Center for Biological Diversity et al v. U.S. Forest Service et al

9:23-cv-00110Mtd11.12.2025

Gesamter Gesetzestext

1
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF MONTANA
MISSOULA DIVISION
CENTER FOR BIOLOGICAL
DIVERSITY, et al.,
Plaintiffs,
vs.
U.S. FOREST SERVICE, et al.,
Defendants,
and
SUN MOUNTAIN LUMBER, INC., a
Montana Corporation,
Defendant-Intervenor.
Lead Case No.
CV 23–110–M–DWM
Member Case No.
CV 23–154–M–DWM
ORDER
The plaintiffs are environmental organizations challenging the United States
Forest Service’s (the “Forest Service”) and the United States Fish and Wildlife
Service’s (the “Fish and Wildlife Service”) approval of a forest treatment project in
the Custer Gallatin National Forest (the “South Plateau Landscape Area Treatment
Project,” the “South Plateau Project,” or the “Project”) under the National
Environmental Policy Act (“NEPA”), the National Forest Management Act
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 1 of 46
2
(“NFMA”), and the Endangered Species Act (“ESA”). (Doc. 12.)1 Center for
Biological Diversity, Alliance for the Wild Rockies, and Council on Wildlife and
Fish (collectively “Center for Biological Diversity”) are plaintiffs in the lead case,
CV 23–110–M–DWM. Gallatin Wildlife Association, Native Ecosystems Council,
and WildEarth Guardians (collectively “Gallatin Wildlife Association”) are
plaintiffs in the member case, CV 23–154–M–DWM. Collectively they are
referred to as “Plaintiffs.” The defendants are all officials or agencies within the
United States Department of Agriculture (“Federal Defendants”) and Sun
Mountain Lumber, Inc. (“Defendant-Intervenor”) (collectively, “Defendants”).
The parties’ filed cross-motions for summary judgment, (Docs. 45, 47, 54,
56), and the Center for Biological Diversity moved to supplement the
administrative record, (Doc. 43). A motion hearing was held before United States
Magistrate Judge Kathleen L. DeSoto on March 11, 2025, (see Doc. 68 (Min.
Entry)), and on March 31, 2025, Judge DeSoto entered Findings and
Recommendations, recommending that the Center for Biological Diversity’s
motion to supplement be denied and that summary judgment be granted in favor of
Defendants, (Doc. 69), Plaintiffs filed objections, (see Docs. 72, 73), to which
Defendants responded, (Docs. 75, 76). Plaintiffs’ objections are reviewed de novo,
28 U.S.C. § 636(b)(1), and addressed individually below. The Findings and
1 Docket citations are to the lead case, CV 23–110–M–DWM.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 2 of 46
3
Recommendations are otherwise reviewed for clear error. See Thomas v. Arn, 474
U.S. 140, 154 (1985); United States v. Syrax, 235 F.3d 422, 427 (9th Cir. 2000)
(defining “clear error”). Because Judge DeSoto provided a complete background
of the Project, (Doc. 69 at 4–7), it is not restated here.
The Forest Service’s compliance with NEPA, NFMA, and the ESA is
reviewed under the Administrative Procedure Act (“APA”). See Native
Ecosystems Council v. Marten, 883 F.3d 783, 788 (9th Cir. 2018). The APA
authorizes a court to “hold unlawful and set aside agency action, findings and
conclusions found to be . . . arbitrary, capricious, an abuse of discretion, or
otherwise not in accordance with law.” 5 U.S.C. § 706(2)(A). Agency action is
arbitrary and capricious if the administrative record demonstrates that “the agency
has relied on factors which Congress has not intended it to consider, entirely failed
to consider an important aspect of the problem, offered an explanation for its
decision that runs counter to the evidence before the agency, or is so implausible
that it could not be ascribed to a difference in view or the product of agency
expertise.” Motor Vehicle Mfrs. Ass’n of U.S., Inc. v. State Farm Mut. Auto. Ins.
Co., 463 U.S. 29, 43 (1983). Where an agency’s administrative record is complete
and constitutes the whole and undisputed facts underlying agency decisionmaking,
summary judgment is appropriate. See City & Cnty. of San Francisco v. United
States, 130 F.3d 873, 877 (9th Cir. 1997).
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 3 of 46
4
A NALYSIS
Although Plaintiffs argue specific components of the South Plateau Project
fail to comply with NEPA, NFMA, and the ESA, their primary challenge concerns
the Project’s condition-based management approach. “Condition-based
management involves developing proposed treatments based on pre-identified
management requirements but deferring specific decisions about which treatments
will be applied in particular locations until the Forest Service conducts pre-
implementation field reviews.” N. Cascades Conserv. Council v. U.S. Forest
Serv., 136 F.4th 816, 829 (9th Cir. 2025). Consistent with this approach, the Forest
Service “has identified areas as preliminarily suitable for treatment actions” within
the Project area without identifying the precise location and size of the treatment
units or the location and configuration of associated roads. See SP_004339–40,
4343. Rather, the Decision Notice and Final EA assess the potential “maximum”
effects of possible treatments and outline several “design features” that future
treatment activities must comply with before they may proceed. See SP_004340,
4343. For example, “treatment actions will only be implemented after [an]
interdisciplinary team of resource specialists verifies that the action is consistent
with the Treatment Matrix (Appendix A), meets the Design Features (Appendix
B), and completes Resource Review Checklists (Appendix C). Then, the
Responsible Official will review the plan and complete the Concurrence Checklist
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 4 of 46
5
(Appendix C) to approve the action.” SP_004343. According to the Forest
Service, this approach “increase[s] [its] flexibility to respond to any change in
conditions in the project area during the time between [the] decision and
implementation.” SP_004490.
Plaintiffs’ skepticism of whether a condition-based management approach—
i.e., the deferral of all specific decisions regarding project activities—meets the
requirements of NEPA, NFMA, or the ESA permeates their objections. Plaintiffs
argue that this approach conflates a promise of future statutory compliance with
actual compliance. Plaintiffs insist that it is impossible to assess the true
environmental impacts of the Project under NEPA, or determine whether it meets
statutory or Forest Plan protections for grizzly bears and lynx under the ESA and
NFMA, without identifying the specific project activities that will occur. More
specifically, Plaintiffs argue that: (1) the Forest Service failed to take the requisite
“hard look” at the environmental impacts on grizzly bears and climate change and
failed to prepare an environmental impact statement (“EIS”) in violation of NEPA;
(2) the Forest Service failed to show that the Project complies with specific Forest
Plan Standards governing grizzly bear secure habitat and regenerative habitat for
lynx in violation of NFMA; and (3) the Fish and Wildlife Service improperly
defined “patch” size for grizzly bear secure habitat, failed to adequately consider
the Project’s effects on grizzly bears in its “no jeopardy” determination, and
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 5 of 46
6
improperly relied on the Project’s Design Features to mitigate potential harm in
violation of the ESA. Having reviewed those objections de novo, 28 U.S.C.
§ 636(b)(1), and the remainder of the Findings for clear error, Thomas, 474 U.S. at
154, the Findings and Recommendation are adopted in part, rejected in part, and
modified as reflected below.
I. 	NEPA
“[NEPA] is a procedural statute that requires federal agencies to take a ‘hard
look’ at the environmental consequences of their actions.” N. Cascades, 136 F.4th
at 821 (internal quotation marks omitted). To satisfy the “hard look” requirement,
an agency must provide “a reasonably thorough discussion of the significant
aspects of the probable environmental consequences.” Ctr. for Biological
Diversity v. Nat’l Highway Traffic Safety Admin., 538 F.3d 1172, 1194 (9th Cir.
2008). NEPA requires agencies to prepare an EIS for “major Federal actions
significantly affecting the quality of the human environment.” 42 U.S.C.
