UNITED STATES DEPARTMENT OF LABOR BOARD OF ALIEN LABOR CERTIFICATION APPEALS Washington, DC ______________ Issue Date: 10 December 2025 BALCA No.: 2025-TLN-00188 ETA No.: H-400-25187-154801 In the Matter of: DAWKINS PRECISION FLOORING INSTALLATION LLC, Employer Certifying Officer: Chicago National Processing Center Appearances: Norman Bryan, Program Manager, For the Employer Office of the Solicitor Employment and Training Legal Services U.S. Department of Labor Washington, D.C. For the Certifying Officer Before: Natalie A. Appetta Administrative Law Judge DECISION AND ORDER AFFIRMING DENIAL OF CERTIFICATION This case arises from the September 19, 2025, request for review of Dawkins Precision Flooring Installation LLC (“Employer”) regarding the Certifying Officer’s (“CO”) September 2, 2025 Final Determination denying Employer’s application for temporary alien labor certification under the H-2B non-immigrant program. The H-2B program permits employers to hire foreign workers to perform temporary nonagricultural work within the United States on a one-time occurrence, seasonal, peakload, or intermittent basis, as defined by the United States Department of Homeland Security. See 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6);1 20 C.F.R. § 1 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated Appropriations Act, 2016, Pub. L. No. 114-113, Division H, Title I, § 113 (2015). This definition has remained in place through subsequent appropriations legislation, including the current legislation. See Further Consolidated Appropriations Act, 2024, Pub. L. No. 118-47, Division D, Title I, § 111 (2024); Full-Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No. 119-4, Division A, Title I, §§ 1101(a)(8), 1105—1106 (2025) (extending the provisions of various appropriations acts, including the relevant provisions of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025); Continuing Appropriations, Agriculture, Legislative Branch, Military Construction and Veterans Affairs, and Extensions Act, 2026, Pub. L. No. 119-37, Division A, §§ 101, 106 (2025) (extending the relevant provisions of the Full-Year
- 2 - 655.6(b).2 Employers who seek to hire foreign workers under this program must apply for and receive labor certification from the United States Department of Labor using a Form ETA-9142B, Application for Temporary Employment Certification (“Form 9142”). A CO in the Office of Foreign Labor Certification (“OFLC”) of the Employment and Training Administration reviews applications for temporary labor certification. Following the CO’s denial of an application under 20 C.F.R. § 655.53, an employer may request review by the Board of Alien Labor Certification Appeals (“BALCA” or “the Board”). 20 C.F.R. § 655.61(a). I. Background On July 5, 2025, the Department of Labor’s Employment and Training Administration (“ETA”) received Employer’s application for temporary labor certification, requesting certification for 50 “Tile Setter Helpers” for the period of October 1, 2025, to July 31, 2026, under the SOC code 47-3011.00 and SOC occupation title of “Helpers – Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setter.” AF 84-112.3 Employer’s application indicates that the nature of temporary need is “intermittent.” AF 85. In Employer’s response to the Notice of Deficiency, it indicated that the nature of its temporary need is “one-time occurrence.” AF 56. The CO issued a Notice of Deficiency (“NOD”) on August 7, 2025, listing five deficiencies in the Employer’s application. AF 71-83. On August 14, 2025, Employer responded to the NOD and submitted supporting documentation. AF 48-70. Employer also amended the request for the total number of Tile Setter Helpers to 30. AF 58. On September 2, 2025, the CO issued a Final Determination outlining three deficiencies from the first NOD that remain. AF 34-44. Specifically, the CO concluded that Employer failed to establish the job opportunity as temporary in nature, pursuant to 20 C.F.R. §§ 655.(a) and (b), and failed to establish a temporary need for the number of workers requested, pursuant to 20 C.F.R. §§ 655.11(e)(3) and (4), 655.1(a)(1) and 655.6. AF 38-44. Therefore, the CO denied Employer’s application. AF 44. By letter dated September 18, 2025, Employer requested administrative review of the CO’s Final Determination. AF 1-33. BALCA assigned this case to Administrative Law Judge Sean M. Ramaley on September 29, 2025. On the same date, ALJ Ramaley issued a Notice of Assignment and Expedited Briefing Schedule permitting the CO (Solicitor) and Employer to file a brief within seven business days of receiving the Appeal File. 20 C.F.R. § 655.61(c). Neither party filed a brief. On Continuing Appropriations and Extensions Act, 2025, until either subsequent appropriations legislation is enacted into law or January 30, 2026, whichever occurs first). 2 On April 29, 2015, the Department of Labor (“DOL”) and the Department of Homeland Security (“DHS”) jointly published an Interim Final Rule (“IFR”) amending the standards and procedures that govern the H-2B temporary labor certification program. See Temporary Non-Agricultural Employment of H-2B Aliens in the United States; Interim Final Rule, 80 Fed. Reg. 24,042 et seq. (Apr. 29, 2015). The rules provided in the IFR apply to applications “submitted on or after April 29, 2015, and that have a start date of need after October 1, 2015.” IFR, 20 C.F.R. § 655.4(e). All citations to 20 C.F.R. Part 655 in this opinion and order are to the IFR. 3 References to the appeal file will be abbreviated with an “AF” followed by the page number.
