Federal Register proposed rules — 1995-12-20

issue-1995-12-20Federal Register proposed rules — 1995-12-20Proposed Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 95-30990 Requirements for Approval of Flame-Resistant Conveyor Belts
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65609-65610]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30990]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF LABOR

Mine Safety and Health Administration

30 CFR Parts 18 and 75

RIN 1219-AA65

Requirements for Approval of Flame-Resistant Conveyor Belts

AGENCY: Mine Safety and Health Administration, Labor.

ACTION: Proposed Rule; extension of comment period.

-----------------------------------------------------------------------

SUMMARY: In response to requests from the mining community for 
additional time in which to prepare comments, the Mine Safety and 
Health Administration (MSHA) is extending the period for public comment 
on its proposed rule addressing the requirements for approval of flame-
resistant conveyor belts to be used in underground mines.

DATES: Written comments must be received on or before February 5, 1996.

ADDRESSES: Send comments to the Office of Standards, Regulations, and 
Variances, MSHA, Room 631, 4015 Wilson Boulevard, Arlington, Virginia 
22203.

[[Page 65610]]

    Commenters are encouraged to submit comments on a computer disk 
along with a hard copy.

FOR FURTHER INFORMATION CONTACT: Patricia W. Silvey, Director, Office 
of Standards, Regulations, and Variances, 703-235-1910.

SUPPLEMENTARY INFORMATION: On October 31, 1995, MSHA published a 
document in the Federal Register (60 FR 55353) announcing the reopening 
of the rulemaking record on its proposed standard for flame-resistant 
conveyor belts used in underground mines. Comment period was scheduled 
to close on December 15, 1995. By this document, the Agency is 
extending the comment period to February 5, 1996. All interested 
parties are encouraged to submit comments prior to that date.

    Dated: December 15, 1995.
J. Davitt McAteer,
Assistant Secretary for Mine Safety and Health.
[FR Doc. 95-30990 Filed 12-15-95; 4:08 pm]
BILLING CODE 4510-43-P

Complete official Federal Register PDF

FR Doc. 95-30985 Proposed Removal of Federal Water Quality Standards for Surface Waters of the Sacramento River, San Joaquin River, and San Francisco Bay and Delta of the State of California
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65614-65616]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30985]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 131

[FRL-5399-8]

Proposed Removal of Federal Water Quality Standards for Surface 
Waters of the Sacramento River, San Joaquin River, and San Francisco 
Bay and Delta of the State of California

AGENCY: Environmental Protection Agency.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: In December 1994, under the authority of the Clean Water Act 
(CWA), the Environmental Protection Agency (EPA) promulgated a rule 
establishing four sets of water quality criteria to protect the 
designated uses for the surface waters of the Sacramento River, San 
Joaquin River, and San Francisco Bay and Delta of the State of 
California (Bay/Delta). Subsequent to this promulgation, the State of 
California adopted water quality standards for the Bay/Delta and 
submitted them to EPA for approval. On September 26, 1995, the Regional 
Administrator for EPA Region IX approved the state water quality 
standards as protective of the designated uses for the relevant 
waterbodies. Currently, the State of California is in the process of 
implementing these state-adopted and EPA-approved water quality 
standards through a state water rights hearing 

[[Page 65615]]
process. Accordingly, EPA's promulgated water quality standards are no 
longer needed to meet the requirements of the Clean Water Act. 
Therefore, EPA proposes to remove the rule.

DATES: Comments on this proposal will be accepted until March 19, 1996.

ADDRESSES: Comments should be addressed to Palma Risler, Water 
Management Division, Environmental Protection Agency, 75 Hawthorne 
Street, San Francisco, California 94105.

FOR FURTHER INFORMATION CONTACT: Palma Risler, Water Management 
Division, Environmental Protection Agency, 75 Hawthorne Street, San 
Francisco, California 94105, 415-744-2017. The public record for this 
rulemaking is available through this contact at this same address.

SUPPLEMENTARY INFORMATION:

Background

    In December 1994, under the authority of section 303 of the CWA, 
EPA promulgated a rule establishing four sets of water quality criteria 
to protect the designated uses for the surface waters of the Sacramento 
River, San Joaquin River, and San Francisco Bay and Delta of the State 
of California (Bay/Delta)(60 FR 4664, January 24, 1995). These criteria 
consisted of estuarine habitat criteria (consisting of a salinity 
requirement measured at three different locations in Suisun Bay for a 
specified number of days during the critical spring months), fish 
migration criteria (consisting of an indexed value representing 
successful fish migration on the Sacramento River and the San Joaquin 
River), fish spawning criteria on the lower San Joaquin River 
(consisting of a salinity requirement measured at various points in 
April and May), and narrative criteria protecting the brackish tidal 
marshes in Suisun Marsh. A description of these criteria are provided 
in the preamble to the final rule and in the rulemaking record.
    Prior to federal promulgation of the water quality standards for 
the Bay/Delta, EPA, the Bureau of Reclamation and Fish and Wildlife 
Service of the U.S. Department of Interior, and the National Marine 
Fisheries Service of the U.S. Department of Commerce worked with the 
State of California to attempt to resolve the water quality issues in 
the Bay/Delta underlying EPA's rulemaking. This effort led to an 
agreement, informally called the ``Bay Delta Accords'' signed by the 
federal agencies, California state agencies, and interested 
stakeholders. These Bay Delta Accords, signed by all the parties in 
December 1994, articulate both substantive measures and processes to 
protect the Bay/Delta estuary, and laid out the framework for the 
adoption, review, and approval of the new State standards.
    On May 22, 1995, the California State Water Resources Control Board 
adopted water quality standards for the Bay/Delta in its water quality 
control plan (1995 WQCP). After these revised standards were approved 
by the California Office of Administrative Law in accordance with 
California law, the revised standards were submitted to EPA for its 
review under section 303(c) of the CWA on July 27, 1995. On September 
26, 1995, the EPA Regional Administrator for Region IX approved these 
standards as protective of the designated uses for the Bay/Delta. The 
reasons for this approval are set forth in the approval letter and are 
supplemented by additional information in the rulemaking record. Both 
the approval letter and this supporting information are included in the 
public record for this rulemaking.
    The CWA gives the states primary responsibility for adopting water 
quality standards. Throughout the rulemaking process to promulgate 
federal water quality standards for the Bay/Delta, EPA has maintained 
that it would withdraw the federal standards if the State adopts and 
submits standards to the Agency that meet the requirements of the Act. 
EPA also indicated this intent in the Bay Delta Accords.
    EPA recognizes that with the exception of the Suisun Bay narrative 
criteria,1 the State's 1995 WQCP provisions are not precisely 
identical to the federal promulgation. Nevertheless, for the reasons 
set forth in EPA's approval, the Technical Support Memorandum dated 
September 21, 1995, underlying the approval, and this rulemaking 
record, EPA found that the provisions in the 1995 WQCP protect the 
designated uses of the estuary and otherwise meet the requirements of 
the CWA. The state is currently implementing these standards. 
Accordingly, the EPA rule is no longer needed to meet the requirements 
of the CWA, and EPA proposes to remove the rule at 40 CFR 131.37.

    \1\ The State's 1995 WQCP includes a description of ``beneficial 
uses'' of the Bay/Delta waters and a set of ``objectives'' that 
protect those beneficial uses. In its review of the 1995 WQCP, and 
in keeping with past practice, EPA is treating the State's 
beneficial uses and objectives as the ``designated uses'' and 
``criteria'' required under the federal Clean Water Act. To avoid 
confusion, this document will generally use the federal terms 
``designated uses'' and ``criteria.''
---------------------------------------------------------------------------

    EPA understands that the 1995 WQCP is the subject of state court 
litigation raising both procedural and substantive challenges to the 
plan. Although EPA believes that the State Board should ultimately 
prevail in this litigation, there is always a possibility in such 
litigation for adverse court actions affecting the 1995 WQCP. Should 
EPA proceed to final withdrawal of the federal water quality standards 
as proposed in this notice, and the 1995 WQCP is subsequently rejected 
or remanded, there would be no water quality standards in effect in 
California carrying out the Bay Delta Accords. EPA intends to work with 
the State so that if this situation were to arise, the requirements of 
the Clean Water Act and the purposes of the Bay Delta Accords are 
achieved.

Regulatory Assessment Requirements

A. Executive Order 12866

    Under Executive Order 12866 (56 FR 51735, October 4, 1993), the 
Agency must determine whether the regulatory action is ``significant'' 
and therefore subject to all the requirements of the order (i.e, 
Regulatory Impact Analysis and review by the Office of Management and 
Budget). Under section 3(f), the order defines ``significant'' as those 
actions likely to lead to a rule: (1) Having an annual effect on the 
economy of $100 million or more, or adversely and materially affecting 
a sector of the economy, productivity, competition, jobs, the 
environment, public health or safety, or State, local, or tribal 
governments or communities (also known as ``economically 
significant''); (2) creating serious inconsistency or otherwise 
interfering with an action taken or planned by another agency; (3) 
materially altering the budgetary impacts of entitlements, grants, user 
fees, or loan programs; or (4) raising novel legal or policy issues 
arising out of legal mandates, the President's priorities, or the 
principles set forth in this order. Pursuant to the terms of this 
order, EPA has determined that the withdrawal of this rule would not be 
``significant.''

B. Regulatory Flexibility Act

    Under the Regulatory Flexibility Act, 5 U.S.C. 601 et seq., EPA is 
certifying that a withdrawal of this rule would not have significant 
impact on a substantial number of small businesses.

C. Paperwork Reduction Act

    There are no information collection requirements associated with 
the withdrawal of this rule that are covered under the provisions of 
the Paperwork Reduction Act of 1980, 44 U.S.C. 3501 et seq. 

[[Page 65616]]

D. Unfunded Mandates

    Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), P.L. 
104-4, establishes requirements for Federal agencies to assess the 
effects of their regulatory actions on State, local, and tribal 
governments and the private sector. Under section 202 of the UMRA, EPA 
generally must prepare a written statement, including a cost-benefit 
analysis, for proposed and final rules with ``Federal mandates'' that 
may result in expenditures to State, local, and tribal governments, in 
the aggregate, or to the private sector, of $100 million or more in any 
one year.
    Today's proposal contains no Federal mandates under the regulatory 
provisions of Title II of the UMRA for State, local, or tribal 
governments or the private sector. In fact, removing the federal water 
quality standards for the Bay/Delta will facilitate the State of 
California's implementation of the state adopted and EPA-approved water 
quality standards for the Bay/Delta.

List of Subjects in 40 CFR Part 131

    Environmental protection, Indians--lands, Intergovernmental 
relations, Reporting and recordkeeping requirements, Water pollution 
control, Water quality standards, Water quality criteria.

    Dated: December 14, 1995.
Carol M. Browner,
Administrator.
    Part 131 of title 40 of the Code of Federal Regulations is proposed 
to be amended as follows:

PART 131--[AMENDED]

    1. The authority citation for part 131 continues to read as 
follows:

    Authority: 33 U.S.C. 1251 et seq.

Sec. 131.37  [Removed and reserved]

    2. Section 131.37 is removed and reserved.
[FR Doc. 95-30985 Filed 12-19-95; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 95-30967 Drawbridge Operation Regulations; Nacote Creek, New Jersey
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65613-65614]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30967]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 117

[CGD05-95-065]

Drawbridge Operation Regulations; Nacote Creek, New Jersey

AGENCY: Coast Guard, DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: At the request of the New Jersey Department of Transportation 
(NJDOT), the Coast Guard is proposing to change the regulations 
governing operation of the Route 9 Bridge across Nacote Creek, mile 
1.5, in Smithville, Atlantic County, New Jersey. This proposal would 
require the Route 9 Bridge to open on signal except during the period 
from 11 p.m. to 7 a.m., when a two-hour advance notice for openings 
would be required. This change should help relieve the bridge owner of 
the burden of having a bridgetender constantly available at times when 
there are few or no quests for openings, while still proving for the 
needs of navigation.

DATE: Comments must be received on or before February 20, 1996.

ADDRESSES: Comments may be mailed to Commander, Fifth Coast Guard 
District, c/o Commander (obr), First Coast Guard District, Bldg. 135A, 
Governors Island, New York 10004-5073, or may be hand-delivered to the 
same address between 8 a.m. and 4:30 p.m., Monday through Friday, 
except Federal holidays. The telephone number is (212) 668-7170. 
Comments will become part of this docket and will be available for 
inspection and copying at the above address.

FOR FURTHER INFORMATION CONTACT: Gary Kassof, Bridge Administrator-NY, 
Fifth Coast Guard District, (212) 668-6969.

SUPPLEMENTARY INFORMATION:

Request for Comments

    The Coast Guard encourages interested persons to participate in 
this rulemaking by submitting written views, comments, data, or 
arguments. Persons submitting comments should include their names and 
addresses, identify this rulemaking (CGD05-95-065), the specific 
section of this rule to which each comment applies, and give reasons 
for each comment. The Coast Guard requests that all comments and 
attachments be submitted in an unbound format suitable for copying and 
electronic filing. If that is not practical, a second copy of any bound 
material is requested. Persons wanting acknowledgment of receipt of 
comments should enclose a stamped, self-addressed postcard or envelope.
    The Coast Guard will consider all comments received during the 
comment period. It may change this rule in view of the comments.
    The Coast Guard plans no public hearing. Persons may request a 
public hearing by writing to the Commander, Fifth Coast Guard District, 
c/o Commander (obr), First Coast Guard District at the address listed 
under ADDRESSES. The request should include reasons why a hearing would 
be beneficial. If it determines that the opportunity for oral 
presentations will aid this rulemaking, the Coast Guard will hold a 
public hearing at a time and place announced by a later notice in the 
Federal Register.

Drafting Information

    The principal persons involved in drafting this document are Mr. J. 
Arca, Fifth Coast Guard District, Bridge 

[[Page 65614]]
Branch-NY, Project Officer, and CAPT R.A. Knee, Fifth Coast Guard 
District Legal Office, Project Counsel.

Background and Purpose

    The Route 9 Bridge across Nacote Creek, mile 1.5, at Smithville, 
Atlantic County, NJ, has a vertical clearance of 5' above mean high 
water (MHW) and 8' above mean low water (MLW) in the closed position. 
The current regulations require the bridge to open on signal at all 
times.
    Review of the bridge logs provided by NJDOT reveals that from 11 
p.m. to 7 a.m., there were no requests for bridge openings in 1992 and 
1993, and only 13 requests for openings in 1994 during these hours. 
NJDOT is seeking relief from the requirement that a bridgetender be 
present during the hours of 11 p.m. to 7 a.m. when there are minimal 
requests for openings.
    The New Jersey Department of Transportation requested that the 
Coast Guard make a permanent change to the regulations governing 
operation of the Route 9 Bridge to require the draw to open on signal 
except from 11 p.m. to 7 a.m., which would require a two-hour advance 
notice. At all other times, the bridge would open on signal. The 
bridgetenders would be on call to open the draw when the advance notice 
is given. A 24-hour special telephone number would be posted on the 
bridge and maintained by the NJDOT.
    Accordingly, a new provision allowing the draw of the Route 9 
bridge, at mile 1.5, to remain closed during late night and early 
morning hours unless two hours advance notice is given will be 
designated as paragraph (a). The current provision allowing the draw of 
the Atlantic County (Rte. 575) bridge, at mile 3.5, to remain closed 
unless eight hours advance notice is given will be designated as 
paragraph (b). A general provision requiring the passage of Federal, 
State, and local government vessels used for public safety through all 
drawbridges in published at 33 CFR 117.31, and is no longer required to 
be published for each waterway. Therefore, this proposal would remove a 
provision requiring passage of public vessels from section 117.732.

Regulatory Evaluation

    The proposed action is not a significant regulatory action under 
section 3(f) of Executive Order 12866 and does not require an 
assessment of potential costs and benefits under section 6(a)(3) of 
that order. It has been exempted from review by the Office of 
Management and Budget under that order. It is not significant under the 
regulatory policies and procedures of the Department of Transportation 
(DOT) (44 FR 11040, February 26, 1979). The Coast Guard expects the 
economic impact of this rule to be so minimal that a full Regulatory 
Evaluation, under paragraph 10e of the regulatory policies and 
procedures of DOT is unnecessary. This conclusion is based on the fact 
that the rule will not prevent mariners from transiting the bridge. It 
will only require mariners to plan their transits.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider whether this proposal, if adopted, will have 
a significant economic impact on a substantial number of small 
entities. ``Small entities'' include independently owned and operated 
small businesses that are not dominant in their field and that 
otherwise qualify as ``small business concerns'' under section 3 of the 
Small Business Act (15 U.S.C. 632). Because it expects the impact of 
this proposal to be minimal, the Coast Guard certifies under 5 U.S.C. 
605(b) that this proposal will not have a significant economic impact 
on a substantial number of small entities.

Collection of Information

    This proposal contains no collection of information requirements 
under the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

    The Coast Guard has analyzed this rule under the principles and 
criteria contained in Executive Order 12612 and it has been determined 
that this proposal will not have sufficient federalism implications to 
warrant preparation of a Federalism Assessment.

Environment

    The Coast Guard considered the environmental impact of this 
proposal and concluded that under section 2.B.2.e.(32)(e) of Commandant 
Instruction M16475.1B (as amended, 59 FR 38654, July 29, 1994), this 
proposal is categorically excluded from further environmental 
documentation. A Categorical Exclusion Determination statement has been 
prepared and placed in the rulemaking docket.

List of Subjects in 33 CFR Part 117

    Bridges.

    In consideration of the foregoing, the Coast Guard proposes to 
amend part 117 of Title 33, Code of Federal Regulations, as follows:

PART 117--DRAWBRIDGE OPERATION REGULATIONS

    1. The authority citation for part 117 continues to read as 
follows:

    Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section 
117.255 also issued under the authority of Pub. L. 102-587, 106 
Stat. 5039.

    2. Section 117.732 is revised to read as follows:

Sec. 117.732  Nacote Creek.

    (a) The Route 9 bridge, mile 1.5, shall open on signal except that 
from 11 p.m. to 7 a.m., the draw shall open if at least two hours 
advance notice is given.
    (b) The draw of the Atlantic County (Rte. 575) bridge, mile 3.5, at 
Port Republic, shall open on signal if at least eight hours advance 
notice is given.

    Dated: November 22, 1995.
W.J. Ecker,
Rear Admiral, U.S. Coast Guard, Commander, Fifth Coast Guard District.
[FR Doc. 95-30967 Filed 12-19-95; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 95-30948 Indiana Permanent Regulatory Program Amendment
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65611-65613]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30948]

-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR
Office of Surface Mining Reclamation and Enforcement

30 CFR Part 914

[IN-110, Amendment Number 93-7, Part II]

Indiana Permanent Regulatory Program Amendment

AGENCY: Office of Surface Mining Reclamation and Enforcement (OSM), 
Interior.

ACTION: Proposed rule; reopening of public comment period.

-----------------------------------------------------------------------

SUMMARY: OSM is announcing receipt of additional changes to an 
amendment previously submitted by Indiana as a modification to the 
State's permanent regulatory program (hereinafter referred to as the 
Indiana program) under the Surface Mining Control and Reclamation Act 
of 1977 (SMCRA). The changes add new language concerning minor field 
revisions to the second of three subparts of the original amendment. 
The changes are intended to incorporate language desired by the State.
    This notice sets forth the times and locations that the Indiana 
program and the proposed amendment to that program will be available 
for public inspection, the comment period during which interested 
persons may submit written comments on the proposed amendment, and the 
procedures that will be followed for a public hearing, if one is 
requested.

DATES: Written comments must be received on or before 4:00 p.m. on 

[[Page 65612]]
January 4, 1996; if requested, a public hearing on the proposed 
amendment is scheduled for 1:00 p.m. on January 3, 1996; and requests 
to present oral testimony at the hearing must be received on or before 
4:00 p.m. on January 2, 1996.

ADDRESSES: Written comments and requests to testify at the hearing 
should be directed to Mr. Roger W. Calhoun, Director, Indianapolis 
Field Office, at the address listed below. If a hearing is requested, 
it will be held at the same address.
    Copies of the Indiana program, the amendment, a listing of any 
scheduled public meetings, and all written comments received in 
response to this notice will be available for public review at the 
following locations, during normal business hours, Monday through 
Friday, excluding holidays:

Office of Surface Mining Reclamation and Enforcement, Indianapolis 
Field Office, Minton-Capehart Federal Building, 575 North Pennsylvania 
Street, Room 301, Indianapolis, IN 46204. Telephone: (317) 226-6166.
Indiana Department of Natural Resources, 402 West Washington Street, 
Room 295, Indianapolis, IN 46204. Telephone: (317) 232-1547.

    Each requester may receive, free of charge, one copy of the 
proposed amendment by contacting the OSM Indianapolis Field Office.

FOR FURTHER INFORMATION CONTACT: Mr. Roger W. Calhoun, Director, 
Telephone (317) 226-6166.

SUPPLEMENTARY INFORMATION:

I. Background on the Indiana Program

    On July 29, 1982, the Indiana program was made effective by the 
conditional approval of the Secretary of the Interior. Information 
pertinent to the general background on the Indiana program, including 
the Secretary's findings, the disposition of comments, and a detailed 
explanation of the conditions of approval of the Indiana program can be 
found in the July 26, 1982, Federal Register (47 FR 32107). Subsequent 
actions concerning the conditions of approval and program amendments 
are identified at 30 CFR 914.10, 914.15, and 914.16.

II. Discussion of the Proposed Amendments

    Since July 29, 1982, (the date of conditional approval of the 
Indiana program), a number of changes have been made to the Federal 
regulations concerning surface coal mining and reclamation operations. 
Pursuant to the Federal regulations at 30 CFR 732.17, OSM informed 
Indiana on May 22, 1985 (Regulatory Reform I), on August 24, 1988 
(Regulatory Reform II), and on September 20, 1989 (Regulatory Reform 
III), that a number of Indiana regulations are less effective than or 
inconsistent with the revised Federal requirements.
    By letter dated December 30, 1993 (Administrative Record No. IND-
1322), the Indiana Department of Natural Resources (IDNR) submitted to 
OSM a State program amendment package (number 93-7) consisting of 
revisions to 38 sections of the Indiana rules. These revisions address 
changes to the Indiana program that were identified in the three 
letters referred to above, and certain required program amendments. The 
State has also proposed additional changes which Indiana believes will 
further improve the approved State program. The primary focus of the 
submittal is on soil capability and restoration standards, individual 
civil penalties, significant/non-significant revisions, coal 
exploration, and performance bonds.
    OSM announced receipt of the proposed amendment in the January 24, 
1994, Federal Register (59 FR 3528), and, in the same notice, opened 
the public comment period and provided opportunity for a public hearing 
on the adequacy of the proposed amendment. The comment period closed on 
February 24, 1994.
    By letter dated December 6, 1995 (Administrative Record Number IND-
1415), Indiana submitted additional minor changes to amendment 93-7.
    By letter dated January 12, 1995 (Administrative Record Number IND-
1423), OSM provided Indiana with comments concerning the proposed 
amendment. Indiana responded by letter dated January 25, 1995 
(Administrative Record Number IND-1419). In that letter, Indiana said 
that it wishes to separate amendment 93-7 into three subparts. OSM 
approved the amendments contained in subpart I on November 9, 1995 (60 
FR 56516).
    By letter dated May 5, 1995 (Administrative Record Number IND-
1462), Indiana submitted additional minor changes to subpart II of 
amendment 93-7, and added a new subparagraph at 301 IAC 12-3-121(d) 
concerning minor field revisions.
    Indiana proposes to add the following language.
    310 IAC 12-3-121(d).
    If the director determines on a case-by-case basis or by policy 
guidelines that the conditions of paragraph (c) of this section are met 
and that the proposed change does not require technical review or 
design analysis, the proposed change may be approved as a minor field 
revision by the field inspector in the inspection report or on a form 
signed in the field. Minor field revisions must be properly documented 
and separately filed and may include, but are not necessarily limited 
to, the following:
    (1) Soil stockpile locations and configurations.
    (2) As-built pond certifications.
    (3) Minor transportation facilities changes.
    (4) Pond depth/shape/orientation.
    (5) Temporary drainage control/water storage areas.
    (6) Equipment changes.
    (7) Explosive storage areas.
    (8) Minor mine management/support facility locations (not refuse).
    (9) Adding United States Soil Conservation Service conservation 
practices.
    (10) Methods of erosion protection on diversions.
    (11) Temporary cessation orders.
    (12) Minor diversion location changes.

III. Public Comment Procedures

    In accordance with provisions of 30 CFR 732.17(h), OSM is now 
seeking comment on whether the amendment proposed by Indiana satisfies 
the requirements of 30 CFR 732.15 for the approval of State program 
amendments. If the amendment is deemed adequate, it will become part of 
the Indiana program.

Written Comments

    Written comments should be specific, pertain only to issues 
proposed in this rulemaking, and include explanations in support of the 
commenter's recommendations. Comments received after the time indicated 
under DATES or at locations other than the Indianapolis Field Office 
will not necessarily be considered in the final rulemaking or included 
in the Administrative Record.

Public Hearing

    Persons wishing to comment at the public hearing should contact the 
person listed under FOR FURTHER INFORMATION CONTACT by the close of 
business on January 2, 1996. If no one requests an opportunity to 
comment at a public hearing, the hearing will not be held.
    Filing of a written statement at the time of the hearing is 
requested as it will greatly assist the transcriber. Submission of 
written statements in advance of the hearing will allow OSM officials 
to prepare adequate responses and appropriate questions.
    The public hearing will continue on the specified date until all 
persons scheduled to comment have been heard. 

[[Page 65613]]
Persons in the audience who have not been scheduled to comment and who 
wish to do so will be heard following those scheduled. The hearing will 
end after all persons who desire to comment have been heard.

Public Meeting

    If only one person requests an opportunity to comment at a hearing, 
a public meeting, rather than a public hearing, may be held. Persons 
wishing to meet with OSM representatives to discuss the proposed 
amendment may request a meeting at the Indianapolis Field Office by 
contacting the person listed under FOR FURTHER INFORMATION CONTACT. All 
such meetings will be open to the public and, if possible, notices of 
meetings will be posted in advance at the locations listed above under 
ADDRESSES. A summary of the meeting will be included in the 
Administrative Record.

Executive Order 12866

    This proposed rule is exempted from review by the Office of 
Management and Budget under Executive Order 12866.

Executive Order 12778

    The Department of the Interior has conducted the reviews required 
by section 2 of Executive Order 12778 and has determined that, to the 
extent allowed by law, this rule meets the applicable standards of 
subsections (a) and (b) of that section. However, these standards are 
not applicable to the actual language of State regulatory programs and 
program amendments since each such program is drafted and promulgated 
by a specific State, not by OSM. Under sections 503 and 505 of SMCRA 
(30 U.S.C. 1253 and 1255) and 30 CFR 730.11, 732.15 and 732.17(h)(10), 
decisions on proposed State regulatory programs and program amendments 
submitted by the States must be based solely on a determination of 
whether the submittal is consistent with SMCRA and its implementing 
Federal regulations and whether the other requirements of 30 CFR Parts 
730, 731, and 732 have been met.

National Environmental Policy Act

    No environmental impact statement is required for this rule since 
section 702(d) of SMCRA [30 U.S.C. 1292(d)] provides that agency 
decisions on proposed State regulatory program provisions do not 
constitute major Federal actions within the meaning of section 
102(2)(C) of the National Environmental Policy Act, 42 U.S.C. 
4332(2)(C).

Paperwork Reduction Act

    This rule does not contain information collection requirements that 
require approval by the Office of Management and Budget under the 
Paperwork Reduction Act, 44 U.S.C. 3507 et seq.

Regulatory Flexibility Act

    The Department of the Interior has determined that this rule will 
not have a significant economic impact on a substantial number of small 
entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). 
The State submittal which is the subject of this rule is based upon 
counterpart Federal regulations for which an economic analysis was 
prepared and certification made that such regulations would not have a 
significant economic effect upon a substantial number of small 
entities. Hence, this rule will ensure that existing requirements 
previously promulgated by OSM will be implemented by the State. In 
making the determination as to whether this rule would have a 
significant economic impact, the Department relied upon the data and 
assumptions for the counterpart Federal regulations.

List of Subjects in 30 CFR Part 914

    Intergovernmental relations, Surface mining, Underground mining.

    Dated: December 12, 1995.
Allen D. Klein,
Regional Director, Appalachian Regional Coordinating Center.
[FR Doc. 95-30948 Filed 12-19-95; 8:45 am]
BILLING CODE 4310-05-M

Complete official Federal Register PDF

FR Doc. 95-30923 Proposed Amendment to Class E Airspace; Muscatine, IA
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65601-65602]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30923]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 71

[Airspace Docket No. 95-ACE-17]

Proposed Amendment to Class E Airspace; Muscatine, IA

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice proposes to amend the Class E airspace area at 
Muscatine Municipal Airport, Muscatine, IA. The development of a new 
Standard Instrument Approach Procedure (SIAP) based on the relocated 
Port City Very High Frequency Omnidirectional Range/Distance Measuring 
Equipment (VOR/DME), has made the proposal necessary. The intended 
effect of this proposal is to provide additional controlled airspace 
for aircraft executing the SIAP at Muscatine Municipal Airport.

DATES: Comments must be received on or before January 19, 1996.

ADDRESSES: Send comments on the proposal in triplicate to: Manager, Air 

[[Page 65602]]
Traffic Operations Branch, ACE-530, Federal Aviation Administration, 
Docket No. 95-ACE-17, 601 East 12th Street, Kansas City, Missouri 
64106.

    The official docket may be examined in the Office of the Assistant 
Chief Counsel for the Central Region at the same address between 9:00 
a.m. and 3:00 p.m., Monday through Friday, except Federal holidays.
    An informal docket may also be examined during normal business 
hours in the office of the Manager, Air Traffic Operations Branch, Air 
Traffic Division, at the address listed above.

FOR FURTHER INFORMATION CONTACT:
Kathy Randolph, Air Traffic Division, Air Traffic Operations Branch, 
ACE-530C, Federal Aviation Administration, 601 East 12th Street, Kansas 
City, Missouri 64106; telephone number: (816) 426-3408.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with those comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No. 95-
ACE-17.'' The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the closing date 
for comments will be considered before taking action on the proposed 
rule. The proposal contained in this notice may be changed in light of 
comments received. All comments submitted will be available for 
examination in the Rules Docket both before and after the closing date 
for comments. A report summarizing each substantive public contact with 
FAA personnel concerned with this rulemaking will be filed in the 
docket.

Availability of NPRMs

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the Federal Aviation Administration, 
Office of Public Affairs, Attention: Public Inquiry Center, APA-230, 
800 Independence Avenue, SW., Washington, DC 20591, or by calling (202) 
267-3484. Communications must identify the notice number of this NPRM. 
Persons interested in being placed on a mailing list for future NPRMs 
should also request a copy of Advisory Circular No. 11-2A, which 
describes the procedures.

The Proposal

    The FAA is considering an amendment to part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to provide additional controlled 
airspace for a new SIAP based on the relocated Port City VOR/DME at the 
Muscatine, IA, Municipal Airport. The additional airspace would 
segregate aircraft operating under VFR conditions from aircraft 
operating under IFR procedures. The area would be depicted on 
appropriate aeronautical charts thereby enabling pilots to 
circumnavigate the area or otherwise comply with IFR procedures. Class 
E airspace designations for airspace areas extending upward from 700 
feet or more above the surface of the earth are published in paragraph 
6005 of FAA Order 7400.9C, dated August 17, 1995, and effective 
September 16, 1995, which is incorporated by reference in 14 CFR 71.1. 
The Class E airspace designation listed in this document would be 
published subsequently in the Order.
    The FAA has determined that this proposed regulation only involves 
an established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore, this proposed regulation--(1) is not a ``significant 
regulatory action'' under Executive Order 12866; (2) is not a 
``significant rule'' under DOT Regulatory Policies and Procedures (44 
FR 11034; February 26, 1979); and (3) does not warrant preparation of a 
Regulatory Evaluation as the anticipated impact is so minimal. Since 
this is a routine matter that will only affect air traffic procedures 
and air navigation, it is certified that this proposed rule will not 
have a significant economic impact on a substantial number of small 
entities under the criteria of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me, the Federal 
Aviation Administration proposes to amend part 71 of the Federal 
Aviation Regulations (14 CFR part 71) as follows:

PART 71--[AMENDED]

    1. The authority citation for part 71 continues to read as follows:

    Authority: 49 U.S.C. 106(g); 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1   [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 6005  Class E airspace areas extending upward from 700 
feet or more above the surface of the earth.

* * * * *

ACE IA E5 Muscatine, IA [Revised]

Muscatine Municipal Airport, IA
    (Lat. 41 deg.22'00'' N., long. 91 deg.08'44'' W)
Port City VOR/DME
    (Lat. 41 deg.21'59'' N., long. 91 deg.08'57'' W)
Muscatine NDB
    (Lat. 41 deg.21'44'' N., long. 91 deg.08'46'' W)

    That airspace extending upward from 700 feet above the surface 
within a 6-mile radius of Muscatine Municipal Airport and within 1.4 
miles each side of the 067 deg. radial of the Port City VOR/DME 
extending from the 6-mile radius to 7 miles northeast of the airport 
and within 2.6 miles each side of the 256 deg. bearing from the 
Muscatine NDB extending from the 6-mile radius to 7 miles southwest 
of the airport.
* * * * *
    Issued in Kansas City, MO, on November 30, 1995.
Herman J. Lyons, Jr.,
Manager, Air Traffic Division, Central Region.
[FR Doc. 95-30923 Filed 12-19-95; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 95-30922 Proposed Amendment to Class E Airspace; Hastings, NE
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65602-65603]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30922]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-ACE-16]

Proposed Amendment to Class E Airspace; Hastings, NE

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice proposes to amend the Class E airspace area at 
Hastings Municipal Airport, Hastings, Nebraska. The development of a 
new Standard Instrument Approach Procedure (SIAP) based on the Global 
Positioning System (GPS) has made the proposal necessary. The intended 
effect of this proposal is to provide additional controlled airspace 
for aircraft executing the SIAP at Hastings Municipal Airport.

[[Page 65603]]

DATES: Comments must be received on or before January 15, 1996.

ADDRESSES: Send comments on the proposal in triplicate to: Manager, Air 
Traffic Operations Branch, ACE-530, Federal Aviation Administration, 
Docket No. 95-ACE-16, 601 East 12th Street, Kansas City, Missouri 
64106.
    The official docket may be examined in the Office of the Assistant 
Chief Counsel for the Central Region at the same address between 9:00 
a.m. and 3:00 p.m., Monday through Friday, except Federal holidays.
    An informal docket may also be examined during normal business 
hours in the office of the Manager, Air Traffic Operations Branch, Air 
Traffic Division, at the address listed above.

FOR FURTHER INFORMATION CONTACT:
Kathy Randolph, Air Traffic Division, Air Traffic Operations Branch, 
ACE-530C, Federal Aviation Administration, 601 East 12th Street, Kansas 
City, Missouri 64106; telephone number: (816) 426-3408.

SUPPLEMENTARY INFORMATION: 

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with those comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No. 95-
ACE-16.'' The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the closing date 
for comments will be considered before taking action on the proposed 
rule. The proposal contained in this notice may be changed in light of 
comments received. All comments submitted will be available for 
examination in the Rules Docket both before and after the closing date 
for comments. A report summarizing each substantive public contact with 
FAA personnel concerned with this rulemaking will be filed in the 
docket.

Availability of NPRMs

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the Federal Aviation Administration, 
Office of Public Affairs, Attention: Public Inquiry Center, APA-230, 
800 Independence Avenue, SW, Washington, DC 20591, or by calling (202) 
267-3484. Communications must identify the notice number of this NPRM. 
Persons interested in being placed on a mailing list for future NPRMs 
should also request a copy of Advisory Circular No. 11-2A, which 
describes the procedures.

The Proposal

    The FAA is considering an amendment to part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to provide additional controlled 
airspace for a new SIAP based on the GPS at the Hastings, Nebraska, 
Municipal Airport. The additional airspace would segregate aircraft 
operating under VFR conditions from aircraft operating under IFR 
procedures. The area would be depicted on appropriate aeronautical 
charts thereby enabling pilots to circumnavigate the area or otherwise 
comply with IFR procedures. Class E airspace designations for airspace 
areas extending upward from 700 feet or more above the surface of the 
earth are published in paragraph 6005 of FAA Order 7400.9C, dated 
August 17, 1995, and effective September 16, 1995, which is 
incorporated by reference in 14 CFR 71.1. The Class E airspace 
designation listed in this document would be published subsequently in 
the Order.
    The FAA has determined that this proposed regulation only involves 
an established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore, this proposed regulation--(1) is not a ``significant 
regulatory action'' under Executive Order 12866; (2) is not a 
``significant rule'' under DOT Regulatory Policies and Procedures (44 
FR 11034; February 26, 1979); and (3) does not warrant preparation of a 
Regulatory Evaluation as the anticipated impact is so minimal. Since 
this is a routine matter that will only affect air traffic procedures 
and air navigation, it is certified that this proposed rule will not 
have a significant economic impact on a substantial number of small 
entities under the criteria of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me, the Federal 
Aviation Administration proposes to amend part 71 of the Federal 
Aviation Regulations (14 CFR part 71) as follows:

PART 71--[AMENDED]

    1. The authority citation for part 71 continues to read as follows:

    Authority: 49 U.S.C. 106(g); 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 6005  Class E airspace areas extending upward from 700 
feet or more above the surface of the earth.

* * * * *

ACE NE E5 Hastings, NE [Revised]

Hastings Municipal Airport, NE
    (Lat. 40 deg.36'16''N., long. 98 deg.25'39''W)

    That airspace extending upward from 700 feet above the surface 
within a 6.7 mile radius of Hastings Municipal Airport and within 2 
miles each side of the 338 deg. bearing from the Hastings Municipal 
Airport extending from the 6.7-mile radius to 10 miles north of the 
airport and within 2 miles each side of the 143 deg. bearing from 
Hastings Municipal Airport extending from the 6.7-mile radius to 10 
miles southeast of the airport, and within 3 miles each side of the 
219 deg. bearing from Hastings Municipal Airport extending from the 
6.7-mile radius to 10 miles southwest of the airport.
* * * * *
    Issued in Kansas City, MO, on November 30, 1995.
Herman J. Lyons, Jr.,
Manager, Air Traffic Division, Central Region.
[FR Doc. 95-30922 Filed 12-19-95; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 95-30921 Proposed Amendment to Class E Airspace; Carroll, IA
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65603-65604]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30921]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-ACE-15]

Proposed Amendment to Class E Airspace; Carroll, IA

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice proposes to amend the Class E airspace area at 
Arthur N. Neu Airport, Carroll, Iowa. The development of a new Standard 
Instrument Approach Procedure (SIAP) based on the Global Positioning 
System 

[[Page 65604]]
(GPS) has made the proposal necessary. The intended effect of this 
proposal is to provide additional controlled airspace for aircraft 
executing the SIAP at Arthur N. Neu Airport.

DATES: Comments must be received on or before January 15, 1996.

ADDRESSES: Send comments on the proposal in triplicate to: Manager, Air 
Traffic Operations Branch, ACE-530, Federal Aviation Administration, 
Docket No. 95-ACE-15, 601 East 12th Street, Kansas City, MO 64106.
    The official docket may be examined in the Office of the Assistant 
Chief Counsel for the Central Region at the same address between 9:00 
a.m. and 3:00 p.m., Monday through Friday, except Federal holidays.
    An informal docket may also be examined during normal business 
hours in the office of the Manager, Air Traffic Operations Branch, Air 
Traffic Division, at the address listed above.

FOR FURTHER INFORMATION CONTACT:
Kathy Randolph, Air Traffic Division, Air Traffic Operations Branch, 
ACE-530C, Federal Aviation Administration, 601 East 12th Street, Kansas 
City, Missouri 64106; telephone number: (816) 426-3408.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with those comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No. 95-
ACE-15.'' The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the closing date 
for comments will be considered before taking action on the proposed 
rule. The proposal contained in this notice may be changed in light of 
comments received. All comments submitted will be available for 
examination in the Rules Docket both before and after the closing date 
for comments. A report summarizing each substantive public contact with 
the FAA personnel concerned with this rulemaking will be filed in the 
docket.

Availability of NPRMs

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the Federal Aviation Administration, 
Office of Public Affairs, Attention: Public Inquiry Center, APA-230, 
800 Independence Avenue, SW., Washington, DC 20591, or by calling (202) 
267-3484. Communications must identify the notice number of this NPRM. 
Persons interested in being placed on a mailing list for future NPRMs 
should also request a copy of Advisory Circular No. 11-2A, which 
describes the procedures.

The Proposal

    The FAA is considering an amendment to Part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to provide additional controlled 
airspace for a new SIAP based on the GPS at the Arthur N. Neu Airport. 
The additional airspace would segregate aircraft operating under VFR 
conditions from aircraft operating under IFR procedures. The area would 
be depicted on appropriate aeronautical charts thereby enabling pilots 
to circumnavigate the area or otherwise comply with IFR procedures. 
Class E airspace designations for airspace areas extending upward from 
700 feet or more above the surface of the earth are published in 
paragraph 6005 of FAA Order 7400.9C, dated August 17, 1995, and 
effective September 16, 1995, which is incorporated by reference in 14 
CFR 71.1. The Class E airspace designation listed in this document 
would be published subsequently in the Order.
    The FAA has determined that this proposed regulation only involves 
an established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore, this proposed regulation (1) is not a ``significant 
regulatory action'' under Executive Order 12866; (2) is not a 
``significant rule'' under DOT Regulatory Policies and Procedures (44 
FR 11034; February 26, 1979); and (3) does not warrant preparation of a 
Regulatory Evaluation as the anticipated impact is so minimal. Since 
this is a routine matter that will only affect air traffic procedures 
and air navigation, it is certified that this proposed rule will not 
have a significant economic impact on a substantial number of small 
entities under the criteria of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me, the Federal 
Aviation Administration proposes to amend part 71 of the Federal 
Aviation Regulations (14 CFR part 71) as follows:

PART 71--[AMENDED]

    1. The authority citation for part 71 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 6005  Class E airspace areas extending upward from 700 
feet or more above the surface of the earth.

* * * * *

ACE IA E5 Carroll, IA [Revised]

Arthur N. Neu Airport, IA
    (Lat. 42 deg.02'46''N. long. 94 deg.47'20''W)
Carroll NDB
    (Lat. 42 deg.02'42''N., long. 94 deg.47'07''W)

    That airspace extending upward from 700 feet above the surface 
within a 6.5-mile radius of Arthur N. Neu Airport and within 2.6 
miles each side of the 142 deg. bearing from the Carroll NDB 
extending from the 6.5-mile radius to 7 miles southeast of the 
airport.
* * * * *
    Issued in Kansas City, MO, on November 30, 1995.
Herman J. Lyons, Jr.,
Manager, Air Traffic Division, Central Region.
[FR Doc. 95-30921 Filed 12-19-95; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 95-30920 Proposed Amendment to Class E Airspace; Atlantic, IA
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65604-65605]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30920]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-ACE-14]

Proposed Amendment to Class E Airspace; Atlantic, IA

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice proposes to amend the Class E airspace area at 
Atlantic, IA. The development of a new Standard Instrument Approach 
Procedure (SIAP) based on the Global Positioning System (GPS) has made 
the proposal necessary. The intended effect of this proposal is to 
provide additional 

[[Page 65605]]
controlled airspace for aircraft executing the SIAP at Atlantic 
Municipal Airport.

DATES: Comments must be received on or before January 15, 1996.

ADDRESSES: Send comments on the proposal in triplicate to: Manager, Air 
Traffic Operations Branch, ACE-530, Federal Aviation Administration, 
Docket No. 95-ACE-14, 601 East 12th Street, Kansas City, MO. 64106
    The official docket may be examined in the Office of the Assistant 
Chief Counsel for the Central Region at the same address between 9:00 
a.m. and 3:00 p.m., Monday through Friday, except Federal holidays.
    An informal docket may also be examined during normal business 
hours in the office of the Manager, Air Traffic Operations Branch, Air 
Traffic Division, at the address listed above.

FOR FURTHER INFORMATION CONTACT:
Kathy Randolph, Air Traffic Division, Air Traffic Operations Branch, 
ACE-530c, Federal Aviation Administration, 601 East 12th Street, Kansas 
City, Missouri 64106; telephone number: (816) 426-3408.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with those comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No. 95-
ACE 14'' The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the closing date 
for comments will be considered before taking action on the proposed 
rule. The proposal contained in this notice may be changed in light of 
comments received. All comments submitted will be available for 
examination in the Rules Docket both before and after the closing date 
for comments. A report summarizing each substantive public contact with 
FAA personnel concerned with this rulemaking will be filed in the 
docket.

Availability of NPRMs

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the Federal Aviation Administration, 
Office of Public Affairs, Attention: Public Inquiry Center, APA-230, 
800 Independence Avenue, SW, Washington, DC 20591, or by calling (202) 
267-3484. Communications must identify the notice number of this NPRM. 
Persons interested in being placed on a mailing list for future NPRMs 
should also request a copy of Advisory Circular No. 11-2A, which 
describes the procedures.

The Proposal

    The FAA is considering an amendment to part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to provide additional controlled 
airspace of a new SIAP based on the GPS at the Atlantic, IA, Municipal 
Airport. The additional airspace would segregate aircraft operating 
under VFR conditions from aircraft operating under IFR procedures. The 
area would be depicted on appropriate aeronautical charts thereby 
enabling pilots to circumnavigate the area or otherwise comply with IFR 
procedures. Class E airspace designations for airspace areas extending 
upward from 700 feet or more above the surface of the earth are 
published in paragraph 6005 of FAA Order 7400.9C, dated August 17, 
1995, and effective September 16, 1995, which is incorporated by 
reference in 14 CFR 71.1. The Class E airspace designation listed in 
this document would be published subsequently in the Order.
    The FAA has determined that this proposed regulation only involves 
an established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore, this proposed regulation--(1) is not a ``significant 
regulatory action'' under Executive Order 12866; (2) is not a 
``significant rule'' under DOT Regulatory Policies and Procedures (44 
FR 11034; February 26, 1979); and (3) does not warrant preparation of a 
Regulatory Evaluation as the anticipated impact is so minimal. Since 
this is a routine matter that will only affect air traffic procedures 
and air navigation, it is certified that this proposed rule will not 
have a significant economic impact on a substantial number of small 
entities under the criteria of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me, the Federal 
Aviation Administration proposes to amend part 71 of the Federal 
Aviation Regulations (14 CFR part 71) as follows:

PART 71--[AMENDED]

    1. The authority citation of part 71 continues to read as follows:

    Authority: 49 U.S.C. 106(g); 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 6005  Class E airspace areas extending upward from 700 
feet or more above the surface of the earth.

* * * * *

ACE IA E5 Atlantic, IA [Revised]

Atlantic Municipal Airport, IA
    (Lat. 41 deg.24'26'' N., long. 95 deg.02'49'' W)
Atlantic NDB
    (Lat. 41 deg.24'26'' N., long. 95 deg.02'47'' W)

    That airspace extending upward from 700 feet above the surface 
within a 6.4-mile radius of Atlantic Municipal Airport and within 4 
miles each side of the 315 deg. bearing from the Atlantic NDB 
extending from the 6.4-mile radius to 8.3 miles northwest of the 
airport.
* * * * *
    Issued in Kansas City, MO, on November 30, 1995.
Herman J. Lyons, Jr.,
Manager, Air Traffic Division, Central Region.
[FR Doc. 95-30920 Filed 12-19-95; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 95-30917 Proposed Amendment to Class E airspace; Worcester, MA
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65605-65607]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30917]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-ANE-61]

Proposed Amendment to Class E airspace; Worcester, MA

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of Proposed Rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice proposes to establish Class E airspace at 
Worcester, MA (ORH). With the commissioning of the Automated Surface 
Observation System (ASOS) at the Worcester Municipal Airport, weather 
reporting is now continuously available at that 

[[Page 65606]]
airport. This action is necessary to establish controlled airspace 
extending upward from the surface for aircraft operating under 
instrument flight rules (IFR) to and from the Worcester Municipal 
Airport during the times when the air traffic control tower is closed.

DATES: Comments must be received on or before January 19, 1996.

ADDRESSES: Send comments on the proposal in triplicate to: Manager, 
System Management Branch, ANE-530, Federal Aviation Administration, 
Docket No. 95-ANE-60, 12 New England Executive Park, Burlington, MA 
01803-5299; telephone (617) 238-7530; fax (617) 238-7596.
    The official docket file may be examined in the Office of the 
Assistant Chief Counsel, New England Region, ANE-7, Room 401, 12 New 
England Executive Park, Burlington, MA 01803-5299; telephone (617) 238-
7040; fax (617) 238-7055.
    An informal docket may also be examined during normal business 
hours in the Air Traffic Division, Room 408, by contacting the Manager, 
System Management Branch at the first address listed above.

FOR FURTHER INFORMATION CONTACT: Raymond Duda, System Management 
Branch, ANE-533, 12 New England Executive Park, Burlington, MA 01803-
5299; telephone (617) 238-7533; fax (617) 238-7596.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed first under ADDRESSES 
above. Commenters wishing the FAA to acknowledge receipt of their 
comments on this notice must submit with those comments a self-
addressed, stamped postcard on which the following statement is made: 
``Comments to Docket No. 95-ANE-61.'' The postcard will be date/time 
stamped and returned to the commenter. All communications received on 
or before the closing date for comments will be considered before 
taking action on the proposed rule. The proposal contained in this 
notice may be changed in light of comments received. All comments 
submitted will be available for examination in the Rules Docket both 
before and after the closing date for comments. A report summarizing 
each substantive public contact with FAA personnel concerned with this 
rulemaking will be filed in the docket.

Availability of NPRMs

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the Federal Aviation Administration, 
Office of Public Affairs, Attention: Public Inquiry Center, APA-230,800 
Independence Avenue, SW, Washington, DC 20591, or by calling (202) 267-
3484. Communications must identify the notice number of this NPRM. 
Persons interested in being placed on a mailing list for future NPRM's 
should also request a copy of Advisory Circular No. 11-2A, which 
describes the application procedures.

The Proposal

    The FAA is considering an amendment to part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to establish a Class E surface 
area at the Worcester Municipal Airport, Worcester, MA (ORH). Since the 
air traffic control tower (ATCT) at Worcester does not operate 
continuously, aircraft operating under instrument flight rules (IFR) to 
and from Worcester would not have had the benefit of weather reports 
from the airport during the times when the tower is closed. The lack of 
continuous weather reporting also required that the controlled airspace 
for Worcester could not extend to the surface. Recently, however, an 
Automated Surface Observation System (ASOS) has been commissioned at 
Worcester, making weather reporting now available continuously. As 
result, this action is necessary to establish controlled airspace 
extending from the surface for those aircraft operating to and from 
Worcester under IFR during the times when the ATCT is closed. Class E 
airspace designations for airspace areas extending upward from the 
surface of the earth in the vicinity of airports are published in 
paragraph 6002 of FAA Order 7400.9C, dated August 17, 1995, and 
effective September 16, 1995, which is incorporated by reference in 14 
CFR 71.1. The Class E airspace designation listed in this document 
would be published subsequently in this Order.
    The FAA has determined that these proposed regulations only involve 
an established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore these proposed regulations--(1) are not ``significant 
regulatory actions'' under Executive Order 12866; (2) are not 
``significant rules'' under DOT Regulatory Policies and Procedures (44 
FR 11034; February 26, 1979); and (3) do not warrant preparation of a 
Regulatory Evaluation as these routine matters will only affect air 
traffic procedures and air navigation, it is certified that these 
proposed rules will not have significant economic impact on a 
substantial number of small entities under the criteria of the 
Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me, the Federal 
Aviation Administration proposes to amend part 71 of the Federal 
Aviation Regulations (14 CFR part 71) as follows:

PART 71--[Amended]

    1. The authority citation for part 71 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1994, and effective September 16, 
1995, is amended as follows:

Subpart E--Class E Airspace

* * * * *

Paragraph 6002  Class E surface areas extending upward from the 
surface of the earth.

* * * * *

ANE MA E2 Worcester, MA [New]

Worcester Municipal Airport, MA
    (Lat. 42 deg.16'02'' N, long. 71 deg.52'32'' W)

    That airspace extending upward from the surface within a 4.2-
mile radius of Worcester Municipal Airport. This Class E airspace 
area is effective during the specific dates and times established in 
advance by a Notice to Airmen. The effective dates and times will 
thereafter by continuously published in the Airport/Facility 
Directory.
* * * * * 

[[Page 65607]]

    Issued in Burlington, MA, on December 13, 1995.
John J. Boyce, Jr.,
Acting Manager, Air Traffic Division, New England Region.
[FR Doc. 95-30917 Filed 12-19-95; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 95-30896 Radio Broadcasting Services; Cassville and Kimberling City, MO
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Page 65618]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30896]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 73

[MM Docket No. 95-179; RM-8728]

Radio Broadcasting Services; Cassville and Kimberling City, MO

AGENCY: Federal Communications Commission.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This document requests comments on a petition filed by Kevin 
M. and Patricia W. Wodlinger, proposing the substitution of Channel 
261C2 for Channel 261A at Cassville, Missouri, reallotment of Channel 
261C2 to Kimberling City, Missouri, and modification of the license for 
Station KRLK accordingly. The coordinates for Channel 261C2 at 
Kimberling City are 36-30-00 and 93-23-00. We shall propose to modify 
the license for Station KRLK in accordance with Sections 1.420(g) and 
(i) of the Commission's Rules and will not accept competing expressions 
of interest for the use of the channel or require petitioner to 
demonstrate the availaility of an additional equivalent class channel 
for use by such parties.

DATES: Comments must be filed on or before February 5, 1996, and reply 
comments on or before February 20, 1996.

ADDRESSES: Federal Communications Commission, Washington, DC 20554. In 
addition to filing comments with the FCC, interested parties should 
serve the petitioner's counsel, as follows: William J. Pennington, III, 
Post Office Box 1447, Mount Pleasant, South Carolina 29465.

FOR FURTHER INFORMATION CONTACT: Kathleen Scheuerle, Mass Media Bureau, 
(202) 418-2180.

SUPPLEMENTARY INFORMATION: This is a summary of the Commission's Notice 
of Proposed Rule Making, MM Docket No. 95-179, adopted December 6, 
1995, and released December 15, 1995. The full text of this Commission 
decision is available for inspection and copying during normal business 
hours in the Commission's Reference Center (Room 239), 1919 M Street, 
NW., Washington, DC. The complete text of this decision may also be 
purchased from the Commission's copy contractors, International 
Transcription Services, Inc., 2100 M Street, NW., Suite 140, 
Washington, DC 20037, (202) 857-3800.
    Provisions of the Regulatory Flexibility Act of l980 do not apply 
to this proceeding.
    Members of the public should note that from the time a Notice of 
Proposed Rule Making is issued until the matter is no longer subject to 
Commission consideration or court review, all ex parte contacts are 
prohibited in Commission proceedings, such as this one, which involve 
channel allotments. See 47 CFR 1.1204(b) for rules governing 
permissible ex parte contact.
    For information regarding proper filing procedures for comments, 
see 47 CFR 1.415 and 1.420.

List of Subjects in 47 CFR Part 73

    Radio broadcasting.

Federal Communications Commission.
John A. Karousos,
Chief, Allocations Branch, Policy and Rules Division, Mass Media 
Bureau.
[FR Doc. 95-30896 Filed 12-19-95; 8:45 am]
BILLING CODE 6712-01-F

Complete official Federal Register PDF

FR Doc. 95-30879 Bureau of Economic and Business Affairs; Foreign Prohibitions on Longshore Work by U.S. Nationals
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Page 65609]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30879]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF STATE

22 CFR Part 89

Bureau of Economic and Business Affairs; Foreign Prohibitions on 
Longshore Work by U.S. Nationals

[Public Notice No. 2314]
AGENCY: Department of State.

ACTION: Proposed rule; extension of Comment Period.

-----------------------------------------------------------------------

SUMMARY: On November 24, 1995, the Department of State issued a 
proposed rulemaking regarding longshore work by foreign nationals in 
U.S. ports and waters. In response to requests from several interested 
parties, the Department is extending the deadline for comments by 30 
days, from December 26, 1995 to January 26, 1996.

DATES: Interested parties are invited to submit comments in triplicate 
no later than January 26, 1996.

ADDRESSES: Comments may be mailed to the Office of Maritime and Land 
Transport (EB/TRA/MA), Room 5828, Department of State, Washington, D.C. 
20520-5816.

FOR FURTHER INFORMATION CONTACT:
Richard T. Miller, Office of Maritime and Land Transport, Department of 
State, (202) 647-6961.

SUPPLEMENTARY INFORMATION: On November 24, 1995, the Department of 
State issued a proposed rulemaking (60 FR 58026) updating the list of 
longshore work by particular activity, of countries where performance 
of such a particular activity by crewmembers aboard United States 
vessels is prohibited by law, regulation, or in practice in the 
country. The crews of ships registered in or owned by nationals of the 
countries on the list may not perform the activities enumerated on the 
list. Citing the need for more time to assess the full effects of the 
proposed rule, a number of parties have requested an extension of the 
comment period. Consequently, the Department will extend the deadline 
by 30 days, from December 26, 1995 to January 26, 1996.

(8 U.S.C. 1288, Pub. L. 010-649, 104 Stat. 4878)

    Dated: December 14, 1995.
Daniel K. Tarullo,
Assistant Secretary, Economic and Business Affairs, Department of 
State.
[FR Doc. 95-30879 Filed 12-19-95; 8:45 am]
BILLING CODE 4710-07-M

Complete official Federal Register PDF

FR Doc. 95-30862 Exemption of the Securities of the Federative Republic of Brazil, the Republic of Argentina, and the Republic of Venezuela Under the Securities Exchange Act of 1934 for Purposes of Trading Futures Contracts on Those Securities
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65607-65609]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30862]

=======================================================================
-----------------------------------------------------------------------

SECURITIES AND EXCHANGE COMMISSION

17 CFR Part 240

[Release No. 34-36580, International Series Release No. 900, File No. 
S7-34-95]
RIN 3235-AG68

Exemption of the Securities of the Federative Republic of Brazil, 
the Republic of Argentina, and the Republic of Venezuela Under the 
Securities Exchange Act of 1934 for Purposes of Trading Futures 
Contracts on Those Securities

AGENCY: Securities and Exchange Commission.

ACTION: Proposed rule amendment and solicitation of public comments.

-----------------------------------------------------------------------

SUMMARY: The Commission proposes for comment an amendment to Rule 3a12-
8 (``Rule'') that would designate debt obligations issued by the 
Federative Republic of Brazil (``Brazil''), the Republic of Argentina 
(``Argentina''), and the Republic of Venezuela (``Venezuela'') 
(collectively the ``Proposed Countries'') as ``exempted securities'' 
for the purpose of marketing and trading of futures contracts on those 
securities in the United States. The amendment is intended to permit 
futures trading on the sovereign debt of the Proposed Countries. This 
change is not intended to have any substantive effect on the operation 
of the Rule.

DATES: Comments should be submitted by January 19, 1996.

ADDRESSES: All comments should be submitted in triplicate and addressed 
to Jonathan G. Katz, Secretary, Securities and Exchange Commission, 450 
Fifth Street, N.W., Washington, D.C. 20549. All comments should refer 
to File No. S7-34-95, and will be available for public inspection and 
copying at the Commission's Public Reference Room, 450 Fifth Street, 
N.W., Washington, D.C.

FOR FURTHER INFORMATION CONTACT: James T. McHale, Attorney, Office of 
Market Supervision (``OMS''), Division of Market Regulation 
(``Division''), Securities and Exchange Commission (Mail Stop 5-1), 450 
Fifth Street, N.W., Washington, D.C. 20549, at 202/942-0190.

SUPPLEMENTARY INFORMATION:

I. Introduction

    Under the Commodity Exchange Act (``CEA''), it is unlawful to trade 
a futures contract on any individual security unless the security in 
question is an exempted security (other than a municipal security) 
under the Securities Act of 1933 (``Securities Act'') or the Securities 
Exchange Act of 1934 (``Exchange Act''). Debt obligations of foreign 
governments are not exempted securities under either of these statutes. 
The Securities and Exchange Commission (``SEC'' or ``Commission''), 
however, has adopted Rule 3a12-8 under the Exchange Act to designate 
debt obligations issued by certain foreign governments as exempted 
securities under the Exchange Act solely for the purpose of marketing 
and trading futures contracts on those securities in the United States. 
As amended, the foreign governments currently designated in the Rule 
are Great Britain, Canada, Japan, Australia, France, New Zealand, 
Austria, Denmark, Finland, The Netherlands, Switzerland, Germany, the 
Republic of Ireland, Italy, Spain, and Mexico (the ``Designated Foreign 
Governments''). As a result, futures contracts on the debt obligations 
of these countries may be sold in the United States, as long as the 
other terms of the Rule are satisfied.
    The Commission today is soliciting comments on a proposal to amend 
Rule 3a12-8 (17 CFR 240.3a12-8) to add the debt obligations of Brazil, 
Argentina, and Venezuela to the list of Designated Foreign Government 
securities that are exempted by Rule 3a12-8. To qualify for the 
exemption, futures contracts on debt obligations of the Proposed 
Countries would have to meet all the other existing requirements of the 
Rule.

II. Background

    Rule 3a12-8 was adopted in 1984 1 pursuant to the exemptive 
authority in Section 3(a)(12) of the Exchange Act in order to provide a 
limited exception from the CEA's prohibition on futures overlying 
individual securities.2 As originally adopted, the Rule provided 
that the debt obligations of Great Britain and Canada would be deemed 
to be exempted securities, solely for the purpose of permitting the 
offer, sale, and confirmation of ``qualifying foreign futures 
contracts'' on such securities. The securities in question were not 
eligible for the exemption if they were registered under the Securities 
Act or were the subject of any American depositary receipt so 
registered. A futures contract on such a debt obligation is deemed 
under the Rule to be a ``qualifying foreign futures contract'' if the 
contract is deliverable outside the United States and is traded on a 
board of trade.3

    \1\ See Securities Exchange Act Release Nos. 20708 (``Original 
Adopting Release'') (March 2, 1984), 49 FR 8595 (March 8, 1984) and 
19811 (``Original Proposing Release'') (May 25, 1983), 48 FR 24725 
(June 2, 1983).
    \2\ In approving the Futures Trading Act of 1982, Congress 
expressed its understanding that neither the SEC nor the Commodity 
Futures Trading Commission (``CFTC'') had intended to bar the sale 
of futures on debt obligations of the United Kingdom of Great 
Britain and Northern Ireland to U.S. persons, and its expectation 
that administrative action would be taken to allow the sale of such 
futures contracts in the United States. See Original Proposing 
Release, supra note 1, 48 FR at 24725 (citing 128 Cong. Rec. H7492 
(daily ed. September 23, 1982) (statements of Representatives 
Daschle and Wirth)).
    \3\ As originally adopted, the Rule required that the board of 
trade be located in the country that issued the underlying 
securities. This requirement was eliminated in 1987. See Securities 
Exchange Act Release No. 24209 (March 12, 1987), 52 FR 8875 (March 
20, 1987).
---------------------------------------------------------------------------

    The conditions imposed by the Rule were intended to facilitate the 
trading of futures contracts on foreign government securities in the 
United States while requiring offerings of foreign government 
securities to comply with the federal securities laws. Accordingly, the 
conditions set forth in the Rule were designed to ensure that, absent 
registration, a domestic market in unregistered foreign government 
securities would not develop, and that markets for futures on these 
instruments would not be used to avoid the securities law registration 
requirements. In particular, the Rule was intended to ensure that 
futures on exempted sovereign debt did not operate as a surrogate means 
of trading the unregistered debt.
    Subsequently, the Commission amended the Rule to include the debt 
securities issued by Japan, Australia, France, New Zealand, Austria, 
Denmark, Finland, the Netherlands, Switzerland, Germany, Ireland, 
Italy, Spain, and, most recently, Mexico.4

    \4\ As originally adopted, the Rule applied only to British and 
Canadian government securities. See Original Adopting Release, supra 
note 1. In 1986, the Rule was amended to include Japanese government 
securities. See Securities Exchange Act Release No. 23423 (July 11, 
1986), 51 FR 25996 (July 18, 1986). In 1987, the Rule was amended to 
include debt securities issued by Australia, France and New Zealand. 
See Securities Exchange Act Release No. 25072 (October 29, 1987), 52 
FR 42277 (November 4, 1987). In 1988, the Rule was amended to 
include debt securities issued by Austria, Denmark, Finland, the 
Netherlands, Switzerland, and West Germany. See Securities Exchange 
Act Release No. 26217 (October 26, 1988), 53 FR 43860 (October 31, 
1988). In 1992 the Rule was again amended to (1) include debt 
securities offered by the Republic of Ireland and Italy, (2) change 
the country designation of ``West Germany'' to the ``Federal 
Republic of Germany,'' and (3) replace all references to the 
informal names of the countries listed in the Rule with references 
to their official names. See Securities Exchange Act Release No. 
30166 (January 6, 1992), 57 FR 1375 (January 14, 1992). In 1994, the 
Rule was amended to include debt securities issued by the Kingdom of 
Spain. See Securities Exchange Act Release No. 34908 (October 27, 
1994), 59 FR 54812 (November 2, 1994). Finally, the Rule was amended 
to include the debt securities of Mexico. See Securities Exchange 
Act Release No. 36530 (November 30, 1995), 60 FR 62323 (December 6, 
1995) (``Mexico Adopting Release''). 

[[Page 65608]]

---------------------------------------------------------------------------

III. Discussion

    The Chicago Mercantile Exchange (``CME'') has proposed that the 
Commission amend Rule 3a12-8 to include the sovereign debt of the 
Proposed Countries.5 The CME intends to develop a futures contract 
market in Brady bonds issued by the Proposed Countries.6 Brady 
bonds are issued pursuant to the Brady plan which allows developing 
countries to restructure their commercial bank debt by issuing long-
term dollar denominated bonds.7 The Commission understands that 
Brady bonds issued by the Proposed Countries are currently traded 
primarily in the over-the-counter market in the United States.

    \5\ See Letter from William J. Brodsky, President and Chief 
Executive Officer, CME, to Arthur Levitt, Jr., Chairman, Commission, 
dated November 10, 1995 (``CME petition'').
    \6\ The marketing and trading of foreign futures contracts is 
subject to regulation by the CFTC. In particular, Section 4b of the 
CEA authorizes the CFTC to regulate the offer and sale of foreign 
futures contracts to U.S. residents, and Rule 9 (17 CFR 30.9), 
promulgated under Section 2(a)(1)(A) of the CEA, is intended to 
prohibit fraud in connection with the offer and sale of futures 
contracts executed on foreign exchanges. Additional rules 
promulgated under 2(a)(1)(A) of the CEA govern the domestic offer 
and sale of futures and options contracts traded on foreign boards 
of trade. These rules require, among other things, that the domestic 
offer and sale of foreign futures be effected through the CFTC 
registrants or through entities subject to a foreign regulatory 
framework comparable to that governing domestic futures trading. See 
17 CFR 30.3, 30.4, and 30.5 (1991).
    \7\ There are several types of Brady bonds, but ``Par Bradys'' 
and ``Discount Bradys'' represent the great majority of issues in 
the Brady bond market. In general, both Par Bradys and Discount 
Bradys are secured as to principal at maturity by U.S. Treasury 
zero-coupon bonds. Additionally, usually 12 to 18 months of interest 
payments are also secured in the form of a cash collateral account, 
which is maintained to pay interest in the event that the sovereign 
debtor misses an interest payment.
---------------------------------------------------------------------------

    Under the proposed amendment, the existing conditions set forth in 
the Rule (i.e., that the underlying securities not be registered in the 
United States,8 the futures contracts require delivery outside the 
United States,9 and the contracts be traded on a board of trade) 
would continue to apply.

    \8\ The Commission notes that while no Brady bonds of Proposed 
Countries have been registered in the United States, certain 
sovereign debt issues of Argentina and Venezuela have been so 
registered. The trading of futures on U.S-registered debt securities 
of Argentina and Venezuela would not be exempted under Rule 3a12-8 
from the CEA's general prohibition on futures overlying individual 
securities.
    \9\ The CME's proposed futures contracts will be cash-settled 
(i.e., settlement of the futures contracts will not entail delivery 
of the underlying securities). The Commission has recognized that a 
cash-settled futures contract is consistent with the requirement of 
the Rule that delivery must be made outside the United States. See 
Securities Exchange Act Release No. 25072 (October 29, 1987), 52 FR 
42277 (November 4, 1987).
---------------------------------------------------------------------------

    In determining whether to amend the Rule to add new countries, the 
Commission has considered whether there is an active and liquid 
secondary trading market in the particular sovereign debt. There 
appears to be an active and liquid market in the debt instruments of 
the Proposed Countries. According to the CME, as of December 31, 1993, 
the total public and publicly guaranteed debt 10 of Brazil, 
Argentina, and Venezuela was approximately US$86 billion, US$55 
billion, and US$74 billion, respectively.11 Moreover, the cash 
market for Brady bonds issued by the Proposed Countries evidences 
relatively active trading. Based on data provided by the CME, the total 
1994 trading volume in the Brady bonds of Brazil, Argentina, and 
Venezuela was approximately US$371 billion, US$360 billion, and US$320 
billion, respectively.12

    \10\ Public debt is an external obligation of a public debtor, 
including the national government, a political subdivision (or any 
agency of either) and autonomous public bodies. Publicly guaranteed 
debt is an external obligation of a private debtor that is 
guaranteed for repayment by a public entity.
    \11\ See Letter from Carl A. Royal, Senior Vice President and 
Special Counsel, CME, to James T. McHale, Attorney, OMS, Division, 
Commission, dated November 30, 1995 (citing the World Bank's 1995 
World Debt Tables as the source for this information) (``November 30 
letter'').
    \12\ See November 30 letter, supra note 11. As mentioned 
earlier, the Commission recently amended the Rule to include the 
debt securities of Mexico. The total 1994 trading volume in Mexican 
Brady bonds was approximately US$282.3 billion. See Mexico Adopting 
Release, supra note 4.
---------------------------------------------------------------------------

    In light of the above data, the Commission believes preliminarily 
that the debt obligations of the Proposed Countries should be subject 
to the same regulatory treatment under the Rule as the debt obligations 
of the Designated Foreign Governments. Moreover, the trading of futures 
on the sovereign debt of Brazil, Argentina, and Venezuela should 
provide U.S. investors with a vehicle for hedging the risks involved in 
the trading of the underlying sovereign debt of the Proposed Countries.
    In addition, the Commission preliminarily believes that the 
proposed amendment offers potential benefits for U.S. investors. If 
adopted, the proposed amendment would allow U.S. boards of trade to 
offer in the United States, and U.S. investors to trade, a greater 
range of futures contracts on foreign government debt obligations. The 
Commission does not anticipate that the proposed amendment would result 
in any direct cost for U.S. investors or others. The proposed amendment 
would impose no recordkeeping or compliance burdens, and merely would 
provide a limited purpose exemption under the federal securities laws. 
The restrictions imposed under the proposed amendment are identical to 
the restrictions currently imposed under the terms of the Rule and are 
designed to protect U.S. investors.
    Section 23(a)(2) of the Exchange Act requires the Commission in 
amending rules to consider potential impact on competition. Because the 
proposal is intended to expand the range of financial products 
available in the United States, the Commission preliminarily believes 
that the proposed amendment to the Rule will not impose any burden on 
competition not necessary or appropriate in furtherance of the purposes 
of the Exchange Act.

IV. Request for Comments

    The Commission seeks comments on the desirability of designating 
the debt securities of the Proposed Countries as exempted securities 
under Rule 3a12-8. Comments should address whether the trading or other 
characteristics of the Proposed Countries' debt warrant an exemption 
for purposes of futures trading. Commentators may wish to discuss 
whether there are any legal or policy reasons for distinguishing 
between the Proposed Countries and the Designated Foreign Governments 
for purposes of the Rule. The Commission also solicits comments on the 
costs and benefits of the proposed amendment to Rule 3a12-8. 
Specifically, the Commission requests commentators to address whether 
the proposed amendment would generate the anticipated benefits, or 
impose any costs on U.S. investors or others. Finally, the Commission 
seeks comment on the general application and operation of the Rule 
given the increased globalization of the securities markets since the 
Rule was adopted.

V. Regulatory Flexibility Act Certification

    Pursuant to Section 605(b) of the Regulatory Flexibility Act, 5 
U.S.C. Sec. 605(b), the Chairman of the Commission has certified that 
the amendment proposed herein would not, if adopted, have a significant 
economic impact on a substantial number of small entities. This 
certification, including the reasons therefor, is attached to this 
release as Appendix A. 

[[Page 65609]]

VI. Statutory Basis

    The amendment to Rule 3a12-8 is being proposed pursuant to 15 
U.S.C. Secs. 78a et seq., particularly Sections 3(a)(12) and 23(a), 15 
U.S.C. Secs. 78c(a)(12) and 78w(a).

List of Subjects in 17 CFR Part 240

    Reporting and recordkeeping requirements, Securities.

VII. Text of the Proposed Amendment

    For the reasons set forth in the preamble, the Commission is 
proposing to amend Part 240 of Chapter II, Title 17 of the Code of 
Federal Regulations as follows:

PART 240--GENERAL RULES AND REGULATIONS, SECURITIES EXCHANGE ACT OF 
1934

    1. The authority citation for part 240 continues to read in part as 
follows:

    Authority: 15 U.S.C. 77c, 77d, 77g, 77j, 77s, 77eee, 77ggg, 
77nnn, 77sss, 77ttt, 78c, 78d, 78i, 78j, 78l, 78m, 78n, 78o, 78p, 
78q, 78s, 78w, 78x, 78ll(d), 79q, 79t, 80a-20, 80a-23, 80a-29, 80a-
37, 80b-3, 80b-4 and 80b-11, unless otherwise noted.
* * * * *
    2. Section 240.3a12-8 is amended by removing the word ``or'' at the 
end of paragraph (a)(1)(xv), removing the ``period'' at the end of 
paragraph (a)(1)(xvi) and adding ``; or'' in its place, and adding 
paragraph (a)(1)(xvii), paragraph (a)(1)(xviii), and paragraph 
(a)(1)(xix) to read as follows:

Sec. 240.3a12-8 Exemption for designated foreign government securities 
for purposes of futures trading.

    (a) * * *
    (1) * * *
    (xvii) the Federative Republic of Brazil;
    (xviii) the Republic of Argentina; or
    (xix) the Republic of Venezuela.
* * * * *
    By the Commission.

    Dated: December 13, 1995.
Jonathan G. Katz,
Secretary.
    Note: Appendix A to the Preamble will not appear in the Code of 
Federal Regulations.

Appendix A--Regulatory Flexibility Act Certification

    I, Arthur Levitt, Jr., Chairman of the Securities and Exchange 
Commission, hereby certify, pursuant to 5 U.S.C. 605(b), that the 
proposed amendment to Rule 3a12-8 (``Rule'') under the Securities 
Exchange Act of 1934 (``Exchange Act'') set forth in Securities 
Exchange Act Release No. 36580, which would define government debt 
securities of Brazil, Argentina and Venezuela (collectively the 
``Proposed Countries'') as exempted securities under the Exchange 
Act for the purpose of trading futures on such securities, will not 
have a significant economic impact on a substantial number of small 
entities for the following reasons. First, the proposed amendment 
imposes no record-keeping or compliance burden in itself and merely 
allows, in effect, the marketing and trading in the United States of 
futures contracts overlying the government debt securities of the 
Proposed Countries. Second, because futures contracts on the sixteen 
countries whose debt obligations are designated as ``exempted 
securities'' under the Rule, which already can be traded and 
marketed in the U.S., still will be eligible for trading under the 
proposed amendment, the proposal will not affect any entity 
currently engaged in trading such futures contracts. Third, because 
the level of interest presently evident in this country in the 
futures trading covered by the proposed rule amendment is modest and 
those primarily interested are large, institutional investors, 
neither the availability nor the unavailability of these futures 
products will have a significant economic impact on a substantial 
number of small entities, as that term is defined for broker-dealers 
in 27 CFR 240.0-10 and to the extent that it is defined for futures 
market participants in the Commodity Futures Trading Commission's 
``Policy Statement and Establishment of Definitions of `Small 
Entities' for Purposes of the Regulatory Flexibility Act.'' 1

    \1\ 45 FR 18618 (April 30, 1982).
---------------------------------------------------------------------------

    Dated: December 13, 1995.
Arthur Levitt, Jr.,
Chairman.
[FR Doc. 95-30862 Filed 12-19-95; 8:45 am]
BILLING CODE 8010-01-P

Complete official Federal Register PDF

FR Doc. 95-30821 Atlantic Mackerel, Squid, and Butterfish Fisheries; Amendment 5
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65618-65631]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30821]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Parts 611 and 655

[Docket No. 951208293-5293-01; I.D. 110995B]
RIN 0648-AF01

Atlantic Mackerel, Squid, and Butterfish Fisheries; Amendment 5

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Proposed rule; request for comments.

-----------------------------------------------------------------------

SUMMARY: NMFS issues this proposed rule to implement the measures 
contained in Amendment 5 to the Fishery Management Plan for the 
Atlantic Mackerel, Squid, and Butterfish Fisheries (FMP). Amendment 5 
is intended to further the Americanization of the fisheries and to 
implement measures to prevent overfishing and avoid overcapitalization 
of the domestic fleet.

DATES: Comments on the proposed rule must be received on or before 
January 29, 1996.

ADDRESSES: Comments on the proposed rule should be sent to: Dr. Andrew 
A. Rosenberg, Regional Director, National Marine Fisheries Service, 
Northeast Regional Office, One Blackburn Drive, Gloucester, MA 01930-
2298. Mark the outside of the envelope, ``Comments on Amendment 5 
Atlantic Mackerel, Squid, and Butterfish.''
    Comments regarding the burden-hour estimates or any other aspect of 
the collection-of-information requirements contained in this proposed 
rule should be sent to the Northeast Regional Director at the address 
above and the Office of Management and Budget (OMB) (Attention: NOAA 
Desk Officer), Washington, D.C. 20503.
    Copies of the Amendment, final environmental impact statement, 
regulatory impact review, and other supporting documents are available 
upon request from David R. Keifer, Executive Director, Mid-Atlantic 
Fishery Management Council, Room 2115, Federal Building, 300 South New 
Street, Dover, DE 19901-6790.

FOR FURTHER INFORMATION CONTACT: Myles Raizin, Fishery Policy Analyst, 
508-281-9104. 

[[Page 65619]]

SUPPLEMENTARY INFORMATION:

Background

    Amendment 5 was developed in response to concerns regarding 
overcapitalization expressed by industry representatives at several 
meetings of the Mid-Atlantic Fishery Management Council (Council) and 
its Squid, Mackerel, and Butterfish (SMB) Committee in the early 
1990's. Increases in domestic squid landings and a stagnation in the 
growth of butterfish landings at well below the maximum sustainable 
yield (MSY) for that species moved the Council to develop this 
comprehensive amendment.
    At its July, 1992, meeting, the Council voted to publish a notice 
of control date for the Atlantic mackerel, squid, and butterfish 
fisheries. The control date established was August 13, 1992 (57 FR 
36384, August 13, 1992). This notice informed the public that the 
Council was considering a moratorium on vessel permits issued for these 
fisheries. At its July, 1994, meeting, the Council reconsidered the 
need for a control date for the Atlantic mackerel fishery. The data the 
Council reviewed indicated the catch and fishing effort had decreased 
in 1993 and 1994, while stock biomass remained high. In response, the 
Council rescinded the control date for the Atlantic mackerel fishery 
(59 FR 49235, September 27, 1994). Initial public scoping meetings to 
discuss possible management measures for SMB took place in January, 
1993, at which time the vessel moratorium, mesh restrictions, and area 
and seasonal closures were identified as measures for consideration. A 
public hearing draft of Amendment 5 was adopted by the Council at its 
June, 1994, meeting and presented at public hearings in December, 1994. 
As a result of issues raised at the hearings, the Council voted in 
February, 1995, to issue a supplement to Amendment 5 that contained 
revisions to the Loligo minimum mesh net requirement and the qualifying 
criteria for the vessel moratoria. Public hearings were conducted in 
April, 1995, to present the revised Amendment. The Council adopted 
Amendment 5 on May 25, 1995, for submission to NMFS for Secretarial 
review.

Status of the Stocks

    In 1993, the 17th Northeast Regional Stock Assessment Workshop 
(17th SAW) was convened to examine the status of several species, 
including Illex and Loligo squid and butterfish.
    Results of SAW 17, as indicated in the March, 1994, plenary report, 
estimated MSY for Loligo squid to be 36,000 metric tons (mt) based on 
the finding that the Loligo has a life span of one year rather than 
three, as previously believed. The present MSY for Loligo squid is 
specified in the FMP as 44,000 mt, based on the assumption that Loligo 
squid has a 3-year life span. The 17th SAW advised that Loligo is 
considered to be fully utilized when based on the revised MSY of 36,000 
mt.
    The present MSY for Illex is specified in the FMP as 30,000 mt and 
is based on the disproven assumption that the life span of these 
animals is 2 years. Though the 17th SAW determined that Illex also has 
a life span of 1 year, it did not recommend revising the MSY. Instead, 
the 17th SAW recommended that, since Illex is a transboundary stock 
between the United States and Canada, a joint assessment should be 
conducted before a revised MSY could be recommended. However, the 17th 
SAW advised that the current MSY for Illex may be inappropriate and 
cautioned that, while the stock is under-exploited based on current 
MSY, the potential for recruitment overfishing may be substantial.
    The exploitation rate for butterfish is unknown. However, the stock 
is at a low-to-medium biomass level and current catch levels are well 
below the MSY of 16,000 mt. The adult component of the stock has 
declined since 1990 and is currently well below average. It is 
estimated that 50 percent of the harvest of butterfish over the past 
several years has been discarded due to both the relatively small size 
of the fish and the lack of markets. The largest butterfish landings in 
recent years have been made as bycatch in the Loligo squid fishery.
    At the time the Council was developing and adopting Amendment 5, 
the most recent stock assessment for Atlantic mackerel was that done in 
1991, when the 12th SAW assessed the stock as underexploited with a 
high biomass. That assessment indicated that, following a period of 
poor year classes from 1976 through 1980, there were several years with 
relatively good recruitment, yielding especially strong year classes in 
1982, 1987, and 1988. These cohorts contributed to a marked increase in 
stock biomass. Estimated spawning stock biomass was 3,010,000 mt in 
1991 with an exploitation rate of 2 percent.
    The recently concluded 20th SAW determined that, based on the 1994 
stock assessment, the Atlantic mackerel stock continues to be under-
exploited and at a high biomass level. The exploitation rate of two 
percent has not changed. The 20th SAW further concluded that the long-
term potential catch (LTPC) projected for the Canadian and U.S. 
Atlantic mackerel combined was approximately 150,000 mt. This 
represents an increase of 16,000 mt from the previous LTPC value of 
134,000 mt. The LTPC is the estimate of allowable annual catch levels 
that would sustain the fishery for several years.

Management Measures

    NMFS is requesting comment on all measures contained in Amendment 
5. However, NMFS has serious concerns about the proposed criteria for 
entry into the fisheries for the squids and butterfish, the exemption 
proposed for the sea herring fishery, the Council's proposal to 
constrain ABC by the LTPC value, and the use of the 50-fathom curve as 
a boundary for the exemption from the minimum mesh size for Loligo 
during prosecution of the summer Illex fishery. Because of NMFS' 
concerns regarding the enforceability of the 50-fathom curve as a 
boundary, NMFS proposes a set of latitude-longitude coordinates to 
achieve the Council's intent in an enforceable manner. While comment is 
sought on all measures contained in the proposed rule, NMFS asks the 
public to focus on these measures in particular, to assist in 
conducting a thorough and deliberative review of the amendment before 
final approval or disapproval by the Secretary of Commerce (Secretary).
    In addition, NMFS notes that the provision contained in Amendment 5 
that would require the Secretary to publish a control date for the 
Atlantic mackerel fishery when commercial landings reach 50 percent of 
allowable biological catch (ABC) is not included in this proposed rule. 
NMFS does not consider this provision to be a management measure to be 
implemented by a fishery management plan. Rather, it is viewed as a 
statement of Council intent; NMFS expects that the Council will 
recommend the publication of a notice of control date when it deems 
this action necessary.
    The permit and reporting requirements and revision to the annual 
specification process, if approved, will be implemented for the 1997 
fishing year. Other provisions may be effective prior to that time.

Elimination of the Potential for Joint Ventures and Directed Foreign 
Fishing for the Squids and Butterfish

    The Council proposes to eliminate foreign participation in these 
fisheries. Joint ventures and total allowable levels of foreign fishing 
(TALFF) have not been allocated for squid or butterfish since the mid-
1980's. The Council concluded that the domestic fleet has the capacity 
to harvest the OY from 

[[Page 65620]]
these fisheries. However, joint venture and TALFF allocations for 
Atlantic mackerel may continue. If there is TALFF specified for 
Atlantic mackerel, there will be butterfish bycatch TALFF allocated 
that is equal to 0.08 percent of the mackerel TALFF, in order to reduce 
waste of bycatch in that fishery. The definitions of ``other allocated 
species'' and ``prohibited species'' at 50 CFR 611.50(b) are modified 
accordingly, to make squids ``prohibited species.''

MSY for Loligo Squid

    The Council would revise the MSY for Loligo squid to 36,000 mt from 
44,000 mt. The revision is based on the finding that the squid has a 
one-year life span. The stock is considered to be fully-exploited.