§ 4332(2)(C). To determine whether an EIS is necessary, an agency “may prepare
an Environmental Assessment (‘EA’) first.” N. Cascades, 136 F.4th at 821 (citing
40 C.F.R. § 1508.1(j) (2024)).2 “[Courts] examine the EA with two purposes in
2 NEPA’s implementing regulations have since been rescinded. See Removal of
Nat’l Envtl. Policy Act Implementing Regs., 90 Fed. Reg. 10610 (Feb. 25, 2025)
(to be codified at 40 C.F.R. pts. 1500–08). Because the Forest Service proceeded
under the 2020 regulations, see SP_004502, those regulations are applied here.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 6 of 46
7
mind: to determine whether it has adequately considered and elaborated the
possible consequences of the proposed agency action when concluding that it will
have no significant impact on the environment, and whether its determination that
no EIS is required is a reasonable conclusion.” Ctr. for Biological Diversity, 538
F.3d at 1215. “An EIS must be prepared if substantial questions are raised as to
whether a project may cause significant degradation of some human environmental
factor.” Blue Mtns. Biodiversity Project v. Blackwood, 161 F.3d 1208, 1212 (9th
Cir. 1998) (internal quotation marks and alteration omitted). If the EA reveals no
significant effect, the agency may issue a Finding of No Significant Impact, or a
“FONSI.” See Ocean Advocates v. U.S. Army Corps of Eng’rs, 402 F.3d 846, 864
(9th Cir. 2005).
In their objections, Plaintiffs argue that the Forest Service failed to take the
requisite “hard look” at the Project’s impacts on grizzly bears and climate change
and that it was necessary to prepare an EIS. One of Plaintiff’s objections regarding
grizzly bears has merit.
A. 	Grizzly Bears
Plaintiffs argue that by relying on condition-based management, which does
not identify the location of the 56.8 miles of temporary roads associated with the
Project, the Forest Service failed to adequately consider the environmental impact
the Project will have on grizzly bear secure habitat. Plaintiffs also argue that the
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 7 of 46
8
Forest Service arbitrarily limited the geographic scope of its NEPA cumulative
effects analysis, omitting consideration of the nearby Yale Creek Project.
Plaintiffs’ first argument has merit.
1. 	Temporary Roads
Plaintiffs first argue that the Forest Service’s reliance on condition-based
management and a maximum effect analysis violates NEPA’s requirement that the
agency take a “hard look” at the impact temporary roads will have on grizzly bear
secure habitat. “Grizzly bear secure habitat is defined as areas greater than 10
acres that are more than 500 meters from motorized routes.” SP_004350. “The
most important predictors of survival . . . [a]re the amount of secure habitat within
a bear’s home range and road densities outside of secure habitat.” FWS_002869.
Roads therefore inherently pose a threat to grizzly bear abundance. FWS_000025–
32, 2868.
“Up to 56.8 miles of temporary project roads may be constructed to a
standard appropriate for their intended use to support project actions.” SP_004343.
It is undisputed that the EA does not identify the precise locations of those roads.
See SP_004343 (“The exact locations of temporary roads are not yet known . . . .”).
However, Defendants maintain that the Forest Service adequately considered the
potential maximum impact these roads would have on grizzly bear secure habitat
by analyzing the “worst case scenario” of all roads being in existence at one time,
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 8 of 46
9
SP_041089, and mapping their probable location based on “GIS data, current road
system locations, and field surveys,” SP_004344, 041205, 041208. The Forest
Service also provided proposed maps for the first two timber sale contracts. See
SP_006168, 4344. Plaintiffs argue that this analysis is inherently insufficient
because road location, not total mileage, determines how roads will affect secure
habitat. Defendants maintain that the Forest Service’s identification of potential
road location and its “maximum effects” analysis adequately considered those
impacts. On this record, Plaintiffs have the better argument.
A condition-based management approach has been historically limited to
situations involving inherent uncertainties in project activities, such as projects
involving mineral exploration. See Te-Moak Tribe of W. Shoshone of Nev. v. U.S.
Dep’t of Interior, 608 F.3d 592, 600 (9th Cir. 2010) (“An exploration
project . . . inherently involves uncertainties; if mining companies knew the precise
location of mineral deposits before drilling, exploration would not be required. In
approving mineral exploration projects, the [agency] must balance these
uncertainties with its duty under NEPA to analyze possible environmental
impacts.”). In those situations, NEPA requires that the agency “analyze the
[project] activities in all parts of the project area and impose effective avoidance
and mitigation measures to account for unknown impacts.” Id.; see also N. Alaska
Envt’l Ctr. v. Kempthorne, 457 F.3d 969, 977 (9th Cir. 2006) (stating that the
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 9 of 46
10
agency did not have to perform a “parcel by parcel examination of potential
environmental effects” of oil and gas leases in the ocean “because the parcels
likely to be affected are not yet known”). But, as argued by Plaintiffs, the South
Plateau Project involves no such uncertainty.
Nonetheless, in its recent Northern Cascades decision, the Ninth Circuit
upheld a condition-based management approach in the context of a timber
treatment project much like the one at issue here. 136 F.4th 816 (9th Cir. 2025).
In that case, the Forest Service performed a “maximum effects analysis” for
various treatment activities on 21,149 acres without specifically identifying the
treatment units. Id. at 829. But because the Forest Service “identified specific
methods of understory thinning, overstory treatments, and fuels reduction and
provided unit-by-unit maps of the maximum effects of each treatment,” the Ninth
Circuit ultimately held that the agency complied with NEPA, though it was a
“close question.” Id. at 829–30. The narrowness of that holding is reflected in a
recent district court decision, Alliance for the Wild Rockies v. United States Forest
Service, where the court found an agency’s use of condition-based management
was “too vague” because the agency failed to provide a “unit-by-unit map[] of the
maximum effect of each treatment type. Instead, the maps developed by the
Service only identif[ied] locations for the two different restoration types—
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 10 of 46
11
commercial and noncommercial.” 2025 WL 2655984, at *8 (E.D. Wash. Sept. 16,
2025).
This case falls somewhere between Northern Cascades and Alliance.
Consistent with Northern Cascades, the Forest Service has met its NEPA mandate
here as it relates to the maximum possible effect the treatment activities may have
across the identified units. See SP_004339–43. But what makes this case unique
is the enduring dilemma of grizzly bears and roads. As stated above, the Forest
Service evaluated the impacts on the landscape if all 56.8 miles of temporary road
were implemented at the same time and explained how it identified the likely
location of those roads. See SP_004344–52. But it is the precise location of those
roads, not their total mileage, that determines the impact they will have on grizzly
bear secure habitat. And the Forest Service does not purport to analyze a “worst
case” scenario based on road placement, as opposed to mileage. See SP_041089
(explaining that its mapping of “temporary routes is generally considered the
‘worst case’ scenario, or the maximum mileage of temporary routes that would be
constructed under the project”). Accordingly, the current NEPA analysis fails to
address an important aspect of the problem, Motor Vehicle, 463 U.S. at 43,
“detract[ing] from the decisionmaker’s or public participant’s ability to assess a
proposed action’s environmental consequences,” N. Cascades, 136 F.4th at 829.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 11 of 46
12
The Supreme Court has recently reaffirmed that “NEPA does not require the
agency to weigh environmental consequences in any particular way. Rather, an
agency may weigh environmental consequences as the agency reasonably sees fit
under its governing statute and any relevant substantive environmental laws.”
Seven Cnty. Infrastructure Coal v. Eagle Cnty., Co., 605 U.S. 168, 173 (2025).
“Simply stated, NEPA is a procedural cross-check, not a substantive roadblock.
The goal of the law is to inform agency decisionmaking, not to paralyze it.” Id.
Here, however, in the context of grizzly bear secure habitat, the lack of specific
road mapping prevents such informed decisionmaking. See Neighbors of Cuddy
Mtn. v. U.S. Forest Serv., 137 F.3d 1372, 1380 (9th Cir. 1998) (“NEPA requires
consideration of the potential impact of an action before the action takes place.”