- 3 - November 6, 2025, the case was reassigned to the undersigned. On November 28, 2025, the undersigned received the administrative file.4 In its application, Employer requested certification of 50 Tile Setter Helpers. AF 85. On Employer’s application (Form 9142), in response to its statement of temporary need, Employer stated: We regularly employ permanent, year-round tile setter workers who do not use any helper[s] to get our residential jobs done in this area as per the reports submitted herewith and duly signed as per the letter of intent. The magnitude of this job at 27100 Perdido Beach Blvd. is 220,000 square feet of wall and flooring installation, will need approximately 40 tile setter helpers for the duration of the project. A minimum of 2 tile setter helper[s] will be assigned to each tile setter in order to average an output of 500 square feet per week. Each tile setter will have 2 helpers assigned them for maximum output. These helper[s] will ensure the tiler setter has the required materials and all the necessary work aid for maximum efficiency and effectiveness for maximum output. Our need for tile setter helpers arises where the magnitude of this project demands our tile setters to have helpers other than normal. This need will begin October 1, 2025 and persist until July 31, 2026, requiring us to temporarily supplement our permanent staff of tile setters due to the one-time occurrence need and also the magnitude of this project, within the Mobile Alabama area. These temporary additions to our workforce do not and will not become part of our regular operation as our need for them ends in July 2026. AF 90. In the NOD, issued August 7, 2025, the CO listed the five deficiencies. The CO stated that (1) Employer failed to establish the job opportunity as temporary in nature, pursuant to 20 C.F.R. § 655.6(a)and (b), (2) failed to establish a temporary need for the number of workers requested, pursuant to 20 C.F.R. §§ 655.1(e)(3) and (4); 655.1(a)(1) and 655.6, (3) failed to submit an acceptable job order, pursuant to 20 C.F.R. §§655.16 and 655.18, (4) job assurances and contents pursuant to 20 C.F.R. §655.18(a)(1), and (5) failure to submit a complete and accurate ETA Form 9142. AF 76-83. The CO noted the first deficiency as Employer’s “failure to establish the job opportunity as temporary in nature,” citing 20 C.F.R. § 655.6(a) and (b) for the requirement that “an employer must establish that its need for non-agricultural services or labor is temporary, regardless of whether the underlying job is permanent or temporary” and an “employer’s need is considered temporary if 4 There was a delay in the transmittal of the appeal file due to a lapse in federal appropriations lasting from October 1, 2025 through November 12, 2025. The CO and Employer should be notified of the BALCA’s decision within seven business days of the submission of the CO’s brief of 10 business days after the appeal file, whichever is later. 20 C.F.R. §655.61(f).
