Filed 12/27/24 Ballona Ecosystem etc. v. Dept. of Fish & Wildlife CA2/7
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS

California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions
not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion
has not been certified for publication or ordered published for purposes of rule 8.1115.

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

SECOND APPELLATE DISTRICT

DIVISION SEVEN

BALLONA ECOSYSTEM B331193
EDUCATION PROJECT,
(Los Angeles County
Plaintiff and Appellant, Super. Ct.
No. 21STCV03657)
v.

CALIFORNIA DEPARTMENT OF
FISH AND WILDLIFE,

Defendant and Respondent.

APPEAL from a judgment of the Superior Court of
Los Angeles County, James C. Chalfant, Judge. Affirmed.
Law Office of Todd T. Cardiff and Todd T. Cardiff for
Plaintiff and Appellant.
Rob Bonta, Attorney General, Tracy L. Winsor, Senior
Assistant Attorney General, Gary E. Tavetian, Supervising
Deputy Attorney General, and John S. Sasaki, Deputy Attorney
General, for Defendant and Respondent.

INTRODUCTION

This action is a challenge under the California
Environmental Quality Act (CEQA) (Pub. Resources Code,
§ 21000 et seq.) to the California Department of Fish and
Wildlife’s certification of a project to enhance and establish
certain habitats in the Ballona wetlands ecosystem in
Los Angeles County. Ballona Ecosystem Education Project, a
nonprofit environmental organization (the Organization), argues
the Department’s environmental impact report (EIR) for the
project was deficient in numerous respects. We conclude the EIR
met the requirements under CEQA to describe the project and a
reasonable range of alternatives to the proposed action and to
provide detail sufficient for the public to understand and
comment on the project. We also conclude the Department
sufficiently addressed and responded to comments concerning
potential short- and long-term impacts to the protected white-
tailed kite. Therefore, we affirm.

FACTUAL AND PROCEDURAL BACKGROUND

A. The Ballona Wetlands Ecological Reserve
The Ballona wetlands ecosystem once spanned more than
2,100 acres that stretched from Playa del Rey to Venice and
inland to Baldwin Hills and that supported diverse wetland
habitats. Over time commercial development destroyed or
degraded much of that wetland habitat. In the 1930’s the United
States Army Corps of Engineers (the Corps) constructed the

2
Ballona Creek flood risk management channel and confined
Ballona Creek, which runs through the center of the ecosystem,
to a concrete-sided channel that flows into the Pacific Ocean. In
the 1950’s developers of Marina del Rey dumped approximately
3 million cubic yards of dredged material in the Ballona Reserve,
burying many acres of wetland habitat.
In 2005 the State of California declared the remaining
wetlands ecosystem an ecological reserve to protect native plants,
wildlife, and specialized habitat types. (See Fish & G. Code,
§ 1580; Cal. Code Regs., tit. 14, § 15000 (CEQA Guidelines).)1
The Ballona Reserve now consists of 566 acres south of Marina
del Rey and east of Playa del Rey. The Department manages the
land within the Ballona Reserve with the exception of the
Ballona Creek channel and levee system, over which the Corps
and the Los Angeles County Flood Control District have
jurisdiction. In general, the Department is “the State’s trustee
for fish and wildlife resources with jurisdiction over the
conservation, protection, and management of fish, wildlife, native
plants, and habitat necessary for biologically sustainable
populations of those species.”
In 2012 the United States Environmental Protection
Agency determined all wetland habitats within the Ballona

1 “‘CEQA Guidelines’ refers to the regulations codified in
title 14, section 15000 et seq. of the California Code of
Regulations, which have been ‘prescribed by the Secretary for
Resources to be followed by all state and local agencies in
California in the implementation of [CEQA].’” (California
Natural Gas Vehicle Coalition v. State Air Resources Bd. (2024)
105 Cal.App.5th 304, 322, fn. 3; see CEQA Guidelines, § 15000;
see also Planning & Conservation League v. Department of Water
Resources (2024) 98 Cal.App.5th 726, 749, fn. 9.)

3
Reserve were “impaired.” Invasive, nonnative plants were
crowding out native plants and providing less support for native
wildlife. With few exceptions, the general public may not enter
the Ballona Reserve without authorization from the Department.

B. The Department Certifies a Final Environmental
Impact Report for the Project
In September 2017 the Department issued a draft EIR for
public review and comment on a project called the “Restoration of
the Ballona Reserve” (the Project).2 The draft EIR described the
Project as “a large-scale restoration of the Ballona Reserve that
would entail restoring, enhancing, and establishing native
coastal wetland and upland habitats within the Ballona
Reserve.”3 The objectives of the Project include (1) establishing
“estuarine and associated habitats”4 that support multiple

2 According to the Department, it prepared a joint draft EIR
with the Corps because certain aspects of the Project, such as
modifications to the Ballona Creek channel and levees, require
Corps approval. Thus, the draft EIR addresses requirements
under both CEQA and the federal National Environmental Policy
Act. After the Department released the draft EIR for public
comment, the Corps informed the Department it would delay its
final environmental impact statement because of changes in
federal policies. Rather than wait for the Corps, the Department
issued a final EIR for compliance under CEQA only.

3 Upland habitats are areas bordering aquatic and riparian
habitats. (Center for Sierra Nevada Conservation v. U.S. Forest
Service (E.D.Cal. 2011) 832 F.Supp.2d 1138, 1176, fn. 42.)
4 Estuarine habitats are “‘coastal complexes where fresh
water from the land meets the salt water of the sea with a daily
tidal flux.’” (State v. Brooks (1969) 275 N.C. 175, 178; see Note:

4
habitat types and are “self-sustaining” by adapting to sea level
rise and requiring minimal “active management”; (2) “improving
tidal circulation into the wetlands to enlarge the amount of area
that is tidally inundated . . . and creating dynamic hydrologic
interactions between the Ballona Creek channel, wetlands within
the Ballona Reserve, and the Santa Monica Bay”; and
(3) developing public access for recreation and educational
activities.
The draft EIR described and analyzed three alternatives
that would implement the Project to varying degrees, as well as a
“no project” alternative. Each alternative would impact three
areas of the Ballona Reserve described in the EIR differently.
Area A is a mostly undeveloped tract of 156 acres north of
Ballona Creek where dredged material was dumped in the
mid-20th century. It is now predominantly upland habitat.
Area B is 335 acres south of Ballona Creek; it includes a
freshwater marsh that would not be affected by the Project.
Area C is 69 acres adjacent to Area A, north of Ballona Creek and
east of Lincoln Boulevard; it includes monitoring wells and
associated pipelines owned by Southern California Gas Company,
as well as baseball fields used by the public.
The draft EIR identified Alternative 1, “Full Tidal
Restoration/Proposed Action,” as the “Proposed Action.” The EIR
proposed implementing Alternative 1 in two phases. During
Phase 1 the concrete levees on a portion of Ballona Creek would
be removed, Ballona Creek would be “realigned to flow in a more
natural meander-shaped pattern,” and portions of Areas A and C

Corporate Welfare?: State Tax Incentives for Air Pollution
Control (2003) 35 Conn. L.Rev. 1717, 1738, fn. 141 [“‘Estuarine’ is
the area where the current of a river meets the ocean tides.”].)

5
would be lowered by removing the existing fill to create a
“connected floodplain.” Phase 2 would affect primarily Area B,
where the remaining portions of the levees would be lowered to
create a full tidal wetland, removed fill would be used to build
new earthen levees and berms,5 and parts of Area B would be
regraded to establish upland habitat. To implement
Alternative 1, over 2 million cubic yards of fill would be removed
primarily from Area A and used to create the new levees and
berms, as well as “transition zones” and “upland restoration
areas” to allow Ballona Creek “to reconnect with its historic
floodplain.”
The draft EIR stated that, following implementation of
Alternative 1, the Project would (1) establish 81 acres of new, and
enhance 105.8 acres of existing, native wetlands; (2) establish
38.7 acres of new, and enhance 58 acres of existing, non-
wetlands; (3) subject 31.4 acres of wetlands to permanent loss
and 30.2 acres to temporary impacts; and (4) subject 5.2 acres of
non-wetlands to permanent loss and 25 acres to temporary
impacts. In sum, Alternative 1 would create 246.9 acres of new
or enhanced habitat and temporarily impact 55.2 acres of
wetlands and non-wetlands. New or enhanced habitats would
include “tidal wetland, brackish marsh, salt pan, dune, annual
grassland, transitional, upland scrub, and riparian scrub.”
Alternative 1 would also create new hiking trails, bike trails, and

5 “A berm is an earthen or concrete wall which prevents
discharges.” (Sultany Trucking, LLC v. Missouri Clean Water
Com. (Mo.Ct.App. 2023) 662 S.W.3d 775, 779.) It is also “a ‘flat
strip of land, raised bank, or terrace bordering a river or canal; a
path or grass strip beside a road; an artificial ridge or
embankment . . . .’” (Hartford Fire Ins. Co. v. Gandy Dancer, LLC
(D.N.M. 2013) 981 F.Supp.2d 981, 989, fn. 6.)

6
bridges for pedestrians and bikes and open the Ballona Reserve
to certain recreational and educational uses.
Alternatives 2 and 3, which the draft EIR ultimately
rejected for various reasons, would have a smaller impact on
existing habitats. For example, Alternative 2 would remove less
area of the concrete levees and leave habitats in certain parts of
Area B intact. Alternative 3 would focus primarily on Areas A
and C and would not remove any portion of the existing levees.
Instead, the Department would install new water control
structures to support tidal circulation in Area A.
The draft EIR also identified and analyzed potential
environmental impacts caused by each alternative the
Department considered. And the draft EIR identified measures
to avoid or reduce potentially significant environmental impacts
caused by Alternative 1. In particular, the draft EIR identified
potentially significant impacts Alternative 1 may have on special-
status plants, habitats, and wildlife, and it identified mitigation
measures for each such impact.
The Department received over 8,000 comments on the draft
EIR. In December 2019 the Department issued a final EIR,
including over 4,000 pages of responses to those comments and
revisions to the draft EIR. The Department certified the EIR on
December 30, 2020.