(internal quotation marks omitted)). Accordingly, the Forest Service has failed to
meet its NEPA mandate.
2. 	Cumulative Effects – Yale Creek Project
Plaintiffs’ second grizzly-bear based NEPA objection focuses on the Forest
Service’s cumulative effects analysis, specifically its failure to consider the nearby
Yale Creek Project, which falls within the same bear management unit (“BMU”),
but not subunit, as the South Plateau Project. It is well-recognized that an agency
has discretion to define the scope of its cumulative effects analysis area so long as
it “show[s] that it considered the relevant factors,” “provide[s] support for,” and
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 12 of 46
13
“justif[ies] its decision.” Selkirk Conserv. All. v. Forsgren, 336 F.3d 944, 959 (9th
Cir. 2003). According to the Forest Service, because “[s]ubunits provide the
optimal scale for evaluation of seasonal feeding opportunities and landscape
patterns of food availability for grizzly bears,” and “[t]he project area lies within
the Madison #2, Henry’s #2, and Plateau #1 Subunits,” those subunits dictate the
“spatial boundary” of analysis for the Project. SP_041072; see also SP_004403.
As a result, the Forest Service did not consider the cumulative effects of Yale
Creek Project, which is located in the Henry’s BMU but outside Henry’s #2
subunit and the Project area. See SP_004403.
There is no question that NEPA does not mandate that analysis occur at any
specific scale or the BMU level. But Plaintiffs argue that the cumulative effects
analysis should have included the entire Henry’s BMU because certain forest plan
standards apply at the BMU, not subunit, level. Specifically, Plaintiffs cite to FW-
STD-WLGB(3)(b), or the “1% Standard,” which addresses the total amount of
secure habitat within a BMU:
Total acreage of secure habitat below baseline values within a given
[BMU] shall not exceed 1 percent of the acreage in the largest subunit
within that [BMU]. The acreage of a project that counts against the 1
percent limit (for example the amount of secure habitat affected) is
measured as the acreage within the 500-meter buffer around any
temporary motorized access route or low-level helicopter flight line that
intrudes into existing secure habitat.
SP_000065.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 13 of 46
14
In determining the scope of its cumulative analysis, “the agency has to draw
the line somewhere” and “offer[] a reasonable justification for why it drew the line
where it did.” Friends of the Wild Swan v. Weber, 767 F.3d 936, 944 (9th Cir.
2014). Here, the Forest Service explained that the BMU subunit was the optimal
scope of analysis based on grizzly bear foraging needs, SP_004403, and that even
at that scale, the action area is over 300,000 acres, SP_004402. See Friends of the
Wild Swan, 767 F.3d at 945 (indicating that larger action areas may “dilute” effects
analysis). But while the Yale Creek Project does not fall within those 300,000+
acres, it was not ignored. Indeed, the Forest Service specifically recognized that
“[i]mplementation of the South Plateau Project (Henry’s Lake #2 Subunit) depends
on the Yale Creek Project’s impact to the 1%, as the allowed temporary reduction
below baseline is assessed at the scale of the entire Bear Management Unit, not the
Subunit scale.” SP_004432, 004511–12. Thus, the very concern identified by
Plaintiffs, i.e., the Yale Creek Project’s cumulative impact on the 1% Standard,
was addressed. Accordingly, the Forest Service’s selection of the boundaries for
analyzing cumulative effects on the grizzly bear was neither arbitrary nor
capricious.
B. 	Climate Change
Plaintiffs further argue that the Forest Service failed to adequately address
the cumulative impacts of climate change. This Court has previously explained
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 14 of 46
15
that “merely discussing carbon impacts and concluding that they will be minor
does not equate to a ‘hard look.’” Ctr. for Biological Diversity v. U.S. Forest
Serv., 687 F. Supp. 3d 1053, 1076–77 (D. Mont. 2023), overruled on other
grounds 2025 WL 586358 (9th Cir. Feb. 24, 2025). Indeed, “NEPA requires more
than a statement of platitudes, it requires appraisal to the public of the actual
impacts of an individual project.” Id. at 1077. Here, the Forest Service determined
that the Project would result in a short-term release of carbon but, over the long
term, was “likely to increase carbon storage and reduce emissions by reducing
disturbance risk and storing carbon in wood products, as well as recapturing carbon
as forests regrow.” SP_004371–72. In reaching this conclusion, the Forest Service
“tiered” the carbon analysis for the Project “to the programmatic analysis of carbon
sequestration in the [2022] Land Management Plan EIS” for the Custer Gallatin
National Forest. SP_004372; see SP_001121–796. According to the 2022 Forest
Plan EIS, potential management actions, including projects such as the South
Plateau Project, would “affect up to less than 0.25 percent of the forested area” and
result in “less than 1 teragram[] of carbon annually.” SP_001440. While the Ninth
Circuit has made clear that “agencies cannot ‘tier’ their environmental review
under NEPA to assessments of similar projects that do not actually discuss the
impacts of the project at issue,” Envt’l Def. Ctr. v. Bureau of Ocean Energy Mgm’t,
36 F.4th 850, 874 (9th Cir. 2022) (internal quotation marks omitted), the 2022
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 15 of 46
16
Forest Plan EIS directly considered this type of management activity in the Project
area. Given the nature of this Project and the recency and scope of the tiered
analysis, the Forest Service adequately considered the Project’s cumulative effects
on climate change. This objection lacks merit.
C. 	EIS
Plaintiffs’ final objection under NEPA is that an EIS should have been
prepared because the South Plateau Project is a “major Federal action[]
significantly affecting the quality of the human environment.” 42 U.S.C.
§ 4332(2)(C). More specifically, Plaintiffs argue that an EIS was required because
they have raised a substantial question as to five of the ten “intensity” factors
identified in 40 C.F.R. § 1508.27(b). However, other than disagreeing with Judge
DeSoto’s conclusion as to this issue, Plaintiffs fail to specifically object to her
conclusions. Plaintiffs’ objection, (see Doc. 73 at 30–34), is almost identical to
their summary judgment argument, (see Doc. 48 at 65–69). Finding no clear error
in Judge DeSoto’s analysis, it is adopted here. Nonetheless, given the issues
identified in this Order, the agency should consider whether an EIS is required
following any additional analysis performed on remand.
II. 	NFMA
“NFMA creates a two-step process for the management of our national
forests.” Native Ecosystems Council v. U.S. Forest Serv., 428 F.3d 1233, 1249 (9th
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 16 of 46
17
Cir. 2005). First, the Forest Service must develop, maintain, and, as appropriate,
revise Forest Plans, which provide a framework for where and how certain
activities can occur in national forests. Id.; see also 16 U.S.C. § 1604(f). Second,
the Forest Service must ensure that all individual projects within a forest are
“consistent with each forest’s overall management plan.” Native Ecosystems
Council, 428 F.3d at 1249; see also 16 U.S.C. § 1604(i). “It is well-settled that the
Forest Service’s failure to comply with the provisions of a Forest Plan is a
violation of NFMA.” Native Ecosystems Council v. U.S. Forest Serv., 418 F.3d
953, 961 (9th Cir. 2005).
Here, Plaintiffs argue that the Project violates NFMA because it fails to
comply with the Forest Plan standards for grizzly bear secure habitat and limiting
timber harvest within lynx habitat. Plaintiffs’ primary objection is that the promise
of future compliance with Forest Plan standards does not satisfy NFMA. Plaintiffs
further argue that the Project fails to comply with the Forest Plan Standard VEG-
S2 governing lynx or FW-STD-WLGB(03)(b) (the “1% Standard”) and FW-STD-
WLGB(03)(c) (the “Four-Year Standard”) governing grizzly bears. Because
Plaintiffs are correct on all fronts, the Project fails to comply with NFMA.
