DO-DECISION AND ORDER ON THE MERITS NUMBER OF PAGES 16 JUDGE SWANK - Decision and Order Affirming Denial of Certification — 2026TLN00140

2026TLN00140Dol Oalj

Gesamter Gesetzestext

UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS
Washington, DC
______________
Issue Date: 08 October 2026
BALCA CASE No.: 2026-TLN-00140
ETA No.: H-400-26208-125397
In the Matter of:
MT MITCHELL ENTERPRISES LLC,
Employer.
Appearances: Sharon Lynch
For the Employer
Catherine A. Ross, Esq.
Office of the Solicitor
Employment and Training Legal Services
U.S. Department of Labor
Washington, D.C.
For the Certifying Officer
Before: DREW A. SWANK
Administrative Law Judge
DECISION AND ORDER AFFIRMING DENIAL OF CERTIFICATION
This case arises from a request for administrative review filed by MT Mitchell Enterprises
LLC (“Employer”) in regard to the Certifying Officer’s (“CO”) August 27, 2026 Final Determination
denying its application for temporary alien labor certification under the H-2B non-immigrant
program. The H-2B program permits employers to hire foreign workers to perform temporary
nonagricultural work within the United States on a one-time occurrence, seasonal, peakload, or
intermittent basis, as defined by the United States Department of Homeland Security. See 8 U.S.C. §
1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6);1 20 C.F.R. § 655.6(b).2 Employers who seek to hire
1 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated Appropriations Act, 2016,
Pub. L. No. 114‐113, Division H, Title I, § 113 (2015). This definition has remained in place through subsequent
appropriations legislation, including the current legislation. Consolidated Appropriations Act, 2026, Pub. L. No. 119-75,
Division B, Title I, § 111 (2026); see Continuing Appropriations and Extensions Act, 2027, Pub. L. No. 119-103, Division
A, §§ 101(8), 106 (2026) (extending the relevant provisions of the Consolidated Appropriations Act, 2026, until either
subsequent appropriations legislation is enacted into law or December 11, 2026, whichever occurs first).
2 On April 29, 2015, the Department of Labor (“DOL”) and the Department of Homeland Security (“DHS”) jointly
published an Interim Final Rule (“IFR”) amending the standards and procedures that govern the H-2B temporary labor
certification program. See Temporary Non-Agricultural Employment of H-2B Aliens in the United States; Interim Final
Rule, 80 Fed. Reg. 24,042 et seq. (Apr. 29, 2015). The rules provided in the IFR apply to applications “submitted on or
- 2 -
foreign workers under this program must apply for and receive labor certification from the United
States Department of Labor using a Form ETA-9142B, Application for Temporary Employment
Certification (“Form 9142”). A CO in the Office of Foreign Labor Certification (“OFLC”) of the
Employment and Training Administration reviews applications for temporary labor certification.
Following the CO’s denial of an application under 20 C.F.R. § 655.53, an employer may request
review by the Board of Alien Labor Certification Appeals (“BALCA” or “the Board”). 20 C.F.R. §
655.61(a).
BACKGROUND
On July 26, 2026, the Department of Labor’s Employment and Training Administration
(“ETA”) received Employer’s application for temporary labor certification, requesting certification
for 50 “Hospitality and Commercial Cleaning Associates” for the period of October 23, 2026, to
March 31, 2027. AF 123-145.3 Employer’s application indicates that the nature of temporary need
is “Seasonal.” AF 124. On the application, the Employer states the following regarding its temporary
need:
MT Mitchell enterprises, LLC respectfully submits this statement of temporary need
in support of its request for temporary hospitality and commercial cleaning associates
during the period from October 23, 2026, to March 31, 2027.
MT Mitchell has secured a bona fide contractual obligation to provide hospitality,
housekeeping, commercial-cleaning, sanitation, laundry, room-turnover and related
facility-support services within the east Tennessee nonmetropolitan area during the
2026-2027 winter season.
The need for additional workers increases substantially during this period because the
area experiences heightened winter tourism associated with fall travel, Thanksgiving,
Christmas and New Year vacations, winter resort stays, holiday theme-park
operations, seasonal festivals, live Christmas productions, group tours, conventions,
and special events.
This increased visitor activity creates a corresponding rise in hotel and resort
occupancy, guest-room turnover, linen replacement, laundry volume, public-area
sanitation, restroom cleaning, trash removal, deep cleaning, and evening, weekend,
and holiday schedules.
MT Mitchell’s regular workforce is not sufficient to absorb the additional workload
created by the winter contractual obligation while continuing to meet its existing
service commitments. The requested temporary workers are therefore necessary to
supplement the regular workforce during this defined seasonal period.
after April 29, 2015, and that have a start date of need after October 1, 2015.” IFR, 20 C.F.R. § 655.4(e). All citations to
20 C.F.R. Part 655 in this opinion and order are to the IFR.
3 References to the appeal file will be abbreviated with an “AF” followed by the page number.
- 3 -
The need is temporary and finite. It begins as winter and holiday operations increase
in October, continues through the peak holiday and winter tourism period, and ends
on March 31, 2027, when the seasonal workload and contractual staffing requirements
decline.
MT Mitchell therefore requests temporary workers to fulfill its winter contractual
obligations and meet the increased demand for hospitality and commercial cleaning
throughout the covered area.