- 4 - justified to the CO as one of the following: 1) a one-time occurrence; 2) a seasonal need; 3) a peakload need; or 4) an intermittent need as defined by DHS regulations.” 20 C.F.R. § 655.6(b). AF 76. The CO stated that the Employer did not submit sufficient documentation in its application to support its statement that tile setter helpers have not been hired in the past and are only needed in the current scenario. AF 77. The CO also noted that the employer selected “intermittent” for the nature of its temporary need, but its temporary need statement references a “one-time” need occurrence. Id. The CO concluded that the employer did not demonstrate how its need meets the regulatory standard and has not explained what events cause the intermittent need. Id. The CO requested additional information including, (1) description of the Employer’s business history, activities and schedule of operations, (2) explanation of why the job opportunity and number of workers requested reflect a temporary need, and (3) how this request for temporary labor certification meets the regulatory standards. AF 77. The CO also requested additional documentation, including (1) monthly invoices from calendar years 2024 and 2025 showing that work will be performed during the requested period of need, (2) signed service contracts from customers for the previous calendar year, and (3) summarized monthly payroll reports for at least two calendar years, identifying for each month and separately for full-time permanent and temporary employment in the requested occupation, the total number of workers or staff employed, total hours worked, and total earnings received, signed by the Employer and attesting that the information was compiled from the Employer’s actual accounting records or system, and if needed, submit other explanation of how the documents support the requested dates of need. Id. The CO listed the second deficiency as failure to establish a temporary need for the number of workers requested.” AF 77. Regarding this deficiency, the CO stated that the employer had not established that the number of worker positions and period of need are justified, and that the request represents a bona fide job opportunity, as required by 20 C.F.R. §§ 655.11(e)(3) and (4) and 20 C.F.R. §§ 655.1(a)(1) and 655.6. Id. The CO noted that the Employer requested certification for 50 Tile Setter Helpers from October 1, 2025 to July 31, 2026, and stated that the Employer did not indicate how it determined that it needs these workers during the requested period of need. AF 77-78. Accordingly, the CO requested additional evidence and documentation to establish that the number of workers requested is true and accurate and represents bona fide job opportunities. AF 78. The requested information included: (1) an explanation for why the Employer is requesting 50 Helpers – Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters for Mobile, Alabama during the dates of need requested, (2) documentation including contracts, letters of intent etc. that specify the number of workers and dates of need, (3) summarized monthly patrol reports for at least the previous two calendar years, that identify, for each month and separately for full-time permanent and temporary employment in the requested occupation, the total number of workers or staff employed, total hours worked, and total earnings received; (4) An explanation of the payroll documentation, as well as other evidence and documentation that similarly serves to justify the number of workers requested, and (5) other evidence and documentation that justifies the dates of need requested for certification. AF 78- 79.
- 5 - The CO noted the third deficiency as “failure to submit an acceptable job order,” pursuant to 20 C.F.R. §§ 655.18 and 655.19, the fourth deficiency as “job assurances and contents,” pursuant to 20 C.F.R. §655.18(a)(1), and requested an amended job order. AF 80-82. Finally, the CO noted a fifth deficiency, “failure to submit a complete and accurate ETA Form 9142, pursuant to 20 C.F.R. §655.15(a) and requested clarification as to how many workers the employer is requesting. AF 82- 83. As these deficiencies were not noted in the Final Determination denying certification and did not form a basis for the final denial; they will not be addressed in this decision. On August 14, 2025, Employer responded to the NOD. AF 48-70. In response, Employer submitted a response email, a response letter, a letter of intent to hire the Employer, the 2024 monthly payroll reports, an article about labor shortage titled “Alabama Construction News: Combatting the construction labor shortage,” issued July 11, 2024, and a copy of the SWA job order, and attempted to address the deficiencies. Id. The CO noted that in its response letter, the Employer explained, As stated, our clients in Baldwin, County Alabama to whom we will be subcontracted to, have a one-time occurrence need from October 1, 2025 to July 31, 2026. In fact, the letter of intent submitted herein from our client stipulates this one-time occurrence need. The need is neither permanent nor year-round. As such, we have a one time occurrence need for Tile Setter Helpers from October 1, 2025 to July 31, 2026. AF 40. In the final Determination, issued September 2, 2025, the CO concluded, however, that the Employer did not demonstrate