A. 	Future Compliance
Plaintiffs’ primary objection focuses on the Forest Service’s use of “Design
Features” to meet its NFMA obligations. Because the Project is anticipated to
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 17 of 46
18
occur across 16,462 acres over the next 15 years, it does not identify the precise
location of the proposed treatment activities or Project roads. See SP_004338–40.
Rather, the Forest Service “has identified areas as preliminary suitable for
treatment actions” and set maximum acreage footprints for treatment units with
“[t]he precise location and size of the treatment units [to] be determined by
applying the Design Features” that appear in Appendix B in the EA. SP_004340.
According to the Forest Service, this approach is intended “to account for potential
changes in on the ground conditions over the 15-year period of implementation.”
SP_004340. Under this approach, all future treatment activities, including fuels
reduction and road construction, must comply with the identified Design Features
prior to implementation. See SP_004340–43. More specifically,
After the decision, treatment actions will only be implemented after the
interdisciplinary team of resources specialists verifies that the action is
consistent with the Treatment Matrix (Appendix A), meets the Design
Features (Appendix B), and complete Resource Review Checklists
(Appendix C). Then, the Responsible Official will review the plan and
complete the Concurrent Checklist (Appendix C) to approve the action.
SP_004343; see SP_004475 (stating the Decision “includes and makes binding the
application of the Treatment Matrix, Design Features, Resource Review
Checklists, and the Monitoring Plan”). Relevant here, the Design Features
incorporate the Forest Plan Standards for lynx, see SP_004429–31, and grizzly
bears, see SP_004432–34.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 18 of 46
19
Plaintiffs argue that because these Design Features are mere “promise[s] to
comply with forest plan standards” in the future, (Doc. 73 at 20), they are
insufficient to show NFMA compliance in the present. In response, Defendants
argue that because all project activities must comply with the Design Features,
such compliance is not optional but rather “[is] the Decision framework” even if
the substantive review will occur in the future. (Doc. 75 at 19–20.) Plaintiffs have
the better argument. The Ninth Circuit has previously rejected an agency’s
“decision to authorize the Project first and verify [its compliance with NFMA]
later.” Ecology Ctr. v. Austin, 430 F.3d 1057, 1071 (9th Cir. 2005). In that case,
for example, the Forest Service “plan[ned] to verify soil conditions in the activity
areas after authorizing the Project, but before actually commencing harvest
activities.” Id. The Ninth Circuit held that that approach “violates NFMA.” Id.
The situation here is no different. The EA does not show that the Project meets the
Forest Plan Standards but rather that such compliance will be assessed after the
specific treatment actions are identified. But that assurance is merely a truism of
NFMA itself: “NFMA requires that the proposed site-specific actions be consistent
with the governing Forest Plan.” Native Ecosystems Council v. Weldon, 697 F.3d
1043, 1056 (9th Cir. 2012); see All. for the Wild Rockies v. U.S. Forest Serv., 907
F.3d 1105, 1110 (9th Cir. 2018) (“A project is consistent [with NFMA] if it
conforms to the applicable ‘components’ of the forest plan, including the standards,
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 19 of 46
20
guidelines, and desired conditions that are set forth in the forest plan and that
collectively establish the details of forest management.”). The Forest Service
avowing that future activities will comply with NFMA falls far short of showing
that those activities do so. “Under NFMA, the Forest Service calculations need not
be perfect. However, [courts] must still be able to reasonably ascertain from the
record that the Forest Service is in compliance with the [Forest] Plan standard[s].”
Native Ecosystems Council v. U.S. Forest Serv., 418 F.3d 953, 963 (9th Cir. 2005).
That is not possible here.
Accordingly, the Forest Service failed to meet its obligations under NFMA
by relying on future compliance with its provisions. See WildEarth Guardians v.
Jeffries, 370 F. Supp. 3d 1208, 1234 (D. Or. 2019) (“The duty to demonstrate
Forest Plan consistency applies at the time of the decision, not at a speculative
future date.”). The problems posed by a condition-based management approach to
NFMA compliance are only emphasized by the fact that the record indicates that
future activities may violate the standards identified by Plaintiffs. See Save Our
Cabinets v. U.S. Dep’t of Agr., 254 F. Supp. 3d 1241, 1259 (D. Mont. 2017)
(finding a NFMA violation because the authorized action was expected to violate
forest plan standards in the future and therefore the decision was not supported by
the record).
B. 	VEG-S2: Lynx Regeneration Standard
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 20 of 46
21
Pursuant to the VEG S2 Forest Plan Standard, “[t]imber management
projects shall not regenerate more than 15 percent of lynx habitat on [National
Forest system] lands within a[ Lynx Analysis Unit] in a ten-year period.”
SP_000567. Here, the Forest Service calculated that while 14,572 acres of lynx
habitat would be affected in the South Madison Lynx Analysis Unit, SP_004676, to
comply with VEG S2, no more than 4,696 acres of lynx habitat may be regenerated
within the Project area, SP_004508. Accordingly, one of the Design Features of
the Project limits regeneration to “no more than 4,600 acres of lynx habitat to
comply with this standard.” SP_004508. But because the exact nature of the
treatments is unknown and the Decision Notice authorizes 5,551 acres of clearcuts,
SP_004340, 4477, the current record does not show that Standard will be met.
More specifically, the record does not show where the regeneration harvest units
are located in relation to lynx habitat, nor the size of those units. To the contrary,
the record shows an intent to clearcut areas greater than that permitted under VEG
S2 Standard. NFMA compliance demands more than the agency’s “word” that it
will comply. See Alliance for the Wild Rockies v. Marten, 2021 WL 4551496, at *4
(D. Mont. Oct. 5, 2021).
C. 	FW-STD-WLGB(3)(b): The 1% Standard
FW-STD-WLGB(03)(b), or the 1% Standard, addresses the total amount of
grizzly bear secure habitat within a BMU:
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 21 of 46
22
Total acreage of secure habitat below baseline values within a given
[BMU] shall not exceed 1 percent of the acreage in the largest subunit
within that [BMU]. The acreage of a project that counts against the 1
percent limit (for example the amount of secure habitat affected) is
measured as the acreage within the 500-meter buffer around any
temporary motorized access route or low-level helicopter flight line that
intrudes into existing secure habitat.
SP_000065. The Forest Service interpreted this standard as assessing the total
impacts to secure habitat at a given moment in time, which would permit the
“staging” of project activities over time. Plaintiffs argue that the Forest Service’s
interpretation is neither permissible nor supported by the Project record.
Ultimately, while the Forest Service’s interpretation of the Standard is reasonable,
the condition-based approach the Forest Service has adopted here prevents it from
showing the Standard is met.
The Forest’s Service’s temporal interpretation is permissible. “Agencies are
entitled to deference to their interpretation of their own regulations, including
Forest Plans.” Native Ecosystems Council v. U.S. Forest Serv., 418 F.3d 953, 960
(9th Cir. 2005). No such deference is due, however, if “it is plainly inconsistent
with the regulation at issue,” “is without a substantial basis in fact,” or is “based on
a clear error of judgment.” Id. (internal quotation marks omitted). Plaintiffs insist
that the 1% Standard applies over the life of the Project and that the Project’s
“staging” of activities would, in aggregate over the course of years, reduce secure
habitat below the 1% limit in violation of the Forest Plan. But that reading is
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 22 of 46
23
contrary to the plain language of the provision. The 1% Standard, consistent with
the Forest Service’s interpretation, falls under the heading of “temporary [c]hanges
in secure habitat” or “temporary reductions” and applies to the “total acreage of
secure habitat below baseline values” in the present, not in the aggregate. See
SP_000065 (emphasis added). It is also consistent with the Grizzly Bear
Conservation Strategy’s use of the term “at any one time” to describe the
limitation. See SP_045858 (“at any one time”). 	Thus, the Forest Service’s
interpretation is permissible.
