V Lions Farming, LLC v. County of Kern

CourtListener 9482189Calctapp07.03.2024

Gesamter Gesetzestext

Filed 3/7/24

CERTIFIED FOR PARTIAL PUBLICATION*

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIFTH APPELLATE DISTRICT

V LIONS FARMING, LLC, et al.,
F084763, F085102, F085220
Plaintiffs and Appellants,
(Super. Ct. Nos. BCV-15-101645,
v. BCV-15-101666, BCV-15-101679,
BCV-21-100533, BCV-21-100536)
COUNTY OF KERN et al.,

Defendants and Respondents; OPINION
CALIFORNIA INDEPENDENT
PETROLEUM ASSOCIATION et al.,

Real Parties in Interest and Respondents.

APPEAL from a judgment of the Superior Court of Kern County. Gregory A.
Pulskamp, Judge.
Shute, Mihaly & Weinberger, Rachel B. Hooper, Susannah T. French, Kevin P.
Bundy, Tori B. Gibbons, and Daniel P. Selmi for Plaintiff and Appellant V Lions
Farming.
Earthjustice, Colin C. O’Brien and Gregory D. Muren for Plaintiffs and Appellants
Natural Resources Defense Council and Sierra Club.

* Pursuant to California Rules of Court, rules 8.1105(b) and 8.1110, this opinion is
certified for publication with the exception of the Facts, Proceedings, and parts I., III.,
IV., V., VI., VII., and V.III. of the Discussion.
Center on Race, Poverty & The Environment, Caroline Farrell and Daniel I. Ress
for Plaintiffs and Appellants Committee for a Better Arvin, Committee for a Better
Shafter, and Comité Progreso de Lamont.
Natural Resources Defense Council and Ann Alexander for Plaintiff and Appellant
Natural Resources Defense Council.
Center for Biological Diversity and Hollin K. Kretzmann for Plaintiff and
Appellant Center for Biological Diversity.
Margo A. Raison, County Counsel, Andrew C. Thomson, Deputy County
Counsel; Holland & Knight, Jennifer L. Hernandez, Bradley B. Brownlow, Marne S.
Sussman, Daniel R. Golub and Emily M. Lieban for Defendants and Respondents.
Pillsbury Winthrop Shaw Pittman, Blaine I. Green, Mark E. Elliott, and Eric
Moorman for Real Party in Interest and Respondent Western States Petroleum
Association.
Manatt, Phelps & Phillips, Craig A. Moyer, Benjamin G. Shatz and Sigrid R.
Waggner for Real Party in Interest and Respondent California Independent Petroleum
Association.
Environmental Law Clinic and Deborah A. Sivas for California Council of Land
Trusts as Amici Curiae on behalf of Appellants.
Environmental Law Clinic, Deborah A. Sivas and Rica Garcia for David J.X.
González, Ph.D., Rachel Morello-Frosch, Ph.D., Jill Johnston, Ph.D., Mary Willis, Ph.D.,
Jonathan Buonocore, Ph.D., Joan A. Casey, Ph.D., and Lisa Mckenzie, Ph.D. as Amici
Curiae on behalf of Appellants.
Frank G. Wells Environmental Law Clinic, Andria So, Cara Horowitz and Gabriel
F. Greif for H. Bradley Shaffer as Amici Curiae on behalf of Appellants.
-ooOoo-

2.
This is the second appeal addressing whether the County of Kern1 complied with
the California Environmental Quality Act (CEQA; Pub. Resources Code, § 21000 et
seq.)2 in approving an ordinance streamlining the permitting process for new oil and gas
wells. (King & Gardiner Farms, LLC v. County of Kern (2020) 45 Cal.App.5th 814
(King & Gardiner).) In the first appeal, we determined the environmental impact report
(EIR) was defective and ordered the issuance of a writ of mandate directing the County to
correct those defects before reapproving the ordinance. (Id. at p. 901.) The County
prepared a revised supplemental recirculated environmental impact report (SREIR) and
an addendum, certified the completion of the SREIR, and adopted a slightly modified
ordinance. After the County filed a return, the superior court determined the CEQA
violations had been corrected and discharged the writ. This appeal followed.
In the published part of this opinion, we consider whether an agricultural
conservation easement (ACE) partially mitigates a conversion of agricultural land caused
by the project. In King & Gardiner, supra, 45 Cal.App.5th 814, we decided a narrow
aspect of the efficacy of ACE’s as mitigation by concluding ACE’s were not effective at
reducing the project’s conversion of agricultural land to a less than significant level for
purposes of CEQA. Here, we address the broader issue of whether ACE’s qualify as
compensatory mitigation for purposes of California Code of Regulations, title 14, section
15370, subdivision (e) (hereafter “Guidelines”),3 which defines mitigation to include
“[c]ompensating for the impact by … providing substitute resources.” (Guidelines,
§ 15370, subd. (e).) To promote CEQA’s purpose of long term protection of the
environment, we join the First District in interpreting the phrase “providing substitute

1 In this opinion, “County” refers to the governmental entity and “Kern County”
refers to the geographical area.
2 All unlabeled statutory references are to the Public Resources Code.
3 “Guidelines” hereafter refers to the regulations that implement CEQA and are
codified in California Code of Regulations, title 14, section 15000 et seq.

3.
resources” to encompass preserving existing agricultural land. (Masonite Corp. v.
County of Mendocino (2013) 218 Cal.App.4th 230, 238 (Masonite).) Thus, ACE’s
qualify as compensatory mitigation, even though they do not replace or otherwise offset
the acres of agricultural land converted by the project—that is, they do not ensure the
project results in no net loss of agricultural land. (Ibid.; see Black Warrior Riverkeeper,
Inc. v. U.S. Army Corps of Engineers (11th Cir. 2016) 833 F.3d 1274, 1281 [under
federal law, one of four methods of compensatory mitigation is the preservation of an
existing aquatic site]; 40 C.F.R. § 230.92 [definitions of compensatory mitigation and
preservation].)
In the unpublished part of this opinion, we address whether the SREIR’s
discussion of the cancer risk associated with the drilling of more than one well near a
sensitive receptor complied with CEQA. We conclude that discussion is inadequate for
purposes of CEQA because it lacks sufficient information for the public and decision
makers to meaningfully understand the cancer risk resulting from multiple wells drilled
outside the 210-foot setback distance specified in the ordinance. The health risk
assessment for the drilling of multiple wells used a setback distance of just under 1,000
feet instead of analyzing reasonably foreseeable situations that could arise under the
ordinance’s actual setback distances. This informational defect must be corrected before
the ordinance is reapproved.
We also address whether the County misconstrued CEQA when it decided to
remove a water supply mitigation measure because “there is no requirement in CEQA to
perform an analysis or provide mitigation for impacts to low-income or disadvantaged
communities.” While social and economic effects are not themselves environmental
impacts, social and economic effects are relevant in determining the significance of a
physical change to the conditions constituting the environment. (Guidelines, § 15064,
subd. (e).) Here, the County’s erroneous view of CEQA’s principles addressing social
and economic effects tainted its analysis of (1) the significance of lowering groundwater

4.
levels in wells and (2) appropriate mitigation for reducing the significance of the
project’s contribution to that cumulative impact.
We also conclude appellants have not carried their burden of establishing
prejudicial error involving (1) the air quality mitigation measures addressing emissions of
particulate matter, (2) the analysis of impacts to the Temblor legless lizard, or (3) the
absence of Spanish language translations of certain notices and portions of the SREIR.
We therefore reverse the judgment and discharge order and remand for further
proceedings.
THE PARTIES
Appellant V Lions Farming, LLC (Lions Farming) was named King and Gardiner
Farms, LLC before it amended its articles of organization in February 2021. The other
appellants are Natural Resources Defense Council, Sierra Club, Committee For A Better
Arvin, Committee For A Better Shafter, Comite Progreso de Lamont, and Center for
Biological Diversity (collectively, Sierra Club).
The respondents are the County, the Board, and real parties in interest Western
States Petroleum Association and California Independent Petroleum Association. They
filed a joint respondents’ brief to Lions Farming’s opening brief, a joint respondent’s
brief to Sierra Club’s opening brief, and are referred to collectively as the County.
FACTS*
The Project
The proposed project is an amendment of Title 19 of the Kern County Zoning
Ordinance that focuses on Chapter 19.98, which contains procedures and standards
applicable to the exploration, drilling and production of oil and gas. The amendment is
designed to streamline the process for obtaining permits for local oil and gas activities,
such as drilling new wells.

* See footnote, ante, page 1.

5.
The previous amendment streamlining the procedures in the zoning ordinance is
described in King & Gardiner, supra, 45 Cal.App.5th 814, and was effective from
December 9, 2015 through March 25, 2020. While it was in effect, 5,861 permits subject
to “Oil and Gas Conformity Review” were issued and 622 permits subject to “Minor
Activity Review” were issued.
The environmental review conducted for that amendment began in 2013 and
ended with the Board’s November 9, 2015 approval of the project, which included
adopting the amendment as set forth in ordinance No. G-8605 (Ordinance). (King &
Gardiner, supra, 45 Cal.App.5th at pp. 834–835.) The Board also certified the 2015 EIR
as complete and adopted (1) findings of fact to support its determinations relating to
significant environmental impacts; (2) a statement of overriding considerations; and (3) a
proposed mitigation measure monitoring program. (Id. at p. 835.)
Project Area, Subareas and Tiers
The project area contains 3,700 of Kern County’s 8,202 square miles. It includes
most of the San Joaquin Valley Floor located in Kern County. The SREIR divides the
project area into three subareas (western, central and eastern) and used those subareas in
its analysis of many of the project’s environmental impacts. (See King & Gardiner,
supra, 45 Cal.App.5th at pp. 832–833.)
In addition, a system of five tiers based on land use was adopted to classify the
land within the project area and subareas. Tier 1 land is where oil and gas activities are
the primary land use and the existing well and activity densities preclude almost all other
uses. Tier 2 land has agriculture as the primary land use. Tier 3 land is zoned for light,
medium or heavy industrial, natural resource, recreation forestry, floodplain, and a few
other uses. Tier 4 land is zoned for residential and commercial use and oil and gas
activities require a conditional use permit. Tier 5 land has specific plan boundaries either
adopted with a special planning district or which include specific provisions for oil and
gas operations.

6.
PROCEEDINGS*
Prior Appeal
In December 2015, Lions Farming and Sierra Club filed petitions for writ of
mandate and complaints. (King & Gardiner, supra, 45 Cal.App.5th at pp. 835–836.)
The superior court consolidated the matters based on the parties’ stipulation. (Id. at p.
836.) The trial court issued its ruling on the CEQA issues in March 2018, finding a
couple of CEQA violations and denying the others. (King & Gardiner, supra, at p. 836.)
In April 2018, the court entered a final judgment. (Ibid.) Lions Farming and Sierra Club
appealed. (Id. at p. 837.) In February 2020, we affirmed the judgment in part and
reversed it in part. (Id. at p. 901.) We directed the superior court enter a modified
judgment and issue a second peremptory writ of mandate directing the County to set
aside its approval of the 2015 ordinance. (Ibid.) We also stated the writ should direct the
County, in the event it decided to present the Ordinance for reapproval, to prepare a
revised EIR “correcting the CEQA violations relating to (a) water supply impacts and
mitigation measures, (b) PM2.5 emission impacts and mitigation measures, (c)
agricultural land impacts and mitigation measures, and (d) the analysis of noise impacts.”
(Ibid.)
Proceedings on Remand
In April 2020, the County issued an “INITIAL STUDY/NOTICE OF
PREPARATION” for a slightly revised ordinance. The notice stated that the SREIR,
including the “Multi-Well Health Risk Assessment,”4 would be recirculated for public

* See footnote, ante, page 1.
4 In the previous appeal, we agreed with the County’s statement that the assessment
titled “Cumulative Health Risk Assessment” was not a “cumulative impact” analysis as
that term is used in CEQA because the assessment did not address the “cumulative
impact from several projects” on human health risk in the project area. (Guidelines,
§ 15355, subd. (b) [definition of “[c]umulative impacts”].) As a result, we referred to,
and continue to refer to, the document as the “Multi-Well Health Risk Assessment.”

7.
review and comment and the County would prepare and publish responses to the
comments. The proposed revised ordinance limited the number of new well permits to
2,697 per year, instead of 3,746. (See King & Gardiner, supra, 45 Cal.App.5th at p. 832
[2015 EIR forecast 2,697 new wells would be drilled each year].) In May 2020, the
County held a virtual scoping meeting and solicited written and oral responses to the
notice of preparation. At that meeting, Spanish translation services were provided.
On June 12, 2020, the superior court (1) filed an order vacating portions of, and
modifying its order dated March 12, 2018, and (2) issued the first modified judgment.
On June 17, 2020, the court issued a second peremptory writ of mandate (Second Writ)
directing the Board to set aside its certification of the EIR, its findings of fact and
statement of overriding considerations, and its approval of the Ordinance. The Second
Writ stated the County “must refrain from reviewing and approving permits pursuant to
the Ordinance until and unless the Ordinance is readopted in compliance with CEQA and
this writ.” It also identified the CEQA violations that needed to be corrected before the
Ordinance, or a modified version, could be readopted.
On August 3, 2020, the County released a draft SREIR. Two weeks later, the
County’s department of planning and natural resources hosted a virtual public briefing
workshop to provide an overview of the draft SREIR and an opportunity for public
comments. At the end of August, the County filed an initial return to the Second Writ
stating the County’s approvals relating to the Ordinance had been set aside and the
issuance of permits had ceased as of the close of business on March 26, 2020. The initial
return also described the actions relating to the draft SREIR. The 45-day review period
for public comments on the draft SREIR ended on September 16, 2020.
On October 30, 2020, the County released a revised draft SREIR. In January
2021, the County released the final SREIR, which included responses to the public
comments received. The comments and response relevant to the issues raised in this

8.
appeal are described later in this opinion. In February 2021, the County release its
proposed findings of fact and statement of overriding considerations.
Approval of Revised Ordinance
On March 8, 2021, the Board held a special meeting and unanimously adopted
Ordinance No. G-8992 (Revised Ordinance), which amended title 19 of the County’s
Ordinance Code. The Board’s resolution found that certain environmental impacts could
not be mitigated, adopted a statement of overriding considerations, and found the final
SREIR was complete and complied with CEQA.
Challenges to Revised Ordinance
On March 10, 2021, Lions Farming and Sierra Club filed separate petitions for
writ of mandate and complaints for injunctive relief challenging the County’s adoption of
the Revised Ordinance, certification of the completion of the SREIR, and adoption of the
statement of overriding considerations. They requested the issuance of a writ of mandate
directing the County to vacate those decisions.
On April 6, 2021, the County filed a final return to the Second Writ stating it had
complied with the terms of the writ and adopted the Revised Ordinance in compliance
with CEQA and the writ. Three days later, Lions Farming and Sierra Club filed a joint
objection to the County’s final return to the Second Writ. The joint objection referred to
the CEQA violations set forth in the writ petitions and complaints they filed a month
earlier.
The County Begins Issuing Permits
In August 2021, Lions Farming and Sierra Club filed a joint motion to enforce the
Second Writ along with supporting papers. The joint motion asserted the County had
begun to review and issue permits under the Revised Ordinance in direct violation of the
Second Writ. The superior court heard the motion in September 2021, after the County
filed an opposition and Lions Farming and Sierra Club filed a reply.

9.
In October 2021, the superior court issued a written ruling granting in part the
joint motion to enforce the Second Writ. The court determined it, rather than the County,
should determine whether the Second Writ had been satisfied and directed the County to
immediately suspend operation of the Revised Ordinance and cease the review and
issuance of permits. The court did not retroactively invalidate the permits the County had
issued before its order.
Ruling on the Petitions for a Third Writ
On June 7, 2022, the superior court issued a ruling on the petitions of Lions
Farming and Sierra Club had filed in March 2021 to challenge the final SREIR and the
County’s approval of the Revised Ordinance. The court granted the petitions in part and
denied them in part, finding four CEQA violations. The court determined (1) a
mitigation measure of emission for particulate matter of 2.5 microns or less in diameter
(PM2.5)5 was not enforceable; (2) the SREIR did not adequately analyze water supply
impacts; (3) the elimination of a measure involving the removal of legacy equipment to
mitigate the project’s conversion of agricultural land was not adequately addressed; and
(4) the foregoing violations required the invalidation of the statement of overriding
considerations.
The superior court rejected other claims by determining (1) the County was not
required to adopt ACE’s as a mitigation measure for the conversion of agricultural land
because the 2020 opinion ruled ACE’s do not provide effective mitigation for such
conversions; (2) the health risk assessment addressing the risk of cancer from drilling
multiple wells near a sensitive receptor, such as a residence or school, was legally
adequate; (3) information in a 2019 study of the Temblor legless lizard was not “new
information” or “changed circumstances” for purposes of Guidelines section 15162 and,

5 (40 C.F.R. § 50.7(a) [definition of PM2.5]; Cal. Code Regs., tit. 17, § 70100, subd.
(j) [definition of fine suspended particulate matter].)

10.
therefore, further analysis of impacts to that species was not required; and (4) res judicata
barred Sierra Club’s challenge to the County’s decision not to translate notices and parts
of the SREIR into Spanish. Each of these four determinations are among those
challenged in this appeal.
The June 7, 2022 trial court ruling did not identify the relief that would be granted
for the CEQA violations. Instead, it directed the parties to meet and confer on the issue
before a case management conference addressing remedies. The parties did not agree on
the appropriate remedies, but did agree to a briefing schedule and a September 2022
hearing date.
Judgment and Third Writ
On October 4, 2022, the superior court issued a ruling on the remedies and relief
for the CEQA violations previously identified. The court concluded it was not necessary
to vacate the project approval or vacate the certification of the SREIR as complete. It
also extended the full suspension of project activities that had been entered earlier. The
same day, the court issued a “SECOND MODIFIED JUDGMENT” and a “THIRD
PEREMPTORY WRIT OF MANDATE” (Third Writ). The second modified judgment
stated the petitions for writ of mandate were granted in part and denied in part, set forth
the terms to be included in the Third Writ, and stated a full suspension of project
activities pending corrective action was sufficient to achieve compliance with CEQA and
protect the environment.
The Third Writ stated it replaced and superseded the Second Writ and directed the
County to address the four discrete CEQA violations identified in the June 7, 2022 ruling
and to file a return within 90 days setting forth how those violations had been addressed.
About a week later, the County filed a return to the Third Writ and requested the
writ be discharged. The County’s papers included a copy of the resolutions adopted by
the Board on August 23, 2022. One resolution included the Board’s approval of the
SREIR, a proposed addendum, revised and restated findings of fact, and a restated

11.
statement of overriding considerations. Another resolution approved a program called
the “VOLUNTARY DISADVANTAGED COMMUNITY DRINKING WATER
GRANT FUND PILOT PROGRAM” to which permit applicants could make voluntary,
nonrefundable contributions. That resolution stated that, before permitting had been
halted, permit applicants had contributed over $180,000 for use by the County public
health department in water challenged communities.
On November 2, 2022, the superior court discharged the Third Writ in an order
finding the County had complied with the writ in all respects. The order also lifted the
suspension of the operation of the Revised Ordinance.
Notices of Appeal
Lions Farming and Sierra Club filed separate notices of appeal from (1) the
superior court’s June 7, 2022 ruling on the merits of their petitions for a third writ of
mandate; (2) the October 4, 2022 second modified judgment and the related ruling on
remedies and relief; and (3) the November 2, 2022 order discharging the Third Writ. In
December 2022, after appellants’ motion to consolidate went unopposed, the three
appeals were consolidated by this court under case No. F084763.
Stay Granted
In December 2022, Lions Farming and Sierra Club jointly filed a petition for writ
of supersedeas and a request for stay to prevent the continuing issuance of permits under
the Revised Ordinance. On January 26, 2023, after respondents filed an opposition to the
petition and appellants filed a reply, this court granted a stay of the superior court’s
November 2, 2022 discharge order. As a result of the stay, the previously ordered
suspension of the operation of the Revised Ordinance remained in full force and effect.
Further Briefing
In June 2023, after appellants’ reply briefs were filed, H. Bradley Shaffer, Ph.D.,
applied for leave to file an amicus curiae brief in support of appellants on issues related to
the Temblor legless lizard. In July 2023, David J.X., Gonzalez, Ph.D., four other

12.
professors, and an environmental epidemiologist applied for leave to file an amicus
curiae brief in support of appellants on issues involving cancer risk and the Multi-Well
Health Risk Assessment. Also, that July, the California Council of Land Trust applied
for leave to file an amicus curiae brief in support of appellants on issues related to
agricultural conservation easements.
This court granted the applications and authorized the County to file a
consolidated answer to the three briefs. The order also directed the answer to address
three questions relating to the project’s conversion of agricultural land and allowed the
answer to “include an interpretation of the text of subdivision (e) of Guidelines section
15370 (as amended in 2018) and an application of that interpretation to the facts of this
case. (See 1 Kostka & Zischke, Practice Under the Cal. Environmental Quality Act
(Cont.Ed.Bar 2d ed. 2023) § 13.72, pp. 13-100 to 13-102 [discussing relationship of King
& Gardiner … to 2018 version of Guidelines § 15370, subd. (e)].)”
In August 2023, this court granted Lions Farming’s application to file a reply to
the consolidated answer. Subsequently, this court issued an order giving the County an
opportunity to address specific issues relating to the interpretation of the discussion and
conclusions relating to agricultural conservation easements in our 2020 opinion. (See
King & Gardiner, supra, 45 Cal.App.5th at pp. 872–876, 878–879 [pts. VI.C.1. &
VI.C.5.].) The County elected to file a supplemental brief.
DISCUSSION

I. STANDARD OF REVIEW*
Section 21168.5 provides that in any action or proceeding addressing
noncompliance with CEQA, the judicial “inquiry shall extend only to whether there was a
prejudicial abuse of discretion. Abuse of discretion is established if the agency has not
proceeded in a manner required by law or if the determination or decision is not

* See footnote, ante, page 1.