Spawning Stock Biomass (SSB) and LTPC for Atlantic Mackerel

    The FMP currently specifies ABC for Atlantic mackerel as that U.S. 
catch that would yield an SSB of 600,000 mt. The Council would revise 
this threshold upward to 900,000 mt to promote recruitment. A time 
series based on the 1991 assessment found that the median year class 
size for years 1962-93, inclusive, was 1.277 billion fish. When the SSB 
was less than 900,000 mt, only 35 percent of the ensuing year classes 
were observed to be above the median. Conversely, 82 percent of the 
year classes were above the median recruitment level when SSB exceeded 
900,000 mt.
    The Council would also constrain ABC with a derived LTPC. The 
current LTPC specified annually by the Council would be 150,000 mt 
minus the projected annual Canadian catch. Therefore, at present, if 
this measure were approved, ABC could be no larger than 150,000 mt and 
is likely to be less. The Council believes that management of Atlantic 
mackerel should be based on long-term yield projections. However, NMFS 
is concerned about the fact that Atlantic mackerel stock abundance is 
very high currently, and that limiting ABC by LTPC may be overly 
constraining in the short term. The 20th SAW states that at current 
stock abundance amounts, Atlantic mackerel landings of 200,000 mt could 
be sustained for several years because of foregone yield in the fishery 
recently.

Seasonal Quota for Loligo Squid

    This management measure would give the Regional Director authority 
to establish annual seasonal quotas for Loligo based on the 
recommendations of the Atlantic Mackerel, Squid, and Butterfish 
Monitoring Committee (Monitoring Committee) and the Council. Such 
quotas are intended to ensure sufficient escapement of Loligo squid 
from the offshore winter fishery to allow for catches in traditional 
inshore fisheries.

Moratorium on Vessel Permits for Butterfish and Squids

    The Council would establish a moratorium on new vessel permits for 
the directed fisheries for butterfish and the squids. The Council would 
also establish a vessel permit category open to all vessels, which 
would allow a vessel to retain up to 2,500 lb (1.13 mt) of each species 
per trip. This incidental catch level could be adjusted annually.
    Moratorium permits would be issued for Loligo squid and butterfish 
jointly and Illex squid separately. In the November, 1994, public 
hearing draft, the time horizon that served as a basis for qualifying 
for the moratoria permits was August 13, 1988, to August 13, 1993. 
Landings requirements proposed at that time were 5,000 lb (2.27 mt) in 
one week for Loligo squid or butterfish and five separate trips of at 
least 5,000 lb (2.27 mt) each for Illex. Furthermore, it was proposed 
that vessels would qualify for the Illex permit if owners had purchased 
refrigerated sea water equipment or an on-board freezer by May 31, 
1994, and had landed five trips of at least 5,000 lb (2.27 mt) prior to 
the promulgation of the final regulations implementing Amendment 5. 
Under both moratoria, vessel replacement would be allowed if a 
qualifying vessel leaves the fishery involuntarily; for example, if it 
sinks.
    Comments during the public hearings held in December, 1994, 
indicated that the industry believed the qualification period for the 
Illex squid permit should be extended back to August 13, 1981. This 
revision would allow the catch history of vessels that participated in 
the foreign joint venture fishery prior to 1988 to qualify them for a 
moratorium permit. At the February 23, 1995, SMB Committee meeting, 
industry representatives argued that it would not be fair to limit the 
extension of the qualification period to the Illex fishery only, 
convincing the Committee to recommend that the Council extend the 
qualification period back to 1981, for both the Illex and Loligo/
butterfish moratoria permits. Furthermore, the SMB Committee believed 
that the Loligo/butterfish landing criterion was not in line with 
active participation in these fisheries. It recommended requiring 
20,000 lb (9.07 mt) to have been landed in any 30-consecutive-day 
period during the qualification period. The Council accepted the SMB 
Committee's recommendations at its March, 1995, meeting. However, since 
these changes to the Public Hearing Draft regarding qualifying 
conditions were viewed as substantive, a Supplemental Public Hearing 
Draft was developed and presented at public hearings in April, 1995. 
After taking into account public comment, the Council adopted the 
revised qualifying criteria in May, 1995.

Party or Charter Boat Permit

    The owner of a party or charter boat (vessel for hire) would be 
required to obtain an SMB party or charterboat permit. A party or 
charter vessel obtaining this permit could also have a commercial 
permit for Atlantic mackerel or a commercial moratorium permit for 
Illex squid and/or Loligo/butterfish if the vessel meets the qualifying 
criteria. However, such a vessel would be prohibited from fishing 
commercially when carrying passengers for a fee.

Atlantic Mackerel Permit

    Although a moratorium would not exist on entry into the Atlantic 
mackerel fishery, an Atlantic mackerel permit would be required to 
harvest and sell Atlantic mackerel. Vessels receiving permits for the 
Atlantic mackerel fishery would be required to comply with the 
requirements implemented under the FMP, including recordkeeping and 
reporting.

Operator Permit

    An operator of a vessel with a permit issued under this FMP would 
be required to have an operator permit issued by the Northeast Region, 
NMFS. The operator permits issued to operators in the fisheries for 
Northeast multispecies, American lobster, and Atlantic sea scallops 
would satisfy this requirement. The operator would be held accountable 
for violations of the fishing regulations and would be subject to a 
permit sanction. During the permit sanction period, the operator could 
not work in any capacity aboard a federally permitted fishing vessel.

Transfers at Sea

    Only vessels issued a moratorium permit would be allowed to 
transfer Loligo squid, Illex squid, or butterfish at sea. This 
provision is intended to enhance enforcement of the incidental catch 
allowance for vessels without moratorium permits, which is currently 
specified as 2,500 lb (1.13 mt) of Illex, Loligo, or butterfish per 
trip.

Reporting and Recordkeeping

    The Council intends to institute recordkeeping and reporting 

[[Page 65621]]
    requirements in the FMP that are identical to those required by the 
Summer Flounder, Northeast Multispecies, and Atlantic Sea Scallop 
Fishery Management Plans.
    Commercial logbooks would be submitted on a monthly basis by vessel 
owners in order to monitor the fishery. Real-time assessment and 
management of the Loligo and Illex resources may be necessary due to 
the risk of overfishing stocks comprised of only a single cohort. The 
Council proposes that the Regional Director specify, during the first 
year of implementation, the data elements and reporting mechanism 
required to establish a real-time assessment and management program for 
the annual squid species. The Council would investigate the feasibility 
of such a management system in year 2 of the management program. 
Operators of party and charter boats with Federal permits would also be 
required to provide catch information on logbooks submitted monthly.
    Dealers with permits issued pursuant to the FMP would submit weekly 
reports showing species purchased in pounds, and the name and permit 
number of the vessels from which the aforementioned species were 
purchased. Buyers that do not purchase directly from vessels would not 
be required to submit reports under this provision.

Minimum Mesh Size Requirement for Loligo Squid

    The minimum mesh size requirement for the Loligo squid fishery and 
exemptions from that requirement would be established on a framework 
basis. These provisions could be changed by the Regional Director based 
upon the recommendation of the Council. This amendment proposes that 
initially, otter trawl vessels possessing one pound (0.45 kg) or more 
of Loligo squid be required to fish with nets having a minimum mesh 
size of 1-7/8 inch (48-mm) diamond mesh, inside stretch measure, 
applied throughout the net including the body and codend. A liner would 
be allowed to close the opening created by the rings in the rearmost 
portion of the codend, provided that it does not extend more than ten 
meshes forward from the rearmost portion of the codend. Net 
strengtheners, ropes, lines, or chafing gear on the outer portion of 
the trawl net would be required to have a mesh opening of at least 4.5 
inches (115 mm), inside stretch measure. This provision would be 
implemented as a fishery measure that could be adjusted annually by the 
Regional Director, based upon a recommendation by the Council.
    There are two proposed exemptions from the minimum mesh size 
requirement for Loligo. The first would exempt vessels fishing for 
Illex during the months of June, July, August, and September seaward of 
the 50-fathom curve. The second would exempt vessels participating in 
the directed fishery for sea herring, provided that 75 percent or more 
of their catch, by weight, is comprised of sea herring.
    NMFS Office of Enforcement and the Coast Guard have expressed 
concern about the enforceability of an exemption area defined by a 
fathom curve, so NMFS proposes a set of latitude-longitude coordinates 
intended to follow closely the 50-fathom curve and achieve the 
Council's intent in an enforceable manner. These law enforcement 
agencies are also concerned with the feasibility of the proposed sea 
herring exemption because of the difficulties in ascertaining relative 
percentages of the catch. After receiving public comment on these 
exemptions, NMFS will determine how best to administer these 
provisions, should they be approved.

Classification

    Section 304(a)(1)(D)(ii) of the Magnuson Act, as amended, requires 
NMFS to publish regulations proposed by a Council within 15 days of 
receipt of the amendment and proposed regulations. At this time, NMFS 
has not determined that the amendment these rules would implement is 
consistent with the national standards, other provisions of the 
Magnuson Act, and other applicable law. NMFS, in making that 
determination, will take into account the information, views, and 
comments received during the comment period.
    The General Counsel of the Department of Commerce certified to the 
Chief Counsel for Advocacy, Small Business Administration, that this 
proposed rule, if adopted, would not have a significant economic impact 
on a substantial number of small entities. The provisions that would be 
implemented by Amendment 5 would prevent overcapitalization of these 
fisheries relative to abundance and availability of the stocks of 
Loligo, Illex, and butterfish. Amendment 5, as indicated in the initial 
regulatory flexibility analysis prepared by the Council, would 
essentially maintain the status quo, in terms of revenues for 
participants in the fishery, since the proposed limited entry measures 
would include historical participants in the fisheries. Proposed 
measures would not substantially affect more than 20 percent of the 
present participants in these fisheries and would not directly increase 
or decrease utilization or production of the affected species resulting 
in a change in expected revenues of greater than 5 percent.
    This proposed rule contains collection-of-information requirements 
subject to the Paperwork Reduction Act (PRA). Mandatory dealer 
reporting and annual employment data reporting have been approved by 
OMB under control numbers 0648-0229 and 0648-0018, respectively. Dealer 
reporting responses are estimated to take 2 minutes and employment data 
responses 6 minutes. The proposed rule also contains new requirements 
that have been submitted to OMB for approval. These requirements and 
their estimated response times are: vessel permits and vessel permit 
appeals at 30 minutes per response, operator permits at one hour per 
response, dealer permits at 5 minutes per response, and an observer 
notification requirement at 2 minutes per response.
    The response estimates shown include the time for reviewing 
instructions, searching exiting data sources, gathering and maintaining 
the data needed, and completing and reviewing the collection of 
information. Send comments regarding any of these burden estimates or 
any other aspect of the collection of information to NMFS or OMB at the 
ADDRESSES above. Notwithstanding any other provision of the law, no 
person is required to respond to, nor shall any person be subject to a 
penalty for failure to comply with a collection of information, subject 
to the requirements of the PRA, unless that collection of information 
displays a currently valid OMB Control Number.
    This proposed rule has been determined to be not significant for 
purposes of E.O. 12866.

List of Subjects

50 CFR Part 611

    Fisheries, Foreign relations, Reporting and recordkeeping 
requirements.

50 CFR Part 655

    Fisheries, Reporting and recordkeeping requirements.

    Dated: December 14, 1995.
Gary Matlock,
Program Management Officer, National Marine Fisheries Service.

    For the reasons set out in the preamble, 50 CFR parts 611 and 655 
are proposed to be amended as follows:

PART 611--FOREIGN FISHING

    1. The authority citation for part 611 continues to read as 
follows:

 
[[Page 65622]]

    Authority: 16 U.S.C. 1801 et seq., 16 U.S.C. 971 et seq., 22 
U.S.C. 1971 et seq., and 16 U.S.C. 1361 et seq.

    2. In Sec. 611.50, paragraphs (b)(3) and (b)(4)(i) and (b)(4)(ii) 
are revised to read as follows:

Sec. 611.50  Northwest Atlantic Ocean fishery.

* * * * *
    (b) * * *
    (3) TALFF. The TALFFs for the Northwest Atlantic Ocean fishery are 
published in the Federal Register. Current TALFFs are also available 
from the Regional Director. The procedures for determining and 
adjusting the Atlantic mackerel TALFF is set forth in 50 CFR part 655.
    (4) * * *
    (i) The other allocated species, namely: Atlantic herring, Atlantic 
mackerel, butterfish (as a bycatch of Atlantic mackerel), and river 
herring (including alewife, blueback herring, and hickory shad); and
    (ii) The prohibited species, namely: American plaice, American 
shad, Atlantic cod, Atlantic menhaden, Atlantic redfish, Atlantic 
salmon, all marlin, all spearfish, sailfish, swordfish, black sea bass, 
bluefish, croaker, haddock, ocean pout, pollock, red hake, scup, sea 
turtles, sharks (except dogfish), silver hake, spot, striped bass, 
summer flounder, tilefish, yellowtail flounder, weakfish, white hake, 
short-finned squid, long-finned squid, windowpane flounder, winter 
flounder, witch flounder, Continental Shelf fishery resources, and 
other invertebrates (except non-allocated squids).
* * * * *
    3. Part 655 is revised to read as follows:

PART 655--ATLANTIC MACKEREL, SQUID, AND BUTTERFISH FISHERIES

Subpart A--General Provisions

Sec.
655.1  Purpose and scope.
655.2  Definitions.
655.3  Relation to other laws.
655.4  Vessel permits.
655.5  Operator permit.
655.6  Dealer permit.
655.7  Recordkeeping and reporting requirements.
655.8  Vessel identification.
655.9  Prohibitions.
655.10  Facilitation of enforcement.
655.11  Penalties.

Subpart B--Management Measures

655.20  Fishing year.
655.21  Maximum optimum yields.
655.22  Procedures for determining initial amounts.
655.23  Closure of the fishery.
655.24  Time and area restrictions for directed foreign fishing.
655.25  Gear restrictions.
655.26  Minimum fish sizes. [Reserved]
655.27  Possession limits. [Reserved]
655.28  At-sea observer coverage.
655.29  Transfer-at-sea.
655.30  Experimental fishery.
Figure 1 to Part 655--Exemption line to minimum net mesh-size 
requirement for Loiigo squid.

    Authority: 16 U.S.C. 1801 et seq.

Subpart A--General Provisions

Sec. 655.1  Purpose and scope.

    (a) The regulations in this part govern the conservation and 
management of Atlantic mackerel, Illex squid, Loligo squid, and 
butterfish.
    (b) The regulations governing fishing for Atlantic mackerel, Illex 
squid, Loligo squid, and butterfish by vessels other than vessels of 
the United States are contained in 50 CFR part 611.
    (c) This part implements the Fishery Management Plan for the 
Atlantic Mackerel, Squid, and Butterfish Fisheries of the Northwest 
Atlantic Ocean.

Sec. 655.2  Definitions.

    In addition to the definitions in the Magnuson Act and in 
Sec. 620.2 of this chapter, the terms used in this part have the 
following meanings:
    Atlantic butterfish or butterfish means the species Peprilus 
triacanthus.
    Atlantic mackerel or mackerel means the species Scomber scombrus.
    Atlantic Mackerel, Squid, and Butterfish Monitoring Committee or 
Monitoring Committee means a committee made up of staff representatives 
of the Mid-Atlantic and New England Fishery Management Councils, and 
the Northeast Regional Office and Northeast Fisheries Science Center of 
NMFS. The Council Executive Director or a designee chairs the 
Committee.
    Being rerigged means physical alteration of the vessel or its gear 
had begun to transform the vessel into one capable of fishing 
commercially for squid or butterfish.
    Blast freezer means a freezing system in which fish are frozen by 
being exposed to cold air being blown over them. The freezer must be 
designed for use on a fishing vessel rather than designed for 
residential or similar use.
    Charter or party boat means any vessel that carries passengers for 
hire to engage in fishing.
    Council means the Mid-Atlantic Fishery Management Council.
    Dealer means any person who receives squid, mackerel, or butterfish 
for a commercial purpose, other than solely for transport on land, from 
the owner or operator of a vessel issued a permit under Sec. 655.4.
    Fishery Management Plan (FMP) means the Fishery Management Plan for 
the Atlantic mackerel, squid, and butterfish fisheries of the Northwest 
Atlantic Ocean, as revised by subsequent amendments.
    Fishing for commercial purposes means any fishing or fishing 
activity that results in the harvest of Atlantic mackerel, squid, or 
butterfish, one or more of which (or parts thereof) is sold, traded, or 
bartered.
    Fishing trip or trip means a period of time during which fishing is 
conducted, beginning when the vessel leaves port and ending when the 
vessel returns to port.
    Gross registered tonnage (GRT) means the gross tonnage specified on 
the U.S. Coast Guard documentation.
    Illex means the species Illex illecebrosus (short-finned or summer 
squid).
    Joint venture harvest means U.S.-harvested Atlantic mackerel 
transferred to foreign vessels in the EEZ.
    Land means to begin offloading fish or to offload fish at sea or on 
land, or to enter port with fish.
    Liner means a piece of mesh rigged inside the main or outer net.
    Loligo means the species Loligo pealei (long-finned or bone squid).
    Metric ton (mt) means 1,000 kg or 2,204.6 lb.
    Operator means the master, captain, or other individual on board a 
fishing vessel and in charge of that vessel's operations.
    Personal use means not for sale, barter, or trade.
    Plate freezer means a freezing system in which fish are frozen by 
contact with refrigerated plates. The freezer must be designed for use 
on a fishing vessel rather than designed for residential or similar 
use.
    Postmark means independently verifiable evidence of date of 
mailing, such as U.S. Postal Service postmark, United Parcel Service 
(U.P.S.) or other private carrier postmark, certified mail receipt, 
overnight mail receipt, or receipt received upon hand delivery to an 
authorized representative of NMFS.
    Recirculating sea water equipment means a refrigerated sea-water 
system in which the seawater cooled by mechanical refrigeration is 
circulated through tanks that contain fish.
    Recreational fishing means fishing that is not intended to, nor 
does result in, the barter, trade, or sale of fish.
    Recreational fishing vessel means any vessel from which no fishing 
other than recreational fishing is conducted. Charter and party boats 
are not considered recreational fishing vessels.
    Regional Director means the Regional Director, Northeast Region, 
National 

[[Page 65623]]
Marine Fisheries Service, 1 Blackburn Drive, Gloucester, MA 01930-2298, 
or a designee.
    Reporting month means the period of time beginning at 0001 hours 
local time on the first day of each calendar month and ending at 2400 
hours local time on the last day of each calendar month.
    Reporting week means a period of time beginning at 0001 hours local 
time on Sunday and ending at 2400 hours local time the following 
Saturday.
    Squid means Loligo pealei and Illex illecebrosus.
    Substantially similar harvesting capacity means the same or less 
GRT and vessel registered length for commercial vessels.
    Total length (TL) means the distance from the tip of the snout to 
the tip of the tail (caudal fin) while the fish is lying on its side 
normally extended.
    Transfer means to begin to remove, to pass over the rail, or 
otherwise take away fish from any vessel and move them to another 
conveyance.
    Under construction means that the keel has been laid.
    Vessel registered length means the registered length specified on 
U.S. Coast Guard Documentation, or state registration if the state 
registered length is verified by a NMFS authorized official.

Sec. 655.3  Relation to other laws.

    (a) The relation of this part to other laws is set forth in 
Sec. 620.3 of this chapter and paragraphs (b) through (d) of this 
section.
    (b) Additional regulations governing domestic fishing for Northeast 
Multispecies, which affect this part, are found at 50 CFR part 651.
    (c) Additional regulations governing domestic fishing for summer 
flounder, which affect this part, are found at 50 CFR part 625.
    (d) Nothing in these regulations supersedes more restrictive state 
management measures.

Sec. 655.4  Vessel permits.

    (a) General--(1) Requirement. Vessels, including party or charter 
vessels, must obtain a permit issued under this part to fish for or 
retain Atlantic mackerel, Loligo, Illex, or butterfish in or from the 
EEZ. This requirement does not pertain to recreational fishing vessels.
    (2) Condition. Vessel owners who apply for a fishing vessel permit 
under this section must agree as a condition of the permit that the 
vessel's fishing, catch and pertinent gear (without regard to whether 
such fishing occurs in or from the EEZ or landward of the EEZ, and 
without regard to where such fish or gear are possessed, taken or 
landed) will be subject to all requirements of this part. All such 
fishing, catch and gear will remain subject to all applicable state 
requirements. If a requirement of this part and a management measure 
required by state law differ, any vessel owner permitted to fish in the 
EEZ must comply with the more restrictive requirement.
    (b) Moratorium permits--(1) Loligo squid and butterfish. A vessel 
is eligible for a moratorium permit to fish for and retain Loligo squid 
or butterfish in excess of the incidental catch allowance specified in 
paragraph (c)(1) of this section, if it meets any of the following 
criteria:
    (i) The vessel landed and sold at least 20,000 lb (9.07 mt) of 
Loligo or butterfish in any 30-consecutive-day period between August 
13, 1981, and August 13, 1993; or
    (ii) The vessel is replacing a vessel of substantially similar 
harvesting capacity that involuntarily left the Loligo or butterfish 
fishery during the effective period of the moratorium, and both the 
entering and replaced vessels are owned by the same person. Vessel 
permits issued to vessels that involuntarily leave the fishery may not 
be combined to create larger replacement vessels.
    (iii) Vessels that are judged unseaworthy by the Coast Guard for 
reasons other than lack of maintenance may be replaced by a vessel of 
substantially similar harvesting capacity during the effective period 
of the moratorium.
    (2) Illex squid. A vessel is eligible for a moratorium permit to 
fish for and retain Illex squid in excess of the incidental catch 
allowance specified in paragraph (c)(1) of this section, if it meets 
any of the following criteria:
    (i) The vessel landed and sold at least 5,000 lb (2.27 mt) of Illex 
on each of five trips between August 13, 1981, and August 13, 1993; or
    (ii) Recirculating sea water equipment or an on-board commercial 
plate or blast freezer was purchased by May 31, 1994, and installed on 
the vessel, and the vessel landed five trips of at least 5,000 lb (2.27 
mt) each of Illex prior to the effective date of these regulations; or
    (iii) The vessel is replacing a vessel of substantially similar 
harvesting capacity that involuntarily left the Illex fishery during 
the effective period of the moratorium, and both the entering and 
replaced vessels are owned by the same person. Vessel permits issued to 
vessels that involuntarily leave the fishery may not be combined to 
create larger replacement vessels.
    (iv) Vessels that are judged unseaworthy by the Coast Guard for 
reasons other than lack of maintenance may be replaced by a vessel with 
the same or less GRT and vessel registered length for commercial 
vessels during the effective period of the moratorium.
    (3) Restriction. No one may apply for the permits specified in 
paragraphs (b) (1) and (2) of this section more than 12 months after 
the effective date of these regulations, or the event specified under 
paragraph (i)(1) of this section. This section does not affect annual 
permit renewals.
    (4) Appeal of denial of permit. (i) Any applicant denied a 
moratorium permit may appeal to the Regional Director within 30 days of 
the notice of denial. Any such appeal shall be in writing. The only 
ground for appeal is that the Regional Director erred in concluding 
that the vessel did not meet the criteria in paragraph (b) of this 
section. The appeal shall set forth the basis for the applicant's 
belief that the Regional Director's decision was made in error.
    (ii) The appeal may be presented, at the option of the applicant, 
at a hearing before an officer appointed by the Regional Director.
    (iii) The hearing officer shall make a recommendation to Regional 
Director.
    (iv) The decision on the appeal by the Regional Director is the 
final decision of the Department of Commerce.
    (c) Incidental catch permit. (1) Any vessel of the United States 
may obtain a permit to fish for or retain up to 2,500 lb (1.13 mt) of 
Loligo squid, Illex squid, or butterfish as an incidental catch in 
another directed fishery.
    (2) Adjustments to the incidental catch. The incidental catch 
allowance may be revised by the Regional Director after recommendation 
by the Council following the procedure set forth in Sec. 655.22. NMFS 
will publish a notification of any proposed adjustment in the Federal 
Register. The public may comment on the adjustment for 30 days after 
the date of publication. After consideration of public comments, NMFS 
may publish a notification of adjustment to the incidental catch 
allowance in the Federal Register.
    (d) Atlantic mackerel permit. Any vessel of the United States may 
obtain a permit to fish for or retain Atlantic mackerel in or from the 
EEZ.
    (e) Party and charter boat permit. Any party or charter boat may 
obtain a permit to fish for or retain Atlantic mackerel, squid or 
butterfish while carrying passengers for hire.
    (f) Vessel permit application. (1) An application for a permit 
under this section must be submitted and signed by the owner of the 
vessel on an appropriate form obtained from the Regional Director at 
least 30 days prior to the date on which the applicant 

[[Page 65624]]
desires to have the permit made effective. The Regional Director will 
notify the applicant of any deficiency in the application pursuant to 
this section. Applicants for moratorium permits shall provide 
information with the application sufficient for the Regional Director 
to determine if the vessel meets any eligibility requirements. Dealer 
weighout forms, joint venture receipts, and notarized statements from 
marine architects or surveyors or shipyard officials will be considered 
acceptable forms of proof.
    (2) Information requirements. In addition to applicable information 
required to be provided by paragraph (f)(1) of this section, an 
application for a permit under this section must contain at least the 
following information, and any other information required by the 
Regional Director: Vessel name; owner name, mailing address, and 
telephone number; U.S. Coast Guard documentation number and a valid 
copy of the vessel's U.S. Coast Guard documentation or, if 
undocumented, the state registration number and a copy of the current 
state registration; home port and principal port of landing; overall 
length; gross tonnage; net tonnage; engine horsepower; year the vessel 
was built; type of construction; type of propulsion; approximate fish 
hold capacity; type of fishing gear used by the vessel; number of crew; 
permit category; if the owner is a corporation, a copy of the 
Certificate of Incorporation showing the principals in the corporation, 
and the names and addresses of all shareholders owning 25 percent or 
more of the corporation's shares; if the owner is a partnership, a copy 
of the Partnership Agreement and the names and addresses of all 
partners; if there is more than one owner, names of all owners that 
have acquired more than a 25-percent interest; the name and signature 
of the owner or the owner's authorized representative; permit number of 
any current or, if expired, previous Federal fishery permit issued to 
the vessel; and a copy of the charter/party boat license and number of 
passengers the vessel is licensed to carry (charter and party boats); 
and any other information required by the Regional Director to manage 
the fishery.
    (g) Fees. The Regional Director may charge a fee to recover 
administrative expenses of issuing a permit required under this 
section. The amount of the fee is calculated in accordance with the 
procedures of the NOAA Finance Handbook for determining administrative 
costs of each special product or service. The fee may not exceed such 
costs and is specified on each application form. The appropriate fee 
must accompany each application; if it does not, the application will 
be considered incomplete for purposes of paragraph (h) of this section. 
Any fee paid by an insufficient bank draft shall render any permit 
issued on the basis thereof null and void.
    (h) Issuance. (1) Except as provided in Subpart D of 15 CFR Part 
904, the Regional Director will issue a permit under this section 
within 30 days of receipt of the application unless:
    (i) The applicant has failed to submit a complete application as 
described in paragraph (f) of this section. An application is complete 
when all requested forms, information, documentation, and fees, if 
applicable, have been received; or
    (ii) The application was not received by the Regional Director by 
the deadlines set forth in paragraph (b)(3) of this section; or
    (iii) The applicant has failed to comply with all applicable 
reporting requirements of Sec. 655.7 during the 12 months immediately 
preceding the application.
    (2) Upon receipt of an incomplete application, or an application 
from a person who has not complied with all applicable reporting 
requirements of Sec. 655.7 during the 12 months immediately preceding 
the application, the Regional Director will notify the applicant of the 
deficiency. If the applicant fails to correct the deficiency within 30 
days of the Regional Director's notification, the application will be 
considered abandoned.
    (i) Expiration. Except as provided in paragraphs (b)(1)(ii) and 
(b)(2)(iii) of this section, a permit expires:
    (1) When the owner retires the vessel from the fishery;
    (2) Upon the renewal date specified on the permit; or
    (3) When the ownership of the vessel changes; however, the Regional 
Director may authorize the continuation of a moratorium permit for the 
squid and butterfish fisheries if the new owner requests. Applications 
for permit continuations must be addressed to the Regional Director.
    (j) Duration. A permit is valid until it is revoked, suspended, or 
modified under 15 CFR part 904, or until it otherwise expires, or 
ownership changes, or the applicant has failed to report any change in 
the information on the permit application to the Regional Director as 
specified in paragraph (m) of this section.
    (k) Replacement. Replacement permits for an otherwise valid permit 
may be issued by the Regional Director when requested in writing by the 
owner or authorized representative, stating the need for replacement, 
the name of the vessel, and the federal fisheries permit number 
assigned. An application for a replacement permit will not be 
considered a new application. An appropriate fee may be charged for 
issuance of the replacement permit.
    (l) Transfer. Permits issued under this part are not transferable 
or assignable. A permit is valid only for the fishing vessel and owner 
for which it is issued.
    (m) Change in application information. Any change in the 
information specified in paragraph (f)(2) of this section must be 
submitted by the applicant in writing to the Regional Director within 
15 days of the change. If the written notice of the change in 
information is not received by the Regional Director within 15 days, 
the permit is void.
    (n) Alteration. Any permit that has been altered, erased, or 
mutilated is invalid.
    (o) Display. The permit must be maintained in legible condition and 
displayed for inspection upon request by any authorized officer.
    (p) Sanctions. Procedures governing enforcement-related permit 
sanctions and denials are found at subpart D of 15 CFR part 904.

Sec. 655.5  Operator permit.

    (a) General. Any operator of a vessel holding a valid Federal 
Atlantic mackerel, Loligo, Illex, or butterfish permit under this part, 
or any operator of a vessel fishing for Atlantic mackerel, Loligo, 
Illex, or butterfish in the EEZ or in possession of Atlantic mackerel, 
Loligo, Illex, or butterfish in or harvested from the EEZ, must have 
and carry on board a valid operator's permit issued under this part. An 
operator permit issued pursuant to Parts 649, 650, or 651 shall satisfy 
the permitting requirement of this paragraph.
    (b) Operator application. Applicants for a permit under this 
section must submit a completed permit application on an appropriate 
form obtained from the Regional Director. The application must be 
signed by the applicant and submitted to the Regional Director at least 
30 days prior to the date on which the applicant desires to have the 
permit made effective. The Regional Director will notify the applicant 
of any deficiency in the application pursuant to this section.
    (c) Condition. Vessel operators who apply for an operator's permit 
under this section must agree as a condition of this permit that the 
operator and vessel's fishing, catch, and pertinent gear (without 
regard to whether such fishing occurs in the EEZ or landward of the 
EEZ, and without regard to where 

[[Page 65625]]
such fish or gear are possessed, taken, or landed), are subject to all 
requirements of this part while fishing in the EEZ or on board a vessel 
permitted under Sec. 655.4. The vessel and all such fishing, catch, and 
gear will remain subject to all applicable state or local requirements. 
Further, such operators must agree as a condition of this permit that, 
if the permit is suspended or revoked pursuant to 15 CFR part 904, the 
operator cannot be on board any fishing vessel issued a Federal 
Fisheries Permit or any vessel subject to Federal fishing regulations 
while the vessel is at sea or engaged in offloading. If a requirement 
of this part and a management measure required by state or local law 
differ, any operator issued a permit under this part must comply with 
the more restrictive requirement.
    (d) Information requirements. An applicant must provide at least 
all the following information and any other information required by the 
Regional Director: Name, mailing address, and telephone number; date of 
birth; hair color; eye color; height; weight; social security number 
(optional); and signature of the applicant. The applicant must also 
provide two recent (no more than 1 year old) color passport-size 
photographs.
    (e) Fees. The Regional Director may charge a fee to recover the 
administrative expense of issuing a permit required under this section. 
The amount of the fee is calculated in accordance with the procedures 
of the NOAA Finance Handbook for determining the administrative costs 
of each special product or service. The fee may not exceed such costs 
and is specified on each application form. The appropriate fee must 
accompany each application; if it does not, the application will be 
considered incomplete for purposes of paragraph (f) of this section. 
Any fee paid by an insufficiently funded commercial instrument shall 
render any permit issued on the basis thereof null and void.
    (f) Issuance. Except as provided in subpart D of 15 CFR part 904, 
the Regional Director shall issue an operator's permit within 30 days 
of receipt of a completed application if the criteria specified herein 
are met. Upon receipt of an incomplete or improperly executed 
application, the Regional Director will notify the applicant of the 
deficiency in the application. If the applicant fails to correct the 
deficiency within 30 days following the date of notification, the 
application will be deemed abandoned.
    (g) Expiration. A Federal operator permit will expire upon the 
renewal date specified in the permit.
    (h) Duration. A permit is valid until it is revoked, suspended or 
modified under 15 CFR part 904, or otherwise expires, or the applicant 
has failed to report a change in the information on the permit 
application to the Regional Director as specified in paragraph (k) of 
this section.
    (i) Replacement. Replacement permits, for otherwise valid permits, 
may be issued by the Regional Director when requested in writing by the 
applicant, stating the need for replacement and the Federal operator 
permit number assigned. An applicant for a replacement permit must also 
provide two recent color passport-size photos of the applicant. An 
application for a replacement permit will not be considered a new 
application. An appropriate fee may be charged.
    (j) Transfer. Permits issued under this section are not 
transferable or assignable. A permit is valid only for the person to 
whom it is issued.
    (k) Change in application information. Notice of a change in the 
permit holder's name, address, or telephone number must be submitted in 
writing to, and received by, the Regional Director within 15 days of 
the change in information. If written notice of the change in 
information is not received by the Regional Director within 15 days, 
the permit is void.
    (l) Alteration. Any permit that has been altered, erased, or 
mutilated is invalid.
    (m) Display. Any permit issued under this part must be maintained 
in legible condition and displayed for inspection upon request by any 
authorized officer.
    (n) Sanctions. Vessel operators with suspended or revoked permits 
may not be on board a federally permitted fishing vessel in any 
capacity while the vessel is at sea or engaged in offloading. 
Procedures governing enforcement related permit sanctions and denials 
are found at subpart D of 15 CFR part 904.
    (o) Vessel owner responsibility. Vessel owners are responsible for 
ensuring that their vessels are operated by an individual with a valid 
operator's permit issued under this section.

Sec. 655.6  Dealer permit.

    (a) General. All dealers must have a valid permit issued under this 
part in their possession.
    (b) Dealer application. Applicants for a permit under this section 
must submit a completed application on an appropriate form provided by 
the Regional Director. The application must be signed by the applicant 
and submitted to the Regional Director at least 30 days before the date 
upon which the applicant desires to have the permit made effective. The 
Regional Director will notify the applicant of any deficiency in the 
application pursuant to this section.
    (c) Information requirements. Applications must contain at least 
the following information and any other information required by the 
Regional Director: Company name, place(s) of business, mailing 
address(es) and telephone number(s), owner's name; dealer permit number 
(if a renewal); and name and signature of the person responsible for 
the truth and accuracy of the report. If the dealer is a corporation, a 
copy of the Certificate of Incorporation must be included with the 
application. If the dealer is a partnership, a copy of the Partnership 
Agreement and the names and addresses of all partners must be included 
with the application.
    (d) Fees. The Regional Director may charge a fee to recover the 
administrative expense of issuing a permit required under this section. 
The amount of the fee is calculated in accordance with the procedures 
of the NOAA Finance Handbook for determining the administrative costs 
of each special product or service. The fee may not exceed such costs 
and is specified with each application form. The appropriate fee must 
accompany each application; if it does not, the application will be 
considered incomplete for purposes of paragraph (e) of this section. 
Any fee paid by an insufficiently funded commercial instrument shall 
render any permit issued on the basis thereof null and void.
    (e) Issuance. Except as provided in subpart D of 15 CFR part 904, 
the Regional Director will issue a permit at any time during the 
fishing year to an applicant unless the applicant has failed to submit 
a completed application. An application is complete when all requested 
forms, information, and documentation have been received and the 
applicant has submitted all applicable reports specified in 
Sec. 655.7(a). Upon receipt of an incomplete or improperly executed 
application, the Regional Director will notify the applicant of the 
deficiency in the application. If the applicant fails to correct the 
deficiency within 30 days following the date of notification, the 
application will be considered abandoned.
    (f) Expiration. A permit will expire upon the renewal date 
specified in the permit.
    (g) Duration. A permit is valid until it is revoked, suspended, or 
modified 

[[Page 65626]]
under 15 CFR part 904, or otherwise expires, or ownership changes, or 
the applicant has failed to report any change in the information on the 
permit application to the Regional Director as required by paragraph 
(j) of this section.
    (h) Replacement. Replacement permits, for otherwise valid permits, 
may be issued by the Regional Director when requested in writing by the 
applicant, stating the need for replacement and the Federal dealer 
permit number assigned. An application for a replacement permit will 
not be considered a new application. An appropriate fee may be charged.
    (i) Transfer. Permits issued under this part are not transferable 
or assignable. A permit is valid only for the person to whom, or other 
business entity to which, it is issued.
    (j) Change in application information. Within 15 days after a 
change in the information contained in an application submitted under 
this section, a written report of the change must be submitted to, and 
received by, the Regional Director. If written notice of the change in 
information is not received by the Regional Director within 15 days, 
the permit is void.
    (k) Alteration. Any permit that has been altered, erased, or 
mutilated is invalid.
    (l) Display. Any permit, or a valid duplicate thereof, issued under 
this part must be maintained in legible condition and displayed for 
inspection upon request by any authorized officer.
    (m) Federal versus state requirements. If a requirement of this 
part differs from a fisheries management measure required by state law, 
any dealer issued a Federal dealer permit must comply with the more 
restrictive requirement.
    (n) Sanctions. Procedures governing enforcement-related permit 
sanctions and denials are found at subpart D of 15 CFR part 904.

Sec. 655.7  Recordkeeping and reporting requirements.

    (a) Dealers--(1) Weekly report. Dealers must send by mail, to the 
Regional Director or official designee, on a weekly basis, on forms 
supplied by or approved by the Regional Director, a report of fish 
purchases. If authorized in writing by the Regional Director, dealers 
may submit reports electronically or through other media. The following 
information and any other information required by the Regional Director 
must be provided in the report: Name and mailing address of dealer; 
dealer number; name and permit number of the vessels from which fish 
are landed or received; dates of purchases; pounds by species; price by 
species; and port landed. If no fish are purchased during the week, a 
report so stating must be submitted. All report forms must be signed by 
the dealer or other authorized individual.
    (2) Annual report. All persons required to submit reports under 
paragraph (a)(1) of this section are required to complete the 
``Employment Data'' section of the Annual Processed Products Reports; 
completion of the other sections on that form is voluntary. Reports 
must be submitted to the address supplied by the Regional Director.
    (3) Inspection. Upon the request of an authorized officer, or by an 
employee of NMFS designated by the Regional Director to make such 
inspections, the dealer must make immediately available for inspection 
copies of the required reports that have been submitted, or should have 
been submitted, and the records upon which the reports were based.
    (4) Record retention. Copies of reports, and records upon which the 
reports were based, must be retained and be available for review for 1 
year after the date of the last entry on the report. The dealer must 
retain such reports and records at its principal place of business.
    (5) Submitting reports. Reports must be received, or postmarked if 
mailed, within 3 days after the end of each reporting week. Each dealer 
will be sent forms and instructions, including the address to which to 
submit reports, shortly after receipt of a dealer permit.
    (6) At-sea activities. All persons purchasing, receiving, or 
processing any mackerel, squid, or butterfish at sea for landing at any 
port of the United States must submit information identical to that 
required by paragraphs (a) (1) and (2) of this section and provide 
those reports to the Regional Director or designee on the same 
frequency basis.
    (b) Vessel owners--(1) Fishing log reports. The owner of any vessel 
issued a Federal Atlantic mackerel, Loligo squid, butterfish or Illex 
squid permit under Sec. 655.4 must maintain on board the vessel, and 
submit, an accurate daily fishing log report for all fishing trips, 
regardless of species fished for or taken, on forms supplied by or 
approved by the Regional Director. If authorized in writing by the 
Regional Director, vessel owners may submit reports electronically. At 
least the following information, and any other information required by 
the Regional Director, must be provided: Vessel name, U.S. Coast Guard 
(USCG) documentation number (or state registration number if 
undocumented); permit number; date/time sailed; date/time landed; trip 
type; number of crew; number of anglers (if a charter or party boat); 
gear fished; quantity and size of gear; mesh/ring size; chart area 
fished; average depth; latitude/longitude (or loran station and 
bearings); total hauls per area fished; average tow time duration; 
pounds by species of all species landed or discarded; dealer permit 
number; dealer name; date sold; port and state landed; and vessel 
operator's name, signature, and operator permit number.
    (2) When to fill in the log. Fishing log reports must be filled in, 
except for information required but not yet ascertainable, before 
offloading has begun. All information in paragraph (b)(1) of this 
section must be filled in for each fishing trip before starting the 
next fishing trip.
    (3) Inspection. Upon the request of an authorized officer, or an 
employee of NMFS designated by the Regional Director to make such 
inspections, at any time during or after a trip, owners and operators 
must make immediately available for inspection the fishing log reports 
currently in use, or to be submitted.
    (4) Record retention. Copies of the fishing log reports must be 
retained and available for review for 1 year after the date of the last 
entry on the report.
    (5) Submitting reports. Fishing log reports must be received or 
postmarked, if mailed, within 15 days after the end of the reporting 
month. Each owner will be sent forms and instructions, including the 
address to which to submit reports, shortly after receipt of a Federal 
Fisheries Permit. If no fishing trip is made during a month, a report 
so stating must be submitted.

Sec. 655.8  Vessel identification.

    (a) Vessel name. Each fishing vessel owner subject to this part and 
over 25 ft (7.6 m) in length must affix permanently its name on the 
port and starboard sides of the bow and, if possible, on its stern.
    (b) Official number. Each fishing vessel owner subject to this 
section and over 25 ft (7.6 m) in length must display its official 
number on the port and starboard sides of its deckhouse or hull, and on 
an appropriate weather deck, so as to be visible from above by 
enforcement vessels and aircraft. The official number is the U.S. Coast 
Guard documentation number, or the vessel's state registration number 
for vessels not required to be documented under title 46 of U.S.C.
    (c) Numerals. Except as provided in paragraph (e) of this section, 
the official number must be permanently affixed in block arabic 
numerals in contrasting color at least 18 inches (45.7 cm) in 

[[Page 65627]]
height for vessels over 65 ft (19.8 m) in length, and at least 10 
inches (25.4 cm) in height for all other vessels over 25 ft (7.6 m) in 
length.
    (d) Duties of owner. Any vessel owner subject to this part will:
    (1) Keep the vessel's name and official number clearly legible and 
in good repair; and
    (2) Ensure that no part of the vessel, its rigging, its fishing 
gear, or any other object obstructs the view of the official number 
from any enforcement vessel or aircraft.
    (e) Nonpermanent marking. Vessels carrying recreational fishing 
parties on a per capita basis or by charter must use markings that meet 
the above requirements, except for the requirement that they be affixed 
permanently to the vessel. The nonpermanent markings must be displayed 
in conformity with the above requirements when the vessel is fishing 
for Atlantic mackerel, squid, or butterfish.

Sec. 655.9  Prohibitions.

    (a) In addition to the general prohibitions specified in Sec. 620.7 
of this chapter, it is unlawful for any person owning or operating a 
vessel issued a valid Federal Atlantic mackerel, squid, or butterfish 
permit under Sec. 655.4, or issued an operator permit under Sec. 655.5, 
to do any of the following:
    (1) Possess more than the incidental catch allowance of squid, or 
butterfish unless issued a moratorium permit pursuant to Sec. 655.4(b).
    (2) Use any vessel for taking, catching, harvesting, or landing of 
any Atlantic mackerel, squid, or butterfish, except as provided in 
Sec. 655.4(a), unless the vessel has on board a valid permit issued 
under Sec. 655.4.
    (3) Fail to report to the Regional Director within 15 days any 
change in the information contained in the permit application for a 
vessel, as specified in Sec. 655.4(m).
    (4) Falsify or fail to affix and maintain vessel markings as 
required by Sec. 655.8.
    (5) Take, retain, or land Atlantic mackerel, squid, or butterfish 
in excess of the trip allowance specified under Sec. 655.23.
    (6) Take, retain, or land Atlantic mackerel, squid, or butterfish 
after a total closure specified under Sec. 655.23.
    (7) Make any false statement, written or oral, to an authorized 
officer, concerning the taking, catching, landing, purchase, sale, or 
transfer of any mackerel, squid, or butterfish.
    (8) Fish with or possess nets or netting that do not meet the 
minimum mesh requirement for Loligo specified in Sec. 655.25(a) or that 
are modified, obstructed, or constricted, if subject to the minimum 
mesh requirement, unless the nets or netting are stowed in accordance 
with Sec. 655.25(b) or the vessel is fishing under an exemption 
specified in Sec. 655.25(a).
    (9) Sell or transfer Atlantic mackerel, squid, or butterfish to 
another person for a commercial purpose, other than transport, unless 
that person has a dealer permit issued under Sec. 655.6.
    (10) Falsify information in order to qualify a vessel for a 
moratorium permit pursuant to Sec. 655.4(b).
    (11) Transfer squid, or butterfish at sea to another vessel unless 
that other vessel is issued a valid moratorium permit issued pursuant 
to Sec. 655.4(b) or a letter of authorization issued by the Regional 
Director.
    (12) Fail to comply with any measures implemented pursuant to 
Sec. 655.22.
    (13) Refuse to embark a sea sampler if requested by the Regional 
Director.
    (14) Assault, resist, oppose, impede, harass, intimidate, or 
interfere with or bar by command, impediment, threat, coercion or 
refusal of reasonable assistance an observer or sea sampler conducting 
his or her duties aboard a vessel.
    (15) Fail to affix and maintain markings as required by Sec. 655.8.
    (16) Carry passengers for hire while fishing commercially under a 
permit issued pursuant to Sec. 655.4 (b), (c), or (d).
    (17) Fail to carry on board a letter of authorization if fishing in 
an experimental fishery pursuant to Sec. 655.30.
    (18) Employ an operator on board a vessel who has not been issued 
an operator permit that meets the requirements of Sec. 655.5.
    (b) It is unlawful for the owner and operator of a party or charter 
boat issued a permit (including a moratorium permit) pursuant to 
Sec. 655.4, when the boat is carrying passengers for hire, to do any of 
the following:
    (1) Violate any recreational fishing measures established pursuant 
to Sec. 655.22(d)
    (2) Sell or transfer Atlantic mackerel, squid, or butterfish to 
another person for a commercial purpose.
    (3) Refuse to embark a sea sampler if requested by the Regional 
Director.
    (c) It is unlawful for any person to do any of the following:
    (1) Possess in or harvest from the EEZ Atlantic mackerel, squid, or 
butterfish, except as provided in Sec. 655.4(a), unless the person is 
operating a vessel issued a permit pursuant to Sec. 655.4, and the 
permit is on board the vessel, and has not been surrendered, revoked, 
or suspended.
    (2) Possess nets or netting with mesh not meeting the minimum size 
requirement of Sec. 655.25 that does not meet the net stowage 
provisions of Sec. 655.25, if the person possesses Loligo squid 
harvested in or from the EEZ.
    (3) If subject to the permitting requirements in Sec. 655.4, 
Sec. 655.5, or Sec. 655.6, to offload, to cause to be offloaded, sell 
or buy, whether on land or at sea, as an owner, operator, dealer, 
buyer, or receiver, without accurately and completely preparing and 
submitting in a timely fashion the documents required by Sec. 655.7.
    (4) Transfer squid or butterfish within the EEZ, unless the vessels 
participating in the transfer are issued valid moratorium permits 
pursuant to Sec. 655.4(b) or valid letters of authorization pursuant to 
Sec. 655.29.
    (5) Purchase or otherwise receive, except for transport, Atlantic 
mackerel, squid, or butterfish from the owner or operator of a vessel 
issued a permit pursuant to Sec. 655.4, unless in possession of a valid 
permit issued under Sec. 655.6.
    (6) Purchase or otherwise receive for a commercial purpose, 
Atlantic mackerel, squid, or butterfish caught by other than a vessel 
issued a permit pursuant to Sec. 655.4, unless the vessel has not been 
issued a permit under this part and is fishing exclusively within the 
waters under the jurisdiction of any state.
    (7) Make any false statements, oral or written, to an authorized 
officer concerning the catching, taking, harvesting, landing, purchase, 
sale, possession, or transfer of any Atlantic mackerel, squid, or 
butterfish.
    (8) Fail to report to the Regional Director within 15 days any 
change in information contained in the permit application.
    (9) Assault, resist, impede, oppose, harass, intimidate, or 
interfere with or bar by command, impediment, threat, coercion, or 
refusal of reasonable assistance to an observer or sea sampler 
conducting his or her duties aboard a vessel.
    (10) Operate a vessel fishing for Atlantic mackerel, squid, or 
butterfish within the EEZ, unless issued an operator permit that meets 
the requirements of Sec. 655.5.
    (11) Violate any other provisions of this part, the Magnuson Act, 
or any regulation or permit issued under the Magnuson Act.
    (d) All Atlantic mackerel and butterfish possessed on board a party 
or charter boat issued a permit under Sec. 655.4 are deemed to have 
been harvested from the EEZ.
    (e) It is unlawful for any person to violate any terms of a letter 
authorizing experimental fishing pursuant to 

[[Page 65628]]
Sec. 655.30 or to fail to keep such letter on board the vessel during 
the period of the experiment.

Sec. 655.10  Facilitation of enforcement.

    See Sec. 620.8 of this chapter.

Sec. 655.11  Penalties.

    See Sec. 620.9 of this chapter.

Subpart B--Management Measures

Sec. 655.20  Fishing year.

    The fishing year is the 12-month period beginning on January 1 and 
ending on December 31.

Sec. 655.21  Maximum optimum yields.

    The optimum yields (OYs) specified pursuant to Sec. 655.22 during a 
fishing year may not exceed the following amounts:
    (a) Atlantic mackerel: That quantity of mackerel that is less than 
or equal to ABC specified pursuant to Sec. 655.22;
    (b) Loligo squid: 36,000 mt (79,362,000 lb);
    (c) Illex squid: 30,000 mt (66,135,000 lb); and
    (d) Butterfish: 16,000 mt (35,272,000 lb).

Sec. 655.22  Procedures for determining initial annual amounts.

    (a) Initial annual specifications. The Atlantic Mackerel, Squid, 
and Butterfish Monitoring Committee (Monitoring Committee) will meet 
annually to develop specifications regarding:
    (1) The initial optimum yield (IOY), domestic annual harvest (DAH), 
and domestic annual processing (DAP) for the squids;
    (2) The IOY, DAH, DAP and bycatch level of the total allowable 
level of foreign fishing (TALFF), if any, for butterfish; and
    (3) The IOY, DAH, DAP, joint venture processing (JVP), if any, and 
TALFF, if any, for Atlantic mackerel.
    (4) The Monitoring Committee will recommend these specifications to 
the Mackerel, Squid, and Butterfish Committee (Committee) of the 
Council. As a basis for establishing these specifications and 
restrictions, the Monitoring Committee will review available data 
pertaining to the following:
    (i) Commercial and recreational landings;
    (ii) Current estimates of fishing mortality;
    (iii) Stock status;
    (iv) The most recent estimates of recruitment;
    (v) Virtual population analysis results;
    (vi) Levels of noncompliance by harvesters or individual states;
    (vii) Impact of size/mesh regulations;
    (viii) The results of a survey of domestic processors and joint 
venture operators of estimated Atlantic mackerel processing capacity 
and intent to use that capacity (approved by the Office of Management 
and Budget under OMB control number 0648-0114);
    (ix) The results of a survey of fishermen's trade associations of 
estimated Atlantic mackerel harvesting capacity and intent to use that 
capacity (approved by the Office of Management and Budget under OMB 
control number 0648-0114);
    (x) Any other relevant information.
    (b) Guidelines. The specifications determined pursuant to paragraph 
(a) by the Monitoring Committee will be consistent with the following 
guidelines:
    (1) Squid. (i) The most recent biological data, including data on 
discards, will be reviewed annually under the procedures specified in 
paragraph (a) of this section. ABC for any fishing year is either the 
maximum OY specified in Sec. 655.21, or a lower amount if stock 
assessments indicate that the potential yield is less than the maximum 
OY.
    (ii) IOY is a modification of ABC based on social and economic 
factors.
    (2) Atlantic mackerel. (i) Atlantic mackerel ABC is derived using 
the following terms: C = Estimated mackerel catch in Canadian waters 
for the upcoming fishing year; S = Mackerel spawning-stock size at the 
beginning of the upcoming fishing year for which catch estimates and 
quotas are being specified; and LTPC = Long term potential catch as 
estimated by the Northeast Fisheries Science Center (NEFSC).
    (ii) ABC for the upcoming fishing year must be set at a level to 
maintain a minimum value for S of 900,000 mt (1,984,050,000 lb) and 
cannot exceed LTPC minus C.
    (iii) IOY is less than or equal to ABC and represents a 
modification of ABC, based on social and economic factors.
    (iv) IOY is composed of DAH and TALFF. DAH, DAP and JVP are 
projected by reviewing data from sources specified in this paragraph 
(a) and other relevant data including past domestic landings, projected 
amounts of mackerel necessary for domestic processing and for joint 
ventures during the fishing year, projected recreational landings, and 
other data pertinent for such a projection. The JVP component of DAH is 
the portion of DAH that domestic processors either cannot or will not 
use. In addition, IOY is based on such criteria as contained in the 
Magnuson Act, specifically section 201(e), and the application of the 
following economic factors:
    (A) Total world export potential by mackerel producing countries;
    (B) Total world import demand by mackerel consuming countries;
    (C) U.S. export potential based on expected U.S. harvests, expected 
U.S. consumption, relative prices, exchange rates, and foreign trade 
barriers;
    (D) Increased/decreased revenues to the U.S. from foreign fees;
    (E) Increased/decreased revenues to U.S. harvesters (with/without 
joint ventures);
    (F) Increased/decreased revenues to U.S. processors and exporters;
    (G) Increases/decreases in U.S. harvesting productivity due to 
decreases/increases in foreign harvest;
    (H) Increases/decreases in U.S. processing productivity; and
    (I) Potential impact of increased/decreased TALFF on foreign 
purchases of U.S. products and services and U.S.-caught fish, changes 
in trade barriers, technology transfer, and other considerations.
    (v) The Council may also recommend that certain ratios of TALFF to 
purchases of domestic harvested fish and/or domestic processed fish be 
established in relation to the initial annual amounts.
    (3) Butterfish. (i) The most recent biological data, including data 
on discards, will be reviewed annually under the procedures specified 
in paragraph (a) of this section. If this review indicates that the 
stock cannot support a level of harvest equal to the maximum OY, the 
Council will recommend establishing an ABC less than the maximum OY for 
the fishing year. This level represents the modification of maximum OY 
to reflect 
FR Doc. 95-30821 Atlantic Mackerel, Squid, and Butterfish Fisheries; Amendment 5
biological and ecological factors. If the stock is able to 
support a harvest level equivalent to the maximum OY, the ABC is to be 
set at that level.
    (ii) IOY is a modification of ABC based on social and economic 
factors. The IOY is composed of a DAH and bycatch TALFF which is equal 
to 0.08 percent of the allocated portion of the Atlantic mackerel 
TALFF.
    (c) Adjustments. The specifications established pursuant to this 
section may be adjusted by the Regional Director, in consultation with 
the Council, during the fishing year by publishing a notification in 
the Federal Register stating the reasons for such an action with a 30-
day comment period.
    (d) Recommended measures. Based on the review of the data described 
in paragraph (a) of this section, the Monitoring Committee will 
recommend to the Committee the following 

[[Page 65629]]
measures it determines are necessary to assure that the specifications 
are not exceeded:
    (1) Commercial quotas;
    (2) The amount of Loligo squid, Illex squid, and butterfish which 
may be retained, possessed and landed by vessels issued the incidental 
catch permit specified in Sec. 655.4(c);
    (3) Commercial minimum fish sizes;
    (4) Commercial trip limits;
    (5) Commercial seasonal quotas;
    (6) Minimum mesh sizes;
    (7) Commercial gear restrictions;
    (8) Recreational harvest limit;
    (9) Recreational minimum fish size;
    (10) Recreational possession limits;
    (11) Recreational season.
    (e) Annual fishing measures. (1) The Committee shall review the 
recommendations of the Monitoring Committee. Based on these 
recommendations and any public comment, the Committee shall make its 
recommendations to the Council with respect to the specifications and 
any other measures necessary to assure that the specifications are not 
exceeded. The Council shall review these recommendations. Based on 
these recommendations, and any public comment, the Council shall make 
recommendations to the Regional Director. Included in the 
recommendation will be supporting documents, as appropriate, concerning 
the environmental, economic, and social impacts of the proposed action. 
The Regional Director will review these recommendations, and on or 
about November 1 of each year, will publish a notification in the 
Federal Register of proposed specifications and any other measures 
necessary to assure that the specifications are not exceeded. If the 
specifications differ from those recommended by the Council, the 
reasons for any differences must be clearly stated and the revised 
specifications must satisfy the criteria set forth in this section. The 
Federal Register notification of proposed specifications will provide 
for a 30-day public comment period.
    (2) The Council's recommendations will be available in aggregate 
form for inspection at the office of the Regional Director during the 
public comment period.
    (3) On or about December 15 of each year, the Secretary will make a 
final determination concerning the specifications for each species and 
the other measures contained in the notification of proposed 
specifications. After the Secretary considers all relevant data and any 
public comments, a notification of final specifications and response to 
public comments will be published in the Federal Register. If the final 
amounts differ from those recommended by the Council, the reason(s) for 
the difference(s) must clearly be stated and the revised specifications 
must be consistent with the guidelines set forth in paragraph (b) of 
this section.

Sec. 655.23  Closure of the fishery.

    (a) General. The Secretary shall close the directed Atlantic 
mackerel, Illex squid, Loligo squid, or butterfish fishery in the EEZ 
when U.S. fishermen have harvested 80 percent of the DAH, if such 
closure is necessary to prevent the DAH from being exceeded. The 
closure will be in effect for the remainder of the fishing year, with 
incidental catches allowed as specified in paragraph (c) of this 
section, until the entire DAH is attained. When the Regional Director 
projects that DAH will be attained for any of the species, the 
Secretary shall close the fishery in the EEZ to all fishing for that 
species, and the incidental catches specified in paragraph (c) of this 
section will be prohibited.
    (b) Notification. The Secretary will take the following actions if 
it is determined that a closure is necessary:
    (1) Notify, in advance, the Executive Directors of the Mid- 
Atlantic, New England, and South Atlantic Councils;
    (2) Mail notifications of the closure to all holders of permits 
issued under Secs. 655.4, 655.5 and 655.6 at least 72 hours before the 
effective date of the closure;
    (3) Provide for adequate notification of the closure to 
recreational participants in the fishery; and
    (4) Publish a notification of closure in the Federal Register.
    (c) Incidental catches. During a period of closure of the directed 
fishery, the trip limit for the species for which the fishery is closed 
is 10 percent by weight of the total amount of fish on board for 
vessels with Loligo/butterfish moratorium permits, Illex moratorium 
permits or mackerel commercial permits. During a period of closure of 
the directed fishery, the trip limit for the species for which the 
fishery is closed is either 10 percent by weight of the total amount of 
fish on board, or the allowed level of incidental catch specified in 
Sec. 655.4(c)(1), whichever is less.

Sec. 655.24  0Time and area restrictions for directed foreign fishing.

    Foreign fishing is regulated under the provisions specified in 
Sec. 611.50(b)(2).

Sec. 655.25  Gear restrictions.

    (a) Mesh restriction and exemptions. Owners or operators of otter 
trawl vessels possessing Loligo squid harvested in or from the EEZ may 
only fish with nets having a minimum mesh size of 1\7/8\ inches (48 mm) 
diamond mesh, inside stretch measure, applied throughout the entire 
net. There are two exemptions to this requirement:
    (1) During the months of June, July, August, and September, otter 
trawl vessels fishing for Illex seaward of the following coordinates 
(see Figure 1 to part 655):

------------------------------------------------------------------------
              Point                    Latitude            Longitude    
------------------------------------------------------------------------
                                                                        
Point M1........................  43 deg.58.0' N.     67 deg.22.0' W.   
Point M2........................  43 deg.50.0' N.     68 deg.35.0' W.   
Point M3........................  43 deg.30.0' N.     69 deg.40.0' W.   
Point M4........................  43 deg.20.0' N.     70 deg.00.0' W.   
Point M5........................  42 deg.45.0' N.     70 deg.10.0' W.   
Point M6........................  42 deg.13.0' N.     69 deg.55.0' W.   
Point M7........................  41 deg.00.0' N.     69 deg.00.0' W.   
Point M8........................  41 deg.45.0' N.     68 deg.15.0' W.   
Point M9........................  42 deg.10.0' N.     67 deg.10.0' W.   
Point M10.......................  41 deg.18.6' N.     66 deg.24.8' W.   
Point M11.......................  40 deg.55.5' N.     66 deg.38.0' W.   
Point M12.......................  40 deg.45.5' N.     68 deg.00.0' W.   
Point M13.......................  40 deg.37.0' N.     68 deg.00.0' W.   
Point M14.......................  40 deg.30.0' N.     69 deg.00.0' W.   
Point M15.......................  40 deg.22.7' N.     69 deg.00.0' W.   
Point M16.......................  40 deg.18.7' N.     69 deg.40.0' W.   
Point M17.......................  40 deg.21.0' N.     71 deg.03.0' W.   
Point M18.......................  39 deg.41.0' N.     72 deg.32.0' W.   
Point M19.......................  38 deg.47.0' N.     73 deg.11.0' W.   
Point M20.......................  38 deg.04.0' N.     74 deg.06.0' W.   
Point M21.......................  37 deg.08.0' N.     74 deg.46.0' W.   
Point M22.......................  36 deg.00.0' N.     74 deg.52.0' W.   
Point M23.......................  35 deg.45.0' N.     74 deg.53.0' W.   
Point M24.......................  35 deg.28.0' N.     74 deg.52.0' W.   
------------------------------------------------------------------------

Vessels fishing under this exemption may not have available for 
immediate use, as described in paragraph (b) of this section, any net 
with mesh size less than 1\7/8\ inches (48 mm) diamond mesh when the 
vessel is landward of the specified coordinates.
    (2) Vessels participating in the directed fishery for sea herring, 
provided that their catch comprises 75 percent or more by weight of sea 
herring.
    (b) Net stowage requirements. Otter trawl vessels possessing Loligo 
squid that are subject to the minimum mesh size may not have 
``available for immediate use'' any net, or any piece of net, not 
meeting the minimum mesh size requirement, or any net, or any piece of 
net, with mesh that is rigged in a manner that is inconsistent with the 
minimum mesh size. A net that conforms to one of the following 
specifications and that can be shown not to have been in recent use, is 
considered not to be ``available for immediate use'':
    (1) A net stowed below deck, provided: 
    
[[Page 65630]]

    (i) it is located below the main working deck from which the net is 
deployed and retrieved;
    (ii) the towing wires, including the leg wires, are detached from 
the net; and
    (iii) it is fan-folded (flaked) and bound around its circumference; 
or
    (2) A net stowed and lashed down on deck, provided:
    (i) it is fan-folded (flaked) and bound around its circumference;
    (ii) it is securely fastened to the deck or rail of the vessel; and
    (iii) the towing wires, including the leg wires, are detached from 
the net; or
    (3) A net that is on a reel and is covered and secured, provided:
    (i) the entire surface of the net is covered with canvas or other 
similar material that is securely bound;
    (ii) the towing wires, including the leg wires, are detached from 
the net; and
    (iii) the codend is removed from the net and stored below deck; or
    (4) Nets that are secured in a manner authorized in writing by the 
Regional Director and published in the Federal Register.
    (c) Mesh obstruction or constriction. Any combination of mesh or 
liners that effectively decreases the mesh below the minimum size is 
prohibited, except that a liner may be used to close the opening 
created by the rings in the rearmost portion of the net, provided the 
liner extends no more than 10 meshes forward of the rearmost portion of 
the net.
    (d) Net obstruction or constriction. The owner or operator of a 
fishing vessel shall not use any device, gear, or material, including, 
but not limited to, nets, net strengtheners, ropes, lines, or chafing 
gear, on the top of the regulated portion of a trawl net that results 
in an effective mesh opening of less than 1\7/8\ inches (48 mm) mesh 
(inside stretch measure); net strengtheners (covers), splitting straps 
and/or bull ropes or wire may be used, provided they do not constrict 
the top of the regulated portion of the net to less than effective 1\7/
8\ inches (48 mm) mesh (inside stretch measure). ``Top of the regulated 
portion of the net'' means the 50 percent of the entire regulated 
portion of the net which (in a hypothetical situation) would not be in 
contact with the ocean bottom during a tow if the regulated portion of 
the net were laid flat on the ocean floor. For the purpose of this 
paragraph, head ropes shall not be considered part of the top of the 
regulated portion of a trawl net. Net strengtheners (covers) may not 
have a mesh less than effective 4.5-inch (11.43-cm) mesh (inside 
stretch measure).

Sec. 655.26  Minimum fish sizes. [Reserved]

Sec. 655.27  Possession limits. [Reserved]

Sec. 655.28  At-sea observer coverage.

    (a) The Regional Director may require observers for any vessel 
holding a permit issued under Sec. 655.4.
    (b) Owners of vessels selected for observer coverage must notify 
the appropriate Regional or Center Director, as specified by the 
Regional Director, before commencing any fishing trip that may result 
in the harvest of Atlantic mackerel, Loligo squid, Illex squid, or 
butterfish. Notification procedures will be specified in selection 
letters to vessel owners.
    (c) An owner or operator of a vessel on which a NMFS-approved 
observer is embarked must:
    (1) Provide accommodations and food that are equivalent to those 
provided to the crew;
    (2) Allow the observer access to and use of the vessel's 
communications equipment and personnel upon request for the 
transmission and receipt of messages related to the observer's duties;
    (3) Allow the observer access to and use of the vessel's navigation 
equipment and personnel upon request to determine the vessel's 
position;
    (4) Allow the observer free and unobstructed access to the vessel's 
bridge, working decks, holding bins, weight scales, holds, and any 
other space used to hold, process, weigh, or store fish; and
    (5) Allow the observer to inspect and copy any records associated 
with the catch and distribution of fish for that trip.

Sec. 655.29  Transfer-at-sea.

    Only vessels issued a moratorium permit under Sec. 655.4(b) may 
transfer Loligo, Illex, or butterfish at sea. Unless authorized in 
writing by the Regional Director, vessels issued an incidental catch 
permit under 655.4(c) are prohibited from transferring or attempting to 
transfer Illex, Loligo, or butterfish from one vessel to another 
vessel.

Sec. 655.30  Experimental fishery.

    (a) The Regional Director, in consultation with the Executive 
Director of the Council, may exempt any person or vessel from the 
requirements of this part for the conduct of experimental fishing 
beneficial to the management of the Atlantic mackerel, squid, or 
butterfish resource or fishery.
    (b) The Regional Director may not grant such exemption unless he/
she determines that the purpose, design, and administration of the 
exemption is consistent with the objectives of the FMP, the provisions 
of the Magnuson Act, and other applicable law, and that granting the 
exemption will not:
    (1) Have a detrimental effect on the Atlantic mackerel, squid, or 
butterfish resource and fishery; or
    (2) Cause any quota to be exceeded; or
    (3) Create significant enforcement problems.
    (c) Each vessel participating in any exempted experimental fishing 
activity is subject to all provisions of this FMP except those 
necessarily relating to the purpose and nature of the exemption. The 
exemption will be specified in a letter issued by the Regional Director 
to each vessel participating in the exempted activity. This letter must 
be carried on board the vessel seeking the benefit of such exemption.
    4. Figure 1 to part 655 is added to read as follows:

BILLING CODE 3510-22-P

[[Page 65631]]

Figure 1 to Part 655--Exemption line to minimum net mesh-size 
requirement for Loligo squid
[GRAPHIC][TIFF OMITTED]TP20DE95.000

[FR Doc. 95-30821 Filed 12-15-95; 11:27 am]
BILLING CODE 3510-22-C

Complete official Federal Register PDF

FR Doc. 95-30798 Lewisburg Dump Superfund Site, Lewisburg, TN
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65616-65618]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30798]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR PART 300

[FRL-5346-9]

Lewisburg Dump Superfund Site, Lewisburg, TN

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of intent to delete.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA), Region IV, 
announces its intent to delete the Lewisburg Dump site from the 
National Priorities List (NPL) and requests public comment on this 
proposed action. The NPL constitutes Appendix B of 40 CFR part 300 
which is the National Oil and Hazardous Substances Pollution 
Contingency Plan (NCP), promulgated by EPA, pursuant to Section 105 of 
the Comprehensive Environmental Response, Compensation, and Liability 
Act (CERCLA) of 1980, as amended. EPA and the State of Tennessee 
Department of the Environment & Conservation have determined that the 
site no longer poses a significant threat to public health or the 
environment and, therefore, further CERCLA remedial measures are not 
appropriate.

DATES: A 30-Day Public Comment Period (December 11, 1995 to January 11, 
1996) has been established for the Lewisburg Dump site deletion 
proposal. Comments concerning the proposal may be submitted by January 
11, 1996.

ADDRESSES: Comments may be mailed to: Femi Akindele, U.S. Environmental 
Protection Agency, 345 Courtland Street, Atlanta, Georgia, 30365.
    Comprehensive information on this site is available for review at 
the following site information repositories.

Marshall County Memorial Library, 310 Farmington Pike, Lewisburg, TN 
37091.
U.S. EPA Record Center, 345 Courtland St., Atlanta, GA 30365.

FOR FURTHER INFORMATION CONTACT: Femi Akindele, U.S. Environmental 
Protection Agency, 345 Courtland Street, Atlanta, Georgia, 30365, 404-
347-3555 EXT. 2042 or 1-800-435-9233 EXT 2042.

SUPPLEMENTARY INFORMATION:

Introduction

    This notice is to announce EPA's intent to delete the Lewisburg 
Dump site from the NPL. It also serves to request public comments on 
the deletion proposal.
    EPA identifies sites that appear to present a significant risk to 
public health, welfare, or environment and maintains the NPL as the 
list of these sites. Sites on the NPL qualify for remedial responses 
financed by the Hazardous Substances Response Trust Fund (Fund). As 
described in 300.425(e)(3) of the NCP, sites deleted from the NPL 
remain eligible for Fund-financed remedial actions in the unlikely 
event that conditions at the site warrant such actions. EPA accepts 
comments on the proposal to delete a site from the NPL for thirty days 
after publication of this notice in the Federal Register.

NPL Deletion Criteria

    The NCP establishes the criteria that EPA uses to delete sites from 
the NPL. In accordance with Sec. 300.425(e) of the NCP, sites may be 
deleted from the NPL where no further response is appropriate. In 
making this determination, EPA, in consultation with the State, 
considers whether the site has met any of the following criteria for 
site deletion:
    (i) Responsible or other parties have implemented all appropriate 
response actions required.
    (ii) All appropriate response actions under CERCLA have been 
implemented and no further response actions are deemed necessary.
    (iii) Remedial investigation has determined that the release poses 
no significant threat to public health or the environment and, 
therefore, no remedial action is appropriate.

Deletion Procedures

    The following procedures were used for the intended deletion of 
this site:
    (1) EPA Region IV issued a Final Close Out Report in September 
1993, which addressed the site conditions, quality assurance and 
control during construction, and technical criteria for satisfying the 
completion requirements.
    (2) Concurrent with this announcement, a notice has been published 
in the local newspaper and has been distributed to appropriate federal, 
state, and local officials announcing the commencement of a 30-day 
public comment period on the Notice of Intent to Delete.
    (3) EPA has made all relevant documents available for public review 
at the information repositories.
    Deletion of the site from the NPL does not itself create, alter, or 
revoke any individual's rights or obligations. The NPL is designed 
primarily for information purposes and to assist EPA management. As 
mentioned earlier, Section 300.425(e)(30) of the NCP states that 
deletion of a site from the NPL does not preclude eligibility of the 
site for future Fund-financed response actions.
    For the deletion of this site, EPA will accept and evaluate public 
comments on this Notice of Intent to Delete before finalizing the 
decision. If necessary, the Agency will prepare a Responsiveness 
Summary to address any significant public comments received during the 
comment period. The deletion is finalized after the Regional 
Administrator places a Notice of Deletion in the Federal Register. 

[[Page 65617]]

Basis for Intended Lewisburg Dump Site Deletion

    The following is a summary of activities on the Lewisburg Dump 
Site. It provides EPA's rationale for the proposed deletion.
    The site is a 20-acre tract of farmland located less than one mile 
north of Lewisburg, Tennessee. It contains an abandoned six acre 
limestone quarry and a pond. The City of Lewisburg owned and operated 
the dump which used about four acres at the western portion of the 
quarry for landfill operations from the late 1950s to 1979. The 
landfill was open to all residential and industrial dumpers. City 
records have indicated that several surrounding communities hauled 
wastes to the dump.
    In 1973, a study was conducted by the Tennessee Department of 
Public Health (TDPH) which indicated that the old quarry was unfit for 
a sanitary landfill. Also, in the early 1970s, the City submitted plans 
to TDPH for an on-site incinerator, interim maintenance, and final 
closure of the dump. In 1977, preliminary closure of the landfill began 
as soil was applied to cover the wastes. In 1979, final closure of the 
landfill was conducted.
    EPA initially inspected and assessed the conditions of the site in 
1982. Among the wastes observed during the inspection were adhesives, 
paint stripper, empty pails coated with yellow lacquer, metal cuttings, 
sawdust, pencil cores, cosmetic powders and shoe linings. Results of 
the assessment indicated the presence of organic and inorganic 
compounds including lead, toluene, PCB, chlordane, and phenol. After 
evaluating the conditions of the landfill, EPA added Lewisburg Dump to 
the NPL in December 1982.
    In 1985, EPA contacted a group of companies, agencies, and 
individuals who were identified as potentially responsible for the 
wastes at the dump to address the problem. The City of Lewisburg and 
other potentially responsible parties (PRPs) formed the Lewisburg 
Environmental Response Committee (LERC) to conduct a Remedial 
Investigation/Feasibility Study (RI/FS) on the site. The study was 
conducted under the terms of an Administrative Order on Consent which 
the PRPs entered into with EPA.
    The RI/FS, which was completed in 1990, confirmed the presence of 
contaminants at the site. Organic and inorganic compounds were detected 
in the landfill soil, shallow aquifers beneath the site, and in the 
abandoned quarry pond.
    The most prevalent organic contaminants at the site were bis(2-
ethylhexyl)phthalate, (DEHP), methylene chloride, xylene, ethylbenzene, 
4-methyl-2-pentanone, 2-butanone, carbon disulfide, and toluene. The 
most common inorganic contaminants were copper, chromium, aluminum, 
arsenic, iron, lead, manganese, mercury, barium, and zinc. Of these 
contaminants, only DEHP and copper were detected at levels of 
significant concern. No contaminants were detected at appreciable 
concentrations outside the site.
    The RI/FS results indicated that, although contaminant 
concentrations were generally insignificant, the wide variety of the 
compounds was of concern. Other concerns noted were that the compounds 
had the potential to become exposed by landfill cap deterioration, the 
open access to the site and possible disturbance of landfill 
constituents. In addition, there was potential for increased 
groundwater contamination and leachate generation if site conditions 
were not improved.
    Special studies, including well surveys and dye trace analyses were 
conducted in the area of the site to evaluate groundwater conditions 
since most residences had water wells. The well survey identified 123 
households within a 2 mile radius of the site with a minimum of one 
well on each property. Approximately 70 of these households were 
utilizing groundwater from wells for domestic or livestock purposes. 
However, most residences near the site were connected to the municipal 
water supply. No industrial or municipal wells were found in the survey 
area. The dye trace studies did not indicate an immediate effect of the 
site on the domestic wells.
    In order to alleviate potential adverse effects of the site on 
human health and the environment, the RI/FS evaluated several possible 
remedial measures. Based on the results, EPA issued a Record of 
Decision (ROD) in September 1990, which described the remedy selected 
for the site. The major components of the selected remedy were: (1) 
removal and disposal of all site surface debris, (2) removal and 
disposal of all debris in the quarry pond, (3) replacement of plastic 
test-pit caps with landfill cap material, (4) regrading of the landfill 
cap, (5) implementation of institutional controls, and (6) long-term 
monitoring and analysis.
    Soon after the ROD was issued, EPA requested the PRPS to implement 
and fund the selected remedy. The PRPs agreed and signed a Consent 
Decree in 1991 to perform the work. All remedial activities were 
completed between September 4, 1992, and September 20, 1993. The 
Remedial Action Report submitted by the PRPs indicated that 382 cubic 
yards of debris/soil, 172 tires, 50 empty drums and 2 drums containing 
lead paint and sludge were removed from the site. These were disposed 
of at properly permitted facilities. EPA and TDEC performed a final 
site work inspection in September 1993, and determined that the 
Remedial Action (RA) had been successfully executed.
    Following the RA completion, the PRPs initiated site maintenance 
and monitoring activities, including regular site inspection and 
groundwater sampling. Laboratory results and other reports on these 
activities have confirmed that the cleanup work at Lewisburg Dump was 
successful and that the site no longer poses a threat to human health 
or the environment.
    The PRPs will continue to monitor the groundwater periodically and 
report results to EPA as stipulated in the 1991 Consent Decree. TDEC 
will provide necessary oversight.
    The Consent Decree required the PRPs to place deed restrictions on 
the property. The deed restrictions were recorded with the Office of 
the Hamilton County Register on August 19, 1993.
    Throughout this project, EPA conducted active community relations 
activities to ensure that the local residents were well informed about 
the different activities occurring at the site. These included the 
development of Community Relations Plans, public meetings, and routine 
publications of progress report fact sheets. A public meeting 
presenting the Proposed Plan was held on July 25, 1990 in Lewisburg, 
Tennessee. Public comments on the selected remedy were addressed in the 
1990 ROD, and site information was placed at the repository in a local 
library. A Pre-Construction meeting was held on August 17, 1992 in 
Lewisburg to discuss the start of cleanup activities with the 
community. In December 1993, EPA announced the end of site cleanup 
activities in the local newspaper after the final RA inspection.
    EPA provided oversight and involved the State in the evaluation and 
approval of work conducted by the PRPs at the site. The Remedial Design 
(RD), RA contract, and RA Work Plan were carefully reviewed by EPA and 
TDEC for compliance with all quality assurance/quality control (QA/QC) 
procedures. EPA reviewed or developed site evaluations, project plans, 
technical and material specifications, construction, installation, 
testing, and sampling requirements and procedures 

[[Page 65618]]
for all laboratory analyses. Work Plans were developed as necessary by 
contractors which specified appropriate QA/QC measures for all cleanup 
activities. EPA reviewed and approved the QA/QC plans which, in 
general, were based on the protocols in the U.S. EPA, Region IV.
    Consistent with EPA guidance, a five year review of this project is 
necessary to ensure continued protection of human health and the 
environment. The statutory review will be conducted according to the 
Office of Solid Waste and Emergency Response Directive 9355.7-02, 
``Structure and Components of the Five year Reviews''.
    The five-year period begins with the date of RA contract award 
which, for this project, is September 8, 1992. Therefore, the review 
should be completed prior to September 8, 1997.
    In conclusion, EPA, with the concurrence of the State, has 
determined that all appropriate remedial actions at the Lewisburg Dump 
site under CERCLA have been completed. The site no longer poses a 
threat to human health or the environment. Therefore, EPA proposes to 
delete the site from the NPL and requests public comments on the 
proposal.

    Dated: November 27, 1995.
Patrick M. Tobin,
Acting Regional Administrator, USEPA, Region IV.
[FR Doc. 95-30798 Filed 12-19-95; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 95-30782 Proposed Regulation Relating to Definition of Plan Assets; Participant Contributions
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 66036-66040]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30782]

[[Page 66035]]

_______________________________________________________________________

Part V

Department of Labor

_______________________________________________________________________

Pension and Welfare Benefits Administration

_______________________________________________________________________

29 CFR Part 2510

Proposed Regulation Relating to Definition of Plan Assets; Participant 
Contributions; Proposed Rule

Federal Register / Vol. 60, No. 244 / Wednesday, December 20, 1995 / 
Proposed Rules

[[Page 66036]]

DEPARTMENT OF LABOR

Pension and Welfare Benefits Administration

29 CFR Part 2510

RIN 1210-AA53

Proposed Regulation Relating to Definition of Plan Assets; 
Participant Contributions

AGENCY: Pension and Welfare Benefits Administration, Department of 
Labor.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This document contains a proposed regulation revising the 
definition of when certain monies which a participant pays to, or has 
withheld by, an employer for contribution to an employee benefit plan 
are ``plan assets'' for purposes of Title I of the Employee Retirement 
Income Security Act of 1974 (ERISA) and the related prohibited 
transaction provisions of the Internal Revenue Code (the Code). This 
regulation will provide guidance to employers that sponsor contributory 
plans, including plans complying with section 401(k) of the Internal 
Revenue Code, as well as fiduciaries, participants, and beneficiaries 
of such plans.

DATES: Written comments and requests to testify concerning the proposed 
regulation must be received by February 5, 1996. The Department has 
scheduled a public hearing on this proposal on January 24, 1995, and, 
if necessary, on January 25, 1995. The hearing will begin at 10:00 am 
on both days.

ADDRESSES: Interested persons are invited to submit written comments 
and requests to testify concerning this proposed regulation to: Pension 
and Welfare Benefits Administration, Room N-5669, U.S. Department of 
Labor, 200 Constitution Ave., N.W., Washington, DC 20210. Attention: 
Proposed Participant Contribution Regulation. All submissions will be 
open to public inspection at the Public Documents Room, Pension and 
Welfare Benefits Administration, U.S. Department of Labor, Room N-5638, 
200 Constitution Ave., NW., Washington, DC 20210. Written comments may 
also be sent by the Internet to the following address: 
[email protected]. The hearing on this proposal will be held in 
Room N-3437A, Constitution Ave., N.W., Washington, DC 20210.

FOR FURTHER INFORMATION CONTACT: Rudy Nuissl, Office of Regulations and 
Interpretations, Pension and Welfare Benefits Administration, U.S. 
Department of Labor, Washington, DC (202) 219-7461; or William W. 
Taylor, Plan Benefits Security Division, Office of the Solicitor, U.S. 
Department of Labor, Washington, DC (202) 219-9141. These are not toll-
free numbers.

SUPPLEMENTARY INFORMATION: In 1988, the Department of Labor (the 
Department) published a final regulation defining when certain monies 
that a participant pays to, or has withheld by, an employer for 
contribution to a plan are ``plan assets'' for purposes of Title I of 
ERISA and the related prohibited transaction provisions of the Code.\1\ 
53 FR 17628 (May 17, 1988). The final regulation provided that the 
assets of the plan include amounts (other than union dues) that a 
participant or beneficiary pays to an employer, or amounts that a 
participant has withheld from his or her wages by an employer, for 
contribution to the plan as of the earliest date on which such 
contributions can reasonably be segregated from the employer's general 
assets, but in no event to exceed 90 days from the date on which such 
amounts are received by the employer (in the case of amounts that a 
participant or beneficiary pays to an employer) or 90 days from the 
date on which such amounts would otherwise have been payable to the 
participant in cash (in the case of amounts withheld by an employer 
from a participant's wages).\2\ This final rule was based on a record 
developed with respect to a proposed regulation published in 1979. 44 
FR 50363 (August 28, 1979).

    \1\ The Secretary of Labor has authority to issue regulations 
relating to section 4975 of the Internal Revenue Code pursuant to 
section 102 of Reorganization Plan No. 4 of 1978. 5 U.S.C. App. 165. 
For the sake of clarity, the remainder of the preamble refers only 
to Title I of ERISA. However, these references apply to the 
corresponding provisions of section 4975 of the Code as well.
    \2\ The Department has taken the position that elective 
contributions to an employee benefit plan, whether made pursuant to 
a salary reduction agreement or otherwise, constitute amounts paid 
to or withheld by an employer (i.e., participant contributions) 
within the scope of Sec. 2510.3-102, without regard to the treatment 
of such contributions under the Internal Revenue Code. See 53 FR 
29660 (Aug. 8, 1988).
---------------------------------------------------------------------------

    Except as provided in ERISA Sec. 403(b), plan assets are required 
to be held in trust by one or more trustees.\3\ ERISA Sec. 403(a), 29 
U.S.C. 1103(a). In addition, ERISA's fiduciary responsibility 
provisions apply to the management of plan assets. Among other things, 
these provisions make clear that the assets of a plan may not inure to 
the benefit of any employer and shall be held for the exclusive purpose 
of providing benefits to participants in the plan and their 
beneficiaries, and defraying reasonable expenses of administering the 
plan. ERISA Secs. 403-404, 29 U.S.C. 1103-1104. They also prohibit a 
broad array of transactions involving plan assets. ERISA Secs. 406-408, 
29 U.S.C. 1106-1108. Employers who fail to transmit promptly 
participant contributions, and plan fiduciaries who fail to collect 
those amounts in a timely manner, will violate the requirement that 
plan assets be held in trust; in addition, such employers and 
fiduciaries may be engaging in prohibited transactions.