AF 129.
The CO issued a Notice of Deficiency (“NOD”) on August 6, 2026, listing five deficiencies
in the Employer’s application. AF 105-116. The CO noted the first deficiency as “[f]ailure to
establish the job opportunity as temporary in nature.” The CO cited 20 C.F.R. § 655.6(a) and (b) for
the requirement that “an employer must establish that its need for non-agricultural services or labor
is temporary, regardless of whether the underlying job is permanent or temporary.” AF 110. The
CO cited the regulatory language which states that an “employer’s need is considered temporary if
justified to the CO as one of the following: 1) a one-time occurrence; 2) a seasonal need; 3) a peakload
need; or 4) an intermittent need as defined by DHS regulations.” 20 C.F.R. § 655.6(b). Id.
The CO stated that the Employer did not sufficiently demonstrate the requested standard of
need, which Employer stated was seasonal on its application. The CO stated that, in order to establish
a seasonal need, the Employer must show that the service or labor for which it seeks workers is
traditionally tied to a season of the year by an event or pattern and is of a recurring nature. Further
the employer must specify the period(s) of time during each year in which it does not need the services
or labor. The CO further noted that the employment is not seasonal if the period during which the
service or labor is needed is unpredictable, subject to change or considered a vacation period for the
employer’s permanent employees. Id.
The CO quoted the Employer’s application and its statement of temporary need but
determined that although the Employer indicated that its need is tied to seasonal tourism in the East
Tennessee nonmetropolitan area, this explanation alone does not establish a seasonal need. The CO
noted that no supporting documentation was provided to substantiate the Employer’s need.
Accordingly, the CO directed the Employer to submit additional information and documentation
including the following:
1. A statement describing the Employer's business history and activities (i.e. primary
products or services);
2. A schedule of operations throughout the year, noting that for a seasonal need the employer
must state the time period(s) each year when it does not need the services or labor;
3. Summarized monthly occupancy reports for calendar years 2024 and 2025, at the
employer’s worksite location(s);
4. Summarized monthly payroll reports for calendar years 2024 and 2025 and up-to-date
2026, that identify for each month and separately for full-time permanent and temporary
employment in the requested occupation, Hospitality and Commercial Cleaning
Associate, the total number of workers or staff employed, total hours worked, and total
- 4 -
earnings received, noting that such documentation must be signed by the employer
attesting that the information is compiled from employer’s actual accounting records or
system;
5. An explanation of the data in the submitted payroll documentation; and
6. Other evidence and documentation that similarly serves to justify the dates of need being
requested for certification.
AF 111.
In regard to the second deficiency – Failure to establish temporary need for the number of
workers requested, the CO cited 20 C.F.R. §§ 655.11(e)(3) - ( 4), 655.1(a)(1) and 655.6. AF 112.
The CO determined that Employer had not sufficiently demonstrated that the number of workers
requested on the application is true and accurate and represents bona fide job opportunities. Regarding
this requirement, the CO stated:
Temporary need includes establishing not only when the need occurs as well as the
nature of this need, but also how many workers are required. See 20 CFR 655.6. It is
inherent that the Department needs to know how many bona fide job opportunities are
available so that it can determine whether ‘there are not sufficient U.S. workers who
are qualified and who will be available to perform the temporary services.’ 20 CFR
655.1(a)(1); 8 USC 1101(a)(15)(H)(ii)(b); 8 USC 1184(c)(1). Temporary need,
including the number of workers, is adjudicated during the processing of applications.
20 CFR § 655.11(j). The Department has said that “[t]he factors used by the CO to
determine whether the employer’s need is temporary in nature are the requirements in
20 CFR 655.6 and 655.11(d) and (e).
Id.
The CO determined that Employer did not indicate how it determined that it needs fifty
Hospitality and Commercial Cleaning Associates from October 23, 2026 through March 31, 2027.
AF 112. Again, the CO requested further explanation and documentation supporting the Employer’s
request for 50 Hospitality and Commercial Cleaning Associates during the dates of need including
an explanation with supporting documentation such as contracts, letters of intent, etc. that specify the
number of workers and dates of need. In addition, the CO requested summarized monthly payroll
reports for calendar years 2024 and 2025, and up to date 2026, that identify for each month and
separately for full-time permanent and temporary employment in the requested occupation, as well
as the total number of workers or staff employed, total hours worked, and total earnings received, as
well as other documentation supporting and justifying the number of workers requested. AF 113.
The CO also listed deficiencies related to Employer’s failure to submit a job order, a
deficiency in Employer’s assurances and obligations, and also Employer’s failure to submit a
complete and accurate ETA Form 9142. AF 113-116. As these additional deficiencies were not
listed in the Final Determination as a basis for the denial of certification, they will not be addressed
in this decision.
