CourtListener 10622177•Kitchen Gallery v. AmGUARD Insurance Co. CA2/4
Kitchen Gallery v. AmGUARD Insurance Co. CA2/4
CourtListener 10622177Calctapp02.07.2025
Gesamter Gesetzestext
Filed 7/2/25 Kitchen Gallery v. AmGUARD Insurance Co. CA2/4
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions
not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion
has not been certified for publication or ordered published for purposes of rule 8.1115.
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
SECOND APPELLATE DISTRICT
DIVISION FOUR
KITCHEN GALLERY, INC. et al., B337755
Plaintiffs and Appellants,
v. (Los Angeles County
Super. Ct. No.20NWCV00699)
AMGUARD INSURANCE
COMPANY,
Defendant and Respondent.
APPEAL from a judgment of the Superior Court of Los Angeles
County, Roger T. Ito, Judge. Affirmed.
Vivoli Saccuzzo and Jason P. Saccuzzo for Plaintiffs and
Appellants.
Cozen O’Connor, Michael R. Davisson for Defendant and
Respondent.
Developer Villa Madrid, LLC and general contractor
Kitchen Gallery, Inc. (collectively appellants) sued subcontractor
East & West Plumbing, Inc. (E&W), alleging that its defective
work caused damage and delay to their apartment building
project. After the trial court imposed terminating sanctions
against E&W, appellants obtained a judgment totaling over $1.1
million.
Appellants subsequently brought the instant coverage
action against respondent AmGUARD Insurance Co., which
issued a businessowner’s insurance policy to E&W. Respondent,
which declined to defend E&W in the underlying litigation,
moved for summary judgment on various grounds, including two
“faulty workmanship” exclusions in the insurance policy. The
trial court denied the summary judgment motion.
Shortly before trial, respondent moved to bifurcate trial of
legal coverage issues from factual damages issues. A different
trial court granted the motion over appellants’ objections. After
briefing and a hearing, the trial court concluded that the faulty
workmanship exclusions fully precluded coverage as a matter of
law, because it was undisputed that E&W damaged the work of
other subcontractors while performing its own defective work.
The court accordingly entered judgment for respondent without
proceeding to a jury trial phase.
Appellants now contend the court committed structural
error by denying them their right to a jury trial, treating the
motion to bifurcate as a dispositive motion without providing
them proper notice or due process, and/or entering judgment
without considering the evidence submitted at summary
judgment. They alternatively contend that the trial court
2
construed the faulty workmanship exclusions too narrowly and
improperly denied coverage because the damage at issue was
outside E&W’s scope of work. We affirm.
BACKGROUND
I. Construction Project and Damage
This case arises from appellant Villa Madrid’s development
of a 22-unit apartment building in Lakewood. The project had a
target completion date of July 2017, to allow Villa Madrid to take
advantage of the summer rental market and refinance its
construction loan at a lower rate available for completed projects.
In May 2016, Villa Madrid hired appellant Kitchen Gallery
as the general contractor on the project. Kitchen Gallery in turn
hired subcontractor E&W to perform “rough plumbing” work
specified in the plans and requirements of the project. E&W
began work in July 2016 and was contracted to complete it by
December 31, 2016, or face a $200 penalty for each day it was
late.
In November 2016, Kitchen Gallery notified E&W that it
had installed the wrong type of drain piping and demanded E&W
replace it by December 12, 2016. E&W corrected the error to
Kitchen Gallery’s satisfaction in December 2016. Also in
December 2016, E&W obtained a businessowner’s insurance
policy from respondent, effective December 16, 2016 to December
16, 2017. The policy, which we discuss in more detail below,
covered “property damage” caused by an “occurrence.” However,
exclusion k(5) barred coverage of property damage to “[t]hat
particular part of real property on which you or any contractor or
subcontractor working directly or indirectly on your behalf is
performing operations, if the ‘property damage’ arises out of those
operations.” Exclusion k(6) barred coverage of property damage
3
to “[t]hat particular part of any property that must be restored,
repaired or replaced because ‘your work’ was incorrectly
performed on it.”
E&W completed most of its work by April 2017. A city
building inspection subsequently revealed that E&W had “double
stacked” the vent pipes on the drain lines, preventing the proper
ventilation of sewer gases. The inspector issued a compliance
notice, requiring correction of the issue before the rough
plumbing work could be approved.
To address the compliance notice, E&W added additional
vents “in a haphazard way,” cutting into the structural walls of
the project and cutting out essential framing and firewalls.
According to a declaration from a managing member of Villa
Madrid who was involved in the project, Kitchen Gallery
subsequently had to repair the damage to the framing, as well as
“insulation damaged by E&W, stucco work damaged as a result of
E&W, [and] water damage caused when E&W vented water pipes
in the partially completed Project.” Kitchen Gallery also had to
perform “electrical work where wires had to be pulled to
accommodate the vents E&W failed to install originally, further
rough plumbing work that E&W was unable or unwilling to
complete,” and “considerable trash removal due to E&W’s repair
work, and additional cleaning.” Additionally, Kitchen Gallery
had to hire an engineer to ensure the framing of the project was
structurally sound. This work cost Kitchen Gallery
approximately $93,000.
Kitchen Gallery also paid E&W $218,408.10 for the work it
performed. Kitchen Gallery later learned that E&W was not
properly licensed and was a suspended California corporation.
4
Due to the delays on the project, Villa Madrid was unable
to refinance its loan and incurred over $70,000 in additional
interest carry charges. Villa Madrid also was unable to rent the
apartment units as planned in summer 2017.
II. Underlying Litigation Against E&W
Appellants jointly filed a complaint against E&W in June
2018. Both appellants asserted causes of action for negligence,
negligence per se, fraud, breach of the implied warranties of
quality and fitness and workmanlike construction, and claim on
contractor’s bond. Kitchen Gallery additionally asserted causes
of action for breach of contract and disgorgement of monies paid.