    \3\ ERISA Sec. 403(b) contains a number of exceptions to the 
trust requirement for certain types of assets, including assets 
which consist of insurance contracts, and for certain types of 
plans. In addition, the Secretary has issued a technical release, 
T.R. 92-01, which provides that, with respect to certain welfare 
plans (e.g., cafeteria plans), the Department will not assert a 
violation of the trust or certain reporting requirements in any 
enforcement proceeding, or assess a civil penalty for certain 
reporting violations, involving such plans solely because of a 
failure to hold participant contributions in trust. 57 FR 23272 
(June 2, 1992), 58 FR 45359 (Aug. 27, 1993).
---------------------------------------------------------------------------

    As was noted in the preamble to the final regulation published in 
1988, the Department of Justice takes the position that, under 18 
U.S.C. 664, the embezzlement, conversion, abstraction, or stealing of 
``any of the moneys, funds, securities, premiums, credits, property, or 
other assets of any employee welfare benefit plan or employee pension 
benefit plan, or any fund connected therewith'' is a criminal offense, 
and that under such language, criminal prosecution may go forward in 
situations in which the participant contributions is not a plan asset 
for purposes of Title I of ERISA. The final regulation defined when 
participant contributions become ``plan assets'' only for the purposes 
of Title I of ERISA and the related prohibited transaction excise tax 
provisions of the Code. The Department reiterates that this regulation 
may not be relied upon to bar criminal prosecutions pursuant to 18 
U.S.C. 664.
    Similarly, the Department wishes to reemphasize its view, expressed 
in the preamble to the final regulation, that in circumstances in which 
the employer clearly converts participant contributions to its own use, 
such amounts are considered ``segregated,'' and thus will be ``plan 
assets''.

The Need for a Proposed Regulation

    Although the Department believes that, in the vast majority of 
contributory employee benefit plans, participant contributions are 
handled with integrity, recent investigations conducted by the 
Department have revealed numerous violations related to employers' 
delay in transmitting or failing to transmit to employee benefit plans 
amounts that a participant or beneficiary pays to an employer, or 

[[Page 66037]]
amounts that employers withhold from participants' wages, for 
contribution to the plans. Evidence uncovered in ongoing investigations 
indicates that such delays are not uncommon.\4\ The above described 
recent enforcement activities focused on participant contribution 
indicate a significantly higher frequency of violations for such 
investigations than the Department encounters in general.\5\

    \4\ In the Spring of 1995 PWBA began a project to investigate 
misuse of employee contributions to employee benefit plans and in 
particular in 401(k) plans. As of October 31, 1995 there were 417 
employee contribution investigations open and 130 cases were closed 
during the year. More than $3.7 million has been recovered through 
voluntary compliance in situations where employee contributions were 
not placed in trust for participants.
    \5\ Of the 130 closed employee contribution cases, 44, or 33.8 
percent of closed cases, resulted in findings of violations of 
ERISA's fiduciary provisions. This compares to a finding of 
fiduciary violations in 12 percent of all other closed cases in FY 
95.
---------------------------------------------------------------------------

    In addition, the Department, responding to requests for technical 
assistance from employers and participants, has received information 
that many employers who receive participant contributions are under the 
misimpression that the current regulation permits a delay of up to 90 
days in segregating such contributions, even if the participant 
contributions can reasonably be segregated much sooner. The Department 
has also received similar information from a variety of other sources. 
Such delays deprive participants of earnings on their contributions and 
increase the risk to participants and their beneficiaries that their 
contributions will be lost due to the employer's insolvency or 
misappropriation by the employer.
    In order to better protect the security of participant 
contributions to employee benefit plans, the Department believes that 
the final regulation published in 1988 must be revised. It is important 
to clarify that participant contributions become plan assets as soon as 
they can reasonably be segregated from the employer's general assets. 
In addition, the Department believes that the 90-day maximum period 
under 1988 regulation is too long, given the abuses that have been 
uncovered by the Department's investigations, and improvements in cash 
management and payroll processing practices since the final regulation 
was adopted.

The Proposed Regulation

    This document contains a proposal to revise the regulation at 29 
CFR 2510.3-102 by changing the maximum period during which participant 
contributions to an employee benefit may be treated as other than 
``plan assets''. Under the current regulation, the maximum period is 90 
days from the date on which the participant contributions are received 
by the employer (for amounts that participants or beneficiaries pay to 
the employer) or would otherwise have been payable to the participants 
in cash (for amounts that the employer withholds from the participants' 
wages).
    Under the proposed rule, the maximum period for an employer to 
transmit participant contributions to the plan would be the same number 
of days as the period in which the employer is required to deposit 
withheld income taxes and employment taxes under rules promulgated by 
the Internal Revenue Service (IRS). The currently applicable rules are 
codified at 26 CFR 31.6302-1.\6\ In general, these rules require 
employers who have reported more than $50,000 of withheld income taxes 
and employment taxes for a prior 12-month ``lookback'' period (defined 
as ``semi-weekly depositors'') to make tax deposits to a Federal 
Reserve Bank or authorized financial institution within a few days of 
withholding from wages. Employers who have reported $50,000 or less of 
withheld income taxes and employment taxes in the lookback period are 
defined as ``monthly depositors'' and must make such deposits on or 
before the 15th day of the month following the month in which the 
employees' wages are paid.

    \6\ See also IRS Publication 15 (Cat. No. 10000W) Circular E, 
Employer's Tax Guide (Rev. January 1995) and IRS Notice 931 (Rev. 
October 1995).
---------------------------------------------------------------------------

    In addition, the IRS regulations reflect the statutory requirement 
that an employer who has accumulated on any day $100,000 in withheld 
income taxes and employment taxes must deposit such taxes by the next 
banking day. 26 U.S.C. 6302(g). If an employer accumulates less than a 
$500 tax liability during a calendar quarter, no deposits are required; 
the tax is paid with the filing of the tax return for the quarter.\7\ 
The Department solicits comments on the appropriateness of including 
these two special rules to the general tax deposit rules in the IRS 
regulation.

    \7\ The Department recognizes that mistakes may occur in the 
processing of participant contributions. It is the Department's view 
that ERISA does not prevent the return of any mistaken contributions 
nor the ability to make correcting contributions after the mistakes 
are discovered. See ERISA Sec. 403(c), 29 U.S.C. 11103(c).
---------------------------------------------------------------------------

    The proposed rule would require employers who cannot reasonably 
segregate participant contributions at an earlier date to treat such 
amounts as plan assets within the same time frame that the employer is 
required to segregate and deposit withheld income taxes and employment 
taxes. The following table illustrates the basic time periods specified 
in the IRS regulations:

------------------------------------------------------------------------
      Type of depositor           Date withheld       Date deposit due  
------------------------------------------------------------------------
Semi-Weekly Depositor (more   Wednesday, Thursday,  Following Wednesday.
 than $50,000 of Federal       and/or Friday.       Following Friday.   
 Income, Social Security and  Saturday, Sunday,                         
 Medicare taxes                Monday and/or                            
 (collectively, employment     Tuesday.                                 
 taxes) reported for 12-                                                
 month period ending last                                               
 June 30).                                                              
Monthly Depositor ($50,000    In any day during a   By the 15th of the  
 or less of employment taxes   calendar month.       following calendar 
 reported for 12-month                               month.             
 period ending on the                                                   
 previous June 30).                                                     
Either semi-weekly or         Not relevant........  Next banking day    
 monthly depositor, if                               after the $100,000 
 $100,000 or more in                                 in employment taxes
 employment taxes are                                was accumulated.   
 accumulated on any date.                                               
------------------------------------------------------------------------

    For example, a semi-weekly depositor that pays its employees on 
Wednesday, December 13, is required to deposit withheld income taxes 
and employment taxes by the following Wednesday (December 20). Under 
the proposed rule, any participant contributions withheld on December 
13 would become plan assets as soon as they could reasonably be 
segregated from the employer's general assets, but no later than 
December 20. Participant contributions that are paid separately by 
employees or former employees to the employer would be subject to the 
same time frames. For example, if a semi-weekly depositor receives a 
participant's payment on Monday, 

[[Page 66038]]
December 18, the payment amount would become plan assets as soon as 
they could reasonably be segregated from the employer's general assets, 
but no later than the following Friday, December 22.
    Because the IRS tax deposit rules are generally applicable to 
employers, the Department expects that employers who sponsor 
contributory employee benefit plans are familiar with and have systems 
in place to comply with the IRS requirements.\8\ Thus, the Department 
believes that applying these same rules in determining when the maximum 
period beyond which participant contributions must be treated as plan 
assets should not result in serious inconvenience or expense for such 
employers. The Department believes that currently available cash 
management and payroll processing technology allows the segregation of 
participant contributions within the maximum period proposed in this 
document. Furthermore, the final regulation published in 1988 requires 
that participant contributions be treated as plan assets as soon as 
they can reasonably be segregated from the employer's general assets. 
As a result, this proposed change will not be material for many 
employers who have complied with the final regulation published in 
1988. The Department recognizes that some employers perceive 
difficulties in the transfer of participant contributions to the plan 
that they do not have in the deposit of federal employment taxes. The 
Department solicits comments as to any specific burdens and associated 
costs of this kind. The Department also requests comments on the 
transition period needed for employers and service providers, 
especially small businesses, to make changes in practices that may be 
necessary to comply with the proposal if it is adopted.

    \8\ The Department understands that most employers who sponsor 
section 401(k) plans are ``semi-weekly depositors'' under the IRS 
rules.
---------------------------------------------------------------------------

    Although the proposed rule would not change the requirement that 
participant contributions be treated as plan assets at the earliest 
date they can reasonably be segregated from the employer's general 
assets, changing the regulations to provide for an outer limit that 
conforms to IRS requirements will allow the Department and plan 
participants to more quickly and easily determine that a violation has 
occurred. This will assist the Department in its increased monitoring 
and enforcement in this area, as it reduces the room for argument as to 
how rapidly participant contributions must be segregated from the 
employer's general assets. In addition, changing the ninety-day limit 
for treating participant contributions as other than ``plan assets'' 
reduces the risk of loss that exists when employers improperly hold 
participant contributions in their general assets for the maximum 
period rather than segregating them from the employer's general assets 
at the earliest reasonable date.
    The proposed rule does not include an alternative proposal for a 
maximum period based on a fixed period of days (such as 15 days), but 
the Department may consider adopting such a rule in place of the rule 
described above if adopting the IRS tax deposit rules as the maximum 
period for segregating participant contributions would place an undue 
burden on plan sponsors. Commenters may wish to address the advantages 
or disadvantages of using a fixed period of days or some other 
formulation for a maximum period when they provide comments on the 
proposed rule.
    The Department also welcomes comments on the advisability of other 
measures that it might consider to address the problem of delays in 
transmitting participant contributions to plans, such as, for example, 
requirements for more frequent disclosure to participants of 
participant contributions and account balances by the plan.
    This document also modifies the language in section 2510.3-102 to 
emphasize that the assets of a plan include participant contributions 
as of the earliest date on which such contributions can reasonably be 
segregated from the employer's general assets. Although this 
modification would not change the effect of the existing regulation, 
the Department expects that the proposed new language will reduce the 
likelihood that employers will incorrectly believe that the maximum 
period in the proposed rule is a safe harbor and that they may delay 
the segregation of participant contributions up to the maximum period.

Effective Date of Regulation

    Pursuant to the requirements of the Administrative Procedure Act at 
5 U.S.C. 553(b), the Department is publishing this notice of proposed 
rulemaking for notice and comment and will promulgate this rule in 
final form subsequent to such comment period. The Department expects to 
issue a final rule 45 days following the close of the comment period. 
The Department has determined to propose that the final rule will be 
effective 60 days after its publication, which the Department believes 
will allow sufficient time for an appropriate transition to the new 
maximum periods. The Department solicits comments regarding the 
appropriate effective date for the final regulation.

Regulatory Flexibility Act

    The Department has determined that this regulation would not have a 
significant economic impact on small plans or other small entities. The 
regulation would describe when contributions made by a participant of a 
plan subject to ERISA or to the related prohibited transaction excise 
tax provisions of the Internal Revenue Code must be transmitted to the 
plan by an employer withholding the contributions. The Department 
solicits comments on whether the proposal is likely to have a 
significant economic impact on small entities. The Department also 
requests comments from small entities regarding what, if any, special 
problems they anticipate they may encounter if the proposal were to be 
adopted, and what changes, if any, could be made to minimize these 
problems.

Executive Order 12866

    Under Executive Order 12866 (58 FR 51735, Oct. 4, 1993), the 
Department must determine whether the regulatory action is 
``significant'' and therefore subject to review by the Office of 
Management and Budget (OMB) and the requirements of the Executive 
Order. Under section 3(f), the order defines a ``significant regulatory 
action'' as an action that is likely to result in, among other things, 
a rule raising novel policy issues arising out of the President's 
priorities.
    Pursuant to the terms of the Executive Order, the Department has 
determined that this regulatory action is a ``significant regulatory 
action'' as that term is used in Executive Order 12866 because the 
action would raise novel policy issues arising out of the President's 
priorities. Thus, the Department believes this notice is 
``significant,'' and subject to OMB review on that basis. The 
Department also solicits comments on potential economic effects of this 
proposed rule in the context of Executive Order 12866, and any evidence 
with respect to whether or not this proposed rule may be ``economically 
significant''.

Paperwork Reduction Act

    The regulation being issued here is not subject to the requirements 
of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.) because 
it does not 

[[Page 66039]]
contain an ``information collection request'' as defined in 44 U.S.C. 
3502(11).

Statutory Authority

    The proposed regulation would be adopted pursuant to the authority 
contained in section 505 of ERISA (Pub. L. 93-406, 88 Stat. 894; 29 
U.S.C. 1135) and section 102 of Reorganization Plan No. 4 of 1978 (43 
FR 47713, October 17, 1978), effective December 31, 1978 (44 FR 1065, 
January 3, 1979), 3 CFR 1978 Comp. 332, and under Secretary of Labor's 
Order No. 1-87, 52 FR 13139 (Apr. 21, 1987).

List of Subjects in 29 CFR Part 2510

    Employee benefit plans, Employee Retirement Income Security Act, 
Pensions, Plan assets.

PART 2510--[AMENDED]

    1. The authority for Part 2510 is revised to read:

    Authority: Secs. 3(2), 111(c), 505, Pub. L. 93-406, 88 Stat. 
852, 894 (29 U.S.C. 1002(2), 1031, 1135); Secretary of Labor's Order 
No. 27-74, 1-86 (51 FR 3521, January 28, 1986), 1-87 (52 FR 13139, 
April 21, 1987), and Labor Management Services Administration Order 
No. 2-6.

    Section 2510.3-40 is also issued under sec. 3(40), Pub. L. 97-
473, 96 Stat. 2611, 2612 (29 U.S.C. 1002(40)).
    Section 2510.3-101 is also issued under sec. 102 of 
Reorganization Plan No. 4 of 1978 (43 FR 47713, October 17, 1978), 
effective December 31, 1978 (44 FR 1065, January 3, 1978), 3 CFR 
1978 Comp. 332 and sec. 11018(d) of Pub. L. 99-272, 100 Stat. 82.
    Section 2510.3-102 is also issued under sec. 102 of 
Reorganization Plan No. 4 of 1978 (43 FR 47713, October 17, 1978), 
effective December 31, 1978 (44 FR 1065, January 3, 1978), 3 CFR 
1978 Comp. 332.
    2. Section 2510.3-102 is revised to read as follows:

2510.3-102  Definition of ``plan assets''--participant contributions.

    (a) General rule. For purposes of Subtitle A and Parts 1 and 4 of 
Subtitle B of Title I of ERISA and section 4975 of the Internal Revenue 
Code only (but without any implication for and may not be relied upon 
to bar criminal prosecutions under 18 U.S.C. 664), the assets of the 
plan include amounts (other than union dues) that a participant or 
beneficiary pays to an employer, or amounts that a participant has 
withheld from his wages by an employer, for contribution to the plan as 
of the earliest date on which such contributions can reasonably be 
segregated from the employer's general assets.
    (b) Maximum time period. In no event shall the date determined 
pursuant to paragraph (a) of this section occur later than the end of 
period of time during which the employer is required to make federal 
tax deposits for withheld income taxes and taxes under the Federal 
Insurance Contributions Act under regulations issued at 26 CFR 31.6302-
1, measured from the date on which such amounts are received by the 
employer (in the case of amounts that a participant or beneficiary pays 
to an employer) or the date on which such amounts would otherwise have 
been payable to the participant in cash (in the case of amounts 
withheld by an employer from a participant's wages).
    (c) Examples. The requirements of this section are illustrated by 
the following examples:
    (1) Employer W is a small company with a small number of employees 
at a single payroll location. W maintains a plan under section 401(k) 
of the Internal Revenue Code in which all of its employees participate. 
W's practice is to issue a single check to the trust that is maintained 
under the plan in the amount of the total withheld employee 
contributions within two days of the date on which the employees are 
paid. Under applicable Internal Revenue Service federal tax deposit 
rules, W is a ``monthly depositor'' as defined at 26 CFR 31.6302-
1(c)(1). Under these rules W must deposit withheld federal income taxes 
and employment taxes no later than the 15th of the month following the 
month in which the relevant wages are paid. In view of the relatively 
small number of employees and the fact that they are paid from a single 
location, W could reasonably be expected to transmit participant 
contributions to a trust within two days after the employee's wages are 
paid. Therefore, the assets of W's 401(k) plan include the participant 
contributions attributable to any pay period as of the date two days 
from the close of such period, even though IRS federal tax deposit 
rules allow W substantially more time in which to make tax deposits.
    (2) Employer X is a large national corporation which sponsors a 
section 401(k) plan. X has several payroll centers and uses an outside 
payroll processing service to pay employee wages and process 
deductions. Each payroll center has a different pay period. Each center 
maintains separate accounts on its books for purposes of accounting for 
that center's payroll deductions and provides the outside payroll 
processor the data necessary to prepare employee paychecks and process 
deductions. The payroll processing service has adopted a procedure 
under which it issues the employees' paychecks when due and deducts all 
payroll taxes and elective employee deductions. It deposits withheld 
income and employment payroll taxes within the time frame specified by 
26 CFR 31.6302-1 and forwards a computer data tape representing the 
total payroll deductions for each employee, for a month's worth of pay 
periods, to a centralized location in X, where the data tape is checked 
for accuracy. A single check representing the aggregate participant 
contributions for the month is issued to the plan by the employer. X 
believes that this procedure, which takes 7 days after receipt of the 
date tape to complete, permits segregation of participant contributions 
at the earliest practicable time and avoids mistakes in the allocation 
of contribution amounts for each participant. X, however, is a ``semi-
weekly depositor'' under the Internal Revenue Service's Federal Deposit 
Rules and makes Federal tax deposits within the time frames, set forth 
in those IRS rules. Under paragraphs (a) and (b) of this section, the 
assets of the plan include the participant contributions as soon as X 
could reasonably be expected to segregate the contributions from its 
general assets, but in no event later than the date on which the 
employer would be required to deposit withheld income taxes and 
employment taxes under 26 CFR 31.6302-1. The participant contributions 
become plan assets no later than end of the time period within which X 
is required to deposit withheld income taxes and employment taxes.
    (3) Employer Y is medium-sized company which maintains a self-
insured contributory group health plan. Several former employees have 
elected, pursuant to the provisions of ERISA Sec. 602, 29 U.S.C. 1162, 
to pay Y for continuation of their coverage under the plan. Y is a 
semi-weekly depositor of withheld Federal income taxes and employment 
taxes. Under paragraphs (a) and (b) of this section, the assets of the 
plan include the former employees' payments as soon as Y could 
reasonably be expected to segregate the payments from its general 
assets, but in no event later than the date on which Y would be 
required to deposit the payment amounts if the payments were withheld 
from Federal income taxes or employment taxes. A former employee's 
payment received on a Monday would have become plan assets no later 
than the following Friday.
    (d) Effective date. This section is effective 60 days after date of 
publication of final regulation.

[[Page 66040]]

    Signed at Washington, DC, this 14th day of December 1995.
Alan D. Lebowitz,
Deputy Assistant Secretary for Program Operations, Pension and Welfare 
Benefits Administration, U.S. Department of Labor.
[FR Doc. 95-30782 Filed 12-19-95; 8:45 am]
BILLING CODE 4510-29-M

Complete official Federal Register PDF

FR Doc. 95-30767 Valuation of Oil From Federal and Indian Leases
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65610-65611]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30767]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Minerals Management Service

30 CFR Part 206

RIN 1010-AC09

Valuation of Oil From Federal and Indian Leases

AGENCY: Minerals Management Service (MMS), Interior.

ACTION: Advance notice of proposed rulemaking.

-----------------------------------------------------------------------

Summary: In response to changes in the oil and gas industry and the 
marketplace, the Minerals Management Service (MMS) is considering 
amending its regulations regarding the valuation of crude oil produced 
from or allocated to Federal and Indian leases.
    Most Federal and Indian leases provide that the value of production 
for royalty purposes be determined by the Secretary. This notice is 
intended to solicit comments on new methodologies to establish the 
royalty value of oil produced from Federal and Indian leases. MMS 
specifically seeks comments on the use of crude oil posted prices as a 
means to value oil not sold under arm's-length conditions, and the 
meaning and application of the term ``significant quantities''.

DATES: Comments must be received on or before March 19, 1996.

ADDRESSES: Written comments, suggestions, or objections regarding 
valuation issues should be mailed to the Minerals Management Service, 
Royalty Management Program, Rules and Procedures Staff, Denver Federal 
Center, Building 85, P.O. Box 25165, Mail Stop 3101, Denver, Colorado 
80225-0165, Attention: David S. Guzy, telephone (303) 231-3432, fax 
(303) 231-3194.

FOR FURTHER INFORMATION CONTACT: David S. Guzy, Chief, Rules and 
Procedures Staff, MMS Royalty Management Program, at telephone (303) 
231-3432, fax (303) 231-3491, e-mail David__G[email protected].

SUPPLEMENTARY INFORMATION:

I. Background

    All Federal and Indian oil and gas leases contain provisions for 
the determination of royalty obligations.
    Most of these Federal and Indian leases reserve to the Secretary 
considerable discretion in determining value for royalty purposes. This 
Advance Notice of Proposed Rulemaking is intended to solicit comments 
on new methodologies to establish value for crude oil production from 
Federal and Indian leases. Comments received in response to this 
Advance Notice will be considered in the development of a proposed 
rulemaking that MMS will publish in the Federal Register.
    In conjunction with the lease terms, the valuation of oil 
production from Federal and Indian leases is subject to the regulations 
at 30 CFR Part 206, Subpart C--Federal and Indian Oil. The present 
regulations govern the valuation of production from both Federal and 
Indian (Tribal and allotted) leases (except leases on the Osage Indian 
Reservation, Oklahoma). MMS believes it could provide an improved 
regulatory framework in which lease terms could be strictly enforced 
while requiring little or no extra information from lessees.
    MMS may issue separate regulations to value oil from Indian leases 
because of the Secretary's trust obligation in the administration of 
Indian oil and gas leases. In view of this obligation, the Secretary 
must ensure that Indians receive the maximum benefits from mineral 
resources on their lands. Thus, the value of production for royalty 
purposes from an Indian lease should be determined considering the 
higher reasonable values provided by the terms of the standard lease. 
MMS believes this goal is consistent with: the terms of these Indian 
oil and gas leases, the statutes governing Indian oil and gas leases, 
and court decisions providing judicial guidance in the interpretation 
and administration of Indian oil and gas leases. Specific comments are 
requested on issuing separate regulations for valuing oil from Indian 
leases.

II. Discussion of Alternatives

    The Secretary's responsibility to determine the royalty value of 
oil produced from Federal and Indian lands has not changed, although 
the industry and marketplace have changed dramatically over the years. 
Specifically, oil posted prices may no longer represent the price a 
purchaser is willing to pay for a particular crude oil. MMS plans to 
develop a set of regulations to permit the Secretary to discharge the 
Department's royalty valuation responsibility in an environment of 
continuing and accelerating change in the industry and the marketplace. 
Given the ever-changing marketplace, the Secretary's responsibilities 
regarding oil production from Federal and Indian leases require 
development of flexible valuation methodologies that lessees can comply 
with accurately and timely. MMS specifically seeks to improve oil 
valuation regarding the use of oil posted prices, including methods of 
determining ``significant quantities.'' A discussion of these areas 
follows:

(a) Oil Posted Prices, Including Effects on Existing Valuation 
Benchmarks for Oil Not Sold Under Arm's-Length Contract

    MMS is considering modifying or replacing the current benchmark 
system at 30 CFR 206.102(c) used to value oil not sold under arm's-
length contracts. MMS believes that the current regulations may place 
too much emphasis on posted prices--the lessee's and others'. The first 
two of the five benchmarks rely on postings if a significant quantity 
of like-quality crude is purchased or sold at such postings in a field 
or area. Likewise, the third benchmark relies at least partly on 
postings because it applies the average of arm's-length contract 
prices, which often are tied to postings, for purchases or sales of 
significant quantities of oil in the area. (The fourth benchmark relies 
on spot sales and other relevant matters, and the fifth relies on a 
net-back or any other reasonable method to determine value.)
    MMS recently has received information indicating that oil posted 
prices don't always reflect market value and in fact may often be no 
more than a beginning point for negotiation.
    MMS has found numerous examples where crude oil purchasers pay 
premiums over the posted price. Further, consultation with private 
consultants, various State government personnel, and other non-Federal 

[[Page 65611]]
royalty-owners indicates a consistent belief that oil posted prices may 
not represent market value. And, while posted prices historically were 
presumed to represent actual prices offered for a particular crude oil, 
postings no longer necessarily represent an offer to buy at that price.
    Revising the benchmark system in the regulations could remove some 
of the current heavy reliance on posted oil prices and provide MMS more 
flexibility in determining proper royalty value.
    MMS is soliciting comments on the continued applicability of oil 
posted prices as a fair and reasonable indicator of royalty value. 
Specifically, MMS seeks input on how oil marketing takes place today 
and whether and how oil posted prices typically factor into oil sales/
purchases/exchanges.
    MMS invites specific comments on various aspects of posted prices 
as applied to crude oil sales and royalty value for Federal and Indian 
leases, including the option of separate oil valuation regulations for 
Indian leases. MMS would like examples demonstrating whether crude oil 
price postings form the true basis for oil values in given fields or 
areas--and, to the extent possible, nationwide. And, if the commenter 
feels postings don't reflect market value for the field or area, MMS 
would like specific suggested alternative royalty valuation 
methodologies for oil not sold under arm's-length conditions. That is, 
if postings don't reflect market value and because the existing 
benchmarks for oil not sold under arm's-length conditions rely heavily 
on posted prices, what are some suggested alternative valuation 
benchmarks? For example:
     Are there indices or other published prices that better 
reflect actual market value than oil postings?
     Where prices posted by individual companies differ 
considerably within the same field or area, how are these differences 
best reconciled?
     Are there fixed ``reference'' prices against which 
quality, transportation, and other adjustments can be made to develop 
reasonable royalty values (e.g., West Texas Intermediate)?
     Are spot prices of sufficient reliability and do they 
cover wide enough geographic areas to use as value bases?
     Do oil ``futures'' prices provide meaningful bases for 
royalty valuation?
     What alternative valuation method(s) best balance the 
needs to (a) reflect the market value of the oil as sold, exchanged, or 
otherwise disposed of; and (b) maximize administrative efficiency for 
all concerned? (Please consider the amount of information needed by the 
lessee and MMS, and the overall administrative costs of all parties.)
    For royalty valuation involving arm's-length transactions, MMS 
generally accepts the contractual terms, which may include postings. 
MMS further requests comments on whether the use of alternative methods 
for valuing oil not sold under arm's-length conditions would impact the 
acceptability of posted prices for valuing oil sold at arm's-length.

(b) Quantifying ``Significant Quantities'' of Oil

    The current MMS royalty valuation benchmarks for oil not sold under 
arm's-length contract rely on ``significant quantity'' determinations. 
Under the benchmarks, the lessee's or others' posted or contract prices 
used in arm's-length purchases or sales of ``significant quantities'' 
of like-quality oil from the same field or area establish royalty 
value. The first applicable of the five benchmarks is to be used, and 
the first four rely on ``significant quantity'' determinations. For 
example, if the lessee sells ``significant quantities'' of its field 
production at arm's-length, the arm's-length contract sales price may 
apply to the lessee's other, internally-transferred crude oil from the 
same field. But the existing regulations contain no fixed definition of 
``significant quantities,'' either on an absolute or relative basis. 
Thus, MMS would like comments on the best ways to determine what 
constitutes ``significant quantities.'' For example:
     Is there an absolute volume measure (barrels per day/
month/year, etc.) that would allow MMS to determine whether specific 
arm's-length sales involve ``significant quantities''? If so, should 
this volume vary by field or area?
     Is there a fixed percentage of field or area production 
that MMS can use as a comparison basis to determine whether specific 
arm's-length sales represent ``significant quantities''?
     What should be the comparative basis for ``significant 
quantity'' determinations? Should individual arm's-length transactions 
be related to all field production, or should some volumes such as 
internal company transfers of production or exchanges or buy/sell 
exchanges with other oil companies first be excluded from field 
production?
     Are there measures other than ``significant quantities'' 
that may better apply given alternative valuation scenarios?
    In providing comments on (a) and (b) above, please consider not 
only current oil marketing practices, but also any changes that may be 
foreseen. MMS intends for any oil valuation rule changes to be flexible 
enough to accommodate future oil marketing changes as much as possible 
to avoid ongoing rule modification.
    In addition to comments on (a) and (b) above, MMS would like 
comments on the process to use and make potential changes to the oil 
valuation rules. Specifically, MMS would like comments on whether any 
oil valuation regulatory changes should be subject to negotiated 
rulemaking procedures or other consensual mechanisms for developing 
regulations.

    Dated: December 8, 1995.
Bob Armstrong,
Assistant Secretary for Land and Minerals Management.
[FR Doc. 95-30767 Filed 12-19-95; 8:45 am]
BILLING CODE 4310-MR-P

Complete official Federal Register PDF

FR Doc. 95-30725 Reimbursement for Providing Financial Records; Recordkeeping Requirements for Certain Financial Records
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65599-65601]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30725]

========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================

Federal Register / Vol. 60, No. 244 / Wednesday, December 20, 1995 / 
Proposed Rules

[[Page 65599]]

FEDERAL RESERVE SYSTEM

12 CFR Part 219

[Regulation S; Docket No. R-0906]

Reimbursement for Providing Financial Records; Recordkeeping 
Requirements for Certain Financial Records

AGENCY: Board of Governors of the Federal Reserve System.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Board of Governors of the Federal Reserve System (Board) 
is proposing amendments to Subpart A of Regulation S, which implements 
the requirement under the Right to Financial Privacy Act (RFPA) that 
the Board establish the rates and conditions under which payment shall 
be made by a government authority to a financial institution for 
assembling or providing financial records pursuant to RFPA. These 
proposed amendments update the fees to be charged and streamlines the 
subpart generally.

DATES: Comments must be submitted on or before February 20, 1996.

ADDRESSES: Comments should refer to Docket No. R-0906, and may be 
mailed to William W. Wiles, Secretary, Board of Governors of the 
Federal Reserve System, 20th Street and Constitution Avenue, N.W., 
Washington, D.C. 20551. Comments also may be delivered to Room B-2222 
of the Eccles Building between 8:45 a.m. and 5:15 p.m. weekdays, or to 
the guard station in the Eccles Building courtyard on 20th Street, N.W. 
(between Constitution Avenue and C Street) at any time. Comments 
received will be available for inspection in Room MP-500 of the Martin 
Building between 9:00 a.m. and 5:00 p.m. weekdays, except as provided 
in 12 CFR 261.8 of the Board's rules regarding availability of 
information.

FOR FURTHER INFORMATION CONTACT: Elaine M. Boutilier, Senior Counsel 
(202/452-2418), Legal Division, Board of Governors of the Federal 
Reserve System, Washington, DC 20551. For users of the 
Telecommunication Device for the Deaf (TDD), please contact Dorothea 
Thompson (202/452-3544).

SUPPLEMENTARY INFORMATION:

Background

    Section 1115 of the RFPA (12 U.S.C. 3415) requires the Board to 
establish, by regulation, the rates and conditions under which payment 
is made by a Government authority to a financial institution for 
searching for, reproducing, or transporting data required or requested 
under the RFPA. Shortly after the RFPA was adopted, the Board issued 
Regulation S (12 CFR 219) to implement this provision (44 FR 55812, 
September 28, 1979). No changes to the rates have been made since that 
time. In January 1995, the Board adopted a new Subpart B of Regulation 
S (to become effective on January 1, 1996 1) and designated this 
part of Regulation S as Subpart A. 60 FR 231 (January 3, 1995) No 
substantive changes were made to the newly designated Subpart A. 
Pursuant to section 303 of the Riegle Community Development and 
Regulatory Improvement Act of 1994, Pub. L. 103-325 (12 U.S.C. 4803), 
the Board has reviewed Subpart A of Regulation S and proposes to update 
it through these amendments. These amendments streamline the regulation 
by eliminating unnecessary provisions, and they update the rates to be 
paid and the exceptions to the provisions of this Subpart.

    \1\  In a rulemaking issued on August 24, 1995 (60 FR 44144), 
the effective date of Subpart B has been delayed until April 1, 
1996.
---------------------------------------------------------------------------

I. Definitions

    The definitions in Subpart A reiterate the statutory definitions 
from the RFPA for the applicable terms of this Subpart. The definition 
for ``directly incurred costs'' has been removed and incorporated into 
the section concerning cost reimbursement.

II. Cost Reimbursement

    This section has been streamlined and reorganized to place the 
rates in a separate Appendix A for clarity and ease of amendment when 
updating the rates. The proposed amendments also recognize that courts 
issuing orders or subpoenas in connection with grand jury proceedings 
must pay the rates set by Subpart A.

III. Rates

    The Board is particularly interested in receiving comments on the 
rates proposed in Appendix A. It is difficult to establish rates to be 
applied across all geographic regions and to all depository 
institutions, regardless of size. While recognizing this difficulty, 
the Board nevertheless proposes a uniform rate in the belief that 
administration of a complex fee schedule would be difficult.
A. Reproduction
    The rates proposed for reproduction are the same rates used by the 
Board to charge requesters seeking documents under the Freedom of 
Information Act (FOIA). The Board establishes its FOIA fees based upon 
the actual costs of making such reproductions and believes that these 
costs are similar to those incurred by other entities. The Board 
welcomes comments on the appropriateness of the proposed fees and any 
suggested alternative methods of determining the fees.
B. Search and Processing
    The proposed fees for search and processing are separated into two 
categories--clerical/technical and manager/supervisory. Any search for 
sensitive customer records is likely to involve both clerical staff and 
managerial staff, who are paid at different levels. The rates set for 
this reimbursement were calculated using the 1994 Bank Cash 
Compensation Survey done by the Bank Administration Institute. Based 
upon the job descriptions in the Cash Compensation Survey, the position 
of Supervisor, Bookkeeping was used to calculate the managerial rate. 
The calculation was made based upon the total compensation (with bonus) 
for all banks on a national average ($27,600) divided by 2080 hours, 
adjusted up by 25% to cover benefits, and further adjusted by 3% for 
inflation since 1994. The clerical rate was calculated in the same way, 
but using an average of the two job positions of Clerk II (Bookkeeping 
and Operations @ $18,100) and Clerk I (Bookkeeping and Operations @ 
$15,100). The Board is very interested in receiving comments on the 
rates and the method of calculation. 

[[Page 65600]]

IV. Exceptions

    This section has been updated to reflect changes in the exceptions 
listed by the RFPA.

V. Conditions for Payment and Payment Procedures

    No substantive changes have been made to these two sections.

Regulatory Flexibility Act

    Pursuant to 5 U.S.C. 605, the Board certifies that this proposed 
rule, if adopted, will not have a significant economic impact on a 
substantial number of small entities. The proposed rule confers a 
benefit on financial institutions, including small financial 
institutions, by providing for reimbursement of certain costs incurred 
in complying with a requirement to assemble and produce financial 
records.

Paperwork Reduction Act

    In accordance with section 3506 of the Paperwork Reduction Act of 
1995 (44 U.S.C. Ch. 35; 5 CFR 1320 Appendix A.1), the Board reviewed 
the proposed rule under the authority delegated to the Board by the 
Office of Management and Budget. Comments on the collections of 
information should be sent to the Office of Management and Budget, 
Paperwork Reduction Project (7100-0203), Washington, DC 20503, with 
copies of such comments to be sent to Mary M. McLaughlin, Federal 
Reserve Board Clearance Officer, Division of Research and Statistics, 
Mail Stop 97, Board of Governors of the Federal Reserve System, 
Washington, DC 20551.
    The Right to Financial Privacy Act mandates that each financial 
institution maintain a record of instances in which it releases a 
consumer's financial information to a government agency. Generally, the 
institution may not release records until the government agency has 
notified the consumer of its intent to request the record, together 
with the reason for the request. Normally, the agency may not obtain 
records unless it has a subpoena, a search warrant, or an authorization 
from the consumer.
    The Federal Reserve may not conduct or sponsor, and an organization 
is not required to respond to, this information collection unless it 
displays a currently valid OMB control number. The OMB control number 
for the Recordkeeping and Disclosure Requirements in Connection with 
the Right to Financial Privacy Act is 7100-0203.
    Because the records would be maintained at banks, no issue of 
confidentiality under the Freedom of Information Act arises.
    This proposed regulation, 12 CFR 219, has no effect upon the 
paperwork burden associated with the Recordkeeping and Disclosure 
Requirements in Connection with the Right to Financial Privacy Act. 
That hour burden is estimated to be 22 minutes per response. It is 
estimated that the frequency of response at state member banks is 30 
responses per year. Thus the annual hour burden across the 975 state 
member banks is estimated to be 10,725 hours. Based on an hourly cost 
of $20, the annual cost to the public is estimated to be $214,500.

List of Subjects in 12 CFR Part 219

    Banks, banking, Currency, Federal Reserve System, Foreign banking, 
Reporting and recordkeeping requirements.

    For the reasons set out in the preamble, 12 CFR Part 219, as 
amended at 60 FR 231 and 44144 effective April 1, 1996, is proposed to 
be amended as set forth below.

PART 219--REIMBURSEMENT FOR PROVIDING FINANCIAL RECORDS; 
RECORDKEEPING REQUIREMENTS FOR CERTAIN FINANCIAL RECORDS 
(REGULATION)

Subpart A--Reimbursement to Financial Institutions for Providing 
Financial Records

    1. The authority citation for Subpart A continues to read as 
follows:

    Authority: 12 U.S.C. 3415

    2. Subpart A is amended by revising Secs. 219.2 through 219.6 to 
read as follows:

Sec. 219.2  Definitions.

    For the purposes of this subpart, the following definitions shall 
apply:
    Customer means any person or authorized representative of that 
person who uses any service of a financial institution, or for whom a 
financial institution acts or has acted as a fiduciary in relation to 
an account maintained in the person's name. Customer does not include 
corporations or partnerships comprised of more than five persons.
    Financial institution means any office of a bank, savings bank, 
card issuer as defined in section 103 of the Consumers Credit 
Protection Act (15 U.S.C. 1602(n)), industrial loan company, trust 
company, savings association, building and loan, or homestead 
association (including cooperative banks), credit union, or consumer 
finance institution, located in any State or territory of the United 
States, the District of Columbia, Puerto Rico, Guam, American Samoa, or 
the Virgin Islands.
    Financial record means an original or copy of, or information known 
to have been derived from, any record held by a financial institution 
pertaining to a customer's relationship with the financial institution.
    Government authority means any agency or department of the United 
States, or any officer, employee or agent thereof.
    Person means an individual or a partnership of five or fewer 
individuals.

Sec. 219.3  Cost reimbursement.

    (a) Fees payable. Except as provided in Sec. 219.4, a government 
authority, or a court issuing an order or subpoena in connection with 
grand jury proceedings, seeking access to financial records pertaining 
to a customer shall reimburse the financial institution for reasonably 
necessary costs directly incurred in searching for, reproducing or 
transporting books, papers, records, or other data as set forth in this 
section. The reimbursement schedule for a financial institution is set 
forth in Appendix A to this section. If a financial institution has 
financial records that are stored at an independent storage facility 
that charges a fee to search for, reproduce, or transport particular 
records requested, these costs are considered to be directly incurred 
by the financial institution and may be included in the reimbursement.
    (b) Search and processing costs. (1) Reimbursement of search and 
processing costs shall cover the total amount of personnel time spent 
in locating, retrieving, reproducing, and preparing financial records 
for shipment. Search and processing costs shall not cover analysis of 
material or legal advice.
    (2) If itemized separately, search and processing costs may include 
the actual cost of extracting information stored by computer in the 
format in which it is normally produced, based on computer time and 
necessary supplies; however, personnel time for computer search may be 
paid for only at the rates specified in Appendix A to this section.
    (c) Reproduction costs. The reimbursement rates for reproduction 
costs for requested documents are set forth in Appendix A to this 
section. Copies of photographs, films, computer tapes, and other 
materials not listed in Appendix A to this section are reimbursed at 
actual cost.
    (d) Transportation costs. Reimbursement for transportation costs 
shall be for the reasonably necessary costs directly incurred to 
transport personnel to locate and retrieve the 

[[Page 65601]]
requested information, and to convey such material to the place of 
examination.

Appendix A to Sec. 219.3--Reimbursement Schedule

Reproduction:                                                           
  Photocopy, per page..........................................      .15
  Paper copies of microfiche, per frame........................      .15
  Duplicate microfiche, per microfiche.........................      .30
  Computer diskette............................................     5.00
Search and Processing:                                                  
  Clerical/Technical, hourly rate..............................    11.00
  Manager/Supervisory, hourly rate.............................    17.00
                                                                        

Sec. 219.4  Exceptions.

    A financial institution is not entitled to reimbursement under this 
subpart for costs incurred in assembling or providing financial records 
or information related to:
    (a) Security interests, bankruptcy claims, debt collection. Any 
financial records provided as an incident to perfecting a security 
interest, proving a claim in bankruptcy, or otherwise collecting on a 
debt owing either to the financial institution itself or in its role as 
a fiduciary.
    (b) Government loan programs. Financial records that are necessary 
to permit the appropriate government authority to carry out its 
responsibilities under a government loan, loan guaranty or loan 
insurance program.
    (c) Nonidentifiable information. Financial records that are not 
identified with or identifiable as being derived from the financial 
records of a particular customer.
    (d) Financial supervisory agencies. Financial records disclosed to 
a financial supervisory agency in the exercise of its supervisory, 
regulatory, or monetary functions with respect to a financial 
institution.
    (e) Internal Revenue summons. Financial records disclosed in 
accordance with procedures authorized by the Internal Revenue Code.
    (f) Federally required reports. Financial records required to be 
reported in accordance with any federal statute or rule promulgated 
thereunder.
    (g) Government civil or criminal litigation. Financial records 
sought by a government authority under the Federal Rules of Civil or 
Criminal Procedure or comparable rules of other courts in connection 
with litigation to which the government authority and the customer are 
parties.
    (h) Administrative agency subpoenas. Financial records sought by a 
government authority pursuant to an administrative subpoena issued by 
an administrative law judge in an adjudicatory proceeding subject to 5 
U.S.C. 554, and to which the government authority and the customer are 
parties.
    (i) Investigation of financial institution or its noncustomer. 
Financial records sought by a government authority in connection with a 
lawful proceeding, investigation, examination, or inspection directed 
at the financial institution in possession of such records, or at an 
entity that is not a customer as defined in Sec. 219.2.
    (j) General Accounting Office requests. Financial records sought by 
the General Accounting Office pursuant to an authorized proceeding, 
investigation, examination, or audit directed at a government 
authority.
    (k) Federal Housing Finance Board requests. Financial records or 
information sought by the Federal Housing Finance Board (FHFB) or any 
of the Federal home loan banks in the exercise of the FHFB's authority 
to extend credit to financial institutions or others.
    (l) Department of Veterans Affairs. The disclosure of the name and 
address of any customer to the Department of Veterans Affairs where 
such disclosure is necessary to, and used solely for, the proper 
administration of benefits programs under laws administered by that 
Department.

Sec. 219.5  Conditions for payment.

    (a) Direct costs. Payment shall be made only for costs that are 
both directly incurred and reasonably necessary to provide requested 
material. Search and processing, reproduction, and transportation costs 
shall be considered separately when determining whether the costs are 
reasonably necessary.
    (b) Compliance with legal process, request, or authorization. No 
payment may be made to a financial institution until it satisfactorily 
complies with the legal process, the formal written request, or the 
customer authorization. When the legal process or formal written 
request is withdrawn, or the customer authorization is revoked, or 
where the customer successfully challenges disclosure to a grand jury 
or government authority, the financial institution shall be reimbursed 
for the reasonably necessary costs incurred in assembling the requested 
financial records prior to the time the financial institution is 
notified of such event.
    (c) Itemized bill or invoice. No reimbursement is required unless a 
financial institution submits an itemized bill or invoice specifically 
detailing its search and processing, reproduction, and transportation 
costs.

Sec. 219.6  Payment procedures.

    (a) Notice to submit invoice. Promptly following a service of legal 
process or request, the court or government authority shall notify the 
financial institution that it must submit an itemized bill or invoice 
in order to obtain payment and shall furnish an address for this 
purpose.
    (b) Special notice. If a grand jury or government authority 
withdraws the legal process or formal written request, or if the 
customer revokes the authorization, or if the legal process or request 
has been successfully challenged by the customer, the grand jury or 
government authority shall promptly notify the financial institution of 
these facts, and shall also notify the financial institution that it 
must submit an itemized bill or invoice in order to obtain payment of 
costs incurred prior to the time of the notice to the financial 
institution receives this notice.
    3. Section 219.7 is removed.

    By order of the Board of Governors of the Federal Reserve 
System, December 13, 1995.
William W. Wiles,
Secretary of the Board.
[FR Doc. 95-30725 Filed 12-19-95; 8:45 am]
BILLING CODE 6210-01-P

Complete official Federal Register PDF

FR Doc. 95-30625 1890 Institution Capacity Building Grants Program; Administrative Provisions
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 66014-66033]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30625]

[[Page 66013]]

_______________________________________________________________________

Part IV

Department of Agriculture

_______________________________________________________________________

Cooperative State Research, Education, and Extension Service

_______________________________________________________________________

7 CFR Part 3406

1890 Institution Capacity Building Grants Program; Administrative 
Provisions; Proposed Rule

Federal Register / Vol. 60, No. 244 / Wednesday, December 20, 1995 / 
Proposed Rules

[[Page 66014]]

DEPARTMENT OF AGRICULTURE

Cooperative State Research, Education, and Extension Service

7 CFR Part 3406

1890 Institution Capacity Building Grants Program; Administrative 
Provisions

AGENCY: Cooperative State Research, Education, and Extension Service, 
USDA.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Cooperative State Research, Education, and Extension 
Service (CSREES) proposes to add a new part 3406 to Title 7, Subtitle 
B, Chapter XXXIV of the Code of Federal Regulations, for the purpose of 
administering the 1890 Institution Capacity Building Grants Program 
conducted under the authority of section 1472(c) of the National 
Agricultural Research, Extension, and Teaching Policy Act of 1977, as 
amended (7 U.S.C. 3318) and pursuant to annual appropriations made 
available specifically for an 1890 Institution Capacity Building Grants 
Program. This action establishes and codifies the administrative 
procedures to be followed annually in the solicitation of competitive 
proposals, the evaluation of such proposals, and the award of grants 
under this program.

DATES: Written comments are invited from interested individuals and 
organizations. Comments must be received on or before January 19, 1996.

ADDRESSES: Comments should be sent to Dr. Jeffrey L. Gilmore, Grant 
Programs Manager, Office of Higher Education Programs, Cooperative 
State Research, Education, and Extension Service, U.S. Department of 
Agriculture, Ag Box 2251, Washington, D.C. 20250-2251. Comments may 
also be sent via electronic mail to [email protected].

FOR FURTHER INFORMATION CONTACT: Dr. Jeffrey L. Gilmore at 202-720-1973 
(voice), 202-720-2030 (fax) or via electronic mail at 
[email protected].

SUPPLEMENTARY INFORMATION:

Paperwork Reduction

    Under the provisions of the Paperwork Reduction Act of 1980, as 
amended (44 U.S.C. Chapter 35), the collection of information 
requirements contained in this proposed rule have been reviewed and 
approved by the Office of Management and Budget (OMB) and given the OMB 
Document Nos. 0524-0022, 0524-0024, 0524-0030, and 0524-0033. The 
public reporting burden for the information collections contained in 
these regulations (Forms CSRS-662, CSRS-663, CSRS-708, CSRS-710, CSRS-
711, CSRS-712, CSRS-713, and CSRS-1234 as well as the Proposal Summary 
and Proposal Narrative) is estimated to be 39\1/2\ hours per response, 
including the time for reviewing instructions, searching existing data 
sources, gathering and maintaining the data needed, and completing and 
reviewing the collection of information. Send comments regarding this 
burden estimate or any other aspect of this collection of information, 
including suggestions for reducing this burden, to the Department of 
Agriculture, Clearance Analyst, OIRM, Ag Box 7630, Washington, D.C. 
20250-7630, and to the Office of Management and Budget, Paperwork 
Reduction Project, Washington, D.C. 20503.

Classification

    This proposed rule has been reviewed under Executive Order No. 
12866, and it has been determined that it is not a ``significant 
regulatory action'' rule because it will not have an annual effect on 
the economy of $100 million or more or adversely and materially affect 
a sector of the economy, productivity, competition, jobs, the 
environment, public health or safety, or State, local, or tribal 
governments or communities. This rule will not create any serious 
inconsistencies or otherwise interfere with actions taken or planned by 
another agency. It will not materially alter the budgetary impact of 
entitlements, grants, user fees, or loan programs, or the rights and 
obligations of recipients thereof, and does not raise novel legal or 
policy issues arising out of legal mandates, the President's 
priorities, or principles set forth in Executive Order No. 12866.

Regulatory Flexibility Act

    The Administrator, CSREES, certifies that this proposed rule will 
not have a significant impact on a substantial number of small entities 
as defined in the Regulatory Flexibility Act, Public Law No. 96-534, as 
amended (5 U.S.C. 601 et seq.).

Executive Order No. 12612

    This rule involves no policies that have federalism implications 
under Executive Order No. 12612, Federalism, dated October 26, 1987.

Executive Order No. 12778

    This rule has been reviewed in accordance with Executive Order No. 
12778, Civil Justice Reform, and the required certification has been 
made to OMB. All State and local laws and regulations that are in 
conflict with this rule are preempted. No retroactive effect is to be 
given to this rule. This rule does not require administrative 
proceedings before parties may file suit in court.

Regulatory Analysis

    Not required for this proposed rulemaking.

Environmental Impact Statement

    As outlined in 7 CFR Part 3407 (CSREES's implementing regulations 
of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et 
seq.)), environmental data for the proposed project are to be provided 
to CSREES in order for a determination to be made as to the need of any 
further action.

Catalog of Federal Domestic Assistance

    This program is listed in the Catalog of Federal Domestic 
Assistance under No. 10.216, 1890 Institution Capacity Building Grants 
Program. For the reasons set forth in the Final Rule related Notice to 
7 CFR Part 3015, Subpart V, 57 FR 15278, April 27, 1992, this program 
is excluded from the scope of Executive Order 12372 which requires 
intergovernmental consultation with State and local officials.

Background and Purpose

    Historically, the Department has had a close relationship with the 
1890 colleges and universities, including Tuskegee University. Through 
its role as administrator of the Second Morrill Act, the Department has 
borne the responsibility for helping these institutions develop to 
their fullest potential in order to meet the needs of students and the 
needs of the Nation.
    Accordingly, the Secretary recognized, on April 18, 1990, the 
findings made by Congress in section 301(a) of Public Law 99-498, 
October 17, 1986 (20 U.S.C. 1060), that the States and the Federal 
government have discriminated in the allocation of land and financial 
resources to support these institutions under the Morrill Act of 1862 
and its progeny. In the above-referenced findings, Congress 
acknowledged, and the Secretary recognized, that these institutions 
were discriminated against in the award of Federal grants and 
contracts, and in the distribution of Federal resources generally which 
were intended to benefit institutions of higher education. The 
Secretary found that the capacity of the 1890 colleges and 
universities, including Tuskegee University, to develop programs to 
assist the Nation and the Department in producing food and agricultural 
science professionals 

[[Page 66015]]
has suffered as a direct result of this discrimination.
    The Secretary concluded that a capacity building grants program set 
aside for the 1890 land-grant colleges and universities, including 
Tuskegee University, was an appropriate remedial step to redress past 
inequities found by Congress to have occurred regarding these 
institutions. Subsequent to the Secretary's establishment of the 
program, Congress began making annual appropriations specifically for 
an 1890 Institution Capacity Building Grants Program.
    This document proposes to establish Part 3406 of Title 7, Subtitle 
B, Chapter XXXIV of the Code of Federal Regulations, for the purpose of 
administering the 1890 Institution Capacity Building Grants Program. 
Under the authority of section 1472(c) of the National Agricultural 
Research, Extension, and Teaching Policy Act of 1977, as amended (7 
U.S.C. 3318), and pursuant to annual appropriations made available 
specifically by Congress for an 1890 Institution Capacity Building 
Grants Program (see, e.g., Pub. L. No. 103-330), the Secretary conducts 
this institutional capacity building grants program.
    This proposed rule establishes and codifies the administrative 
procedures to be followed annually in the solicitation of grant 
proposals, the evaluation of such proposals, and the award of grants 
under this program. The 1890 Institution Capacity Building Grants 
Program is competitive in nature and is intended to stimulate the 
development of high quality teaching and research programs at these 
institutions to build their capacities as full partners in the mission 
of the Department to provide more, and better-trained, professionals 
for careers in the food and agricultural sciences.

List of Subjects in 7 CFR Part 3406

    Grant programs--agriculture. Agriculture Higher Education Programs, 
1890 Institution Capacity Building Grants Program.
    It is therefore proposed to amend Title 7, Subtitle B, Chapter 
XXXIV, of the Code of Federal Regulations by adding Part 3406 to read 
as follows:

PART 3406--INSTITUTION CAPACITY BUILDING GRANTS PROGRAM

Subpart A--General Information

Sec.
3406.1 Applicability of regulations.
3406.2 Definitions.
3406.3 Institutional eligibility.

Subpart B--Program Description

3406.4 Purpose of the program.
3406.5 Matching funds.
3406.6 USDA agency cooperator requirement.
3406.7 General scope of program.
3406.8 Joint project proposals.
3406.9 Complementary project proposals.
3406.10 Use of funds for facilities.

Subpart C--Preparation of a Teaching Proposal

3406.11 Scope of a teaching proposal.
3406.12 Program application materials--teaching.
3406.13 Content of a teaching proposal.

Subpart D--Review and Evaluation of a Teaching Proposal

3406.14 Proposal review--teaching.
3406.15 Evaluation criteria for teaching proposals.

Subpart E--Preparation of a Research Proposal

3406.16 Scope of a research proposal.
3406.17 Program application materials--research.
3406.18 Content of a research proposal.

Subpart F--Review and Evaluation of a Research Proposal

3406.19 Proposal review--research.
3406.20 Evaluation criteria for research proposals.

Subpart G--Submission of a Teaching or Research Proposal

3406.21 Intent to submit a proposal.
3406.22 When and where to submit a proposal.

Subpart H--Supplementary Information

3406.23 Access to peer review information.
3406.24 Grant awards.
3406.25 Use of funds; changes.
3406.26 Monitoring progress of funded projects.
3406.27 Other Federal statutes and regulations that apply.
3406.28 Confidential aspects of proposals and awards.
3406.29 Evaluation of program.

    Authority: Sec. 1470, National Agricultural Research, Extension, 
and Teaching Policy Act of 1977, as amended (7 U.S.C. 3316).

Subpart A--General Information

Sec. 3406.1  Applicability of regulations.

    (a) The regulations of this part apply only to capacity building 
grants awarded to the 1890 land-grant institutions and Tuskegee 
University under the provisions of section 1472(c) of the National 
Agricultural Research, Extension, and Teaching Policy Act of 1977, as 
amended (7 U.S.C. 3318(c)) to further the research, extension, and 
teaching programs in the food and agricultural sciences. This statute 
authorizes the Secretary of Agriculture, who has delegated the 
authority to the Administrator of the Cooperative State Research, 
Education, and Extension Service (CSREES), to enter into grants, or 
cooperative agreements, for periods not to exceed five years, with 
State agricultural experiment stations, State cooperative extension 
services, all colleges and universities, other research or education 
institutions and organizations, Federal and private agencies and 
organizations, individuals, and any other contractor or recipient, 
either foreign or domestic, to further research, extension, or teaching 
programs in the food and agricultural sciences of the Department of 
Agriculture. Only 1890 land-grant institutions and Tuskegee University 
are eligible for this grants program.
    (b) To the extent that funds are available, each year CSREES will 
publish a Federal Register notice announcing the program and soliciting 
grant applications.
    (c)(1) Based on the amount of funds appropriated in any fiscal 
year, CSREES will determine and cite in the program announcement:
    (i) The program area(s) to be supported (teaching, research, or 
both)
    (ii) The proportion of the appropriation reserved for, or available 
to, teaching projects and research projects;
    (iii) The targeted need area(s) in teaching and in research to be 
supported;
    (iv) The degree level(s) to be supported;
    (v) The maximum project period a proposal may request;
    (vi) The maximum amount of funds that may be requested by an 
institution under a regular, complementary, or joint project proposal; 
and
    (vii) The maximum total funds that may be awarded to an institution 
under the program in a given fiscal year, including how funds awarded 
for complementary and for joint projects will be counted toward the 
institutional maximum
    (2) The program announcement will also specify the deadline date 
for proposal submission, the number of copies of each proposal that 
must be submitted, the address to which a proposal must be submitted, 
and whether or not Form CSRS-711, ``Intent to Submit a Proposal,'' is 
requested.
    (d)(1) If it is deemed by CSREES that, for a given fiscal year, 
additional determinations are necessary, each, as relevant, will be 
stated in the program announcement. Such determinations may include:
    (i) Limits on the subject matter/emphasis areas to be supported;
    (ii) The maximum number of proposals that may be submitted on 
behalf of the same school, college, or 

[[Page 66016]]
equivalent administrative unit within an institution;
    (iii) The maximum total number of proposals that may be submitted 
by an institution;
    (iv) The maximum number of proposals that may be submitted by an 
individual in any one targeted need area;
    (v) The minimum project period a proposal may request;
    (vi) The minimum amount of funds that may be requested by an 
institution under a regular, complementary, or joint project proposal;
    (vii) The proportion of the appropriation reserved for, or 
available to, regular, complementary, and joint project proposals;
    (viii) The proportion of the appropriation reserved for, or 
available to, projects in each announced targeted need area;
    (ix) The proportion of the appropriation reserved for, or available 
to, each subject matter/emphasis area;
    (x) The maximum number of grants that may be awarded to an 
institution under the program in a given fiscal year, including how 
grants awarded for complementary and joint projects will be counted 
toward the institutional maximum; and
    (xi) Limits on the use of grant funds for travel or to purchase 
equipment, if any.
    (2) The program announcement also will contain any other 
limitations deemed necessary by CSREES for proper conduct of the 
program in the applicable year.
    (e) The regulations of this part prescribe that this is a 
competitive program; it is possible that an institution may not receive 
any grant awards in a particular year.
    (f) The regulations of this part do not apply to grants for other 
purposes awarded by the Department of Agriculture under section 1472 of 
the National Agricultural Research, Extension, and Teaching Policy Act 
of 1977, as amended (7 U.S.C. 3318) or any other authority.

Sec. 3406.2  Definitions.

    As used in this part:
    Authorized departmental officer means the Secretary or any employee 
of the Department who has the authority to issue or modify grant 
instruments on behalf of the Secretary.
    Authorized organizational representative means the president of the 
1890 Institution or the official, designated by the president of the 
institution, who has the authority to commit the resources of the 
institution.
    Budget period means the interval of time (usually 12 months) into 
which the project period is divided for budgetary and reporting 
purposes.
    Cash contributions means the applicant's cash outlay, including the 
outlay of money contributed to the applicant by non-Federal third 
parties.
    Citizen or national of the United States means:
    (1) a citizen or native resident of a State; or,
    (2) a person defined in the Immigration and Nationality Act, 8 
U.S.C. 1101(a)(22), who, though not a citizen of the United States, 
owes permanent allegiance to the United States.
    College or University means an educational institution in any State 
which:
    (1) Admits as regular students only persons having a certificate of 
graduation from a school providing secondary education, or the 
recognized equivalent of such a certificate;
    (2) Is legally authorized within such State to provide a program of 
education beyond secondary education;
    (3) Provides an educational program for which a baccalaureate 
degree or any other higher degree is awarded;
    (4) Is a public or other nonprofit institution; and
    (5) Is accredited by a nationally recognized accrediting agency or 
association.
    Complementary project proposal means a proposal for a project which 
involves coordination with one or more other projects for which funding 
was awarded under this program in a previous fiscal year, or for which 
funding is requested under this program in the current fiscal year.
    Cost-sharing or Matching means that portion of project costs not 
borne by the Federal Government, including the value of in-kind 
contributions.
    Department or USDA means the United States Department of 
Agriculture.
    1890 Institution or 1890 land-grant institution or 1890 colleges 
and universities means one of those institutions eligible to receive 
funds under the Act of August 30, 1890 (26 Stat. 417-419, as amended; 7 
U.S.C. 321-326 and 328) that are the intended recipients of funds under 
programs established in Subtitle G of the National Agricultural 
Research, Extension, and Teaching Policy Act of 1977, as amended (7 
U.S.C. 3221 et seq.), including Tuskegee University.
    Eligible participant means, for purposes of Sec. 3406.11(b), 
Faculty Preparation and Enhancement for Teaching, and Sec. 3406.11(f), 
Student Recruitment and Retention, an individual who:
    (1) Is a citizen or national of the United States, as defined in 
this section; or
    (2) Is a citizen of the Federated States of Micronesia, the 
Republic of the Marshall Islands, or the Republic of Palau. Where 
eligibility is claimed under paragraph (2) of the definition of 
``Citizen or national of the United States'' in this section, 
documentary evidence from the Immigration and Naturalization Service as 
to such eligibility must be made available to CSREES upon request.
    Food and agricultural sciences means basic, applied, and 
developmental research, extension, and teaching activities in the food, 
agricultural, renewable natural resources, forestry, and physical and 
social sciences, in the broadest sense of these terms, including but 
not limited to, activities concerned with the production, processing, 
marketing, distribution, conservation, consumption, research, and 
development of food and agriculturally related products and services, 
and inclusive of programs in agriculture, natural resources, 
aquaculture, forestry, veterinary medicine, home economics, rural 
development, and closely allied disciplines.
    Grantee means the 1890 Institution designated in the grant award 
document as the responsible legal entity to which a grant is awarded.
    Joint project proposal means a proposal for a project, which will 
involve the applicant 1890 Institution and two or more other colleges, 
universities, community colleges, junior colleges, or other 
institutions, each of which will assume a major role in the conduct of 
the proposed project, and for which the applicant institution will 
transfer at least one-half of the awarded funds to the other 
institutions participating in the project. Only the applicant 
institution must meet the definition of ``1890 Institution'' as 
specified in this section; the other institutions participating in a 
joint project proposal are not required to meet the definition of 
``1890 Institution'' as specified in this section, nor required to meet 
the definition of ``college'' or ``university'' as specified in this 
section.
    Peer review panel means a group of experts or consultants, 
qualified by training and experience in particular fields of science, 
education, or technology to give expert advice on the merit of grant 
applications in such fields, who evaluate eligible proposals submitted 
to this program in their personal area(s) of expertise.
    Principal investigator/project director means the single individual 
designated by the grantee in the grant application 

[[Page 66017]]
and approved by the Secretary who is responsible for the direction and 
management of the project.
    Prior approval means written approval evidencing prior consent by 
an authorized departmental officer as defined in this section.
    Project means the particular teaching or research activity within 
the scope of one or more of the targeted areas supported by a grant 
awarded under this program.
    Project period means the period, as stated in the award document 
and modifications thereto, if any, during which Federal sponsorship 
begins and ends.
    Research means any systematic inquiry directed toward new or fuller 
knowledge and understanding of the subject studied.
    Research capacity means the quality and depth of an institution's 
research infrastructure as evidenced by its: faculty expertise in the 
natural or social sciences, scientific and technical resources, 
research environment, library resources, and organizational structures 
and reward systems for attracting and retaining first-rate research 
faculty or students at the graduate and post-doctorate levels.
    Research project grant means a grant in support of a project that 
addresses one or more of the targeted need areas or specific subject 
matter/emphasis areas identified in the annual program announcement 
related to strengthening research programs including, but not limited 
to, such initiatives as: studies and experimentation in food and 
agricultural sciences, centralized research support systems, technology 
delivery systems, and other creative projects designed to provide 
needed enhancement of the Nation's food and agricultural research 
system.
    Secretary means the Secretary of Agriculture and any other officer 
or employee of the Department of Agriculture to whom the authority 
involved may be delegated.
    State means any one of the fifty States, the Commonwealth of Puerto 
Rico, Guam, American Samoa, the Commonwealth of the Northern Marianas, 
the Virgin Islands of the United States, and the District of Columbia.
    Teaching means formal classroom instruction, laboratory 
instruction, and practicum experience in the food and agricultural 
sciences and matters related thereto (such as faculty development, 
student recruitment and services, curriculum development, instructional 
materials and equipment, and innovative teaching methodologies) 
conducted by colleges and universities offering baccalaureate or higher 
degrees.
    Teaching capacity means the quality and depth of an institution's 
academic programs infrastructure as evidenced by its: curriculum, 
teaching faculty, instructional delivery systems, student experiential 
learning opportunities, scientific instrumentation for teaching, 
library resources, academic standing and racial, ethnic, or gender 
diversity of its faculty and student body as well as faculty and 
student recruitment and retention programs provided by a college or 
university in order to achieve maximum results in the development of 
scientific and professional expertise for the Nation's food and 
agricultural system.
    Teaching project grant means a grant in support of a project that 
addresses one or more of the targeted need areas or specific subject 
matter/emphasis areas identified in the annual program announcement 
related to strengthening teaching programs including, but not limited 
to, such initiatives as: curricula design and materials development, 
faculty preparation and enhancement for teaching, instruction delivery 
systems, scientific instrumentation for teaching, student experiential 
learning, and student recruitment and retention.
    Third party in-kind contributions means non-cash contributions of 
property or services provided by non-Federal third parties, including 
real property, equipment, supplies and other expendable property, 
directly benefiting and specifically identifiable to a funded project 
or program.
    USDA agency cooperator means any agency or office of the Department 
which has reviewed and endorsed an applicant's request for support, and 
indicates a willingness to make available non-monetary resources or 
technical assistance throughout the life of a project to ensure the 
accomplishment of the objectives of a grant awarded under this program.

Sec. 3406.3  Institutional eligibility.

    Proposals may be submitted by any of the 16 historically black 1890 
land-grant institutions and Tuskegee University. The 1890 land-grant 
institutions are: Alabama A&M University; University of Arkansas--Pine 
Bluff; Delaware State University; Florida A&M University; Fort Valley 
State College; Kentucky State University; Southern University and A&M 
College; University of Maryland--Eastern Shore; Alcorn State 
University; Lincoln University; North Carolina A&T State University; 
Langston University; South Carolina State University; Tennessee State 
University; Prairie View A&M University; and Virginia State University.

Subpart B--Program Description

Sec. 3406.4  Purpose of the program.

    (a) The Department of Agriculture and the Nation depend upon sound 
programs in the food and agricultural sciences at the Nation's colleges 
and universities to produce well trained professionals for careers in 
the food and agricultural sciences. The capacity of institutions to 
offer suitable programs in the food and agricultural sciences to meet 
the Nation's need for a well trained work force in the food and 
agricultural sciences is a proper concern for the Department.
    (b) Historically, the Department has had a close relationship with 
the 1890 colleges and universities, including Tuskegee University. 
Through its role as administrator of the Second Morrill Act, the 
Department has borne the responsibility for helping these institutions 
develop to their fullest potential in order to meet the needs of 
students and the needs of the Nation.
    (c) The institutional capacity building grants program is intended 
to stimulate development of quality education and research programs at 
these institutions in order that they may better assist the Department, 
on behalf of the Nation, in its mission of providing a professional 
work force in the food and agricultural sciences.
    (d) This program is designed specifically to build the 
institutional teaching and research capacities of the 1890 land-grant 
institutions through cooperative programs with Federal and non-Federal 
entities. The program is competitive among the 1890 Institutions and 
encourages matching funds on the part of the States, private 
organizations, and other non-Federal entities to encourage expanded 
linkages with 1890 Institutions as performers of research and 
education, and as developers of scientific and professional talent for 
the United States food and agricultural system. In addition, through 
this program, CSREES will strive to increase the overall pool of 
qualified job applicants from underrepresented groups in order to make 
significant progress toward achieving the objectives of work force 
diversity within the Federal Government, particularly the U.S. 
Department of Agriculture.

Sec. 3406.5  Matching support.

    The Department strongly encourages and may require non-Federal 
matching support for this program. In the annual program solicitation, 
CSREES will announce any incentives that may be 

[[Page 66018]]
offered to applicants for committing their own institutional resources 
or securing third party contributions in support of capacity building 
projects. CSREES may also announce any required fixed dollar amount or 
percentage of institutional cost sharing, if applicable.

Sec. 3406.6  USDA agency cooperator requirement.

    (a) Each application must provide documentation that at least one 
USDA agency or office has agreed to cooperate with the applicant 
institution on the proposed project. The documentation should describe 
the expected benefits of the partnership venture for the USDA agency 
and for the 1890 Institution, and describe the partnership effort 
between USDA and the 1890 Institution in regard to the proposed 
project. Such USDA agency cooperation may include, but is not limited 
to, assisting the applicant institution with proposal development, 
identifying possible sources of matching funds, securing resources, 
implementing funded projects, providing technical assistance and 
expertise throughout the life of the project, participating in project 
evaluation, and disseminating project results.
    (b) The designated CSREES agency contact can provide suggestions to 
institutions seeking to secure a USDA agency cooperator on a particular 
proposal.
    (c) USDA 1890 Liaison Officers, and other USDA employees serving on 
the campuses of the 1890 colleges and universities, may assist with 
proposal development and project execution to satisfy the cooperator 
requirement, in whole or in part, but may not serve as project 
directors or principal investigators.
    (d) Any USDA office responsible for administering a competitive or 
formula grants program specifically targeted to 1890 Institutions may 
not be a cooperator for this program.

Sec. 3406.7  General scope of program.

    This program supports both teaching project grants and research 
project grants. Such grants are intended to strengthen the teaching and 
research capabilities of applicant institutions. Each 1890 Institution 
may submit one or more grant applications for either category of grants 
(as allowed by the annual program notice). However, each application 
must be limited to either a teaching project grant proposal or a 
research project grant proposal.

Sec. 3406.8  Joint project proposals.

    Applicants are encouraged to submit joint project proposals as 
defined in Sec. 3406.2, which address regional or national problems and 
which will result overall in strengthening the 1890 university system. 
The goals of such joint initiatives should include maximizing the use 
of limited resources by generating a critical mass of expertise and 
activity focused on a targeted need area(s), increasing cost-
effectiveness through achieving economies of scale, strengthening the 
scope and quality of a project's impact, and promoting coalition 
building likely to transcend the project's lifetime and lead to future 
ventures.

Sec. 3406.9  Complementary project proposals.

    Institutions may submit complementary project proposals as defined 
in Sec. 3406.2. Such complementary project proposals may be submitted 
by the same or by different eligible institutions.

Sec. 3406.10  Use of funds for facilities.

    Under the 1890 Institution Capacity Building Grants Program, the 
use of grant funds to plan, acquire, or construct a building or 
facility is not allowed. With prior approval, in accordance with the 
cost principles set forth in OMB Circular No. A-21, some grant funds 
may be used for minor alterations, renovations, or repairs deemed 
necessary to retrofit existing teaching or research spaces in order to 
carry out a funded project. However, requests to use grant funds for 
such purposes must demonstrate that the alterations, renovations, or 
repairs are incidental to the major purpose for which a grant is made.

Subpart C--Preparation of a Teaching Proposal

Sec. 3406.11  Scope of a teaching proposal.

    The teaching component of the program will support the targeted 
need area(s) related to strengthening teaching programs as specified in 
the annual program announcement. Proposals may focus on any subject 
matter area(s) in the food and agricultural sciences unless limited by 
determinations as specified in the annual program announcement. A 
proposal may address a single targeted need area or multiple targeted 
need areas, and may be focused on a single subject matter area or 
multiple subject matter areas, in any combination (e.g., curriculum 
development in horticulture; curriculum development, faculty 
enhancement, and student experiential learning in animal science; 
faculty enhancement in food science and agribusiness management; or 
instruction delivery systems and student experiential learning in plant 
science, horticulture, and entomology). Applicants are also encouraged 
to include a library enhancement component related to the teaching 
project in their proposals. A proposal may be directed toward the 
undergraduate or graduate level of study as specified in the annual 
program announcement. Targeted need areas for teaching programs will 
consist of one or more of the following:
    (a) Curricula design and materials development. (1) The purpose of 
this need area is to promote new and improved curricula and materials 
to increase the quality of, and continuously renew, the Nation's 
academic programs in the food and agricultural sciences. The overall 
objective is to stimulate the development and facilitate the use of 
exemplary education models and materials that incorporate the most 
recent advances in subject matter, research on teaching and learning 
theory, and instructional technology. Proposals may emphasize: the 
development of courses of study, degree programs, and instructional 
materials; the use of new approaches to the study of traditional 
subjects; or the introduction of new subjects, or new applications of 
knowledge, pertaining to the food and agricultural sciences.
    (2) Examples include, but are not limited to, curricula and 
materials that promote:
    (i) Raising the level of scholastic achievement of the Nation's 
graduates in the food and agricultural sciences.
    (ii) Addressing the special needs of particular groups of students, 
such as minorities, gifted and talented, or those with educational 
backgrounds that warrant enrichment.
    (iii) Using alternative instructional strategies or methodologies, 
including computer-assisted instruction or simulation modeling, media 
programs that reach large audiences efficiently and effectively, 
activities that provide hands-on learning experiences, and educational 
programs that extend learning beyond the classroom.
    (iv) Using sound pedagogy, particularly with regard to recent 
research on how to motivate students to learn, retain, apply, and 
transfer knowledge, skills, and competencies.
    (v) Building student competencies to integrate and synthesize 
knowledge from several disciplines.
    (b) Faculty preparation and enhancement for teaching. (1) The 
purpose of this need area is to advance faculty development in the 
areas of teaching competency, subject matter expertise, or student 
recruitment and 

[[Page 66019]]
advising skills. Teachers are central to education. They serve as 
models, motivators, and mentors--the catalysts of the learning process. 
Moreover, teachers are agents for developing, replicating, and 
exchanging effective teaching materials and methods. For these reasons, 
education can be strengthened only when teachers are adequately 
prepared, highly motivated, and appropriately recognized and rewarded.
    (2) Each faculty recipient of support for developmental activities 
under Sec. 3406.11(b) must be an ``eligible participant'' as defined in 
Sec. 3406.2 of this part.
    (3) Examples of developmental activities include, but are not 
limited to, those which enable teaching faculty to:
    (i) Gain experience with recent developments or innovative 
technology relevant to their teaching responsibilities.
    (ii) Work under the guidance and direction of experts who have 
substantial expertise in an area related to the developmental goals of 
the project.
    (iii) Work with scientists or professionals in government, 
industry, or other colleges or universities to learn new applications 
in a field.
    (iv) Obtain personal experience working with new ideas and 
techniques.
    (v) Expand competence with new methods of information delivery, 
such as computer-assisted or televised instruction.
    (c) Instruction delivery systems. (1) The purpose of this need area 
is to encourage the use of alternative methods of delivering 
instruction to enhance the quality, effectiveness, and cost efficiency 
of teaching programs. The importance of this initiative is evidenced by 
advances in educational research which have substantiated the theory 
that differences in the learning styles of students often require 
alternative instructional methodologies. Also, the rising costs of 
higher education strongly suggest that colleges and universities 
undertake more efforts of a collaborative nature in order to deliver 
instruction which maximizes program quality and reduces unnecessary 
duplication. At the same time, advancements in knowledge and technology 
continue to introduce new subject matter areas which warrant 
consideration and implementation of innovative instruction techniques, 
methodologies, and delivery systems.
    (2) Examples include, but are not limited to:
    (i) Use of computers.
    (ii) Teleconferencing.
    (iii) Networking via satellite communications.
    (iv) Regionalization of academic programs.
    (v) Mobile classrooms and laboratories.
    (vi) Individualized learning centers.
    (viii) Symposia, forums, regional or national workshops, etc.
    (d) Scientific instrumentation for teaching. (1) The purpose of 
this need area is to provide students in science-oriented courses the 
necessary experience with suitable, up-to-date equipment in order to 
involve them in work central to scientific understanding and progress. 
This program initiative will support the acquisition of instructional 
laboratory and classroom equipment to assure the achievement and 
maintenance of outstanding food and agricultural sciences higher 
education programs. A proposal may request support for acquiring new, 
state-of-the-art instructional scientific equipment, upgrading existing 
equipment, or replacing non-functional or clearly obsolete equipment.
    (2) Examples include, but are not limited to:
    (i) Rental or purchase of modern instruments to improve student 
learning experiences in courses, laboratories, and field work.
    (ii) Development of new ways of using instrumentation to extend 
instructional capabilities.
    (iii) Establishment of equipment-sharing capability via consortia 
or centers that develop innovative opportunities, such as mobile 
laboratories or satellite access to industry or government 
laboratories.
    (e) Student experiential learning. (1) The purpose of this need 
area is to further the development of student scientific and 
professional competencies through experiential learning programs which 
provide students with opportunities to solve complex problems in the 
context of real-world situations. Effective experiential learning is 
essential in preparing future graduates to advance knowledge and 
technology, enhance quality of life, conserve resources, and revitalize 
the Nation's economic competitiveness. Such experiential learning 
opportunities are most effective when they serve to advance decision-
making and communication skills as well as technological expertise.
    (2) Examples include, but are not limited to, projects which:
    (i) Provide opportunities for students to participate in research 
projects, either as a part of an ongoing research project or in a 
project designed especially for this program.
    (ii) Provide opportunities for students to complete 
apprenticeships, internships, or similar participatory learning 
experiences.
    (iii) Expand and enrich courses which are of a practicum nature.
    (iv) Provide career mentoring experiences that link students with 
outstanding professionals.
    (f) Student recruitment and retention. (1) The purpose of this need 
area is to strengthen student recruitment and retention programs in 
order to promote the future strength of the Nation's scientific and 
professional work force. The Nation's economic competitiveness and 
quality of life rest upon the availability of a cadre of outstanding 
research scientists, university faculty, and other professionals in the 
food and agricultural sciences. A substantial need exists to supplement 
efforts to attract increased numbers of academically outstanding 
students to prepare for careers as food and agricultural scientists and 
professionals. It is particularly important to augment the racial, 
ethnic, and gender diversity of the student body in order to promote a 
robust exchange of ideas and a more effective use of the full breadth 
of the Nation's intellectual resources.
    (2) Each student recipient of monetary support for education costs 
or developmental purposes under Sec. 3406.11(f) must be enrolled at an 
eligible institution and meet the requirement of an ``eligible 
participant'' as defined in Sec. 3406.2 of this part.
    (3) Examples include, but are not limited to:
    (i) Special outreach programs for elementary and secondary students 
as well as parents, counselors, and the general public to broaden 
awareness of the extensive nature and diversity of career opportunities 
for graduates in the food and agricultural sciences.
    (ii) Special activities and materials to establish more effective 
linkages with high school science classes.
    (iii) Unique or innovative student recruitment activities, 
materials, and personnel.
    (iv) Special retention programs to assure student progression 
through and completion of an educational program.
    (v) Development and dissemination of stimulating career information 
materials.
    (vi) Use of regional or national media to promote food and 
agricultural sciences higher education.
    (vii) Providing financial incentives to enable and encourage 
students to pursue and complete an undergraduate or graduate degree in 
an area of the food and agricultural sciences.

[[Page 66020]]

Sec. 3406.12  Program application materials--teaching.

    Program application materials in an application package will be 
made available to eligible institutions upon request. These materials 
include the program announcement, the administrative provisions for the 
program, and the forms needed to prepare and submit teaching grant 
applications under the program.

Sec. 3406.13  Content of a teaching proposal.

    (a) Proposal cover page. (1) Form CSRS-712, ``Higher Education 
Proposal Cover Page,'' must be completed in its entirety. Note that 
providing a Social Security Number is voluntary, but is an integral 
part of the CSREES information system and will assist in the processing 
of the proposal.
    (2) One copy of the Form CSRS-712 must contain the pen-and-ink 
signatures of the project director(s) and authorized organizational 
representative for the applicant institution.
    (3) The title of the teaching project shown on the ``Higher 
Education Proposal Cover Page'' must be brief (80-character maximum) 
yet represent the major thrust of the project. This information will be 
used by the Department to provide information to the Congress and other 
interested parties,
    (4) In block 7. of Form CSRS-712, enter ``1890 Institution Capacity 
Building Grants Program.''
    (5) In block 8.a. of Form CSRS-712, enter ``Teaching.'' In block 
8.b. identify the code for the targeted need area(s) as found on the 
reverse of the form. If a proposal focuses on multiple targeted need 
areas, enter each code associated with the project. In block 8.c. 
identify the major area(s) of emphasis as found on the reverse of the 
form. If a proposal focuses on multiple areas of emphasis, enter each 
code associated with the project; however, limit the selection to three 
areas. This information will be used by program staff for the proper 
assignment of proposals to reviewers.
    (6) In block 9. of Form CSRS-712, indicate if the proposal is a 
complementary project proposal or a joint project proposal as defined 
in Sec. 3406.2 of this part. If it is not a complementary project 
proposal or a joint project proposal, identify it as a regular project 
proposal.
    (7) In block 13. of Form CSRS-712, indicate if the proposal is a 
new, first-time submission or if the proposal is a resubmission of a 
proposal that has been submitted to, but not funded under, the 1890 
Institution Capacity Building Grants Program in a previous competition.
    (b) Table of contents. For ease in locating information, each 
proposal must contain a detailed table of contents just after the 
Proposal Cover Page. The Table of Contents should include page numbers 
for each component of the proposal. Pagination should being immediately 
following the summary documentation of USDA agency cooperation.
    (c) USDA agency cooperator. To be considered for funding, each 
proposal must include documentation of cooperation with at least one 
USDA agency of office. If multiple agencies are involved as 
cooperators, documentation must be included from each agency. When 
documenting cooperative arrangements, the following guidelines should 
be used.
    (1) A summary of the cooperative arrangements must immediately 
follow the Table of Contents. This summary should:
    (i) Bear the signatures of the Agency Head (or his/her designated 
authorized representative) and the university project director;
    (ii) Indicate the agency's willingness to commit support for the 
project;
    (iii) Identify the person(s) at the USDA agency who will serve as 
the liaison or technical contact for the project;
    (iv) Describe the degree and nature of the USDA agency's 
involvement in the proposed project, as outlined in Sec. 3406.6(a) of 
this part, including its role in:
    (A) Identifying the need for the project;
    (B) Developing a conceptual approach;
    (C) Assisting with project design;
    (D) Identifying and securing needed agency or other resources 
(e.g., personnel, grants/contracts; in-kind support, etc.);
    (E) Developing the project budget;
    (F) Promoting partnerships with other institutions to carry out the 
project;
    (G) Helping the institution launch and manage the project;
    (H) Providing technical assistance and expertise;
    (I) Providing consultation through site visits, E-mail, conference 
calls, and faxes;
    (J) Participating in project evaluation and dissemination of final 
project results; and
    (K) Seeking other innovative ways to ensure the success of the 
project and advance the needs of the institution or the agency; and
    (v) Describe the expected benefits of the partnership venture for 
the USDA agency and for the 1890 Institution.
    (2) A detailed discussion of these partnership arrangements should 
be provided in the narrative portion of the proposal, as outlined in 
paragraph (f)(2)(iv)(B) of this section.
    (3) Additional documentation, including letters of support or 
cooperation, may be provided in the Appendix.
    (d) Project summary. (1) A Project Summary should immediately 
follow the summary documentation of USDA agency cooperation section. 
The information provided in the Project Summary will be used by the 
program staff for a variety of purposes, including the proper 
assignment of proposals to reviewers and providing information to 
reviewers prior to the peer panel meeting. The name of the institution, 
the targeted need area(s), and the title of the proposal must be 
identified exactly as shown on the ``Higher Education Proposal Cover 
Page.''
    (2) If the proposal is a complementary project proposal, as defined 
in Sec. 3406.2 of this part, indicate such and identify the other 
complementary project(s) by citing the name of the submitting 
institution, the title of the project, the project director, and the 
grant number (if funded in a previous year) exactly as shown on the 
cover page of the complementary project so that appropriate 
consideration can be given to the interrelatedness of the proposals in 
the evaluation process.
    (3) If the proposal is a joint project proposal, as defined in 
Sec. 3406.2 of this part, indicate such and identify the other 
participating institutions and the key faculty member or other 
individual responsible for coordinating the project at each 
institution.
    (4) The Project Summary should be a concise description of the 
proposed activity suitable for publication by the Department to inform 
the general public about awards under the program. The text must not 
exceed one page, single-spaced. The Project Summary should be a self-
contained description of the activity which would result if the 
proposal is funded by USDA. It should include: The objectives of the 
project; a synopsis of the plan of operation; a statement of how the 
project will enhance the teaching capacity of the institution; a 
description of how the project will strengthen higher education in the 
food and agricultural sciences in the United States; a description of 
the partnership efforts between, and the expected benefits for, the 
USDA agency cooperator(s) and the 1890 Institution; and the plans for 
disseminating project results. The Project Summary should be written so 
that a technically literate reader can evaluate the use of Federal 
funds in support of the project.

