issue of fact material to said ground of law. [¶] Otherwise, a
party which could have shown a triable issue of material fact put in issue by
the complaint or answer but neglected to do so because the point was not
asserted by the moving party as a ground for summary judgment would be
deprived unjustly of the chance to demonstrate the existence of a triable issue
of material fact which requires the process of trial. Moreover, if the
dispositive ground of law was not asserted in the trial court by the moving
party and the record fails to establish that the opposing party could not have
shown a triable issue of material fact had the ground of law been asserted by
the moving party, a reviewing court ordinarily cannot determine if the trial

5
The trial court seemed to acknowledge this at the hearing on the
motion: “. . . because I think nuisance in the context of the facts in this case
regarding construction, I think it really is then a negligence claim and I think
I cited something. I realize that–I don’t think it was cited by either side, but I
was trying to understand the nuisance claim in the context of this case.”

18
court’s decision was correct.” (Juge v. County of Sacramento (1993) 12
Cal.App.4th 59, 70-71.)
Such is our difficulty. There is no evidence in the record to
indicate appellant could not have shown a triable issue of material fact
distinguishing her negligence and nuisance claims had the Peter firm made
this argument. Indeed, the pleading shows, contrary to the trial court’s
finding, that appellant has sought abatement of the nuisance—injunctive
relief—not simply monetary damages. On the face of the pleading, the
nuisance claim is thus a different cause of action with a different remedy,
which renders summary judgment based on El Escorial improper.
Despite having presumably very little, if any, time to prepare a
response, appellant’s counsel also explained to the trial court why its
impression was inaccurate: “. . . the conduct in and of itself doesn’t have to be
negligence to constitute a nuisance . . . [¶] . . . [¶] . . . the conduct—that is,
issuing this report and the resulting failure of the foundation system on this
Hill’s property, constituted nuisance because it interferes with the use and
enjoyment of our client’s property as a result of the damage. [¶] . . . even if
the court determines that [the Peter firm was not negligent], their conduct
still resulted in the interference with the use and enjoyment of one’s
property.” The trial court thereafter expressed a worry that “any wrongdoing”
could “lead to any nuisance claim[,]” to which counsel responded: “only if it
results in the interference of use and enjoyment of one’s property.”
Counsel provided the court with an accurate statement of the
law. “[I]t is well settled in this state that an owner of land may not do even
nonnegligent acts on his property with impunity where they create a
nuisance as to his neighbor.” (See Sturges v. Charles L. Harney, Inc. (1958)
165 Cal.App.2d 306, 318.) “To prevail on an action for private nuisance, a

19
plaintiff must first prove an interference with the plaintiff’s use and
enjoyment of his or her property. (San Diego Gas & Electric Co. v. Superior
Court (1996) 13 Cal.4th 893, 938 . . . .) Second, ‘the invasion of the plaintiff’s
interest in the use and enjoyment of the land [must be] substantial, i.e., that
it cause[s] the plaintiff to suffer “substantial actual damage.”’ (Ibid.) Third,
‘“[t]he interference with the protected interest must not only be substantial,
but it must also be unreasonable” [citation], i.e., it must be “of such a nature,
duration or amount as to constitute unreasonable interference with the use
and enjoyment of the land.”’ (Ibid.; accord, Mendez[(v. Rancho Valencia
Resort Partners, LLC] 3 Cal.App.5th [248,] 262–263.)” (Chase v. Wizmann
(2021) 71 Cal.App.5th 244, 253 (Chase).)
To be sure, the trial court’s concern about the scope of a potential
nuisance claim dovetails with the El Escorial court’s opinion that the
statutory definition of a nuisance “is so broad that it could be ‘“. . . applied
indiscriminately to everything . . . .”’ [Citation.]” (El Escorial, supra, 154
Cal.App.4th at p. 1348, quoting City of San Diego v. U.S. Gypsum Co. (1994)
30 Cal.App.4th 575, 585 (U.S. Gypsum).) The elements laid out for a private
nuisance claim in Chase, however, provide the limitations which address
these concerns. When conduct is alleged by a nuisance plaintiff to obstruct
the free use of property, the plaintiff cannot simply allege a fleeting or trivial
obstruction. Rather, the obstruction must be substantial, and it must
unreasonably interfere with the plaintiff’s use of her property.
El Escorial and its predecessor, U.S. Gypsum, it should be noted,
were not factually similar to this case. In U.S. Gypsum, the City of San Diego
sued the manufacturers of asbestos-containing building materials for
nuisance, alleging the deterioration of the building materials had created a
continuing nuisance. (U.S. Gypsum, supra, 30 Cal.App.4th at p. 584.) The