- 5 -
On August 6, 2026, Employer filed a response to the Notice of Deficiency. AF 31-104. In
addition to its cover letter addressing the deficiencies, Employer submitted multiple documents which
include its Exhibit list, a corrected Appendix B, an amended job order, payroll and staffing analysis,
as well as December 2024 through July 2026 payroll summaries, with Employer’s payroll attestation,
a master service agreement and franchise formation documents. In its cover letter Employer stated
that its Tennessee operation is new. Therefore, it has no historical 2024 or 2025 payroll, staffing,
hours-worked, earnings or occupancy records attributable to its Dollywood Parks & Resorts contract
or any other prior Tennessee worksite. Accordingly, Employer stated that it attached its executed
contract, its corrected Tennessee job order, its established company-wide payroll history and
independent public data concerning the Pigeon Forge/Great Smoky Mountains hospitality market to
support the prospective temporary need. Employer further states that the present filing is based on a
newly secured Tennessee contract with Dollywood Parks & Resorts, noting that the executed
Statement of Work states that Dollywood anticipates a temporary winter staffing need from October
1, 2026 through March 31, 2027, for approximately 50 to 75 temporary hospitality support staff.
Employer states that it is requesting the low end of this estimate which is 50 workers. Employer also
authorized the National Processing Center to amend its start date to October 1, 2026 noting that the
first two weeks of employment would consist of paid orientation and on the job training before full
operational deployment of the workers would occur.
In support of its temporary need Employer asserts that the positions are connected to a
specific, prospective, and time limited winter staffing obligation, rather than an indefinite year-round
expansion of MT Mitchell’s permanent workforce. Employer also provided the City of Pigeon Forge
Department of Tourism’s 2025 Lodging revenue report in support of its seasonal need. Employer
noted that months within the Employer's requested winter period generated substantial lodging
activity, including approximately $54.2 million in October, $43.5 million in November, $43.0 million
in December, $21.3 million in January, $19.1 million in February, and $34.4 million in March. The
total Pigeon Forge Lodging revenue for the year 2025 is indicated as $478,303,184. AF 46. Employer
also submitted its company-wide payroll records to show that it has a permanent workforce although
it noted that it has no records for the new Tennessee/Dollywood area. AF 47.
Regarding the second deficiency concerning the number of workers requested, Employer
states that the 50 workers requested is derived from the specific executed statement of work for its
current project at Dollywood. AF 48.
On August 27, 2026, the CO issued a Final Determination Denial to the Employer, stating
that the deficiencies regarding the Employer’s failure to establish the job opportunity as temporary
in nature, as well as Employer’s failure to establish the temporary need for the number of workers
requested still remained, and therefore Employer’s application was denied. AF 21-30. The CO
acknowledged the documentation submitted by the Employer including the executed statement of
work for the Employer’s Dollywood 2026-2027 winter contract, company-wide payroll summaries
for 2024-2026, a summer 2026 temporary H-2B payroll summary, independent municipal lodging
revenue for Pigeon Forge, National Park Service visitor use data and an explanation that this is the
Employer’s first contracted operation with Dollywood and therefore no Dollywood specific historical
occupancy or Dollywood specific historical payroll records existed.
- 6 -
In reviewing the Employer’s documentation, the CO determined that a contractual obligation
to provide hospitality and commercial cleaning services during a single winter season does not
establish that the Employer’s need is seasonal and of a recurring nature as required by 20 C.F.R. §
655.6. The CO stated that to demonstrate a seasonal need, the employer must show that its services
are tied to a repeating seasonal pattern in the Area of Intended Employment (AIE) and identify
predictable periods when the labor is not needed. The CO noted that the contractual statement of
work does not accomplish this and the Employer’s response lacked sufficient area of intended
employment specific evidence showing that a recurring seasonal pattern aligning with the requested
October to March period exists.
The CO also noted that the lodging and tourism data submitted is incomplete and does not
include full calendar year information which is necessary to compare the claimed October through
March busy season against the April to September season. The data submitted also does not show
complete monthly trends across full years and therefore does not demonstrate that the requested
period corresponds to a true recurring busy season for the requested occupation in the East Tennessee
nonmetropolitan area. The CO concluded that without this complete area of intended employment
specific evidence the record does not establish a recurring seasonal pattern.
Further, as the payroll documentation reflects companywide operations from other locations
it is not relevant to labor needs in the area of intended employment pertinent to the current application
which is the East Tennessee nonmetropolitan area. The CO concluded that as the employer has no
Dollywood‑specific historical staffing or occupancy records and did not submit sufficient equivalent
area of intended employment specific evidence, the provided documentation does not establish a
recurring seasonal need at the Pigeon Forge, Tennessee, worksite. Accordingly, the CO determined
that the Employer did not establish its seasonal need during the requested period of need and did not
overcome the deficiency.
The CO also determined that Employer failed to establish a temporary need for the number
of workers requested. The CO acknowledged that Employer had submitted the executed Statement
of Work indicating an anticipated temporary winter staffing need of approximately 50 to 75 workers,
the corrected Tennessee Job Order listing 50 openings and the company wide payroll summaries for
2024-2025 with Employer’s explanation that no Dollywood historical staffing records exist and that
50 represents the low end of the anticipated range of workers. The CO concluded that the explanation
and submitted documentation did not overcome the deficiency. The CO noted that the Employer did
not provide documentation explaining how the 50 workers were determined “beyond citing an
approximate staffing need of 50 to 75 workers in the client’s Statement of Work.” AF 30. The CO
pointed out that the payroll summaries pertain to operations outside the East Tennessee
nonmetropolitan area of intended employment and therefore are not probative of the staffing
requirements for the requested worksite. The CO determined that in the absence of area of intended
employment operational evidence or historical staffing metrics, the contractual Statement of Work
alone is insufficient to justify that the requested 50 positions represent bona fide job opportunities
during the requested period of need. The CO also rejected Employer’s assertion that the job order
itself demonstrates the need for 50 workers, noting that all job orders reflect the Employer’s requested
recruitment parameters but without supporting evidence related to the area of intended employment,
Employer has not established that the number of workers requested is justified. Accordingly, the CO
- 7 -
determined that Employer failed to establish that the number of worker positions and period of need
were justified and did not overcome the deficiency.