[[Page 66021]]

    (e) Resubmission of a proposal. (1) Resubmission of previously 
unfunded proposals. (i) If a proposal has been submitted previously, 
but was not funded, such should be indicated in block 13. on Form CSRS-
712, ``Higher Education Proposal Cover Page,'' and the following 
information should be included in the proposal:
    (A) The fiscal year(s) in which the proposal was submitted 
previously;
    (B) A summary of the peer reviewers' comments; and
    (C) How these comments have been addressed in the current proposal, 
including the page numbers in the current proposal where the reviewers' 
comments have been addressed. (ii) This information may be provided as 
a section of the proposal following the Project Summary and preceding 
the proposal narrative or it may be placed in the Appendix (see 
paragraph (j) of this section). In either case, the location of this 
information should be indicated in the Table of Contents, and the fact 
that the proposal is a resubmitted proposal should be stated in the 
proposal narrative. Further, when possible, the information should be 
presented in tabular format. Applicants who choose to resubmit 
proposals that were previously submitted, but not funded, should note 
that resubmitted proposals must compete equally with newly submitted 
proposals. Submitting a proposal that has been revised based on a 
previous peer review panel's critique of the proposal does not 
guarantee the success of the resubmitted proposal.
    (2) Resubmission of previously funded proposals. Recognizing that 
capacity building is a long-term ongoing process, the 1890 Institution 
Capacity Building Grants Program is interested in funding subsequent 
phases of previously funded projects in order to build institutional 
capacity, and institutions are encouraged to build on a theme over 
several grant awards. However, proposals that are sequential 
continuations or new stages of previously funded Capacity Building 
Grants must compete with first-time proposals. Therefore, project 
directors should thoroughly demonstrate how the project proposed in the 
current application expands substantially upon a previously funded 
project (i.e., demonstrate how the new project will advance the former 
project to the next level of attainment or will achieve expanded 
goals). The proposal must also show the degree to which the new phase 
promotes innovativeness and creativity beyond the scope of the 
previously funded project. Please note that the 1890 Institution 
Capacity Building Grants Program is not designed to support activities 
that are essentially repetitive in nature over multiple grant awards. 
Project directors who have had their projects funded previously are 
discouraged from resubmitting relatively identical proposals for 
further funding.
    (f) Narrative of a teaching proposal. The narrative portion of the 
proposal is limited to 20 pages in length. The one-page Project Summary 
is not included in the 20-page limitation. The narrative must be typed 
on one side of the page only, using a font no smaller than 12 point, 
and double-spaced. All margins must be at least one inch. All pages 
following the summary documentation of USDA agency cooperation must be 
paginated. It should be noted that reviewers will not be required to 
read beyond 20 pages of the narrative to evaluate the proposal. The 
narrative should contain the following sections:
    (1) Potential for advancing the quality of education.
    (i) Impact.
    (A) Identify the targeted need area(s).
    (B) Clearly state the specific instructional problem or opportunity 
to be addressed.
    (C) Describe how and by whom the focus and scope of the project 
were determined. Summarize the body of knowledge which substantiates 
the need for the proposed project.
    (D) Describe ongoing or recently completed significant activities 
related to the proposed project for which previous funding was received 
under this program.
    (E) Discuss how the project will be of value at the State, 
regional, national, or international level(s).
    (F) Discuss how the benefits to be derived from the project will 
transcend the proposing institution or the grant period. Also discuss 
the probabilities of its adaptation by other institutions. For example, 
can the project serve as a model for others?
    (ii) Continuation plans. Discuss the likelihood of, or plans for, 
continuation or expansion of the project beyond USDA support. For 
example, does the institution's long-range budget or academic plan 
provide for the realistic continuation or expansion of the initiative 
undertaken by this project after the end of the grant period, are plans 
for eventual self-support built into the project, are plans being made 
to institutionalize the program if it meets with success, and are there 
indications of other continuing non-Federal support?
    (iii) Innovation. Describe the degree to which the proposal 
reflects an innovative or non-traditional approach to solving a higher 
education problem or strengthening the quality of higher education in 
the food and agricultural sciences.
    (iv) Products and results. Explain the kinds of results and 
products expected and their impact on strengthening food and 
agricultural sciences higher education in the United States, including 
attracting academically outstanding students and increasing the ethnic, 
racial, and gender diversity of the Nation's food and agricultural 
scientific and professional expertise base.
    (2) Overall approach and cooperative linkages.
    (i) Proposed approach.
    (A) Objectives. Cite and discuss the specific objectives to be 
accomplished under the project.
    (B) Plan of operation.
    (1) Describe procedures for accomplishing the objectives of the 
project.
    (2) Describe plans for management of the project to enhance its 
proper and efficient administration.
    (3) Describe the way in which resources and personnel will be used 
to conduct the project.
    (C) Timetable. Provide a timetable for conducting the project. 
Identify all important project milestones and dates as they relate to 
project start-up, execution, dissemination, evaluation, and close-out.
    (ii) Evaluation plans.
    (A) Provide a plan for evaluating the accomplishment of stated 
objectives during the conduct of the project. Indicate the criteria, 
and corresponding weight of each, to be used in the evaluation process, 
describe any data to be collected and analyzed, and explain the 
methodology that will be used to determine the extent to which the 
needs underlying the project are met.
    (B) Provide a plan for evaluating the effectiveness of the end 
results upon conclusion of the project. Include the same kinds of 
information requested in paragraph (f)(2)(ii)(A) of this section.
    (iii) Dissemination plans. Discuss plans to disseminate project 
results and products. Identify target audiences and explain methods of 
communication.
    (iv) Partnerships and collaborative efforts.
    (A) Explain how the project will maximize partnership ventures and 
collaborative efforts to strengthen food and agricultural sciences 
higher education (e.g., involvement of faculty in related disciplines 
at the same institution, joint projects with other colleges or 
universities, or cooperative activities with business or industry). 
Also explain how it will stimulate 

[[Page 66022]]
academia, the States, or the private sector to join with the Federal 
partner in enhancing food and agricultural sciences higher education.
    (B) Provide evidence, via letters from the parties involved, that 
arrangements necessary for collaborative partnerships or joint 
initiatives have been discussed and realistically can be expected to 
come to fruition, or actually have been finalized contingent on an 
award under this program. Letters must be signed by an official who has 
the authority to commit the resources of the organization. Such letters 
should be referenced in the plan of operation, but the actual letters 
should be included in the Appendix section of the proposal. Any 
potential conflict(s) of interest that might result from the proposed 
collaborative arrangements must be discussed in detail. Proposals which 
indicate joint projects with other institutions must state which 
proposer is to receive any resulting grant award, since only one 
submitting institution can be the recipient of a project grant under 
one proposal.
    (C) Explain how the project will create a new or enhance an 
existing partnership between the USDA agency cooperator(s) and the 1890 
Institution(s). This section should expand upon the summary information 
provided in the documentation of USDA agency cooperation section, as 
outlined in paragraph (c)(1) of this section. This is particularly 
important because the focal point of attention in the peer review 
process is the proposal narrative. Therefore, a comprehensive 
discussion of the partnership effort between USDA and the 1890 
Institution should be provided.
    (3) Institutional capacity building.
    (i) Institutional enhancement. Explain how the proposed project 
will strengthen the teaching capacity as defined in Sec. 3406.2 of this 
part, of the applicant institution and, if applicable, any other 
institutions assuming a major role in the conduct of the project. For 
example, describe how the proposed project is intended to strengthen 
the institution's academic infrastructure by expanding the current 
faculty's expertise base, advancing the scholarly quality of the 
institution's academic programs, enriching the racial, ethnic, or 
gender diversity of the student body, helping the institution establish 
itself as a center of excellence in particular field of education, 
helping the institution maintain or acquire state-of-the-art scientific 
instrumentation or library collections for teaching, or enabling the 
institution to provide more meaningful student experiential learning 
opportunities.
    (ii) Institutional commitment.
    (A) Discuss the institution's commitment to the project and its 
successful completion. Provide, as relevant, appropriate documentation 
in the Appendix. Substantiate that the institution attributes a high 
priority to the project.
    (B) Discuss how the project will contribute to the achievement of 
the institution's long-term (five- to ten-year goals and how the 
project will help satisfy the institution's high-priority objectives. 
Show how this project is linked to and supported by the institution's 
strategic plan.
    (C) Discuss the commitment of institutional resources to the 
project. Show that the institutional resources to be made available to 
the project will be adequate, when combined with the support requested 
from USDA, to carry out the activities of the project and represent a 
sound commitment by the institution. Discuss institutional facilities, 
equipment, computer services, and other appropriate resources available 
to the project.
    (g) Key personnel. A Form CSRS-708, ``Summary Vita-Teaching 
Proposal,'' should be included for each key person associated with the 
project.
    (h) Budget and cost-effectiveness. (1) Budget form.
    (i) Prepare Form CSRS-713, ``Higher Education Budget,'' in 
accordance with instructions provided with the form. Proposals may 
request support for a period to be identified in each year's program 
announcement. A budget form is required for each year of requested 
support. In addition, a summary budget is required detailing the 
requested total support for the overall project period. Form CSRS-713 
may be reproduced as needed by proposers. Funds may be requested under 
any of the categories listed on the form, provided that the item or 
service for which support is requested is allowable under the 
authorizing legislation, the applicable Federal cost principles, the 
administrative provisions in this part, and can be justified as 
necessary for successful conduct of the proposed project.
    (ii) The approved negotiated instruction rate or the maximum rate 
allowed by law should be used when computing indirect costs. If a 
reduced rate of indirect costs is voluntarily requested from USDA, the 
remaining allowable indirect costs may be used as matching funds.
    (2) Matching funds. When documenting matching contributions, use 
the following guidelines:
    When preparing the column of Form CSRS-713 entitled ``Applicant 
Contributions To Matching Funds,'' only those costs to be contributed 
by the applicant for the purposes of matching should be shown. The 
total amount of this column should be indicated in item M.
    (ii) In item N of Form CSRS-713, show a total dollar amount for 
Cash Contributions from both the applicant and any third parties; also 
show a total dollar amount (based on current fair market value) for 
Non-cash Contributions from both the applicant and any third parties.
    (iii) To qualify for any incentive benefits stemming from matching 
support or to satisfy any cost sharing requirements, proposals must 
include written verification of any actual commitments of matching 
support (including both cash and non-cash contributions) from third 
parties. Written verification means--
    (A) For any third party cash contributions, a separate pledge 
agreement for each donation, signed by the authorized organizational 
representatives of the donor organization (or by the donor if the gift 
is from an individual) and the applicant institution,which must 
include:
    (1) The name, address, and telephone number of the donor;
    (2) The name of the applicant institution;
    (3) The title of the project for which the donation is made;
    (4) The dollar amount of the cash donation; and
    (5) A statement that the donor will pay the cash contribution 
during the grant period; and
    (B) For any third party non-cash contributions, a separate pledge 
agreement for each contribution, signed by the authorized 
organizational representatives of the donor organization (or by the 
donor if the gift is from an individual) and the applicant institution, 
which must include:
    (1) The name, address, and telephone number of the donor;
    (2) The name of the applicant institution;
    (3) The title of the project for which the donation is made;
    (4) A good faith estimate of the current fair market value of the 
non-cash contribution; and
    (5) A statement that the donor will make the contribution during 
the grant period.
    (iv) All pledge agreements must be placed in the proposal 
immediately following Form CSRS-713. The sources and amounts of all 
matching support from outside the applicant institution should be 
summarized in the Budget Narrative section of the proposal.

[[Page 66023]]

    (v) Applicants should refer to OMB Circulars A-110, ``Uniform 
Administrative Requirements for Grants and Agreements With Institutions 
of Higher Education, Hospitals and Other Non-profit Organizations,'' 
and A-21, ``Cost Principles for Educational Institutions,'' for further 
guidance and other requirements relating to matching and allowable 
costs.
    (3) Chart on shared budget for joint project proposal.
    (i) For a joint project proposal, a plan must be provided 
indicating how funds will be distributed to the participating 
institutions. The budget section of a joint project proposal should 
include a chart indicating:
    (A) The names of the participating institutions;
    (B) The amount of funds to be disbursed to those institutions; and
    (C) The way in which such funds will be used in accordance with 
items A through L of Form CSRS-713, ``Higher Education Budget.''
    (ii) If a proposal is not for a joint project, such a chart is not 
required.
    (4) Budget narrative.
    (i) Discuss how the budget specifically supports the proposed 
project activities. Explain how each budget item (such as salaries and 
wages for professional and technical staff, student stipends/
scholarships, travel, equipment, etc.) is essential to achieving 
project objectives.
    (ii) Justify that the total budget, including funds requested from 
USDA and any matching support provided, will be adequate to carry out 
the activities of the project. Provide a summary of sources and amounts 
of all third party matching support.
    (iii) Justify the project's cost-effectiveness. Show how the 
project maximizes the use of limited resources, optimizes educational 
value for the dollar, achieves economies of scale, or leverages 
additional funds. For example, discuss how the project has the 
potential to generate a critical mass of expertise and activity focused 
on a targeted need area or promote coalition building that could lead 
to future ventures.
    (iv) Includes the percentage of time key personnel will work on the 
project, both during the academic year and summer. When salaries of 
university project personnel will be paid by a combination of USDA and 
institutional funds, the total compensation must not exceed the faculty 
member's regular annual compensation. In addition, the total commitment 
of time devoted to the project, when combined with time for teaching 
and research duties, other sponsored agreements, and other employment 
obligations to the institution, must not exceed 100 percent of the 
normal workload for which the employee is compensated, in accordance 
with established university policies and applicable Federal cost 
principles.
    (v) If the proposal addresses more than one targeted need area 
(e.g., student experiential learning and instruction delivery systems), 
estimate the proportion of the funds requested from USDA that will 
support each respective targeted need area.
    (i) Current and pending support. Each applicant must complete Form 
CSRS-663, ``Current and Pending Support,'' identifying any other 
current public- or private-sponsored projects, in addition to the 
proposed project, to which key personnel listed in the proposal under 
consideration have committed portions of their time, whether or not 
salary support for the person(s) involved is included in the budgets of 
the various projects. This information should also be provided for any 
pending proposals which are currently being considered by, or which 
will be submitted in the near future to, other possible sponsors, 
including other USDA programs or agencies. Concurrent submission of 
identical or similar projects to other possible sponsors will not 
prejudice the review or evaluation of a project under this program.
    (j) Appendix. Each project narrative is expected to be complete in 
itself and to meet the 20-page limitation. Inclusion of material in an 
Appendix should not be used to circumvent the 20-page limitation of a 
proposal narrative. However, in those instances where inclusion of 
supplemental information is necessary to guarantee the peer review 
panel's complete understanding of a proposal or to illustrate the 
integrity of the design or a main thesis of the proposal, such 
information may be included in an Appendix. Examples of supplemental 
material are photographs, journal reprints, brochures and other 
pertinent materials which are deemed to be illustrative of major points 
in the narrative but unsuitable for inclusion in the proposal narrative 
itself. Information on previously submitted proposals may also be 
presented in the Appendix (refer to paragraph (e) of this section). 
When possible, information in the Appendix should be presented in 
tabular format. A complete set of the Appendix material must be 
attached to each copy of the grant application submitted. The Appendix 
must be identified with the title of the project as it appears on Form 
CSRS-712 of the proposal and the name(s) of the project director(s). 
The Appendix must be referenced in the proposal narrative.

Subpart D--Review and Evaluation of a Teaching Proposal

Sec. 3406.14  Proposal review--teaching.

    The proposal evaluation process includes both internal staff review 
and merit evaluation by peer review panels comprised of scientists, 
educators, business representatives, and Government officials who are 
highly qualified to render expert advice in the areas supported. Peer 
review panels will be selected and structured to provide optimum 
expertise and objective judgment in the evaluation of proposals.

Sec. 3406.15  Evaluation criteria for teaching proposals.

    The maximum score a teaching proposal can receive is 150 points. 
Unless otherwise stated in the annual solicitation published in the 
Federal Register, the peer review panel will consider the following 
criteria and weights to evaluate proposals submitted:

------------------------------------------------------------------------
                                                                Weight  
                    Evaluation Criterion                       (points) 
------------------------------------------------------------------------
(a) Potential for advancing the quality of education:                   
    This criterion is used to assess the likelihood that the            
     project will have a substantial impact upon and advance            
     the quality of food and agricultural sciences higher               
     education by strengthening institutional capacities                
     through promoting education reform to meet clearly                 
     delineated needs.                                                  
        (1) Impact--Does the project address a targeted need            
         area(s)? Is the problem or opportunity clearly                 
         documented? Does the project address a State,                  
         regional, national, or international problem or                
         opportunity? Will the benefits to be derived from              
         the project transcend the applicant institution or             
         the grant period? Is it probable that other                    
         institutions will adapt this project for their own             
         use? Can the project serve as a model for others?..          15

[[Page 66024]]
                                                                        
        (2) Continuation plans--Are there plans for                     
         continuation or expansion of the project beyond                
         USDA support with the use of institutional funds?              
         Are there indications of external, non-Federal                 
         support? Are there realistic plans for making the              
         project self-supporting?...........................          10
        (3) Innovation--Are significant aspects of the                  
         project based on an innovative or a non-traditional            
         approach toward solving a higher education problem             
         or strengthening the quality of higher education in            
         the food and agricultural sciences? If successful,             
         is the project likely to lead to education reform?.          10
        (4) Products and results--Are the expected products             
         and results of the project clearly defined and                 
         likely to be of high quality? Will project results             
         be of an unusual or unique nature? Will the project            
         contribute to a better understanding of or an                  
         improvement in the quality, distribution, or                   
         effectiveness of the Nation's food and agricultural            
         scientific and professional expertise base, such as            
         increasing the participation of women and                      
         minorities?........................................          15
(b) Overall approach and cooperative linkages:                          
    This criterion relates to the soundness of the proposed             
     approach and the quality of the partnerships likely to             
     evolve as a result of the project.                             
FR Doc. 95-30625 1890 Institution Capacity Building Grants Program; Administrative Provisions
    
        (1) Proposed approach--Do the objectives and plan of            
         operation appear to be sound and appropriate                   
         relative to the targeted need area(s) and the                  
         impact anticipated? Are the procedures                         
         managerially, educationally, and scientifically                
         sound? Is the overall plan integrated with or does             
         it expand upon other major efforts to improve the              
         quality of food and agricultural sciences higher               
         education? Does the timetable appear to be readily             
         achievable?........................................          15
        (2) Evaluation--Are the evaluation plans adequate               
         and reasonable? Do they allow for continuous or                
         frequent feedback during the life of the project?              
         Are the individuals involved in project evaluation             
         skilled in evaluation strategies and procedures?               
         Can they provide an objective evaluation? Do                   
         evaluation plans facilitate the measurement of                 
         project progress and outcomes?.....................           5
        (3) Dissemination--Does the proposed project include            
         clearly outlined and realistic mechanisms that will            
         lead to widespread dissemination of project                    
         results, including national electronic                         
         communication systems, publications, presentations             
         at professional conferences, or use by faculty                 
         development or research/teaching skills workshops?.           5
        (4) Partnerships and collaborative efforts--Does the            
         project have significant potential for advancing               
         cooperative ventures between the applicant                     
         institution and a USDA agency? Does the project                
         workplan include an effective role for the                     
         cooperating USDA agency(s)? Will the project expand            
         partnership ventures among disciplines at a                    
         university, between colleges and universities, or              
         with the private sector? Will the project lead to              
         long-term relationships or cooperative partnerships            
         that are likely to enhance program quality or                  
         supplement resources available to food and                     
         agricultural sciences higher education?............          15
(c) Institutional capacity building:                                    
    This criterion relates to the degree to which the                   
     project will strengthen the teaching capacity of the               
     applicant institution. In the case of a joint project              
     proposal, it relates to the degree to which the project            
     will strengthen the teaching capacity of the applicant             
     institution and that of any other institution assuming             
     a major role in the conduct of the project.                        
        (1) Institutional enhancement--Will the project help            
         the institution to: expand the current faculty's               
         expertise base; attract, hire, and retain                      
         outstanding teaching faculty; advance and                      
         strengthen the scholarly quality of the                        
         institution's academic programs; enrich the racial,            
         ethnic, or gender diversity of the faculty and                 
         student body; recruit students with higher grade               
         point averages, higher standardized test scores,               
         and those who are more committed to graduation;                
         become a center of excellence in a particular field            
         of education and bring it greater academic                     
         recognition; attract outside resources for academic            
         programs; maintain or acquire state-of-the-art                 
         scientific instrumentation or library collections              
         for teaching; or provide more meaningful student               
         experiential learning opportunities?...............          15
        (2) Institutional commitment--Is there evidence to              
         substantiate that the institution attributes a high-           
         priority to the project, that the project is linked            
         to the achievement of the institution's long-term              
         goals, that it will help satisfy the institution's             
         high-priority objectives, or that the project is               
         supported by the institution's strategic plans?                
         Will the project have reasonable access to needed              
         resources such as instructional instrumentation,               
         facilities, computer services, library and other               
         instruction support resources?.....................          15
(d) Personnel Resources:                                                
    This criterion relates to the number and qualifications             
     of the key persons who will carry out the project. Are             
     designated project personnel qualified to carry out a              
     successful project? Are there sufficient numbers of                
     personnel associated with the project to achieve the               
     stated objectives and the anticipated outcomes?                    
(e) Budget and cost-effectiveness:                                      
    This criterion relates to the extent to which the total             
     budget adequately supports the project and is cost-                
     effective.                                                         
        (1) Budget--Is the budget request justifiable? Are              
         costs reasonable and necessary? Will the total                 
         budget be adequate to carry out project activities?            
         Are the source(s) and amount(s) of non-Federal                 
         matching support clearly identified and                        
         appropriately documented? For a joint project                  
         proposal, is the shared budget explained clearly               
         and in sufficient detail?..........................          10
        (2) Cost-effectiveness--Is the proposed project cost-           
         effective? Does it demonstrate a creative use of               
         limited resources, maximize educational value per              
         dollar of USDA support, achieve economies of scale,            
         leverage additional funds or have the potential to             
         do so, focus expertise and activity on a targeted              
         need area, or promote coalition building for                   
         current or future ventures?........................           5
(f) Overall quality of proposal:                                        
    This criterion relates to the degree to which the                   
     proposal complies with the application guidelines and              
     is of high quality. Is the proposal enhanced by its                
     adherence to instructions (table of contents,                      
     organization, pagination, margin and font size, the 20-            
     page limitation, appendices, etc.); accuracy of forms;             
     clarity of budget narrative; well prepared vitae for               
     all key personnel associated with the project; and                 
     presentation (are ideas effectively presented, clearly             
     articulated, and thoroughly explained, etc.)?..........           5
------------------------------------------------------------------------

                                                              
[[Page 66025]]

Subpart E--Preparation of a Research Proposal

Sec. 3406.16  Scope of a research proposal.

    The research component of the program will support projects that 
address high-priority research initiatives in areas such as those 
illustrated in this section where there is a present or anticipated 
need for increased knowledge or capabilities or in which it is feasible 
for applicants to develop programs recognized for their excellence. 
Applicants are also encouraged to include in their proposals a library 
enhancement component related to the initiative(s) for which they have 
prepared their proposals.
    (a) Studies and experimentation in food and agricultural sciences.
    (1) The purpose of this initiative is to advance the body of 
knowledge in those basic and applied natural and social sciences that 
comprise the food and agricultural sciences.
    (2) Examples include, but are not limited to:
    (i) Conduct plant or animal breeding programs to develop better 
crops, forests, or livestock (e.g., more disease resistant, more 
productive, yielding higher quality products).
    (ii) Conceive, design, and evaluate new bioprocessing techniques 
for eliminating undesirable constituents from or adding desirable ones 
to food products.
    (iii) Propose and evaluate ways to enhance utilization of the 
capabilities and resources of food and agricultural institutions to 
promote rural development (e.g., exploitation of new technologies by 
small rural businesses).
    (iv) Identify control factors influencing consumer demand for 
agricultural products.
    (v) Analyze social, economic, and physiological aspects of 
nutrition, housing, and life-style choices, and of community strategies 
for meeting the changing needs of different population groups.
    (vi) Other high-priority areas such as human nutrition, sustainable 
agriculture, biotechnology, agribusiness management and marketing, and 
aquaculture.
    (b) Centralized research support systems.
    (1) The purpose of this initiative is to establish centralized 
support systems to meet national needs or serve regions or clientele 
that cannot otherwise afford or have ready access to the support in 
question, or to provide such support more economically thereby freeing 
up resources for other research uses.
    (2) Examples include, but are not limited to:
    (i) Storage, maintenance, characterization, evaluation and 
enhancement of germplasm for use by animal and plant breeders, 
including those using the techniques of biotechnology.
    (ii) Computerized data banks of important scientific information 
(e.g., epidemiological, demographic, nutrition, weather, economic, crop 
yields, etc.).
    (iii) Expert service centers for sophisticated and highly 
specialized methodologies (e.g., evaluation of organoleptic and 
nutritional quality of foods, toxicology, taxonomic identifications, 
consumer preferences, demographics, etc.).
    (c) Technology delivery systems.
    (1) The purpose of this initiative is to promote innovations and 
improvements in the delivery of benefits of food and agricultural 
sciences to producers and consumers, particularly those who are 
currently disproportionately low in receipt of such benefits.
    (2) Examples include, but are not limited to:
    (i) Computer-based decision support systems to assist small-scale 
farmers to take advantage of relevant technologies, programs, policies, 
etc.
    (ii) Efficacious delivery systems for nutrition information or for 
resource management assistance for low-income families and individuals.
    (d) Other creative proposals. The purpose of this initiative is to 
encourage other creative proposals, outside the areas previously 
outlined, that are designed to provide needed enhancement of the 
Nation's food and agricultural research system.

Sec. 3406.17  Program application materials--research.

    Program application materials in an application package will be 
made available to eligible institutions upon request. These materials 
include the program announcement, the administrative provisions for the 
program, and the forms needed to prepare and submit research grant 
applications under the program.

Sec. 3406.18  Content of a research proposal.

    (a) Proposal cover page. (1) Form CSRS-712, ``Higher Education 
Proposal Cover Page,'' must be completed in its entirety. Note that 
providing a Social Security Number is voluntary, but is an integral 
part of the CSREES information system and will assist in the processing 
of the proposal.
    (2) One copy of Form CSRS-712 must contain the pen-and-ink 
signatures of the principal investigator(s) and Authorized 
Organizational Representative for the applicant institution.
    (3) The title of the research project shown on the ``Higher 
Education Proposal Cover Page'' must be brief (80-character maximum) 
yet represent the major thrust of the project. This information will be 
used by the Department to provide information to the Congress and other 
interested parties.
    (4) In block 7. of Form CSRS-712, enter ``Capacity Building Grants 
Program.''
    (5) In block 8.a. of Form CSRS-712, enter ``Research.'' In block 
8.b. identify the code of the targeted need area(s) as found on the 
reverse of the form. If a proposal focuses on multiple targeted need 
areas, enter each code associated with the project. In block 8.c. 
identify the major area(s) of emphasis as found on the reverse of the 
form. If a proposal focuses on multiple areas of emphasis, enter each 
code associated with the project; however, please limit your selection 
to three areas. This information will be used by the program staff for 
the proper assignment of proposals to reviewers.
    (6) In block 9. of Form CSRS-712, indicate if the proposal is a 
complementary project proposal or joint project proposal as defined in 
Sec. 3406.2. If it is not a complementary project proposal or a joint 
project proposal, identify it as a regular proposal.
    (7) In block 13. of Form CSRS-712, indicate if the proposal is a 
new, first-time submission or if the proposal is a resubmission of a 
proposal that has been submitted to, but not funded under the 1890 
Institution Capacity Building Grants Program in a previous competition.
    (b) Table of contents. For ease of locating information, each 
proposal must contain a detailed table of contents just after the 
Proposal Cover Page. The Table of Contents should include page numbers 
for each component of the proposal. Pagination should begin immediately 
following the summary documentation of USDA agency cooperation.
    (c) USDA agency cooperator. To be considered for funding, each 
proposal must include documentation of cooperation with at least one 
USDA agency or office. If multiple agencies are involved as 
cooperators, documentation must be included from each agency. When 
documenting cooperative arrangements, the following guidelines should 
be used:
    (1) A summary of the cooperative arrangements must immediately 
follow the Table of Contents. This summary should:

[[Page 66026]]

    (i) Bear the signatures of the Agency Head (or his/her designated 
authorized representative) and the university project director;
    (ii) Indicate the agency's willingness to commit support for the 
project;
    (iii) Identify the person(s) at the USDA agency who will serve as 
the liaison or technical contact for the project;
    (iv) Describe the degree and nature of the USDA agency's 
involvement in the proposed project, as outlined in Sec. 3406.6(a) of 
this part, including its role in:
    (A) Identifying the need for the project;
    (B) Developing a conceptual approach;
    (C) Assisting with project design;
    (D) Identifying and securing needed agency or other resources 
(e.g., personnel, grants/contracts; in-kind support, etc.);
    (E) Developing the project budget;
    (F) Promoting partnerships with other institutions to carry out the 
project;
    (G) Helping the institution launch and manage the project;
    (H) Providing technical assistance and expertise;
    (I) Providing consultation through site visits, E-mail, conference 
calls, and faxes;
    (J) Participating in project evaluation and dissemination of final 
project results; and
    (K) Seeking other innovative ways to ensure the success of the 
project and advance the needs of the institution or the agency; and
    (v) Describe the expected benefits of the partnership venture for 
the USDA agency and for the 1890 Institution.
    (2) A detailed discussion of these partnership arrangements should 
be provided in the narrative portion of the proposal, as outlined in 
paragraph (f)(2)(iv)(B) of this section.
    (3) Additional documentation, including letters of support or 
cooperation, may be provided in the Appendix.
    (d) Project summary. (1) A Project Summary should immediately 
follow the summary documentation of USDA agency cooperation. The 
information provided in the Project Summary will be used by the program 
staff for a variety of purposes, including the proper assignment of 
proposals to reviewers and providing information to reviews prior to 
the peer panel meeting. The name of the institution, the targeted need 
area(s), and the title of the proposal must be identified exactly as 
shown on the ``Higher Education Proposal Cover Page.''
    (2) If the proposal is a complementary project proposal, as defined 
in Sec. 3406.2 of this part, clearly state this fact and identify the 
other complementary project(s) by citing the name of the submitting 
institution, the title of the project, the principal investigator, and 
the grant number (if funded in a previous year) exactly as shown on the 
cover page of the complementary project so that appropriate 
consideration can be given to the interrelatedness of the proposals in 
the evaluation process.
    (3) If the proposal is a joint project proposal, as defined in 
Sec. 3406.2 of this part, indicate such and identify the other 
participating institutions and the key person responsible for 
coordinating the project at each institution.
    (4) The Project Summary should be a concise description of the 
proposed activity suitable for publication by the Department to inform 
the general public about awards under the program. The text should not 
exceed one page, single-spaced. The Project Summary should be a self-
contained description of the activity which would result if the 
proposal is funded by USDA. It should include: the objective of the 
project, a synopsis of the plan of operation, a statement of how the 
project will enhance the research capacity of the institution, a 
description of how the project will enhance research in the food and 
agricultural sciences, and a description of the partnership efforts 
between, and the expected benefits for, the USDA agency cooperator(s) 
and the 1890 Institution and the plans for disseminating project 
results. The Project Summary should be written so that a technically 
literate reader can evaluate the use of Federal funds in support of the 
project.
    (e) Resubmission of a proposal. (1) Resubmission of previously 
unfunded proposals. (i) If the proposal has been submitted previously, 
but was not funded, such should be indicated in block 13. On Form CSRS-
712, ``Higher Education Proposal Cover Page,'' and the following 
information should be included in the proposal.
    (A) The fiscal year(s) in which the proposal was submitted 
previously;
    (B) A summary of the peer reviewers' comments; and
    (C) How these comments have been addressed in the current proposal, 
including the page numbers in the current proposal where the reviewers' 
comments have been addressed.
    (ii) This information may be provided as a section of the proposal 
following the Project Summary and preceding the proposal narrative or 
it may be placed in the appendix (see paragraph (j) of this section). 
In either case, the location of this information should be indicated in 
the Table of Contents, and the fact that the proposal is a resubmitted 
proposal should be stated in the proposal narrative. Further, when 
possible, the information should be presented in a tabular format. 
Applicants who choose to resubmit proposals that were previously 
submitted, but not funded, should note that resubmitted proposals must 
compete equally with newly submitted proposals. Submitting a proposal 
that has been revised based on a previous peer review panel's critique 
of the proposal does not guarantee the success of the resubmitted 
proposal.
    (2) Resubmission of previously funded proposals. Recognizing that 
capacity building is a long-term ongoing process, the 1890 Institution 
Capacity Building Grants Program is interested in funding subsequent 
phases of previously funded projects in order to build institutional 
capacity, and institutions are encouraged to build on a theme over 
several grant awards. However, proposals that are sequential 
continuations or new stages of previously funded Capacity Building 
Grants must compete with first-time proposals. Therefore, project 
directors should thoroughly demonstrate how the project proposed in the 
current application expands substantially upon a previously funded 
project (i.e., demonstrate how the new project will advance the former 
project to the next level of attainment or will achieve expanded 
goals). The proposal must also show the degree to which the new phase 
promotes innovativeness and creativity beyond the scope of the 
previously funded project. Please note that the 1890 Institution 
Capacity Building Grants Program is not designed to support activities 
that are essentially repetitive in nature over multiple grant awards. 
Principal investigators who have had their projects funded previously 
are discouraged from resubmitting relatively identical proposals for 
future funding.
    (f) Narrative of a research proposal. The narrative portion of the 
proposal is limited to 20 pages in length. The one-page Project Summary 
is not included in the 20-page limitation. The narrative must be typed 
on one side of the page only, using a font no smaller than 12 point, 
and double-spaced. All margins must be at least one inch. All pages 
following the summary documentation of USDA agency cooperation must be 
paginated. It should be noted that reviewers will not be required to 
read beyond 20 pages of the narrative to evaluate the proposal. The 
narrative should contain the following sections:
    (1) Significance of the problem.
    (i) Impact.
    
[[Page 66027]]

    (A) Identification of the problem or opportunity. Clearly identify 
the specific problem or opportunity to be addressed and present any 
research questions or hypotheses to be examined.
    (B) Rationale. Provide a rationale for the proposed approach to the 
problem or opportunity and indicate the part that the proposed project 
will play in advancing food and agricultural research and knowledge. 
Discuss how the project will be of value and importance at the State, 
regional, national, or international level(s). Also discuss how the 
benefits to be derived from the project will transcend the proposing 
institution or the grant period.
    (C) Literature review. Include a comprehensive summary of the 
pertinent scientific literature. Citations may be footnoted to a 
bibliography in the Appendix. Citations should be accurate, complete, 
and adhere to an acceptable journal format. Explain how such knowledge 
(or previous findings) is related to the proposed project.
    (D) Current research and related activities. Describe the relevancy 
of the proposed project to current research or significant research 
support activities at the proposing institution and any other 
institution participating in the project, including research which may 
be as yet unpublished.
    (ii) Continuation plans. Discuss the likelihood or plans for 
continuation or expansion of the project beyond USDA support. Discuss, 
as applicable, how the institution's long-range budget, and 
administrative and academic plans, provide for the realistic 
continuation or expansion of the line of research or research support 
activity undertaken by this project after the end of the grant period. 
For example, are there plans for securing non-Federal support for the 
project? Is there any potential for income from patents, technology 
transfer or university-business enterprises resulting from the project? 
Also discuss the probabilities of the proposed activity or line of 
inquiry being pursued by researchers at other institutions.
    (iii) Innovation. Describe the degree to which the proposal 
reflects an innovative or non-traditional approach to a food and 
agricultural research initiative.
    (iv) Products and results. Explain the kinds of products and 
results expected and their impact on strengthening food and 
agricultural sciences higher education in the United States, including 
attracting academically outstanding students or increasing the ethnic, 
racial, and gender diversity of the Nation's food and agricultural 
scientific and professional expertise base.
    (2) Overall approach and cooperative linkages.
    (i) Approach.
    (A) Objectives. Cite and discuss the specific objectives to be 
accomplished under the project.
    (B) Plan of operation. The procedures or methodologies to be 
applied to the proposed project should be explicitly stated. This 
section should include, but not necessarily be limited to a description 
of:
    (1) The proposed investigations, experiments, or research support 
enhancements in the sequence in which they will be carried out.
    (2) Procedures and techniques to be employed, including their 
feasibility.
    (3) Means by which data will be collected and analyzed.
    (4) Pitfalls that might be encountered.
    (5) Limitations to proposed procedures
    (C) Timetable. Provide a timetable for execution of the project. 
Identify all important research milestones and dates as they relate to 
project start-up, execution, dissemination, evaluation, and close-out.
    (ii) Evaluation plans.
    (A) Provide a plan for evaluating the accomplishment of stated 
objectives during the conduct of the project. Indicate the criteria, 
and corresponding weight of each, to be used in the evaluation process, 
describe any performance data to be collected and analyzed, and explain 
the methodologies that will be used to determine the extent to which 
the needs underlying the project are being met.
    (B) Provide a plan for evaluating the effectiveness of the end 
results upon conclusion of the project. Include the same kinds of 
information requested in Sec. 3406.13(f)(2)(ii)(A).
    (iii) Dissemination plans. Provide plans for disseminating project 
results and products including the possibilities for publications. 
Identify target audiences and explain methods of communication.
    (iv) Partnerships and collaborative efforts.
    (A) Explain how the project will maximize partnership ventures and 
collaborative efforts to strengthen food and agricultural sciences 
higher education (e.g., involvement of faculty in related disciplines 
at the same institution, joint projects with other colleges or 
universities, or cooperative activities with business or industry). 
Also explain how it will stimulate academia, the States, or the private 
sector to join with the Federal partner in enhancing food and 
agricultural science higher education.
    (B) Provide evidence, via letters from the parties involved, that 
arrangements necessary for collaborative partnerships or joint 
initiatives have been discussed and realistically can be expected to 
come to fruition, or actually have been finalized contingent on an 
award under this program. Letters must be signed by an official who has 
the authority to commit the resources of the organization. Such letters 
should be referenced in the plan of operation, but the actual letters 
should be included in the Appendix section of the proposal. Any 
potential conflict(s) of interest that might result from the proposed 
collaborative arrangements must be discussed in detail. Proposals which 
indicate joint projects with other institutions must state which 
proposer is to receive any resulting grant award, since only one 
submitting institution can be the recipient of a project grant under 
one proposal.
    (C) Explain how the project will create a new or enhance an 
existing partnership between the USDA agency cooperator(s) and the 1890 
Institution(s). This section should expand upon the summary information 
provided in the documentation of USDA agency cooperation section, as 
outlined in paragraph (c)(1) of this section. This is particularly 
important because the focal point of attention in the peer review 
process is the proposal narrative. Therefore, a comprehensive 
discussion of the partnership effort between USDA and the 1890 
Institution should be provided.
    (3) Institutional capacity building.
    (i) Institutional enhancement. Explain how the proposed project 
will strengthen the research capacity, as defined in Sec. 3406.2 of 
this part, of the applicant institution and, if applicable, any other 
institutions assuming a major role in the conduct of the project. For 
example, describe how the proposed project is intended to strengthen 
the institution's research infrastructure by advancing the expertise of 
the current faculty in the natural or social sciences; providing a 
better research environment, state-of-the-art equipment, or supplies; 
enhancing library collections; or enabling the institution to provide 
efficacious organizational structures and reward systems to attract and 
retain first-rate research faculty and students--particularly those 
from underrepresented groups.
    (ii) Institutional commitment.
    (A) Discuss the institution's commitment to the project and its 
successful completion. Provide, as relevant, appropriate documentation 
in the Appendix. Substantiate that the 

[[Page 66028]]
institution attributes a high priority to the project.
    (B) Discuss how the project will contribute to the achievement of 
the institution's long-term (five- to ten-year) goals and how the 
project will help satisfy the institution's high-priority objectives. 
Show how this project is linked to and supposed by the institution's 
strategic plan.
    (C) Discuss the commitment of institutional resources to the 
project. Show that the institutional resources to be made available to 
the project will be adequate, when combined with the support requested 
from USDA, to carry out the activities of the project and represent a 
sound commitment by the institution. Discuss institutional facilities, 
equipment, computer services, and other appropriate resources available 
to the project.
    (g) Key personnel. A From CSRS-710, ``Summary Vita--Research 
Proposal,'' should be included for each key person associated with the 
project.
    (h) budget and cost-effectiveness.
    (1) Budget form.
    (i) Prepare Form CSRS-713, ``Higher Education Budget,'' in 
accordance with instructions provided with the form. Proposals may 
request support for a period to be identified in each year's program 
announcement. A budget form is required for each year of requested 
support. In addition, a summary budget is required detailing the 
requested total support for the overall project period. Form CSRS-713 
may be reproduced as needed by proposers. Funds may be requested under 
any of the categories listed on the form, provided that the item or 
service for which support is requested is allowable under the 
authorizing legislation, the applicable Federal cost principles, these 
administrative provisions, and can be justified as necessary for 
successful conduct of the proposed project.
    (ii) The approved negotiated research rate or the maximum rate 
allowed by law should be used when computing indirect costs. If a 
reduced rate of indirect costs is voluntarily requested from USDA, the 
remaining allowable indirect costs may be used as matching funds. In 
the event that a proposal reflects an incorrect indirect cost rate and 
is recommended for funding, the correct rate will be applied to the 
approved budget in the grant award.
    (2) Matching funds. When documenting matching contributions, use 
the following guidelines:
    (i) When preparing the column of Form CSRS-713 entitled ``Applicant 
Contributions To Matching Funds,'' only those costs to be contributed 
by the applicant for the purposes of matching should be shown. The 
total amount of this column should be indicated in item M.
    (ii) In item N of Form CSRS-713, show a total dollar amount for 
Cash Contributions from both the applicant and any third parties; also 
show a total dollar amount (based on current fair market value) for 
Non-cash Contributions from both the applicant and any third parties.
    (iii) To qualify for an incentive benefits stemming from matching 
support or to satisfy any cost sharing requirements, proposals must 
include written verification of any actual commitments of matching 
support (including both cash and non-cash contributions) from third 
parties. Written verification means--
    (A) For any third party cash contributions, a separate pledge 
agreement for each donation, signed by the authorized organizational 
representatives of the donor organization (or by the donor if the gift 
is from an individual) and the applicant institution, which must 
include:
    (1) The name, address and telephone number of the donor;
    (2) The name of the applicant institution;
    (3) The title of the project for which the donation is made;
    (4) The dollar amount of the cash donation; and
    (5) A statement that the donor will pay the cash contribution 
during the grant period; and
    (B) For any third party non-cash contributions, a separate pledge 
agreement for each contribution, signed by the authorized 
organizational representatives of the donor organization (or by the 
donor if the gift is from an individual) and the applicant institution, 
which must include:
    (1) The name, address, and telephone number of the donor;
    (2) The name of the applicant institution;
    (3) The title of the project for which the donation is made;
    (4) A good faith estimate of the current fair market value of the 
non-cash contribution; and
    (5) A statement that the donor will make the contribution during 
the grant period.
    (iv) All pledge agreements must be placed in the proposal 
immediately following Form CSRS-713. The sources and amounts of all 
matching support from outside the applicant institution should be 
summarized in the Budget Narrative section of the proposal.
    (v) Applicants should refer to OMB Circulars A-110, ``Uniform 
Administrative Requirements for Grants and Agreements With Institutions 
of Higher Education, Hospitals and Other Non-profit Organizations,'' 
and A-21, ``Cost Principles for Educational Institutions,'' for further 
guidance and other requirements relating to matching and allowable 
costs.
    (3) Chart on shared budget for joint project proposal.
    (i) For a joint project proposal, a plan must be provided 
indicating how funds will be distributed to the participating 
institutions. The budget section of a joint project proposal should 
include a chart indicating:
    (A) The names of the participating institutions;
    (B) The amount of funds to be disbursed to those institutions; and
    (C) The way in which such funds will be used in accordance with 
items A through L of Form CSRS-713, ``Higher Education Budget.''
    (ii) If a proposal is not for a joint project, such a chart is not 
required.
    (4) Budget narrative.
    (i) Discuss how the budget specifically supports the proposed 
project activities. Explain how each budget item (such as salaries and 
wages for professional and technical staff, student workers, travel, 
equipment, etc.) is essential to achieving project objectives.
    (ii) Justify that the total budget, including funds requested from 
USDA and any matching support provided, will be adequate to carry out 
the activities of the project. Provide a summary of sources and amounts 
of all third party matching support.
    (iii) Justify the project's cost-effectiveness. Show how the 
project maximizes the use of limited resources, optimizes research 
value for the dollar, achieves economies of scale, or leverages 
additional funds. For example, discuss how the project has the 
potential to generate a critical mass of expertise and activity focused 
on a high-priority research initiatives(s) or promote coalition 
building that could lead to future ventures.
    (iv) Include the percentage of time key personnel will work on the 
project, both during the academic year and summer. When salaries of 
university project personnel will be paid by a combination of USDA and 
institutional funds, the total compensation must not exceed the faculty 
member's regular annual compensation. In addition, the total commitment 
of time devoted to the project, when combined with time for teaching 
and research duties, other sponsored agreements, and other employment 
obligations to the institution, must not exceed 100 percent of the 
normal workload for which the 

[[Page 66029]]
employee is compensated, in accordance with established university 
policies and applicable Federal cost principles.
    (v) If the proposal addresses more than one targeted need area, 
estimate the proportion of the funds requested from USDA that will 
support each respective targeted need area.
    (i) Current and pending support. Each applicant must complete Form 
CSRS-663, ``Current and Pending Support,'' identifying any other 
current public- or private-sponsored projects, in addition to the 
proposed project, to which key personnel listed in the proposal under 
consideration have committed portions of their time, whether or not 
salary support for the person(s) involved is included in the budgets of 
the various projects. This information should also be provided for any 
pending proposals which are currently being considered by, or which 
will be submitted in the near future to, other possible sponsors, 
including other USDA programs or agencies. Concurrent submission of 
identical or similar projects to other possible sponsors will not 
prejudice the review or evaluation of a project under this program.
    (j) Appendix. Each project narrative is expected to be complete in 
itself and to meet the 20-page limitation. Inclusion of material in the 
Appendix should not be used to circumvent the 20-page limitation of the 
proposal narrative. However, in those instances where inclusion of 
supplemental information is necessary to guarantee the peer review 
panel's complete understanding of a proposal or to illustrate the 
integrity of the design or a main thesis of the proposal, such 
information may be included in the Appendix. Examples of supplemental 
material are photographs, journal reprints, brochures and other 
pertinent materials which are deemed to be illustrative of major points 
in the narrative but unsuitable for inclusion in the proposal narrative 
itself. Information or previously submitted proposals may also be 
presented in the Appendix (refer to paragraph (e) of this section). 
When possible, information in the Appendix should be presented in 
tabular format. A complete set of the Appendix material must be 
attached to each copy of the grant application submitted. The Appendix 
must be identified with the title of the project as it appears on Form 
CSRS-712 of the proposal and the name(s) of the principal 
investigator(s). The Appendix must be referenced in the proposal 
narrative.
    (k) Special considerations. A number of situations encountered in 
the conduct of research require special information or supporting 
documentation before funding can be approved for the project. If such 
situations are anticipated, proposals must so indicate via completion 
of Form CSRS-662, ``Assurance Statement(s).'' It is expected that some 
applications submitted in response to these guidelines will involve the 
following:
    (1) Recombinant DNA research. All key personnel identified in the 
proposal and all endorsing officials of the proposing organization are 
required to comply with the guidelines established by the National 
Institutes of Health entitled ``Guidelines for Research Involving 
Recombinant DNA Molecules,'' as revised. All applicants proposing to 
use recombinant DNA techniques must so indicate by checking the 
appropriate box on Form CSRS-712, ``Higher Education Proposal Cover 
Page,'' and by completing the applicable section of Form CSRS-662. In 
the event a project involving recombinant DNA or RNA molecules results 
in a grant award, the Institutional Biosafety Committee of the 
proposing institution must approve the research plan before CSREES will 
release grant funds.
    (2) Protection of human subjects. Responsibility for safeguarding 
the rights and welfare of human subjects used in any grant project 
supported with funds provided by CSREES rests with the performing 
organization. Guidance on this is contained in the Department of 
Agriculture regulations under 7 CFR part 1c. All applicants who propose 
to use human subjects for experimental purposes must indicate their 
intention by checking the appropriate block on Form CSRS-712, ``Higher 
Education Proposal Cover Page,'' and by completing the appropriate 
portion of Form CSRS-662. In the event a project involving human 
subjects results in a grant award, the Institutional Review Board of 
the proposing institution must approve the research plan before CSREES 
will release grant funds.
    (3) Laboratory animal care. Responsibility for the humane care and 
treatment of laboratory animals used in any grant project supported 
with funds provided by CSREES rests with the performing organization. 
All key project personnel and all endorsing officials of the proposing 
organization are required to comply with the Animal Welfare Act of 
1966, as amended (7 U.S.C. 2131 et seq.), and the regulations 
promulgated thereunder by the Secretary of Agriculture in 9 CFR parts 
1, 2, 3, and 4 pertaining to the care, handling, and treatment of 
laboratory animals. All applicants proposing a project which involves 
the use of laboratory animals must indicate their intention by checking 
the appropriate block on Form CSRS-712, ``Higher Education Proposal 
Cover Page,'' and by completing the appropriate portion of Form CSRS-
662. In the event a project involving the use of living vertebrate 
animals results in a grant award, the Institutional Animal Care and Use 
Committee of the proposing institution must approve the research plan 
before CSREES will release grant funds.
    (l) Compliance with the National Environmental Policy Act (NEPA). 
As outlined in 7 CFR part 3407 (CSREES's implementing regulations of 
the National Environmental Policy Act of 1969), environmental data for 
the proposed project is to be provided to CSREES in order for a 
determination to be made as to the need for any further action such as 
preparation of an environmental assessment (EA) or environmental impact 
statement (EIS).
    (1) NEPA determination statement. In order for a determination to 
be made, pertinent information regarding environmental activities is 
necessary; therefore, Form CSRS-1234, ``National Environmental Policy 
Act Exclusions Form,'' along with supporting documentation, must be 
included in the proposal indicating whether or not the project falls 
under USDA categorical exclusions as defined in 7 CFR 1b.3 (and 
restated at 7 CFR 3407.6(a)(1)) or CSREES categorical exclusions 
defined at 7 CFR 3407.6(a)(2) (i) and (ii). The information should be 
identified in the Table of Contents as ``NEPA Determination Statement'' 
and Form CSRS-1234 and the supporting documentation should be placed at 
the back of the proposal.
    (2) Exceptions to categorical exclusions. An EA or EIS shall be 
prepared for an activity which is normally within the purview of 
categorical exclusion where it is determined by CSREES that substantial 
controversy on environmental grounds exists or that other extraordinary 
conditions or circumstances are present which may cause such activity 
to have a significant environmental effect.

Subpart F--Review and Evaluation of a Research Proposal

Sec.  3406.19   Proposal review--research.

    The proposal evaluation process includes both internal staff review 
and merit evaluation by peer review panels comprised of scientists, 
educators, business representatives, and Government officials who are 
highly qualified to render expert advice in the areas supported. Peer 
review panels will be selected and structured to provide 

[[Page 66030]]
optimum expertise and objective judgment in the evaluation of 
proposals.

Sec.  3406.20  Evaluation criteria for research proposals.

    The maximum score a research proposal can receive is 150 points. 
Unless otherwise stated in the annual solicitation published in the 
Federal Register, the peer review panel will consider the following 
criteria and weights to evaluate proposals submitted.

------------------------------------------------------------------------
                                                                 Weight 
                    Evaluation Criterion                       (points) 
------------------------------------------------------------------------
(a) Significance of the problem:                                        
    This criterion is used to assess the likelihood that the            
     project will advance or have a substantial impact upon             
     the body of knowledge constituting the natural and                 
     social sciences undergirding the argicultural, natural             
     resources, and food systems.                                       
        (1) Impact--Is the problem or opportunity to be                 
         addressed by the proposed project clearly                      
         identified, outlined, and delineated? Are research             
         questions or hypotheses precisely stated? Is the               
         project likely to further advance food and                     
         agricultural research and knowledge? Does the                  
         project have potential for augmenting the food and             
         agricultural scientific knowledge base? Does the               
         project address a State, regional, national, or                
         international problem(s)? Will the benefits to be              
         derived from the project transcend the applicant               
         institution or the grant period?...................          15
        (2) Continuation plans--Are there plans for                     
         continuation or expansion of the project beyond                
         USDA support? Are there plans for continuing this              
         line of research or research support activity with             
         the use of institutional funds after the end of the            
         grant? Are there indications of external, non-                 
         Federal support? Are there realistic plans for                 
         making the project self-supporting? What is the                
         potential for royalty or patent income, technology             
         transfer or university-business enterprises? What              
         are the probabilities of the proposed activity or              
         line of inquiry being pursued by researchers at                
         other institutions?................................          10
        (3) Innovation--Are significant aspects of the                  
         project based on an innovative or a non-traditional            
         approach? Does the project reflect creative                    
         thinking? To what degree does the venture reflect a            
         unique approach that is new to the applicant                   
         institution or new to the entire field of study?...          10
        (4) Products and results--Are the expected products             
         and results of the project clearly outlined and                
         likely to be of high quality? Will project results             
         be of an unusual or unique nature? Will the project            
         contribute to a better understanding of or an                  
         improvement in the quality, distribution, or                   
         effectiveness of the Nation's food and agricultural            
         scientific and professional expertise base, such as            
         increasing the participation of women and                      
         minorities?........................................          15
(b) Overall approach and cooperative linkages:                          
    This criterion relates to the soundness of the proposed             
     approach and the quality of the partnerships likely to             
     evolve as a result of the project.                                 
        (1) Proposed approach--Do the objectives and plan of            
         operation appear to be sound and appropriate                   
         relative to the proposed initiative(s) and the                 
         impact anticipated? Is the proposed sequence of                
         work appropriate? Does the proposed approach                   
         reflect sound knowledge of current theory and                  
         practice and awareness of previous or ongoing                  
         related research? If the proposed project is a                 
         continuation of a current line of study or                     
         currently funded project, does the proposal include            
         sufficient preliminary data from the previous                  
         research or research support activity? Does the                
         proposed project flow logically from the findings              
         of the previous stage of study? Are the procedures             
         scientifically and managerially sound? Are                     
         potential pitfalls and limitations clearly                     
         identified? Are contingency plans delineated? Does             
         the timetable appear to be readily achievable?.....          15
        (2) Evaluation--Are the evaluation plans adequate               
         and reasonable? Do they allow for continuous or                
         frequent feedback during the life of the project?              
         Are the individuals involved in project evaluation             
         skilled in evaluation strategies and procedures?               
         Can they provide an objective evaluation? Do                   
         evaluation plans facilitate the measurement of                 
         project progress and outcomes......................           5
        (3) Dissemination--Does the proposed project include            
         clearly outlined and realistic mechanisms that will            
         lead to widespread dissemination of project                    
         results, including national electronic                         
         communication systems, publications and                        
         presentations at professional society meetings?....           5
        (4) Partnerships and collaborative efforts--Does the            
         project have significant potential for advancing               
         cooperative ventures between the applicant                     
         institution and a USDA agency? Does the project                
         workplan include an effective role for the                     
         cooperating USDA agencie(s)? Will the project                  
         encourage and facilitate better working                        
         relationships in the university science community,             
         as well as between universities and the public or              
         private sector? Does the project encourage                     
         appropriate multidisciplinary collaboration? Will              
         the project lead to long-term relationships or                 
         cooperative partnerships that are likely to enhance            
         research quality or supplement available resources?          15
(c) Institutional capacity building:                                    
    This criterion relates to the degree to which the                   
     project will strengthen the research capacity of the               
     applicant institution. In the case of a joint project              
     proposal, it relates to the degree to which the project            
     will strengthen the research capacity of the applicant             
     institution and that of any other institution assuming             
     a major role in the conduct of the project.                        
        (1) Institutional enhancement--Will the project help            
         the institution to advance the expertise of current            
         faculty in the natural or social sciences; provide             
         a better research environment, state-of-the-art                
         equipment, or supplies; enhance library collections            
         related to the area of research; or enable the                 
         institution to provide efficacious organizational              
         structures and reward systems to attract, hire and             
         retain first-rate research faculty and students--              
         particularly those from underrepresented groups....          15
        (2) Institutional commitment--Is there evidence to              
         substantiate that the institution attributes a high-           
         priority to the project, that the project is linked            
         to the achievement of the institution's long-term              
         goals, that it will help satisfy the institution's             
         high-priority objectives, or that the project is               
         supported by the institution's strategic plans?                
         Will the project have reasonable access to needed              
         resources such as scientific instrumentation,                  
         facilities, computer services, library and other               
         research support resources?........................          15
(d) Personnel Resources:                                                
    This criterion relates to the number and qualifications             
     of the key persons who will carry out the project. Are             
     designated project personnel qualified to carry out a              
     successful project? Are there sufficient numbers of                
     personnel associated with the project to achieve the               
     stated objectives and the anticipated outcomes? Will               
     the project help develop the expertise of young                    
     scientists at the doctoral or post-doctorate level?....          10
(e) Budget and cost-effectiveness:                                      

[[Page 66031]]
                                                                        
    This criterion relates to the extent to which the total             
     budget adequately supports the project and is cost-                
     effective.                                                         
        (1) Budget--Is the budget request justifiable? Are              
         costs reasonable and necessary? Will the total                 
         budget be adequate to carry out project activities?            
         Are the source(s) and amount(s) of non-Federal                 
         matching support clearly identified and                        
         appropriately documented? For a joint project                  
         proposal, is the shared budget explained clearly               
         and in sufficient detail?..........................          10
        (2) Cost-effectiveness--Is the proposed project cost-           
         effective? Does it demonstrate a creative use of               
         limited resources, maximize research value per                 
         dollar of USDA support, achieve economies of scale,            
         leverage additional funds or have the potential to             
         do so, focus expertise and activity on a high-                 
         priority research initiative(s), or promote                    
         coalition building for current or future ventures?.           5
(f) Overall quality of proposal:                                        
    This criterion relates to the degree to which the                   
     proposal complies with the application guidelines and              
     is of high quality. Is the proposal enhanced by its                
     adherence to instructions (table of contents,                      
     organization, pagination, margin and font size, the 20-            
     page limitation, appendices, etc.); accuracy of forms;             
     clarity of budget narrative; well prepared vitae for               
     all key personnel associated with the project; and                 
     presentation (are ideas effectively presented, clearly             
     articulated, thoroughly explained, etc.)?..............           5
------------------------------------------------------------------------

Subpart G--Submission of a Teaching or Research Proposal

Sec. 3406.21  Intent to submit a proposal.

    To assist CSREES in preparing for the review of proposals, 
institutions planning to submit proposals may be requested to complete 
Form CSRS-711, ``Intent to Submit a Proposal,'' provided in the 
application package. CSREES will determine each year if Intent to 
Submit a Proposal forms will be requested and provide such information 
in the program announcement. If Intent to Submit a Proposal forms are 
required, one form should be completed and returned for each proposal 
an institution anticipates submitting. Submitting this form does not 
commit an institution to any course of action, nor does failure to send 
this form prohibit an institution from submitting a proposal.

Sec. 3406.22  When and where to submit a proposal.

    The program announcement will provide the deadline date for 
submitting a proposal, the number of copies of each proposal that must 
be submitted, and the address to which proposals must be submitted.

Subpart H--Supplementary Information

Sec. 3406.23  Access to peer review information.

    After final decisions have been announced, CSREES will, upon 
request, inform the project director of the reasons for its decision on 
a proposal. Verbatim copies of summary reviews, not including the 
identity of the reviewers, will be made available to respective project 
directors upon specific request.

Sec. 3406.24  Grant awards.

    (a) General. Within the limit of funds available for such propose, 
the authorized departmental officer shall make project grants to those 
responsible, eligible applicants whose proposals are judged most 
meritorious in the announced targeted need areas under the evaluation 
criteria and procedures set forth in this part. The beginning of the 
project period shall be no later than September 30 of the Federal 
fiscal year in which the project is approved for support. All funds 
granted under this part shall be expended solely for the purpose for 
which the funds are granted in accordance with the approved application 
and budget, the regulations of this part, the terms and conditions of 
the award, the applicable Federal cost principles, and the Department's 
Uniform Federal Assistance Regulations (7 CFR part 3015).
    (b) Organization management information. Specific management 
information relating to a proposing institution shall be submitted on a 
one-time basis prior to the award of a project grant identified under 
this part if such information has not been provided previously under 
this or another program for which the sponsoring agency is responsible. 
Copies of forms used to fulfill this requirement will be sent to the 
proposing institution by the sponsoring agency as part of the pre-award 
process.
    (c) Notice of grant award. The grant award document shall include 
at a minimum the following:
    (1) Legal name and address of performing organization.
    (2) Title of project.
    (3) Name(s) and address(es) of principal investigator(s)/project 
director(s).
    (4) Identifying grant number assigned by the Department.
    (5) Project period, which specifies how long the Department intend 
to support the effort without requiring reapplication for funds.
    (6) Total amount of Federal financial assistance approved during 
the project period.
    (7) Legal authority(ies) under which the grant is awarded.
    (8) Approved budget plan for categorizing allocable project funds 
to accomplish the stated purpose of the grant award.
    (9) Other information or provisions deemed necessary by the 
Department to carry out its granting activities or to accomplish the 
purpose of this particular project grant.
    (d) Obligation of the Federal Government. Neither the approval of 
any application nor the award of any project grant shall legally commit 
or obligate CSREES or the United States to provide further support of a 
project or any portion thereof.

Sec. 3406.25  Use of funds; changes.

    (a) Delegation of fiscal responsibility. The grantee may not in 
whole or in part delegate or transfer to another person, institution, 
or organization the responsibility for use or expenditure of grant 
funds.
    (b) Change in project plans. (1) The permissible changes by the 
grantee, project director(s), or other key project personnel in the 
approved project grant shall be limited to changes in methodology, 
techniques, or other aspects of the project to expedite achievement of 
the project's approved goals. If the grantee or the project director(s) 
are uncertain as to whether a change complies with this provision, the 
question must be referred to the Department for a final determination.
    (2) Changes in approved goals, or objectives, shall be requested by 
the grantee and approved in writing by the authorized departmental 
officer prior to effecting such changes. In no event shall requests for 
such changes be approved which are outside the scope of the approved 
project.
    (3) Changes in approved project leadership or the replacement or 
reassignment of other key project personnel shall be requested by the 
grantee and approved in writing by the authorized departmental officer 
prior to effecting such changes. 

[[Page 66032]]

    (4) Transfers of actual performance of the substantive programmatic 
work in whole or in part and provisions for payment of funds, whether 
or not Federal funds are involved, shall be requested by the grantee 
and approved in writing by the authorized departmental officer prior to 
effecting such transfers.
    (c) Changes in project period. The project period may be extended 
by the authorized departmental officer without additional financial 
support for such additional period(s) as the authorized departmental 
officer determines may be necessary to complete or fulfill the purposes 
of an approved project. However, due to statutory restriction, no grant 
may be extended beyond five years from the original start date of the 
grant. Grant extensions shall be conditioned upon prior request by the 
grantee and approval in writing by the authorized departmental officer.
    (d) Changes in approved budget. Changes in an approved budget must 
be requested by the grantee and approved in writing by the authorized 
departmental officer prior to instituting such changes if the revision 
will:
    (1) Involved transfers of amounts budgeted for indirect costs to 
absorb an increase in direct costs;
    (2) Involve transfers of amounts budgeted for direct costs to 
accommodate changes in indirect cost rates negotiated during a budget 
period and not approved when a grant was awarded; or
    (3) Involve transfers or expenditures of amounts requiring prior 
approval as set forth in the applicable Federal cost principles, 
Departmental regulations, or in the grant award.

Sec. 3406.26  Monitoring progress of funded projects.

    (a) During the tenure of a grant, project directors must attend at 
least one national project directors meeting, if offered, in 
Washington, D.C. or any other announced location. The purpose of the 
meeting will be to discuss project and grant management, opportunities 
for collaborative efforts, future directions for education reform, 
research project management, advancing a field of science, and 
opportunities to enhance dissemination of exemplary end products/
results.
    (b) An Annual Performance Report must be submitted to the USDA 
program contact person within 90 days after the completion of the first 
year of the project and annually thereafter during the life of the 
grant. Generally, the Annual Performance Reports should include a 
summary of the overall progress toward project objectives, current 
problems or unusual developments, the next year's planned activities, 
and any other information that is pertinent to the ongoing project or 
which may be specified in the terms and conditions of the award. These 
reports are in addition to the annual Current Research Information 
System (CRIS) reports required for all research grants under the 
award's ``Special Terms and Conditions.''
    (c) A Final Performance Report must be submitted to the USDA 
program contact person within 90 days after the expiration date of the 
project. The expiration date is specified in the award documents and 
modifications thereto, if any. Generally, the Final Performance Report 
should be a summary of the completed project, including: a review of 
project objectives and accomplishments; a description of any products 
and outcomes resulting from the project; activities undertaken to 
disseminate products and outcomes; partnerships and collaborative 
ventures that resulted from the project; future initiatives that are 
planned as a result of the project; the impact of the project on the 
project director(s), the institution, and the food and agricultural 
sciences higher education system; and data on project personnel and 
beneficiaries. The Final Performance Report should be accompanied by 
samples or copies of any products or publications resulting from or 
developed by the project. The Final Performance Report must also 
contain any other information which may be specified in the terms and 
conditions of the award.

Sec. 3406.27  Other Federal statutes and regulations that apply.

    Several other Federal statutes and regulations apply to grant 
proposals considered for review and to project grants awarded under 
this part. These include but are not limited to:
    7 CFR part 1, subpart A--USDA implementation of Freedom of 
Information Act.
    7 CFR part 3--USDA implementation of OMB Circular No. A-129 
regarding debt collection.
    7 CFR part 15, subpart A--USDA implementation of Title VI of the 
Civil Rights Act of 1964, as amended.
    7 CFR part 3015--USDA Uniform Federal Assistance Regulations, 
implementing OMB directives (i.e., Circular Nos. A-21 and A-122) and 
incorporating provisions of 31 U.S.C. 6301-6308 (the Federal Grant and 
Cooperative Agreement Act of 1977, Public Law 95-224), as well as 
general policy requirements applicable to recipients of Departmental 
financial assistance.
    7 CFR part 3017--Governmentwide Debarment and Suspension 
(Nonprocurement); Governmentwide Requirements for Drug-Free Workplace 
(Grants), implementing Executive Order 12549 on debarment and 
suspension and the Drug-Free Workplace Act of 1988 (41 U.S.C. 701).
    7 CFR part 3018--Restrictions on Lobbying, prohibiting the use of 
appropriated funds to influence Congress or a Federal agency in 
connection with the making of any Federal grant and other Federal 
contracting and financial transactions.
    7 CFR part 3019--USDA implementation of OMB Circular A-110, Uniform 
Administrative Requirements for Grants and Agreements With Institutions 
of Higher Education, Hospitals, and Other Nonprofit Organizations.
    7 CFR part 3051--Audits of Institutions of Higher Education and 
other Nonprofit Institutions.
    29 U.S.C. 794, section 504--Rehabilitation Act of 1973, and 7 CFR 
part 15b (USDA implementation of statute), prohibiting discrimination 
based upon physical or mental handicap in Federally assisted programs.
    35 U.S.C. 200 et seq.--Bayh-Dole Act, controlling allocation of 
rights to inventions made by employees of small business firms and 
domestic nonprofit organizations, including universities, in Federally 
assisted programs (implementing regulations are contained in 37 CFR 
part 401).

Sec. 3406.28  Confidential aspects of proposals and awards.

    When a proposal results in a grant, it becomes a part of the record 
of the Agency's transactions, available to the public upon specific 
request. Information that the Secretary determines to be of a 
privileged nature will be held in confidence to the extent permitted by 
law. Therefore, any information that the applicant wishes to have 
considered as privileged should be clearly marked as such and sent in a 
separate statement, two copies of which should accompany the proposal. 
The original copy of a proposal that does not result in a grant will be 
retained by the Agency for a period of one year. Other copies will be 
destroyed. Such a proposal will be released only with the consent of 
the applicant or to the extent required by law. A proposal may be 
withdrawn at any time prior to the final action thereon.

Sec. 3406.29  Evaluation of program.

    Grantees should be aware that CSREES may, as a part of its own 
program evaluation activities, carry out 

[[Page 66033]]
in-depth evaluations of assisted activities. Thus, grantees should be 
prepared to cooperate with CSREES personnel, or persons retained by 
CSREES, evaluating the institutional context and the impact of any 
supported project. Grantees may be asked to provide general information 
on any students and faculty supported, in whole or in part, by a grant 
awarded under this program; information that may be requested includes, 
but is not limited to, standardized academic achievement test scores, 
grade point average, academic standing, career patterns, age, race/
ethnicity, gender, citizenship, and disability.

    Done at Washington, D.C., this 11th day of December 1995.
Colien Hefferan,
Acting Administrator, Cooperative State Research, Education, and 
Extension Service.
[FR Doc. 95-30625 Filed 12-19-95; 8:45 am]
BILLING CODE 3410-22-M

Complete official Federal Register PDF

FR Doc. 95-30547 Flight Crewmember Duty Period Limitations, Flight Time Limitations and Rest Requirements
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65951-65977]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30547]

Federal Register / Vol. 60, No. 244 / Wednesday, December 20, 1995 / 
Proposed Rules
=======================================================================
-----------------------------------------------------------------------

[[Page 65951]]

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Parts 121, 135

[Docket No. 28081; Notice No. 95-18]
RIN 2120-AF63

Flight Crewmember Duty Period Limitations, Flight Time 
Limitations and Rest Requirements

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: The FAA proposes to amend existing regulations to establish 
one set of duty period limitations, flight time limitations, and rest 
requirements for flight crewmembers engaged in air transportation. The 
proposal results from public and congressional interest in regulating 
flight crewmember rest requirements, NTSB Safety Recommendations, 
petitions for rulemaking, and scientific data contained in recent 
National Aeronautics and Space Administration (NASA) studies relating 
to flight crewmember duty periods, flight times, and rest. The proposal 
would update the regulations and replace certain out-dated regulations 
with a simplified regulatory approach based upon scientific studies of 
fatigue. The objective of the proposal is to contribute to an improved 
aviation safety system by ensuring that flight crewmembers are provided 
with the opportunity to obtain sufficient rest to perform their routine 
and emergency safety duties.

DATES: Comments must be received on or before March 19, 1996.

ADDRESSES: Send or deliver comments on this notice in triplicate to: 
Federal Aviation Administration, Office of the Chief Counsel, 
Attention: Rules Docket (AGC-200), Room 915G, Docket No. 28081, 800 
Independence Avenue, SW, Washington, DC 20591. Comments may also be 
submitted to the Rules Docket by using the following Internet address: 
[email protected]. Comments must be marked Docket No. 28081. 
Comments may be examined in the Rules Docket in Room 915G on weekdays 
between 8:30 a.m. and 5:00 p.m., except on Federal holidays.

FOR FURTHER INFORMATION CONTACT: Larry Youngblut, Project Development 
Branch, AFS-240, Air Transportation Division, Flight Standards Service, 
Room 829, Federal Aviation Administration, 800 Independence Avenue, 
SW., Washington, DC 20591; telephone (202) 267-3755.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested persons are invited to participate in this rulemaking by 
submitting written data, views, or arguments, and by commenting on the 
possible environmental, economic, and federalism- or energy-related 
impact of the adoption of this proposal. Comments concerning the 
proposed implementation and effective date of the rule are also 
specifically requested.
    Comments should carry the regulatory docket or notice number and 
should be submitted in triplicate to the Rules Docket address specified 
above. All comments received and a report summarizing any substantive 
public contact with FAA personnel on this rulemaking will be filed in 
the docket. The docket is available for public inspection both before 
and after the closing date for receiving comments.
    Before taking any final action on this proposal, the Administrator 
will consider the comments made on or before the closing date for 
comments, and the proposal may be changed in light of the comments 
received.
    The FAA will acknowledge receipt of a comment if the commenter 
includes a self-addressed, stamped postcard with the comment. The 
postcard should be marked ``Comments to Docket No. 28081.'' When the 
comment is received by the FAA, the postcard will be dated, time 
stamped, and returned to the commenter.

Availability of the NPRM

    Any person may obtain a copy of this NPRM by submitting a request 
to the Federal Aviation Administration, Office of Public Affairs, 
Attention: Public Inquiry Center, APA-430, 800 Independence Avenue SW., 
Washington, DC 20591, or by calling (202) 267-3484. Communications must 
identify the notice number of this NPRM.
    Persons interested in being placed on a mailing list for future FAA 
NPRM's should request a copy of Advisory Circular No. 11-2A, Notice of 
Proposed Rulemaking Distribution System, which describes application 
procedures.

Background

    The aviation industry requires 24-hour activities to meet 
operational demands. Growth in global long-haul, regional, overnight 
cargo, and short-haul domestic operations is likely to increase round-
the-clock requirements. Flight crews must be available to support 24-
hour a day operations to meet these industry demands. Both domestic and 
international aviation frequently require crossing multiple time zones. 
Therefore, shift work, night work, irregular work schedules, 
unpredictable work schedules, and time zone changes will continue to be 
commonplace components of the aviation industry. These factors affect 
human physiology by causing performance-impairing fatigue that can 
affect the level of safety. The FAA believes that it is critical, 
whenever possible, to incorporate scientific information on fatigue and 
human sleep physiology into regulations on flight crew scheduling. Such 
scientific information can help to maintain the safety margin and 
promote optimum crew performance and alertness during flight 
operations.
    Over the past 40 years, scientific knowledge about sleep, sleep 
disorders, circadian physiology, fatigue, sleepiness/alertness, and 
performance decrements has grown significantly. Some of this scientific 
knowledge, gained through field and simulator studies, has confirmed 
that aviators experience performance-impairing fatigue from sleep loss 
resulting from current flight and duty practices. Incorporation of 
scientific knowledge on fatigue into operations (e.g., regulatory 
scheduling considerations, personal strategies, fatigue 
countermeasures) would greatly benefit safety. A primary purpose of 
this rulemaking is to incorporate as much as possible of the scientific 
knowledge into the applicable regulations.
    A second purpose of this proposed rulemaking is to establish 
consistent and clear duty period limitations, flight time limitations, 
and rest requirements for all types of operations. The current 
regulations require revising because of their complexity and age. While 
domestic flight time limitations and some commuter limitations were 
updated in 1985, flag and supplemental operations were not. With 
advancements in new aircraft, these operational distinctions are no 
longer as meaningful as they once were. This proposal would establish 
the same duty period limitations, flight time limitations, and rest 
requirements for all types of operations in part 121 for domestic, 
flag, and supplemental operations and in part 135 for commuter and on-
demand operations. The duty period limitations, flight time 
limitations, and rest requirements would allow for differences based on 
the length of flights and number of flight crewmembers on a flight. 

[[Page 65952]]

General Discussion

Historical Review

    The Civil Aeronautics Act of 1938 (52 Stat. 1007; as amended by 62 
Stat. 1216, 49 U.S.C. 551) and subsequently, the Federal Aviation Act 
of 1958 (now codified at 49 U.S.C. 40101 et seq.) addressed the issue 
of regulating flight crewmember hours of service. The Federal Aviation 
Act, as amended, empowers and directs the Secretary of Transportation 
to promote the safety of civil air flight in air commerce by 
prescribing and revising from time to time ``reasonable rules and 
regulations governing, in the interest of safety, the maximum hours or 
periods of service of airmen, and other employees.''
    Despite many changes in the airline transportation industry over 
the 30 years before 1983, the rules governing flight time limitations 
and rest requirements remained virtually unchanged because no safety 
reasons had been presented which necessitated changes to the 
regulations. But the presumed level of safety established by these 
rules did not necessarily mean that the rules were as effective as they 
should have been when considered in light of changes that had occurred 
in the industry in the previous 30 years.
    In 1983, a significant rulemaking was initiated to clarify and 
simplify the regulations and to make them more applicable to the air 
transportation environment at that time. A significant driving force 
for amending the flight time regulations in 1983 was that the 
requirements under part 121 were so complicated that they had required 
thousands of pages of interpretation and had sometimes been incorrectly 
followed by air carriers.
    A second significant factor justifying amendment of the rules in 
1983 was their inflexibility. For example, although under the then 
existing rule, air carriers were not considered in violation of the 
rules if flight times were exceeded due to adverse weather conditions 
or other circumstances beyond the control of the air carrier, an air 
carrier did not have the flexibility to adjust scheduled rest periods 
in the event of late arrivals or other factors. If a flight was late, 
the subsequent flights often had to be delayed while substitute flight 
crewmembers were brought in or while the flight crewmembers received 
their scheduled rest periods.
    A third factor affecting the pre-1983 rules was, under deregulation 
of the air transportation industry, the number and variety of domestic 
certificate holders dramatically increased. The complexity and variety 
of the newer operations required that the FAA provide clear and simple 
minimum safety criteria for all operators.
    A fourth factor affecting the pre-1983 rules, and one related to 
the changing character of the air transportation industry, was the 
growth of commuter operations. Some commuter operations fall under part 
121 domestic rules while others fall under part 135 rules. A question 
existed as to whether either set of requirements effectively covered 
these comparatively new and growing operations. Thus an additional aim 
of the 1983-1985 rulemaking proceedings was to study the materials 
submitted by the commuter industry group and incorporate the findings 
into the applicable rules in order to provide, in this segment of the 
industry, a level of safety equivalent to other air transportation 
operations.
    The 1983-1985 rulemaking proceeding was not the FAA's first attempt 
to solve the previously described problems. For a number of years 
before 1983 the FAA recognized that the flight time limits and rest 
requirements needed to be clarified and substantively improved in those 
areas where they were potentially inadequate. On several occasions the 
FAA had attempted to correct the flight time limitation problems of 
both parts 121 and 135 through rulemaking actions. But because of the 
complexity of the flight time rules and the economic interests 
affected, none of the previous proposals succeeded in resolving the 
problems to the satisfaction of the affected parties. Given the 
importance of the flight time rules in air transportation safety, the 
FAA decided in 1983 to try an innovative approach that would bring the 
affected parties together to negotiate a resolution.
1983-1985 Regulatory Negotiation
    In 1983 regulatory negotiation was a new concept recommended by the 
Administrative Conference of the United States. Basically, it was a 
procedure by which representatives of all interests affected by a 
rulemaking could be brought together to fully discuss the issues under 
conditions conducive to narrowing or eliminating differences and to 
negotiating a proposed rule acceptable to each interest. In accordance 
with the recommended procedure, the FAA created an advisory committee 
chartered under the Federal Advisory Committee Act. The committee was 
comprised of persons representing the diverse interests affected by the 
flight time rules, including persons representing flight crewmembers, 
air carriers, air taxis, helicopter operators, and the public.
    The committee met for 16 days in 1983 under the direction of a 
convener/mediator and thoroughly discussed the major issues involved in 
the regulation of flight time limits and rest requirements for domestic 
operations under part 121 and for operations under part 135. Although 
the committee did not reach consensus on any particular proposal, its 
deliberations were successful in narrowing the differences among 
parties and in reaching substantial agreement on some issues. In 
addition, the committee identified major areas of concern and all 
parties obtained significant, new information on a subject which had 
been discussed, without resolution, for years. The committee 
deliberations led to a notice of proposed rulemaking [49 FR 12136, 
March 28, 1984] and then to a final rule [50 FR 29306, July 18, 1985]. 
The final rule reflected comments received from the organizations 
represented on the Advisory Committee and from others. The final rule 
accomplished the following major objectives:
    (1) It resolved a series-of-flights problem in part 121, domestic 
air carrier rules, thereby addressing many interpretation issues;
    (2) It established a new rest period requirement in part 121, 
domestic air carrier rules, for flight crewmembers scheduled to fly 8 
hours or less in 24 consecutive hours and allowed greater scheduling 
flexibility, including the introduction of a reduced rest period;
    (3) It upgraded the requirements for all operations in part 135, 
particularly scheduled operations; and
    (4) It incorporated into the rules certain exemptions that had wide 
applicability: The reduction of a 10-hour rest under part 135 under 
certain conditions; the extension of flight time with augmented crews; 
and the special limitations needed for helicopter medical emergency 
services.
ARAC Flight/Duty Working Group
    While the FAA's 1983-1985 flight time limitations rulemaking was a 
step forward in dealing with rest and flight time issues, the 
rulemaking was limited in its scope and did not address either flag or 
supplemental operations under part 121. The FAA recognized at the time 
that flag and supplemental rules would need to be updated because these 
rules contained some of the same language and problems contained in the 
domestic rules that were amended. Furthermore, though the 1985 
rulemaking clarified some of the flight time and rest requirements, it 
did not resolve the problems completely. Also, since the 1985 
rulemaking, the complexity of the rules and 

[[Page 65953]]
inconsistencies associated with various types of operations (domestic, 
flag, and supplemental under part 121 and commuter and on-demand under 
part 135) have continued to make application and interpretation 
burdensome. A number of petitions to amend the various sections were 
received (discussed in more detail later), as well as hundreds of 
letters concerning the interpretation of rest requirements for flight 
crewmembers assigned to a reserve status. Therefore, on June 15, 1992, 
the FAA announced [57 FR 26685] the establishment of the Flight 
Crewmember Flight/Duty Rest requirements working group (ARAC Flight/
Duty Working Group) of the Aviation Rulemaking Advisory Committee 
(ARAC).
    The ARAC had been established by the FAA in January 1991 [46 FR 
2190, January 22, 1991] as a vehicle for convening representatives of 
interested groups to assist the FAA in addressing regulatory problems 
in a forum that could use, in a less formal setting, many of the 
regulatory negotiation techniques that had been used by the 1983-1985 
flight time limitations advisory committee. The working group's task 
was to determine whether regulations pertaining to air carrier flight 
duty and rest requirements are consistently interpreted and understood 
by the FAA, air carriers, and pilots; to evaluate industry compliance/
practice regarding scheduling of reserve duty and rest periods; and to 
evaluate reports of excessive pilot fatigue as a result of such 
scheduling. The working group was to develop recommendations for 
advisory material and a regulatory revision as appropriate.
    Between its creation on June 15, 1992, and June 30, 1994, the ARAC 
Flight/Duty Working Group met on numerous occasions. The chairman of 
this working group (Dr. Donald E. Hudson of the Aviation Medicine 
Advisory Service) submitted a preliminary report on February 1, 1994, 
and a final report on June 30, 1994. The report indicated that while 
the working group did not reach a consensus on the specific issues, the 
working group did agree on four major areas that the FAA should address 
in future rulemaking actions: Absence of a duty time limitation; 
reserve scheduling; back-side-of-the-clock operations; and scheduled 
reduced rest. Each of the four areas is briefly described here. Three 
areas are specifically addressed in this rulemaking and one, back-side-
of-the-clock operations, is partially, though indirectly, addressed.
    Continuous or indefinite duty could occur under the current rules 
if flight crewmembers complete their daily schedule when delays 
encountered are beyond the control of the certificate holder, no matter 
how long it extends their duty period. The reserve scheduling issue 
concerns questions such as, do the same rest period requirements apply 
to flight crewmembers assigned to reserve duty as the rest period 
requirements that apply to flight crewmembers assigned to scheduled 
flights? Back-side-of-the clock operations refers to the question 
whether special duty limitations and rest requirements should be 
developed for operations that are scheduled during a flight 
crewmember's normal sleep cycle. The scheduled reduced rest issue 
concerns whether certificate holders should be allowed to schedule 
reduced rest in advance or whether reduced rest should only be allowed 
to deal with unavoidable delays.
    Because no consensus could be reached, Dr. Hudson's final report 
included proposals submitted by several members of the working group. 
It also stated that there is enough clear scientific guidance available 
to assist the FAA in establishing a regulatory ``safety floor'' that 
will both address the identified issues and not unfairly penalize 
carriers economically. The report further stated that there is not any 
physiological justification for having different work rules for part 
121 and 135 operators.
NASA Research Program
    In 1980, in response to a Congressional request, the National 
Aeronautic and Space Administration (NASA) Ames Research Center created 
a Fatigue/Jet Lag Program to examine whether there are safety problems 
due to transmeridian flying and fatigue in association with various 
factors found in air transport operations. Since its inception, the 
program has pursued the following three goals: (1) to determine the 
extent of fatigue, sleep loss, and circadian disruption in both 
domestic and international flight operations; (2) to determine the 
impact of these factors on flight crew performance; and (3) to develop 
and evaluate countermeasures to reduce the adverse effects of these 
factors and improve flight crew performance and alertness. In 1991, the 
NASA Ames Program was renamed the NASA Ames Fatigue Countermeasures 
Program to highlight the increased focus on the third goal. Since the 
beginning of the program, NASA has worked in close cooperation with the 
FAA and with the airline industry to collect data and to provide the 
findings of its extensive research as quickly as possible. This 
research is fundamental to this proposal.
    NASA Technical Memoranda reveal general principles pertinent to 
scheduling flight crewmembers. The memoranda include but are not 
limited to the following:
    1. Crew Factors in Flight Operations II: Psychophysiological 
Responses to Shorthaul Air Transport Operations. (NASA Technical 
Memorandum 108856, November 1994)
    2. Crew Factors in Flight Operations: Factors Influencing Sleep 
Timing and Subjective Sleep Quality in Commercial Long-Haul Operations. 
(NASA Technical Memorandum 103852, December 1991)
    3. Principles and Guidelines for Duty and Rest Scheduling in 
Commercial Aviation. (NASA Technical Memorandum, 1995)
    Copies of these memoranda have been placed in the public docket for 
this rulemaking.
    These memoranda state that sleep, awake time off, and recovery are 
primary considerations for maintaining alertness and performance 
levels. Adequate sleep is essential to maintain alertness and 
performance, a positive mood, and overall health and well-being. Each 
individual has a basic sleep requirement. The average sleep requirement 
is for 8 hours in a 24-hour period. Losing as little as 2 hours of 
sleep in a 24-hour time period can result in acute sleep loss, which 
will promote fatigue and degrade subsequent performance and alertness. 
Over days, sleep loss will accrue into a cumulative sleep debt which 
can only be reversed by sleep. An individual who has obtained required 
sleep performs better even after long hours awake or during altered 
work schedules. An individual who is fatigued typically shows a decline 
in performance by requiring more time to complete a given task. Two 
nights of an individual's usual sleep requirement will typically 
stabilize the sleep pattern and restore acceptable levels of waking 
alertness and performance. More frequent recovery periods reduce 
cumulative fatigue more effectively than less frequent ones. For 
example, weekly recovery periods afford a higher likelihood of 
relieving acute fatigue than monthly recovery periods. Consequently, 
regulations that ensure minimum days off per week are critical for 
minimizing the effects of cumulative fatigue over longer periods of 
time.
    The NASA findings and recommendations have been summarized in a 
1995 NASA Technical Memorandum titled ``Principles and Guidelines for 
Duty and Rest Scheduling in Commercial Aviation.'' 