Appellants obtained entry of default against E&W on August 31,
2018.
Appellants subsequently named E&W’s principal,
Rene Abelardo Reyes Cardoza (Reyes), as an additional
defendant. Reyes timely answered the complaint, and the court
granted E&W relief from default in January 2019. In March
2019, Kitchen Gallery notified respondent of the pending action
and formally tendered its claims against E&W as an additional
insured on the policy. Respondent declined to defend or
indemnify E&W, asserting that the claims were not covered
under the policy.
Shortly thereafter, E&W and Reyes’s counsel withdrew,
and E&W and Reyes ceased responding to appellants’ discovery
requests. The trial court granted several of appellants’ discovery
motions, including motions for sanctions, and deemed admitted
their requests for admission. E&W accordingly admitted that it
was “negligent in the performance of [its] work on the [project],”
and that its work “was not performed in a workman like
manner.” It also admitted that it breached its subcontract with
5
Kitchen Gallery, defrauded Kitchen Gallery, and damaged both
appellants as alleged in the complaint.
Appellants subsequently moved for and obtained
terminating sanctions, resulting in a September 2020 default
judgment of $430,269.82 for Kitchen Gallery and $714,312.73 for
Villa Madrid.
III. Instant Coverage Litigation
In December 2020, appellants initiated the instant
coverage action. In the operative first amended complaint filed in
April 2021, appellants asserted causes of action for breach of
statutory duty under Insurance Code section 11580, subdivision
(b)(2)1 against respondent, another insurance company no longer
involved in the litigation, and 50 Doe defendants.
A. Summary Judgment Proceedings
Respondent moved for summary judgment, arguing that
the policy did not cover the claims for various reasons. As most
relevant here, it argued that even if the policy covered the
damages, which it disputed, faulty workmanship exclusions k(5)
and k(6) precluded coverage because “the items of damage that
gave rise to the lawsuit against E&W were items of damage to
property on which E&W was performing its operations” and
“related directly to restoring or repairing property because
E&W’s work was performed incorrectly.” Respondent cited
several cases in support of this argument, including Letgolts v.
1 Insurance Code section 11580, subdivision (b)(2) states that
insurance policies must contain a “provision that whenever
judgment is secured against the insured…in an action based
upon bodily injury, death, or property damage, then an action
may be brought against the insurer on the policy and subject to
its terms and limitations, by such judgment creditor to recover on
the judgment.”
6
David H. Pierce & Associates, PC (2021) 71 Cal.App.5th 272, 285
(Letgolts), which held that exclusion k(6) excluded claims of
property damage inflicted by a contractor who “wrecked” portions
of the property beyond the scope of his contract.
Appellants opposed the motion for summary judgment. As
most relevant here, they argued that the faulty workmanship
exclusions should be narrowly construed to reach only the
“particular part” of the project on which E&W worked—the
plumbing—and not the other, unrelated parts of the project that
E&W damaged. Appellants argued that Letgolts was
distinguishable because it involved a general contractor whose
work arguably included the entire project. It urged the court to
instead follow other case law, including Global Modular, Inc. v.
Kadena Pacific, Inc. (2017) 15 Cal.App.5th 127, 137-138, 141
(Global Modular), which held that exclusion k(5) applied only to
property damage to the particular part of a project on which the
insured was actively performing construction activities and
exclusion k(6) applied “only to the particular component of the
insured’s work that was incorrectly performed and not to the
insured’s entire project.”
The trial court, Judge Tsao, denied the motion after
hearing in May 2023. The court found that there were disputed
issues of material fact as to whether the damages were covered
“occurrences” within the meaning of the policy and as to when
Kitchen Gallery knew that “property damage” occurred. The
court did not state that there were disputed issues of material
fact regarding the faulty workmanship. Instead, it concluded that
Global Modular, which involved a subcontractor and narrowly
construed the “particular part” language of the exclusions to
apply to “very specific parts of the subcontractor’s work,” was
7
more pertinent and persuasive than Letgolts, which involved a
general contractor. The court stated that the faulty
workmanship exclusions “may exclude E&W/Reyes’s work that
was incorrectly performed, but does not exclude damages to other
parts of the Project,” including all the repair and replacement
damages articulated in the declaration in the underlying
litigation.
Jury trial was set for November 2, 2023.
B. Bifurcation Proceedings
1. Motion and Opposition
On October 18, 2023, the day before the parties’ final status
conference, respondent filed a motion pursuant to Code of Civil
Procedure sections 592 and 598 to bifurcate trial of legal coverage
issues from factual damages issues.
Appellants opposed the motion. They argued that it was
untimely and that bifurcation “would result in two trials
involving the same witnesses and evidence.” Appellants also
argued that the motion was “in reality, a motion to deprive
Plaintiffs of their constitutional right to a jury trial on their
entitlement to directly enforce the Judgment against Amguard as
a third-party beneficiary under Ins. Code section 11580.”
2. Initial Hearing
On November 2, 2023, while the motion to bifurcate was
pending, the matter was assigned to a different trial court, Judge
Ito, for trial.
The trial court continued the matter to November 7, 2023
to hear the motion to bifurcate. The court indicated at the outset
of the hearing that it was inclined to “bifurcate the legal issues
involving . . . the insurance contract itself.” It recognized,
however, that there were “some factual disputes that are part of
8
that contract that may be necessary with a jury,” namely whether
the problems were known before the insurance policy took effect
and “the amounts of damages that are appropriate given the
circumstances.” The court told the parties’ counsel before they
argued that “I don’t want to know” what those damages were,
“because I believe that that is a factual determination best left to
a jury, but I want to know generically what category of damages
fall [sic] within the purview of this particular insurance contract.”
Counsel for appellants expressed concern that “we are
walking on thin ice” in terms of “getting into factual issues that
are frankly for the jury to decide.” He contended that
determining coverage was a factual question, and pointed to
appellants’ underlying judgment that E&W was negligent.