On September 11, 2026, Employer submitted a request for administrative review regarding
the Final Determination-denial of its application. AF 1-20. Employer argues that the CO erred in
imposing a historical evidence requirement that could not be satisfied by a new Tennessee operation.
Employer argues that as it has never previously operated at the Dollywood location or at any East
Tennessee business, historical payroll and other information does not exist to support its application.
It also states that it did not rely on its companywide payroll as proof of its Dollywood specific
headcount. Rather it submitted this payroll information solely to show that it has an existing
permanent workforce and its year-round operating baseline. Employer stated that to prove its
prospective Tennessee staffing need, it relied primarily on its executed Dollywood agreement, its
corrected job order, the client’s stated staffing requirement, and the area of intended specific
tourism/lodging evidence.
Employer argues that it provided sufficient area of intended employment specific evidence to
support its application. Employer cites the City of Pigeon Forge lodging-revenue information and
Great Smoky Mountains National Park monthly visitor-use data as independent evidence concerning
the Pigeon Forge/Great Smoky Mountains hospitality market which it states it provided as alternative
evidence in place of payroll records which do not exist. Employer argues that it sufficiently identified
its season as October 1 through March 31 and the period when it would not need the requested
workers as April 1 through September 30. Employer asserts that it provided sufficient documentation
to support its need for 50 workers during the requested period of October 1 through March 31.
With its request for review Employer also included some new documentary evidence that had
not been submitted to the CO prior to the issuance of the Final Determination. However, the
regulation at 20 C.F.R. § 655.61(a) specifies that BALCA may only consider the appeal file prepared
by the CO, the legal briefs submitted by the parties, and the Employer’s request for review, which
may contain only legal argument and such evidence as was actually submitted to the CO before the
date the CO’s determination was issued. Accordingly, no new evidence submitted with the
Employer’s request for review will be considered or addressed in this appeal.
By Order dated September 28, 2026, the CO and the Employer were given the opportunity to
file briefs in support of their positions on or before October 6, 2026. The Employer did not file any
additional brief or legal argument, in addition to that which was included in its request for review.
The Solicitor, U.S. Department of Labor, Office of Employment and Training Legal Services
(“Solicitor”) filed a brief, on behalf of the CO, on October 6, 2026.
In her brief the Solicitor argues that the CO correctly determined that Employer failed to
establish its seasonal need for 50 Hospitality and Commercial Cleaning Associates for the period of
October 23, 2026 to March 31, 2027, based on a temporary, seasonal need. The Solicitor asserts that
Employer failed to establish a seasonal need that is traditionally tied to a season of the year or is of a
recurring nature. She notes that Employer admitted that it is unable to provide any worksite specific
historical records and argues that there is nothing in the record that establishes that a seasonal need
exists. Although Employer relies on its statement of work in its contract with Dollywood, the
Solicitor contends that the CO correctly noted in the Final Determination that a single contractual
- 8 -
obligation to provide services during a single winter season does not establish that the Employer’s
need is seasonal, and of a recurring nature, as required by the regulation at 20 C.F.R. § 655.6. The
Solicitor argues that the statement of work by itself does not establish that Employer’s hospitality
services are tied to a repeating seasonal pattern in the area of intended employment. In addition, she
asserts that Employer did not submit any other area of intended employment specific evidence
supporting a recurring seasonal pattern that aligns with the requested period of October to March.
The Solicitor notes that the public tourism and lodging data for the Pigeon Forge/Great Smokey
Mountain market, that was supplied by the Employer, is flawed and does not establish a substantial
increase in visitor activity during the months of the Employer’s alleged seasonal need because it does
not include a full calendar year. Rather the evidence only shows tourism and lodging statistics
covering the months of October through March in the year 2025, and omits statistics from April to
September, Employer’s purported off-season. Accordingly, there is no way to compare the seasonal
period of October to March against the off-season of April to September to determine whether there
is an increase in the winter period as alleged by the Employer.
The Solicitor further asserts that the Employer failed to meet its burden to establish its need
for 50 temporary workers, noting that the statement of work alone is insufficient as Employer failed
to establish how it determined it would need 50 hospitality workers to meet a seasonal need. Further
the Solicitor notes that Employer’s claim that the job order supports its alleged need for 50 temporary
workers should be rejected because the job order merely reflects the Employer’s requested
recruitment parameters. It does not, without supporting area of intended employment specific
evidence, establish that the number of workers requested is justified. The Solicitor points out that
BALCA has consistently determined that bare assertions without supporting evidence are insufficient
to support an employer’s temporary need or a bona fide need for the number of workers requested.
Accordingly, the Solicitor argues that the CO’s determination was not arbitrary or capricious and
should be affirmed.