[[Page 65954]]

    This is the first document that NASA intends to publish. This first 
document is intended to be concise, focused on operational 
considerations and to provide specific scientific input to this complex 
issue. The second document will provide the specific scientific 
references that support the principles and guidelines outlined in the 
first document. The second document will be longer and will focus on 
the scientific considerations related to these issues. NASA has assured 
the FAA that the Technical Reports presently in the docket contain the 
data on which the results and conclusions in both the first and second 
document are based. While not every NASA finding or recommendation is 
specifically reflected in this proposal, the overall thrust of this 
proposal is consistent with those findings and recommendations. 
Specific findings of the 1995 NASA memorandum are discussed and where 
relevant referenced by paragraph number in the discussion of specific 
proposals in this document.
National Transportation Safety Board Recommendations (NTSB)
    Issues of fatigue in transportation have been of special concern to 
the NTSB in all modes of transportation. In 1989, the NTSB made three 
recommendations to the Department of Transportation (DOT) to encourage 
an aggressive Federal program to address the problems of fatigue and 
sleep issues in transportation safety:
    Expedite a coordinated research program on the effects of fatigue, 
sleepiness, sleep disorders, and circadian factors on transportation 
system safety. (I-89-1)
    Develop and disseminate educational material for transportation 
industry personnel and management regarding shift work; scheduled work 
and rest; and proper regimens of health, diet, and rest. (I-89-2)
    Review and upgrade regulations governing hours of service for all 
modes to ensure that they are consistent and that they incorporate the 
results of the latest research on fatigue and sleep issues. (I-89-3)
    Further NTSB recommendations were issued as a result of the August 
18, 1993, Douglas DC-8-61 freighter crash at the Leeward Point Airfield 
at the U.S. Naval Air Station, Guantanamo Bay, Cuba after the captain 
lost control of the airplane on approach. The airplane was destroyed by 
impact forces and a post accident fire, and the three flight 
crewmembers sustained serious injuries. NTSB determined that among the 
probable causes of this accident were impaired judgment, impaired 
decision-making, and impaired flying abilities of the captain and 
flightcrew due to the effects of fatigue.
    In the letter accompanying the NTSB Safety Recommendations issued 
as a result of the accident, the NTSB cited the fact that FAA's flight 
and duty rules applicable to part 121 and 135 certificate holders, as 
interpreted, allow flight crewmembers to conduct flights under part 91, 
e.g., ferry flights for their certificate holders following the 
completion of flights conducted under part 121 or 135, without having 
to count these flight hours or duty time toward the part 121 or 135 
flight time duty time limitations and rest requirements. The NTSB 
concluded that ``the accident trip was under the provisions of a 
combination of separate regulations that allowed extended flight and 
duty times to be scheduled, contrary to safe operating practices.'' The 
NTSB went on to note that the United States and France are the only 
countries in the world that base their aviation hours of service 
regulations on flight time, while most other countries base them on 
duty time or a combination of duty and flight time.
    As a result of the Guantanamo Bay accident, the NTSB issued the 
following Safety Recommendations that relate to flight and duty time 
limits:
    (1) Revise part 121 to require that flight time accumulated in 
noncommercial ``tail end'' ferry flights conducted under part 91, as a 
result of 14 CFR, part 121, revenue flights, be included in the flight 
crewmember's total flight and duty time accrued during those revenue 
operations. (A-94-105)
    (2) Expedite the review and upgrade of flight/duty time limitations 
of the Federal Aviation Regulations to ensure that they incorporate the 
results of the latest research on fatigue and sleep issues. (A-94-106)
    The NTSB also reiterated an earlier recommendation that the FAA 
require U.S. air carriers operating under 14 CFR part 121, to include, 
as part of pilot training, a program to educate pilots about the 
detrimental effects of fatigue, and strategies for avoiding fatigue and 
countering its effects. (A-94-5)
Aviation Safety Reporting System
    The FAA has recently examined incident reports submitted by pilots 
to NASA's Aviation Safety Reporting System. Since January 1, 1986, NASA 
has received several reports of situations resulting from fatigue from 
pilots engaged in part 121 operations and 200 reports from pilots 
conducting part 135 operations. Although these incidents did not 
actually result in accidents, they were of a sufficiently serious 
nature that pilots took the trouble to file a report with NASA with the 
hope of gaining the attention of the regulatory authorities.
Petitions for Rulemaking
    The FAA has received several petitions for rulemaking on flight, 
duty, and rest requirements:
    On June 1, 1989, the Air Transport Association of America (ATA) 
petitioned the FAA to amend part 121, Subpart R of the FAR (which 
contains the flight time limitations for flag operations). This 
petition primarily addressed the need for rulemaking to address the 
industry wide technological airplane changes that have taken place 
since these rules were promulgated, such as airplanes that require only 
two pilots on long distance flights and significant improvements in 
cockpit automation and noise reduction. Specifically, the petition 
requested that two-pilot flight crews be allowed to fly 12 hours 
between required rest periods.
    On June 22, 1990, the Air Line Pilots Association (ALPA) petitioned 
the FAA to amend Secs. 121.471 and 135.265 to delete the reduced rest 
provisions and to increase the required minimum rest for flight 
crewmembers who are scheduled to fly fewer than 8 hours in a 24-hour 
period to 10 hours with at least 8 hours in a rest facility; propose 
longer rest for flight crewmembers who are scheduled to fly more than 8 
hours or who make more than eight landings in a 24-hour period; limit 
duty period time to 14 consecutive hours in a 24-hour period; mandate 1 
calendar day free of duty every 7 days, even when flight crewmembers 
are assigned reserve and/or training duties; and restrict air carriers 
from interrupting a flight crewmember's rest by communicating with him 
or her during a required rest period.
    On September 12, 1990, the Regional Airline Pilot Association 
(RAPA) petitioned to amend Sec. 135.265 of the FAR to delete the 
reduced rest provisions for flight crewmembers who are scheduled to fly 
in pressurized aircraft during a 24-hour period and increase the 
minimum rest period to 10 hours with at least 9 hours in a rest 
facility. For those crewmembers scheduled to fly in unpressurized 
aircraft, and those who make more than seven landings in a 24-hour 
period, RAPA petitioned to require a 12-hour rest with at least 10 
hours in a rest facility. RAPA petitioned also for an amendment to 
Sec. 135.265(a) of the FAR which would reduce the total flight time 
allowed per year to 1,000 hours and per month to 100 hours. 

[[Page 65955]]

    On November 25, 1991, Mr. Thomas T. Gasta, a captain on turbo-jet 
aircraft, petitioned the FAA to amend the definitions in part 1 of the 
FAR to include a definition of rest that would ensure that a rest 
period is free from restraint and free from responsibility for work. 
Mr. Gasta's particular concern is to ensure that reserve time is not 
considered rest.
    The FAA has considered each of these petitions for rulemaking in 
preparing this NPRM.
Commuter Rulemaking
    The FAA has issued a proposed rulemaking that would affect commuter 
operations, in general, including applicable flight time limitations 
and rest requirements (Notice 95-5, 60 FR 16230; March 29, 1995).
    The effect of Notice 95-5, if adopted, would be to apply the part 
121 domestic flight time limitations and rest requirements to certain 
commuter operations within the United States and the part 121 flag 
flight time limitations and rest requirements to certain commuter 
operations to or from the United States. Thus, that proposal would 
eliminate the present differences between part 121 and part 135 flight 
time limitations and rest requirements for affected commuter 
operations. For all of the reasons discussed in this preamble, the FAA 
has decided to propose one set of duty period limitations, flight time 
limitations, and rest requirements for flight crewmembers engaged in 
air transportation (domestic, flag, supplemental, commuter and on-
demand operations). Since, if adopted, this proposal would eliminate 
all of the present differences between parts 121 and 135 in this 
subject area, it overrides the related proposal and discussion in 
Notice 95-5. Nonetheless, in any final rule action based on this 
proposal, the FAA will consider, where relevant, any comments relating 
to flight time limitations and rest requirements submitted in response 
to Notice 95-5.
    If the commuter rulemaking is issued as a final rule, the 
compliance date for the flight time limitations and rest requirements 
of that rule will be coordinated with the effective date of any final 
rule that may be issued as a result of this NPRM, so that certificate 
holders conducting commuter operations will have to change their 
procedures for scheduling duty periods, flight time, and rest only 
once.

The Proposal

General

    This proposal is a preventive measure designed to address the 
potential safety problems associated with fatigue-based performance 
decrements. This proposal is not a response to specific accidents, but 
rather to extensive data which shows a relationship between fatigue and 
a decrement in performance. This proposed measure would place 
limitations on flight crewmember hours of service by requiring certain 
scheduling limitations and minimum rest periods.
    The proposed rule would simplify existing flight crewmember flight 
time limitations and rest requirements by replacing existing Subparts 
Q, R, and S of part 121 with a new Subpart Q and revising most of 
subpart F of part 135. Subpart Q of part 121 would not differentiate 
between domestic, flag, and supplemental operations as current 
regulations do, and subpart F of part 135 would not differentiate 
between commuter and on-demand operations.
    As stated previously, the proposed regulatory limitations for parts 
121 and 135 are based in part on knowledge of effects of fatigue as 
reflected in the scientific studies done by NASA. These proposed 
amendments would be compatible with air carrier operations and would 
provide reasonable, basic limitations that are conducive to safety.
    The FAA considered a number of options prior to proposing those 
outlined in this notice. The proposal in this notice takes a combined 
approach based on duty period limitations, flight time scheduling 
limitations, daily and weekly rest requirements, and requirements for 
augmented flight crews. Since the studies concerning fatigue in flight 
operations could not determine any fatigue based rationale for 
differentiating between types of operations, a single proposed set of 
scheduling limitations was selected for all types of operations. The 
proposal is designed to provide science based parameters for duty 
limitations and rest requirements and, at the same time, be 
understandable to everyone involved in flight operations. The proposal 
would establish a basic scheduling limitation for two pilot flight 
crews of 14 hours of scheduled duty, 10 hours of scheduled flight time, 
and 10 hours of scheduled rest. Certificate holders would have 
additional flexibility under the proposal to increase the length of 
scheduled duty periods, but only under certain conditions. The proposed 
scheduled maximum 14 hour duty period, 10 hours of scheduled flight 
time, and 10 hour rest period are consistent with the NASA ``Principles 
and Guidelines'' (Specific Principles, Guidelines, and Recommendations 
2.2.3 and 2.1.2, hereafter referred to as ``Recommendations'') for 2-
pilot crews.
    Although not a proposal in this notice, the FAA also requests that 
commenters provide scientific data concerning the amount of flight time 
that two pilot flightcrews should be allowed to fly in a 14-hour duty 
period, particularly on long range international flights that infringe 
on the flight crewmember's window of circadian low (2 a.m. to 6 a.m. at 
the crewmember's home base time).

Applicability

    Proposed Secs. 121.471 and 135.261 state the applicability of these 
amendments. Subpart Q in part 121 would provide duty period 
limitations, flight time limitations, and rest requirements for flight 
crewmembers in domestic, flag, and supplemental operations. Subpart F 
in part 135 would provide duty period limitations, flight time 
limitations, and rest requirements for commuter and on-demand 
operations.
    The proposed duty period limitations, flight time limitations, and 
rest requirements would also be applicable to duty periods and flight 
time performed for a certificate holder conducting part 91 operations, 
as specified in proposed Secs. 121.1, 121.487, 135.1, and 135.275.

Terms and Definitions

    Proposed Secs. 121.471 and 135.261 contain a list of terms and 
definitions applicable to the proposed amendments.
    The proposal defines ``approved sleeping quarters'' to mean an area 
designated for the purpose of flight crewmembers obtaining sleep as 
approved by the Administrator. See Advisory Circular 121-31, 
``Flightcrew Sleeping Quarters and Rest Facilities'' for guidance on 
methods obtaining FAA approval for aircraft used in part 121 and 135 
operations. Sleeping quarters that are already in use that have been 
determined to be adequate by the Administrator, such as bunks or other 
horizontal surfaces, will not need to be reapproved because of this 
proposed rule. The FAA recognizes that there is a difference between 
the term ``adequate'' sleeping quarters and ``approved'' sleeping 
quarters. Approved sleeping quarters could include additional 
possibilities that were not part of ``adequate sleeping quarters'' as 
previously interpreted. For example, formerly passenger seats were 
never considered adequate for use as sleeping quarters. Recently, 
however, a 

[[Page 65956]]
new type of passenger seat has been developed that meets the guidelines 
in AC 121-31 and therefore could be approved for use as sleeping 
quarters by certificate holders operating under part 121 or part 135.
    The proposed rule defines four kinds of time: assigned time, duty 
involving flight time (referred to as ``duty period''), reserve time, 
and rest (referred to as ``rest period''). Definitions of each of these 
times, as well as other terms, as proposed in Secs. 121.471 and135.261, 
are discussed below.
    ``Assigned time'' is time when the flight crewmember is assigned by 
the certificate holder to activities other than flight duties. Assigned 
time may include activities such as deadhead transportation, training, 
loading baggage, taking tickets, administrative tasks and any other 
assignments, excluding reserve time and required rest periods. Assigned 
time may be performed as part of a duty period, in which case the 
proposed duty period limitations and rest requirements in 
Secs. 121.473, 121.475, and 135.263 would apply. Rest requirements 
associated with assigned time that is not part of a duty period are 
found in proposed Secs. 121.483(f) and 135.271(f).
    The proposed rule defines ``duty period'' as the period of elapsed 
time between reporting for an assignment involving flight time and 
release from that assignment by the certificate holder. The time is 
calculated using either Coordinated Universal Time or the local time of 
the flight crewmember's home base.
    The proposed rule defines two types of reserve: ``Reserve time'' 
and ``standby duty.'' ``Reserve time'' is defined as a period of time 
when a flight crewmember must be available to report upon notice for a 
duty period. The certificate holder must allow the flight crewmember a 
minimum of 1 hour or more to report. Reserve time is not considered 
part of a rest period and is not considered a duty period. Reserve time 
does not include activities defined as assigned time. Reserve time ends 
when the crewmember reports for a duty period, when the crewmember is 
notified of a future flight assignment and released from all further 
responsibilities until report time for that assignment, or when the 
flight crewmember has been relieved for a rest period.
    ``Standby duty'' in the proposed rule must be treated just like any 
other duty period associated with flight. Standby reserve duty is any 
period of time when a flight crewmember is required to report for a 
flight assignment in less than 1 hour from the time of notification. It 
also includes time when a flight crewmember is required to report to 
and remain at a specific facility (e.g., airport, crew lounge) 
designated by a certificate holder.
    The proposed rule defines ``rest period'' as the time period free 
of all restraint or duty for a certificate holder and free of all 
responsibility for work or duty should the occasion arise. Rest periods 
are considered personal time. Rest periods are provided to give the 
flight crewmember a predetermined opportunity for rest.
    For example, if a flight crewmember is scheduled for a duty period 
which ends on 1200 on Tuesday and requires 14 hours of rest and the 
flight crewmember is not scheduled for another duty period until 1200 
on Thursday, then the 48 hours between duty periods is considered a 
rest period. The flight crewmember's minimum rest period requirements 
would be satisfied after 14 hours from the time the duty period ended. 
The air carrier may reschedule the flight crewmember, but must ensure 
the minimum rest period requirements are satisfied. It should be noted 
that the crewmember cannot be required by the air carrier to contact 
the air carrier, answer the phone, carry a beeper, remain at a specific 
location or in any other way be responsible to the air carrier during a 
scheduled rest period. This does not prohibit the flight crewmember 
from contacting the air carrier at his or her own discretion.
    For clarification purposes, the proposal also defines a ``calendar 
day'' as the period of elapsed time, using Coordinated Universal Time 
or local time, that begins at midnight and ends 24 hours later at the 
next midnight. The definition is needed because certificate holders 
have been confused about the application of the term. ``Calendar day'' 
is defined in the proposed rule in a manner consistent with past 
interpretations of the rule.
    Also, for clarification purposes, the proposal defines 
``operational delays'' as delays that are beyond the control of the 
certificate holder such as those that would be caused by weather, 
aircraft equipment malfunctions, and air traffic control delays. It 
would not include late arriving passengers, late food service, late 
fuel trucks, or delays in loading baggage, freight, or mail, or similar 
events.

Flight Crewmember Duty, Flight, and Rest

    Proposed Secs. 121.473, 121.475, and 135.263 would establish 
maximum scheduled duty periods and a maximum scheduled amount of flight 
time for flight crewmembers within the maximum scheduled duty period. 
In addition, the proposal would establish minimum rest requirements for 
flight crewmembers, including requirements that apply when flight crews 
are augmented and when on board rest facilities are provided.
    Current rules are primarily based on flight time. In addition, in 
some cases the current rules are based on actual rather than scheduled 
flight time. The major basis for the proposed rule is scheduled duty. 
The reason for going to a scheduled duty rule is that it is more 
consistent with current studies relating to fatigue.
    For the purposes of assignments involving flight time, the duty 
period includes the total elapsed time between when the flight 
crewmember reports for a flight assignment, as required by the air 
carrier, and when the flight crewmember is relieved from duty by the 
air carrier. A typical duty period for a flight crewmember would 
consist of pre-flight duties and post-flight duties assigned by the air 
carrier. Pre-flight safety duties include aircraft emergency equipment 
checks, flight planning/dispatch related duties, and complying with the 
certificate holder's approved operations manual.
    At least one industry study and information obtained from 
crewmembers indicates that air carriers vary in how early they require 
flight crewmembers to check in to begin their duty periods and pre-
flight duties. This check-in or report time varies depending on the 
type of equipment flown and the flight destination. Carriers typically 
require flight crewmembers to arrive 30 minutes to 1 hour before 
scheduled departure. For international flights some carriers require 
flight crewmembers to report for duty up to 2 hours before departure.
    Post-flight safety duties include the post-landing duties, safe 
deplaning of passengers, duties related to securing the aircraft, and 
administrative responsibilities such as reporting inoperative equipment 
to maintenance personnel. Typically, flight crewmembers are required to 
remain on duty after the aircraft arrives at the gate to accomplish 
these post-flight duties before they are relieved from duty.
    A duty period may also include activities defined as ``assigned 
time,'' as discussed under ``Terms and Definitions,'' above.
    Thus, a flight crewmember's duty period is not solely a function of 
whether the aircraft is airborne. Flight crewmembers perform important 
safety duties during boarding and deplaning. This proposal, therefore, 
is based on duty periods that include flight time 

[[Page 65957]]
rather than solely on flight time. The FAA expects certificate holders 
to establish realistic report and release times to allow flight 
crewmembers sufficient time to complete these essential pre-flight and 
post-flight safety activities.
    Proposed Secs. 121.473 and 135.263 would provide for different duty 
period limits based on the number of pilots assigned. Each duty period 
would have a scheduled flight time limit and would be followed by a 
required rest period. NASA (Recommendation 2.3.6) recognizes that the 
use of additional flight crewmembers justifies longer duty periods if 
the flight crewmembers are provided on-duty sleep opportunities.
    To allow flexibility a scheduled duty period could be extended two 
hours if the extension is needed because of operational delays. Rest 
periods may be reduced by up to one hour only if the reduction is 
needed because of operational delays and then only if the pilot has not 
exceeded the pilot's scheduled maximum duty-period limitations. If a 
rest period is reduced, the next rest period would have to be extended.
    Table 1 provides a summary of the proposed limitations on duty 
periods and flight time and the proposed rest requirements for pilots.
    For one- and two-pilot crews. In proposed Sec. 135.263(b), the 
basic duty period scheduling limitation for a one-pilot crew would be 
14 hours, including no more than 8 scheduled hours of flight time. In 
proposed Secs. 121.473(b) and 135.263(c), the basic duty period 
limitations for a two-pilot crew would be 14 hours, including no more 
than 10 scheduled hours of flight time. The minimum rest period for 
one- and two-pilot crews would be 10 hours. The proposed 10-hour limit 
on scheduled flight time and the proposed 10-hour minimum rest are 
consistent with NASA Recommendations 2.3.3 and 2.1.1, respectively.
    These proposed duty periods for one- and two-pilot crews could be 
extended to 16 hours due to operational delays. The rest periods may be 
reduced to 9 hours if the actual duty period is not more than 14 hours 
and if the reduction is needed due to operational delays. If the rest 
period is reduced the next rest period would have to be a minimum of 11 
hours. A duty period extended due to operational delays may involve 
longer than scheduled flight time.

                                             Table 1.--Pilot Duty Period, Flight Time and Rest Requirements                                             
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                      Rest hours                        
                                                                                   Minimum                             following    Extended duty period
           No. of pilots              Duty period hours      Flight time hours       rest      Reduced rest hours    reduced rest         hours \2\     
                                                                                    hours             \1\           (compensatory)                      
--------------------------------------------------------------------------------------------------------------------------------------------------------
1 (part 135)......................  No more than 14......  No more than 8.......         10  9, May only be                   11    Up to 16 only if due
                                                                                              reduced if duty                        to operational     
                                                                                              period has not                         delays             
                                                                                              exceeded 14.                                              
2.................................  No more than 14......  No more than 10......         10  9, May only be                   11    Up to 16 only if due
                                                                                              reduced if duty                        to operational     
                                                                                              period has not                         delays             
                                                                                              exceeded 14.                                              
3.................................  No more than 16......  No more than 12......         14  12, May only be                  16    Up to 18 only if due
                                                                                              reduced if duty                        to operational     
                                                                                              period has not                         delays             
                                                                                              exceeded 16.                                              
3 Each pilot must have sleep        More than 16, but no   No more than 16......         18  16, May only be                  20    Up to 20 only if due
 opportunity and approved sleeping   more than 18.                                            reduced if duty                        to operational     
 quarters must be available.                                                                  period has not                         delays             
                                                                                              exceeded 18.                                              
4 Each pilot must have sleep        More than 18 but no    No more than 18......         22  20, May only be                  24    Up to 26 only if due
 opportunity ad approved sleeping    more than 24.                                            reduced if duty                        to operational     
 quarters must be available \3\.                                                              period has not                         delays             
                                                                                              exceeded 24.                                              
--------------------------------------------------------------------------------------------------------------------------------------------------------
\1\ Rest periods may be reduced only when the actual duty period does not exceed the maximum scheduled duty period for that crew composition and if the 
  pilot is provided a compensatory rest period. This compensatory rest period must be scheduled to begin no later than 24 hours after the beginning of  
  the reduced rest period.                                                                                                                              
\2\ The flights to which the pilot is assigned must at block out time be expected to reach their destination within the extended duty period.           
\3\ Applies only to duty periods with one or more flights that land or take off outside the 48 contiguous states and DC.                                

    Longer Duty Period for a 3-Pilot Crew. Under proposed 
Secs. 121.473(c) and 135.263(d), the certificate holder may schedule up 
to a 16-hour duty period with up to 12 hours of flight time if 3 pilots 
are assigned to the flight. The required rest would be 14 hours. This 
duty period could be extended to 18 hours due to operational delays. 
The required rest could be reduced to 12 hours if the actual duty 
period is not more than 16 hours. If the rest is reduced the next rest 
would have to be 16 hours.
    Longer duty period for three-pilot flightcrews with approved 
sleeping quarters. Under proposed Secs. 121.473(d) and 135.263(e), if 
three pilots are assigned and if approved sleeping quarters are 
provided, the scheduled duty period can be up to 18 hours with a 
scheduled flight time limit of 16 hours. The required rest would be 18 
scheduled hours. Each pilot must be given an opportunity to rest in 
approved sleeping quarters. The duty period could be extended to 20 
hours due to operational delays. The rest could be reduced to 16 hours 
if the actual duty period is not more than 18 hours. If the rest is 
reduced, the next rest would have to be 20 hours.
    Longer duty period if outside the U.S., four pilots, and approved 
sleeping quarters. Under proposed Secs. 121.473(e) and 135.263(f), if 
the duty period involves one or more flights outside the 48 contiguous 
states, if four pilots are assigned, and if approved sleeping quarters 
are provided, the scheduled duty period can be up to 24 hours with 18 
hours of scheduled flight time. Each 

[[Page 65958]]
pilot must be given an opportunity to rest in flight in approved 
sleeping quarters. The required scheduled rest following the duty 
period would be 22 hours. The duty period could be extended to 26 hours 
due to operational delays. The rest could be reduced to 20 hours if the 
duty period is not greater than 24 hours. If the rest is reduced, the 
next rest would have to be 24 hours.
    Reporting for a duty period. The effect of the proposal is that if 
a flight crewmember reports for duty, including standby duty, as 
required and finds that the flight assignment was incorrectly scheduled 
or that the flight is delayed or canceled, a duty period nevertheless 
would have begun. For example, a flight crewmember may report for duty 
as scheduled, only to find that the assigned report time is incorrect 
and that duty actually begins 2 hours later. The carrier could either 
keep the flight crewmember on duty or release the flight crewmember for 
a complete rest period under the applicable section of this proposed 
rule. While the rule language does not spell out in detail this kind of 
example, or application, this is how the concept of duty period would 
work.
    Extension of duty periods. The intent of this proposed rule is to 
ensure that flight crewmembers are provided adequate opportunity to 
rest through properly scheduled duty periods, flight times, and rest. 
Regular delays on certain routes or deviations from certain schedules 
would indicate that the schedules need to be adjusted to comply with 
the proposed limitations. The proposal acknowledges that certain 
delays, such as adverse weather, cannot be anticipated. A flight 
crewmember would not be considered to be scheduled for flight time or a 
duty period in excess of flight time or duty period limitations if the 
flights to which he is assigned are scheduled and normally terminate 
within the limitations, but due to operational delays (such as adverse 
weather conditions, equipment malfunctions, and air traffic control) 
are not at block out time expected to reach their destination within 
the scheduled time. Operational delays do not include late arriving 
passengers, late food service, late fuel trucks, delays in handling 
baggage, freight, or mail, or similar events. (See proposed 
Secs. 121.473, 121.475, 121.479, 135.263, 135.267.)
    The FAA is proposing limiting the extension of any scheduled duty 
period due to operational delays to no more than 2 hours. If at any 
time during a duty period it is determined that, due to operational 
delays, a scheduled flight will not terminate within the scheduled 
termination of that duty period plus 2 hours, then the flight 
crewmembers must be relieved of duty before initiating that flight 
segment. They may be scheduled for another flight as long as that 
flight is scheduled to terminate within the original scheduled duty 
period limitations plus two hours. The FAA believes that 2 hours 
provides flexibility in the event of operational delays and also limits 
the possibility of flight crewmembers being on a continuous duty period 
even when the duty period is extended due to circumstances beyond the 
control of the certificate holder. The limit on flight time hours is 
discussed elsewhere in this preamble.
    Certificate holders would be expected to recognize when certain 
schedules need adjustment due to regularly experienced or seasonal 
delays.

Augmented Flight Crews

    The longer scheduled duty periods that would be allowed under 
proposed Sec. 121.473 (c), (d), and (e) and Sec. 135.263 (c), (d), and 
(e) are contingent upon the assignment of additional pilots in order to 
maintain safety by distributing the workload and permitting more rest. 
This will ensure that pilots are alert and can contribute to safe 
operations. It is important to note that if a pilot is scheduled for a 
duty period longer than 14 hours, the appropriate number of additional 
pilots would have to be present on every flight segment within that 
duty period. In practical terms, the FAA expects that this would occur 
on larger aircraft and, generally, long-haul operations with relatively 
few flight segments. This result would be consistent with the intent of 
the proposal and consistent with current industry practice.
    It should be noted, however, that if a flight crew with additional, 
non-required pilots is assigned a duty period of 14 hours or less, the 
certificate holder may follow Sec. 121.473(b) or Sec. 135.263(b), 
(i.e., provide a rest period of 10 hours).
    Proposed Secs. 121.473 (d) and (e) would require opportunities for 
flightcrew members to rest and availability of approved sleeping 
quarters for duty periods of more than 16 hours. The provision for 
additional flight crewmembers and for on board sleeping quarters takes 
into account the extended time flight crewmembers may be on duty to 
complete long range flight segments. Existing rules, (Secs. 121.483, 
121.485, 121.507, 121.509, 121.521, 121.523) require augmented 
flightcrews for longer duty periods.
    Existing rules in some cases, under present Sec. 121.523(c), allow 
a scheduled duty period of 30 hours; however, the FAA believes that 24 
hours should be the limit of any scheduled duty period.
    This proposal does not provide for substituting flight engineers 
for pilots. Rather the augmentation of pilots must take place 
regardless of the number of flight engineers assigned.
    Reduction of the rest period. In order to provide additional 
flexibility, the FAA is proposing to allow the reduction of rest due to 
operational delays. The rest period may be reduced only if the maximum 
scheduled duty period limitation has not been exceeded or extended. 
Table 1 provides information on reduced rest periods followed by 
compensatory rest periods.

Flight Engineers

    Proposed Sec. 121.475 would provide similar requirements for flight 
engineers. Table 2 provides a summary of the proposed limitations on 
duty periods and flight time and the proposed rest requirements for 
pilots and flight engineers. Present part 121 rules for domestic 
operations do not contain separate flight time limitation requirements 
for flight engineers. The flag and supplemental operations rules 
(Secs. 121.493 and 121.511) deal with flight engineers by referencing 
other sections within the applicable subpart. To avoid any possible 
confusion as to which flight time limitation rules apply to flight 
engineers, the FAA proposes in Sec. 121.475 to address flight engineers 
separately.

                                                                                                                                                        

[[Page 65959]]
                                        Table 2.--Flight Engineer Duty Period, Flight Time and Rest Requirements                                        
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                      Rest hours                        
                                                                                   Minimum     Reduced rest hours      following    Extended duty period
      No. of flight engineers         Duty period hours      Flight time hours    rest hours          (\1\)          reduced rest         hours \2\     
                                                                                                                    (compensatory)                      
--------------------------------------------------------------------------------------------------------------------------------------------------------
1.................................  No more than 14......  No more than 10.....           10  9, May only be                   11   Up to 16 only if due
                                                                                               reduced if duty                       to operational     
                                                                                               period has not                        delays             
                                                                                               exceeded 14.                                             
1.................................  No more than 16......  No more than 12.....           14  12, May only be                  16   Up to 18 only if due
                                                                                               reduced if duty                       to operational     
                                                                                               period has not                        delays             
                                                                                               exceeded 16.                                             
2 Each flight engineer must have    More than 16, but no   No more than 16.....           18  16, May only be                  20   Up to 20 only if due
 sleep opportunity and approved      more than 20.                                             reduced if duty                       to operational     
 sleeping quarters must be                                                                     period has not                        delays             
 available.                                                                                    exceeded 18.                                             
2 Each flight engineer must have    More than 18 but no    No more than 18.....           22  20, May only be                  24   Up to 26 only if due
 sleep opportunity and approved      more than 24 \3\.                                         reduced if duty                       to operational     
 sleeping quarters must be                                                                     period has not                        delays             
 available.                                                                                    exceeded 24.                                             
--------------------------------------------------------------------------------------------------------------------------------------------------------
\1\ Rest periods may be reduced only when the actual duty period does not exceed the maximum scheduled duty period for that crew composition and if the 
  flight engineer is provided a compensatory rest period. This compensatory rest period must be scheduled to begin no later than 24 hours after the     
  beginning of the reduced rest period.                                                                                                                 
\2\ The flights to which the flight engineer is assigned must at block out time be expected to reach their destination within the extended duty period. 
\3\ Applies only to duty periods with one or more flights that land or take off outside the 48 contiguous States and DC.                                

Reserve and Standby Assignments

    Current regulations do not specifically cover the issue of reserve 
time and standby duty. Within the air transportation industry two types 
of generic reserve assignments have developed. One type, usually 
referred to as ``standby reserve,'' is essentially the same as a duty 
period, and as discussed below would be treated as duty for duty period 
limitation and rest requirement purposes. The other type, here called 
``reserve time'' is not considered part of a rest period and is not 
considered part of a duty period and therefore would be dealt with 
separately under this proposal. Proposed Secs. 121.477 and 135.265 
provide reserve assignment requirements.
    Under the proposal a standby duty period must be scheduled in 
accordance with proposed Secs. 121.473, 121.475, or 135.263. A standby 
duty ends when the duty period associated with a subsequent flight 
assignment ends or the flight crewmember is relieved from standby duty 
for a scheduled rest period.
    Standby duty periods are assigned because the air carrier believes 
that some time within that period the flight crewmember will be needed 
for a flight assignment and must report for flight assignment within 
less than 1 hour of being notified. Standby duty also includes time 
when a flight crewmember is required to report to and remain at a 
specific facility (e.g., airport, crew lounge) designated by a 
certificate holder. Usually flight crewmembers are assigned to standby 
duty at the airport. In addition, since the industry has indicated that 
they treat standby as duty, this proposed definition should not impose 
any additional burdens on certificate holders. It is because of the 
momentary anticipation of a flight assignment, which prevents a pilot 
from planning for adequate rest, that standby assignments are treated 
as duty periods.
    The proposed standby duty period would be treated as a duty period 
that is associated with flight, regardless of whether the flight 
crewmember is ever assigned to flight time during that standby duty 
period or not. Standby duty periods would be scheduled in accordance 
with proposed duty period limitations, flight time limitations, and 
rest requirements. A standby duty period commences when the flight 
crewmember is placed on standby duty and ends when the flight 
crewmember is relieved of duty, whether that duty is standby or flight. 
Following standby duty, the flight crewmember must be scheduled for and 
must receive the same amount of rest as he or she would receive if he 
or she accumulated flight time, even if there is no actual flight time.
    Reserve time is a period of time when a flight crewmember is not on 
duty but nonetheless must be available to report upon notice for a duty 
period. During reserve time a flight crewmember typically goes about 
his or her off duty routine, obtaining rest as needed during each 24 
hour period. Reserve time is not considered part of a rest period, is 
not considered part of a duty period, and is not considered assigned 
time. Reserve time ends when the crewmember is released, the crewmember 
is notified of a future duty period assignment and released from all 
further responsibility until the report time for that assignment, or 
the crewmember reports for a duty period. The certificate holder must 
allow the flight crewmember a minimum of 1 hour to report.
    Often flight crewmembers are on reserve for days at a time and are 
given 10 or more hours notification prior to a duty period assignment. 
However, there are times when a flight crewmember is given fewer than 
10 hours notification and may not be completely rested. Some flight 
crewmembers arise early in the morning and may have been awake for many 
hours at the time they receive notification of an evening flight. These 
flight crewmembers may not have an opportunity for a complete rest 
period before the flight assignment. The same may be true of a flight 
crewmember who does not awaken until the middle of the afternoon and 
receives fewer than 10 hours notification of a duty period which starts 
after midnight.
    Since it is difficult to predict when an individual flight 
crewmember sleeps and when he or she awakens, no attempt has been made 
in the proposal to correlate the amount of notice a flight crewmember 
should receive with the time of day. Rather, the emphasis is placed on 
the flight crewmember's receiving enough notice to provide an 

[[Page 65960]]
opportunity for rest before the duty period assignment. If a flight 
crewmember receives at least 10 hours notice there would be enough time 
for the flight crewmember to be fully rested before reporting for a 
duty period of 14 hours. However, under proposed Secs. 121.477(b) and 
135.265(b), when flight crewmembers receive fewer than 10 hours notice 
for a duty period assignment, there is a reduction in the length of 
that duty period. While it could be possible for a flight crewmember to 
receive 10 hours rest before being placed on reserve and then given 10 
hours of notification in order to serve a 14-hour duty period, the FAA 
believes that efficient crew scheduling will minimize the possibility 
of this happening. Table 3 shows for each proposed amount of 
notification time the proposed corresponding duty period limitation.
    Proposed Secs. 121.477(b)(2) and 135.265(b)(2) would provide 
another option under which a flight crewmember could be given a minimum 
6-hour period of protected time for each 24 hours of reserve time. 
During this 6-hour period of protected time the certificate holder 
would not be able to contact the flight crewmember or assign the flight 
crewmember to any duty. The 6-hour period must be assigned before the 
flight crewmember begins the reserve time assignment and must occur at 
the same time during each 24-hour period during a reserve time 
assignment. Any duty period assignment must be scheduled to be 
completed within the 18-hour reserve time, exclusive of the 6 hours of 
protected time. The length of the duty period and the subsequent rest 
period must be in accordance with Secs. 121.473, 121.475, or 135.263. 
The FAA believes that this option would allow flexibility for the 
certificate holder while giving the flight crewmember sufficient 
certainty to plan for and obtain adequate rest. While the 6 hours of 
protected time must be the same 6 hours for any reserve assignment, it 
could be a different 6 hours for subsequent reserve assignments (e.g., 
a subsequent reserve assignment following duty or assigned time).
    Under either reserve time assignment option, the flight crewmember 
must be notified of which option has been selected before the beginning 
of the reserve time assignment.
    Although NASA recommends a predictable and protected 8-hour sleep 
opportunity (2.6.2), the FAA believes that the above described options 
are practical and in most instances will provide at least an 8-hour 
rest opportunity. Either the flight crewmember is provided an 
opportunity for a full 10-hour rest period or, in the case of a short 
notice, the flight crewmember's duty period is limited, or the flight 
crewmember is able to plan each day with the certain knowledge there 
will be a minimum 6-hour period for undisturbed rest. Thus, these 
options would protect against excess fatigue without eliminating the 
objective of the reserve system and without placing a significant 
economic burden on the industry.
    There have been a number of complaints stating that in some cases 
pilots were unable to obtain enough rest because they were given a 
reserve assignment immediately following a duty period and then were 
called for duty before they had received an adequate rest. While under 
these proposed rules such a practice would be a violation because of 
the requirement for a minimum rest period between duty periods, the FAA 
has included in proposed Secs. 121.477(b) and 135.265(b) a requirement 
that a flight crewmember must be given a 10-hour rest period before 
beginning a reserve time assignment. Sections 121.483(c) and 135.271(c) 
state that required rest periods can occur concurrently so this 
proposed requirement may not require an additional rest period.
    The FAA believes that both of these methods of handling reserve 
time assignments would provide more flexibility, would be less costly 
for certificate holders, and would be more likely to ensure adequate 
rest than the current rules. Under the lookback provision in the 
current rules, for instance, a flight crewmember on reserve could not 
take a flight assignment unless he or she had a scheduled rest period 
in the previous 24 hours. There have been situations in which 
certificate holders have professed experiencing difficulties in 
implementing rest requirements for flight crewmembers on reserve. 
Recognizing this, the FAA has developed this proposal. However, if this 
proposal on reserve time assignments is not issued as a final rule, the 
FAA intends to ensure that the current rule, as interpreted, is being 
correctly implemented.

Other Proposals on Reserve Time Presented During ARAC Discussions

    Southwest Airlines proposed a system under which the total of 
reserve time and ``time engaged in scheduled air transportation'' could 
not exceed 18 hours (16 hours if this period included any time during 
the hours between 0300 and 0459). In addition, Southwest proposed that 
reserve time between 0001 and 1000 not be included if the air carrier 
did not contact the crewmember during that period. One option presented 
by the Air Line Pilots Association is similar to Southwest's proposal. 
ALPA would not allow reserve time and duty time to exceed 16 hours. A 
14-hour maximum would apply when the duty time is not contained with 
the period between 0500 and 0259.
    The FAA has several concerns about this approach. First, we believe 
it will be difficult to understand and to apply consistently. More 
importantly, although it appears to provide for some reductions in duty 
time, depending on the time of day a crewmember is notified of a flight 
assignment, it do
FR Doc. 95-30547 Flight Crewmember Duty Period Limitations, Flight Time Limitations and Rest Requirements
es not expressly provide for any dedicated rest 
opportunity. Moreover, it is not clear exactly what would be 
encompassed by Southwest's term ``time engaged in scheduled air 
transportation.'' The FAA requests that commenters supporting this 
approach provide additional details about this alternative and 
operational scenarios on how it would be applied. Commenters should 
provide information on how this alternative does or does not provide 
the flexibility of the options proposed in this NPRM, and how this 
alternative provides an equivalent level of safety to the options 
proposed here.
    The International Brotherhood of Teamsters proposed two 
alternatives for reserve duty. The first alternative proposes that a 
crewmember could be assigned a reserve period of 24 consecutive hours 
if the crewmember is given 11 hours or more advance notification for a 
flight assignment. The second alternative would allow a crewmember to 
be assigned a reserve period of up to 12 consecutive hours if the 
crewmember is given less than 11 hours of advance notification. In this 
case, the total flight time and duty time could not exceed 17 hours. 
The FAA believes that both of these options unnecessarily limit the 
scheduling flexibility of the operator and that both would greatly 
increase operators' costs while providing no increase in safety when 
compared with the reserve options proposed in this NPRM.
    The Air Transport Association would give the operator five 
alternatives for dealing with reserve time. (1) The carrier could give 
the employee at least eight consecutive hours of rest during any 24 
hour period on reserve; (2) The carrier could give the crewember at 
least 10 hours of advance notice of any assignment, at which point the 
crewmember would be released on rest until the time to report; (3) The 
carrier could not assign the crewmember on 

[[Page 65961]]
reserve to flights between midnight and 5 a.m.; (4) The carrier could 
assign the crewmember on reserve to no more than two flight segments; 
or (5) The carrier could establish alternative policies and procedures 
to ensure that a crewmember will not be assigned to a flight unless 
that crewmember is ``adequately rested for that flight assignment.''
    The first three ATA proposals are generally similar to this NPRM. 
The NPRM contains the option of blocking out a protected period of at 
least six hours during which the crewmember could not be disturbed by 
the employer. This is less restrictive than ATA's proposal (1), 
although it involves a slightly longer period than would be provided by 
proposal (3). Like ATA's proposal (2), the NPRM would provide for 
advance notice of assgnments. However, the NPRM is not limited to a 
single cut-off of 10 hours' notice. Carriers would be permitted to 
assign crewmembers to duty periods that vary with the amount of advance 
notice, down to as little as 4 hours' notice. Since ATA's proposal 
number (4) does not address rest at all, it is not included in the 
NPRM. Proposal number (5) sets no minimum standards for rest, and it, 
too, is therefore not part of this NPRM.
    The Air Line Pilots Association, in addition to the alternative 
described above, offered a proposal somewhat similar to that of ATA. 
ALPA's proposal appears intended to provide more stability for pilot 
rest periods; it would not permit carriers to move the eight hour rest 
period more than three hours in any 24-hour period. Similarly, ALPA 
proposed a six-hour protected period, comparable to the five-hour 
period proposed by ATA. Our comments on ATA's proposal apply to ALPA's 
as well, i.e., we believe we have accomodated much of their objectives.
    Another proposal advanced during the ARAC discussions came from a 
labor/pilot group consisting mainly of Part 135 pilots. This proposal 
would limit any combination of reserve time and duty periods to no more 
than 18 hours or any duty assignment to no more than 14 hours. After 
being on reserve for 18 hours, a crewmember would have to receive a 10-
hour rest period before accepting another reserve assignment. This 
proposal is not included in the NPRM because it unnecessarily limits 
the air carrier's reserve scheduling flexibility and provides no 
increase in safety when compared with the options proposed in the NPRM.

                                                             Table 3.--Advance Notification                                                             
--------------------------------------------------------------------------------------------------------------------------------------------------------
 No. of hours notification prior to                            8 or more hours but    6 or more hours but    4 or more hours but                        
            report time                 10 hours or more          less than 10            less than 8            less than 6         Less than 4 hours  
--------------------------------------------------------------------------------------------------------------------------------------------------------
Maximum scheduled duty period......  Maximum scheduled duty  No more than 12 hours.  No more than 10 hours  No more than 8 hours.  No more than 6 hours.
                                      period \1\.                                                                                                       
--------------------------------------------------------------------------------------------------------------------------------------------------------
\1\ Maximum scheduled duty period could be 14, 16, 18, or 24 hours.                                                                                     

Additional Duty Period Limitations and Reduced Rest

    Current Secs. 121.471(g) and 135.263(d) state that a flight 
crewmember is not considered to be scheduled for flight time in excess 
of the flight time limitations if the flights to which he or she is 
assigned normally terminate within the limitations, but due to 
circumstances beyond the control of the certificate holder (such as 
adverse weather conditions) are not at block out time expected to reach 
their destination within the scheduled time. These requirements do not 
specify a limit to the flight time extensions under these 
circumstances.
    In theory, under the current rule language, duty periods could be 
extended for unlimited periods of time as long as the extension was due 
to operational causes beyond the control of the air carrier such as 
weather, mechanical problems, and Air Traffic Control situations. This 
could result in flight crewmembers who, after the first flight of a 
flight schedule in a duty period, would be as much as 6 hours late, but 
would still continue with the flight schedule. The NASA Scientific 
Working Group determined that extended duty periods with no limit on 
the amount of time which the duty period could be extended was one of 
the major fatigue related problems with current flight crewmember 
assignments (Recommendations 1.4, 2.1.2, and 2.3.3). Therefore, the FAA 
has proposed to place a limit on the amount of time that a duty period 
may be extended regardless of the nature of the delay.
    Proposed Secs. 121.473, 121.475, and 135.263 would allow 
certificate holders an extension of a duty period of not more than 2 
hours beyond the maximum scheduled duty period if the extension is due 
to operational delays not under the control of the certificate holder. 
The proposed requirements would also allow the reduction of the 
required rest if the flight crewmember has not exceeded the required 
duty period (without the extension), if the flight crewmember is 
provided with a longer subsequent rest period as specified, and if the 
reduction in rest is due to operational delays. Reduced rest periods 
may not be scheduled in advance.
    Proposed Secs. 121.479 (a) and (b) and 135.267 (a) and (b) would 
state that a flight crewmember is not considered to be scheduled for a 
duty period or flight time in excess of the duty period or flight time 
limitations if the duty period or flight times to which the flight 
crewmember is assigned are scheduled and normally terminate within the 
limitations, but due to operational delays are not at block out time 
expected to reach their destination within the scheduled duty period or 
flight time.
    In addition, proposed Secs. 121.479(a) and 135.267(a) state that a 
flight crewmember may not serve as a crewmember in an aircraft if, at 
block out time for the purpose of flight, that flight crewmember's 
actual elapsed duty time plus duty time scheduled for the next flight 
will cause the flight crewmember to exceed the applicable duty period 
limitations by more than two hours. However, there is no limit on 
actual flight time accrued during a duty period, if the additional 
flight time is due to operational delays, but in any event the duty 
time limit may not be extended by more than 2 hours.
    The proposal would allow a certificate holder the flexibility to 
schedule the same crew on a flight even when that flight is going to be 
late; however, it would not allow flight crewmembers to be scheduled 
indefinitely even when the circumstances which caused them to be late 
are beyond the control of the certificate holder. During a scheduled 
flight assignment, if the combination of scheduled times for the 
remaining flights would mean that the maximum scheduled duty period 
would be exceeded by more than two hours, the flight crewmember would 
have to be 

[[Page 65962]]
rescheduled so that the remaining duty period to which he or she is 
assigned will not exceed the maximum scheduled duty period by more than 
two hours. This can be done by assigning a flight crewmember to a new 
flight schedule or by reassigning the original scheduled flights so the 
flight crewmember is relieved of duty before commencing the flight 
which would extend beyond the maximum scheduled duty period plus two 
hours.

Weekly and Monthly Flight Time Limitations

    Proposed Secs. 121.481 and 135.269 would provide limits on the 
amount of actual flight time which a flight crewmember can accrue in a 
calendar month and in any 7 consecutive calendar days. These proposed 
rules would replace current Secs. 121.471(a), 121.481 (d), (e), and 
(f), 121.503 (d) and (e), 135.265(a) and 135.267(a). Although NASA 
states that there is insufficient scientific information to provide 
guidance in this area, these limits are proposed to counter any harmful 
effects of any possible cumulative fatigue.
    In addition to the scheduled flight time limits which are 
integrated into the scheduled duty periods, weekly and monthly flight 
time limits are proposed as follows:
     Proposed Secs. 121.481(a) and 135.269(a) would limit a 
flight crewmember to 32 flight hours in any 7 consecutive calendar 
days.
     Proposed Secs. 121.481(b) and 135.269(b) would limit a 
flight crewmember to 100 flight hours in any calendar month.
    In practice, this means that, before beginning to fly on any 
particular day, a flight crewmember's actual accrued flight time for 
the previous six days must be added to the flight time scheduled to be 
flown that day. If the result is fewer than 32 hours, the flight 
crewmember may begin and complete the day's scheduled flying even if 
delays (which are beyond the carrier's control) encountered during the 
day eventually cause the total time to exceed 32 hours. The same 
principle applies for the calendar month flight time limitation.
    Current regulations place varying limits on the amount of time that 
a flight crewmember can serve. The variance is based on the type of 
operation. Flight crewmembers given flight assignments under part 121 
for domestic operations (Sec. 121.471(a)) are limited to 30 flight 
hours in any 7 consecutive days. The 7 consecutive day limit for flag 
operations is 32 flight hours (Sec. 121.481(d)) and there is no 7 
consecutive day limit for supplemental operations. Under 
Sec. 135.265(a) in scheduled operations the amount of flight time which 
may be accrued in any 7 consecutive days is 34 hours and there is no 7 
consecutive day limit for unscheduled operations. Sections 121.471(a) 
and 121.481(e) restrict flight crewmembers serving in domestic or flag 
operations conducted under part 121 to 100 hours in any calendar month 
and Sec. 121.503(d) restricts flight crewmembers serving in 
supplemental operations to 100 flight hours in any 30 consecutive days. 
Section 121.521(c) allows certain flight crewmembers to accrue 120 
hours in any 30 consecutive days. Section 135.265 allows flight 
crewmembers serving in part 135 scheduled operations to accumulate 120 
flight hours in any calendar month.
    In addition, Sec. 121.471(a) restricts flight crewmembers engaged 
in domestic operations conducted under part 121 to 1000 hours in any 
calendar year. Section 135.265 allows flight crewmembers serving in 
part 135 scheduled operations to serve as crewmembers during flight for 
1200 hours in any calendar year, while Sec. 135.267 allows 1,400 flight 
hours in a calendar year for unscheduled operations. Sections 121.503, 
121.521, 135.267, and 135.269 also provide other calendar quarter and 
90 consecutive day limitations.
    The proposed rule would establish a common 32 hour limitation in 
any 7 consecutive days, a 100 hour limitation in any calendar month, 
and would eliminate quarterly, 90 consecutive day and calendar year 
limitations.
    The proposed rule does not provide a yearly flight time limitation 
because the monthly limit would effectively restrict flight time to 
1200 hours in a calendar year. Although the NASA document recommends 
the annual flight time limitations be decreased a percentage of the 
monthly requirement, it also states that there is not enough scientific 
data to provide specific guidance in this area. The FAA believes that 
this proposal contains sufficient additional rest provisions (i.e. 36 
hours in 7 days, 10 hour rest periods, and 48 hours for crossing 
multiple time zones). Because of the increase in rest requirements, the 
FAA believes that safety would not be adversely affected because of a 
lack of a yearly flight time limit which is less than the sum of all 
the monthly flight time limits. At the same time the lack of annual 
flight time limits will provide flexibility and the opportunity for 
increased productivity. In view of the fact that there is no scientific 
data to suggest a discrete yearly limit and the fact that the 
requirement for rest has been increased, the FAA believes the proposed 
rule will provide the appropriate level of safety.
    The FAA believes that there is no longer justification for the 
different weekly, monthly, and annual flight time limitations for 
different types of operations and that proposing a single limitation 
standard provides adequate safeguard against the effects of cumulative 
fatigue, eliminates rules that do not have an adequate scientific 
rationale, and also simplifies the overall limitations. The FAA asks 
for comments from the public about the maximum number of hours a flight 
crewmember should be allowed to fly under this chapter. Further, the 
FAA asks for comments regarding the impact of this rule on seasonal 
flying.

Additional Rest Requirements

    The proposed rule would continue some of the rest requirements 
which are contained in the existing regulations. Proposed 
Secs. 121.483(a) and 135.271(a) would state that no certificate holder 
may assign any flight crewmember and no flight crewmember may accept 
any duty period or flight time with the certificate holder unless the 
flight crewmember has had at least the minimum rest period required. 
Proposed Secs. 121.483(b) and 135.271(b) would state that no duty could 
be assigned during any required rest period. This proposed requirement 
would preclude any carrier from assigning any type of duty, including 
nonflight assignments (such as training, assigned time, reserve time, 
standby duty, or ground duties), to any flightcrew member during a 
required rest period. These proposed requirements are the same as those 
in current Sec. 121.471(c)(4) and (e) and Sec. 135.263(a) and (b).
    Proposed Secs. 121.483(c) and 135.271(c) would be a new requirement 
to clarify that rest periods required under the subpart can occur 
concurrently with any other required rest period. For instance a 
required 10-hour rest could occur concurrently with the 36-hour rest 
required under proposed Secs. 121.483(e) and 135.271(e). Further, under 
the proposal, if a flight crewmember is not serving in assigned time, 
reserve time, standby duty or a duty period, that crewmember would be 
in a rest period.
    Proposed Secs. 121.483(d) and 135.271(d) would be a new requirement 
stating that a rest period required in Secs. 121.473, 121.475, or 
135.263 may be reduced only because of operational delays. The 
reductions may not be scheduled in advance.
    Current Secs. 121.471 and 135.265 require each domestic air carrier 
operating under part 121 and each 

[[Page 65963]]
certificate holder in scheduled operations under part 135 to relieve 
each flight crewmember engaged in scheduled air transportation from all 
further duty for at least 24 consecutive hours during any 7 consecutive 
days. Proposed Secs. 121.483(e) and 135.271(e) would require that each 
flight crewmember who is assigned to one or more duty periods, standby 
duty, or reserve time shall be provided a rest period of at least 36 
consecutive hours during any 7 consecutive calendar days. The proposed 
36-hour rest could be taken during a layover. Thirty-six hours of rest 
is the amount of time recommended by the NASA Scientific Working Group 
(2.1.3); further the FAA believes that flight crewmembers should be 
provided at least 36 consecutive hours rest during any 7 consecutive 
calendar days any time they are assigned to reserve regardless of the 
nature of the reserve. This allows flight crewmembers the time to plan 
for and obtain a thorough rest so that they are not fatigued if they 
receive a duty period assignment.
    The Air Transport Association proposed, during the ARAC 
discussions, that this provision be applied over a period of 168 
consecutive hours rather than 7 consecutive calendar days. We believe 
that it would be more difficult for crewmembers and carriers to 
maintain records in this fashion. However, commenters are invited to 
address this issue more fully in their comments. If adequate 
justification is shown for using 168 hours rather than 7 calendar days, 
the final rule may incorporate that proposal. Commenters should note 
that any change in this provision would likely require corresponding 
changes in the flight time limitations proposed in Secs. 121.481 and 
135.269.
    Proposed Secs. 121.483(f) and 135.271(f) would require certificate 
holders to provide each flight crewmember assigned to assigned time, as 
defined in proposed Secs. 121.471 and 135.261, a minimum rest period of 
10 hours before the commencement of a subsequent duty period. This rest 
period may occur concurrently with another required rest period. This 
proposed rest requirement is needed to address situations in which a 
flight crewmember is assigned to one of a group of activities that are 
neither rest nor part of an assignment involving flight time, but which 
could contribute to crewmember fatigue (e.g. training, deadhead 
transportation, etc.). The intent of this proposed rule is for flight 
crewmembers to have the opportunity to obtain sufficient rest in order 
to be able to perform assigned flight duties, regardless of whether the 
fatigue was caused by flight duties or by other activities for the 
certificate holder. However, certificate holders have the option of 
counting assigned time as part of a duty period and scheduling the 
appropriate rest period for that duty period or of counting assigned 
time exclusively as assigned time and ensuring that the flight 
crewmember is given 10 hours of rest before commencing a duty period. 
The 10 hours is consistent with the other required rest periods.
    For example, a flight crewmember could be deadheaded to a new 
location at the beginning of a duty period and then begin a schedule 
flight assignment. In this case the deadhead transportation would be 
counted as part of the duty period. Alternatively, after completing a 
duty period, a flight crewmember could be deadheaded back to his or her 
home base before beginning the required rest period. In this case the 
deadhead transportation could be considered assigned time. Performing 
assigned time after the completion of a duty period would be permitted 
as long as the flight crewmember received the minimum rest required for 
that duty period or 10 hours, whichever is greater, before the next 
duty period.
    Proposed Secs. 121.483(g) and 135.271(g) would establish a 
requirement for a certificate holder to provide each flight crewmember 
at least 48 consecutive hours of rest upon return to the flight 
crewmember's home base after completion of one or more duty periods 
that terminate in a time zone or zones that differs from the time zone 
of the flight crewmember's home base by 6 or more hours and the flight 
crewmember remains in that time zone or zones for at least 48 
consecutive hours. The accumulation of the 48 hours may be in one or 
more time zones but each of these time zones must be 6 or more hours 
from the flight crewmember's home base. The flight crewmember must 
receive this rest before beginning a subsequent duty period. The home 
base is determined by the certificate holder and is where that 
crewmember is based and receives schedules. The present rules make no 
provisions for rest periods based on time zones. The NASA Scientific 
Working Group data and subjective comments from crewmembers indicate 
there is a need to recognize the additional fatigue effects of crossing 
time zones (2.1.4). The literature indicates that some flight 
crewmembers experience, at times, additional fatigue from crossing as 
few as two time zones; while others do not report the same fatigue 
until they have crossed many more time zones. The FAA recognizes the 
complicated problem of addressing each individual flight crewmembers 
circadian rhythm; nevertheless by establishing a minimum rest 
requirement at the home base for flight crewmembers who cross 6 or more 
time zones the FAA believes these flight crewmembers will be given an 
opportunity to once again establish what is for that flight crewmember 
the normal sleep awake cycle. The proposed rest requirement is a 
minimum requirement and is provided to give the flight crewmember an 
opportunity for rest. The flight crewmember should use this time to 
obtain the needed rest so that he or she will be rested when called 
upon for the next duty period. The FAA will issue advisory material 
based on scientific studies to assist air carriers and flight 
crewmembers in dealing with fatigue related issues.

Deadhead Transportation

    Current Secs. 121.471(f) and 135.263(c) specify that time spent in 
transportation, not local in character, that a certificate holder 
requires of a flight crewmember and provides to transport the 
crewmember to an airport to which he or she is to serve on a flight as 
a crewmember, or from an airport at which the flight crewmember was 
relieved from duty to return to his or her home base is not considered 
part of a rest period. This type of transportation is commonly called 
``deadhead'' transportation. Proposed Secs. 121.485 and 135.273 would 
be the same as the current requirement except that in addition it would 
specify that for duty period limitation purposes the certificate holder 
and flight crewmember must consider deadhead time as assigned time or 
as part of a duty period associated with flight.

Other Flying for a Certificate Holder

    Proposed Secs. 121.487 and 135.275 establish duty period and flight 
time limitations for other flying for a certificate holder, including 
flying under part 91. Flight crewmembers and certificate holders must 
ensure that any duty periods and flight assignments assigned by the 
certificate holder are scheduled, assigned, and performed under the 
applicable requirements of parts 121 and 135 (14 CFR 121.473, 121.477, 
121.479,121.481, 121.483, and 14 CFR 135.263, 135.265, 135.267, 
135.269, and 135.271) even if the flight is not conducted under part 
121 or 135. In addition, any flight crewmember who is employed by two 
or more air carriers or commercial operators must ensure that any duty 
periods and flight assignments are scheduled, assigned and performed 
under the applicable rules of parts 121 and 135. In other 

[[Page 65964]]
words, when certificate holders assign flight crewmembers to conduct 
ferry flights, or other flights under part 91, this flight assignment 
is treated just as any other duty period involving flight.
    This proposal is based on NTSB recommendation A-94-105, which was 
issued as a result of the Guantanamo Bay accident, discussed above 
under ``NTSB Recommendations'' and the FAA's belief that other flying 
for a certificate holder such as training flights for a 121 or 135 
certificate holder may cause both short term and cumulative fatigue 
which may adversely effect that flight crewmember's flight duties 
performed under parts 121 and/or 135. This would include flying for 
more than one part 121 and/or 135 certificate holder.

Proposed Effective Date for Final Rule

    The FAA is proposing an effective date of 60 days after these 
proposals are published as a final rule. By that date all certificate 
holders operating under part 121 or part 135 would have to begin 
scheduling all flight time duty periods and rest periods in accordance 
with the new requirements. However, as mentioned above under ``Commuter 
Rulemaking,'' the FAA intends to coordinate the effective date of this 
rulemaking with the compliance date of the commuter rulemaking, so that 
certificate holders conducting commuter operations will have to change 
their procedures for scheduling flight time, duty periods, and rest 
periods only once.
    The FAA requests comments on the length of time needed between the 
issuance of the final rule and its effective date.

Regulatory Impact Analysis Summary

    Proposed changes to Federal regulations must undergo several 
economic analyses. First, Executive Order 12866 directs that each 
Federal agency shall propose or adopt a regulation only upon a reasoned 
interpretation that the benefits of the intended regulation justify its 
costs. Second, the Regulatory Flexibility Act of 1980 requires agencies 
to analyze the economic effect of regulatory changes on small entities. 
Third, the Office of Management and Budget directs agencies to assess 
the effect of regulatory changes on international trade. In conducting 
these analyses, the FAA has determined that this Notice of Proposed 
Rulemaking (NPRM) would probably generate benefits and cost savings 
that are greater than its costs and is ``a significant regulatory 
action'' as defined in the Executive Order. The FAA also estimates that 
the NPRM would have a significant economic impact on a substantial 
number of small entities. No part of the proposed rule is expected to 
constitute a barrier to international trade. These analyses, available 
in the docket, are summarized below.
    This proposal would amend existing regulations to establish one set 
of duty period limitations, flight time limitations, and rest 
requirements for flight crewmembers engaged in air transportation. 
Currently, these limitations and requirements differ across the various 
sectors of the industry (e.g., part 121, part 135). In addition, the 
FAA is required to consider alternatives to the proposed rule when the 
following circumstances are met:

--The regulatory action is designated as a ``significant regulatory 
action'' (as defined by Executive Order 12866), and
--The regulatory action is designated as having a significant impact on 
a substantial number of small businesses, nonprofit groups, or airports 
operated by small governmental jurisdictions.

    The FAA has determined that the potential economic impacts of the 
proposed rule are sufficiently large that both of these criteria are 
satisfied. Accordingly, two alternatives will be discussed in the 
section entitled ``Analysis of Alternatives'' below.

Cost-Benefit Analysis

Proposal

    As mentioned above, the main thrust of the proposal is to amend 
existing regulations to establish one set of duty period limitations, 
flight time limitations, and rest requirements for flight crewmembers 
engaged in air transportation. The proposal would establish a basic 
scheduling limitation for 2 pilot crews of 14 hours of scheduled duty 
and 10 hours of scheduled rest. The maximum length of duty periods 
permitted would increase as the number of pilots increases. The 
proposal would also revise limits on the amount of flight time which a 
flight crewmember can accrue in a duty period, in any 7 consecutive 
calendar days, and in a calendar month. The maximum duty period limits 
would be decreased in most cases for part 121 and part 135 operators, 
and the required length of rest periods would be increased. These 
changes are expected to impose unquantifiable costs on unscheduled part 
135 operators.
    Although the maximum length of duty periods would generally 
decrease under the proposal, the maximum allowable flight times for 
pilots operating 2-pilot aircraft (no flight engineer) would increase 
from 8 to 10 hours. This provision should create the potential for 
substantial cost savings for both part 121 and 135 operators.
    The FAA determined that 2 provisions of the proposed rule could 
impose substantial quantifiable costs. Another provision could impose 
substantial costs on the commuter operators, but could not be 
quantified. The potential economic impacts on the air taxi operators of 
these provisions could not be quantified at this time. The most costly 
provision applies to the scheduling and duty assignments of reserve 
pilots. A reserve pilot must be available to report upon notice for a 
duty period with one hour or longer of notice. The proposal would 
require that the maximum length of a duty period be reduced in those 
cases when less than 10 hours of notice for a duty period assignment is 
received. The proposal would also provide another option under which a 
flight crewmember could be given a regularly scheduled minimum 6 hour 
protected time within each 24 hours of reserve time.
    The other provision which would impose substantial quantifiable 
costs would require that ``ferry'' flight time used to reposition 
aircraft be counted the same as time accrued in part 121/135 revenue 
operations for the purpose of determining compliance with FAA 
limitations on duty periods and flight time limitations. Another 
provision that would increase the minimum required rest periods between 
flight duty periods might impose substantial costs on the commuter 
operators, but they cannot be quantified without additional data. The 
provisions pertaining to reserve pilot scheduling might also impose 
substantial costs on air taxi operators, but these costs could not be 
quantified.

Cost Analysis

    As described in more detail in the Regulatory Impact Analysis, the 
FAA has relied heavily on surveys of a limited number of operators to 
develop its analysis. The FAA is interested in comments on the 
representativeness of the data used for extrapolation to the entire 
affected population. Where commenters believe these survey data do not 
reflect the circumstances/responses for operators generally, the FAA 
welcomes any and all relevant data supporting such claims.
    The FAA also seeks comments on its methodology, assumptions, and/or 
data used to estimate the following:
    (1) The efficiency gains from the increase in allowable flight time 
from 8 to 10 hours. 

[[Page 65965]]

    (2) The likely operator response to the reserve pilot requirements 
(i.e., the likelihood of operators choosing between canceling flights 
and adding pilots),
    (3) The cost to operators and passengers of flight cancellations 
and of adding pilots, and
    (4) The potential safety benefits from reduced fatigue.
Part 121  Air Carriers
    The FAA estimated the economic impact of each provision of this 
proposed rule. Some of the provisions by themselves were estimated to 
entail substantial compliance costs, whereas others have the potential 
for affording substantial cost savings to operators.
    The proposed rule is estimated to impose discounted costs of 
$842.03 million on part 121 operators over the next 15 years, but these 
costs are expected to be offset by the cost savings. The total 
potential discounted cost savings from increased productivity were 
estimated at $1.72 billion over this period. The net discounted 
compliance cost savings of the proposed rule would therefore amount to 
$877.90 million over this period. The cost savings would result if 
operators take advantage of opportunities afforded by the proposal to 
more efficiently schedule their existing workforce, which could enable 
them to reduce their plans for hiring new pilots by 3,348 pilots over 
the next 15 years.
Costs
    The FAA determined that the primary cost of implementing the 
reserve pilot scheduling and duty time regulations would consist of the 
cost of reassigning some scheduled airline pilots or hiring new pilots 
to assure adequate coverage of flights that would otherwise have to be 
canceled or delayed. Other provisions of the proposal, however, may 
allow operators to use on-line pilots more intensively; therefore, the 
need for additional reserve pilots is likely to be satisfied by 
reassigning on-line pilots that would become available because of 
enhanced productivity. In addition, a relatively small number of 
flights might be canceled.
    These cost estimates were based on the least cost combination of 
reserve pilot scheduling options for each operator based on the nature 
of its flight operations, such as the amount of advance notification 
provided reserve pilots and duty period durations. The FAA estimates 
that the part 121 scheduled operators would have to hire an additional 
500 pilots, representing a 1% increase in their current pilot staffing 
level, thereby increasing their recurring annual salary costs by $41.29 
million. In addition, the FAA estimated that the flight cancellations 
resulting from decreased flexibility in scheduling reserve pilots would 
impose societal costs (the value of delayed passenger time) amounting 
to $8.12 million per year. The total potential cost of the reserve 
pilot regulation was therefore estimated at $49.40 million annually 
after the first year the proposed rule were in effect for part 121 
scheduled carriers. In the first year, this annual cost would be 
increased by $9.26 million to $58.66 million to capture initial 
training costs.
    The FAA determined that the reserve pilot regulation would also 
impose substantial costs on part 121 unscheduled or ``supplemental'' 
air carriers. The economic impact on these air carriers is expected to 
be greater than for the scheduled part 121 carriers because of the less 
predictable nature of their operations, which doesn't allow them to 
give as much advance notification of flight assignments to their 
reserve pilots. The FAA estimated that approximately 330 additional 
pilots, representing about 4% of their present pilot staffing level, 
would need to be hired by these air carriers at a recurring annual cost 
of $24.02 million.
    The FAA determined that the proposed restriction on ``ferry'' 
flights would have very little, if any, impact on scheduled part 121 
operators. These proposed restrictions, however, could have a 
substantial economic impact on part 121 unscheduled operators, which 
are more likely than the scheduled operators to conduct these 
operations because of the greater distance between crew bases and 
destination points of their revenue flights. The FAA estimated that 
these operators would have to hire an additional 235 pilots (3% 
increase in current pilot staff) to avoid major disruptions in their 
flight schedules, entailing recurring annual costs amounting to $17.04 
million.
    The total recurring annual potential compliance costs (reserve 
pilot and ``ferry flight'' restrictions) for unscheduled or 
supplemental operators were therefore estimated at $41.06 million. The 
first year initial training costs for these unscheduled air carriers 
were estimated to add $10.10 million to annual costs in the first year.
    In summary, the total first year annual compliance costs for all 
part 121 air carriers of the reserve pilot regulation and restriction 
on ferry flights were estimated at $110.28 million. Societal costs 
resulting from canceled flights were estimated to comprise $8.12 
million of this total. These costs were estimated based on the time 
that passengers on canceled flight would be delayed, which the analysis 
assumes would be two hours. Total discounted costs were estimated at 
$842.46 million over the period from 1996-2010.
Cost Savings
    The FAA expects that these costs would be more than offset by cost 
savings afforded the scheduled part 121 operators by the opportunity to 
more effectively utilize their flight crewmembers. The potential cost 
savings for the unscheduled part 121 air carriers, however, are not 
expected to be of a sufficient magnitude to outweigh the proportionally 
higher potential costs that were estimated for this sector of the 
industry. Under the proposal, both scheduled and unscheduled air 
carriers could increase the maximum permitted flight times within 
individual duty periods from 8 to 10 hours for 2-pilot crews.
    The potential productivity gains from this provision should enable 
scheduled part 121 air carriers to maintain their current schedules 
with fewer pilots and transfer some pilots from active or nonreserve to 
reserve status. The decrease in the anticipated need for pilots among 
the scheduled air carriers is expected to substantially outweigh any 
potential increased need for pilots among the unscheduled air carriers. 
In other words, the overall need for pilots in future years should 
decrease because the positive economic effects resulting from increased 
productivity are expected to outweigh the negative economic impacts of 
the need for more reserve pilots.
    Data collected by the FAA indicate that domestic air carriers do 
not fly their crewmembers close to the maximum permitted current limit 
of 100 hours per month. The average monthly flying time for the 
scheduled air carriers is 60 hours. The part 121 unscheduled operators 
tended to fly their crewmembers from 40-60 hours per month. In fact, 
most unionized air carriers are prevented by labor contracts from 
flying their crewmembers more than 75-80 hours per month.
    If this proposed rule is adopted as an amendment, most air carriers 
would likely attempt to take advantage of the opportunity to utilize 
their crewmembers more effectively. The increase from 8 to 10 hours in 
the maximum permitted flight hours 2-pilot crews could fly within 
individual duty periods should provide an incentive for air carriers to 
increase the daily flight hours and hence monthly flight hours of their 
crews and decrease the amount of duty time which is not flight time. 
The FAA determined that air carriers would 

[[Page 65966]]
most likely be able to increase utilization of their pilots by 4% on 
average (which would amount to an additional 2 flight hours per month 
per pilot in most cases).
    Air carriers would realize these productivity gains only to the 
extent that their pilot salary costs would not increase. Such an 
assumption appears warranted for the following reasons. The FAA 
estimated that about 10% of the pilot salary cost of the major air 
carriers is for nonproductive time (i.e., time within a duty period 
that is not devoted to actually flying the airplane). Air carriers 
frequently pay pilots for this nonproductive time at a reduced hourly 
rate, as established by formulas in their contracts. The proposal would 
allow them to significantly reduce this nonproductive time by 
permitting an increase in maximum flight hours from 8 to 10 hours 
within a shorter duty period.
    Many unionized part 121 air carriers would probably have to 
renegotiate their contracts in order to reduce the amount of 
nonproductive time for which they are currently paying. Renegotiation 
would not be required, however, in order to add about 2 hours on 
average to monthly pilot flying hours because actual flying hours are 
currently considerably lower than the maximum range of 75-80 hours 
under most contracts. In addition, the nonunionized air carriers would 
in theory have a greater potential for increasing flight hours flown by 
their crewmembers because their maximum limits on flight hours tend to 
be closer to the current regulatory maximums of 1,000 hours per year. 
Under the proposal, the maximum monthly flight time of 100 hours per 
month would effectively allow 1,200 hours of flight time per year, 
thereby affording them the potential of a 20% increase in productivity 
(nonunionized air carriers account for 16% of the operations flown by 
all part 121 air carriers). This analysis, however, only assumes a 4% 
increase in productivity.
    The FAA estimated that a 4% overall productivity enhancement would 
afford part 121 carriers overall total cost savings amounting to $3.07 
billion (present value, $1.72 billion) over the next 15 years. These 
estimates are based on an expected decrease of 3,348 new pilots hired 
over this period and an average loaded salary of $82,572 for part 121 
scheduled and $72,600 for part 121 supplemental. In addition, initial 
training costs of $18,516 for part 121 scheduled pilot and $17,908 for 
part 121 supplemental pilot were used in this analysis as in the cost 
analysis.
    This estimate should be regarded as an lower bound for potential 
cost savings arising from the increase in pilot productivity. 
Productivity cost savings above 4% are theoretically possible; however, 
due to any salary increases that unions may negotiate, the air carriers 
may not be able to achieve all of these savings. In any event, air 
carriers would have a greater opportunity to limit pay for 
nonproductive time under the proposal, as noted above, which currently 
amounts to a significant part of their total salary costs. The FAA does 
not have sufficient information to assess the interplay of these 
factors in determining pilot salaries and requests comments from the 
public on this issue.
    Longer proposed flying hours would also allow air carriers to 
reduce the number of 3-pilot crews in favor of 2-pilot crews. The FAA 
estimates an additional savings of 200 pilots, with annual net cost 
savings which could amount to $20.40 million in the first year and 
$16.54 million in subsequent years. These potential cost savings were 
estimated at $119.62 million (discounted) over a 15-year period. 
Consequently, total cost savings of the proposed rule for part 121 air 
carriers is expected to amount to $3.32 billion (present value, $1.87 
billion) over the next 15 years.
Part 135  Scheduled Air Carriers
    The proposed rule is estimated to impose discounted quantifiable 
costs of $56.75 million on part 135 carriers over the next 15 years, 
but these costs could be offset by cost savings. The total potential 
cost savings of the proposed rule are expected to amount to $94.04 
million over the next 15 years. The net cost savings, which would 
result from an expected net reduction of 353 new pilots hired over the 
next 15 years, could therefore amount to $50.68 million over this 
period. This conclusion is contingent on the assumption that these 
operators would be able to modify their flight schedules so as to avoid 
expenses associated with longer minimum rest periods without 
significantly affecting revenues.
Costs
    The FAA estimated that the reserve pilot provisions of the proposal 
would result in the hiring of 152 additional pilots in order to avoid 
having to cancel flights because of inadequate reserve pilot resources. 
The increased annual cost for the industry was estimated at $6.12 
million. In addition, these operators are expected to incur incremental 
initial training costs amounting to $1.06 million in the first year the 
proposed rule is in effect, increasing annual compliance costs to $7.18 
million in that year. These costs would amount to a discounted $56.75 
million over a 15-year period.
Cost Savings
    Part 135 scheduled airlines would reap potential cost savings 
amounting to $145.04 million (present value, $84.76 million) over the 
next 15 years. Although these operators currently tend to utilize their 
pilots more intensively than the part 121 operators (i.e., 74-89 
hours), they still utilize them well under the proposed regulatory 
maximum of 100 hours a month. The potential for a 4% increase in 
productivity would still remain. The fact that a considerably smaller 
portion of the part 135 pilot workforce is unionized would remove that 
possible constraint to increased productivity.
    These potential cost savings are based on a projection that these 
operators would need 353 fewer pilots at an average annual loaded 
salary of $40,280 that was used in the analysis of costs. In addition, 
initial training costs of $6,948 per pilot would be saved.

Benefits

    The FAA has promulgated flight time limitation rules that contain 
rest requirements for certain operations and weekly and monthly limits 
on the number of hours of flight time in an effort to protect flight 
crewmembers from work-related fatigue. The issue did not receive much 
publicity until May 1994, when the NTSB cited pilot fatigue as a 
probable cause in an accident when the captain lost control of a DC-8 
freighter while approaching the U.S. Naval Station Airbase at 
Guantanomo Bay, Cuba in August 18, 1993. Prior to that time, this 
factor had never been cited by the NTSB as a probable cause in an 
accident involving part 135 or 121 operations.
    In its investigation, the NTSB noted that the flight crew had been 
on duty about 18 hours and had flown about 9 hours at the time of the 
accident. Under the proposed rule, this flight would have been illegal 
because the maximum length of a duty period for a 3-person flight crew 
on an airplane lacking appropriate sleeping quarters is 16 hours. In 
addition, the company had intended to further extend this flight by 
having the crew ferry the airplane back to Atlanta after the plane had 
landed at Guantanamo Bay, which would have resulted in a total duty 
time of 24 hours. The NTSB report specifically noted that the flight 
crewmembers had experienced a disruption of circadian rhythms and sleep 
loss, which resulted in fatigue that had adversely affected 

[[Page 65967]]
performance during the critical landing phase.
    The National Aeronautic and Space Administration (NASA) Ames 
Research Center has been studying this issue since 1980 and has 
published a number of studies on it. These studies have established a 
relationship between long duty periods and fatigue and between fatigue 
and a deterioration in performance.
    It is very difficult to quantify the potential safety benefits of 
this proposed rule because of the scarcity of accidents that have been 
attributable to pilot fatigue. The NTSB has not focused on this issue 
until quite recently in its accident investigations. The FAA believes 
that the investigation of the effects of fatigue on pilot performance 
should not be limited to a review of relevant accidents. A better 
understanding of this issue can be gained from examining incident 
reports submitted by pilots to the National Aeronautical and Space 
Administration's Aviation Safety Reporting System (ASRS). Since January 
1, 1986, ASRS has received 21 reports of unsafe incidents resulting 
from fatigue by pilots engaged in part 121 operations and 200 reports 
from pilots conducting part 135 operations. Although these incidents 
did not actually result in accidents, they were of a sufficiently 
serious nature that pilots filed a report with NASA with the hope of 
gaining the attention of the regulatory authorities.
    NASA has sponsored some research into the issue of the relationship 
between fatigue and performance decrements based on information 
contained in these incident reports. The researchers found that about 
21% of the reports citing air transport flight crew errors were related 
to the general issue of fatigue. The researchers selected a control or 
comparison group of incident reports citing these problem areas but 
where fatigue was not an apparent factor. Most of the incidents in both 
data sets involved altitude or clearance operational deviations (e.g., 
taking off or landing without clearance). The deviations within the 
fatigue set tended to occur more frequently during the more critical 
descent, approach, and landing flight phases. This finding was expected 
because fatigue is most likely to set in towards the end of a flight or 
work day. Another key finding was that duty period length and workload 
level were most frequently cited as being responsible for the fatigue.
    The FAA has quantified the economic value of all major accidents 
involving the part 121 air carriers and part 135 air carriers over the 
1985-1994 period that were attributable to pilot error. For the part 
121 analysis, the FAA examined the seating capacity, average passenger 
load, and the average replacement cost of a representative sample of 
both narrow body and wide body aircraft. The FAA examined the same 
factors in estimating the cost of a part 135 accident.
    For the part 121 analysis, the FAA assumes that an average airplane 
costs $14.75 million in 1994 dollars and carries 107 people (101 
passengers, 3 flight crewmembers, and 3 flight attendants). In order to 
provide the public and government officials with a benchmark comparison 
of the expected safety benefits of rulemaking actions over an extended 
period of time with estimated costs in dollars, the FAA currently uses 
a value of $2.7 million to statistically represent a human fatality 
avoided. The values for serious and minor injuries are $518,000 and 
$38,000, respectively. For the part 135 analysis, the FAA used the same 
assumptions regarding the value of a human life and injuries. The 
amount of airplane damage and severity of injuries was based on a 
review of NTSB reports of all accidents involving 10-30 seat aircraft 
over the period from 1985-1994.
    Based on these assumptions, the FAA estimated that the economic 
value of the 71 serious accidents involving pilot error used in part 
121 scheduled operations that were involved in serious accidents over 
the 1985-1994 period at $1.896 billion. Projecting this total from 1996 
to 2010 yields a discounted $1.151 billion. The comparable total for 
the 8 serious accidents involving pilot error used in part 121 
supplemental operations that were involved in serious accidents over 
this time period was $273.9 million. Projecting this total from 1996 to 
2010 yields a discounted $166.3 million. The corresponding total for 
the 71 aircraft involving pilot error used in part 135 operations with 
10 to 30 seats that were involved in serious accidents over that period 
was $602.32 million. Projecting this total from 1996 to 2010 yields a 
discounted $365.73 million.
    The NASA research study summarized above revealed that 21% of pilot 
error incidents were related to fatigue. Applying this proportion to 
the total discounted value of the pilot error accidents, using the 
assumptions noted above, one could conclude that fatigue resulted in 
accidents valued at $398.24 million (present value, $241.81 million) 
for part 121 scheduled operations, $57.52 million (present value, 
$34.92 million) for part 121 supplemental operations, and $126.49 
million (present value, $76.80 million) for part 135 operations over a 
15-year period. These estimates could be used to provide some idea of 
the potential safety benefits of this proposed rule, assuming it is 
100% effective in preventing these types of accidents.

Cost Savings and Benefits

    Initial annual quantifiable compliance costs for part 121 
scheduled, part 121 supplemental, and scheduled part 135 air carriers 
were estimated at $58.66 million, $41.16 million and $7.18 million, 
respectively. Subsequent annual quantifiable compliance costs were 
estimated at $49.40 million, $41.06 million and $6.12 million, 
respectively. Over the period from 1996 to 2010, costs would amount to 
$750.33 million (present value, $458.63 million), $625.99 million 
($383.40 million) and $92.89 million (present value, $56.75 million), 
respectively.
    For part 121 scheduled operators, these compliance costs should be 
more than offset by cost savings that are projected to result from 
productivity enhancements for the scheduled part 121 carriers. The same 
conclusion may apply to the part 135 operators as well in view of the 
potential magnitude of the unquantifiable costs. But cost savings 
expected to accrue to the part 121 supplemental carriers are not 
expected be sufficient to offset potential costs for this sector of the 
industry.
    The estimates for the scheduled part 135 air carriers do not 
include the potential costs of the proposed general limitations on 
flight duty and rest periods, which are expected to be fairly 
significant, although not quantifiable at the present time. On the 
other hand, these estimates do not take account of potential cost 
savings as air carriers gain more experience in implementing the 
various combinations of the available options, which should in theory 
result in the selection of the most cost effective option. The extent 
to which these potential impacts would offset each other cannot be 
determined on the basis of the available data.
    These estimates also do not include the potential costs of the 
proposed rule for air taxi operators, which could not be quantified. 
The FAA expects that the costs of the reserve pilot restrictions would 
probably not be substantial for this sector of the industry because the 
majority of the operators should be able to adopt the second reserve 
pilot scheduling option without major operational disruptions. The FAA 
does not have sufficient information to estimate the potential 
compliance costs for this sector of the industry if the ``other 
commercial flying'' restrictions in the proposal are adopted. The 
potential for cost savings would appear 

[[Page 65968]]
to be more limited for these operators because of the point-to-point 
and geographically restricted nature of their operations, which would 
tend to limit the length of flight assignments.
    The FAA has quantified the economic value of all major accidents 
involving the part 121 fleet and part 135 fleet over the 1985-1994 
period that were attributable to pilot error. Based on this value and 
the proportion of incidents with similar causal factors where pilots 
were affected by fatigue, the FAA estimated that if proposed rule were 
100% effective at eliminating fatigue as a factor in accidents, it 
could prevent accidents involving part 121 scheduled operations valued 
at $242 million and part 121 supplemental operations at $35 million 
over a 15-year period. The same methodology yielded an estimate of $77 
million for the potential effectiveness of the proposal in preventing 
part 135 accidents. It is important to note that it is unlikely that 
this proposal would be 100% effective, in part because it addresses 
duty and rest times, but does not require pilots to rest. The FAA is 
unable to develop an estimate of effectiveness of this proposal in 
reducing fatigue-related incidents, but welcomes data and methodologies 
that may assist such an effort.
    The table below compares the costs, potential benefits, and cost 
savings sections. The FAA therefore concludes that the proposed rule 
would be cost beneficial for the part 121 scheduled operators, sector 
of the air transportation industry, would probably be cost beneficial 
for the entire part 121 sector of the air transportation industry, and 
could be cost beneficial for the scheduled part 135 operators as well, 
provided the unquantifiable compliance costs for the commuters do not 
exceed about $127.5 million (discounted) over a 15-year period.
    The FAA does not have sufficient information at this time to 
evaluate the cost effectiveness of this proposal for air taxi 
operators. A more definitive overall conclusion would not be 
appropriate in view of the lack of data pertaining to how the affected 
air carriers would modify their operations in order to comply with the 
proposed rule and also to take advantage of the opportunities to 
increase pilot productivity. The FAA has decided to issue this proposed 
rule with the expectation that additional data that can clarify these 
issues will be forthcoming.