13.
supported by substantial evidence.” (§ 21168.5.) Based on this provision and established
case law, the parties agree that the abuse of discretion standard of judicial review applies
in this appeal. (See Sierra Club v. County of Fresno (2018) 6 Cal.5th 502, 512 [“standard
of review in a CEQA case … is abuse of discretion”].) When reviewing an agency’s
decision, courts must follow the “principle that there is no presumption that error is
prejudicial.” (§ 21005, subd. (b).)
Under CEQA, an abuse of an agency’s discretion usually occurs in one of two
ways. (King & Gardiner, supra, 45 Cal.App.5th at p. 837.) First, the “agency could fail
to proceed in the manner required by CEQA, thereby committing procedural (i.e., legal)
error.” (Id. at pp. 837–838.) “Whether the public agency has employed the correct
procedures—that is, followed applicable law—is subject to independent judicial review.”
(Id. at p. 838.) Examples of whether an agency followed applicable procedures include
whether the agency provided sufficient notice and opportunity to comment on a draft EIR
and whether the agency omitted the required discussion of alternatives. (Sierra Club v.
County of Fresno, supra, 6 Cal.5th at p. 512.)
Second, an agency could abuse its discretion by making findings of fact that are
not supported by sufficient evidence. (King & Gardiner, supra, 45 Cal.App.5th at p.
838.) The agency’s findings of fact are subject to the deferential substantial evidence
standard of review. (Ibid.) Substantial evidence includes “facts, reasonable assumptions
predicated upon facts, and expert opinion supported by facts” and excludes argument,
speculation, and unsubstantiated opinion. (§ 21082.2, subd. (c); Guidelines, § 15384.)
Sometimes, the inquiry into CEQA compliance does not fall neatly into one of
these two categories and, instead, “[t]he inquiry presents a mixed question of law and
fact.” (Sierra Club v. County of Fresno, supra, 6 Cal.5th at p. 516.) Generally, courts
conduct an independent review of mixed questions while applying the substantial
evidence standard to an agency’s underlying findings of fact. (Ibid.) However, when
“factual questions predominate, a more deferential standard is warranted.” (Ibid.) For

14.
example, an agency’s choice of methodology for analyzing a potentially significant
environmental effect is subject to review under the substantial evidence standard. (Id. at
pp. 514, 516.)
II. AGRICULTURAL CONSERVATION EASEMENTS
The parties dispute whether ACE’s qualify as a type of mitigation for the project’s
conversion of agricultural land. CEQA defines “ ‘[a]gricultural land’ ” as “prime
farmland, farmland of statewide importance, or unique farmland, as defined by the
United States Department of Agriculture land inventory and monitoring criteria, as
modified for California.” (§ 21060.1, subd. (a).) This opinion adopts this definition and
uses the terms “agricultural land” and “farmland” interchangeably.
To summarize the discussion that follows, in King & Gardiner, supra, 45
Cal.App.5th 814, we decided a narrow aspect of the efficacy of ACE’s as mitigation,
addressing only whether ACE’s were “effective” at reducing the project’s conversion of
agricultural land to a less than significant level for purposes of CEQA. We concluded
ACE’s were not “effective” at accomplishing that specific task.
Here, we address the broader question whether ACE’s are effective at providing
any type of mitigation for purposes of CEQA. The Guidelines define “ ‘[m]itigation’ ” by
giving five examples, including “[c]ompensating for the impact by … providing
substitute resources.” (Guidelines, § 15370, subd. (e).) We conclude this text is
ambiguous and, therefore, resolve the ambiguity by adopting the interpretation that best
effectuates CEQA’s purpose of the long term protection of the environment. The long
term protection of the environment is best promoted by accepting, rather than rejecting,
ACE’s as a type of compensatory mitigation. Consequently, we join the First District in
concluding “ACEs compensate for the loss of farmland within the Guidelines definition
of mitigation” by “preserving substitute resources,” even though ACE’s do not ensure the
project causes no net loss of farmland. (Masonite, supra, 218 Cal.App.4th at p. 238.)

15.
A. Background
1. Conservation Easements
The term “conservation easement” is statutorily defined as a limitation in the form
of an easement, restriction, covenant, or condition in an instrument executed by or on
behalf of the landowner; it is binding on successive owners; and its purpose is “to retain
land predominantly in its natural, scenic, historical, agricultural, forested, or open-space
condition.” (Civ. Code, § 815.1.) A conservation easement “shall be perpetual in
duration,” “shall constitute an interest in real property,” and its characteristics shall be
those specified in the written instrument. (Civ. Code, § 815.2, subds. (b), (c), (d).) A
conservation easement may be acquired and held by certain nonprofit organizations, state
or local government entities including a county or city, and certain Native American
tribes. (Civ. Code, § 815.3.) Other aspects of conservation easements, including
recordation and enforcement, are addressed in Civil Code sections 815.4 through 815.10.
The more specific term “agricultural conservation easement” is defined as “an
interest in land, less than fee simple, that represents the right to prevent the development
or improvement of the land, as specified in Section 815.1 of the Civil Code, for any
primary purpose other than agricultural production. The easement shall be granted for
the California Farmland Conservancy Program by the owner of a fee simple interest in
land to any of the organizations or entities specified in Section 815.3 of the Civil Code.
It shall be granted in perpetuity as the equivalent of covenants running with the land.”
(§ 10211; see § 10230.2 [California Farmland Conservancy Program].)
2. Interpreting Appellate Opinions
Our 2020 opinion discussed ACE’s as a mitigation measure for the project’s
conversion of agricultural land to another use. The parties disagree on how to interpret
that discussion and the resulting conclusions. (See King & Gardiner, supra, 45
Cal.App.5th at pp. 872–876 [pt. VI.C.1.].) Accordingly, we set forth the principles that
govern the interpretation of appellate opinions.

16.
Other CEQA decisions have addressed a disagreement among the parties about the
meaning or effect of an opinion published in an earlier appeal. (E.g., POET, LLC v. State
Air Resources Bd. (2017) 12 Cal.App.5th 52, 63 (Poet II); Protect Our Water v. County
of Merced (2005) 130 Cal.App.4th 488, 494 [issue of who was the prevailing party turned
on the import of this court’s earlier opinion]; San Bernardino Valley Audubon Society v.
Metropolitan Water Dist. (2001) 89 Cal.App.4th 1097, 1101–1102 [respondents’ narrow
interpretation of prior opinion rejected].) In Poet II, we addressed how POET, LLC v.
State Air Resources Bd. (2013) 218 Cal.App.4th 681 should be interpreted. (Poet II,
supra, 12 Cal.App.5th at p. 63.) We concluded (1) the interpretation of the earlier
opinion presented a question of law and (2) that question was subject to our independent
review. (Ibid.; see Ayyad v. Sprint Spectrum, L.P. (2012) 210 Cal.App.4th 851, 859
[interpretation of an appellate opinion is a legal issue subject to de novo review].)
In accordance with Poet II, we again conclude the interpretation of our prior
opinion presents a question of law subject to our independent review. We make this
opinion more explicit than Poet II or San Bernardino Valley Audubon Society v.
Metropolitan Water Dist., supra, 89 Cal.App.4th 1097, by noting that the “interpretation
of an appellate opinion is governed by the rules of construction that apply to any other
writing.” (16 Cal.Jur.3d (2020) Courts, § 331, p. 925.) Under those rules, an opinion
must receive an objectively reasonable interpretation—that is, (1) it must be read as
whole, (2) its language must be viewed in light of the facts and the issues before the
court, and (3) each statement must be considered in its proper context. (Ibid.; Kirk v.
First American Title Ins. Co. (2010) 183 Cal.App.4th 776, 797.) The scope of the
“[l]anguage used in any opinion is of course to be understood in the light of the facts and
the issue then before the court, and an opinion is not authority for a proposition not
therein considered.” (Ginns v. Savage (1964) 61 Cal.2d 520, 524, fn. 2; Geiser v. Kuhns
(2022) 13 Cal.5th 1238, 1252 [cases are not authority for propositions not considered];

17.
see 9 Witkin, Cal. Procedure (6th ed. 2021) Appeal, § 530, pp. 563–564 [ratio decidendi
and dicta].)
The first step in analyzing the meaning of a writing is determining whether the
language is ambiguous. (In re Estate of Russell (1968) 69 Cal.2d 200, 208–209 [initial
determination is whether the terms of any written instrument are free from ambiguity];
see Joseph v. City of Atwater (2022) 74 Cal.App.5th 974, 982 [ambiguity is the threshold
question in contract interpretation]; Gutierrez v. Carmax Auto Superstores California
(2018) 19 Cal.App.5th 1234, 1249 [whether a statute’s language is ambiguous is the first
question of statutory interpretation].) “Ambiguous” means susceptible to more than one
reasonable interpretation. (Gutierrez, supra, at p. 1249; Estate of Newmark (1977) 67
Cal.App.3d 350, 355 [“ambiguity exists in a written instrument when its language is
properly susceptible to multiple constructions”].)
B. The 2020 Opinion
1. Effective Mitigation
In King & Gardiner, supra, 45 Cal.App.5th 814, Lions Farming raised several
issues related to the project’s conversion of agricultural land. (Id. at p. 872 [Part VI.B.,
Contentions of the Parties].) The issue relevant to this appeal arose from Lions
Farming’s contention that the mitigation measure for the conversion of agricultural land,
mitigation measure (MM) 4.2-1, “does not support the Board’s finding that conversions
of agricultural land would be reduced to a less than significant level.” (Ibid.) To resolve
this alleged CEQA violation, we evaluated “the effectiveness of each” of the four
mitigation options contained in MM 4.2-1. (King & Gardiner, supra, at p. 872.)
The first mitigation option, MM 4.2-1.a, authorized the use of ACE’s. (King &
Gardiner, supra, 45 Cal.App.5th at p. 872.) We analyzed the characteristic of ACE’s and
concluded “that MM 4.2-1.a does not provide effective mitigation for the conversion of
agricultural land.” (Id. at p. 876, italics added.) How to interpret this conclusion is at the

18.
heart of the parties’ dispute over ACE’s. The discussion immediately preceding the
conclusion stated:

“Entering into a binding agricultural conservation easement does not create
new agricultural land to replace the agricultural land being converted to
other uses. Instead, an agricultural conservation easement merely prevents
the future conversion of the agricultural land subject to the easement.
Because the easement does not offset the loss of agricultural land (in whole
or in part), the easement does not reduce a project’s impact on agricultural
land. The absence of any offset means a project’s significant impact on
agricultural land would remain significant after the implementation of the
agricultural conservation easement. Restating this conclusion using the
data from this case, the implementation of agricultural conservation
easements for the 2[98] acres of agricultural land estimated to be converted
each year would not change the net effect of the annual conversions. At the
end of each year, there would be 2[98] fewer acres of agricultural land in
Kern County. Accordingly, under the thresholds of significance listed in
the EIR, this yearly impact would qualify as a significant environmental
effect.” (King & Gardiner, supra, at pp. 875–876.)
Later, the opinion described the resulting noncompliance with CEQA by stating
the Board’s finding that the project’s estimated conversion of agricultural land was an
impact that “ ‘would be less than significant with mitigation’ ” was a “finding as to the
effectiveness of MM 4.2-1 [that was] not supported by substantial evidence and [wa]s
based on a legally incorrect view of the operation of [ACE’s].” (King & Gardiner, supra,
45 Cal.App.5th at p. 878.) Our ultimate conclusion was that “the EIR and the Board’s
finding as to the mitigation of a significant impact on agricultural land d[id] not comply
with CEQA.” (Id. at p. 879.)
2. Proposed Interpretations
The County’s interpretation of the 2020 opinion is set forth in the final SREIR’s
responses to comments. Response No. 0004-2 explained:

“The SREIR … has an expanded discussion explaining that, based on the
court’s analysis, it is not possible to reduce a projects impact on agricultural
land by requiring a conservation easement because such easements do not
offset the loss of agricultural land in whole or in part. Since an agricultural

19.
conservation easement does not create new agricultural land to replace the
agricultural land being converted to other uses at the end of each year there
would be a net loss of agricultural land equal to the amount converted by
the Project and the Project’s impact on agricultural land would remain
significant despite the implementation of the easement. Accordingly, under
the threshold of significance in the SREIR, conservation easements do not
provide an effective means of even partial mitigation for agricultural
conversion impacts.”
Thus, the County argues it cannot legally rely on ACE’s to mitigate the farmland
conversion impact. In contrast, Lions Farming asserts the 2020 opinion did not conclude
ACE’s are categorically ineffective at providing any type of CEQA mitigation, but
determined that ACE’s alone would not be effective at reducing the project-specific
impacts to a less than significant level because ACE’s could not ensure no net loss of
farmland. To determine which interpretation is correct, we apply the rules for construing
an opinion set forth in part II.A.2., ante.
C. Construing the Opinion
1. Threshold Question of Ambiguity
Pursuant to the general rules of construction that apply to writings, we begin by
considering whether the conclusion “that MM 4.2-1.a does not provide effective
mitigation for the conversion of agricultural land” (King & Gardiner, supra, 45
Cal.App.5th at p. 876, italics added) and other statements about the effectiveness of
ACE’s as mitigation are ambiguous. We conclude the statements are ambiguous because,
taken alone, they can be interpreted broadly as proposed by the County.
The conclusion that ambiguities exist also is supported by a CEQA practice
guide’s discussion of Masonite, supra, 218 Cal.App.4th 230, King & Gardiner, supra, 45
Cal.App.5th 814, and the 2018 amendment to Guidelines section 15370, subdivision (e)
along with the practice guide’s statement that “it is unclear whether it would be
appropriate for a lead agency to find that requiring an off-site conservation easement as
mitigation is sufficient to ‘avoid,’ ‘minimize,’ or ‘substantially lessen’ the impact to

20.
farmland that results when it is developed.” (1 Kostka & Zischke, Practice Under the
Cal. Environmental Quality Act, supra, § 13.72, pp. 13-100 to 13-101.)
2. Narrow Scope of the 2020 Opinion
The ambiguity in the 2020 opinion is resolved by applying the rules of
construction described earlier. Although those rules do not inquire into actual intent, we
confirm that the result produced by applying those rules reflects the actual intent of the
2020 opinion because we did not intend to adopt any principle of law about mitigation
that was not needed to decide the particular issue presented. (Ginns v. Savage, supra, 61
Cal.2d at p. 524, fn. 2 [opinions are “understood in the light of the facts and the issue then
before the court”].) The particular issue presented was whether the mitigation measure
authorizing the use of ACE’s supported the Board’s finding that the project’s estimated
annual conversion of 298 acres of farmland “would be reduced to a less than significant
level.” (King & Gardiner, supra, 45 Cal.App.5th at p. 872.)
The scope of this issue impliedly limited what the opinion meant by “effective
mitigation.” Specifically, to be regarded as “effective mitigation” in the context
presented, ACE’s would need to reduce or offset the project-specific impact “to a less
than significant level.” (King & Gardiner, supra, 45 Cal.App.5th at p. 872.)6 To explain
the limitation resulting from the issue presented, we turn to the definitions of “project-
specific impact” and “threshold of significance.”

6 A footnote in King & Gardiner stated our view that the determinations in
Masonite did not contradict our conclusion that the absence of an offset by the ACE’s
“means a project’s significant impact on agricultural land would remain significant after
the implementation of the [ACE].” (King & Gardiner, supra, at p. 875, fn. 32 and
accompanying text.) The footnote explained the lack of contradiction by stating in part:
“In Masonite, the court did not consider the net effect of implementing an agricultural
conservation easement and whether a significant impact could be reduced to a less than
significant level by such an easement.” (Ibid., italics added.) That explanation would
have been clearer if the italicized “and” had been replaced with the phrase “in the context
of deciding the narrow question of.”

21.
“ ‘Project-specific effect’ means all the direct or indirect environmental effects of
a project other than cumulative effects and growth-inducing effects.” (Guidelines,
§ 15191, subd. (j) [same]; see Guidelines, § 15358, subd. (a) [direct and indirect effects
defined].) In this case, the project-specific impact is the estimated conversion of 298
acres of agricultural land per year, which is the amount predicted in both the EIR and
SREIR.7 (See King & Gardiner, supra, 45 Cal.App.5th at p. 870.) They also predicted a
maximum (i.e., worst-case) conversion of 7,450 acres of farmland between 2015 and
2040, which was less than 1 percent of the farmland in Tier 2 of the project area. (Id. at
p. 871.)
Next, we compare the estimated conversion of agricultural land to the applicable
threshold of significance. “A threshold of significance is an identifiable quantitative,
qualitative or performance level of a particular environmental effect, non-compliance
with which means the effect will normally be determined to be significant by the agency
and compliance with which means the effect normally will be determined to be less than
significant.” (Guidelines, § 15064.7, subd. (a).) The EIR and the SREIR described the
applicable threshold of significance by stating the conversion of any agricultural land
would be considered a significant impact. (See King & Gardiner, supra, 45 Cal.App.5th
at p. 871.) Applying this threshold to the project-specific effect, both the EIR and the
SREIR concluded the conversion of agricultural land was considered significant. (Ibid.)
Consequently, under the threshold of significance adopted by the County, ACE’s
would be “effective” for purposes of the issue addressed in the 2020 opinion only if they
reduced or offset the conversion of farmland to zero acres. Stated another way, the
ACE’s would have had to achieve no net loss of agricultural land to render the
conversion insignificant. As a result, the 2020 opinion’s statement that ACE’s were not

7 The SREIR continued to use the EIR’s estimate despite a March 2021 staff report
on the Revised Ordinance stating: “The actual[] permitting from 2015, to March 2020,
resulted [in] impacts to 54.18 acres with an average of 12 acres per year.”

22.
“effective mitigation” and did not support the Board’s finding, meant ACE’s would not
reduce or offset the conversion of farmland to zero and, therefore, the project’s
conversion of agricultural land would remain significant after implementation of ACE’s.
In other words, “[a]t the end of each year, there would be 2[98] fewer acres of
agricultural land in Kern County. Accordingly, under the thresholds of significance listed
in the EIR, this yearly impact would qualify as a significant environmental effect.” (King
& Gardiner, supra, 45 Cal.App.5th at p. 876.)
Therefore, based on the issue actually presented and decided in King & Gardiner,
supra, 45 Cal.App.5th 814, we conclude the County construed the opinion too broadly
and mistakenly concluded the opinion established the principle that ACE’s “do not
provide an effective means of even partial mitigation for agricultural conversion
impacts.” Because the opinion did not decide, one way or the other, whether ACE’s
provide some form of mitigation despite their inability to reduce or offset the project’s
conversion of farmland to zero acres, the County’s misreading of the opinion, by itself,
does not establish the County violated CEQA. The County may have properly
interpreted CEQA and the Guidelines when it determined that ACE’s provide no
mitigation of any type for the conversion of agricultural land. Accordingly, we now turn
to whether ACE’s qualify as a type of mitigation despite their inability to achieve no net
loss of farmland. This inquiry is focused on whether ACE’s provide compensatory
mitigation.
D. ACE’s and Compensatory Mitigation
1. Background
CEQA and the federal legislation on which it was modeled, the National
Environmental Policy Act of 1969 (NEPA; 42 U.S.C. section 4321, et seq.), do not
themselves define “mitigation.” Instead, the term is defined in regulations. (Guidelines,
§ 15370; 40 C.F.R. § 1508.1(s) (2023); 28 C.F.R. § 91.51(c) (2023).)

23.
The federal definition of mitigation was adopted in 1978 as part of the regulations
implementing the procedural provisions of NEPA. (43 Fed.Reg. 55978, 56005 (Nov. 29,
1978).) “ ‘Mitigation’ includes: [¶] (a) Avoiding the impact altogether by not taking a
certain action or parts of an action. [¶] (b) Minimizing impacts by limiting the degree or
magnitude of the action and its implementation. [¶] (c) Rectifying the impact by
repairing, rehabilitating, or restoring the affected environment. [¶] (d) Reducing or
eliminating the impact over time by preservation and maintenance operations during the
life of the action. [¶] (e) Compensating for the impact by replacing or providing
substitute resources or environments.” (Ibid.; see 40 C.F.R. § 1508.20 (1979).) This
language remains unchanged in the five examples of mitigation contained in the current
NEPA regulation. (See 40 C.F.R. § 1508.1(s)(1)-(5) (2023).)
In 1983, the Guidelines were amended to add a definition of mitigation that
“originally mirrored the definition contained in the federal NEPA regulations.” (Natural
Resources Agency, Final Statement of Reasons for Regulatory Action Amendments to
the State CEQA Guidelines (Nov. 2018) p. 64 (FSOR 2018); see Register 83, No. 29-B
(July 16, 1983) p. 322.52.) The only difference in language was that subdivision (c) of
Guidelines section 15370 referred to the “impacted environment” instead of the “affected
environment.” In 2018, subdivision (e) of Guidelines section 15370 was amended to
include a clause referring to conservation easements:

“Compensating for the impact by replacing or providing substitute
resources or environments, including through permanent protection of such
resources in the form of conservation easements.” (Guidelines, § 15370,
subd. (e), italics added; see FSOR 2018, supra, at pp. 92–93.)
The fundamental dispute in this appeal about the use of ACE’s as mitigation is
whether the preservation of existing agricultural land qualifies as compensatory
mitigation by “providing substitute resources.” (Guidelines, § 15370, subd. (e).) The
dispute about whether preservation should constitute compensatory mitigation is not new.
Nearly a decade ago, commentators observed that “one of the central concerns with

24.
preservation as mitigation is that it does not prevent net loss of habitat.” (Morris &
Owley, Mitigating the Impacts of the Renewable Energy Gold Rush (Winter 2014) 15
Minn. J.L. Sci & Tech. 293, 369.) The commentators argued preservation as mitigation
is unsatisfying because preservation “generally protects off-site habitat without truly
offsetting project impacts.” (Ibid.) The County has made the same argument here, which
interprets the term “mitigation” narrowly to require a replacement or offset that can be
quantified and compared to the quantity of farmland converted.
As context for our textual analysis of Guidelines section 15370, we consider how
federal agencies have dealt with preservation as a form of compensatory mitigation. A
review of their approach is useful because CEQA was modeled on NEPA and California
courts treat judicial and administrative interpretations of the federal act as persuasive
authority in interpreting CEQA. (See Citizens of Goleta Valley v. Board of Supervisors
(1990) 52 Cal.3d 553, 565, fn. 4.) Also, we have located no published California
decision discussing the federal view of compensatory mitigation and the preservation of
existing resources.
2. Federal Approach to Compensatory Mitigation
Initially, we note definition of mitigation in the NEPA regulations is not applied
only to activities exclusively within the jurisdiction of the United States Environmental
Protection Agency (EPA). The NEPA regulation defining mitigation and other terms
states: “Federal agencies shall use these terms uniformly throughout the Federal
Government.” (40 C.F.R. § 1508.1.) Consequently, other federal regulations also state
that mitigation includes “compensating for the impact by replacing or providing
substitute resources or environments.” (1 C.F.R. § 601.3 [National Capital Planning
Commission definition of mitigation]; 10 C.F.R. § 960.2 [Department of Energy
definition of mitigation]; 32 C.F.R. § 651.15(a)(5) [Department of the Army definition of
mitigation]; 43 C.F.R. § 3809.5 [Bureau of Land Management definition of mitigation].)