C. The Trial Court Grants in Part and Denies in Part
the Organization’s Petition for a Writ of Mandate
Challenging the Project’s Certification
In January 2021 the Organization, along with another
nonprofit organization called Grassroots Coalition, filed a petition
for writ of mandate challenging the Department’s certification of

7
the Project under CEQA. The Organization made various
arguments, including (1) the Project’s description was
misleading; (2) the EIR failed to consider a reasonable range of
alternatives, such as a “freshwater/brackish water marsh
alternative”; (3) the EIR failed to include a vegetation map
showing where specific types of vegetation would be cultivated;
(4) the EIR failed to properly study and analyze, and improperly
deferred, mitigation of certain impacts to habitat and wildlife;
(5) the EIR failed to adequately address certain environmental
impacts to special status wildlife species, including the white-
tailed kite; and (6) substantial evidence did not support the
Department’s findings there were no significant unmitigable
environmental impacts. In particular, the Organization argued
the Project’s description was misleading by referring to the
Project as a “restoration” and by failing to include the correct
flood control design standard.
The trial court rejected the Organization’s arguments, with
the exception of the contention that the Project description failed
to include the correct flood control design standard and that, as a
result, the EIR failed to analyze the wildlife and habitat impacts
of a levee design consistent with the correct standard. The trial
court also ruled the Department violated CEQA “by authorizing
material changes to [the EIR’s performance criteria] without a
framework for approval or future supplemental environmental
review.” The court, however, stated “this defect can be easily
rectified by a commitment to additional environmental review.”
Thus, the trial court granted the Organization’s petition in part
and issued a writ directing the Department to set aside the final
EIR and approval of the Project and prepare and certify a legally

8
adequate EIR if the Department chose to proceed with the
Project.
The trial court entered judgment, and the Organization
timely appealed. Grassroots Coalition and the Department did
not appeal.

DISCUSSION

A. Applicable Law and Standard of Review
CEQA ensures “public agencies will consider the
environmental consequences of discretionary projects they
propose to carry out or approve.” (Stockton Citizens for Sensible
Planning v. City of Stockton (2010) 48 Cal.4th 481, 488; see
County of Butte v. Department of Water Resources (2023)
90 Cal.App.5th 147, 157-158 (County of Butte).) “To that end,
absent an exemption, an agency proposing to carry out or approve
a project generally must conduct an initial study to determine ‘if
the project may have a significant effect on the environment.’
[Citation.] ‘If, after performing an initial study, the agency
responsible for CEQA compliance, referred to as the “lead
agency,” finds substantial evidence that a project may have a
significant environmental impact, the agency must prepare and
certify an EIR before approving or proceeding with the project.’”
(County of Butte, at p. 158, fn. omitted; see County of Butte v.
Department of Water Resources (2022) 13 Cal.5th 612, 627;
CEQA Guidelines, § 15063, subd. (a).)
“An EIR, as courts have often said, is the heart of CEQA.”
(County of Butte, supra, 90 Cal.App.5th at p. 158, internal
quotation marks omitted; see Cleveland National Forest
Foundation v. San Diego Assn. of Governments (2017) 3 Cal.5th

9
497, 511; In re Bay-Delta etc. (2008) 43 Cal.4th 1143, 1162
(Bay-Delta).) An EIR “serves to ‘(1) inform the government and
public about a proposed activity’s potential environmental
impacts; (2) identify ways to reduce, or avoid, those impacts;
(3) require project changes through alternatives or mitigation
measures when feasible; and (4) disclose the government’s
rationale for approving a project.’” (County of Butte, at p. 158; see
Protecting Our Water & Environmental Resources v. County of
Stanislaus (2020) 10 Cal.5th 479, 488; see also Southwest
Regional Council of Carpenters v. City of Los Angeles (2022)
76 Cal.App.5th 1154, 1171 [“An EIR ‘is an informational
document’ designed to ‘provide public agencies and the public in
general with detailed information about the effect [of] a proposed
project . . . on the environment.’”].) “To fulfill these purposes, an
‘EIR “must include detail sufficient to enable those who did not
participate in its preparation to understand and to consider
meaningfully the issues raised by the proposed project.”’”
(County of Butte, at p. 158; see Cleveland National Forest
Foundation, at p. 511.)
To comply with CEQA an EIR also “must include a
description of the proposed project and its environmental setting
and discussions of (1) the possible environmental effects of the
project, (2) feasible measures to mitigate any significant, adverse
environmental effects of the project, (3) the comparative
environmental effects of a range of reasonable alternatives to the
proposed project, including a ‘no project’ alternative, and (4) the
cumulative impact of the project’s various environmental effects.”
(County of Butte v. Department of Water Resources, supra,
13 Cal.5th at p. 627; see Yerba Buena Neighborhood Consortium,
LLC v. Regents of University of California (2023) 95 Cal.App.5th

10
779, 791 (Yerba Buena Neighborhood Consortium).) “The
sufficiency of an EIR is to be evaluated in light of what is
reasonably feasible.” (Southwest Regional Council of Carpenters
v. City of Los Angeles, supra, 76 Cal.App.5th at p. 1173; see
CEQA Guidelines, § 15151.) The overriding issue on review is
thus whether the lead agency reasonably and in good faith
discussed a project in detail sufficient to enable the public to
discern from the EIR the “‘analytic route the . . . agency traveled
from evidence to action.’” (Southwest Regional Council of
Carpenters, at p. 1173; see People ex rel. Bonta v. County of Lake
(2024) 105 Cal.App.5th 1222, 1230.) “But that does not mean an
EIR must be exhaustive on all topics. Courts look ‘“not for
perfection but for adequacy, completeness, and a good faith effort
at full disclosure.”’” (County of Butte, supra, 90 Cal.App.5th at
p. 158; see Sierra Club v. County of Fresno (2018) 6 Cal.5th 502,
515; Bay-Delta, supra, 43 Cal.4th at p. 1175.)
“On appeal from a judgment in a mandamus proceeding
under CEQA, our standard of review is the same as the trial
court’s: we independently review the administrative record and
the lead agency’s action, not the trial court’s decision and in this
sense our review under CEQA is de novo.” (Upland Community
First v. City of Upland (2024) 105 Cal.App.5th 1, 14; see Vineyard
Area Citizens for Responsible Growth, Inc. v. City of Rancho
Cordova (2007) 40 Cal.4th 412, 427; People ex rel. Bonta v.
County of Lake, supra, 105 Cal.App.5th at p. 1231.) In reviewing
whether an agency has complied with CEQA, however, our
inquiry extends “‘only to whether there was a prejudicial abuse of
discretion.’” (Vineyard Area Citizens, at p. 426; see Pub.
Resources Code, § 21168.5; Planning & Conservation League
v. Department of Water Resources (2024) 98 Cal.App.5th 726,

11
748.)6 “Such an abuse is established if the agency has not
proceeded in a manner required by law or if the determination or
decision is not supported by substantial evidence. . . . Therefore,
we resolve the CEQA issues before us by independently
determining whether the administrative record demonstrates any
legal error by the [agency] and whether it contains substantial
evidence to support the [agency’s] factual determinations.”
(Planning & Conservation League, at p. 748, internal quotation
marks omitted; see Vineyard Area Citizens, at p. 427.)
“‘“Judicial review of these two types of error differs
significantly: While we determine de novo whether the agency
has employed the correct procedures, ‘scrupulously enforc[ing] all
legislatively mandated CEQA requirements’ [citation], we accord
greater deference to the agency’s substantive factual conclusions.
In reviewing for substantial evidence, the reviewing court ‘may
not set aside an agency’s approval of an EIR on the ground that
an opposite conclusion would have been equally or more
reasonable,’ for, on factual questions, our task ‘is not to weigh
conflicting evidence and determine who has the better
argument.’”’” (County of Butte, supra, 90 Cal.App.5th at p. 158.)
Mixed questions of law and fact—such as whether an EIR’s
discussion of environmental impacts is adequate—are generally
subject to independent review, but a more deferential standard
may be warranted in circumstances where factual questions
predominate. (People ex rel. Bonta v. County of Lake, supra,
105 Cal.App.5th at p. 1238; see Sierra Club v. County of Fresno,
supra, 6 Cal.5th at p. 513; County of Butte, at p. 159.)

6 Undesignated statutory references are to the Public
Resources Code.

12
“A violation of CEQA’s procedural requirements ‘is deemed
prejudicial if it deprived the public and decision makers of
substantial relevant information about the project’s likely
adverse impacts.’” (Yerba Buena Neighborhood Consortium,
supra, 95 Cal.App.5th at p. 793; see Neighbors for Smart Rail v.
Exposition Metro Line Construction Authority (2013) 57 Cal.4th
439, 463.) “An agency’s failure to disclose required information
‘may be prejudicial “regardless of whether a different outcome
would have resulted if the public agency had complied” with the
law,’ but ‘[i]nsubstantial or merely technical omissions are not
grounds for relief.’” (Yerba Buena Neighborhood Consortium, at
p. 793; accord, Neighbors for Smart Rail, at p. 463; see Rominger
v. County of Colusa (2014) 229 Cal.App.4th 690, 709 [“we must
look at the nature of the county’s noncompliance to determine if it
was of the sort that ‘“preclude[d] informed decisionmaking and
informed public participation”’”], disapproved on another ground
in Union of Medical Marijuana Patients, Inc. v. City of San Diego
(2019) 7 Cal.5th 1171, 1194 & fn. 10.)

B. The Project Description Was Not Prejudicially
Misleading
The Organization argues the Project’s name and certain
aspects of its description were misleading because they used the
term “restoration.” The Organization’s argument fails.

1. Applicable Law
“An accurate and complete project description is necessary
for an intelligent evaluation of a project’s potential
environmental impacts. [Citations.] It must contain sufficient
information to understand the project’s environmental impacts.