Appellants’ counsel also contended that the applicability of the
faulty workmanship exclusions was a factual question, because
E&W’s “particular part was the plumbing system.” He
nevertheless suggested “that we simply submit some briefs to the
court on those issues, as the court directs us to, and then have
the court issue a ruling saying this part is not going to be
covered; you don’t talk about it; this is a factual issue; this is how
the court construes this provision, and rather than me putting all
the same witnesses on and sort of running through all this stuff.”
The court agreed there were some factual issues, but
stated, “whether or not it’s either an occurrence or not
occurrence, no, these are legal determinations that I can make.”
It added that it was “more than happy to entertain briefing and
argument from both sides on specifically the issue or the
interpretation of the insurance policy contract,” particularly
things like “this is an occurrence, this isn’t an occurrence; this is
an accident, this isn’t an accident.”
9
After respondent’s counsel argued, the court reiterated that
it did not “want to be getting facts and dates and so forth” in the
briefing. It added, “I don’t want to run afoul of counsel’s very,
very correct argument that this is a right to a jury trial in terms
of these factual determinations. So I really, really want to be
making only the legal call on this case.”
Appellants’ counsel proposed that the court hold a
“comeback hearing” to hear additional argument and rule on
what would be tried to the jury, and then give the parties
additional time to prepare for trial in light of the ruling. The
court agreed and set a simultaneous briefing schedule and
December 1, 2023 hearing. The parties stipulated to admission of
the underlying complaint, the insurance policy, and the judgment
against E&W.
3. Substantive Briefing
In their brief, appellants included a “brief summary of
factual background” in which they summarized the project,
E&W’s work, the damages they suffered, and the underlying
litigation. Appellants did not provide citations for any of these
facts or indicate that they were disputed. Appellants devoted five
pages of their brief to the faulty workmanship exclusions, which
they argued should be narrowly construed. They urged the court
to follow Global Modular, which they characterized as “directly
on point” and quoted and discussed at length. Appellants argued
that Letgolts was distinguishable, because it was a legal
malpractice case that involved a “specialized policy” and a
general rather than subcontractor. Appellants also discussed
other case law relevant to the faulty workmanship exclusions and
urged the court to “reject Amguard’s efforts to rely on the ‘faulty
work’ exclusions to the Policy as narrowing or eliminating
10
coverage, just as the Court previously did when denying
Amguard’s motion for summary judgment.”
Respondent likewise devoted five pages of its brief to the
faulty workmanship exclusions, contending that their plain
language precluded coverage of the damages in this case.
Respondent asserted that the exclusions were a standard
component of general liability policies and were intended to
incentivize contractors to exercise care in their work while
protecting against “less frequent but potentially large claims for
damage to the property of others.” Respondent argued that “the
damages to the work of other contractors – i.e., to the framing
and drywall – was done by E&W when repairing its installation
of the venting system, and thus occurred during E&W’s
operations” and therefore came within the scope of the exclusions.
Respondent urged the court to follow Letgolts, which also
emphasized moral hazard concerns, and argued that Global
Modular was distinguishable because there was a factual issue
regarding the quality of the subcontractor’s work.
4. Hearing and Ruling
On December 1, 2023, the parties appeared for a hearing
or, as the court stated at the outset, a “court trial, specifically on
the issue . . . of the applicability and coverage of AmGuard’s
policy with E&W, . . . the subcontractor, as part of this case.” The
court informed the parties that it had read and considered their
briefing, as well as the case law cited therein, including Global
Modular and Letgolts.
Observing that “both sides argued Global Modular in their
briefs and previously as part of the case,” the court opined that
Global Modular involved “a genuine factual dispute as to
whether or not it was defective work.” The court found that
11
distinguishable from the instant case, in which “there is no
factual dispute that E&W’s work was defective, negligent, not up
to code, and the genesis of all of this damage.” The court
tentatively concluded that “all of these damages are as a result of
E&W’s shoddy, negligent, defective work. And because of that,
all of the subsequent consequential damages are not within the
purview of this policy.” The court then invited argument from
counsel.
Starting from the premise that “there certainly was
property damage that would be covered under the policy,”
appellants’ counsel argued that respondent was attempting to
construe the faulty workmanship exclusions so broadly as to
render the policy illusory. Appellants’ counsel argued that
exclusions must be construed narrowly, and, when so construed,
the “particular part” language in the faulty workmanship
exclusions referred to the rough plumbing system only. “[T]heir
particular part, East & West, was the rough plumbing system.
That was it. Wasn’t the framing walls. Wasn’t the insulation.
Wasn’t the electrical. Wasn’t the roofing. It wasn’t any of those
things, period.” Counsel asserted that, as in Global Modular, “we
have a subcontractor whose work is more limited,” and “anything
else that was outside” the limited contractual scope of E&W’s
work, i.e., anything aside from the plumbing system itself, “was
outside of that exclusion.”
Appellants’ counsel further argued that “this would be an
issue that would have to get resolved by a jury,” and the court
cannot “necessarily adjudicate those facts . . . as far as what the
judgment was, what the basis of the underlying judgment was,
the amount of damages of the judgment, and those type of
issues.” He also asserted that the court was “making this
12
decision in somewhat of a vacuum,” since it had not heard
testimony or other evidence of the damages. He did not dispute
that E&W’s work was defective.
Respondent’s counsel expressly confirmed the court’s
understanding that “we all agree it’s defective work.” He
continued, arguing, “and we all agree it’s the work product of
E&W, starting with the pipe and then with the venting. And
when they went to fix the venting, your honor, they did some
other damage. But they were in the course of their work at that
time. And that is undisputed. And that’s why . . . the exclusion
swallows up all the damages in this case.”