25.
Although the NEPA regulations do not contain a definition of “compensatory
mitigation,” other regulations developed jointly by the EPA and other federal agencies
define the term. For example, the EPA and U.S. Army Corps of Engineers (Corps) have
adopted regulations containing standards and criteria for the use of compensatory
mitigation in connection with the Corps’ issuance of permits under section 404 of the
Clean Water Act (33 U.S.C. § 1344). (40 C.F.R. § 230.91(a)(1); see generally, 40 C.F.R.
§ 230 [Subpart J — Compensatory Mitigation for Losses of Aquatic Resources].) Those
regulations state:

“Compensatory mitigation means the restoration (re-establishment or
rehabilitation), establishment (creation), enhancement, and/or in certain
circumstances preservation of aquatic resources for the purposes of
offsetting unavoidable adverse impacts which remain after all appropriate
and practicable avoidance and minimization has been achieved. [¶] … [¶]

“Preservation means the removal of a threat to, or preventing the decline
of, aquatic resources by an action in or near those aquatic resources. This
term includes activities commonly associated with the protection and
maintenance of aquatic resources through the implementation of
appropriate legal and physical mechanisms. Preservation does not result in
a gain of aquatic resource area or functions.” (40 C.F.R. § 230.92, italics
added.)
In adopting this regulation, the EPA and Corps provided the following summary:
“Compensatory mitigation can be carried out through four methods: the restoration of a
previously-existing wetland or other aquatic site, the enhancement of an existing aquatic
site’s functions, the establishment (i.e., creation) of a new aquatic site, or the preservation
of an existing aquatic site.” (Compensatory Mitigation for Losses of Aquatic Resources,
73 Fed.Reg. 19594–01, 19594 (April 10, 2008); see Black Warrior Riverkeeper, Inc. v.
U.S. Army Corps of Engineers, supra, 833 F.3d at p. 1281.) Of interest for this appeal are
the comments presented to the agencies that, like the County’s argument, asserted
preservation alone was not a form of compensatory mitigation because it failed to

26.
promote no net loss of wetlands. In response, the agencies stated that, under part
203.93(h)(2) of title 40 of the Code of Federal Regulations:

“[P]reservation will be provided [only] in conjunction with aquatic
resource restoration, establishment, and/or enhancement activities, unless
the district engineer waives this requirement in a situation where
preservation has been identified as a high priority using a watershed
approach. If the district engineer makes such a waiver, a higher
compensation ratio shall be required. For each mitigation bank and in-lieu
fee project involving preservation, the district engineer, in consultation with
the [Interagency Review Team], will determine the number of credits that
will result from that preservation activity.” (Compensatory Mitigation for
Losses of Aquatic Resources, supra, 73 Fed.Reg. at p. 19635; see 33 C.F.R.
§§ 332.2 [definition of compensatory mitigation], 332.3(a)(2)
[compensatory mitigation may be performed by using preservation in
certain circumstances, with restoration generally being the first option],
332.3(h)(1) [criteria for using preservation as compensatory mitigation].)
Similar restrictions on the use of preservation appear in other federal regulations.
“Compensatory mitigation means the restoration (reestablishment or rehabilitation),
establishment (creation), enhancement, and/or, in certain circumstances, preservation of
aquatic resources for the purposes of offsetting unavoidable adverse impacts that remain
after all appropriate and practicable avoidance and minimization have been achieved.”
(24 C.F.R. § 55.2(a)(2), italics added; see 24 C.F.R. § 55.20(e)(2) [compensatory
mitigation includes the use of preservation easements or protective covenants; use of
compensatory mitigation is not a substitute for avoiding or minimizing impacts to the
maximum extent practicable].) A regulation adopted by the Federal Highway
Administration states in part: “Compensatory mitigation means restoration,
enhancement, creation, and under exceptional circumstances, preservation, of wetlands,
wetland buffer areas, and other natural habitats.” (23 C.F.R. § 777.2, italics added; cf.
Northwest Bypass Group v. U.S. Army Corps of Engineers (D.N.H. 2008) 552 F.Supp.2d
97, 120 [guidance letter issued by the Corps states “ ‘[p]reservation does not result in a
gain of wetland acres and will be used only in exceptional circumstances’ ”].)

27.
In 1996, the United States Fish & Wildlife Service and the National Marine
Fisheries Service issued the Habitat Conservation Plan Handbook, which states:
“Potential types of habitat mitigation include, but are not limited to: (1) acquisition of
existing habitat; (2) protection of existing habitat through conservation easements or
other legal instruments; (3) enhancement or restoration of disturbed or former habitat; (4)
prescriptive management of habitat to achieve specific biological characteristics; and (5)
creation of new habitats.” (Id. at pp. 3-21 to 3-22, italics added.) The first two mitigation
options do not lead to increased habitat but protect habitat that already exists. (Owley,
The Increasing Privatization of Environmental Permitting (2013) 46 Akron L.Rev. 1091,
1101.) Professor Owley also asserted that preservation of habitat was the most common
mitigation technique. (Ibid.)
To summarize, federal agencies treat compensatory mitigation as including
preservation of existing habitat, but usually restrict the use of preservation to exceptional
circumstances. Despite this restriction, preservation is a common type of mitigation.
3. Principles for Interpreting the Guidelines
Before analyzing the text of Guidelines section 15370, subdivision (e), we
describe the principles governing its interpretation. When interpreting the Guidelines,
courts usually apply the same rules that govern the interpretation of statutes. (Los
Angeles Dept. of Water & Power v. County of Inyo (2021) 67 Cal.App.5th 1018, 1037
[the existence of ambiguity is the threshold inquiry when interpreting a regulation]
(County of Inyo).) Under those rules, the interpretation of Guidelines section 15370
presents a question of law that is subject to our independent review. (See BullsEye
Telecom, Inc. v. Public Utilities Com. (2021) 66 Cal.App.5th 301, 309 [questions of
statutory interpretation are questions of law subject to independent review].) The
threshold inquiry is whether the regulatory text is ambiguous. (County of Inyo, supra, at
p. 1037.) If the text contains ambiguities, the next step is to resolve those ambiguities.

28.
(Id. at p. 1039.) Generally, a court’s primary goal when construing an ambiguous
Guideline is to adopt the interpretation that best effectuates the legislative and regulatory
intent or purpose. (Ibid.)
4. The Ambiguities
Guidelines section 15370, subdivision (e) states that mitigation includes:
“Compensating for the impact by replacing or providing substitute resources or
environments, including through permanent protection of such resources in the form of
conservation easements.” Initially, we consider whether the clause “including through
permanent protection of such resources in the form of conservation easements”
unambiguously requires ACE’s to be treated as a type of compensatory mitigation in all
situations where a project converts agricultural land to other uses. (Guidelines, § 15370,
subd. (e).)
The County argues the clause does not, emphasizing the term “such resources.”
The County asserts that term refers back to earlier language in the subdivision and, to fall
within the earlier language, the ACE “must result in ‘substitute resources or
environments’ being ‘replac[ed] or provid[ed.]’ ” We accept the County’s construction
of the term “such resources.” As a result, the clause “including through permanent
protection of such resources in the form of conservation easements” (Guidelines,
§ 15370, subd. (e)) does not unambiguously require ACE’s to be accepted as
compensatory mitigation in all situations where agricultural land is converted. Instead, to
determine whether an ACE is mitigation that “[c]ompensat[es]” for the conversion of
agricultural land depends on whether the ACE “replac[es] or provid[es] substitute
resources or environments.” (Guidelines, § 15370, subd. (e).) Consequently, we next
consider whether “replacing or providing substitute resources or environments” is
ambiguous. (Ibid.) We address the two verbs—replacing and providing—separately.

29.
The County argues ACE’s do not replace the converted farmland and cites the
2020 opinion’s statement that “[e]ntering into a binding agricultural conservation
easement does not create new agricultural land to replace the agricultural land being
converted to other uses.” (King & Gardiner, supra, 45 Cal.App.5th at p. 875, italics
added; see Masonite, supra, 218 Cal.App.4th at p. 238 [“an ACE does not replace the
onsite resources”].) Accordingly, we conclude (1) the verb “replacing” is not ambiguous
in the context of this case and (2) the use of ACE’s would not compensate for the
conversion of 298 acres of agricultural land per year by “replacing” the converted acres.
(Guidelines, § 15370, subd. (e).)
Next, we consider whether the verb “providing” and the term “substitute resources
or environments” contain ambiguities. (Guidelines, § 15370, subd. (e).) The Guidelines
do not define the verb “providing” or the term “substitute resources.” One dictionary
definition of the verb “[p]rovide” is “[t]o make, procure, or furnish for future use,
prepare. To supply, to afford, to contribute.” (Black’s Law Dict. (6th ed. 1990) p. 1224.)
Another dictionary states that “provide” and “supply” are often interchangeable and the
former “may suggest equipping, stocking, or giving in the interest of preparing with
foresight.” (Webster’s Third New Internat. Dict. (1993) p. 1827.)
The County’s briefing suggests the verb “providing” should be interpreted to mean
“replacing.” We reject this suggestion because such an interpretation would make the
term “providing” redundant and such interpretations are disfavored. (See Kern County
Hospital Authority v. Dept. of Corrections & Rehabilitation (2023) 91 Cal.App.5th 1313,
1326 [courts avoid an interpretation that renders regulatory language mere surplusage].)
The County’s briefing also suggests that “providing” is not the equivalent of preserving
or protecting in perpetuity. In our view, the verb “providing” could be reasonably
construed narrowly to mean supplying something new, while excluding the preservation
of something that already exists. Alternatively, “providing” could be reasonably
construed more broadly to include preserving (i.e., protecting in perpetuity) because

30.
preserving and protecting in perpetuity could be equated to “giving in the interest of
preparing with foresight” (Webster’s Third New Internat. Dict., supra, p. 1827) against
long term depletion of agricultural land. Based on the different ways the verb
“providing” could be interpreted, we conclude it is ambiguous in the context of this case.
ACE’s must “provid[e] substitute resources or environments” for the converted
agricultural land to qualify as compensatory mitigation. (Guidelines, § 15370, subd. (e).)
The usual or ordinary meaning of the noun “substitute” is “that which stands in place of
another; that which stands in lieu of something else” and the verb form means “[t]o put in
the place of another person or thing; to exchange.” (Webster’s Third New Internat. Dict.,
supra, at p. 1429.) Taking these definitions into consideration, we conclude the term
“substitute resources” is ambiguous. It could be interpreted narrowly to mean that,
immediately after the substitute acreage has been provided, the amount of land suitable
for agricultural use is the same—that is, there is no net loss of farmland. (See generally,
Malloy, Symbolic Gestures or Our Saving Grace: The Relevance of Compensatory
Mitigation for Florida’s Wetlands in the Climate Change Era (2011) 27 J. Land Use &
Envtl. L. 103, 105 [no net loss policy adopted in 1989 by President Bush designed to
ensure total acres of wetlands remained constant].) This interpretation of what
constitutes “substitute resources” focuses on the immediate result. Alternatively, it could
be interpreted broadly to refer to other land that will be available in the future to grow
crops that could no longer be grown on the land being converted. Based on these
different interpretations, we conclude that, in the context of this case, the term “substitute
resources” is ambiguous. (Guidelines, § 15370, subd. (e).)
5. Resolving the Ambiguities
Having determined the phrase “providing substitute resources or environments”
and the derivative term “such resources” (Guidelines, § 15370, subd. (e)), are ambiguous,
the next step is to resolve the ambiguities. That step involves an independent review and

31.
our adoption of the interpretation that best effectuates the purpose of CEQA. (See
County of Inyo, supra, 67 Cal.App.5th at p. 1039.)
In 2018, the Natural Resources Agency explained the purpose of adding the phrase
“including through permanent protection of such resources in the form of conservation
easements” to subdivision (e) of section 15370 by stating:

“[We] revised Section 15370 of the CEQA Guidelines, however, to clarify
in the CEQA Guidelines that permanent protection of off-site resources
through conservation easements constitutes mitigation. The proposed
changes incorporate the First District Court of Appeal holding in Masonite
Corporation v. County of Mendocino (2013) 218 Cal.App.4th 230 wherein
the court ruled that off-site agricultural conservation easements constitute a
potential means to mitigate for direct, in addition to cumulative and
indirect, impacts to farmland.” (FSOR 2018, supra, at p. 64.)
Based on the role Masonite played in the amendment of section 15370,
subdivision (e), we next describe that decision. In Masonite, the First District reversed a
judgment denying a petition for writ of mandate, and directed the issuance of a writ
requiring the county to (1) set aside its certification of the EIR and approval of permits
for a quarry project and (2) correct deficiencies in the EIR involving ACE’s as mitigation
for the conversion of agricultural land. (Masonite, supra, 218 Cal.App.4th at p. 242.)
The court rejected the respondents’ contention that ACE’s were legally infeasible and
concluded “that ACEs may appropriately mitigate the direct loss of farmland when a
project converts agricultural land to a nonagricultural use, even though an ACE does not
replace the onsite resources.” (Masonite, supra, 218 Cal.App.4th at p. 238, italics
added.) The court stated its conclusion was “reinforced by the CEQA Guidelines, case
law on offsite mitigation for loss of biological resources, case law on ACEs, prevailing
practice, and the public policy of this state.” (Ibid.) The court then explained:

“ACEs preserve land for agricultural use in perpetuity. (See
Civ.Code, §§ 815.1, 815.2 [describing agricultural and other conservation
easements]; Pub. Resources Code, § 10211 [defining ‘agricultural
conservation easement’].) As the California Farm Bureau Federation

32.
(CFBF) observes in an amicus curiae brief advocating for the conclusion
we reach: ‘The permanent protection of existing resources off-site is
effective mitigation for [a project’s direct, cumulative, or growth-inducing]
impacts because it prevents the consumption of a resource to the point that
it no longer exists.... If agricultural land is permanently protected off-site
at, for example, a 1:1 replacement ratio, then at least half of the agricultural
land in a region would remain after the region has developed its available
open space.’ By thus preserving substitute resources, ACEs compensate for
the loss of farmland within the Guidelines’ definition of mitigation.
(Guidelines, § 15370, subd. (e) [mitigation includes ‘[c]ompensating for the
impact by replacing or providing substitute resources or environments’].)”
(Masonite, supra, 218 Cal.App.4th at p. 238, italics added.)
Although not stated in detail, the foregoing demonstrates that the First District
interpreted the phrase “providing substitute resources” to encompass preserving (i.e.,
permanently protecting) existing agricultural land. (Guidelines, § 15370, subd. (e).)
As further support for its conclusion that ACE’s mitigate the conversion of
agricultural land despite not replacing the converted land, the First District noted the
cases accepting offsite preservation of habitats for endangered species as a means of
mitigating impacts on biological resources and stated there was no good reason to
distinguish the use of offsite ACE’s to mitigate the conversion of agricultural land.
(Masonite, supra, 218 Cal.App.4th at pp. 238–239, citing Preserve Wild Santee v. City of
Santee (2012) 210 Cal.App.4th 260, 278 [loss of habitat mitigated by conservation of
other habitat at a one-to-one ratio]; California Native Plant Society v. City of Rancho
Cordova (2009) 172 Cal.App.4th 603, 610–611, 614–626 [mitigation by offsite
preservation of two acres of existing habitat or creation of one acre of new habitat for
each acre of habitat impacted by the project]; Endangered Habitats League, Inc. v.
County of Orange (2005) 131 Cal.App.4th 777, 794 [mitigation by “off-site preservation
of similar habitat”]; Environmental Council of Sacramento v. City of Sacramento (2006)
142 Cal.App.4th 1018, 1038 [purchase of a half-acre for habitat reserves for every acre of
development].)

33.
In addition, the First District discussed the “relatively sparse case law involving
ACEs” and determined those cases supported its conclusion. (Masonite, supra, 218
Cal.App.4th at pp. 239–240.) The court also noted ACE’s are commonly used in
California as mitigation. (Id. at p. 240.) Finally, the court stated the Legislature had
declared that the preservation of agricultural land is an important public policy and had
declared CEQA was intended to effectuate the policy. (Masonite, supra, at pp. 240–241,
citing Stats. 1993, ch. 812, § 1, p. 4428.)
The interpretation in Masonite of what constitutes compensatory mitigation for
purposes of Guidelines section 15370, subdivision (e) was confirmed by the First District
about nine years later when it rejected the argument that protection of an 85-acre site
“under a conservation easement would not result in the provision of any new resources to
offset or compensate for the [32 acres of] habitat permanently lost to the Project.” (Save
the Hill Group v. City of Livermore (2022) 76 Cal.App.5th 1092, 1117, italics added.)
Our inquiry into the meaning of compensatory mitigation does not end with the
First District’s interpretation of Guidelines section 15370, subdivision (e) because there is
no horizontal stare decisis within the California Court of Appeal. Also, while courts
ordinarily give deference to how the promulgating agency has interpreted its regulation
(Fischl v. Pacific Life Insurance Company (2023) 94 Cal.App.5th 108, 122), we conclude
the Natural Resources Agency’s interpretation of an ambiguous Guideline is not binding
on the courts. Under Government Code section 11342.2, “no regulation adopted is valid
or effective unless consistent and not in conflict with the statute and reasonably necessary
to effectuate the purpose of the statute.” We infer from this provision that the
interpretation of an ambiguous Guideline also must be consistent and not in conflict with
CEQA and reasonably necessary to effectuate CEQA’s purpose. (See generally,
Communities for a Better Environment v. California Resources Agency (2002) 103
Cal.App.4th 98, 105 [upholding invalidation of certain CEQA Guidelines].)

34.
The main purpose of CEQA is “to provide long-term protection to the
environment.” (Mountain Lion Foundation v. Fish & Game Com. (1997) 16 Cal.4th 105,
112.) Thus, “CEQA is to be interpreted ‘to afford the fullest possible protection to the
environment within the reasonable scope of the statutory language.’ ” (Ibid.) Another
purpose is identified in the Legislature’s declaration that CEQA “plays an important role
in the preservation of agricultural lands.” (Stats. 1993, ch. 812, § 1, subd. (d), p. 4428;
see Masonite, supra, 218 Cal.App.4th at p. 241.)
Interpreting the verb “providing” to encompass preserving or permanently
protecting and the term “substitute resources” (Guidelines, § 15370, subd. (e)) to include
existing agricultural land would promote the use of ACE’s, which would advance
CEQA’s purpose of long term protection of the environment and its specific role of
preserving agricultural land. In comparison, the interpretation that existing agricultural
land is not a “substitute resource” for purposes of compensatory mitigation would
diminish the use of ACE’s and result in less long term protection of California’s
agricultural land. Therefore, the interpretation offered by the County is not the one that
best effectuates CEQA’s purpose. As a result, we conclude the phrase “providing
substitute resources” (Guidelines, § 15370, subd. (e)) includes preserving (i.e.,
permanently protecting) existing agricultural land. Consequently, ACE’s are a type of
compensatory mitigation for the conversion of agricultural even though, operating by
themselves, they do not replace the converted land or otherwise result in no net loss of
agricultural land. (See generally, Sierra Club v. County of Fresno, supra, 6 Cal.5th at p.
523 [mitigation measures must be at least partially effective, even if they cannot mitigate
significant impacts to less than significant levels].)8

8 Based on this interpretation, we do not consider whether ACE’s provide a type of
mitigation for purposes of CEQA that is not among the five examples set forth in
subdivisions (a) through (e) of Guidelines section 15370. The latter question arises from
the use of “includes” before the list of examples in Guidelines section 15370. (See
Ornelas v. Randolph (1993) 4 Cal.4th 1095, 1101 [“includes” ordinarily is “a term of

35.
Consequently, the County failed to comply with CEQA when it eliminated the use
of ACE’s as a mitigation measure for the conversion of agricultural land in situations
where the permit applicant’s adoption of other mitigation has not reduced the net loss of
agricultural land to zero acres.9 To remedy that noncompliance, the superior court shall
issue a fourth peremptory writ of mandate directing the County to take corrective action
before reapproving the Revised Ordinance. (§ 21168.9, subd. (b).)

III. MITIGATION OF PM2.5 EMISSIONS*
A. Background
1. Prior CEQA Violations
In King & Gardiner, supra, 45 Cal.App.5th 814, Sierra Club challenged the
mitigation measures for air quality impacts on several grounds. Our discussion of those
challenges was not published. (Id. at pp. 870, 900.) One challenge asserted the
mitigation measure for criteria pollutants,10 MM 4.3-8, should have separately addressed

enlargement rather than limitation”].) Also, because ACE’s are effective at providing
compensatory mitigation for project-specific impacts, the question whether they are
effective at only addressing cumulative impacts to agricultural land does not arise.
9 For some but not all permit applications, the mitigation measure requiring the
removal of unused legacy equipment and restoration of the surface will offset the
conversion of farmland caused by the drilling of a new well. Where an applicant’s
proposed conversion of farmland is completely offset by other mitigation, it would be
inappropriate to also require the applicant to provide compensatory mitigation, such as an
ACE.
* See footnote, ante, page 1.
10 The EPA has established health-based ambient air quality standards, or allowable
limits, for seven “criteria pollutants”—ozone, carbon monoxide, nitrogen dioxide (NO2),
sulfur dioxide (SO2), lead, respirable particulate matter (PM10), and PM2.5. PM10
refers to particulate matter of 10 microns or less in diameter. (40 C.F.R. § 50.6(a); Cal.
Code Regs., tit. 17, § 70100, subd. (i) [definition of suspended particulate matter
(PM10)].) Because PM2.5 refers to particulate matter of 2.5 microns or less in diameter,
it is necessarily a subset of PM10. (40 C.F.R. § 50.7(a); Cal. Code Regs., tit. 17, §
70100, subd. (j).)

36.
PM2.5 and should have provided enforceable mitigation for that pollutant. That
challenge succeeded when we identified two CEQA violations that involved MM 4.3-8:

“First, the EIR did not discuss the impact of the measure on PM2.5
emissions or, alternatively, provide a rational explanation for why there is
no separate discussion of the measure’s impact on PM2.5 emissions.
Second, MM 4.3-8 does not provide for enforceable mitigation of PM2.5
emissions, and there is no finding that mitigation of this specific pollutant
was not feasible. These deficiencies must be remedied on remand.”
2. Revisions After Remand
The County attempted to remedy the CEQA violations identified in this court’s
opinion and the superior court’s writs of mandate by (1) preparing an SREIR with an
extensive discussion of PM2.5 emissions, (2) certifying the completion of the SREIR, (3)
adopting a clarified MM 4.3-8 that explicitly referred to PM2.5 emissions, and (4)
amending the oil and gas emission reduction agreement with the Air District (OG-ERA)
to explicitly address PM2.5.
The SREIR’s discussion of PM2.5 emissions describes the attainment status of the
San Joaquin Valley Air Basin (SJVAB) for PM2.5, attainment plans for PM2.5, and
potential adverse health effects of PM2.5 emissions. It states the SJVAB has not attained
federal or California PM2.5 standards, has not attained California PM10 standards, and
has attained federal PM10 standards. The SREIR includes a table summarizing ambient
PM10 and PM2.5 data collected at monitoring stations in Kern County, a 2012 baseline
of criteria pollutant emissions, significance thresholds for criteria pollutants (including
PM10 and PM2.5), and several tables estimating emissions that would be caused by the
project.
The SREIR also attempts to clarify the enforceability and impact of MM 4.3-8 on
PM2.5 emissions. As revised, the first two paragraphs of the MM 4.3-8 now provide:

“For criteria emissions not required to be offset under a District rule as
described in MM 4.3-1, and for Project vehicle and other mobile source
emissions, the County will enter into an emission reduction agreement with

37.
the [Air] District, pursuant to which the Applicant shall pay fees to fully
offset Project emissions of NOx (oxides of nitrogen), ROG (reactive organic
gases), PM10 (particulate matter of 10 microns or less in diameter) and
PM2.5 (particulate matter of 2.5 microns or less in diameter) (including as
applicable mitigating for reactive organic gases by additive reductions of
particulate matter of 10 microns or less in diameter) (collectively,
‘designated criteria emissions’) to avoid any net increase in these
pollutants. The air quality mitigation fee shall be paid to the County as part
of the Site Plan review and approval process, and shall be used to reduce
designated criteria emissions to fully offset Project emissions that are not
otherwise required to be fully offset by District permit rules and
regulations.

