Filed 2/26/14 Walden v. Visionscape CA2/3
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication
or ordered published for purposes of rule 8.1115.
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
SECOND APPELLATE DISTRICT
DIVISION THREE
MATTHEW AND DANA WALDEN, as B239212
Trustees, etc.,
(Los Angeles County
Plaintiffs and Appellants, Super. Ct. No. SC105804)
v.
VISIONSCAPE, INC., et al.,
Defendants and Respondents.
APPEAL from a judgment of the Superior Court of Los Angeles County,
Jacqueline A. Connor and Gerald Rosenberg, Judges. Reversed.
Parcells Law Firm and Dayton B. Parcells III for Plaintiffs and Appellants.
Freisleben Law Group and Lily Chow for Defendants and Respondents.
_____________________
INTRODUCTION
Plaintiffs Matthew Walden and Dana Walden, as Trustees of the Walden Family
Trust (the Waldens), appeal from the judgment entered in favor of Defendants
Visionscape, Inc. and Ruben Flores (Visionscape) after a bench trial. The Waldens
contend the trial court erred in permitting Visionscape, a licensed contractor, to retain
payments made pursuant to a home improvement contract, based on an erroneous finding
that Visionscape complied with certain regulatory statutes governing the content of such
contracts and prohibiting contractors from requesting and accepting payments for work
that has not been performed and materials that have not been delivered. We agree the
trial court’s finding was contrary to the undisputed evidence and erroneous as a matter of
law. Because the trial court made no other finding in its statement of decision that would
independently support the judgment, we reverse and remand the case for a new trial.
FACTUAL AND PROCEDURAL BACKGROUND
1. The Design Services and Tree Trimming Contracts
In late 2007, the Waldens retained Visionscape, pursuant to an Agreement for
Design Services (Design Services Contract), to create a landscape design for a planned
backyard and pool renovation at their home in Brentwood, California. In March 2008,
the Waldens approved Visionscape’s proposed design drawings, and the parties
proceeded with negotiations concerning Visionscape’s bid to provide installation services
for the landscape remodeling project.
In September 2008, while the installation negotiations continued, the Waldens and
Visionscape entered into a Tree Trimming Contract, under which Visionscape agreed to
perform an extensive trimming of all trees, hedges and shrubs within the property’s
existing landscape for the fixed price of $14,350. In September 2008, the Waldens made
an initial payment of $7,175 and, in December 2008, the Waldens made another $7,175
payment, satisfying the remaining balance due under the Tree Trimming Contract.
2
2. Visionscape’s “Progress Payment” Request for Installation Services
In November 2008, in anticipation of reaching an agreement on the installation
bid, Visionscape requested a $20,000 deposit from the Waldens to begin “tagging” trees
in order to reserve the best specimens. Visionscape explained that a deposit was required
by its vendors, but confirmed that all trees would be presented to the Waldens for
approval, and the entire $20,000 was “refundable.” On December 1, 2008, the Waldens
transferred the requested $20,000 to Visionscape.
In February 2009, as negotiations on the installation bid neared completion,
Visionscape requested a payment of $100,000 in anticipation of moving forward with the
landscape remodeling project. Before remitting the payment, the Waldens requested an
itemized list describing how the funds would be used. On February 19, 2009,
Visionscape submitted the requested itemization in the form of a written request for a
“progress payment.” The request included an invoice that purported to detail how the
funds would be applied to installation services Visionscape would perform under a not-
yet-executed Agreement for Installation Services. Although some trees had arrived and
some planting, grading, irrigation and drainage work had commenced, Visionscape
confirmed that the $100,000 “progress payment” was mostly for work it had yet to
perform. The Waldens wire transferred the requested $100,000 to Visionscape.
3. The Installation Contract
On February 25, 2009, the Waldens and Visionscape executed the Agreement for
Installation Services (Installation Contract) and an incorporated Addendum thereto. The
parties agreed to a fixed price of $400,000 for all materials, labor and services to be
provided by Visionscape under the Installation Contract. Billing was to take place on a
“bi-weekly, monthly or major milestone basis dependent upon the Project timeline,” with
invoices “represent[ing] amounts due based on the percent of Project completed at the
time of invoice . . . .”
With respect to change orders, paragraph D of the Addendum required
Visionscape to submit “written copies of Contractor’s cost or credit proposal for any and
all requested changes in the Work, whether requested by Client or required by any
3
authority having jurisdiction of the Project (a ‘Change Order’)” and provided that
“Contractor shall not be required to begin, nor shall Client be obligated to pay for, any
additional Work until the change in the Contract Price and/or Contract Time has been
agreed to, and the appropriate Change Order has been signed, by Client and Contractor.”
In addition to termination by mutual agreement of the parties in writing, paragraph
G of the Addendum granted the Waldens the right to “terminate this Agreement at any
time for any reason or for no reason whatsoever.” Upon termination, the Waldens were
required to pay Visionscape “for any unpaid cost of the Project due it under this
Agreement based upon the portion of the Project completed to the date of termination.”