13
[Citation.] ‘Only through an accurate view of the project may
affected outsiders and public decision-makers balance the
proposal’s benefit against its environmental cost, consider
mitigation measures, assess the advantage of terminating the
proposal . . . and weigh other alternatives in the balance.’” (Save
Our Capitol! v. Department of General Services (2023)
87 Cal.App.5th 655, 673; see Tulare Lake Canal Co. v. Stratford
Public Utility Dist. (2023) 92 Cal.App.5th 380, 402.) “‘A project
description that gives conflicting signals to decision makers and
the public about the nature of the project is fundamentally
inadequate and misleading.’” (Save Our Capitol!, at p. 674; see
Southwest Regional Council of Carpenters v. City of Los Angeles,
supra, 76 Cal.App.5th at p. 1173.) Thus, a project description
violates CEQA if it “may have thwarted the public’s ability to
participate in the process and comment meaningfully on the
EIR.” (Save Our Capitol!, at p. 674.) “Whether the EIR contains
an accurate . . . project description is a question of law subject to
de novo review.” (Id. at p. 673.)

2. The Draft EIR’s Use of “Restoration” Did Not
Thwart the Public’s Ability To Participate and
Comment Meaningfully on the Project
As stated, the name of the Project is “Restoration of the
Ballona Reserve.” The draft EIR introduced the Project as
follows: “What once were more than 2,100-acres of marshes, mud
flats, salt pans, and sand dunes currently provides approximately
153 acres of wetland habitat, as well as 83 acres of non-wetland
waters of the U.S.[7]. . . . All aquatic resources within the reserve

7 “Waters of the United States” includes wetlands adjacent to
“[r]elatively permanent, standing or continuously flowing bodies

14
are degraded. The [Department] proposes a large-scale
restoration that would entail enhancing and establishing native
coastal aquatic and upland habitats within the Ballona Reserve.
The proposal is intended to return the daily ebb and flow of tidal
waters where practically feasible to achieve predominantly
estuarine conditions, maintain freshwater conditions, and
enhance physical and biological functions within the Ballona
Reserve. . . . [¶] . . . To varying extents, each of the restoration
alternatives would enhance and create native coastal wetland,
other aquatic resources, and upland habitats; improve flood and
storm water management in the surrounding area; provide public
access and visitor amenities; and modify infrastructure and
utilities within the reserve to support the restoration efforts.”
(Italics added.) The Organization contends the EIR’s use of the
term “restore” (or any variation of the word) and its reference to
the historic “daily ebb and flow of tidal waters” misled the public
and thwarted meaningful participation. The Department argues
the EIR’s description of the historic conditions in the Ballona
wetlands was accurate and, in any case, whether the area was
historically subject to tidal influence is not relevant to assessing
the Project’s potential environmental impacts. The Department
is mostly correct.

of water . . . and with a continuous surface connection to those
waters.” (33 C.F.R. § 328.3(a)(4)(ii) (2024).)

15
a. The Draft EIR’s Descriptions of Historic
and Current Conditions at the Ballona
Reserve Were Consistent with Scientific
Studies
The Organization argues the Project “is not ‘restoration’ of
the daily ebb and flow of tidal waters, because the Ballona
Wetlands was rarely open to the [o]cean, except for short periods
after heavy rains.” But the draft EIR described these same
historic conditions: “Compared to the Ballona Reserve today . . . ,
the historic Ballona Lagoon wetlands in the late 1800s included a
larger area of freshwater, brackish, and tidally affected
saltmarsh habitats that transitioned into a more
alkaline/freshwater system approximately 1.5 miles inland from
the coast (Dark et al. 2011).[8] The mouth of Ballona Creek often
was closed to the ocean by a sand berm along the beach, causing
perching of water within the Ballona Lagoon (Jacobs et al.
2010).[9] During wet weather periods when stream flow discharge
was high enough to overflow and/or scour a channel to the ocean,
the Ballona Creek mouth was open to the ocean (Jacobs et al.
2010) and likely experienced some degree of tidal influence until
the sand berm reformed across the mouth, causing it to close.”
(The draft EIR described these same conditions several pages
later.) As indicated in this excerpt, the draft EIR cited two
scientific studies the Organization also cites for its assertion the

8 Dark et al., Historical Ecology of the Ballona Creek
Watershed (2011).

9 Jacobs et al., Classification of California Estuaries Based
on Natural Closure Patterns: Templates for Restoration and
Management (Rev. Aug. 2011).

16
Ballona Reserve “only experienced tidal estuarine conditions for
short periods after heavy rains.” On that point, there appears to
be no disagreement.

b. The Draft EIR’s Use of “Restoration”
Accurately Described Many Features of
the Project
The Organization appears to argue that, because the draft
EIR suggested the Ballona Reserve once experienced “the daily
ebb and flow of tidal waters,” when in fact tidal waters
historically inundated the Reserve only during periods of heavy
rains, the draft EIR’s use of the term “restore” was misleading.
The Organization cites the draft EIR’s reference to the federal
definition of “restoration,” which states: “Restoration means the
manipulation of the physical, chemical, or biological
characteristics of a site with the goal of returning natural/historic
functions to a former or degraded aquatic resource.” (33 C.F.R.
§ 332.2 (2024).) The Organization asserts that, because the
Reserve never experienced a “daily ebb and flow of tidal waters,”
the Project’s goal of establishing habitats affected by tidal flow
will not return any “natural/historic functions.”
The draft EIR, however, explained at length its use of the
term “restoration”: “It should be noted that the proposed
restoration includes elements of both habitat restoration and
habitat creation.” The Lead Agencies’ “understanding of the
historical ecology of the Ballona region is largely inferred from
historical accounts of the Los Angeles coast (e.g., Dark et al.
2011); few hard data exist regarding historical habitat

17
composition or ecosystem function at the [Ballona Reserve].[10]
Moreover, development within the Ballona Creek watershed and
the associated need for flood control greatly limit the options
available for restoration. Some aspects of the restoration plan
involve ‘restoration’ in the sense of recovering historical
conditions. However, most aspects of the restoration plan involve
reestablishment of natural processes and ecological functions and
either habitat creation (i.e., creating a particular type of habitat
where it previously did not exist) or habitat enhancement
(i.e., modification of existing conditions). However, to avoid
overcomplicating the [EIR], the term ‘restoration’ was used
throughout the text and is meant to encompass all of these
elements and not only the re-creation of a historical condition.”
Indeed, the Project consists of much more than creating
tidally affected habitats. For example, the draft EIR stated
Alternative 1 would, among other things, restore the connection
between Ballona Creek and a broader wetland floodplain by
removing the existing levees, realign Ballona Creek to a more
meandering channel, and create “dynamic interactions” between
the Ballona Creek channel, the Ballona Reserve, and the
Santa Monica Bay. Each of these components would return some
type of “natural/historic function” to the Ballona Reserve and
thus “restore” the area, even under the federal definition. (See
33 C.F.R. § 332.2 (2024).) The Organization’s sole focus on
whether returning the “daily ebb and flow of tidal waters” to the

10 Indeed, the Dark study states “obtain[ing] consistent
corroborating evidence for the system” is “difficult” because
sources provided “conflicting and broad descriptions as to the
historical habitat and ecological communities.”

18
Ballona Reserve is technically a “restoration” misses the forest
for the trees (or the wetlands for the hydrophytes).
Moreover, as the Organization acknowledges, the
administrative record includes evidence the Ballona Reserve
historically included tidal marshes, though those marshes may
not have been the predominant habitat. The Dark study states
that in the late 1800’s about “half of the aggregate Ballona
Lagoon area consisted of a freshwater and tidally affected
saltmarsh and brackish habitats that transitioned into a more
alkaline/freshwater system about 1.5 miles (2.4 km) inland.”
That study also states the “[h]istorical habitat of the Ballona
Lagoon coastal complex consisted of substantial amounts of
brackish to salt marsh/tidal marsh habitat.” Thus, creating any
amount of tidal marsh habitat (which, by definition, requires
occasional tidal inundation) where there currently is none
“restores” that habitat to the Ballona Reserve.

c. The Draft EIR’s Reference to the Daily
Ebb and Flow of Tidal Waters Was Not
Prejudicially Misleading
The EIR appears to acknowledge the Ballona Reserve has
not experienced daily ebbs and flows of tidal waters in recent
history;11 thus, its use of that phrase is arguably misleading. But
the Organization has not shown how that phrase thwarted the
public’s ability to understand the Project and comment
meaningfully on the EIR. The Organization argues commenters
“may mistakenly believe that the project constitutes ‘restoration’

11 Studies suggest it has been approximately 2,000 years
since the Ballona estuary became trapped by a sand barrier and
frequently closed to the ocean.

19
and not creation.” As discussed, however, the draft EIR
explained its use of the term “restoration,” and many aspects of
the Project comport with the EIR’s definition of that term. The
EIR also stated multiple times the Project would “establish” or
“create” estuarine and associated habitats in addition to restoring
them. Thus, it is unclear how, and unlikely that, the public
would be misled by the draft EIR’s use of the term “restoration.”
The Organization also suggests the perception of the
Project as a “restoration” might affect the public’s willingness to
approve the Project, which the Organization claims favors “one
habitat type over another.” The Organization contends the public
“may feel very differently” if it knew the Project would “destroy[ ]
very rare alkali meadow and salt pan in favor of habitat that has
not existed at the Ballona Wetlands for over 2,000 years.” But
the Organization does not contend the draft EIR inaccurately
describes the habitats that currently exist or that would exist at
the Ballona Reserve after implementation of Alternative 1.
Regarding alkali meadow, the evidence cited by the Organization
shows only that such meadows previously existed in a portion of
the Ballona Reserve, but do not currently exist. Regarding salt
pan, the EIR shows Alternative 1 would actually increase the
acreage of salt pan, not destroy it. Moreover, a chart in the draft
EIR listed 19 habitat types and the acreage for each that
currently exist and that would exist after implementing
Alternative 1. The chart makes clear “[t]here is no fully tidal
marsh under existing conditions,” but after implementing
Alternative 1, there would be 153.4 acres of tidal marsh. Thus,
the public was under no illusion about the tradeoffs described by
the Organization.