“As an alternative to paying the fee, an Applicant may reduce emissions for
one or more designated criteria emissions through actual reductions in air
emissions from other Applicant sources, as submitted to the County and
validated by the [Air] District. This Project offset requirement alternative
shall be enforced by the County and verified by [Air] District, and must be
approved in advance by the [Air] District. If a voluntary emission
reduction agreement is not executed by the County and [Air] District, then
each Applicant must mitigate for the full amount of designated criteria
pollutants as verified by the [Air] District, with evidence of such District-
verified offsets presented as part of the Site Plan Conformity Review
application documentation.”
Thus, MM 4.3-8 provides two pathways for mitigating emissions of criteria
pollutants—either activities undertaken directly by the applicant or activities funded by
the applicant’s fees in accordance with the terms of the OG-ERA. The third paragraph of
MM 4.3-8 provides examples of feasible air emission reduction activities that might be
implemented under either pathway.
The OG-ERA was revised to mention PM2.5 in two places. First, a recital in the
amended OG-ERA states that MM 4.3-8 requires applicants for permits issued under the
Revised Ordinance to fully mitigate emissions of oxides of nitrogen, reactive organic
compounds, PM10, and PM2.5 “through emission reductions that are either: (1)
implemented by the Applicant, with the quantity of emission reduction verified by the
[Air] District; or (2) funded by the Applicant through the [Air] District’s incentive
programs, as described below.” Section 1 of the amended OG-ERA provides:

38.
“Project-related Criteria Pollutant Emissions not required to be offset per
[Air] District rules shall be fully mitigated by achieving surplus,
quantifiable and enforceable emission reductions for ROG, NOx, PM10 and
PM2.5 (collectively, ‘Mitigation of Criteria Pollutants’). ‘Surplus’ emission
reductions are reductions that are not otherwise required by laws or
regulations. The determination of whether proposed emission reductions
are surplus shall be performed by the [Air] District.” (Italics added.)
Subsequent provisions of the OG-ERA address the emission mitigation required,
the emission mitigation fee required, and the use of the mitigation fees to reduce
emissions. The OG-ERA states that the County and the Air District shall regularly meet
and confer regarding potential projects and the final selection of emission reduction
projects to be funded by the mitigation fees.
The SREIR explains why table 4.3-32 includes a total PM value (i.e., combines
PM10 and its subset, PM2.5) for use in (1) calculating the mitigation fees charged
applicants and (2) tracking emission reductions achieved pursuant to the OG-ERA. One
reason is that, historically, the Air District has addressed PM2.5 and PM10 jointly in its
attainment plans and State Implementation Plan strategies for achieving both PM2.5 and
PM10 air quality standards. The Air District explained its approach in responding to
comments on a 2018 attainment plan:

“ ‘The [Indirect Source Review] rule targets NOx and PM10 emissions
from mobile source equipment related to the project construction and
operational activities. Particulate matter emissions from mobile source
equipment emissions are overwhelmingly PM2.5, a subset of PM10.
Therefore, the PM10 emission reductions achieved by our emission
reduction incentive grants through expenditure of offsite fees collected
under [Indirect Source Review] result directly in PM2.5 emission
reductions. In other words, PM10 emissions increases are being offset by
emission reductions that are overwhelmingly PM2.5, a positive impact on
PM2.5 concentrations. Adding a PM2.5 emission reduction requirement to
the existing PM10 emission reduction target will not contribute to further
reduce actual PM2.5 emissions.’ ”
The SREIR notes the State Air Resources Board (ARB) has accepted the Air
District’s approach to PM2.5 attainment and states that, under the Air District’s approach,

39.
the calculation of emissions reductions required by the OG-ERA includes PM2.5. The
SREIR states that the County has relied on the Air District’s judgment that differentiating
between PM2.5 and PM10 for purposes of incentive measures and tracking reductions
from emission reduction projects (such as the projects funded under the OG-ERA) is not
necessary and would not contribute to further reduction of actual PM2.5 emissions. The
SREIR justifies this reliance by noting that the Air District is the expert agency with
responsibility for air quality in the project area. The SREIR also states it is not currently
possible to identify and commit to specific emission reduction projects for each year
through 2035 and the OG-ERA provides flexibility to allow the mitigation fees to be
spent on the most effective projects available at the time the fees are received.
The SREIR forecasts that implementing MM 4.3-8’s two pathways “will offset
NOx, PM10, and PM2.5 emissions to net zero” but states that actual reductions of ROG,
NOx, PM10, and PM2.5 “remain impossible to certify as 100% reduced to zero.” Due to
this uncertainty, the SREIR concludes the project’s air quality impacts are significant and
unavoidable. It also states: “However, all reasonable and feasible mitigation has been
required and will reduce the air emissions as close to a ‘no net increase’ from the current
emissions over the next 21 years as is scientifically possible to quantify and confirm.”
The SREIR estimates that the mitigation fees collected over the 21-year period will range
from $260 million to $2.5 billion.11
B. Contentions of the Parties
Sierra Club contends the County has failed to comply with CEQA because (1)
CEQA requires the adoption of particular and fully enforceable mitigation measures for

11 A table in the SREIR sets forth the yearly amount of mitigation fees paid for
permits issued in 2016 through 2019. These fees totaled nearly $88.9 million and
accounted for 91 percent of all mitigation fees received by the Air District under its
various emission reductions agreements. By 2020, the Air District had entered into a
running total of 45 such agreements, which includes the OG-ERA.

40.
the project’s PM2.5 emissions; (2) the amended OG-ERA does not provide for such
mitigation; and (3) the County’s excuses for not adopting particular and fully enforceable
mitigation for PM2.5 emissions are unavailing.
The County contends MM 4.3-8 now uses mandatory language requiring
applicants to mitigate PM2.5 emissions from project activities to no net increase and,
similarly, the OG-ERA was amended to state that PM2.5 is a criteria pollutant that “shall
be fully mitigated by achieving surplus, quantifiable and enforceable emission
reductions.” On the issue of enforceability, the County asserts that, if projects funded
through the OG-ERA inadequately mitigate PM2.5 emissions, the Revised Ordinance
authorizes the County to take enforcement action and revoke any permit. The County
also asserts (1) it will monitor and enforce the required offset of PM2.5 emissions
pursuant to the mitigation monitoring and reporting program and (2) the required offset is
an enforceable condition of permit issuance.
In response, Sierra Club contends that MM 4.3-8 and the OG-ERA remain
unchanged in substance because they continue to allow reductions in PM10 to be treated
as offsets for PM2.5 emissions. It argues the County’s prediction that its approach will,
in practice, result in offsetting the project’s PM2.5 emissions, is not a lawful substitute
for adopting enforceable mitigation that actually requires PM2.5 emissions to be offset.
C. Mitigation Requirement for PM2.5 is Enforceable
1. Applicable Law
CEQA provides that a “public agency shall mitigate or avoid the significant effect
on the environment of projects that it carries out or approves whenever it is feasible to do
so.” (§ 21002.1, subd. (b).) “If, after the feasible mitigation measures have been
implemented, significant effects still exist, a project may still be approved if it is found
that the ‘unmitigated effects are outweighed by the project’s benefits.’ ” (Sierra Club,
supra, 6 Cal.5th at p. 524.) Even if a project’s benefits outweigh its unmitigated

41.
environmental effects, CEQA requires agencies to implement all mitigation measures
unless those measures are truly infeasible. (Sierra Club, supra, at pp. 524–525.) Before
approving a project that will have significant environmental effects after implementation
of all feasible mitigation measures, the agency must adopt a statement of overriding
considerations. (Id. at p. 525; § 21081, subd. (b) [agency finding that specific benefits
outweigh the significant environmental effects]; Guidelines, § 15093 [statement of
overriding considerations].) The foregoing requirements reflect the EIR’s purpose of
identifying the project’s significant environmental effects and describing how those
effects can be mitigated or avoided. (§ 21002.1, subd. (a); Guidelines, § 15126.4, subd.
(a).)
The mitigation measures adopted by a lead agency must be “fully enforceable
through permit conditions, agreements, or other measures. Conditions of project
approval may be set forth in referenced documents which address required mitigation
measures .…” (§ 21081.6, subd. (b).) Echoing this requirement, Guidelines section
15126.4, subdivision (a)(2) states: “Mitigation measures must be fully enforceable
through permit conditions, agreements, or other legally-binding instruments.” The
responsibility of the public agency does not end with simply requiring enforceable
mitigation measures. “The public agency shall adopt a reporting or monitoring program
for the … conditions of project approval, adopted in order to mitigate or avoid significant
effects on the environment.” (§ 21081.6, subd. (a)(1).) The purpose of a monitoring
program is to ensure compliance with the mitigation measures imposed as conditions of
the project approval. (Ibid.)
2. Particularity of the Mitigation
Sierra Club contends a mitigation measure must be particular and fully
enforceable. We conclude MM 4.3-8 contains the requisite particularity because, as

42.
clarified in the SREIR, it specifically addresses PM2.5 and PM10 using mandatory
language.
First, MM 4.3-8 provides that the County will enter into an emission reduction
agreement with the Air District. The County and the Air District have fulfilled this
aspect of MM 4.3-8 by adopting, then amending, the OG-ERA.
Second, MM 4.3-8 provides that, pursuant to the OG-ERA, applicants “shall pay
fees to fully offset Project emissions of … PM10 (particulate matter of 10 microns or less
in diameter) and PM2.5 (particulate matter of 2.5 microns or less in diameter) … to avoid
any net increase in these pollutants.” Section 1 of the amended OG-ERA complies with
MM 4.3-8 by providing that the project’s criteria pollutant emissions “shall be fully
mitigated by achieving surplus, quantifiable and enforceable emission reductions for …
PM10 and PM2.5.”
As a result, a CEQA defect in the prior version of MM 4.3-8—namely, the failure
to address PM2.5 emissions—has been cured. In addition, MM 4.3-8’s phrases “fully
offset” and “avoid any net increase” adequately describe the standard of mitigation of
PM2.5 emissions that must be achieved.
3. Enforceability of the Mitigation Standard
Sierra Club’s argument that MM 4.3-8 is not fully enforceable as applied to PM2.5
emissions raises two questions. First, does the County have the authority to enforce MM
4.3-8’s requirement that PM2.5 emissions be fully offset? Second, if the County shirks
its responsibility to enforce the mitigation measure, is there a means for enforcing the
mitigation measure? The answer to both questions is yes.
The County contends provisions in the Revised Ordinance provide it with the
authority to enforce MM 4.3-8. Section 19.98.040.A of the Revised Ordinance provides
that no oil and gas activities may be undertaken until an application for a permit, along
with payment of all fees, is submitted to and approved by the planning director as

43.
consistent with section 19.98.060. Section 19.98.060.D of the Revised Ordinance
provides that a permit applicant must “comply with all applicable Mitigation Measures as
shown in the steps to compliance checklist in the approved Mitigation Monitoring and
Reporting Program (MMRP).” To assist the County in determining whether the
mitigation requirements are met, item 11 of section 19.98.080.E and item 15 of section
19.98.085.F of the Revised Ordinance provide that the applicant’s site plan must include
written documentation showing all conditions required by section 19.98.060 will be
complied with, including all applicable mitigation measures listed in the MMRP. In
accordance with these provisions, if the applicant does not pay the criteria pollutant
mitigation fee or satisfy the alternate mitigation pathway, the County will enforce the
mitigation measure by refusing to issue a permit. As a result, we conclude that the
“measures are not vague as to how they will be [initially] enforced, [because] the County
will enforce them during the approval process.” (Sierra Club v. County of Fresno, supra,
6 Cal.5th at p. 526.)
Next, we consider the County’s ability to enforce the mitigation measure after the
permit has been issued. We consider this issue because of the time lag between an
applicant’s payment of a mitigation fee and the use of that fee to fund an emission
reduction project approved by the Air District. Section 19.98.160 of the Revised
Ordinance states that “[a]ny permit issued pursuant to this chapter may be revoked or
modified pursuant to Section 19.102.020 of this Title.” In turn, section 19.102.020
provides that any permit may be modified or revoked by the official or decision-making
body that originally approved the permit by the same procedure under which the permit
was issued if “any term or condition of the permit … has not been complied with.”
Under these provisions, if the County learns that the Air District’s emission reduction
projects and incentive programs funded with the mitigation fees are not achieving the
required level of mitigation of PM2.5 or other criteria pollutants, the County has the
authority to revoke the permits issued previously with the expectation that emission

44.
reduction projects would achieve the requisite offsets. Obtaining the information needed
to exercise this authority is aided by section 1.3(b) of the OG-ERA, which provides that
the Air District and the County shall meet and confer regularly regarding potential
emission reduction projects and the final selection of those projects. This contractual
provision provides the County with access to information about the emission reduction
projects and their effectiveness in offsetting the emissions of criteria pollutants, including
PM2.5. Consequently, we conclude the Revised Ordinance and the OG-ERA provide the
County with the authority to enforce the mitigation measure for PM2.5 after a permit has
been issued. Furthermore, the OG-ERA provides a mechanism for obtaining information
needed to enforce the mitigation requirements. Stated another way, the County has not
forestalled enforcement by agreeing to be kept in the dark.
Consequently, we conclude the County has the authority and the means to enforce
MM 4.3-8’s requirement that PM2.5 emissions be fully offset, both before and after
permits are issued.
The final question about MM 4.3-8’s enforceability is what would happen if the
County, either inadvertently or intentionally, fails to properly administer that measure.
Such a situation could arise if, among other things, the County fails to assure the
emission reduction projects funded with the mitigation fees do, in fact, fully offset the
PM2.5 emissions.
Our analysis of this question begins with the Board’s findings in support of its
adoption of the SREIR and approval of the project. In section 1 of the findings, the
Board (1) stated “the County hereby binds itself to implement these [mitigation]
measures” and (2) found that “[t]he County will use the MMRP to track compliance with
Project mitigation measures.” As a result, the Board explicitly bound the County to
implement the mitigation measures and track compliance pursuant to the MMRP. Any
failure of the County to fulfill this duty “would amount to an abuse of discretion, which
could be corrected in a court mandamus proceeding.” (Sierra Club v. County of Fresno,

45.
supra, 6 Cal.5th at p. 526; see Rominger v. County of Colusa (2014) 229 Cal.App.4th
690, 727 [abuse of discretion related to dust control mitigation measure “could be
remedied through the courts in mandamus”].)
Consequently, we conclude the mitigation measure for PM2.5 emissions is “fully
enforceable” as that term is used in section 21081.6, subdivision (b) and Guidelines
section 15126.4, subdivision (a)(2) and explained by our Supreme Court in Sierra Club v.
County of Fresno, supra, 6 Cal.5th 502.

IV. MULTI-WELL HEALTH RISK ASSESSMENT*
A. Background
1. Previous Decision
The introduction to our 2020 opinion stated the conclusions that (1) the Multi-
Well Health Risk Assessment prepared in October 2015 by Environmental Compliance
Solutions, Inc. constituted new information that had been omitted from the draft EIR; (2)
the new information was significant because the draft EIR inadequately addressed the
subject of multiple oil wells in a given area and there was no meaningful public review
and comment on the new assessment; and (3) the Multi-Well Health Risk Assessment
must be included in any revised EIR recirculated to correct the other CEQA violations.
(King & Gardiner, supra, 45 Cal.App.5th at p. 830.) An unpublished part of the opinion
set forth the supporting analysis and legal principles. That analysis did not address (1)
the adequacy of the discussion in the Multi-Well Health Risk Assessment or (2) the
methodologies employed. Our remand order required the superior court to issue a writ of
mandate directing the County to (1) recirculate a revised EIR and the Multi-Well Health
Risk Assessment for public review and comment and (2) prepare and publish responses
to the comments received before certifying the completion of any revised EIR and
reapproving the project. (Id. at p. 901.)

* See footnote, ante, page 1.

46.
2. Recirculation of the SREIR
The County’s April 2020 “Initial Study/Notice of Preparation” stated the SREIR,
including the Multi-Well Health Risk Assessment, would be recirculated for public
review and comment and the County would prepare and publish responses to the
comments. The Multi-Well Health Risk Assessment, the June 2015 single-well health
risk assessment, and the September 2015 updated single-well health risk assessment were
included in appendix B of the SREIR. In addition, a Supplemental Health Risk
Assessment Technical Memorandum dated October 2020 (technical memorandum) was
included in the SREIR as appendix B-1. The technical memorandum provided a further
explanation of the assumptions, modeling, and conclusions in the Multi-Well Health Risk
Assessment. An assumption important to this appeal was that the hypothetical sensitive
receptor being assessed “had a 300m x 300m (or approximately 1,000 foot fence around
it).”
Impact 4.3-3 of the October 2020 draft SREIR addressed the exposure of sensitive
receptors12 to substantial pollutant concentrations and described the three health risk
assessments prepared in 2015. The three assessments evaluated potential cancer risks,
acute (short term) noncancer risks, and chronic (long term) noncancer risks13 resulting
from toxic emissions associated with oil and gas processing equipment and with well
construction, drilling, and completion. Generally, an assessment of health risks involves
four steps: (1) hazardous emission estimations, (2) exposure assessment, (3) dose-
response assessments, and (4) quantification of potential health risks.

12 The Revised Ordinance defines a sensitive receptor as a church, hospital, single or
multi-family dwelling, or place of public assembly where 100 or more people gather in a
building or structure for purposes of amusement, entertainment or retail sales.
13 The temporal aspect of these types of risks was defined in a report prepared for
Lions Farming by Dr. Phyllis Fox, which stated: “Acute impacts are those that occur
over a 1-hour exposure time while cancer and chronic impacts result from a lifetime of
exposure.”

47.
Each assessment described the guidelines, software, and models used. The
assessments followed the California’s Office of Environmental Health Hazard
Assessment (OEHHA) “Air Toxics Hot Spots Program Risk Assessment Guidelines,” as
amended in March 2015. In accordance with the guidelines’ recommendation, the
assessments used the ARB’s “Hotspots Analysis and Reporting Program, Version 2”
(HARP2). HARP2 includes a dispersion module, an exposure-dose module, and a risk
module. The dispersion module incorporates the EPA’s AERMOD, which predicts
resulting cumulative concentrations from various emission sources. AERMOD includes
a terrain processor, AERMAP, that incorporates actual terrain elevations for sources and
receptors. The Multi-Well Health Risk Assessment stated that five years of
meteorological data required for AERMOD was obtained from the Air District.
The draft SREIR stated the Air District’s thresholds of significance considered the
following risks were acceptable: (1) a cancer risk equal or less than 10 in one million,14
(2) a chronic hazard index equal to or less than one, and (3) an acute hazard index equal
to or less than one. It also stated that the 2015 single-well assessments showed the
potential cancer risk exceeded the 10 in one million threshold “for drilling a 10,000-foot
well in any Project year, for drilling a 5,000-foot well in year 2015, and for operations of
the oil processing equipment.” The draft SREIR dealt with the cancer risk associated
with well drilling and construction by determining how far a receptor needed to be from
the well site and project boundary to have the receptor’s risk drop below 10 in one

14 Section 5.0 of the Multi-Well Health Risk Assessment stated a project’s cancer
risk equal to or less than 20 in one million is not considered significant under the Air
District’s published thresholds and, therefore, is acceptable. Section 1.0 of the September
2015 updated single-well health risk assessment stated the Air District’s comment letter
to the draft EIR requested that the assessment’s results be compared against the Air
District’s significance threshold for toxic air contaminants of 20 in one million. Thus, the
Board’s March 2021 findings in support of the project applied the Air District’s risk
threshold of 20 in one million. Similarly, this opinion uses 20 in one million as the
significance threshold for cancer risk.

48.
million. For example, the setback needed for a 10,000 foot-deep well drilled in the
western or central subarea was estimated at 367 feet in 2015 and 232 feet in 2020 after
stricter diesel emission standards went into effect. Based on these estimates, MM 4.3-5
provides that where a sensitive receptor is within 4,000 feet of a well construction site,
the application must provide information “showing the distance from the closest edge of
the well pad to the property line of the nearest sensitive receptor” and the minimum
distances shall be 367 feet for a 10,000 foot well in the western or central subarea and
296 feet for a 10,000 foot well in the eastern subarea. For wells 5,000 feet deep, the
setback distance is 116 feet in the western or central subarea and no setback is imposed in
the eastern subarea.
The draft SREIR described the Multi-Well Health Risk Assessment and some of
its underlying assumptions and noted the primary driver for cancer risk is days of drilling,
not well depth. The draft SREIR stated that under the conservative multi-well scenario
assumed, the Multi-Well Health Risk Assessment found the cancer health risk would be
9.3 in one million, which was below the Air District’s threshold of 20 in one million.
As to acute and chronic noncancer impacts, the draft SREIR stated they were not
considered because approximately 99.9 percent of the risk associated with the multi-well
scenario came from diesel particulate matter (DPM) and, as shown in the single-well
assessments, the acute and chronic noncancer impacts were well below the Air District’s
thresholds. For instance, Table 4.3-36 listed the potential acute impacts identified in the
June 2015 single-well health risk assessment as 0.0098 on a scale that regarded the
hazard as significant when it was 1.0 or more.
3. Comments to the SREIR
Lions Farming’s September 16, 2020 comment letter asserted the draft SREIR had
not corrected defects in the Multi-Well Health Risk Assessment. The letter referred to
Dr. Fox’s November 2015 report, which asserted the assessment did not analyze impacts

49.
from multiple wells at densities that actually occur in Kern County. Dr. Fox’s report
stated that 48 wells drilled in concentric circles around a sensitive receptor in an area
with a diameter of one mile (i.e., 2,011 acres) would have only 0.02 wells per acre (or
one well per 42 acres) and included photographs of oil fields where well densities were
much higher.
Sierra Club’s September 16, 2020 comment letter asserted the County must revise
the Multi-Well Health Risk Assessment because, among other things, the way the wells
were modeled in rings at distances of approximately 0.2 mile, 1/3 mile, 1/2 mile, and one
mile created artificially low pollutant concentrations. In addition, the letter asserted the
proposed setback requirements were arbitrary and inconsistent.
The ARB’s December 14, 2020 comment letter stated the draft SREIR should
clearly state the assumptions made in the Multi-Well Health Risk Assessment and
asserted the assessment may have severely underestimated the project’s potential health
risks to residents and communities near drilling and production activities. ARB’s
comments addressed acute risks and also asserted that, because over 2,000 notices of
intent to drill were submitted to the County in 2019 and wells continue to emit pollutants
throughout their productive lifespan, the Multi-Well Health Risk Assessment should have
examined the lifetime air quality impacts of new wells.
4. The County’s Responses to Comments
The County’s response No. 0008-27 addressed in two ways Lions Farming’s
comment that the well density used in the Multi-Well Health Risk Assessment did not
reflect actual well densities in Kern County. First, the response attempted to explain why
the well density used was appropriate. It stated the Multi-Well Health Risk Assessment
analyzed a well density of approximately 13 wells per square mile and asserted the
majority of Kern County has well densities in the range of one to 99 wells per square
mile and a much smaller subset of areas have well densities greater than 400 wells per

50.
square mile. The response stated Dr. Fox’s suggestion that a well density of more than
600 wells per square mile was common was not supported and provided a color-coded
map showing seven categories of well density across Kern County.
Second, response No. 0008-27 stated the driver of health risks was drilling, not
ongoing production operations. Accordingly, the response stated, “the relevant inquiry is
not the overall well density in any area in [Kern] County but (1) the density of wells
being drilled proximate in time to each other, and (2) the density of these wells near a
particular sensitive receptor such that the sensitive receptor will be exposed to the risks
from drilling multiple wells over time.” In other words, overall well density is not the
appropriate metric for multi-well modeling when the health risk is predominately related
to drilling. The response stated, the Multi-Well Health Risk Assessment did not assume a
well density for operating well “but for wells being drilled at the same time or in close
temporal succession.” More specifically, it assumed “that forty-eight 13,000-foot wells
would be drilled not only in close proximity to a single sensitive receptor but also close in
time to each other in order that they would impact one individual over their lifetime
living at the same location. See SREIR (October 2020), Vol. 1, at 4.3-152–155.” The
response asserted that this and other assumptions “are extremely conservative.” The
response explains that, at any given time between 2015 and 2020, there had been four to
12 drill rigs operating in Kern County and, since April 2020, that there had been only
three or four.15 The response predicted that the number was unlikely to increase in the
near future, but made no attempt to correlate drilling activity to the 2,697 ministerial
permits that Revised Ordinance section 19.98.040.C authorized to be issued each
calendar year. The response concluded that drilling 633 wells in one location was not
reasonably foreseeable because, based on the rigs present in Kern County, it would take

15 Table 1 in the September 2015 updated single-well health risk assessment stated it
takes “3 rigs at 1,040 HP each” drilling for 23 days to complete a 10,000-foot well and “3
rigs at 440 HP each” drilling for eight days to complete a 5,000-foot well.