The Installation Contract incorporated a Master Installation Worksheet, which
detailed the installation services to be performed by Visionscape and allocated portions of
the $400,000 fixed price to each specified task. The Tree Trimming Contract and
payments there under, as well as Visionscape’s February 2009 invoice and the $100,000
payment thereon, were incorporated into the Master Installation Worksheet and
Installation Contract.
4. Visionscape Requests an Additional Payment and the Waldens Terminate
the Installation Contract
Shortly after executing the Installation Contract, the Waldens became discontented
with Visionscape’s handling of the project. Among other things, the Waldens claimed
Visionscape had been dishonest about a change order submitted on the pool renovation
and also misrepresented the magnitude of its markup on outdoor furniture it proposed to
purchase for the project.
On April 7, 2009, Visionscape submitted another $100,000 invoice for services to
be performed under the Installation Contract. Unlike the February 2009 “progress
payment” request, the April invoice did not purport to itemize the specific services to be
performed, but instead requested a payment for “Draw on Contract” to be put toward the
general categories of further ground preparation, debris removal, grading, irrigation
installation, drainage installation and planting.
4
The Waldens claim the request for an additional $100,000 payment, coupled with
their concerns over the pool renovation change order and markups on outdoor furniture,
caused them to lose trust in Visionscape. On April 27, 2009, the Waldens terminated the
Installation Contract and requested that Visionscape account for its use of all funds paid.
5. Dispute Over Refund Due
On June 8, 2009, in response to the Waldens’ request for an accounting,
Visionscape provided a copy of the Master Installation Worksheet, with annotations
identifying charges it claimed for services and materials allegedly provided pursuant to
the Installation Contract. Visionscape’s accounting included charges for “Management”
work, “Administrative” work, additional tree trimming, and “Front Yard” work that had
not been specified in the Master Installation Worksheet or Installation Contract.
Visionscape claimed other charges for items in the Master Installation Worksheet, based
upon the percentage of work allegedly completed. The remainder of the charges related
to plants and other fixtures purportedly purchased for the property. The accounting
offered the Waldens a proposed refund of $12,902.30.
On August 14, 2009, the Waldens, through their attorney, sent a letter to Visionscape
responding to its accounting. The letter identified 19 categories of charges from
Visionscape’s accounting and contested nearly all the charges. The Waldens challenged
the charges for management, administrative and front yard work on the ground that none
of those charges had been contemplated or included in the Installation Contract. They
also challenged the charges for additional tree trimming on the ground that the work was
included in the Tree Trimming Contract, which had been fully paid. As for charge
categories that were part of the Master Installation Worksheet, the Waldens challenged
Visionscape’s estimates concerning the amount and value of the work performed and
materials provided. Additionally, the Waldens demanded a credit for a mature olive tree
that Visionscape had removed from the property and previously agreed to replace. In
total, the Waldens requested a refund of $98,984.77. At a minimum, the Waldens
demanded Visionscape immediately refund the $12,902.30 that it acknowledged in its
accounting.
5
On August 28, 2009, Visionscape responded to the Waldens’ letter and request for
refund. Visionscape largely rejected the Waldens’ contentions, responding with brief
notations on each of the 19 categories about why it claimed it was entitled to the charges
set forth in its original accounting. With its response, Visionscape enclosed a check for
the $12,902.30 refund, along with invoices totaling $7,667.71 for allegedly unpaid
balances due under the Design Services Contract.
6. The Waldens’ Complaint
On November 25, 2009, the Waldens filed a five-count complaint against
Visionscape for breach of contract, unfair business practices, fraud, common counts and
an accounting. With respect to the breach of contract and unfair business practices
claims, the complaint alleged the Installation Contract was “contrary to public policy,
void, and unenforceable” because the contract failed to include certain disclosures
concerning prohibited downpayments as required by Business and Professions Code
section 7159. The complaint also alleged Visionscape violated Business and Professions
Code section 7159.5 by requesting and accepting payments in excess of 10 percent of the
contract price for work that had not been completed and materials that had not been
purchased.1 As for the fraud claim, the complaint alleged Visionscape misrepresented the
magnitude of its markups to induce the Waldens to enter the Installment Contract.
1
As we discuss later in this opinion, Business and Professions Code section 7159
requires written disclosures to be included in home improvement contracts advising the
homeowner that the contractor may not charge a downpayment of more than $1,000 or
10 percent of the contract price, whichever is less. The statute also requires a disclosure
advising homeowners that the contractor may not accept a payment, other than the
permitted downpayment, for services that have not been performed or materials that have
not been delivered. (Bus. & Prof. Code, § 7159, subds. (d)(8) & (9).) Consistent with
these disclosures, Business and Professions Code section 7159.5 makes it illegal for a
contractor to request and collect payment for services that have not been performed or
materials that have not been delivered.
6
The complaint sought an accounting of all services and costs of materials provided
by Visionscape, and return of all improperly retained funds.
7. Order Severing Issues for Trial
On November 24, 2010, Visionscape filed a motion to sever the equitable
accounting claim to have it tried first by the court. The Waldens opposed the motion,
asserting that the “gist of the action” was a legal claim for money improperly obtained
under the allegedly void Installment Contract. Alternatively, the Waldens asserted that if
the accounting claim were severed for a bench trial, it should be tried together with the
unfair business practices claim. Visionscape agreed that the unfair business practices and
accounting claims should be tried together by the court.