                                                       Fifteen Year Discounted Costs/Cost Savings                                                       
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                    Part 121           Part 121                              Part 135                                   
                                                   scheduled         supplemental      Total part 121       scheduled                 Air taxi          
--------------------------------------------------------------------------------------------------------------------------------------------------------
Compliance costs.............................       $458,627,143       $383,403,020       $842,030,163        $56,750,685  Unknown.                     
    Reserve requirements.....................        458,627,143        224,331,554        682,958,697         56,750,685  Unknown.                     
    Other requirements.......................                  0        159,071,466        159,071,466                  0  Unknown.                     
Potential safety benefits....................        241,806,628         34,922,912        276,729,539         76,802,495  Unknown.                     
Net costs of reserve and other requirements..        216,820,515        348,480,108        565,300,623       (20,051,810)  Unknown.                     
Cost savings.................................      1,658,078,896        215,723,343      1,873,802,239        107,431,330  Unknown.                     
Increased flight times.......................      1,504,206,226        215,723,343      1,719,929,569        107,431,330  Unknown.                     
Other cost savings...........................        153,872,670                  0        153,872,670                  0  Unknown.                     
Net combined cost savings of proposal........      1,441,258,380      (132,756,765)      1,308,501,615        127,483,140  Unknown.                     
--------------------------------------------------------------------------------------------------------------------------------------------------------

    This rulemaking should be considered complimentary to the Commuter 
Rule and the Air Carrier Training Program final rule. One of the goals 
of these three rulemaking actions is to prevent the 67 accidents that 
represent the accident-rate gap between part 135 commuter operators and 
part 121 operators. The FAA estimates that over the next 15 years, 
closing this gap would prevent 67 accidents at a present value benefit 
of $350 million.
    In terms of the accident rate gap, the benefits of this NPRM are a 
part of this total benefit. However, it is not possible to allocate 
that benefit among the three rulemaking actions because it difficult to 
determine which rulemaking action would prevent a given accident. For 
example, individual accidents may be prevented by any one or a 
combination of several factors such as:
     Preventing the occurrence of a problem with an airplane in 
the first place (Commuter rule);
     Providing more or better crew training to properly respond 
to the problem after it occurs (Air Carrier Training Program rule);
     Providing a dispatcher to help identify a problem before 
it becomes a potential accident (Commuter rule);
     And ensuring pilots are not over-worked and tired (Pilot 
Rest and Duty NPRM).
    The Commuter Rule only addresses a portion of the necessary 
requirements to close the accident-rate gap. If the $51 million present 
value in net cost savings of this rule ($107 million in cost savings 
minus $56 million in costs) is combined with the cost of the Commuter 
Rule, $75 million, and the cost of Pilot Training, $34 million, the 
total cost, $58 million (-$51+$75+$34), is still less than the 
estimated $350 million benefit of eliminating the accident-rate gap. 
These rules combined need only be 17 percent effective to be cost-
beneficial. The $77 million in potential safety benefits of this 
proposed rule is a subset of the aforementioned $350 million.

Analysis of Alternatives

    As explained above, the FAA is required to consider alternatives to 
the proposed rule; the two alternatives will be discussed in this 
section. As indicated earlier in this preamble, if this proposal on 
reserve time assignments is not issued as a final rule, the FAA intends 
to ensure that the current rule, as interpreted, is being correctly 
implemented. The FAA has estimated that doing so could cost part 121 
operators in excess of $2.5 billion and part 135 operators in excess of 
$450 million discounted over the next 10 years. At the same time, the 
resulting potential safety benefits would be no more than those 
estimated for this proposal.

Alternative Number One

    This alternative would be to maintain the status quo. This option 
would not impose any costs on operators because it would not require 
that they change their pilot scheduling practices. It could impose 
costs on society, however, by increasing the risk of a preventable 
fatigue-related accident. The accumulation of a substantial body of 
scientific evidence documenting the harmful effects of fatigue on pilot 
performance have increased the need to amend these rules. In addition, 
given the scientific data available and the NTSB recommendations 
resulting from an accident at Guantanamo Bay in August 1993, this 
option is not feasible.

Alternative Number Two

    This alternative was the original proposal considered by the FAA. 
After surveying industry, the FAA determined 

[[Page 65969]]
that such a proposal would impose substantial costs, and that these 
costs would outweigh any potential benefits. Consequently, the current 
proposal was established, which uses some of the elements of this 
original proposal.
    This alternative would afford operators three options for 
scheduling their reserve pilots but does not address the fatigue 
problem for pilots who are not on reserve status. The three options for 
scheduling reserve pilots are as follows:

    Option 1: The certificate holder provides a minimum of 10 hours 
of advance notice of reporting time for flight duty.
    Option 2: The certificate holder provides 8 hours of rest each 
24 hour period of reserve duty. The 8 hours of rest must be assigned 
prospectively and remain constant for the duration of the reserve 
assignment.
    Option 3: For each 24 hour period of reserve duty the flight 
crewmember is limited to 18 hours of eligibility for flight duty, 
with the remaining 6 hours being set aside for rest.

    The potential annual compliance costs for the part 121 scheduled 
carriers were estimated at $225 million on an annual basis based on the 
assumption they would have to increase their pilot staffing by 4%. The 
second most heavily affected sector of the industry was the air taxi 
operators, who indicated they would have to increase their pilot 
staffing by 74%, resulting in potential annual compliance costs of $175 
million. The FAA estimated that commuter operators would increase their 
pilot staffing by 5% in order to avoid disrupting their flight 
schedules, resulting in potential annual compliance costs of $24 
million. Finally, the annual compliance cost for the part 121 
unscheduled operators was estimated at $11.5 million.
    The total annual cost was estimated to be $436 million for the air 
carrier industry. These costs would not be offset by any cost savings 
because of the limited nature of this alternative (i.e., applies only 
to reserve pilots). In addition, this alternative would have a 
considerably lower potential for preventing accidents than the proposal 
for the same reason. The FAA therefore concluded that this alternative 
would not be cost beneficial.

Initial Regulatory Flexibility Determination

    The Regulatory Flexibility Act of 1980 (RFA) requires Federal 
agencies to review rules that may have ``a significant economic impact 
on a substantial number of small entities.''
    Under FAA Order 2100.14A, the criterion for a ``substantial 
number'' is a number that is not less than 11 and that is more than one 
third of the small entities subject to the rule. This rule would 
primarily affect part 121 and 135 operators. For operators of aircraft 
for hire, a small operator is one that owns, but not necessarily 
operates, nine or fewer aircraft. The FAA's criteria for ``significant 
impact'' are $4,600 or more per year for an unscheduled operator, 
$119,900 or more per year for a scheduled operator whose airplane fleet 
has over 60 seats, and $67,000 or more for other scheduled carriers.

A. Initial Regulatory Flexibility Determination

    The present value cost savings of the proposed rule over the 10-
year study period would be $1.20 billion for the part 121 scheduled 
carriers or $148.47 million annualized at 7%. Based on a total fleet of 
3,429 airplanes for these air carriers, the projected annualized cost 
savings of this rule would be $43,298 per airplane. Given the threshold 
annualized cost of $119,900 for a small part 121 scheduled operator, 
the FAA estimates that the proposed rule would have a significant 
economic impact on any operator owning 3 or more aircraft but less than 
10 aircraft. However, there are only 7 small operators in this 
category. Since this is less than 11, a substantial number of these 
entities would not be affected.
    The present value of the net costs of the proposed rule over the 
10-year study period would be $139.56 million for the part 121 
unscheduled carriers or $19.82 million annualized at 7%. Based on a 
total fleet of 557 airplanes for these operators, the projected annual 
cost of this rule would be $42,747 per airplane. This exceeds the cost 
threshold of $4,600 per unscheduled operator for all small operators in 
this sector of the industry.
    The present value of the cost savings of the proposed rule over the 
study period has been estimated at $50.68 million for the part 135 
scheduled carriers or $7.2 million annualized at 7%. Based on a total 
fleet of 950 airplanes for these operators, the projected annual cost 
of this rule would be $7,579 per airplane. Given the threshold 
annualized cost of $67,000 for a small commuter operator, the FAA 
estimates that an operator would need to own exactly 9 airplanes in 
order to incur a significant economic impact. As there is only one part 
135 scheduled carrier with 9 airplanes, the FAA concludes that a 
substantial number of small entities in this sector of the industry 
would not be significantly affected by the proposed rule.
    The FAA requests comments from small air taxi operators regarding 
the potential economic impacts of this proposed rule on their 
operations. Would additional pilots be required to maintain the current 
scope of their operations?

B. Initial Regulatory Flexibility Analysis

    As the proposed rule would have a significant economic impact on a 
substantial number of small part 121 unscheduled operators, an initial 
regulatory flexibility analysis has been prepared. This analysis 
assures that agencies have examined selected regulatory alternatives 
that could minimize the economic burdens of the proposed rule on small 
entities. As delineated in section 603(b) of the RFA, this initial 
regulatory flexibility analysis is required to identify: (1) the 
reasons why the agency is considering this action, (2) the objectives 
and legal basis for the proposed rule, (3) the kind and number of small 
entities to which the proposed rule would apply, (4) the projected 
reporting, record keeping, and other compliance requirements of the 
proposed rule, and (5) all Federal rules which may duplicate, overlap 
or conflict with the proposed rule. This section of the RFA further 
requires that each initial regulatory flexibility analysis contain a 
description of any significant alternatives to the proposed rule which 
accomplish the stated objectives of applicable statutes and which 
minimize any significant economic impact of the proposed rule on small 
entities.
1. Why the Agency Action is Taken
    The main reason for the NPRM is that the FAA Administrator, when 
prescribing safety regulations, is required by statute to consider 
``the duty of an air carrier to provide service with the highest 
possible safety in the public interest.'' The FAA has determined that 
the most appropriate way to meet this statutory mandate is to ensure 
that flight crewmembers are provided with the opportunity to obtain 
sufficient rest to perform their routine and emergency safety duties. 
The need for this rulemaking is supported by studies on pilot fatigue 
conducted by NASA, anecdotal evidence of the problem contained in pilot 
reports submitted to the Aviation Safety Reporting System, and the 
complexity and age of the current flight duty and rest period 
restrictions.
2. Objective of and Legal Basis for the Proposed Rule
    The objective of the proposed rule is to increase safety in 
passenger- and cargo-carrying operations, both scheduled and 
unscheduled. The proposed rule would also clarify and 

[[Page 65970]]
simplify existing regulations pertaining to duty period limitations, 
flight time limitations, and rest requirements for crewmembers. This 
objective is more thoroughly discussed in the preamble to the NPRM.
    The legal basis for the proposed rule is 49 U.S.C. 106(g), 1153, 
40101, 40102, etc.
3. Description of the Small Entities Affected by the Proposed Rule
    The proposal would affect part 121 air carriers conducting both 
scheduled and unscheduled operations. The FAA estimates that the 
proposal would affect only one scheduled part 121 operator, which owns 
9 aircraft. The remaining operators in this category each own 5 or 
fewer aircraft, less than the number required for a substantial 
economic impact potential. The FAA estimates that the proposal would 
have a substantial economic impact on all 23 small part 121 unscheduled 
operators, which operate a total of 99 aircraft.
4. Compliance Requirements of the Proposed Rule
    The proposed duty period limitations, flight time limitations, and 
rest requirements would apply to all crewmembers conducting part 121 
domestic, flag, and supplemental operations, as well as those engaged 
in commuter and on-demand operations. These limitations and 
requirements would also apply to part 121 and 135 certificate holders 
conducting part 91 operations. The preamble to the NPRM provides a more 
thorough discussion of the compliance requirements of the proposed 
rule.
5. Overlap of the Proposed Rule With Other Federal Regulations
    No other Federal rules would duplicate, overlap, or conflict with 
the proposed rule.
6. Alternatives to the Proposed Rule
    Alternative Number One did not have any potential compliance costs. 
Alternative Number Two would have been more costly and would have had a 
significant impact on a substantial number of entities for the three 
industry areas where costs could be estimated. Alternative Number Two 
would have projected annual costs of $65,325 per aircraft for part 121 
scheduled operators. Therefore, any operator with 2 or more aircraft 
would be significantly affected by this alternative rule. Since these 
operators would comprise more than one-third of the total number of 
small operators in this category, the FAA concludes that a substantial 
number of small entities would be affected. In addition, Alternative 
Number Two was substantially more costly for part 121 unscheduled 
operators than the proposed rule, which would have affected all 
operators in this sector of the industry. The impacts of this 
Alternative on these operators would be considerably greater than the 
proposed rule.
    Alternative Number Two would have projected annual costs of $20,443 
per aircraft for part 135 scheduled operators.
    Therefore, any operator with 4 or more aircraft would be 
significantly affected by this alternative rule. Since these operators 
comprise at least one-third of the total number of small entities in 
this sector of the industry, the FAA concludes that a substantial 
number of small operators would be affected. This Alternative, which 
would be considerably more costly for on-demand air taxis than 
scheduled part 135 operators, would have a significant economic impact 
on a substantial number of small operators in this sector of the 
industry as well.
    In addition, the FAA considered an alternative proposal for part 
121 supplemental carriers that was proposed at an ARAC (Aviation 
Regulatory Advisory Committee) meeting. Under this proposal, part 121 
supplementals could develop alternative policies and procedures or 
flight schedules that allow a flight crewmember to anticipate when a 
flight time assignment might occur or that otherwise ensures a flight 
crewmember will not be assigned to a flight unless that flight 
crewmember is adequately rested for that flight assignment. However, 
the FAA rejected this option because it does not provide one level of 
safety for the industry. These different policies or procedures would 
be ripe for abuse by both certificate holders and pilots and they would 
be very difficult for the FAA to enforce. In short the FAA believes 
this alternative would not provide the same level of safety as the 
proposal. The FAA do
FR Doc. 95-30547 Flight Crewmember Duty Period Limitations, Flight Time Limitations and Rest Requirements
es, however request comments on other possible 
alternatives.

Initial Trade Impact Analysis

    The FAA believes that in specific foreign countries, including 
Great Britain, Germany, and some other European countries, pilot, 
flight, and duty regulations are more restrictive because they make use 
of more variables as constraints than in the United States. These 
variables include 1) take-offs and landings, 2) day or night flights, 
3) cumulative duty hours per week and month, 4) the number of flights 
in a duty period, 5) whether the flight crew is ``acclimated'' to the 
local time. The net impact of the proposal on the U.S. firms' operating 
costs is likely to be considerably less than the compliance costs with 
current rules because of the projected gains in productivity. Foreign 
air carriers may already be burdened with similar or higher costs to 
the extent the applicable regulations are as strict or more strict than 
the proposal. The FAA solicits information from commenters regarding 
these policies.
    Any impacts should be limited to the part 121 air carriers. Most of 
the nation's 65 commuter airlines operate almost exclusively on 
domestic routes, with only limited international operations and no 
transoceanic routes. Similarly, air taxi operators seldom fly outside 
of domestic airspace.

Federalism Implications

    The proposed regulations do not have substantial direct effects on 
the states, on the relationship between national government and the 
states, or on the distribution of power and responsibilities among 
various levels of government. Thus, in accordance with Executive Order 
12612, it is determined that such a regulation does not have federalism 
implications warranting the preparation of a Federalism Assessment.

Paperwork Reduction Act

    The reporting and recordkeeping requirements associated with this 
proposed rule remain the same as under the current rules and have 
previously been approved by the Office of Management and Budget under 
the provisions of the Paperwork Reduction Act of 1980 (Public Law 96-
511) and have been assigned OMB Control Numbers 2120-0585. The FAA 
believes that this proposed rule would not impose any additional 
recordkeeping or reporting requirements. If, however, a commenter finds 
that this notice would require additional recordkeeping or reporting, 
the FAA solicits specific information on the volume, type, and costs of 
the additional records or reports.

Conclusion

    For the reasons set forth under the heading ``Regulatory 
Analysis,'' the FAA has determined that this proposed regulation is a 
significant rule under Executive Order 12866, and is a significant rule 
under Department of Transportation Regulatory Policies and Procedures 
(44 FR 11034, February 26, 1979). Also, for the reasons stated under 
the headings ``Trade Impact Statement'' and ``Regulatory Flexibility 
Determination,'' the FAA certifies that the proposed rule would have a 
significant economic impact on a 

[[Page 65971]]
substantial number of small entities. A copy of the full regulatory 
evaluation is filed in the docket and may also be obtained by 
contacting the person listed FOR FURTHER INFORMATION CONTACT.

List of Subjects

14 CFR Part 121

    Air carriers, Aircraft, Aircraft pilots, Airmen, Airplanes, 
Aviation Safety, Safety.

14 CFR Part 135

    Air carriers, Aircraft, Airmen, Aviation Safety, Pilots, Safety.

The Proposed Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration proposes to amend the Federal Aviation Regulations (14 
CFR parts 121 and 135) as follows:

PART 121--CERTIFICATION AND OPERATIONS: DOMESTIC, FLAG, AND 
SUPPLEMENTAL AIR CARRIERS AND COMMERCIAL OPERATORS OF LARGE 
AIRCRAFT

    1. The authority citation for part 121 continues to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40113, 44119, 44101, 44701-44702, 
44705, 44709-44711, 44713, 44716-44717, 44722, 44901, 44903-44904, 
44912, 46105. 46103, 46105.

    2. Section 121.1 is amended by adding a new paragraph (g) to read 
as follows

Sec. 121.1  Applicability.

* * * * *
    (g) As specified in Sec. 121.487, the duty period limitations, 
flight time limitations and rest requirements of this part are also 
applicable to duty periods and flight time performed for a certificate 
holder conducting operations under part 91 or part 135 of this chapter.

Subpart R--[Removed and reserved]

    3. Subpart R (Secs. 121.480 through 121.493) is removed, and the 
subpart heading is reserved.
    4. Subpart Q is revised to read as follows:
Subpart Q--Flight Crewmember Duty Period Limitations, Flight Time 
Limitations and Rest Requirements
Sec.
121.471  Applicability and terms.
121.473  Pilot duty period limitations, flight time limitations, and 
rest requirements.
121.475  Flight engineer duty period limitations, flight time 
limitations, and rest requirements.
121.477  Reserve and standby assignments.
121.479  Additional flight crewmember duty period and flight time 
scheduling limitations.
121.481  Weekly and monthly flight crewmember flight time 
limitations.
121.483  Additional flight crewmember rest requirements.
121.485  Deadhead transportation.
121.487  Duty period and flight time limitations: Other flying for a 
certificate holder.

Subpart Q--Flight Crewmember Duty Period Limitations, Flight Time 
Limitations and Rest Requirements

Sec. 121.471  Applicability and terms.

    (a) This subpart prescribes duty period limitations, flight time 
limitations and rest requirements for flight crewmembers in domestic, 
flag, and supplemental operations.
    (b) For the purpose of this subpart the following terms and 
definitions apply:
    (1) Approved sleeping quarters means an area designated for the 
purpose of flight crewmembers obtaining sleep as approved by the 
Administrator.
    (2) Assigned time means a period of time when the flight crewmember 
is assigned by the certificate holder to activities other than flight 
duties or reserve time. Assigned time may include activities such as 
deadhead transportation, training, loading baggage, taking tickets, 
administrative tasks, or any other assignments at the direction of the 
certificate holder. Assigned time may be considered part of a duty 
period or not part of a duty period, at the discretion of the 
certificate holder.
    (3) Calendar day means a period of elapsed time, using Coordinated 
Universal Time or local time, that begins at midnight and ends 24 hours 
later at the next midnight.
    (4) Duty period means a period of elapsed time between reporting 
for an assignment involving flight time and release from that 
assignment by the certificate holder. The time is calculated using 
either Coordinated Universal Time or the local time of the flight 
crewmember's home base, to reflect the total elapsed time.
    (5) Operational delays means delays due to operational conditions 
and requirements that are beyond the control of the certificate holder 
such as adverse weather, aircraft equipment malfunctions, and air 
traffic control. It does not include late arriving passengers, late 
food service, late fuel trucks, delays in handling baggage, freight or 
mail, or similar events.
    (6) Protected time means a period of time during which a 
certificate holder may not contact the flight crewmember and the 
crewmember has no responsibility for work. Protected time occurs only 
during a reserve assignment pursuant to Sec. 121.477(b)(2).
    (7) Reserve time means a period of time when a flight crewmember 
must be available to report upon notice for duty involving flight time 
and the certificate holder allows the flight crewmember at least 1 hour 
to report. Reserve time is not considered part of a rest period and is 
not considered part of a duty period involving flight time. Reserve 
time ends when the flight crewmember reports for a duty period, when 
the flight crewmember is notified of a future flight assignment and 
released from all further responsibilities until report time for that 
assignment, or when the flight crewmember has been relieved for a rest 
period. Reserve time does not include activities defined as ``assigned 
time.''
    (8) Rest period means a period of time free of all restraint or 
duty for a certificate holder and free of all responsibility for work 
or duty should the occasion arise. A flight crewmember is not ``free of 
all restraint'' or ``free of all responsibility'' if that person must, 
among other things, accept phone calls, carry a beeper, or contact the 
air carrier. If a flight crewmember is not serving in assigned time, 
reserve time, standby duty or a duty period, that crewmember would be 
in a rest period.
    (9) Standby duty means any period of time when a flight crewmember 
is required to report for a flight assignment in less than 1 hour from 
the time of notification. It also includes time when a flight 
crewmember is required to report to and remain at a specific facility 
(e.g. airport, crew lounge) designated by a certificate holder. Standby 
duty is considered part of a duty period. Standby duty commences when 
the flight crewmember is placed on standby duty. Standby duty ends when 
the flight crewmember is relieved from duty associated with an actual 
flight or is otherwise relieved from duty.

Sec. 121.473  Pilot duty period limitations, flight time limitations, 
and rest requirements.

    (a) A certificate holder may assign a scheduled duty period or 
reserve assignment to a pilot and a pilot may accept that assignment 
only when the applicable duty period limitations, flight time 
limitations, and rest requirements of this section are met.
    (b) Except as required in paragraphs (c), (d), and (e) of this 
section, no certificate holder may assign a flight crew consisting of 
two pilots, and no pilot may accept, a scheduled duty period of more 
than 14 hours. The duty period may not include more than 10 scheduled 
hours of flight time. Each pilot must be scheduled for a subsequent 
rest period of at least 10 consecutive hours. This rest period 

[[Page 65972]]
must occur between the completion of the scheduled duty period and the 
commencement of the next duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (b) may be reduced to no fewer than 9 consecutive hours if 
the pilot has not actually exceeded the maximum 14-hour duty period and 
if the pilot's next rest period is at least 11 hours. This subsequent 
rest period must be scheduled to begin no later than 24 hours after the 
beginning of the reduced rest period and must occur between the 
completion of the scheduled duty period and the commencement of the 
next duty period.
    (2) The duty period required under this paragraph (b) may be 
extended to 16 hours when the extension is due to operational delays. 
In this case the 10 hour rest period may not be reduced.
    (c) A certificate holder may assign a flight crew consisting of 3 
pilots, and a pilot may accept, a scheduled duty period of up to 16 
hours. The duty period may not include more than 12 scheduled hours of 
flight time. Each pilot must be scheduled for a subsequent rest period 
of at least 14 consecutive hours. This rest period must occur between 
the completion of the scheduled duty period and the commencement of the 
next duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (c) may be reduced to no fewer than 12 consecutive hours if 
the pilot has not actually exceeded the maximum 16-hour duty period and 
if the pilot's next rest period is at least 16 hours. This subsequent 
rest period must be scheduled to begin no later than 24 hours after the 
beginning of the reduced rest period and must occur between the 
completion of the scheduled duty period and the commencement of the 
next duty period.
    (2) The duty period required under this paragraph (c) may be 
extended to 18 hours when the extension is due to operational delays. 
In this case the 14 hour rest period may not be reduced.
    (d) A certificate holder may assign a flight crew consisting of 3 
pilots, and a pilot may accept, a scheduled duty period of more than 16 
hours, but no more than 18 hours. The duty period may not include more 
than 16 scheduled hours of flight time. Each pilot must be given an 
opportunity to rest in-flight in approved sleeping quarters. Each pilot 
must be scheduled for a subsequent rest period of at least 18 
consecutive hours. This rest period must occur between the completion 
of the scheduled duty period and the commencement of the next 
subsequent duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (d) may be reduced to no fewer than 16 consecutive hours if 
the pilot has not actually exceeded the maximum 18-hour duty period and 
if the pilot's next rest period is at least 20 hours. This subsequent 
rest period must be scheduled to begin no later than 24 hours after the 
beginning of the reduced rest period and must occur between the 
completion of the scheduled duty period and the commencement of the 
next subsequent duty period.
    (2) The duty period required under this paragraph (d) may be 
extended to 20 hours when the extension is due to operational delays. 
In this case the 18 hour rest period may not be reduced.
    (e) If the scheduled duty period includes one or more flights that 
land or take off outside the 48 contiguous states and the District of 
Columbia, a certificate holder may assign a flight crew consisting of 4 
pilots, and a pilot may accept, a scheduled duty period of more than 18 
hours but not more than 24 hours. The duty period may not include more 
than 18 scheduled hours of flight time. Each pilot must be given an 
opportunity to rest in-flight in approved sleeping quarters. Each pilot 
must be scheduled for a subsequent rest period of at least 22 
consecutive hours. This rest period must occur between the completion 
of the scheduled duty period and the commencement of the next 
subsequent duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (e) may be reduced to no fewer than 20 consecutive hours if 
the pilot has not actually exceeded the maximum 24 hour duty period and 
if the pilot's next rest period is at least 24 hours. This subsequent 
rest period must be scheduled to begin no later than 24 hours after the 
beginning of the reduced rest period and must occur between the 
completion of the scheduled duty period and the commencement of the 
next subsequent duty period.
    (2) The duty period required under this paragraph (e) may be 
extended to 26 hours when the extension is due to operational delays. 
In this case the 22 hour rest period may not be reduced.

Sec. 121.475  Flight engineer duty period limitations, flight time 
limitations, and rest requirements.

    (a) A certificate holder may assign a scheduled duty period or 
reserve assignment to a flight engineer, and a flight engineer may 
accept, a scheduled duty period only when the applicable duty period 
limitations, flight time limitations, and rest requirements of this 
section are met.
    (b) Except as provided in paragraphs (c), (d), and (e) of this 
section, no certificate holder may assign a flight engineer, and no 
flight engineer may accept, a scheduled duty period of more than 14 
hours. The duty period may not include more than 10 scheduled hours of 
flight time. Each flight engineer must be scheduled for a subsequent 
rest period of at least 10 consecutive hours. This rest period must 
occur between the completion of the scheduled duty period and the 
commencement of the next subsequent duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (b) may be reduced to no fewer than 9 consecutive hours if 
the flight engineer has not actually exceeded the maximum 14-hour duty 
period and if the flight engineer is provided with a subsequent rest 
period of at least 11 hours. This subsequent rest period must be 
scheduled to begin no later than 24 hours after the beginning of the 
reduced rest period and must occur between the completion of the 
scheduled duty period and the commencement of the next subsequent duty 
period.
    (2) The duty period required under this paragraph (b) may be 
extended to 16 hours when the extension is due to operational delays. 
In this case the 10 hour rest period may not be reduced.
    (c) A certificate holder may assign a flight engineer, and a flight 
engineer may accept, a scheduled duty period of more than 14 hours, but 
no more than 16 hours. The duty period may not include more than 12 
scheduled hours of flight time. Each flight engineer must be scheduled 
for a subsequent rest period of at least 14 consecutive hours. This 
rest period must occur between the completion of the scheduled duty 
period and the commencement of the next subsequent duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (c) may be reduced to no fewer than 12 consecutive hours if 
the flight engineer has not actually exceeded the maximum 16-hour duty 
period and if the flight engineer is provided with a subsequent rest 
period of at least 16 hours. This subsequent rest period must be 
scheduled to begin no later than 24 hours after the beginning of the 
reduced rest period and must occur between the completion of the 
scheduled duty period and the commencement of the next subsequent duty 
period.
    (2) The duty period required under this paragraph (c) may be 
extended to 18 hours when the extension is due to operational delays. 
In this case the 14 hour rest period may not be reduced.
    (d) A certificate holder may assign a flight engineer, and a flight 
engineer 

[[Page 65973]]
may accept, a scheduled duty period of more than 16 hours, but no more 
than 18 hours. The duty period may not include more than 16 scheduled 
hours of flight time. The certificate holder must assign to the flight 
or flights in that duty period at least two flight engineers. Each 
flight engineer must be given an opportunity to rest in flight in 
approved sleeping quarters. Each flight engineer must be scheduled for 
a subsequent rest period of at least 18 consecutive hours. This rest 
period must occur between the completion of the scheduled duty period 
and the commencement of the next subsequent duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (d) may be reduced to no fewer than 16 consecutive hours if 
the flight engineer has not actually exceeded the maximum 18-hour duty 
period and if the flight engineer is provided with a subsequent rest 
period of at least 20 hours. This subsequent rest period must be 
scheduled to begin no later than 24 hours after the beginning of the 
reduced rest period and must occur between the completion of the 
scheduled duty period and the commencement of the next subsequent duty 
period.
    (2) The duty period required under this paragraph (d) may be 
extended to 20 hours when the extension is due to operational delays. 
In this case the 18 hour rest period may not be reduced.
    (e) If the scheduled duty period includes one or more flights that 
land or take off outside the 48 contiguous states and the District of 
Columbia, the certificate holder may assign a flight engineer, and a 
flight engineer may accept, a scheduled duty period of more than 18 
hours but not more than 24 hours. The duty period may not include more 
than 18 scheduled hours of flight time. The certificate holder must 
assign to the flight or flights in that duty period at least two flight 
engineers. Each flight engineer must be given an opportunity to rest 
in-flight in approved sleeping quarters. Each flight engineer must be 
scheduled for a subsequent rest period of at least 22 consecutive 
hours. This rest period must occur between the completion of the 
scheduled duty period and the commencement of the next subsequent duty 
period.
    (1) Due to operational delays, the rest period required under this 
paragraph (e) may be reduced to no fewer than 20 consecutive hours if 
the flight engineer has not actually exceeded the maximum 24-hour duty 
period and if the flight engineer is provided with a subsequent rest 
period of at least 24 hours. This subsequent rest period must be 
scheduled to begin no later than 24 hours after the beginning of the 
reduced rest period and must occur between the completion of the 
scheduled duty period and the commencement of the next subsequent duty 
period.
    (2) The duty period required under this paragraph (e) may be 
extended to 26 hours when the extension is due to operational delays. 
In this case the 22 hour rest period may not be reduced.

Sec. 121.477  Reserve and standby assignments.

    (a) Standby duty. Standby duty commences when a flight crewmember 
is placed on standby duty. Standby duty periods must be scheduled in 
accordance with Secs. 121.473 or 121.475. Standby duty periods end when 
the duty period associated with a subsequent flight assignment ends or 
the flight crewmember is relieved from standby duty for a scheduled 
rest period.
    (b) Reserve time. A certificate holder may assign a reserve 
assignment to a flight crewmember and a flight crewmember may accept 
that assignment only when the applicable provisions of this section are 
met. Each flight crewmember must be given a 10-hour rest period before 
being assigned to reserve time. Reserve time may be assigned under 
either of the following options and the flight crewmember must be 
notified of which option has been selected before the beginning of the 
reserve time assignment:
    (1) A certificate holder may schedule a flight crewmember assigned 
to reserve time and a flight crewmember may accept any duty period if 
the flight crewmember receives at least 10 hours notice and if the duty 
period is scheduled in accordance with Secs. 121.473 or 121.475. If a 
flight crewmember does not receive at least 10 hours notice, the 
following limitations apply:
    (i) If at least 8 hours notice is given, the scheduled duty period 
is limited to no more than 12 hours. The duty period required under 
this paragraph (b)(1) may be extended to 14 hours when the extension is 
due to operational delays.
    (ii) If at least 6 hours notice is given, the scheduled duty period 
is limited to no more than 10 hours. The duty period required under 
this paragraph (b)(1) may be extended to 12 hours when the extension is 
due to operational delays.
    (iii) If at least 4 hours notice is given, the scheduled duty 
period is limited to no more than 8 hours. The duty period required 
under this paragraph (b)(1) may be extended to 10 hours when the 
extension is due to operational delays.
    (iv) If fewer than 4 hours notice is given, the scheduled duty 
period is limited to no more than 6 hours. The duty period required 
under this paragraph (b)(1) may be extended to 8 hours when the 
extension is due to operational delays. 
    (2) A certificate holder may assign a flight crewmember to a 
reserve assignment, and a flight crewmember may accept a duty period, 
if, for each 24-hour period, the flight crewmember receives at least a 
regularly scheduled 6-hour period that is protected from any contact by 
the certificate holder. The hours of the 6-hour protected time period 
must be assigned before the flight crewmember begins the reserve time 
assignment and must occur at the same time during each 24-hour period 
during a reserve time assignment. Any duty period assignment must be 
scheduled to be completed within the 18 hour reserve period. The length 
of the duty period and the subsequent rest period must be in accordance 
with Secs. 121.473 or 121.475.

Sec. 121.479  Additional flight crewmember duty period and flight time 
scheduling limitations.

    (a) A flight crewmember is not considered to be scheduled for a 
duty period in excess of the scheduled duty period limitations if the 
duty periods to which he or she is assigned are scheduled and normally 
terminate within the limitations, but, due to operational delays, the 
flights to which he or she is assigned are not at block out time 
expected to reach their destination within the scheduled duty period. 
However, no air carrier may assign a flight crewmember, nor may a 
flight crewmember accept, a flight that at block out time would extend 
the flight crewmembers scheduled duty period maximum more than two 
hours, as provided in Secs. 121.473 and 121.475.
    (b) A flight crewmember is not considered to be scheduled for 
flight time in excess of the flight time limitations if the flights to 
which he or she is assigned are scheduled and normally terminate within 
the limitations, but due to operational delays are not at block out 
time expected to reach their destination within the scheduled time.

Sec. 121.481  Weekly and monthly flight crewmember flight time 
limitations.

    No certificate holder may schedule any flight crewmember, and no 
flight crewmember may accept, an assignment for flight time under this 
part if that flight crewmember's total flight time for a certificate 
holder under parts 91, 121, and 135 of this chapter will exceed--
    (a) 32 hours in any 7 consecutive calendar days.
    (b) 100 hours in any calendar month. 
    
[[Page 65974]]

Sec. 121.483  Additional flight crewmember rest requirements.

    (a) No certificate holder may assign any flight crewmember, and no 
flight crewmember may accept, any duty period or flight time with the 
certificate holder unless the flight crewmember has had at least the 
minimum rest required under this subpart.
    (b) No certificate holder may assign any flight crewmember and no 
flight crewmember may accept any duty with the certificate holder 
during any required rest period. For example the flight crewmember may 
not be required to contact the certificate holder, answer the 
telephone, carry a beeper, remain at a specific location or in any 
other way be responsible to the air carrier during a rest period.
    (c) Rest periods that are required under this subpart can occur 
concurrently with any other rest period.
    (d) The reduced rest periods allowed under Secs. 121.473 and 
121.475 may only be used due to operational delays and may not be 
scheduled in advance.
    (e) Each certificate holder shall provide each flight crewmember 
who is assigned to one or more duty periods, standby duty, or reserve 
time a rest period of at least 36 consecutive hours during any 7 
consecutive calendar days.
    (f) Each certificate holder must provide each flight crewmember 
assigned to assigned time, when the assigned time is not part of a duty 
period, a rest period of at least 10 hours before the commencement of a 
subsequent duty period.
    (g) Each certificate holder must provide each flight crewmember at 
least 48 consecutive hours of rest upon return to the flight 
crewmember's home base after completion of one or more duty periods 
that contain flights that terminate in a time zone or zones that 
differs from the time zone of the flight crewmember's home base by 6 or 
more hours and the flight crewmember remains in that time zone or zones 
for at least 48 consecutive hours. The flight crewmember must receive 
this rest before beginning a subsequent duty period. The home base is 
determined by the certificate holder and is where that crewmember is 
based and receives schedules.

Sec. 121.485  Deadhead transportation.

    Time spent in transportation, not local in character, that a 
certificate holder requires of a flight crewmember and provides to 
transport the crewmember to an airport at which he or she is to serve 
on a flight as a crewmember, or from an airport at which he or she was 
relieved from duty to return to his or her home station is not 
considered part of a rest period. For duty period limitation purposes 
the certificate holder and flight crewmember must consider deadhead 
time as assigned time or as part of a duty period associated with 
flight.

Sec. 121.487  Duty period and flight time limitations: Other flying for 
a certificate holder.

    No flight crewmember who is employed by a certificate holder 
conducting operations under this part may do any other duty or flying 
for any certificate holder conducting operations under part 121 or 135 
of this chapter if that duty or flying for a certificate holder plus 
his or her duty or flying under this part will exceed any duty period 
or flight time limitation in this part. This section applies to any 
other duty or flying under part 91, part 121 or part 135 of this 
chapter for any certificate holder whether the duty or flying precedes 
or follows the flight crewmember's flying under this part.

Subpart S--[Removed and reserved]

    5. Subpart S (Secs. 121.500 through 121.525) is removed, and the 
subpart heading is reserved.

PART 135--AIR TAXI OPERATORS AND COMMERCIAL OPERATORS

    6. The authority citation for part 135 is revised to read as 
follows:

    Authority: 49 U.S.C. 106(g), 1153, 40101, 40102, 40103, 40113, 
44105, 44106, 44111, 44701-44717, 44722, 44901, 44903, 44904, 44906, 
44912, 44914, 44936, 44938, 46103, 46105.

    7. Section 135.1 is amended by adding a new paragraph (b) to read 
as follows

Sec. 135.1  Applicability.

* * * * *
    (b) As specified in Sec. 135.275, the duty period limitations, 
flight time limitations and rest requirements of this part are also 
applicable to duty periods and flight time performed for a certificate 
holder conducting operations under part 91 or part 121 of this chapter.
    8. The heading for subpart F is revised to read as follows:

Subpart F--Flight Crewmember Duty Period Limitations, Flight Time 
Limitations, and Rest Requirements

    9. Sections 135.261, 135.263, 135.265, 135.267, 135.269, and 
135.273 are revised and 135.275 is added.

Sec. 135.261  Applicability and terms.

    (a) This subpart prescribes duty period limitations, flight time 
limitations and rest requirements for flight crewmembers in commuter 
and on-demand operations.
    (b) For the purpose of this subpart the following terms and 
definitions apply:
    (1) Approved sleeping quarters means an area designated for the 
purpose of flight crewmembers obtaining sleep as approved by the 
Administrator.
    (2) Assigned time is time when the flight crewmember is assigned by 
the certificate holder to activities other than flight duties or 
reserve time. Assigned time may include activities such as deadhead 
transportation, training, loading baggage, taking tickets, 
administrative tasks, or any other assignments at the direction of the 
certificate holder. Assigned time may be considered part of a duty 
period or not part of a duty period, at the discretion of the 
certificate holder.
    (3) Calendar day means the period of elapsed time, using 
Coordinated Universal Time or local time, that begins at midnight and 
ends 24 hours later at the next midnight.
    (4) Duty period means the period of elapsed time between reporting 
for an assignment involving flight time and release from that 
assignment by the certificate holder. The time is calculated using 
either Coordinated Universal Time or the local time of the flight 
crewmember's home base, to reflect the total elapsed time.
    (5) Operational delays means delays due to operational conditions 
and requirements that are beyond the control of the certificate holder 
such as adverse weather, aircraft equipment malfunctions, and air 
traffic control. It does not include late arriving passengers, late 
food service, late fuel trucks, delays in handling baggage, freight or 
mail, or similar events.
    (6) Protected time means a period of time during which a 
certificate holder may not contact the flight crewmember and the 
crewmember has no responsibility for work. Protected time occurs only 
during a reserve assignment pursuant to Sec. 121.477(b)(2).
    (7) Reserve time means a period of time when a flight crewmember 
must be available to report upon notice for duty involving flight time 
and the certificate holder allows the flight crewmember at least 1 hour 
to report. Reserve time is not considered part of a rest period and is 
not considered part of a duty period involving flight time. Reserve 
time ends when the flight crewmember reports for a duty period, when 
the flight crewmember is notified of a future flight assignment and 
released from all further responsibilities until report time for that 
assignment, or when the flight crewmember has been relieved for a rest 

[[Page 65975]]
period. Reserve time does not include activities defined as ``assigned 
time.''
    (8) Rest period means the time period free of all restraint or duty 
for a certificate holder and free of all responsibility for work or 
duty should the occasion arise. ``Free of all restraint'' and ``free of 
all responsibility'' would include, but not be limited to, accepting 
phone calls, being required to carry a beeper, or being required to 
contact the air carrier. If a flight crewmember is not serving in 
assigned time, reserve time, standby duty or a duty period, that 
crewmember would be in a rest period.
    (9) Standby duty means any period of time when a flight crewmember 
is required to report for a flight assignment in less than 1 hour from 
the time of notification. It also includes time when a flight 
crewmember is required to report to and remain at a specific facility 
(e.g. airport, crew lounge) designated by a certificate holder. Standby 
duty is treated like any other duty associated with flight. Standby 
duty commences when the flight crewmember is placed on standby duty. 
Standby duty ends when the flight crewmember is relieved from duty 
associated with an actual flight or is otherwise relieved from duty.

Sec. 135.263  Pilot duty period limitations, flight time limitations, 
and rest requirements.

    (a) A certificate holder may assign a scheduled duty period or 
reserve assignment to a pilot and a pilot may accept that assignment 
only when the applicable duty period limitations, flight time 
limitations, and rest requirements of this section are met.
    (b) For aircraft for which only one pilot is required, no 
certificate holder may assign a pilot and no pilot may accept a 
scheduled duty period of more than 14 hours. The duty period may not 
include more than 8 scheduled hours of flight time. The pilot must be 
scheduled for a rest period of at least 10 consecutive hours. This rest 
period must occur between the completion of the scheduled duty period 
and the commencement of the next subsequent duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (b) may be reduced to no fewer than 9 consecutive hours if 
the pilot has not actually exceeded the maximum 14-hour duty period and 
if the pilot is provided with a subsequent rest period of at least 11 
hours. This subsequent rest period must be scheduled to begin no later 
than 24 hours after the beginning of the reduced rest period and must 
occur between the completion of the scheduled duty period and the 
commencement of the next duty period.
    (2) The duty period required under this paragraph (b) may be 
extended to 16 hours when the extension is due to operational delays. 
In this case the 10 hour rest period may not be reduced.
    (c) Except as required in paragraphs (d), (e), and (f) of this 
section, no certificate holder may assign a flight crew consisting of 
two pilots and no pilot may accept a scheduled duty period of more than 
14 hours. The duty period may not include more than 10 scheduled hours 
of flight time. Each pilot must be scheduled for a rest period of at 
least 10 consecutive hours. This rest period must occur between the 
completion of the scheduled duty period and the commencement of the 
next duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (c) may be reduced to no fewer than 9 consecutive hours if 
the pilot has not actually exceeded the maximum 14-hour duty period and 
if the pilot is provided with a subsequent rest period of at least 11 
hours. This subsequent rest period must be scheduled to begin no later 
than 24 hours after the beginning of the reduced rest period and must 
occur between the completion of the scheduled duty period and the 
commencement of the next duty period.
    (2) The duty period required under this paragraph (c) may be 
extended to 16 hours when the extension is due to operational delays. 
In this case the 10 hour rest period may not be reduced.
    (d) A certificate holder may assign a flight crew consisting of 3 
pilots and a pilot may accept a scheduled duty period of more than 14 
hours, but no more than 16 hours. The duty period may not include more 
than 12 scheduled hours of flight time. Each pilot must be scheduled 
for a rest period of at least 14 consecutive hours. This rest period 
must occur between the completion of the scheduled duty period and the 
commencement of the next duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (d) may be reduced to no fewer than 12 consecutive hours if 
the pilot has not actually exceeded the maximum 16-hour duty period and 
if the pilot is provided with a subsequent rest period of at least 16 
hours. This subsequent rest period must be scheduled to begin no later 
than 24 hours after the beginning of the reduced rest period and must 
occur between the completion of the scheduled duty period and the 
commencement of the next duty period.
    (2) The duty period required under this paragraph (d) may be 
extended to 18 hours when the extension is due to operational delays. 
In this case the 14 hour rest period may not be reduced.
    (e) A certificate holder may assign a flight crew consisting of 3 
pilots, and a pilot may accept a scheduled duty period of more than 16 
hours, but no more than 18 hours. The duty period may not include more 
than 16 scheduled hours of flight time. Each pilot must be given an 
opportunity to rest in-flight in approved sleeping quarters. Each pilot 
must be scheduled for a rest period of at least 18 consecutive hours. 
This rest period must occur between the completion of the scheduled 
duty period and the commencement of the next subsequent duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (e) may be reduced to no fewer than 16 consecutive hours if 
the pilot has not actually exceeded the maximum 18-hour duty period and 
if the pilot is provided with a subsequent rest period of at least 20 
hours. This subsequent rest period must be scheduled to begin no later 
than 24 hours after the beginning of the reduced rest period and must 
occur between the completion of the scheduled duty period and the 
commencement of the next subsequent duty period.
    (2) The duty period required under this paragraph (e) may be 
extended to 20 hours when the extension is due to operational delays. 
In this case the 18 hour rest period may not be reduced.
    (f) If the scheduled duty period includes one or more flights that 
land or take off outside the 48 contiguous states and the District of 
Columbia, a certificate holder may assign a flight crew consisting of 4 
pilots and a pilot may accept a scheduled duty period of more than 18 
hours but not more than 24 hours. The duty period may not include more 
than 18 scheduled hours of flight time. Each pilot must be given an 
opportunity to rest in-flight in approved sleeping quarters. Each pilot 
must be scheduled for a rest period of at least 22 consecutive hours. 
This rest period must occur between the completion of the scheduled 
duty period and the commencement of the next subsequent duty period.
    (1) Due to operational delays, the rest period required under this 
paragraph (f) may be reduced to no fewer than 20 consecutive hours if 
the pilot has not actually exceeded the maximum 24 hour duty period and 
if the pilot is provided with a subsequent rest period of at least 24 
hours. This subsequent rest period must be scheduled to begin no later 
than 24 hours after the beginning of the reduced rest period and must 
occur between the completion of the 

[[Page 65976]]
scheduled duty period and the commencement of the next subsequent duty 
period.
    (2) The duty period required under this paragraph (f) may be 
extended to 26 hours when the extension is due to operational delays. 
In this case the 22 hour rest period may not be reduced.

Sec. 135.265  Reserve and standby assignments.

    (a) Standby duty. Standby duty commences when a flight crewmember 
is placed on standby duty assignment. Standby duty periods must be 
scheduled in accordance with Sec. 135.263. Standby duty periods end 
when the duty period associated with a subsequent flight assignment 
ends or the flight crewmember is relieved from standby duty for a 
scheduled rest period.
    (b) Reserve time. A certificate holder may assign a reserve 
assignment to a flight crewmember and a flight crewmember may accept 
that assignment only when the applicable provisions of this section are 
met. Each flight crewmember must be given a 10-hour rest period before 
being assigned to reserve time. Reserve time may be assigned under 
either of the following options and the flight crewmember must be 
notified of which option has been selected before the beginning of the 
reserve time assignment:
    (1) A certificate holder may schedule a flight crewmember assigned 
to reserve time and a flight crewmember may accept any duty period if 
the flight crewmember receives at least 10 hours notice and if the duty 
period is scheduled in accordance with Sec. 135.263. If a flight 
crewmember does not receive at least 10 hours notice, the following 
limitations apply:
    (i) If at least 8 hours notice is given the scheduled duty period 
is limited to no more than 12 hours. The duty period required under 
this paragraph (b)(1) may be extended to 14 hours when the extension is 
due to operational delays.
    (ii) If at least 6 hours notice is given the scheduled duty period 
is limited to no more than 10 hours. The duty period required under 
this paragraph (b)(1) may be extended to 12 hours when the extension is 
due to operational delays.
    (iii) If at least 4 hours notice is given the scheduled duty period 
is limited to no more than 8 hours. The duty period required under this 
paragraph (b)(1) may be extended to 10 hours when the extension is due 
to operational delays.
    (iv) If fewer than 4 hours notice is given the scheduled duty 
period is limited to no more than 6 hours. The duty period required 
under this paragraph (b)(1) may be extended to 8 hours when the 
extension is due to operational delays.
    (2) A certificate holder may assign a flight crewmember to a 
reserve assignment and a flight crewmember may accept a duty period if, 
for each 24-hour period, the flight crewmember receives at least a 
regularly scheduled 6-hour period that is protected from any contact by 
the certificate holder. The hours of the 6-hour protected time period 
must be assigned before the flight crewmember begins the reserve time 
assignment and must occur at the same time during each 24-hour period 
during a reserve time assignment. Any duty period assignment must be 
scheduled to be completed within the 18 hour reserve period. The length 
of the duty period and the subsequent rest period must be in accordance 
with Sec. 135.263.

Sec. 135.267  Additional flight crewmember duty period and flight time 
scheduling limitations.

    (a) A flight crewmember is not considered to be scheduled for a 
duty period in excess of the scheduled duty period limitations if the 
duty periods to which he or she is assigned are scheduled and normally 
terminate within the limitations, but, due to operational delays, the 
flights to which he or she is assigned are not at block out time 
expected to reach their destination within the scheduled duty period. 
However, no air carrier may schedule a flight crewmember, nor may a 
flight crewmember accept a flight that at block out time would extend 
the flight crewmembers scheduled duty period maximum more than two 
hours, as provided in Sec. 135.263.
    (b) A flight crewmember is not considered to be scheduled for 
flight time in excess of the flight time limitations if the flights to 
which he or she is assigned are scheduled and normally terminate within 
the limitations, but due to operational delays are not at block out 
time expected to reach their destination within the scheduled time.

Sec. 135.269  Weekly and monthly flight crewmember flight time 
limitations.

    No certificate holder may schedule any flight crewmember and no 
flight crewmember may accept an assignment for flight time under this 
part if that flight crewmember's total flight time for a certificate 
holder under parts 91, 121, and 135 of this chapter will exceed--
    (a) 32 hours in any 7 consecutive calendar days.
    (b) 100 hours in any calendar month.

Sec. 135.271  Additional flight crewmember rest requirements.

    (a) No certificate holder may assign any flight crewmember and no 
flight crewmember may accept any duty period or flight time with the 
certificate holder unless the flight crewmember has had at least the 
minimum rest required under this subpart.
    (b) No certificate holder may assign any flight crewmember and no 
flight crewmember may accept any duty with the certificate holder 
during any required rest period. For example the flight crewmember may 
not be required to contact the certificate holder, answer the 
telephone, carry a beeper, remain at a specific location or in any 
other way be responsible to the air carrier during a rest period.
    (c) Rest periods that are required under this subpart can occur 
concurrently with any other rest period.
    (d) The reduced rest periods allowed under Sec. 135.263 may only be 
used due to operational delays and may not be scheduled in advance.
    (e) Each certificate holder shall provide each flight crewmember 
who is assigned to one or more duty periods, standby duty, or reserve 
time a rest period of at least 36 consecutive hours during any 7 
consecutive calendar days.
    (f) Each certificate holder must provide each flight crewmember 
assigned to assigned time, when the assigned time is not part of a duty 
period, a rest period of at least 10 hours before the commencement of a 
subsequent duty period.
    (g) Each certificate holder must provide each flight crewmember at 
least 48 consecutive hours of rest upon return to the flight 
crewmember's home base after completion of one or more duty periods 
that terminate in a time zone or zones that differs from the time zone 
of the flight crewmember's home base by 6 or more hours and the flight 
crewmember remains in that time zone or zones for at least 48 
consecutive hours. The flight crewmember must receive this rest before 
beginning a subsequent duty period. The home base is determined by the 
certificate holder and is where that crewmember is based and receives 
schedules.

Sec. 135.273  Deadhead transportation.

    Time spent in transportation, not local in character, that a 
certificate holder requires of a flight crewmember and provides to 
transport the crewmember to an airport at which he or she is to serve 
on a flight as a crewmember, or from an airport at which he or she was 
relieved from duty to return to his or her home station is not 
considered part of a rest period. For 

[[Page 65977]]
duty period limitation purposes the certificate holder and flight 
crewmember must consider deadhead time as assigned time or as part of a 
duty period associated with flight.

Sec. 135.275  Duty period and flight time limitations: Other flying for 
a certificate holder.

    No flight crewmember who is employed by a certificate holder 
conducting operations under this part may do any other duty or flying 
for a certificate holder conducting operations under part 121 or part 
135 of this chapter if that duty or flying for a certificate holder 
plus his or her duty or flying under this part will exceed any duty 
period or flight time limitation in this part. This section applies to 
any other duty or flying under part 91, part 121, or part 135 of this 
chapter for a certificate holder whether the duty or flying precedes or 
follows the flight crewmember's flying under this part.

Sec. 135.271  [Redesignated as Sec. 135.277]

    10. Section 135.271 is redesignated as Sec. 135.277 and revised to 
read as follows:

Sec. 135.277  Additional flight crewmember rest requirements.

    (a) No certificate holder may assign any flight crewmember and no 
flight crewmember may accept any duty period or flight time with the 
certificate holder unless the flight crewmember has had at least the 
minimum rest required under this subpart.
    (b) No certificate holder may assign any flight crewmember and no 
flight crewmember may accept any duty with the certificate holder 
during any required rest period. For example the flight crewmember may 
not be required to contact the certificate holder, answer the 
telephone, carry a beeper, remain at a specific location or in any 
other way be responsible to the air carrier during a rest period.
    (c) Rest periods that are required under this subpart can occur 
concurrently with any other rest period.
    (d) The reduced rest periods allowed under Sec. 135.263 may only be 
used due to operational delays and may not be scheduled in advance.
    (e) Each certificate holder shall provide each flight crewmember 
who is assigned to one or more duty periods, standby duty, or reserve 
time a rest period of at least 36 consecutive hours during any 7 
consecutive calendar days.
    (f) Each certificate holder must provide each flight crewmember 
assigned to assigned time, when the assigned time is not part of a duty 
period, a rest period of at least 10 hours before the commencement of a 
subsequent duty period.
    (g) Each certificate holder must provide each flight crewmember at 
least 48 consecutive hours of rest upon return to the flight 
crewmember's home base after completion of one or more duty periods 
that terminate in a time zone or zones that differs from the time zone 
of the flight crewmember's home base by 6 or more hours and the flight 
crewmember remains in that time zone or zones for at least 48 
consecutive hours. The flight crewmember must receive this rest before 
beginning a subsequent duty period. The home base is determined by the 
certificate holder and is where that crewmember is based and receives 
schedules.

    Issued in Washington, D.C., on December 11, 1995.
Thomas C. Accardi,
Acting Director, Flight Standards Service.
[FR Doc. 95-30547 Filed 12-14-95; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 95-30546 The Age 60 Rule
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65977-65986]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30546]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 121

[Docket No. 27264]
RIN 2120-AF96

The Age 60 Rule

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Disposition of comments and notice of agency decisions.

-----------------------------------------------------------------------

SUMMARY: This action announces FAA's decisions on a number of issues 
regarding the FAA's ``Age 60 Rule''. The issues include: responding to 
the comments requested in 1993 regarding various aspects of the Age 60 
Rule, including the ``Age 60 Project, Consolidated Database 
Experiments, Final Report'', and issues raised by pilots seeking 
exemptions from the Age 60 Rule, issues raised by a petition for 
rulemaking by the Professional Pilots Federation (PPF), requesting the 
FAA to remove the Age 60 Rule.
    After review of all comments, studies, and other pertinent 
information, the FAA has determined not to initiate rulemaking to 
change the Age 60 Rule at this time. The FAA also has decided not to 
grant any of the pending petitions for exemption or rulemaking.

ADDRESSES: The complete docket containing recent comments on the Age 60 
Rule, including copies of studies related to the Age 60 issue, may be 
examined at the Federal Aviation Administration, Office of the Chief 
Counsel (AGC-200), Rules Docket, Room 915-G, 800 Independence Avenue 
SW., Washington, DC 20591, weekdays (except Federal holidays) between 
8:30 a.m. and 5:00 p.m.

Availability of Disposition

    Any person may obtain a copy of this Disposition by submitting a 
request to the Federal Aviation Administration, Office of Public 
Affairs, Attention: Public Inquiry Center, APA-220, 800 Independence 
Avenue, SW., Washington, DC 20591, or by calling (202) 267-3484. 
Requests should be identified by the docket number of this Disposition.

FOR FURTHER INFORMATION CONTACT:
Daniel V. Meier, Jr., AFS-240, Regulations Branch, Federal Aviation 
Administration, 800 Independence Avenue, SW., Washington, DC 20591, 
Telephone (202) 267-3749 or (202) 267-8086.

SUPPLEMENTARY INFORMATION: 

I. Background

    Section 121.383(c) of the Federal Aviation Regulations (FAR) (14 
CFR Sec. 121.383(c)) prohibits any air carrier from using the services 
of any person as a pilot, and prohibits any person from serving as a 
pilot, on an airplane engaged in operations under part 121 if that 
person has reached his or her 60th birthday. The FAA adopted the ``Age 
60 Rule'', as it has come to be known, in 1959 (24 FR 9767, December 5, 
1959).
    In late 1990, the FAA initiated a study aimed at consolidating 
available accident data and correlating it with the amount of flying by 
pilots as a function of their age. This resulted in a document entitled 
``Age 60 Project, Consolidated Database Experiments, Final Report'', 
dated March 1993 (the ``Hilton Study''). The FAA held a public meeting 
and requested comments regarding various issues related to the Age 60 
Rule, including the Hilton Study (58 FR 21336, April 20, 1993). The FAA 
has reviewed the written comments received in the docket (Docket No. 
27264) and to the comments presented at the public meeting. The FAA is 
also responding to a number of pending petitions from pilots seeking an 
exemption from the Age 60 Rule. Finally, the FAA is responding to a 
petition for rulemaking submitted by the Professional Pilots Federation 
(PPF).
    This document describes the history and basis for the rule, the 
major events during the history of the rule, the FAA's response to the 
issues raised above, and the FAA's rationale for maintaining the Age 60 
Rule.

I(a). Basis for the 1959 Rule

    The FAA promulgated the Age 60 Rule in 1959 because of concerns 
that a hazard to safety was presented by utilization of aging pilots in 
air carrier operations. As noted in that rulemaking, 

[[Page 65978]]
the agency found ``that there is a progressive deterioration of certain 
important physiological and psychological functions with age, that 
significant medical defects attributable to this degenerative process 
occur at an increasing rate as age increases, and that sudden 
incapacity due to such medical defects becomes more frequent in any 
group reaching age 60.'' 24 FR 9767. It also found that ``[s]uch 
incapacity, due primarily to heart attacks and strokes, cannot be 
predicted accurately as to any specific individual on the basis of 
presently available scientific tests and criteria.'' 24 FR 9767. The 
FAA noted ``[o]ther factors, even less susceptible to precise 
measurement as to their effect but which must be considered in 
connection with safety in flight, result simply from aging alone and 
are, with some variations, applicable to all individuals. These relate 
to loss of ability to perform highly skilled tasks rapidly, to resist 
fatigue, to maintain physical stamina, to perform effectively in a 
complex and stressful environment, to apply experience, judgment and 
reasoning rapidly in new, changing and emergency situations, and to 
learn new techniques, skills and procedures.'' 24 FR 9767. While the 
FAA recognized that such losses generally start well before age 60, the 
agency determined that beyond age 59 the risks associated with these 
losses become unacceptable for pilots in part 121 operations.
    The agency noted that, due to seniority, older pilots tend to ``fly 
the largest, highest-performance aircraft, carrying the greatest number 
of passengers over the longest non-stop distances,'' in the highest 
density traffic. 24 FR 9767. The FAA concluded that, because of the 
high risks involved, persons should be precluded from piloting aircraft 
in part 121 operations after reaching age 60.
    While the Age 60 Rule prohibits pilots from operating aircraft 
under part 121 after reaching their 60th birthdays, it does not impose 
mandatory retirement for affected pilots. A pilot may work as a flight 
engineer or flight instructor in operations conducted under part 121 or 
may work as a pilot in operations outside of part 121. The pilot also 
may function as an instructor or evaluator in simulators, an area that 
has expanded over the years.

I(b). Subsequent Rulemaking Actions

    In the early 1980's, the FAA explored possible changes to the Age 
60 Rule, stemming from direction from Congress in 1979 that the 
National Institutes of Health (NIH) study the desirability of mandatory 
age retirement for certain pilots. (P.L. 96-171). The NIH assigned the 
National Institute on Aging (NIA) the primary responsibility for 
implementing the legislation. In the report from this study, ``Report 
of the National Institute on Aging Panel on the Experienced Pilot 
Study'' (August 1981) (NIH report), NIA recommended that the age 60 
limit be retained. Among other things, the panel concluded that, while 
no medical significance could be attached to age 60 as a mandatory 
retirement age, age-related health changes endanger aviation safety and 
no medical or performance appraisal system could be identified that 
would single out pilots who would pose a hazard to safety. The 
conclusions reached by the NIA panel and the supporting statements 
contained in the report pointed to an inability to distinguish those 
persons who, as a consequence of aging, present a threat to air safety 
from those who do not. The following recommendations were made:
    1. The age 60 limit should be retained for pilots in command and 
first officers.
    2. The FAA or some other appropriate Federal agency should be 
requested to engage in a systematic program to collect the medical and 
performance data necessary to consider relaxing the age 60 rule.
    3. In view of the growing importance of commuter air carriers, the 
age 60 limit should be extended to cover all pilots engaged in carrying 
passengers for hire, specifically including operations under part 135 
to provide a level of safety equivalent to that provided in part 121 
operations.
    As part of its study, NIA looked at information on functional 
decline with age and the increased frequency of a number of medical 
disorders (including cardiovascular disease, neurological and mental 
disorders, and changes in perceptual, psychomotor and intellectual 
functions) associated with aging. In addition, NIA looked at death and 
disability rates in air carrier pilots and flight engineers, death 
rates in the general population, and accident rates for pilots.
    In response to the NIH recommendations, in 1982 the FAA published 
an Advance Notice of Proposed Rulemaking (ANPRM) on the Age 60 Rule (47 
FR 29782, July 8, 1982). The FAA was considering identifying a select 
group of pilots who would continue flying in part 121 operations in 
order to allow the FAA to collect data on selected pilots, age 60 and 
over, flying in actual operations under part 121. The FAA was also 
considering establishing age limits for flight engineers serving on 
airplanes operated under part 121. The FAA withdrew the ANPRM in 1984 
(49 FR 14692, April 12, 1984). The FAA found that valid tests did not 
exist for selecting a group of pilots age 60 and over who could act as 
the test group for collecting data. The FAA was concerned that without 
valid selection tests these pilots would create an unacceptable safety 
risk to part 121 operations. The FAA also stated that it was not 
appropriate to establish an age limit for flight engineers at that 
time.

I(c). 1993 Request for Comments on Age 60 Rule and Hilton Study

    In late 1990 the FAA contracted for the Hilton Study, a 2-year 
study to consolidate accident data and correlate it with flying 
experience and age of pilots. This study analyzed accident data between 
1976 and 1988. Although the focus of the study was on part 121 pilots, 
the study analyzed the accident rates for pilots in part 91, 121, and 
135 operations holding Class I, Class II, and Class III medical 
certificates. The authors of the study found ``no hint of an increase 
in accident rate for pilots of scheduled air carriers as they neared 
their 60th birthday'' but noted that there were no data available on 
scheduled air carrier pilots beyond age 60. Observing a ``hint, and a 
hint only,'' of an increase in accident rates for Class III pilots 
older than 63 years of age, they concluded that ``one could cautiously 
increase the retirement age to age 63.''
    In addition, on April 20, 1993, the FAA published a notice of 
public meeting and request for comments regarding various aspects of 
the Hilton Study. (58 FR 21336; April 20, 1993.) The public meeting was 
held on September 29 and 30, 1993, and the comment period closed on 
October 15, 1993. In response to the FAA's notice of public meeting and 
request for comments, 46 members of the public made presentations at 
the public meeting, and the FAA received approximately 1,200 written 
comments on the Hilton Study and the Age 60 Rule in general before the 
close of the comment period.

I(d). Commuter Rule

    The FAA addressed the Age 60 Rule in a Notice of Proposed 
Rulemaking (Notice 95-5, 60 FR 16230, March 29, 1995) that would 
require certain commuter operators that now conduct operations under 
part 135 to conduct those operations under part 121 (the ``Commuter 
Rule''). In that notice, the FAA proposed to apply all part 121 rules, 
including the Age 60 Rule, to those pilots currently employed in 
certain part 135 scheduled operations who would be affected by the 
Commuter Rule. In response to Notice 95-5 the FAA received many 
comments dealing 

[[Page 65979]]
with the question, not raised by Notice 95-5, of whether there should 
be an age limitation for part 121 pilots and what that age should be. 
To that extent those comments have been considered in this Disposition.

I(e). Public Comment

1993 Meeting and Request for Comments
    In addition to the comments at the 1993 public meeting and received 
during the comment period, the FAA received over 2,000 comments after 
the comment period closed. The issues raised in the comments by both 
sets of commenters are similar and will be discussed together. The 
majority of the commenters at the public meeting and those submitting 
written comments before the close of the comment period are in favor of 
raising the age limit, while the majority of commenters submitting 
written comments after the close of the comment period are against 
raising the age limit. Commenters in favor of raising the age limit 
offer several different alternatives, ranging from age 62 to no age 
limit. Some commenters opposed to a rule change state that the age 
limit should be decreased to age 55.
Commuter Rule
    In addition to the above comments, over 2,000 comments on the age 
60 issue (including about 1,000 postcards from members of an airline 
pilot organization) were received in the docket established for the 
Commuter Rule. The overwhelming majority of these comments support 
maintaining the Age 60 Rule and do not express opinions that are 
different from other comments received in response to the public 
meeting and request for comments in Docket 27264.
    The issues raised at the public meeting, the written comments, and 
the Commuter Rule are discussed below.

I(f). Professional Pilots Federation Petition for Rulemaking To Repeal 
the Age 60 Rule

    The PPF, an organization whose membership is composed of pilots who 
oppose the Age 60 Rule, filed a petition for rulemaking in July 1993 
(Docket 27375; 58 FR 46585, September 2, 1993) that requests the 
removal of Sec. 121.383(c). PPF believes that Federal law and policy, 
operational and regulatory developments since promulgation of the rule, 
and the results of the Hilton Study warrant the removal.
    In its petition, the PPF states that the Age 60 Rule has no basis 
in fact; refusal to repeal the rule would constitute arbitrary and 
capricious action by the FAA, contrary to the provisions of the 
Administrative Procedure Act; refusal to repeal the rule without 
evidence of a need to retain it in the interest of public safety is 
inconsistent with Federal policy against age discrimination; and repeal 
of the rule would have a positive economic impact on the U.S. air 
carrier industry.
    In addition, the PPF states that the FAA should exercise leadership 
in the international community and repeal the Age 60 Rule; the Age 60 
standard in ICAO Annex 1 is ready for change; and the JAA has proposed 
increasing the maximum age limit for air transport pilots to 65. (The 
FAA notes that JAA's proposal is to allow pilots to operate in multi-
pilot operations up to the age of 65, provided no more than one pilot 
in the cockpit is over the age of 60.)
    The major issues brought up in the PPF's petition for rulemaking 
(such as age discrimination, the Hilton Study, economic impacts of the 
Age 60 Rule, etc.) are discussed below in connection with the 
disposition of comments in Docket No. 27264. Because the FAA has 
determined that there is insufficient justification to change the Age 
60 Rule at this time and that the rule is consistent with Federal law, 
PPF's petition for rulemaking will be denied in a separate document.

I(g). Petitions for Exemption From the Age 60 Rule

    Over the years the FAA has received numerous petitions for 
exemption from the Age 60 Rule. The FAA consistently has denied these 
petitions. Some petitioners have sought review in the United States 
Courts of Appeals, and the Courts have upheld the denials. However, in 
1992 when the Hilton Study was underway, the FAA delayed action on the 
pending petitions for exemption and those newly received. Most of the 
issues raised by the petitions were so intertwined with the underlying 
Age 60 Rule issues, the FAA chose to defer action pending deliberation 
of the broader issues involving the Age 60 Rule itself. There are 
currently over 100 petitions for exemption pending. Summaries of the 
petitions were published in the Federal Register, and comments were 
received for some of the petitions. These comments expressed opinions 
and did not provide the FAA with new information. The issues raised by 
commenters are discussed in sections II, III, and V below.
    Overall, the petitioners provide similar information and arguments 
that they contend justify exemptions. Part of their assertions involve 
their personal fitness (see section II(a)) and the ability of the FAA 
to test them individually with simulators (see section III(a)). They 
state that they hold or are qualified to hold first-class airman 
medical certificates (see section III(b)). Some state that they have 
extensive skill and experience as pilots (see section II(c)). They also 
note that the FAA gives many exemptions to younger pilots for various 
medical conditions (see section III(b)).
    The petitioners also contend that the Age 60 Rule is discriminatory 
(see section V(b)). In addition, the petitioners state that the Age 60 
Rule is an arbitrary age and that the age of 60 has not scientifically 
been shown to be an accurate predictor of health or ability (see 
section II(a)). They state that studies used by the FAA in the past to 
justify the rule are flawed, including the NIH Study and the reports 
prepared by Richard Golaszewski (Acumenics Research and Technology, 
Incorporated, The Influence of Total Flight Time, Recent Flight Time 
and Age on Pilot Accident Rates, Final Report (1983) (First Golaszewski 
Report); General Aviation Safety Studies: Preliminary Analysis of Pilot 
Proficiency (1991) and his subsequent work, Additional Analysis of 
General Aviation Pilot Proficiency (1993) (Second Golaszewski Report) 
(section II(b)). They state that pilots at age 60 are in the safest age 
group and that forcing them to retire results in individuals with less 
experience serving as pilots, resulting in lower safety (sections II(c) 
and V(f)). They state that sudden incapacitation is not a cause of 
accidents in Part 121 operations (section II(a)). They state that the 
rule was promulgated for economic reasons alone (section V(a)). They 
state that the rule is contrary to the Age Discrimination in Employment 
Act (section V(b)). They point out that other countries have higher 
retirement ages for their pilots (section V(c)). They state that 
deleting the rule would save the air carriers money (section IV(a)).
    Under 49 U.S.C. 44701(e) the FAA, in its discretion, may grant 
exemptions from the requirements of a regulation if it finds that such 
an exemption is in the public interest. Section 11.25 (14 CFR 
Sec. 11.25) provides procedures for petitioning for an exemption. 
Section 11.25(b)(5) provides that such a petition must--

Contain any information, views, or arguments available to the 
petitioner to support the action sought, the reasons why the 
petition would be in the public interest and, * * * the reason why 
the exemption would not adversely affect safety or the action to be 
taken by the petitioner to provide a level of safety equal to that 
provided by the rule from which the exemption is sought.

[[Page 65980]]

The petitioners have the burden of showing that the exemption is 
justified.
    The FAA does not doubt that the petitioners, in general, are well-
qualified, experienced, and safe pilots. However, no petitioner has 
suggested or shown how he or she is unique compared to others who are 
subject to the rule.
    To the extent that petitioners' comments involve the justification 
for the Age 60 Rule itself, these issues are discussed in sections II, 
III, and V below.
    As to individual petitioners' fitness to serve as pilots past the 
age of 60, which petitioners assert can be demonstrated by 
individualized testing or evaluation, no petitioner has submitted a 
protocol, nor is the FAA aware of a protocol, that would permit the FAA 
to adequately assess an aging individual's relative risks of 
incapacitation, either sudden or subtle. They have not shown how their 
circumstances are different in a significant way from others subject to 
the rule. For instance, there is nothing unique in petitioners holding 
first-class airman medical certificates; all pilots who exercise the 
privileges of an Air Transport Pilot certificate are required to hold a 
first-class airman medical certificate. Numerous pilots operating under 
part 121, who are approaching age 60, have long, distinguished careers. 
Indeed, the FAA considered these issues in response to the comments in 
Docket 27264, and they are further responded to below.
    The FAA has determined that the petitioners have not shown their 
circumstances to be unique compared with those who comply with the 
rule, and that the issues they raise are more appropriately considered 
in connection with whether the FAA should propose to change the general 
rule. The FAA will in separate documents deny the pending petitions for 
exemption from the Age 60 Rule.
    In addition, the FAA intends to handle future petitions for 
exemptions for the Age 60 Rule differently. The normal procedures for 
handling petitions for exemption are set forth in Secs. 11.25 and 
11.26. They include publishing a summary of the petition, reviewing any 
comments received, and issuing an individualized grant or denial of the 
petition that recites the basis for the petition and the FAA's analysis 
as to why it is granted or denied. This process can take a substantial 
amount of time. It appears not to be necessary, however, to carry out 
all these steps for future petitions for exemption from the Age 60 Rule 
that are substantially similar to those discussed here. In the future, 
the FAA will deny any petition for exemption from the Age 60 Rule 
without first publishing it for comment unless it contains a proposed 
technique, not discussed in this Disposition, to assess an individual 
pilot's abilities and risks of subtle and sudden incapacitation. 
Petitions that do not contain new information or a protocol that may 
allow the FAA to accurately assess the individual will be summarily 
denied. A copy of this disposition will be attached to the denial to 
explain the basis for the FAA's denial. Any petition that does contain 
such a proposal will be processed and evaluated as provided in 
Secs. 11.25 and 11.26.

II. Concerns Regarding Aging Pilots

    After considering all comments and known studies, FAA concludes 
that concerns regarding aging pilots and underlying the original rule 
have not been shown to be invalid or misplaced.

II(a). Physical Degradation with Age

    As noted above, the Age 60 Rule was promulgated in 1959 to address 
the progressive deterioration of physiological and psychological 
functions with age and an increasing occurrence of significant medical 
defects and sudden incapacitation associated with this degenerative 
process. While emphasizing heart attacks and strokes, the agency also 
noted ``other'' factors, less susceptible to precise measurement, 
resulting from aging alone. Major emphasis was placed on the 
difficulties in attempting to predict incapacity.
    Several commenters state that the death rate in general and the 
cardiovascular death rate in particular for men in the relevant age 
groups declined dramatically between 1960 and 1989. The commenters 
believe, therefore, that the age limit could be raised. Other 
commenters, however, state that insurance statistics show a dramatic 
rise in cardiovascular disease in people over age 50.
    In the 35 years since the rule was introduced, there has been 
remarkable progress in medicine, particularly in the ability to 
evaluate cardiovascular fitness and in the diagnosis and treatment of 
cardiac and cerebrovascular illness. For example, cardiovascular 
disease rises with age, steeply, beginning between ages 55 and 65, and, 
though mortality has dropped since 1960, cardiovascular disease remains 
the most frequent cause of death in pilots and the general population. 
With this increased incidence of cardiovascular disease in the older 
population, the risk for unexpected threatening events is raised. 
Cardiac events (e.g., heart attacks, sudden death) during flight have 
continued to occur in low but fairly consistent numbers over the years 
and have caused general aviation accidents.
    Other conditions are known to increase in incidence or to become 
more complicated with aging. Many present greater difficulties of 
detection and risk assessment than does cardiovascular disease. Among 
these are cerebrovascular disease; malignancies; endocrine dysfunction; 
neurological disorders; psychiatric diagnoses including depression; and 
decline in sensory and motor capabilities. There has been an increasing 
awareness of the more subtle adverse conditions affecting performance, 
those related to cognitive functioning.
    The concepts of ``age-related cognitive decline'' or ``age-
associated memory impairment'' describe objective impairment of 
cognitive function (e.g., attention; language; some visuospatial 
skills; and, particularly, memory), as a result of aging. These 
concepts are applied to describe a longitudinal decline in performance 
that is age appropriate, i.e., a normal outcome of aging (Petersen, RC; 
Normal Aging, Mild Cognitive Impairment, and Early Alzheimer's Disease; 
The Neurologist; 1:000-000, 1995 [in press]). Since there now is 
general agreement that a functional decline occurs with normal aging, 
on-going research seeks tools for its identification and quantification 
and to determine its significance for individuals. A condition of 
``mild cognitive impairment'' also is recognized and appears to be the 
herald of degenerative disease or dementia. Again, research looks for 
diagnostic tools and for predictor variables of the ultimate outcome 
for the individual.
    Dementia in the adult population is a major and growing medical and 
social problem. It occurs at all ages, but its incidence increases with 
advancing age so that the largest group of demented patients is in the 
older age groups (Differential Diagnosis of Dementing Diseases; 
National Institutes of Health Consensus Conference Statement; Volume 6, 
Number 11; July 6-8, 1987). One in 10 persons over age 65 and nearly 
half of those over 85 have Alzheimer's disease alone, and increasingly 
it is found in people in their 40's and 50's.
    Many of the dementing diseases can be confirmed or denied with 
certainty only at autopsy. The history includes a decline from the 
individual's previously attained intellectual level and usually 
involves defects in memory, other cognitive capacities, and adaptive 
behavior. Usually, it is marked by significant deterioration of memory 
and 

[[Page 65981]]
of one or more other intellectual functions such as language, spatial 
or temporal orientation, judgment, and abstract thought. Onset is 
usually but not always insidious, and the patient may or may not be 
aware of the dementia. Deterioration may vary from subtle changes that 
are overlooked by coworkers, family, and friends, to totally 
incapacitating.
    Is there a level of cognitive dysfunction acceptable in a part 121 
pilot? On a particular basis, can pilots be screened for mild cognitive 
deficits or for the ``normal'' age-related cognitive decline? Can early 
dementia be identified before the affected pilot becomes a risk? How do 
we know when the pilot becomes a risk? How specifically are the 
deficits identified through currently available neuropsychological 
testing related to performance and to the real requirements of 
piloting? What is an acceptable level of risk in aviation? When does 
the incidence of cognitive deficit become unacceptable? Are current 
proficiency evaluations adequate for determination of a pilot's ability 
to perform adequately under every reasonably anticipated circumstance 
regardless of age? At present, adequate answers to these questions have 
not been provided.
    In its 1981 report, the Institute of Medicine (IOM) of the National 
Academy of Science (on which the NIH report is based) noted that in 
addition to the increased incidence of cardiovascular disease and 
degradation in cognitive functions associated with aging, other effects 
of aging become more prevalent. For example, diabetes, thyroid disease, 
pulmonary dysfunction, and gastrointestinal malignancy are more common 
with advancing age.
    There is other deterioration with age. For instance, research 
points to a decline with age in the speed and/or quality of many 
aspects of perceptual and motor functioning. In the general population, 
the ability to see fine details declines slightly in adulthood until 
about 60, and more markedly thereafter. With age, there is typically 
some loss in ability to hear effectively; the higher the frequency 
beyond about 1,000 hertz, the greater the loss.
    Clearly, there is progressive anatomic, physiological, and 
cognitive decline associated with aging, albeit variable in severity 
and onset among individuals. Physicians, psychologists, physiologists, 
and scientists of other disciplines have identified many age-associated 
variables, some easily measurable, some not, that may be important to 
human function. There may be other variables, not yet identified, that 
play an equally significant role. We know that, at some age, everyone 
reaches a level of infirmity or unreliability that is unacceptable in a 
pilot in air transportation. That age will vary from person to person 
but cannot yet be predicted in a specific individual. Because it is 
unacceptable for these pilots to work until failure or until there is 
obvious impairment, the age of 60 has served well as a regulatory limit 
since 1959. Many commenters state that the Age 60 Rule is arbitrary and 
there is no scientific basis for it. Others would choose a different 
arbitrary age. For instance, the Acting Chief, Adult Psychological 
Development, Behavioral and Social Research Program, NIA, submitted a 
comment in 1993 on behalf of the NIA. He states the view that the age 
limit could be increased ``to an age closer to the mid-sixties.'' 
However, the studies he cites do not point to an age closer to the mid-
sixties any more definitively than they point to the age of 60 as an 
appropriate age limit.
    While science does not dictate the age of 60, that age is within 
the age range during which sharp increases in disease mortality and 
morbidity occur.

II(b). Hilton Study and Other Accident Rate Studies

    Over the years, several reports have examined the rate of accidents 
as they relate to age in various populations groups, in an effort to 
better understand how aging may affect safety. As discussed above, the 
Hilton Study was initiated by the FAA to look at accident rates in 
pilots. Many commenters state that the report provides justification 
for a rule change. They point out that the report shows the same 
accident rate for pilots who are 50 and pilots who are 65. They state 
that the report finds that accident rates of part 121 pilots decrease 
with age. Some other commenters, however, state that the report does 
not provide justification for a rule change. They state that the report 
is not meaningful since correlating accident rates solely with total 
flying hours and recent flying hours is not a valid measurement. They 
also state that it is not meaningful to compare private pilots who fly 
beyond age 60 with pilots who fly a lot of hours per year in part 121 
operations.
    David Michaels, Ph.D., MPH, Associate Professor of Epidemiology, 
The City University of New York Medical School, submitted comments on 
the Hilton Study. He points out that accident rates are a very crude 
tool to examine the relationship between pilot age, health, and 
performance. The IOM, he notes, ``recognized the existence of a 
fundamental problem: since there are no Class I pilots flying Part 121 
flights beyond age 60, there are no medical, performance or even 
accident data on the group of greatest interest. Needed are data on 
vision, reaction time, judgment, circadian rhythm and many other 
neurobehavioral and physiological measures.'' This problem led to the 
IOM's recommendation that extensive additional data be collected and 
analyzed to better understand the relationship of aging and pilot 
performance. Dr. Michaels notes that the Hilton Study did not take the 
approach recommended by the IOM. Rather than examining the 
neurobehavioral and physiological measures detailed by the IOM, the 
authors of the Hilton Study examined only accident rates. (However, the 
authors of the Hilton Report fully carried out the work statement of 
their research contract with the agency which asked only that accidents 
be studied.)
    Dr. Michaels further noted that numerous studies have demonstrated 
that, among various groups of pilots examined, increasing accident risk 
is associated with increasing age. He includes papers by Golaszewski 
(1983); Mortimer (1991); and an analysis by the Office of Technology 
Assessment (1990) which support this finding. He also invites attention 
to the citation by the NIA Report of studies by Harper (1964); 
Lategola, et al (1970); Rohde and Ross (1966); and Booze (1977), all 
demonstrating increasing risk with increasing age. Dr. Michaels warns 
that it would be contrary to customary epidemiologic practice to accept 
unconditionally and definitively findings from a single study that are 
substantially different from those of previous studies.
    There is contention regarding the Hilton Study's grouping of pilots 
for comparison purposes. Richard Golaszewski, the author of two papers 
on the relationship between pilot age and accident rates, belives that 
the Hilton Study's conclusions are based on the use of a group of 
pilots (holders of Class III medical certificates who have more than 
500 hours of total flight time and 50 hours of flight time in the last 
year), inappropriate for inferences about the likely accident rate 
performance of airline pilots of age 60 and above. He believes this 
group is least like airline pilots and suggests his own alternative: 
Professional pilots who did not fly for airlines but who held Class I 
or II medical certificates. Mr. Golaszewski cites the Second 
Golaszewski Report for conclusions opposite to the Hilton Study--
increases in accident rates with age for professional pilots.