51.
98 years, which was beyond the longest period it would be reasonable to assume the same
person was located at one sensitive receptor. The response also concluded that the
setback distances in the SREIR’s MM 4.3-5 “reduces impacts of health risk from Project
activities to below [Air District] thresholds” and the Multi-Well Health Risk Assessment
“demonstrates that this mitigation measure would adequately protect the public from the
potential health risks due to exposure from multiple wells.”
The County’s response No. 0009-33 addressed the Sierra Club’s comment that the
setback distances in the Revised Ordinance and various mitigation measures were
inadequate to protect public health. The response stated the setback distances were based
on the health risk assessments and referred to response No. 0008-27’s discussion of the
adequacy of those assessments and resulting setback distances. Addressing clarity and
enforceability, the response stated the minimum distances established by the mitigation
measures “are immutable—no new well may be located within 210 feet of a sensitive
receptor or within 300 feet of a school.” Addressing how the distances are measured, the
response stated the distances in “the air quality mitigation measures are measured from
the closest edge of the well pad to the property line of the nearest sensitive receptor.”
The County’s response No. 00014-7 addressed the ARB’s comment that health
risks might be underestimated because there is a potential to drill a new well every day of
the year—a comment supported by CalGEM data showing that over 2,000 notices of
intent to drill were submitted to the County in 2019. The response stated that only 759 of
the notices were for oil and gas production wells and, furthermore, not every well for
which a permit is obtained is drilled. The response also stated that for purposes of the
health risk assessments, it is the number of wells drilled proximate in time near a single
sensitive receptor that matters, not the total number of wells drilled across the entire
project area.

52.
5. Board’s Findings of Fact
The Board’s findings of fact in support of the final SREIR described various
assumptions made in the Multi-Well Health Risk Assessment, including that (1) “forty-
eight 13,000 foot wells would be drilled in concentric circles around a sensitive receptor,
12 at 1/8 of a mile, 12 at 1/4 of a mile, 12 at 3/4 of a mile and 12 at 1 mile”;16 (2) “all
phases of the drilling occurred concurrently”; (3) “each well would have an associated
mud sump with emissions”; and (4) “well re-work would occur on every well every other
year.” The Board found these assumptions were extremely conservative because (1)
wells of 13,000 feet were considerably deeper than the average well in Kern County; (2)
only 3 percent of such wells were deeper than 10,000 feet; (3) historically, between 2015
and 2020, four to 12 drill rigs were in Kern County at any given time; and (4) it would
take eight rigs drilling continuously for almost a year to drill 48 wells 13,000 feet deep.
Another assumption stated in the technical memorandum was that all PM10 was assumed
to be toxic DPM that was inhalable even though approximately 9 percent of DPM might
not be inhalable.
The Board addressed the alternative of an ordinance using a 2,500-foot setback
and found the alternative would not result in less severe environmental impacts than the
setbacks required by MM 4.3-5. To support this finding, the Board referred to the Multi-
Well Health Risk Assessment’s determination that, under conservative assumptions, the
cancer risk would only be 9.3 in one million, which was well below the Air District’s
threshold of 20 in one million. One way of interpreting this response is that, because the
identified cancer risk was not significant for purposes of CEQA, further consideration of
an alternative with a lower cancer risk was not required.

16 This description of the distances is inaccurate and conflicts with the technical
memorandum’s statement about a 300-meter fence. An eighth of a mile is 660 feet
(0.125 of a mile), while 300 meters is approximately 984.25 feet (0.1864 of a mile). The
County asserts it addressed the discrepancies in its responses to comments and the
findings would not be altered by correcting the discrepancies.

53.
B. Contentions
On appeal, Sierra Club contends the Multi-Well Health Risk Assessment does not
comply with CEQA because it does not analyze health risks posed by drilling allowed by
the Revised Ordinance—specifically, drilling two or more wells close to a home or
school. Sierra Club argues the Multi-Well Health Risk Assessment’s remarkable
prediction of a lower cancer risk from drilling 48 wells simultaneously than from drilling
a single well is explained by the fact that the Multi-Well Health Risk Assessment only
evaluated wells separated from sensitive receptors by distances much greater than
allowed by the Revised Ordinance. Sierra Club restates this argument by asserting the
Multi-Well Health Risk Assessment does not evaluate the nearest and most dangerous
drilling allowed by the Revised Ordinance and, thus, violates CEQA by failing to identify
and discuss a foreseeable and significant health risk.
The County contends the SREIR’s analysis of health risks is adequate for purposes
of CEQA and its findings of fact are supported by substantial evidence. The County
relies on the principle that CEQA requires an EIR to study only reasonably foreseeable
consequences of the project. (See High Sierra Rural Alliance v. County of Plumas (2018)
29 Cal.App.5th 102, 125, citing Laurel Heights Improvement Assn. v. Regents of
University of California (1988) 47 Cal.3d 376, 390–391 (Laurel Heights I).) The County
also contends a dispute over the methodology used to evaluate an environmental impact
is subject to the substantial evidence test and the hypothetical assumed by Sierra Club is
not supported by substantial evidence. The County characterizes Sierra Club’s attack as
asserting “the County must analyze … 48 wells located at the closest distance allowed by
the Ordinance [citation] regardless of whether that scenario is reasonably foreseeable or
likely.”
Sierra Club’s reply asserts the County has persisted in mischaracterizing its claim
and the County’s brief is devoted to knocking down a straw man. Sierra Club contends
the County’s failure to analyze the drilling of multiple wells at the shorter distances

54.
allowed by the Revised Ordinance is an informational defect, not a methodological
choice, and the County’s failure to explain the absence of an evaluation of health risks
from drilling at shorter distances constitutes a separate CEQA violation.
C. Impact Zone and Methodology
In Sierra Club v. County of Fresno, supra, 6 Cal.5th 502, the Supreme Court
stated that a public agency’s “decision to use a particular methodology and reject another
is amenable to substantial evidence review.” (Id. at p. 514.) The court reframed this
principle by stating “underlying factual determinations—including, for example, an
agency’s decision as to which methodologies to employ for analyzing an environmental
effect—may warrant deference.” (Id. at p. 516; accord, Bakersfield Citizens for Local
Control v. City of Bakersfield (2004) 124 Cal.App.4th 1184, 1198.) In contrast, “whether
a description of an environmental impact is insufficient because it lacks analysis or omits
the magnitude of the impact is not a substantial evidence question.” (Sierra Club v.
County of Fresno, supra, at p. 514.)
The parties agree a choice of methodology is entitled to deferential review, but
dispute whether the setback distances adopted in the Multi-Well Health Risk Assessment
qualifies as a choice of methodology. They also dispute whether this case is comparable
to Sierra Watch v. County of Placer (2021) 69 Cal.App.5th 86 (Sierra Watch).
1. Sierra Watch
In Sierra Watch, the real party in interest sought the county’s approval of a
proposal to develop a 94-acre resort. (Sierra Watch, supra, 69 Cal.App.5th at p. 91.)
The project’s EIR did not consider noise impacts occurring more than 50 feet from the
expected construction activity, except for impacts on a boarding school. (Id. at p. 106.)
The school was 250 feet from the construction activity and the EIR acknowledged the
school would experience noise levels up to 85 decibels and those noise levels would
cause a significant impact. (Id. at p. 107.) The EIR did not discuss the reasons for

55.
omitting an evaluation of other noise impacts outside the 50-foot zone. (Id. at p. 106.)
The plaintiff’s CEQA claims asserted, among other things, the EIR’s analysis of the
project’s construction noise impacts was inadequate. (Sierra Watch, supra, at p. 104.)
The plaintiff argued that “ ‘the EIR does not analyze the Project’s full geographic range
of noise impacts, for it ignores activities occurring farther than 50 feet from sensitive
receptors.’ ” (Id. at p. 106.) The Third District agreed that the EIR’s analysis was
inadequate and instructed the trial court to issue a writ of mandate. (Id. at pp. 104, 111.)
In Sierra Watch, the court concluded use of a 50-foot zone was “arbitrary line
drawing,” which resulted in the EIR ignoring expected impacts occurring outside the area
defined by the 50-foot boundary. (Sierra Watch, supra, 69 Cal.App.5th at p. 107.)
Although the opinion did not state this conclusion about arbitrariness was essentially a
factual determination, we regard it as such. (See Halaco Engineering Co. v. South
Central Coast Regional Com. (1986) 42 Cal.3d 52, 79 [whether agency’s conduct is
arbitrary or capricious for purposes of Gov. Code § 800 is essentially a question of fact].)
The court in Sierra Watch gave two reasons to support its factual determination that noise
impacts were expected to occur outside the 50-foot zone. First, “while the EIR would
acknowledge significant impacts to a receptor sitting 50 feet from expected construction
activity, it would altogether ignore potential impacts to a receptor sitting an inch more
distant — even though the noise levels at these two distances would presumably be the
same.” (Sierra Watch, supra, at pp. 106–107.) Second, the EIR acknowledged that noise
impacts at the boarding school, which was 200 feet beyond the 50-foot zone, would be
significant. (Id. at p. 107.) The existence of a significant noise impact at an additional
200 feet from the 50-foot zone strongly supported the inference that other significant
noise impacts could occur beyond the 50-foot zone. As a result, the court concluded the
EIR should have considered potential noise impacts to other receptors over 50 feet from
the project or, alternatively, explained why those impacts were excluded from the
discussion. (Ibid.)

56.
After setting forth the foregoing application of CEQA’s principles to the facts of
the case and the resulting conclusions, the court in Sierra Watch provided a further layer
of analysis by explaining the defects in arguments made by the real party in interest.
Those arguments asserted that (1) it was “ ‘standard’ ” to focus on receptors located
within 50 feet of construction activity and (2) the agency’s use of that distance was a
methodological issue entitled to deference. (Sierra Watch, supra, 69 Cal.App.5th at p.
107.) The court rejected the use of a so-called “standard” for the simple reason that the
record contained evidence of noise impacts outside the 50-foot radius. (Ibid.) The court
also concluded an agency “cannot employ a methodological approach in a manner that
entirely forecloses consideration of evidence showing … impacts to areas sitting beyond
50 feet from construction activities.” (Ibid.) In other words, if the use of a 50-foot radius
was a methodological choice, that choice was not supported by substantial evidence and,
moreover, directly contradicted the evidence about noise impacts.
We interpret Sierra Watch as concluding the EIR’s approach to the project’s noise
impacts resulted in two CEQA violations. First, the use of the 50-foot zone itself was a
violation of CEQA because it excluded from consideration some of the project’s
significant noise impacts. Stated another way, substantial evidence did not support a
factual finding that the construction activities would have no significant noise impacts
beyond the 50-foot zone. Indeed, the evidence showed the opposite. (Sierra Watch,
supra, 69 Cal.App.5th at p. 107.) Second, the EIR was inadequate as an informational
document because it did not explain why “it declined to consider potential noise impacts”
to receptors other than the boarding school that were outside the 50-foot zone. (Ibid.; see
Guidelines, § 15121 [EIR is an informational document].) In our view, the second
violation identified in Sierra Watch is less important in the context of that case because
the action taken to correct the first violation most likely would remedy the EIR’s
informational defect—that is, a corrected EIR likely would discuss the significant noise

57.
impacts beyond the 50-foot zone and, thus, would not need to explain why those impacts
were not considered.
The parties dispute whether Sierra Watch is analogous to the present case; they do
not contend it contains legal error and, therefore, different principles should be applied
here. To address the parties’ dispute, we summarize the relevant precedent contained in
Sierra Watch. First, from a broad perspective, Sierra Watch adopted an approach for
analyzing CEQA compliance where an EIR’s evaluation excludes an area or zone where
there is, or might be, significant environmental impacts. We will use Sierra Watch’s
approach as the broad framework for analyzing the “excluded zone” in this case—a term
we use for the area outside the setbacks adopted in the Revised Ordinance and inside the
300-meter by 300-meter fence17 that the Multi-Well Health Risk Assessment assumed
surrounded the sensitive receptor.
As described two paragraphs earlier, the first inquiry in that broad framework is
whether the agency’s adoption of an excluded zone violated CEQA because it resulted in
a significant environmental impact not being considered. Here, the evidence does not
plainly demonstrate that there would be significant cancer risk impacts within the
excluded zone. Thus, we cannot adopt the first conclusion reached in Sierra Watch—
namely, that the EIR violated CEQA by failing to address some significant environmental
impacts whose existence was plainly demonstrated by the record. Instead, we are
confronted with a case where it is unclear whether it is reasonably foreseeable that
activity from the project within the excluded zone would cause a significant
environmental impact—specifically, a significant cancer risk over the lifetime of a
sensitive receptor. Due to this lack of clarity, we must address the second inquiry in

17 The County’s use of the term “fence” is, for practical purposes, a euphemism or
shorthand way of describing a setback distance that is larger than the 210-foot and 300-
foot setbacks contained in the Revised Ordinance. When 300 meters is multiplied by
3.28084 feet per meter, the result is 984.252 feet (approximately 0.1864 of a mile).

58.
Sierra Watch’s broad framework and consider whether the SREIR violates CEQA
because it is inadequate as an informational document.
2. Potentially Significant Effect
The broad question of whether the SREIR adequately discussed the project’s
cancer risks, presents a series of more specific questions. Under our interpretation of
CEQA and the case law, the initial question is whether the risk of cancer from drilling
multiple wells near a sensitive receptor is a potentially significant effect. That question is
derived from the principle that an EIR must “consider and resolve every fair argument
that can be made about the possible significant environmental effects of a project.”
(Protect the Historic Amador Waterways v. Amador Water Agency (2004) 116
Cal.App.4th 1099, 1109.) We interpret the quoted language as the equivalent of our
Supreme Court’s references to “the discussion of potentially significant effects in an
EIR” and “the discussion of a potentially significant effect.” (Sierra Club v. County of
Fresno, supra, 6 Cal.5th at pp. 515–516, italics added.) The latter phrase appears in the
court’s statement of the basic principle that “a reviewing court must determine whether
the discussion of a potentially significant effect is sufficient or insufficient, i.e., whether
the EIR comports with its intended function of including ‘ “ ‘detail sufficient to enable
those who did not participate in its preparation to understand and to consider
meaningfully the issues raised by the proposed project.’ ” ’ ” (Ibid.) Deciding “whether
a discussion is sufficient is not solely a matter of discerning whether there is substantial
evidence to support the agency’s factual conclusions. [¶] The ultimate inquiry ... is
whether the EIR includes enough detail ‘to enable those who did not participate in its
preparation to understand and to consider meaningfully the issues raised by the proposed
project.’ [Citations.] The inquiry presents a mixed question of law and fact.” (Id. at p.
516; see pt. I., ante [Standard of Review].)

59.
The question whether the cancer risk from drilling multiple wells near a sensitive
receptor is potentially significant is easily answered. First, the SREIR and the Multi-
Well Health Risk Assessment themselves have addressed the cancer risk of drilling
multiple wells, which implies that the risk caused by the project has the potential to be
significant. Second and most importantly, our independent review of the record has
located substantial evidence to support a fair argument that the drilling of multiple wells
near a sensitive receptor may have a significant environmental impact due to an increased
risk of cancer. (See generally, Guidelines, § 15384, subd. (a) [term “fair argument” used
in the definition of “substantial evidence”].) That substantial evidence includes, without
limitation, (1) the fact that the Revised Ordinance’s setback distances were based on the
point from the receptor where the cancer risk from drilling a single well dropped below
the 10 in one million threshold of significance; (2) the fact that the Revised Ordinance
authorizes 2,697 permits to be issued annually, which relates to the potential volume of
well drilling per year; and (3) the evidence of existing wells, which shows that wells can
and have been located close to one another. Therefore, we conclude the cancer risk of
drilling multiple wells is a potentially significant impact for purposes of CEQA that must
be discussed in the EIR.
3. Adequacy of the Discussion
The SREIR and the Multi-Well Health Risk Assessment did discuss the potentially
significant risk of cancer from drilling multiple wells and set forth the conclusion that the
risk was not significant. Whether that discussion was legally sufficient for purposes of
CEQA depends on whether the SREIR included details sufficient to enable those who did
not participate in its preparation to understand and to consider meaningfully the issues
raised by the proposed project. (Sierra Club v. County of Fresno, supra, 6 Cal.5th at p.
516.) This presents a mixed question of law and fact. (Ibid.) We analyze the underlying

60.
factual determinations under the deferential substantial evidence standard of review.
(Ibid.)
The SREIR and the Multi-Well Health Risk Assessment evaluated the project’s
cancer risk for sensitive receptors by assuming sensitive receptors were located 300
meters (984.25 feet) from the nearest well being drilled, adopting other assumptions, and
plugging those assumptions and other data into the models chosen (e.g., HARP2,
AERMOD, and AERMAP). The 984.25-foot “fence” or setback used in the SREIR is
much larger than the setbacks required by section 19.98.060.A of the Revised Ordinance,
which provides that no oil or gas well shall be drilled within (1) 100 feet of any building
utilized for commercial purposes, (2) 210 feet of any sensitive receptor, and (3) 300 feet
from the property line of a parcel containing a school.
The failure of the SREIR and the Multi-Well Health Risk Assessment to analyze
the risk for a sensitive receptor, such as a residence, where at least one of several wells
was drilled near the 210-foot setback distance specified in the Revised Ordinance creates
the following question: Does substantial evidence support an implied factual finding that
the drilling of a single well near the 210-foot setback distance from a residence or other
sensitive receptor is not reasonably foreseeable?18

18 We assume, without deciding, that this and any other implied findings discussed
below (so long as supported by substantial evidence) would justify the SREIR’s failure to
discuss a multiple well scenario where at least one well is drilled near the 210-foot
setback. This assumption about implied findings is favorable to the County when
compared to the alternative of requiring explicit findings supported by substantial
evidence to support the conclusion that omitting a discussion of such a scenario would
not harm the ability of the Board and the public “to understand and consider
meaningfully the [cancer risk] raised by the project.” (Laurel Heights I, supra, 47 Cal.3d
at p. 405; see Sierra Club v. County of Fresno, supra, 6 Cal.5th at p. 516; Guidelines, §
15002, subd. (a)(1) [a basic purpose of CEQA: “Inform governmental decision makers
and the public about the potential, significant environmental effects of proposed
activities”].) .

61.
The terms of the Revised Ordinance demonstrate there is a potential for wells to
be drilled about 210 feet from a sensitive receptor. (Revised Ordinance, § 19.98.060.A.)
Therefore, we next consider whether the evidence supports a finding that drilling such a
well, while possible, is not reasonably foreseeable. (See Guidelines, §§ 15144
[forecasting], §15145 [speculation].) In conducting our review, we located no evidence
supporting the inference that drilling a well approximately 210 feet or slightly further
from a sensitive receptor is not reasonably foreseeable. Furthermore, the County has not
addressed this factual question and, thus, has not referred to any evidence supporting an
implied finding that drilling such a well is unforeseeable. Therefore, on this narrow yet
basic question, we conclude an implied finding that the drilling of such a well was not
reasonably foreseeable lacks evidentiary support. (Cf. King & Gardiner, supra, 45
Cal.App.5th at p. 869, fn. 23 [an implied finding by the Board was not supported by
substantial evidence].) As a result, we reject the existence of such an implied finding.
Having addressed the drilling of a single well within the excluded zone and near
the 210-foot setback distance from a sensitive receptor, we next consider the drilling of
additional wells that might impact the same receptor. Again, we frame the issue as
whether substantial evidence supports an implied factual finding that it is not reasonably
foreseeable that additional wells would be drilled near a sensitive receptor with a well
drilled just outside its setback distance.
As before, we have not located substantial evidence supporting an implied finding
that it is unforeseeable that additional wells could be drilled near a sensitive receptor that
has had a well drilled just outside the setback distance. The County’s appellate briefing
has not addressed this specific question and, thus, has not cited any evidence on point.
In contrast, the scenario evaluated in the SREIR and the Multi-Well Health Risk
Assessment assumes wells are drilled near one another. Figure 1 in Dr. H. Andrew
Gray’s September 15, 2020 memorandum illustrates the scenarios’ use of four rings of
wells centered around sensitive receptors.

62.
In Figure 1 of the memorandum, orange dots represent each of the 48 wells
located on the concentric rings. On both the first (inner) and second rings, two wells are
positioned near one another in the twelve o’clock, three o’clock, six o’clock and nine
o’clock locations, with one additional well positioned on each ring midway between the
four pairs of wells. Thus, the two innermost rings contain 12 wells each. Gray’s
memorandum states that the wells on the first ring are located from 0.18 to 0.22 miles
from the centrally located receptors and the second ring wells are located from 0.31 to
0.34 miles from the receptors. Therefore, the distance between the wells at the 12
o’clock position on the first and second rings is approximately 0.13 miles or 684.4 feet.
Thus, if a sensitive receptor were located 210 feet above (presumably north of) the 2
wells on the first ring’s 12 o’clock position, the receptor would be roughly 474 feet from
the two wells in the 12 o’clock position on the second ring. Consequently, the Multi-
Well Health Risk Assessment’s configuration of multiple wells relatively close together
suggests it is reasonably foreseeable that additional wells could be drilled near a sensitive
receptor that has had a well drilled just outside the applicable setback distance.
Consequently, we conclude substantial evidence does not support an implied
factual finding that it is not reasonably foreseeable that additional wells could be drilled
near a sensitive receptor that has had a well drilled just outside the setback distance.
Next, because the SREIR addresses the timing of the drilling of multiple wells, we
examine when those wells might be drilled. In particular, we consider whether the
drilling would be close enough in time that the additional wells would impact one
individual over his or her lifetime living at the same location—that is, a location where a
first well was drilled just outside the setback distance. This reference to wells being
drilled “close in time” is taken from the Board’s discussion of the Multi-Well Health Risk
Assessment’s assumption about multiple wells “drilled not only in close proximity to a
single sensitive receptor but also close in time to each other in order that they would
impact one individual over their lifetime living at the same location.” (Italics added.)