The trial court granted Visionscape’s motion and ordered the accounting and
unfair business practices claims severed to be tried first by the court.
8. Bench Trial
The bench trial commenced on July 18, 2011. Mr. Flores, Visionscape’s
president, was the principal witness for both parties. His testimony largely focused on
the work Visionscape claimed it performed prior to the Waldens’ termination of the
Installation Contract and the process by which Visionscape estimated the value of its
work on the project in its June 8, 2009 accounting.
Mr. Flores conceded that most of the payments Visionscape requested and accepted from
the Waldens were for services that had not been performed and materials that had not
been delivered to the project site. With respect to the Tree Trimming Contract, Mr.
Flores acknowledged that Visionscape had required and accepted a downpayment of
$7,175 (50 percent of the contract price) before performing any work. Similarly, with
respect to the $20,000 deposit for tree tagging, Mr. Flores admitted that Visionscape
accepted this payment for materials that had not been purchased. Mr. Flores likewise
admitted that the $100,000 “progress payment” request was for work that was “going to
be done” but had not been performed.
7
The trial court strictly adhered to a two-day time limit for live testimony. At the
end of the second day, the court ordered the parties to file any additional evidence they
wished to submit through written declarations and exhibits, together with written closing
arguments and proposed statements of decision.
9. Closing Arguments
In their closing and rebuttal briefs, the Waldens argued the undisputed evidence
established Visionscape had violated Business and Professions Code sections 7159 and
7159.5 by failing to include mandatory disclosures regarding prohibited downpayments
and progress payments, while requesting and accepting illegal payments for work not yet
completed and materials not yet delivered. Additionally, the Waldens argued
Visionscape had no legal or equitable right to keep the illegally obtained funds because
(1) the funds had not been used for the purposes for which they were provided; (2) the
funds had been applied to charges for work the Waldens had never agreed to pay in a
written change order; and (3) the magnitude of the claimed charges was not supported by
Visionscape’s evidence. With respect to these latter contentions, the Waldens identified
23 categories of charges and credits to be resolved by the trial court in the requested
accounting.
Visionscape argued the Waldens were not entitled to relief based on the alleged
statutory violations because (1) Business and Professions Code sections 7159 and 7159.5
do not authorize civil penalties; and (2) Visionscape was permitted to charge a “progress
payment” under Business and Professions Code section 7159.5. Because the Waldens
had terminated the Installation Contract, Visionscape asserted resolution of the
accounting claim should be limited to determining the value of the services and materials
it had supplied, regardless of whether the funds had been used for the specific purposes
for which they were provided. In that regard, Visionscape maintained the 19 categories
identified in the Waldens’ April 2009 letter provided the proper framework for analyzing
the accounting claim. Visionscape asserted its evidence, in particular Mr. Flores’s trial
testimony and several photographs taken contemporaneously with Visionscape’s
completion of work, substantiated its claimed charges on all 19 categories. In contrast,
8
Visionscape argued the Waldens had failed to “sustain[ ] their burden of proving how or
why their claim for an additional refund is accurate or reliable.”
10. Statement of Decision
On November 16, 2011, the trial court issued its proposed statement of decision.
With respect to the asserted statutory violations and Visionscape’s right to compensation
under the Installation Contract, the court made the following findings: “Pursuant to
Business and Professions Code § 7159, progress payments are permitted, contrary to [the
Waldens’] written closing argument, provided that the amount of work or services to be
performed and materials and equipment to be supplied are delineated. The Court finds
that [Visionscape was] in compliance with this Code and find[s] no fault with
[Visionscape] for requesting or collecting the progress payments or ‘deposits,’ as the
parties referred to them.” The court found “the parties agreed to various installment
payments” and there was “nothing to show in the agreements that [the Waldens] were
required by the contract to pay for the services and materials as they were completed—or
‘pay as you go.’ ” The court also found that, “while the contract did call for change
orders and preapproved authorizations, the relationship throughout the term included any
number of additional requests by the [Waldens] to add to, adjust, or modify items
contemplated by the original agreement, and that both parties proceeded regularly
without the formality of preauthorizations and change order documents.” Hence, the
court determined that “[t]he main issue in this action is whether [Visionscape] earned the
monies paid by [the Waldens] for the landscaping services and materials prior to their
termination in April 2009.” The trial court’s proposed statement of decision stated no
other basis for concluding Visionscape was entitled to payment under the Installation
Contract or otherwise.