[[Page 65982]]

    The Hilton Study provides a discussion of the First Golaszewski 
Report, noting those researchers' disagreement with Mr. Golaszewski's 
methodology and questioning his conclusions. The study also notes 
methodological concerns regarding the cited works by the Office of 
Technology Assessment; Mortimer; and Guide and Gibson (1991).
    Dr. Michaels concludes that (1) the Hilton Study does not present 
convincing evidence that pilots holding Class I medical certificates 
past the age of 60 are not at increased risk of accidents, and (2) that 
the study is a methodologically invalid foundation for rulemaking. He 
suggests that the analyses performed are not valid because of the small 
size of the study (very few accidents and a very large number of flight 
hours), because the study is insensitive to the real concerns (whether 
aging is associated with increased risk for incapacitation), and 
because the study does not have well-documented exposure data. The 
later refers the fact that the Hilton Study calculated accident rates 
by comparing the total hours flown. However, because most accidents 
occur during take offs and landings, Dr. Michaels states that hours 
flown is not a useful measure in calculating the risk of accidents. He 
believes that the methods used in the Hilton Study would obscure any 
increased rate of accidents among older pilots in the analyses 
presented.
    The First Golaszewski Report concluded that pilots with Class I 
medical certificates (required for part 121 air carrier pilots in 
command) and Class II medical certificates (required for other 
commercial pilots) had a substantially higher accident rate after age 
60 than at younger ages. This report was cited by the FAA in denying a 
petition for exemption from Sec. 121.383(c) submitted by Courtney Y. 
Bennett et al., and John H. Baker, et al., in 1986. Golaszewski, in the 
study report itself, noted and resolved to the FAA's satisfaction 
various sources of potential error and provided rationale for the 
choices made. Because the study viewed the accident experience of 
holders of Class III medical certificates (required for non-commercial 
operations) and of all classes of medical certificate combined rather 
than that of identified airline pilots, however, and because of 
disagreement with Golaszewski's selection of numerators and 
denominators for calculating accident rates, the study findings and 
methodology were disputed by the petitioners in their later legal 
action in a U.S. Circuit Court of Appeals. Although the court 
identified limitations in the study, it upheld the FAA's denial of the 
petition. Baker v. FAA, 917 F.2d 318 (7th Cir. 1990).
    The Second Golaszewski Report indicated similar findings. These 
studies were based on data contained in the National Transportation 
Safety Board Accident Records Database and the FAA Comprehensive Airman 
Information System medical database.
    It should be noted that increasing accident rates with age is not 
found just in aviation. The National Research Council (NRC) has found 
increasing car accident rates with increasing driver age. In a report 
published in 1988, the NRC concluded that ``older drivers show an 
involvement in crashes that is more extensive than that of middle-age 
drivers, * * *'' Transportation in an Aging Society, Transportation 
Research Board, National Research Council, Washington, D.C. 1988. While 
safely piloting an airplane is more complex than driving an automobile, 
both require knowledge, quick reflex actions, good judgment, long-and 
short-term recall, and many other skills and abilities. Accident rate 
data represent a quantitative compilation of occurrences where skills 
and abilities were, for one reason or another, inadequate to cope with 
a specific situation.
    Because statistical analysis of over-age-60 pilots in part 121 
operations cannot be done (because there are no such pilots) studies 
must use surrogate data. As has been the case in both the Hilton Study 
and the Golaszewski reports, such analyses are subject to the criticism 
that the data used do not reflect reality and, therefore, are flawed. 
This is even truer with the consideration of accident rate data in car 
crashes. Unfortunately, accurate counts of all pilots flying in 
scheduled air carrier operations during a given time period and their 
age, current and total flight time, and accident experience are not 
available. Accidents in air carrier operations are, fortunately, rare, 
and there are other factors (e.g., seniority bidding for routes) that 
compound the difficulties encountered in developing meaningful 
statistics regarding the effects of aging. Further, flying by non-part 
121 pilots generally involves aircraft, equipment, airports, 
operational conditions, and operating procedures that are quite 
different than part 121 operations. Nevertheless, these studies and the 
efforts of earlier researchers provide a foundation for this current 
consideration of the issue.
    The Hilton Study, the First Golaszewski Report, and the Second 
Golaszewski Report sought to define the effects of aging on older 
pilots in terms of accident rates. While conclusions may differ as to 
the effect of aging on pilots, the studies are similarly limited by the 
rule itself since data cannot be gathered on pilots over age 60 
operating in part 121 operations. Factors that may have contributed to 
the contradictory conclusions are that the accident rates for pilots 
over age 60 can be determined only in operations outside of part 121 
and, therefore, may not be fully useful in drawing conclusions about 
pilot performance in operations conducted under part 121; and grouping 
the data differently may lead to different conclusions. While we 
believe the studies all tend to support a regulatory age limit, they 
provide no consensus as to precisely what that age limit should be.
    In the NIH Study, the most comprehensive study yet performed of the 
issues involved in age-related retirement of airline pilots, the Panel 
found that ``age-related changes in health and performance influence 
adversely the ability of increasing numbers of individuals to perform 
as pilots with the highest level of safety and, consequently, endanger 
the safety of the aviation system as a whole.'' In response to the 
question, ``What is the effect of aging on the ability of individuals 
to perform the duties of pilots with the highest level of safety?'', 
the Panel responded, in part, that--

Undoubtedly, the number of individuals experiencing substantial 
decline in performance does increase with advancing age * * * 
Variability in performance appears to increase, and average 
performance to decrease, with increasing age * * * the risk of an 
accident increases in the later life of a pilot, and * * * such risk 
probably accelerates with advancing age * * * The duties of pilots 
embrace not only maneuvering skill but also decision-making, crew 
coordination and resource management. Decline in cognitive and 
psychomotor performance, as well as in physiological performance, 
occurs with increasing age and will affect how these duties are 
executed. The health status of the pilot is apt to affect his/her 
flying performance. In this regard, subtle decrements in performance 
due to aging processes or subclinical functional impairment are more 
likely to pose a problem than is complete failure of performance due 
to sudden incapacitation.

The Hilton Study has not provided answers to these basic concerns.
    After careful deliberation, the FAA has determined that the Hilton 
Study does not provide an acceptable basis warranting proposing to 
change the Age 60 Rule. Supporters of both the Hilton Study and the 
First and Second Golaszewski Reports have good points. The subgroups 
studied by each is to some extent limited, in that they necessarily do 
not mirror the subgroup 

[[Page 65983]]
of part 121 pilots to which the Age 60 Rule applies. The studies do not 
look at pilot performance, indeed, they count all accidents regardless 
of cause (not just those caused by pilot error), and do not count 
incidents of pilot incapacitation that did not result in accidents.
    Debate surrounding the reliance to be placed on these studies 
illustrates the difficulty of the task. The changes in accident rates 
identified in the Hilton Study were small, and its conclusions, 
therefore, were appropriately cautious. In view of the lack of 
consensus among the best experts who have looked at this matter, the 
FAA considers caution appropriate in declining to consider the Hilton 
Study warranting a change to the Age 60 Rule at this time.

II(c). Performance

    Many commenters assert that older pilots have more experience and 
better performance capability than younger pilots, while other 
commenters state that older pilots lose performance ability. First, age 
does not necessarily imply quantity or quality of experience. 
Experience is valuable, but it does not offset all risks or decrements 
associated with aging. Also, at some point, the law of diminishing 
returns comes into play. Once a pilot achieves a certain level of 
expertise, additional flight time will not significantly improve pilot 
performance.
    It must also be pointed out that reference to ``younger'' pilots 
may be misleading in this context. It is the FAA's experience in the 
industry that retiring age 60 pilots (who generally are captains) are 
not replaced by very young and inexperienced pilots. Rather, they are 
replaced by pilots who have substantial experience as pilots in the 
first officer position, and often as flight engineers before that.
    In addition, some commenters state that pilots near age 60 have 
performed heroically, proving that performance does not degrade with 
age and experience, while other commenters state that courageous 
performances by pilots who were near age 60 are not reasons for 
abandoning the rule. While the FAA recognizes that certain older pilots 
have performed heroically in specific circumstances, the decision to 
change the Age 60 Rule cannot be based on isolated commendable acts. 
The FAA must make a decision on whether change to the rule is called 
for based on the totality of evidence available on the safety 
implications of aging.

II(d). Health and Technology

    Many commenters state that since the rule was issued medical 
technology has advanced and life expectancy has increased; hence, they 
conclude, the rule is obsolete. In addition, they reference that 
medical technology is now more capable of screening out pilots with 
medical risks and that fatigue is no longer an issue due to more modern 
aircraft that reduce workload and stress levels. Many commenters also 
state that the aging process can vary markedly among individuals and 
that some individuals are in worse physical or mental condition at age 
40 than others are at age 60. Hence, these commenters do not believe 
that age should be a means for determining capability. Many other 
commenters, however, state that older pilots are not in good physical 
shape and improvements in medical screening do not detect the subtle 
impairments with age that can undermine the margin of safety.
    As noted earlier, the incidence of cardiovascular disease rises 
with age, and it remains that most frequent cause of death in pilots 
and the general population. Though the FAA relies on sophisticated 
medical assessment and monitoring to permit the certification of 
carefully selected pilots with known heart disease, the need for the 
highest level of safety in air carrier operations has required that the 
increasing, unpredictable danger associated with aging be limited.
    In addition, there has been an increasing awareness of the more 
subtle adverse conditions affecting performance, those related to 
cognitive functioning. Current medical certification procedures 
identify those individuals who are at most risk and are adequate for 
assessing many medical problems in pilots. The significance of the 
known as well as the potential unknown or unmeasurable adverse factors 
increases with aging, however, and reduces confidence in the 
sensitivity of the medical certification process. The Age 60 Rule 
recognizes this reduction of sensitivity in the context of the 
statutory recognition that the highest possible degree of safety is 
required in air carrier operations. As both the incidence of 
incapacitation risk factors and other adverse effects increase with 
age, the Age 60 Rule provides additional confidence in air 
transportation safety.

II(e). Multicrew Concept

    Some commenters point out that operations under part 121 use 2-
pilot crews, and some also have a flight engineer on board. They state 
that if one pilot becomes incapacitated, the other crew member(s) can 
take over. The FAA agrees that the multicrew concept provides an 
additional measure of safety. Indeed, redundancy in safety features is 
an important part of the overall safety benefits in part 121 
operations, including not only pilots but also other personnel, 
aircraft structures, and procedures. The safety benefits of redundancy 
would be reduced, however, if the level of safety of any of the 
elements were to degrade. The sudden incapacitation of a pilot is not 
without risk even in a multiple-member crew and is to be avoided. Of 
equal concern is the prospect of subtle degradation in the judgment, 
cognitive function, and crew coordination that may accompany advancing 
age. Unlike the case of sudden incapacitation, such degradation may not 
be readily apparent to the other crew, and it may be difficult for the 
crew to deal with the results.
    The FAA does not consider the fact that part 121 operations have 
multiple pilots to be a basis for permitting one (or both) of those 
pilots to be at unacceptable risk for age-related problems.

III. Alternatives to an Age Limitation

III(a). Performance Checks

    Some commenters suggested that the FAA can do performance checks 
for pilots past age 60 in simulators to ensure that they meet the 
performance standards. Periodic proficiency and competency checks are 
intended to detect a pilot's performance deficiency and to correct 
those deficiencies before the pilot is returned to flight operations. 
These checks only verify the state of a pilot's performance at the time 
of the checks. They are not useful for detection of early or 
subclinical cognitive defects that may subtly degrade performance or 
which, in time, may progress to risks for errors in judgment or other 
actions that may jeopardize safety. The checks do not predict whether 
an individual pilot's performance will degrade at any time in the 
future as a result of age. In addition, in its 1981 report, NIA noted 
that proficiency checks and simulator checks usually are designed to 
train pilots to meet standards of proficiency under optimal testing 
conditions using known routines and maneuvers. Although the proficiency 
checks suffice for pilot performance purposes, they are not suitable 
for testing complex cognitive functions under actual conditions, such 
as fatigue and stress; nor are they used to determine at what rate the 
skills learned in the training sessions decline between two consecutive 
checks. Standard maneuvers used in proficiency tests are inappropriate 
for measuring any but obvious decrements in pilot performance. Their 
inadequacy stems 

[[Page 65984]]
from the fact that the maneuvers are well-known in advance; they may be 
well-practiced and over-learned by experienced pilots; and they may 
give no indication of the pilot's ability to perform them under 
particular levels of stress, fatigue, or unexpected decision-making 
requirements. Furthermore, the pass/fail nature of the testing program; 
the probable wide variability among testers; and the train-to-
proficiency nature of these tests make them inadequate as a screening 
mechanism.

III(b). Class I Medical Certificates and Special Issuance Certificates

    Some commenters state that part 121 pilots are required to hold FAA 
medical certificates, and that the medical certification process tests 
their medical fitness. Commenters also point out that the FAA issues 
waivers to pilots and permits them to fly with various medical 
conditions, including cardiovascular problems. They state that if such 
pilots can be evaluated, older pilots can too.
    The question of operational privileges for aging pilots is not 
comparable to the question of assessment of younger airmen with 
specific medical conditions. Although individuals with known medical 
conditions have been returned to air carrier duties, their 
circumstances are not comparable with those of an individual who has 
reached an advanced age. For the person with known disease, the 
prognosis for the disease can normally be assessed and specific tests 
or evaluations identified to monitor the condition. Special issuance 
medical certificates are granted to airmen who have certain known 
medical conditions or static defects that are disqualifying under the 
established standards of the Federal Aviation Regulations. This 
practice does not compromise safety and does not demand similar 
consideration with respect to the Age 60 Rule. When a special issuance 
medical certificate is granted, the condition in question has been 
clearly identified, and the agency has been able to develop a means of 
assessment and surveillance specially designed to demonstrate the 
individual's capabilities and to identify any adverse changes. If that 
is not possible, certification is not granted. Such is not the case in 
aging, since there are no generally applicable medical tests that can, 
at this time, adequately determine which individual pilots are subject 
to incapacitation secondary to either acute cardiovascular or 
neurological events or to more subtle adverse conditions related to 
decline of cognitive functioning.

III(c). Suggested Protocol for Gathering Additional Data

    One commenter states that data from actual part 121 pilots under 60 
and over 60 are needed. The commenter suggested that a pilot group 
should be established that can fly over age 60. He believes that a 
cohort of over age 60 pilots can be identified with a quantifiable five 
year cardiovascular risk that is lower than the risk in the 50 to 59 
year age group. Also this group can be tested by serial performance 
testing to ensure that there has not been subtle incapacitation. The 
kind of data that is needed to change the rule could then be collected 
and analyzed.
    The commenter recommends that a consensus working group of experts, 
appointed by the Federal Air Surgeon, deliver a document that describes 
a battery of state-of-the-art testing to identify a group of age 60 or 
older pilots who have the attributes for continued safe flying. A 
second group of non-flying crew age 60 or older would also be 
considered. The document would include all testing, follow up, 
methodology, etc. The Federal Air Surgeon would then review the 
protocol, obtain additional expert help as needed, and produce the 
final protocol. Finally, the FAA would choose the sites for 
participants in the long term surveillance program.
    FAA Response: While the FAA appreciates the proposed protocol that 
the commenter submitted, the FAA does not find it an acceptable basis 
for initiating a rule change at this time. The FAA's ANPRM in 1982 
proposed identification of a select group of aged 60 and over pilots 
who would continue flying in part 121 operations to permit FAA to 
collect data. The FAA withdrew the ANPRM in 1984 because valid 
selection tests for the group did not exist. The FAA was concerned 
that, without valid selection tests, these pilots would create an 
unacceptable safety risk in part 121 operations. The commenter does not 
suggest any data that indicates that a group described would be able to 
identify any such tests. The FAA has the same concerns today.

IV. Financial Impact of the Age 60 Rule

IV(a). Costs

    Some commenters stated that raising the age limit will reduce 
costs, while other commenters stated that raising the age limit will 
increase costs.
    FAA Response: For the reasons discussed in this Disposition, the 
FAA has determined that an amendment to the Age 60 Rule should not be 
proposed at this time. Therefore, the FAA has not evaluated the 
economic impact of a proposed change.

IV(b). Hiring of Pilots

    Some commenters state that increasing the age limit would result in 
the hiring of fewer new pilots, while others state that there would be 
no change in hiring and no increase in furloughs because economic 
success rather than retirements determines hiring and furloughs. 
Commenters estimate that between 10 and 50 percent of pilots would 
continue to fly if the age limit is extended.
    FAA Response: The FAA believes that the primary determinant of new 
pilot hiring and furlough is general economic conditions rather than 
retirements. The effects of increasing the age of mandatory retirement 
would depend on the number of pilots opting to delay their retirement, 
which may vary considerably among air carriers. Pilots with long 
tenures at a single carrier would be less inclined to delay their 
retirement than pilots who began their service at a relatively late age 
and may not have sufficient years of service at their present employer 
to qualify for full vesting in pension plans. In addition, the hiring 
and furlough plans of those air carriers that permit pilots over age 60 
to serve as flight engineers would be less affected. Any effects on 
furlough and new hires would be temporary as retirements would not be 
delayed by more than the difference between the existing and the 
amended mandatory retirement age.

V. Other Comments

V(a). Original Promulgation of Age 60 Rule

    Several commenters contend that the Age 60 Rule was promulgated for 
economic reasons in response to an improper personal request from the 
chairman of American Airlines to the Administrator of the FAA and 
question the FAA's recent actions in reviewing the rule.
    FAA Response: When the Age 60 Rule was first promulgated in 1959, 
the FAA followed standard rulemaking procedures. Notices were published 
in the Federal Register (draft releases 59-4, 5, and 6, 24 FR 5249, 
5248, and 5247, June 27, 1959), the public was given an opportunity to 
comment on the proposal, and then the final rule was issued. The rule 
was not issued to facilitate the operations of any air carrier. The 
rule was promulgated in order to maintain a high level of safety in 
part 121 operations, and that remains the FAA objective at the present 
time.

[[Page 65985]]

V(b). Age Discrimination

    Many commenters state that the current rule discriminates against 
pilots 60 years of age or older and that the Age 60 Rule is not in 
compliance with the Age Discrimination in Employment Act. In addition, 
many commenters state that the original establishment of the age 60 
limit discriminated against people 60 years and older. However, many 
commenters who are opposed to changing the rule state that since pilots 
knew about the age 60 limit when they were hired, it is not 
discriminatory.
    FAA Response: The FAA agrees that limitations based on age are to 
be avoided if possible. However, safety in air transportation is 
paramount. As discussed above, the FAA has not found a way to 
acceptably evaluate the inevitable deterioration that occurs with age. 
Considering that the consequences of a pilot's subtle or sudden 
incapacitation potentially are so severe, the FAA has determined that 
at this time safety requires the Age 60 Rule to remain unchanged.
    The Equal Opportunity Employment Commission suggests that the FAA 
use special testing or screening to identify those pilots over age 60 
who should be required to stop serving in part 121 operations. They 
note that some employers of pilots in non-part 121 operations have 
resolved age discrimination litigation by agreeing to use such 
additional testing to develop data about pilots' health. However, the 
FAA has not been apprised of the testing protocols or of the results of 
any such testing, has not seen them discussed in the medical 
literature, and has not been party to the agreements. Accordingly, 
these are not a basis to determine that such testing can be used 
instead of an age limitation.

V(c). Foreign Pilots Over Age 60

    Many commenters reference ICAO standards, the JAA proposal, and the 
foreign countries that permit pilots to be over age 60, with varying 
restrictions. In addition, many commenters point out that the FAA 
allows foreign carriers to operate in U.S. airspace and airports with 
over age 60 pilots and questioned why U.S. pilots over 60 can't operate 
in U.S. airspace and airports.
    FAA Response: Following the FAA's promulgation of the Age 60 Rule, 
the International Civil Aviation Organization (ICAO) adopted changes to 
international safety standards that established an age limit of 60 for 
the pilot in command of large transport aircraft operating in 
international air transport service. ICAO standards do not limit the 
age of the second in command, although an age limit of 60 is 
recommended. In October 1994, a working group of ICAO's Air Navigation 
Commission prepared a working paper on the upper age limits for flight 
crewmembers. The group, acknowledging the lack of medical statistical 
information, recommended that the age limit not be changed. Some 
countries such as France and Germany have an Age 60 Rule similar to the 
United States, while other countries such as the United Kingdom and 
Switzerland have adopted rules that allow pilots to fly after their 
60th birthdays. If foreign airlines operate in the U.S., the FAA 
requires that the carrier adhere to the ICAO standard. In addition, the 
Joint Aviation Authorities (JAA) in Europe has proposed to harmonize 
the European rule to allow pilots who have not reached the age of 65 to 
operate in multi-pilot operations, provided no more than one pilot in 
the cockpit is over the age of 60. (JAR-FCL 2-1.11.)
    Accordingly, not all countries have dealt with the issue of age 
limitations in the same manner, and for the reasons discussed elsewhere 
in this Disposition, the FAA has determined that the Age 60 Rule should 
be maintained in the United States.

V(d). Inconsistency With Other Regulations

    Many commenters point out that pilots who operate under other than 
part 121 can fly after reaching age 60. They believe, therefore, that 
there should not be an age limit in part 121 operations.
    FAA Response: The Age 60 Rule, like many other safety rules that 
apply to part 121 operations and not others, provides an increased 
level of safety appropriate to the operations conducted under part 121. 
The Commuter Rule proposal, as discussed above, looked at enhancing the 
level of safety for certain operations now under part 135. The FAA 
proposed one age limit on all pilots employed in part 121 operations, 
including those pilots currently employed in the part 135 operations 
covered by the proposal (60 FR 16230; March 29, 1995). The final 
Commuter Rule is being issued concurrently with this Disposition.
    The FAA's statute requires the Administrator to give consideration 
to the duty resting upon air carriers to perform their services with 
the highest possible degree of safety in the public interest and to 
make rules appropriate to the differences between air transportation 
and other air commerce. The Age 60 Rule is responsive to this mandate.

V(e). Pilot Union Membership

    Many commenters state that pilot unions and employers may favor 
retirement at age 60 and write this into their labor contracts, but 
pilots who do not belong to those unions should not be penalized by 
actions that benefit union members. In addition, commenters state that 
some union members disagree with their union's position and they 
question their union's motivation for changing their position on the 
question of raising the age limit.
    FAA Response: The Age 60 Rule is a safety rule that must apply to 
all pilots, regardless of union membership or labor contracts. The FAA 
cannot speculate as to the basis for union or management positions.

V(f). Experienced Pilot Shortages

    Many commenters state that new pilots have a shorter time for 
gaining experience as second and first officer because of the rapid 
expansion of the major carriers and the increasing numbers of two-
person cockpits. The commenters state that carriers that allow rapid 
promotion to Captain have poor safety records. Commenters also point 
out that industry forecasts project a shortage of pilots between 1995 
and 2010 due to sharply reduced military pilot training, thus the 
airlines' most experienced pilots should be retained.
    FAA Response: The FAA has not been apprised of data that shows that 
the Age 60 Rule will create a shortage of experienced pilots and 
thereby compromise safety.

VI. Conclusion

    While the FAA considered each comment in its evaluation of the Age 
60 Rule, for the most part the comments made assertions and expressed 
opinions but did not provide the FAA with additional facts or analysis 
sufficient to support changing the rule. The FAA's overriding 
regulatory concern is safety. Before issuing a regulation, the FAA must 
be satisfied that it will maintain or raise the current level of 
safety.
    The Civil Aviation Medical Association's (CAMA) comments are 
particularly relevant. CAMA noted that medical conditions are degraded 
by age and that the aging process accelerates with time. It took a 
neutral position as to the Age 60 Rule, however, stating that the basic 
question is one of public policy and determining how much risk is 
acceptable.
    The only things that are clear from review of all of the comments 
and relevant literature is that there is no one obviously ``right 
answer'' discovered through scientific or medical studies, 

[[Page 65986]]
and, as CAMA states, the basic question is one of public policy and 
determining how much risk is acceptable. The FAA must evaluate all the 
varied evidence that indicates what those risks are, and determine 
where the public interest lies. At this time, the FAA cannot be assured 
that raising the age 60 limit will maintain or raise the level of 
safety that the Age 60 Rule offers.
    Although the Hilton Study provides useful information on accident 
rates for pilots as a function of their age, it does not provide a 
satisfactory basis for changing the Age 60 Rule.
    Therefore, after carefully considering the written comments 
submitted to the docket, the comments presented at the public meeting, 
and analysis of the Hilton Study, the FAA has determined for the 
reasons stated above that no change to the Age 60 Rule should be 
proposed at this time.

    Issued in Washington, DC on December 11, 1995.
William J. White,
Acting Director, Flight Standards Service.
[FR Doc. 95-30546 Filed 12-14-95; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 95-30402 Adoption of Industry Standards
[Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
[Proposed Rules]
[Pages 65988-66011]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30402]

[[Page 65987]]

_______________________________________________________________________

Part III

Department of Transportation

_______________________________________________________________________

Coast Guard

_______________________________________________________________________

46 CFR Part 26 et al.

Adoption of Industry Standards; Proposed Rule

Federal Register / Vol. 60, No. 244, Wednesday, December 20, 1995 / 
Proposed Rules

[[Page 65988]]

DEPARTMENT OF TRANSPORTATION

Coast Guard

46 CFR Parts 26, 31, 32, 34, 35, 38, 54, 56, 61, 72, 76, 77, 78, 
92, 95, 96, 97, 108, 109, 153, 160, 162, 164, 167, 168, 169, 190, 
193, and 196

[CGD 95-027]
RIN 2115-AF09

Adoption of Industry Standards

AGENCY: Coast Guard, DOT.

ACTION: Notice of proposed rulemaking and public meeting.

-----------------------------------------------------------------------

SUMMARY: As part of the President's Regulatory Reinvention, the Coast 
Guard is proposing to amend its regulations governing both inspected 
and uninspected commercial vessels by removing or revising obsolete and 
unnecessary provisions and incorporating industry standards and 
practices. The provisions proposed for removal or revision are 
categorized as: Regulations discussing equipment which is no longer 
manufactured or used; Regulations imposing requirements that are 
repeated in another, more useful section; Regulations imposing 
requirements which make a negligible contribution to shipboard safety; 
Regulations which can be replaced by an appropriate industry consensus 
standard or practice; and, Regulations which merely repeat statutory 
language.
    The Coast Guard expects these amendments will reduce the regulatory 
burden to the maritime industry, reduce the administrative burden to 
government and industry, reduce government printing costs, and provide 
a more concise and useful Title 46, Code of Federal Regulations.

DATES: Comments must be received not later than February 20, 1996. A 
public meeting will be held on February 9, 1996 to discuss this 
rulemaking.

ADDRESSES: Comments may be mailed to the Executive Secretary, Marine 
Safety Council (G-LRA), U.S. Coast Guard, 2100 Second Street SW, 
Washington, DC 20593-0001, or may be delivered to room 3406 at the same 
address between 8 a.m. and 3 p.m., Monday through Friday, except 
Federal holidays. Comments will become part of this docket and will be 
available for inspection or copying at room 3406, Coast Guard 
Headquarters, between 8 a.m. and 3 p.m., Monday through Friday, except 
Federal holidays.
    A public meeting scheduled for February 9, 1996 will be held in 
Room 2415 at Coast Guard Headquarters, 2100 Second Street SW, 
Washington, DC 20593-0001.
    A copy of the material listed in ``Incorporation by Reference'' of 
this preamble is available for inspection at Room 1300, U.S. Coast 
Guard Headquarters.

FOR FURTHER INFORMATION CONTACT: Design and Engineering Standards 
Division (G-MMS), U.S. Coast Guard, 2100 Second Street SW., Washington, 
DC 20593-0001, telephone (202) 267-2206--LCDR R. K. Butturini, Project 
Manager; LTJG Jaqueline Twomey, Project Engineer; Ms. Shereen Bell, 
Project Assistant. Regulations and Administrative Law Division (G-LRA), 
U.S. Coast Guard, 2100 Second Street SW., Washington, DC 20593-0001, 
telephone (202) 267-1534--LT Rachel Goldberg, Project Counsel,

SUPPLEMENTARY INFORMATION:

 Request for Comments

    The Coast Guard encourages interested persons to participate in 
this rulemaking by submitting written data, views, or arguments. 
Persons submitting comments should include their names and addresses, 
identify this rulemaking (CGD 95-027) and the specific section of this 
proposed rule to which each comment applies, and give the reason for 
each comment. Please submit two copies of all comments and attachments 
in an unbound format, no larger than 8\1/2\ by 11 inches, suitable for 
copying and electronic filing. Persons wanting acknowledgment of 
receipt of comments should enclose a stamped, self-addressed postcard 
or envelope.
    The Coast Guard will consider all comments received during the 
comment period. It may change this proposal in view of the comments.
    A public meeting was held on April 20, 1995 (60 FR 16423) to 
discuss Coast Guard regulations and the regulatory process. The 
relevant comments received at the hearing or in writing have been 
considered for the changes included in this document. The Coast Guard 
will hold another public meeting on February 9, 1996 from 9 a.m. to 3 
p.m. to discuss these proposed rules and to solicit other suggestions 
or comments for regulatory reform. The meeting will be held at the site 
indicated in the ADDRESSES section. Comments received at the hearing 
will be considered as part of the review of this proposal and the Coast 
Guard may change this proposal in view of these comments.

Background and Purpose

    This proposal has been sparked by several recent calls for 
regulatory review and reform. For example, on March 4, 1995, the 
President issued a memorandum calling on executive agencies to review 
regulations with the goals of--
    (1) Cutting obsolete regulations;
    (2) Focusing on results instead of process and punishment;
    (3) Convening meetings with the regulated community; and,
    (4) Expanding efforts to promote consensual rulemaking.
    The President's memorandum coincides with U.S. maritime industry 
requests for greater alignment of Coast Guard regulations with 
international marine safety standards to reduce cost disadvantages 
incurred by the U.S. maritime industry and thereby improve the 
competitiveness of the U.S. industry. The ongoing National Performance 
Review effort, which stresses reducing red tape and maximizing results, 
provides further justification for identifying excessive requirements 
in Coast Guard regulations and for streamlining government processes. 
Also, the Coast Guard recognizes the need to explore regulatory reform 
where it provides an opportunity to reprogram Coast Guard resources to 
focus more attention on human factors and port state control activities 
to ensure other nations are conscientiously implementing international 
safety agreements.
    The Coast Guard held a public meeting on April 20, 1995, announced 
in the March 30, 1995 Federal Register (60 FR 16423), to discuss the 
Coast Guard's regulatory development process and the President's 
Regulatory Review Initiative. During the public meeting, the Coast 
Guard announced its goals of purging obsolete and outdated regulations 
and eliminating any Coast Guard induced differences between 
requirements that apply to U.S. vessels in international trade and 
those that apply to similar vessels in international trade that fly the 
flag of other responsible foreign nations. In the May 31, 1995 Federal 
Register (60 FR 28376), the Coast Guard reiterated its intention to 
harmonize Coast Guard regulations with international safety standards.
    To accomplish all of these goals, the Coast Guard is considering 
alternative compliance methods, examining ways to make existing 
regulations more efficient and comparing U.S. marine safety regulations 
with American Bureau of Shipping (ABS) Rules and the International 
Convention for the Safety of Life at Sea, 1974, as amended (SOLAS '74). 
An initial rulemaking removing or amending obsolete and unnecessary 
provisions was published in the September 18, 1995 Federal 

[[Page 65989]]
Register (60 FR 48044). That rulemaking focused on regulations for 
which no adverse public comment was expected, such as removal of the 
requirements for nuclear vessels, ocean incinerator ships and ocean 
thermal energy conversion facilities and plantships. This proposal 
removes or amends obsolete or unnecessary regulations of a more 
significant nature and seeks to incorporate industry consensus 
standards and practices. The broader scope of this proposal and the 
nature of the proposed changes, when compared to the previous 
rulemaking, make increased public involvement desirable.
    In compiling the list of CFR sections included in this proposed 
rule, the Coast Guard did not consider parts of Title 46 Code of 
Federal Regulations (46 CFR) that are under review as part of other, 
ongoing regulatory projects.
    In this proposal, sections of the CFR were identified for removal 
or revision by comparing the section subject matter to the following 
list of selection criteria:
    (a) Equipment discussed in a section is no longer manufactured or 
used:
    (b) Requirements imposed by a section are repeated in another 
section;
    (c) Requirements imposed by a section make a negligible 
contribution to shipboard safety;
    (d) An appropriate industry consensus standard or practice exists 
which can be referenced instead of publishing detailed requirements in 
a regulation; or,
    (e) The text of a regulation merely repeats statutory language.

Discussion of Proposed Rules

    The following discussion summarizes the changes proposed by this 
rule:
    1. The requirement addresses equipment that is no longer 
manufactured or used. The following sections are being removed or 
revised because they impose requirements for equipment that is no 
longer manufactured, that is technologically obsolete, or is no longer 
used in the marine industry.
    Section 31.10-15(a) of Title 46 CFR contains requirements for 
nuclear vessels. This section was inadvertently omitted from an earlier 
rulemaking entitled Removal of Obsolete and Unnecessary Regulations (60 
FR 48044) which focused on removing regulations for nuclear vessels, 
ocean incinerator vessels and ocean thermal energy conversion 
facilities and plantships. Therefore, this section which pertains to 
nuclear vessels is proposed for removal.
    Section 34.05-5 and Subparts 34.13, 76.13 and 95.13 of Title 46 CFR 
contain requirements for steam smothering systems used for fire 
fighting purposes. The Coast Guard has prohibited installation of steam 
smothering systems on vessels since 1962. Existing steam smothering 
systems may be retained as long as they are kept in good condition to 
the satisfaction of the Officer in Charge, Marine Inspection. As no new 
installation of steam smothering systems are allowed and the designs of 
existing installations have already been approved, the design 
requirements for steam smothering systems are no longer necessary and 
are proposed for removal. The Coast Guard is retaining the regulations 
pertaining to testing and inspection of installed systems.
    Subparts 35.70, 78.80, 97.70 and Sec. 108.613 of Title 46 CFR 
contain requirements for power-operated industrial trucks. Power-
operated industrial trucks have historically been used on break-bulk 
ships for handling cargo in the holds. Only 66 U.S. flag break-bulk 
ships are currently inspected by the Coast Guard. Well over half of 
these ships are maintained by the Maritime Administration (MARAD), but 
are not operating. Of MARAD's ships, only 7 will eventually carry 
power-operated industrial trucks as ship's equipment. On the remaining, 
privately owned break-bulk ships, few trucks are still carried as 
ship's equipment because dockside trucks are readily available. Trucks 
are also used on mobile offshore drilling units (MODUs) to move 
palletized stores such as bagged cement. Efficient cargo handling 
systems are increasingly replacing trucks aboard MODUs for this 
purpose. The demand for faster loading methods and the evolution of 
container ships, lighter-aboard ships (LASH) and roll-on/roll-off 
(RORO) ships has also reduced the use of power-operated industrial 
trucks. Additionally, there have been no reported accidents involving 
power-operated industrial trucks in the last fifteen years. Therefore, 
regulations for power-operated industrial trucks are no longer 
necessary and are proposed for removal.
    Sections 32.15-10, 77.27-1, 96.27-1 and 167.40-20 of Title 46 CFR 
contain requirements for sounding equipment, including deep-sea hand 
leads. Reliable, inexpensive electronic sounding equipment and position 
fixing equipment are available from numerous manufacturers. It is 
unlikely that a hand lead would be necessary to determine the water 
depth. Therefore, the requirements for deep sea hand leads are not 
necessary and are proposed for removal.
    Section 32.02-5 and Subparts 78.35, 97.33 and 196.33 require cable 
travelers between fore and aft deck houses separated by more than 46 m 
(150 ft) to protect crewmembers needing to cross the weather decks. 
Cable travelers have been replaced by raised fore and aft bridges and 
side tunnels as safer means of moving between the deckhouses. 
Additionally, modern vessel designs have abandoned the two deck house 
arrangement in favor of a single deckhouse. Therefore, these sections 
are being revised to remove the requirement for installation of cable 
travelers between separated deckhouses and merely require a fixed means 
of facilitating movement between both ends of the vessel.
    Sections 34.05-15, 76.05-30, 95.05-20, 167.45-40, 193.05-20 and 
Subpart 34.55 of 46 CFR require sand, sawdust impregnated with soda or 
other appropriate dry materials, and a scoop or shaker for 
distribution, to be located in the machinery spaces for fire fighting 
purposes. Sand is inferior to other, common fire fighting means, such 
as portable extinguishers, and this burdensome requirement is no longer 
appropriate. Therefore, regulations requiring sand in the engine room 
are proposed for removal.
    Subparts 35.12, 78.53, 97.43, 196.43 and Section 167.65-50 of 46 
CFR require instructions for the use of breeches buoys. Modern 
communications and lifesaving equipment have made the use of breeches 
buoys for lifesaving purposes obsolete. Therefore, the requirement for 
an instruction placard for the use of breeches buoys is no longer 
necessary and these sections are proposed for revision to remove this 
requirement.
    Sections 35.30-45, 72.05-60, 167.40-35 and 169.321 and Subparts 
78.75, 97.60 and 196.60 of Title 46 CFR contain requirements for motion 
picture film. Subpart 78.75 also contains a requirement that motion 
picture projectors comply with the requirements in the electrical 
engineering regulations. With the exception of large passenger vessels, 
video cassette recorders and televisions have replaced motion picture 
projectors on most vessels. Large passenger vessels use motion picture 
projectors in their movie theaters. Slow-burning film is the only type 
of film currently available in reel format for use with movie 
projectors. Section 111.89-1 of Title 46 in the electrical engineering 
regulations requires all motion picture projectors to meet Article 540 
of the National Electrical Code. Therefore, as the risks previously 
associated with motion picture film no longer exist, the regulations 
for motion picture film are not necessary and are proposed for removal.

[[Page 65990]]

    Sections 180.403 and 167.45-55 of Title 46 CFR allow the 
installation of water spray systems for fire fighting purposes in 
boiler spaces of mobile offshore drilling units (MODU) and public 
nautical school ships. Other fire fighting media, such as carbon 
dioxide, have shown to be more effective, reliable and practical than 
water spray systems and no MODU or public nautical school ship 
currently uses a water spray system in a boiler space for fire fighting 
purposes. Therefore, these provisions are not necessary and are 
proposed for removal.
    Subpart 160.018 of Title 46 CFR contains specifications for rigid 
liferafts. Rigid liferafts are no longer manufactured for use in the 
marine industry. Therefore, the specifications for rigid liferafts in 
46 CFR 160.018 are no longer necessary and are proposed for removal.
    Subpart 160.034 of Title 46 CFR contains specifications for 
lifeboat hand propelling gear. Hand propelled lifeboats have largely 
been replaced by reliable, engine-driven lifeboats and are no longer 
manufactured for use in the marine industry. Therefore, the 
specifications for hand propelling gear in 46 CFR 160.034 are no longer 
necessary and are proposed for removal.
    Section 164.016 of Title 46 CFR contains specifications for 
microcellular nylon used in the construction of lifesaving equipment. 
Microcellular nylon has been replaced by more effective materials and 
is no longer manufactured for use in Coast Guard approval lifesaving 
equipment. Therefore, the specifications for microcellular nylon are no 
longer needed and are proposed for removal.

----------------------------------------------------------------------------------------------------------------
           Cite (46 CFR)                   Proposed change                Subject addressed by regulation       
----------------------------------------------------------------------------------------------------------------
Sec.  31.10-15.....................  Revision...................  Nuclear vessels.                              
Sec.  32.02-5......................  Revision...................  Cable traveler.                               
Sec.  32.15-10.....................  Revision...................  Deep-sea hand leads.                          
Sec.  34.05-5......................  Revision...................  Steam smothering systems.                     
Sec.  34.05-15.....................  Removal....................  Sand in the engineroom.                       
Subpart 34.13......................  Revision...................  Steam smothering systems.                     
Subpart 34.55......................  Removal....................  Sand in the engineroom.                       
Subpart 35.12......................  Revision...................  Breeches buoy placard.                        
Sec.  35.30-45.....................  Revision...................  Motion picture film.                          
Subpart 35.70......................  Removal....................  Power-operated industrial trucks.             
Sec.  76.05-60.....................  Removal....................  Motion picture film.                          
Sec.  76.05-20.....................  Revision...................  Fixed firefighting systems.                   
Sec.  76.05-30.....................  Removal....................  Sand in the engineroom.                       
Subpart 76.13......................  Revision...................  Steam smothering systems.                     
Sec.  77.27-1......................  Revision...................  Deep-sea hand leads.                          
Subpart 78.35......................  Revision...................  Cable traveler.                               
Subpart 78.53......................  Revision...................  Breeches buoy placard.                        
Subpart 78.75......................  Removal....................  Motion picture film.                          
Subpart 78.80......................  Removal....................  Power-operated industrial trucks.             
Sec.  95.05-10.....................  Revision...................  Fixed firefighting systems.                   
Sec.  95.05-20.....................  Removal....................  Sand in boiler rooms.                         
Subpart 95.13......................  Revision...................  Steam smothering systems.                     
Sec.  96.27-1......................  Revision...................  Deep-sea hand leads.                          
Subpart 97.33......................  Revision...................  Cable traveler.                               
Subpart 97.43......................  Revision...................  Breeches buoy placard.                        
Subpart 97.60......................  Removal....................  Motion picture film.                          
Subpart 97,70......................  Removal....................  Power-operated industrial trucks.             
Sec.  108.403......................  Revision...................  Water spray systems.                          
Sec.  108.613......................  Removal....................  Power-operated industrial trucks.             
Subpart 160.018....................  Removal....................  Rigid liferafts.                              
Subpart 160.034....................  Removal....................  Lifeboat hand propelling gear.                
Subpart 164.016....................  Removal....................  Microcellular nylon.                          
Sec.  167.40-20....................  Revision...................  Deep-sea hand leads.                          
Sec.  167.40-35....................  Removal....................  Motion picture film.                          
Sec.  167.45-40....................  Revision...................  Sand in enginerooms.                          
Sec.  167.45-55....................  Revision...................  Water spray systems.                          
Sec.  167.65-50....................  Revision...................  Breeches buoy placard.                        
Sec.  169.321......................  Removal....................  Motion picture film.                          
Sec.  193.05-20....................  Removal....................  Sand in boiler rooms.                         
Subpart 196.33.....................  Revision...................  Cable traveler.                               
Subpart 196.43.....................  Revision...................  Breeches buoy placard.                        
Subpart 196.60.....................  Removal....................  Motion picture film.                          
----------------------------------------------------------------------------------------------------------------

    2. The requirement is repeated in another section. The following 
provisions are being removed or revised because the requirements are 
repeated in other, more useful locations in Title 33 CFR or Title 46 
CFR.
    Subparts 32.95, 78.85, 97.75, 196.18 and 196.75 and Section 109.583 
of Title 46 CFR contain identical language regarding the requirement 
that certain vessels operate in accordance with the requirements of the 
Federal Water Pollution Control Act (FWPCA), as amended, the Oil 
Pollution Act (OPA), 1961, as amended and Parts 151, 155 and 156 of 
Title 33 CFR. However, each of the requirements cited contain language 
regarding their applicability. Therefore, the sections of Title 46 CFR 
which merely restate the applicability of the FWPCA, OPA and Title 33 
CFR are not necessary and are proposed for removal.
    Sections 35.20-25 and 167.65-1 and Subparts 78.25, 97.23 and 196.23 
of Title 46 prohibit carrying any light not required by law that will 
interfere with 

[[Page 65991]]
distinguishing signal lights. However, Rule 20 of both the Inland and 
International Rules of the Road published in 33 U.S.C. 2020 and 33 CFR 
81, Appendix A, respectively, contains the same requirement. It is more 
logical to retain requirements pertaining to signal lights in the Rules 
of the Road. Therefore, the sections of Title 46 CFR prohibiting 
carrying lights that interfere with signal lights are not necessary and 
are proposed for removal.
    Sections 35.20-40, 78.21-1, 97.19-1 and 196.19-1 of Title 46 CFR 
require ocean and coastwise vessels over 1600 gross tons to display 
maneuvering information on a fact sheet in the pilothouse. These 
sections include instructions for validating the information on the 
fact sheet after the vessel begins operating. Section 164.35 of Title 
33 CFR also contains a requirement to display maneuvering information 
on a fact sheet in the pilothouse for vessels over 1600 gross tons on 
all navigable waters of the U.S.
    The intent of both Title 33 CFR and Title 46 CFR is to provide 
information about the vessel's maneuvering characteristics for use in 
piloting waters. However, there are slight differences in the language 
of the requirements. Also, the requirement to display maneuvering 
information in Title 33 CFR and Title 46 CFR apply to some of the same 
vessels, but some vessels are only covered by one title. Under the 
current regulations, both requirements apply to an oceangoing U.S. 
vessel entering a U.S. port, resulting in a conflict between Title 33 
CFR and Title 46 CFR.
    As the information required to be displayed in Title 33 CFR and 
Title 46 CFR is similar and the purpose is the same, the requirement 
need not be printed in both locations. It is more useful and consistent 
to retain the description of the maneuvering information required in 
the navigation safety regulations of Title 33 CFR. Therefore, this 
proposal, if adopted, would remove paragraphs repeating the maneuvering 
information to be displayed from Title 46 CFR and retain the 
instructions in Title 46 CFR for validating the maneuvering information 
with an added reference to Title 33 CFR.
    Section 56.50-100 of Title 46 CFR merely contains a one sentence 
reference to Subpart 58.30 of Title 46 CFR for fluid power and control 
system requirements. Subpart 58.30, Fluid Power and Control Systems, 
contains the detailed requirements. Therefore, Sec. 56.50-100 is not 
necessary and is proposed for removal.
    Sections 92.01-13 and 190.01-13 of Title 46 CFR contain 
requirements for the design and operation of sliding watertight door 
assemblies on cargo and miscellaneous vessels and oceanographic 
research vessels. Section 170.270 of the subdivision and stability 
regulations in Title 46 CFR contains identical requirements. The 
requirements for sliding watertight doors are included in Part 170 
because the subdivision and stability regulations apply to all vessels 
inspected under Title 46, including cargo and miscellaneous vessels and 
oceanographic research vessels. For example, the passenger vessel and 
tank vessel regulations do not contain specific provisions for the 
design and operation of sliding watertight door assemblies because 
Sec. 170.270 applies. Therefore, repeating the requirements for the 
design and operation of sliding watertight door assemblies in 
Secs. 92.01-13 and 190.01-13 is not necessary and these provisions are 
proposed for removal.
    In the following list of sections proposed for removal or revision, 
the citation to the sections where duplicate requirements are being 
retained is indicated in square brackets below the section being 
removed or revised.

----------------------------------------------------------------------------------------------------------------
          Cite (46 CFR)                 Proposed change                 Subject addressed by regulation         
----------------------------------------------------------------------------------------------------------------
Subpart 32.95 [33 CFR Subchapter   Removal..................  Oil pollution.                                    
 O].                                                                                                            
Sec.  35.20-25 [33 CFR 81 and 33   Removal..................  Unauthorized lights.                              
 U.S.C. 2020].                                                                                                  
Sec.  35.20-40 [33 CFR 164.35]...  Revision.................  Maneuvering characteristics.                      
Sec.  56.50-100 [Sec.  58.30]....  Removal..................  Fluid power and control systems.                  
Sec.  78.21-1 [33 CFR 164.35]....  Removal..................  Maneuvering characteristics.                      
Subpart 78.25 [33 CFR 81 and 33    Removal..................  Unauthorized lights.                              
 U.S.C. 2020].                                                                                                  
Subpart 78.85 [33 CFR Subchapter   Removal..................  Pollution prevention.                             
 O].                                                                                                            
Sec.  92.01-13 [46 CFR Subchapter  Removal..................  Watertight doors.                                 
 S, Subpart H] [33 CFR 164.35].                                                                                 
Sec.  97.19-1 [33 CFR 164.35]....  Removal..................  Maneuvering characteristics.                      
Subpart 97.23 [33 CFR 81 and 33    Removal..................  Unauthorized lights.                              
 U.S.C. 2020].                                                                                                  
Subpart 97.75 [33 CFR Subchapter   Removal..................  Pollution prevention.                             
 O].                                                                                                            
Sec.  109.583 [33 CFR Subchapter   Removal..................  Pollution prevention.                             
 O].                                                                                                            
Sec.  167.65-10 [33 CFR 81 and 33  Removal..................  Unauthorized lights.                              
 U.S.C. 2020].                                                                                                  
Sec.  190.01-13 [46 CFR            Removal..................  Watertight doors.                                 
 Subchapter S, Subpart H].                                                                                      
Subpart 196.18 [33 CFR Subchapter  Removal..................  Pollution prevention.                             
 O].                                                                                                            
Sec.  196.19-1 [33 CFR 164.35]...  Removal..................  Maneuvering characteristics.                      
Subpart 196.23 [33 CFR 81 and 33   Removal..................  Unauthorized lights.                              
 U.S.C. 2020].                                                                                                  
Subpart 196.75 [33 CFR Subchapter  Removal..................  Pollution prevention.                             
 O].                                                                                                            
----------------------------------------------------------------------------------------------------------------

    3. The requirement does not improve shipboard safety. The following 
sections are being removed or revised because they make no significant 
contribution to shipboard safety. This list includes provisions which 
are typically exceeded by industry voluntarily, regulations which have 
outlived their usefulness and requirements which result in inefficient 
administrative procedures.
    Sections 32.05-5, 78.47-67, 97.37-45, 169.742 and 196.37-45 of 
Title 46 CFR contain requirements for marking fire hose and fire axes 
with the vessel's name. Emergency equipment is typically marked with 
instructions or identifying symbols, such as the ``E'' on emergency 
lights, to aid in its identification and use. Lifesaving equipment that 
floats and could be discovered during a search is marked with the 
vessel's name to help identify the vessel in the event of a sinking. 
However, fire hose and fire axes have no need for either of these types 
of markings. These pieces of equipment do not float and are not 
amenable to marking with instructions. Therefore, the requirement to 
mark fire hoses and fire axes with the vessel's name is not necessary 
and is proposed for removal.
    Section 35.01-5 and Subparts 32.40, 72.20, 92.20, 167.50, 168.15 
and 190.20 of Title 46 CFR contain requirements for on-board crew 
accommodations. In some cases, the requirements contained in these 
sections are unnecessarily detailed or exceed the requirements of the 
International Labor Office Merchant 

[[Page 65992]]
Shipping (Minimum Standards) Convention, 1976 (ILO 147) to which the 
United States is signatory. For example, ILO 147 requires a hospital 
space be provided for tankships over 500 gross tons carrying a crew of 
15 persons or more and on a voyage of over three days duration. Current 
Sec. 32.40-50 requires a hospital space for all tankships carrying a 
crew of 12 persons or more and on a voyage of over three days duration.
    The changes proposed by this rulemaking would remove or revise 
those sections of the regulations that are unnecessarily detailed or 
exceed the requirements of ILO 147 in order to make the regulations 
more concise and consistent with the international standard for on-
board crew accommodations.
    Sections 35.10-5 and 35.20-30 of Title 46 CFR discuss the officer 
in command's responsibility to conduct drills and the prohibitions 
against unauthorized lights, flashing blinding lights and unauthorized 
whistling. Section 35.25-1 of Title 46 CFR discusses the chief 
engineer's responsibility to examine the boilers and report their 
condition. Additionally, Sections 78.57-1, 97.47-1 and 167.65-15 of 
Title 46 CFR require mariners to comply strictly with routing 
instructions issued by competent naval authorities. Each of these 
sections include phrases to indicate that the master or the other 
licensed officers of a vessel may be held liable against their licenses 
in suspension and revocation proceedings for failure to comply with the 
provisions of these sections. Phrases of this type are inconsistent 
with the President's memorandum of March 4, 1995 directing the federal 
agencies to focus on results rather than process and punishment and do 
not contribute to shipboard safety. The authority to proceed in 
suspension and revocation proceedings against licensed or certificated 
mariners that fail to obey a law or regulation is explained in Part 5 
of this chapter. Reiterating a mariner's liability in other subchapters 
is not necessary. Therefore, to meet the Coast Guard's goal of focusing 
on results instead of process and punishment this proposal, if adopted, 
would remove or revise sections that restate mariners' liability for 
failure to obey laws or regulations, while retaining the prohibition 
against the underlying conduct.
    Sections 35.20-15 and 167.65-30 and Subparts 78.20, 97.17 and 
196.17 of Title 46 CFR specify the words Right Rudder and Left Rudder 
be used when it is intended that the wheel, rudder blade and the head 
of the ship move to the right or left, respectively. Specifying the 
direction of the wheel, rudder or ship intended by the commands Right 
Rudder and Left Rudder is a detail that is not necessary for 
professional seamen. Proper steering orders are ingrained in the 
commercial maritime industry culture and need not be repeated in the 
regulations. Therefore, these regulations are not necessary and are 
proposed for removal.
    Sections 61.05-5 and 61.30-5 of Title 46 CFR assign 
responsibilities to the chief engineer to prepare the boilers and 
thermal fluid heaters for inspection. Preparing machinery for 
inspection reduces the time needed to conduct the required inspections 
and determine the condition of the machinery. It is a matter of 
convenience for the vessel and the attending marine inspectors or 
classification society surveyors to have the machinery prepared in 
advance, but is not a safety issue. Not preparing machinery for 
inspections has no impact on safety because all required inspections 
must eventually be conducted to the satisfaction of the attending 
inspectors or surveyors. Therefore, regulations assigning the 
responsibility to prepare machinery for inspection to the chief 
engineer are proposed for removal.
    Sections 54.01-1, 54.01-3 and 54.01-5 and Table 54.01-5 of Title 46 
CFR reference the standards of the Tubular Exchanger Manufacturers 
Association (TEMA) and the American Society of Mechanical Engineers 
(ASME) Code for Boilers and Pressure Vessels (ASME Code) for the 
construction of heat exchangers. Comments received from heat exchanger 
manufacturers and shipyards indicate that referencing both the TEMA and 
ASME standards has created confusion. The ASME Code is the primary 
industry standard for pressure vessels of all types and is extensively 
referenced in the regulations. The ASME Code is comprehensive and 
includes updated requirements for design and construction of the heat 
exchanger components for which a reference to TEMA standards was 
previously necessary. The ASME Code requirements are equivalent to TEMA 
requirements. Heat exchangers built solely in accordance with the ASME 
Code have demonstrated their suitability for shipboard use. Referencing 
only the ASME Code will result in simplified regulations and less 
confusion. Therefore, the regulations referencing the TEMA standards 
are no longer necessary and are proposed for removal.
    Part 153 of Title 46 CFR contains the requirements for issuance of 
a Certificate of Compliance (COC) and Subchapter O Endorsement (SOE). 
Under the existing regulations, a COC and SOE are issued by the Coast 
Guard to a foreign chemical tanker registered with a nation signatory 
to the International Convention for the Prevention of Pollution from 
Ships, 1973, as modified by the Protocol of 1978 (MARPOL 73/78). 
Issuance of the COC and SOE are based primarily on a review of the 
vessel's plans and possession of a valid Certificate of Fitness (COF) 
issued by the flag state or an authorized third party.
    The process to obtain a COC and SOE is initiated when a series of 
documents are submitted to the Coast Guard for review. The required 
submission of these documents to both the Coast Guard's Marine Safety 
Center (MSC) and the cognizant Officer in Charge, Marine Inspection 
(OCMI) often results in unnecessary delays in obtaining a COC and SOE. 
Also, under current practices, after the COC and SOE have been issued, 
if a Coast Guard marine inspector discovers that the COF has been 
reissued by the flag state or its authorized third party, the COC 
becomes invalid and cargo operations have to be stopped until the MSC 
reviews the new COF and issues a new SOE.
    A new proposed procedure would make the Coast Guard's regulations 
more consistent with actual practice. Due to the large number of 
cargoes typically authorized under a COF, currently the MSC does not 
conduct a detailed review of the majority of a vessel's plans. Instead, 
the MSC concentrates on identifying cargoes prohibited from bulk 
carriage in U.S. waters and those cargoes for which the U.S. has 
special requirements. The MSC accepts a valid COF issued by the flag 
state or its authorized third party as documentation that the vessel 
complies with the applicable international codes for carriage of bulk 
chemicals. These codes are the Bulk Chemical Code (BCH Code) and the 
International Bulk Chemical Code (IBC Code) developed by the 
International Maritime Organization. Compliance with these codes is 
mandatory for any vessel whose flag state is signatory to MARPOL 73/78. 
Under this proposal, it would be only those chemical tankers whose flag 
state is not signatory to MARPOL 73/78 that would require a detailed 
plan review by the MSC to be issued an SOE. Following plan review, the 
MSC would issue an SOE to these vessels with the notation that the flag 
state is not signatory to MARPOL 73/78.
    Therefore, this proposal, if adopted, would amend the review and 
issuance 

[[Page 65993]]
process found in 46 CFR Part 153 to allow the OCMI to issue the COC and 
SOE without the MSC's involvement for those vessels whose flag states 
are signatory to MARPOL 73/78. This proposal would also enable the SOE 
to remain valid as long as the COF is valid even if the COF is revised. 
The burden on the Coast Guard would also be reduced through streamlined 
administrative procedures.

----------------------------------------------------------------------------------------------------------------
            Cite (46 CFR)                     Proposed change              Subject addressed  by regulation     
----------------------------------------------------------------------------------------------------------------
Tank Vessels:                                                                                                   
    Sec.  32.05-5....................  Revision.....................  Equipment marking.                        
    Subpart 32.40....................  Revision.....................  Accommodations.                           
    Sec.  35.01-5....................  Revision.....................  Accommodations.                           
    Sec.  35.10-5....................  Revision.....................  Emergency drills.                         
    Sec.  35.20-15...................  Revision.....................  Steering orders.                          
    Sec.  35.20-30...................  Revision.....................  Blinding lights.                          
    Sec.  35.20-35...................  Revision.....................  Unnecessary whistling.                    
    Sec.  35.25-1....................  Revision.....................  Examination of boiler and machinery by    
                                                                       engineer.                                
    Sec.  35.40-40...................  Revision.....................  Equipment marking.                        
Pressure Vessels:                                                                                               
    Sec.  54.01-1....................  Revision.....................  Heat exhangers.                           
    Sec.  54.01-3....................  Removal......................  Heat exhangers.                           
    Sec.  54.01-5....................  Revision.....................  Heat exhangers.                           
Inspectins and Examinations:                                                                                    
    Sec.  61.05-5....................  Revision.....................  Preparing boilers for inspection.         
    Sec.  61.30-5....................  Revision.....................  Preparing thermal fluid heater for        
                                                                       inspection.                              
Passenger Vessels:                                                                                              
    Subpart 72.20....................  Revision.....................  Accommodations.                           
    Subpart 78.20....................  Removal......................  Steering orders.                          
    Sec.  78.47-67...................  Removal......................  Equipment marking.                        
    Sec.  78.57-1....................  Revision.....................  Routing instructions.                     
Cargo and Miscellaneous Vessels:                                                                                
    Subpart 92.20....................  Revision.....................  Accommodation.                            
    Subpart 97.17....................  Removal......................  Steering orders.                          
    Sec.  97.37-45...................  Removal......................  Equipment marking.                        
    Sec.  97.47-1....................  Revision.....................  Routing instructions.                     
Hazardous Cargoes:                                                                                              
    Part 153.........................  Revision.....................  Certificate of Compliance procedures.     
Public School Ships:                                                                                            
    Subpart 167.50...................  Revision.....................  Accommodations.                           
    Sec.  167.55-5...................  Revision.....................  Special Markings.                         
    Sec.  167.65-15..................  Revision.....................  Routing instructions.                     
    Sec.  167.65-30..................  Removal......................  Steering orders.                          
Civilian Nautical School Ships:                                                                                 
    Subpart 168.15...................  Revision.....................  Accommodations.                           
Sailing School Vessels:                                                                                         
    Sec.  169.742....................  Removal......................  Equipment marking.                        
Oceanographic Research Vessels:                                                                                 
    Subpart 190.20...................  Revision.....................  Accommodations.                           
    Subpart 196.17...................  Removal......................  Steering Orders.                          
    Sec.  196.37-45..................  Removal......................  Equipment marking.                        
----------------------------------------------------------------------------------------------------------------

    4. An appropriate industry standard or practice exists which can be 
referenced instead of publishing detailed requirements in the 
regulations. The Coast Guard has been systematically replacing detailed 
specifications in the regulations with industry consensus standards for 
over 20 years. To date, over 250 regulatory provisions have been 
replaced with adopted industry standards. Incorporation of industry 
standards saves time and resources for both the Coast Guard and 
industry by streamlining the shipboard equipment acceptance process.
    Sections 34.10-10, 34.10-90, 76.10-10, 76.10-90, 95.10-10, 95.10-
90, 108.425, 167.45-40, 193.10-10 and 193.10-90 of Title 46 CFR contain 
requirements for fire hose nozzles that are approved under 46 CFR 
162.027. In 1994, the Coast Guard helped U.S. nozzle manufacturers 
develop an American Society for Testing and Materials (ASTM) standard 
for fire fighting nozzles--ASTM F 1546-94, Standard Specification for 
Marine Fire Fighting Nozzles. The standard was developed for modern 
variable flow or variable pressure nozzle with the expectation that it 
would eventually be incorporated into the regulations. Testing 
conducted by the Coast Guard Research and Development Center in 1988 
demonstrated these nozzles are superior to the currently approved all-
purpose nozzles. Two of the tested models were issued Coast Guard 
approvals in 1990. Variable flow or variable pressure nozzles are used 
by virtually every shoreside fire department in the United States. 
Incorporation of this standard will make a superior product with a 
long, successful service history available to the marine industry. 
Therefore, this proposal, if adopted, would replace current 
specifications for fire hose nozzles contained in Subpart 162.027 

[[Page 65994]]
with a reference to ASTM F 1546-94 and would allow the use of nozzles 
that meet the new Subpart 162.027 in lieu of nozzles previously 
approved under Subpart 162.027.
    Sections 56.30-35 and 56.30-40 of Title 46 CFR contain regulations 
for gasketed mechanical couplings and mechanically attached fittings, 
respectively. In 1993, the Coast Guard and ASTM developed ASTM 
standards F 1387-93, Standard Specification for Performance of 
Mechanically Attached Fittings, and F 1476-93, Standard Specification 
for Performance of Gasketed Mechnical Couplings for Use in Piping 
Applications, with the expectation that they would eventually be 
incorporated into the regulations in lieu of Secs. 56.30-35 and 56.30-
40. This proposal, if adopted, would incorporate F 1387F-93 and F 1476-
93 into the regulations.
    Section 61.20-17 of Title 46 CFR contains the requirements for 
tailshaft examination intervals. The current requirements for tailshaft 
examination intervals are based on the type of lubricant in the bearing 
lubrication system. With some exceptions, water-lubricated tailshafts 
must be drawn and examined at each drydocking. Oil-lubricated bearings 
need not be drawn and examined if the bearing clearances are taken 
during drydocking, the inboard seals are examined, the lubricating oil 
is analyzed and nondestructive testing is conducted on the connection 
between the propeller to the tailshaft. The differences in the scope 
and frequency of inspection are due to the non-corrosive properties of 
oil. Consequently, the use of an oil-lubricated tailshaft can translate 
into substantial savings during drydock periods. However, a potential 
drawback is liability for oil released from leaky seals. As a result, 
industry demand has spurred development of water-miscible, 
environmentally safe, non-corrosive lubricants.
    The Coast Guard supports the development and use of non-polluting 
lubricants and has evaluated the means for a manufacturer to 
demonstrate a lubricant's equivalency to oil, based on the lubricant's 
non-corrosive properties, for purposes of the tailshaft inspection 
interval. Under this proposal, if adopted, a water-miscible lubricant 
tested in accordance with ASTM D 665-92, Standard Test Method for Rust-
Preventing Characteristics of Inhibited Mineral Oil in the Presence of 
Water, may be considered equivalent to oil for the purposes of the 
tailshaft inspection interval. Therefore, this proposal, if adopted, 
would incorporate ASTM D 665-92 into the regulations and add 
appropriate text into Sec. 61.20-17 explaining the procedures for 
accepting water-miscible lubricants as equivalent to oil. Additionally, 
this proposal, if adopted, would clarify the purpose of the tailshaft 
lubricating oil analysis by explaining that the analysis is to 
determine the presence of bearing material or other contaminants.
    Section 38.25-10 of Title 46 CFR contains the inspection 
requirements for safety relief valves installed on pressure vessel type 
cargo tanks used in the carriage of liquefied petroleum gas. Under the 
current regulations, safety relief valves must be tested and adjusted, 
if necessary, every four years. The ABS Rules require testing and 
adjustment every five years. The ABS Rules, with the longer testing 
interval, have shown to be adequate by the satisfactory performance of 
safety relief valves on non-U.S. vessels classed by ABS. The Coast 
Guard has amended the inspection intervals for vessel drydockings and 
for various pieces of shipboard equipment to agree with the inspection 
intervals in international standards and class society rules. These 
amendments have been made after consideration for any possible 
degradation in safety to allow major pieces of equipment to be tested 
on a cycle that coincides with the normal drydock schedule for the 
convenience of the vessel owner, class society and the Coast Guard. 
Therefore, this proposal, if adopted, would change the testing interval 
for safety valves installed on pressure vessel type cargo tanks from 
four years to five years to be consistent with international standards 
and classification society rules.

------------------------------------------------------------------------
                                                      Subject addressed 
          Cite (46 CFR)            Proposed change      by regulation   
------------------------------------------------------------------------
Sec.  34.10-10..................  Revision.........  Fire hose nozzles. 
Sec.  34.10-90..................  Revision.........  Fire hose nozzles. 
Sec.  38.25-10..................  Revision.........  Safety relief      
                                                      valves.           
Sec.  56.01-2...................  Revision.........  Incorporation by   
                                                      reference.        
Sec.  56.30-35..................  Revision.........  Gasketed mechanical
                                                      couplings.        
Sec.  56.30-40..................  Revision.........  Mechanically       
                                                      attached fittings.
Subpart 61.03...................  New..............  Incorporation by   
                                                      reference.        
Sec.  61.20-17..................  Revision.........  Tailshaft          
                                                      inspections.      
Sec.  76.10-10..................  Revision.........  Fire hose nozzles. 
Sec.  76.10-90..................  Revision.........  Fire hose nozzles. 
Sec.  95.10-10..................  Revision.........  Fire hose nozzles. 
Sec.  95.10-90..................  Removal..........  Fire hose nozzles. 
Sec.  108.425...................  Revision.........  Fire hose nozzles. 
Subpart 162.027.................  Revision.........  Fire hose nozzles. 
Sec.  167.45-40.................  Revision.........  Fire hose nozzles. 
Sec.  193.10-10.................  Revision.........  Fire hose nozzles. 
Sec.  193.10-90.................  Revision.........  Fire hose nozzles. 
------------------------------------------------------------------------

    5. Statutory language repeated. The regulatory text of the 
following provisions repeats language or restates requirements from 
self-executing statutes without any additional regulatory provisions.
    Section 26.15-1 of Title 46 CFR repeats the statutory language of 
46 U.S.C. 527e authorizing the Coast Guard to board numbered, 
uninspected commercial vessels. Section 527e of Title 46 U.S.C. was 
repealed on August 10, 1971 (P.L. 92-75; 85 Stat. 228). The authority 
for the Coast Guard to conduct boardings on uninspected vessels remains 
in Title 14 U.S.C. 89. Therefore, Sec. 26.15-1 is no longer needed and 
is proposed for revision.
    Sections 35.07-5, 35.07-15, 78.37-3, 97.35-3, 97.35-10, 196.35-3 
and 196.35-10 of Title 46 CFR either repeat statutory language or 
paraphrase statutory requirements for making logbook entries. Subparts 
78.03, 97.03 and 196.03 of Title 46 CFR repeat the possible 
consequences of a violation of the provisions of Title 46 CFR and 
mariners' liability under the suspension and revocation proceedings. 
Sections 167.65-3 and 196.27-10 of Title 46 CFR repeat the statutory 
language regarding negligent operations of a vessel.
    Regulations which do not add meaning or additional requirements to 
self-executing statutes are not useful. Therefore, regulations which 
only repeat language or summarize requirements from self-executing 
statutes are not necessary and are proposed for removal.

                                                                        
                                                                        
------------------------------------------------------------------------
                                                      Subject addressed 
          Cite (46 CFR)            Proposed change      by regulation   
------------------------------------------------------------------------
Sec.  26.15-1...................  Revision.........  Boarding by Coast  
                                                      Guard.            
Sec.  35.07-5...................  Revision.........  Logbook entries.   
Sec.  35.07-15..................  Removal..........  Logbook entries.   
Subpart 78.03...................  Removal..........  Statutory          
                                                      penalties.        

[[Page 65995]]
                                                                        
Sec.  78.37-3...................  Revision.........  Logbook entries.   
Subpart 97.03...................  Removal..........  Statutory          
                                                      penalties.        
Sec.  97.35-3...................  Revision.........  Logbook entries.   
Sec.  97.35-10..................  Removal..........  Logbook entries.   
Sec.  167.65-3..................  Removal..........  Negligent          
                                                      operations.       
Subpart 196.03..................  Removal..........  Statutory          
                                                      penalties.        
Sec.  196.27-10.................  Removal..........  Negligent          
                                                      operations.       
Sec.  196.35-3..................  Revision.........  Logbook entries.   
Sec.  196.35-10.................  Removal..........  Logbook entries.   
------------------------------------------------------------------------

Incorporation by Reference

    The following material would be incorporated by reference:

American Society for Testing and Materials (ASTM):
    Standard Specification for Performance of Mechanically Attached 
Fittings, F 1387-93--Secs. 56.01-2, 56.30-35
    Standard Specification for Performance of Gasketed Mechanical 
Couplings for Use in Piping Applications, F 1476-93--Secs. 56.01-2, 
56.30-40
    Standard Specification for Marine Fire Fighting Nozzles, ASTM F 
1546-93--Secs. 162.027-1, 162.027-2, 162.027-3

    Copies of the material are available for inspection where indicated 
under ADDRESSES. Copies of the material are available from the sources 
listed in Secs. 56.01-2 and 162.027-1.
    Before publishing a final rule, the Coast Guard will submit this 
material to the Director of the Federal Register for approval of the 
incorporation by reference.

Regulatory Evaluation

    This proposal is not a significant regulatory action under section 
3(f) of Executive Order 12866 and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order, nor 
has it been reviewed by the Office of Management and Budget. It is not 
significant under the regulatory policies and procedures of the 
Department of Transportation (DOT) (44 FR 11034; February 26, 1979). 
The Coast Guard expects the economic impact of this proposal to be so 
minimal that a full Regulatory Assessment is unnecessary.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider the economic impact on small entities of a 
rule for which a general notice of proposed rulemaking is required. 
``Small entities'' may include (1) small businesses and not-for-profit 
organizations that are independently owned and operated and are not 
dominant in their fields and (2) governmental jurisdictions with 
populations of less than 50,000.
    This proposed rule will have no economic impact on small entities 
because it amends portions of regulations that: (1) Are purely 
administrative; (2) Do not reflect common marine industry practice; (3) 
Do not have general applicability; or, (4) Are repeated in other 
sections.
    Therefore, the Coast Guard finds that this proposed rule will not 
have a significant economic impact on a substantial number of small 
entities. If, however, you think that your business or organization 
qualifies as a small entity and that this rule will have a significant 
economic impact on your business or organization, please submit a 
comment (see ADDRESSES) explaining why you think it qualifies and in 
what way and to what degree this proposed rule will economically affect 
it.

Collection of Information

    This proposed rule imposes on the public no new or added 
requirements for collecting information under the Paperwork Reduction 
Act (44 U.S.C. 3501 et seq.).

Federalism

    The Coast Guard has analyzed this proposed rule in accordance with 
the principles and criteria of Executive Order 12612 and has determined 
that this rule does not have sufficient implications for federalism to 
warrant the preparation of a Federalism Assessment.

Environment

    The Coast Guard has considered the environmental impact of this 
proposed rule and concluded that, under section 2.B.2.c of Commandant 
Instruction M16475.1B, this rule is categorically excluded from further 
environmental documentation. A Categorical Exclusion Determination is 
available in the docket for inspection or copying where indicated under 
ADDRESSES.

List of Subjects

46 CFR Part 26

    Marine safety, Penalties, Reporting and recordkeeping requirements.

46 CFR Part 31

    Cargo vessels, Marine safety, Reporting and recordkeeping 
requirements.

46 CFR Part 32

    Cargo vessels, Fire prevention, Marine safety, Navigation (water), 
Occupational safety and health, Reporting and recordkeeping 
requirements, Seamen.

46 CFR Part 34

    Cargo vessels, Fire prevention, Marine safety.

46 CFR Part 35

    Cargo vessels, Marine safety, Navigation (water), Occupational 
safety and health, Reporting and recordkeeping requirements, Seamen.

46 CFR Part 38

    Cargo vessels, Fire prevention, Gases, Hazardous materials 
transportation, Marine safety, Reporting and recordkeeping 
requirements.

46 CFR Part 54

    Reporting and recordkeeping requirements, Vessels.

46 CFR Part 56

    Reporting and recordkeeping requirements, Vessels.

46 CFR Part 61

    Reporting and recordkeeping requirements, Vessels.

46 CFR Part 72

    Fire prevention, Marine safety, Occupational safety and health, 
Passenger vessels, Seamen.

46 CFR Part 76

    Fire prevention, Marine safety, Passenger vessels.

46 CFR Part 77

    Marine safety, Navigation (water), Passenger vessels.

46 CFR Part 78

    Marine safety, Navigation (water), Passenger vessels, Penalties, 
Reporting and recordkeeping requirements.

46 CFR Part 92

    Cargo vessels, Fire prevention, Marine safety, Occupational safety 
and health, Seamen.

46 CFR Part 95

    Cargo vessels, Fire prevention, Marine safety.

46 CFR Part 96

    Cargo vessels, Marine safety, Navigation (water). 
    
[[Page 65996]]

46 CFR Part 97

    Cargo vessels, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements.

46 CFR Part 108

    Fire prevention, Marine safety, Occupational safety and health, Oil 
and gas exploration, Vessels.

46 CFR Part 109

    Marine safety, Occupational safety and health, Oil and gas 
exploration, Reporting and recordkeeping requirements, Vessels.

46 CFR Part 153

    Administrative practice and procedure, Cargo vessels, Hazardous 
materials transportation, Marine safety, Reporting and recordkeeping 
requirements, Water pollution control.

46 CFR Part 160

    Marine safety, Reporting and recordkeeping requirements.

46 CFR Part 162

    Fire Prevention, Marine safety, Oil pollution, Reporting and 
recordkeeping requirements.

46 CFR Part 164

    Fire prevention, Marine safety, Reporting and recordkeeping 
requirements.

46 CFR Part 167

    Fire prevention, Marine safety, Reporting and recordkeeping 
requirements, Schools, Seamen, Vessels.

46 CFR Part 168

    Occupational safety and health, Schools, Seamen, Vessels.

46 CFR Part 169

    Fire prevention, Marine safety, Reporting and recordkeeping 
requirements, Schools, Vessels.

46 CFR Part 190

    Fire prevention, Marine safety, Occupational safety and health, 
Oceanographic research vessels.

46 CFR Part 193

    Fire prevention, Marine safety, Oceanographic research vessels.

46 CFR Part 196

    Marine safety, Oceanographic research vessels, Reporting and 
recordkeeping requirements.

    For the reasons set out in the preamble, the Coast Guard proposes 
to amend 46 CFR Parts 26, 31, 32, 34, 35, 38, 54, 56, 61, 72, 76, 77, 
78, 92, 95, 96, 97, 108, 109, 153, 160, 162, 164, 167, 168, 169, 189, 
190, 193, and 196 as follows:

PART 26--OPERATIONS

    1. The authority citation for Part 26 continues to read as follows:

    Authority: 46 U.S.C. 3306, 4104, 6101, 8105; E.O. 12234, 45 FR 
58801, 3 CFR, 1980 Comp., p. 277.; 49 CFR 1.46.

    2. In Sec. 26.15-1, paragraphs (a) and (b) are removed, paragraph 
(c) is redesignated as paragraph (b), and a new paragraph (a) is added 
to read as follows:

Sec. 26.15-1  May board at any time.

    (a) To facilitate the boarding of vessels by the commissioned, 
warrant, and petty officers of the U.S. Coast Guard in the exercise of 
their authority, every uninspected vessel, as defined in 46 U.S.C. 
2101(43), if underway and upon being hailed by a Coast Guard vessel, 
shall stop immediately and lay to, or shall maneuver in such a way as 
to permit the Coast Guard boarding officer to come aboard. Failure to 
permit a Coast Guard boarding officer to board a vessel or refusal to 
comply will subject the operator or owner of the vessel to the 
penalties provided in law.
* * * * *

PART 31--INSPECTION AND CERTIFICATION

    3. The authority citation for Part 31 continues to read as follows:

    Authority: 33 U.S.C. 1321(j); 46 U.S.C. 2103, 3306; 49 U.S.C. 
5103, 5106; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; E.O. 
12777, 56 FR 54757, 3 CFR 1991 Comp., p. 351; 49 CFR 1.46. Section 
31.10-21a also issued under the authority of Sect. 4109, Pub. L. 
101-380, 104 Stat. 515.

Sec. 31.10-15  [Amended]

    4. In Sec. 31.10-15, paragraph (a) is amended by removing the words 
``and in the case of nuclear vessels, at least once every year''.

PART 32--SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS

    5. The authority citation for Part 32 continues to read as follows:

    Authority: 46 U.S.C. 2103, 3306, 3703; E.O. 12234, 45 FR 58801, 
3 CFR, 1980 Comp., p. 277; 49 CFR 1.46; Subpart 32.59 also under the 
authority of Sect. 4109, Pub. L. 101-380, 104 Stat. 515.

    6. Section 32.02-5 is revised to read as follows:

Sec. 32.02-5  Communication between deckhouses--TB/OCLB.

    On all tank vessels where the distance between deckhouses is more 
than 46 m (150 ft), a fixed means of facilitating communication between 
both ends of the vessel, such as a raised fore and aft bridge or side 
tunnels, shall be provided. Previously approved arrangements may be 
retained so long as they are maintained in satisfactory condition to 
the satisfaction of the Officer in Charge, Marine Inspection.

Sec. 32.05-5  [Amended]

    7. In Sec. 32.05-5, the words ``fire hose, fire axes,'' are 
removed.
    8. Section 32.15-10 is revised to read as follows:

Sec. 32.15-10  Sounding machines--T/OCL.

    All mechanically propelled vessels in ocean or coastwise service of 
500 gross tons and over, and all mechanically propelled vessels in 
Great Lakes service of 500 gross tons and over certificated for service 
on the River St. Lawrence eastward of the lower exit of the St. Lambert 
Lock at Montreal, Canada, shall be fitted with an efficient electronic 
deep-sea sounding apparatus.
    9. Subpart 32.40 is revised to read as follows:

Subpart 32.40--Accommodations for Officers and Crew

Sec.
32.40-1  Application--TB/ALL.
32.40-5  General--T/ALL.
32.40-10  Restrictions--T/ALL.
32.40-15  Location of crew spaces--T/ALL.
32.40-20  Arrangement of sleeping spaces--T/ALL.
32.40-25  Size of sleeping spaces--T/ALL.
32.40-30  Berths and lockers--T/ALL.
32.40-35  Wash spaces; toilet spaces; and shower spaces--T/ALL.
32.40-40  Messrooms--T/ALL.
32.40-45  Hospital spaces--T/ALL.
32.40-50  Miscellaneous accommodation spaces--T/ALL.
32.40-55  Heating requirements--T/ALL.
32.40-60  Inspect screens--T/ALL.
32.40-65  Crew accommodations on tankships of less than 100 gross 
tons and manned tank barges--TB/ALL.
32.40-70  Crew accommodations on tankships constructed before June 
15, 1987--T/ALL.

Sec. 32.40-1  Application--TB/ALL.

    (a) The provisions of this subpart, with the exception of 
Sec. 32.40-70 and Sec. 32.40-90, apply to all tankships of 100 gross 
tons and over constructed on or after June 15, 1987.
    (b) Tankships of less than 100 gross tons and manned tank barges 
must meet the requirements of Sec. 32.40-70.
    (c) Tankships of 100 gross tons and over constructed prior to June 
15, 1987, must meet the requirements of Sec. 32.40-90.

Sec. 32.40-5  General--T/ALL.

    The accommodations provided for the crew, including both officers 
and 

[[Page 65997]]
unlicensed members, on all tankships must be securely constructed, 
properly lighted, heated, drained, ventilated, equipped, located, 
arranged, and insulated from undue noise, heat and odors.

Sec. 32.40-10  Restrictions--T/ALL.

    (a) There must be no direct communication between the accommodation 
spaces and any chainlocker, stowage, or machinery space, except through 
solid, close-fitted doors or hatches.
    (b) No access, vent, or sounding tube from a fuel or oil tank may 
open into any accommodation space, except that accesses and sounding 
tubes may open into corridors.

Sec. 32.40-15  Location of crew spaces--T/ALL.

    Crew quarters must not be located forward of a vertical plane 
located at five percent of the tankship's length aft of the stem at the 
designated summer load line. However, for tankships in other than ocean 
or coastwise service, this distance does not need to exceed 8.5 m (28 
ft). For the purposes of this paragraph, the length defined in 
Sec. 42.13-15 of Subchapter E (Load Lines) of this chapter is to be 
used. No section of the deckhead of the crew spaces may be below the 
deepest load line.

Sec. 32.40-20  Arrangement of sleeping spaces--T/ALL.

    Each department head and watchstanding officer must be provided 
with a separate stateroom.

Sec. 32.40-25  Size of sleeping spaces--T/ALL.

    (a) No sleeping space may berth more than four persons.
    (b) Without deducting any furnishings used by the occupants, each 
sleeping space must have for each occupant--
    (1) 2.78 m\2\ (30 ft\3\) of deck area: and
    (2) 5.8 m\3\ (210 ft\2\) of volume.
    (c) Each sleeping space must have at least 190 cm (75 in) of 
headroom over clear deck areas.

Sec. 32.40-30  Berths and lockers--T/ALL.

    (a) Each person shall have a separate berth and not more than one 
berth shall be placed above another.
    (b) Each berth must have a framework of hard, smooth, non-corrosive 
material.
    (c) Each berth must be at least 68 cm (27 in) wide by 190 cm (75 
in) long.
    (d) The bottom of the lower berth must be at least 30 cm (12 in) 
above the deck. The bottom of an upper berth must be at least 76 cm (30 
in) from the bottom of the berth below it and from the deck or any 
pipe, ventilating duct, or other overhead installation.
    (e) Each person accommodated in a room shall be provided a locker.
    (f) Each berth must have a berth light.

Sec. 32.40-35  Wash spaces: toilet spaces; and shower spaces--T/ALL.

    (a) Each tankship must have enough public facilities to provide at 
least one toilet, one shower, and one washbasin for each eight persons 
who occupy sleeping spaces that do not have private or semi-private 
facilities.
    (b) Each public toilet space and washing space must be convenient 
to the sleeping space that it serves.
    (c) Each washbasin, shower, and bathtub must have hot and cold 
running water.
    (d) Adjacent toilets must be separated by a partition that is open 
at the top and bottom.
    (e) Each washing space and toilet space must be constructed and 
arranged so that it can be kept in a clean and sanitary condition and 
the plumbing and mechanical appliances kept in good working order.

Sec. 32.40-40  Messrooms--T/ALL.

    Each messroom must seat the number of persons expected to eat in 
the messroom at one time.

Sec. 32.40-45  Hospital space--T/ALL.

    (a) Except as specifically modified by paragraph (h) of this 
section, each tankship, which in the ordinary course of its trade makes 
voyages of more than three days duration between ports, other than on a 
coastal voyage, and which carries a crew of twelve persons or more, 
must have a hospital space.
    (b) The hospital must be used only for the care of the sick.
    (c) Each hospital space must have a toilet, washbasin, and bathtub 
or shower accessible from the hospital space.
    (d) Each hospital space must have a clothes locker, a table, and 
seats.
    (e) On tankships in which the entire crew is berthed in single 
occupancy rooms, a hospital space is not required if one room is 
designated and fitted for use as a treatment and isolation room, and 
meets the following standards:
    (1) The room must be available for immediate medical use;
    (2) A washbasin with hot and cold running water must be installed 
either in or immediately adjacent to the space and other required 
sanitary facilities must be conveniently located.

Sec. 32.40-50  Miscellaneous accommodation spaces--T/ALL.

    (a) Each tankship must have enough facilities for the crew to wash 
and dry their own clothes, including at least one tub or sink that has 
hot and cold running water.
    (b) Each tankship must have an accommodation space that can be used 
for recreation.

Sec. 32.40-55  Heating requirements--T/ALL.

    (a) Radiators and other heating apparatus must be constructed, 
located or shielded so as to avoid risk of fire or danger and 
discomfort to the occupants of each accommodation space.
    (b) Each exposed pipe in an accommodation space leading to a 
radiator or other heating apparatus must be insulated.

Sec. 32.40-60  Insect screens--T/ALL.

    Accommodation spaces must be protected against the admission of 
insects.

Sec. 32.40-65  Crew accommodations on tankships of less than 100 gross 
tons and manned tank barges--TB/ALL.

    (a) The crew accommodations on all tankships of less than 100 gross 
tons and all manned tank barges must have sufficient size and 
equipment, and be adequately constructed to provide for the protection 
of the crew in a manner practicable for the size, facilities, and 
service of the tank vessel.
    (b) The crew accommodations must be consistent with the principles 
underlying the requirements for crew accommodations of tankships of 100 
gross tons or more.

Sec. 32.40-70  Crew accommodations on tankships constructed before June 
15, 1987--T/ALL.

    All tankships of 100 gross tons and over constructed before June 
15, 1987 may retain previously accepted or approved installations and 
arrangements so long as they are maintained in good condition to the 
satisfaction of the Officer in Charge, Marine Inspection.

Subpart 32.95--[Removed]

    10. Subpart 32.95 is removed.

PART 34--FIREFIGHTING EQUIPMENT

    The authority citation for Part 34 continues to read as follows:

    Authority: 46 U.S.C. 3306, 3703; E.O. 12234, 45 FR 58801, 3 CFR, 
1980 Comp., p. 277; 49 CFR 1.46.

    12. In Sec. 34.05-5, paragraphs (a)(1), (a)(2), (a)(3) and (a)(4) 
are revised to read as follows:

Sec. 34.05-5  Fire-extinguishing systems--T/ALL.