20
Second District Court of Appeal, Division Six, acknowledged that “California
law has permitted recovery in nuisance where a defendant has owned or
controlled property from which the nuisance arose [citation], where a
defendant has created a nuisance on another’s property [citation] or where a
defendant has employed another to perform work that has resulted in a
nuisance to plaintiff’s property,” but the City of San Diego could point to no
case allowing “recovery for a defective product under a nuisance cause of
action.” (Id. at pp. 585-586.)
Similarly, in El Escorial, a panel of the same court composed of
two of the same justices (Presiding Justice Gilbert and Justice Yegan)
concluded a condominium owners’ association could not maintain a nuisance
claim against drywall contractors when defective construction resulted in
toxic mold contamination. (El Escorial, supra, 154 Cal.App.4th at pp. 1343,
1348-1349.) The court found such contamination similar to the asbestos-
contaminated building materials in U.S. Gypsum. (El Escorial, supra, 154
Cal.App.4th at p. 1349.)
This case is distinguishable from U.S. Gypsum and El Escorial in
that the interference with use of property is not as remote from the
defendant’s conduct. The Peter firm rendered a geotechnical opinion knowing
that Grover Construction would be relying on it in pouring a footing for the
Lynches’ remodel. The footing failed and the house continues to subside.
Without question, this is a substantial and unreasonable interference with
appellant’s use of the property and it was one created, at least indirectly, by
the Peter firm’s own conduct, rather than a defective product.
But our discomfort with El Escorial is perhaps more
fundamental. The court held: “Where negligence and nuisance causes of
action rely on the same facts about lack of due care, the nuisance claim is a

21
negligence claim.” (El Escorial, supra, 154 Cal.App.4th at p. 1349.) With
great respect to our distinguished colleagues in our sister court, we find this
framework for analyzing the viability of a nuisance claim in the construction
defect context a bit rigid. Nuisance is an entirely separate cause of action
from negligence, and the analysis should focus on whether the plaintiff has
alleged all necessary elements of the claim; as set forth, for example, in
Chase. Even if the nuisance claim relies on the same facts about lack of due
care supporting the negligence claim, it does not mean the claims are
identical or duplicative. Indeed, many pleadings allege numerous causes of
action based on the same facts. This does not mean the causes of action are
all the same.6 Also, assessing a nuisance claim in this manner ignores the fact
that a duty between defendant and plaintiff need not exist to maintain a
nuisance claim. By conflating the two theories, the trial court added an
element to appellant’s nuisance claim she was never required to establish in
the first place. We have serious due process concerns about granting
summary judgment on such reasoning.
In that vein, we also echo the view of the Fifth District Court of
Appeal in Brantley v. Pisaro (1996) 42 Cal.App.4th 1591 (Brantley): “Section
437c is a complicated statute. There is little flexibility in the procedural
imperatives of the section, and the issues raised by a motion for summary
judgment (or summary adjudication) are pure questions of law. As a result,
section 437c is unforgiving; a failure to comply with any one of its myriad
requirements is likely to be fatal to the offending party. [¶] Section 437c thus
does not furnish the trial courts with a convenient procedural means, to

El Escorial allowed that “because of the broad definition of
6

nuisance, whether a cause of action is viable depends on the facts of each
case.” (El Escorial, supra, 154 Cal.App.4th at p. 1348.)