63.
The Board also referred to sensitive receptor “exposed to the risks from drilling multiple
wells over time.”
The Multi-Well Health Risk Assessment made the conservative assumption that
the wells would be drilled simultaneously, and stated it was unlikely to actually happen
due to the large project area where wells might be drilled and the small number of drilling
rigs operating in Kern County. However, the four to 12 drilling rigs reported to be active
in Kern County does not preclude the drilling of the wells sequentially or at least close
enough in time to impact one individual over his or her lifetime of living at that location.
Consequently, we conclude the size of the project area and number of active drilling rigs
is not sufficient by itself to support an implied finding that the drilling of additional wells
near a sensitive receptor close in time to the drilling of a well just outside the applicable
setback distance is not reasonably foreseeable.
Having eliminated the implied factual findings discussed above, we turn to the
legal side of the mixed question of whether the SREIR’s discussion of cancer risks was
sufficient or insufficient. The adequacy of the SREIR as an informational document
depends upon whether that document serves its intended function of including sufficient
detail to enable those who did not participate in its preparation to understand and consider
meaningfully the issues raised by the project. (Sierra Club v. County of Fresno, supra, 6
Cal.5th at p. 516.) In particular, we address whether the final SREIR provided a
sufficient explanation of the Multi-Well Health Risk Assessment’s assumption that the
sensitive receptors were surrounded by a 984.25-foot by 984.25-foot “fence” (i.e.,
setback).
The final SREIR included a technical memorandum dated October 2020 that
acknowledged the assumption “that the sensitive receptor had a 300m x 300m (or
approximately 1,000 foot fence around it).” While acknowledging its use, the technical
memorandum does not explain why the 984.25-foot (300 meter) setback distance was
chosen and, moreover, does not acknowledge that the assumption created an excluded

64.
zone when compared to the actual setback distances of 100, 210 and 300 feet adopted in
the Revised Ordinance. We conclude the failure to explain why a 984.25-foot setback
was assumed in the Multi-Well Health Risk Assessment when the setbacks in the Revised
Ordinance were much smaller rendered the SREIR’s discussion insufficient for purposes
of CEQA because it precluded a meaningful understanding of the cancer risks created by
the setbacks actually adopted.
In reaching the conclusion that the SREIR did not provide an adequate discussion
of the project’s cancer risk, we have considered whether the scenario of 48
simultaneously drilled wells used in the Multi-Well Health Risk Assessment is an
appropriate substitute for an analysis that, in contrast, does not create an excluded zone
over an eighth of a mile wide.19 We conclude the information provided does not allow
the public or decision makers reading the SREIR to meaningfully understand how the
analysis of a scenario with the excluded zone is a logical substitute to an analysis without
an excluded zone. Perhaps the conservative assumptions about other factors offset the
reduction in cancer risk resulting from the overly large setback distance of 984.25 feet.
But, maybe not. The critical point is that, someone reading the SREIR would not develop
a meaningful understanding of the cancer risk resulting from a well being drilled just
outside the 210-foot setback and other reasonably foreseeable wells drilled nearby. The
repeated statements about conservative assumptions on other parameters do not rationally
explain why the unrealistically large setback distance of 984.25 feet and the resulting
creation of an excluded zone was appropriate or, alternatively, was harmless error.
In Sierra Watch, supra, 69 Cal.App.5th 86, the court was able to determine “the
EIR fell short with this arbitrary line drawing.” (Id. at p. 107.) Here, we lack sufficient
information to go that far. But, from the opposite point of view, we also lack sufficient

19 984.25 feet minus 210 feet is 664.25 feet, which is more than 660 feet (i.e., 5,280
feet per mile divided by eight).

65.
information to determine that the line drawn 984.25 feet from a sensitive receptor was not
arbitrary in light of the setback distances set forth in the Revised Ordinance. The lack of
information for the latter determination means the SREIR contains an informational
defect that must be corrected on remand. (See § 21005, subd. (a) [noncompliance with
the information disclosure provisions of CEQA may constitute a prejudicial error].)
We recognize that in Sierra Watch, supra, 69 Cal.App.5th 86, the court’s
discussion of noise impacts addressed the issue from two perspectives. The first
addressed whether the EIR’s noise impact discussion complied with CEQA. That
discussion was sufficient to fulfill the court’s constitutional obligation to provide a
decision “in writing with reasons stated.” (Cal. Const., art. VI, § 14.) The second
separately addressed arguments raised by the real party in interest and explained why
those arguments were unconvincing. (Sierra Watch, supra, at p. 107.) Here, we do not
address the County’s arguments in the detail provided in Sierra Watch because we agree
with Sierra Club that the County has advanced a straw man argument by stating Sierra
Club’s attack is based on the premise “that the County must analyze a theoretical worst-
case scenario—i.e., 48 wells located at the closest distance allowed by the Ordinance
[citation] regardless of whether that scenario is reasonably foreseeable or likely.” Sierra
Club’s papers clearly show that extreme scenario is not the foundation for its claims of
error.
Finally, we note that we are unable, as a court of review, to suggest the parameters
or assumptions that should be plugged into the models in connection with another multi-
well analysis prepared for the County after remand. Based on the standard adopted by
our Supreme Court, we can reiterate that, among other things, the use of a setback
distance in the models that is greater than the setback distances in the Revised Ordinance
should be explained to enable members of the public “to understand and to consider
meaningfully the issues raised by the proposed project.” (Laurel Heights I, supra, 47
Cal.3d at p. 405; Sierra Club v. County of Fresno, supra, 6 Cal.5th at p. 516.)

66.
V. WATER SUPPLY IMPACTS*
The parties dispute whether the SREIR’s analysis of water supply impacts and
related mitigation measures complies with CEQA. In particular, Sierra Club contends the
County failed to adequately analyze localized water supply conditions and impacts and
unlawfully rejected proposed mitigation measures when it removed MM 4.17-5 based on
a legal error involving social and economic impacts.
A. Background
1. Water Code Provisions
Context for the parties’ dispute about the proper analysis of water supply impacts
and related mitigation measures is established by various provisions in the Water Code
addressing groundwater. These provisions are part of the “Regulatory Setting” addressed
in section 4.9.3 of the SREIR.
The Legislature has stated an established policy of California is “that every human
being has the right to safe, clean, affordable and accessible water adequate for human
consumption, cooking, and sanitary purposes.” (Wat. Code, § 106.3, subd. (a); Stats.
2012, ch. 524 § 1.)
In 2009, the Legislature amended the Water Code to require the Department of
Water Resources (DWR) to implement a California statewide groundwater elevation
monitoring (CASGEM) program. (Stats. 2009-2010, 7th Ex.Sess., ch. 1, § 1; see Wat.
Code, §§ 10920–10936.) The Legislature intended “that on or before January 1, 2012,
groundwater elevations in all groundwater basins and subbasins be regularly and
systematically monitored locally and that the resulting groundwater information be made
readily and widely available.” (Wat. Code, § 10920, subd. (a).) The SREIR stated that
the CASGEM program collects data on groundwater levels and use for 515 designated

* See footnote, ante, page 1.

67.
basins in the state, including the Kern County subbasin that underlies most of the project
area.
In 2014, the Legislature adopted the Sustainable Groundwater Management Act
(SGMA; Wat. Code, § 10720 et seq.) to provide for sustainable management of
groundwater basins, to enhance local management of groundwater consistent with the
rights to use and store groundwater, to preserve the security of water rights to the greatest
extent possible consistent with sustainable management of groundwater, to provide local
groundwater agencies with the authority and assistance necessary to sustainably manage
groundwater, to avoid or minimize subsidence, to improve data collection and
understanding of groundwater, to increase groundwater storage, and to remove
impediments to recharge. (Wat. Code, § 10720.1.) SMGA “will not be fully
implemented for several years, allowing groundwater overdraft to continue in some
regions.” (Wat. Code, former § 13807, subd. (b).) The SREIR states that to achieve its
objectives, the SGMA empowers local agencies to form groundwater sustainability
agencies (GSA’s) to manage basins and requires the GSA’s to adopt groundwater
sustainability plans (GSP’s).
SMGA required the Kern County subbasin to be managed under a GSP, or a
coordinated set of plans, by January 31, 2020, because the subbasin had been designated
as high or medium priority under the CASGEM program and was subject to critical
overdraft conditions. (King & Gardiner, supra, 45 Cal.App.5th at p. 840–841.)20 The
Kern County subbasin is being managed under a coordination agreement among 11
GSA’s implementing five GSP’s and 15 management area plans to attain SGMA’s goals

20 In 2017, the Legislature added Water Code former sections 13807 through
13808.8 to address new wells in critically overdrafted groundwater basins, which
includes the project area. (Stats. 2017, ch. 538, § 1, pp. 4053–4055.) Among other
things, the legislation (1) required applicants for new wells in such basins to include
information about the proposed well in their permit applications and (2) made that
information available to the public and GSA’s. (Wat. Code, former §§ 13808, 13808.2.)

68.
by 2040. These plans are based on adaptive management principles and, the SREIR
states it is virtually certain that the nature and extent of SGMA projects used in the
project area will be modified significantly during the five-year reviews of the plans,
during the 20-year SGMA compliance period, and during SGMA’s 50-year planning and
implementation horizon.
2. 2020 Opinion
In King & Gardiner, supra, 45 Cal.App.5th 814, Lions Farming contended CEQA
required the EIR to analyze water supply impacts to the extent reasonably possible and
the EIR failed to meet this standard because it only analyzed water supply impacts at a
regional level and, without adequate justification, disregarded local impacts. (Id. at p.
838.) The County responded by arguing the EIR met the applicable standard by
performing a detailed, systematic analysis of water supply impacts within three separate
subareas using the best available data. The County argued a more localized analysis was
not required by CEQA because of (1) the technical challenges in using more
geographically specific area and (2) the many uncertainties in forecasting long term use
at the local level, some of which stemmed from how SMGA, which was new, would be
implemented.
In the 2020 opinion, we concluded (1) the EIR, at the time it was circulated, did
not violate CEQA’s requirement for an analysis of water supply impacts to the extent
reasonably possible; (2) the EIR’s discussion of mitigation measures for the project’s
significant impacts to water supplies was inadequate; and (3) the analysis of water supply
in a revised EIR must be brought up to date. (King & Gardiner, supra, 45 Cal.App.5th at
pp. 845–846 and fn. 15.) We also stated: “Whether the updated information will warrant
an analysis of impact[s] to water supplies at a level other than the subareas used in the
original EIR is a question that must be decided in the first instance by the County in its
role as lead agency.” (Id. at p. 846, fn. 15.)

69.
3. October 2020 Draft SREIR
The draft SREIR of October 2020 stated that (1) the demand for municipal and
industrial (M&I) water from oil and gas activity was projected to increase about 2,982
acre-feet per year (AFY) from 2012 to 2035; (2) there is no surplus M&I water in the
project area; (3) new uses of M&I water would increase the regional groundwater
shortfall if supplied by groundwater extraction; and (4) increasing M&I water demand
under overdraft conditions would contribute to a significant cumulative water supply
impact in the project area. It also stated it was not feasible to implement mitigation
measures (1) directly curtailing oil and gas activities to reduce water demand or (2)
indirectly curtailing other activities (such as agriculture) to reduce water demand.
On the subject of groundwater supplies, the draft SREIR stated that such “supplies
exist in specific basins.” It also stated that such supplies do not exist in localized pockets
of subbasins where a local water district controls all the water. As a result, the draft
SREIR concluded that the three subareas it adopted for other purposes were appropriate
for analyzing groundwater supply. It also stated the Kern County subbasin that underlies
most of the project area has been designated by the DWR as high-priority and critically
overdrafted.
The draft SREIR noted that, under SGMA, GSA’s in the project area are the
exclusive local agencies for implementing SGMA in accordance with duly adopted
GSP’s and management area plans. It also stated (1) most GSP’s and management area
plans include water supply and demand projections over a 50-year planning and
implementation horizon and (2) none of the adopted GSP’s or management area plans
within the project area identify oil and gas operations as a significant factor affecting the
achievement of the SGMA objectives. Based on this and other aspects of the plans, the
SREIR stated the review of the plans did not provide any new information indicating the
water supply or other SGMA-related impacts, including water quality, would be greater
in magnitude or scope than previously considered.

70.
Among the mitigation measures discussed in the draft SREIR was the possibility
that “produced water” from oil and gas activities could be used elsewhere and, thus,
would have a positive impact on the water supply. “Produced water is groundwater that
naturally occurs in oil and gas reservoirs, is brought to the surface with the extracted oil
and gas, and is separated from the hydrocarbons after extraction.” (King & Gardiner,
supra, 45 Cal.App.5th at p. 840.) Produced water usually is poor quality water unsuited
for agricultural, residential, commercial or industrial uses without substantial treatment to
remove contaminants. (Ibid.) The draft SREIR concluded that, based on current
technological and economic restraints, the available evidence did not show that produced
water would continue to be utilized or that expanded produced water reuse would occur
in the project area in predictable volumes over time. Thus, a mitigation measure
requiring additional use of produced water was rejected as infeasible.
The draft SREIR included three mitigation measures addressing groundwater
supply. MM 4.17-3 provides that permit applicants may use groundwater only from
wells equipped with a water meter and requires permit applications to include estimates
of the source and use of groundwater along with the source and estimated use of
reclaimed water. The County will compile the water use information, post it online each
year, and send a copy to all GSA’s and the Kern County Water Agency.
MM 4.17-4 applies to oil and gas activities that fall outside the Revised
Ordinance’s streamlined permitting process and, thus, require conditional use permits. It
provides: “Public Notices of all Conditional Use Permits for oil and gas activities shall
be sent to appropriate Water Districts, Groundwater Authorities, and the Kern County
Water Agency for review and comment on water availability and usage.”
MM 4.17-5 required permit applicants to pay a fee of $50 or $250 per well,
depending on whether they are subject to minor activity review or oil and gas conformity
review. The fees were to be deposited into a grant fund to be implemented and
administered by Kern County Public Health. The grants were to be available for projects

71.
in disadvantaged communities in the valley portion of Kern County that involved the
design, permitting, and construction of physical improvements to water wells or water
systems serving an identified disadvantaged community.
The draft SREIR noted that Water Code section 10723.2 requires GSA’s to
consider the interests of all beneficial uses and users of groundwater in developing and
implementing GSP’s and management area plans. The statutory list of such users
includes domestic well owners, municipal well operators, public water systems,
disadvantaged communities, and others. (Wat. Code, § 10723.2, subds. (a)(2), (b), (c),
(i).) Disadvantaged communities include, but are not limited to, “those served by private
domestic wells or small community water systems.” (Wat. Code, § 10723.2, subd. (i).)21
Despite SGMA’s requirement that the interests of all beneficial users be considered, the
draft SREIR stated there was substantial evidence that disadvantaged communities’
interest in groundwater supplies had not been sufficiently considered in the development
and implementation of GSA’s and management area plans. The draft SREIR concluded
that project M&I water use would contribute to a cumulatively significant impact on
disadvantaged communities that use groundwater but are not adequately considered in the
plans adopted under SGMA in the project area. It stated the funds collected under MM
4.17-5 would mitigate the project’s fair share of cumulative impacts to disadvantaged
communities that are insufficiently considered in the existing SGMA process.

21 Section 21080.47, subdivision (a)(2) states: “ ‘Disadvantaged community’ means
a community with an annual median household income that is less than 80 percent of the
statewide annual median household income.” Section 21080.47 provides an exemption
from CEQA requirements for projects consisting solely of the installation, repair, or
reconstruction of water infrastructure that primarily benefits a small disadvantaged
community water system or a state small water system. (Legis. Counsel’s Dig., Sen. Bill
No. 974, (2019–2020 Reg. Sess.).

72.
4. Comments, Reponses and Briefing
Sierra Club’s September 2020 comment letter asserted the draft SREIR’s analysis
of water supply mitigation measures did not comply with CEQA. Sierra Club contended
the County (1) improperly relied on SGMA to relieve itself of the duty under CEQA to
mitigate impacts; (2) failed to consider the obvious mitigation measure of limited oil and
gas drilling or provide any evidence for finding measures that reduced drilling were
infeasible; and (3) ignored many potential mitigation measures that were feasible and
easily accessible. These other mitigation measures included water demand reduction
measures outside the oil and gas industry, such as land purchases and incentive programs
to fallow land or convert to less water-demanding crops. Sierra Club argued demand-
reduction measures were within the County’s power and would ameliorate some of the
project’s most harmful and inequitable water supply impacts, such as contributing to
domestic wells in disadvantaged communities going dry.
In January 2021, the County released its responses to the comments. Among other
things, the County stated that the SREIR provided a thorough analysis of potential water
supply mitigation measures, provided substantial evidence supporting findings that
certain measures could not be feasibly implemented or would not predictably reduce
water supply impacts, and required three water supply mitigation measures to be
implemented. The responses and other revisions to the draft SREIR are part of the final
SREIR.
In March 2021, Sierra Club sent a letter to the Board asserting the final SREIR
contained legal flaws and the proposed findings of fact and statement of overriding
considerations were legally inadequate. Addressing water supply impacts, the letter
stated the County had not adopted or adequately considered feasible mitigation measures.
In particular, Sierra Club asserted (1) MM 4.17-5 was an unlawful fair-share fee, (2) the
SREIR failed to adequately describe the cumulative water supply impacts on

73.
disadvantaged communities, and (3) the SREIR failed to adequately describe the water
supply baseline in disadvantaged communities.
At a September 2021 case management conference, the superior court set forth a
briefing schedule for the challenges to the final SREIR. In November 2021, Sierra Club
filed an opening brief asserting the challenges raised in its March 2021 letter. The
County’s opposition asserted, among other things, that the SREIR provided valuable
mitigation of impacts unique to disadvantaged communities even though CEQA does not
require a separate analysis of effects on minority, low-income, or disadvantaged
communities. The County describes the SREIR’s discussion of water supply impacts on
disadvantaged communities as its voluntary (i.e., not required by CEQA) consideration of
a social effect and any defects in its voluntary discussion could not constitute prejudicial
error.
5. Superior Court’s Ruling
The superior court’s June 7, 2022, ruling on the petitions for a third writ of
mandate addressed the adequacy of the SREIR’s analysis and mitigation of water supply
impacts. The court considered the arguments concerning impacts to disadvantaged
communities, concluded the SREIR’s analysis failed to comply with CEQA, and
explained: “While the County is correct that there is no requirement in CEQA to perform
an analysis of impacts to low-income or disadvantaged communities, once the County
committed to the analysis and imposed a mitigation fee to fund improvements to drinking
water wells or systems that serve [disadvantaged communities], it had an obligation to
make sure that its analysis and findings complied with the requirements of CEQA.” The
court concluded that the SREIR violated CEQA by disclosing nothing about baseline
water supply conditions in disadvantaged communities and disclosing nothing about the
nature or magnitude of impacts to disadvantaged communities. One of the issues
addressed in this appeal is whether, in the context of this case, the statement that “there is

74.
no requirement in CEQA to perform an analysis of impacts to low-income or
disadvantaged communities” is an accurate statement of law.
6. August 2022 Addendum to the SREIR
After receiving the superior court’s ruling, the County decided to delete MM 4.17-
5. The August 2022 addendum to the SREIR stated MM 4.17-5 had been “included in
the SREIR based on analysis of potential impacts to disadvantaged community water
supplies.” The measure imposed a fee ($50 or $250) on permit applicants that would be
used “to fund assistance for water supplies, including bottled water and water well or
water system improvements serving disadvantaged communities in the Valley portion of
the County.” The addendum explained the County’s decision to delete MM 4.17-5 by
stating that “there is no requirement in CEQA to perform an analysis or provide
mitigation for impacts to low-income or disadvantaged communities (see, e.g., Court
Ruling at 19). The Board … proposes to delete MM 4.17-5 from the SREIR and the
MMRP to comply with the Court Ruling and CEQA.” In place of MM 4.17-5, the Board
approved the Voluntary Disadvantaged Community Drinking Water Grant Fund Pilot
Program that would be funded by voluntary, nonrefundable contributions from permit
applicants.
7. Discharge Order
In November 2022, the superior court issued an order discharging the Third Writ.
The order did not mention the August 2022 addendum or the objections made to its use,
but the order’s general finding that the County had satisfied the Third Writ in all respects
implies the court determined the addendum and the removal of MM 4.17-5 complied with
CEQA.
B. Environmental Impact or Socioeconomic Change
The first water supply issue we address is raised by Sierra Club’s argument that
the County’s justification for eliminating MM 4.17-5 an erroneous insistence that water

75.
supply impacts in disadvantaged communities were not environmental impacts and, thus,
did not need to be analyzed or mitigated to comply with CEQA. In response, the County
recognizes that “water supply impacts to Project area residents as a whole are impacts
cognizable under CEQA” and contends the superior court “correctly confirmed ‘there is
no requirement in CEQA to perform an analysis of impacts to low-income or
disadvantaged communities.’ ” The County reiterates the argument that its initial
decision to discuss disadvantaged communities did not create a new obligation under
CEQA and any defect in that discussion could not be prejudicial error.
The issue presented by the County’s approach to water supply impacts
experienced by disadvantaged communities can be restated broadly as whether the
County abused its discretion by failing to “proceed[] in a manner required by law.”
(§ 21168.5.) Whether the County followed applicable law is a question subject to
independent judicial review. (King & Gardiner, supra, 45 Cal.App.5th at p. 838.) Our
independent review begins with an overview of the provisions in CEQA and the
Guidelines defining environmental impacts and the role of social and economic impacts.
1. CEQA’s Approach to Economic and Social Changes
CEQA was designed to provide long term protection to the environment.
(Mountain Lion Foundation v. Fish & Game Com., supra, 16 Cal.4th at p. 112.) CEQA
defines the “environment” as the physical conditions that exist in the project area.
(§ 21060.5.) “ ‘Significant effect on the environment’ means a substantial, or potentially
substantial, adverse change in the environment.” (§ 21068.) Economic and social
changes usually do not alter the physical conditions constituting the environment and,
thus, do not qualify as significant effects on the environment. (Friends of Davis v. City of
Davis (2000) 83 Cal.App.4th 1004, 1019.) Accordingly, CEQA’s definition of
substantial evidence relevant to whether a project might cause a significant effect on the
environment expressly excludes “evidence of social or economic impacts that do not

76.
contribute to, or are not caused by, physical impacts on the environment.” (§ 21080,
subd. (e)(2); see Guidelines, §§ 15064, subd. (f)(6) & 15384, subd. (a) [definition of
substantial evidence].) Eliminating the double negative from the definition produces the
statement that substantial evidence may include “evidence of social or economic impacts
that … contribute to, or are … caused by[] physical impacts on the environment.”
(§ 21080, subd. (e)(2).)
The use of the disjunctive “or” in this statement indicates there are two situations
in which social or economic impacts are relevant evidence for purposes of CEQA. Those
situations are described in the second and third principles set forth in Guidelines section
15064, subdivision (e). The first principle, which reflects CEQA’s definitions and case
law, provides that “[e]conomic and social changes resulting from a project shall not be
treated as significant effects on the environment.” (Guidelines, § 15064, subd. (e);
County of Butte v. Dept. of Water Resources (2023) 90 Cal.App.5th 147, 174 [“an
economic effect in itself is not a significant effect on the environment”].) For example,
the claim by neighboring landowners that a proposed project could adversely affect their
property values involves an economic impact that is not recognized as an environmental
impact under CEQA. (Porterville Citizens for Responsible Hillside Development v. City
of Porterville (2007) 157 Cal.App.4th 885, 903.)
The second principle provides that, “[w]here a physical change is caused by
economic or social effects of a project, the physical change may be regarded as a
significant effect in the same manner as any other physical change resulting from the
project.” (Guidelines, § 15064, subd. (e), italics added; e.g., Citizens Assn. for Sensible
Development of Bishop Area v. County of Inyo (1985) 172 Cal.App.3d 151, 170–171
[county required to consider whether proposed regional shopping center would put
downtown stores out of business and cause physical deterioration of the downtown
area].) In such a situation, the economic or social impact is an intermediate link in the
chain of events causing an environmental impact. (See Make UC A Good Neighbor v.