20
Finally, as the Department correctly points out, whether
the Ballona Reserve was historically subject to tidal influence is
not relevant or necessary for the public to understand and
comment on the environmental impact the Project would have on
current conditions. (See Neighbors for Smart Rail v. Exposition
Metro Line Construction Authority, supra, 57 Cal.4th at p. 452
[potential environmental impacts are to be measured against a
baseline that describes existing environmental conditions];
Anderson v. County of Santa Barbara (2023) 94 Cal.App.5th 554,
572 [same]; Riverwatch v. County of San Diego (1999)
76 Cal.App.4th 1428, 1453 [“environmental impacts should be
examined in light of the environment as it exists when a project
is approved”]; CEQA Guidelines, §§ 15125, subd. (a)(1), 15126.2,
subd. (a).) Thus, because CEQA requires an EIR to assess a
project’s effects based on the conditions as they exist at the time
of the analysis, whether the Ballona Reserve experienced the
daily ebb and flow of tidal waters in the distant past is not
relevant to the EIR’s analysis and does not affect the public’s
ability to comment meaningfully on the Project.
For the first time in its reply brief, the Organization argues
the Department’s “mischaracterization” of the Ballona Reserve
impacted its baseline analysis of environmental impacts. The
Organization contends the Department used an assessment
method intended for estuarine habitats, even though there are
also non-estuarine habitats at the Reserve. It is unclear whether
the Organization is arguing substantial evidence did not support
the Department’s use of the chosen assessment model, but even if
the Organization had not forfeited this argument by failing to
raise it in its opening brief (see Golden Door Properties, LLC
v. County of San Diego (2020) 50 Cal.App.5th 467, 518), the

21
Organization has not identified how the Department’s arguably
inferior assessment model affected the public’s ability to
meaningfully comment on the Project or its environmental
impacts. The Organization suggests only that the statement in
the draft EIR that “a portion of the Ballona Reserve has been
identified as ‘among the most degraded wetlands in California’
using standardized wetland condition protocols” was tainted by
an artificially low assessment “score.” But the Organization cites
no evidence showing how a higher score derived from using a
different model would affect the EIR’s description of the Project
or its environmental impacts. Moreover, the draft EIR cited the
United States Environmental Protection Agency and another
study to support the statement that all wetland habitats within
the Ballona Reserve are impaired. Substantial evidence
supported that conclusion.

C. The Department Considered a Reasonable Range of
Alternatives

1. Applicable Law
CEQA requires the lead agency to “consider potentially
feasible alternatives to a project” that “would avoid or
substantially lessen a project’s significant environmental
impacts, ‘accomplish most of the basic objectives of the project,’
and be at least potentially feasible.” (California Natural Gas
Vehicle Coalition v. State Air Resources Bd. (2024)
105 Cal.App.5th 304, 322 (California Natural Gas Vehicle
Coalition); see Citizens of Goleta Valley v. Board of Supervisors
(1990) 52 Cal.3d 553, 565; People ex rel. Bonta v. County of Lake,
supra, 105 Cal.App.5th at p. 1233.) “The lead agency is

22
responsible for proposing the alternatives considered and,
although they need not consider every potential alternative, must
select ‘a range of reasonable alternatives to the project.’”
(California Natural Gas Vehicle Coalition, at p. 322; see Citizens
of Goleta Valley, at p. 565; CEQA Guidelines, § 15126.6,
subds. (a)-(c), (f).) The EIR need only “identify those alternatives
necessary to permit a reasoned choice and then must examine in
detail only those that ‘“the lead agency determines could feasibly
attain most of the basic objectives of the project.”’” (California
Natural Gas Vehicle Coalition, at p. 323; see Bay-Delta, supra,
43 Cal.4th at p. 1163.) “‘There is no ironclad rule governing the
nature or scope of the alternatives to be discussed other than
[this] rule of reason.’” (Bay-Delta, at p. 1163; see California
Natural Gas Vehicle Coalition, at p. 323; CEQA Guidelines,
§ 15126.6, subd. (f).)
“The lead agency begins by establishing the project
objectives. [Citation.] The EIR ‘need not study in detail an
alternative that is infeasible or that the lead agency has
reasonably determined cannot achieve the project’s underlying
fundamental purpose.’ [Citation.] ‘Although a lead agency may
not give a project’s purpose an artificially narrow definition, a
lead agency may structure its EIR alternative analysis around a
reasonable definition of underlying purpose and need not study
alternatives that cannot achieve that basic goal.’” (California
Natural Gas Vehicle Coalition, supra, 105 Cal.App.5th at p. 323;
see Bay-Delta, supra, 43 Cal.4th at p. 1163.) “‘CEQA does not
require that an agency consider specific alternatives that are
proposed by members of the public or other outside agencies.’”
(Center for Biological Diversity v. Department of Fish & Wildlife
(2015) 234 Cal.App.4th 214, 256; see City of Maywood

23
v. Los Angeles Unified School Dist. (2012) 208 Cal.App.4th 362,
420.) An EIR, however, “should not exclude an alternative from
detailed consideration merely because it ‘would impede to some
degree the attainment of the project objectives.’” (Bay-Delta, at
p. 1165; see Yerba Buena Neighborhood Consortium, supra,
95 Cal.App.5th at p. 791; CEQA Guidelines, § 15126.6, subd. (b).)
“We presume an EIR complies with the rule of reason; it is
the appellant’s ‘burden to demonstrate that the alternatives
analysis is deficient.’” (California Natural Gas Vehicle Coalition,
supra, 105 Cal.App.5th at p. 323; see California Native Plant
Society v. City of Santa Cruz (2009) 177 Cal.App.4th 957, 987.)
“We thus defer to the selection of alternatives unless the
[appellant] (1) demonstrates the alternatives selected are
manifestly unreasonable and . . . do not contribute to a
reasonable range of alternatives and (2) identifies evidence of an
alternative that was both feasible and adequate, because it was
capable of attaining most of the basic objectives of the project.”
(California Natural Gas Vehicle Coalition, at p. 323, internal
quotation marks omitted; see Yerba Buena Neighborhood
Consortium, supra, 95 Cal.App.5th at p. 796; Save Our Access etc.
v. Watershed Conservation Authority (2021) 68 Cal.App.5th 8, 30;
South of Market Community Action Network v. City and County
of San Francisco (2019) 33 Cal.App.5th 321, 345.) “We ‘review an
agency’s substantive factual or policy determinations for
substantial evidence.’ [Citation.] [¶] . . . The question before us
at the stage where the lead agency chooses which alternatives to
consider and which to reject is whether the decision is supported
by substantial evidence and comports with the rule of reason.”
(California Natural Gas Vehicle Coalition, at p. 323; see

24
Bay-Delta, supra, 43 Cal.4th at p. 1167; California Native Plant
Society, at p. 957.)

2. The Organization Has Not Shown the
Department’s Selection of Alternatives Was
Manifestly Unreasonable
The Organization contends the EIR’s mischaracterization
of the ecological history of the Ballona Reserve artificially
narrowed the purposes of the Project to “require tidal inundation
and increasing tidal influence.” This narrow claimed purpose,
the Organization argues, necessarily excluded from analysis and
consideration the “freshwater alternative” described in
Alternative 10, which the Department rejected for detailed
review. That alternative would have left in place the fill
deposited in the Ballona Reserve and the existing levees and
would have pumped fresh water into upland areas to create fresh
and brackish wetlands and seasonal wetland habitats. The
Organization, however, has not shown that the Project’s scope
was artificially narrow or that the range of alternatives
considered by the EIR was unreasonable. As a result, we do not
consider whether Alternative 10 was feasible and adequate. (See
California Natural Gas Vehicle Coalition, supra, 105 Cal.App.5th
at p. 323; Yerba Buena Neighborhood Consortium, supra,
95 Cal.App.5th at p. 796.)
The “fundamental purposes” or “basic objectives”
(Bay-Delta, supra, 43 Cal.4th at p. 1166) of the Project include
establishing “natural processes and functions within the Ballona
Reserve that support estuarine and associated habitats through
measures such as improving tidal circulation into the wetlands to
enlarge the amount of area that is tidally inundated . . . and

25
creating dynamic hydrological interactions between the Ballona
Creek channel, wetlands within the Ballona Reserve, and the
Santa Monica Bay.”12 The Department prioritized “estuarine and
associated habitats,” including tidal wetlands, because they are
“rare in the region” and suitable conditions for restoration exist
in only a few places. In discussing the historical context
underlying the Department’s choice of alternatives, the final EIR
observed that the loss of coastal wetlands has contributed to
decreased biodiversity. The final EIR cited several studies to
support these observations, including the Ballona Wetlands
Feasibility Report,13 which states: “The project site represents
the only opportunity to restore a large tidal wetland in
Santa Monica Bay, and fills a large gap in the chain of wetlands
along the Southern California coast.” The Organization does not
contend otherwise.
The range of alternatives analyzed in the EIR reflected the
Department’s priority for creating a coastal wetland and included
three alternatives and a “no project” alternative: Alternative 1,
Full Tidal Restoration/Proposed Action; Alternative 2, Restored
Partial Sinuous Creek; and Alternative 3, Levee Culverts and
Oxbow. As stated, in contrast to Alternative 1, Alternatives 2
and 3 would affect a smaller area of the Ballona Reserve and
remove less or none of the existing concrete levees. Each of the
considered alternatives would promote new estuarine habitats to

12 In total, the draft EIR identifies seven “CEQA objectives.”

13 Philip Williams & Associates, Ltd. et al., Ballona Wetlands
Feasibility Report (Sept. 2008), included in an appendix to the
draft EIR.