    (a) * * *
    (1) Dry cargo compartments. A carbon 
FR Doc. 95-30402 Adoption of Industry Standards
dioxide or water spray system 
shall be installed for the protection of all dry cargo compartments. 
Where such 

[[Page 65998]]
compartments are readily accessible by means of doors such spaces need 
be protected only by the fire main system.
    (2) Cargo tanks. A deck foam system shall be installed for the 
protection of all cargo tank spaces. Where a deck foam system is 
installed, an approved inert gas, steam or other system may also be 
installed for the purposes of fire prevention or inerting of cargo 
tanks. For vessels under 100 feet in length, the semiportable equipment 
required by footnote 1 of Table 34.05-5(a) will be considered as 
meeting the requirements of this subparagraph.
    (3) Lamp and paint lockers and similar spaces. A carbon dioxide or 
water spray system shall be installed in all lamp and paint lockers, 
oil rooms, and similar spaces.
    (4) Pumprooms. A carbon dioxide, inert gas, foam or water spray 
system shall be installed for the protection of all pumprooms.
* * * * *

Sec. 34.05-15  [Removed]

    13. Section 34.05-15 is removed.
    14. In Sec. 34.10-10, paragraphs (e), (e-1) and (n) are removed, 
paragraphs (f) through (m) are redesignated as paragraphs (g) through 
(n), respectively, and new paragraphs (e), (f) and (o) are added to 
read as follows:

Sec. 34.10-10  Fire station hydrants, hose and nozzles--T/ALL.

* * * * *
    (e) Each fire station hydrant must have at least one length of fire 
hose. Each fire hose on the hydrant must have a combination solid 
stream and water spray fire hose nozzle that meets the requirements in 
Subpart 162.027 of this chapter. Fire hose nozzles previously approved 
under Subpart 162.027 of this chapter may be retained so long as they 
are maintained in good condition to the satisfaction of the Officer in 
Charge, Marine Inspection. A suitable hose rack or other device shall 
be provided. Hose racks on weather decks shall be located so as to 
afford protection from heavy seas. The hose shall be stored in the open 
or so as to be readily visible.

   Table 34.10-10(E).--Hydrants with Coast Guard Approved Low-Velocity  
                         Water Spray Applicators                        
------------------------------------------------------------------------
                                 No. of hydrants                        
            Location              with approved     Approved applicator 
                                   applicators    length (meters (feet))
------------------------------------------------------------------------
Living spaces..................               1   1.2(4)                
Weather deck...................               4   3(10) or 3.7(12)      
Machinery space................               2   1.2(4)                
------------------------------------------------------------------------

    (f) Each combination nozzle previously approved under Subpart 
162.027 of this chapter in the locations listed in Table 34.10-10(E) 
must have a low-velocity water spray applicator also previously 
approved under Subpart 162.027 of this chapter that is of the length 
listed in that table.
* * * * *
    (o) Each low-velocity water spray applicator under paragraph (f) of 
this section must have fixed brackets, hooks, or other means for 
stowing next to the hydrant.
    15. In Sec. 34.10-90, paragraphs (a)(12) and (a)(13) are removed, 
paragraph (a)(14) is redesignated as (a)(12) and paragraphs (a)(10), 
(a)(11) and (b)(2) are revised to read as follows:

Sec. 34.10-90  Installations contracted for prior to May 26, 1965--T/
ALL.

    (a) * * *
    (10) Each fire station hydrant on a tankship of 500 gross tons or 
more must have at least one length of firehose. Each firehose on the 
hydrant must have a combination solid stream and water spray firehose 
nozzle that meets the requirements of Subpart 162.027. Fire hose 
nozzles previously approved under Subpart 162.027 of this chapter may 
be retained so long as they are maintained in good condition to the 
satisfaction of the Officer in Charge, Marine Inspection.
    (11) On each tankship of 1000 gross tons or more, the nozzle 
required by paragraph (a)(10) on each of the following hydrants must 
have a low velocity applicator that was previously approved under 
Subpart 162.027 and that connects to that nozzle when the nozzle itself 
was previously approved under Subpart 162.027;
    (i) At least two hydrants in the machinery and boiler spaces.
    (ii) At least 25 percent of other hydrants.
* * * * *
    (b) * * *
    (2) Each fire station hydrant must have at least one length of 
firehose. Each firehose on the hydrant must have a combination solid 
stream and water spray nozzle that meets the requirements of Subpart 
162.027. Fire hose nozzles previously approved under Subpart 162.027 of 
this chapter may be retained so long as they are maintained in good 
condition to the satisfaction of the Officer in Charge, Marine 
Inspection. If the fire hose nozzles were previously approved under 
Subpart 162.027, each of the number of hydrants in the locations listed 
in Table 34.10-10(E) must have a low velocity water spray applicator 
that:
    (i) Was previously approved under Subpart 162.027 of this chapter:
    (ii) Is the length listed in Table 34.10-(E); and
    (iii) Meets Sec. 34.10-10(o).
    16. Subpart 34.13 is revised to read as follows:

Subpart 34.13--Steam Smothering Systems

Sec. 34.13-1  Application--T/ALL.

    Steam smothering fire extinguishing systems are not permitted on 
vessels contracted for on or after January 1, 1962. Previously approved 
installations may be retained as long as they are maintained in good 
condition to the satisfaction of the Officer in Charge, Marine 
Inspection.

Subpart 34.55--[Removed]

    17. Subpart 34.55 is removed.

PART 35--OPERATIONS

    18. The authority citation for Part 35 continues to read as 
follows:

    Authority: 33 U.S.C. 1321(j); 46 U.S.C. 3306, 3703, 6101; 49 
U.S.C. 5103, 5106; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 
277; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; 49 CFR 
1.46.

Sec. 35.01-5  [Amended]

    19. In Sec. 35.01-5, paragraphs (b) and (c) are removed and the 
paragraph designation ``(a)'' is removed from paragraph (a).
    20. Section 35.07-5 is revised to read as follows:

Sec. 35.07-5  Logbooks and records--TB/ALL.

    (a) The master or person in charge of a vessel that is required by 
46 U.S.C. 11301 to have an official logbook shall maintain the logbook 
on Form CG-706. When the voyage is completed, the master or person in 
charge shall file the logbook with the Officer in Charge, Marine 
Inspection.
    (b) The master or person in charge of a vessel that is not required 
by 46 U.S.C. 11301 to have an official logbook, shall maintain, on 
board, an unofficial logbook or record in any form desired 

[[Page 65999]]
for the purposes of making entries therein as required by law or 
regulations in this subchapter. Such logs or records are not filed with 
the Officer in Charge, Marine Inspection, but shall be kept available 
for review by a marine inspector for a period of one year after the 
date to which the records refer. Separate records of tests and 
inspections of firefighting equipment shall be maintained with the 
vessel's logs for the period of validity of the vessel's certificate of 
inspection.

Sec. 35.07-15  [Removed]

    21. Section 35.07-15 is removed.

Sec. 35.10-5  [Amended]

    22. In Sec. 35.10-5, paragraph (g) is removed and paragraphs (h) 
and (i) are redesignated as paragraphs (g) and (h), respectively.
    23. Subpart 35.12 is revised to read as follows:

Subpart 35.12--Placard of Lifesaving Signals

Sec.
35.12-1  Application--T/OCLB.
35.12-5  Availability--T/OCLB.

Sec. 35.12-1  Application--T/OCLB.

    The provisions of this subpart shall apply to all vessels on an 
international voyage, and all other vessels of 150 gross tons or over 
in ocean, coastwise or Great Lakes service.

Sec. 35.12-5  Availability--T/OCLB.

    On all vessels to which this subpart applies there shall be readily 
available to the deck officer of the watch a placard containing 
instructions for the use of the lifesaving signals set forth in 
Regulation 16, Chapter V, of the International Convention for Safety of 
Life at Sea, 1974. These signals shall be used by vessels or persons in 
distress when communicating with lifesaving stations and maritime 
rescue units.

Sec. 35.20-15  [Removed]

    24. Section 35.20-15 is removed.

Sec. 35.20-25  [Removed]

    25. Section 35.20-25 is removed.
    26. Section 35.20-30 is revised to read as follows:

Sec. 35.20-30  Flashing the rays of a searchlight or other blinding 
light--T/ALL.

    No person shall flash or cause to be flashed the rays of a search 
light or other blinding light onto the bridge or into the pilothouse of 
any vessel under way.
    27. Section 35.20-35 is revised to read as follows:

Sec. 35.20-35  Whistling--All.

    The unnecessary sounding of a vessel's whistle is prohibited within 
any harbor limits of the United States.
    28. Section 35.20-40 is revised to read as follows:

Sec. 35.20-40  Maneuvering characteristics--T/OC.

    (a) Each ocean and coastwide tankship of 1,600 gross tons or over 
must have the maneuvering information listed in 33 CFR 164.35(g)(1) 
through (g)(7) prominently displayed in the pilot house on a fact 
sheet.
    (b) The information on the fact sheet must be:
    (1) Verified by the owner or operator six months after the vessel 
is placed in service; or
    (2) Modified six months after the vessel is placed into service and 
verified within three months thereafter.
    (c) The information that appears on the fact sheet may be obtained 
from:
    (1) Trial trip observations;
    (2) Model tests;
    (3) Analytical calculations;
    (4) Simulations;
    (5) Information established from another vessel of similar hull 
form, power, rudder and propeller; or
    (6) Any combination of the above. The accuracy of the information 
in the fact sheet required is that attainable by ordinary shipboard 
navigation equipment.
    (d) The requirement for information for fact sheets for vessels of 
unusual design will be specified on a case by case basis.
    29. Section 35.25-1 is revised to read as follows:

Sec. 35.25-1.  Examination of boilers and machinery by engineer--T/ALL.

    It shall be the duty of an engineer when he assumes charge of the 
boilers to examine the same forthwith and thoroughly. If he finds any 
part thereof in bad condition, he shall immediately report the facts to 
the master, owner, or agent, and to the nearest Officer in Charge, 
Marine Inspection.

Sec. 35.30-45  [Removed]

    30. Section 35.30-45 is removed.

Sec. 35.40-40  [Amended]

    31. In Sec. 35.40-40, paragraph (a) is amended by removing the 
words ``fire hoses, fire axes,''.

Subpart 35.70--[Removed]

    32. Subpart 35.70 is removed.

PART 38--LIQUEFIED FLAMMABLE GASES

    33. The authority citation for Part 38 is revised to read as 
follows:

    Authority: 46 U.S.C. 2103, 3306, 3703; 49 U.S.C. 5101, 5106; 
E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

    34. In Sec. 38.25-10, paragraph (b) is revised to read as follows:

Sec. 38.25-10  Safety relief valves--TB/ALL.

* * * * *
    (b) The safety relief valve discs shall be lifted from their seats 
in the presence of a marine inspector by either liquid, gas, or vapor 
pressure at least once every 5 years to determine the accuracy of 
adjustment and, if necessary, shall be reset.

PART 54--PRESSURE VESSELS

    35. The authority citation for Part 54 is revised to read as 
follows:

    Authority: 33 U.S.C. 1509; 43 U.S.C. 1333; 46 U.S.C. 3306, 3703; 
E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

Sec. 54.01-1  [Amended]

    36. In Sec. 54.01-1, paragraph (b) is amended by removing the 
incorporation by reference entry for the Tubular Exchanger 
Manufacturers Association.

Sec. 54.01-3  [Removed]

    37. Section 54.01-3 is removed.

Sec. 54.01-5  [Amended]

    38. In Sec. 54.01-5, paragraph (d)(5) is amended by adding the word 
``and'' after the semicolon, paragraph (d)(6) is removed, paragraph 
(d)(7) is redesignated as paragraph (d)(6) and footnote 8 is removed 
from Table 54.01-5(b).

PART 56--PIPING SYSTEMS AND APPURTENANCES

    39. The authority citation for Part 56 continues to read as 
follows:

    Authority: 33 U.S.C. 1321(j), 1509; 43 U.S.C. 1333; 46 U.S.C. 
3306, 3703; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; E.O. 
12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; 49 CFR 1.46.

    40. In Sec. 56.01-2, paragraph (b) is amended by adding in 
numerical order of the standards incorporated by reference from the 
American Society for Testing and Materials (ASTM) the following 
additional standards:

Sec. 56.01-2  Incorporation by reference.

* * * * *
    (b) * * *

ASTM F 1387-93 Standard--56.30-40
    Specification for Performance of Mechanically Attached Fittings
ASTM F 1476-93 Standard--56.30-35
    Specification for Performance of Casketed Mechanical Couplings for 
Use in Piping Applications
* * * * *
    41. Section 56.30-35 is revised to read as follows:
    
[[Page 66000]]

Sec. 56.30-35  Sleeve coupled and other proprietary joints.

    Coupling type, mechanical gland type and other proprietary joints 
may be used in certain locations (see Sec. 56.30-40(d) for limitations) 
where experience or tests have demonstrated that the joint is safe for 
the operating conditions, and where adequate provision is made to 
prevent separation of the joint. Fittings of this type shall be 
designed, constructed, tested and marked in accordance with ASTM F 
1476-93.
    42. In Sec. 56.30-40, paragraphs (b), (c), (e), and (h) are 
removed, paragraph (d) is redesignated as paragraph (c), paragraphs (f) 
and (g) are redesignated as paragraphs (d) and (e), respectively, and a 
new paragraph (b) is added to read as follows:

Sec. 56.30-40  Flexible pipe couplings of the compression or slip-on 
type.

* * * * *
    (b) Couplings shall be designed, constructed, tested and marked in 
accordance with ASTM F 1387-93.
* * * * *

Sec. 56.50-100  [Removed]

    43. Section 56.50-100 is removed.

PART 61--PERIODIC TESTS AND INSPECTIONS

    44. The authority citation for Part 61 continues to read as 
follows:

    Authority: 43 U.S.C. 1333; 46 U.S.C. 3306, 3703; E.O. 12234, 45 
FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

    45. Subpart 61.03 is added to read as follows:

Subpart 61.03--Incorporation of Standards

Sec. 61.03-1  Incorporation by reference.

    (a) Certain material is incorporated by reference into this part 
with the approval of the Director of the Federal Register in accordance 
with 5 U.S.C. 552(a). To enforce any edition other than that specified 
in paragraph (b) of this section, the Coast Guard must publish notice 
of change in the Federal Register and make the material available to 
the public. All approved material is on file at the Office of the 
Federal Register, 800 North Capitol Street, NW., suite 700, Washington, 
DC, and at the U.S. Coast Guard, Design and Engineering Standards 
Division (G-MMS), 2100 Second Street SW., Washington, DC 20593-0001 and 
is available from the sources indicated in paragraph (b) of this 
section.
    (b) The material for incorporation by reference in this part and 
the sections affected are:

American Society for Testing and Materials (ASTM), 1916 Race Street, 
Philadelphia, PA 19103
ASTM D 665-92, Standard Test Method for Rust-Preventing Characteristics 
of Inhibited Mineral Oil in the Presence of Water, 1992--61.20-17

Sec. 61.05-5  [Amended]

    46. In Sec. 61.05-5, paragraph (a) is removed and paragraphs (b) 
and (c) are redesignated as paragraphs (a) and (b), respectively.
    47. Section 61.20-17 is revised to read as follows:

Sec. 61.20-17  Examination intervals.

    (a) A lubricant that demonstrates the corrosion inhibiting 
properties of oil when tested in accordance with ASTM D 665-92 is 
considered to be equivalent to oil for the purposes of the tailshaft 
examination interval.
    (b) Except as provided in paragraphs (c) through (f) of this 
section, each tailshaft on a vessel must be examined twice within any 
five year period. No more than three years may elapse between any two 
tailshaft examinations.
    (c) Tailshafts on vessels fitted with multiple shafts must be 
examined once every five years.
    (d) Tailshafts with inaccessible portions fabricated of materials 
resistant to corrosion by sea water, or fitted with a continuous liner 
or a sealing gland which prevents sea water from contacting the shaft, 
must be examined once every five years if they are constructed or 
fitted with a taper, keyway, and propeller designed in accordance with 
the American Bureau of Shipping standards to reduce stress 
concentrations or are fitted with a flanged propeller. Accessible 
portions of tailshafts must be examined visually during each drydock 
examination.
    (e) Tailshafts with oil lubricated bearings, including bearings 
lubricated with a substance considered to be equivalent to oil under 
the provisions of paragraph (a), need not be drawn for examination--
    (1) If tailshaft bearing clearance readings are taken whenever the 
vessel undergoes a drydock examination or underwater survey;
    (2) If the inboard seal assemblies are examined whenever the vessel 
undergoes a drydock examination or underwater survey;
    (3) If an analysis of the tailshaft bearing lubricant is performed 
semiannually in accordance with the lubrication system manufacturer's 
recommendations to determine bearing material content or the presence 
of other contaminants; and
    (4) If--
    (i) For tailshafts with a taper, the propeller is removed and the 
taper and the keyway (if fitted) are nondestructively tested at 
intervals not to exceed five years; or
    (ii) For tailshafts with a propeller fitted to the shaft by means 
of a coupling flange, the propeller coupling bolts and flange radius 
are nondestructively tested whenever they are removed or made 
accessible in connection with overhaul or repairs.
    (f) Tailshafts on mobile offshore drilling units are not subject to 
examination intervals under paragraphs (b) through (d) of this section 
if they are--
    (1) Examined during each regularly scheduled drydocking; or
    (2) Regularly examined in a manner acceptable to the Commandant (G-
MCO).

Sec. 61.30-5  [Amended]

    48. In Sec. 61.30-5, paragraph (a) is removed and the paragraph 
designation ``(b)'' is removed from paragraph (b).

PART 72--CONSTRUCTION AND ARRANGEMENT

    49. The authority citation for Part 72 continues to read as 
follows:

    Authority: 46 U.S.C. 3306; E.O. 12234, 45 FR 58801, 3 CFR, 1980 
Comp., p. 277; 49 CFR 1.46.

Sec. 72.05-60  [Removed]

    50. Section 72.05-60 is removed.
    51. Subpart 72.20 is revised to read as follows:

Subpart 72.20--Accommodations for Officers and Crew

Sec.
72.20-1  Application.
72.20-5  Intent.
72.20-10  Location of crew spaces.
72.20-15  Construction.
72.20-20  Sleeping accommodations.
72.20-25  Washrooms and toilet rooms.
72.20-30  Messrooms.
72.20-35  Hospital space.
72.20-40  Other spaces.
72.20-45  Lighting.
72.20-50  Heating.
72.20-55  Insect screens.
72.20-90  Vessels contracted for prior to November 19, 1952.

Sec. 72.20-1  Application.

    The provisions of this subchapter, except Sec. 72.20-90, apply to 
all vessels contracted for after November 18, 1952. Vessels contracted 
for before November 19, 1952 shall meet the requirements of Sec. 72.20-
90.

Sec. 72.20-5  Intent.

    It is the intent of this subpart that the accommodations provided 
for officers and crew on all vessels shall be securely 

[[Page 66001]]
constructed, properly lighted, heated, drained, ventilated, equipped, 
located, arranged, and where practicable, shall be insulated from undue 
noise, heat and odors.

Sec. 72.20-10  Location of crew spaces.

    (a) Crew quarters shall not be located farther forward in the 
vessel than a vertical plane located at 5 percent of the vessel's 
length abaft the forward side of the stem at the designed summer load 
water line. However, for vessels in other than ocean or coastwise 
service, this distance need not exceed 8.5 m (28 ft). For the purposes 
of this paragraph, the length shall be as defined in Sec. 43.15-1 of 
Subchapter E (Load Lines) of this chapter. No section of the deck of 
the crew spaces shall be below the deepest load line, except that in 
special cases, the Commandant may approve such an arrangement.
    (b) There shall be no direct communication, except through solid, 
close fitted doors or hatches between crew spaces and chain lockers, or 
machinery spaces.

Sec. 72.20-15  Construction.

    All crew spaces are to be constructed in a manner suitable to the 
purpose for which they are intended. The accommodations provided for 
officers and crew on all vessels shall be securely constructed, 
properly lighted, heated, drained, ventilated, equipped, located, 
arranged, and, where practicable, shall be insulated from undue noise, 
heat and effluvia.

Sec. 72.20-20  Sleeping accommodations.

    (a) Where practicable, each licensed officer shall be provided with 
a separate stateroom.
    (b) Sleeping accommodations for the crew shall be divided into 
rooms, no one of which shall berth more than four persons.
    (c) Each room shall be of such size that there is at least 2.78 m 
\2\ (30 ft \3\) of deck area and a volume of at least 5.8 m \3\ (210 ft 
\2\) for each person accommodated. The clear head room shall be not 
less than 190 cm (75 in). In measuring sleeping accommodations any 
furnishings contained therein for the use of the occupants are not to 
be deducted from the total volume or from the deck area.
    (d) Each person shall have a separate berth and not more than one 
berth shall be placed above another. The berth shall be composed of 
materials not likely to corrode. The overall size of a berth shall not 
be less than 68 cm (27 in) wide by 190 cm (75 in) long, except by 
special permission of the Commandant. Where two tiers of berths are 
fitted, the bottom of the lower berth must not be less than 30 cm (12 
in) above the deck. The berths shall not be obstructed by pipes, 
ventilating ducts, or other installations.
    (e) A locker shall be provided for each person accommodated in a 
room.

Sec. 72.20-25  Washrooms and toilet rooms.

    (a) There shall be provided at least one toilet, one washbasin, and 
one shower or bathtub for each eight members or portion thereof in the 
crew to be accommodated. The crew to be accommodated shall include all 
members who do not occupy rooms to which private or semi-private 
facilities are attached.
    (b) The toilet rooms and washrooms shall be located convenient to 
the sleeping quarters of the crew to which they are allotted but shall 
not open directly into such quarters except when they are provided as 
private or semi-private facilities.
    (c) All washbasins, showers, and bathtubs shall be equipped with 
proper plumbing, including hot and cold running water. All toilets 
shall be installed with proper plumbing for flushing. Where more than 
one toilet is located in a space or compartment, each toilet shall be 
separated by partitions.

Sec. 72.20-30  Messrooms.

    Messrooms shall be located as near to the galley as is practicable 
except where the messroom is equipped with a steam table. The messroom 
shall be of such size as to seat the number of persons normally 
scheduled to be eating at one time.

Sec. 72.20-35  Hospital space.

    (a) Each vessel which in the ordinary course of its trade makes 
voyages of more than 3 days duration between ports and which carries a 
crew of twelve or more, shall be provided with a hospital space. This 
space shall be situated with due regard to the comfort of the sick so 
that they may receive proper attention in all weathers.
    (b) The hospital shall be suitably separated from other spaces and 
shall be used for the care of the sick and for no other purpose.
    (c) The hospital shall be fitted with berths in the ratio of one 
berth to every twelve members of the crew or portion thereof who are 
not berthed in single occupancy rooms, but the number of berths need 
not exceed six.
    (d) The hospital shall have a toilet, washbasin, and bath tub or 
shower conveniently situated. Other necessary suitable equipment of 
such character as clothes locker, table, seat, etc., shall be provided.
    (a) Sufficient facilities shall be provided where the crew may wash 
and dry their own clothes. There shall be at least one sink supplied 
with hot and cold fresh water.
    (b) Recreation accommodations shall be provided.
    (c) A space or spaces of adequate size shall be available on an 
open deck to which the crew has access when off duty.

Sec. 72.20-45  Lighting.

    Berth lights shall be provided for each member of the crew.

Sec. 72.20-50  Heating.

    (a) All crew spaces shall be adequately heated in a manner suitable 
to the purpose of the space.
    (b) Radiators and other heating apparatus shall be so placed, and 
where necessary shielded, as to avoid risk of fire, danger or 
discomfort to the occupants. Pipes leading to radiators or heating 
apparatus shall be lagged where those pipes create a hazard to persons 
occupying the space.

Sec. 72.20-55  Insect screens.

    Provisions shall be made to protect the crew quarters against the 
admission of insects.

Sec. 72.20-90  Vessels contracted for prior to November 19, 1952.

    (a) Vessels of 100 gross tons and over, contracted for prior to 
March 4, 1915, shall meet the requirements of this paragraph.
    (1) Existing structure, arrangements, materials, and facilities, 
previously approved will be considered satisfactory so long as they are 
maintained in a suitable condition to the satisfaction of the Officer 
in Charge, Marine Inspection. Minor repairs and alterations may be made 
to the same standard as the original construction provided that in no 
case will a greater departure from the standards of Secs. 72.20-5 
through 72.20-55 be permitted than presently exists.
    (b) Vessels of 100 gross tons and over, contracted for on or after 
March 4, 1915, but prior to January 1, 1941, shall meet the 
requirements of this paragraph.
    (1) Existing structure, arrangements, materials, and facilities, 
previously accepted or approved will be considered satisfactory so long 
as they are maintained in a suitable condition to the satisfaction of 
the Officer in Charge, Marine Inspection. Minor repairs and alterations 
may be made to the same standard as the original construction.
    (2) Where reasonable and practicable, a minimum of 1 toilet, 
shower, and washbasin shall be provided for each 10 members of the crew 
or fraction thereof.
    (3) Crew spaces shall have a volume of at least 3.4 m\3\ (120 
ft\2\) and a deck 

[[Page 66002]]
area of at least 1.5 m\2\ (16 ft\3\) for each person accommodated.
    (4) Each crewmember shall have a separate berth, and berths may not 
be placed more than two high.
    (5) Each vessel, which in the ordinary course of its trade makes a 
voyage of more than 3 days duration between ports and which carries a 
crew of twelve or more persons, shall be provided with a suitable 
hospital space for the exclusive use of the sick or injured. Berths 
shall be provided in the ratio of 1 berth for each twelve members of 
the crew or fraction thereof, but the number of berths need not exceed 
6.
    (6) The crew spaces shall be securely constructed, properly 
lighted, heated, drained, ventilated, equipped, located, and arranged, 
and where practicable shall be insulated from undue noise and odors.
    (d) Vessels of 100 gross tons and over, contracted for on or after 
January 1, 1941, but prior to November 19, 1952, shall meet the 
requirements of this paragraph.
    (1) Existing structure, arrangements, materials, and facilities, 
previously accepted or approved will be considered satisfactory so long 
as they are maintained in a suitable condition to the satisfaction of 
the Officer in Charge, Marine Inspection. Minor repairs and alterations 
may be made to the same standard as the original construction.
    (2) There shall be a minimum of one toilet, shower, and washbasin 
for each eight members of the crew or fraction thereof who are not 
accommodated in rooms having attached private or semi-private 
facilities. Washbasins, showers, and bathtubs if substituted for 
showers, shall be equipped with proper plumbing, including hot and cold 
running water.
    (3) Crew spaces shall have a volume of at least 3.4 m\3\ (120 
ft\2\) and a deck area of at least 1.5 m\2\ (16 ft\3\) for each person 
accommodated.
    (4) Each crewmember shall have a separate berth, and berths may not 
be placed more than two high.
    (5) Each vessel, which in the ordinary course of its trade makes a 
voyage of more than 3 days duration between ports and which carries a 
crew of twelve or more persons, shall be provided with a suitable 
hospital space for the exclusive use of the sick or injured. Berths 
shall be provided in the ratio of 1 berth for each twelve members of 
the crew or fraction thereof, but the number of berths need not exceed 
6.
    (6) The crew spaces shall be securely constructed, properly 
lighted, heated, drained, ventilated, equipped, located, and arranged, 
and where practicable shall be insulated from undue noise and odors.

PART 76--FIRE PROTECTION EQUIPMENT

    52. The authority citation for Part 76 continues to read as 
follows:

    Authority: 46 U.S.C. 3306, E.O. 12243, 45 FR 58801, 3 CFR, 1980 
Comp., p. 277; 49 CFR 1.46.

    53. Section 76.05-20 is revised to read as follows:

Sec. 76.05-20  Fixed fire extinguishing systems.

    Approved fire extinguishing systems shall be installed, as required 
by Table 76.05-1(a) on all self-propelled vessels and on all barges 
with sleeping accommodations for more than six persons.

Sec. 76.05-30  [Removed]

    54. Section 76.05-30 is removed.
    55. In Sec. 76.10-10, paragraphs (j-1) and (j-2) are removed, 
paragraph (k) and (l) is redesignated as paragraphs (m) and (n), 
paragraph (j) is revised and new paragraphs (k) and (l) are added to 
read as follows:

Sec. 76.10-10  Fire hydrants and hose.

* * * * *
    (j) Each fire hose on each hydrant must have a combination solid 
stream and water spray fire hose nozzle that meets the requirements in 
Subpart 162.027 of this chapter. Fire hose nozzles previously approved 
under Subpart 162.027 of this chapter may be retained so long as they 
are maintained in good condition to the satisfaction of the Officer in 
Charge, Marine Inspection.
    (k) Fire hose nozzles previously approved under Subpart 162.027 of 
this chapter in the following locations must have low-velocity water 
spray applicators also previously approved under Subpart 162.027 of 
this chapter.
    (1) In accommodation and service areas, two fire hoses.
    (2) In each propulsion machinery space containing an oil-fired 
boiler, internal combustion machinery, or oil fuel unit on a vessel on 
an international voyage or of 1000 gross tons or more, each fire hose. 
The length of each applicator must be not more than 1.8 m (6 feet).
    (1) Fixed brackets, hooks, or other means for stowing an applicator 
must be next to each fire hydrant that has an applicator under 
paragraph (k) of this section.
* * * * *
    56. In Sec. 76.10-90, paragraph (a)(7) is removed and paragraph 
(a)(6) is revised to read as follows:

Sec. 76.10-90  Installations contracted for prior to May 26, 1965.

    (a) * * *
    (6) Firehose nozzles and low velocity spray applicators must meet 
the requirements of Secs. 76.10-10(j), 76.10-10(k) and 76.10-10(l).
    57. Subpart 76.13 is revised to read as follows:

Subpart 76.13--System Smothering Systems

Sec. 76.13-1  Application.

    Steam smothering systems are not permitted on vessels contracted 
for on or after January 1, 1962. Previously approved installations may 
be retained as long as they are maintained in good condition to the 
satisfaction of the Officer in Charge, Marine Inspection.

PART 77--VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT

    58. The authority citation for Part 77 continues to read as 
follows:

    Authority: 46 U.S.C. 3306; E.O. 12234, 45 FR 58801, 3 CFR, 1980 
Comp., p. 277; 49 CFR 1.46.

    59. Section 77.27-1 is revised to read as follows:

Sec. 77.27-1  When required.

    All mechanically propelled vessels of 500 gross tons and over in 
ocean or coastwise service, and all mechanically propelled vessels of 
500 gross tons and over in Great Lakes service certificated for service 
on the River St. Lawrence eastward of the lower exit of the St. Lambert 
Lock at Montreal, Canada, shall be fitted with an efficient electronic 
deep-sea sounding apparatus.

PART 78--OPERATIONS

    60. The authority citation for Part 78 continues to read as 
follows:

    Authority: 33 U.S.C. 1321(j); 46 U.S.C. 2103, 3306, 6101; 49 
U.S.C. 5103, 5106; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 
277; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; 49 CFR 
1.46.

Subpart 78.03--[Removed]

    61. Subpart 78.03 is removed.

Subpart 78.20--[Removed]

    62. Subpart 78.20 is removed.
    63. In Sec. 78.21-1, paragraphs (a), (b), (c) and (d) are removed, 
paragraphs, (e) and (f) are redesignated as paragraphs (b) and (c), 
respectively, and a new paragraph (a) is added to read as follows:

[[Page 66003]]

Sec. 78.21-1  Data required.

    (a) The information on the maneuvering characteristics fact sheet 
required by 33 CFR 164.35(g) must be:
    (1) Verified six months after the vessel is placed into service; or
    (2) Modified six months after the vessel is placed into service and 
verified within three months thereafter.
* * * * *

Subpart 78.25--[Removed]

    64. Subpart 78.25 is removed.
    65. Subpart 78.35 is revised to read as follows:

Subpart 78.35--Communication between deckhouses

Sec. 78.35-1  When required.

    On all vessels navigating in other than protected waters, where the 
distance between deckhouses is more than 46 m (150 ft) a fixed means of 
facilitating communication between both ends of the vessel, such as a 
raised fore and aft bridge or side tunnels, shall be provided. 
Previously approved arrangements may be retained so long as they are 
maintained in satisfactory condition to the satisfaction of the Officer 
in Charge, Marine Inspection.
    66. Section 78.37-3 is revised to read as follows:

Sec. 78.37-3  Logbooks and records.

    (a) The master or person in charge of a vessel that is required by 
46 U.S.C. 11301 to have an official logbook shall maintain the logbook 
on Form CG-706. When the voyage is completed, the master or person in 
charge shall file the logbook with the Officer in Charge, Marine 
Inspection.
    (b) The master or person in charge of a vessel that is not required 
by 46 U.S.C. 11301 to have an official logbook, shall maintain, on 
board, an unofficial logbook or record in any form desired for the 
purposes of making entries therein as required by law or regulations in 
this subchapter. Such logs or records are not filed with the Officer in 
Charge, Marine Inspection, but shall be kept available for review by a 
marine inspector for a period of one year after the date to which the 
records refer. Separate records of tests and inspections of 
firefighting equipment shall be maintained with the vessel's logs for 
the period of validity of the vessel's certificate of inspection.

Sec. 78.47-67  [Removed]

    67. Section 78.47-67 is removed.
    68. Subpart 78.53 is revised to read as follows:

Subpart 78.53--Placard of Lifesaving Signals

Sec.
78.53-1 Application.
78.53-5 Availability.

Sec. 78.53-1  Application.

    The provisions of this subpart shall to all vessels on an 
international voyage, and all other vessels of 150 gross tons or over 
in ocean, coastwise or Great Lakes service.

Sec. 78.53-5  Availability.

    On all vessels to which this subpart applies there shall be readily 
available to the deck officer of the watch a placard containing 
instructions for the use of the lifesaving signals set forth in 
Regulation 16, Chapter V, of the International Convention for Safety of 
Life at Sea, 1974. These signals shall be used by vessels or persons in 
distress when communicating with lifesaving stations and maritime 
rescue units.
    69. Section 78.57-1 is revised to read as follows:

Sec. 78.57-1  All personnel must comply.

    All licensed masters, officers, and certificated seamen on United 
States vessels shall comply strictly with routing instructions issued 
by competent naval authority.

Subpart 78.75--[Removed]

    70. Subpart 78.75 is removed.

Subpart 78.80--[Removed]

    71. Subpart 78.80 is removed.

Subpart 78.85--[Removed]

    72. Subpart 78.85 is removed.

PART 92--CONSTRUCTION AND ARRANGEMENT

    73. The authority citation for Part 92 continues to read as 
follows:

    Authority: 46 U.S.C. 3306; E.O. 12234, 45 FR 58801, 3 CFR, 1980 
Comp., p. 277; 49 CFR 1.46.

Sec.  92.01-13  [Removed]

    74. Section 92.01-13 is removed.
    75. Subpart 92.20 is revised to read as follows:

Subpart 92.20--Accommodations for Officers and Crew

Sec.
92.20-1  Application.
92.20-5  Intent.
92.20-10  Location of crew spaces.
92.20-15  Construction.
92.20-20  Sleeping accommodations.
92.20-25  Washrooms and toilet rooms.
92.20-30  Messrooms.
92.30-35  Hospital space.
92.20-40  Other spaces.
92.20-45  Lighting.
92.20-50  Heating.
92.20-55  Insect screens.
92.20-90  Vessels contracted for prior to November 19, 1952.

Sec.  92.20-1  Application.

    (a) The provisions of this subpart, with the exception of Sec.  
92.20.90, shall apply to all vessels of 100 gross tons and over 
contracted for on or after November 19, 1952. Vessels of 100 gross tons 
and over contracted for prior to November 19, 1952 shall meet the 
requirements of Sec.  92.20-90.
    (b) Vessels of less than 100 gross tons shall meet the applicable 
requirements of this subpart insofar as is reasonable and practicable.

Sec.  92.20-5  Intent.

    It is the intent of this subpart that the accommodations provided 
for officers and crew on all vessels shall be securely constructed, 
properly lighted, heated, drained, ventilated, equipped, located, 
arranged, and, where practicable, shall be insulated from undue noise, 
heat and odors.

Sec.  92.20-10  Location of crew spaces.

    (a) Crew spaces shall be located, where practicable, so that the 
maximum amount of fresh air and light are obtainable.
    (b) Crew quarters shall not be located farther forward in a vessel 
than a vertical plane located at 5 percent of the vessel's length abaft 
the forward side of the stem at the designed summer load waterline. 
However, for vessels in other than ocean services, this distance need 
not exceed 8.5 m (28 ft). For the purpose of this paragraph, the length 
shall be as defined in Sec.  42.13-15 of Subchapter E (Load Lines) of 
this chapter.
    There shall be no direct communication, except through solid, close 
fitted doors or hatches between crew spaces and chain lockers, cargo, 
or machinery spaces.
    (d) There shall be no access, vents, or sounding tubes from fuel or 
cargo oil tanks opening into crew spaces, except that sounding tubes 
and access openings may be located in corridors.

Sec.  92.20-15  Construction.

    All crew spaces are to be constructed in a manner suitable to the 
purpose for which they are intended. The accommodations provided for 
officers and crew on all vessels shall be securely constructed, 
properly lighted, heated, drained, ventilated, equipped, located, 
arranged, and, where practicable, shall be insulated from undue noise, 
heat and odors.

[[Page 66004]]

Sec.  92.20-20  Sleeping accommodations.

    (a) Each department head and watchstanding officer shall have a 
separate stateroom.
    (b) Sleeping accommodations for the crew shall be divided into 
rooms, no one of which shall berth more than four persons.
    (c) Each room shall be of such size that there is at least 2.78 
m\2\ (30 ft\3\) of deck area and a volume of at least 5.8 m\3\ (210 
ft\2\) for each person accommodated. The clear headroom shall be not 
less than 190 cm (75 in). In measuring sleeping quarters allocated to 
crews of vessels, any furnishings contained therein for the use of the 
occupants are not to be deducted from the total volume or deck area.
    (d) Each person shall have a separate berth and not more than one 
berth shall be placed above another. The berths shall be composed of a 
material not likely to corrode. The overall size of a berth shall not 
be less than 68 cm (27 in) wide by 190 cm (75 in) long. Where two tiers 
of berths are fitted, the bottom of the lower berth must not be less 
than 30 cm (12 in) above the deck. The berths shall not be obstructed 
by pipes, ventilating ducts, or other installations.
    (e) A locker provided for each person accommodated in a room.

Sec. 92.20-25  Washrooms and toilet rooms.

    (a) There shall be provided at least one toilet, one washbasin, and 
one shower or bathtub for each eight members or portion thereof in the 
crew to be accommodated. The crew to be accommodated shall include all 
members who do not occupy rooms to which private or semiprivate 
facilities are attached.
    (b) The toilet rooms and washrooms shall be located convenient to 
the sleeping quarters of the crew to which they are allotted but shall 
not open directly into such quarters except when they are provided as 
private or semiprivate facilities.
    (c) All washbasins, showers, and bathtubs shall be equipped with 
proper plumbing, including hot and cold running water. All toilets 
shall be installed with proper plumbing for flushing.
    (d) At least one washbasin shall be fitted in each toilet room, 
except where private or semi-private facilities are provided and 
washbasins are installed in the sleeping rooms.
    (e) When more than one toilet is located in a space, each toilet 
shall be separated by partitions.

Sec. 92.20-30  Messrooms.

    Messrooms shall be located as near to the galley as practicable. 
The messrooms shall be of such size as to seat the number of persons 
normally scheduled to be eating at one time.

Sec. 92.20-35  Hospital space.

    (a) Except as specifically modified by paragraph (f) of this 
section, each vessel which in the ordinary course of its trade makes 
voyages of more than 3 days duration between ports and which carries a 
crew of twelve or more, shall be provided with a hospital space. This 
space shall be situated with due regard to the comfort of the sick so 
that they may receive proper attention in all weathers.
    (b) The hospital shall be suitably separated from other spaces and 
shall be used for the care of the sick and for no other purpose.
    (c) The hospital shall be fitted with berths in the ratio of one 
berth to every twelve members of the crew or portion thereof who are 
not berthed in single occupancy rooms, but the number of berths need 
not exceed six.
    (e) The hospital shall have a toilet, washbasin, and bath tub or 
shower conveniently situated. Other necessary suitable equipment of 
such character as clothes locker, table, seat, etc., shall be provided.
    (f) On vessels in which the crew is berthed in single occupancy 
rooms a hospital space will not be required, provided, that one room 
shall be designated and fitted for use as a treatment and isolation 
room. Such room shall meet the following standards:
    (1) The room must be available for immediate medical use; and,
    (2) A washbasin with hot and cold running water must be installed 
either in or immediately adjacent to the space and other required 
sanitary facilities must be conveniently located.

Sec. 92.20-40  Other spaces.

    (a) Sufficient facilities shall be provided where the crew may wash 
and dry their own clothes. There shall be at least one sink supplied 
with hot and cold fresh water.
    (b) Recreation accommodations shall be provided.

Sec. 92.20-45  Lighting.

    Berth lights shall be provided for each member of the crew.

Sec. 92.20-50  Heating.

    (a) All crew spaces shall be adequately heated in a manner suitable 
to the purpose of the space.
    (b) Radiators and other heating apparatus shall be so placed, and 
where necessary shielded, as to avoid risk of fire, danger or 
discomfort to the occupants. Pipes leading to radiators or heating 
apparatus shall be lagged where those pipes create a hazard to persons 
occupying the space.

Sec. 92.20-55  Insect screens.

    Provisions shall be made to protect the crew quarters against the 
admission of insects.

Sec. 92.20-90  Vessels contracted for prior to November 19, 1952.

    (a) Vessels of less than 100 gross tons, contracted for prior to 
November 19, 1952 shall meet the general intent of Sec. 92.20-5 and in 
addition shall meet the following requirements:
    (1) Existing structure, arrangements, materials, and facilities, 
previously accepted or approved will be considered satisfactory so long 
as they are maintained in a suitable condition to the satisfaction of 
the Officer in Charge, Marine Inspection. Minor repairs and 
alternations may be made to the same standard as the original 
construction.
    (b) Vessels of 100 gross tons and over, contracted for prior to 
March 4, 1915, shall meet the requirements of this paragraph.
    (1) Existing structure, arrangements, materials, and facilities, 
previously approved will be considered satisfactory so long as they are 
maintained in good condition to the satisfaction of the Officer in 
Charge, Marine Inspection. Minor repairs and alterations may be made to 
the same standard as the original construction: Provided, That in no 
case will a greater departure from the standards of 92.20-5 through 
92.20-55 be permitted than presently exists.
    (c) Vessels of 100 gross tons and over, contracted for on or after 
March 4, 1915, but prior to January 1, 1941, shall meet the 
requirements of this paragraph.
    (1) Existing structure, arrangements, materials, and facilities, 
previously approved will be considered satisfactory so long as they are 
maintained in a suitable condition to the satisfaction of the Officer 
in Charge, Marine Inspection. Minor repairs and alternations may be 
made to the same standard as the original construction.
    (2) Each vessel, which in the ordinary course of its trade makes a 
voyage of more than three days duration between ports and which carries 
a crew of 12 or more persons, shall be provided with a suitable 
hospital space for the exclusive use of the sick or injured.
    (3) The crew spaces shall be securely constructed, properly 
lighted, heated, drained, ventilated, equipped, located, and arranged, 
and where practicable, shall be insulated from undue noise and odors.
    (d) Vessels of 100 gross tons and over, contracted for on or after 
January 1, 

[[Page 66005]]
1941, but prior to November 19, 1952, shall meet the requirements of 
this paragraph.
    Existing structure, arrangements, materials, and facilities, 
previously approved will be considered satisfactory so long as they are 
maintained in a suitable condition to the satisfaction of the Officer 
in Charge, Marine Inspection. Minor repairs and alternations may be 
made to the same standard as the original construction.
    (2) Washbasins, showers, and bath tubs if substituted for showers, 
shall be equipped with proper plumbing including hot and cold running 
water.
    (3) Each crewmember shall have a separate berth, and berths may not 
be placed more than two high.
    (4) Each vessel, which in the ordinary course of its trade makes a 
voyage of more than three days duration between ports and which carries 
a crew of twelve or more persons, shall be provided with a suitable 
hospital space for the exclusive use of the sick or injured. Berths 
shall be provided in the ratio of one berth for each twelve members of 
the crew or fraction thereof, but the number of berths need not exceed 
six.
    (5) The crew spaces shall be securely constructed, properly 
lighted, heated, drained, ventilated, equipped, located and arranged, 
and where practicable, shall be insulated from undue noise and odors.

PART 95--FIRE PROTECTION EQUIPMENT

    76. The authority citation for Part 95 continues to read as 
follows:

    Authority: 46 U.S.C. 3306; E.O. 12234, 45 FR 58801, 3 CFR, 1980 
Comp., p. 277; 49 CFR 1.46.

    77. In Sec. 95.05-10, paragraph (g) is removed and paragraphs (b) 
and (c) are revised to read as follows:

Sec. 95.05-10  Fixed fire extinguishing systems.

* * * * *
    (b) A fixed carbon dioxide or other approved system shall be 
installed in all cargo compartments and tanks for combustible cargo, 
except that vessels engaged exclusively in the carriage of coal or 
grain in bulk need not be fitted with such system. For cargo 
compartments and tanks fitted with a fixed carbon dioxide or other 
approved system a deck foam system is not required. In lieu of the 
carbon dioxide system or other approved system, the following systems 
may be used or required in special cases:
    (1) A fixed foam system may be used in cargo tanks.
    (2) In cases where a cargo is normally accessible and is considered 
to be a part of the working or living quarters, a water sprinkling 
system may be required, and the details of such system will be subject 
to special approval.
    (3) Spaces ``specially suitable for vehicles'' shall be fitted with 
an approved carbon dioxide system. Alternately, the Commandant may 
permit the installation of an approved water sprinkler system or other 
suitable system.
    (c) On vessels other than motorboats, a fixed carbon dioxide or 
other approved system shall be installed in all lamp and paint lockers, 
oil rooms, and similar spaces.
* * * * *

Sec. 95.05-20  [Removed]

    78. Section 95.05-20 is removed.
    79. In Sec. 95.10-10, paragraphs (i), (i-1), (i-2) and (1) are 
removed, paragraphs (j) and (k) are redesignated as paragraphs (l) and 
(m), respectively, and new paragraphs (i), (j), (k), (n), (n)(1), 
(n)(2) an (n)(3) are added to read as follows:

Sec. 95.10-10  Fire hydrants and hose.

* * * * * * *
    (i) Except as allowed in this paragraph, each fire hose on each 
hydrant must have a combination solid stream and water spray fire hose 
nozzle approved under Subpart 162.027 of this chapter. Fire hose 
nozzles previously approved under Subpart 162.027 of this chapter may 
be retained so long as they are maintained in good condition to the 
satisfaction of the Officer in Charge, Marine Inspection.
    (j) In each propulsion machinery space containing an oil fired 
boiler, internal combustion machinery, or oil fuel unit on a vessel on 
an international voyage or of 1,000 gross tons or more, each fire hose 
having a combination nozzle previously approved under Subpart 162.027 
of this chapter must have a low-velocity water spray applicator that is 
also previously approved under Subpart 162.027 of this chapter. The 
length of the applicator must be less than 1.8 m (6 feet).
    (k) Fixed brackets, hooks, or other means for stowing an applicator 
must be next to each fire hydrant that has an applicator under 
paragraph (j) of this section.
 * * * * *
    (n) Fire hose and couplings shall be as follows:
    (1) Couplings shall be of brass, bronze, or other equivalent metal. 
National Standard fire hose coupling threads shall be used for the 38 
mm (1\1/2\ inch) and 64 mm (2\1/2\ inch) sizes.
    (2) Where 19 mm (\3/4\ inch) hose is permitted by Table 95.10-5(a), 
the hose and couplings shall be of good commercial grade.
    (3) Each section of fire hose must be lined commercial fire hose 
that conforms to Underwriters' Laboratories, Inc. Standard 19 or 
Federal Specification--H-451E. Hose that bears the label of 
Underwriters' Laboratories, Inc. as lined fire hose is accepted as 
conforming to this requirement.
* * * * *
    80. In Sec. 95.10-90, paragraph (a)(6) is removed and paragraph 
(a)(5) is revised to read as follows:

Sec. 95.10-90  Installations contracted for prior to May 26, 1965.

    (a) * * *
    (5) Firehose nozzles and low velocity spray applicators must meet 
the requirements of 95.10-10(i), 95.10-10(j) and 95.10-10(k).
    81. Subpart 95.13 is revised to read as follows:

Subpart 95.13--Steam Smothering Systems

Sec. 95.13-1  Application.

    Steam smothering systems are not permitted on vessels contracted 
for on or after January 1, 1962. Previously approved installations may 
be retained as long as they are maintained in good condition to the 
satisfaction of the Officer in Charge, Marine Inspection.

PART 96--VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT

    82. The authority citation for Part 96 continues to read as 
follows:

    Authority: 46 U.S.C. 3306; E.O. 12234, 45 FR 58801, 3 CFR, 1980 
Comp., p. 277; 49 CFR 1.46.

    83. Section 96.27-1 is revised to read as follows:

Sec. 96.27-1  When required.

    All mechanically propelled vessels of 500 gross tons and over in 
ocean or coastwise service and all mechanically propelled vessels of 
500 gross tons and over in Great Lakes service and certificated for 
service on the River St. Lawrence eastward of the lower exit of the St. 
Lambert Lock at Montreal, Canada, shall be fitted with an efficient 
electronic sounding apparatus.

PART 97--OPERATIONS

    84. The authority citation for Part 97 is revised to read as 
follows:

    Authority: 33 U.S.C. 1321(j); 46 U.S.C. 2103, 3306, 6101; 49 
U.S.C. 5103, 5106; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 
277; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; 49 CFR 
1.46.

[[Page 66006]]

Subpart 97.03--[Removed]

    85. Subpart 97.03 is removed.

Subpart 97.17--[Removed]

    86. Subpart 97.17 is removed.
    87. In Sec. 97.19-1, paragraphs (a), (b) and (c) are removed, 
paragraphs (d), (e) and (f) are redesignated as paragraphs (a), (b) and 
(c), respectively, and the new paragraph (a) is revised to read as 
follows:

Sec. 97.19-1  Data required.

* * * * *
    (a) The information on the maneuvering characteristics fact sheet 
required by 33 CFR 164.35(g) must be:
* * * * *

Subpart 97.23--[Removed]

    88. Subpart 97.23 is removed.
    89. Subpart 97.33 is revised to read as follows:

Subpart 97.33--Communication Between Deckhouses

Sec. 97.33-1  When required.

    On all vessels navigating in other than protected waters, where the 
distance between deckhouses is more than 46 m (150 ft) a fixed means of 
facilitating communication between both ends of the vessel, such as a 
raised fore and aft bridge or side tunnels, shall be provided. 
Previously approved arrangements may be retained so long as they are 
maintained in satisfactory condition to the satisfaction of the Officer 
in Charge, Marine Inspection.
    90. Section 97.35-3 is revised to read as follows:

Sec. 97.35-3  Logbooks and records.

    (a) The master or person in charge of a vessel that is required by 
46 U.S.C. 11301 to have an official logbook shall maintain the logbook 
on Form CG-706. When a voyage is completed, or after a specified period 
of time, the master or person in charge shall file the logbook with the 
Officer in Charge, Marine Inspection.
    (b) The master or person in charge of a vessel that is not required 
by 46 U.S.C. 11301 to have an official logbook, shall maintain, on 
board, an unofficial logbook or record in any form desired for the 
purposes of making entries therein as required by law or regulations in 
this subchapter. Such logs or records are not filed with the Officer in 
Charge, Marine Inspection, but shall be kept available for review by a 
marine inspector for a period of one year after the date to which the 
records refer. Separate records of tests and inspections of 
firefighting equipment shall be maintained with the vessel's logs for 
the period of validity of the vessel's certificate of inspection.

Sec. 97.35-10  [Removed]

    91. Section 97.35-10 is removed.

Sec. 97.37-45  [Removed]

    92. Section 97.37-45 is removed.
    93. Subpart 97.43 is revised to read as follows:

Subpart 97.43--Placard of Lifesaving Signals

Sec.
97.43-1  Application.
97.43-5  Availability.

Sec. 97.43-1  Application.

    The provisions of this subpart shall apply to all vessels on an 
international voyage, and all other vessels of 150 gross tons or over 
in ocean, coastwise or Great Lakes service.

Sec. 97.43-5  Availability.

    On all vessels to which this subpart applies there shall be readily 
available to the deck officer of the watch a placard containing 
instructions for the use of the lifesaving signals set forth in 
Regulation 16, Chapter V, of the International Convention for Safety of 
Life at Sea, 1974. These signals shall be used by vessels or persons in 
distress when communicating with lifesaving stations and maritime 
rescue units.
    94. Section 97.47-1 is revised to read as follows:

Sec. 97.47-1  All persons must comply.

    All licensed masters, officers, and certificated seamen on United 
States vessels must comply strictly with routing instructions issued by 
competent naval authority.

Subpart 97.60--[Removed]

    95. Subpart 97.60 is removed.

Subpart 97.70--[Removed]

    96. Subpart 97.70 is removed.

Subpart 97.75--[Removed]

    97. Subpart 97.75 is removed.

PART 108--DESIGN AND EQUIPMENT

    98. The authority citation for Part 108 is revised to read as 
follows:

    Authority: 43 U.S.C. 1333; 46 U.S.C. 3102, 3306; 49 CFR 1.46.

Sec. 108.403  [Amended]

    99. In Sec. 108.403, the words ``, water spray,'' are removed from 
paragraph (b).
    100. In Sec. 108.425, paragraph (c) and the introductory text of 
paragraph (d) are revised to read as follows:

Sec. 108.425  Fire hoses and associated equipment.

* * * * *
    (c) Each nozzle for a fire hose in a fire main system must be a 
combination solid stream and water spray fire hose nozzle that is 
approved under Subpart 162.027. Combination solid stream and water 
spray nozzles previously approved under Subpart 162.027 of this chapter 
may be retained so long as they are maintained in good condition to the 
satisfaction of the Officer in Charge, Marine Inspection.
    (d) A combination solid stream and water spray fire hose nozzle 
previously approved under Subpart 162.027 of this chapter installed in 
the following locations must have a low-velocity spray applicator also 
previously approved under Subpart 162.027 of this chapter----
* * * * *

Sec. 108.613  [Removed]

    101. Section 108.613 is removed.

PART 109--OPERATIONS

    102. The authority citation for Part 109 is revised to read as 
follows:

    Authority: 43 U.S.C. 1333; 46 U.S.C. 3306, 6101, 10104; 49 CFR 
1.46.

Sec. 109.583  [Removed]

    103. Section 109.583 is removed.

PART 153--SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED 
GAS HAZARDOUS MATERIALS

    104. The authority citation for Part 153 continues to read as 
follows:

    Authority: 46 U.S.C. 3703; 49 CFR 1.46. Section 153.40 issued 
under 49 U.S.C. 1804. Sections 153.470 through 153.491, 153.1100 
through 153.1132, and 153.1600 through 153.1608 also issued under 33 
U.S.C. 1903(b).

    105. In Sec. 153.9, paragraph (a) introductory text is revised to 
read as follows:

Sec. 153.9  Foreign flag vessel endorsement application.

    (a) Application for a vessel whose flag administration is signatory 
to MARPOL 73/78 and issues IMO Certificates. A person who desires a 
Certificate of Compliance endorsed to carry a cargo in Table 1 of this 
part, as described in 153.900, must request the endorsement from the 
cognizant Officer in Charge, Marine Inspection and have aboard the 
vessel copies of IMO Certificates issued by the vessel's administration 
and the following:
* * * * *

[[Page 66007]]

Sec. 153.16  [Amended]

    106. In Sec. 153.16, the introductory text is amended by replacing 
``Certificate of Compliance endorsed with the name of a cargo,'' with 
``Certificate of Compliance endorsed to carry a cargo.''

Sec. 153.808  [Amended]

    107. Section 153.808 is amended by replacing ``Certificate of 
Compliance endorsed with the name of a cargo,'' with ``Certificate of 
Compliance endorsed to carry a cargo''.
    108. Section 153.809 is revised to read as follows:

Sec. 153.809  Procedures for having the Coast Guard examine a vessel 
for a Certificate of Compliance.

    The owner of a foreign flag vessel wishing to have the Coast Guard 
conduct a Certificate of Compliance examination, as required by 
Sec. 153.808, must proceed as follows:
    (a) Notify the Officer in Charge, Marine Inspection, for the port 
where the vessel is to be inspected at least seven days before the 
vessel arrives and arrange the exact time and other details of the 
examination. This notification is in addition to any other pre-arrival 
notice to the Coast Guard required by other regulations, but may be 
concurrent with the endorsement application in 153.9, and must include:
    (1) The name of the vessel's first U.S. port of call;
    (2) The date the vessel is scheduled to arrive;
    (3) The name and telephone number of the owner's local agent; and
    (4) The names of all cargoes listed in Table 1 of this part that 
are on board the vessel.
    (b) Make certain that the following plans are on board the vessel 
and available to the Marine Inspector before the examination required 
by 153.808 is begun:
    (1) A general arrangement (including the location of fire fighting, 
safety and lifesaving gear);
    (2) A capacity plan;
    (3) A schematic diagram of cargo piping on deck and in tanks 
(including the location of all valves and pumps); and
    (4) A schematic diagram of cargo tank vent piping (including the 
location of relief valves and flame screens).
    109. In Sec. 153.902, paragraph (b) and (c) are revised to read as 
follows:

Sec. 153.902  Expiration and invalidation of the Certificate of 
Compliance.

* * * * *
    (b) The endorsement of a Certificate of Compliance under this part 
is invalid if the ship does not have a valid IMO Certificate of 
Fitness.
    (c) The endorsement on a Certificate of Compliance invalidated 
under paragraph (b) of this section, becomes valid once again when the 
ship has the IMO Certificate of Fitness revalidated or reissued.

PART 160--LIFESAVING EQUIPMENT

    110. The authority citation for Part 160 continues to read as 
follows:

    Authority: 46 U.S.C. 2103, 3306, 3703, and 4302; E.O. 12234, 45 
FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

Subpart 160.018--[Removed]

    111. Subpart 160.018 is removed.

Subpart 160.034--[Removed]

    112. Subpart 160.034 is removed.

PART 162--ENGINEERING EQUIPMENT

    113. The authority citation for Part 162 continues to read as 
follows:

    Authority: 33 U.S.C. 1321(j), 1903; 46 U.S.C. 3306, 3703, 4104, 
4302; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; E.O. 
11735, 38 FR 21243, 3 CFR, 1971-1975 Comp., p. 793; 49 CFR 1.46.

    114. Subpart 162.027 is revised to read as follows:
Subpart 162.027--Combination Solid Stream and Water Spray Fire Hose 
nozzle
Sec.
162.027-1  Incorporation by reference.
162.027-2  Design, construction, testing and marking requirements.
167.027-3  Approval procedures.

Sec. 162.027-1  Incorporation by reference.

    (a) Certain material is incorporated by reference into this part 
with the approval of the Director of the Federal Register in accordance 
with 5 U.S.C. 552(a). To enforce any edition other than that specified 
in paragraph (b) of this section, the Coast Guard must publish notice 
of change in the Federal Register and make the material available to 
the public. All approved material is on file at the Office of the 
Federal Register, 800 North Capitol Street, NW., Suite 700, Washington, 
DC, and at the U.S. Coast Guard, Design and Engineering Standards 
Division (G-MMS), 2100 Second Street and is available from the sources 
indicated in paragraph (b) of this section.
    (b) The material approved for incorporation by reference in this 
part and the sections affected are:

American Society for Testing and Materials, 1916 Race Street, 
Philadelphia, PA 19103
ASTM F 1546-94, Standard Specification for Fire Hose nozzles, 1994--
162.027-2, 162.027-3

Sec. 162.027-2  Design, construction, testing and marking requirements.

    Each combination solid stream and water spray nozzle shall meet the 
requirements of ASTM F 1546-94.

Sec. 162.027-3  Approval procedures.

    (a) All inspections and tests required by ASTM F 1546-94 shall be 
performed by an independent laboratory accepted by the Coast Guard 
under subpart 159.010 of this chapter. A list of independent 
laboratories accepted by the Coast Guard as meeting subpart 159.010 of 
this chapter may be obtained by contacting the Commandant (G-MMS).
    (b) Upon completion of the testing required by ASTM F 1546-94, the 
independent laboratory shall prepare a report on the results of the 
testing and shall furnish the manufacturer with a copy of the test 
report.

PART 164--MATERIALS

    115. The authority citation for part 164 is revised to read as 
follows:

    Authority: 46 U.S.C. 3306, 3703, 4302; E.O. 12234, 45 FR 58801, 
3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

Subpart 164.016--[Removed]

    116. Subpart 164.016 is removed.

PART 167--PUBLIC NAUTICAL SCHOOL SHIPS

    117. The authority citation for part 167 continues to read as 
follows:

    Authority: 46 U.S.C. 3306, 6101, 8105; E.O. 12234, 45 FR 58801, 
3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

Sec. 167.40-20  [Amended]

    118. In Sec. 167.40-20, the words ``in addition to the ordinary 
deep-sea hand lead'' are removed.

Sec. 167.40-35  [Removed]

    119. Section 167.40-35 is removed.
    120. In Sec. 167.45-40, paragraphs (c-1) and (c-2) are removed and 
paragraphs (a), (b) and (c) are revised to read as follows:

Sec. 167.45-40  Fire fighting equipment on nautical schoolships using 
oil as fuel.

* * * * *
    (a) In each boiler room and in each of the machinery spaces of a 
nautical school ship propelled by steam, in which a part of the fuel-
oil installation is situated, two or more approved fire extinguishers 
of the foam type of not less than 9.5 L (2\1/2\ gallons) each or two or 
more approved fire extinguishers of the carbon dioxide type of not less 
than 33 kg (15 pounds) each shall be placed where accessible and ready 
for 

[[Page 66008]]
immediate use: Provided, That on a nautical school ship of 1,000 gross 
tons and under only one of the fire extinguishers may be required.
    (b) In boiler and machinery spaces, at least two fire hydrants must 
have a fire hose of a length that allows each part of the boiler and 
machinery spaces to be reached by the combination nozzle.
    (c) Each fire hose under paragraph (b) of this section must have a 
combination solid stream and water spray nozzle that meets subpart 
162.027 of this chapter. A combination nozzle and a low-velocity spray 
applicator previously approved under subpart 162.027 of this chapter 
may remain so long as they are maintained in good condition to the 
satisfaction of the Officer in Charge, Marine Inspection.
* * * * *

Sec. 167.45-55  [Removed]

    121. Section 167.45-55 is removed.

Subpart 167.50--[Removed]

    122. Subpart 167.50 is removed.
    123. In Sec. 167.55-5, paragraph (i) is removed, paragraph (j) is 
redesignated as paragraph (i) and the new paragraph (i)(1) is revised 
to read as follows:

Sec. 167.55-5  Marking of fire and emergency equipment, etc.

* * * * *
    (i) * * *
    (1) All lifeboats, rigid type oars and paddles, life preservers, 
EPIRB and life buoys shall be painted or branded with the name of the 
nautical school ship.
* * * * *

Sec. 167.65-3  [Removed]

    124. Section 167.65-3 is removed.

Sec. 167.65-10  [Removed]

    125. Section 167.65-10 is removed.
    126. Section 167.65-15 is revised to read as follows:

Sec. 167.65-15  Routing instructions; strict compliance with.

    All licensed masters, officers, and certificated seamen on nautical 
school ships must comply strictly with routing instructions issued by 
competent naval authority.

Sec. 167.65-30  [Removed]

    137. Section 167.65-30 is removed.

Sec. 167.65-45  [Amended]

    128. In Sec. 167.65-45, paragraphs (a), (b), and (c) are removed 
and the paragraph designation ``(d)'' is removed from paragraph (d).
    129. Section 167.65-50 is revised to read as follows:

Sec. 167.65-50  Posting placards of lifesaving signals.

    On all vessels to which this subpart applies there shall be readily 
available to the deck officer of the watch placard containing 
instructions for the use of the lifesaving signals set for in 
Regulation 16, Chapter V, of the International Convention for Safety of 
Life at Sea, 1974. These signals shall be used by vessels or persons in 
distress when communicating with lifesaving stations and maritime 
rescue units.

PART 168--CIVILIAN NAUTICAL SCHOOL VESSELS

    130. The authority citation for Part 168 is revised to read as 
follows:

    Authority: 46 U.S.C. 3305, 3306; 48 CFR 1.46.

    131. Subpart 168.15 is revised to read as follows:

Subpart 168.15--Accommodations

Sec.
168.15-1  Intent.
168.15-5  Locations.
168.15-10  Construction.
168.15-15  Size.
168.15-20  Equipment.
168.15-25  Washrooms.
168.15-30  Toilet rooms.
168.15-35  Hospital space.
168.15-40  Lighting.
168.15-45  Heating.
168.15-50  Ventilation.
168.15-55  Screening.
168.15-60  Inspection.

Sec. 168.15-1  Intent.

    It is the intent of this subpart to provide minimum standards for 
the size, ventilation, plumbing, and sanitation of quarters assigned to 
the members of the crew, passengers, cadets, students, instructors, or 
any other persons at any time quartered on board any such vessel.

Sec. 168.15-5  Location.

    (a) Quarters shall be located so that sufficient fresh air and 
light are obtainable compatible with accepted practice or good 
arrangement and construction.
    (b) Quarters shall not be located forward of the collision 
bulkhead, nor shall such section or sections of any deck occupied by 
quarters be below the deepest load line except in special case.

Sec. 168.15-10  Construction.

    (a) The accommodations provided must be securely constructed, 
properly lighted, heated, drained, ventilated, equipped, located, 
arranged, and insulated from undue noise, heat and odors.
    (b) All accommodations shall be constructed and arranged so that 
they can be kept in a clean, workable, and sanitary condition.

Sec. 168.15-15  Size.

    (a) Sleeping accommodations shall be divided into rooms, no one of 
which shall berth more than 6 persons. The purpose for which each space 
is to be used and the number of persons it may accommodate, shall be 
marked.
    (b) Each room shall be of such size that there is at least 1.8 m\2\ 
(20 ft \3\) of deck area and a volume of at least 4.2 m\3\ (150 ft \2\) 
for each person accommodated. In measuring sleeping quarters, any 
furnishings contained therein are not to be deducted from the total 
volume or from the deck area.

Sec. 168.15-20  Equipment.

    (a) Each person shall have a separate berth and not more than 1 
berth shall be placed above another. The berths shall be of metal 
framework. The overall size of a berth shall not be less than 68 cm (27 
in) wide by 190 cm (75 in) long. Where 2 tiers of berths are fitted, 
the bottom of the lower berth must not be less than 30 cm (12 in) above 
the deck, and the bottom of the upper must not be less than 76 cm (30 
in) both from the bottom of the lower and from the deck overhead. The 
berths shall not be obstructed by pipes, ventilating ducts, or other 
installations.
    (b) A metal locker shall be provided for each person accommodated 
in a room.

Sec. 168.15-25  Washrooms.

    (a) There shall be provided 1 shower for each 10 persons or 
fraction thereof and 1 wash basin for each 6 persons or fraction 
thereof to be accommodated. The persons to be accommodated shall 
include all persons who do not occupy rooms to which private facilities 
are attached.
    (b) All wash basins and showers shall be equipped with proper 
plumbing including hot and cold running fresh water.

Sec. 168.15-30  Toilet rooms.

    (a) There shall be provided 1 toilet for each 10 persons or 
fraction thereof to be accommodated. The persons to be accommodated 
shall include all persons who do not occupy rooms to which private 
facilities are attached.
    (b) The toilet rooms shall be located convenient to the sleeping 
quarters of the persons to which they are allotted but shall not open 
directly into such quarters except when they are provided as private or 
semiprivate facilities.
    (c) Where more than one toilet is located in a space or 
compartment, each toilet shall be separated by partitions.

[[Page 66009]]

Sec. 168.15-35  Hospital space.

    (a) Each vessel shall be provided with a hospital space. This space 
shall be situated with due regard for the comfort of the sick so that 
they may receive proper attention in all weather.
    (b) The hospital shall be suitably separated from other spaces and 
shall be used for the care of the sick and for no other purpose.
    (c) The hospital shall be fitted with berths in the ratio of 1 
berth to every twelve persons, but the number of berths need not exceed 
6.
    (d) The hospital shall have a toilet, wash basin, and bath tub or 
shower conveniently located. Other necessary suitable equipment of a 
sanitary type such as clothes locker, table, seat, etc., shall be 
provided.

Sec. 168.15-40  Lighting.

    All quarters, to include washrooms, toilet rooms, and hospital 
spaces, shall be adequately lighted.

Sec. 168.15-45  Heating.

    All quarters shall be adequately heated in a manner suitable to the 
purpose of the space.

Sec. 168.15-50  Ventilation.

    (a) All quarters shall be adequately ventilated in a manner 
suitable to the purpose of the space and route of the vessel.
    (b) When mechanical ventilation is provided for sleeping rooms, 
washrooms, toilet rooms, hospital spaces and messrooms, these spaces 
shall be supplied with fresh air equal to at least 10 times the volume 
of the room each hour.

Sec. 168.15-55  Screening.

    Provision shall be made to protect the quarters against the 
admission of insects.

Sec. 168.15-60  Inspection.

    The Officer in Charge, Marine Inspection, shall inspect the 
quarters of every such vessel at least once in each month or at such 
time as the v
FR Doc. 95-30402 Adoption of Industry Standards
essel shall enter an American port and shall satisfy 
himself that such vessel is in compliance with the regulations in this 
part.

PART 169--SAILING SCHOOL VESSELS

    132. The authority citation for Part 169 is revised to read as 
follows:

    Authority: 33 U.S.C. 1321(j); 46 U.S.C. 3306, 6101; E.O. 11735, 
38 FR 21243, 3 CFR, 1971-1975 Comp., p. 793; 49 CFR 1.45, 1.46; 
Sec. 169.117 also issued under the authority of 44 U.S.C. 3507.

Sec. 169.321  [Removed]

    133. Section 169.321 is removed.

Sec. 169.569  [Removed]

    134. Section 169.569 is removed.

Sec. 169.742  [Removed]

    135. Section 169.742 is removed.

PART 189--INSPECTION AND CERTIFICATION

PART 190--CONSTRUCTION AND ARRANGEMENT

    136-138. The authority citation for Part 190 continues to read as 
follows:

    Authority: 46 U.S.C. 2113, 3306; E.O. 12234, 45 FR 58801, 3 CFR, 
1980 Comp., p. 277; 49 CFR 1.46.

Sec. 190.01-13  [Removed]

    139. Section 190.01-13 is removed.
    140. Subpart 190.20 is revised to read as follows:
Subpart 190.20--Accommodations for Officers, Crew, and Scientific 
Personnel
Sec.
190.20-1  Application.
190.20-5  Intent.
190.20-10  Location of crew spaces.
190.20-15  Construction.
190.20-20  Sleeping accommodations.
190.20-25  Washrooms and toilet rooms.
190.20-30  Messrooms.
190.20-35  Hospital space.
190.20-40  Other spaces.
190.20-45  Lighting.
190.20-50  Heating.
190.20-55  Insect screens.
190.20-90  Vessels contracted for prior to March 1, 1968.

Sec. 190.20-1  Application.

    (a) The provisions of this subpart, with the exception of 
Sec. 190.20-90, shall apply to all vessels contracted for on or after 
March 1, 1968.
    (b) Vessels contracted for prior to March 1, 1968, shall meet the 
requirements of Sec. 190.20-90.

Sec. 190.20-5  Intent.

    (a) It is the intent of this subpart that the accommodations 
provided for officers, crew, and scientific personnel on all vessels 
shall be securely constructed, properly lighted, heated, drained, 
ventilated, equipped, located, arranged, and, where practicable, shall 
be insulated from undue noise and free from odors.
    (b) Provided the intent of this subpart is met, consideration may 
be given by the Officer in Charge, Marine Inspection to relax the 
requirements relating to the size and separation of accommodations for 
scientific personnel.

Sec. 190.20-10  Location of crew spaces.

    (a) Crew quarters shall not be located farther forward in the 
vessel than a vertical plane located at 5 percent of the vessel's 
length abaft the forward side of the stem at the designated summer load 
water line. However, for vessels in other than ocean or coastwise 
service, this distance need not exceed 8.5 m (28 ft). For purpose of 
this paragraph the length shall be as defined in Sec. 43.15-1 of 
Subchapter E (Load Lines) of this chapter. No section of the deck of 
the crew spaces shall be below the deepest load line, except that in 
special cases, the Commandant may approve such an arrangement.
    (b) There shall be no direct communication, except through solid, 
close fitted doors or hatches between crew spaces and chain lockers, or 
machinery spaces.

Sec. 190.20-15  Construction.

    All crew spaces are to be constructed in a manner suitable to the 
purpose for which they are intended. The accommodations provided for 
officers and crew on all vessels shall be securely constructed, 
properly lighted, heated, drained, ventilated, equipped, located, 
arranged, and, where practicable, shall be insulated from undue noise, 
heat and odors.

Sec. 190.20-20  Sleeping accommodations.

    (a) Where practicable, each licensed officer shall be provided with 
a separate stateroom.
    (b) Sleeping accommodations for the crew shall be divided into 
rooms, no one of which shall berth more than four persons.
    (c) Each room shall be of such size that there are at least 2.78 
m\2\ (30 ft\3\) of deck area and a volume of at least 5.8 m\3\ (210 
ft\2\) for each person accommodated. The clear head room shall be not 
less than 190 cm (75 in). In measuring sleeping accommodations any 
furnishings contained therein for the use of the occupants are not to 
be deducted from the total volume or from the deck area.
    (d) Each person shall have a separate berth and not more than one 
berth shall be placed above another. The berth shall be composed of 
materials not likely to corrode. The overall size of a berth shall not 
be less than 68 cm (27 in) wide by 190 cm (75 in) long, except by 
special permission of the Commandant. Where two tiers of berths are 
fitted, the bottom of the lower berth must not be less than 30 cm (12 
in) above the deck. The berths shall not be obstructed by pipes, 
ventilating ducts, or other installations.
    (e) A locker shall be provided for each person accommodated in a 
room.

Sec. 190.20-25  Washrooms and toilet rooms.

    (a) There shall be provided at least one toilet, one washbasin, and 
one 

[[Page 66010]]
shower or bathtub for each eight members or portion thereof in the crew 
to be accommodated. The crew to be accommodated shall include all 
members who do not occupy rooms to which private or semi-private 
facilities are attached.
    (b) The toilet rooms and washrooms shall be located convenient to 
the sleeping quarters of the crew to which they are allotted but shall 
not open directly into such quarters except when they are provided as 
private or semi-private facilities.
    (c) All washbasins, showers, and bathtubs shall be equipped with 
proper plumbing, including hot and cold running water. All toilets 
shall be installed with proper plumbing for flushing. Where more than 
one toilet is located in a space or compartment, each toilet shall be 
separated by partitions.

Sec. 190.20-30  Messrooms.

    Messrooms shall be located as near to the galley as is practicable 
except where the messroom is equipped with a steam table. The messroom 
shall be of such size as to seat the number of persons normally 
scheduled to be eating at one time.

Sec. 190.20-35  Hospital space.

    (a) Except as specifically modified by paragraph (f) of this 
section, each vessel which in the ordinary course of its trade makes 
voyages of more than 3 days duration between ports and which carries a 
crew of twelve or more, shall be provided with a hospital space. This 
space shall be situated with due regard to the comfort of the sick so 
that they may receive proper attention in all weathers.
    (b) The hospital shall be suitably separated from other spaces and 
shall be used for the care of the sick and for no other purpose.
    (c) The hospital shall be fitted with berths in the ratio of one 
berth to every twelve members of the crew or portion thereof who are 
not berthed in single occupancy rooms, but the number of berths need 
not exceed six. Where all single occupancy rooms are provided, the 
requirement for a separate hospital may be withdrawn: Provided, That 
one stateroom is fitted with a bunk accessible from both sides.
    (e) The hospital shall have a toilet, washbasin, and bath tub or 
shower conveniently situated. Other necessary suitable equipment of 
such character as clothes locker, table, seat, etc., shall be provided.
    (f) On vessels in which the crew is berthed in single occupancy 
rooms a hospital space will not be required, Provided, That one room 
shall be designated and fitted for use as a treatment and isolation 
room. Such room shall meet the following standards:
    (1) The room must be available for immediate medical use; and
    (2) A washbasin with hot and cold running water must be installed 
either in or immediately adjacent to the space and other required 
sanitary facilities must be conveniently located.

Sec. 190.20-40  Other spaces.

    (a) Sufficient facilities shall be provided where the crew may wash 
and dry their own clothes. There shall be at least one sink supplied 
with hot and cold fresh water.
    (b) Recreation accommodations shall be provided.

Sec. 190.20-45  Lighting.

    Berth lights shall be provided for each member of the crew.

Sec. 190.20-50  Heating.

    (a) All crew spaces shall be adequately heated in a manner suitable 
to the purpose of the space.
    (b) Radiators and other heating apparatus shall be so placed, and 
where necessary shielded, as to avoid risk of fire, danger or 
discomfort to the occupants. Pipes leading to radiators or heating 
apparatus shall be lagged where those pipes create a hazard to persons 
occupying the space.

Sec. 190.20-55  Insect screens.

    Provisions shall be made to protect the crew quarters against the 
admission of insects.

Sec. 190.20-90  Vessels contracted for prior to March 1, 1968.

    Existing structures, arrangements, materials, and facilities 
previously approved will be considered satisfactory so long as they are 
maintained in good condition to the satisfaction of the Officer in 
Charge, Marine Inspection. Minor repairs and alterations may be made to 
the same standards as the original construction: Provided, That in no 
case will a greater departure from the standards of Sec. 190.20-5 
through 190.20-55 be permitted than presently exists.

PART 193--FIRE PROTECTION EQUIPMENT

    141. The authority citation for Part 193 continues to read as 
follows:

    Authority: 46 U.S.C. 2213, 3102, 3306; E.O. 12234, 45 FR 58801, 
3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

Sec. 193.05-20  [Removed]

    142. Section 193.05-20 is removed.
    143. In Sec. 193.10-10, paragraphs (j) and (k) are redesignated 
paragraphs (l) and (m), respectively, paragraphs (i-1) and (i-2) are 
removed, paragraphs (d) and (i) are revised and new paragraphs (j) and 
(k) are added to read as follows:

Sec. 193.10-10  Fire hydrants and hose.

* * * * *
    (d) Fire hydrants shall be of sufficient number and so located that 
any part of the vessel, other than main machinery spaces, may be 
reached with at least 2 streams of water from separate outlets, at 
least one of which shall be from a single length of hose. In main 
machinery spaces, all portions of such spaces shall be capable of being 
reached by at least 2 streams of water, each of which shall be from a 
single length of hose from separate outlets; however, this requirement 
need not apply to shaft alleys containing no assigned space for the 
stowage of combustibles. Fire hydrants shall be numbered as required by 
Sec. 196.37-15 of this subchapter.
* * * * *
    (i) Each fire hydrant shall have at least one length of fire hose. 
Each fire hose must have a combination solid stream and water spray 
nozzle that is approved under Subpart 162.027 of this subchapter, 
except 19 mm (\3/4\ inch) hose may have a garden hose nozzle that is 
bronze or metal with strength and corrosion resistance equivalent to 
bronze. Combination solid stream and water spray nozzles previously 
approved under Subpart 162.027 of this chapter may be retained so long 
as they are maintained in good condition to the satisfaction of the 
Officer in Charge, Marine Inspection.
    (j) Each of the following must have a low-velocity water spray 
applicator previously approved under Subpart 162.027 of this chapter 
when the fire hose nozzle was also previously approved under Subpart 
162.027 of this chapter.
    (1) At least one length of fire hose on each fire hydrant outside 
and in the immediate vicinity of each laboratory.
    (2) Each fire hose in each propulsion machinery space containing an 
oil-fired boiler, internal combustion machinery, or oil fuel unit on a 
vessel of 1000 gross tons or more. The length of each applicator must 
be 1.2 m (4 feet).
    (k) Fixed brackets, hooks, or other means for stowing an applicator 
must be next to each fire hydrant that has an applicator under 
paragraph (j) of this section.
* * * * *
    144. Section 193.10-90 is revised to read as follows:
    
[[Page 66011]]

Sec. 193.10-90  Installations contracted for prior to March 1, 1968.

    Installations contracted for prior to March 1, 1968, shall meet the 
following requirements:
    (a) Except as specifically modified by this paragraph, the 
requirements of Secs. 193.10-5 through 193.10-15 shall be complied with 
insofar as the number and general type of equipment is concerned.
    (b) Existing equipment, except fire hose nozzles and low-velocity 
water spray applicators, previously approved but not meeting the 
applicable requirements of Secs. 193.10-5 through 193.10-15, may be 
continued in service so long as they are maintained in good condition 
to the satisfaction of the Officer in Charge, Marine Inspection. Minor 
repairs, alterations, and replacements may be permitted to the same 
standards as the original installations. However, all new installations 
or major replacements shall meet the applicable requirements in this 
subpart for new installations.
    (c) The general requirements of Sec. 193.10-5 (c) through (g), 
Sec. 193.10-10 (d) through (m), and Sec. 193.10-15 shall be complied 
with insofar as is reasonable and practicable.
    (d) Each fire hose nozzle must meet Sec. 193.10-10(i), and each 
low-velocity water spray applicator must meet Sec. 193.10-10(j).

PART 196--OPERATIONS

    145. The authority citation for Part 196 is revised to read as 
follows:

    Authority: 33 U.S.C. 1321(j); 46 U.S.C. 2113, 3306, 6101; E.O. 
11735; 38 FR 21243, 3 CFR, 1971-1975 Comp., p. 793; E.O. 12234, 45 
FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

Subpart 196.03--[Removed]

    146. Subpart 196.03 is removed.

Subpart 196.17--[Removed]

    147. Subpart 196.17 is removed.

Subpart 196.18--[Removed]

    148. Subpart 196.18 is removed.
    149. In Sec. 196.19-1, paragraphs (a), (b) and (c) are removed, 
paragraphs (d), (e) and (f) are redesignated as paragraphs (a), (b) and 
(c), respectively, and the new paragraph (a) is revised to read as 
follows:

Sec. 196.19-1  Data required.

* * * * *
    (a) The information on the maneuvering characteristics fact sheet 
required by 33 CFR 164.35(g) must be:
* * * * *
    150. Subpart 196.23 is removed.

Sec. 196.27-10  [Removed]

    151. Section 196.27-10 is removed.
    152. Subpart 196.33 is revised to read as follows:

Subpart 196.33--Communication Between Deckhouses

Sec. 196.33-1  When required.

    On all vessels navigating in other than protected waters, where the 
distance between deckhouses is more that 46 m (150 ft) a fixed means of 
facilitating communication between both ends of the vessel, such as a 
raised fore and aft bridge or side tunnels, shall be provided. 
Previously approved arrangements may be retained so long as they are 
maintained in satisfactory condition to the satisfaction of the Officer 
in Charge, Marine Inspection.
    153. Section 196.35-3 is revised to read as follows:

Sec. 196.35-3  Logbooks and records.

    (a) The master or person in charge of an oceanographic research 
vessel that is required by 46 U.S.C. 11301 to have an official logbook 
may maintain the logbook on Form CG-706 or in the owner's format for an 
official logbook. Such logs shall be kept available for a review for a 
period of one year after the date to which the records refer or for the 
period of validity of the vessel's current certificate of inspection, 
whichever is longer. When the voyage is completed, the master or person 
in charge shall file the logbook with the Officer in Charge, Marine 
Inspection.
    (b) The master or person in charge of a vessel that is not required 
by 46 U.S.C. 11301 to have an official logbook, shall maintain, on 
board, an unofficial logbook or record in any form desired for the 
purposes of making entries therein as required by law or regulations in 
this subchapter. Such logs or records are not filed with the Officer in 
Charge, Marine Inspection, but shall be kept available for review by a 
marine inspector for a period of one year after the date to which the 
records refer. Separate records of tests and inspections of 
firefighting equipment shall be maintained with the vessel's logs for 
the period of validity of the vessel's certificate of inspection.

Sec. 196.35-10   [Removed]

    154. Section 196.35-10 is removed.

Sec. 196.37-45   [Removed]

    155. Section 196.37-45 is removed.
    156. Subpart 196.43 is revised to read as follows:

Subpart 196.43--Placard of Lifesaving Signals

Sec.
196.43-1  Application.
196.43-3  Availability.

Sec. 196.43-1   Application.

    The provisions of this subpart shall apply to all vessels on an 
international voyage, and all other vessels of 150 gross tons or over 
in ocean, coastwise or Great Lakes service.

Sec. 196.43-5   Availability.

    On all vessels to which this subpart applies there shall be readily 
available to the deck officer of the watch a placard containing 
instructions for the use of the lifesaving signals set forth in 
Regulation 16, Chapter V, of the International Convention for Safety of 
Life as Sea, 1974. These signals shall be used by vessels or persons in 
distress when communicating with lifesaving stations and maritime 
rescue units.

Subpart 196.60--[Removed]

    157. Subpart 196.60 is removed.

Subpart 196.75--[Removed]

    158. Subpart 196.75 is removed.

    Dated: December 8, 1995.
J.C. Card,
Rear Admiral, U.S. Coast Guard, Chief, Office of Marine Safety, 
Security and Environmental Protection.
[FR Doc. 95-30402 Filed 12-19-95; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

Setzen Sie Ihre Recherche in ChatGPT oder Claude fort

Verbinden Sie Omnilex, um den Rechtskorpus über Ihren KI-Assistenten zu durchsuchen.