The court remarked that although it was “extraordinarily
sympathetic” to appellants’ position, “all of these damages,
everything. . . . They all spin off because E&W did such terrible
work.” The court further remarked that interpreting the
exclusions as appellants argued “would defy logic” and invite
moral hazard, because a subcontractor “could do whatever type of
terrible or inadequate work that they want, and they’re really not
going to be on the hook for anything.” The court reiterated that
there was a genuine dispute as to whether the subcontractor’s
work was defective in Global Modular, whereas here, “there
appears to be no dispute. As a matter of fact, your judgment was
articulating that, in fact, this was truly defective work by E&W.”
Appellants’ counsel acknowledged the court’s concerns
about moral hazard, but asserted moral hazard occurred only
“when the insurance company comes in and fixes the insured’s
actual work. We’re not talking about the insured’s actual work.
We’re talking about damage to other parts of the project. It’s
different. And all the cases make that distinction.” He argued
that the cases “make clear if there’s damage to other parts of the
13
project, damage to other subcontractors’ work, that is not part of
the moral hazard. That’s the whole purpose of these insuring
provisions here.” Counsel expressed concern that the court was
“swallowing all the coverage with its read of this faulty work
exclusion, which is very specific as to a particular part,” here, the
plumbing only. He explained, “we’re not saying ‘fix the
plumbing.’ We’re saying, ‘deal with the property damage’” to all
the other parts of the project, including the delay damages.
The court found that the faulty workmanship exclusions
“exclude or prevent the carrier, AmGuard . . . from any exposure
as a result of the shoddy, inadequate, and defective work of E&W,
their insured.” It directed respondent’s counsel to prepare a
statement of decision. The proposed statement of decision
concluded that the faulty workmanship exclusions were “clear
and unambiguous” and were not designed “to provide contractors
and developers with coverage against claims that their work is
inferior or defective.” It found “Letgolts to be persuasive,”
distinguished Global Modular, and ultimately concluded, “the
Policy excludes any damages arising from E&W’s operations if
the property damage arose from those operations, or if the
property had to be restored, repaired or replaced because E&W’s
work was incorrectly performed. In this case, it is undisputed
that the property damage arose from E&W’s operations, and that
the property damage occurred while repairs to that work was
being made. As a result, Exclusion k of the Policy precludes any
coverage for the property damage caused by E&W to the
Property, and there is no coverage for the judgments obtained by
Plaintiffs in the Underlying Action.”
After the trial court adopted the proposed statement of
decision without modification, appellants objected “to the
14
proposed findings of fact on the grounds that no evidence was
admitted (or offered) at the hearing.” They asserted that only
limited procedural facts were “considered or stipulated to,”
including the existence and resolution of appellants’ underlying
action against E&W and Reyes, the existence of the policy, and
the existence of the instant action. Appellants further objected
that “it was not undisputed that E&W damaged other portions of
the project while repairing defective work” and “it was not
undisputed that the property damage arose from E&W/Reyes’
operations, or that the property damage occurred while repairs to
work were being made.”
The trial court subsequently issued a minute order stating
that it had read and considered the objections but adopted the
proposed statement of decision and proposed judgment. It
entered judgment for respondent, and appellants timely
appealed. We accepted for filing an amicus curiae brief
submitted by AmTrust Financial Services, Inc., on behalf of
respondent.
DISCUSSION
Appellants contend that the judgment must be reversed on
both procedural and substantive grounds. Procedurally, they
contend the trial court committed structural error by depriving
them of a jury trial and denying them due process.
Substantively, they contend that the trial court erroneously
construed the policy. We disagree on both grounds.
I. Structural Error
Article VI, section 13 of the California constitution
“generally ‘prohibits a reviewing court from setting aside error
unless it finds the error prejudicial,’” even when the alleged error
is constitutional in nature. (F.P. v. Monier (2017) 3 Cal.5th 1099,
15
1108.) However, “an error is reversible per se when it constitutes
‘a “‘structural [defect] in the . . . trial mechanism’” that defies
evaluation for harmlessness.’” (Ibid.) “Such errors affect ‘the
framework within which the trial proceeds, rather than simply
an error in the trial process itself,’ thus affecting the entire
conduct of the trial from beginning to end.” (Severson & Werson,
P.C. v. Sepehry-Fard (2019) 37 Cal.App.5th 938, 950.)
“Structural errors require per se reversal ‘because it cannot be
fairly determined how a trial would have been resolved if the
grave error had not occurred.’” (Id. at pp. 950-951.) “In the civil
context, structural error typically occurs when the trial court
violates a party’s right to due process by denying the party a fair
hearing.” (Conservatorship of Maria B. (2013) 218 Cal.App.4th
514, 534.) “Structural errors requiring automatic reversal
include denying a party’s request for jury trial [citation] and
violating a party’s right to present testimony and evidence
[citation].” (Ibid.)
Appellants contend the trial court’s “decision to enter
judgment in favor of Amguard after previously denying
Amguard’s motion for summary judgment due to the existence of
triable issues of material fact constituted structural error,
fundamentally undermining Appellants’ constitutional right to a
jury trial and a fair hearing.” We reject this contention for three
reasons.
First, a “trial court has inherent authority to revisit its
ruling on a summary judgment motion and to reach a different
conclusion in subsequent proceedings.” (Kerley v. Weber (2018)
27 Cal.App.5th 1187, 1197, citing Le Francois v. Goel (2005) 35
Cal.4th 1094, 1107.) Appellants acknowledge the court’s
authority to revisit its ruling, but assert the court denied them
16
due process by failing to give them appropriate notice that it
intended to do so. We disagree. When a court reconsiders a
summary judgment ruling, “it should inform the parties of this
concern, solicit briefing, and hold a hearing.” (Le Francois v.
Goel, supra, 35 Cal.4th at p. 1108.) The parties here were
afforded, and took advantage of, the opportunity to brief and
argue the coverage and exclusion issues on which the court based
its ultimate ruling.