77.
Regents of University of California (2023) 88 Cal.App.5th 656, 693.) In the present case,
there is no claim that changes to the physical environment will be caused by the
economic or social effects resulting from the project causing lower levels of groundwater
in disadvantaged communities or elsewhere.
The third principle, which applies in this appeal, provides that “economic and
social effects of a physical change may be used to determine that the physical change is a
significant effect on the environment.” (Guidelines, § 15064, subd. (e).) Thus, adverse
economic or social effects on people may be used as a factor in determining whether the
physical change that caused the economic or social changes is significant. (Ibid.;
Guidelines, § 15382.) “For example, if a project would cause overcrowding of a public
facility and the overcrowding causes an adverse effect on people, the overcrowding
would be regarded as a significant effect.” (Guidelines, § 15064, subd. (e).)
2. Application of Principles
There are four basic steps in our analysis of the project’s impact on groundwater
supply and the significance of that impact. First, the use of groundwater in the project
area contributes to the lowering of the groundwater levels. Therefore, the project’s oil
and gas activities that use groundwater will contribute to lower groundwater levels in the
project area. This lowering of groundwater levels qualifies as a change in “the physical
conditions which exist in the project area” and, therefore, is a change in the
“environment.” (§ 21060.5)
Second, simply saying that groundwater levels will be lowered in the project area
does not fully describe the environmental impact because there also will be a physical
impact on groundwater wells in the project area. The lowering of the water level in such
wells qualifies as a change in the environment for purposes of CEQA because the
definition of “ ‘environment’ includes both natural and man-made conditions.”
(Guidelines, § 15360.) Groundwater wells are a man-made condition and, therefore,

78.
they are part of the environment protected by CEQA. Thus, a proper analysis of the
project’s environmental impacts includes the more specific impact of lower water levels
in groundwater wells. (See Gray v. County of Madera (2008) 167 Cal.App.4th 1099,
1112 [decline in water levels in private wells adjacent to proposed quarry project a
potentially significant impact] (Gray).)
Third, lower water levels in groundwater wells might physically impact the people
and communities that rely on those wells for water. We use the word “might” because of
the following possibilities. First, where a well is deep relative to the groundwater level
and there is plenty of water available for existing uses, there would be no discernable
immediate physical impact on the users. Second, where a well is not deep relative to the
groundwater level, the lower groundwater level might reduce the amount of water
available for use to the point where those who rely on the well do not have enough
available well water for existing uses. (See Gray, supra, 167 Cal.App.4th at p. 1112
[decline in pumping rates in adjacent private wells a potentially significant impact].)
Such groundwater wells could be referred to as partially or fully dewatered. Thus, the
third step seeks to distinguish between the two possibilities and identify where lower
water levels in groundwater wells has “effects on human beings, either directly or
indirectly.” (§ 21083, subd. (b)(3).) For example, the lower groundwater levels in the
wells could have effects on human beings because they would have to obtain water from
a different source, reduce usage, or a combination of the two. Thus, the third step looks
beyond the impact on the well itself and considers whether the lowering of the water
level in the well impacts the human beings who use the well.
Fourth, with the impacts on groundwater levels, groundwater wells, and human
beings identified, the lead agency is required to find whether or not those impacts qualify
as a “ ‘significant effect on the environment’ ” for purposes of CEQA. (§ 21083, subd.
(b).) This inquiry into significance includes determining whether the direct or indirect
impacts on human beings are “adverse” and “substantial.” (§ 21083, subd. (b)(3).)

79.
Appendix G of the Guidelines mandates a finding in response to the issue: “Does the
project have environmental effects which will cause substantial adverse effects on human
beings, either directly or indirectly?” (Guidelines, Appendix G, XXI, subd. (c).) The
answers listed in the appendix are (1) potentially significant impact, (2) less than
significant with mitigation incorporated, (3) less that significant impact, and (4) no
impact. (Ibid.) As described in part V.B.1., ante, the determination of whether an
environmental impact is significant takes into account the social and economic impacts
caused by that environmental impact. Because the social and economic effects of the
physical impact of having less groundwater available may vary from area to area or
community to community based on socioeconomic conditions, it necessarily follows that
the severity (i.e., degree of significance) of a reduction in available well water also may
vary from area to area or community to community even where the physical reduction in
available water per person is essentially the same. It also follows that a particular
mitigation measure might be more effective at reducing the significance of the
environmental impact in some communities where the significance or severity is greater
than in communities where the significance of a similar or nearly equivalent
environmental impact is less severe.
Based on the foregoing, we conclude the superior court’s statement that “there is
no requirement in CEQA to perform an analysis of impacts to low-income or
disadvantaged communities” contains legal error. Physical impacts to groundwater levels
and the related physical impact of dewatering of groundwater wells cannot be ignored
simply because some or all of those environmental impacts occur in low-income or
disadvantaged communities. Furthermore, the analysis of the significance of the
environmental impact of dewatering wells across the entire range of affected
communities that rely on such wells should not exclude social or economic factors
because those factors are relevant to determining the significance of the physical impact.
As a result, the significance of the physical impact may vary from community to

80.
community because of social or economic impacts experienced by a particular
community. (Guidelines, § 15064, subd. (e) [adverse economic or social effects on
people are relevant to determining whether a physical change is significant].)
Accordingly, the County failed to “proceed[] in a manner required by law”
(§ 21168.5) when it decided to delete MM 4.17-5 on the ground that “there is no
requirement in CEQA to perform an analysis or provide mitigation for impacts to low-
income or disadvantaged communities.” Similarly, on appeal, the County argues that
CEQA does not require an analysis unique to a particular socioeconomic class. This
argument is inaccurate to the extent it contradicts the principle that social and economic
effects play a role in determining the significance of an environmental impact (see
Guidelines, § 15064, subd. (e)) and the significance of an environmental impact may be
greater to human beings who experience adverse social or economic effects.
The administrative record contains substantial evidence supporting a fair argument
that groundwater wells in the project area have been and continue to be at risk for
dewatering and, therefore, will be impacted by the project’s contribution to a cumulative
impact. Therefore, any subsequent EIR seeking to correct the defects in the SREIR
should address that evidence along with Sierra Club’s argument that information about
baseline water supply conditions in disadvantaged communities and the nature or
magnitude of the impacts to those communities is readily available. However, in
accordance with the principles described above, an analysis of localized impacts on
groundwater wells should not be limited to disadvantaged communities. Instead, the
communities’ socioeconomic status should be taken into account only when determining
the significance of the physical impact or identifying mitigation measures to lessen the
significance. To the extent that such an analysis is limited by available evidence, the
County should explain those limitations and why the discussion it provides has analyzed
the issues of physical impact and significance (which includes social and economic

81.
impacts) “ ‘to the extent reasonably possible.’ ” (King & Gardiner, supra, 45
Cal.App.5th at p. 843.)
C. Fee Payment as a Mitigation Measure
Sierra Club contends the County violated CEQA by rejecting proposed water
supply mitigation measures. In particular, it argues the County removed MM 4.17-5
based on an erroneous legal determination and the County’s reasons for declining to pay
GSA’s a fair-share fee are legally erroneous. In response, the County argues (1) it
properly removed MM 4.17-5, (2) CEQA and case law do not require fee payments to
other agencies with exclusive responsibility for funding and undertaking actions, and (3)
CEQA does not require fee payments to other agencies if such fees will not result in
actual mitigation.
1. Removal of MM 4.17-5
The removal of MM 4.17-5 was justified, in the County’s view, because “impacts
particular to a socioeconomic class are not cognizable under CEQA” and the measure, as
explained in the County’s revised findings, “went beyond CEQA’s requirements by
attempting to address a socioeconomic impact.” The County also asserts that it
“concluded there was no feasible way to assess impacts to a particular socioeconomic
group.”
First, as described in part V.B., ante, the County’s argument that impacts to a
socioeconomic class are not cognizable under CEQA is off point. The applicable rule of
law provides that social and economic effects are relevant to determining the significance
of a change in physical conditions (i.e., an environmental impact), such as the lowering of
groundwater levels in wells.
Second, the contention that MM 4.17-5 went beyond CEQA’s requirements by
attempting to address a socioeconomic impact also misapplies the principles established
by CEQA and the Guidelines for addressing social and economic effects. The proper

82.
characterization of MM 4.17-5 is that it attempted to reduce the significance of the
cumulative impact to which the project will contribute. An attempt to reduce the
significance of an environmental impact by reducing the social or economic effects
caused by the environmental impact is distinguishable under CEQA from attempting to
reduce social or economic impacts that are not caused by the project’s effects on the
environment. This distinction is overlooked, rather than acknowledged, by the County’s
arguments.
Third, the County’s references to the record do not establish that its
decisionmaker, the Board, actually found or concluded there was no feasible way to
access impacts to a particular socioeconomic group. More importantly, this contention
(like the first two reasons for removing MM 4.17-5) is based on a skewed view of
CEQA’s principles for addressing social and economic effects in determining the
significance of the lowering of groundwater levels in wells. This legal error undermines
any purported finding of infeasibility.
Consequently, the County’s rationale for removing MM 4.17-5 do not comply
with CEQA and, therefore, constitutes an abuse of discretion for purposes of section
21168.5.
2. Fee Payment Program
Under section 21081, subdivision (a)(2), a lead agency is not required to undertake
mitigation measures if the agency finds that the measures “are within the responsibility
and jurisdiction of another public agency and have been, or can and should be, adopted
by that other agency.” A finding disclaiming the responsibility to mitigate significant
“environmental effects is permissible only when the other agency said to have
responsibility has exclusive responsibility.” (City of Marina v. Board of Trustees of
California State University (2006) 39 Cal.4th 341, 366 (Marina); see Guidelines,
§ 15091, subd. (c).)

83.
Here, the County contends CEQA does not require it to impose a fair-share fee on
permit applicants because the GSA’s have exclusive responsibility for mitigating the
environmental effects of declining groundwater levels. To support this contention, the
County cites Water Code sections 10723.8, subdivision (d) and 10730.2. Under these
provisions, the County asserts that “there is no question that the GSAs have independent
authority to pursue a fair-share fee if one is deemed necessary to implement SGMA.” As
explained below, we agree GSA’s have the authority to impose fair-share fees, but
conclude that authority is not an exclusive responsibility.
Our analysis of the Water Code provisions and whether GSA’s have exclusive
responsibility for purposes of section 21081, subdivision (a)(2), begins with the definition
of a GSA because that definition mentions fees. Water Code section 10721, subdivision
(j) states:

“ ‘Groundwater sustainability agency’ means one or more local agencies
that implement the provisions of this part. For purposes of imposing fees
pursuant to Chapter 8 (commencing with Section 10730) or taking action to
enforce a groundwater sustainability plan, “groundwater sustainability
agency” also means each local agency comprising the groundwater
sustainability agency if the plan authorizes separate agency action.” (Italics
added.)
Water Code section 10723.8, subdivision (a) provides that when a local agency or
combination of local agencies decide to form a GSA, it shall notify the DWR “of its
decision and its intent to undertake sustainable groundwater management.” Subdivision
(d) of that section provides that “after the decision to be a groundwater sustainability
agency takes effect, the groundwater sustainability agency shall be presumed to be the
exclusive sustainability agency within the area … described in the notice.” (Wat. Code,
§ 10723.8, subd. (d), italics added.) This provision identifies the entity that is the one and
only GSA for a particular area, but it does not identify what actions are exclusively the
responsibility of a GSA.

84.
The powers and authorities of a GSA are set forth in a Water Code chapter
containing sections 10725 through 10726.9. The County has not cited any of these
sections in support of its argument that GSA’s have exclusive authority over the
imposition of fair-share fees. We have located nothing within those sections stating that
fair-share fees are the exclusive province of GSA’s or, alternatively, that other
governmental entities are precluded from requiring a fair-share fee to be paid to the GSA.
We note that Water Code section 10726.8, subdivision (f) provides: “Nothing in this
chapter or a groundwater sustainability plan shall be interpreted as superseding the land
use authority of cities and counties, including the city or county general plan, within the
overlying basin.” This provision does not support the view that SGMA placed exclusive
responsibility for imposing fair-share fees on the GSA and took any such authority away
from counties. Therefore, we conclude Water Code sections 10725 through 10726.9 do
not grant GSA’s exclusive authority for fair-share fees related to groundwater use.
Next, we consider the provision in SGMA that addresses the authority of a GSA to
impose fees. Water Code section 10730, subdivision (a) states that a GSA “may impose
fees, including, but not limited to, permit fees and fees on groundwater extraction or
other regulated activity, to fund the costs of a groundwater sustainability program .…”
Water Code section 15 states that “ ‘may’ is permissive.” Therefore, we conclude the
authority granted to a GSA to impose fees is discretionary. The wording in Water Code
section 10730 does not support the inference that this discretionary authority also is an
exclusive responsibility. Furthermore, the County has cited no case addressing the issue
of exclusive responsibility for imposing fees and no legislative history. Consequently,
we conclude the County’s responsibility to adopt mitigation measures in compliance with
CEQA includes the authority to impose a fair-share fee. In other words, the Water Code
did not take that authority away from counties and vest it entirely with GSA’s.
Therefore, like the Supreme Court in Marina, we conclude that if the County cannot
adequately mitigate the project’s contribution to declining groundwater levels, then

85.
requiring permit applicants to pay a fair-share fee to the relevant GSA “may well
represent a feasible mitigation.” (Marina, supra, 39 Cal.4th at p. 367.)
The County argues that CEQA does not require the payment of fees to other
agencies, such as GSA’s, if such fees will not result in actual mitigation. It contends
there is substantial evidence in the SREIR that the effectiveness, technological feasibility,
and cost of implementing GSP’s in the project area is uncertain and there is no substantial
evidence that GSP’s will result in any predictable amount of mitigation as they are
adaptively managed over the coming decades. The problem with these arguments about
substantial evidence is that they do not reference findings by the Board about the
infeasibility of funding that the evidence supports. Section 21081 and Guidelines section
15091 require findings, with a brief explanation of the underlying rationale, and the
absences of such findings and explanation are not rendered harmless by determinations in
the SREIR’s supported by substantial evidence.
Accordingly, we will remand the issue of mitigation in the form of a fair-share fee
paid to the local GSA or to the County for further consideration along with findings and
the explanation of those findings in accordance with Guidelines section 15091. The
County’s further consideration must take into account that Water Code section 10727.2,
subdivision (d)(3) provides that a GSA shall include a component relating to the
mitigation of the basin’s overdraft and the implication of a finding by the Board of
infeasibility—that is, it is infeasible for GSA’s to fulfill their mitigation responsibility.
Stated another way, if the Board makes an infeasibility finding on remand, that finding
must be “for reasons other than those we have rejected.” (Marina, supra, 39 Cal.4th at p.
369.)
The County suggests the imposition of a fair-share fee would be inappropriate
because of the possibility that a GSA might also impose a fee and, as a result, the permit
applicant would be required to pay twice. This possibility does not establish a fair-share
fee is infeasible because the County’s mitigation measure could be drafted to require

86.
payment of the fee only if the GSA had not adopted one. The County also asserts that a
fee may become inappropriate in the future if produced water becomes acceptable for
uses in agricultural and, as a result, the oil and gas industry become a net supplier of
water. If that situation arises and the oil and gas activity authorized by the Revised
Ordinance is no longer contributing to an adverse impact on water supplies, the County
could amend the Revised Ordinance to eliminate the fee.

VI. TEMBLOR LEGLESS LIZARD*
A. Background
1. 2015 EIR
Section 4.4 of the July 2015 draft EIR addressed the project’s impacts on
biological resources and mitigation measures for those impacts. The biological resources
included special status wildlife species,22 three of which were the silvery legless lizard
(Anniella pulchra pulchra), the Bakersfield legless lizard (Annielle grinnelli), and the
Temblor legless lizard (Anniella alexanderae). Legless lizards can be mistaken for
snakes because of their elongated body and absence of limbs. Unlike snakes, they have
movable eyelids and lack external ear openings. From snout to vent, the species’ length
is 3.5 to 6.7 inches; with tail, their total length is around 8 inches.
The EIR explained that in September 2013, the Anniella species was split into five
species, the four newly described species had not had their status determined, and the
silvery legless lizard had been a California species of special concern. The EIR
addressed the unresolved status of the newly described species by treating them as special

* See footnote, ante, page 1.
22 The 2015 EIR defined special status wildlife species as those listed as threatened
or endangered by the United States Fish and Wildlife Service (USFWS) or the California
Department of Fish and Wildlife (CDFW); designated as a species of special concern by
CDFW; fully protected under state law; or that meet the definition of rare or endangered
under Guidelines section 15380, subdivisions (b) and (d).

87.
status. The EIR stated three species of legless lizards were expected to occur in the
project area and discussed them together because information about the distribution of the
new described species was limited. The habitat for the legless lizards was described as
“[b]urrows in sandy or loose loamy soil and leaf litter of high moisture content under
sparse vegetation, particularly in coastal dune and oak woodland habitats.”
The EIR stated the Temblor legless lizard was differentiated from the other species
by its ventral coloring and was known from two sites in areas of sandy soil at the
southeast base of the Temblor Range. The two sites were separated by continuous habitat
west of Highway 33. Notwithstanding the two known sites, the EIR listed the Temblor
legless lizard as a Category 2 species23 and potential impacts were evaluated based on the
potential occurrence in each project area tier and subarea.
Habitat suitability models were used to evaluate the project’s potential impacts on
legless lizards and other wildlife species. The results from the models address the
potential impacts to habitat for the various species. The EIR stated that by modeling
habitat impacts, the project’s effects could be quantified without knowing the actual
occurrence of a species at a particular place. An advantage of this methodology is that
habitat importance is based on relative quality instead of occupation levels, which
fluctuate over time. The modeling predicted annual levels of disturbance to 0.40 percent
of the legless lizard’s high quality habitat and 0.25 percent of its poor to moderate quality
habitat. The EIR also estimated 25-year impacts to 9.9 percent of the legless lizard’s
high quality habitat and 6.2 percent to its poor to moderate quality habitat. The EIR
concluded: “These impacts would be significant without mitigation.” More generally,

23 The 2015 EIR defines a Category 2 species as one “known or likely to occur in the
Project Area for which modeling data was not available to quantify and analyze potential
Project impacts.” In comparison, a Category 1 species (like the silvery legless lizard) is
one “for which one of four types of habitat suitability modeling data was available and
used to quantify and analyze potential Project impacts.”

88.
the EIR concluded “potential impacts to special status plants and wildlife would be
significant without mitigation.”
The draft EIR set forth 20 mitigation measures for impacts to biological resources.
MM 4.4-1 required special status wildlife surveys to be completed by a qualified
biologist within 30 days before new ground disturbing construction activity began. MM
4.4-3 provided for the use of exclusion barriers or buffers where they were deemed
feasible by the qualified biologist. MM 4.4-14 required the development and
implementation of a worker environmental awareness program for all personnel that
could access a site prior to commencing disturbance activities. Personnel were required
to sign a statement verifying completion of the awareness program and the permit
applicants were required to keep training records for at least five years. The EIR
concluded that, after mitigation, the impacts to special status species would be less than
significant.
2. Comment to Draft SREIR and the County’s Response
Sierra Club’s September 2020 comment letter to the draft SREIR (1) stated the
2015 EIR did not fully evaluate impacts to the Bakersfield and Temblor legless lizards
because the EIR claimed habitat modeling was unavailable and (2) asserted a recent study
added new information about the species that allowed for habitat modeling. The study
cited was commissioned by the California Department of Fish and Wildlife. (Parham, et
al, Conservation Assessment of the California Legless Lizard (Aug. 16, 2019) (2019
Parham Study).) The comment letter asserted the Temblor legless lizard “may be at
particular risk due to its limited habitat, and the fact that the vast majority of its habitat is
privately owned land.” The comment letter stated the draft SREIR must be updated to
evaluate the potential harms to each species of legless lizard separately and to consider
feasible mitigation measures, such as avoidance of legless lizard habitat.

89.
County’s response No. 0009-112 noted the comment had cited the 2019 Parham
Study and had asserted the study provided new information about the newly identified
species of legless lizards and provided modeling for their habitat. The response rejected
the comment’s claim that the SREIR must be updated to provide an additional discussion
of the legless lizards. First, the response stated the defects that the 2020 opinion required
to be corrected did not include any issues involving legless lizards. Second, the response
concluded the comment did “not raise either substantial changes in circumstances or new
information requiring supplemental analysis under CEQA.”
The response summarized the 2015 EIR’s approach to stating it (1) found the
silvery, Bakersfield and Temblor legless lizards had the potential to occur within the
project area; (2) little was known about the Bakersfield and Temblor legless lizards and
they were conservatively assumed to be species of special status like the silvery legless
lizard; (3) potential impacts to the three species were evaluated based on their potential
occurrence in each tier and subarea of the project area; and (4) all three species were
discussed together due to the limited distribution information available.
The response acknowledged the 2019 Parham Study had expanded the ranges of
the Temblor legless lizard and two other new species and noted the study did not indicate
that habitat for any species within Kern County was outside the subareas or tiers
identified in the 2015 EIR. The response disagreed with the comment’s assertion that
some species of legless lizards may be disproportionately harmed due to the proximity of
their habitat to oil and gas activity. The response concluded that, “[g]iven the limited
information and need for further study identified in [the 2019 Parham Study], it remains
appropriate to treat the legless lizard species together.
The response also described the conservative assumption made in the 2015 EIR’s
analysis of the three species of legless lizards. It noted the Bakersfield and Temblor
legless lizards were classified as Category 2 species—that is, species “ ‘known or likely
to occur in the Project Area for which modeling data is not available to quantify and

90.
analyses potential Project impacts.’ ” Potential impacts on Category 2 (i.e., nonmodeled)
species such as the Temblor legless lizard were conservatively assumed to occur “even in
areas where there is an extremely low likelihood of species impact.”
With respect to the mitigation measures, the response stated MM 4.4-3 has been
clarified to state that the 30-foot buffer zone applied to all legless lizard species. The
earlier version had referred to the silvery legless lizard. The response also described
other mitigation measures that would benefit all legless lizards in the project area.
B. Legal Principles Governing Additional CEQA Review
Sierra Club contends the County did not revise the SREIR’s discussion of impacts
to the Temblor legless lizard and, as a result, violated CEQA’s requirements for
subsequent or supplemental review contained in section 21166 and Guidelines section
15162, subdivision (a). In response, the County contends it complied with CEQA
because the requirement for additional environmental review does not apply to the facts
of this case. Based on the way the parties have framed their arguments, we assume for
purposes of this appeal that the question presented is properly framed as whether the
County erred when it determined section 21166 and Guidelines section 15162,
subdivision (a) did not require a more extensive environmental review of the impacts to
the Temblor legless lizard.24
Section 21166 provides in part:

“When an environmental impact report has been prepared for a project
pursuant to [CEQA], no subsequent or supplemental environmental impact
report shall be required by the lead agency … unless one or more of the

24 We note, however, that this case is not the typical situation where new information
is learned by the lead agency after it has “certif[ied] the completion of” an EIR (§ 21100,
subd. (a)) and that certification is in effect when the claim for additional review is
presented to the lead agency. Here, the Board’s certification of the 2015 EIR was
vacated before the 2019 Parham Study was presented to the County. Also, that new
information was discussed in the SREIR and made available to the Board before it
certified the SREIR as complete.