With respect to whether Visionscape earned the monies paid by the Waldens, the
trial court found that the “best way to assess whether work was done and its value, is to
try to examine the valuations of the work, services, materials and labor provided through
April 2009 as a whole, rather than to try to determine which efforts relate to which item
under the total fixed price of the contract . . . .” With the exception of a portion of
9
Visionscape’s management charges and the credit for replacement of the olive tree, the
trial court concluded that Visionscape’s figures were “reasonable and supported by the
testimony, evidence, and documents offered.” The court stated that it had “primarily
focused” on the correspondence and accountings the parties exchanged after termination
of the contract. The court also found the photographs submitted by Visionscape
constituted “the best ‘evidence’ of what was done and whether such work was in
compliance with the demands and expectations of both sides.” On the other hand, the
court stated it was “troubled by discrepancies in argument and positions taken by [the
Waldens] and actual testimony of [the Waldens’] witnesses.” The court, however, noted
“that the proposed valuations from both sides were not supported by any measure of
detailed invoices or declarations of value, and the limited number of invoices and/or
declarations of value were vigorously challenged by the other side.” Nevertheless, while
acknowledging that its recitation of the evidence was not intended to be “exhaustive,” the
court stated its review should be “sufficient to demonstrate that [the Waldens] have not
met their burden of proof.”
Based on the foregoing findings, the trial court’s proposed statement of decision
disposed of the complaint’s remaining causes of action as follows: “The Court, further
finding no breach or actionable conduct, determines that the remainder of Plaintiffs[’]
claims are rendered moot. In addition, the §17200 action requires an unlawful, unfair or
fraudulent business practice, which has not been supported by the evidence offered by the
Plaintiffs.”
On December 1, 2011, the Waldens filed objections to the trial court’s proposed
statement of decision. Among other things, the Waldens objected to the findings that
(1) Visionscape was in compliance with Business and Professions Code sections 7159
and 7159.5; (2) the Waldens had the burden of proof on the accounting claim; and (3) the
unfair business practices and other remaining causes of action were rendered moot
because the Waldens failed to establish any actionable or illegal conduct by Visionscape.
As to each finding, the Waldens requested that the court correct or clarify the legal and
factual basis for its determination in light of the undisputed evidence that Visionscape
10
had requested and accepted payments from the Waldens for services that had not been
performed and materials that had not been delivered.
On January 11, 2012, the trial court entered the final statement of decision without
substantive change.2 On January 13, 2012, judgment was entered. The Waldens timely
appealed.
DISCUSSION
1. Standard of Review
Upon the trial of a question of fact by the superior court, “[t]he court shall issue a
statement of decision explaining the factual and legal basis for its decision as to each of
the principal controverted issues at trial upon the request of any party appearing at the
trial.” (Code Civ. Proc., § 632.)
When a request for a statement of decision has been made, the scope of appellate
review is affected by the statement of decision provided by the trial judge. (See Wegner
et al., Cal. Practice Guide: Civil Trials and Evidence (The Rutter Group 2013) ¶¶ 16:197
to 16:216.5.) This principle derives from the statement of decision’s fundamental
purposes. “ ‘The code provision requiring written findings of fact is for the benefit of the
court and the parties. To the court it gives an opportunity to place upon [the] record, in
definite written form, its view of the facts and the law of the case, and to make the case
2
Effective January 3, 2012, the case was reassigned from Judge Jacqueline Connor,
who presided over the bench trial and issued the proposed statement of decision, to Judge
Gerald Rosenberg. On January 10, 2012, the Waldens filed an ex parte application for
instructions concerning the status of the statement of decision. The application explained
that objections had been filed to the proposed statement of decision, as directed by the
trial court, but the parties had not received notice from the court of any further action on
the statement of decision. Judge Rosenberg entered an order stating the court would
contact Judge Connor regarding the statement of decision. On January 11, 2012, Judge
Connor signed the statement of decision without substantive change. Judge Connor has
since retired from the superior court.
11
easily reviewable on appeal by exhibiting the exact grounds upon which judgment rests.
To the parties, it furnishes the means, in many instances, of having their cause reviewed
without great expense.’ ” (Whittington v. McKinney (1991) 234 Cal.App.3d 123,
126-127.) A proper statement of decision is thus essential to effective appellate review.
“Without a statement of decision, the judgment is effectively insulated from review by
the substantial evidence rule”; as we would have no means of ascertaining the trial
court’s reasoning or determining whether its findings on disputed factual issues support
the judgment as a matter of law. (Gordon v. Wolfe (1986) 179 Cal.App.3d 162, 168.)
“When a statement of decision does not resolve a controverted issue, or if the
statement is ambiguous and the record shows that the omission or ambiguity was brought
to the attention of the trial court . . . , it shall not be inferred on appeal . . . that the trial
court decided in favor of the prevailing party as to those facts or on that issue.” (Code
Civ. Proc., § 634.) Under this mandate, a proper objection to a proposed statement of
decision avoids the doctrine of implied findings, and we will not presume that the trial
court made a factual finding necessary to sustain the judgment unless the finding was
explicitly stated. (See Culbertson v. Cizek (1964) 225 Cal.App.2d 451, 465-466; see also
In re Marriage of Arceneaux (1990) 51 Cal.3d 1130, 1133-1134 [“if omissions or
ambiguities in the statement are timely brought to the trial court’s attention, the appellate
court will not imply findings in favor of the prevailing party”].)
Thus, “[w]ritten findings are required on all material issues raised by the pleadings
and evidence, unless they are waived, and if the trial court renders judgment without
making findings on all material issues, the case must be reversed on appeal. [Citations.]