Second, the disputed issues of material fact the trial court
identified at summary judgment concerned coverage: were the
damages “occurrences” within the meaning of the policy, and did
Kitchen Gallery have notice of the damage before the policy
became effective. These coverage issues were rendered moot by
the court’s legal conclusion that the damages would come within
the faulty workmanship exclusions in any event. Indeed, at the
December 1 “comeback” hearing, appellants’ counsel argued from
the premise that these issues had already been adjudicated in
appellants’ favor. Although they now claim they “identified
disputed factual issues” necessitating trial, appellants point only
to the “brief summary of factual background” section of their
bifurcation brief, which included no citations to the record and
gave no indication any facts were disputed. Appellants also made
no effort to challenge or correct respondent’s counsel’s
representations that the facts were undisputed, or disabuse the
court of that notion at the hearing. To the extent they objected
after the court adopted the proposed statement of decision, they
did so only in general terms and without citing the record.
Third, we agree with respondent that “the jury issue is a
red herring.” (Equitable Life Assurance Society v. Berry (1989)
212 Cal.App.3d 832, 836.) As appellants acknowledge in their
17
opening brief, “interpretation of an insurance policy is a question
of law.” (Ameron Internat. Corp. v. Insurance Co. of Sate of
Pennsylvania (2010) 50 Cal.4th 1370, 1377 (Ameron).) “Where
the trial court concludes…that a writing is not reasonably
susceptible of a construction urged, there is no issue to be
submitted to a jury. Thus, even if bifurcation had not been
ordered, the trial court would have been required to hear the
evidence bearing on the meaning of the instrument out of the
presence of the jury, and the conclusion the court arrived at
would have terminated the case” all the same. (Equitable Life
Assurance Society v. Berry, supra, 212 Cal.App.3d at p. 836.)
Appellants were not guaranteed a particular coverage
interpretation in light of the summary judgment ruling or their
request for a jury trial.
Appellants next contend that they “were not provided fair
notice of the nature of the proceedings that followed from the
trial court’s order granting Amguard’s belated motion to
bifurcate.”2 They argue that “[a]t some point,” the motion to
bifurcate “morphed into a dispositive motion without any of the
procedural safeguards afforded to such motions.” This alleged
change, they assert, “is a basic violation of due process.” We are
not persuaded. It was clear from the outset of the bifurcation
proceedings that the court planned to resolve the legal coverage
issues. Although appellants may not have acknowledged it, there
was always some possibility that the court would resolve those
issues against them and thereby obviate the need for a jury trial
of factual issues. The realization of that possibility did not
2 Although they argued below that the motion was untimely
under Code of Civil Procedure section 598, appellants no longer
pursue that contention here.
18
change the nature of the motion or proceedings, or deprive
appellants of due process. Moreover, the court conducted the
proceedings in accordance with the briefing and hearing
procedure appellants’ counsel proposed, and gave appellants’
counsel ample opportunity to argue orally and on the papers.
Appellants finally contend it is “even more troubling” that
the court “entered judgment against Appellants without even
considering the prior evidence submitted in connection with
Amguard’s motion for summary judgment.” They assert that
evidence was “critical,” and without it, the trial court was making
factual rulings “in a complete vacuum” while ostensibly resolving
only legal questions of policy interpretation. Appellants cite
Kline v. Zimmer, Inc. (2022) 79 Cal.App.5th 123, 135 for the
proposition that “[o]ne element of a fair trial is the right to offer
admissible evidence on a material issue.” To the extent that
authority applies here—the cited statement addresses the
improper exclusion of necessary expert testimony at trial—it does
not persuade us that structural error occurred. The parties
stipulated that the court would consider a limited universe of
documents, and appellants in their briefing affirmatively
provided the court with the factual background they now claim it
lacked. Appellants have not established the existence of
structural error warranting automatic reversal.
II. Policy Interpretation
The trial court concluded that the faulty workmanship
exclusions in the policy, k(5) and k(6), barred coverage of
appellants’ claims. Appellants contend this was error.
A. Legal Principles
“In general, interpretation of an insurance policy is a
question of law and is reviewed de novo under settled rules of
19
contract interpretation.” (Ameron, supra, 54 Cal.4th at p. 1377;
see also Yahoo Inc. v. National Union Fire Ins. Co. of Pittsburgh
(2022) 14 Cal.5th 58, 67 (Yahoo).) Mindful of the Supreme
Court’s recent guidance that its “formulation” of the standard
articulated in Yahoo controls (Yahoo, supra, 14 Cal.5th at p. 67
fn. 7), we paraphrase that standard here.
The ordinary rules of contract interpretation apply to
insurance policies. Accordingly, the parties’ mutual intent at the
time the contract was formed governs interpretation. To the
extent possible, we infer this intent solely from the written
provisions of the insurance policy. When the policy language is
clear and explicit, it governs. If the terms of the policy are
ambiguous, meaning they are susceptible of more than one
reasonable interpretation, we interpret them to protect the
objectively reasonable expectations of the insured. (Yahoo, supra,
14 Cal.5th at p. 67.) “‘Only if these rules do not resolve a claimed
ambiguity do we resort to the rule that ambiguities are to be
resolved against the insurer.’” (Ibid.) “We may not impose
coverage by adopting a strained or absurd interpretation in order
to create an ambiguity where none exists.” (Rosen v. Nations
Title Ins. Co. (1997) 56 Cal.App.4th 1489, 1497.) The trial court’s
“threshold determination of ambiguity is subject to independent
review.” (Winet v. Price (1992) 4 Cal.App.4th 1159, 1165.)
To ensure that coverage “conforms fully to the objectively
reasonable expectations of the insured, the corollary rule of
interpretation has developed that, in cases of ambiguity, basic
coverage provisions are construed broadly in favor of affording
protection, but clauses setting forth specific exclusions from
coverage are interpreted narrowly against the insurer.” (Minkler
v. Safeco Ins. Co. of America (2010) 49 Cal.4th 315, 322.) “The
20
insured has the burden of establishing that a claim, unless
specifically excluded, is within basic coverage, while the insurer
has the burden of establishing that a specific exclusion applies.”