26
some degree and feature some tidal influence. A “predominantly
freshwater” alternative would not.14
Substantial evidence supported the Department’s decision
to prioritize estuarine and associated habitats, and the
Department selected a reasonable range of alternatives to
accomplish that priority. (See Center for Biological Diversity
v. Department of Fish & Wildlife, supra, 234 Cal.App.4th at
p. 256 [“‘[I]f a reasonable basis for the choices the agency makes
is found in the EIR or elsewhere in the record, a reviewing court
will defer to the agency’s selection of alternatives.’”].) The
Department might have chosen to prioritize freshwater habitats
and their associated plants and wildlife and thus analyzed a
freshwater alternative. But courts may not set aside an agency’s
approval of an EIR on the ground an opposite conclusion would
have been equally or more reasonable. (Bay-Delta, supra,
43 Cal.4th at pp. 1161-1162; California Natural Gas Vehicle
Coalition, supra, 105 Cal.App.5th at p. 324.) Given the scope of
the project objectives, defining the Project to require some
amount of tidal influence was not unduly narrow, and the EIR’s
range of alternatives “permit[ed] a reasoned choice.” (California
Natural Gas Vehicle Coalition, at p. 326; see Yerba Buena
Neighborhood Consortium, supra, 95 Cal.App.5th at p. 798.)
The Organization cites We Advocate Thorough
Environmental Review v. County of Siskiyou (2022)
78 Cal.App.5th 683, where the court held an EIR’s stated
objectives “were ‘so narrow[ ] as to preclude any alternative other

14 The Department identified several reasons for excluding
Alternative 10 or a different freshwater alternative from full
consideration, including feasibility, which, as stated, we do not
address.

27
than the Project.’” (Id. at p. 692.) The project in that case was a
bottling facility on a site formerly developed and operated as a
bottling plant. (Ibid.) The stated project objectives “mirror[ed]
the proposed project itself,” including “use of ‘the full production
capacity of the existing Plant,’” locating the proposed facility “at
the Plant,” and allowing the “‘operation of the Plant as soon as
possible.’” (Ibid.) The court stated that, “if the principal project
objective is simply pursuing the proposed project, then no
alternative other than the proposed project would do.” (Ibid.)
The EIR did not define the Project so narrowly that no
alternative other than Alternative 1 would accomplish the
Project’s objectives. The EIR included two very different
alternatives that would accomplish some of the Project objectives
while mitigating some of its impacts. Thus, this case is more like
California Natural Gas Vehicle Coalition, supra, 105 Cal.App.5th
304, where the project’s goal was to transition certain transport
sectors to zero-emission vehicles. (Id. at p. 324.) The EIR in that
case considered four alternatives to achieve the project’s purpose,
but excluded from consideration an alternative that would have
allowed the use of low-emission vehicles as an interim step to
zero-emission technology. (Ibid.) The agency rejected from
consideration the low-emission alternative because it would “‘not
advance the adoption of heavy-duty zero-emission technologies
and develop a self-sustaining [zero-emission] truck market.’” (Id.
at p. 315.) In rejecting a challenge to the agency’s exclusion of
the low-emission alternative, the court stated: “Given the overall
scope of the project objectives, this court does not see defining the
project as a move to [zero-emission vehicles] to be unduly narrow
or lacking substantial evidence.” (Id. at p. 324.) The court held:
“The identified objectives of the [project] provide substantial

28
evidence supporting the conclusion that an alternative reaching
similar goals but, in a manner, contradicting those objectives fails
to achieve the project’s fundamental purpose.” (Ibid.; see
Bay-Delta, supra, 43 Cal.4th at p. 1166 [permitting an agency to
reject inland building sites as an alternative for a planned
oceanfront development].) Similarly, given the importance of the
Department’s objective to create estuarine and associated
habitats, substantial evidence supported the Department’s
decision to exclude a freshwater alternative from the range of
alternatives. (See Yerba Buena Neighborhood Consortium,
supra, 95 Cal.App.5th at p. 798 [agency briefly addressed and
reasonably excluded from consideration an alternative to place a
project at a different location given the importance of location to
the project objectives].)

D. The EIR Sufficiently Addressed the Corps’
Landscaping Guidelines
The Organization contends the Department deprived the
public of substantial relevant information by excluding certain
information about the Corps’ landscaping guidelines from the
draft EIR and in responses to comments on it. In particular, the
Organization argues the Department failed to disclose the Corps
has “specific maintenance requirements for levees that
significantly degrade[ ] such habitat for wildlife,” discourage
burrowing animals, and require a “vegetation free zone” that is
the width of the levee plus 15 feet on each side.
But the draft EIR and the Department’s responses to
comments disclosed much of this information, at least in
sufficient detail to allow the public to understand and
meaningfully comment on the Project. The draft EIR stated in an

29
appendix titled “Preliminary Operations and Maintenance Plan”
that the perimeter levees must be maintained in accordance with
the Corps’ landscaping guidelines for planting and vegetation at
levees; it also provided a full citation to those guidelines.15 The
draft EIR identified three zones for vegetation on or near the
levees that complied with the landscaping guidelines, including a
“Vegetation Free Zone” extending 15 feet beyond “the toe of the
levee core,” a “Vegetation Management Zone” extending another
15 feet, and a “Habitat Zone.” The draft EIR stated the
Vegetation Free Zone would support only grasses that had to be
mowed “to facilitate inspection of the levee core,” while the
Vegetation Management Zone would provide grasses and low
shrubs that could be mowed or removed as necessary to facilitate
maintenance and inspections. The Habitat Zone would support
“the full range of habitat plantings included in the upland and
transitional habitat mix.” The draft EIR also included a map of
the Project site showing the areas subject to the Corps’
maintenance requirements, a drawing of a levee cross-section
showing where and to what extent maintenance would be
required, and the dimensions of the levees.
The Organization contends the draft EIR failed to
acknowledge the “reduced habitat values” for areas subject to the

15 The Organization argues for the first time on appeal the
EIR’s failure to include a copy of the Corps’ landscaping
guidelines deprived the public of sufficient information to
meaningfully comment on the Project. In the trial court,
however, the Organization acknowledged the guidelines
document “is readily available to . . . the public.” In any event,
the Organization has not shown how the Department’s omission
of the Corps’ “readily available” landscaping guidelines
prejudiced public participation.

30
Corps’ maintenance requirements. The Organization cites a
public comment stating that, to comply with the Corps’
landscaping guidelines, the Project would have to include at least
36 acres of upland habitat, including the levees, from which
rodents and burrowing animals would be excluded. In response,
the Department added a footnote to a table summarizing habitat
acreages created by each alternative “to clarify that areas
requiring annual vegetation management . . . are important to
wildlife species such as burrowing owls and ground squirrels that
rely on the availability of relatively short grasslands.” The
response also stated that “[b]oth of these species thrive under
management conditions such as grazing and mowing that result
in short stature vegetation” and that “vegetation maintenance on
the levees” would “not be needed regularly.”
The Organization does not argue substantial evidence did
not support this response. Instead, the Organization argues the
Department’s response was insufficient because it “failed to
identify the acreage of maintained habitat.” As indicated by the
public comment identifying 36 acres impacted by the Corps’
landscaping guidelines, the public was able to get a pretty close
approximation. Moreover, the Department’s response indicated
the Corps’ landscaping guidelines are unlikely to degrade the
upland habitat area as much as the Organization suggests they
will. And the Organization does not explain how the EIR’s
failure to state the precise acreage of maintained habitat
precluded informed public participation.16

16 The Organization also argues the Department’s response to
a comment from the Los Angeles County Flood Control District
stating the EIR did not disclose and analyze environmental
impacts from post-restoration operations and maintenance

31
E. The Lack of a Vegetation Map Did Not Preclude the
Public from Evaluating Environmental Impacts in
High Marsh and Upland Habitats
The Organization acknowledges the draft EIR included a
map listing the types of post-restoration habitats and showing
where each habitat will be located at the Project site. The
Organization also acknowledges the EIR identified the acreage of
each type of habitat that will exist after the Project is completed,
including “high marsh” and “upland” habitats. The Organization
faults the EIR, however, for failing to include a vegetation map
with an “actual planting plan.” The Organization claims this
omission “renders it difficult, if not impossible, to evaluate the
significant impacts to species that rely on [high] marsh and
upland habitats.”
It is true the EIR did not include a vegetation map. The
EIR, however, provided a lot of information about the types of
habitats enhanced or created under Alternative 1, including
detailed descriptions of the “vegetation communities” to be
established for each habitat. Here’s a taste of those descriptions:
For tidal marsh habitats, the draft EIR stated the “primary
targeted species for tidal wetland restoration at the [Ballona
Reserve] include Pacific cordgrass in the low to mid-marsh zones,
pickleweed in the mid-marsh to high-marsh zones, and a
combination of Parish’s glasswort (Arthrocnemum subterminale),

activities was deficient. The Organization does not explain how
the Department’s response was deficient or even cite the
Department’s response. The Organization also fails to
acknowledge the draft EIR addressed “Post-Restoration” impacts,
including from “maintenance activities.” The Organization has
not shown the EIR omitted necessary information concerning the
impacts of post-restoration maintenance.

32
shoregrass (Monanthochloe littoralis), saltgrass, alkali heath, and
coastal gumweed (Grindelia stricta) in the high marsh zone.”
For brackish marsh, the draft EIR stated that “it will be
difficult to predict the extent to which brackish conditions will
develop, and it is likely that such conditions will vary from
season to season and from year to year,” but that “[v]egetation
should include some combination of California bulrush, southern
cattail, ditch grass, spiny rush, pickle weed, saltgrass, alkali
heath, and other species typical of habitats ranging from
freshwater to tidal wetlands . . . . Target acreages for brackish
marsh should be flexible, as it is likely that the extent of brackish
conditions will shift from season to season and year to year.”
For salt pan, the draft EIR explained that “[i]t is unclear
how long it may take for salinity to reach levels sufficient” to
develop salt pans and that “typical tidal marsh plant species such
as Parish’s glasswort, pickleweed, and saltgrass may become
established in a developing salt pan[ ] when surface salinities are
not yet elevated.” The draft EIR also stated “[w]eeds with some
salt tolerance such as perennial pepperweed (Lepidium
latifolium) may also become established during the initial years
of the restoration when salinity levels are relatively low.”
Eventually, however, salinity levels in the salt pans should
exclude most plants.
For seasonal wetlands (including non-tidal salt marsh), the
draft EIR explained the “duration and depth of ponding is the
major determinant of plant community development in seasonal
wetlands [citation]. Longer periods and deeper depths of ponding
will result in vegetation dominated by wetland-adapted,
sometimes perennial species, whereas shorter periods and more
shallow depths of ponding may result in vegetation dominated by

33
annual species adapted to fluctuating moisture regimes. At the
[Ballona Reserve], soil salinity will also play a major role in
determining the plant communities that will develop in seasonal
wetlands.” In general, the draft EIR stated, “seasonal wetlands
on coastal terraces in the Ballona region supported a high
diversity of freshwater vernal pool plant species,” and the “focus
of seasonal wetland restoration in areas of low-salinity soils at
the Reserve will be on the creation of shallow depressions with
appropriate soils for supporting a similar assemblage of southern
California vernal pool plant species.”
For riparian scrub and woodland habitats, including an
existing eucalyptus grove located at the Project site, the
draft EIR stated the grove initially would be preserved because
the trees are currently used as roosting habitat for monarch
butterfly. The eucalyptus trees eventually would be replaced
with native trees suitable for the site and for monarch roosting.
Regarding riparian scrub areas, the draft EIR stated the
Department will incorporate “appropriate native riparian plants
. . . to increase diversity and provide appropriate habitat
structure for riparian wildlife species.”
For coastal dune areas the draft EIR stated the
Department will encourage “both common and rare native dune
species,” including “special-status plants (e.g., South Coast
branching phacelia) as well as potential host plants for special-
status invertebrates (e.g., El Segundo blue butterfly).” “Target
vegetation for existing and created dune habitat will be similar in
diversity and structure to stabilized back-dune systems in the
region, with high diversity and cover of native species, including
both woody perennials and herbaceous annuals.”