Nevertheless, the Project record does not show that this Standard will be met
here. Analyzing this issue requires a disassociation between the numerical
calculations provided and the facts upon which they are based. Essentially, while
the Forest Service’s math checks out, it is unclear how the Forest Service can
calculate the amount of secure habitat that will be lost without first determining
where the temporary roads will be routed. For example, the Forest Service
determined that in the Madison #2 Subunit, project activities will reduce secure
habitat by 248 acres below baseline, which equates to a reduction in secure habitat
of 0.2% of the acreage of the largest subunit in that BMU. SP_041106. Similarly,
while the Project authorizes a total reduction in secure habitat below baseline in
Henry’s #2 of 2,426 acres over the lifetime of the Project (a 1.9% reduction), it
permits only 1,276 acres at a time. SP_004511–12, SP_041091; see also
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 23 of 46
24
SP_041205. But the Project authorizes the construction of 56.8 miles of temporary
roads without committing to exact routes or locations. See SP_004343 (“The exact
locations of temporary roads are not yet known . . . .”). Plaintiffs insist it is
impossible to assess compliance with the 1% Standard without knowing the road
locations within each of the three BMUs. Indeed, “secure habitat” is defined as
blocks of habitat of at least 10 acres that are at least 500 meters from a road.
SP_004406. Accordingly, road location, not total mileage, is critical to determine
compliance with this Standard. While the Forest Service has provided a potential
map of those routes, see SP_041205, 4339, the EA clearly states that these routes
“have not been vetted and are entirely subject to change,” SP_004344. Where
even a ten-foot shift in a single road could affect compliance, the Forest Service
has failed to show that the 1% Standard has been met here.
D. 	FW-STD-WLGB(3)(c): The Four-Year Standard
FW-STD-WLGB(3)(c), or the Four-Year Standard, also addresses grizzly
bear secure habitat:
New temporary roads shall be limited to administrative purposes
associated with project activities. 	Project activities shall not reduce
secure habitat below baseline levels for more than four consecutive
years. The collective set of temporary roads that affect secure habitat
below baseline levels shall be closed to all motorized use after three
years. Temporary roads shall be decommissioned such that secure
habitat is restored within one year after closure.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 24 of 46
25
SP_000065. The Forest Service concluded that this standard was met here because
the Project will be split into 4 to 6 separate timber sale or other contracts,
SP_004343, 041092, and each individual timber sale its own “project” with its own
“project activities.” Thus, according to the agency, it is the individual timber
contracts, not the South Plateau Project as a whole, that must comply with the
Four-Year Standard. Plaintiffs argue that this “interpretation conflicts with the
standard’s plain language, undermines its purpose, and is contradicted by the
agency’s own interpretation in the record.” (Doc. 73 at 20.) Plaintiffs are correct.
The Forest Plan does not define the term “project activities.” And while the
Forest Plan often lists both “projects and activities” or “projects or activities,” see,
e.g., SP_000012, 18–19, it only uses the term “project activities” seven times, all
but once in reference to the grizzly bear standards and guidelines at issue here, see
SP_000065, 67, 68, 107. Nevertheless, the Forest Plan refers to “projects” in terms
of the site-specific decisions that must be authorized through NEPA. See, e.g.,
SP_000010. Thus, the term “project,” acting as a noun adjunct, means that
“project activities” refers to the collective whole of those activities undertaken as
part of the NEPA-approved decision, not the component parts of that decision. As
a result, the Forest Service’s attempt to fragment the South Plateau Project into
four to six different sets of “project activities” is counter to the plain language of
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 25 of 46
26
the Forest Plan: all activities associated with the NEPA-approved project may not
reduce secure habitat below the requisite levels for more than four years.
Review of the Forest Plan’s purpose only strengthens this conclusion.
Defendants argue that aggregating “project activities” would prevent “long-term”
projects from occurring. But that appears to be by design. The Forest Plan itself
states that it is only meant to “provide guidance for project and activity-level
decision making on the national forest for approximately the next 15 years.”
SP_000010. This indicates that, counter to Defendants’ position, the Forest Plan
was not authored with the purpose of approving projects that have the same
lifespan as the Forest Plan itself.
But even if the Forest Plan’s use of the term “project activities” could be
read to apply to the segregated actions within a single project, this record shows
that was not how the Forest Service used these terms in this case. The term
“project” is used over a thousand times in the EA for the South Plateau Project,
SP_004326–4469, and over four hundred times in the Decision Notice,
SP_004470–4551. Every single one of those references is to the “South Plateau
Project” as a whole, not to the individual timber sales or other contracts underlying
the Project. The EA also uses the term “project activities” multiple times, but once
again, always in reference to the South Plateau Project as a whole. See, e.g.,
SP_004380 (“Project activities will be spread out in time and space, so unaffected
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 26 of 46
27
portions of the project area will be available while treatments are ongoing.”);
SP_004403 (“Project activities will not reduce the presence or abundance of moose
and elk (ungulates) in the area, but the proposed activities could alter their
distribution.”); SP_004407 (“[P]roject activities will be implemented in stages.”);
SP_004413 (“[P]roject activities will be spread out in time and space so that
undisturbed habitat will be available for nesting and foraging for migratory birds in
any given year in the project area.”); SP_004446 (“Project activities include all
proposed treatment actions and associated activities.”). The same can be said of
the references to “project activities” in the Decision Notice. See, e.g., SP_004490
(“Based on effects analyses conducted for this project, I have determined that the
effects likely to result from project activities do not rise to the level of
significance.”); SP_004493 (“In the short-term, (the period of project
implementation) adverse effects will result from disturbance caused by project
activities.”); SP_004525 (“Project activities include all proposed treatment actions
and associated activities.”).
To be sure, the Fish and Wildlife Service states in the Project Biological
Opinion that “[e]ach individual sale or stage is considered as an individual project
under the standard and application rules.” SP_005220. But this interpretation is
not reflected by the Forest Service. To the contrary, in interpreting the Forest
Plan’s “one project” standard—which states that “[o]nly one project affecting
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 27 of 46
28
secure habitat below baseline values may be active within a given bear
management subunit at any one time,” SP_000065—the Forest Service considered
the South Plateau Project to be that “one project,” not the individual treatments or
timber contracts. See SP_004432 (referencing the nearby Yale Creek Project and
affirming that “[o]nly one project may reduce secure habitat below baseline in a
unit at a time”); see also SP_004401, 4409.
Because neither the plain language of the Four-Year Standard nor this record
supports the Forest Service’s anomalous interpretation of “project activities” in this
context, the Forest Service’s decision is arbitrary and capricious in violation of the
APA and NFMA.
III. 	ESA
Section 7 of the ESA requires agencies proposing actions to engage in
consultation with the Fish and Wildlife Service to ensure the action “is not likely to
jeopardize the continued existence of any endangered species or threatened species
or result in the destruction or adverse modification of habitat of such species[.]”
16 U.S.C. § 1536(a)(2). An action will result in “jeopardy” if it will “reduce
appreciably the likelihood of both the survival and recovery of a listed species.”
50 C.F.R. § 402.02. If formal consultation is deemed necessary, the Fish and
Wildlife Service issues a biological opinion. 50 C.F.R. § 402.14(g)–(h). Under
this consultation process, the Fish and Wildlife Service is required to, inter alia,
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 28 of 46
29
“[e]valuate the effects of the action and cumulative effects on the listed species or
critical habitat.” 50 C.F.R. § 402.14(g)(3). This analysis must consider the effects
on the species from the proposed action as well as the “consequences of other
activities that are caused by the proposed action.” 50 C.F.R. § 402.02. The
“environmental baseline includes the past and present impacts of all Federal, State,
or private actions and other human activities in the action area, the anticipated
impacts of all proposed Federal projects in the action area that have already
undergone formal or early section 7 consultation, and the impact of State or private
actions which are contemporaneous with the consultation process.” Id.
Plaintiffs challenge the Fish and Wildlife Service’s ESA analysis for grizzly
bears as it relates to patch size, secure habitat, and the agency’s no jeopardy
finding. With limited exception, these challenges have merit.