how its need meets the regulatory standard. The CO stated that to qualify for a one-time occurrence, The employer must demonstrate that it has not employed workers for this type of labor in the past and that it will not need such workers in the future, or that its usual employment situation is permanent, but a temporary event of short duration has created a need for additional workers. The employer has failed to provide sufficient evidence in this case. AF 41. The CO noted that the employer stated in response to the NOD, “There is no payroll for permanent Tile Setter Helpers. This is because the company only uses Tile Setter Helpers on a contractual basis, that’s temporary.” Id. The CO explained that it appears the employer has hired tile setter helpers in the past and will continue to do so as it obtains new projects and therefore, it is unclear how the employer has a one-time occurrence need from October 1, 2025 through July 31, 2026. Id. The CO further explained that the payroll records for temporary Tile Setter Helpers in 2024 show that the Employer had two temporary Tile Setter Helpers working full time in every month except August and September. Id. The CO states that it is unclear how the employer has a one-time occurrence need for Tile Setter Helpers if they are part of the Employer’s regular operations. Id. Finally, the CO addresses the article discussing labor shortages in Alabama, issued July 2024, and states that a labor shortage alone does not meet the regulatory requirements for granting temporary
- 6 - labor certification. Id. The CO concludes that therefore, the employer did not overcome the deficiency. Id. The CO also states that although the Employer provided a Letter of Intent from American Flooring, Cabinets and Granite, it did not provide any signed service contracts from customers as requested in the NOD and because no service contracts have been provided, the Department “is unable to make a comparison to the increase in workload between the previous year and the employer’s requested period of need. AF 40. The CO also notes that the employer states in the response to the NOD that previous contracts make up its year-round services, and it therefore does not appear that this project represents a unique event in its business operations; “the employer is in the business of seeking, securing and implementing construction projects on an on-going basis, regardless of the size or requested occupation of the project.” AF 40-41. Regarding the second deficiency, failure to establish temporary need for the number of workers requested, pursuant to 20 C.F.R. §§655.11(e)(3) and (4), 655.1(a)(1) and 655.6, the CO notes that the regulations state that an employer must establish that the number of worker positions and period of need are justified and that the requires represents a bona fide job opportunity and temporary need includes establishing when the need occurs, the nature of the need and how many workers are required. AF 41. The CO states that the Department needs to know how many bona fide job opportunities are available so it can determine whether there are not sufficient U.S. workers who are qualified and will be able to perform the temporary services. Id. The CO notes that the employer stated in its response to the NOD, The scope of the work for this job, which is approximately 180 thousand square feet of Wall and Flooring Tile Installation, will need approximately 30 Tile Setter helpers whom [sic] will be helpers for our Tile Setters, and have an average output of approximately 4 to 5 hundred square feet per week. Each Tile Setter will have 3 Helper[s] assigned to them for maximum output. These Helper[s] will ensure the Tile Setter has the required materials and all the necessary work aid for maximum efficiency and effectiveness for maximum output. AF 43. The CO states that although the Employer states it requires 30 Tile Setter Helpers to complete the project outlined in the letter of intent, it provided no formal contract. Id. The CO stated that letters of intent “merely reflect a preliminary commitment between parties and, as non-binding documents, do not sufficiently support the request for workers. Id. The CO further states that the Employer provided 2024 payroll reports for Tile Setter Helpers and the payroll shows two temporary Tile Setter Helpers employed in every month in 2024 except August and September. Id. However, the CO states that the Employer did not provide signed service contracts from customers for the previous calendar year as requested in the NOD. Id. The CO states that because no service contracts have been provided, the Department “is unable to make a comparison to the increase in workload between the previous year and the employer’s requested period of need” and it is therefore unclear how the Employer has a one-time occurrence need for 30 Tile Setter helpers from October 1, 2025 through July 31, 2026. The CO concluded that based on these reasons, the Employer’s application is denied. AF 44. On September 19, 2025, Employer requested administrative review. AF 1-33. In its request for review, it reiterated its statement of temporary need from its application. AF 24. Employer also