SCOPE OF REVIEW
BALCA has a limited scope of review in H-2B cases. Specifically, BALCA may only
consider the appeal file prepared by the CO, the legal briefs submitted by the parties, and the
Employer’s request for review, which may contain only legal argument and such evidence as was
actually submitted to the CO before the date the CO’s determination was issued. 20 C.F.R. §
655.61(a). After considering this evidence, BALCA must take one of the following actions in
deciding the case:
(1) Affirm the CO’s determination; or
(2) Reverse or modify the CO’s determination; or
(3) Remand to the CO for further action.
20 C.F.R. § 655.61(e).
STANDARD OF REVIEW
Neither the Immigration and Nationality Act, nor the regulations applicable to H-2B
temporary labor certifications, identify a specific standard of review pertaining to an Administrative
- 9 -
Law Judge’s review of determinations by the CO in H-2B matters. BALCA has applied an arbitrary
and capricious standard to its review of the CO’s determination in H-2B temporary labor certification
cases. See Brook Ledge Inc., 2016-TLN- 00033, slip op. at 5 (May 10, 2016) (BALCA panel
acknowledging that it reviewed the CO’s determination under an arbitrary and capricious standard).
BALCA must be satisfied that the CO has examined “the relevant data and [has] articulate[d] a
satisfactory explanation for its action including a rational connection between the facts found and the
choice made.” See Custom Retaining Walls, LLC 2023 TLN 00057 (April 10, 2023) quoting Motor
Vehicle Mfrs. Ass’n, Inc. v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983). In reviewing the
CO’s explanation, BALCA must “consider whether the decision was based on a consideration of the
relevant factors and whether there has been a clear error of judgment.” Id.
ISSUES
Whether the Certifying Officer properly denied the Employer’s H-2B application due to:
1) Employer’s failure to establish that its request for 50 “Hospitality and Commercial
Cleaning Associates,” for the period of October 23, 2026, to March 31, 2027, is based upon a
“temporary” employment need, according to the Employer’s stated standard of “seasonal need,” and
2) Employer’s failure to establish a bona fide need for the number of workers requested.
DISCUSSION
In order to obtain temporary labor certification for foreign workers under the H-2B program,
the Employer is required to establish that its need for the requested workers is “temporary.”
Temporary need is defined by the Department of Homeland Security (“DHS”) regulation at 8 C.F.R.
§ 214.2(h)(6)(ii)(A). This regulation states:
Temporary services or labor under the H-2B classification refers to any job in which
the petitioner’s need for the duties to be performed by the employee(s) is temporary,
whether or not the underlying job can be described as permanent or temporary.
8 C.F.R. § 214.2(h)(6)(ii)(A).
The DHS regulation further states in regard to the nature of petitioner’s need:
Employment is of a temporary nature when the employer needs a worker for a limited
period of time. The employer must establish that the need for the employee will end
in the near, definable future. Generally, that period of time will be limited to one year
or less, but in the case of a one-time event could last up to 3 years. The petitioner’s
need for the services or labor shall be a one-time occurrence, a seasonal need, a
peakload need, or an intermittent need.
8 C.F.R. § 214.2(h)(6)(ii)(B).
- 10 -
In the current case, the Employer is applying for temporary labor certification for 50
“Hospitality and Commercial Cleaning Associates” for the period of October 23, 2026, to March 31,
2027, on the basis of a seasonal need. In order to prove a seasonal need, the DHS regulation states,
[t]he petitioner must establish that the services or labor is traditionally tied to a season
of the year by an event or pattern and is of a recurring nature. The petitioner shall
specify the period(s) of time during each year in which it does not need the service or
labor. The employment is not seasonal if the period during which the services or labor
is not needed is unpredictable or subject to change or is considered a vacation period for
the petitioner’s permanent employees.
(8 C.F.R. §214.2(h)(6)(ii)(B)(2)).
The Employer bears the burden of establishing why the job opportunity and number of
workers requested reflect a temporary need within the meaning of the H-2B program. See, e.g., Alter
and Son General Engineering, 2013-TLN-3 (Nov. 9, 2012) (affirming denial where the Employer did
not provide an explanation regarding how its request fits within one of the regulatory standards of
temporary need).
An Employer must also demonstrate a bona fide need for the number of workers and period
of need requested. 20 C.F.R. § 655.11(e)(3) and (4). See Roadrunner Drywall, 2017-TLN-00035,
slip op. at 9-10 (May 4, 2017) (affirming denial where the employer’s temporary and permanent
employee payroll data did not support its claimed number of workers or period of need).
In the Notice of Deficiency, the CO determined that the Employer did not sufficiently
demonstrate its temporary “seasonal” need for 50 “Hospitality and Commercial Cleaning Associates”
for the period of October 23, 2026, to March 31, 2027. AF 110. The CO stated that, in order to
establish a seasonal need, the Employer must show that the service or labor for which it seeks workers
is traditionally tied to a season of the year by an event or pattern and is of a recurring nature. Further
the employer must specify the period(s) of time during each year in which it does not need the services
or labor. The CO further noted that the employment is not seasonal if the period during which the
service of labor is needed is unpredictable, subject to change or considered a vacation period for the
employer’s permanent employees. Id. The CO quoted the Employer’s application and its statement
of temporary need but determined that the Employer had not explained what events cause the seasonal
need and the specific period of time, in which the Employer will not need the services or labor. Id.