34
The draft EIR stated upland scrub and grassland areas will
feature “grasslands dominated by species such as California
barley (Hordeum brachyantherum ssp. californicum), purple
needlegrass (Stipa [Nassella] pulchra), saltgrass, and alkali
ryegrass (Elymus triticoides) and scrub dominated by species
such as coyote brush, California sagebrush (Artemisia
californica), mugwort (Artemisia douglasiana), big saltbush,
lemonade berry (Rhus integrifolia), and seacliff buckwheat
(Eriogonum parvifolium). Additional species will be included in
both upland habitat types to increase overall native plant
diversity.”
The draft EIR also included a 16-page list of potential
plants for each type of habitat in the Ballona Reserve post-
implementation, as well as performance criteria for vegetation in
each type of habitat for up to 10 years post-implementation. This
list, along with the map showing each type of habitat and its
location in the Reserve and the table listing the approximate size
of each habitat, provided sufficient information for the public to
comment on potential impacts to species that rely on high marsh
and upland habitats. It is hard to see how a vegetation map
would add much to all of this detailed information or make it
easier for the public to submit comments.
The Organization argues certain areas will not be available
for habitat development because they will include bike paths,
a pedestrian trail, and areas on or near levees subject to the
Corps’ maintenance requirements. The Organization cites a
public comment asking whether “the requisite habitat elements”
necessary to support certain wildlife can “fit within the area left
over” and stating “a post-project vegetation map . . . could be used
to answer that question.” But the EIR disclosed the sizes of each

35
of these components of the Project, and neither the comment nor
the Organization explains how the public needs a vegetation map
(that necessarily would be preliminary, given the uncertainties
for habitat development cited in the draft EIR), in addition to the
wealth of information already provided, to determine whether the
listed habitats will support certain species.
The Organization characterizes the EIR’s contingent
vegetation plans as “deferred mitigation,” which the Organization
asserts is permissible only when the lead agency cannot obtain
certain information at the time an EIR is prepared. (See People
ex rel. Bonta v. County of Lake, supra, 105 Cal.App.5th at p. 1236
[mitigation measure’s specific details may be developed after
project approval when it is impractical or infeasible to include
those details during a project’s environmental review]; Preserve
Wild Santee v. City of Santee (2012) 210 Cal.App.4th 260, 280
[same].) Organization contends the necessary information is
available because the Department can “work with the Army
Corps and develop a proposed or final vegetation map.” Even
accepting the Organization’s characterization of the EIR’s
vegetation plans as “mitigation,” it is unclear (and the
Organization does not specify) how a “proposed” map would
provide any more information than what the EIR already
provided. Moreover, the draft EIR explained in several places
why the Department cannot now identify specific species that will
thrive in certain habitats, and the Organization does not argue
substantial evidence did not support these explanations.
A “final” map is not currently feasible.
CEQA requires only “a good faith effort at full disclosure.”
(County of Butte, supra, 90 Cal.App.5th at p. 158, internal
quotation marks omitted; see Sierra Club v. County of Fresno,

36
supra, 6 Cal.5th at p. 515.) The EIR’s habitat map, list of
habitats, detailed specifications for the types of vegetation to be
planted or maintained for each habitat, and performance criteria
for each habitat and its vegetation met this standard.

F. The EIR Sufficiently Addressed Potential Short-term
Impacts to White-tailed Kites, and Substantial
Evidence Supported the EIR’s Finding of
No Significant Short-term Impacts
The Organization argues the EIR failed to identify certain
short-term environmental impacts to the protected white-tailed
kite. (See Fish & G. Code, § 3511, subd. (b)(10).) The
Organization also argues substantial evidence did not support
the EIR’s finding the short-term impacts to raptors like white-
tailed kites are not significant.

1. The EIR Identifies Potential Impacts on White-
tailed Kites and Their Foraging Habitat
The white-tailed kite is a species of raptor that appears in
the Ballona Reserve “largely in a foraging role.” The draft EIR
reported “[t]wo to three kites are expected at the Reserve” from
mid-summer through mid-winter. White-tailed kites prey on
small mammals and rodents such as voles and mice, which can be
found in coastal scrub, non-tidal salt marsh, and annual
grassland habitats. The draft EIR states the entire Project site,
including new tidal marsh habitat, also “has the potential to be
utilized for foraging by raptors” and “represents an exceedingly
important foraging area for raptors.”
The draft EIR stated Alternative 1, if not mitigated, would
“result in a limited adverse impact” to special-status raptor

37
species such as the white-tailed kite. The draft EIR stated that a
“portion of foraging habitat” would be “temporarily impacted and
not available for foraging” during the two implementation phases
of the Project, but that “the majority of the Ballona Reserve
containing suitable foraging habitat would remain.” The draft
EIR stated implementing the “Habitat Restoration and
Monitoring Plan” and Mitigation Measure BIO-1i-i, Nesting Bird
and Raptor Avoidance would further reduce any remaining
potential impacts to a “less-than-significant level.” The Habitat
Restoration and Monitoring Plan is “a mechanism to implement
the standards and criteria” for every habitat type and species
impacted by the Project. It includes monitoring the Project site
during and after implementation to meet performance criteria for
habitat development and special-status species, among other
goals.17 The Nesting Bird and Raptor Avoidance mitigation
measure, however, appears to address only “impacts to nesting
habitat for birds and raptors,” and the EIR reported white-tailed
kites do not typically nest in the Ballona Reserve.
The Department intends to implement Alternative 1 over
two phases, and multiple stages within each phase, “to facilitate
habitat restoration and plant establishment.” The Department
anticipates Phase 1 will last up to five years and consist of
24 stages. As stated, during Phase 1 the fill dumped in Area A

17 The trial court ruled the EIR’s performance criteria
violated CEQA by allowing the Department “to reduce
restoration goals” without permitting the public to comment on
any such modifications. That ruling did not impact the substance
of the stated performance criteria and required only that the
Department include in its revised EIR a commitment to
additional environmental review in the event the Department
wanted to change the performance criteria in the future.

38
would be excavated over time and transported to build earthen
levees during Phase 2. Portions of Areas B and C also would be
cleared and graded during Phase 1. The draft EIR stated
“ground-disturbing activities would proceed in stages, leaving a
majority (74%) of upland areas available for foraging throughout
the restoration process.” The draft EIR also explained Phase 2
would not begin for at least 18 months after Phase 1 is complete
“to facilitate habitat restoration and plant establishment.”
During that time, the Department would monitor and adapt new
habitats as necessary to meet the Project’s performance goals. In
particular, the draft EIR stated the Department would prepare
an “adaptive management plan” to “track restoration success
relative to performance criteria and determine when criteria have
been met [before] the restoration would proceed to its next
phase.” This plan would include ensuring “sensitive species
would begin inhabiting the restored/enhanced areas.” During
construction, special-status wildlife species like the white-tailed
kite would receive particular attention to “inform the need for
active management of the species or habitats in which they
reside.”
In addition to phasing the Project, the Department plans
“to salvage all native wildlife species of low mobility that may be
killed or injured prior to and during Project-related vegetation or
ground disturbances” to mitigate impacts during “ground-
disturbing activities such as vegetation clearing, grubbing, and
re-grading.” “Salvaged species” would be “relocated to adjacent
suitable habitat not subject to site disturbances.” It is unclear
from the record whether voles and mice are “low mobility”
wildlife that require relocation; it is also unclear whether this
mitigation measure is intended to benefit white-tailed kites.

39
Comments received during the public comment period
asked whether temporary impacts from bulldozing and other
ground-disturbing activities would have significant effects on
wildlife currently living in the Ballona Reserve. One comment
stated: “I saw no indication of any plans for any sort of relocation
or even attempt to guide certain critters in a certain direction
when the bulldozers close in. . . . [W]hat will happen to the
species who lose their habitat due to massive bulldozing and
berm-building operations . . . ?” Another said: “The Draft [EIR]
does not explain how wildlife, plants and insects, including some
threatened and endangered species, will be protected during the
excavation of millions of cubic yards of sediment and soil. The
proposition that the wildlife, plants and insects can be captured,
retained and released back into the ‘restored’ environment is not
feasible, nor is it credible.” Several others asked variations on
the question what will happen to the plants and wildlife
currently living at the Ballona Reserve after certain areas are
bulldozed.
The Department’s responses to these comments explained
that “the amount of [ground] disturbance would be as limited as
possible to achieve the Project objectives” and that construction
would be limited to “the minimal area necessary to complete the
objectives of a given phase.” The Department also said that “the
area that would be disturbed by heavy machinery would be
limited to the extent feasible” and that “salvaged wildlife species
will be relocated to adjacent or nearby suitable habitat that is not
subject to site disturbances, or has been previously restored as
planned under the Project.” In general, the Department referred
commenters to the draft EIR’s discussion of potential impacts to
wildlife and to General Response 5 in the final EIR concerning

40
biological resources at the Project site. General Response 5 also
referred commenters to the draft EIR’s discussion of special-
status wildlife species.