- 7 - discussed labor shortage in Alabama and its impacts, including job openings outpacing job seekers in the construction industry, a nursing shortage affecting hospitals, lower productivity from businesses, a 2023 Alabama law that attempts to address the labor shortage, and delays in completing construction projects due to labor shortages. AF 25. The Employer addressed its payroll reports and stated that there is no payroll for permanent Tile Setter Helpers because it only employs workers in this position on a temporary, contractual basis. AF 26. It also stated that it did not employ any temporary Tile Setter Helpers in 2023. Id. Employer also further addressed why it believes this application is a one-time occurrence need for 30 Tile Setter Helpers. It stated that it is a flooring company with year-round clients in residential tile installation services and an increased number of clients who have subcontract projects to Employer, which increases its need for Temporary Tile Setter Helpers. AF 24. The Employer explained that the projects “are one time occurrence project from our Flooring Installations Companies Clients that are seeking our services due to a one-time occurrence.” AF 27. It also asserts that this is a one-time occurrence project to be completed in the time frame of October 1, 2025 through July 31, 2026, to be completed and inspected before July 31, 2026, and asserts that this period of time to complete the project “shows that this is a one-time occurrence and that the need is Temporary in Nature.” Id. Finally, the Employer stated that its prior application for 70 Tile and Stone Setters was a one-time occurrence project requiring Tile and Stone Setters, but it lost the contract because it could not hire workers in time.5 Id. II. Discussion and Applicable Law BALCA has a limited scope of review in H-2B cases. Specifically, BALCA may only consider the appeal file prepared by the CO, the legal briefs submitted by the parties, and the Employer’s request for review, which may contain only legal argument and such evidence as was actually submitted to the CO before the date the CO’s determination was issued. 20 C.F.R. § 655.61(a). After considering this evidence, BALCA must take one of the following actions in deciding the case: (1) Affirm the CO’s determination; or (2) Reverse or modify the CO’s determination; or (3) Remand to the CO for further action. 20 C.F.R. § 655.61(e). Neither the Immigration and Nationality Act, nor the regulations applicable to H-2B temporary labor certifications, identify a specific standard of review pertaining to an Administrative Law Judge’s review of determinations by the CO in H-2B matters. BALCA applies an arbitrary and capricious standard to its review of the CO’s determination in H-2B temporary labor certification cases. See Brook Ledge Inc., 2016-TLN- 00033 at 5 (May 10, 2016) (BALCA panel acknowledging that it reviewed the CO’s determination under an arbitrary and capricious standard). Therefore, a 5 The Board reviewed the Employer’s prior application for 70 “Tile Setter Helpers” from October 17, 2023 until June 30, 2024, which requested the workers on the basis of a one-time occurrence. The ALJ reversed the CO’s denial of certification. See Dawkins Precision Flooring Installation LLC, Case No. 2024-TLN-00057 (Nov. 27, 2023).
- 8 - CO’s denial of certification must be upheld unless shown by Employer to be arbitrary and capricious or otherwise not in accordance with the law. BALCA must be satisfied that the CO has examined “the relevant data and [has] articulate[d] a satisfactory explanation for its action including a rational connection between the facts found and the choice made.” See Custom Retaining Walls, LLC 2023 TLN 00057 (April 10, 2023) quoting Motor Vehicle Mfrs. Ass’n, Inc. v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983) (citation and internal quotation marks omitted). In reviewing the CO’s explanation, BALCA must “consider whether the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment.” Id. Employers seeking certification under the H-2B program "must establish that [their] need for non-agricultural services or labor is temporary, regardless of whether the underlying job is permanent or temporary." 20 C.F.R. § 655.6(a). Need is considered temporary if justified as "a one-time occurrence[,] a seasonal need[,] a peakload need[,] or an intermittent need." 20 C.F.R. § 655.6(b); see also 8 U.S.C. § 8 U.S.C. 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6)(ii)(B). Here, Employer is requesting a temporary “intermittent” need for 30 “Tile Setter Helpers” for October 1, 2025 to July 31, 2026. AF 58, 85. However, throughout its submissions, Employer has asserted it is requesting certification for a “one-time occurrence” need for 30 Tile Setter Helpers and therefore this is the temporary need standard that the CO addressed and will be reviewed here. To demonstrate a temporary need on the basis of a one-time occurrence under the DHS regulation: The petitioner must establish that it has not employed workers to perform the services or labor in the past and that it will not need workers to perform the services or labor in the future, or that it has an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for a temporary worker. 8 C.F.R. §214.2(h)(6)(ii)(B)(1). The Employer bears the burden of establishing why the job opportunity and number of workers being requested reflect a temporary need within the meaning of the H-2B program. 