Accordingly, the CO directed the Employer to submit information and documentation in
support of its seasonal need and the dates of need being requested. Specific information requested
included a description of the Employer’s business history and activities, a schedule of operations
through the year, summarized monthly occupancy report for calendar years 2024, 2025 and up to the
present for 2026, summarized monthly payroll reports for the same period, broken down by
permanent and temporary workers in the requested position of Hospitality and Commercial Cleaning
Associate and other evidence that similarly serves to justify the dates of need being requested. AF
111.
- 11 -
The CO also determined that the Employer’s application was deficient as it did not establish
that the number of workers requested on the application is true and accurate and represents bona fide
job opportunities. Specifically, the CO stated that the Employer had not adequately justified its need
for 50 “Hospitality and Commercial Cleaning Associates” for the period of October 23, 2026, to
March 31, 2027. Again, the CO requested further explanation of why the Employer is requesting 50
Hospitality and Commercial Cleaning Associates for the period of need requested, and specific
documentation, including contracts, letters of intent, etc. that specify the number of workers and dates
of need. In addition, the CO requested summarized monthly payroll reports for the job title for
calendar years 2024 and 2025 and up to date 2026, that identify full-time permanent and temporary
employment in the requested occupation, as well as the total number of workers or staff employed,
total hours worked, and total earnings received, as well as other documentation supporting and
justifying the number of workers requested. AF 113.
In response to the Notice of Deficiency, Employer submitted multiple documents which
include its Exhibit list, a corrected Appendix B, an amended job order, payroll and staffing analysis,
as well as December 2024 through July 2026 payroll summaries, with Employer’s payroll attestation,
a master service agreement and franchise formation documents. AF 31-104. In its cover letter
Employer stated that its Tennessee operation is new. Therefore, it has no historical 2024 or 2025
payroll, staffing, hours-worked, earnings or occupancy records attributable to its Dollywood Parks &
Resorts contract or any other prior Tennessee worksite. Accordingly, Employer stated that it attached
its executed contract, its corrected Tennessee job order, its established company-wide payroll history
and independent public data concerning the Pigeon Forge/Great Smoky Mountains hospitality market
to support the prospective temporary need. Employer further stated that the present filing is based
on a newly secured Tennessee contract with Dollywood Parks & Resorts, noting that the executed
Statement of Work states that Dollywood anticipates a temporary winter staffing need from October
1, 2026 through March 31, 2027, for approximately 50 to 75 temporary hospitality support staff.
Employer stated that it is requesting the low end of this estimate which is 50 workers.
In support of its temporary need Employer asserted that the positions are connected to a
specific, prospective, and time limited winter staffing obligation, rather than an indefinite year-round
expansion of MT Mitchell’s permanent workforce. Employer also provided the City of Pigeon Forge
Department of Tourism’s 2025 Lodging revenue report in support of its seasonal need. Employer
noted that months within the Employer's requested winter period generated substantial lodging
activity, including approximately $54.2 million in October, $43.5 million in November, $43.0 million
in December, $21.3 million in January, $19.1 million in February, and $34.4 million in March. The
total Pigeon Forge Lodging revenue for the year 2025 is indicated as $478,303,184. AF 46. Employer
also submitted its company-wide payroll records to show that it has a permanent workforce although
it noted that it has no records for the new Tennessee/Dollywood area. AF 47.
Regarding the second deficiency concerning the number of workers requested, Employer
stated that the 50 workers requested is derived from the specific executed statement of work for its
current project at Dollywood. AF 48.
In the Final Determination issued by the CO on August 27, 2026, the CO acknowledged and
discussed the evidence submitted by the Employer but determined that the Employer failed to prove
its seasonal need for the requested 50 Hospitality and Commercial Cleaning Associates. AF 21-30.
- 12 -
Specifically, the CO noted the Employer submitted an executed statement of work for the Employer’s
Dollywood 2026-2027 winter contract, company-wide payroll summaries for 2024-2026, a summer
2026 temporary H-2B payroll summary, independent municipal lodging revenue for Pigeon Forge,
National Park Service visitor use data and an explanation that this is the Employer’s first contracted
operation with Dollywood and therefore no Dollywood specific historical occupancy or Dollywood
specific historical payroll records existed.
In reviewing the Employer’s documentation, the CO determined that a contractual obligation
to provide hospitality and commercial cleaning services during a single winter season does not
establish that the Employer’s need is seasonal and of a recurring nature as required by 20 C.F.R. §
655.6. The CO stated that to demonstrate a seasonal need, the employer must show that its services
are tied to a repeating seasonal pattern in the Area of Intended Employment (AIE) and identify
predictable periods when the labor is not needed. The CO noted that the contractual statement of
work does not accomplish this and the Employer’s response lacked sufficient area of intended
employment specific evidence showing that a recurring seasonal pattern, aligning with the requested
October to March period, exists.