A. 	Patch Size
In the biological opinions for both the 2022 Forest Plan and for the present
Project, the Fish and Wildlife Service relied on metrics associated with grizzly bear
secure habitat to assess the effects of roads on grizzly bears. See SP_005199–201.
“Secure habitat is defined in the 2016 [Grizzly Bear] conservation strategy as areas
more than 500 meters from an open or gated motorized access route or reoccurring
helicopter flight line that are greater than or equal to 10 acres in size.” SP_005200
(citations omitted). Consistently, both biological opinions determined the overall
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 29 of 46
30
quantity of secure habitat using a 10-acre “patch size.” According to Plaintiffs,
there is no scientific support for defining “secure habitat” as patches of land as
small as 10 acres. That objection has merit.
The ESA requires an agency to use “the best available scientific and
commercial data available” when formulating a biological opinion. 16 U.S.C.
§ 1536(a)(2). “An agency complies with the best available science standard so
long as it does not ignore available studies, even if it disagrees with or discredits
them.” San Luis & Delta-Mendota Water Auth. v. Locke, 776 F.3d 971, 995 (9th
Cir. 2014); see Kern Cnty. Farm Bureau v. Allen, 450 F.3d 1072, 1081 (9th Cir.
2006) (“Without any evidence in the record that [the Service] ignored relevant
information, we hold that [the Service] satisfied its duty to base its listing
determinations on the best available data.”). Courts “must defer to the agency’s
interpretation of complex scientific data” so long as the agency “has articulated a
rational basis for its conclusion.” Nw. Ecosystem All. v. U.S. Fish & Wildlife Serv.,
475 F.3d 1136, 1150 (9th Cir. 2007).
Here, in defending the Fish and Wildlife Service’s reliance on a 10-acres
patch size, Defendants argue that: (1) this has been the patch size used in the
Greater Yellowstone Ecosystem since 2003; (2) the science supports any patch
size, however small; and (3) a small patch size is more sensitive in assessing loss
of secure habitat than a larger patch size. Because none of these arguments provide
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 30 of 46
31
scientific support for the decision to adopt a 10-acre patch size, they do not support
a finding that the agency used the “best available science” as required under the
ESA.
1. 	Metric for the Greater Yellowstone Ecosystem
Since the late 1980s, grizzly bears within the Greater Yellowstone
Ecosystem have been “managed under standards and guidelines established by the
Interagency Grizzly Bear Committee.” SP_044366; see FWS000815.
“Acknowledging that humans are the primary agent of grizzly bear mortalities, a
principal objective of the [Committee] was to improve survival rates by
implementing management strategies that minimized anthropogenic influences and
grizzly bear-human conflicts.” SP_044366. That includes the recognition “that
secure habitat (areas that are free of motorized traffic, also referred to as core
areas) is an important component of grizzly bear habitat,” SP_044341, and that
“[a]dequate secure habitat is essential to the survival and reproductive success of
grizzly bears,” SP_044372. Accordingly, “[i]t is the goal of habitat management
agencies to maintain or improve habitat conditions . . . at or above 1998 levels,”
SP_044372, as the “conditions in 1998 are believed to have supported and
contributed to the population growth observed during 1983–2001[,] . . .
establish[ing] a clear benchmark against which future improvement and impacts of
habitat can be measured,” SP_044368.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 31 of 46
32
It is less clear, however, how the Committee determined what qualifies as
“secure habitat” as that term is used above. For example, the 2016 Interagency
Grizzly Bear Conservation Strategy merely states that “[s]ecure habitat is defined
as any contiguous area ≥ 10 acres in size and more than 500 m[eters] from an open
or gated motorized access route (road or trail) or recurring low level helicopter line
during the non-denning period (March 1 – November 30),” SP_044373, and
“secure habitat is correlated with key habitat components, such as foods, cover,
space, arrangement of habitat types, and ability of grizzly bears to move between
them,” SP_044374. But neither reference explains the adoption of a 10-acre
standard. Nor do the 2003 or 2007 conservation strategies provide any further
information regarding how the 10-acre metric was chosen, other than to state that
“[h]abitat security allows a population to increase in numbers and distribution as
lowered mortality results in more reproduction and cub recruitment into the adult
population. This results in an increasing population.” SUPP-FWS_8090; see
SUPP-FWS_008075, 8109, 8215 (2003 Strategy); SUPP-FWS_007208, 7223,
7244 (2007 Strategy).3
3 Notably, these strategies do explain the portion of the “secure habitat” definition
regarding proximity to roads, stating that “[g]rizzly bear researchers and managers
generally agree that secure habitat, defined as those area more than 500 meters
(550 yards) from a motorized access route during the non-denning period, are
especially important to the survival and reproductive success of grizzly bears,
especially adult female grizzly bears.” SUPP-FWS_007244, 8111.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 32 of 46
33
Thus, contrary to Defendants’ argument, the Interagency Grizzly Bear
Conservation Strategy documents do not provide a scientific basis for the Fish and
Wildlife Service’s adoption of the 10-acre patch size for secure habitat.
2. 	Any Patch Size
In the 2022 Species Status Assessment for the Grizzly Bear in the Lower-48
States, the Fish and Wildlife Service explained that its “definition of secure habitat
includes areas as small as 10 acres . . . in size because both the [Interagency
Grizzly Bear Study Team] and the [Yellowstone Ecosystem Subcommittee]
concluded that all secure habitats are important for grizzly bears in the [Greater
Yellowstone Ecosystem], regardless of size, particularly in the peripheral areas.”
FWS_000819, 1042. But that statement does not cite a specific document by either
organization. While the agency states that “[r]esearch by Schwartz et al. (2010 p.
661) supported this conclusion and demonstrated a direct link between this
definition and grizzly bear survival in the [Greater Yellowstone Ecosystem],”
FWS_000819, Schwartz (2010) merely concluded that “[t]he most important
predictors of survival . . . [a]re the amount of secure habitat within a bear’s home
range and road densities outside of secure habitat,” SUPP-FWS_006747. Contrary
to the Fish and Wildlife Service’s characterization, Schwartz (2010) does not
provide any independent justification for a 10-acre patch size, as it merely adopted
the “secure habitat” definition used by the Interagency Grizzly Bear Committee
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 33 of 46
34
with no further discussion. See SUPP-FWS_006743. Thus, while the record
supports the Fish and Wildlife Service’s general conclusion that some amount of
roadless acreage is better for bears than none, Defendants identify no specific
explanation of why 10 acres, as opposed to 1 acre, 5 acres, or 50 acres, is an
appropriate metric.
That omission is only more telling when one considers the secure habitat
standard for the Northern Continental Divide Ecosystem. In that Ecosystem,
“secure habitat” is defined as “areas on Federal lands within the analysis area more
than 500 m[eters] (1,650 f[ee]t) from a motorized access route and at least 2,500
acres . . . in size, and in place for 10 years.” FWS_001043. In that case, the size of
the secure area is explicitly tied to foraging range: “The 2,500 acre . . . minimum
size for secure core habitat is based on the 1994 [Interagency Grizzly Bear
Conservation] Guidelines that state minimum size will be recovery zone specific
and ‘the minimum size for the core area(s) be that area necessary to support a
female grizzly bear for 24 hours of foraging.’” FWS001043. While grizzly bears
in different Ecosystems may have different habitat needs, see SP_005401–02, the
10-acre patch size here remains untethered to any identified grizzly bear survival
metric. Thus, even if Defendants are correct that “any size” of secure habitat will
do, that lends no specific support for a 10-acre patch size.