20 C.F.R. § 655.6(a) and (b). See, e.g., Alter and Son General Engineering, 2013-TLN-3 (Nov. 9, 2012) (affirming denial where the Employer did not provide an explanation regarding how its request fit within one of the regulatory standards of temporary need). The Department has addressed the purpose and intent of a one-time occurrence need in the preamble to the applicable H-2B regulations, known as the Interim Final Rule or IFR. It describes a one-time occurrence as follows: One Time Occurrence. The Departments will employ the definition of one-time occurrence established in DHS regulations at 8 CFR 214.2(h)(6)(ii)(B)(1). The Departments do not intend for the 3-year accommodation of special projects to provide a specific exemption for industries like construction in which many of an employer's projects or contracts may prove a permanent rather than a temporary need. Therefore, we will closely review all assertions of temporary need on the basis of a one-time occurrence to ensure that the use of this category is limited to those circumstances where the employer has a non-recurring need which exceeds
- 9 - the 9-month limitation. For example, an employer who has a construction contract that exceeds 9 months may not use the program under a one time occurrence if it has previously filed an Application . . . identifying a onetime occurrence and the prior Application . . . requested H-2B workers to perform the same services or labor in the same occupation. 80 Fed. Reg. at 24,056 (Apr. 29, 2015). This preamble passage is relevant to the current application and makes clear that the “3 year accommodation of special projects” which applies to a one-time occurrence temporary need is not meant to provide an exemption for industries like construction. Id. Here, Employer asserts that it has not employed permanent workers as Tile Setter Helpers and only hires in this position on a temporary basis. The CO accurately notes that the payroll records for temporary Tile Setter Helpers in 2024 show that the Employer had two temporary Tile Setter Helpers working full time in every month except August and September and concludes that it is therefore unclear how the employer has a one-time occurrence need for Tile Setter Helpers if they are part of the Employer’s regular operations. Thus, the CO reasonably concluded that Employer’s request for H-2B workers does not fall within the first prong of the one-time occurrence definition – “that it has not employed workers to perform the services or labor in the past and that it will not need workers to perform the services or labor in the future.” 8 C.F.R. § 214.2(h)(6)(ii)(B)(1). The CO also notes that the employer states in the response to the NOD that previous contracts make up its year-round services, and it therefore does not appear that this project represents a unique event in its business operations, and here, the employer is in the business of seeking, securing and implementing construction projects on an on-going basis, regardless of the size or requested occupation of the project. Further, the CO accurately determined that the Employer had not explained what temporary event or events of short duration had caused the one-time occurrence or provided documentation, including service contracts, to allow the Department to compare the Employer’s workload in prior years to an increased workload in the Employer’s requested period of need. Thus, the CO reasonably concluded that Employer’s request for H-2B workers does not fall within the second prong of the one-time occurrence definition – “that it has an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for a temporary worker.” 8 C.F.R. § 214.2(h)(6)(ii)(B)(1). The record reveals that the Employer did not submit the documentation requested by the CO. Although the Employer submitted some of the requested information including a response letter and emails that attempt to address the deficiencies, a letter of intent to hire the Employer, the 2024 monthly payroll reports, and also submitted an article about labor shortage titled, “Alabama Construction News: Combatting the construction labor shortage,” issued July 11, 2024, and a copy of the SWA job order, it did not submit monthly invoices for 2024 and 2025, service contracts from the previous calendar year, summarized monthly patrol reports for two prior years identifying for each month and separately for full-time permanent and temporary employment in the position of Tile Setter Helper, the total number of workers or staff employed, total hours worked, and total earnings received, or explanation of the payroll documentation. Additionally, BALCA case law supports that single contracts alone do not create a temporary event of short duration as defined by the regulation when a business’s model consists of securing one