Reversal is compelled if there was evidence introduced on such issues and this evidence
was sufficient to have sustained finding in favor of the party complaining. [Citations]
Findings are also necessary on equitable issues.” (Duff v. Duff (1967) 256 Cal.App.2d
781, 785; see also Macmorris Sales Corp. v. Kozak (1968) 263 Cal.App.2d 430, 440-442
[“The failure to make any finding on equitable issues when they are material is reversible
error.”].)
12
On the other hand, a party is not required to object to legal errors appearing on the
face of the statement of decision, as such errors are not waived. (United Services Auto.
Assn. v. Dalrymple (1991) 232 Cal.App.3d 182, 186.) Further, where a statement of
decision clearly expresses the legal and factual basis for the trial court’s resolution of
controverted issues, we will not imply findings that the trial court did not make. (See
Paterno v. State of California (2003) 113 Cal.App.4th 998, 1015 (Paterno) [“ ‘When the
record clearly demonstrates what the trial court did, we will not presume it did something
different’ ”].)
2. Law Governing Home Improvement Contracts
To put our review of the trial court’s statement of decision in context, we begin
with the law governing home improvement contracts. Business and Professions Code3
section 7159 “identifies the projects for which a home improvement contract is required,
outlines the contract requirements, and lists the items that shall be included in the
contract . . . .” A “home improvement contract” is “an agreement, whether oral or
written, or contained in one or more documents, between a contractor and an owner . . .
for the performance of a home improvement . . . if the aggregate contract price . . . ,
including all labor, services, and materials to be furnished by the contractor, exceeds five
hundred dollars ($500).” (§ 7159, subd. (b).)
A home improvement contract must be in writing, legible, printed in at least
10-point typeface (except where a larger typeface is specified), with bold headings, and
signed by the parties. (§ 7159(c)(1) & (2).) The licensed contractor must deliver a copy
of the home improvement contract to the owner of the property before work begins.
(§ 7159, subd. (c)(3)(A).) “[T]he policy of section 7159 is to encourage written contracts
3
All future statutory references are to the Business and Professions Code unless
otherwise specified.
13
for home improvements in order to protect unsophisticated consumers.” (Asdourian v.
Araj (1985) 38 Cal.3d 276, 292 (Asdourian).)
As relevant here, section 7159, subdivision (d) mandates, among other things, the
form and content of written notifications that must be included in a home improvement
contract if a downpayment or progress payments will be charged:
“(8) If a downpayment will be charged, the details of the
downpayment shall be expressed in substantially the following form,
and shall include the text of the notice as specified in subparagraph
(C):
(A) The heading: ‘Downpayment.’
(B) A space where the actual downpayment appears.
(C) The following statement in at least 12-point boldface
type:
‘THE DOWNPAYMENT MAY NOT EXCEED $1,000 OR
10 PERCENT OF THE CONTRACT PRICE, WHICHEVER
IS LESS.’
(9) If payments, other than the downpayment, are to be made before
the project is completed, the details of these payments, known as
progress payments, shall be expressed in substantially the following
form, and shall include the text of the statement as specified in
subparagraph (C):
(A) A schedule of progress payments shall be preceded by
the heading: “Schedule of Progress Payments.”
(B) Each progress payment shall be stated in dollars and
cents and specifically reference the amount of work or
services to be performed and materials and equipment to be
supplied.
14
(C) The section of the contract reserved for the progress
payments shall include the following statement in at least
12-point boldface type:
‘The schedule of progress payments must specifically
describe each phase of work, including the type and amount
of work or services scheduled to be supplied in each phase,
along with the amount of each proposed progress payment.
IT IS AGAINST THE LAW FOR A CONTRACTOR TO
COLLECT PAYMENT FOR WORK NOT YET
COMPLETED, OR FOR MATERIALS NOT YET
DELIVERED. HOWEVER, A CONTRACTOR MAY
REQUIRE A DOWNPAYMENT.’ ”
Consistent with the foregoing mandatory notices, section 7159.5 provides: “If a
downpayment will be charged, the downpayment may not exceed one thousand dollars
($1,000) or 10 percent of the contract amount, whichever is less” (§ 7159.5, subd. (a)(3))
and “[e]xcept for a downpayment, the contractor may neither request nor accept payment
that exceeds the value of the work performed or material delivered” (§ 7159.5, subd.
(a)(5)). Violation of these statutes by a licensed contractor is a misdemeanor and cause
for discipline by the Contractors’ State License Board. (§§ 7159.5, subd. (b), 7159, subd.
(a)(5).)