3. 	Sensitivity
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 34 of 46
35
Defendants’ primary argument in support of the Fish and Wildlife Service’s
adoption of a 10-acre patch size, and the one most clearly presented in the
biological opinions for the 2022 Forest Plan and this Project, is that a smaller patch
size is more sensitive to habitat loss than a large patch size. In its 2022
programmatic biological opinion for the Forest Plan, the Fish and Wildlife Service
explicitly recognized that grizzly bears in different Ecosystems have different
habitat requirements, SP_005402, and that there are pros and cons to both large
and small patch sizes, explaining:
Patch size of secure habitat is also an important consideration in the
effectiveness of secure habitat. 	Although small patches of secure
habitat may provide stepping stones to facilitate movement by bears,
Gibeau et al. (2001, p.[ ]124) estimated the minimum daily foraging
requirements for grizzly bears in Banff National Park, Canada is . . .
[]2,224 acres[]. 	Small patches of secure habitat may also be less
effective if they are within a matrix of high road density . . . . However,
a small patch size provides greater sensitivity for determining loss of
secure habitat. 	Existing secure habitat calculated using a minimum
patch size of 2,500 acres would allow many additional roads to occur
in patches <2,500 acres without indicating a net loss in secure habitat.
Comparatively, a minimum patch size of 10 acres would be much more
sensitive to net losses in secure habitat from additional roads.
SP_005403. This is then consistent with the Final EIS issued by the Forest Service
for the 2022 Forest Plan, which states:
[t]he 10-acre minimum patch size for secure habitat is a reasonably
sized area that is useable by an individual grizzly bear, while avoiding
disturbance associated with motorized use on roads and trails. The 10-
acre minimum patch size represents the minimum size area that would
be protected by plan components for secure habitat. 	If the minimum
patch size for secure habitat were much larger, it would mean that larger
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 35 of 46
36
patches of secure habitat could be eliminated by road building, and still
comply with plan components to maintain secure habitat.
SP_001537 (citation omitted).
But as argued by Plaintiffs, neither explanation fills the analytical gap
identified above, i.e., how or why does a 10-acre area represent the minimum area
needed for grizzly bear habitat? In the absence of a connection between the size of
the patch and the habitat needs of a grizzly bear, a 10-acre metric “cannot be more
‘sensitive’ to loss of secure habitat if the prescribed patch size is insufficient to
provide grizzly bears truly secure habitat in the first place.” (Doc. 73 at 37.)
Indeed, the record shows that the 1994 Interagency Grizzly Bear Committee
recommended secure areas “be that area necessary to support a female grizzly bear
for 24 hours of foraging,” FWS_003694, and based on similar metrics, grizzly
bears in other Ecosystems have been found to need upwards of 2,000 acres of
secure habitat, SP_005403 (recognizing estimated need for 2,224 acres of range in
Banff National Park, Canada based on daily foraging requirements); FWS001043
(defining secure habitat as 2,500 acres for the Northern Continental Divide
Ecosystem). Even Schwartz (2010), heavily relied on by Defendants here,
explicitly states that smaller secure areas can create isolated “islands” of habitat
that actually increase grizzly bear mortality by “fragmenting the landscape.” See
FWS002869.
4. 	Conclusion
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 36 of 46
37
In relying on a 10-acre patch size to define grizzly bear secure habitat in the
absence of any scientific evidence showing that such acreage provides adequate
habitat, the Fish and Wildlife Service’s failed to use the “best available science” in
violation of the ESA.
B. 	Effects Analysis
During formal consultation, the Fish and Wildlife Service is, among other
things, required to “[e]valuate the effects of the action and cumulative effects on
the listed species,” and formulate its biological opinion as to whether the action,
taken together with cumulative effects, “is likely to jeopardize the continued
existence of listed species.” 50 C.F.R. § 402.14(g); see also 16 U.S.C.
§ 1536(a)(2). Here, the Fish and Wildlife Service determined that while motorized
access associated with the Project will temporarily disturb or displace grizzly bears
in the Project area, SP_005222, the Project is “not likely to jeopardize the
continued existence of” the grizzly bear, SP_005233, 5240.
Plaintiffs raise three objections to the Fish and Wildlife Service’s analysis of
the Project’s effects on grizzly bears: (1) the agency’s speculation regarding
unknown road locations and project timing, (2) the agency’s reliance on the
condition-based management features discussed above, and (3) the agency’s
determination of the action area boundaries for the Project. Plaintiffs’ first
argument has merit.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 37 of 46
38
1. 	Road Locations and Project Timing
Plaintiffs first argue that the Fish and Wildlife Service failed to use the best
available science or consider an important aspect of the problem when it analyzed
the putative effects the Project will have on grizzly bear secure habitat without
knowing the location of the temporary project roads or the timing of the project
activities. In response, Defendants argue that the Fish and Wildlife Service’s
decision to focus on secure habitat, not road location, is entitled to deference and
that, regardless, the agency considered possible road locations, the maximum
possible impact on secure habitat, and seasonal bear activity. Akin to the NEPA
analysis discussed above, Plaintiffs are ultimately correct that it was arbitrary and
capricious for the agency to fail to consider road placement in its assessment of
grizzly bear secure habitat.
As an initial matter, deference on the issue of secure habitat is not
dispositive here. In Gifford Pinchot Task Force v. United States Fish and Wildlife
Service, the plaintiffs challenged the Fish and Wildlife Service’s use of habitat as a
proxy for its jeopardy analysis for the spotted owl. 378 F.3d 1059, 1065–66 (9th
Cir. 2004), superseded by regulation 81 Fed. Reg. 7214 (Feb. 11, 2016). The
Ninth Circuit ultimately upheld the agency’s analysis because “[a]n agency’s
scientific methodology is owed substantial deference,” and the Fish and Wildlife
Service demonstrated that its “habitat proxy reasonably correlate[d] to the actual
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 38 of 46
39
population of owls.” Id. at 1066. But Plaintiffs’ challenge here is fundamentally
different. Plaintiffs do not argue that secure habitat does not accurately reflect
grizzly bear abundance or that the Fish and Wildlife Service should not have relied
on secure habitat as a proxy for jeopardy. Rather, Plaintiffs argue that the Fish and
Wildlife Service could not accurately analyze secure habitat without knowing the
temporary route locations because secure habitat is defined by distance from a
motorized route. Thus, Plaintiffs do not challenge the agency’s scientific
judgment, but rather its execution, arguing that it was arbitrary and capricious to
fail to consider a critical component of secure habitat, i.e. road placement. That
argument has merit.
The Fish and Wildlife Service recognizes that “[r]esearch has confirmed
adverse impacts of roads on grizzly bears,” SP_005211, and that “secure habitat
and road densities outside of secure habitat [a]re important predictors of grizzly
bear survival,” SP_005215. Consistently, in its 2022 programmatic Biological
Opinion prepared in conjunction with the Forest Plan, the agency “anticipated that
some level of adverse effects to female grizzly bears with home ranges impacted
by such [motorized access] routes may occur in some situations in the future[,]”
although “[t]he level of effects would depend on such things as location of the
routes, length of the routes, and the frequency and intensity of use,” SP_005218;
see also SP_005222 (“The amount of disturbance and/or displacement would vary
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 39 of 46
40
across the action area, depending on site-specific conditions and actions.”). Thus,
any project-specific analysis would require consideration of those features. But, as
recognized by Defendants, the Fish and Wildlife Service’s secure habitat analysis
here was based on its consideration of “the maximum proposed miles of temporary
road construction and use (56.8 miles),” and the acreage information provided by
the Forest Service in its Biological Assessment, see SP_004707–08, which found
that “approximately 2,417 acres or 5.2 percent of the secure habitat in the Henry’s
Lake #2 subunit would be temporarily affected; approximately 228 acres or 0.4
percent of secure habitat in the Madison #2 subunit would be temporarily affected;
and approximately 2,328 acres or 1.9 percent of secure habitat in the Plateau #1
subunit would be temporarily affected,” SP_005219.