(Ibid.; accord, Yahoo, supra, 14 Cal.5th at p. 68.)
B. Relevant Policy Provisions
The businessowner’s insurance policy in this case is nearly
100 pages long. The parties agree that only a few of its myriad
provisions are pertinent here.
The policy provides that “A person or organization may sue
us [respondent] to recover on an agreed settlement or on a final
judgment against an insured; but we will not be liable for
damages that are not payable under the terms of this policy or
that are in excess of the applicable Limit of Insurance. . . .” The
limit of the policy is $2,000,000 for each “occurrence.” E&W paid
$3,274 for the policy, which was effective from December 16, 2016
to December 16, 2017.
The business liability coverage grant of the policy states
that the insurer “will pay those sums that the insured becomes
legally obligated to pay as damages because of ‘bodily injury,’
‘property damage,’ or ‘personal and advertising injury’ to which
this insurance applies.” The insurance applies to defined terms
“bodily injury” and “property damage” “only if: (a) The ‘bodily
injury’ or ‘property damage’ is caused by an ‘occurrence’ that
takes place in the ‘coverage territory’; (b) The ‘bodily injury’ or
‘property damage’ occurs during the policy period; and (c) Prior to
the policy period, no [listed] insured . . . and no [authorized]
‘employee’ . . . knew that the ‘bodily injury’ or ‘property damage’
had occurred, in whole or in part. If such a listed insured or
authorized ‘employee’ knew, prior to the policy period, that the
‘bodily injury’ or ‘property damage’ occurred, then any
21
continuation, change, or resumption of such ‘bodily injury’ or
‘property damage’ during or after the policy period will be deemed
to have been known before the policy period.”
The policy defines “property damage” in relevant part as “a.
Physical injury to tangible property, including all resulting loss of
use of that property. All such loss shall be deemed to occur at the
time of the physical injury that caused it; or b. Loss of use of
tangible property that is physically injured. All such loss of use
shall be deemed to occur at the time of the ‘occurrence’ that
caused it.” It defines an “occurrence” as “an accident, including
continuous or repeated exposure to substantially the same
general harmful conditions.”
The faulty workmanship exclusions in section k of the
policy state that the insurance does not apply to “property
damage” to “(5) That particular part of real property on which
you or any contractor or subcontractor working directly or
indirectly on your behalf is performing operations, if the ‘property
damage’ arises out of those operations; or (6) That particular part
of any property that must be restored, repaired or replaced
because ‘your work’ was incorrectly performed on it.” “Your
work” means “(1) Work or operations performed by you or on your
behalf; and (2) Materials, parts or equipment furnished in
connection with such work or operations.” The policy does not
define “that particular part.”
C. Analysis
As a general rule, “before considering whether any
exclusions apply, a court must examine the coverage provisions to
determine whether coverage exists at all.” (Rosen v. Nations
Title Ins. Co., supra, 56 Cal.App.4th at p. 1497.) That analytical
process is consistent with the burden-shifting nature of proving
22
damages are covered: first the insured demonstrates the
possibility of coverage, then the insurer may invoke and prove an
exclusion. (See Yahoo, supra, 14 Cal.5th at p. 68.) Here,
however, the parties have largely treated the exclusions as a
threshold issue at summary judgment, during the bifurcation
proceedings, and in their appellate briefing. Apparently
following that lead, the trial court issued a statement of decision
that was silent on the issue of coverage. Though the parties now
superficially dispute whether the damages at issue fall within the
coverage provisions, the bulk of their briefing focuses on whether
any coverage would be excluded by exclusions k(5) and k(6). We
decline to address coverage in the first instance, with the limited
input of the parties. We instead assume for purposes of this
appeal that appellants’ claimed damages would be covered, and
proceed directly to an examination of the faulty workmanship
exclusions.
Appellants contend that both exclusions k(5) and k(6) by
their plain terms exclude coverage only for “damage caused to
specific areas of property that are directly part of the insured’s
work.” They point to the exclusions’ usage of the phrase
“particular part,” which they contend “limits their scope to the
smallest specific area that is part of the insured’s work.” Here,
they assert, that is “the plumbing system” and not the “structural
walls, electrical systems, insulation, and other components that
were not part of E&W’s assigned work.”
Appellants simultaneously acknowledge, however, that
“broader areas of the construction site, including structural and
fire walls, . . . were damaged as a consequence of E&W’s actions,”
namely its “improper cutting into walls and the resultant water
intrusion” while installing the venting required for the plumbing.
23
The fact that E&W damaged the property while engaging in its
work places the damages squarely within the ambit of exclusion
k(6), which excludes coverage for “[t]hat particular part of any
property that must be restored, repaired or replaced because
‘your work’ was incorrectly performed on it.”
Letgolts, supra, 71 Cal.App.5th 272, a recent legal
malpractice case from Division Eight of this District that
analyzed the same exclusion k(6), is instructive and persuasive.
In Letgolts, plaintiffs Allen Letgolts and Gabriella Plattner hired
a contractor to remodel their home. (Id. at p. 275.) The
contractor “botched the home remodel,” negligently causing
“extensive damage” before abandoning the job and leaving the
home “‘completely uninhabitable.’” (Id. at p. 276.) Plaintiffs
eventually obtained a default judgment against the contractor,
but he was insolvent. (Id. at p. 280.) They then sought relief
from the contractor’s insurance company, but it also went
bankrupt before plaintiffs could collect on the judgment. (Ibid.)
Plaintiffs then sued their counsel for malpractice, alleging
counsel negligently delayed in seeking otherwise obtainable
recovery from the insurance company. (Ibid.) Counsel defended
against the action by arguing that any error on his part was
harmless, because plaintiffs’ claims were not covered by the
insurance policy in any event. (Ibid.) Plaintiffs appealed after
counsel prevailed on this theory at a bench trial, and the
appellate court affirmed. (See id. at pp. 280-285.)