2. The Organization Has Not Shown the EIR’s
Discussion of Short-term Impacts to White-
tailed Kites Was Insufficient
The Organization argues the EIR failed to consider and
disclose significant short-term impacts to the white-tailed kite
caused by bulldozing its foraging habitat.18 “‘Under CEQA, an
agency must determine what, if any, effect on the environment a

18 The Department argues the Organization may not make
this argument because none of the commenters raised this issue
during the public comment period. In particular, the Department
contends none of the comments about white-tailed kites made
“any claims about any short-term or other such temporary
impacts on foraging habitat for this species that might occur
during the initial phase of the Project.” As discussed, however,
several comments addressed the short-term impacts on wildlife
and habitats by ground-disturbing activities, and those comments
were sufficiently detailed to give the Department an opportunity
to address the short-term impacts on foraging habitat for special-
status species like the white-tailed kite. (See California Natural
Gas Vehicle Coalition v. State Air Resources Bd., supra,
105 Cal.App.5th at p. 327 [“[a]lthough not a perfect callout of the
issue raised on appeal,” the public comments were sufficient to
allow an agency to decide the matter and to learn the contentions
of interested parties]; see also § 21177, subd. (a); Save the Hill
Group v. City of Livermore (2022) 76 Cal.App.5th 1092, 1104 [to
attack a decision subject to CEQA, the alleged grounds for
noncompliance must have been presented to the public agency
with sufficient specificity to allow the agency to evaluate the
issue and respond].)

41
proposed project may have.’ [Citation.] To that end, the EIR
‘must identify and discuss “all significant effects on the
environment” of a proposed project.’ [Citations.] The term
‘“[s]ignificant effect on the environment”’ is defined as ‘a
substantial, or potentially substantial, adverse change in the
environment.’ [Citation.] Because a particular environmental
effect can only be identified as significant after careful
consideration, an EIR is required to discuss and analyze a
possible impact of the project if there is a fair argument that it
constitutes a significant effect on the environment.” (Yerba
Buena Neighborhood Consortium, supra, 95 Cal.App.5th at
p. 802; accord, Visalia Retail, LP v. City of Visalia (2018)
20 Cal.App.5th 1, 13; see § 21068 [defining “‘[s]ignificant effect on
the environment’”].) “‘An agency must find a “fair argument” if
there is any substantial evidence to support that conclusion, even
if there is competing substantial evidence in the record that the
project will not have a significant environmental effect.’” (Yerba
Buena Neighborhood Consortium, at p. 802; see World Business
Academy v. State Lands Commission (2018) 24 Cal.App.5th 476,
499.) An agency must disclose “short- and medium-term
environmental costs,” as well as long-term impacts. (Neighbors
for Smart Rail v. Exposition Metro Line Construction Authority,
supra, 57 Cal.4th at p. 455.) “Though we might rationally choose
to endure short- or medium-term hardship for a long-term,
permanent benefit, deciding to make that tradeoff requires some
knowledge about the severity and duration of the near-term
hardship.” (Ibid.)
As discussed at length, the EIR identified and analyzed
potential short-term impacts to the foraging habitat of raptors
like the white-tailed kite and various mitigation measures to

42
address them. At a minimum, that discussion was “‘a good faith
effort at full disclosure.’” (Save the El Dorado Canal v. El Dorado
Irrigation Dist. (2022) 75 Cal.App.5th 239, 269; see Center for
Biological Diversity v. California Department of Conservation, etc.
(2019) 36 Cal.App.5th 210, 233.)
The Organization suggests the EIR was not forthcoming
about the “immediate loss of approximately 200 acres of upland
foraging habitat,” though it is unclear where the Organization got
the 200-acre figure.19 In any event, the draft EIR explained that
Phase 1 will occur over the course of five years, that almost three-
quarters of the site will be available for foraging raptors at any
given time, and that monitors will ensure the habitats for special-
status species such as the white-tailed kite meet stated
performance criteria. The Organization contends that “there is
no analysis or disclosure of the acreage or percentage of White-
tailed Kite habitat that will remain available” and that there is
no source for the draft EIR’s statement 74 percent of foraging
habitat will remain available for foraging. The Organization,
however, does not cite any statute, case, or CEQA Guideline
requiring that level of detail. The EIR identified potential
impacts to foraging habitats for raptors like the white-tailed kite,
design features that will minimize such impacts (like phasing
and sequencing construction over time), and mitigation measures
to reduce any remaining impacts. This analysis was sufficient for

19 The Organization may be rounding down from a figure
provided in Table 2-3 in the draft EIR, “Alternative 1 Post
Restoration Habitats and Acreages.” That table indicates the
Project will impact 215.1 acres of “Upland” habitat, but that
number appears to be the total amount impacted over the course
of Phases 1 and 2, at the conclusion of which there will still be
195.8 acres of upland habitat.

43
the public to “‘“intelligently take[ ] account of environmental
consequences”’” (Save the El Dorado Canal v. El Dorado
Irrigation Dist., supra, 75 Cal.App.5th at p. 264) to white-tailed
kites during construction and implementation. (See Center for
Biological Diversity v. California Department of Conservation,
etc., supra, 36 Cal.App.5th at p. 233.)
The Organization also argues the Project’s performance
criteria showed the Project will have undisclosed significant
short-term impacts on white-tailed kites because the criteria for
upland scrub and grassland habitats state: “The species richness
and abundance of birds will not fall below 50% of pre-restoration
levels after Year 1.” This statement, however, applied to all
birds, including common (i.e., not special-status) bird species (of
which there are well over 100 in the Ballona Reserve); the draft
EIR addressed special-status birds like the white-tailed kite
separately. Moreover, the draft EIR stated white-tailed kites
forage in habitats other than upland scrub and grasslands, which
are the only habitats relevant to the performance criterion cited
by the Organization. To the extent white-tailed kites are subject
to potentially significant short-term impacts, the other mitigation
measures were designed to reduce those impacts to less-than-
significant levels. The Organization has not shown there is a fair
argument anything not already disclosed by the EIR constituted
a significant short-term effect on white-tailed kites. (See Yerba
Buena Neighborhood Consortium, supra, 95 Cal.App.5th at
p. 802.)

44
3. Substantial Evidence Supported the EIR’s
Finding There Were No Significant Short-term
Impacts to White-tailed Kites
The Organization makes a number of arguments seeking to
cast doubt on the EIR’s conclusion potential indirect impacts to
raptors caused by changes to their foraging habitats could be
reduced to a “less-than-significant level” through mitigation
measures. None of these arguments, however, undermines the
substantial evidence supporting the EIR’s conclusion.
“Substantial evidence is ‘“enough relevant information and
reasonable inferences . . . that a fair argument can be made to
support a conclusion, even though other conclusions might also be
reached.”’ [Citations.] Substantial evidence includes ‘facts,
reasonable assumptions predicated upon facts, and expert
opinion supported by facts,’ but does not include ‘[a]rgument,
speculation, unsubstantiated opinion or narrative.’” (Upland
Community First v. City of Upland, supra, 105 Cal.App.5th at
p. 13; see Laurel Heights Improvement Assn. v. Regents of
University of California (1988) 47 Cal.3d 376, 393; § 21080,
subd. (e)(1) & (2); CEQA Guidelines, § 15384, subds. (a), (b).) “‘As
with all substantial evidence challenges, an appellant
challenging an EIR for insufficient evidence must lay out the
evidence favorable to the other side and show why it is lacking.
Failure to do so is fatal. A reviewing court will not independently
review the record to make up for appellant’s failure to carry his
burden.’” (South County Citizens for Smart Growth v. County of
Nevada (2013) 221 Cal.App.4th 316, 330; see County of Butte,
supra, 90 Cal.App.5th at p. 166; Defend the Bay v. City of Irvine
(2004) 119 Cal.App.4th 1261, 1265-1266.)

45
The Organization repeats its assertion the Project would
cause an immediate loss of 200 acres of foraging habitat during
Phase 1 without addressing the Department’s evidence ground-
disturbing activities would take place over time and with
mitigation measures for special-status species (such as
monitoring and active management) in place. In its reply brief,
the Organization similarly claims there would be “an immediate
impact of 156.4 acres” on raptor foraging habitat, but that
number represents the total acreage of Area A, which the draft
EIR explains will be excavated over time and with mitigation
measures. Moreover, other habitats on the Project site, including
non-tidal salt marsh in Area B and grasslands and coastal scrub
in Areas B and C, will remain available to foraging raptors at
various times during Phase I. The Organization argues the
Department’s conclusion substantial portions of the Reserve will
remain available for raptor foraging is an unsupported opinion,
but the Organization has not shown the Department’s five-year
sequencing plan for Phase 1 will result in significant, temporary
losses of foraging habitat. Moreover, to the extent the
Department’s conclusion is an opinion, it is an expert opinion
based on the implementation plan. An agency may “‘rely upon
the opinion of its staff in reaching decisions, and the opinion of
staff has been recognized as constituting substantial evidence.’”
(Oakland Heritage Alliance v. City of Oakland (2011)
195 Cal.App.4th 884, 900; see ibid. [substantial evidence
supported an agency’s opinion a mitigation measure reduced an
environmental impact to a “less than significant level”]; Center
for Biological Diversity v. Department of Forestry & Fire
Protection (2014) 232 Cal.App.4th 931, 948 [“A public agency may