In Asdourian, supra, 38 Cal.3d 276, our Supreme Court considered whether a
contractor’s violation of section 7159 renders a home improvement contract void per se
and, thus, bars a contractor from receiving payment as a matter of law. There, a
contractor brought an action against property owners, who were real estate investors, to
recover compensation for work performed under two oral home improvement contracts
for sums exceeding $500. The Asdourian court concluded that, in the circumstances
presented by the case, the contracts could be enforced, notwithstanding section 7159’s
mandate that such contracts be in writing. In so holding, the court acknowledged the
general rule that “a contract made in violation of a regulatory statute is void,” but stressed
15
“ ‘the rule is not an inflexible one to be applied in its fullest rigor under any and all
circumstances.’ ” (Asdourian, at p. 291.) Rather, the court explained, “In compelling
cases, illegal contracts will be enforced in order to ‘avoid unjust enrichment to a
defendant and a disproportionately harsh penalty upon the plaintiff.’ [Citation.]
‘ “In each case, the extent of enforceability and the kind of remedy granted depend upon
a variety of factors, including the policy of the transgressed law, the kind of illegality and
the particular facts.” ’ ” (Id. at p. 292.)
Applying these factors to the oral contracts at issue, the Asdourian court
concluded they should be enforced. The court observed that “the policy of section 7159
is to encourage written contracts for home improvements in order to protect
unsophisticated consumers.” (Asdourian, supra, 38 Cal.3d at p. 292.) The record,
however, supported the conclusion that the defendant real estate investors were “not
members of the group primarily in need of the statute’s protection.” (Ibid.) In that
context, the court found that section 7159’s misdemeanor penalties were sufficient and
that it would “not defeat the statutory policy to allow plaintiff to recover for the
reasonable value of the work performed.” (Ibid.)
Conversely, the court found the “penalty which would result from the denial of
relief would be disproportionately harsh in relation to the gravity of the violations.”
(Asdourian, supra, 38 Cal.3d at p. 294.) In that regard, the court reasoned that “because
plaintiff and defendants were friends, who had had business dealings in the past, the
failure to comply with the strict statutory formalities is, perhaps, understandable.”
(Id. at 293.) It was undisputed that the plaintiff had fully performed according to the oral
agreements, and the defendants accepted the benefits of the oral agreements,
notwithstanding the lack of a written contract. Under those circumstances, the court
concluded that were defendants “allowed to retain the value of the benefits bestowed by
plaintiff without compensating him, they [would] be unjustly enriched.” (Id. at p. 293.)
Thus, the court affirmed the judgment in favor of the plaintiff for the reasonable value of
the work performed under the oral home improvement contracts.
16
With these authorities in mind, we turn to the legal and factual findings set forth in
the trial court’s statement of decision.
3. The Finding that Visionscape Complied with the Governing Statutes Is
Contrary to the Undisputed Evidence
The trial court concluded Visionscape should retain the funds paid by the Waldens
pursuant to the Installment Contract based solely on the following legal and factual
findings in its statement of decision: “Pursuant to Business and Professions Code § 7159,
progress payments are permitted . . . provided that the amount of work or services to be
performed and materials and equipment to be supplied are delineated. The Court finds
that [Visionscape was] in compliance with this Code and find[s] no fault with
[Visionscape] for requesting or collecting the progress payments or ‘deposits,’ as the
parties referred to them.” (Italics added.) As we shall explain, the trial court’s legal
conclusion regarding the permissibility of progress payments under section 7159 is
incomplete, and its finding that Visionscape complied with the governing statutes is
contrary to the undisputed evidence. Because the trial court’s statement of decision
provided no other legal or factual basis for its conclusion that Visionscape was entitled to
payment under the Installment Contract or otherwise, the judgment in favor of
Visionscape must be reversed.
As discussed, section 7159 mandates the form and content of certain notifications
regarding downpayments and progress payments that must be included in a home
improvement contract. Specifically, section 7159, subdivision (d) requires notifications,
printed in 12-point boldfaced type, stating that a “DOWNPAYMENT MAY NOT
EXCEED $1,000 OR 10 PERCENT OF THE CONTRACT PRICE, WHICHEVER IS
LESS” and that “IT IS AGAINST THE LAW FOR A CONTRACTOR TO COLLECT
PAYMENT FOR WORK NOT YET COMPLETED, OR FOR MATERIALS NOT YET
DELIVERED.” It is undisputed that the Installment Contract contained neither of these
statutorily mandated notifications. This fact alone, contrary to the trial court’s stated
findings, establishes that Visionscape failed to comply with section 7159, potentially
17
barring it from collecting payment pursuant to the Installment Contract. (See Asdourian,
supra, 38 Cal.3d at p. 291.)
Furthermore, the omission of these mandatory notifications arguably was not a
mere technical violation of the governing statutes. Importantly, Visionscape not only
omitted the requisite notifications, but it also arguably undermined the purpose of the
notification requirement by charging a purported “progress payment” for work that had
not been performed and materials that had not been delivered.4 Contrary to the trial
court’s incomplete legal conclusion, sections 7159 and 7159.5 require more than a
request for progress payment that specifically references the work to be performed and
materials to be supplied—these statutes also require the contractor to complete the work
and supply the materials before accepting the progress payment. (§§ 7159,
subd. (d)(9)(C), 7159.5, subd. (a)(5).) At trial, Mr. Flores admitted that Visionscape
requested and accepted the Waldens’ $100,000 payment for work that was “going to be
done” but had not been performed. Had Visionscape provided the statutorily mandated
notifications, the Waldens would have been advised that they were not required to make
this payment and that it was illegal for Visionscape to accept it.