The insurance policy at issue contained the same k(6)
faulty workmanship exclusion at issue here: “‘This insurance does
not apply to ‘property damage’ to . . . [t]hat particular part of any
real property or personal property that must be restored,
repaired or replaced because ‘your work’ was incorrectly
24
performed on it.’” (Letgolts, supra, 71 Cal.App.5th at pp. 281-
282,.) Division Eight explained that the principle underlying this
exclusion is “simple. The insurance company says, ‘Contractor,
you are on the hook for your own bad construction work. We are
not.’” (Id. at p. 282.) The court further explained that “[i]t would
create a moral hazard for insurance companies to sell insurance
to contractors that would tempt the contractors then to exploit by
doing cheap construction work for clients, only to leave the
insurers responsible for fixing the faults.” (Ibid.) The court
continued, “It would be very unprofitable for [an insurance
company] to encourage insureds to magnify the very risks against
which the insurance company is insuring. No insurance company
wants to encourage its insureds to game its own system against
itself. Rational companies will write policies to eliminate moral
hazard.” (Id. at p. 283.)
The court found that exclusion k(6) “evinced a goal of
avoiding moral hazard” by drawing the line at insuring the
quality of the contractor’s own work. (Letgolts, supra, 71
Cal.App.5th at p. 284.) It further found that the exclusion was
squarely applicable, because the “initial and seemingly main
reason Letgolts and Plattner were unhappy with [the contractor]
was that he botched their remodel. He took too long and left too
soon. The work he did do was of low quality. . . . Paragraph k(6)
excluded [the contractor’s] faulty workmanship from the policy.”
(Ibid.)
The court rejected the plaintiffs’ contention that certain
items of damaged property, the shed and driveway, fell outside
the exclusion because they were “not within the scope” of the
contractor’s contract. (Letgolts, supra, 71 Cal.App.5th at p. 285.)
It reasoned that the plaintiffs “wanted their shed and driveway
25
repaired because [the contractor] wrecked them,” and therefore
the claims were excluded by the phrase “‘your work’ was
incorrectly performed on it.” (Ibid.) The court further concluded
that the plaintiffs’ argument lacked logical support, because the
goal of the k(6) exclusion “is to ensure contractors do acceptable
work,” and that goal “is unaffected by whether the work is within
or beyond the scope of a contract.” (Ibid.)
The salient facts and rationale of Letgolts are on all fours
with this case. Appellants want respondent to pay for repair and
replacement of various parts of the building because a
subcontractor “wrecked them” while installing the plumbing and
related vents. The subcontractor “incorrectly performed” its
work, which was the direct cause of damage to parts of the
project outside its scope of work. As in Letgolts, the goal and
plain language of exclusion k(6) preclude coverage of that
damage. E&W was engaged in its scope of work, providing
venting for the plumbing, when it damaged the work of others. It
would not be “objectively reasonable” (Yahoo, supra, 14 Cal.5th at
p. 67) for an insured to expect coverage for its own defective work.
(See Clarendon America Insurance Company v. General Security
Indemnity Company of Arizona (2011) 193 Cal.App.4th 1311,
1325 (Clarendon) [“Exclusions j(5) and (6) show that the parties
to the . . . policy intended that [contractor and policyholder]
Hilmor bear the risks of faulty workmanship or defective
materials.”].)
Appellants attempt to distinguish Letgolts by arguing that
“the contractor in Letgolts was a general contractor responsible
for the entire project, not a subcontractor working on a discrete
aspect of the project as in the present case.” This contention is
reasonable in the abstract, as courts indeed have distinguished
26
between “the case of a general contractor, [where] all the work at
the project is considered its work product, whereas in the case of
a subcontractor, . . ., only its portion of the work, such as siding,
is the work product and damage to other parts of the project is
considered damage to other property.” (George F. Hillenbrand,
Inc. v. Insurance Company of North America (2002) 104
Cal.App.4th 784, 805; see also Roger H. Proulx & Co. v. Crest-
Liners, Inc. (2002) 98 Cal.App.4th 182, 196 [“To be covered under
a commercial general liability (CGL) policy, such as the policy in
this case, the ‘property damage’ must be to tangible property
other than the insured’s own work, caused by the insured’s
defective work.”]; Clarendon, supra, 193 Cal.App.4th at p. 1325
[“‘The contractor bears the risk of repairing or replacing faulty
workmanship, while the insurer bears the risk of damage to the
property of others.’”].)
The very same case law recognizes, however, that “under
the proper set of facts, either undisputed or resolved by trial, the
faulty workmanship exclusion precludes coverage.” (George F.
Hillenbrand, Inc. v. Insurance Company of North America, supra,
104 Cal.App.4th at p. 805.) For instance, in Clarendon, supra,
193 Cal.App.4th at p. 1326, the court found the faulty
workmanship exclusions applicable to claims based on defects
and deficiencies resulting from poor workmanship and materials,
and rejected as speculative an unsupported contention that some
of the deficiencies harmed the work of others. The court in
Global Modular, supra, 15 Cal.App.5th at p. 142 also expressly
rejected an insurance company’s argument that the faulty
workmanship exclusions should apply because it was “based on
its view of the underlying policy of CGL insurance and not on an
application of the policy language to the facts of the case.”
27
Simply put, the facts matter, and the facts here show that E&W
caused the damage at issue.
Appellants also contend that we should follow Global
Modular, supra, 15 Cal.App.5th 127, which involved a
subcontractor, because it “parallels” this case and is therefore
“the proper guiding authority.” We disagree.
In Global Modular, general contractor Kadena Pacific, Inc.
hired subcontractor Global Modular (Global) to build, deliver,
install, and partially finish 53 modular units as part of a larger
project. (Id. at pp. 131-132.) Global’s scope of work included the
units’ framing and drywall, but excluded flooring and roofing.