91.
following events occurs: [¶] … [¶] (c) New information, which was not
known and could not have been known at the time the environmental
impact report was certified as complete, becomes available.”
Guidelines section 15162 explains when changes or new information trigger the
need for additional environmental review by stating in part:

“(a) When an EIR has been certified …, no subsequent EIR shall be
prepared for that project unless the lead agency determines, on the basis of
substantial evidence in the light of the whole record, one or more of the
following: [¶] …[¶]

“(2) Substantial changes occur with respect to the circumstances
under which the project is undertaken which will require major revisions of
the previous EIR … due to the involvement of new significant
environmental effects or a substantial increase in the severity of previously
identified significant effects; or

“(3) New information of substantial importance, which was not
known and could not have been known with the exercise of reasonable
diligence at the time the previous EIR was certified as complete or the
negative declaration was adopted, shows any of the following:

“(A) The project will have one or more significant effects not
discussed in the previous EIR or negative declaration;

“(B) Significant effects previously examined will be substantially
more severe than shown in the previous EIR.”
For practical purposes, the foregoing provisions create “a presumption against
further environmental review after a project has been previously subjected to
environmental review.” (Save Our Heritage Organisation v. City of San Diego (2018) 28
Cal.App.5th 656, 666.) “[S]ection 21166 comes into play precisely because in-depth
review has already occurred, the time for challenging the sufficiency of the original EIR
has long since expired [citation], and the question is whether circumstances have changed
enough to justify repeating a substantial portion of the process.” (Id. at pp. 666–667.)
The County’s determination that, for purposes of section 21166, there was no new
information of substantial importance and no substantial change in circumstances is
reviewed for substantial evidence. (Citizens’ Committee to Complete the Refuge v. City

92.
of Newark (2021) 74 Cal.App.5th 460, 470.) Sierra Club, as the party challenging the
County’s determination, has the burden of demonstrating that the County’s decision is
not supported by substantial evidence and, therefore, violates CEQA. (Ibid.) In applying
the substantial evidence standard, our task is not to weigh conflicting evidence and
determine who has the better argument. (Banning Ranch Conservancy v. City of Newport
Beach (2017) 2 Cal.5th 918, 935.)
Another principle of judicial review applicable to this appeal is that our review for
substantial evidence is limited to the administrative record. Stated another way, we
decide “only whether the administrative record as a whole demonstrates substantial
evidence to support the determination that the changes in the project or its circumstances
were not so substantial as to require major modifications of the EIR.” (Sierra Club v.
County of Sonoma (1992) 6 Cal.App.4th 1307, 1318.) Guidelines section 15162,
subdivision (a) refers to “substantial evidence in the light of the whole record” and this
reference to the whole record means the administrative record before the lead agency
when it made the decision that additional environmental review was not required.
Accordingly, to the extent that the amicus curiae brief addressing the Temblor legless
lizard refers to documents outside the administrative record, we have not considered
those documents.
C. Application of the Substantial Evidence Standard
Our analysis of whether new information or changed circumstances requires
additional environmental review begins by identifying the new information relied upon
by Sierra Club. Most of that information is contained in the 2019 Parham Study and the
October 2020 petition to list the Temblor legless lizard as a threatened or endangered
species under the federal Endangered Species Act (ESA; 16 U.S.C. § 1531 et seq.). Both
of these documents are part of the administrative record. The claim of changed

93.
circumstances overlaps with the new information because the changed circumstances are
described by the new information about the Temblor legless lizard’s range and rarity.
1. 2019 Parham Study
The 2019 Parham Study was generated to report the results of a four-year project
whose main objective was to establish species range boundaries and evolutionary
lineages for the newly described species of legless lizards. The project consisted of
surveys and genetic and ecological analyses addressing the distribution of legless lizards
and testing the validity of the newly described species. The field surveys were focused
on new sites between the samples or known ranges described in a 2013 study. The
project resulted in specimens for six species of legless lizards being collected from new
localities and, thus, new range estimates were made for those six species.
Appendix B to the 2019 Parham Study listed the survey sites checked for the
presence of legless lizards and the collections, if any, from the site. Kern County
contained 32 of the survey sites and seven of those sites resulted in 13 collections. Table
2 reported that for all the sites included in the study, 27 specimens of Temblor legless
lizards were obtained from seven unique locations.
The 2019 Parham Study stated: “The most significant range extension involved
[the Temblor legless lizard], which was previously known from one area east of the
Temblor Mountains. We have extended its range as far north as Coalinga.” It also stated
that most specimens of the Temblor legless lizard were found in alkali desert scrub or
annual grasslands. The total range of the Temblor legless lizard was estimated at
1,719.54 square kilometers (approximately 664 square miles) with only about 5.5 percent
of this land being federal land or protected by the CDFW. The 2019 Parham Study
describes the range as “narrow” and stated the predictive range maps generated by
Ecological Niche Modeling had overpredicted the Temblor legless lizard range into areas
that had been developed, which “may indicate potential extirpation from recent human

94.
development.” In other words, development might or might not be the reason Temblor
legless lizards were not found further east in the San Joaquin Valley. The study stated
the occurrence of Temblor legless lizards further west into the Coast Range could be
tested with further sampling, but all known samples from that area were confirmed to be
silvery legless lizards.
The 2019 Parham Study concluded with seven recommendations. The third
recommendation stated that more protection for the Temblor legless lizard may be
warranted and suggested applying for federal or state listing. It also stated the discovery
of new sites for the Temblor legless lizard “provide additional hope for its conservation,
but currently all but one known site for this species is on private land.” The sixth
recommendation stated:

“Additional field surveys for Anniella are needed to discover new sites and
samples for each species. Given the potentially imperiled status of [the
Temblor legless lizard], identifying additional sites for this species should
be a top priority. In the Coast Ranges Transverse Ranges and Southern
Sierra Nevada, there are also areas where it is unclear what species may
occur. By further sampling these areas we can identify areas of sympatry,
better understand their geographic ranges, and better understand the factors
that shape their distribution. With this information we can make more
informed statements about their conservation status.”
2. Conflicting Inferences
The parties have presented different views of the information in the 2019 Parham
Study. The County takes the view that the information was far from complete, yet
provided good news that the range of the Temblor legless lizard was more extensive than
shown in the 2013 study. In contrast, Sierra Club and an amicus curiae believe the new
information shows the impact on the Temblor legless lizard will be more severe than
described in the 2015 EIR.
In our view, the different views of the 2019 Parham Study are the result of the
parties drawing different inferences from the information provided. Our analysis of these

95.
different views is governed by the principle of law stating how a reviewing court applies
the deferential substantial evidence standard to the parties’ conflicting inferences. In an
earlier CEQA case involving the County, we described that principle of law by stating:

“We recognize conflicting inferences could be drawn from the evidence
presented, but the substantial evidence standard only requires sufficient
evidence from which any reasonable trier of fact could find the fact in
question. (See California Native Plant Society v. City of Rancho Cordova[,
supra,] (2009) 172 Cal.App.4th 603, 639 [under substantial evidence
standard, plaintiffs have burden of showing lead agency could not have
reasonably made the factual determination challenged].)” (Association of
Irritated Residents v. Kern County Bd. of Supervisors (2017) 17
Cal.App.5th 708, 745.)
The principle that a court of review must accept reasonable inferences drawn by
the lead agency in a CEQA case is consistent with how the substantial evidence standard
of review is applied to trial court decisions. In that context, “[t]he trier of fact is the sole
arbiter of all conflicts in the evidence, conflicting interpretations thereof, and conflicting
inferences which reasonably may be drawn therefrom.” (Horn v. Oh (1983) 147
Cal.App.3d 1094, 1099.)
We note that the appellate briefing of Sierra Club and the amicus curiae have not
acknowledged the principle about conflicting inferences. Although the County’s briefing
does not address conflicting inferences, it quotes the definition of substantial evidence
that mentions “reasonable inferences.” (Guidelines, § 15384, subd. (a).)
Applying the principle about conflicting inferences to the facts of this case, we
conclude the County did not draw an unreasonable inference when it determined that the
information about the expanded range of the Temblor legless lizard was positive news
and, thus, did not warrant inferring the impacts on the Temblor legless lizard would be
more severe than the significant impact (without mitigation) identified in the 2015 EIR.
Also, the statements in the 2019 Parham Study’s recommendation for additional surveys
and the study’s many uses of the word “may” support the County’s inference that the new

96.
information is not definitive. Consequently, under the deferential substantial evidence
standard, we uphold the County’s determination that there was no new information of
substantial importance and no substantial change in circumstances warranting additional
environmental review. (§ 21166; Guidelines, § 15162, subd. (a).)
Besides failing to address the principle about conflicting inferences, Sierra Club’s
arguments are unconvincing because they are based on a misinterpretation of the 2015
EIR. For example, Sierra Club asserts: “The 2015 EIR told the public and
decisionmakers that the Temblor legless lizard was present throughout nearly all of Kern
County, with only a small percentage of its habitat affected by the Ordinance. (AR1122-
23, 1231.)” This assertion is objectively unreasonable because the 2015 EIR states: “The
Temblor legless lizard is known from two sites separated by continuous habitat west of
Highway 33. The known sites are in areas of sandy soil at the southeast base of the
Temblor Range between McKittrick and Taft on the west side of the southern San
Joaquin Valley in Kern County, California.” These sentences do not tell the reader that
the Temblor legless lizard is present throughout nearly all of Kern County. Thus, part of
Sierra Club’s argument about the 2019 Parham Study containing significant new
information is based on a mischaracterization of the old information presented in the
2015 EIR.

VII. SPANISH TRANSLATION*
A. Background
Sierra Club’s May 29, 2020 letter to the County asserted the County must make its
CEQA process accessible to the many Spanish language speakers in Kern County.
Similarly, Sierra Club’s September 2020 comment letter to the draft SREIR stated the
County must disclose information about the Revised Ordinance and its environmental
impacts in Spanish to ensure meaningful involvement of Spanish speaking residents who

* See footnote, ante, page 1.

97.
are disproportionately harmed by oil and gas activities. The letter asserted that at the
August 2020 workshop, the County did not disclose any environmental information but
merely described the draft SREIR’s structure and the decision making schedule. It also
stated the County prohibited the public from offering oral comments at the May 2020 and
August 2020 virtual workshops.
The County’s response No. 0009-8 noted that CEQA and the Guidelines do not
require translation and, even so, Spanish translation services were provided at the May
13, 2020 virtual scoping meeting and the two virtual public workshops held in August
and November of 2020 during the COVID-19 pandemic. The response also stated that, at
the workshops, live translation services and closed captioning in Spanish were provided
to facilitate participation and understanding of the SREIR. The County’s response No.
0007-2 stated the Spanish language translation through closed captioning and live
simultaneous interpretation via conference call for the scoping meeting and workshops
provided “access opportunities beyond what is required by law to ensure that the
County’s Spanish-speaking residents could participate” and the presentations given
emphasized that written comments could be submitted in any language. Both responses
addressed the upcoming public hearings before the planning commission and the Board,
with response No. 0009-8 stating “Spanish translation services will be available for the
presentation, as well as for Spanish-speakers who request to provide public comment.”
The Board’s March 2021 written findings described (1) the closed captioning and
live stream Spanish translation used at the May 2020 virtual scoping meeting; (2) the
August 2020 release of the draft SREIR, (3) the August 2020 virtual public workshop
where closed captioning and translations services were provided, (4) the second
circulation of the draft SREIR, which incorporated public and agency comments, (5) the
subsequent November 2020 virtual public workshop where closed captioning and
translations services were provided, and (6) the January 2021 release of responses to all
written comments, which preceded the Board’s public hearing.

98.
B. Contentions
On appeal, Sierra Club contends the County’s refusal to translate notices or any
portion of the SREIR into Spanish constitutes an abuse of discretion because it was not
supported by substantial evidence and it undermined CEQA’s purposes of informing the
public and promoting public participation. In particular, Sierra Club contends the limited
accommodations did not provide Spanish-speaking residents who attended a meeting
with access to the information disclosed in the SREIR because (1) the PowerPoint slides
presented at two workshops were in English and did not identify specific impacts or
project alternatives and (2) workshop attendees were directed to read for themselves
substantive information in the SREIR, which was available only in English.
In response, the County contends substantial evidence supports its decision not to
translate portions of the SREIR into Spanish. In addition, the County contends Sierra
Club’s argument is procedurally barred by res judicata and law of the case from raising
the issue.
C. Res Judicata
“ ‘Res judicata’ describes the preclusive effect of a final judgment on the merits.
Res judicata, or claim preclusion, prevents relitigation of the same cause of action in a
second suit between the same parties or parties in privity with them.” (Mycogen Corp. v.
Monsanto Co. (2002) 28 Cal.4th 888, 896.) The elements of the doctrine of res judicata
are: “ ‘(1) A claim or issue raised in the present action is identical to a claim or issue
litigated in a prior proceeding; (2) the prior proceeding resulted in a final judgment on the
merits; and (3) the party against whom the doctrine is being asserted was a party or in
privity with a party to the prior proceeding.’ ” (People v. Barragan (2004) 32 Cal.4th
236, 253.)
The doctrine of res judicata does not prevent Sierra Club from arguing notices
relating to the SREIR and portions of the SREIR should have been translated into
Spanish. While the third element (i.e., same parties) is satisfied, the first element is not.

99.
When our February 2020 opinion was issued, the SREIR and related notices that are the
subject of Sierra Club’s argument did not exist. Because the documents are different
from those addressed previously, the issue of translation raised in this appeal is not
“identical to a claim or issue litigated in a prior proceeding.” (People v. Barragan,
supra, 32 Cal.4th at p. 253, italics added.) Therefore, res judicata’s primary aspect (i.e.,
claim preclusion) and secondary aspect (i.e., issue preclusion or collateral estoppel) do
not apply to the arguments raised in this appeal. (See DKN Holdings LLC v. Faerber
(2015) 61 Cal.4th 813, 823–824 [two aspects of res judicata]; see generally, Heiser,
California’s Confusing Collateral Estoppel (Issue Preclusion ) Doctrine (1998) 35 San
Diego L.Rev. 509, fn. 1.)
D. Law of the Case
California’s law of the case doctrine provides that when an appellate court decides
an appeal and “ ‘states in its opinion a principle or rule of law necessary to the decision,
that principle or rule becomes the law of the case and must be adhered to throughout its
subsequent progress, both in the lower court and upon subsequent appeal ....’ ” (Kowis v.
Howard (1992) 3 Cal.4th 888, 892–893.)
In King & Gardiner, supra, 45 Cal.App.5th 814, an unpublished portion of the
opinion concluded that “Sierra Club has not established the County abused its discretion
when it chose not to provide interpreters and chose not to translate notices or parts of the
EIR into Spanish. (§ 21168.5.) Accordingly, Sierra Club has not demonstrated
prejudicial error.” In reaching this conclusion, the opinion stated the following principles
or rules of law.
First, the California Constitution does not require or prohibit public agencies from
translating CEQA documents into other languages such as Spanish. (See Cal. Const., art.
III, § 6, subds. (b), (c).) Second, CEQA and the Guidelines do not require or prohibit
public agencies from translating CEQA documents into other languages or providing

100.
translators during CEQA workshops, public meetings, or other administrative
proceedings. Third, the question of whether to provide interpreters and translations of
CEQA documents is committed to the public agency’s discretion and that discretionary
authority is derived from CEQA’s purposes of (1) informing the public of the potentially
significant environmental effects of proposed activities and (2) promoting public
participation in the environmental review process.25 We also concluded that in
exercising this discretion, an agency must evaluate the facts and circumstances of the
case and the factual basis for the agency’s decision is reviewed under the substantial
evidence standard. The foregoing principles (i.e., rules of law) must be applied in this
appeal to comply with the law of the case doctrine.
To explain the scope of the foregoing principles, we note that nothing in our 2020
opinion stated or implied that a lead agency’s decisions about providing translations and
interpreters was committed to the agency’s absolute discretion and, thus, was beyond
judicial review. (Cf. Heckler v. Chaney (1985) 470 U.S. 821, 831 [“agency’s decision
not to prosecute or enforce, whether through civil or criminal process, is a decision
generally committed to an agency’s absolute discretion”; such decisions unsuitable for
judicial review].) Instead, our analysis demonstrated that the County’s decisions
regarding translations and interpreters were subject to judicial review, which necessarily
implies it is possible for situations to arise where a failure to translate documents or
provide interpreters constitutes an abuse of discretion.
Based on the first two principles identified above, we conclude the County’s
decision not to translate notices or portions of the SREIR did not violate a constitutional,
statutory, or regulatory rule of law mandating a translation when specified criteria are
met, such as a timely request. No such rule of law exists. Instead, the County’s decision

25 We note that the conclusion that translation is committed to an agency’s discretion
necessarily implies that there are situations where a failure to translate constitutes an
abuse of that discretion.

101.
not to translate documents involves an exercise of discretionary authority that is subject
to judicial review under the abuse of discretion standard.
Applying the abuse of discretion standard to the County’s decision includes
reviewing the County’s underlying findings for fact, either expressed or implied, under
the substantial evidence standard. (See Haraguchi v. Superior Court (2008) 43 Cal.4th
706, 711 [“abuse of discretion standard is not a unified standard”].) The 2020 opinion
implied that the process an agency undertakes involves (1) considering the totality of the
circumstances, (2) making findings of fact, and (3) then weighing those facts in light of
CEQA’s purposes to reach a decision how to exercise the discretionary authority. This
last step, unlike finding facts or making conclusions of law, is truly a matter of discretion,
and results in error “only if arbitrary and capricious.” (Id. at p. 712.) Another way of
stating the arbitrary and capricious test is that the decision “exceeded the bounds of
reason, all of the circumstances … being considered.” (In re Marriage of Connolly
(1979) 23 Cal.3d 590, 598 [abuse of discretion standard]; see Safeco Ins. Co. of America
v. Superior Court (2009) 173 Cal.App.4th 814, 832 [decision exceeds the bounds of
reason].)
E. The County Evaluated the Evidence
Sierra Club asserts that roughly one in six residents of Kern County speaks
Spanish with limited or no English proficiency and the County made its decision not to
translate documents without evaluating these facts and circumstances. It is relatively
easy for an appellant to contend an agency or a superior court failed to consider or
evaluate certain evidence or factors. However, it is difficult for an appellant to actually
demonstrate the mental process used by an agency’s decision makers or a judge omitted
or ignored evidence. (See Gonzales v. Interinsurance Exchange (1978) 84 Cal.App.3d
58, 63 [“ ‘consider’ ” refers to the mental process of weighing of evidence].)

102.
Here, we assume without deciding that a lead agency, after receiving a timely
request to translate CEQA documents, abuses its discretion when it decides the request
without considering the relevant evidence. This assumption is based on case law
concluding a trial court abuses its discretion by failing to consider relevant evidence.
(Ritchie v. Konrad (2004) 115 Cal.App.4th 1275, 1282; In re Marriage of Cheriton
(2001) 92 Cal.App.4th 269, 304 [“court does not have discretion to ignore any relevant
circumstance enumerated in the statute”].)
Based on the administrative record, we reject the contention that, when the County
refused to translate certain CEQA documents into Spanish, it failed to consider or
evaluate evidence about the population, demographics and poverty levels within Kern
County generally or within the project area in particular. The County’s response No.
0010-3 notes that the SREIR “includes updated demographic and poverty level census
tract data in the projected locations of future oil and gas activities permitted under the
Project.” The response discusses the percent of population identified as white and
Hispanic in Tier 1 areas (where oil and gas activity is the primary land use) and non-Tier
1 areas. It states that a vast majority of the wells likely to be drilled under the Revised
Ordinance will be located in Tier 1 areas, which has a higher proportion of white
residents and lower poverty rate than non-Tier 1 lands and Kern County as a whole.
Thus, the SREIR rejected the assertion that oil and gas activities authorized by the project
would disproportionately focus potential environmental impacts on Hispanic or low
income populations.
The information and analysis in the final SREIR, including the County’s response
No. 0010-3, and the explicit statements about Spanish translations for the scoping
meeting, workshops, and public hearings in the Board’s findings demonstrates the
County did evaluate the facts and circumstances relevant to Sierra Club’s request for
translation of notices and portions of the SREIR. Consequently, we reject Sierra Club’s
claim to the contrary.

103.
Also, to the extent that Sierra Club contends the County abused its discretion by
refusing to acknowledge or recognize it had the discretionary authority described in our
prior opinion, we reject this contention. The fact that the County granted the request in
part by providing translations and closed captioning at the virtual scoping meeting and
workshops shows the County exercised its discretion and, thus, supports the inference
that the County was aware of its discretionary authority.
F. No Abuse of Discretion
The evidence in the administrative record relating to the translation of the notices
and portions of the SREIR does not point to a single outcome. Some evidence supports
translating the documents to further CEQA’s purposes of informing the public and
promoting public participation and other evidence supports the County’s decision not to
translate the notices and portions of the SREIR. When applying the substantial evidence
standard to an agency’s findings, a reviewing court must not reweigh conflicting
evidence. (Friends of Lagoon Valley v. City of Vacaville (2007) 154 Cal.App.4th 807,
816.) Applying this rule of appellate procedure, we will not reweigh the evidence.
Instead, we conclude that implied findings of fact derived from that conflicting evidence
are sufficient to establish that the County’s decision was not arbitrary and capricious—
that is, was not beyond the bounds of reason—and, thus, was not an abuse of discretion.
A more detailed account of the conflicting evidence is not provided here because,
contrary to the applicable rules of appellate practice, Sierra Club’s challenge to the
sufficiency of the evidence lacked the requisite summary of the evidence on point,
favorable and unfavorable. (See Schmidlin v. City of Palo Alto (2007) 157 Cal.App.4th
728, 738.) Without such a summary, the challenge may be deemed waived, which is
another way of saying the appellant failed to carry its burden of affirmatively
demonstrating error. (In re Marriage of Fink (1979) 25 Cal.3d 877, 887 [appellant
“cite[d] only evidence favorable to his position, ignoring all to the contrary. Such briefing

104.
is manifestly deficient.”].) Accordingly, we do not reach the question of whether Sierra
Club demonstrated prejudice from the asserted abuse of discretion. (See § 21005, subd.
(b) [“there is no presumption that error is prejudicial”].)

VIII. APPELLATE RELIEF*
As in the prior appeal, we conclude the “ ‘usual remedy of setting aside a project
approval’ ” is appropriate. (King & Gardiner, supra, 45 Cal.App.5th at p. 896.) We
have considered the County’s arguments for a limited remedy that allows the project
approvals to remain in place while the SREIR is brought into compliance with CEQA.
(See § 21168.9.) A suspension limited to noncompliant project activities is allowed
“only if a court finds that (1) the portion or specific project activity or activities are
severable, (2) severance will not prejudice complete and full compliance with [CEQA],
and (3) the court has not found the remainder of the project to be in noncompliance with
[CEQA].” (§ 21168.9, subd. (b).) Here, the CEQA violations relating to the assessment
of health risks and impacts on water supply are relatively far reaching and also taint the
adoption of the statement of overriding considerations. (See Marina, supra, 39 Cal.4th at
p. 368 [court invalidated the statement of overriding considerations].) Therefore, in the
circumstances presented, we cannot find the affected project activities are severable and
severance will not prejudice full compliance with CEQA. Accordingly, we will direct the
superior court to issue a writ of mandate that implements the usual remedy.
DISPOSITION
The second modified judgment entered on October 4, 2022, is reversed in part and
affirmed in part and the order discharging the third writ filed on November 2, 2022 is
reversed. The part of the second modified judgment and the third writ directing the
respondents to suspend operation of Kern County Ordinance No. G-8992 and to refrain
from reviewing and approving permits pursuant to that ordinance, or a modified form of

* See footnote, ante, page 1.

105.
that ordinance, shall remain in effect pending the superior court’s issuance of a modified
judgment and fourth peremptory writ of mandate continuing the suspension. That
suspension shall remain in effect until the superior court discharges the fourth writ.
On remand, the superior court is directed to enter a modified judgment and a
fourth peremptory writ of mandate for corrective action that are not inconsistent with this
opinion. The modified judgment and fourth peremptory writ of mandate shall direct the
Board to (1) set aside its certification of the final SREIR and August 2022 addendum as
complete, (2) set aside its adoption of the revised and restated findings of fact and the
restated statement of overriding considerations, and (3) set aside the approval of the
Revised Ordinance. The writ of mandate also shall direct the County not to present an
ordinance streamlining the permitting of oil and gas activities to the Board for approval
until the County has (4) prepared a revised environmental impact report that corrects the
CEQA violations relating to (a) the rejection of agricultural conservation easements as a
form of partial mitigation for the conversion of agricultural land, (b) the assessment of
cancer risks associated with the drilling of multiple wells near sensitive receptors, and (c)
the analysis of water supply impacts; (5) circulated the revised environmental impact
report for public review and comment; and (6) prepared and published responses to the
comments received before certifying the revised environmental impact report as complete
and approving such an ordinance.
Appellants shall recover their costs on appeal. (Cal. Rules of Court, rule 8.278.)

FRANSON, Acting P. J.
WE CONCUR:

PEÑA, J.

SNAUFFER, J.

106.