4
Visionscape contends the assertion that it violated section 7159 by failing to
include the mandatory notification regarding a $1,000 limit on downpayments is
“disingenuous,” because its initial draft of the Installment Contract contained a provision
for a $1,000 downpayment, which the Waldens requested be removed. There are two
problems with this contention. First, the subject provision in the initial draft agreement
stated only “A deposit in the amount of $1000.00 is due upon execution of the
Agreement”—it did not provide the mandatory notification, in the form required by
section 7159, that “THE DOWNPAYMENT MAY NOT EXCEED $1,000 OR 10
PERCENT OF THE CONTRACT PRICE, WHICHEVER IS LESS.” (§ 7159, subd.
(d)(8)(C).) Second, the record shows the Waldens asked to have the provision removed
because they had already paid a $100,000 deposit in the form of the February 2009
“progress payment.” Had any draft of Visionscape’s Installment Contract contained the
statutorily mandated notification, it is reasonably likely that the Waldens would not have
paid $100,000 for work that had yet to be performed.
18
Without conceding the trial court erred, Visionscape argues we must presume the
judgment is correct and affirm “if it was a right ruling, even if for the wrong reason.”
The tenor of this argument is that a violation of section 7159 does not necessarily void
the Installment Contract under Asdourian, and substantial evidence exists for the
predicate findings that the Waldens are sophisticated consumers who would be unjustly
enriched if Visionscape were required to refund the illicit downpayments. The argument
misconstrues the applicable standard of review.
As we explained, when a statement of decision unambiguously expresses the legal and
factual basis for the trial court’s resolution of controverted issues, we do not imply
findings that the trial court did not make. Rather, we review the trial court’s express
findings, and determine whether those findings are supported by substantial evidence and
sufficient to sustain the judgment as a matter of law. The presumption of correctness
does not apply in this context. On the contrary, “ ‘[w]hen the record clearly demonstrates
what the trial court did, we will not presume it did something different.’ ” (Paterno,
supra, 113 Cal.App.4th at p. 1015.)
The statement of decision unambiguously sets forth the legal and factual basis for
the trial court’s determination that Visionscape was entitled to retain the Waldens’
payments for work performed under the Installment Contract. The court found that
Visionscape was “in compliance” with the governing statutes and that its undisputed
request and acceptance of payments for work that had not been performed did not impair
its claim to payment for the reasonable value of the services ultimately rendered. The
trial court did not find the Waldens were sophisticated consumers outside the class of
individuals in need of the statutes’ protections; it did not find that Visionscape’s
violations were “understandable” due to prior dealings with the Waldens; and it did not
find that the Waldens had willingly accepted the work performed by Visionscape such
that they would be unjustly enriched were they permitted to deny Visionscape
compensation due to the statutory violations. (Cf. Asdourian, supra, 38 Cal.3d at
pp. 291-294.) As the legal and factual basis for the trial court’s conclusion is clearly set
19
forth in its statement of decision, we will not imply findings the court did not make.5
(Paterno, supra, 113 Cal.App.4th at p. 1015.)
In deciding Visionscape was entitled to retain funds paid by the Waldens pursuant
to the Installment Contract, the trial court found only that Visionscape had complied with
sections 7159 and 7159.5. As we have explained, that finding is contrary to the
undisputed evidence and cannot sustain the judgment as a matter of law. The judgment is
reversed and the case remanded for a new trial.6
5
Code of Civil Procedure section 634 also prohibits this court from inferring
findings in favor of the prevailing party where “a statement of decision does not resolve a
controverted issue, or if the statement is ambiguous and the record shows that the
omission or ambiguity was brought to the attention of the trial court . . . .” The Waldens
specifically objected to the proposed finding, and requested that the trial court “correct or
clarify the ambiguities in the statement of decision to explain the factual and legal basis
for its decision that it was not against the law for [Visionscape] to collect payment for
work not yet completed, or for materials not yet delivered in excess of $1,000 and the
factual and legal basis for its decision that ‘Defendants were in compliance with this
Code.’ ” The Waldens’ objection gave the trial court an opportunity to correct its
statement of decision and make findings to satisfy the factors identified by the Supreme
Court in Asdourian. The trial court’s final statement of decision made no such findings,
and we are prohibited from inferring the findings on appeal.
6
In most circumstances in which a defective statement of decision requires reversal,
the matter may be remanded to the trial judge who originally presided over the trial to
make the necessary findings. However, if the trial judge has become incapacitated or, as
in this case, has retired from the bench, no other judge can perform the task and the
matter must be retried. (See Raville v. Singh (1994) 25 Cal.App.4th 1127, 1130-1133;
Karlsen v. Superior Court (2006) 139 Cal.App.4th 1526, 1531.)
20
4. Visionscape Bears the Burden of Proving It Is Entitled to Retain the Funds
Paid by the Waldens
In an action for money had and received on an accounting, the plaintiff seeking the
return of funds bears the initial burden of proving the amount of money allegedly
received by the defendant. (Kennard v. Glick (1960) 183 Cal.App.2d 246, 251.) Once
the plaintiff has made this showing, the burden shifts to the defendant to prove it returned
the money to the plaintiff or otherwise properly disposed of the funds. (Ibid.)