(Id. at p. 132.) Because rubberized sheet roofing had to be
installed on all 53 units at once, Global “agreed to deliver the
units covered only by a roof deck substrate—a three-fourths of an
inch base sheet of plywood.” (Id. at p. 131; see also id. at p. 133.)
After Global delivered the units, with the unfinished roof
substrate covered with “heavy-duty plastic tarps,” rain repeatedly
infiltrated the units and damaged the interiors, including the
drywall and insulation. (Global Modular, supra, 15 Cal.App.5th
at p. 133.) Kadena alerted Global, but by the time Global hired a
remediation provider, Kadena and the roofing contractor had
begun installing the rubberized roof. Kadena and Global
terminated their contract, and Kadena subsequently remediated
the water-damaged units. (Ibid.) A jury ultimately found that
Global was contractually responsible for the water damage and
awarded Kadena slightly more than $1 million. (Id. at p. 131.)
Global’s insurer, North American Capacity Insurance
Company (NAC), subsequently sued Kadena, and the parties
cross-moved for summary judgment on the issue of whether the
insurance policy required NAC to indemnify Global for the jury
28
award. (Global Modular, supra, 15 Cal.App.5th at p. 131.) NAC
argued that the faulty workmanship exclusions in Global’s
insurance policy, numbered j(5) and j(6) but substantively
identical to exclusions k(5) and k(6) in this case, excluded the
damage from coverage. (See id. at pp. 131, 134, 136-137, 139.)
The trial court concluded that both exclusions were “ambiguous
and can reasonably be interpreted to exclude damage only to the
particular component of Global’s work that was defective.
Applying this interpretation to the undisputed facts from trial,
the court found none of the drywall, insulation, framing, or
ducting Kadena repaired or replaced was defective, and thus
concluded exclusions j(5) and j(6) did not apply.” (Id. at p. 134.)
On appeal, the Court of Appeal rejected NAC’s contentions
that exclusions j(5) and j(6) precluded coverage. With respect to
exclusion j(5), it agreed with Kadena that “the use of the active,
present tense construction ‘are performing operations’ indicates
the exclusion applies only to damage caused during physical
construction activities.” (Global Modular, supra, 15 Cal.App.5th
at p. 137.)
The court further concluded that exclusion j(6) applied only
“to the specific part of the insured’s work on which the insured
preformed faulty workmanship and not, more broadly, to the
general area of the construction site affected by the insured’s
work.” (Global Modular, supra, 15 Cal.App.5th at p. 140.) That
is, it applies “only to the particular component of the insured’s
work that was incorrectly performed and not to the insured’s
entire project.” (Id. at p. 141.) The court explained, “based on
the undisputed facts from trial, the only arguably defective
components or parts of Global’s work are the plastic tarps, as
they failed to keep the water out. However, because the jury was
29
not asked to decide whether Global’s waterproofing efforts were
incorrect or simply overcome by heavy rains, it is by no means an
undisputed fact that the tarps were faulty or Global’s placement
of them was incorrect.” (Ibid.) It later reiterated this point,
noting “we do not know whether Global’s rain protection was
defective or simply overcome by heavy rain.” (Id. at p. 144.)
The court also found it crucial that there was “no allegation
the items for which Kadena sought repair and replacement costs—
the drywall, insulation, framing, and ducting—were defective.
Those items were acceptable until it rained and they suffered
water damage.” (Global Modular, supra, 15 Cal.App.5th at p.
141.) It “therefore conclude[d] the trial court was correct in
determining exclusion j(6) does not preclude coverage for the
repair/replacement costs as a matter of law.” (Ibid.)
Letgolts distinguished Global Modular on the ground that
“there was a fact question about whether the contractor’s work
was faulty,” because it was unclear if Global’s waterproofing was
defective or “simply overcome by heavy rain.” (Letgolts, supra, 71
Cal.App.5th at p. 285.) It contrasted that to the facts of Letgolts,
where the plaintiffs “strongly agree” that “the contractor’s work
was defective.” (Ibid.) We find this distinction persuasive.
Global Modular expressly rejected NAC’s reliance on several
cases because they “involve[d] the cost of replacing an insured’s
defective—as opposed to nondefective—work.” (Global Modular,
supra, 15 Cal.App.4th at p. 144.) Here, as in Letgolts, it is
undisputed that E&W’s work was defective; appellants
acknowledge that the damage arose directly from “E&W’s
improper cutting into walls.”
Appellants argue that the damages here nevertheless were
“covered consequential damages” because they “were not the
30
‘particular part’ of the Project on which E&W/Reyes were
performing their work.” This interpretation of “particular part”
strains credulity and is not objectively reasonable. Venting sewer
gas is a crucial part of plumbing and was the particular part of
the project E&W was attempting to complete. Although the walls
and other elements of the project that E&W damaged were not
“plumbing,” E&W’s shoddy work on the plumbing and related
necessary venting was the root cause of the damage. (Cf. Arroyo
v. Unigard Ins. Co. (9th Cir. 2016) 669 Fed.App’x 881, 882-883
[district court “properly concluded that ‘are performing
operations’ does not exclude only property damage that developed
simultaneously as the work was being performed, but also
property damage that clearly flows from the insured’s work on
the property”].) The trial court accordingly did not err in
applying the faulty workmanship exclusions and entering
judgment for respondent.
DISPOSITION
The judgment is affirmed. Respondent AmGUARD
Insurance Company may recover its costs of appeal.
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
COLLINS, J.
We concur:
ZUKIN, P. J. MORI, J.
31
Was bedeutet dieser Text für Ihre Situation?
Kostenlose und unverbindliche Beratung
Schildern Sie uns Ihre Situation. Unser Team meldet sich per E-Mail bei Ihnen für Ihre Beratung.
Setzen Sie Ihre Recherche in ChatGPT oder Claude fort
Verbinden Sie Omnilex, um den Rechtskorpus über Ihren KI-Assistenten zu durchsuchen.