The CO also noted that the lodging and tourism data submitted is incomplete and does not
include full calendar year information which is necessary to compare the claimed October through
March busy season against the April to September season. The data submitted also does not show
complete monthly trends across full years and therefore does not demonstrate that the requested
period corresponds to a true recurring busy season for the requested occupation in the East Tennessee
nonmetropolitan area. The CO concluded that without this complete area of intended employment
specific evidence, the record does not establish a recurring seasonal pattern. The CO also determined
that as the payroll documentation reflects companywide operations from other locations it is not
relevant to labor needs in the area of intended employment pertinent to the current application which
is the East Tennessee nonmetropolitan area.
The CO also determined that Employer failed to establish a temporary need for the number
of workers requested. The CO acknowledged that Employer had submitted the executed Statement
of Work indicating an anticipated temporary winter staffing need of approximately 50 to 75 workers,
the corrected Tennessee Job Order listing 50 openings and the company wide payroll summaries for
2024-2025 with Employer’s explanation that no Dollywood historical staffing records exist and that
50 represents the low end of the anticipated range of workers. The CO concluded that the explanation
and submitted documentation did not overcome the deficiency. The CO noted that the Employer did
not provide documentation explaining how the 50 workers were determined “beyond citing an
approximate staffing need of 50 to 75 workers in the client’s Statement of Work.” AF 30. The CO
pointed out that the payroll summaries pertain to operations outside the East Tennessee
nonmetropolitan area of intended employment and therefore are not probative of the staffing
requirements for the requested worksite. The CO determined that in the absence of area of intended
employment operational evidence or historical staffing metrics, the contractual Statement of Work
alone is insufficient to justify that the requested 50 positions represent bona fide job opportunities
during the requested period of need.
After reviewing the record in this case, the undersigned finds that the CO did not act arbitrarily
or capriciously in denying the Employer’s application for H-2B certification for 50 “Hospitality and
- 13 -
Commercial Cleaning Associates” for the period of October 23, 2026, to March 31, 2027. In order
to receive temporary labor certification under the H-2B program, it is the Employer’s burden to
establish the basis for its temporary need based on its chosen standard. In the Employer’s application
it stated that its standard of need is seasonal.
The CO accurately and reasonably determined that the Employer’s explanation and
documentation failed to establish that its need for temporary workers fits within the definition of a
seasonal need. As noted by the CO, in order to prove a seasonal need, the DHS regulation states,
[t]he petitioner must establish that the services or labor is traditionally tied to a season
of the year by an event or pattern and is of a recurring nature. The petitioner shall
specify the period(s) of time during each year in which it does not need the service or
labor. The employment is not seasonal if the period during which the services or labor
is not needed is unpredictable or subject to change or is considered a vacation period
for the petitioner’s permanent employees.
(8 C.F.R. §214.2(h)(6)(ii)(B)(2)).
The CO reasonably concluded that the Employer’s provided payroll information and other
documentation failed to support that its need for 50 “Hospitality and Commercial Cleaning
Associates” for the period of October 23, 2026, to March 31, 2027 is a seasonal need. The CO
acknowledged the Employer’s explanation that it has never previously operated at the Dollywood
location or at any East Tennessee business. Therefore there is no historical payroll information to
support its application. However, although the Employer did not have historical payroll information
for the Dollywood location, it is still required to prove its seasonal need based on the submitted
documentation. In this case the CO thoroughly analyzed the submitted information and reasonably
determined it did not establish the Employer’s seasonal need for 50 Hospitality and Commercial
Cleaning Associates for the requested period.
The CO addressed the submitted payroll information and correctly determined that as it
reflected companywide operations from other locations it is not relevant to labor needs in the area of
intended employment pertinent to the current application, which is the East Tennessee
nonmetropolitan area.
The CO also addressed the lodging and tourism data submitted by the Employer, but
reasonably determined it is incomplete and does not include full calendar year information which is
necessary to compare the claimed October through March busy season against the April to September
season.
The data submitted by the Employer is found in the charts set out below.
Period Pigeon Forge Lodging Revenue Year-over-Year Change
Jan 2025 $21,278,518 14%
Feb 2025 $19,103,824 -3%
Mar 2025 $34,383,680 -6%
Oct 2025 $54,208,033 9%
- 14 -
Period Pigeon Forge Lodging Revenue Year-over-Year Change
Nov 2025 $43,547,726 7%
Dec 2025 $42,950,410 2%
2025 Total $478,303,184 1%
Source: City of Pigeon Forge Department of Tourism, 2025 Lodging Revenue Report.
Period Great Smoky Mountains NP Recreation Visits
Jan 2025 276,999
Feb 2025 409,449
Mar 2025 845,724
Oct 2025 1,561,683
Nov 2025 867,677
Dec 2025 714,902
2025 Total 11,527,939
Source: U.S. National Park Service, Great Smoky Mountains NP visitor-use statistics.
The CO accurately notes that Employer only provided data for the months of its claimed
seasonal need, October through March. The CO reasonably determined that as the data does not show
each month of the year, it is impossible to use the data from the alleged seasonal months and compare
it to the off-season months. Further the data only includes one year and therefore cannot be used to
determine if there is a consistent recurring seasonal need during the alleged period. Therefore the
CO determined the data does not demonstrate that the requested period of seasonal need corresponds
to a true recurring busy season for the requested occupation in the East Tennessee nonmetropolitan
area. The CO therefore concluded that without this complete area of intended employment specific
evidence the record does not establish a recurring seasonal pattern. In reviewing the information
submitted as a whole, the CO reasonably concluded that as the employer has no Dollywood‑specific
historical staffing or occupancy records, and did not submit sufficient equivalent area of intended
employment specific evidence, the provided documentation does not establish a recurring seasonal
need at the Pigeon Forge, Tennessee, worksite.