46
choose between differing expert opinions, and may also properly
rely upon the opinion of its staff in reaching decisions.”].)
The Organization also argues the mitigation measures
identified in the EIR are not “designed to reduce indirect impacts
to White-tailed Kites from the destruction of foraging habitat.”
But they are. Mitigation measures like the Habitat Restoration
and Monitoring Plan call for “ongoing” monitoring of habitats to
ensure their success based on stated performance criteria. And
while not technically a mitigation measure, the planned phasing
and sequencing, as discussed, are designed to minimize impacts
to foraging habitats.
The Organization doubts whether relocating small
mammals would successfully mitigate impacts on the white-
tailed kite’s foraging habitat, but, as stated, it is unclear whether
this measure was even intended to address voles and mice. The
Organization cites a study relied on by another commenter for
the proposition that “[s]imply ‘moving’ the wildlife out of the path
of immediate harm is not a mitigation measure because any
suitable destination site would very likely already be occupied.”
Another study cited in the same comment and highlighted by the
Organization observed California Meadow Voles are territorial,
making relocation “a wholly inappropriate mitigation measure.”
The same commenter, however, said white-tailed kites prey on a
different species of vole (the South Coast Marsh Vole), as well as
common mice, and the Organization cites nothing suggesting
these mammals will not survive in sufficient numbers for raptor
foraging during the Project’s phased implementation. More
fundamentally, nothing cited by the Organization suggests the
amount of habitat available for foraging at the Project site during

47
Phase 1 will not support the white-tailed kites that have been
observed there.

G. The Department’s Responses to Comments Regarding
Potential Long-term Impacts on White-tailed Kites
Complied with CEQA

1. The Department Responds to Comments
Regarding Losses to White-tailed Kite Habitat
Under Alternative 1 a portion of the white-tailed kites’
upland foraging habitat would be converted to tidal marsh, but
according to the draft EIR, that habitat would provide foraging
“that is comparable to or better than pre-Project conditions.” To
the extent indirect impacts on raptors remain after the Project’s
implementation, the draft EIR stated that use of the Nesting
Bird and Raptor Avoidance mitigation measure, the Habitat
Restoration and Monitoring Plan, and other measures would
reduce them to a “less-than-significant level.”
The Department received a public comment from the
Los Angeles Audubon Society that included a report from Land
Protection Partners on the Project. The report included two
comments relevant to white-tailed kites, which the final EIR
labeled O15-108 and O15-109. Comment O15-108 recommended
the EIR address impacts to individual raptor species such as
white-tailed kites because the evaluation of impacts on raptors
depends on the abundance of their rodent prey in the post-
implementation landscape. In particular, comment O15-108 cited

48
a study led by K.M. Wolf20 concluding restored grasslands
support fewer voles and mice (and therefore raptors) than
unrestored grasslands dominated by invasive species. Comment
O15-108 further stated the Project should include “more high
marsh and transitional habitats compared with middle and low
marsh, tidal channels, and open water to make up for the
predictable reduction in [rodent] density with restoration of
annual grassland to a native vegetation type.”
In response to comment O15-108, the final EIR stated:
“Raptor foraging abilities at the Project Site will be largely
retained through the phasing of the Project over time such that
large areas of grassland habitat will be available to white-tailed
kite . . . and other raptor species during and following
restoration-related construction activities. The replacement of
several hundred acres of invasive monoculture stands with
annual and perennial grasslands will provide an important
improvement to foraging habitat for many raptor species. The
availability and quality of habitat on the site will change
dramatically with the Project, and while the site may experience
an overall lift in raptor foraging habitat quality when restored;
the restoration effort may not benefit all raptors equally. The
[Wolf study] cited by [a] commenter is interesting, and found that
an annual grassland and restored perennial grassland examined
by the researcher had a slightly different capacity to support
wildlife and raptors.[ ] In comparing treatments, it found more
wildlife, including raptors, on unrestored sites. The commenter’s
suggestion that it is necessary to evaluate pre-project mouse and

20 See Wolf et al., Rodent, snake and raptor use of restored
native perennial grasslands is lower than use of unrestored exotic
annual grasslands (2018) 55 J. of Applied Ecology 1133.

49
vole densities, and modify the Project to provide more high marsh
and transitional areas to increase future mouse and vole
densities is interesting and unique, but such a study is not
warranted to estimate future raptor use of the site, and is beyond
the scale of what is required under CEQA. Under CEQA, projects
are not required to balance current and future raptor foraging
capacity. Following project implementation, the site will
continue support [for] small mammals such as mice and voles,
which are an important foraging species for many raptors
including white-tailed kite, and is expected to support many of
the same raptor species that presently use the site.” The final
EIR’s response to comment O15-108 also referred to responses to
comments concerning potential impacts to raptors, which, in
turn, referred to portions of the draft EIR addressing raptors and
their habitat.
Comment O15-109 observed that Alternative 1 would
reduce upland habitat by 76 acres, plus another 12 acres of trails,
and that 36 acres of vegetation would be affected by the Corps’
maintenance requirements. In response to this loss, the draft
EIR stated, “Although a portion of suitable upland foraging
habitat would be converted to tidal marsh, the marsh also would
provide suitable foraging habitat for these species, and thus no
net loss of foraging habitat is expected.” Comment O15-109
faulted the draft EIR for failing to provide evidence “upland bird
species of concern” could forage in salt marsh. The comment
concluded it was “highly unlikely” that “all of the upland species”
will have “additional habitat” after Alternative 1’s
implementation. The comment did not list the white-tailed kite
among the species of upland birds at issue.

50
In response to comment O15-109, the final EIR referred to
the draft EIR’s discussion of impacts on special-status upland
birds and stated: “[The Department] believes that the retaining
and restoring 195 acres of the 271 total ‘upland’ acres of existing
upland habitat within the Ballona Reserve would retain
substantial areas for use by special-status upland bird species,
adequately offset impacts to foraging from 76 acres of habitat
loss, and would not result in a reduction in grassland species
range or extirpation of species. [The Department] acknowledges
that the commenter may reach different conclusions based on the
evidence presented, but this difference of opinion does not
indicate that the EIR is inadequate or inaccurate.”

2. Applicable Law
“After the designated lead agency makes a draft EIR
available to the public, the public may comment on the draft.
The lead agency must evaluate and respond to timely comments
relating to significant environmental issues, and include the
comments and responses in the final EIR. The agency’s response
must demonstrate a good faith, reasoned analysis, but need not
be exhaustive. The response can be sufficient if it refers to parts
of the draft EIR that analyzes the environmental impacts raised
by the comment. Furthermore, general comments can be met
with general responses, and comments that are only objections to
the merits of the project itself may be addressed with cursory
responses.” (Save the El Dorado Canal v. El Dorado Irrigation
Dist., supra, 75 Cal.App.5th at p. 268, cleaned up; see Los Angeles
Conservancy v. City of West Hollywood (2017) 18 Cal.App.5th
1031, 1039-1040; CEQA Guidelines, § 15088.)

51
3. The Department’s Responses to Comments
O15-108 and O15-109 Were Sufficient
The Organization argues the Department’s responses to
comments O15-108 and O15-109 were “impermissibly
conclusory.” The Organization contends the Department “must
do more than simply claim that habitat improvements will
mitigate the permanent loss of foraging habitat for White-tailed
Kites.” But it did. The Department responded to the comments
directly and with references to the draft EIR’s discussion of the
potential environmental impacts to raptors and their foraging
habitats. The Organization has not explained how those
responses failed to address the ways in which the Department
plans to mitigate the loss of certain foraging habitat for white-
tailed kites.
The Organization contends the Department’s “‘opinion’ that
habitat improvements will mitigate the permanent loss of
76 acres is not supported by substantial evidence.” But the
Department’s statement that “no net loss of foraging habitat is
expected” was based not on its opinion, but on the total amount of
foraging habitat anticipated after the Project’s implementation.
In addition to almost 200 acres of upland habitat, the Project also
will create approximately 9 acres of non-tidal salt marsh and
54 acres of high marsh, which the Department and Land
Protection Partners identified as possible foraging habitat for
raptors. And again, the Organization does not contend or point to
any evidence suggesting this amount of habitat cannot support
the two to three white-tailed kites that forage in the Ballona
Reserve.
The Organization also argues the Department cannot
discount evidence in the Wolf study showing restored habitats

52
may reduce vole and mice populations and therefore impact
raptor density. The Department, however, responded to that
evidence by stating that the Wolf study showed only a “slightly
different capacity to support wildlife and raptors” in restored
areas and that “CEQA projects are not required to balance
current and future raptor foraging capacity.” Indeed, so long as
there is no significant environmental impact on raptor foraging
capacity, the Department need not attempt to mitigate its loss.
(See County of Butte, supra, 90 Cal.App.5th at p. 158;
CEQA Guidelines, § 15063, subd. (d)(4).) As the Department also
points out, the Organization has not cited any evidence the
restored habitats addressed in the Wolf study are comparable to
the habitats in the Ballona Reserve or involve the same
vegetation types or climate conditions.
Finally, the Organization contends the Department failed
to account for sea level rise that will convert portions of Areas A
and B to mudflats by 2050 and to open water by 2100, neither of
which will provide habitat for white-tailed kites and other
terrestrial bird species. But as the Department argues, “the
purpose of an EIR is to identify the significant effects of a project
on the environment, not the significant effects of the environment
on the project.” (Ballona Wetlands Land Trust v. City of
Los Angeles (2011) 201 Cal.App.4th 455, 473.) In Ballona
Wetlands Land Trust the court held an EIR need not address “the
impacts of the project on the surrounding area in the event of sea
level rise resulting from global climate change.” (Id. at p. 475;
see City of Long Beach v. Los Angeles Unified School Dist. (2009)
176 Cal.App.4th 889, 905 [EIR for a school project need not
address the cumulative effects of air quality in the area on staff
and student health].) The EIR was not deficient for failing to

53
address or mitigate the effect of sea level rise on raptor foraging
habitats.21

DISPOSITION

The judgment is affirmed. The Department is to recover its
costs on appeal.

SEGAL, Acting P. J.

We concur:

FEUER, J.

STONE, J.

21 We do not address the Organization’s contention,
articulated for the first time in its reply brief, there is a fair
argument the Project may have permanent impacts on white-
tailed kite foraging habitat. (See Golden Door Properties, LLC
v. County of San Diego, supra, 50 Cal.App.5th at p. 518.) Even if
we were to consider the argument, the Organization has not cited
evidence showing the loss of upland foraging habitat in light of
mitigation measures and other newly established habitat would
have a significant impact on the two to three white-tailed kites
currently foraging at the Ballona Reserve.