22
which only ‘lip service’ need be given, by which to clear the trial calendar of
what may appear to be meritless or weak cases. (See Whitaker v. Coleman
(5th Cir.1940) 115 F.2d 305, 307 [A ‘catch penny contrivance to take unwary
litigants into its toils and deprive them of a trial’].) Any arbitrary disregard of
the statutory commands in order to bring about a particular outcome raises
procedural due process concerns. (Chevron U.S.A., Inc. v. Superior
Court[(1992)] 4 Cal.App.4th [544,] 553.) Motions for summary judgment
cannot therefore properly be decided by employing a sort of detached ‘smell
test.’ The success or failure of the motion must be determined, as we have
done here, by application of the required step-by-step evaluation of the
moving and opposing papers [citation.] In that way, ‘due regard’ will be given
to the right of those persons asserting claims ‘that are adequately based in
fact to have those claims . . . tried to a jury’ as well as to the ‘rights of persons
opposing such claims . . . to demonstrate in the manner provided by [section
437c] that the claims . . . have no factual basis.’ (Celotex Corp. v.
Catrett[(1986)] 477 U.S. [317,] 327.)” (Brantley, supra, 42 Cal.App.4th at p.
1607.)
IV.
EVIDENTIARY OBJECTIONS
Finally, we address appellant’s concerns about the trial court’s
rulings on evidentiary objections. The Peter firm lodged three objections to
appellant’s own declaration and four to the Axten declaration. Each of these
objections was based on multiple grounds. The trial court sustained the
objections in their entirety by saying: “Each of Defendant’s evidentiary
objections . . . is SUSTAINED.” Appellant claims this amounts to an
impermissible blanket ruling on objections, and we agree.

23
Typically, review of evidentiary rulings is for abuse of discretion.
But by ruling in blanket fashion on all of the objections with no explanation
as to the ground relied upon, the trial court left us without information
necessary to ascertain whether its discretion was abused. (See Serri v. Santa
Clara University (2014) 226 Cal.App.4th 830, 852, 857.)
Furthermore, the objections were repetitive and boilerplate. For
instance, the Peter firm objected to appellant’s averments regarding the work
done by it based on foundation, relevance, and hearsay. One such averment is
paragraph 4 of her declaration, which stated: “On or about April 25, 2018, we
retained Peter & Associates . . . through our general contractor, Grover . . . to
provide geotechnical services and to inspect the excavated footing trenches
. . . at our Property.” This averment is certainly relevant since it is the Peter
firm’s work which is the subject of this lawsuit. Foundation for her statement
is quite apparent given she is the owner of the property and she and her
husband were paying for the work being done. And the averment contains no
out-of-court statement implicating the hearsay rule. The Peter firm’s
remaining objections are similarly without merit. As such, there was no basis
to sustain them.

24
DISPOSITION
Summary judgment in favor of respondent is reversed and the
matter remanded to the trial court with instructions to deny respondent’s
motion in its entirety. Appellant to recover her costs on appeal.

MOORE, J.

WE CONCUR:

O’LEARY, P. J.

GOODING, J.

25
Filed 9/11/24

CERTIFIED FOR PUBLICATON

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FOURTH APPELLATE DISTRICT

DIVISION THREE

CHERYL LYNCH, Individually and
as Trustee, etc.,
G063021
Plaintiff and Appellant,
(Super. Ct. No. 30-2021-
v. 01183592)

PETER & ASSOCIATES, ORDER GRANTING
ENGINEERS, GEOLOGISTS, REQUEST FOR
SURVEYORS, INC., PUBLICATION

Defendant and Respondent.

Attorney Talin Grigorian from Tomassian, Inouye & Grigorian,
LLP Attorneys at Law; Attorney Michael D. Turner from Kasdan Turner
Thomson Booth, LLP; Attorney Robert S. Throckmorton from Stone, LLP;
and Attorney James J. Orland from Orland Law Group have requested that
our opinion, filed on August 20, 2024, be certified for publication. It appears
that our opinion meets the standards set forth in California Rules of Court,
rule 8.1105(c)(2) and (3). The requests are GRANTED.
The opinion is ordered published in the Official Reports.

MOORE, J.

WE CONCUR:

O’LEARY, P. J.

GOODING, J

2