Even assuming that these acreages accurately reflect the probable temporary
routes associated with the Project,4 the Fish and Wildlife Service failed to consider
the potential impact to secure habitat if actual road placement differs in any way
from the Forest Service’s projections. See SP_004741 (Figure 8). Despite
acknowledging the importance of road placement in this analysis, see SP_005218,
the negative impacts roads will have on grizzly bear secure area in the Project area,
4 It is not clear how these acreages were calculated. The Biological Assessment
states: “[a]creages were calculated using model runs performed for this project on
10 January 2022. Proposed Action secure habitat acreage was subtracted from the
existing condition of secure habitat to get acres of secure affected. Results of this
model run are included in the project record.” SP_004708.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 40 of 46
41
see SP_005222, and the uncertainty surrounding road placement under the
condition-based management approach utilized here, see SP_004343, the Fish and
Wildlife Service provides no discussion of this issue. As argued by Plaintiffs, the
worst-case scenario here is not that the Project may have 56.8 total miles of
temporary roads, but that those temporary roads may be located in such a way as to
eviscerate secure habitat. The failure to consider that possibility is arbitrary and
capricious.
2. 	Conditional Management/Mitigation
Plaintiffs further argue that it was arbitrary and capricious for the Fish and
Wildlife Service to rely on the Project’s Design Features to mitigate effects on
grizzly bears. Specifically, the Fish and Wildlife Service relied on the potential
future dropping or staging of the Project in Henry’s #2 as a “key factor” in
concluding that the Project would not jeopardize grizzly bears. See SP_005234–
35. In response, Defendants argue that the Design Features are components of the
Project, not mitigation measures, and that even if they were considered mitigation,
they could be appropriately relied upon here. Defendants have the better
argument.
As argued by Defendants, the Design Features are an inherent part of the
Project and, as such, do not qualify as “mitigation” measures under the ESA. But
even if they did, their vagueness is not fatal in this context. To be sure, for a
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 41 of 46
42
mitigation measure to be relied on, it must represent a “clear, definite commitment
of resources” that is “reasonably certain to occur.” See Ctr. for Biological
Diversity v. Bernhardt, 982 F.3d 723, 743 (9th Cir. 2020) (internal quotation marks
omitted) (“Binding mitigation measures cannot refer only to generalized
contingencies or gesture at hopeful plans; they must describe, in detail, the action
agency’s plan to offset the environmental damage caused by the project.”).
Because the Design Features themselves contain no details or deadlines, they fail
to meet that requirement. But the Ninth Circuit recognizes that mitigation
“measures can be made enforceable in a variety of ways, including by
incorporation into the terms and conditions of an incidental take statement.” Id. at
744. Because the Fish and Wildlife Service did that here, see SP_005245–46, its
reliance on the Design Features in making its “no jeopardy” finding was not
arbitrary and capricious. That said, these features remain problematic for the other
reasons identified herein.
3. 	Action Area – Yale Creek Project
Plaintiffs are also critical of the Fish and Wildlife Service’s failure to
consider the effects of the nearby Yale Creek Project in its analysis. “When
evaluating the effects of the action under the ESA, the agency is to consider direct
and indirect effects to the species and/or critical habitat, together with other
activities added to the environmental baseline, which includes ‘the past and present
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 42 of 46
43
impacts of all Federal activities in the action area, and the anticipated impacts of all
proposed Federal projects in the action area.’” Friends of the Wild Swan v. Weber,
767 F.3d 936, 950 (9th Cir. 2014) (quoting 50 C.F.R. § 402.02) (alterations
omitted). “The choice of appropriate action areas requires application of scientific
methodology and, as such, is within the agency’s discretion.” Id. (internal
quotation marks omitted).
Here, as discussed above, the Yale Creek Project is located in the Henry’s
Lake BMU and therefore is relevant to assessing the South Plateau Project’s
compliance with the 1% Forest Plan Standard, which is calculated at the BMU
level. See SP_000065. Nevertheless, the Fish and Wildlife Service performed its
effects analysis at the BMU subunit level because “[s]ubunits approximate the
annual home range of adult female grizzly bears and provide the optimal scale for
evaluation of seasonal feeding opportunities and landscape patterns of food
availability for grizzly bears.” SP_005199. According to the agency, this level of
analysis also prevents the action area from being “so large as to dilute the potential
effects of the action,” SP_005199, and the Forest Plan Standards prevent
concurrent activity, SP_005221. Because the agency provided a reasonable
explanation for its decision to define the action area at the subunit level, which
excludes the Yale Creek Project from that area, that decision is due deference.
Friends of the Wild Swan, 767 F.3d at 950. This objection lacks merit.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 43 of 46
44
IV. 	Remedy
The APA directs that “[t]he reviewing court shall . . . set aside agency
action, findings, and conclusions found to be . . . arbitrary, capricious, an abuse of
discretion, or otherwise not in accordance with law.” 5 U.S.C. § 706(2)(A).
Vacatur is the presumed remedy where an agency has acted unlawfully, All. for the
Wild Rockies v. U.S. Forest Serv., 907 F.3d 1105, 1121 (9th Cir. 2018), but the
district court “is not required to set aside every unlawful agency action,” Nat’l
Wildlife Fed’n v. Espy, 45 F.3d 1337, 1343 (9th Cir. 1995); see Cal. Cmtys.
Against Toxics v. U.S. E.P.A., 688 F.3d 989, 992 (9th Cir. 2012) (per curiam) (“A
flawed rule need not be vacated.”). “Whether agency action should be vacated
depends on how serious the agency’s errors are and the disruptive consequences of
an interim change that may itself be changed.” Cal. Cmtys., 688 F.3d at 992
(internal quotation marks omitted).
In assessing the seriousness of the error, courts “consider whether vacating a
faulty [decision] could result in possible environmental harm.” Pollinator
Stewardship Council v. Env’t Prot. Agency, 806 F.3d 520, 532 (9th Cir. 2015).
Another consideration is “whether the agency would likely be able to offer better
reasoning or whether by complying with procedural rules, it could adopt the same
[decision] on remand, or whether such fundamental flaws in the agency’s decision
make it unlikely that the same [decision] would be adopted on remand.” Id.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 44 of 46
45
Additionally, courts consider whether the errors are “limited in scope.” All. for the
Wild Rockies v. Savage, 375 F. Supp. 3d 1152, 1156 (D. Mont. 2019).
Here, while the Forest Service may be able to offer additional reasoning on
remand and approve a variation of the Project, the errors identified above
undermine the ability to use a condition-based management approach in this
context. Because that approach is the very foundation of the Project, vacatur is the
appropriate remedy.
III. 	Conclusion
Based on the foregoing and finding no clear error in the portions of Judge
DeSoto’s Findings and Recommendations that were not objected to,
IT IS ORDERED that:
(1) The Findings and Recommendations, (Doc. 69), is ADOPTED IN
PART, REJECTED IN PART, and MODIFIED IN PART as reflected above.
(2) The Center for Biological Diversity’s motion to supplement, (Doc. 43),
is DENIED.
(3) The parties’ cross-motions for summary judgment, (Docs. 45, 47, 54,
56), are GRANTED IN PART and DENIED IN PART. Summary judgment is
GRANTED in favor of Plaintiffs for the following claims:
a. Plaintiffs’ NEPA claim based on temporary roads;
b. Plaintiffs’ NFMA claims; and
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 45 of 46
46
c. Plaintiffs’ ESA claims based on patch size and road locations.
Summary judgment is otherwise granted in favor of Defendants.
(5) The South Plateau Project EA and Decision Notice are VACATED and
REMANDED to the agency to address the deficiencies identified above.
(6) The Clerk is directed to enter judgment consistent with this Order and
close the case file.
DATED this 11 th day of December, 2025.
Case 9:23-cv-00110-DWM Document 86 Filed 12/11/25 Page 46 of 46

Setzen Sie Ihre Recherche in ChatGPT oder Claude fort

Verbinden Sie Omnilex, um den Rechtskorpus über Ihren KI-Assistenten zu durchsuchen.