Here, the Waldens proved, and Visionscape admitted, that they paid a total of
$134,350 to Visionscape for tree trimming services, tree tagging, and as a “progress
payment” under the Installation Contract. The burden thus shifted to Visionscape to
prove the proper disposition of these funds. The trial court erred in concluding the
Waldens had the burden of proving Visionscape was not entitled to the funds it refused to
return.7
Visionscape does not deny that it had the burden of establishing its right to retain
the funds paid by the Waldens. Instead, it argues the trial court’s reference to the
Waldens’ burden of proof was not prejudicial error, because “the record reflects that the
final judgment was based on a review of [Visionscape’s] trial presentation and
substantially supported by the evidence.”
7
The trial court’s misallocation of the burden of proof likely stems from the
anomaly in this case that the Waldens were forced to sue Visionscape for the return of
funds that Visionscape illegally requested and accepted. (See § 7159.5, subd. (a)(5).)
Had section 7159.5’s mandate been followed, no payment would have been made before
work was completed, and the Waldens would have had the opportunity to review and
accept Visionscape’s work before making payment. If the Waldens refused to pay for
completed work, Visionscape would have had the constitutionally protected right, in
addition to all contractual and equitable rights, to obtain a mechanics lien to secure
payment. (See Cal. Const., art. XIV, § 3; Civ. Code, §§ 8400 et seq.) This framework,
however, requires Visionscape to prove it is entitled to payment for work performed and
materials delivered—it does not require the Waldens to prove the negative.
21
Were the question before us merely whether substantial evidence supports the trial
court’s determination concerning the reasonable value of the services and materials
provided by Visionscape, we might be inclined to consider Visionscape’s contention.
However, as we explained in the preceding section, due to Visionscape’s undisputed
violations of sections 7159 and 7159.5, its burden of proving an equitable right to retain
the funds requires more than just proof of the services and materials provided. Because
courts normally “will not ‘ “lend their aid to the enforcement of an illegal agreement or
one against public policy,” ’ ” Visionscape must establish that permitting it to retain the
funds, notwithstanding its statutory violations, is necessary to avoid unjust enrichment.
(Asdourian, supra, 38 Cal.3d at p. 291; see Arya Group, Inc. v. Cher (2000)
77 Cal.App.4th 610, 618, fn. 4 (Arya Group) [holding, under Asdourian, “contracts made
in violation of the statute will not be enforced where a compelling case is not made” and
“even where enforcement is warranted, a contractor will be permitted to recover for the
reasonable value of the work performed only to the extent that the owner would be
unjustly enriched”].)
On retrial, Visionscape bears the burden of proving both a “compelling case” for
enforcement of the Installment Contract, notwithstanding its statutory violations, and the
extent to which the Waldens would be unjustly enriched if it is not permitted to recover
for the reasonable value of the work performed. (Asdourian, supra, 38 Cal.3d at p. 292;
Arya Group, supra, 77 Cal.App.4th at p. 618, fn. 4.)
5. The Trial Court’s Discovery Ruling Was Not an Abuse of Discretion
The Waldens moved to compel Visionscape to produce employment records
substantiating the cost Visionscape incurred to pay its employees for their work on the
project. The trial court granted the motion and ordered Visionscape to provide a
declaration, signed under penalty of perjury by Mr. Flores, disclosing the rates of pay for
Visionscape’s employees who worked on the Walden project. The Waldens contend the
trial court abused its discretion by failing to order Visionscape to produce supporting
payroll records. We disagree.
22
“We review the trial court’s discovery order under the abuse of discretion
standard. [Citations.] Accordingly, we may not substitute our view for that of the trial
court unless there is no legal justification for the court’s order.” (Life Technologies Corp.
v. Superior Court (2011) 197 Cal.App.4th 640, 649.)
At the motion to compel hearing, Visionscape’s counsel represented that the
payroll records would not be the best evidence of the work actually performed on the
Walden project, because those records included wages for all ongoing projects during the
pay period—not just the Walden project. Based on this representation, the trial court was
justified in limiting the discovery order to a declaration under penalty of perjury
disclosing the wages paid on only the Walden project. On retrial, the Waldens can
challenge the credibility and weight of this evidence with respect to Visionscape’s burden
of proof. We find no abuse of discretion.
DISPOSITION
The judgment is reversed. The Waldens are entitled to their costs on appeal.
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
KITCHING, J.
We concur:
KLEIN, P. J.
ALDRICH, J.
23
Was bedeutet dieser Text für Ihre Situation?
Kostenlose und unverbindliche Beratung
Schildern Sie uns Ihre Situation. Unser Team meldet sich per E-Mail bei Ihnen für Ihre Beratung.
Setzen Sie Ihre Recherche in ChatGPT oder Claude fort
Verbinden Sie Omnilex, um den Rechtskorpus über Ihren KI-Assistenten zu durchsuchen.