Although Employer points to the executed statement of work for the Employer’s Dollywood
2026-2027 winter contract, the CO reasonably concluded that a contractual obligation to provide
hospitality and commercial cleaning services during a single winter season does not establish that the
Employer’s need is seasonal and of a recurring nature as required by 20 C.F.R. § 655.6. See Rubees
Cleaners, 2024-TLN-00179, slip op. at 10 (July 2, 2024) (“It is self-evident that one contract for
services for the supposed period of seasonal need does not evidence a seasonal need…”).
The CO reasonably determined that the Employer failed to establish its recurring seasonal
need as it failed to show that its services are tied to a repeating seasonal pattern in the area of intended
employment. As the Employer did not have historical payroll information to establish its recurring
seasonal need, it was reasonable for the CO to require the Employer to provide information specific
to the area of intended employment to support its alleged seasonal need for the workers requested.
After reviewing the record, as well as the CO’s determination, I find that the CO sufficiently
considered the documentation submitted by the Employer and reasonably determined that the
- 15 -
Employer failed to meet its burden of establishing its seasonal need for 50 Hospitality and
Commercial Cleaning Associates during the requested period of October 1, 2026 through March 31,
2027 under the H-2B regulations.
Employer also failed to establish its bona fide need for the number of workers requested.
Although this point is moot, in light of the Employer’s failure to establish its temporary need based
on the seasonal standard of need, the CO’s conclusion regarding Employer’s failure to establish a
bona fide need for the number of workers requested is supported by the record. The CO
acknowledged that Employer had submitted the executed Statement of Work indicating an anticipated
temporary winter staffing need of approximately 50 to 75 workers, the corrected Tennessee Job Order
listing 50 openings and the company wide payroll summaries for 2024-2025 with Employer’s
explanation that no Dollywood historical staffing records exist and that 50 represents the low end of
the anticipated range of workers. The CO concluded that the explanation and submitted
documentation did not overcome the deficiency. The CO noted that the Employer did not provide
documentation explaining how the 50 workers were determined “beyond citing an approximate
staffing need of 50 to 75 workers in the client’s Statement of Work.” AF 30. The CO pointed out
that the payroll summaries pertain to operations outside the East Tennessee nonmetropolitan area of
intended employment and therefore are not probative of the staffing requirements for the requested
worksite.
The CO reasonably determined that in the absence of area of intended employment
operational evidence or historical staffing metrics, the contractual Statement of Work alone is
insufficient to justify that the requested 50 positions represent bona fide job opportunities during the
requested period of need. The CO requested specific supporting documentation which the Employer
failed to supply to meet its burden of proof.
For the reasons stated above I find the CO did not act arbitrarily or capriciously in concluding
that Employer failed to establish its seasonal need for 50 “Hospitality and Commercial Cleaning
Associates” for the period of October 23, 2026, to March 31, 2027. The CO is not required to accept
the claims of an Employer who does not supply supporting documentation. See AB Controls &
Technology, 2013-TLN-00022 (Jan. 17, 2013) (bare assertions without supporting evidence are
insufficient). See also Progressio, LLC, d/b/a La Michoacana Meat, 2013-TLN-00007 (Nov. 27,
2012) (affirming denial where the employer’s payroll records did not demonstrate a consistent need
for increased labor during the entire alleged period of temporary need).
The CO reasonably requested documentation to support the Employer’s specific need for the
requested labor and period of need, which the Employer failed to provide. The regulations are clear
that the burden is on the Employer to establish its temporary need on the basis of the chosen standard.
See Empire Roofing, 2016-TLN-00065 (Sept. 15, 2016) (“An employer cannot just toss hundreds of
puzzle pieces—or hundreds of pages of documents—on the table and expect a CO to see if he or she
can fit them together. The burden is on the applicant to provide the right pieces and to connect them
so the CO can see that the employer has established a legitimate temporary need for workers”).
Accordingly, based on the information submitted to the CO, and for the reasons stated above,
the undersigned finds the CO reasonably determined that the Employer failed to meet its burden of
- 16 -
showing its temporary seasonal employment need for 50 “Hospitality and Commercial Cleaning
Associates” for the period of October 23, 2026, to March 31, 2027.
ORDER
For the foregoing reasons, Employer has failed to meet its burden of establishing its temporary
employment need 50 “Hospitality and Commercial Cleaning Associates” for the period of October
23, 2026, to March 31, 2027. The CO’s denial of Employer’s application was neither arbitrary nor
capricious. Accordingly, the CO’s denial of Employer’s application for temporary labor certification
is AFFIRMED.
SO ORDERED.
For the Board of Alien Labor Certification Appeals:
DREW A. SWANK
Administrative Law Judge

Setzen Sie Ihre Recherche in ChatGPT oder Claude fort

Verbinden Sie Omnilex, um den Rechtskorpus über Ihren KI-Assistenten zu durchsuchen.