- 10 - contract after another. As stated by BALCA in the case of M and L Cleaning Services, 2023-TLN- 00064 (Apr. 4, 2023) slip op. at 4: In the ordinary sense of the words, perhaps, a “temporary” contract or project is a “one-time occurrence,” in that it is only going to be completed once. But in that sense of the word, every temporary contract and every temporary project is a one-time occurrence, because every temporary contract or project ends when it is finished. The Board has consistently held that employers whose business model consists of securing contracts to perform a service cannot use a single contract to meet their burden of demonstrating a one-time occurrence. See, e.g., TK Elec. LLC, 2024-TLN-00011 (Nov. 13, 2023); Sirtecom USA, LLC, 2023-TLN-00073 (May 10, 2023); Sahara Dev., Inc., 2023-TLN-00054 (Mar. 20, 2023). Additionally, a need for workers caused by a labor shortage cannot be fulfilled by the temporary labor certification program. See BMC West LLC, 2018-TLN-00099, at 11 (July 13, 2018) (“The presence of a labor shortage … does not support a finding that Employer’s need is temporary in nature”) and Tofte General Store, Inc., 2022-TLN-00010, at 5 (Nov. 1, 2021) (finding that a “wage war” in the employer’s location due to a labor shortage caused by the COVID-19 pandemic does not meet the requirements for a successful H-2B application). As noted in this case, a temporary contract or project may be temporary in that it is only going to be completed once and has a limited duration. However, this definition does not comport with the Department’s interpretation of the one-time occurrence standard, above, which specifically notes that the one-time occurrence standard of temporary need does not provide an exemption for industries like construction, where many of an employer’s projects or contracts may prove a permanent rather than a temporary need. 80 Fed. Reg. at 24,056. The CO therefore reasonably determined based on the Employer’s explanation, documentation and the Employer’s business model of securing contracts in the industry on a continual basis that it failed to prove a temporary need for workers on the basis of a one-time occurrence. See Sirtecom USA, LLC, 2023-TLN-00073, slip op. at 10 (May 10, 2023) (Considering employer’s business model of soliciting and securing similar contracts employer’s need to employ similar workers to execute its obligations under the contracts is permanent, rather than temporary). The CO’s determination is consistent with numerous BALCA decisions, the regulations and the IFR, all discussed above. The CO’s conclusion that the Employer did not establish its need for the number of workers requested is supported by the record and is rational. BALCA has consistently found that the CO is not required to accept the claims of an Employer who does not supply adequate supporting documentation. See AB Controls & Technology, 2013-TLN-00022 (Jan. 17, 2013) (bare assertions without supporting evidence are insufficient). The regulations are clear that the burden is on the Employer to establish its temporary need on the basis of the chosen standard as well as the number of workers requested. See Empire Roofing, 2016-TLN-00065 (Sept. 15, 2016) (“An employer cannot just toss hundreds of puzzle pieces--or hundreds of pages of document—on the table and expect a CO to see if he or she can fit them together. The burden is on the applicant to provide the right pieces and to connect them so the CO can see that the employer has established a legitimate temporary need for workers.”).
- 11 - Thus, for the reasons set forth above, the CO’s conclusion regarding Employer’s failure to establish a one-time occurrence need for 30 Tile Setter Helpers for the period of October 1, 2025, to July 31, 2026 is reasonable and rational. Employer failed establish a one-time occurrence need for 30 Tile Setter Helpers. Although the Employer submitted a response addressing its business history and activities, schedule of operations, reasons why its need is a one-time occurrence, a letter of intent to hire the Employer, the 2024 monthly payroll reports, an article about labor shortage titled “Alabama Construction News: Combatting the construction labor shortage,” issued July 11, 2024, and a copy of the SWA job order, these documents did not establish that the Employer will not require tile setter helpers to complete future contracts. Accordingly, based on the information submitted to the CO, and for the reasons stated above, the undersigned finds the CO considered the documentation submitted by the Employer and reasonably determined that the Employer failed to meet its burden of proving its temporary need for 30 Tile Setter Helpers for the period of October 1, 2025, to July 31, 2026, based on Employer’s stated “one-time occurrence” standard, as defined by the applicable regulation at 8 C.F.R. § 214.2(h)(6)(ii).6 Thus, the CO did not act arbitrarily or capriciously, nor contrary to law, in denying Employer’s application for temporary labor certification. ORDER The Certifying Officer’s denial of Dawkins Precision Flooring Installation LLC’s application for temporary labor certification for 30 Tile Setter Helpers for the period of October 1, 2025, to July 31, 2026 is AFFIRMED. SO ORDERED. For the Board of Alien Labor Certification Appeals: NATALIE A. APPETTA Administrative Law Judge 6 Because this appeal can be resolved on the issue of failure to establish a one-time occurrence need for the number of workers requested, I have not addressed the CO’s other bases for denial. See in re TT&T Salvage & Towing Svs., Inc., 2014-TLN-00036, n.7 (BALCA Aug. 5, 2014).
Was bedeutet dieser Text für Ihre Situation?
Kostenlose und unverbindliche Beratung
Schildern Sie uns Ihre Situation. Unser Team meldet sich per E-Mail bei Ihnen für Ihre Beratung.
Setzen Sie Ihre Recherche in ChatGPT oder Claude fort
Verbinden Sie Omnilex, um den Rechtskorpus über Ihren KI-Assistenten zu durchsuchen.